0% found this document useful (0 votes)
82 views32 pages

Structural Analysis 1 MS WORD

This document provides a structural design analysis computation sheet for a proposed 2-story residential building in Brgy. Napandong Nueva Valencia Guimaras. It includes design criteria for materials like concrete and steel. It analyzes the design of steel rafters that will have a span of 7.7m and be spaced 3m apart. It also analyzes the design of a roof beam that will have a span of 4.18m and carry a total load of 9702N.

Uploaded by

Jayson Pagal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views32 pages

Structural Analysis 1 MS WORD

This document provides a structural design analysis computation sheet for a proposed 2-story residential building in Brgy. Napandong Nueva Valencia Guimaras. It includes design criteria for materials like concrete and steel. It analyzes the design of steel rafters that will have a span of 7.7m and be spaced 3m apart. It also analyzes the design of a roof beam that will have a span of 4.18m and carry a total load of 9702N.

Uploaded by

Jayson Pagal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 32

STRUCTURAL DESIGN ANALYSIS COMPUTATION SHEET:

DESCRIPTION : STRUCTURAL DESIGN ANALYSIS OF RESIDENTIAL BUILDING

PROJECT : PROPOSED 2-STOREY RESIDENTIAL BUILDING

OWNER : JONAS GALIMBA

LOCATION : BRGY. NAPANDONG NUEVA VALENCIA GUIMARAS

* STRUCTURAL DESIGN CRITERIA


6

Fs = 18000 psi = 124x10 Pa

Fc' = 2500 psi = 17.27x10 Pa

Fc = 1125 psi = 7.77x10 Pa

n = 10

j = 0.871

k = 190 psi = 1.30x10

Vc = 40 psi = 0.276x10 Pa, for slabs

= 50 psi = 0.346x10 Pa, for beams & girders

= 70 psi = 0.484x10 Pa, for footings

u = 120 psi = 0.829x10 Pa, for slabs & beams

= 146 psi = 1.009x10 Pa, for footings

= 16000 psi = 110.50x10 Pa, for stirrups

wt. of concrete = 150 pcf = 23603 N/cu. m.

For Laua-an

Fb = 1400 psi = 9.67x10 Pa,extreme fiber stress

Fv = 100 psi = 0.69x10 Pa, shear paralllel to

the grain

Fc = 1000 psi = 6.91x10 Pa,compression parallel

to the grain
* DESIGN OF STEEL RAFTERS
SPAN = 7.70 m.

spacing = 3.00 m.

tributary area = 23.10 sq.m

DL + LL = 960 Pa = 20 PSF

try 1 - 1.2 x 50 x 50 mm L BAR

As = 0.00011856 sq. m. As = 0.00011856 sq. m. At = 0.00023712 sq. m.

_ 0.00011856 x 0.2

y = ------------------------------ ----------------- ------------------------- = 0.1000 m.

0.00023712

2 2

I = 0.00011856 x 0.1000 + 0.00011856 x

= 1.18598E-06 m.

w = 3.00 x 7.70 x 960

= 22176 N

22176 x 7.70

M = ------------------------------ ----------------- ------------------------- --------------

= 21344.4 N-m.

21344.4 x 0.1000

max fb = ------------------------------ ----------------- ------------------------- = 1799732679 Pa

1.18598E-06

1799.73 MPa < 124.3 MPa

try 1 1.2 x 35.5 x 35.5 MM L BAR MEMBERS

3.1416 x 0.001

__________________ ------------------------- -------------- -------------------

I 64

r= ------------------------------ = ------------------------- -------------- ------------------- = 0.282

A 3.1416 2

------------------------- x 0.001

L 0.177

-------------- = ------------------------------ = 0.627449397 < 120

r 0.282094462

Summary of RAFTERS

1 - 1.2 x 50 x 50 mm L BAR

members - 1 1.2 x 35.5 x 35.5 MM L BAR MEMBERS


* DESIGN OF ROOF BEAM (RB)
span = 4.18 m

area carried = 3.90 sq m

LL = 1919 Pa 40 psf 1 psf = 47.98

wt. of LL = 3.90 x 1919 = 7485 N

wt.of concrete = 23603 Pa

total load w = 7485 N

wL 7485 x 4.18

M = ------------------------------ = ------------------------- -------------- ------------------- = 2604

12 12

assume b = 0.15 m

------------------------------ ------------------------- -------------- -------------------

M 2604

d = ------------------------------ = ------------------------- -------------- -------------------

Rb 1300000 x 0.15

= 0.12 m add 0.05 m conc covering

total d = 0.17 m say 0.30 m

wt. of beam = 0.15 x 0.30 x 4.18 x 23603

= 4434 N

wL 4434 x 4.18

M = ------------------------------ = ------------------------- -------------- ------------------- = 1543

12 12

total M = 1543 + 2604 = 4147 N-m

------------------------------ ------------------------- -------------- -------------------

M 4147

check d = ------------------------------ = ------------------------- -------------- ------------------- = 0.15

Rb 1300000 x 0.15

= 0.15 m < 0.30 m

check for shearing stress

V = ------------------------------ x 4434 = 2217 N

total V = 2217 + 7485 = 9702 N

V 9702

v = ------------------------------ = ------------------------- -------------- ------------------- = 215602

bd 0.15 x 0.30

or v = 0.216 MPa > 0.346 MPa

no stirrups needed

v' = v - va = 0.216 - 0.346 = -0.130


let x = distance from support in which stirrups are required

Lv' 4.18 x -0.130

x = ------------------------------ = ------------------------- -------------- ------------------- = -1.263

2v 2x 0.216

spacing of stirrups

Av = twice the area of 10mm. 0 bar

= 2x 0.00007854 = 0.000157 sq m

Avfv 0.000157 x 110.50

S = ------------------------------ = ------------------------- -------------- ------------------- = -0.89

v'b -0.1304 x 0.15

max. spacing of stirrups is d/2

d/2 = 0.30 / 2= 0.15

use 9 mm. 0 bar stirrups 2 @ 0.05, 4 @ 0.10,

6 @ 0.15 rest @ 0.20 o.c.

