This document is an interconnection agreement between Muhammad Azeem and Lahore Electric Supply Company (LESCO) to interconnect a solar power system to the electric grid. Key details include: 1) Muhammad Azeem wishes to install a 4.905 kW solar system to offset his electricity consumption. 2) LESCO has approved Muhammad Azeem's application and supporting documents for interconnecting the solar system. 3) The agreement covers the technical requirements and responsibilities of both parties regarding interconnecting the solar system to LESCO's distribution system network.

Uploaded by

Ab C
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
280 views29 pages

M Azeem

This document is an interconnection agreement between Muhammad Azeem and Lahore Electric Supply Company (LESCO) to interconnect a solar power system to the electric grid. Key details include: 1) Muhammad Azeem wishes to install a 4.905 kW solar system to offset his electricity consumption. 2) LESCO has approved Muhammad Azeem's application and supporting documents for interconnecting the solar system. 3) The agreement covers the technical requirements and responsibilities of both parties regarding interconnecting the solar system to LESCO's distribution system network.

Uploaded by

Ab C
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 29

DATE

APPLICATION SUMMARY
CLIENT INFORMATION

NAME MUHAMMAD AZEEM


CNIC 35202-2760112-1
ADDRESS 595/655 NASHIMAN IQBAL
Mailing ADDRESS 595/655 NASHIMAN IQBAL
CELL PHONE # &
EMAIL OF CLIENT
EMAIL

DISCO LAHORE ELECTRIC SUPPLY COMPANY LESCO SUB DIVISION ALI RAZA ABAD
REFERENCE
10 11221 1015800 U CUSTOMER ID 7632919
NUMBER

METER NUMBER 3-00049241 BILL TARIFF A-1B(03)T FEEDER NAME NASHEMAN-E-IQBAL

SANCTION LOAD 9 REQUIRED LOAD 4.905


RESIDENTIAL CONSUPTION OF CLIENT kWh PRODUCTION FROM SOLAR SYSTEM NET CONSUMPTION OF CLIENT
NET
CONSUMPTION 2,500 5,000 -2,500
INSTALLER INFORMATION
ad
He

SUN PLAYERS & CO (Private) Limited


er

COMPANY NAME
att
yL

COMPANY
ADDRESS
89-K, BASEMENT, DHA, Phase-1, Lahore
an
mp

AEDB
REGISTRATION CR/21/009/C-3
Co

NUMBER
INSTALLING
ENGINEER Muhmmad Aamir Shahzad
INSTALLER
INSTALLER NAME Muhmmad Aamir Shahzad CNIC 17301-8877170-1
INSTALLER PHONE
# & EMAIL 0322-2023999 [email protected]
SYSTEM INFORMATION

SYSTEM SIZE No. of Panels = 9 X Panel Voltage 545 Wp = 4.905 KW (PV SOLAR PANELS)

PANEL MAKE &


MODEL LONGI LR5-72HPH 545M
INVERTER
CAPACITY & TYPE
Rated Capacity = 6kw , On-Grid , Hybrid ✔
Make Model Inverter Serial Number
INVERTER MAKE &
MODEL CROWN ELEGO-VI-6KW 96142204102084
For more than one make/model of panels on a single inverter, use this area to define the additional solar panels
Make Model # of panels Watts/ panel KW of 2nd Set of Panels
Second set of
solar panels 0.000
Make Model Rated Capacity Inverter Serial Number
Second set of
Inverters

OVERALL SYSTEM
SIZE 4.905
Application Form For NM - V46
Prepared by Engr. Mubashir Bashier
WhatsApp : +923045313414
List of Net Metering Documents
1 1) Distributed Generation Interconnection Agreement between Distributed Generator and 2-7
Distribution Company (Schedule-I). *1

1 2) Inspection of Electrical/DG Installations as per AEDB Regulations *1 8

1 3) Schematic drawings, Single line diagram of the system. (Schedule-VIII) *1 9-11

1 4) Site plan showing location of external disconnect switch *1 12

1 5) Standard Distributed Generation Application Form For Distribution Company (Schedule-II)*1. 13-15

1 6) Schedule 7 AEDB. (Page 23 on judicial paper, Page 24-26 on A3 legal) rest of pages on A4 *3 17-26

2 7) Quotation by DG installer accepted by the Consumer (letter Head) *3

3 8) Copy of attested CNIC if signing on behalf of an organization, then add authority letter on
non judicial paper
4 9) Copy of last paid electricity bill. (DG and Electric Bill Name should be same).*

5 10) Spec Sheets of inverter

6 11) Spec sheet of Panel

*1 - Documents required by DISCO


*3 - Documents required by AEDB

Application Form For NM - V46


Prepared by Engr. Mubashir Bashier
WhatsApp : +923045313414
MUHAMMAD AZEEM 10 11221 1015800 U
1. Interconnection Agreement between DG <-> DISCO1

Schedule-I
[See Regulation 2 (1) (b)]
Distributed Generation Interconnection Agreement (1 kW to 25KW)
between Distributed Generator and Distribution Company

The Distributed Generation Interconnection Agreement (the “Agreement”), is made and entered
in to this _________________ by and between ________________________________
LAHORE ELECTRIC SUPPLY COMPANY (______ LESCO )
hereinafter called “DISCO” and _________________________
MUHAMMAD AZEEM hereinafter called the “Applicant”.
Applicant shall be 3 phase 400 V or 11 kV DISCO’s consumer. DISCO and the Applicant are
hereinafter collectively referred to as the “Parties” and individually as a “Party”.

IESCO

Recitals

A. DISCO is the owner of the electric distribution system serving


ad
_____________________________________________
595/655 NASHIMAN IQBAL [Insert legal description of
He

property or address] “DISCO’s Distribution System”


er
att

B. Applicant desires to install a Distributed Generator (DG) facility or energy storage device
yL

using solar or wind energy resources with a capacity greater than 1 kW but no more than
an

1 MW, including related Interconnection equipment (the “DG facility”) and to


mp
Co

interconnect the DG facility to the DISCO’s Distribution System.


C. DISCO has previously reviewed and approved Applicant’s DG Interconnection Applicant
Form dated_______________, and supporting materials (the “Application”). The
completed Application is attached as Exhibit 1 and incorporated into this Agreement.
D. Applicant wishes to interconnect the DG Facility to DISCO’s distribution system and DISCO
is willing to permit such interconnection subject to the terms and conditions set forth: (1)
the completed Application approved by DISCO; (2) this Agreement
E. No agency or partnership is created with the interconnection of the applicants DG Facility.

