ZIMMERMAN - Integrated Design Process Guide
ZIMMERMAN - Integrated Design Process Guide
Process Guide
By Alex Zimmerman, P. Eng.
Objectives
The intent of this guide is to explain the numerous advantages of "We need to use a new
the Integrated Design Process (IDP); to provide enough information collaborative integrated design
to start applying it to your design projects; and, to help you find process that can create new
additional useful sources of IDP tools and information. approaches and tools, and
beautiful environments that
After reading this article you will: can restore social, economic,
I Understand what IDP is and how it is different from traditional and environmental vitality to
approaches; our communities."
— Bob Berkebile, BNIM, Kansas
I Understand the benefits of IDP and why it is critical for achieving
City, one of the world’s most
sustainable design; respected green architects
I Understand how to generally structure an IDP process;
I Understand who needs to be involved, when and why;
I Understand key success factors to apply IDP; and
I Be able to find additional tools and resources to apply IDP.
Integr ated Design Process Guide
IDP—What is it? I Inclusive—everyone, from the owner to I Iterative—to allow for new information
the operator, has something critical to to inform or refine previous decisions.
Integrated Design Process (IDP) was used contribute to the design and everyone
in the early 1990s, by Canada’s C-20001 I Non-traditional expertise—on the
must be heard.
program and IDEAS Challenge2 team, as needed, or brought in at
competition to describe a more holistic I Collaborative so that the architect is not non-traditional times to contribute
approach to building design. This design simply the form-giver, but more the to the process.
process has been shown to produce more leader of a broader team collaboration
Sustainability is one of the most important
significant results than did investment in with additional active roles earlier in
issues facing human society today. The
capital equipment3. There is now no single the process.
challenges as they relate to buildings are
“right” definition for IDP. Rather, IDP I Holistic or systemic thinking with the complex and the solutions are not simple.
describes a different, intentional way of intent of producing something where Framing the challenge in terms of
approaching sustainable building and the whole is greater than the sum of motivation and means is one way of
community design that offers a much the parts, and which may even be clarifying our thinking. Motivation
higher likelihood of success than any more economic. proceeds from a source or ground, towards
other approach. a goal. The means require some tools and a
I Whole-building budget setting—allows
There are an increasing number of direction to apply them. The tetrad in
financial trade-offs, so money is spent
practitioners of IDP. Each has a different, Figure 1 illustrates these ideas.
where it is most beneficial when a
and valid, perspective on how to do it, holistic solution is found.
based on their experiences and practices.
Most would agree that there are common
elements to every definition.
Why IDP—Getting to What is Important
I Goal-driven with the primary goal D I RE CT I O N
being sustainability, but with explicit (compass)
subsidiary goals, objectives and targets
set as a means to get there.
1
NRCan’s C-2000 program supporting advanced, energy-efficient commercial building design.
2
IDEAS Challenge design competition for multi-unit residential buildings, CMHC.
3
Ibid, C-2000 program
Motivation and demolition account for a significant The Natural Step principles are the “system
share of the problem—about 30 per cent conditions”8 that society must embrace to
The Ground: Sustainability of the energy use and 38 per cent of the be sustainable.
Imperative greenhouse gases in Canada.5 Buildings are
In the sustainable society, nature is not
the source of about 40 per cent of all subject to the systematic increase of:
A host of ecological impacts resulting from
waste6 worldwide. As building designers, we
human activity, have produced ecosystems 1. concentrations of substances
have both an opportunity and a
degradation that directly threatens our extracted from the Earth's crust
responsibility to do something about it.
society. In the words of the UN’s
2. concentrations of substances
Millennium Ecosystem Assessment,
produced by society
competed in 2005: The Goal: A Sustainable
3. degradation by physical means
We are spending Earth’s natural capital, Society
putting such strain on the natural 4. in that society, people are not subject
A sustainable human society has been
functions of Earth that the ability of to conditions that systematically
imagined in many ways. One of these is
the planet’s ecosystems to sustain future undermine their capacity to meet
generations can no longer be taken the definition of sustainable development their needs.
