Capacity Development Guideline (JICA Model)
Capacity Development Guideline (JICA Model)
Capacity Development
Guideline/Manual
(JICA Model)
January 2014
JICA Capacity Building Project for the Implementation of the
Executive Programme for the Agricultural Revival
2014
This guideline and manual were developed and published by JICA Capacity Building Project for
the Implementation of the Executive Programme for the Agricultural Revival in the Republic of the
Sudan.
January 2014
Table of Contents
Guideline
1. Introduction 1-1
2. Capacity Development Concept of the JICA Project 1-1
3. Implementation Structure of the JICA Project 1-3
4. Project Cycle Management (PCM) 1-4
5. Monitoring and Evaluation Framework 1-8
Manual
Implementation Process 2-1
Appendix
1. Capacity Development Working Group (WG) Terms of Reference (June 2010)
2. Organizational Capacity Assessment Sheet (version 2)
3. Individual Capacity Assessment Sheet (version 1 and version 2)
4. Sample of Programme Design Matrix (PDM)
5. Sample of Plan of Operation (PO)
6. Evaluation Sheet for final Presentation
Index of Abbreviations
CB Capacity Building
DG Director General
PO Plan of Operation
TU Training Unit
1. Guideline
Implementation Guideline (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
1. Introduction
JICA Capacity Building Project for the Implementation of the Executive Programme for the
Agricultural Revival (hereinafter as “the JICA Project”) was implemented from March 2010 to
March 2014 (4-year- project). The Project aims that the Ministry of Agriculture and Irrigation
(hereinafter as “FMoAI”) and the Ministries of Agriculture in the state level (hereinafter as
“SMoA”) are to obtain needed capacities towards materializing “the Executive Programme for
the Agricultural Revival”.
The JICA Project is expected to produce two outputs by the end of the project period, such as:
Output 1: Through the experimental activities of the Project, a model system of human
resource development and organizational capacity development of the Ministry of
Agriculture and Irrigation to be established.
In order to complete the outputs, the JICA Project and its counterparts (FMoAI and SMoAs)
have endeavored to conduct various activities for their staff since March 2010. This guideline
and manual contain the training methodologies which we have developed in the process of
conducting output 1 activities. We expect that they can be used by those who will conduct
training courses in FMoAI and SMoAs in the future.
1-1
Implementation Guideline (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
4th Year
Utilization to
3rd Year
Internalization
Training to
2nd Year
1st Year Utilization
Awareness Basic Training
Raising and and Practice
Basic Skill
Training
Based on these concepts, the JICA Project provides capacity development activities for the
target directorates and staff. The detail procedures are introduced in the manual.
1-2
Implementation Guideline (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
Advisory Committee: It is composed of concerned DGs and the JICA Project. It has an
obligation to supervise all capacity development activities of the JICA Project. Meetings are
held 1 or 2 times a year.
Task Team: A Task Team consists of about 10 members who have taken JICA training
courses. The members make an action plan and implement it.
Advisory
Decision Maker Committee
Planner/
Working Group JICA Project
Supervisor
Working Group Working Group Working Group Working Group Working Group
member in ICI member in PAE member in TTE member in HSA member in TU
Task Team in Task Team in Task Team in Task Team in Task Team in
ICI PAE TTE HSA TU
Implementer
1-3
Implementation Guideline (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
The PCM comes up with a “Project Design Matrix (PDM)” as a tool for managing the entire
project cycle. The project cycle consists of “Plan – Do – See”:
i) Plan: a written account of an intended future
course of action aimed at achieving specific
goal(s) and objective(s) within a specific timeframe.
It explains in detail what needs to be done, when,
how and by whom.
ii) Do: to implement, to direct and to monitor all steps
in their proper sequence.
iii) See: to review the steps (process), to evaluate to
what extent the objectives are accomplished, to extract any lessons learnt from the
process and results, and to come up with recommendations for future projects.