2 of 26
06-Oct-16
MUHAMMAD AZEEM 10 11221 1015800 U
1. Interconnection Agreement between DG <-> DISCO1

Agreement

NOW THEREFORE, in consideration of the foregoing Recitals and for good and valuable
consideration, the DISCO and Applicant agree as follows:

1. Design Requirement

The DG Facility shall be installed in compliance with NEPRA (Alternative & Renewable Energy)
Distributed Generation/ Net Metering Regulations 2015

2. Applicant’s Representations and Warranties

Applicant represents and warrants that:


a) The DG Facility is fully and accurately described in the Application;
b) All information in the Application is true and correct;
c) The DG Facility has been installed to Applicant’s satisfaction;
d) Applicant has been given warranty information and an operation manual for the
ad
DG Facility;
He

e) Applicant has been adequately instructed in the operation and maintenance of


er
att

the DG Facility.
yL
an

3. Interconnection Disconnect Switch


mp
Co

The DISCO may require that the Applicant furnish and install an interconnection disconnect
switch that opens, with a visual break, all underground poles of the interconnection circuit. The
interconnection disconnect switch shall be rated for the voltage and fault current requirements
of the DG Facility, and shall meet all the applicable IEC, IEEE Standards, as well as applicable
requirements of the NEPRA Grid Code. The switch enclosure shall be properly grounded. The
interconnection disconnect switch shall be accessible at all times, located for ease o access of
DISCO personnel, and shall be capable of being locked in the open position. The Applicant shall
follow the DISCO’s recommended switching, clearance, tagging and locking procedures.

4. Modifications to the DG Facility

Applicant shall notify DISCO of plans for any material modification to the DG Facility by providing
at least forty working days of advance notice. “Material Modification” is defined as any
modification that changes the maximum electrical output of the DG Facility or changes the
interconnection equipment. The notification shall consists of a completed, revised Application
and such supporting materials as may be reasonably requested by DISCO. Applicant agrees not

3 of 26
MUHAMMAD AZEEM

1. Interconnection Agreement between DG <-> DISCO1

to commence installation of any material modification to the DG Facility until DISCO has
approved the revised Application.

5. Insurance, Indemnification, Liability

5.1 Distributed Generator shall obtain and maintain appropriate insurance for third party
personal injury and general commercial liability.
5.2 Each party as indeminitor shall defend, hold harmless, and indemnify the other party and
the directors, officers, employees, and agents of the other party against and from any and
all loss, liability, damage, claim, cost, charge, demand, or expense (including any direct,
indirect or consequential loss, liability, damage, claim, cost, charge, demand, or expense,
including attorney’s fees) for injury or death to persons, including employees of either
party, and damage to property, including property of either party, arising out of or in
connection with (a) the engineering, design, construction, maintenance, repair,
operation, supervision, inspection, testing, protection or ownership of the indeminitor’s
facilities, or (b) the making of replacements, additions, betterments to, or reconstruction
of the indeminitor’s facilities. This indemnity shall apply notwithstanding the active or
passive negligence of the indemnitee. However, neither party shall be indemnified
hereunder for its loss, liability, damage, claim, cost, charge, demand, or expense resulting
from its sole negligence or willful misconduct.
5.3 The indeminitor shall, on the other party’s request, defend any suit asserting a claim
covered by this indemnity and shall pay for all costs, including reasonable attorney fees
that may be incurred by the other party in enforcing this indemnity.
5.4 The provisions of this Section shall not be construed to relieve any insurer of its
obligations to pay any insurance claims in accordance with the provisions of any valid
insurance policy.
5.5 Except as otherwise provided in this section, neither party shall be liable to the other
party for consequential or remote damages incurred by that party.

6. DG Facility Commissioning Testing

Applicant shall notify DISCO in writing that installation of DG Facility is complete and that the
interconnection equipment is available for testing by DISCO at least fifteen working days duly
certified by Electrical Inspector before Applicant interconnects the DG Facility with DSICO’s
Distribution System. DISCO shall thereupon have the right to test the DG Facility. DISCO shall also
have the right to witness any testing by Applicant of the DG Facility. Any DISCO testing of the DG
Facility shall be completed within ten working days. After the testing which is to the satisfaction
of both parties, the DG facility may be interconnected with the distribution system of DISCO to
be witnessed by representatives of both parties within thirty eight days.

4 of 26
MUHAMMAD AZEEM 10 11221 1015800 U

1. Interconnection Agreement between DG <-> DISCO1

7. Access to DG Facility

Applicant shall permit DISCO’s employees and agents to enter the property on which the DG
Facility is located at any reasonable time for the purposes of inspecting and/or testing Applicant’s
DG Facility to ensure its continued safe and satisfactory operation and the accuracy of DISCO
meters. Such inspections shall not relieve Applicant from its obligation to maintain the DG Facility
and any related equipment owned by Applicant in safe and satisfactory operating conditions.
DISCO shall have the right to witness any testing by Applicant of the DG Facility.

8. Temporary Disconnection of a DG Facility

DISCO may limit the operation and/or disconnect or require the disconnection of a DG Facility
from DISCO’s Distribution System at any time, with or without notice, in the event of fault. DISCO
may also limit the operation and/or disconnect or require the disconnection of DG Facility from
DISCO’s Distribution System upon the provision of thirty days written notice for the conditions to
allow for routine maintenance, repairs or modifications to DISCO’s Distribution System.

9. Disputes; Right to Appeal to Authority

Nothing in this Agreement prevents Applicant from filing a petition with the Authority to appeal
any requirement imposed by DISCO as a condition to interconnection of DG Facility that applicant
alleges is unreasonable. In case of a dispute, the decision of the Authority shall be final and
binding on both the parties.

10. Amendments; Non-Waiver

Any amendment or modification to this Agreement must be in writing and executed by Applicant
and DISCO. The failure of Applicant or DISCO to insist on performance by the other party of any
provision of this Agreement shall not waive the right of the Party who failed to insist on
performance to enforce the same provision at a later time.

11. Term and Termination of Agreement

5 of 26
MUHAMMAD AZEEM 10 11221 1015800 U

1. Interconnection Agreement between DG <-> DISCO1

The term of Agreement between Distributed Generator and DISCO shall be three years with
effect from the date of commissioning of DG facility. At the expiry of initial term, the Agreement
may be automatically renewed by the mutual understanding between Distributed Generator and
DISCO for another term of three years and so on.
a. DISCO may limit the operation and/or disconnect or require the disconnection of a DG
Facility from DISCO’s Distribution System at any time, with or without notice, in the event
of fault. DISCO may also limit the operation and/or disconnect or require the
disconnection of DG Facility from DISCO’s Distribution System upon the provision of thirty
days written notice for the conditions which including as follows:
- To allow for routine maintenance, repairs or modifications to DISCO’s Distribution
System
- Upon DISCO’s determination that DG Facility is not in compliance with these Rules
- Upon termination of the Agreement
b. This Agreement may be terminated in accordance with these Regulations
c. The Distributed Generator may terminate the Agreement upon thirty days written notice
if the Distributed Generator determines to discontinue the sale of electricity to the DISCO
d. The DISCO shall not terminate the Agreement in any event without prior approval of the
Authority
e. All rights and obligations accrued up to termination shall continue in force upon
termination

12. Successors and Assigns

a. Assignment by Applicant: Applicant shall not assign its rights and obligations under this
Agreement in whole or in part without the prior written consent of DISCO, which consent
shall not be unreasonably withheld or unduly delayed. DISCO may withhold its consent to
any proposed assignment if the proposed assignee fails to assume the obligations of
Applicant under this Agreement in writing.
b. Assignment by DISCO: The DISCO shall have the right to assign this agreement in whole
upon written notification to the Applicant.
c. Successors: This Agreement shall be binding upon the personal representatives, heirs,
successors and permitted assignees of the respective Parties.

