From the early 1930’s to late 1950’s, associations of Since its registration, UAP has received many awards,
architects were founded, but only three survived until including the highly-acclaimed PRC’s Most Outstanding
the early 1970’s–the Association of Philippine Accredited Professional Organization. To date, it is still
Government Architects (APGA), League of the first and only APO to win the award four times in
Philippine Architects (LPA), and the Philippine the Award’s eighteen-year history. These were in years
Institute of Architects (PIA). In June 1973, President 2002, 2007 and 2008 and this year 2011. The award is
Ferdinand E. Marcos issued Presidential Decree 223, presented annually to recognize the achievements,
creating the Professional Regulation Commission (PRC) services and commitments of the APO to the profession.
regulating all professions and accrediting only one UAP bested forty two (42) other professional
organization to represent each profession. organizations, through 12 stringent criteria set for the
award.
The newly integrated organization of architects was
called the United Architects of the Philippines (UAP).
For its volunteer works, UAP was chosen in addressing architects. Dito sila nag umpisa yung Architect na term
housing problems, urban degradation, environmental 1563 in English Oxford Dictionary. First english man na
conservation and promotion of volunteerism for socio- tinawag na architect ay si John Shute mga duke ang
economic development; the UAP was a Regional client nya.
Nominee to the “Search for Outstanding Volunteers” by
the Philippine National Service Coordinating Agency Government bodies ng architecture pagdating sa pag
(PNVSCA) in its celebration of National Volunteer establish ng group may advantage kasi kapag individual
Month last December 2005. PNVSCA takes the lead in ay di papakinggan
advocating and recognizing the contributions of
volunteers to nation-building and international The establishment of architects’ governing bodies and
cooperation. institutes in other countries is outlined below:
Last April 2009, in celebration of the Earth Day, the Ireland: 1893 - Royal Institute of Architects of Ireland
UAP, through its advocacy group “Green Architecture
Movement”, was awarded the 2009 Father Neri Satur Holland: 1842 - Royal Institute of Dutch Architects
Award for Environmental Heroism – the only accredited (BNA)
professional organization in the Philippines to receive
such a prestigious environmental award. USA: 1857 - American Institute of Architects (AIA)
-American Institute of Architects need magbayad ng
Last November 2010, UAP received its First membership in dollar nasa around 6000+ kapag naka
International Award – in Adelaide, Australia, the full ang kanyang halaga ay 10K-11K it is annual
EAROPH 50th Golden Jubilee Award in recognition of membership.
the organization’s substantial contribution to the
advancement of Planning, Development and Poland: 1877 - reformed in 1899 - Union of Polish
Management of Human Settlements in the Philippines. Architects (SARP)
Malaysia: 1920 - Malaysian Institute of Architects Czech Republic: 1992 - Czech Chamber of Architects
(PAM)
Russia: 1992 - Union of Architects of Russia (UAR)
Brazil: Institute of Architects of Brazil (IAB)
While current EU regulations and various international
Australia: 1930 - The Australian Institute of Architects agreements, there are now also many other “umbrella”
organizations that interlink architects’ bodies
Spain: 1931 - Superior Council of Colleges of Architects
of Spain (CASCAE) NOTES:
Lebanon: 1934 - Order of Architects and Engineers Kapag ASEAN maraming process kailangang may
(OEA) specific na mga profect kung baga ay specialization nyo.
Example: Projects ay housing projects bale yun ang
France: 1940 - Validated in 1945 - Ile-de-France pinasok nya, may interview. Specialization na kailangan
Association of Architects, currently regulated under icontribute sa organization. May privileges like parang
1948 - International Union of Architects and regionally nasa priority lane.
governed under 1977 - Ordre Des Architectes
Education:
China: 1953 - Architectural Society of China Schools of Architecture
Hong Kong: 1956 - The Hong Kong Institute of The first major academic institutes for architecture as a
Architects profession are listed below:
Argentina: 1969 - reformed in 1988 - Argentina The École des Beaux Arts - Standard and curriculum
Federation of Organizations of Architects (FADEA) CHED ang nag set ng Standard and curriculum sa
Pilipinas.
Bangladesh: 1972 - Institute of Architects Bangladesh To improve the style of architecture and have a style
identity and better education sagustong magstudy
Pakistan: 1975 - The Institute of Architects, Pakistan magkaroon ng higher standard. Inaalam kung ano ang
(IAP) dapat ituro yung nagiging courses na nitetake ay kasama
sa board exam.
