Change Order Form

This change order document is modifying an existing contract between Omoyemi Aderonke Ogunsusi and an unnamed contractor for a job. It allows for changes to be made to the existing contract, including adjustments to the total price, specifications, and completion date. The contractor and owner must both sign to agree to the changes specified in the change order form for it to become part of the existing contract.

Uploaded by

Omoyemi Ogunsusi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
173 views2 pages

Change Order Form

This change order document is modifying an existing contract between Omoyemi Aderonke Ogunsusi and an unnamed contractor for a job. It allows for changes to be made to the existing contract, including adjustments to the total price, specifications, and completion date. The contractor and owner must both sign to agree to the changes specified in the change order form for it to become part of the existing contract.

Uploaded by

Omoyemi Ogunsusi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

CHANGE ORDER

To Job Name/Number
OMOYEMI ADERONKE OGUNSUSI
Attn Job Location
18CB024677
Address Existing Contract Number

City, State, Zip Existing Contract Date

Phone Date: 22/11/2022 Time Extension

We hereby agree to make the following changes:

TOTAL PRICE FOR CHANGES


REVISED CONTRACT TOTAL
REVISED CONTRACT TOTAL

THIS CHANGE ORDER FORM BECOMES PART OF AND IN CONFORMANCE WITH THE EXISTING CO
We hereby agree to make the change(s) specified above at the The prices and specifications of
price indicated per this change order. satisfactory and are hereby acc
performed under established terms
the original contract unless

Authorized Contractor Signature Owner Signa

Date Of Acceptance Date Of Accep


R
Job Phone

ontract Number

ontract Date

Amount +/-

ICE FOR CHANGES


CONTRACT TOTAL
CONTRACT TOTAL

NCE WITH THE EXISTING CONTRACT.


prices and specifications of this Change Order are
factory and are hereby accepted. All work is to be
ed under established terms and conditions specified in
he original contract unless otherwise specified.

Owner Signature

Date Of Acceptance