steel bars requirement

M 4147

As = ------------------------------ = ------------------------- -------------- ------------------- ------------------ ---------------------

fsjd 124000000 x 0.871 x 0.30

= 0.000128 sq m

use - 12 mm = 0.012 m As = 0.000113

no. of bars = 1.13 pcs say 4 - 12

4x 0.000113098 = 0.000452 sq m

0.000452 > 0.000128 sq m

check for bond stress

Eo = 3.1416 x 4x 0.012 = 0.150797

u = ------------------------------

Eojd

9702

= ------------------------------ ----------------- ------------------------- -------------- ------------------- = 246226

0.150797 x 0.871 x 0.30

= 0.25 MPa < 17.27 Mpa

Summary of (RB)

b = 0.15 m

total d = 0.30 m

reinforcement = 4 pcs. - 12 mm 0 rebar

stirrups = 10 mm. 0 bar stirrups 2 @ 0.05, 4 @ 0.10,

6 @ 0.15 rest @ 0.20 o.c.


* DESIGN OF FLOOR SLAB (FS1) short span S = 3.00 m long span
L = 4.18 m
L 4.18
-= ---------------------------- = 1.39 > 1.5
S 3.00
two way slab
2 (ls + ss)
min. t= ---------------------------- ----------------
180
2 ( 3.00 + 4.18 )
= ---------------------------- ---------------- ----------------------- ------------- ------------------ -----------------
180
= 0.079722222 m say 0.125 m wt. of slab = 1.00 x 1.00 x 0.125 x 23603
= 2950 N wt. of LL = 2399 N = 50 psf
total load w= 5349 N
wL 5349 x 3.00
M= ---- = ----------------------- ------------- ------------------ = 6018
8 8
b= 1.00 m
---------------------------- ----------------------- ------------- ------------------
M 6018
req'd d= ---- = ----------------------- ------------- ------------------ = 0.068
Rb 1300000 x 1.00
= 0.068 m
supplied d= 0.125 - 0.025 = 0.100 > 0.068
Check for shear
1 ( 5349 x 3.00 )
V= ---------------------------- ---------------- ----------------------- ------------- ------------------ = 8024 2
8024
v= ---------------------------- ---------------- ----------------------- = 80240.625 Pa
1.00 ( 0.100 ) or = 0.080 MPa < .276 MPa SAFE
main reinforcement bars
steel requirement M 6018
As = ---- = ----------------------- ------------- ------------------ ----------------- ------------------ fsjd
124000000 x 0.871 x 0.100
= 0.000557206 m
use 12 mm.rebar = 0.012 m As = 0.000113098
1.00 x 0.000113098
spacing of bars = ---------------------------- ---------------- ----------------------- s= 0.202972716
0.000557206
max. spacing s= > 3 times t = 3x 0.13
= 0.38 m use s= 0.20 m
area of temp. bars
As = 0.002bt = 0.002 x 1.00 x 0.13
= 0.00025 sq m use 12 mm.rebar = 0.012 m As = 0.000113098
spacing of temp. bars
1.00 x 0.000113098
s= ---------------------------- ---------------- ----------------------- = 0.4523904 m
0.00025
max. spacing s= > 5 times t = 5x 0.13
= 0.63 m

use s= 0.20 m

Summary of Floor Slab (FS1)


slab thickness = 0.125 m main reinforcement = 12 mm @ 0.20 m o.c. temp. bars = 12 mm
@ 0.20 m o.c.
* DESIGN OF FLOOR SLAB (FS2)
short span S = 3.00 m long span L = 3.50 m
L 3.50
- = ---------------------------- = 1.17 < 1.5 two way slab
S 3.00
2 (ls + ss)
min. t = ---------------------------- ----------------
180
2 ( 3.00 + 3.50 )
= ---------------------------- ---------------- ----------------------- ------------- ------------------ -----------------
180

= 0.072222222 m t= 0.072 m

say 0.125 m

wt. of slab = 1.00 x 1.00 x 0.125 x 23603

= 2950 N

wt. of LL = 2879 N = 60 psf

total load w = 5829 N

ws = 5829 ( 1.17 - 0.5 )

= 3886 N/m

wl = 5829 - 3886 = 1943 N/m

for SHORT SPAN

wL 3886 x 3.00

Ms = ---------------------------- = ----------------------- ------------- ------------------ = 4372

8 8

3886 x 3.00

Vs = ---------------------------- ---------------- ----------------------- = 5829 N-m

b = 1.00 m

---------------------------- ----------------------- ------------- ------------------

M 4372

req'd d = ---- = ----------------------- ------------- ------------------ = 0.058

Rb 1300000 x 1.00

supplied ds = 0.125 - 0.025 = 0.100 > 0.058

Check for shear

5829

v = ---------------------------- ---------------- ----------------------- = 58293.75 Pa

1.00 ( 0.100 )

= 0.058 MPa < .276 MPa

main reinforcement

steel requirement M 4372

As = ---- = ----------------------- ------------- ------------------ ----------------- -------------------

fsjd 124000000 x 0.871 x 0.100

= 0.000404803 sq m

5829

o = ---------------------------- ---------------- ----------------------- ------------- ------------------ = 0.081

829000 x 0.871 x 0.1

using 12 mm. bar = 0.012 m

Pi (D) 3.1416 x 0.012


area = ----- = ----------------------- ------------- ------------------

4 4

= 0.000113098 sq m

1.00 x 0.000113098

for area s = ---------------------------- ---------------- ----------------------- s= 0.279

0.000404803

0.037

for bond s = ---------------------------- x 1.00 = 0.458

0.080732669

max. spacing s = > 3 times t = 3x 0.10

= 0.30 m s= 0.300

use s = 0.30 m

for LONG SPAN

wL 1943 x 3.50

Ml = ---------------------------- = ----------------------- ------------- ------------------ = 2975

8 8

1943 x 3.50

Vl = ---------------------------- ---------------- ----------------------- = 3400 N-m

b = 1.00 m

---------------------------- ----------------------- ------------- ------------------

M 2975

req'd d = ---- = ----------------------- ------------- ------------------ = 0.048

