K&N Job Reference

This document lists numerous construction projects that a company provided non-destructive testing services for between 2012 and the present. It includes over 50 projects for various customers such as Mo Kee Construction, Pan Asia Air Conditioning, Gammon Construction Ltd, Kee Lap Engineering Ltd, and Tsun Yip Iron Art Co Ltd. The projects involve construction of buildings, infrastructure works, and renovations.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
244 views10 pages

K&N Job Reference

This document lists numerous construction projects that a company provided non-destructive testing services for between 2012 and the present. It includes over 50 projects for various customers such as Mo Kee Construction, Pan Asia Air Conditioning, Gammon Construction Ltd, Kee Lap Engineering Ltd, and Tsun Yip Iron Art Co Ltd. The projects involve construction of buildings, infrastructure works, and renovations.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

Job Reference Non-Destructive Test

Period Customer : Mo Kee Construction Project : Construction of Steel Frame at G/F, 81 San Wai Tsai, Tai Po, N.T.

2012-Pressent Project : Proposed Alterations & Additions Works at G/F, Nos. 525-529 Shanghai Street and No. 32D Shantung Street

Project : Flat E, 22/F Block 4, Pok Fu Lam Garden, No.180 Pok Fu Lam Rd,I.L.9005 HK

Project : Proposed Steel Canopy for KMB Bus Depot at Tin Shui Wai Area 14 S.T.T.No.1342

Project : 179-180 Connaught Road West and 345 Des Voeux Road West, Hong Kong - M.L.434

Project : Shanghai Disney Resort M2B-M Marquee


Period Customer : Pan Asia Air Conditioning Project : HDC Data Centre at Pat Tat Street, San Po Kong
2012-Pressent
Period Customer : Gammon Construction Ltd Project : 3M Drill Pipe
2012-Pressent Project : J17801 CW-002 Group Station

Project : J15649 - Proposed Office Development at No.17 Cheung Shun St, Cheung Sha Wan, Kln

Project : J3509 - Design and Construction of Foundation Works for HK Science Park Phase 3C & 3d

Project : J3485 - (139-147 Argyle Street Platform)

Project : J15647-Proposed Residential Development at Mount Nicholson Road Inland Lot No.9007

Project : J17801 - RM-013 RCD Drill Rig B182.5m - Clamping Collar 2200

Project : Job 3532, 29-0051 (TC-3) Wolff 320BF


Customer : Kee Lap Engineering Ltd Project : Gondola Track of Motorized Trolley at Proposed Renovation Works at 13-15 Shing Wan Road, Shatin
Period

2012-Pressent Project : Davit Arm Tracks & Bracket HK Baptist Hospital BLK E Redevelopment

Project : Davit Arm Tracks for Redevelopment of Caritas Medical Centre Phase II

Project : BMU Track for Bank of China Tower


Customer : Kam Hung Air-conditioning E & M Eng Ltd Project : No. 1 Kin Wong Street, Tuen Mun
Period
Project : Wo Ming Lane Community Halls
Project : The Construction of Joint-User Complex at Area 44, Fanling, N.T.

2012-Pressent Project : CLP Room 2/F Vitasoy International Holdings Ltd, Kin Mong St, Tune Mun

Period Customer : Swal Asia Ltd Project : Proposed Signage at No.2-18 D'Aguilar Street 2/F-4/F
2012-Pressent
Period Customer : Yee Hop Construction Co Ltd Project : Hong Kong Shue Yan University
2012-Pressent
Customer : Pui Kee Pui Tec Yip Iron & Steel
Period Project : Sales Office at 3/F Miramar
Eng
2012-Pressent Project : HKJC Shatin Racecourse Grandstands Renovation Projects - GSII 5/F

Project : Proposed A&A Works at 20B,21B & Roof Hollywood Heights 6 Old Peak Rd, HK

Project : Proposed Residential Development on 3 and 5EDE Road, Kowloon Tong Kln, N.K.I.L.No.6423

Period Customer : Tsun Yip Iron Art Co Ltd Project : G/F, No.104 Queen's Road East, Hong Kong
2012-Pressent Project : G/F, No.103 Broadway Street, Mei Foo Sun Chuen, Kowloon
Project : G/F, 10 Fir Street, Tai Kok Tsui, Kowloon
Project : Ground Floor, No.216 Castle Peak Road, Sham Shui Po, Kowloon
Project : G/F, No.25 Grandway Garden, 15-35 Tsuen Nam Road, Shatin, N.T.
Project : Mainlaying Near She Shan Tsuen, Tai Po (Contract No.3/WSD/13)
Project : 6F2, 99 Dock Street, Whampoa Estate, Hung Hom, Kowloon
Period Customer : Luk Shing Construction Co Ltd Project : Contract No. 15/WSD/08 Replacement & Rehabilitation of Water Mains Stage 3 - Mains in Tai Po and Shatin
2012-Pressent
Project : Constract No. 14/WSD/08 Replacement & Rehabilitation of Water Mains Stage 3 - Mains in Tuen Mun
Project : Contract No. 09/WSD/10 Replacement & Rehabilitation of Water Mains Stage 3 & 4 Phase 1 -
Mains in Western New Territories
Period Customer : Bma Ktv (MPM) Ltd Project : 12/F & 15/F One Pacific Centre - 414 Kwun Tong Road, Kowloon

2013-Pressent

Period Customer : Tin Yan Machinery Trading & Eng LtdProject : KOBELCO 7090 - 90t S/N (GK01060)

2013-Pressent
Customer : Mang Yip Steel & Glass Decoration Co Project : Fitting Out Works of Tang Shiu Kin Dental Clinic
Period

