0% found this document useful (0 votes)
40 views1 page

Quot. 1629 - Usj - Barge Tirta Niaga Ix Tanpa Main Deck

This technical painting specification outlines the painting requirements for the barge Tirta Niaga IX owned by PT. USDA Seraja Jaya. It details the surface preparation including chemical cleaning, scraping, and blasting the surfaces. It then provides the painting specifications listing the areas to be painted, types of coatings, quantities of materials, and estimated costs. The total estimated cost for the painting project is 130,600,000 Indonesian Rupiah.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views1 page

Quot. 1629 - Usj - Barge Tirta Niaga Ix Tanpa Main Deck

This technical painting specification outlines the painting requirements for the barge Tirta Niaga IX owned by PT. USDA Seraja Jaya. It details the surface preparation including chemical cleaning, scraping, and blasting the surfaces. It then provides the painting specifications listing the areas to be painted, types of coatings, quantities of materials, and estimated costs. The total estimated cost for the painting project is 130,600,000 Indonesian Rupiah.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

TECHNICAL PAINTING SPECIFICATION

BARGE TIRTA NIAGA IX


PT DINAMIKA ANUGERAH
`
PAINTING SPECIFICATION & COST ESTIMATION

Reff. No. : 1629/DA/II/23 Rev. 00 Date : 27/02/2023


A. Surface Preparation Owner Name : PT. USDA SEROJA JAYA
1) Chemical Cleaning to remove oil stain with water soluble detergent, if any. Vessel name : BARGE TIRTA NIAGA IX
2) Scraping & High Presure Fresh Water Washing at entire surface Particular Ship LOA/LBP 67,00/64,32
3) Full blasting for a whole area to grade SIS Sa2.0 BREADTH 18,00
DEPTH 4,20 PS-1
DRAFT Max. 2,65
B. Painting Specification FULL / SPOT BLASTING DRAFT Min.

Coverage
Area Kind Vol. ( m2/L,K ) D.F.T. W.F.T. Estimated
Description
( m2 ) of Solid Theoretical Practical QTY
Coat (%) (Mic.) (Mic.) ( Kg, Liter )
UNDERWATER Scraping, HPFW, Full / Spot blasting to min. grade Sa 2.0
1.289 Sqm 1 UMEGUARD SX-HS REDBROWN 1.289 FC 77 3,49 2,55 150 195 506
2 BANNOH 1500 RZ PLUM 1.289 FC 64 4,57 3,33 100 156 387
3 COASTALINA AF BROWN 1.289 FC 60 5,00 3,65 120 200 353
Total 370 1.246
TOSIDES & EXT. BULWARK Scraping, HPFW, Full / Spot blasting to min. grade Sa 2.0
643 Sqm 1 UMEGUARD SX-HS REDBROWN 643 FC 77 3,49 2,55 150 195 252
2 BANNOH 1500 GREY 643 FC 73 5,21 3,80 100 137 169
3 UNYMARINE HS-M GREEN RAL 6033 643 FC 66 7,94 5,79 60 91 111
Total 310 532
Thinner & Others Thinner :
1 EPOXY THINNER A FC - FULL COAT 260
2 CR/ACRI THINNER TU - TOUCH UP 40
3 URETHANE THINNER FB - FULL BLAST 15
SB - SPOT BLAST
SW - SWEEP BLAST 315

C. Quotation VESSEL NAME : BARGE TIRTA NIAGA IX Date : 27/02/2023

No. Product Name KG LTR Price (IDR) Amount ( IDR ) Packing Size Type
1 UMEGUARD SX-HS REDBROWN 760,00 517,56 70.500 36.487.980 20 Kg x 38 20 kg = 13,62 lt
2 BANNOH 1500 GREY 170,00 121,38 80.500 9.771.090 20 Kg x 8,5 20 kg = 14,28 lt
3 UNYMARINE HS-M GREEN RAL 6033 110,00 79,73 113.500 9.049.355 25 Kg x 4,40 25 kg = 18,12 lt
4 BANNOH 1500 RZ PLUM 390,00 278,46 77.000 21.441.420 20 Kg x 19,5 20 kg = 14,28 lt
5 COASTALINA AF BROWN - 350,00 128.000 44.800.000 20 Ltr x 17,5
6 BITUMEN SOLUTION B - 20,00 43.000 860.000 20 Ltr x 1
7 EPOXY THINNER A - 260,00 33.000 8.580.000 20 Ltr x 13
8 CR/ACRI THINNER - 40,00 26.500 1.060.000 5 Ltr x 8
9 URETHANE THINNER - 15,00 39.000 585.000 5 Ltr x 3
Notes * Franco : Batam SUB TOTAL 132.634.845 Prepared by
* Delivery : 1-2 days after PO Disc 2.034.845 ( sent by email )
GRAND TOTAL 130.600.000 Junny Tan

You might also like