6 of 26
MUHAMMAD AZEEM 10 11221 1015800 U

1. Interconnection Agreement between DG <-> DISCO1

13. Applicant and DISCO Signature and Seal

IN WITNESS WHEREOF, Applicant and DISCO have executed this Agreement as of the year and
date first set forth above.

Applicant Signature & Date DISCO’s Signature with Seal & Date

Sign->
FirstLaNme

Title Title

MUHAMMAD AZEEM

JunaidQazi Witness No. 1 (Name, CNIC & Signature) Witness No. 1 DISCO (Name, CNIC & Signature)

Witness
Sign->
CNIC:35301-1719588-5 Adnan Ahmad Name CNIC

Witness No. 2 (Name, CNIC & Signature) Witness No. 2 DISCO (Name, CNIC & Signature)

Witness
Sign->

CNIC:17301-8877170-1 Aamir shahzad Name CNIC

7 of 26
06-Oct-16
MUHAMMAD AZEEM 10 11221 1015800 U

Date:

Sr. No____________________
MUHAMMAD AZEEM
Name of the Applicant/Consumer: __________________________________
Address:________________________________________________________________________________
595/655 NASHIMAN IQBAL
DISCO’s Sub-Division:_______________________
ALI RAZA ABAD
Inspection of Electrical Installations for Commissioning/Energization for Interconnection of D.G.
Facility with the Distribution system of DISCO for Net-Metering

SUN PLAYERS & CO (Private) Limited


_________________________________________________( Installer) hereby certifies that the electrical
installation work at the premises and for the Applicant/Consumer stated above has been carried out by
_____________________________(Installer)
Muhmmad Aamir Shahzad in full conformity of standards as per NEPRA (Alternative &
Renewable Energy) Distributed Generation and Net Metering Regulations, 2015. AEDB ( CR/21/009/C-3 )
Regulations, 2015 And AEDB Guidelines for consumers and installers. The Particulars of the installation test results
obtained by _____________________________
Muhmmad Aamir Shahzad (Installer) are given below.

Class of Premises: ✔ Residential, Commercials Industrial Agriculture, Other

# of panels System
Make Model Watts/Panel
Size
LONGI LR5-72HPH 545M 9 545
4.905

6kw
II. ___________ KW of On-Grid / ✔ Hybrid Inverter, Make: CROWN Model No: ELEGO-VI-6KW

Following inspections were carried out by Engineer at the time of Survey


Standard Status Remarks

y
IEC Certification Of PV modules verified ✔

n

pa ead
DC Grounded tested
AC Grounded tested ✔
Lightening Arrestor installed with separating grounding ✔
Lockable Disconnect Switch installed outside of facility

o m rh ✔

C tte
Insulation Test ✔
Phase Continuity Test ✔

Le
Cable size as per standard s ✔
Cables have proper Color Coding ✔
On Grid Inverter Complies with UL 1714 Standards ✔
Anti- Islanding Features in Inverter ✔
Circuit Breaker /Switch/Combiner Box for the PV wiring ( According to panel

& Inverter Ratings)
PV Mounting Galvanized & Withstand Windstorm ✔
PV modules attached to mountings by stainless steel nuts & bolts using SS

spring washers
Cables are properly secured with ties & used UPVC conduit ✔

Signed by Authorized Engineer of AEDB Certified Company.

Sign.___________________

Muhmmad Aamir Shahzad


Name.____________________

Stamp:________________________
MUHAMMAD AZEEM 10 11221 1015800 U
3) Schematic drawings, Single line diagram of the system. (Schedule-VIII)
1 2 3 4 5 6
Utility Reference Number 10 11221 1015800 U
Panel Make LONGI
Panel Model LR5-72HPH 545M Meter Number 3-00049241

# of Panels / String 12 Sanction Load 9

A # of Strings 1 Required Load 4.905 A


Voc / Panel 49.65
Voc / String 595.8
Isc / String 13.92
Isc for all strings 13.92
STC Rating 4.905

Guage of DC Wire 6mm Consumer Load


Length of DC Wire 13m
B Main Distribution Box B
Rooftop DC Combiner Box

ad
Installed Yes ✔ No

He
Method of Combiner

er
att
IP Rating
AC Solar Breaker

yL
Poles 2 pole

an
mp
Amp 32A
Guage of DC Wire 6 mm

Co
Main CB
C Length of DC Wire
30 ft Meter AC Disconnect C
DC Disconnect Inverter

Amp M
Guage of Wire
6mm Main Home Supply DISCO
Length of Wire 11m 100A NOTE: AC Disconnect can be
Number of Cables in Conduit 6mm AC Rating

before or after the Utility Meter


Water Protection on wiring
✔ AC Earth
DC SPD Model # BUILT IN
Conduit Dia 1INCH DC SPD Rating
20k
Inverter Make CROWN

Conduit Material PVC # of SPD


1
Inverter Model ELEGO-VI-6KW Name of Company SUN PLAYERS & CO (Private) Limited
10A
D DC Breaker Rating 16A
I AC Max
AEDB License # CR/21/009/C-3 D
# of DC Breakers
Vmax 900
1 Client Name MUHAMMAD AZEEM
Vmin 200
Client Address 595/655 NASHIMAN IQBAL
# of MPPT 2
Date

1 2 5 6
9 of 26
MUHAMMAD AZEEM 10 11221 1015800 U

1 2 3 4 5 6
Utility Reference Number 10 11221 1015800 U
Panel Make LONGI
Panel Model LR5-72HPH 545M Meter Number 3-00049241

# of Panels / String 12 Sanction Load 9

A # of Strings 1 Required Load 4.905 A


Voc / Panel 49.65
Generator
Voc / String 595.8
# phase
Isc / String 13.92 Y Delta

13.92 Voltage
Isc for all strings
Generator KW
STC Rating 4.905 Generator Make
Transfer Switch
Generator Model
Consumer
Critical Load
Guage of DC Wire 6mm M
Length of DC Wire 13m
B Consumer Load B
Automatic