Belgium: 1977 - Conseil national de l’ordre des
architects
Sa mga accrediatation need na makapasa sa standard ng Post management services - mga ar na nagooffer or
curriculum na meron sila. nagiging employed, nakatayo na bldg pero
nangangailangan ng namamahala if maayos ang
Pagdating sa ating practice meron tayo dito sa Pilipinas pagcoconstruct ng structure, in house Ar. Para
na ginagawa para mas maenhance yung practice natin. magkaroon ng post const evaluation if the initial plan for
Di ibig sabihin na graduate ka na ay archi ka na. the bldg is in conformity of the actual performance, dun
Nagkaroon tayo ng registration para mas macontrol sa expectation sa kanya. SPP Doc. 205
yung nagpapractice ng profession. Para maiwasan yung
nagiging problema. Ar is the one who translates or nag iinterpret the idea,
the concept, the dreams of the client to make it into
Architect ay legit licensed ay pwedeng iconfirm dito reality
Spectrum of an Ar’s Services Offers if the owner needs help ng Ar, 8 hr monitoring of
the const. Since it is diff from our regular services
Conceived- pumasok/nabuo sa isipan ng ating client (through the degree of complexity of the proj) If the
owner required the Ar to do the full time management of
Conceived, perfected, transformed - dito na magistart the proj/const the Ar must be paid separately from its
yung work ng Ar kasi yung iniimagine ng client ay keri design services. If s/he wants a detailed design sa
nang iinterpret ng mga Ar (magiging realistic) interior ay diff case bale dapat ay mapaid separately. If
full time service ay dapat whole day sa site si Ar.
Our service is not just for the design or regular service
kung baga ang ginagawa natin ay tinatarget natin kung Const Management Services
paano mabibigyan ng maayos na structure si Client -dito babad at maayos dapat materials, if the const
manager ay dapat magreport sa client at dapat kasundo
Process ng translating abstract falls under sa pre design ni Ar. If ever the Ar will be the const manager ay mas
services SPP Doc 01, eto yung inoofer. Walang working matagal kasi Ar needs to greate the chart, critical
drawing but this is very important para malaman na thought method or CPM, need imonitor yun. Sa isang
feasible, yung di ganung magagastusan si client lalo na const services halimbawa malaki ang proj, the const
kung malakihan Example government, nagpapagawa ng manager must report directly to the client, the const
feasibility study para makapagpagawa ng structure o supervisor need to report to the const manager? Wala pa
makahingi ng pondo. Market study - market ability ng silang civil liab unless sila yung magsasign na Ar in
mga project example sa business proposal mahalaga sa charge of const. The responsibility ay kay client at Ar
mga client kasi dapat in accordance sa design yung const.
Post-Const Services
Complete and detailed docu - -compensated separately, minsan ang compe ay
percentage ng rental to make sure the bldg esp yung
Regular design Services SPP Doc. 02, const and erection rental spaces ay puno or masasabing full yung function
Project Docu, Sche Phase, Design Dev Phase, Contract, nya, but yung iba ay salary or monthly basis kung
Bidding, Const Phase. Work - up to des dev maunti or dumami yung kanilang occupants/nagrerent sa
bldg naka fix pa rin yung compe
Specification writing - going to write ng delivery ng
mats, pinakamatagal or main job ng ar na nagooffer ng Comprehensive Ar Serv
regular architectural services -Team or ar/firm na pwedeng gumawa ng pre-design
hanggang post-const
Qs: pwede bang mag isa lang? Can I offer that services
ng walang kahelp?: Mahihirapan kasi ikaw gagawa ng kanyang purpose, the cost of budget
feasibilit, working drawing, inspection, inilaan mo sarili -paano idedeliver and project Ar to contractor
mo para sa client na yun. Nandun ka from the start Delivery - Contractor - may 3M, men, materials, and
hanggang dulo. machinery sila yung nagpoprovide nun
-Ano bang tawag?: Project Manager - kapag ganto ka ay
ikaw naman ay pinagkatiwalaan ng client at If complex ang project need na ng assistance
magooversee ng lahat, ikaw bahalang kumuha ng team
para sa pre-design, ikaw mag gagawa ng time frame at Full time
proj cost. Sche to Cons Management. Project cost ay sa -oobserve/titingnan if nadedeliver ng contractor ng
feasibility?? design concept ng ar at engr
Allied Fields
-yung sa RA 9266 Yes pwedeng diff mentors kasi sa DT form 2 pwedeng
2, 3-4
TIP: kapag nagaapprentice ay bumili na agad ng
notebook
Curriculum is diff from other univ Dapat si mentor ay updated ang mga PRC dapat di pa
UB Design 1: 2 units 1hr lecture, 3hrs studio - 4hrs expired para di magkaprob yung apprentice.