Rb 1300000 x 1.00

supplied dl = 0.125 - 0.025 - 0.012 =

Check for shear 0.088 > 0.048

3400

v = ---------------------------- ---------------- ----------------------- = 38641.6903 Pa

1.00 ( 0.088 )

= 0.039 MPa < .276 MPa

main reinforcement

steel requirement M 2975

As = ---- = ----------------------- ------------- ------------------ ----------------- -------------------

fsjd 124000000 x 0.871 x 0.088

= 0.000313058 sq m

3400

o = ---------------------------- ---------------- ----------------------- ------------- ------------------ = 0.054


829000 x 0.871 x 0.088

using 12 mm. bar = 0.012 m

Pi (D) 3.1416 x 0.012

area = ----- = ----------------------- ------------- ------------------

4 4

= 0.000113098 sq m

1.00 x 0.000113098

for area s = ---------------------------- ---------------- ----------------------- s= 0.361

0.000313058

0.037

for bond s = ---------------------------- x 1.00 = 0.691

0.053515974

max. spacing s = > 3 times t = 3x 0.09

= 0.26 m s= 0.264

use s = 0.30 m

area of temp. bars

As = 0.002bt = 0.002 x 1.00 x 0.13

= 0.00025 sq m

use 10 mm 0 0.01 m

As = 0.00007854 sq m

spacing of temp. bars

max. spacing s = > 5 times t = 5 x 0 13

= 0.63 m

use s = 0.3Summary of Floor Slab (FS2) m

1.00 x 0.00007854

s = ---------------------------- ---------------- ----------------------- = 0.31416 m

0.00025

slab thickness = 0.125 m

main

reinforcement ls = 12 mm ɸ @ 0.30 m o.c.b.w.

ss = 12 mm ɸ @ 0.30 m o.c.b.w.

temp. bars = 12 mm ɸ @ 0.30 m o.c.b.w.

* DESIGN OF SECOND FLOOR BEAM (B1)


span = 3.50 m (maximum)

area carried = 5.25 sq m (max.)

LL = 2879 Pa 60 psf 1 psf = 47.98

wt. of LL = 5.25 x 2879 = 15114 N


wt.of concrete = 23603 Pa

wt of slab = 5.25 x 0.150 x 23603 = 18587

wt. of wall = 3.50 x 3.00 x 0.15 x 23603

= 37175 N

total load w = 70876 N

wL 70876 x 3.50

M = ------------------------------ = ------------------------- -------------- ------------------- = 31008

8 8

assume b = 0.20 m

------------------------------ ------------------------- -------------- -------------------

M 31008

d = ------------------------------ = ------------------------- -------------- -------------------

Rb 1300000 x 0.20

= 0.35 m add 0.05 m conc covering

total d = 0.40 m say 0.40 m

wt. of beam = 0.20 x 0.40 x 3.50 x 23603

= 6609 N

wL 6609 x 3.50

M = ------------------------------ = ------------------------- -------------- ------------------- = 2891

8 8

total M = 2891 + 31008 = 33900 N-m

------------------------------ ------------------------- -------------- -------------------

M 33900

check d = ------------------------------ = ------------------------- -------------- ------------------- = 0.36

Rb 1300000 x 0.20

= 0.36 m < 0.40 m

check for shearing stress

V = ------------------------------ x 6609 = 3304 N

total V = 3304 + 70876 = 74180 N

V 74180

v = ------------------------------ = ------------------------- -------------- ------------------- = 927253

bd 0.20 x 0.40

or v = 0.927 MPa > 0.346 MPa

stirrups needed

v' = v - va = 0.927 - 0.346 = 0.581

let x = distance from support in which stirrups are required


Lv' 3.5 x 0.581

x = ------------------------------ = ------------------------- -------------- ------------------- = 1.097

2v 2x 0.927

spacing of stirrups

Av = twice the area of 10mm. 0 bar

= 2x 0.00007854 = 0.000157 sq m

Avfv 0.000157 x 110.50

S = ------------------------------ = ------------------------- -------------- ------------------- = 0.15

v'b 0.5813 x 0.20

max. spacing of stirrups is d/2

d/2 = 0.40 / 2= 0.20

use 9 mm. 0 bar stirrups 2 @ 0.05, 4 @ 0.10,

rest @ 0.2 o.c.

steel bars requirement

M 33900

As = ------------------------------ = ------------------------- -------------- ------------------- ------------------ ---------------------

fsjd 124000000 x 0.871 x 0.40

= 0.000785 sq m

use - 16 mm = 0.016 m As = 0.000201

no. of bars = 3.90 pcs say 4 - 16

4x 0.000201062 = 0.000804 sq m

0.000804 > 0.000785 sq m

check for bond stress

Eo = 3.1416 x 4x 0.016 = 0.201062

u = ------------------------------

Eojd

74180

= ------------------------------ ----------------- ------------------------- -------------- ------------------- = 1058959

0.201062 x 0.871 x 0.40

= 1.06 MPa < 17.27 Mpa

Summary of (B1)

b = 0.20 m

total d = 0.40 m

reinforcement = 4 pcs. - 16 mm ɸ rebar

stirrups = 9 mm. ɸ bar stirrups 2 @ 0.05, 4 @ 0.10,

rest @ 0.20 O.C.

* DESIGN OF SECOND FLOOR BEAM (B2)


span = 3.00 m (maximum)
area carried = 6.25 sq m (max.)