1-4
Implementation Guideline (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
The project monitors the activities based on the Plan of Operation (implementation
schedule and responsible persons), and evaluates the progress of the project along with
the indicators on the PDM. Their examples are in the Manual and Appendix.
1-5
Implementation Guideline (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
Project Purpose
What should the
project achieve within
the project period?
Outputs
How should the
project achieve the
Project Purpose?
Activities Input
What should actually Personnel, materials, equipment, facilities
be done to achieve and funds that are required for the project.
output?
Pre-conditions
Conditions that must
be fulfilled before the
project starts.
The PDM does not have a time schedule, a person in charge, an implementer, input or any
other remarks. Thus, the Plan of Operation (PO) is made besides the PDM. The members
of a project implement their activities. The supervisor monitors the progress of the project
based on the PO. Whenever there is a delay, the supervisor investigates the causes and
takes appropriate action. At the same time, the supervisor and implementers check to what
extent the indicators of output and project purpose on the PDM have come to the expected
levels. If they do not, supervisors have to reconsider the means of approach (activities).
1-6
Implementation Guideline (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
1-7
Implementation Guideline (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
1-8
Implementation Guideline (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
1-9
2. Manual
Implementation Manual (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
Implementation Process
The Implementation Process has four (4) steps as shown below. The JICA Project team
carried out from Step 1 to Step 4 with the CB Working Group members. It should be noted
that “the JICA Project” written in the Manual means not only the JICA Project Team
(Japanese experts and the National Consultant) but also CB Working Group members.
The next section explains how to take these steps one by one.
2-1
Implementation Manual (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
The training courses and other capacity development activities have to be designed to satisfy
their needs. However, (3) the available resources (financial, physical and human resources)
can limit the framework of the activities. It is important that the planner seek better solutions
considering the available resources.
In this section, the methodology of training needing analysis and capacity assessment is
introduced.
The workshop was conducted in participatory manner by a facilitator. Each participant wrote
his/her opinion on a card regarding the given theme and presented it on the wall. All
participants discussed all the presented cards with the facilitator.
2-2
Implementation Manual (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
In general, the stakeholders can be allocated into 5 categories as follows. However, in the
JICA Project, the participants analysed 3 categories: beneficiaries (main customer),
implementing agency and funding agency. Some stakeholders may appear in several
categories.
Beneficiaries: Who obtains the benefits if your directorate accomplishes the mandate?
This means that the beneficiaries are the recipients (customers) of your service.
Potential Opponents: Who may lose opportunities/benefits if your directorate
accomplishes the mandate?
Implementing Agency: Your directorate has a responsibility for implementing any
activities along with the mandate, but sometimes you need partners and/or
collaboration with others.
Decision-makers: Which decision-maker has to be concerned if your directorate
accomplishes the mandate?
Funding Agency: You have to consider potential financial agencies besides the
present funding agencies.
2-3
Implementation Manual (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
Basic information: quantitative information (i.e. the number of beneficiaries and cost),
quantitative information (i.e. working productivity)
Problems/weaknesses
Strengths/potentials
In exercise 3, the participants specified 5 categories, which they considered the most
essential capacities for accomplishing the mandate. Then, a facilitator requested the
participants to re-define the listed capacities using verbs.
This is an activity to transfer any conceptual terms into behavioural objectives. Through this
activity, people have a common understanding about what each conceptual term means for
them. At the same time, the definitions show the participants the ideal activities and/or
attitude which they head for.
The table below shows an example about 5 capacities and their definition. The definition can
be different from person/group to person/group. That is fine.
2-4
Implementation Manual (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
In exercise 4, regarding the 5 capacities listed in exercise 3, you will assess to what extent
your directorate/unit has already satisfied the defined activities and attitude of the 5
capacities at present.
The JICA Project adopts the Kirkpatrick Model as the evaluation of capacity development.
According to the Kirkpatrick model, output of capacity development programme can be
divided into 4 levels as the figure below.
Indicatos
Kirkpatrick Model
Level 4 As a result is there any benefit Improvement of benefit for
Result or profit for your customers
directorate/unit?