for granted. in the Bruntland Report, Our Common
Future (1987) as “development that meets Together, the Bruntland definition and The
At the same time, the assessment shows Natural Step Framework system conditions
the needs of the present without
that the future really is in our hands. provide the sustainable development goal
compromising the ability of future
We can reverse the degradation of
generations to meet their own needs.” that buildings must strive to reach.
many ecosystem services over the next
50 years, but the changes in policy and While the Bruntland definition provides a Other decision-making tools for
practice required are substantial and high-level vision, more is needed to apply sustainable community development
not currently underway.4 the concept. Basic principles for social and include “Smart Growth” and the “One
This is a report worth taking the time to ecological sustainability, based on physics, Planet Living” frameworks.9
read to understand the scope and scale of have been articulated by the science
the global challenge. Closer to home, community and are captured in a
building design, construction, operation framework known as The Natural Step.7
4
UN Millennium Ecosystem Assessment, 2005, http://www.millenniumassessment.org/en/index.aspx
5
Based on direct energy numbers from Energy Use Data Handbook, 1990 and 1995 to 2001 June 2003, NRCan and an estimate of the fraction
of energy uses from other sub-sectors that are attributable to buildings
6
Lenssen and Roodman, 1995, Worldwatch Paper 124: A Building Revolution: How Ecology and Health Concerns are Transforming Construction,
Worldwatch Institute – numbers for Canada not available
7
http://www.naturalstep.ca/systemconditions.html
8
Ibid.
9
http://www.smartgrowth.org and http:///www.oneplanetliving.org
Means
Opportunities for Change
The Direction: Green Buildings and the Design S equence
Rating Systems
COST SAVINGS
Beyond Bruntland and The Natural Step, a
strategy for achieving sustainability goals is
still needed. We can develop strategies by C o s t to C h a n g e
imagining future success and then take the
actions needed to get there.
10
http://www.cagbc.org
Air
Emissions
Energy,
11
http://oee.nrcan.gc.ca/commercial/financial-assistance/new-buildings/index.cfm
12
http://www.bchydro.com/business/
13
http://www.cgc.enbridge.com/B/B05-11_building_design.asp
14
http://www.mec.ca, About Us, Sustainability, Green Building Program
15
http://www.greenbuildingsbc.com/new_buildings/pdf_files/value_analysis_dp_guide.pdf
Sustainability In the 2005–2006 season (the fifth), three-day sustainable design conference in
Sustainable Design for Canadian Buildings, Sheperdstown, W.Va., in 2006, with one
Green buildings are characterized by
SDCB 205, RAIC’s cross-country, day devoted to process, in which IDP
performance improvements in a wide range
continuing education course, was entitled features prominently.
of areas, such as reduced site disturbance,
“Green to Green: Opportunities for more
minimal non-renewable resource The implication is clear—if you don’t
Energy-Efficient Building Retrofits.” It
consumption, minimal emissions to water become competent at IDP, you will be left
focused on integrated design. Similar or
and air, and maximal quality of the indoor behind your competitors.
related courses on sustainable design will
environment, as well as providing building
likely continue to be offered.
flexibility and adaptability, generally at no Personally Rewarding
or minimal cost increase. Competitive Advantage One of the unanticipated benefits that I
Conventional design processes are generally have witnessed in integrated design
An advantage of using IDP for design
incapable of delivering all of these goals at processes is that it is just plain fun. IDP
firms is reputation. Once competent at
once. Integrated design has a history of sessions are generally challenging, creative
IDP, architects will be able to deliver better
being able to do so. and personally rewarding. By setting
projects more consistently than their
“stretch goals” and finding novel ways to
competitors. As a design professional, it
Your Association Suppor ts IDP will enhance your reputation, which will
reach them, creativity is unleashed in ways
that conventional design rarely allows for.
In a 2003 study16 carried out for several not only bring more business, but higher-
I have seen battle-weary professionals
architectural associations, including RAIC end business. An enhanced reputation also
become enthusiastic at what they can do
and OAA, one of the key findings on makes recruiting and retaining new talent
in this context. People rediscover why they
sustainable design in Canada17 was: easier. Most of the leading-edge
joined the profession in the first place.
architectural and engineering consultancies
Integrated Design Process (IDP) is
that have gained a reputation for delivering
essential for effective management of
the sustainable design process to ensure sustainability using the IDP do very little
that efficient coordination is maintained recruiting. The best and the brightest seek “Integration is more than just
and that overall project and design them out. having all the designers around
costs are minimized. Several sustainable a single table.”