LL = 2879 Pa 60 psf 1 psf = 47.98

wt. of LL = 6.25 x 2879 = 17993 N

wt.of concrete = 23603 Pa

wt of slab = 6.25 x 0.150 x 23603 = 22128

wt. of wall = 3.00 x 3.00 x 0.15 x 23603

= 31864 N

total load w = 71984 N

wL 71984 x 3.00

M = ------------------------------ = ------------------------- -------------- ------------------- = 26994

8 8

assume b = 0.20 m

------------------------------ ------------------------- -------------- -------------------

M 26994

d = ------------------------------ = ------------------------- -------------- -------------------

Rb 1300000 x 0.20

= 0.32 m add 0.05 m conc covering

total d = 0.37 m say 0.40 m

wt. of beam = 0.20 x 0.40 x 3.00 x 23603

= 5665 N

wL 5665 x 3.00

M = ------------------------------ = ------------------------- -------------- ------------------- = 2124

8 8

total M = 2124 + 26994 = 29118 N-m

------------------------------ ------------------------- -------------- -------------------

M 29118

check d = ------------------------------ = ------------------------- -------------- ------------------- = 0.33

Rb 1300000 x 0.20

= 0.33 m < 0.40 m

check for shearing stress

V = ------------------------------ x 5665 = 2832 N

total V = 2832 + 71984 = 74817 N

V 74817

v = ------------------------------ = ------------------------- -------------- ------------------- = 935209

bd 0.20 x 0.40

or v = 0.935 MPa > 0.346 MPa


stirrups needed

v' = v - va = 0.935 - 0.346 = 0.589

let x = distance from support in which stirrups are required

Lv' 3x 0.589

x = ------------------------------ = ------------------------- -------------- ------------------- = 0.945

2v 2x 0.935

spacing of stirrups

Av = twice the area of 10mm. ɸ bar

= 2x 0.00007854 = 0.000157 sq m

Avfv 0.000157 x 110.50

S = ------------------------------ = ------------------------- -------------- ------------------- = 0.15

v'b 0.5892 x 0.20

max. spacing of stirrups is d/2

d/2 = 0.40 / 2= 0.20

use 9 mm. ɸ bar stirrups 2 @ 0.05, 4 @ 0.10,

rest @ 0.2 o.c.

steel bars requirement

M 29118

As = ------------------------------ = ------------------------- -------------- ------------------- ------------------ ---------------------

fsjd 124000000 x 0.871 x 0.40

= 0.000674 sq m p

use - 16 mm = 0.016 m As = 0.000201

no. of bars = 3.35 pcs say 4 - 16

4x 0.000201062 = 0.000804 sq m

0.000804 > 0.000674 sq m

check for bond stress

Eo = 3.1416 x 4x 0.016 = 0.201062

u = ------------------------------

Eojd

74817

= ------------------------------ ----------------- ------------------------- -------------- ------------------- = 1068045

0.201062 x 0.871 x 0.40

= 1.07 MPa < 17.27 Mpa

Summary of (B2)

b = 0.20 m

total d = 0.40 m

reinforcement = 4 pcs. - 16 mm ɸ rebar


stirrups = 9 mm. ɸ bar stirrups 2 @ 0.05, 4 @ 0.10,

rest @ 0.20 O.C.

* DESIGN OF SECOND FLOOR BEAM (B3)


span = 4.18 m (maximum)

area carried = 6.26 sq m (max.)

LL = 2879 Pa 60 psf 1 psf = 47.98

wt. of LL = 6.26 x 2879 = 18021 N

wt.of concrete = 23603 Pa

wt of slab = 6.26 x 0.150 x 23603 = 22163

wt. of wall = 4.18 x 3.00 x 0.15 x 23603

= 44344 N

total load w = 84529 N

wL 84529 x 4.18

M = ------------------------------ = ------------------------- -------------- ------------------- = 44113

8 8

assume b = 0.30 m

------------------------------ ------------------------- -------------- -------------------

M 44113

d = ------------------------------ = ------------------------- -------------- -------------------

Rb 1300000 x 0.30

= 0.34 m add 0.05 m conc covering

total d = 0.39 m say 0.40 m

wt. of beam = 0.30 x 0.40 x 4.18 x 23603

= 11825 N

wL 11825 x 4.18

M = ------------------------------ = ------------------------- -------------- ------------------- = 6171

8 8

total M = 6171 + 44113 = 50285 N-m

------------------------------ ------------------------- -------------- -------------------

M 50285

check d = ------------------------------ = ------------------------- -------------- ------------------- = 0.36

Rb 1300000 x 0.30

= 0.36 m < 0.40 m

check for shearing stress

V = ------------------------------ x 11825 = 5913 N

total V = 5913 + 84529 = 90441 N

V 90441
v = ------------------------------ = ------------------------- -------------- ------------------- = 753677

bd 0.30 x 0.40

or v = 0.754 MPa > 0.346 MPa

stirrups needed

v' = v - va = 0.754 - 0.346 = 0.408

let x = distance from support in which stirrups are required

Lv' 4.175 x 0.408

x = ------------------------------ = ------------------------- -------------- ------------------- = 1.129

2v 2x 0.754

spacing of stirrups

Av = twice the area of 10mm. ɸ bar

= 2x 0.00007854 = 0.000157 sq m

Avfv 0.000157 x 110.50

S = ------------------------------ = ------------------------- -------------- ------------------- = 0.14

v'b 0.4077 x 0.30

max. spacing of stirrups is d/2

d/2 = 0.40 / 2= 0.20

use 9 mm. ɸ bar stirrups 2 @ 0.05, 4 @ 0.10,

rest @ 0.2 o.c.


=
steel bars requirement
M 50285

As ------------------------------ = ------------------------- -------------- ------------------- ------------------ ---------------------

fsjd 124000000 x 0.871 x

= 0.001164 sq m p

use - 16 mm = 0.016 m As =

no. of bars = 5.79 pcs say 6 -

6x 0.000201062 = 0.001206 sq m

0.001206 > 0.001164 sq m

check for bond stress

Eo = 3.1416 x 6x 0.016 =

u = ------------------------------

Eojd

90441

= ------------------------------ ----------------- ------------------------- -------------- ------------------- =

0.301594 x 0.871 x 0.40

= 0.86 MPa < 17.27 Mpa

Summary of (B3)

b = 0.30 m

total d = 0.40 m

reinforcement = 6 pcs. - 16 mm 0 rebar

stirrups = 9 mm. ɸ bar stirrups 2 @ 0.05, 4 @ 0.10,

rest @ 0.20 O.C.

* DESIGN OF SECOND FLOOR BEAM (B4)


span = 3.00 m (maximum)

area carried = 11.51 sq m (max.)