Base on the Kirkpatrick Model, the JICA Project sets up the 5 assessment grades into
capacity development activities.
Participants assess the present capacities of their directorate/unit with the 5 listed
capacities in exercise 3 by the JICA Grade system.
2-5
Implementation Manual (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
Exercise 5 aims to assess your present capacity, and to specify your weakness (training
needs). Three layers (institution, organization and individual) closely link each other under
one common mission. In order to accomplish the mission, an institutional arrangement
(system) should be established; the organization should set up their mandate within the
institutional framework; and then human resources (individual members) accomplish the
mission by carrying out their job description.
Institution
(System)
Mission
accomplished
Organization Individual
Hence, you are expected to contribute to your directorate/unit to accomplish its mandate as
a member. How you assess your present capacity means to what extent you have
contributed to the goal of your directorate/unit. Thus you assess your present capacity from
the 5 essential capacities which were listed in exercise 3. Assessment criteria can be the
same tool (i.e. JICA 5 grades) as organizational capacity assessment.
2-6
Implementation Manual (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
Section number 2 asks the participants about their present weak points (Needs Analysis),
and then the individual assessment sheet lets them list preferable types and themes of
training in the year in section number 3. Also it confirms how the participants would transfer
the knowledge and skills obtained in the training into their daily work in order to increase the
efficiency and effectiveness of their directorate. Through filling in the individual capacity
assessment sheet, the participants can enhance their comprehension of their strengths and
weaknesses, and eventually specify the area (capacity) which they hope to develop.
The JICA Project considers that the capacity will never be developed unless each individual
recognizes his/her present capacity gap (weakness) by himself/herself. Those who have
identified their weaknesses can easily take action to overcome their weaknesses. Training
is one of the means to do so. Individuals who have the motivation can utilize their
knowledge and skills in their work and assimilate them effectively.
The results of the individual capacity development sheets are entered into a database of
the JICA Project for capacity development activities.
2-7
Implementation Manual (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
When you select themes of any training courses (capacity development programmes), three
factors should be considered: necessity, priority and appropriateness.
(1) Necessity
“Necessity” of the training is one of the fundamental conditions, but whose necessity
should be considered?
Individuals: You have already identified the target group (expected trainees) needs
by the individual capacity assessment sheet. You can select some themes among
candidates by means of analysing all individual capacity assessment sheets about
the frequency, urgency and/or importance of each theme.
Organizations: Since the individual capacity development programme has to be
linked with the necessity of concerned organizations, as well, you can interview the
management of target group about the necessity.
Also if you expect some technical transfer and/or budget contributions from any donors,
you will consider their priority and/or project framework, as well.
(3) Appropriateness
Lastly, you consider whether the selected themes are appropriate areas as a means to
develop the capacity development of the target organization and group.
In order to establish the training framework, you can utilize the PCM methodology. Based on
the results of individual capacity development sheets, you study the details of the capacity
gap (development needs).
2-8
Implementation Manual (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
So the training planner assesses the existing level (basic, intermediate or advance) of
trainees, and designs the training course to be matched with the speed of trainees’
comprehensions. The details are in the next section ((2) Annual Plan of Capacity
Development).
Therefore you had better establish a long-term capacity development goal (7-10 years)
and a mid-term capacity development goal (3-5 years). The long-term and mid-term goals
should be closely linked with the capacity development priority of FMoAI and SMoAs.
However the approach to the goals can be reviewed every year, and revised in the
annual plan.
For example, the JICA Project established a 4 year plan of capacity development, and
adjusted the activities along with the progress of trainees’ activities. The JICA Project had
a goal to solve the problems which the participants claimed in the first year while the
participants conducted a project (“plan-do-see”) by themselves.
2-9
Implementation Manual (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
Selection of Facilitators
The selected themes of the Advanced Training Course are (1) Quality Control, (2) Agriculture
Policy Formulation, and (3) Strategic Management. The Project opened applications for
course facilitators respectively from the public through newspapers. The process is as shown
in table Box1.1.