BSU: 2 hrs lec, 3hrs studio -5hrs
PWEDE MAGDAGDAG BAWAL MABAWASAN
September 15, 2022
4.3. there are some projects na di practical,m kawawa lang si client, 4.8. Sino ba yung interested source na pwedeng mainvolve? Sila
alam mo namang di dadayuhin dahil di maganda or walang market. contractor, suppliers. Makakakuha ng commission, halimbawa si
In terms of that, it is good advice na sabihin na huwag na project na yan, kay project meron kang mga contractor and supplier.
magparesort char rest house na lang. Target proj ni client ay spa sa Yung kikitain ni Ar ay kay client lang dapat ang kikitain lang ay base
kabilang barangay ay yun ay malapit sa bayan at malapit sa kalsada. sa project. Kapag siya naging contractor nun may marereceive na
Si client bet na rin ganun pero liblib na yung lugar, tapos agri yung percentage si Ar. Ar should not ask any in return. Hindi pwedeng
pinaka spource of income the who pupunta? If legal ba, yung sa may mga pa percentage ka dapat si Client yung magbabayad sayo.
return of investment din. Tapos dpinipilit kahit kulang budget even
though hindi achievable yung bet nya. Kapag mapilit si client nagalit 4.9. Walang ibang investment or business relation outside the
sayo atleast honest ka as archi. Bagong bukas na school tapos profession. If may ibang business interest siya na makaka affect ay
naisipan ni client magpatayo ng student hub comp shop, mga dapat inform client beforehand. Yung halimbawa ay may pa product
billiard halls, bar, basta lahat na. Syempre kikita siya but in terms ng ka pala, dapat alam nya na kaya ganern. Halimbawa nagkataon na si
legal importance ay baka ipasara siya in the future. Di ka pumayag client ay magpapatayo ng resto tapos malapit yung resto mo dun edi
because of that. Sa civil liability hindi lang sa tao but yung mga inform mo beforehand. Dapat malinaw kay client yun. Para di kayo
maapektuhan sa future. mag-away ni client. Honest advisor sa kanya and prejudiced sa mga
business interest niya. It’s not about kapag nagtayo ka ng business
4.4. when we do our estimate, kaya nga estimate ay hindi 100% na ganun ay yun lang irerecom mo, the client have the rights na
accurate, nasa 85-89% lang yung accuracy natin kasi napakadaming
magsabi kung saan nya bet kasi di lang yug product mo ang option 5.4. tulad ng sa rs with client wala kang ineexpect na other source
nya. na pagkakakitaan from that project. Hindi dapat na kapag kinuha mo
siya may percentage ka kasi siya yung kinuha mo. It is very
4.10. Shall include in his/her agreement with the client a clause, unethical. Filipino culture: Kapag binigyan tayo ng favor (utang na
nasa civil code pa lang pinag usapan natin siya dati. Yung mga loob) ay ayun. Huwag ilalagay ang sarili sa alanganin. Natapos na
possible arbitration and solution ay hindi na aabot sa court. Gaano project, oks na tapos nagbigay si contractor ng regalo? Like cake, or
katagal, anong dapat mangyari kapag late nagbayad, kapag hindi damit binigyan kayo ni owner both ay pwede yung ganito kasi way
nagawa si Ar. of pagpapasalamat siya kasi naging mabait ka. Basta kadamay si
owner ha, at dapat aware si owner regarding sa pagbibigay. Kapag
4.11. do not cram/ procrastinate. Napakahalaga sa atin ng time ikaw lang binigyan, edi isauli mo. Gifts na di pwede: sasakyan, at
management. Ang dami nating hawak/ involve sa buhay natin. If laging binibigyan ng cash. Example: trabaho sa real-estate if may
mapagsasabay sabay keri naman ihandle. Hindi ibibigay tapos lahat bagong unit owner edi need may contractor yun, tapos si contractor
ay bukas. Learn how to manage your time, ano yung magiging mag aapply ng design, tapos mag aasikaso ng permit. Minsan may
priority, alin yung urgent edi siya yung unang tapusin. Ano yung nag iiwan ng 20K at kung anu-ano pa. Ay sinasauli ni Architect.
pinakamatagal, umpisahan na agad. 2. Kung ano ang next isubmit?