LL = 2879 Pa 60 psf 1 psf =

wt. of LL = 11.51 x 2879 = 33135 N

wt.of concrete = 23603 Pa

wt of slab = 11.51 x 0.150 x 23603 =

wt. of wall = 3.00 x 1.00 x 0.05 x

= 3540 N

total load w = 77426 N

wL 77426 x 3.00

M = ------------------------------ = ------------------------- -------------- ------------------- =

8 8

assume b = 0.20 m

------------------------------ ------------------------- -------------- -------------------

x
=

=
M 29035

d = ------------------------------ = ------------------------- -------------- -------------------

Rb 1300000 x 0.20

= 0.33 m add 0.05 m conc covering

total d = 0.38 m say 0.40 m

wt. of beam = 0.20 x 0.40 x 3.00 x

= 5665 N

wL 5665 x 3.00

M = ------------------------------ = ------------------------- -------------- ------------------- =

8 8

total M = 2124 + 29035 = 31159 N-m

------------------------------ ------------------------- -------------- -------------------

M 31159

check d = ------------------------------ = ------------------------- -------------- ------------------- =

Rb 1300000 x 0.20

= 0.35 m < 0.40 m

check for shearing stress

V = ------------------------------ x 5665 = 2832 N

total V = 2832 + 77426 = 80258 N

V 80258

v = ------------------------------ = ------------------------- -------------- ------------------- =

bd 0.20 0.40

or v 1.003 MPa > 0.346 MPa

stirrups needed

v' v - va = 1.003 - 0.346 =

let x = distance from support in which stirrups are required

Lv' 3x 0.657

x = ------------------------------ = ------------------------- -------------- ------------------- =

2v 2x 1.003

spacing of stirrups

Av = twice the area of 10mm. 0 bar

= 2x 0.00007854 = 0.000157 sq m

Avfv 0.000157 x 110.50

S = ------------------------------ = ------------------------- -------------- ------------------- =

v'b 0.6572 x 0.20


x
=

=
max. spacing of stirrups is d/2

d/2 = 0.40 / 2=

use 9 mm. 0 bar stirrups 2 @ 0.05, 4 @ 0.10,

rest @ 0.2 o.c.

steel bars requirement

M 31159

As = ------------------------------ = ------------------------- -------------- ------------------- ------------------ ---------------------

fsjd 124000000 x 0.871 x

= 0.000721 sq m

use - 16 mm = 0.016 m As =

no. of bars = 3.59 pcs say 4 -

4x 0.000201062 = 0.000804 sq m

0.000804 > 0.000721 sq m

check for bond stress

Eo = 3.1416 x 4x 0.016 =

u = ------------------------------

Eojd

80258

= ------------------------------ ----------------- ------------------------- -------------- ------------------- =

0.201062 x 0.871 x 0.40

= 1.15 MPa < 17.27 Mpa

Summary of (B4)

b = 0.20 m

total d = 0.40 m

reinforcement = 4 pcs. - 16 mm 0 rebar

stirrups = 9 mm. 0 bar stirrups 2 @ 0.05, 4 @ 0.10,

rest @ 0.20 O.C.

* DESIGN OF STAIR BEAM @ LANDING (SB)


span = 3.50 m (max.)

area carried = 2.50 sq m (max.)

LL = 2879 Pa = 60 psf 1 psf =

wt. of LL = 2.50 x 2879 = 7197 N

wt.of concrete = 23603 Pa

wt of slab = 2.50 x 0.150 x 23603 =

wt. of wall = 3.50 x 3.00 x 0.125 x

= 30979 N

x
=

=
total load w = 47027 N

wL 47027 x 3.50

M = ------------------------------ = ------------------------- -------------- ------------------- =

10 10

assume b = 0.20 m

------------------------------ ------------------------- -------------- -------------------

M 16459

d = ------------------------------ = ------------------------- -------------- -------------------

Rb 1300000 x 0.20

= 0.25 m add 0.05 m conc covering

total d = 0.30 m say 0.30 m

wt. of beam = 0.20 x 0.30 x 3.50 x

= 4957 N

wL 4957 3.50

M ------------------------------ = ------------------------- -------------- ------------------- =

10 10

total M 1735 + 16459 = 18194 N-m

------------------------------ ------------------------- -------------- -------------------

M 18194

check d = ------------------------------ = ------------------------- -------------- ------------------- =

Rb 1300000 x 0.20

= 0.26 m < 0.30 m

check for shearing stress

V = ------------------------------ x 4957 = 2478 N

total V = 2478 + 47027 = 49505 N

V 49505

v = ------------------------------ = ------------------------- -------------- ------------------- =

bd 0.20 x 0.30

or v = 0.825 MPa > 0.346 MPa

stirrups needed

v' = v - va = 0.825 - 0.346 =

let x = distance from support in which stirrups are required

Lv' 3.5 x 0.479

x = ------------------------------ = ------------------------- -------------- ------------------- =

2v 2x 0.825

x
=

=
spacing of stirrups

Av = twice the area of 10mm. ɸ bar

= 2x 0.00007854 = 0.000157 sq m

Avfv 0.000157 x 110.50

S = ------------------------------ = ------------------------- -------------- ------------------- =

v'b 0.4791 x 0.20

max. spacing of stirrups is d/2

d/2 = 0.30 / 2=

use 9 mm. ɸ bar stirrups 2 @ 0.05, 4 @ 0.10,

rest @ 0.15 o.c.

steel bars requirement

M 18194

As = ------------------------------ = ------------------------- -------------- ------------------- ------------------ ---------------------

fsjd 124000000 x 0.871 x

= 0.000562 sq m

use - 16 mm = 0.016 m As =

no. of bars = 2.79 pcs say 3 -

3x 0.000201062 = 0.000603 sq m

0.000603 > 0.000562 sq m

check for bond stress

Eo = 3.1416 x 3x 0.016 =

u = ------------------------------

Eojd

49505

= ------------------------------ ----------------- ------------------------- -------------- ------------------- =

0.150797 x 0.871 x 0.30

= 1.26 MPa < 17.27 Mpa

Summary of (SB)

b = 0.20 m

total d = 0.30 m

reinforcement = 3 pcs. - 16 mm ɸ rebar

stirrups = 9 mm. 0 bar stirrups 2 @ 0.05, 4 @ 0.10,

rest @ 0.20 O.C.