✔ # of poles
Combiner Box

ad
Y Delta

He
Method of Combiner Generator CB Amp
Poles Make

er
IP Rating Amps Type

att
Voltage
AC Breaker

yL
Poles 2 pole

an
mp
AMP 32A
Guage of DC Wire 6 mm

Co
Main CB
C Length of DC Wire
30 ft Meter AC Disconnect C
DC Disconnect Inverter

Amp M
Guage of Wire
6mm Main Home Supply DISCO
Length of Wire 11m 100A
Guage of DC Wire 6mm AC Rating

Length of DC Wire
✔ AC Earth
DC Model # BUILT IN
Conduit Width 1INCH IP Rating 20k
Inverter Make CROWN

Conduit Material PVC # of SPD 1


Inverter Model ELEGO-VI-6KW Name of Company SUN PLAYERS & CO (Private) Limited
10A
D DC Breaker Rating 16A I ac max
AEDB License # CR/21/009/C-3 D
# of DC Breakers 1 Vdcmax 900
Client Name MUHAMMAD AZEEM
Vmin 200
Client Address 595/655 NASHIMAN IQBAL
# of MPPT 2
Date

1 2 5 6
10 of 26
MUHAMMAD AZEEM 10 11221 1015800 U
3b) Schematic drawings, Single line diagram of the system. (Schedule-VIII)

1 2 3 4 5 6
10 11221 1015800 U
SLD for grounding and lightning arrestor 3-00049241

Building height is above 15M 9


Frame
A Yes ✔ No Panels 4.905 A
Lightning Arrester

Lightning Arrestor Installed


Lightining arrestor
only required for
buildings above 15 meter

Yes ✔ No

B B

ad
He
er
Lightning Wire Guage of DC Earth 16mm

att
Lighting Wire Len Length of DC Earth

yL
13m

an
mp
Co
C C

Ohm - Ground
Ohm- Ground

0.98
Ground Rod length
Ground Rod length
15ft Name of Company SUN PLAYERS & CO (Private) Limited

D AEDB License # CR/21/009/C-3 D


Client Name MUHAMMAD AZEEM

Client Address 595/655 NASHIMAN IQBAL

Date

1 2 5 6
11 of 26
) Site plan showing location of external disconnect switch. MUHAMMAD AZEEM 10 11221 1015800 U

1 2 3 4 5 6
10 11221 1015800 U

3-00049241

A 4.905 A

B B

ad
He
er
att
yL
an
mp
Co
C C

Name of Company SUN PLAYERS & CO (Private) Limited

D AEDB License # CR/21/009/C-3 D


Client Name MUHAMMAD AZEEM

Client Address 595/655 NASHIMAN IQBAL

Date

1 2 5 6
12 of 26
12) Site plan showing location of external disconnect switch.
MUHAMMAD AZEEM 10 11221 1015800 U

Schedule-II
[See Regulation 3(1)]
Standard Distributed Generation Application Form for Distribution Company

Distributed by Approved by
Name & Address of DISCO
LAHORE ELECTRIC SUPPLY COMPANY
National Electric Power Regulatory Authority
(NEPRA)

Contact Information—The applicant is the person that is legally responsible for the
generation system
Applicant’s Last Name First Name
MUHAMMAD AZEEM
CNIC of Applicant/CUIN in case of Company (copy to be attached)
35202-2760112-1
Applicant’s Mailing Address
595/655 NASHIMAN IQBAL
ad
He
er

Applicant’s Phone Number & Email Address


att

Office:- Fax:-
yL

Cell:- Email:-
an
mp

Emergency Contact Numbers


Co

Location of Generation System


Address at which DG facility is located
595/655 NASHIMAN IQBAL

Latitude-Longitude (i.e.49o 32" N 91o 64’ 18” optional)

Applicant/Consumer Reference Number


10 11221 1015800 U

Applicant’s Ownership Interest in the Generation System

✔ Owner Co-owner Lease Other ____________

13 of 26
MUHAMMAD AZEEM 10 11221 1015800 U

Primary Intent of the Generation System

Onsite Use of Power ✔ Net Energy Billing


Electricity Use, Producion and Purchases
(a) Anticipated annual electricity consumption of the facility or site: 2,500 (kWh)/yr.
(b) Anticipated annual electricity production of the generation system:5,000 (kWh)/yr.
(c) Anticipated annual electricity purchases (i.e., (a) minus (b) -2,500 (kWh)/yr.
"Value will be negative if there are net sales to the DISCO.”

Installing Contractor Information (If Applicable)


Contractor’s Name
Muhmmad Aamir Shahzad
Name of Firm
SUN PLAYERS & CO (Private) Limited
Contractor’s Phone Number Email Address
0322-2023999 [email protected]
Mailing Address
89-K, BASEMENT, DHA, Phase-1, Lahore
ad
He
er
att
yL

Requested In-Service Date


an
mp
Co

Provide One-Line Schematic Diagram of the System


Schematic is attached Number of Pages 2 pages

Generator/Invertor Information
Manufacturer Model No
CROWN ELEGO-VI-6KW
Version No. Serial No.
96142204102084
Generation Type (Check one) Generation Type (Check one)

✔ Three Phase Single Phase ✔ Inverter Other __________


Name Plate AC Ratings (Check one)

6kw
✔ _________ kW ____ _ _kVA ____________ volts
Primary Energy Source

Note:- If there is more than one inverters, attach an additional sheet describing each

14 of 26
MUHAMMAD AZEEM 10 11221 1015800 U

Site Plan Showing Location of the External Disconnect Switch (attach additional sheets as
needed)

Design Requirements
(a) Has the proposed distributed generation paralleling equipment been certified by
Electrical inspector? Y N

Other Comments, Specification and Exceptions (attach additional sheets if needed)

Applicant and Installer Signature


To the best of my knowledge, all the information provided in this application form is
completed and correct.
Applicant Signature Date
MUHAMMAD AZEEM

Installer Signature (if applicable) Date


Solar - Sales Rep

15 of 26
MUHAMMAD AZEEM 10 11221 1015800 U

9) Affidavit (On judicial paper) (Schedule-VI). [ Original be also submitted to concerned office]

Schedule -VI
[See Regulation 4(2) (d)]

I/we MUHAMMAD AZEEM hereby confirm that I/we have read the

DISCO directive and agree to abide by its Terms and Conditions and the contents of the

Application are true and correct to the best of my knowledge and belief and nothing has been

concealed thereof.