Nitetrain in terms of time management kaya may mga deadline. Kasi 5.5. Contractor nag bibill sila, nagbibigay sila ng bill ng client base sa
you agreed sa time limit ng project na yun. Nagkasakit or may progress, Progress Billing ang tawag. From that, ichecheck ni Archi
events na di kontrolado di naman pwedeng sabihin kay client na kung tama ba yung binibill. Yung mga nasa contact docus and quali
may deadline kay client 1, may meeting kay client 2, tapos may of works is oks ba. Magkakaroon ng Certificates of Payment (galing
gagawin kay client 3. Learn how to manage your time. Pag nag agree kay Arc) tapos if nabigay na nito kay client ay mag iissue ng payment
sa time, yung presentation ang magiging usapan ay 1-2 weeks. si owner. Additional expenses kay contractor ay iwasan natin kasi
Huwag mag commit sa hindi kaya. May right ka na sabihin na give kawawa workers nya :((( Tapos huwag idelay si Cert of Payment kasi
me atleast 5 days ganern. Kapag nag eestimate ng oras dapat ay what if maliit na firm lang? With that, malaki yung repsonsibilidad
may palabis. natin sa contractor at mga umaasa sa kanya. Example: Nadelay
payment ni client minsan may mga archi na naglalabas ng pera kasi
4.12. Si client wala sa Pilipinas tapos nagkaprob sa site, halimbawa iisipin paano yung iba? Final Certificate of Completion, di tayo basta
kulang sa ganito ganern di napadalhan ng progress of work si client basta dapat mag issue neto kasi wala nang habol si client kay
edi magagalit si client kasi madedelay ang construction. Need contractor. Ibig sabihin ay completed na at well-delivered na. You
maging honest talaga para walang prob di pwedeng pagtakpan. need to check everything.
Gusto nila kung ano yung totoo yung transparency. Si engr di
nagpapakita edi nadedelay project need mo iinform si client na
ganun lalo sa construction kasi mas mahirap kasi may expected time Article V
ng delivery kaya need dapat laging updated, as much as possible ay Manufacturers, dealers, and agents
weekly report ang ipadala kay client para walang maging prob.
Walang prob if nasa site siya ganern. Section 6. Technical info. Without this partners saan tayo kukuha ng
materials na gagamitin? Example: need mo ng buhangin, yung mga
nagdedeliver ng bato, graba mga dealer ng panambak edi ikaw
Article IV gumawa charot. Partner natin sila sa industry kasi need din natin
Rs with contractor sila. Manufacturer sila nagcoconduct ng experminet, gawa ng
material ay mas magiging advance na siya dahil sa kanila. Itetest
Section 5. Best interest ng client ang ating hinahabol si contractor di muna nila para kapag nipresent na nila sa mga Ar at professionals
pwedeng iset aside kasi sa atin depende kung paano sila may masasabi sila. Tapos papakinggan antin if babagay ba sa ating
makakasweldo. design, sa ating project. If magfifit ba siya. Dapat maging fair tayo sa
lahat.
5.1. Yung ginagawa sa BT ay practice iprepare ang contract docus:
Archi, structural/ civil docus, electrical docus, plumbing and sanitary 6.1. May mga product/supplier na nagooffer ng free engineering.
docus, if needed mech documents. Malalaagay tayo sa alanganin kasi sila na lang nang sila.Example: si
metalyte, kasi siya yung nag ooffer ng free professional engineering
5.2. Mali ni Architect, mali yung ginawa niya may error, tinawagan si services. Ipopprovide lang nila ay structural design sila na bahaal sa
contractor na papalitan, pero what if tapos na? Dapat iinfrom si computation kasi special construction siya. Steel framing, from
cliemt at di rin siya saluhin ni contractor. If si client ay nagtanong ng frames tapos nilagyan ng fiber cement boards.
sa gastos tapos sabi nya na ikaw na magbayad edi ikaw dapat. Tapos
nakalagay dapat sa service agreement na if may circumstances na
ganun. Na liability siya ni Archi. 6.2. Dito yung mga commissions discounts, and fees, etc. Basta
dapat lahat ng discount ay kay client. Yung market discount ay para
5.3. Kaya meron tayong job site or periodic visit. If nagpunta sa site sa expenses ni client. Kasama na yung market value nung material at
or yung schedule na yun ay mahalaga, bago yung buhos ay dapat hindi yung discounted value. Yung pf ni ar ay hindi nakadepende sa
macheck ni Architect kasi what if sa inspection mo ay may mali edi market discount, sa market value naman siya. Kapag siya ang kinuha
macocorrect agad tapos marereject if may mali na materials. Sa ay may 5% mali yun. Mga supplier magaling magbigay ng gifts.
