Nilmani
Nilmani
129070/2020/O/o DG/RDSO
DA: As above
Digitally signed by
NILMANI NILMANI
Date: 2020.08.07
17:07:40 +05'30'
(Nilmani)
Executive Director/Track-I
1 Rail Fracture Action to be taken as per Para All fracture pieces of rail shall be sent
617 of redrafted IRPWM of to M&C Dte. of RDSO for analysis.
June/2020.
3 Gauge corner During the regular trolley/foot Any unusual observed would be
cracking and inspections, ADEN/SSE(PWay) reported to RDSO giving details
surface would carry out careful visual rolling mark, location, laying date,
defects inspection of the rails and
GMT and affected length.
record any significant
observations.
13. South East Central Railway, Bilaspur- 13 nf{k.kiwoZ e/; jsyos] fcykliqj&495004
495004.
Kolkata-700 071
The Chief Administrative Officer eq[ ; iz’ kklfudvf/kdkjh ¼fueZk.k½
(Construction):
1. Central Railway, Mumbai CST - 400 001. 1- e/; jsyos]eqEcbZ lh,lVh&400001
11.South Central Railway, Rail Nilayam, 11-nf{k.k e/; jsyos] jsyfuyk;e] fldUnjkckn&500371
Secunderabad- 500 371.