CUSTOMER NAME :ESSAE GEARS & TRANSMISSIONS PVT.LTD.
8D REPORT
SUPPLIER NAME :STV INDUSTRIES,HOSUR 8D Report No :- 01
Part No : - R1081000/MC-PD-1-01-02-01 Part Name : Gear Starter Clutch
Issued By :- QAD Team Issue Date :- 3/8/2023 Ref No:- Dated
D1 Problem Solving Team
Team Leader : P.MANICKAM
Team Members: D.PARTHIBAN,A.P.BHARATHRAM,S.VINAYAGAM
D2 Problem Description
Complaint Location :- ID Bore burr No. of Complaint Part(s) :- 03
Repeated Failure :- Yes No
Complaint :- Burr observed on oil slot milling
D3 Immediate Containment Action
Stop & Quarantine Immediately Quantity Checked = 1125
Reject the Lot Quantity OK = 1125
Sorting of Suspect Lot Quantity Reject = 0
D4a Root Cause Analysis - Failure
1. Why 2. Why 3. Why 4. Why 5. Why
Cutter wornout Operator doesn't
Burr observed on the milling slot area Due to poor awareness
noticed burr
D4b Root Cause Analysis - Escape (From Machine & From Final inspection) (Look at actual and potential causes)
1. Why 2. Why 3. Why 4. Why 5. Why
Defect part not detected in visual
Burr observed on the milling slot area Because of fast inspection
inspection
D5a Corrective Action - Escape
1.Instruction has been provided to visual inspector to check the part properly and to complete the inspection work at specific interval of time
2.Defect image photos has been provided.
D5b Corrective Action - Failure
Instructed the person to check the every component while running the machine and Inbetween the inspector is being ensured the parts regularly
D6 Implementation of Corrective Action
Action Resp Target Date Status
1. visual displays provided and found ok
Quality 10.03.2023 Completed
2. on job training and found satisfactory
Before After
Specification- Specification-
Milling depth 0.90/1.10
Milling depth 0.95/1.00
No burr observed in running parts
D6a Preventive Action
Action Resp Target Date Status
1. Control plan reviewed and updated
2. PFEMA Review and updated
Quality 10.03.2023 Completed
D7 Standardisation
Document / Not
Applicable Resp. Start Complete Remarks
Checksheet Applicable
PFMEA P QUALITY P
Drawing
CP P QUALITY P
WSS
Incoming
inspection
First-off
inspection
Patrol / Inprocess
inspection
Final inspection P QUALITY P
Pre-delivery
inspection
Tool change / set
up approval sheet
D8 Verification of Effectiveness
1st lot / Batch 2nd lot / Batch 3rd lot / Batch 4th lot / Batch 5th lot / Batch
1250