Deponent

Sign->
MUHAMMAD AZEEM
Name: ___________________
35202-2760112-1
CNIC No: ________________
Date: _____________________
MUHAMMAD AZEEM 10 11221 1015800 U

11 AEDB: Schedule 7

FIRST SCHEDULE TO THE CUSTOMER AGREEEMENT

(Products and Components to be supplied by the DG Installer for the DG Facility):

S# EProduct description Brand S# of Equipment Remarks

1 PV Modules LONGI LR5-72HPH 545M

2 Inverter CROWN ELEGO-VI-6KW

3 DC cables
6 mm 6MM

4 AC cables
6mm 6MM

5 PV frames
GI GI with SS Nut
Bolts with warranty
6 Earthing
16mm 0.92 Ohm
ead

7 AC breakers , fuse links


rH

32A 2 pole
e
att
yL

8 DC breakers and fuse links


16A One breakers
an
mp
Co

9 AC surge protectors
20k Built In

10 DC surge protectors
15K Built In

11 Residual Current detector (RCD)


NA Not installed

12 Bus bar
N/A
13 Manual disconnect
Water proof
100A IP65
14 Any other
accessories/attachments

Pl attach a separate page if required


Name (Customer) MUHAMMAD AZEEM Stamp of DG Installer
Address of Install 595/655 NASHIMAN IQBAL

Installer Initial ____ Consumer Initial ___


This is a legal document and cannot be tampered. -1-

17 of 26
MUHAMMAD AZEEM 10 11221 1015800 U

11 AEDB: Schedule 7

SECOND SCHEDULE TO THE CUSTOMER AGREEEMENT

Quotation by DG installer (on company letter head and bearing company stamp) and bearing acceptance
signatures, name, date and CNIC Number of the customers – (to be uploaded in portal)

(Uploaded separately to the portal.)

Installer Initial ____ Consumer Initial ___


This is a legal document and cannot be tampered with. -2-

18 of 26
MUHAMMAD AZEEM 10 11221 1015800 U

11 AEDB: Schedule 7

THIRD SCHEDULE TO THE CUSTOMER AGREEEMENT

Payment Schedule

Milestone % Amount

1 Upon signing of Agreement 80 420,000

2 Upon completion of installation, testing and commissioning. 20 105,000

3 On receipt of license from NEPRA 0 0

4 Any other term 0 0


Total 100.0 525,000

<-Sign

Muhmmad Aamir Shahzad MUHAMMAD AZEEM


Address Signed on behalf of
89-K, BASEMENT, DHA, Phase-1,
Lahore Self
Date

Installer Initial ____ Consumer Initial ___


This is a legal document and cannot be tampered with. -3-

19 of 26
MUHAMMAD AZEEM 10 11221 1015800 U

11 AEDB: Schedule 7

FOURTH SCHEDULE TO THE CUSTOMER AGREEEMENT


(System and components warranties)
Warranty, PV Modules against manufacturing defects: Years 12 Yrs
PV Modules, standard performance warranty Years 25 Yrs
Workmanship including locally supplied parts (Except Frames) 12 Yrs
PV mounting Frames including fixing screw, nut/bolt and washers etc 12 Yrs
Grid tie inverters, including hybrid (On-grid/Off-Grid as one unit), 5 Yrs
Guaranteed Annual Energy Yield at given site 5,000 KWh/Yr

*In case the system does not yield promised yield, installer promises to rectify till guaranteed yield is
delivered

*This guarantee is subject to

a. No tampering by any un-authorized person


b. Regular maintenance services hired from installer.
c. Not valid under force majeure condition, natural or man-made disasters
d. Yield could vary + / - 10% depending upon location
ad
He

I acknowledge that the following information has been shared with me for information and record
er

purposes.
att
yL
an

MUHAMMAD AZEEM
mp

Name of signer / on behalf of Address


Co

Self 595/655 NASHIMAN IQBAL

Consumer

DG installer Stamp:

Date.

Installer Initial ____ Consumer Initial ___


This is a legal document and cannot be tampered with. -4-

20 of 26
MUHAMMAD AZEEM 10 11221 1015800 U

11 AEDB: Schedule 7

FIFTH SCHEDULE TO THE CUSTOMER AGREEEMENT

Certificate by Installer about compliance to standards as specified by AEDB and Regulations (SRO
S.R.O 812 ( 1 )/2015 dated 1st September 2015) and as amended time to time.

Certificate of Compliance with Mandatory requirements


We,________________________,_______________________________
SUN PLAYERS & CO (Private) Limited 89-K, BASEMENT, DHA, Phase-1, Lahore (Name, address, contact info of
installer ) having been prequalified by AEDB vide reference number ______________have
CR/21/009/C-3 installed the
system as per requirements of Regulations issued vide SRO 892 (I)/ 2015 dated 1st September, 2015 and
all other standards of the components of the DG Facility as specified by AEDB on its website. We
specifically certify the following:-

1) Compliance to quality, safety and environmental standards and technical requirements as stated in
Guidelines issued by AEDB

• The design of the DG facility and its sizing complies with minimum technical
requirements and specifications as provided in the guidelines issued by AEDB
a.
• The components of the DG Facility as supplied to customer complies with the quality,
safety and environment standards as specified by AEDB
b.
ad
He

• The warranties given to the customer for components of DG Facility complies with the
er

requirements as specified by AEDB


att
yL

c.
an

• The installation of the DG Facility complies with the quality and safety requirements,
mp

recommendations and precautions as give in the guidelines issued by AEDB


Co

d.
2) Compliance to Protection Requirements Para 9 of Regulations:

• The protection and control diagrams for the interconnection of the DG Facility has been designed
in accordance with the provision of Grid and Distribution codes and approved by _________(name
LESCO
of DISCO) prior to commissioning of proposed interconnection facilities. Reference has been
derived from typical single line diagram specified at Schedule VIII of the net metering regulations.

• The distributed generator is provided with equipment including without limitation, electrical
lines/circuits, transformer, switch gear, safety and protective devices. Meters to be used for
interconnection shall be arranged in consultation with ___________(DISCO
LESCO name)

• The protective functions are equipped with automatic means to prevent reconnection of
distributed generation facility with the distribution facilities of Distribution Company.

• The distributed generator is equipped with a manual lockable disconnect switch that has a visual
break to isolate the distributed generator facility from distribution facilities.

• The Grid connected generator complies with Underwriter laboratories UL1741 standards and

Installer Initial ____ Consumer Initial ___


This is a legal document and cannot be tampered with. -5-

21 of 26
MUHAMMAD AZEEM 10 11221 1015800 U

11 AEDB: Schedule 7

addresses the electrical interconnection design of various forms of generating equipment IEEE
1547 2003, IEC 61215. Compliance proof or Manufacturers certificate to this effect is attached.

3) Compliance to Para 10 of Regulations: Prevention of interference.

• The DG Facility is designed to free from interference generation. Proper shielding and earthing is
provided to avoid any such generation and suppression. The THD of the inverter used is <3%
--------------
--(Value) which is less than permitted 3%.

