3 Mnyuzi Boq
3 Mnyuzi Boq
Masonry works -
Construct stone masonry Foundation footing
wall using cement sand mortar in the ratio of m3 55 33,000.00 1,815,000.00
(1:4)
Concrete works -
Provide plain insitu concrete grade 15 100mm
thick floor slab concrete with formwork
m3 17 250,000.00 4,200,000.00
around the edges
S/N WORKS DESCRIPTION UNIT QTY RATE AMOUNT
Moisture control -
500mm gauge polythene damp proof
membrane laid over blinded hardcore m2 112 5,000.00 560,000.00
-
SUPERSTRUCTURE -
Walling -
Solid sand cement Block thick wall bedded
and jointed in cement and sand (1:4) mortar
-
FLOORING -
Cement and sand (1;4) screeds and backings
-
ELEMENT NO 8-DECORATION -
Painting work -
Prepare the surface and apply 3-coats of
emulsion paint to ceiling board m2 80 7,800.00 624,000.00
-
ELELECTRICAL INSTALLATION -
a)Allow for the electrical installation sytem
complete with its fitting, conections and
accessories including builders work make sure
the system operates properly (NB, ALL
ELECTRICAL MATERIAL SHOULD BE
TRONIC PRODUCT. LS 1 4,325,000.00 4,325,000.00
-
PLUMBING AND SEWARAGE SYTEM
-
Plumbing work -
a)Allow for the plumbing sytem complete with
fitting, conections and accessories including
builders work make sure the system operates
properly Item 1 2,500,000.00 2,500,000.00
TOTAL 99,023,500.00
ADD 18% VAT 17,824,230.00
TOTAL GRAND 116,847,730.00