The future of building design is found in
design evaluation and assessment
IDP. A recent search of the American – CANMET Energy Technology
systems require the use of IDP due to
Institute of Architects website for “IDP” Centre, Buildings Group website
the benefits derived from working in
a collaborative setting at the outset of turned up 481 hits. AIA’s Design and
the project. Environment committees sponsored a
16
By McGill Business Consulting Group
17
Succeeding by Design, A Perspective on Strengthening the Profession of Architecture in Ontario and Canada, November 2003,
McGill Business Consulting Group
How is IDP Different? Remember, because you started this process These goals and targets need to be clearly
really early on, you get to ask these questions. articulated, written down and kept front
There is no single element of integrated In some cases, the best answer for your and centre as the design progresses. They
design that is revolutionary. Rather it is the client might not result in a new building serve as reference points as the detailed design
sum total of all of the elements and what project this time, but the added value to develops or if conflict arises between goals.
the team does with them that differentiates your client by doing the right thing
IDP from conventional design. IDP differs enhances the relationship, your reputation Facilitated
in intention and emphasis from and will likely result in repeat business.
conventional design. The primary role of the facilitator is not to
From there the team moves on to specific produce the building design or parts of it,
Let’s look at the objectives in more detail. environmental goals. These can be derived but to be accountable for the process of
I’ll follow these with an example of how from rating system categories, but they integrated design. This is of course the key
some of these come together in practice. should include fixed targets for: to good facilitation of any kind. The
facilitator allows the team participants the
Goal-driven I Reduced site impacts;
mental space to do what they do best—
The big-picture goal is incorporating I Reduced off-site impacts, such as in this case green design. The degree of
sustainability into the project, but it is stormwater runoff, greenhouse gases or process intervention or direction will
necessary to set explicit subsidiary goals, other emissions; depend on the skill of the group, with an
objectives and targets as a means of inexperienced group typically needing
I Reduced energy and water more direction than a practiced group.
breaking the goal into manageable pieces.
consumption;
These are best framed in performance; not Can you, as design architect, act as
prescriptive, terms and will then form the I Improved indoor environmental quality facilitator? First, a facilitator requires
basis for strategies to achieve them. and thermal comfort, contributing to certain communication abilities and
human health; attitudes for exploring ideas with the team
These goals are set with the entire project
team involved and must include the client. I Increased construction waste diversion and draw out ideas. Therefore, although
The idea is to get commitment, not and recycling, material reuse and the lead design architect can act as the
compliance, from everyone involved. recycled content; facilitator, it is generally not a good idea, as
People support what they help create. you are wearing two hats—and probably
I Improved durability, longevity and neither very comfortably. Why make the
The first goal is a review of the project maintainability. process more difficult than it needs to be?
brief against the list of client needs. Is this
IDP, because of its inclusionary nature, is The facilitator can be someone else in the
the best location from an environmental
also a useful way to develop goals for social lead architect’s office or it can be someone
point of view? Is a new building actually
values, although there is little consensus in brought in from the outside, who
required or would a major renovation be
the building industry generally on how to specializes in green building facilitation.
more appropriate?
deal with social issues at a project level, unless The key is the difference in primary roles.
they are an explicit part of the program.
Structured tenders closed. In the end, there were brought in as needed. Energy modellers are
negligible cost savings and the operating also important in showing the energy costs
There is a generally recognized order to
cost was also higher for the tenants. Had related to particular design scenarios
dealing with design and sustainability
IDP been employed, the owner would have compared to others.
issues in IDP. The reason that we need to
understood that the system was optimized
deal with issues and decisions in the right Non-traditional exper tise
for the lowest total cost.
order is to avoid locking in bad performance
by making non-reversible decisions with Technical aspects of the design may require
incomplete input or information. expertise that the core team does not
“IDP is everyone, every issue, possess. A daylighting modeller can
For instance, mechanical engineers may early on” quantify daylight contribution that can
come up with very sophisticated air lead to changes in switching design. An
conditioning designs to deal with cooling – Bill Reed, Integrative Design
appraiser can calculate improved
loads, but if those cooling loads are three Collaborative
development residuals resulting from green
times what they need to be, due to huge design. A site ecologist can be included for
amounts of unshaded, low-performance constructed wetland design.