It means that the management skill of your directorate/unit can be improved when its
member (leader and/or staff) enough satisfies with the required activities. That is, the
required activities can equal the main content of training course for
“management”.
2-10
Implementation Manual (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
Table 2.5 shows that the capacity of “management” is to meet the 7 required activities
and/or states. You will design the training curriculum and type of training (i.e. lecture, OJT,
workshop, sightseeing, presentation and so on) to correspond to them.
If you want to increase the knowledge of your target group, in-class training is most
suitable. However, it is necessary for skill training and attitude training to be conducted
not only in-class training but also through workshops and/or On-the-job-training (OJT)
because skills and attitude can only be developed through daily practice.
2-11
Implementation Manual (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
You have to design training courses in consideration with the framework of Aspect,
Required Activities and Training Type.
The JICA Project has prioritized that the trainees utilize the obtained knowledge and skills,
rather than that they just participate in various training programs. Thus in the JICA
training courses and at the end of the training, the trainees are always required to make
an action plan and to implement it in their daily work.
(2) Pre-session between facilitators and trainees (for Advance Training Courses)
In the case that you employ some external facilitator, it is most likely that the facilitator
does not know about your problems and background. The JICA Project set up a
“pre-training interview session” in which the representatives of trainees and a facilitator
exchanged their views and/or expectations of the training courses.
The following is an example of a Pre-training Interview Session conducted by the JICA
Project.
2-12
Implementation Manual (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
3.1 Preparation
Before starting any training courses, some preparation is needed as follows:
(1) Venue
You have to confirm the training venue. Confirm that the venue is the appropriate size
and has the available facilities (desks and chairs, whiteboard (flip-chart),
audio-equipment, and others). You need to confirm the availability of the room, make a
reservation and form a contract.
Please receive the handouts from the facilitators, and prepare the appropriate numbers.
The JICA Project has produced a feedback sheet. It aims to assess the reaction of the
trainees after the training, and to reflect on the comments for the next training.
3.2 Implementation
(1) Opening Session
You may ask suitable person(s) to have opening remarks if necessary.
2-13
Implementation Manual (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
(2) Supervision
You observe the lecture, and monitor the progress. If you notice some problems or
difficulties which the trainees might have during the explanation from the lecturer, you
advise the facilitator(s) during a break to give further explanations. This is because it is
highly likely that an external facilitator will understand the background (educational level,
daily work, usage of technical terms, etc.) of the trainees.
In order to improve the quality of training, “recording” is crucial. You should record
comments and/or requests from the trainees and facilitator(s) through conversations with
them, and also the recording of photos and/or video.
(3) Closing
The facilitator(s) review and summarize every session, and comment on the work/effort
of the trainees during the training.
At the end of the closing session, you ask the trainees to fill-in a feedback sheet and to
submit it to you. The result should be entered into the database.
Also you remind all participants the necessity and importance to utilize knowledge and
skill acquired in the training in the daily work.
3.3 Reporting
You are requested to make a report at the end of the training. The report has to mention, for
example;
Background of training courses, to mention the reason why the training was
conducted. E.g. Individual Capacity Assessment Sheet: Large number of requests
from trainees.
Overview of training courses.
Framework of training.
Facilitator(s) and the reason why he/she/they was (a) facilitator(s).
Curriculum and time table.
Process (results of monitoring).
Results of feedback sheet.
Your comment on the training.
Lessons learnt from the training.
2-14
Implementation Manual (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
Level 1 (Reaction) means what the training participants (trainees) thought about the training.
Some trainees become interested in the training theme after the training, and others may lose
interest.
Level 2 (Learning) means what and to what extent did they learn from the training. Up to level
2, the trainees do not have the practical experience through their work; they only have the
knowledge (concept).
Level 3 (Behaviour) means that trainees have changed their behaviour in their daily work
(and life) from what they have learnt in the training.