2013-Pressent Project : Contract 755 Transportation Platform


Period Customer : Ah Ngau Engineering Ltd Project : Contract No. HY/2009/19 Central - Wan Chai Bypass Tunnel (North Point Section) & Island Eartern Corridor Link
2013-Pressent Projet : Contract 755 Transportation Platform
Project : Replacement of Service Transformer TSY S06 in Tsing Yi Station Contract No. Q047534
Project : Hoarding for Process Water Tank and Process Water Recycling Plant Room in CPPS
Project : Black Point Power Station Combined Cycle Gas Turbine (CCGT) Porject
Project : Steel Platform Near Boiler Blowdown Tank (10 UHW) in D1 Plant, BPPS
Project : Hong Kong Offshore LNG Terminal Project Package B

Page 1
Job Reference Non-Destructive Test

Period Customer : SEBA Machine Engineering Co Ltd Project : The Hong Kong Polytechnic Univeristy Phase 8 Development

2012-Pressent Project : St. Paul's Hospital Redevelopment (Block B)


Projet : IL9018 Lee Tung Street, Wan Chai, Site A & B
Projet : Proposed Residential Development at Kowloon Inland Lot No. 11120, Hung Hom
Project : Design and Construction of Fire Services Training School Cum Driving Training School at Pak Shing Kok
Project : Austin Station Residential Development Site D KIL 11129 & Site C KIL No.11126
Project : Redevelopment of Blk E Build in N.K.I.L.5748 and A&A Works at Blk D Build at N.K.I.L.5907 The HK Baptist Hospital
Project : Shatin Area 52 Phase 2 Shui Chuen O Shatin, N.T.
Project : Communication and Technology Centre, Shatin, HK
Project : Proposed Residential Development at Ap Lei Chau, IL No.135, HK Sit Formation, ELS and Foundation Works
Project : Proposed Development at Lee Tung Street (H15 Project)
Project : Proposed Residential Development at TPTL200 & 201 Pak Shek Kok, Tai Po
Project : Proposed Logistics Centre at Tsing Yi Town at Lot No.181 on Tsing Yi Hong Wan Road
Project : Construction of Home Ownership Scheme Development at ha Tsui Road, Ex-Tai Wo Hau Factory Estate, Tsuen Wan

Project : Construction of Subsidised Sale Flats Development at Au Pui Wan Street, Fotan
Project : No.450-456G Queen's Road West Hong Kong - I.L.834 S.A.R.P.
Project : Proposed Residential Development at TKOTL 70RP, LOHAS Park Package 10, New Territories
Project : Design & Construction of CUHK Medical Centre
Project : Proposed Mixed Development at Tuen Mun Town Lot No. 514
Project : TMTL500
Project : Proposed Residential Development at STTL601, Yiu Sha Road, Whitehead, Ma On Shan, Shatin, N.T.
Project : Proposed Residential Development at STTL605 Lok Wo Sha Lane, Ma On Shan, Shatin
Project : Lai Chi Shan, TPTL221

Period Customer : Program Contractors Ltd Project : FUSIONOPOLIS


2013-Pressent Project : Contract No.14104 Supply & Installation of Stainless Steel Railing Along AOS
Customer : Long Faith Engineering Ltd Project : Contract 823A Tai Kong Po Tsu Uk Tsuen South Launching Shaft - Noise Enclosure - Stage 1
Period

Project : Contract No. CV/2007/03 Development at Anderson Road - Site Formation and Associated
2013-Pressent
Ifrastructure Works Retain Wall R16b Bay 13
Project : Contract No. HY/2010/08 Central - Wan Chai Bypass Tunnel (Slip Road & Section)

Customer : Pollard - CNCEC Joint Venture Project : Contract No. 11/WSD/11 Replacement and Rehabilitation of Water Mains, Stage 4 Phase 2 Mains
Period in Tsuen Wan and Kwai Tsing
2013-Pressent
Period Customer : Sam Hing Engineering Ltd Project : Kai Tak Development Site 1A Phase 1 & 2

2013-Pressent Project : Upgrading of Central Chiller Plant at Towngas Headquarters Building 363, Road, North Point, HK

Project : Fout Season Hotel Apartment Room 23


Customer : Wise Logistics Technology Co Ltd
Period Project : SWOS2001 Overhaul of BSS Stacker Crane

2013-Pressent Project : SHOS6001 Overhaul of BSS Stacker Crane

Project : Overhaul of ETV-EV0Z1


Period Customer : Kin Wo A/C Engineering Ltd Project : Science Park, Tai Po

2013-Pressent

Period Customer : Lux Engineering (HK) Ltd Project : CLP Sham Shui Po Data Centre Enhancement Stage 2

2013-Pressent Project : Proposed Commercial Development at NKIL6269, Hoi Bun Road, Kwun Tong, Kowloon

Period Customer : Alliance Contracting Co Ltd Project : Proposed Residential Development at TW7, Tsuen Wan Town Lot No. 403 N.T.

2013-Pressent Project : MTRC 1117 - Pat Heung Depot Modification Works

Period Customer : Sharp Hing E & M Ltd Project : Galaxy Cotai Mega Resort Lot 1 (Phase 2)
2013-Pressent
Period Customer : Cheung Shing Machinery Eng Co Ltd Project : Widening of Tolo Highway / Fanling Highway Between Island House Interchange and Fanling on Site
2013-Pressent Project : Contract No. 2010007 Construction of Public Rental Housing Development at Kwai Shing Circuit
Period Customer : 永昌工桯 Project : Proposed Hotel / Gamming Development (Area 1a) Galaxy Resort & Casino, Cotai City, Macau
2013-Pressent
Period Customer : Wing Sum Const Eng Co Project : Proposed Residential Development at HHIL556 Lee Kung St, Hung Hom,Kln
2013-Pressent Project : Proposed Residential Development at Lot No.2129 in D.D121,Ping Shan, Yuen Long, N.T.
Project : Meyco Spraving Mobile (M411068)
Project : Proposed Residential Development at Yuen Long 518