4) Compliance to Para 11 of Regulations Voltage and Frequency Range:

• 385-400
The maximum variation in output voltages of the inverter used---------------(Value) which is less than
permissible ±5%

• 49.8-50.2
The maximum variation in output frequency of the inverter used------------(Value) which is less than
permissible ±1%

5) Technical details of the inverter


____________________. Its capacity is of _6kw
The serial number of the inverter installed is 96142204102084 _ _ _ _ KW
and (Manufacturers, type and Make) _________________________.
CROWN The literature containing technical
specifications of the inverter is attached
d

Installer Initial ____ Consumer Initial ___


This is a legal document and cannot be tampered with. -6-

22 of 26
11 AEDB: Schedule 7 MUHAMMAD AZEEM 10 11221 1015800 U

Schedule 7: Customer Agreement (in pursuant to regulation 9(a))


(to be signed between DG Installer and Customer)

1. This Agreement is made on between


H

Name of Signer: Registered address of company AEDB Reg #


L

Muhmmad Aamir Shahzad


Company Name: 89-K, BASEMENT, DHA, Phase-1, Lahore
SUN PLAYERS & CO (Private) Limited CR/21/009/C-3
(hereinafter called “the DG Installer”)
And
Name of signer: MUHAMMAD AZEEM Address

on behalf of: Self 595/655 NASHIMAN IQBAL

(hereinafter referred to as “the Customer”).


er

Whereas: -
p
ci r /

2.1 The Customer has agreed to purchase Wind / Photovoltaic Distributed Generating (DG) system of
Pa

4.905 KWp with 6kw KW grid tie inverter amounting to PKR 525,000
__________
di pe

2.2 The DG Installer is involved in the business of designing, supply and installation of Wind / PV
al
Ju Pa

systems including after sale support


on p

2.3 The Customer is desirous of installing Wind / Photovoltaic Distributed Generation Facility
(hereinafter referred to as “the DG Facility”) at the address of
N ma
St

Installer Initial ____ Consumer Initial ___


This is a legal document and cannot be tampered. -1-

23 of 26
MUHAMMAD AZEEM 10 11221 1015800 U

11 AEDB: Schedule 7

2.4 The DG Installer is registered with Alternative Energy Development Board (AEDB), listed under
the Directory of the Registered DG Installers with registration number CR/21/009/C-3
- and is
listed at AEDB’s website at www.aedb.org

Whereby it is agreed as follows:

3.1 The agreement includes (enter Yes or NO at appropriate column)


S# services Yes/No Remarks
1 Supply and Installation DG Facility based Does not include provisioning and
on net metering, complete in all respect. ✔ installation of bi-directional energy
meter
2 Consultancy services for technical design Technical matters only
and supervision of the planned DG Facility ✔
3che Services for documentation and its
processing with relevant institutions till ✔
1
award of Net Metering license/connection
4 Maintenance services for DG Facility ✔ On annual or other terms basis
5 Services related to bi-directional meter May include provisioning and support
✔ in installation
6 Any other related to net metering subject To be decided by installer and
✔ customer independently

3.2 The Customer hereby appoints the DG Installer to Supply and Install the DG Facility at the Address
as stated in Clause 1 as per requirements of NEPRA (Alternative and Renewable Energy) Distributed
ad

Generation and Net Metering Regulations, 2015 (‘Regulations’) (SRO S.R.O 812 ( 1 )/2015 dated 1st
He

September 2015) as amended time to time. The DG Installer shall strictly comply with the
er

specifications and requirements as stated in the Regulations and standards for the components of the
tt
La

DG Facility as given by AEDB on its website. Compliance certificate shall also be rendered by DG
ny

Facility as per Fifth Schedule attached.


m pa
Co

3.3 The DG Installer shall be responsible to initiate and get processed application of net metering
connection on behalf of the Customer from start till energization of the connection. DG Installer shall
ensure that the whole process for application for Net Metering connection must be completed within
30 days of submission of application.

3.4 The Products and Components and services required for the DG Facility are as set out the quote which
has been agreed between the two parties and are set out in the First Schedule attached.

3.4 Any changes ( after signing this agreement ) to the brand of the products as set out in the First Schedule
have to be mutually agreed, in writing and made a part of this agreement, by both the Customer and
the DG Installer. Copy of the same has also to be provided to IESCO for update of its records.

3.5 The DG Installer hereby agrees to provide the Customer the DG Facility performance expectancy as
set out in the Second Schedule, attached.

3.6 The Customer hereby agrees to pay the DG Installer for the products (including components) and
installation charges as set out in the Third Schedule.

3.7 All payments by the Customer to the DG Installer shall be in the form of cheque, bank draft (cashier’s
order) or electronic transfer. No payment in CASH, shall be made by the Customer to the DG Installer.
All payments must be acknowledged by official receipts issued by the DG Installer.

1
This is mandatory for connections up to 250 kW capacity. For above 250 kW, it is up to the customer’s choice

Consumer Initial ___


Installer Initial ____
-2-
This is a legal document and cannot be tampered with.
24 of 26
MUHAMMAD AZEEM 10 11221 1015800 U

11 AEDB: Schedule 7

3.8 The Customer and DG Installer hereby agree to abide and comply with all rules, regulations, directives
and any written requirement as set out by NEPRA / IESCO / AEDB / any other relevant authority.

3.9 All documents in respect of NEPRA and IESCO for the DG Facility shall be executed by the
Customer. However, DG Installer shall provide services in completing the documentation and
processing for obtaining Net Metering Connection as per Regulations.

3.10 The Customer hereby agrees and covenants to allow the DG Installer, its employees and
person/persons authorized by the DG Installer to enter the address of the Customer for the purpose of
carrying out site survey prior to commencement of works, the supply and installation of the DG
Facility and any other related services and maintenance.

3.11 The DG Installer agrees to provide a warranty as set out Fourth schedule. Minimum warranties
required are as follows.
a. Warranty, PV Modules against manufacturing defects, 10 Years.
b. PV Modules, standard performance warranty, 25 Years
c. Workmanship including locally supplied parts (Except Frames) 5 Years.
d. PV mounting Frames and associated parts, 25 Years
e. Grid tie inverters, including hybrid, 5 years

3.12 The DG Installer shall be responsible to the Customer on any warranty claims on components and
equipment.
ad

3.13 Both the Customer and the DG Installer hereby agree and covenant that they shall not, for the duration
He

of this Agreement executed between them, terminate this Agreement without the written consent of
er
att

the other party. Provided that written consent shall only be granted when the party that intends to
L

terminate the agreement has met all its obligations under this Agreement. The Customer may
ny
pa

terminate the agreement if the DG Installer fails to deliver satisfactory performance as per agreed
m

schedule. Similarly DG Installer may terminate this agreement if payment schedule is not met.
Co

3.14 The duration of this agreement shall start from the date of signing this Agreement and will continue
for the period mentioned in warranty clauses.