progress ng work dapat icheck if tama ba spacing, form works, mga Ethical kapag sa org. Kasi they want to present their products.
lateral ties mga stirrups mga spacer di ba magkakaprob? May tama Wilcon, in every 10K may 1 point ka, tapos converted sa cash. Sa
bang spacing ng mga tiles? Wala bang naka anggat masyado or ganun mga point system cards ay bali wala, it is not as a gift naman
nakalubog? If may prob, inform agad si contractor. Nasa best quality kasi.
kasi dapat ginagawa. 3 days before buhos nag request si contractor
tapos 1 day before ka nagpunta tapos may mali edi kasalanan mo Article 7. Colleagues and Subordinates
yung delay ng works ni contractor. Make yourself available, or Section 1. Mga ate kuya, utoy, ineng yung rs ay nandun yung higher
kinabukasan. year at nakababata ay need iassist, sa ating profession kapag
professional na ay ganun ap rin. Need iassist
7.1. Mahirap umpisahan ang service agreement. Di tayo dapat nag maraming gustong mangyari si client may mga prob na mga may
ooffer ng free, dapat pinapakita natin ay yung mga experience natin. tumutulo tapos ayaw nilang may mga insect sa bahay. Tapos si Ar. B
Hindi siya free taste. Proposal muna, anong nasa proposal? Sa ay dating student at staff siya yung naghandle ng project ni Ar. C.
services natin pwede tayong mag offer ng DADS or DAEDS, sa bawat Then meron ngayong balance sa project di pa siya totally na
isa na yan may corresponding PF. Magbigay ka muna ng proposal warranted, as orig architect (1). Nagpatawag ng meeting si client
tapos if oks na gawa kang service agreement. Tapos ayun pwede mo tapos nakita ni Ar 1 na may mga changes tapos nandun din si ar. B
nang simulan preliminary services. Di lahat ng client ay gustong mag tapos dun nya lang nalaman na si Ar. B nagbago ng design tapos
service agreement, explain na protection siya ni client. Oks na yung matagal na nyang ginagawa at kausap nya na si client. Scenario 4:
project pero yung SA ay hindi napabalik tapos di naman makulit Client, A, B, may prject 1 at 2. Project 1 A, Project 2 B. Nagalit si A
nang makulit kasi nagbayad naman siya. kasi employed naman daw si A tapos nanulot si B, hindi siya
unethical kasi magkaiba namang project.
7.2. Shall abide the RECOMMENDED PROFESSIONAL FEE hindi na
naka basic min fee, dpeende kasi sa SPP kasi magiging dependent na 7.6. Sa situation na eto kay 7.5 same client kay 7.6 magkaiba na
sa experience and professional capability ng architect para di client kasi nagbenta na nang structure. Owner 1 may Ar 1, tapos si
kawawa bago. Sa respo in relation to people mas maganda na itap Owner 2 may Ar 2. Tapos before he proceed ay dapat iinform muna
ang community mga chapel ganern kausapin sila sa halip na si Ar 1 lalo kapag rehabilitation. Si Owner may tenant tapos may
magdonate ng pera ay idonate na lang design, bale valid kasi may agent si owner. Si Ar 1 author ng bldg kausap ni Ar 1 si owner at
exemption naman dito. Halimbawa ay member ka ng Rotary Club agent. Si agent nakakuha ng tenant si tenant kumuha ng Ar 2. Sa
bale may pera sila tapos may project sila tapos nag donate ka ng halip na magkaroon ng rehabilitation ginawa ni Ar 2 pinadaan kay
professional service, tapos ginamit mo as competitive advantage like agent sa pagdating ng remodelling sa structure. Kinausap si Ar 1 na
kaya ka sumali kasi may hidden agenda ka pero kapag mga chapel may babaguhin sa structure sabi ni agent, gusto ni tenant
naman, mga maliliit na proj sa barangay ay walang problema dun magkabutas sa wall. Tapos sabi ni agent kay Ar 1 ay kung pwedeng
kasi nasusuportahan mo community. Halimabawa: Magkasama sa butasan yung partition wall tapos ang proposal ni tenant at ar1 ay
isang org si client, Ar. A, Ar. B, D, E, tapos si client ay may magkakabutas. Anong butas ang maiisip? Bale complicated kasi may
ipapagawang project halimbawa papadesign ng hospital, tapos si A iba’t ibang kind ng hole like butas painting, kitchen window, tapos
