This document summarizes the engineering work flow process: 1. The process begins with a contract acceptance meeting and file transfer with relevant documents. 2. Calculations, datasheets, PFDs, and P&IDs are prepared and reviewed. 3. Upon approval, documents are submitted to clients and other disciplines for further detailing. 4. Work is divided among mechanical, piping, electrical, and civil/structural engineering teams.

Uploaded by

Thamotharan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
442 views

Engineering Flow Chart

This document summarizes the engineering work flow process: 1. The process begins with a contract acceptance meeting and file transfer with relevant documents. 2. Calculations, datasheets, PFDs, and P&IDs are prepared and reviewed. 3. Upon approval, documents are submitted to clients and other disciplines for further detailing. 4. Work is divided among mechanical, piping, electrical, and civil/structural engineering teams.

Uploaded by

Thamotharan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ENGINEERING WORK FLOW

Contract
acceptance
meeting

File Transfer With Process Data Sheet,


P&ID and Project Specification

Making P.R. file

Process

File study & checking


Preparation Process No No
Review with project Process data sheet
Calculation (Sizing) & with customer input
Datasheet PFD & P&ID Preparation

Yes

Product req. check list

Comments Documents
Incorporated submission
to client Work order list
Commented

Approved

Vendor document
Document & Drawing Issued to
other disciplines for further detail
engineering

Design input for General


Arrangement Drawing

Mechanical Piping Electrical / C&I Civil / Structural

3D Modelling by PDMS Piping Calculation / Analyse & Data Sheet Preparation for Foundation Load & Structural,
Isometric Drawing Preparation Instruments Calculation & SGA Drawing
Preparation
Through Purchase
RFQ Preparation & Issued
Mechanical Data Sheet, to Vendor
Calculation & GA Drawing
Preparation From Purchase
Commented Commented Documents
Documents Comments
Commented Comments submit to
Documents submission Incorporated
Comments submission to client client
to client
Commented

Comments Documents
submission Approved Approved
Incorporated TBA
to client Approved No
Review the To Vendor
Vendor Through Purchase
Drawing Issued to Factory for Document Detail Drawing Preparation
Approved Fabrication

Approved

Detail Drawing Preparation


Drawing Issued to Factory for
Fabrication

Mfg. Clearance to Vendor


Drawing Issued to Factory for
Fabrication