glazing in the wrong orientation, the
improvement in energy performance will Inclusive
be marginal and the cost will be higher. Everyone, from the owner to the operator, “It is not possible to do creative,
By contrast, if architects quantitatively has something critical to contribute to the progressive sustainable design
understand at the concept phase the improved function or performance of the without a strong, like-minded,
impact of that glazing on performance design and everyone must be heard. integrated design team.”
and cost, they are in a better position to Having said that, there are about two
come up with alternatives. – Peter Busby, Busby, Perkins
dozen actors involved in the design and + Wills
Also, in most IDP, the design time is construction of every building, from
distributed differently. More time is spent gleam-in-the-eye through to operations,
upfront, but because the quality and and it sometimes is just not practical to
Other non-buildings-related expertise may
completeness of decisions taken are better, have everyone in the room at all times on
be helpful. For example, one successful
less time is required later, especially by the every issue.
recent green building project designed for
engineers on the design team, to re-design In addition to the usual design team, the an inner city brought in a university
and to correct for mistaken assumptions. core team that needs to be engaged at all student working on a thesis about social
For example, on one conventionally times should include, at a minimum, the interactions in the city’s core, which helped
designed project I am aware of, the owner building owner or owner’s agent, the respond to the organization’s intention to
switched glass types during construction, design facilitator, a cost consultant, an have the building support local community
based on an offer from the contractor, in energy simulator and, if the procurement life. Another example of new expertise
the belief that the new glass would save process allows it, a general contractor or helping the design team to explore
money. Unfortunately the cheaper glass contract manager. Representatives of user alternative design issues is demonstrated by
also had lower thermal performance in groups and the facility managers are critical the Seville Theatre Redevelopment Project:
both heating and cooling seasons, which to improved design and should also be Integrated Design Process.
necessitated re-design and upsizing of the invited. Other specialists in particular
https://www03.cmhc-schl.gc.ca/
mechanical systems at a premium after technologies or relevant issues can be
b2c/b2c/init.do?language=en&shop=Z01E
N&areaID=0000000037&productID=000
00000370000000063
Collaborative synergies. When this is done right, you get This is not the best way to get the least
something where the whole is greater than cost building overall. As Amory Lovins has
One of the principal differences of the
the sum of the parts, and it may even be pointed out, “Optimizing components in
process is that the architect is not simply
cheaper. The example at the end of this isolation tends to pessimize the whole
the form-giver, but an active participant in
section illustrates a common way this system—and hence the bottom line”.18
exploring alternative ideas within a broader
is achieved.
team of experts who play active roles earlier A green building design based on holistic
in the process. thinking will not likely cost more overall,
but the costs may be distributed differently
“Optimizing components in than costs based on a traditional design
“Everyone is a co-learner in isolation tends to pessimize approach. Costs get transferred from some
the process” the whole system—and hence components to others. Budgeting must be
the bottom line.You can done in a way that allows the movement of
– Bill Reed, SEFC IDP Workshop, actually make a system less money to where it does the most good
April 2006
efficient, simply by not properly when a holistic solution is found. This
linking up those components. If flexibility should also extend to the
they’re not designed to work determination of the professional’s fee
In particular, there is joint problem-solving
with one another, they’ll tend structure, which will be discussed later.
and joint decision-making rather than team
to work against one another.”
members simply taking their assignments Iterative
away to work on and bringing them back – Hawken, A. Lovins, H. Lovins,
to be re-integrated. It has been proposed by Natural Capitalism The traditional phases of the building
some that IDP could be equally called design process, pre-design, schematic
integrated decision-making. design and development, don’t disappear in
IDP. What does change however is how the
Holistic or systemic thinking Whole-building budget setting work gets done in each phase and how
team moves from one phase to the next.
The old Zen saying that everything is As design professionals, we are pretty good
The IEA Task 23 guideline document19
connected to everything else is never truer at knowing what our piece of the design
describes these intermediate workflows as
than when designing for sustainability. “should” cost. We carry these rules of
“iterative loops,” shown in Figure 4.
