Cluster 10 Internal 2022
Cluster 10 Internal 2022
Instruction: This section consists of eight (8) multiple choice questions; attempt all
questions. Circling the best possible answer, one (1) mark is allotted for each correct
response
2. To prevent possible injury to personnel during start up, the operational status of safety
systems must be check except
(a) Utility systems such as instrument air ,fuel ,gas and water are in operational
condition
(b) Pumps are incorrectly set for manual or automatic start up
(c) No material supplies should be ready
(d) Valves are lined up in alphabetical order
6. Which of the following must be followed when you are shutting down a machine?
(a) Properly turn off or shut down using normal stopping means
(b) Stop immediately without any interference from others
(c) Authorized by supervisor before doing so
(d) Over its work time for the day
8. When apply lock out or tag out devices one should consider the following EXCEPT
1. Before you start up any item of equipment in the field it is necessary to inform the duty
operator in the control room. True or False
2. It's always important to tag out/ isolate machines or equipment that is not in USE.
True or False
3. To prevent possible injury to oneself and others during start up procedure one should do
all proper checks on equipment and electrical components before starting up systems.
True or False
True or False
Instructions: This section consists of Seven (7) short answer questions. Answer all
questions.
1. State three (3) possible reasons that may cause machine breakdown. (3 marks)
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
2. Give six (6) Occupational Health and Safety requirements for performing shut down/
isolate machines and equipment. (6 marks)
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
6. Name two (2) types of misalignment and explain any one (1). (3 marks)
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
7. Name three (3) things you should take in consideration that might need to be addressed to
ensure quality alignment of a fan shaft and explain any two (2). (6 marks)
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
The End
Cluster 10
Practical Class test
Group: Air Conditioning and Refrigeration Level 2
Instructor: Mr Terrence Lyn
Demonstrator: Cpl Richards, T
Practical Task
Instructions: Trainees of the HVAC department are tasked to remove and replace a broken
condensing unit Fan shown in figure 1, and reinstall to the Quality Assurance Department to
ensure that the unit will be operational to cool the equipment and machines inside of the office.
Trainees are required to work in five (5) group of five (5) each member is to give valuable
contribution to complete task.
figure 1
Can perform the task with initiative and adaptability to problem situations.
Can perform the task satisfactorily without assistance and/or supervision.
Can perform the task but requires periodic assistance and/or supervision.
Can perform limited parts of the tasks satisfactorily requires considerable assistance
Has not demonstrated sufficient evidence on which judgment can be made.
Instructor’s feedback
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
___________________________________________________
Cluster 10
Internal test
Group: Air Conditioning and Refrigeration Level 2
Instructor: Mr Terrence Lyn
Demonstrator: SSgt McCuurdy, S
Instruction: This section consists of Six (6) multiple choice questions; attempt all questions.
Circling the best possible answer, one (1) mark is allotted for each correct response
2. Which of the following will give the correct identification of the components required
(a) Tools
(b) Information on replacement parts
(c) Masking tape
(d) Electrical wires
(a) To provide effective cooling and to reduce vibration , hence fan blade tips should be
equal across the plenum or fan shroud
(b) To provide maximum work with minimum fuss
(c) To provide cooling and clearances
(d) None of Above
(a) Isolate , lock out/tag out and shut down all sources
(b) Lock out/tag out , isolate and shut down all sources
(c) Shut down , isolate and lock out/tag out all sources
(d) Isolate and shut down all sources
6. Once the equipment or machine’s energy isolating device has been disconnected, the
lockout or tagout devices shall be
This section consists of six (6) True or False questions. Circle True or False to indicate your
choice for each question/item. One (1) mark is allotted to each correct response.
7. All energy sources should be de-energized before any form of work is performed. True or False
10. Seal wear increases due to shaft loading when shafts are misaligned. True or False
11. .All bolting systems should be tight with minimal flexing of the cooling tower. True or False
12. All components should be replaced with identical parts. False or True
Instructions: This section consists of Thirteen (13) short answer questions. Answer all
questions.
14. State the difference between parallel misalignment and angular misalignment. (4 marks)
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
15. Give three (3) Occupational Health and Safety requirement for performing leveling and
Alignment of Machines and Engineering Components. (3 marks)
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
18. List four (4) equipment uses to shut down/ Isolate in Air Conditioning and Refrigeration
industry. (4 marks)
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
19. State procedure of shutting down/ Isolate an Air Conditioning system. (3 marks)
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
21. List three (3) sequence that must be followed when testing or repositioning a machine or a
piece of equipment. (3 marks)
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
The End
Cluster 10
Practical Class test
Group: Air Conditioning and Refrigeration Level 2
Instructor: Mr Terrence Lyn
Demonstrator: SSgt McCuurdy, S
Practical Task
Instructions: Trainees of the HVAC department are tasked to remove and replace a 24000 BTU
Evaporator Unit shown in figure 1, and reinstall to the Administration Department to ensure that
the unit will be operational to cool the equipment and machines inside of the office.
Trainees are required to work in five (5) group of five (5) each member is to give valuable
contribution to complete task
figure 1
Can perform the task with initiative and adaptability to problem situations.
Can perform the task satisfactorily without assistance and/or supervision.
Can perform the task but requires periodic assistance and/or supervision.
Can perform limited parts of the tasks satisfactorily requires considerable assistance
Has not demonstrated sufficient evidence on which judgment can be made.
Instructor’s feedback
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
___________________________________________________