Alpine Waterproofing Company has provided a quotation for waterproofing work for a temple project. The work includes dismantling old waterproofing treatment, applying acrylic-based waterproofing coating to the terrace slab, and providing a screeding waterproofing layer over the RCC roof with cement mortar mixed with waterproofing chemicals. The company guarantees the work for 10 years. Electricity and water will be provided by the client. GST of 18% will be charged extra on the work done value.

Uploaded by

Anjan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
398 views

Quotation For Anjan Kumar Sir (Temple Project)

Alpine Waterproofing Company has provided a quotation for waterproofing work for a temple project. The work includes dismantling old waterproofing treatment, applying acrylic-based waterproofing coating to the terrace slab, and providing a screeding waterproofing layer over the RCC roof with cement mortar mixed with waterproofing chemicals. The company guarantees the work for 10 years. Electricity and water will be provided by the client. GST of 18% will be charged extra on the work done value.

Uploaded by

Anjan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

ALPINE WATERPROOFING COMPANY

CONSULTANT & CONTRACTOR


To, Date : 18/02/2023
Mr. Anjan Kumar Sir
#766, 1st Floor, 1st Main Road, 2nd Phase
7th Block, BSK Road 3rd Stage,
Bangalore, 560085
Project : Temple
SUB : QUOTATION FOR WATERPROOFING WORK FOR TEMPLE PROJECT

SI. BOQ AMOUNT


DESCRIPTION OF THE WORK UNIT QUANTITY RATE
NO CODE IN FIGURES

1 Terrace Waterproofing work


Dismantling Old method Treatment: Dismantling old waterproofing
treatment, old method with chipper machine and manually removing the
A debris from site, carting away the same and disposing the same without
damaging the base slab as per site conditions and as per the instructions
of Engineer in charge. SFT. 0.00 25.00 0.00

Acrylic Based Water proofing Treatment for terrace slab :- Clean the
surface thoroughly. Remove all dust, foreign matters, oil, loose materials
or any deposits of contamination on the surface. Pre-wet the concrete
surface thoroughly prior to the application.(MYK Multicrete/ SIKA
RAINTITE/ approved Chemical Mix with water in the ratio of 1:2, 1ltr
Chemical : 2kg Cement ) . Coat the surface evenly with the admixture
using a brush. Allow the coating to dry for at least 2 hours and apply a
B
second coat the same way as the first coating by filling honey combs &
treating the construction joints, coving (hanching vata) cracks, pressure
grouting by fixing nozzles 1mtr interval, center to center with Fosroc
Randroc, conbextra Gp2, Cebex 100/ If wherever required etc complete as
per the site conditions and as per the instructions of Engineer in charge.
Waterproofing Coating should be done upto 300mm on the Side walls.
(Actual Measurment will be taken)

PART-02 Terrace Screeding Waterproofing : Providing and laying screed


concrete on the RCC roof surface with cleaning the surface properly.
Spreading cement slurry over the R.C.C. slab and laying avg. 50mm thick
of concrete mixed with waterproofing chemical compound of cement
mortar (1:4), including (Fosroc conplast x4211c/ Sika-sim admixture
approved chemicals). Fosroc conplast integral waterproofing admixture @
C 100 ml per bag of cement laid to required gradient to have easy flow of
water and top finished with joint less waterproofing plaster finished with
smooth wooden trowels with marking of 300*300mm square finishing .
The vertical surface of the adjoining walls should be treated upto a height
of 300mm including rounding of junctions of walls and slabs (Coving ). As
per the site conditions as per the instructions of Engineer in charge.
(Actual Measurment will be taken)
SFT. 0.00 85.00 0.00
TOTAL COST 0.00
NOTE:-
1) Rate including with Materials, Sand, Cement, Jalli, chemicals and labours Only.
2) Electricity, Water, Labour Shed, would be provided by Client.
3) GST Tax 18% extra on work done value.
4) Works Guarantee for 10 (Ten) Years.
Thanking you,
Regards:
ALPINE WATERPROOFING COMPANY.
Mr. Khalid Gour : 9845651100
GSTIN NO: 29ARXPG1936D1ZI
PAN NO: ARXPG1936D
ALPINE WATERPROOFING COMPANY
CONSULTANT & CONTRACTOR
To,
Mr. Anjan Kumar Sir
#766, 1st Floor, 1st Main Road, 2nd Phase
7th Block, BSK Road 3rd Stage,
Bangalore, 560085
Project : Temple
SUB : QUOTATION FOR WATERPROOFING WORK FOR TEMPLE PROJECT

SI. BOQ
DESCRIPTION OF THE WORK
NO CODE

1 Terrace Waterproofing work


Dismantling Old method Treatment: Dismantling old waterproofing
treatment, old method with chipper machine and manually removing the
A debris from site, carting away the same and disposing the same without
damaging the base slab as per site conditions and as per the instructions of
Engineer in charge.

Acrylic Based Water proofing Treatment for terrace slab :- Clean the
surface thoroughly. Remove all dust, foreign matters, oil, loose materials or
any deposits of contamination on the surface. Pre-wet the concrete surface
thoroughly prior to the application.(MYK Multicrete/ SIKA RAINTITE/
approved Chemical Mix with water in the ratio of 1:2, 1ltr Chemical : 2kg
Cement ) . Coat the surface evenly with the admixture using a brush. Allow
B the coating to dry for at least 2 hours and apply a second coat the same
way as the first coating by filling honey combs & treating the construction
joints, coving (hanching vata) cracks, pressure grouting by fixing nozzles
1mtr interval, center to center with Fosroc Randroc, conbextra Gp2, Cebex
100/ If wherever required etc complete as per the site conditions and as
per the instructions of Engineer in charge. Waterproofing Coating should be
done upto 300mm on the Side walls. (Actual Measurment will be taken)
PART-02 Terrace Screeding Waterproofing : Providing and laying screed
concrete on the RCC roof surface with cleaning the surface properly.
Spreading cement slurry over the R.C.C. slab and laying avg. 50mm thick of
concrete mixed with waterproofing chemical compound of cement mortar
(1:4), including (Fosroc conplast x4211c/ Sika-sim admixture approved
chemicals). Fosroc conplast integral waterproofing admixture @ 100 ml per
C bag of cement laid to required gradient to have easy flow of water and top
finished with joint less waterproofing plaster finished with smooth wooden
trowels with marking of 300*300mm square finishing . The vertical surface
of the adjoining walls should be treated upto a height of 300mm including
rounding of junctions of walls and slabs (Coving ). As per the site conditions
as per the instructions of Engineer in charge. (Actual Measurment will be
taken)

TOTAL COST
NOTE:-
1) Rate including with chemicals and labours Only.
2) Electricity, Water, Labour Shed, would be provided by Client.
3) GST Tax 18% extra on work done value.
4) Works Guarantee for 10 (Ten) Years.
Thanking you,
Regards:
ALPINE WATERPROOFING COMPANY.
Mr. Khalid Gour : 9845651100
GSTIN NO: 29ARXPG1936D1ZI
PAN NO: ARXPG1936D
Date : 18/02/2023

TEMPLE PROJECT

AMOUNT
UNIT QUANTITY RATE
IN FIGURES

SFT. 0.00 25.00 0.00


SFT. 0.00 45.00 0.00
0.00