Deviation Request Process
Deviation Request Process
Revision: 0 0
(DR) Process
1.0 Purpose
The purpose of this procedure is to define the process for using material that deviates from
specified process or service requirements via written approval for a temporary period.
2.0 Scope
This procedure applies to all nonconforming materials reported by our Suppliers or within SCON
Sites. Deviation Requests (DRs) can be generated Suppliers or internally by SCON.
Supplier DR: Requested by the Supplier before the product is shipped to SCON
PROJECTS conformances that will not affect form, fit or function. Needs SCON to
approve before the product is shipped to SCON Sites.
Internal DR: Requested internally for a non-conformance that is outside the SCON
Projects specification. Requires internal approval before use or shipment
Internal DR for execution activity: Requested internally for non-conformance
occurred during execution process.
*Does not apply to material attrition accounted for in the execution process.
3.0 Reference Documents
3.1 SCON/MEP/DR/F/10 Deviation Request (DR) form
OP002-F04 Rev A
Format No: - SCON/MEP/DR/F/01
Deviation Request (DR) Revision: 0 0
Process
Purchasing or To forward any Supplier DR request to the appropriate product engineer and
Inventory designee send copy to SCON projects consent person
Execution team Promptly report suspect or nonconforming material
Follow the guidelines outline in this document and Control of
nonconforming material and service
In charge Supplier Assist project team when needed
Quality Work with suppliers
6.0 General
SCON Projects expect to receive and produce conforming product and service, but at times
an unexpected occurrence may occur that impacts the product and or service provision. A
Deviation Request (DR) form fromat No. can be submitted, if it is believed that the non-
conformance will not affect the form, fit or function of the end use. The submittal of the DR is
NOT an authorization to ship or use the impacted product and service provision, it is simply a
request for review. Note: Deviations are TEMPORARY and must be used sparingly.
OP002-F04 Rev A
Deviation Request (DR) Format No:- SCON/MEP/DR/F/01
Revision: 0 0
Process
OP002-F04 Rev A
Deviation Request (DR) Format No:- SCON/MEP/DR/F/01
Revision: 0 0
Process
PRODUCT DEVIATION
Date:-
Format No.: -
Location –
Site Name -
Proposed Settlement
Repair
Replace
Re- work
Return / Reject
Manager - Sign
OP002-F04 Rev A
Deviation Request (DR) Format No: - SCON/MEP/DR/F/01
Revision: 0 0
Process
Originator:
7.5 Actions
The SCON Projects team must determine if any further action is needed.
No further action needed
Drawing Change is needed (Engineering Change Request (ECR) to be
generated) to change the drawing or specification.
Supplier Corrective Action Report (SCAR) required from the supplier to ensure
that proper root cause has been identified, appropriate corrective actions
and preventative actions are identified to prevent re-occurrence. Generation
Instruction.
Other: other actions needed.
7.6 Completed DR
Once the DR form has been disposed, a signed copy must be sent back to the
supplier or the originator. A distribution email should be sent to the approving team
and the DR record formally filed in the Quality SharePoint site.
7.7 DR Impacted Product Identification and service provision
Impacted service provision and or product is to be identified with the appropriate DR
number “DR # ” and a copy
of the approved DR attached to the packing slip of the shipment. The identification must
be protected against weathering.
7.8 Containment - Upon arrival of DR material, the site must control the use of this material and
determine if other containment activities need to be executed. Reference Format No:- SCON/MEP/DR/F/01 –
Control of Nonconforming material.
OP002-F04 Rev A
Deviation Request (DR) Format No:- SCON/MEP/DR/F/01
Revision: 0 0
Process
Originator:
Process
Originator:
8.0 Records
Copies of signed DR’s are to be logged and copies kept for at least 1 years after handing over
of project on the SCON Quality SharePoint.
OP002-F04 Rev A