Period Customer : Wang & Lee Contracting Ltd Project : Proposed A&A Works at Worldtech Ct on K.T.I.L.195 R.P.95 How Ming St, Kwun Tong
2013-Pressent Project : Ocean Park - Coversion of Atoll Reef into Sharks Alive

Period Customer : Lermond Eng Ltd Project : Piling and Foundation Works for Redevelopment of Wing On Lift Building at 22-22A Des Voeux Road Centra, HK

2013-Pressent Project : Proposed Development at No. 301-301C, Prince Edward Road West Kowloon

Period Customer : Chun Wai Engineering Co Project : Contract 1111 Hung Hom Approach Tunnels
2013-Pressent
Page 2
Job Reference Non-Destructive Test

Period Customer : Bosson Engineering Ltd Project : M.V. " New Imperial Star "

2013-Pressent
Period Customer : The Jarinde Eng Corporation Ltd Project : Contract No. DC/2009/24 (Harbour Area Treatment Scheme 2A-Upgrading of Preliminary
Treatment Works at Sandy Bay, Cyberport, Wah Fu, Aberdeen and Ap Lei Chau)
2013-Pressent
Project : HATS2A-Upgrading of Preliminary Treatment Works of Central, North Point and Wan Chai East
Period Customer : Wong Po Air-Condition Eng Co Project : Chiller Plant Conversion for Miramar Tower, Miramar Shopping Centre and Miramar Shopping Centre New
Extenation
2013-Pressent
Project : New Water-Cooled Chillers System Installation at World Peace Centre, 41-45 Woo Tong Tsui Street,
Kwai3RD
Project : Meifu Chung, NT
Aircondition Room
Period Customer : Patwin Eng Co Ltd Project : Galaxy Cotai Mega Resort Lotel (Phase 2)
2013-Pressent Project : West Kowloon 816A
Project : Global Switch Hong Kong Phase I
Project : Contract No. 965C
Project : Seawater Pipe Upgrading - Main MEP Contract at GCR Main Building
Project : HSBC Seawater Pipes Upgrade

Period Customer : Shui Tai Construction Eng Co Ltd Project : Proposed Residential Lot No.2129 in D.D.121 Ping Shan, Yuen Lont, N.T.
2013-Pressent Project : Foundation for Public Rental Housing Development at Shatin Areas 16 & 58D Phase I, Fotan

Period Customer : Star Wah Air Conditioning Ltd Project : The Open University of HK Chung Hau St, Campus Development

2013-Pressent Project : A/C Chillers Replacement Works at Ping Tin SC (Contract : 13-021532)
Project : A/C Chillers Replacement Works at Ming Tak Shopping Centre (Contract : 13-021532)
Project : A/C Chillers Replacement Works at Un Chau SC (Contract : 13-021532)
Project : Upgrading and Improvement of Air Conditioning Plants in University Sports Centre
Project : Replacement of Air Conditioning System at La Salle College
Customer : Excel Eng Co Ltd Project : Contract No. 13/WSD/10 Replacement and Rehabilitation of Water Mains Stage 4, Phase 1 Mains
Period in West Kowloon, Kwai Tsing and Tsuen Wan
Project : Contract No. 10/WSD/11 Replacement and Rehabilitation of Water Mains Stage 4, Phase 1 -
2013-Pressent Major Mains in Eastern New Territories

Period Customer : Chung Hing Construction (H.K) Ltd Project : Public Rental Housing Development at So Uk Estate Phase 1
2013-Pressent Project : Design & Construction of West Kowloon Law Courts Building Contract No.SS W319
Project : Proposed Fall Arrest System at Yau Lai Estate
Project : Innovation Tower The School of Design Development Hong Kong Polytechnic University
Project : Relocation of the Department of Justice to Central Government Offices (Main & East Wings)
Project : Decanting Works for Redevelopment of Kwai Chung Hospital Phase 1
Project : Construction of Public Rental Housing Development at Wing Tai Road
Project : Public Rental Housing Development at Shek Kip Mei Phase 3,6 & 7
Project : Contract No. SS C510 Construction of Sports Centre in Area 24D, Sha Tin
Project : Hong Kong Science Park Expansion Stage 1 (SPX 1) at Pak Shek Kok, Tai Po, T.P.T.L.No.204
Project : Design and Construction of West Kowloon Government Offices in Yau Ma Tei Kowloon
Project : Design & Construction of Junior Police Officers Married Quarters at Fan Garden, Fanling, New Territories
Customer : Bright Access (H.K.) Ltd Project : Proposed Residential Commercial Development at 12-22 Fuk Chak Street, Tai Kok Tsui,
Period
Kowloon I.L.No.2715
2013-Pressent Project : Demolition Works on A.I.L.206,207 & 208 at Nos. 65-69 Shek Pai Wan Road HK
Project : Site Formation and Found Works at Lot No. 726 in D.D.4 Mui Wo, Lantau Island
Project : Proposed Residential Development at Shatin Lot S.T.T.L.563, Area 56A, Kau To Shan, N.T.
Project : Proposed New Building on Lot No.S.I.L.518,R.P.SI.L.518 S.H.R.P.S.I.L.518 at 363-367 Shau Kei Wan Rd
S.A.S.S.I.R.P.HK
Project : Proposed Development at Shau Kei Wan Lot No.854

