DPWH Infr 05ccasr
DPWH Infr 05ccasr
A. GENERAL INFORMATION
1. Name of Firm/Company :
a. Head Office Address : Number: Street Name:
Municipality/City: Province: Region:
Postal Code: Country:
b. Telephone Number :
c. Fax Number :
d. Email Address :
e. Company TIN :
e. Picture
2x2 ID Picture
f. Signature :
----------------------------------------------------------------------------------------------------------------------------------------
DPWH-INFR-05-1015 Page 1 of 11
Signature
----------------------------------------------------------------------------------------------------------------------------------------
DPWH-INFR-05-1015 Page 2 of 11
4. Authorized Liaison Officers: Attach Annex “B”
a. Name : 1. 2. 3.
b. Designation : 1. 2. 3.
c. Tax ID No. : 1. 2. 3.
d. Birthdate : 1. 2. 3.
f. Signature:
A. LEGAL ASPECTS
1. Ownership
----------------------------------------------------------------------------------------------------------------------------------------
DPWH-INFR-05-1015 Page 3 of 11
2. City/Municipal Business Permit: Attach Annex “C”
Date issued:
Validity period:
Tax Identification Number:
3. BIR Tax Clearance (per EO 398, series of 2005): Attach Annex “H”
Date issued:
Validity period:
Tax Identification Number:
4. PhilGEPS Registration
Date issued:
Validity period:
Certificate Number:
Registration Particulars
----------------------------------------------------------------------------------------------------------------------------------------
DPWH-INFR-05-1015 Page 4 of 11
2. List of all contracts completed by the contractor both in government and in the private sector: Attach Annex “I”
Contractor’s
Contract Date Categories of Dimensions Total As Built
Role &
Contract Work Code Refer to Cost
Contract Name Owner Participation Start Actual
ID Refer to Attachment Per Work
% Completion
Attachment A A Category (PhP)
mm/dd/yy mm/dd/yy
----------------------------------------------------------------------------------------------------------------------------------------
DPWH-INFR-05-1015 Page 4 of 11
3. List of all on-going contracts including those already awarded but not yet started, both in government and in the private sector: Attach Annex “J”
NOTE: Cost must be in Philippine Pesos computed on the date of the signing of the contract.
----------------------------------------------------------------------------------------------------------------------------------------
DPWH-INFR-05-1015 Page 5 of 11
C. FINANCIAL ASPECTS (Amounts shall be in Philippine Pesos): Attach Annex “K”
Amount
Total Assets
Current Assets
Total Liabilities
Current Liabilities
Total Net Worth
Current Net Worth
Gross Annual Turnover
(construction)
D. AFFIDAVIT
I hereby certify that all information provided herein, including the annexes and
enclosures thereto, is true and correct, and I hold myself liable, criminally or civilly, for any
misrepresentation or false statement made herein.
I hereby authorize the Department of Public Works and Highways to investigate and
verify the said information.
(Affiant)
Notary Public
Doc. No.
Page No. Until 31 December 20
Book No. PTR No. :
Series No. Issued at :
Issued on :
TIN :
----------------------------------------------------------------------------------------------------------------------------------------
DPWH-INFR-05-1015 Page 6 of 11
CONTRACTOR’S CONFIDENTIAL APPLICATION STATEMENT FOR REGISTRATION (CCASR)
1. The Contractor-Applicant shall accomplish/answer all items in the Application Statement using
the English language. Answers must be given to all questions in the aforesaid statement. All
blanks shall be properly filled up. If necessary, additional sheets may be added to the form or,
if the form has limited space, it can be reproduced and enlarged to suit the Contractor-
Applicant’s needs. Documents submitted on forms or in any format other than that prescribed
in the aforesaid Statement shall be considered non-complying and will be rejected outright.
Forms that may require attachments shall be clearly marked, i.e., Attachments to Form No.1;
Attachments to Form No. 2, etc.
3. Aside from the main Contractor’s Confidential Application Statement for Registration,
the following documents shall be annexed to and form part of the Statement:
Annex “A” Appointment or authority of the Authorized Manager of the Organization with
specimen signature duly notarized.
Annex “B” Appointment or authority of the officially designated Liaison Officer with specimen
signature duly notarized and copies of two (2) valid Government ID’s showing
his/her proper identification.
Annex “C” Certified True Copy of Contractor’s PCAB License for the current year
Annex “D” Certified True Copy of DTI (sole proprietorship), CDA (cooperatives) or SEC
(corporation)
Annex “E” Certified True Copy of Certificate of PhilGEPS Registration (Platinum Membership)
Annex “F” Certified True Copy of Articles of Incorporation (if applicable)
Annex “G” Certified True Copy of valid and current Mayor’s Business Permit
Annex “H” Certified True Copy of BIR Tax Clearance, per E.O. 398, series 2005
Annex “I” Certified True Copy of Contract Agreement and of Certificate of
Completion/Acceptance from the Implementing Office/Owner, with scope of work,
and Contract cost for completed contracts
Annex “J” Certified true copy of Contract Agreement from the Implementing Office/Owner,
with scope of work, Contract costs and statement from the Implementing Office
as to %WA and %TE for all ongoing contracts, and those already awarded but
not yet started, including certified true copy of NTP.