The goal is to optimize the building’s thumb around but they are usually not
performance by considering all of the based on whole building optimization. The team repeatedly reviews and refines
building components and subsystems They also tend to be the basis for value- ideas to resolve problems at whatever scale
together and their interactions, to achieve engineering individual components. is appropriate, at each phase of design. A
key aspect is to allow new information to
inform or refine previous decisions.
18
Natural Capitalism, Hawken, A. Lovins, H. Lovins, 1999, Little, Brown & Company
19
“Integrated Design Process — A Guideline for Sustainable and Solar-Optimised Design,” 2003, International Energy Agency, Task 23, Optimization of
Solar Energy use in Large Buildings, Subtask B, Design Process Guidelines
Integrated
Design Process
courtesy of Nils Larsson, iiSBE
Figure 6 — Graphic Showing the IDP Process
20
Managing the Integrative Design Process; PDF of Presentation Graphics - PowerPoint images from the Workshop,
http://www.integrativedesign.net/our_process/home.htm
21
The Integrated Design Process: Report on a National Workshop held in Toronto in October 2001, search the documents section of the database of
http://www.sbis.info, for Integrated Design
22
ibid , IEA Task 23
Canada Mortgage and Housing Corporation 11
Integr ated Design Process Guide
The IDP Overview23 details the steps for PREDESIGN 1 – STAGING THE CONSTRUCTION AND
each of the elements in the illustration. PROJECT (The Foundation) OPERATIONS – REALIZING
This approach begins by defining the work THE OBJECTIVES
I Client involvement in the design
that needs to be done before the team is
decision process I Follow Through in Construction
assembled and the first major workshop is
Process
held. A kickoff workshop is the first all- I Team Selection
inclusive, collaborative decision-making I Commissioning
I Design Problem Setting
meeting and major performance targets
I Maintenance and Monitoring
are set then. Subsequent workshops will I Identifying Base Conditions
depend on the scale and scope of the The link to the Integrative Design
project, with larger and more complex PREDESIGN 2 – MANAGEMENT Collaborative website is
projects requiring more workshops to deal MAPPING AND GOALS http://www.integrativedesign.net/
with the issues. The Foundation Dialogue As you can see, there are similarities with
The next phase is the first of the iterative I Includes all participants—including the diagram and process laid out by the
loops. Developing the concept design main decision maker other descriptions. A presentation of this
requires the interactive consideration process is available on the Integrative
of structure, envelope, lighting and I Charrette Design Design Collaborative website, which adds
mechanical systems. Once these are I Alignment of Expectations and Core detail for each of these elements.
determined, more consideration is given to Purposes The approach proposed at the Toronto
materials and how to properly convey these
I Addressing the Mindset IDP workshop25 has similarities to the
decisions in contract documents. Quality
other two approaches. Figures 7 and 8
assurance activities throughout the
I Goal Setting of Environmental Metrics illustrate the process in a more linear
construction phase and into operations are
and Benchmarks fashion. The key elements, including early
critical to ensure that what is designed
I Creating a Project Specific Systems client involvement in decision-making,
actually gets built.
Map and Schedule careful team selection, kick-off meetings,
The iiSBE link is http://iisbe.org goal setting and iterative design loops, are
DESIGN PROCESS – SYSTEM all there. This approach does not detail the
Bill Reed, Integrative OPTIMIZATION need for follow-through in construction
phase, but it has become recognized as a
Design Collaborative I Schematic Design
requirement.
Approach I Contractor or Cost Estimator
Engagement
Bill Reed of the Integrative Design
Collaborative24 identifies the basic IDP I Design Development
elements as:
23
IDP Overview
24
Ibid.
25
Ibid.
Kickoff
C lient Decision
IDP Flow Chart Meeting/Charrette
Pr
ob
A key feature of all IDP is the kickoff meeting
on IDP U sers
le
m
Phase 1
De
or charrette. This launch is crucial for:
fin
iti
on
Team I getting the project off to a good start
Incorp orate IDP
Ph
C omp osition
as
into Procuremen t
e
I getting agreement on goals
Int roduce
T eam I team building
& E xp lain Process
C lient Assem b ly
Relationship I getting the big issues and concerns
to Process out in the open early on to avoid
Dem onstrat io n K ick off/Launch
Very re-design later.