Project : HKJC Happy Valley Clubhause Extension at 25 Shan Kwong Road

Period Customer : Tysan Foundation Ltd Project : KIL 11111, Junction of Hung Luen Road and Kin Wan Street, Hung Hom, Kln
2013-Pressent Project : Foundation for Public Rental Housing Development at Ex-Yuen Long Estate
Project : K28 at Sai Yee Street / FA Yuen Street, Mong Kok, Kowloon
Project : Hotel Development at Kln Inland Lot No.11205, Junction of Hung Luen Rd, Hunghom
Project : Residential Development at No.31-69 Chai Wan Road, Shau Kei Wan S.I.L.634
Project : The New Campus at J/O Shing Tai Road & Wing Tai Road, Chai Wan, HK (I.L.9058)
Project : Proposed Industrial Development at No.95-99 Fuk Hi Street, Yuen Long, N.T.
Project : URA Kwun Tong Town Centre Redevelopment (Area 2 & 3) NKIL6514
Project : Proposed Residential Development at J/O Fat Kwong Street and Sheung Foor Street, Homantin,
Kln Inland
Project : Private Lot No.1128
Hospital Development at Nam Fung Path, Aberdeen Inland Lot No.458, Hong Kong
Project : Proposed Residential Development at T.P.T.L. 226, Pak Shek Kok, Tai Po, New Territories
Project : Proposed Industrial Development at Lot 313 & TWIL49, Sha Tsui Road,Tsuen Wan, N.T.
Period Customer : Wang Hing Engineering Project : Shop Reconfiguration on Shop G316-317 of Gateway 2, Harbour City
Project : Design and Build Data Centre for 11/F to 14/F, MCX 10 (Phase 1)
2014-Pressent
Period Customer : Luen Shing Air-Conditioning Co Ltd Project : Chiller Plat Renovation for The Peak Galleria
2014-Pressent

Page 3
Job Reference Non-Destructive Test

Period Customer : Hang Fat Kee-Air-Conditioning Project : Hong Kong Science Park, Phase 3 Tai Po NT
2013-Pressent Metal Co Ltd Project : Lot No.5371 in DD166, Ha Yau Tin Yuen Long, N.T.
Project : Proposed Composite Building at Nos.1-21 (ODD No.) Dundas St, Kn
Project : Urban Renewal Project (H21) at Shau Kei Wan / Nam on Street, Shau Kei Wan I.L.850
Project : Proposed Residential Development on 3 and 5 Ede Road, Kowloon Tong , Kowloon N.K.I.L.No.6423
Project : Proposed AC Platform at Area 56A Shatin Town Lot No.525, Kau To Shan, Shatin, N.T.
Project : Proposed Residential Development at Lot No. 1927 in DD107, Sha Po, Kam Tin, Yuen Long, NT
Project : Proposed Comprehensive Residential Development at Lot in D.D227 and 229, Tai Po Tsai, Sai Kung
Project : 565-577 Fuk Wa Street - N.K.I.L.LS 2189,2190,2191,2192,2193,2194 & 2195
Project : Proposed Residential Redevelopment at Nos.1-12, 12A,14-15 New Eastern Terrace & 11 Dragon Road, HK
Project : Proposed Composite Building at Fanling Sheung Shui Town Lot No.202
Project : Proposed Residential and Commercial Development at 33 Tong Yin Street, TKOTL125, Tseung Kwan O, N.T.
Project : Proposed Residential Building on Y.L.T.L.No.528 Tak Yip Street, Yuen Long, N.T.
Project : Proposed Residential Development at So Kwun Wat, TMTL No.423
Project : Proposed Residential and Commercial Development on YLTL 507 at CDA 15 Yuen Long New Town
Project : Proposed Residential Development at Tseung Kwan O Area 66D2, T.K.O.T.L.118
Project : Lot No.1180 in D.D.215 Hong Tsuen Road, Sai Kung
Project : No.31-69 Chai Wan Road, Shau Keai Wan Inland Lot No. 634
Project : Residential Redevelopment at Nos. 1 Kai Yuen Street, North Point, Hong Kong
Project : Proposed Residential and Commercial Development at TKOTL126 Area 68B2, Tseung Kwan O, N.T.
Project : Proposed Composite Building at No.460 Queen's Road West, Hong Kong I.L.834 S.A.R.P.
Project : Proposed Residential Development at Site G of the Remaining Portion of TKOTL 70 Tseung Kwan O, N.T,
Project : MTRC North Point Station
Project : Pai Tai Street No.38 Ma Tau Kok, Kowloon
Project : Proposed Residential Development at T.M.T.L. No.500 Kwun Chui Road, Tuen Mun
Project : Proposed Property Development at Tai Wai Station on S.T.T.L. No. 520, Tai Wai, Shatin, N.T.
Project : N.K.I.L.6558, Kowloon Road / Kiu Yam Street, Sham Shui Po, Kowloon
Project : King Sau Lane Area 4, Tuen Mun - TMTL 515
Project : Proposed Mixed Development at Tuen Mun Town Lot No.514
Project : So Kwun Wat Road, Area 56 Tuen Mun - TMTL 541
Project : Junction of Fuk Wing Street, Camp Street and Fuk Wa Street, Sham Shui Po - N.K.I.L.6534
Project : Proposed Residential and Commercial Development at J/O Sheung Heung Road & Kowloon City Road
Kowloon, KIL No.11246 SA & RP
Project : 'Proposed Residential Development at KIL11257, Sheung Shing Street, Homantin, Kowloon
Project : Subsidized Sale Project at Shatin Area 36C
Project : Proposed Residential Development at Tai Pown Lot No.214, Fo Yin Road, Pak Shek Kok, Tai Po, N.T.
Period Customer : Lai Man Kee Engineering Co Ltd Project : Proposed Redevelopment at Chinese Rhenish Church, 12 Tat Chee Avenue, Kowloon, NKIL5216

2014-Pressent
Period Customer : Chon Lik Engineering Co Project : Rm 2501-05, 25/F, 2601-05, 26/F, Citbank Tower, 3 Garden Road, Central, HK
2014-Pressent Project : Flat 4 G/F & Flat 4 Cockloft Penoy House East Blk1-7 Pok Man Street, 27-37 Tai Kok Tsui Road, KL
Project : Shop, Ground Floor, K11,18 Hand Road, Tsim Shan Tsui, Kowloon
Period Customer : World Chart Engineering (HK) Ltd Project : Proposed Residential Development at Area 56A, Shatin Town Lot. 525, Kau To, Shatin, N.T.