nagbigay agad ng sketches maganda eto sa mga hospital ganyan open plan. Bale nigrinder daw si buong pader ay impossible naman
ganyan ay nag open up lang naman. As a responsibility sa colleagues kasi within one week ay tapos na tapos nagkaroon ng leak, si
mo hindi dapat ganun kasi parang nakikipagcompete ka sa kanila. Si waterproofing tinanggal yung warranty, yun yung scenario kasi di
B naman ay nag uusap tungkol sa project tapos ikaw naman naisipan nakipag coordinate si Ar 1 kay Ar 2. Si owner yung
mo magbigay ng sample edi nakipag compete ka na kay B. Hindi magkakaproblema. Example laptop warranty 6 months tapos
tayo sa competition dapat, sa mga school may design competition, natanggal si warranty edi wala ka nang habol dun. Sa SPP mas
iniinvite lahat. Open siya sa lahat ng arki. Alam din ng lahat ay may malaki ang pf sa mga remodel and rehabilitation kaya important na
isa lang mananalo, kahit mapaaga ka ng submit ay sabay sabay kahit magkaiba ang owner ay iinform pa rin si original author ng
siyang titingnan. Unang nabuksan, susunod, etc. Kasi naka envelope design. Related sa 7.5 tapos magkaiba na owner. Always coordinate
yun, di dahil sa pangalan yung pagtingin, bale may basis siya yung what if di na kilala yung previous ar? Search na lang kay google. For
design mo. confirmation ng delegates depende sa Area ng chapter sa non-
architect ay mahirap pero ayun nisearch na kay google or fb. Kaya
7.3. Bakit papasok as competitior kapag involve na sa impossible na hindi natin malalaman na hindi natin makita si
pagfofofrmulate sa competition na yun? Alam mo na mga Architect. Kapag walang as built drawings ay mahirap yung ganun
hinahanap tapos nagjoin ka pa as competitor nagsubmit ka pa ng kaya minsan nagdodoble gawain. Kapag patay na ay inform the
idea, etc. Ijajudge mo design at drawing mo, bawal ka rin mag family tapos si fam nasa ibang bansa na out of reach na ayern
adviser or juror kapag nag assist ka sa preparation. Yung member sa proceed na ikaw. Kahit sabihin na hindi pa archi heritage kapag
firm halimbawa ay bawal din yun unethical yun. So ikaw ay, may naman nakikitaan mo na nang quality na mayt potential ay try to
nanalo na sa compe tapos ikaw ang Architect of Record ay unethical propose na post modern if irerenovate or what baka naman
yun dapat ay yung nanalo yung AoR, consulting ar ka lang dapat. masesave at may possibility na magustuhan yun bagong proposal.
7.4. Sa situation nan eto si client tapos may Ar, Ar A, B. Kausap na si Example: Las Casas Filipinas de Acuzar, yung mga structure ay
Ar B on the process na sila nasa negotiation na inaayos na tapos binibili nila yung mga lumang luma nang bahay, yung structure
kaibigan ni Ar A si client naisip nya why di sa kanya binigay, doon mismo tapos disassemble tapos dadalhin na sa mismong place tapos
pumapasok yung susulutin si client para magbigay siya ng proposal. aassemble na ulit. Yung mga bahay tsaka structure ay kung baga ay
On the process of negotiation kay B tapos kausap din pala si A na di brick by brick dinadala nila dun. NOTE: Possibility of restoration.
aware both arki, hindi sakop eto dito kasi di naman aware si A. Mas Kapag ayaw ni client wala taytong magagawa.
bata si A si B kunyare di papasok sa unethical kasi di naman alam at
si client naman yung di naging honest. Kaya if may client ask muna if 7.7. Part of our CREDO, if we have comments we have to lean our
may kausap silang iba at kailangan may minutes of the meeting para comments on a constructive points yung di makakasira or
may proof din halimbawa kapag nag file ng petition or complain ay makakadamage sa name ng ating colleagues. How we can improve
proven na innocent siya. Two-way siya respo sa collegues and respo and not to discredit. Huwag yung lahat na nang nakita ay negative.
sa self na hindi mainvolve sa situation for the sake na may Huwag manira at baka makasuhan din ng libel.
makuhang client ay may magagalit naman na iba.