Annex “K” Audited Financial Statement as reflected in Contractor’s Income Tax Return
stamped received by the Bureau of Internal Revenue
Annex “L” Letter authorizing verification of the integrity of the Registration documents
----------------------------------------------------------------------------------------------------------------------------------------
DPWH-INFR-05-1015 Page 7 of 11
4. The Contractor’s Confidential Application Statement for Registration, including Annexes, shall
be submitted in one (1) envelope. The envelope should be captioned “Application for
Registration” and submitted preferably to the DPWH Central Office: Procurement Service. All
documents submitted shall be treated as confidential and will not be returned.
5. The DPWH will inform all applicants of the result of their application. It reserves the right to
accept or reject any application without any liability to the affected applicants or any
obligation to inform the applicants of the grounds for the action taken thereon.
----------------------------------------------------------------------------------------------------------------------------------------
DPWH-INFR-05-1015 Page 8 of 11
RRA Roads: Rehabilitation - Asphalt km.
RRP Roads: Rehabilitation - PCCP km.
RCTP Roads: Construction - Tunnel - PCCP
RCSPNS Roads: Construction - Slope Protection using non - structural measures km.
(e.g. vetiver, coconet, other vegetation)
RCSPS Roads: Construction - Slope Protection using Structural Measures (e.g. km.
Revetment, Retaining structures, Wirenet)
BICWPLCCP Buildings: Construction - with Piles - Low Rise - Concrete (Frame) - Cast- storeys
in-Place Piles (1 to 5 Storeys)
BICWOPLC Buildings: Construction - without Piles - Low Rise - Concrete (Frame) (1 to storeys
5 Storeys)
BICWPHCDP Buildings: Construction - with Piles - High Rise - Concrete (Frame) - storeys
Driven Piles (6 & above Storeys)
BICWPHCCP Buildings: Construction - with Piles - High Rise - Concrete (Frame) - Cast- storeys
in-Place Piles (6 & above Storeys)
BICWOPHC Buildings: Construction - without Piles - High Rise - Concrete (Frame) (6 & storeys
above Storeys)
BICWPLSDP Buildings: Construction - with Piles - Low Rise - Steel (Frame) - Driven storeys
Piles (1 to 5 Storeys)
BICWPLSCP Buildings: Construction - with Piles - Low Rise - Steel (Frame) - Cast-in- storeys
Place Piles (1 to 6 Storeys)
BICWOPLS Buildings: Construction - without Piles - Low Rise - Steel (Frame) (1 to 5 storeys
Storeys)
BICWPHSDP Buildings: Construction - with Piles - High Rise - Steel (Frame) - Driven storeys
Piles (6 and above Storeys)
BICWPHSCP Buildings: Construction - with Piles - High Rise - Steel (Frame) - Cast-in- storeys
Place Piles (6 and above Storeys)
BICWOPHS Buildings: Construction - without Piles - High Rise - Steel (Frame) (6 and storeys
above Storeys)
BIR Buildings: Repair storeys
BIRTL Buildings: Retrofitting - Low Rise storeys
FCSPNS Flood Control: Construction - Slope Protection using non - structural lm.
measures (e.g. vetiver, coconet, other vegetation)
----------------------------------------------------------------------------------------------------------------------------------------
DPWH-INFR-05-1015 Page 9 of 11
FCSPS Flood Control: Construction - Slope Protection using Structural Measures lm.
(e.g. Revetment, Retaining structures, Wirenet)
FCN Flood Control: Construction - Drainage (Closed and open) Conduits lm.
WSL1 Water Supply (Level 1): Construction (Shallow Wells/Rainwater Collectors) lm.
WSL2&3 Water Supply (Level 2 & 3): Construction (Piped Water with
Communal/Private Water Point)
----------------------------------------------------------------------------------------------------------------------------------------
DPWH-INFR-05-1015 Page 10 of
ANNEX “L”
ANNEX “L”
Dear :
(Name of Firm)
I hereby request that our application for inclusion of the above-mentioned firm in the DPWH
Registry of Contractors for Civil Works be approved.
1. all documents submitted in support of this application are subject to verification by the
DPWH, and
Doc. No. ;
Page No. ;
Book No. ;
----------------------------------------------------------------------------------------------------------------------------------------
DPWH-INFR-05-1015 Page 11 of