Level 4 (Result) means that trainees have produced benefits (profits) for their Directorate/Unit
using the obtained knowledge and skills.
The JICA Project aims that the trainees can reach to level 4 based on the knowledge and
skills with which the Project provides. In order to reach to it, trainees have to practise the
obtained knowledge and skills in their work. However, it is not always possible for the trainees
to do so.
Thus the JICA Project conducts on-the-job-training (OJT) through the implementation of an
action plan.
Indicatos
Kirkpatrick Model
Level 4 As a result is there any benefit Improvement of benefit for
Result or profit for your customers
directorate/unit?
2-15
Implementation Manual (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
The lessons learnt of the JICA Project show that the Task Team whose members come
from the same directorate/unit has merits as follows in implementing an Action Plan:
integrating their awareness of the problems in their work into one action plan
sharing information among the Task Team members
arousing teamwork among the Task Team members
increasing responsibility and identity to their directorate/unit
increasing commitment to the Action Plan activities
The theme of the action plan has to be chosen from the problems/challenges within their
daily work because all the training aims to improve the efficiency and effectiveness of their
work.
At the beginning of the project, the JICA Project recognized the capacity gap between the
expected capacity and existing capacity of the target group. Also the working environment of
the target group was not always cooperative to optimize their capabilities.
Then the JICA Project set up a 4 year capacity development plan to accumulate the
capacities of the target group year by year. Therefore training about PCM, leadership,
communication, team building and other management concepts were provided to the trainees
as basic training in the 1st and 2nd years.
It is important to consider what and how to develop the capacity of your target group, and to
make a mid-term plan and a long-term plan. An Annual Plan should also be considered as
well.
1
The Foundation for Advanced Studies on International Development, Tokyo, Japan
2-16
Implementation Manual (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
Based on the result of the analysis, the Task Team members consider what kinds of
services the beneficiaries expect, whose negative intervention should be controlled, who
can support their activities, how to persuade the decision-makers and so on.
Bad Good
There is no hospital People cannot receive
appropriate medical treatment
Do not include both the cause and the effect of a problem on one card.
2-17
Implementation Manual (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
Selection of Action Plan (Project) is a process of selecting specific project from the objectives
and means which are derived from the Objective Analysis. It is conducted on the use of
selection criteria.
The Objective Tree includes all means necessary to achieve the Core Objective. However, in
actual projects, there are many constraints, such as those related to inputs and schedule. It is
normal that not all means shown on the tree can be implemented as part of a single project.
Therefore, it is necessary to formulate a project from part of the tree.
Conduct the analysis by ensuring the cards right below the objective card cover every
means necessary to achieve objectives. When there are insufficient means, add any
necessary means.
In forming the lower part of the Objective Tree, add cards up to the level at which major
activities can be imagined to be implemented by a project An insufficient downward
development of the Tree causes some difficulties to choose a project.
The Task Team members had better consider whether the Action Plan can anticipate any
negative effects through the implementation.
Table 2.7 Sample of Selection Criteria and the Considering Factors respectively
Sample of selection
Considering factors
criteria
In terms of size, impacts, demands and urgency, is the tentative
Target Group
target group appropriately chosen?
In terms of size, impacts, demands and urgency, is the tentative
Target Area
target area appropriately chosen?
How much human resources, materials and funds for your action
plan can be expected to have?
Possible Input
Which is the most efficient way to use of possible input for
implementing the objective of the approach?
Does the objective of the approach meet the needs of the target
Needs (Demands) group?
Does the objective of the approach meet the stakeholders’ needs?
Is the approach relevant to development policies of their
directorate/unit?
Policy Priority
Is the approach relevant to development policies of the FMoAI
and/or SMoAs
Possible negative Is there any possible negative impact? If yes, can any measures be
impacts taken to remove or minimize such impact?
Achievement of the Can the objective of the approach (the card in the highest position)
Objective be achieved under the current framework and constraints?
Does the action plan use any material/equipment whose
maintenance is not locally available?
Is there enough time to train personnel to take over the activity
Sustainability of the when the action plan ends?