7.8. Maraming enterprise na makasira sa ation example mining
7.5 May isang project na nahandle tapos kapatid ni owner tapos industry, logging, group or supply na hindi naman valid or trusted na
may ipapatuloy, tapos hinanap yung fp, yung mga working drawings pwedeng makasira sa pangalan mo. Sa manufacturing ng isang
tapos nakita nila kung sinong Ar. Tapos kinausap yung previous product tapos yung product ay makakacause ng damage sa
architect. Need pa ba mag gawa ng letter para mainform na environment. Sa supplier hindi naman nakakacommit sa kanyang
pumapayag na siya (fact of writing) tapos pumayag na si Ar na hindi promise date pwede ka ring madamay dun. Kaya don’t let na
na edi oks na. Another example, may addition sa project. Pwede ba gamitin ang name mo for advertisement.
magpaset ng sched? Meeting punta ng bahay, tapos iaask kung sino
yung Ar ayaw sabihin pero dapat iinform si client na need malaman 7.9. There’s a possibility na kapag may lumapit (si tita) kasi
ni dating Ar kasi nga may irerevise lang sila ganern. Scenario 3: Pero papagawa ng structure or bahay tapos nalaman na nagawa kayo ng
hindi na sila yung addition, si client may usapan sila ni Ar. 1, ganun tapos babayaran ka na lang daw 1K per sheet daw. Bale ang
magiging mentality ay magkakaroon ng extra or sideline tapos idea is your idea. Basis sa intellectual ay kapag executed na yung
tinanggap mo. Archi docus lang binigay mo tapos naka cad naman, project. Isang proj sa QC parehas siya pero kapag nag look further ay
siya na bahala raw mag paprint. Sa archi docu may 4 sheets tapos may pinagkaiba naman edi bawal magreklamo. Kapag may idea ipa
binigay na yung file kay tita para maipagawa kay client. Sa 4K kumita patent mo para walang basta basta kokopya kapag may gumamit na
kayo pero the question ay can you claim na yung project na yun ay iba pwede mong kasuhan. Patent dapat ikaw mismo may idea or
project nyo or design nyo? You cannot claim na sayo yun tapos inalis nagdesign nun.
na designed by, etc. Kasi halimbawa pinapirma na lang ay engineer.
Naeexploit ang mga kakayahan. Kapag naman nihire ng instructor ay 7.15. Reputation mo kasi yung service mo fair dealings tapos
pwede naman basta Architect. Tapos drafting lang hindi design maayos trabaho mo tapos nag strive ka para matuto. Professional
mismo. Kapag may revision papaulit. May design na idedetail na know-how mo. Pwedeng pumasok ng mga seminars, short courses,
lang. Sa mentor, design nila at hindi sa student. RA 9266 because of etc. Improve your service. If may achievement tayo hindi atin lang
this law ay pinagbawalan na yung pirma, pirma na lang tapos bigyan ng credit yung nakatulong sa atin.
babayadan na lang ng 500. Bale si Ar yung nakikipag deal on his
behalf yung naka salary ay parang naging staff siya ni Ar Briones 7.16. Huwag basta basta magbibigay ng quotation lalo na if you
during the project. Tunuruan siya kung paano ang process sa don’t have that much info. May nabalitaan, alam mong
pagdating ng profession. Mas makikinabang kayo kasi marami nangangailangan ng estimate or value, appraisal report ikaw naman
kayong matutunan. Huwag pipirma kapag wala yung personal ay ganun yung price nun nagbigay ka ng quotation or fee proposal
supervision. Arki firm nag reg sa dole yung apprentice ay pwedeng tapos masyado palang mababa edi mababarat si client. Masyadong
50% lang ibayad lalabas na allowance lang. Papaano kapag namatay mataas edi under sourcing naman tapos si contractor ay nitake
or namatay na yung mentor? **Buti na lang may anak na Ar. Advise advantage sila madam. Nag agree si contractor ay di naman pala
ay huwag muna magtake ng ALE magpa employ ,muna. swak edi siya ang affected. Kaya huwag pabida or nosey. Alamin
muna ang scope and nature ng project para makapag prep ng
7.10. Naka minimum kasi ang point ay apprentice ang iba naman tamang fee proposal.
ang kanilang niooffer lang ay allowance (food and transpo). If arki na
di pwedeng tanggihan na makaattend ng mga seminars and 7.17. Proposal is not enough. Yung service agreement ay maddl sa
conventions ang staff. He/she shall tutor and mentor. Yung internet, scope of work mga ganun. Kung ang nioffer ay DADS kapag
environment nila noon though masaya naman kasi kakaunti pa. dating sa scope of work nakaindicate kung anu-ano yun. Mga
Mentorship, guiding you para mas matuto hindi eto dapat kung responsibilities, limits and fees nandun din. How computation,
hindiu dahil sa experience, paano hindi magkakamali igaguide na mode kung paano isosolve, provision of termination, if magkasakit si
parang bata na hahayaang madapa para tumayo ulit or hindi Arki or di makapagbayad si client para mas malinaw yung usapan.
hahayaang madapa. Give assistance.