T eam Building M eeting
In
of Inclusive
Re cre
C om p et encies IDP R eview / C larificat io n
so a s
A key objective for the charrette team
lut ing
ion
is to come to a common vision or
/
Cl
T eam understanding of what it is trying to
ar
C ontext/ Preceden t s
ity
Prob lem
R eview C lient G oals/ Prog ram accomplish. This is such a truism that its
Definit ion
importance tends to get overlooked. All
great teams in any endeavour have a
common vision of the goal. A good
Figure 7 – Toronto IDP Workshop Approach – Phase 1 charrette will establish that common vision
and will unleash the creativity inherent in
all teams and focus their efforts on
reaching it.
Visioning :
C onsider w ide
rang e of IDP Flow Chart
So
W hole T eam C reativity T o ols
lut
i
Phase 2
on
s
Ph
as
Feedb ack on Visioning
Exp ansive,
from
e
C om munity of Int erest
C reative,
Loose
Desig n T eam “Homew ork ” for
Visioning O p t ions B ett er Definition
T est Ag ainst
C om munit y of Desig n C ycle M eeting s
In
Int erest
Re cre
so a s
lut ing O ng oing
ion
/
offline
Cl
Desig n C ycle M eeting s
ar
w ork
ity
The scope of the charette will vary, but it time differently and most likely produce Clients also need to be prepared to share at
should be facilitated and carefully planned. designs that are different than what they least some of the potential risks when they
You don’t need to invent how to do this. have been used to seeing. demand extremely high performance or
There is an excellent resource that was technologies that do not have a long track
IDP should be a net time saver but upfront
developed expressly for IDP charrettes: record. In these cases the client should not
time will take longer and late stages will
A Handbook for Planning and Conducting expect the designers or contractors to
take less. Specified equipment and systems
Charrettes for High Performance Buildings, assume the risk and expect the building to
are likely to be different, and the most
free from the U.S. Department of Energy cost the same as a regular building with
successful projects are those the client
website.26 This handbook provides lower risk. This is not a common IDP
understands and shares potential risks
everything from the rationale, how to get situation, but it has happened.
arising from new approaches.
started, how to plan and develop the
charrette, how to conduct it and what the The client needs to make it clear who the
follow-up and next steps should be. It also decision-maker(s) are and commit to We cannot solve our problems
provides checklists, sample agendas, reports having decision-makers present at all the with the same kind of thinking
and every other sample document you key meetings. we used when we created them.
might need.
The client has to change the way the team – Albert Einstein
Another free resource is the Sustainable gets paid. IDP is not commodity-based
Community Planning and Development design, by which I mean, design where the
Design Charrette Planning Guide, available team gets paid by the pound (or a Mindset
from Canada Mortgage and Housing percentage of building cost, which
Corporation.27 amounts to the same thing). This form of The importance of the right mindset or
compensation assumes that all design is attitude for all team members is hard to
pretty much the same, with the effort exaggerate. Some key attributes of the
What Else is Needed for required mindset are as follows:
expended being directly related to building
Successful IDP? cost. Instead, the team should be
I Commitment to the process and
compensated for brains, not stuff.
Earlier, some of the elements that ownership for your part in it.
characterize IDP were presented, but it is If compensation is not changed, working
I Thinking in whole system terms to
also worthwhile considering a few harder or smarter only to see your fee
optimize the project as a whole, not
overarching factors that need to be present reduced, limits the enthusiasm and
value-engineer individual components.
for a successful integrated design process. creativity of even the most dedicated
professional. There are several ways of I Willingness to measure, benchmark
Client Buy-in changing compensation. One approach and quantify performance.
The client has to be fully aware of how that some IDP practitioners have found to
I Active listening and openness to
IDP is better and has to be fully be successful is to negotiate a separate fee
learning from other team member.
committed to it. for the early, creative phase, where the
effort involved is relatively independent of I Asking the right questions, in an open-
This commitment includes an understanding project size. The later phases, which allow ended way, that will lead to new
that while the potential rewards from to complete the design and drawings, are answers, rather than arriving with
pursuing integrated design are great, the more closely related to project size and the preconceived answers.
process will distribute the design teams fees can be more properly linked to size.