Objective Are the trained people likely to remain with the directorate/unit after
the project ends?
Is there any concern to be addressed about its sustainability from
the perspective of the cross-cutting issues?
2-19
Implementation Manual (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
5. If negative factors are found, consider altering the Approach and use a card to
show that it requires further investigation.
6. Select one Approach to be developed into a project.
A target group tentatively selected in the Stakeholder Analysis may be changed as a result
of discussion in the Project Selection stage.
PDM
Project Name:
i.e You took the Duration:
“C” Approach Target Area:
Target Group:
Date:
Version Number
A Objectively
Narrative Means of Important
Verifiable
B C D Summary Verification Assumptions
Indicators
Overall
B-1 B-2 C-1 C-2 D-1 Goal:
A
B-1-1 C-1-1 C-1-2 C-2-1 C-2-2 D-1-1
Project
B and D are
B-1-1-1 C-1-1-1 C-1-2-1 C-2-1-1 C-2-2-1 Purpose: satisfied.
C
B-1-1-2 C-1-1-2 C-1-2-2 C-2-1-2 C-2-2-2
Output:
C-1
C-1-1-3 C-2-2-3
C-2
Activities: Input
C-1-1 Input
C-1-2 Pre-Condition
Objective Analysis
C-2-1 Input
C-2-1
However, if the Task Team found any missing means-ends relation in the Project
Selection process, the top card has to be rewritten.
2-20
Implementation Manual (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
Thus normally the Overall Goal is only one. If you establish multiple Overall Goals, it is
necessary to carefully consider whether the project directions are contradictory, or
whether the Project Purpose can have impacts on all of the Overall Goals.
The Overall Goal is selected from cards positioned one level above the Project Purpose
card.
Output cards can be selected from the cards positioned below the Project Purpose card.
Even if the cards are further below than this level, the cards can be Output as long as
they require many Activities to achieve what the card says.
Task Teams should be careful not to re-phrase the Project Purpose as the Output. If the
Output cards have a sequential relation, Task Team will arrange them in order of time.
As illustrated below, Activities cards are sorted into the respective Output element and
the sequential order.
Sequential Order
Output 1 2 3 4
Sequential
Order 1-2 2-2 3-2 4-2
Important Assumptions
Important Assumptions are conditions that (i) are important for the success of a project
(action plan), (ii) but uncontrollable within the project, and (iii) there is uncertainty about
their fulfilment. They are conditions necessary for achieving an objective in the upper
column after implementing activities or achieving objectives specified for each component
of the Narrative Summary from the Activities to the Overall Goal.
2-21
Implementation Manual (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
Important Assumptions are positive and negative factors influencing the performance of
Activities and the achievement of objectives: for example, changes of economy
(price/distribution), policy/regulation, environment, socio-cultural, human resources, and
others. Therefore they should be monitored during the project’s implementation period.
In identifying Important Assumptions, it is useful to check the objective cards which are
not included in the selected approach in the Objective Tree; i.e. unselected objective
cards.
The indicators always include 5W1H elements: who, what, where, by when, which
measures and how much/many increase/improve. Figure 2.9 shows an example.
If there are any changes in the elements in the Narrative Summary, the corresponding
indicators may need to be modified.
Since Output, Project Purpose and Overall Goal have “Means-Ends” relationship each
other, it is logically impossible that the Project Purpose and Output, for instance, have the
same indicator(s).
Means of Verification
Means of Verification refer to the source of data for Objectively Verifiable Indicators: i.e.
statistics, reports and recorded data. They indicate from where or who the data is to be
obtained, a type of document, methods for obtaining it, and so on.
In selecting data sources, you have to be careful (i) the credibility of the data (data
sources and the methods of study), and (ii) availability of data collection (cost and
accessibility).
4. When data source do not exist, add a project’s activity for collecting data.
Input
Input column shows the inventory of all human resources, facilities, equipment and fund
necessary for the entire project.