*DESIGN OF SECOND FLOOR GIRDER (G1)

span = 5.33 m

area carried = 15.90 sq m

x
=

=
wt. of LL = 15.90 x 2879 = 45776 N

wt.of concrete = 23603 Pa

wt of slab = 15.90 x 0.15 x 23603 =

wt. of wall = 5.33 x 3.00 x 0.125 x

= 47132 N

wt of beam = 4.00 x 0.25 0.30 x

x
=

7081 N

total load w= 156282 N

156282

load/meter = ------------------------------ = 29349 N/m

5.33

concentrated load @ 2.50 m from left (B4) =

2.83 x 77426 29349 x

R1 = ------------------------------ ----------------- ------------------------- + ------------------- ------------------ ---------------------

5.33 2

= 119217 N

2.50 x 77426 29349 x

R2 = ------------------------------ ----------------- ------------------------- + ------------------- ------------------ ---------------------

5.33 2

= 114491 N

M= 119217 x 2.50 - 29349 x

2.50

---------------------

= 206327 N-m

Mmax = ------------------------------ x 206327 = 165062 N-m

10

Vmax = 119217 N

assume b= 0.35 m

------------------------------ ------------------------- -------------- -------------------

M 165062

d= ------------------------------ = ------------------------- -------------- -------------------

Rb 1300000 x 0.35

= 0.60 m add 0.05 m conc covering

d= 0.65 m say 0.65 m

wt. of beam = 0.35 x 0.65 x 5.33 x

= 28594 N

wL 28594 x 5.33

M= ------------------------------ = ------------------------- -------------- ------------------- =

10 10

total M= 15226 + 165062

= 180288 N-m

------------------------------ ------------------------- -------------- -------------------


M 180288

check d= ------------------------------ = ------------------------- -------------- ------------------- =

Rb 1300000 x 0.35

0.63 m < 0.65 m

check for shearing stress

V= ------------------------------ x 28594 = 14297 N

total V= 14297 + 119217 = 133514 N

V 133514

v= ------------------------------ = ------------------------- -------------- ------------------- =

bd 0.35 x 0.65

or v= 0.5869 MPa > 0.346 MPa

stirrups needed

v' = v - va = 0.5869 - 0.346 =

let x = distance from support in which stirrups are required

Lv' 5.325 x 0.2409

x = ------------------------------ = ------------------------- -------------- ------------------- =

2v 2x 0.5869

spacing of stirrups

Av = twice the area of 10mm. 0 bar

= 2x 0.00007854 = 0.00015708 sq m

Avfv 0.000157 x 110.50

S= ------------------------------ = ------------------------- -------------- ------------------- =

v'b 0.2409 x 0.35

max. spacing of stirrups is d/2

d/2 = 0.65 / 2=

use 9 mm. 0 bar stirrups 2 @ 0.05, 4 @ 0.10,

6 @ 0.15, rest @ 0.20m o.c.

steel bars requirement

M 180288

As = ------------------------------ = ------------------------- -------------- ------------------- ------------------ ---------------------

fsjd 124000000 x 0.871 x

= 0.002568 sq m

use - 16 mm = 0.016 m As = 0.000201062

no. of bars = 12.77270136 pcs say 13 - 16

13 x 0.000201062 = 0.0026138 sq m

0.002613811 > 0.002568 sq m


check for bond stress

Eo = 3.1416 x 13 x 0.016 =

u= ------------------------------

Eojd

133514

= ------------------------------ ----------------- ------------------------- -------------- ------------------- =

0.6534528 x 0.871 x 0.65

= 0.36 MPa < 17.27 Mpa

Summary of (G1)

b= 0.35 m

total d= 0.65 m

reinforcement = 13 pcs. - 16 mm 0 rebar

use 9 mm. 0 bar stirrups 2 @ 0.05, 4 @ 0.10,

6 @ 0.15, rest @ 0.20m o.c.

* DESIGN OF CANTILEVER BEAM (CB1)


span = 1.33 m

for uniformly distributed load

area carried = 2.00 sq m

live load (LL) = 2879 Pa

wt. of LL = 2x 2879 = 5758 N

wt.of concrete = 23603 Pa

wt. of wall = 1.33 x 1.75 x 0.125 x

= 6841 N

w = 12599 N

for concentrated load

area carried = 0.13 sq m

live load (LL) = 2879 Pa

wt. of LL = 0.125 x 2879 = 360 N

wt.of concrete = 23603 Pa

wt. of slab = 0.125 x 0.125 x 23603 =

wt. of beam = 1.33 x 0.15 x 0.50 x

= 2354 N

wt. of wall = 1.33 x 2.80 x 0.125 x

= 10987 N

w = 14070 N

1.33

Mmax = 12599 x ------------------------- + 14070 x

2
= 39302 N-m

assume b = 0.25 m

------------------------------ ------------------------- -------------- -------------------

M 39302

d = ------------------------------ = ------------------------- -------------- -------------------

Rb 1300000 x 0.25

= 0.35 m add 0.10 m

total d = 0.60 m

wt. of beam = 0.25 x 0.60 x 1.33 x

= 4691 N

1.33

Mmax = ------------------------------ x 4691 = 3108 N-m

total M = 3108 + 39302 = 42409 N-m

------------------------------ ------------------------- -------------- -------------------

M 42409

check d = ------------------------------ = ------------------------- -------------- ------------------- = 0.361234627

Rb 1300000 x 0.25

= 0.36 m < 0.40

check for shearing stress

total V = 12599 + 14070 + 4691 =

V 31361

v = ------------------------------ = ------------------------- -------------- ------------------- =

bd 0.25 x 0.60

or v = 0.209 MPa > 0.346 MPa

no stirrups needed

use 10 mm. 0 bar stirrups 2 @ 0.05, 4 @ 0.10,

6 @ 0.15, rest @ 0.20m o.c.

steel bars requirement


M 42409

As = ------------------------------ = ------------------------- -------------- ------------------- ------------------ ---------------------

fsjd 124000000 x 0.871 x

= 0.000654 sq m

use - 16 mm 0.016 m As = 0.000201062

no. of bars = 3.254918782 pcs say 4 -

4x 0.000201062 = 0.0008042 sq m

0.00080425 > 0.000654 sq m

use - 4 - 16 mm 0 rebar

check for bond stress

Eo = 3.1416 x 4x 0.016 =
V

u = ------------------------------

Eojd

31361

= ------------------------------ ----------------- ------------------------- -------------- ------------------- =

0.2010624 x 0.871 x 0.60

= 298458 Pa or

0.30 MPa < 17.27 Mpa

Summary of (CB1)

b = 0.25 m

total d = 0.40 m

reinforcement = 16 mm. 0 4 pcs

use 9 mm. 0 bar stirrups 2 @ 0.05, 4 @ 0.10,

6 @ 0.15, rest @ 0.20m o.c.