3.15 The Schedules attached to this Agreement shall form part and parcel of this Agreement and shall be
read as part of this Agreement.

3.16 Any date or period mentioned in this Agreement may with the written consent of the parties be
extended failing which time shall be of the essence of this Agreement.

3.17 The provisions of this Agreement shall be binding upon the personal representatives of each of the
parties being an individual.

3.18 Each party confirms that this Agreement sets out the entire agreement and understanding between the
parties and that it supersedes all prior agreement, arrangement and understanding between them
and that they are not entering into this Agreement or any arrangement contemplated or in reliance
upon any representation or warranty not expressly set out in this Agreement.

3.19 No failure or delay by any party in exercise of any right, power or privilege under this Agreement
shall operate as a waiver of it nor shall any single or partial exercise by such party of any right, power
or privilege preclude any further exercise of it or the exercise of any other right or privilege.

Installer Initial ____ Consumer Initial ___


This is a legal document and cannot be tampered with. -3-

25 of 26
MUHAMMAD AZEEM 10 11221 1015800 U

11 AEDB: Schedule 7

3.20 No party shall have the right to assign any of the rights, liabilities or benefits set out in this Agreement
without the prior written consent of the other party having been first obtained.

3.21 Each party shall bear its own costs, legal fees and other expenses. The stamp duty for this Agreement,
if any, shall be borne by the Customer.

3.22 No provision of this Agreement shall be amended, modified, varied, waived or discharged otherwise
than by the express written agreement of the parties to it nor may any breach of any provision of this
Agreement be waived or discharged except by the written consent the other party.

3.23 In the event of any conflict between the provisions of this Agreement and any other document, the
provision of this Agreement shall prevail.

3.24 All notices required to be given under this Agreement shall be in writing and shall be given or sent to
the party concerned by hand or by Registered Post at the address set out in this Agreement or at such
other address as the parties may so inform the other in writing.

3.25 This Agreement shall be deemed to be a contract made in Pakistan and shall be interpreted in all
respect in accordance with Laws of Pakistan.

IN WITNESS WHEREOF the parties hereto have hereunto set their hands the day and year first above
written.

Sign Company Stamp Sign


<-Sig
ad
He
er

Name Muhmmad Aamir Shahzad Name MUHAMMAD AZEEM


att

Designation Sales Engineer Designation


L
ny

CNIC 17301-8877170-1 On Behalf of (as the customer)


pa

On Behalf of SUN PLAYERS & CO (Private) Limited


m

Self
Co

AEDB-Registration # CR/21/009/C-3
In the presence of In the presence of

Witness 1 Witness 2
CNIC CNIC

Installer Initial ____ Consumer Initial ___


This is a legal document and cannot be tampered. -4-

26 of 26
Solar Energy, Electrical SUN PLAYERS & CO (Private) Limited 89-K, BASEMENT, DHA, Phase-1, Lahore AEDB – CR/21/009/C-3
Service & Installation Contract License #
Tel: 0322-2023999
is hereby authorized by the Owner(s) of the premises mentioned below, hereinafter referred to as Buyer, to furnish all necessary
materials, labor and workmanship to install, construct and place the improvement according to the following description of work, including materials and equipment
to be used on the premises below described;
BUYERS INFORMATION
NAME HOME PHONE CELL/WORK PHONE
MUHAMMAD AZEEM
JOB ADDRESS EMAIL
595/655 NASHIMAN IQBAL
BILLING ADDRESS Province Postal Code
595/655 NASHIMAN IQBAL
ELECTRICAL UTILITY ACCOUNT NUMBER ELECTRIC METER NUMBER SANCTIONED LOAD ANNUAL KWH’S ANNUAL BILL (PKR) ROOF TYPE
10 11221 1015800 U 3-00049241 9 9
Your Solar System includes all Modules/Panels, Inverters, Racking, Building Permits, Application and Processing for Rebates, Installation, Property
Analysis, City and State Approvals, Consultation with HOA, Sales Tax Connection to the Grid and all Labor at no additional charge.
SYSTEM INFORMATION
SYSTEM SIZE AC WATTS ANNUAL PRODUCTION ENERGY OFFSET EXPECTED
5.350 5,000 5500
SYSTEM PRICE (PKR) LOAN (PKR) OUT OF POCKET EXPENSE PKR NET SYSTEM COST PRICE PER WATT
525000 78
Annual production, Energy Offset Annual Savings and Payback Period are estimates and may vary. Payback Period and Annual Savings based on future utility rate
increases. Buyer must pay SUN PLAYERS & CO (Private) Limited for the full System Price of this agreement, including any deficit between the actual and estimated rebates
and/or tax credits.
EQUIPMENT LIST SPECIAL INSTRUCTIONS
Panels 9 x LONGI LR5-72HPH 545M
Inverter 1 x CROWN ELEGO-VI-6KW
DC Cable 6 mm
AC Cable 6mm
Frame GI
Earthing 2
AC Breaker 32A EXCLUSIONS
AC Surge 45k
DC Breaker 16A
ead

Disconnect 100A
The schedule of progress payments must specifically describe each phase of work, including the type and amount of work or services scheduled to be supplied in
rH

each phase, along with the amount of each proposed progress payment. BUYER’S INITIAL:_______
tte

