100% found this document useful (1 vote)
119 views

Engineering Progress Calculation Sheet

The document contains information about engineering requirements and drawings for mechanical equipment for a project. It lists 7 documents with their titles, categories, disciplines, budgeted man-hours, and weight factors. It also includes a table showing the progress of 8 disciplines (Mechanical, Process, Piping, Civil, Structure, Electrical, Instrumentation) in various project phases and their overall progress. The total budgeted man-hours for the project is 5470 hours and the overall progress is estimated at 26%.

Uploaded by

Saqeeb Mallick
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
119 views

Engineering Progress Calculation Sheet

The document contains information about engineering requirements and drawings for mechanical equipment for a project. It lists 7 documents with their titles, categories, disciplines, budgeted man-hours, and weight factors. It also includes a table showing the progress of 8 disciplines (Mechanical, Process, Piping, Civil, Structure, Electrical, Instrumentation) in various project phases and their overall progress. The total budgeted man-hours for the project is 5470 hours and the overall progress is estimated at 26%.

Uploaded by

Saqeeb Mallick
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Document Title Category Discipline Budgeted Man Hour Weight Factor

Pump data sheet- pumps


Spec/Req Mech 200 0.03656
AP10A & AP10B
REQ for compressors-AC20C &
Spec/Req Mech 500 0.09141
AC20D

REQ for pumps AP10A & AP10B Spec/Req Mech 450 0.08227

Specification for compressors-


Spec/Req Mech 350 0.06399
AC20C & AC20D

Specification for pumps AP10A


Spec/Req Mech 350 0.06399
& AP10B
REQ for vessel/drums
Spec/Req Mech 550 0.10055
(AC10,AC20,AD10,AD20)
REQ for heat exchanger (AE10A
Spec/Req Mech 600 0.10969
& AE10B)

Document Title Category Discipline Budgeted Man Hour Weight Factor

GA drawing for pumps - AP10A


& AP10B Drawing Mech 800 0.14625228519

GA drawing for compressors -


Drawing Mech 850 0.15539305302
AC20C & AC20D

GA drawing for exchangers -


Drawing Mech 820 0.14990859232
AE10A & AE10B

GRAND TOTAL 5470 1.0000


construction/
Approval by
Preparation

Progress (%
purchasing

Complete)

Physical/
Quantity

Progress
Issue for
Issue to
Study /

Weight
Client

Blank
client
Start

5% 45% 15% 20% 15%

100.0% 100.0% 100.0% 100.0% 33.0% 90.0% 3.3%

100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 9.1%

100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 8.2%

100.0% 100.0% 100.0% 100.0% 33.0% 90.0% 5.8%

100.0% 100.0% 100.0% 75.0% 0.0% 80.0% 5.1%

100.0% 55.5% 0.0% 0.0% 0.0% 30.0% 3.0%

100.0% 55.5% 0.0% 0.0% 0.0% 30.0% 3.3%


Issue to Client

construction
Approval by
Preparation

Progress (%
Complete)

Physical/
Quantity
Issue for

Progress
Issue for
internal
Study /

Weight
review

client
Start

5% 45% 10% 10% 15% 15%

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

37.8%
Physical
Discipline Budgeted Man hour Weight Factor Progress Overall Progress
(individual)
Mechnical 5470 0.1744 37.80% 7%
Process 3000 0.0956 50% 5%
Piping 8000 0.2550 20% 5%
Civil 3200 0.1020 30% 3%
Structure 3500 0.1116 25% 3%
Electrical 4000 0.1275 15% 2%
Instrumentation 4200 0.1339 13% 2%
TOTAL 31370 26%