* DESIGN OF COLUMN C1
computation of column load (maximum)

wt of concrete = 23603 Pa

area carried = 1.75 x 1.50 = 2.63 sq m

a. roofing

wt. of beams = 0.20 x 0.40 x 3.25 x

= 6137 N

wt. of LL = 1440 x 2.63 = 3780 N

total weight = 9917 N

column load = 9917 N

try 0.25 x 0.30 m col. w/

4 - 16 mm. ɸ rebar

safe load P = 0.85Ag(0.25fc'+fspg)

Ag = 0.25 x 0.30 = 0.075 sq m

no. of bars = 4 - 16 mm.ɸ

As = 0.016 m 16 mm.ɸ = 0.000201062

Ast = 4x 0.000201062 = 0.00080425 sq m

Astotal = 0.00080425 sq m

Astotal 0.00080425

Pg = ------------------------------ = ------------------------- = 0.011

Ag 0.075

= 0.011 > 0.01

wt. of column = 10.00 x 0.25 x 0.30 x

= 17702 N

total col. load = 9917 + 17702 = 27619 N


safe P = 0.85Ag(0.25F'c+FsPg)

.25F'c = 0.25 x 17270000 = 4317500

FsPg = 124000000 x 0.011 = 1329693

P = 0.85 x 0.075 ( 4317500 +

= 360009 N > 27619 N

lateral ties spacing a.) s = > 16 "(bar diameter")

= 16 x 0.016 = 0.26 m b.) s = > 48 (tie diameter)

= 48 x 0.01 = 0.48 m c.) s = least col. dimension = 0.25 m

use 10 mm. ɸ bar ties 1 @ .05, 4 @ 0.10, rest @ 0.20 o.c.

Summary of C1

column dimension = 0.25 x 0.30 m

reinforcement = 4 - 16 mm. 0 bar

use 10 mm. 0 bar ties 1 @ .05, 4 @ 0.10, rest @ 0.20 o.c.

* DESIGN OF COLUMN C2
computation of column load (maximum)

wt of concrete = 23603 Pa

area carried = 3.00 x 3.83 = 11.49 sq m a. roofing

wt. of beams = 0.35 x 0.65 x 3.84 x

= 20620 N

wt. of LL = 1440 x 11.49 = 16546 N

total weight = 37165 N

column load = 37165 N

try 0.25 x 0.40 m col. w/

6 - 16 mm. ɸ rebar

safe load P = 0.85Ag(0.25fc'+fspg)

Ag = 0.25 x 0.40 = 0.1 sq m

no. of bars = 6 - 16 mm.0

As = 0.016 m 16 mm.0 = 0.000201062

Ast = 6x 0.000201062 = 0.001206374 sq m

Astotal = 0.001206374 sq m

Astotal 0.001206374

Pg = ------------------------------ = ------------------------- = 0.012

Ag 0.1

= 0.012 > 0.01

wt. of column = 10.00 x 0.25 x 0.40 x

= 23603 N

total col. load = 37165 + 23603 = 60768 N

safe P = 0.85Ag(0.25F'c+FsPg)

.25F'c = 0.25 x 17270000 = 4317500


FsPg = 124000000 x 0.012 = 1495904

P = 0.85 x 0.1 ( 4317500 +

= 494139 N > 60768 N

lateral ties spacing a.) s = > 16 "(bar diameter")

= 16 x 0.016 = 0.26 m b.) s = > 48 (tie diameter)

= 48 x 0.01 = 0.48 m c.) s = least col. dimension = 0.25 m

use 10 mm. 0 bar ties 1 @ .05, 4 @ 0.10, rest @ 0.20 o.c.

Summary of C2

column dimension = 0.25 x 0.40 m

reinforcement = 6 - 16 mm. 0 bar

use 10 mm. 0 bar ties 1 @ .05, 4 @ 0.10, rest @ 0.20 o.c.

* DESIGN OF FOOTING F1
column load P= 9917 N

Approx. wt. of footing = 8% of col. load

= 1.2 x 9917 = 11900 N

total load = P + 8%P

= 9917 + 9917 x 1.20 =

Total load 21817

required area = ------------------------------ ----------------- ------------------------- = ------------------- = 0.242410178

All. soil pressure 90000

= 0.24 m

A = L = 0.49 m say L =

col. load 9917

net upward soil pressure w = ------------------------- = ------------------- ------------------


---------------------

act. area 1.2 x

= 6887 Pa

column dimension = 0.25 x 0.40 m

M = w(x)L(x/2)

= 6887 x 0.48 x 1.20 x ---------------------

= 932 N-m

------------------------------ ------------------------- -------------- -------------------

M 932

d = ------------------------------ = ------------------------- -------------- -------------------

Rb 1300000 x 1.20

= 0.024 + 0.02 m concrete covering

total d = 0.044 m say 0.30 m

check for shear


one way shear

V = w(L)(y) = 6887 x 1.20 x

= 2479 N

V 2479

v = ____ = ------------------------- -------------- ------------------- =

bd 1.20 x 0.30

or v = 0.007 MPa < 0.484 MPa

punching shear

2 2

Vp = w(L -(c+d) )

= 6887 ( 1.20 - 0.25 +


0.30

= 7575 N

Ap = (c+d)d(4)