I Awareness and respect for team roles and
dynamics, valuing all contributions.
26
A Handbook for Planning and Conducting Charrettes for High Performance Projects, 2003, U.S. Department of Energy,
http://www.eere.energy.gov/buildings/highperformance/pdfs/charrette_handbook/33425rep.pdf
27
CMHC (http://www03.cmhc-schl.gc.ca/b2c/b2c/init.do?language=en&shop=Z01EN&areaID=0000000037&productID=00000000370000000063)
Goal Setting In green building terms, the goals should Objections to IDP
be set at a whole building level, such as a
Critical to success are clear and measurable It is worth discussing some of the standard
LEED Gold standard, but also for specific
goals based on a shared understanding objections that are raised to the Integrated
performance attributes that make sense for
and vision of what is to be achieved. Not Design Process. The objections usually are
a project. Some real-world examples of
every goal need be a BHAG (Big Hairy phrased as the following:
goals that have been set (and met) on
Audacious Goal) but they should be
Canadian green building projects include: “We’ve always done IDP” – That may be
SMART; Specific, Measurable, Achievable,
Realistic, Time-bounded. I 60 per cent better energy performance true, and if so, keep doing it. Usually the
than MNECB – EMS Fleet Centre, people who say this, however, have
Cambridge, ON remarkably few green buildings to show
as evidence.
“If you don't know where you I 95 per cent diversion of construction
are going, any road will take waste from landfill – Vancouver Island “If you want me to do something
you there.” Technology Park different, that implies I’ve been doing it
wrong all these years” – Well no, it
– Lewis Carroll I Zero discharge of sewage waste water – doesn’t. This is the 21st century, with an
MEC Winnipeg Store entirely new situation for human society,
I 50 per cent of all materials supplied and new problems and demands for the
President Kennedy’s “man on the moon” from within 800 km – BC Cancer profession to respond to. Think of IDP as
speech in the early 1960s is often cited Research Institute a new tool to add to the toolbox to address
as an example, for good reason. It was this new situation.
I 75 per cent of the new building
inspirational because it had all the right “The client won’t pay for it” – Possibly
constructed from materials from the old
characteristics. It was specific and measurable not, especially the first time when the value
building on site – MEC Winnipeg Store
(put a man on the moon and bring him has not been demonstrated to the client, but
back safely) and time-bounded (by the end I Elimination of mechanical air-conditioning that’s exactly what is the intent of NRCan’s
of the decade). No one was completely sure system, while retaining occupant Commercial Building Incentive Program.
at the beginning whether it was achievable comfort – Liu Centre, Vancouver
or realistic, but as a stretch goal that was
not too far ahead of what was thought
possible, it created its own momentum.
Goals like these are motivational.
“It affects the schedule and budget” – It “It means a loss of creative control as an
may do, but the benefits should more than architect” – Not from what I have
outweigh the impacts. Experienced teams observed. After all, what generates more
are finding that the time spent is merely creativity—a blank sheet of paper or fitting
shifted from the latter stages of the design the program to a tricky site? An integrated
process to the earlier stages. Design costs design process often generates more
may or may not be greater. It depends on creative ideas and solutions. A good
how well the team manages the project and analogy is that the architect goes from
captures inherent synergies. It is not as if being a soloist to being the conductor. In
traditional projects always come in on time any performance the conductor is always
and under budget. The BC Cancer Agency’s visible, and wears a different suit and often
new laboratory in Vancouver, a LEED Gold his name is in the spotlight.
building, was designed with an IDP process
and came in on time, and $10 million
under the $100 million budget.
Questions
1. What are 6 of the 10 common 4. What is the role of the 7. What is one of the key
elements of most integrated design facilitator in IDP? objectives of the kick-off charrette?
processes that differentiate IDP
from traditional design? 5. What other expertise is critical 8. What are the three key success
to include on the core IDP team? factors in an Integrated Design
2. What are buildings’ contribution Process?
to primary energy consumption and 6. Although there is not a
greenhouse gas production in Canada? common definition of all the 9. How would you structure an
process steps in an IDP process, IDP for your next project? Who
3. List at least three benefits to what are three of the key process would participate? How could
employing an integrated design steps from your perspective? the meetings be facilitated to
process. encourage everyone’s participation?