2014-Pressent
Period Customer : Wah Shun Construction Co Project : Proposed Commercial Development at 30-32, 34-36 D' Aguilar Central, HK

2014-Pressent
Period Customer : Polyfund Engineering Ltd Project : Design and Build for Setting Up TKOIAC at 2/F
2014-Pressent Project : FM-P004 (TGT0102) 2DHB, 22 Chun Cheong Street, Tseung Kwan O Industrial Estate
Project : Design and Build for Data Centre for 11/F to 14/F, MCX 10 (Phase 1)
Period Customer : Copma (Asia Pacific) Ltd Project : Medello Type : 928.9 Licence : LY8273

2014-Pressent
Period Customer : Hin Sum Construction Company Ltd Project : Lifting Crane Vehicle Licence No. LW9118
2014-Pressent
Period Customer : City Concept Technology Ltd Project : BTS SITE (1523) Mei Yue House Shek Kip Mei Estate, Shek Kip Mei, Kowloon
2014-Pressent
Period Customer : Smart Wing Construction Eng Co Ltd Project : Contract No. 11/WSD/11 Replacement & Rehabiliation of Water Mains,
2014-Pressent Stage 4 Phase 2 - Main in Tsuen Wan and Kwai Chung
Period Customer : Amanic Engineering Limited Project : Contract No. HY/2012/08 Tuen Mun-Chek Lap Kok Link-Northern Connection Sub-Sea Tunnel Section
2014-Pressent
Period Customer : Ever Gain Engineering Ltd Project : Contract 1111 Hung Hom North Approach Tunnels Alternative 600 Dia Watermain
2014-Pressent
Period Customer : VSL Intrafor Hong Kong Project : Construction of Public Rental Housing at Sha Tin Area 52 Phase 2
2014-Pressent

Page 4
Job Reference Non-Destructive Test

Period Customer : Chesco Engineering Ltd Project : The Integrated Contract for Construction of Public Rental Housing Development at Anderson Rd
2014-Pressent Sites A & B Phase 1 & 2 (Contract No.20110422)
Project : Contract 1107 Diamond Hill to Kai Tak Tunnels, Kai Tak Cut and Cover Tunnel - Alternatie Tunnel Box
Typical Connection Details
Project : Foundation Works for Proposed Proerty Development at West Rail Tsuen Wan West Station TW5 (Byside)
Project : Wong Chuk Hang Station Package on Property Development, Wong Chuk Hang, Hong Kong
Construction Access to Site A
Project : West Rail Yuen Long Station Property Development at YLTL No.510

Project : J3693-The Proposed House Development at 1 Plantation Road, Hong Kong

Project : J5230 Sai Sha Road Widening - Sai Sha Comprehensive Development Shap SZ Heung, Sai Kung North, N.T.

Project : 300-Place Student Hostel of New Asia College at The Chinese University of Hong Kong
Project : HKAA-C3503 Terminal 2 Foundation and Substructure Works
Project : Proposed Residential Development Yau Tong Inland Lot No.45 Site A & Site B Yau Tong Kowloon

Project : Contract No.HY/2014/08 Central Kowloon Route - Yau Ma Tei East


Project : Proposed Comprehensive Development at Various Lots in D.D.379, TMTL No.463, Siu Sau, Tuen Mun
Period Customer : Hoi Luen Engineering Co Ltd Project : Proposed Residential Development at Area 56A, Shatin Town Lot No. 525, Kau To Shan, Shatin,N.T.
2014-Pressent Project : Proposed Re-development for Hotel at 97 How Ming Street, K.T.I.L.505 S.A.Kwun Tong, Kowloon
Project : Alteration & Addition Works - Replacement of Stone Cladding for External Wall at I.L.8571 & I.L.8582, Queenway
Period Customer : Planning Const Co Ltd Project : Proposed A & A Works at 10/F Ocean View Court Chatham Road South Kowloon K.I.L.6453 R.P.
2014-Pressent
Period Customer : Le Bon Rentals Ltd Project : " KATO " Hydraulic Track Craen Model : SS500 S/N : 51444
2014-Pressent
Period Customer : A & R Engineering Co Ltd Project : New World Center Remodening KIL9844 Nos.18-24 Salisbury Road, Tsim Sha Tsui, Kln (Package No.6701.02)
Project : I.C.C. Kowloon
2014-Pressent
Period Customer : Choi Kee Engineering (HK) Co Ltd Project : Contract 810A West Kowloon Terminus Station North
2014-Pressent
Period Customer : Tinkle Construction Eng Co Ltd Project : 15/WSD/10 ELS at SRGF II Ground Anchor
2014-Pressent
Period Customer : Temmuk Engineering Co Ltd Project : Contract No.KL/2011/02 Infastructure Works for Housing Sites Adjacent to Lung Ping Road at Tai Wo Ping
2014-Pressent
Period Customer : River East Construction Ltd Project : Proposed Development at 33-49 Des Voeux Road West, Hong Kong
2014-Pressent
Period Customer : REC Engineering Co Ltd Project : Contract 1106 Diamond Hill Station KTL DIH Station ECS Modification Level L2 (Concourse Level)
Plan (Phase 1)
2014-Pressent
Project : Contract 1164, Building Services for DIH, KTL DIH Station ECS Modification Level L2 (Concourse Level)
Project : HKSH, Off Campus Nursing School E & M Installation
Period Customer : Net Concept Engineering Co Ltd Project : BTS Site Part of Roof Block A, Sun Lai Garden, 2 King Tung Street, Wong Tai Sin (Site Code : KGD)
2014-Pressent Project : BTS at Oi Tak House, Yau Oi Estate, Tuen Mun
Project : Mount Nicholson (WCNIR)
Period Customer : Yi Fai (Li Tao) Development Eng Ltd Project : N.A
2014-Pressent
Period Customer : Wang Tat Tech Trading Ltd Project : Contract 1111 Hung Hom North Approach Tunnels Alternative 700 Dia Watermain
2014-Pressent
Period Customer : Yat Tong Engineering Co Ltd Project : Contract 810A West Kowloon Terminus Station North
2014-Pressent
Period Customer : Shun Hing System Integration Co Ltd Project : HKIA Contract P534-West Hall Modification Works
2014-Pressent
Period Customer : 錦記鋼鐵工程 Project : Proposed Minor Works for Internal Steel Cat Ladder Installation Between 8/F & 10/F
2014-Pressent
Period Customer : Opus Engineering Ltd Project : Contract No.15/WSD/10 Expansion of Tai Po Water Treatment Works and Ancillary Raw Water & Fresh
2014-Pressent Water Transfer Facilities Design and Build of New Stream II
Project : Contract No. HY/2011/03 Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road - Section Between
Scenic Hill and Hong Kong Boundary Crossing Facilities
Period Customer : Sze Fung Engineering Ltd Project : MTR Express Rail Link Contract 810A West Kowloon Terminus Station North
Project : Happy Valley Clubhouse Extension at 25 Shan Kwong Road, Happy Valley, HK Excavation &
2014-Pressent
Lateral Support and Piled Foundation Works
Project : CLP Black Point Power Station CCGT Project
Project : Contract No. HY/2013/01 Hong Kong - Zhahai - Macao Bridge Hong Kong Boundary Crossing
Facilities - Passemger Clearance Building
Period Customer : Vinci Construction Grands Projects Project : Contract 1103 Hin Keng to Diamond Hill Tunnels (Fung Tak Site)
2014-Pressent Project : Contract 1103 Hin Keng to Diamond Hill Tunnels (Diamond Hill Site)
Project : Contract 1104 Hin Keng to Diamond Hill Tunnels (MCV Site)