It notes that the JICA Project has promoted the “Zero Cost” management in implementing
the Action Plan because the JICA Project expected the trainees not to establish a new
project, but to practice their obtained knowledge and skills within their daily work through
implementing action plan.
Pre-conditions
Pre-conditions are requirements that should be fulfilled before the project begins like
supplying input, termination of application process, singed the formal agreement on the
project implementation and so on.
The Plan of Operation (PO) shows project details, such as the expected results, the
schedule, people in charge, parties responsible for implementation, necessary resources
and equipment, and costs for each activity of the Action Plan.
PO is an effective tool for project implementation and management, and serves as the
basis for monitoring and evaluation of the project. The format and time-frame vary with
the project.
You should monitor the Task Team activities daily and/or weekly, and supervise them through
consultation and/or technical advice.
The main contents of the final report and presentation should be:
background (reason) of the action plan
framework of the action plan: problem and objective analysis, selection of approach,
PDM and PO (action plan)
2-23
Implementation Manual (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
The appraisers examine the performance (various efforts) of the Task Team in implementing
the action plan, and assess to what extent the Task Team achieved their Project Purpose
from the perspective of the five evaluation criteria: Relevance, Effectiveness, Efficiency,
Impacts and Sustainability. These criteria have been put forward by the Development
Assistance Committee (DAC) of the Organization for Economic Cooperation and
Development (OECD).
2-24
Implementation Manual (January 2014)
JICA Capacity Building Project for the Implementation of
the Executive Programme for the Agricultural Revival
In addition to them, the JICA Project compiled the experiences which Task Teams and
Working Group members have made: i.e. challenges and lessons learnt. These experiences
can be useful when the next Task Team members develop their action plan.
2-25
Appendix
Appendix 1
ูῧ 3
1.0 BACKGROUND
The second study was conducted from July to August 2009 to study further on
the three key areas so as to assess the possibility of cooperation within the
framework of the proposed project. Finally, the project started in March 2010
after amendment of outputs as follow;
1. A model system of human resource development in the Ministry of
Agriculture and Forestry is established.
2. Technical Package of rice production is developed.
3. Action plan is formulated for improvement of agro-pastoral productivity in
Kassala state).
4. Capacity of the Ministry of Agriculture and Forestry and the organizations
concerned on Project Cycle Management is enhanced through the
implementation process of the output 1-3
x Enforcement of training skill and knowledge applied into actual work and OJT
(On the job training) conducted during the implementation stage.
x Extracting lesson learned and reflecting into following training plan after
evaluation.
4.1 Membership
2
4.2 Behavioral principles
Discussions will take place in the context of mutual respect, and under the
principle of accountability for statements and actions.
(END)
3
JICA Capacity Building Project for the Implementation for Agricultural Revival version 2
Position: Name:
Score
Target Skills (Capacity) Definition of Target Skills Why did you give yourself the score?
(Self Evaluation)
To make decision
1 Managerial Skill To have good leadership
To formulating plans
3 Planning Skill To conduct monitoring and evaluation
To be able to cooperate
5 Team Work To conduct coorination
skill
3
4 3
skill
4
skill
5
Your skill of (previous year)
Your Skill of (present)
3. If you have a opportunity to attend a training, what kind of training is the best way to improve your capacity. Please consider based on your mandate and required
skill. And describe how are you going to utilize the skill and knowledge into your daily work ? Please raise 3 of them.
Training course attended in (year)? Training you are willing to attend in (year)? How are you going to apply into your work after the training?
4. Please write your dream or resolution in your work at the Ministry of Agriculture this year and in 5 years. And what are you trying to realize your dream.
Your dream and resolution at the MoA What are you trying to realize your dream?
This
year
in 5
years
5. If you wish one change to be happened in your directorate, what are you going to expect ? And Why?
What kind of change do you expect? Reason
Position: Name:
Score
Target Skills (Capacity) Definition of Target Skills Why did you give yourself the score?