7.18. Para sa sarili yung sa branding, magseset ka ng standards may
7.11. Technical knowledge and experience, walang arkitekto na pagkakakilalanlan ka agad. Excellence, standards ano yung
madamot. Siguro nagkakataon na hindi lang fit sa sched. It is about functions, how you practice but also about yourself. Paano ba
time management kung anong kayang pagsabayin ay pagsabayin. magiging trainings, practice, etc. Generally for the org nandun din na
Give time kung paano masheshare ang knowledge sa iba. Di lang if may standard na naset si organization papaano naman ang sarili
tungkol sa matatagal na sa profession. Sometimes yung mga bago mo? Hindi yung generic ka lang palagi. Halimbawa pipili ka okay lang
sila yung maraming alam. They are the one who speaks for the older eto di na baleng mahal basta alam mong okay naman. Respo not
professional. Sharing experiences para may malearn mula sa kanila. just sa org but pati sa sarili. The way you talk, carry yourself, and
how you dress. Kapag lalabas ka titingnan ka muna ng tao. Hindi ka
7.12. Personal commitment and involvement sa organization. nila ijajudge kung magaling ka ba, titingnan muna nila mula ulo
Dedication and commitment kasi pati yung time mo nagsasuffer. hanggang paa.
After 3 years need mag renew ng PRC ID - reqs need ng IAPOA cert +
nandun din or need din ng CPD points or units. Nung nicompute ay 7.19. napagusapan before yung contribution ano ba yung maibibigay
1500 yung chapter dues tapos 600 yung national dues penalty + sa construction idustry kung ano yung maiimprove natin. Promote
50%, 900 * 3 tapos 1500 * 3 = 7200; nagrereklamo kung bakit ang allied arts. Ishare sa iba.
laki ng babayaran etc. Before iimplement yung ganun ay didiscuss
during the membership meeting. Being part ng profession and 7.20. Sa committee of ethics and discipline nagfafile ng report. Yung
organization responsibility mo na maging involve sa advocacy ng complain puro client sa atin kasi as much as possible sabihan muna
org. bago mag complain sa ethics and discipline. UAP protects the
members hindi yung tanggal lisensya agad kapag halimbawa yung
7.13. When you are conducting your professional practice as arki substantial info na nadun yung mga proof hindi lang siya basta belief
magpeperform tayo ng ating trabaho being architect. In our or chismis lang.
performance sa practice natin dapat ay nakakasunod, siguraduhin
na ang firm ay supervised ng maayos tapos qualified yung staff. 7.21. Papaano naman po yung aming, yung sinasabi sa portfolio or
Kapag sa hiring tinitingnan if qualified ba or hindi. Make sure na ang sample of works, syempre papaalam tayo kay mentor at hindi yung
firm alam mo na under appropriate or under ng proper monitoring. kukunin na lang basta. Halimbawa plano ng bangko or plano ng
Hire ng staff imonitor ng maayos yung opisina if okay ba ang bahay ng isang pulitiko or ng mga pawnshop basta yung mahahalaga
performance ng trabaho., If qualified pa ba para magprovide ng yung security hindi basta basta pinamimigay. If sayo lang at di
services. Dapat ang kukuhanin na staff ay qualified. Pwede mag papakita sa iba ay huwag na kunin kasi para saan pa? Files and
function efficiently ang firm kasi binabayaran ni client. Setting docus hingi ng file kasi may pagkakalilanlan yan e. Huwag basta
standard para sa firm, para sa quality. It is the responsibility ng Ar. kukuha lalo na ang pinag uusapan dito ay personally performed by
Kapag nag perform tayo ng duty as arki dapat may naiset tayong the apprentice or employee. Basta pinapaalam baka kasi magkagalit
standard. pa dahil dun.
7.22. Hindi pwedeng magkaroon ng discrimination halimbawa sa age
7.14. Intellectual quality, huwag kumopya basta basta ng design naghahanap ng employee example ay we are hiring RLA 25-35 years
from another arki. Intellectual property law. If si client ang may bet of age with 10 years of experience.
ay inform the arki before gamitin. Kung walang permit nung ar na
yun di pwedeng gamitin. Mahirap ay how can you prove that, that is SCHED NG EXAM
OCTOBER 22 Saturday 3105, 3106, 3017, 3108 1PM to 2:30PM. Kasi may
exam na kasunod sa BT. 4th flr ng CEAFA.
Di pa sure**
Multiple choice
Identification