Period Customer : Shine Team Construction Co Ltd Project : Proposed Residential Development at Tuen Mun Town Lot.508 Tuen Mun. N.T.

2014-Pressent Project : Proposed Commercial Redevelopment at 93 Wai Yip Street, Kwun Tong - KTIL680

Period Customer : 滔記裝修鋼鐵工程 Project : Proposed Steel Balustrade at London House, Shop G5 & UG15 Tsim Sha Tsui Centre, 66 Mody Road, Kln, HK
2014-Pressent

Page 5
Job Reference Non-Destructive Test

Period Customer : Progressive Foundation Co Ltd Project : MTR Wil Contract 758-Escalators and Moving Walkways Safety Screen to Escalator at SYP Station
(ESC-08 & ESC-09) 758-CSF-KON-DEM-000172
2014-Pressent Project : Proposed Development of Industrial Building Lot No.693, D.D.445, 301-305 Castle Peak Road, Kwai Chung, N.T.

Project : Proposed Hotel Development in A.I.L.98 at No.150 Aberdeen Main Road Hong Kong (48 Guest Rooms)
Project : Proposed Hotel Development in HHIL529 at No.84-86 Wuhu Street, Hung Hom, Kowloon
Project : Proposed Residential Development Shatin Town Lot No.611, Whitehead, Ma On Shan, Shatin,
Period Customer : Endless Steam Production Co Project : The Whole of The 27/F and 28/F, Nos.1-23 Tang Lung Street, Hong Kong

2014-Pressent Project : Proposed Steel Frame for Signboard at Cockloft Floor of No.7-11 Shek Yip Road, Sheung Kwai Chung,
Project : Proposed Steel Frame for Signboard from Ground Floor to First Floor at No.50-52 Mong Kok Road, Mong Kok

Project : Proposed Steel Frame for Signboard at Mezz Floor No.195-197 Hip Wo Street, Kwun Tong, Kowloon Mong Kok

