0% found this document useful (0 votes)
28 views

Mir 075

This 3 sentence summary provides the key details from the material inspection report: The report details an inspection of 319 pieces of 12x1220x2440mm shuttering plywood from supplier L&W Construction Pvt. Ltd. for the Metro Complex, Phase-1 Development project. The materials were inspected and found to conform to specifications, mockups, and approved data sheets, pending satisfactory results from material test certificates or third party testing. Signatures from quality control and the project manager approved the materials subject to test results.

Uploaded by

MCCIN L&W
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views

Mir 075

This 3 sentence summary provides the key details from the material inspection report: The report details an inspection of 319 pieces of 12x1220x2440mm shuttering plywood from supplier L&W Construction Pvt. Ltd. for the Metro Complex, Phase-1 Development project. The materials were inspected and found to conform to specifications, mockups, and approved data sheets, pending satisfactory results from material test certificates or third party testing. Signatures from quality control and the project manager approved the materials subject to test results.

Uploaded by

MCCIN L&W
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

BANGALORE TOWER PRIVATE LIMITED

The CUBE @ Karle Town Center, 2nd Floor, 100 Ft Road Nada Prabhu Kempe Gowda Main Road Adjacent to Nagavara Lake, Bangaluru-560 045

MATERIAL INSPECTION REPORT


MIR ID. : MCCIN/MIR-075 Format ref : F-ENG-QA-001

Project name : Metro Complex, Phase-1 Developmet Revision : R-0

Date of Inspection : 17/12/2022 Issue date : -

Contractor / Supplier : L&W Construction Pvt. Ltd. Issued by : -

Invoice No. : BLR2352/22-23 Invoice Date: 14-10-2022 Material approval reference No./ PO/ WO : -
Action taken
Qty as per Test certificate
Sl .No Date of receipt Description of Material Unit Make / Brand Actual Qty Shortage Batch no (approved/Not Remarks
challan enclosed / Details
approved)
1 17-12-2022 12X1220X2440MM SHUTTERING PLYWOOD NOS ECOWOOD 319.000 319.000 - MTC

Materials are inspected and found conformed with respect to

1. Specifications / BOQ 3. Approved Data Sheet

2. Mockup 4.Accepted subject to satisfactory results of MTC / third party testing


P

Signature

QA/QC (Arun M - Sr. Engineer-QA/QC) PROJECT INCHARGE (Nagendra - Sr. Project Manager) PMC / CLIENT

You might also like