0% found this document useful (0 votes)
32 views2 pages

Work Order STI 046 R1

This work order details renovation works for the site office of NCC in Abu Fatira, Kuwait. It includes renovations of three rooms, installation of an AC unit, renovating the toilet, miscellaneous works, furniture, and a total cost of KD 2,110. The responsible person is Mishad M P and works are approved by Sujith Kanjirathinkal.

Uploaded by

Sujith KS
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views2 pages

Work Order STI 046 R1

This work order details renovation works for the site office of NCC in Abu Fatira, Kuwait. It includes renovations of three rooms, installation of an AC unit, renovating the toilet, miscellaneous works, furniture, and a total cost of KD 2,110. The responsible person is Mishad M P and works are approved by Sujith Kanjirathinkal.

Uploaded by

Sujith KS
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

WORK ORDER

Date: (31 Oct 2022) 06 Nov 2022 R1


Project No: STI 046
Client: NCC
Project Name: Site Office Renovation – Abu Fatira
Location: Abu Fatira
Responsible
Mishad M P
Person:
Works
Sujith Kanjirathinkal Signature
Approved By:
Room 1:
• Remove existing white board
• Ceiling repair
• Ceiling Painting
• Wall repair near AC unit
• Curtains (roll type) for windows
• Coffee Table – 2 nos
• Coffee Glass
Cost: KD 250

Room 2:
• Wallpaper for all walls
• Curtains (roll type) for windows
Cost: KD 140
Room 3:
• Wallpaper for all walls
Description of • Curtains (roll type) for windows
Works: Cost: KD 140
Split AC unit
• 24000 BTU
• Cool only
• Make: Haswai or equal
Cost: KD 190
Toilet Renovation:
• Shifting existing heater
• Cut the wall for new door provision
• Install new door
• Partition for new toilet
• Tiles work for partition
• Shifting of existing wash basin
• Shifting of shower
• Removal of existing door
• Install new folding type PVC door for toilet
• Install new WC and WB, taps, mirror, wall light & ceiling light

[email protected] www.shaastec.com
WORK ORDER

• Install new tiles for floor and walls


Cost: KD 450 890

Misc Works:
• Change damaged outside heater
• Change filter for kitchen (double filter type)
• Change lock for outside door
• Change lock for one toilet door
• Change lock for doors
• Wooden door painting
• 1 office chair
• 2 visitor chairs
• Coffee table 1.00M ht
Cost: KD 60 280
Sofa Set:
• 3 – Seater – 1 nos
• Single seater – 2 nos
Cost: KD 220
Total Cost: KD 2,110.00 (Two Thousand One Hundred Ten Only)
Remarks: Cost includes labour charge and transportation
POC: Mr. Karam Sulaiman – NCC (+965 56559857)
Notes:
Working Hours: After 2pm on weekdays and normal time on weekends

[email protected] www.shaastec.com

You might also like