Manpower Forecast 21033-21034

The document outlines manpower requirements for various mechanical, electrical, and plumbing (MEP) projects across multiple facilities over several months. It lists 18 projects requiring MEP works including electrical, plumbing, HVAC ducting and piping, and external drainage. The total manpower required ranges from 37 to 60 personnel per month to complete this work between January and July.

Uploaded by

sabih344
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
103 views2 pages

Manpower Forecast 21033-21034

The document outlines manpower requirements for various mechanical, electrical, and plumbing (MEP) projects across multiple facilities over several months. It lists 18 projects requiring MEP works including electrical, plumbing, HVAC ducting and piping, and external drainage. The total manpower required ranges from 37 to 60 personnel per month to complete this work between January and July.

Uploaded by

sabih344
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

MEP MANPOWER REQUIREMENTS CMW-21033

Manpower required Per Month


Sr # Facility # Division Description of Works Remarks
January February March April May June July
1 Electrical Electrical LV, ELV, SMATV, Fire Alarm 3 3 2 2 3 2 1
2 Plumbing Plumbing Works (PPR, UPVC & Final Fix items) 4 4 4 4 4 2 2
FAC-01
3 HVAC (Ducting) Works Ducting Works 8 4 4 4 2 2 2
4 HVAC (Piping) Works CHW installation works 4 4 4 4 2 2 2
5 Electrical Electrical LV, ELV, SMATV, Fire Alarm 3 3 2 2 3 2 1
6 Plumbing Plumbing Works (PPR, UPVC & Final Fix items) 4 4 4 4 4 2 2
FAC-02
7 HVAC (Ducting) Works Ducting Works 8 4 4 4 2 2 2
8 HVAC (Piping) Works CHW installation works 4 4 4 4 2 2 2
9 Electrical Electrical LV, ELV, SMATV, Fire Alarm 8 8 8 8 8 10 4
10 Plumbing Plumbing Works (PPR, UPVC & Final Fix items) 2 2 4 4 2 2 2
FAC-03
11 HVAC (Ducting) Works Ducting Works 0 2 4 4 4 2 2
12 HVAC (Piping) Works CHW installation works 2 2 2 2 2 2 2
13 Electrical Electrical LV, ELV, SMATV, Fire Alarm 0 0 0 2 2 2 1
FAC-04
15 HVAC (Piping) Works Copper Pipe installation works 0 0 2 0 0 2 0
16 Electrical Electrical LV, ELV, Fire Alarm 0 0 4 2 2 0 0
17 External Plumbing Water Supply & Drainage Works 4 4 4 2 2 0 0
18 HVAC (Piping) Works HDPE installation works 2 4 4 0 0 4 0

TOTAL MEP MANPOWER REQUIRED PER MONTH 56 52 60 52 44 40 25


MEP MANPOWER REQUIREMENTS CMW-21034
Manpower required Per Month
Sr # Facility # Division Description of Works Remarks
January February March April May
1 Electrical Electrical LV, ELV, SMATV, Fire Alarm 2 2 2 4 2
2 Plumbing Plumbing Works (PPR, UPVC & Final Fix items) 2 2 0 0 2
FAC-01
3 HVAC (Ducting) Works Ducting Works 4 4 0 0 0
4 HVAC (Piping) Works Copper Pipes installation works 2 2 0 0 2
5 Electrical Electrical LV, ELV, SMATV, Fire Alarm 1 1 0 0 1
6 FAC-02 Plumbing Plumbing Works (PPR, UPVC & Final Fix items) 0 0 2 0 2
8 HVAC (Piping) Works Copper Pipes installation works 0 2 0 0 2
9 Electrical Electrical LV, ELV, SMATV, Fire Alarm 2 2 2 2 2
10 Plumbing Plumbing Works (PPR, UPVC & Final Fix items) 0 2 2 0 2
FAC-03a
11 HVAC (Ducting) Works Ducting Works 4 4 2 4 3
12 HVAC (Piping) Works CHW installation works 0 4 5 4 2
9 Electrical Electrical LV, ELV, SMATV, Fire Alarm 2 2 2 2 2
10 Plumbing Plumbing Works (PPR, UPVC & Final Fix items) 0 2 2 0 2
FAC-03b
11 HVAC (Ducting) Works Ducting Works 4 4 2 4 3
12 HVAC (Piping) Works CHW installation works 0 4 5 4 2
9 Electrical Electrical LV, ELV, SMATV, Fire Alarm 0 0 2 2 2
FAC-04a
12 Mechanical Fans (Ductman) Mechanical Fans Installation works 0 0 2 2 0
9 Electrical Electrical LV, ELV, SMATV, Fire Alarm 0 0 2 2 2
FAC-04b
12 Mechanical Fans (Ductman) Mechanical Fans Installation works 0 0 2 2 0
13 Electrical Electrical LV, ELV, SMATV, Fire Alarm 0 0 2 2 2
FAC-05
15 HVAC (Piping) Works Copper Pipe installation works 2 2 2
16 Electrical Electrical LV, ELV, Fire Alarm 0 0 2 2 2
17 Plumbing (Drainage) Drainage Works (GRP) 10 10 10 10 10
External
Plumbing (Drainage) Drainage Works (HDPE) 0 4 4 4 4
18 CHW (Piping) Works HDPE installation works 4 4 4 4 4

TOTAL MEP MANPOWER REQUIRED PER MONTH 37 55 58 56 57