SE Notes
SE Notes
Construction: Creating code, testing the system, fixing bugs, and confirming that all criteria are
met.
Umbrella activities:
Umbrella Activities are that take place during a software development process for improved
project management and tracking.
1. Software project tracking and control: This is an activity in which the team can
assess progress and take corrective action to maintain the schedule
2. Risk management: The risks that may affect project outcomes or quality can be
analyzed.
3. Software quality assurance: These are activities required to maintain software
quality.
4. Formal technical reviews: It is required to assess engineering work products to
uncover and remove errors before they propagate to the next activity
5. Software configuration management: Managing of configuration process when any
change in the software occurs.
6. Work product preparation and production: The activities to create models,
documents, logs, forms, and lists are carried out.
7. Reusability management: It defines criteria for work product reuse.
8. Measurement: In this activity, the process can be defined and collected.
Software Myths:
Most, experienced experts have seen myths which creates major problems for management
and technical people.
The types of software-related myths are listed below.
`Types of Software Myths
(ii)Customer Myths:
Myth 1:
A general statement of intent is enough to start writing plans (software development) and
details of objectives can be done over time.
Myth 2:
Software requirements continually change, but change can be easily accommodated because
software is flexible
1. Communication
2. Planning
3. Modeling
4. Construction
5. Deployment
The name 'prescriptive' is given because the model prescribes a set of activities, actions, tasks,
quality assurance and change the mechanism for every project.
• The waterfall model is also called as 'Linear sequential model' or 'Classic life cycle
model'.
• each phase is fully completed before the beginning of the next phase and is used for the
small projects.
• feedback is taken after each phase to ensure that the project is on the right path.
• Testing part starts only after the development is complete.
Advantages of waterfall model
• The waterfall model is simple and easy to understand, implement, and use.
• All the requirements are known at the beginning of the project, hence it is easy to
manage.
• It avoids overlapping of phases because each phase is completed at once.
• This model works for small projects because the requirements are understood very
well.
Disadvantages of the waterfall model
• This model is not good for complex and object oriented projects.
• It is a poor model for long projects.
• The amount of risk is high.
• The cost of the final product may cross the cost estimated initially.
• This model requires a very clear and complete planning.
• The planning of design is required before the whole system is broken into small
increments.
3. RAD model
1. Business Modeling
• Business modeling consist of the flow of information between various functions in the
project.
2. Data modeling
• The information in the business modeling phase is refined into the set of objects and it
is essential for the business.
3. Process modeling
• The data objects defined in the data modeling phase are changed to fulfil the
information flow to implement the business model.
4. Application generation
• The prototypes are independently tested after each iteration so that the overall testing
time is reduced.
Product and process
Product:
Product includes any software manufactured based on the customer’s request. This can be a
problem-solving software or computer-based system. It can also be said that this is the result
of a project.
Process:
Process is a set of sequence steps that must be followed to create a project.
S.
No. Product Process
5. complete the work successfully. make the quality of the project better.
based on the needs and expectations of model for producing various goods in a
6. the customers. similar way.
offer a greater level of protection than provides the inventor only limited
8. process patents. protection.
Helps you verify the functionality of Helps you to verify the performance of
the software. the software.
1. Our highest priority is to satisfy the client through early and continuous
delivery of valuable computer software.
2. Welcome dynamical necessities, even late in development.
3. Deliver operating computer software often, from a pair of weeks to a couple
of months, with a preference to the shorter timescale.
4. Business individuals and developers should work along daily throughout the
project.
5. The build comes around actuated people.
6. the foremost economical and effective methodology of conveyancing info to
and among a development team is face-to-face speech.
7. working computer software is the primary live of progress.
8. Agile processes promote property development.
9. Continuous attention to technical excellence and smart style enhances
nimbleness.
10. Simplicity is essential.
11. the most effective architectures, necessities, and styles emerge from self–
organizing groups.
12. At regular intervals, the team reflects on a way to become simpler, then
tunes and adjusts its behavior consequently.