PAYMENT SCHEDULE ADMINISTRATIVE


La

Payment % Amount (PKR) Details of Payment CEO


a ny

Advance % 80 420,000 Dir Tech


mp

Delivery % 20 105,000 Engr Installation


Co

Installation % 0 0 Asstt Engr


Retention % 0 0 Tech 1
Total % 100.0 Total 525,000 Tech 2

CASH CHECK # C.C # _________________________ EXP _____ FINANCING Bank

WARRANTY: years Solar Modules (per manufacturer), years inverter(s) (per manufacturer), years parts and labor. See reverse for details.
ARBITRATION OF DISPUTES. If any dispute shall arise between Contractor and Buyer regarding performance of the work, or payment of any alleged change in the
work, Contractor may not be forced to continue work until payment is received, if any dispute should arise it is agreed that Contractor and Buyer shall meet first to
review and negotiate in a peaceful manner all disputes per terms and conditions of contract. If the contractor performs to code and inspections are approved by the
inspectors. Buyer cannot withhold any payments or rebate. If the parties cannot resolve their dispute informally, the dispute shall be determined by binding
arbitration administered by an arbitrator chosen contractor, pursuant to its Comprehensive Arbitration Rules and Procedures or Streamlined Arbitration Rules and
Procedures (as determined pursuant to those rules according to the amount in controversy). Judgment on the Award may be entered in any court having
jurisdiction. The prevailing party of any arbitration shall be entitled to reasonable attorney’s fees, costs and expenses incurred.
NOTICE: BY INTIALING IN THE SPACE BELOW YOU ARE AGREEING TO HAVE ANY DISPUTE ARISING OUT OF THE MATTERS INCLUDED IN THE ARBITRATION OF
DISPUTE” PROVISION DECIDED BY NEUTRAL ARBITRATION AS PROVIDED BY PAKISTAN LAW AND YOU ARE GIVING UP ANY RIGHTS YOU MIGHT POSSESS TO HAVE
THE DISPUTE LITIGATED IN A COURT OR JURY TRIAL. BY INITIALING IN THE SPACE BELOW YOU ARE GIVING UPYOUR JUDICIAL RIGHTS TO DISCOVERY AND APPEAL,
UNLESS THOSE RIGHTS ARE SPECIFICALLY INCLUDED IN THE ‘ARBITRATION OF DISPUTE” PROVISION. IF YOU REFUSE TO SUBMIT TO ARBITRATION AFTER AGREEING
TO THIS PROVISION, YOU MAY BE COMPELLED TO ARBITRATE UNDER THE AUTHORITY OF THE BUSINESS AND PROFESSIONS CODE OR OTHER APPLICABLE LOCAL
LAWS. YOUR AGREEMENT TO THIS ARBITRATION PROVISION IS VOLUNTARY.

I AGREE TO ARBITRATION: _____________________ I AGREE TO ARBITRATION: ______________________


(Initials of Buyer) (Initials of Contractor)

RIGHT TO CANCEL: You the Buyer, may not cancel this transaction any time after the signing of this transaction & before financing approval or otherwise.
BUYER’S INITIAL: _____________

TERMS AND CONDITIONS: The terms and conditions on the reverse side of this contract are expressly incorporated into this contract; Buyer
understands that this document is an offer to contract for the services of SUN PLAYERS & CO (Private) Limited. Once approved and accepted by the Buyer and
the Contractor (in writing or by the commencement of work), this document shall become a valid and binding contract.
Proposal by: Ref.# Date: Accepted by: Date:

SUN PLAYERS & CO (Private) Limited


________________ ________________ ____________ _____________________________ ____________
________________ ________________ MUHAMMAD AZEEM
Quotation good for 15 days. Your sign acknowledges you agree to the terms on both pages of this agreement.
Limited Warranty
Contractor provides Customers with complimentary, limited -year PV Modules only and 05 Years Inverters warranty in
combination by component manufacturers to protect Customers against defective workmanship, system or component breakdown,
that results in degradation in electrical output of more than fifteen percent from the originally rated output during the ten year
period. Contractor will not charge for parts and labor costs associated with these limited warranties.

Payback Analysis
The payback analysis (if any) in this report is based on the assumption that there is zero load shedding/rolling blackouts on the client
premises. The final electricity bill depends on the client usage and assumes that the client usage does not increase after the
installation of the Solar Electric System.

Exclusions and Limits


The foregoing limited warranty does not warrant any specific electrical performance of the System except as indicated above, does
not cover a System defective for any other reason than stated above and does not extend past the ten-year (Module) and five-year
(Inverter) term and specifically excludes physical damage whether voluntary or involuntary. In addition, the limited warranty does
not cover cosmetic defects stemming from normal wear and tear of the System. Contractor will not remedy, replace or pay for any
work done on warranted goods by any parties other than the Contractor and/or Contractor’s authorized agents. Warranty claims
must be filed in writing within the applicable warranty period and can only be made by or on the behalf of the original end customer
or person to whom title has been transferred.

Specific to roof penetrating System installations, Contractor provides a limited repair warranty for affected area only for damages to
roof structure caused by Contractor during a System installation for areas within a (3) inch radius of any roof penetrations. The period
for this limited warranty the roof damages is only to the extent of the remaining period of any existing warranties at the time of
System installation provided by the contractor(s) who installed or built the roof.

Existing Conditions
Contractor is not responsible and bears no liability for the malfunctioning of existing electrical equipment at the site, including but
not limited to the main electrical service panel, any major electrical devices, or any other fuses or similar devices.

Unforeseen Conditions
Contractor is not responsible for delays or expenses related to unanticipated, unusual, or unforeseen conditions at the site, including
but not limited to inclement weather, roof condition and structure, subsurface conditions, underground or aboveground water, gas,
or severed pipes, electrical or cable lines or transformers, or any other physical or material hindrance to the installation of the
System. If the Contractor discovers unforeseen conditions requiring additional cost, Contractor shall present such costs to Buyer and
ead

receive Buyer’s written approval before beginning or continuing installation.


rH

Extra Work and Change Orders


tte

Extra work and Change Orders become part of the contract once the order is prepared in writing and signed by the parties prior to
La

commencement of any work covered by the new change order. The order must describe the scope of the extra work or change, the
ny

cost to be added or subtracted from the contract, and the effect the order will have on the schedule of progress payments.
a
mp

Notwithstanding the provision, the Contractor shall have the right to substitute System equipment without Buyer’s agreement, so
Co

long as the substitution adds no extra cost to the project and does not materially affect the System’s performance.

Site Access
Buyer grants Contractor and any subcontractor’s full permission to enter the site during the duration of the System installation, and
to use reasonable work areas in order to complete the System installation. Buyer also grants Contractor permission to access the
site after the System’s completion, for the purposes of repair, inspection, monitoring, or update of the Project, or any of the same
with respect to the monitoring system.

Title and Risk of Loss


Upon delivery of any parts of the System to the Buyer Site including PV modules, rails, disconnects, combiner boxes, inverters or any
other part of the System, Title shall transfer to the Buyer provided all dues have been cleared, and the notwithstanding any other
clause the Buyer shall bear Risk of Loss or damage to such parts from any type of physical harm, theft, or any other damage not
directly resulting from the actions of the Contractor.

Termination and Default


Contractor may terminate this Agreement for any breach of this Agreement, material or non-material, for any failure of Buyer to
agree to an appropriate change order, for any failure of the Buyer to pay the Contractor any amount due, for any bankruptcy or
financial distress of Buyer, or for any hindrance to Contractor in the installation process.

Privacy/Publicity
Buyer grants Contractor full rights and permission to publicly use, display, share, and advertise the photographic images, System
details, price and any other non-personally identi1iing information of the Buyer’s System. Contractor shall not knowingly release any
personal data about Buyer or besides the above, any data associating Buyer with the System Site. The Buyer shall have the right to
opt-out of these publicity rights by communicating such wishes with the Contractor in writing.

Restocking Fee
This contract cannot be cancelled once physical work of installing the Solar PV system starts on the house. Due to certain
circumstances, the company in good faith might agree to cancel the contract before physical work starts on the job. In that case all
equipment as part of the install, will be subject to 20% restocking fee. The company will also charge for any work performed by the
company for that specific job.

Prepared By Engr. Mubashir Bashier


WhatsApp : +923045313414