BILL OF MATERIALS
A) EXCAVATION (LUMPSUM) ₱ 3000.00
B) MASONRY WORKS
600 pcs- 4” CHB @ 15/pc ₱ 9000.00
3 cu. m- SAND @ 1700/cu. m ₱ 5100.00
2 cu. m- GRAVEL @ 1750/cu. m ₱ 3500.00
F) ROOFING
________________
₱ 14,100.00
SUMMARY
__________________