Project : Alternation & Addition Works for Internal Staircase at 22/F to 23/F, Shanghai Commercial Bank, Central
Project : Shop 205, Level 2 Pacific Place No.88 Queensway Hong Kong
Period Customer : Hip Cheong (E&M) Engineering Co Project : Construction of Two 30-Classroom Primary Schools at Site 1A-3 and 1A-4 Kai Tak Development Kln
2014-Pressent
Period Customer : Ngai Shun Construction & Drilling Co Ltd Project : Pile Driver XR180DIV S/N : XUG0199
2014-Pressent Project : Machine Type : Drilling Rig Model : XR180DIV Serial Number : XUG0180RJFHJ00198
Project : Pile Driver DHP-80 S/N : A87302
Project : Pile Driver XR180DIV S/N : XUG0180
Period Customer : Yun Kwan Construction Eng Ltd Project : Anderson Road Public Housing C1 and Auxiliary C2
2014-Pressent Project : Office 03 16/F Hang Bong Commercial Centre 28 Shanghai Street, TST, Kowloon
Project : Redevelopment of Wing On Life Building at 22-22A Des Voeux Road Central
Project : Main Contract Works for The Redevelopment at No.38 Wong Chuk Hang Road, AIL352 Hong Kong
Project : Construction of Public Rental Housing at Sha Tin Area 52 Phase 3 & 4
Project : Kai Tak NKIL 6516 & 6517
Project : Proposed Residential Development at TMTL423, Area 48, Castle Peak Road, So Kwan Wa, Tuen Wan
Project : Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West
Project : Contract No.KL/2014/03 Kai Tak Development - Stage 3 Infrastructure Works for Developments
Project : Proposed Mixed Development at Tuen Mun Town Lot No.514
Project : Comprehensive Development at Nos.1-11 Au Pui Wan Street, Shatin Town Lot No.576, Fotan, N.T.
Project : Proposed Redevelopment for Goldin Financial Global Square
Project : Residential Development at T.M.T.L.No.500, Kwun Chui Road, Tuen Mun
Project : Package A & B for Lohas Park Phase 7 at TKOPL 70 RP, Site C1, New Territories
Project : West Rail Yuen Long Station Property Development at YLTL No.510
Project : Redevelopment of Kwong Wah Hospital
Project : Contract C17W03-Sky Bridge Connecting Terminal 1 with North Satellite Concourse
Period Customer : Chung Yee Engineering Co Project : Alterations & Additions Works at Nos.173 Des Voeux Road Central, Cental, Nan Fung Tower
2014-Pressent Project : Nam Fung Factory
Project : Hong Kong Medical Association 5/F, Duke of Windsor Social Service Building 15 Hennessy Road, Wan Chai
Project : Proposed Residential Development at Tung Chung Area 55B, TCTL No.37
Period Customer : Kit Kee Engineering Ltd Project : Proposed Development at I.L2912, 7C-7F Shan Kwong Rd, Tsui Man St & Village Rd, Happy Valley
2014-Pressent Project : N.K.I.L.No.6269 Junction of Wai Yip St, Shun Yip St, & Hoi Bun Road, Kwun Tong, Kln
Project : Proposed Development at On Kwan Street, Shek Mun Shatin, NT, STTL412
Project : Residential Development at 33 Seymour Road, HK (Phase 2)
Project : Proposed Residential Development at 18-22 Castle Road,92-92A,94,96,98,100 & 102 Caine Road HK
Project : Residential Development at 31-69 Chai Wan Road, Shau Kei Wan S.I.L.634
Project : Proposed Residential Development at TKOTL112, Tseung Kwan O
Project : Hotel Development at Kln Inland Lot No.11205, Junction of Hung Luen Rd, Hunghom
Project : Proposed Grade A Office Development at KTIL 761 Kwun Tong Road, Kwun Tong, Kowloon
Project : Residential Development at No.55-57 Bisney Road, Hong Kong
Period Customer : Yat Ming Civil Engineering Co Ltd Project : Proposed Development for (Academic Building F) Hang Seng Management College at Hang Shin Link,
Siu Lek Yuen, Shatin, N.T.STTL.No.588
2014-Pressent
Project : Proposed Composite Building on N.K.I.L.2768 R.P. at Nos.128-130 Nga Tsin Wai Road, Kowloon City
Project : Proposed Composite Development at No.KIL.11229 Kwun Chung Street, Kowloon
Project : Proposed Residential Development at Tuen Mun Town Lot. 508. Tuen Mun,N.T.
Project : Proposed Commercial Development at KTIL680, 93 Wai Yip Street, Kwun Tong
Project : Redevelopment of Block X The Hong Kong Polytechnic University Hung Hom, Kowloon
Project : Proposed Footbridge Extension Across Nathan Road
Project : Proposed Development at Nos. 115-125 Castle Peak Road, Kowloon
Project : Proposed Residential Development at 18 Stubbs Road Hong Kong - Inland Lot No. 8963
Period Customer : Man Tat Engineering Co Ltd Project : Proposed Hotel Development at No.7 Connaught Road West & No.13 New Market Street, H.Kon M.L.423 R.P.
2016-Pressent
Period Customer : Chi Shing Air-Conditioning Eng Co Project : China Unicom (Hong Kong) Global Center at Tseung Kwan O Industrial Estate
2016-Pressent

Page 6
Job Reference Non-Destructive Test

Customer : Simon & Sons Engineering Ltd Project : Contract No.HY/2011/03 Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road - Section
Period
Between Scenic Hill and Hong Kong Boundary Crossing Facilities

2014-Pressent Project : Proposed Residential Development at Tai Po Town Lot 213 Pak Shek Kok, Tai Po, N.T.
Project : Proposed Residential at NKIL No.6525 Kai Tak Area II, Site I, Kai Tak, Kowloon
Project : Proposed Residential Development at T.P.T.L.227 Pak Shek Kok, Tai Po, New Territories
Project : Proposed Comprehensive Development at Lot No.2131 in D.D. 121 Tong Yan San Tsuen,New Territories
Period Customer : Dix Construction & Transportation LtdProject : Contract No.HY/2013/15 Provision of Barrier - Free Access Facilities for
2014-Pressent Highway Structures Phase 3 Contract 3 (NF296)
Project : Contract No.HY/2013/15 Provision of Barrier - Free Access Facilities for
Highway Structures Phase 3 Contract 3 (NF444)
Project : Contract No.HY/2013/15 Provision of Barrier - Free Access Facilities for
Highway Structures Phase 3 Contract 3 (NS89)
Project : Contract No.HY/2013/15 Provision of Barrier - Free Access Facilities for
Highway Structures Phase 3 Contract 3 (HF185)
Project : Contract No.HY/2013/15 Provision of Barrier - Free Access Facilities for
Highway Structures Phase 3 Contract 3 (HF137)
Project : Contract No.HY/2013/15 Provision of Barrier - Free Access Facilities for
Highway Structures Phase 3 Contract 3 (HF138)
Period Customer : Tsun Yip Waterworks Const Co Ltd Project : Mainlaying Near She Shan Tsuen, Tai Po (Contract No. 3/WSD/13)
2014-Pressent
Project : Contract No. CV/2015/03 Site Formation and Infrastructure Works Near Tong Hang Road and Tsz Tin Road
in Area Tuen Mun
Period Project : Proposed Hotel Development at Tung Chung Town Lot No.38
Customer : Chi Tung Engineering Limited
2016-Pressent
Project : Global Switch Hong Kong Campus Data Centre Tsuen Kwan O Industrial Estate
Project : J3660-Foundation Works for Tin Wing Light Rail Stop Property Development at TSWTL No. 23, Area 33, Tin
Shui Wai
Project : J3869 Sai Sha Residential and Recreational Development (Site B)
Period Customer : Sun Lick Air Conditioning Eng Co Ltd Project : China Unicom (Hong Kong) Global Center at Tseung Kwan O Industrial Estate
2016-Pressent Project : HGC Data Centre at Watson Centre (Phase 2B)
Period Customer : Chun Sing Engineering Co Ltd Project : Design and Construction of West Kowloon Government Offices in Yau Ma Tei Kowloon
2016-Pressent
Project : Proposed Composite Development at Tseung Kwan O Town Lot No. 95