= 0.25 + 0.30 x 0.30 x

= 0.66

Vp 7575

vp = --- = ------------------------- = 11478 Pa

Ap 0.66

= 0.011 Pa < 0.484 MPa

steel requirement

M 932

Ast = ------------------------------ = ------------------------- -------------- ------------------- ------------------ ---------------------

fsjd 124000000 x 0.871 x

= 2.8773E-05 sq m

use - 12 mm = 0.012 m As = 0.000113098

no. of bars = 0.254408825 say 10 -

10 x 0.000113098 = 0.001130976 sq m

0.001130976 > 0.0000288 sq m

bond stress

V 2479

u = ------------------------------ = ------------------------- -------------- ------------------- ------------------ ---------------------

Eojd 0.376992 x 0.871 x

= 25167 m < ua= 3511583 m

wt. of footing = 1.20 x 1.20 x 0.30 x

= 10196 N < 11900 N

Summary of Footing F1

L = 1.20 x 1.20 m

total d = 0.30 m
reinforcement = 10 pcs - 12 mm ɸ o.c. spacing as shown

* DESIGN OF FOOTING F2
column load P= 37165 N

Approx. wt. of footing = 8% of col. load

= 1.2 x 37165 = 44598 N

total load = P + 8%P

= 37165 + 37165 x 1.20 =

Total load 81763

required area = ------------------------------ ----------------- ------------------------- = ------------------- = 0.908482197

All. soil pressure 90000

= 0.91 m

A = L = 0.95 m say L =

col. load 37165

net upward soil pressure w = ------------------------- = ------------------- ------------------


---------------------

act. area 1.2 x

= 25809 Pa

column dimension = 0.25 x 0.40 m

M = w(x)L(x/2)

= 25809 x 0.48 x 1.20 x ---------------------

= 3494 N-m

------------------------------ ------------------------- -------------- -------------------

M 3494

d = ------------------------------ = ------------------------- -------------- -------------------

Rb 1300000 x 1.20

= 0.047 + 0.02 m concrete covering

total d = 0.067 m say 0.30 m

check for shear

one way shear

V = w(L)(y) = 25809 x 1.20 x

= 9291 N

V 9291

v = ____ = ------------------------- -------------- ------------------- =

bd 1.20 x 0.30

or v = 0.026 MPa < 0.484 MPa

punching shear

2 2

Vp = w(L -(c+d) )
2

= 25809 ( 1.20 - 0.25 +


0.30

= 28390 N

Ap = (c+d)d(4)

= 0.25 + 0.30 x 0.30 x

= 0.66

Vp 28390

vp = --- = ------------------------- = 43015 Pa

Ap 0.66

= 0.043 Pa < 0.484 MPa

steel requirement

M 3494

Ast = ------------------------------ = ------------------------- -------------- ------------------- ------------------ ---------------------

fsjd 124000000 x 0.871 x

= 0.000107833 sq m

use - 12 mm = 0.012 m As = 0.000113098

no. of bars = 0.953449606 say 12 -

12 x 0.000113098 = 0.001357171 sq m

0.001357171 > 0.0001078 sq m

bond stress

V 9291

u = ------------------------------ = ------------------------- -------------- ------------------- ------------------ ---------------------

Eojd 0.4523904 x 0.871 x

= 78600 m < ua= 3511583 m

wt. of footing = 1.20 x 1.20 x 0.30 x

= 10196 N < 44598 N

Summary of Footing F2

L = 1.20 x 1.20 m

total d = 0.30 m

reinforcement = 12 pcs - 12 mm ɸ o.c. spacing as shown

* DESIGN OF CONCRETE STAIR


width S = 1.00 m

length L = 6.00 m

L 6.00

-= ------------------------------ = 6.00 > 1.5

S 1.00

one way slab

2 (ls + ss)
min. t= ------------------------------ -----------------

180

2 ( 1.00 + 6.00 )

= ------------------------------ ----------------- ------------------------- -------------- ------------------- ------------------

180

= 0.077777778 m say 0.15 m

Rise r = 0.20 m

Thread t = 0.25 m

No. of steps = 8 steps

LOADINGS

Wt. of steps = 8x 0.20 x 0.25 x

2 2

= 8x 0.10 x 0.13 x

= 0.1 x 23603

= 2360 N

wt. of stair slab / 1 meter strip = 1.00 x 6.00 x 0.15 x

= 21243 N

wt. of LL - Live Load = 4798 N = 100 psf

total load dead l w = 28401 N

wL 28401 x 1.00

M= ---- = ------------------------- -------------- ------------------- =

8 8

b= 1.00 m

------------------------------ ------------------------- -------------- -------------------

M 3550

req'd d= ---- = ------------------------- -------------- ------------------- =

Rb 1300000 x 1.00

= 0.052 m

supplied d= 0.150 - 0.025 = 0.125 >

Check for shear

1 ( 28401 x 1.00 )

V= ------------------------------ ----------------- ------------------------- -------------- ------------------- =

14201

v= ------------------------------ ----------------- ------------------------- = 113604 Pa

1.00 ( 0.125 )

or = 0.114 MPa < .276 MPa SAFE

main reinforcement bars

steel requirement M 3550


As = ---- = ------------------------- -------------- ------------------- ------------------ ---------------------

fsjd 124000000 x 0.871 x

= 0.000262962 m

use 16 mm.rebar = 0.016 m As = 0.000201062

1.00 x 0.000201062

spacing of bars = ------------------------------ ----------------- ------------------------- s= 0.764604889

0.000262962

max. spacing s= > 3 times t = 3x

= 0.45 m

use s= 0.15 m

area of temp. bars

As = 0.002bt = 0.002 x 1.00 x

= 0.0003 sq m

use 12 mm.rebar = 0.012 m As = 0.000113098

spacing of temp. bars

1.00 x 0.000113098

s= ------------------------------ ----------------- ------------------------- = 0.376992 m

0.0003

max. spacing s= > 5 times t = 5x

= 0.75 m

use s= 0.30 m

Summary of CONCRETE STAIR

slab thickness = 0.150 mm thk.

main reinforcement = 16 mm @ bars 0.15 m o.c. o.c.

temp. bars = 12 mm @ 0.30 m o.c. o.c.

Prepared by:

Engr. Leonel Ganuhay


PRC No. 0150111