(Self Evaluation)
To make decision
1 Managerial Skill To have good leadership
To formulating plans
3 Planning Skill To conduct monitoring and evaluation
To be able to cooperate
5 Team Work To conduct coorination
2 To have interest
1 Do not have any interest
PDM of PAE Task Team Action Plan: Enhancement of Coordination and Monitoring System
Target Group: PAE staff Target Area; PAE Project Period: 9 months(March-December) 30 Jan. 2012 ver.0
Narrative Summary Indicators Information Source Important Assumption
1. Questionnaires after the
Improve the Monitoring System and Coordination
Overall goal 60% of Annual Agric. Plans are monitored project
with in MoAI within 3 years
2. Report
1. 60% of PAE staff agree that
Project coordination between departments is 1. Questionnaires
Efficient coordination and monitoring with in GAPE
Purpose improved 2. Clear annual plan of PAE
2. Report done by monitoring Unit
No.
Materials and Cost Progress/
on Activities Sub-Activities Expected results Person in charge Implementer
equipent (SDG) Remarks
PDM 3 4 5 6 7 8 9 10 11
Activate the local area net
1.1 Sharing information Ekhalas Computer Enginer Software 4,000 done
work and outlook
Create Email Address to the
1.2 member does not have email Improve communication Task Team Information Unit Computer 0 done
address
1.3 Reactivate the database Follow up of database Task Team All Department Software 10,000
1.4 Training courses of computer
The subject for the meeting × × × × × × × Sara Hoyam, Sara, Amel, Stationary 0
Joint meeting in each (all?)
1.5 Prepare invitation (place & time) Building teamwork in PAE × × × × × × × Sara Babeker Anwar, Salama Stationary 0
Department
Implementations × × × × × × × Sara and Iman Stationary 0
The subject for the meeting × Stationary 0
Hoyam, Sara, Amel,
Joint session to whole staff
1.6 Prepare invitation (place & time) Awareness of selfness management × Babeker Anwar, Instructor from outside Stationary 0
(brain storming)
Salama and Iman
Implementations × Stationary 0
Hoyam, Sara, Amel,
1.7 Social Activity (Family Day) Arrangement and implementation Strengthen of Social relationship × × × Babeker Anwar, All task team members Stationary 0
Salama and Iman
Exchange of efficiency Hoyam, Sara, Amel,
1.8 experience from other Arrangement and implementation Knowledge new model of team work Babeker Anwar, All task team members Stationary 0
organization (FAO) Salama and Iman
1. inform. Save form damages Technical support and
1.9 Antivirus setup Ekhalas One original CD
2. quick download to useful data information unit
Salwa, Limya, Sumia, Technical support and 2 external
1.10 Back up for data Data will be secured from lost 600
Nada, Nagla, Iman information unit harddisk
1. Validity
Did the action plan match with the mandate and/or policy (plan) of thier
directorate?
2. Effectiveness
How much % of the project purpose has been satisfied?
Why do you assess it so?
What caused the gap between plan and actual result?
What should they have done to fill the gap?
3. Efficiency
Have they done every planned activity (duty) in schedule?
Have they made any efforts to increase cost performance in the process?
What did they do when they faced unexpected delay (any accidents and/or
problems)?
Did they identify the reason or background of the delay, accidents and/or problems?
How did they discuss to overcome such delay, accidents and/or problems within the
team?
4. Impact
Impact means matters and states naturally appearing outside of the action plan’s scope.
Namely impact is a sort of bi-product of the Task Team activity, and the Task Team
usually cannot control impacts.
Impact can be categorized positive impact and negative impact.
Do they recognize existence of positive and negative impacts?
If so, what kinds of positive impacts are there?
What kinds of negative impacts are there?
5. Sustainability
Have they made any efforts to sustain the outcome, which their activity produced?
What is necessary to ensure its sustainability?
Appendix 6
Evaluation Sheet
1. Validity
2. Effectiveness
3. Efficiency
4. Impact
5. Sustainability
6. Lessons Learnt
7. Recommendation
Evaluator’s Name