Period Customer : Alliance Engineering Co Ltd Project : Addition of New Slab at Shop No. F41A, 1/F, The Avenue 200 Queen's Road East Wan Chai, Hong Kong
2016-Pressent
Period Customer : RenoPipe Construction (H.K.) Lted Project : HY/2012/07
2016-Pressent
Period Customer : Wing Fung Metal Manufactory Project : Seawater Pipe Upgrading - Main MEP Contract at GCR Main Building
2016-Pressent
Period Customer : Lin Fat Construction & Eng Co Ltd Project : Alteration Work at Rooms 111,112 & 113 of Haking Wong Building for Department of Mechanical Eng (Job. No.153048)
2016-Pressent
Period Customer : Forward Construction Company Ltd Project : A & A Works at No.3 Matheson Street, J/O Sharp Street, Causeway Bay, Hong Kong
2016-Pressent Project : K11, 6/F
Period Customer : Arnlee Air-Conditioning Project : Development of Kwun Tong Swatow Baptist Church at 11 Tsui Ping Road, Kln on Kwun Tong
2016-Pressent Inland Lot.614

Period Customer : Hing Kee Construction Company Project : Phase 2 Proposed Renovation of Building Facade Signboard and Signage & Associated Works
2016-Pressent for Kerry Cargo Centre at Wing Kei Road, Kwai Chung, New Territories
Project : Exchange Square 2 G/F-1/F Escalator Lobby Stone Wall Alteration Works

Period Customer : Luen Fat (UNI) Air-Conditioning Project : Proposed Residential and Commercial Development on Y.L.T.L.507 at CDA 15, Yuen Long New Town
2016-Pressent Engineering Ltd
Period Customer : Yick Sing Civil Engineering Co Ltd Project : 1/WSD/15 (E) Team Contract for Waterworks District E - New Territories East
2016-Pressent
Period Customer : Shun Hing E & M Engineering Ltd Project : Additional AA & I Project 2016/16 Kowloon Tong Campuses for Hong Kong Baptist University
2016-Pressent
Period Customer : W.M.Construction Limited Project : Proposed Re-development for Hotel at 97 How Ming Street
2016-Pressent
Period Customer : Glorious Future Engineering Co Ltd Project : Liantang / Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works-Contract 7
2016-Pressent
Period Customer : Surety Technical Services Co Ltd Project : Process Facilities Feed System (PFFS) at SENT Landfill
2016-Pressent
Period Customer : Yau Luen Electrical Engineering Ltd Project : Hong Kong International School, Lower Primary School Redevelopment 23 South Bay
2016-Pressent
Period Customer : Golden Success Metal Engineering Ltd Project : Roadwork R2, R5 and D9 at LOHAS Park, Tseung Kwan O
2016-Pressent
Period Customer : Fu Ying Air-Conditions Eng Co Project : Proposed Commercial Development at No.236-242 Des Voeux Road Central, Central, HK
2016-Pressent
Period Customer : Keung Kee Decoration Eng Co Project : Flat B, 7/F, Broadview Mansion Wong Nai Chung Road, Happy Valley
2017-Pressent

Page 7
Job Reference Non-Destructive Test

Period Customer : Liwa Const & Eng Co Ltd


Project : Redevelopment of Lot No. 1949 in D.D.221 Sai Kung, Hong Kong
2016-Pressent
Project : Proposed Extension of New School Building att Pool to Primary School at 3 Fuk Cheung Street Ma Tau Chung

Project : Proposed Redevelopment Complex School / Institution / Office at 1 & 1A Java Road, North Point, Hong Kong

Project : Proposed Residential Development at No.43 Island Road, Hong Kong

Project : Residential Development at TMTL No. 547, Castle Peak Road, Castle Peak Bay Area 48, Tuen Mun
Project : Terminal 2 Expansion, Sky Plaza Main Building, Hong Kong International Airport, Chek Lap Kok, N.T. -
The Remaining Portion of Chek Lap Kok Lot No.1 and the Extension thereto (Viaduct (Batch A) )

Proposed Commercial at NKIL 6556, Kai Tak Area 1F Site 2 Kowloon

Contract C18W07-Office Tower Development

Contract No. 3801 – APM and BHS Tunnels on Existing Airport Island
Building Expansion - New Factory Building Kee Wah Production Center 1 Dai Kwai Street, Tai Po Industrial Est,
Subsection 1 of Section A of T.P.T.L.No.1 & Extension
Period Customer : Tsang Wan Lee Construction Co Ltd Project : Flat A 16/F and Roof, Block 4, Phoenix Court, 39 Kennedy Road, Wan Chai
2017-Pressent
Project : Proposed A & A Works at 50/F, 51/F & Roof Floor, 33 Seymour Road, Hong Kong
Project : Proposed New Building at Nos.80-86 Argyle Street & Nos.99-101 Hak Po Street Kowloon
Period Customer : Wah Sung Construction & Piling Ltd Project : House No.4 Customs Pass Lot 31 in D.D.228, No.18 Fei Ngo Shan Road, Sai Kung, N.T.
2017-Pressent
Period Customer : Glorious Future Engineering Co Ltd Project : Liantang / Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works-Contract 7
2017-Pressent
Period Customer : Turret Technical Service Ltd Project : Proposed Residential Development at Lot No.1180 in D.D.215 Hong Tsuen Road, Sai Kung, N.T.
2017-Pressent
Period Customer : Integral E&M Engineering Limited Project : Contract No. KL/2012/02 Kai Tak Development -Stage 3A Infrastructure at Former North Apron Area
2017-Pressent
Period Customer : Hsin Chong abp Company Limited Project : Museum Plus (M+) of The West Kowloon Cultural District
2017-Pressent
Period Customer : Wai Tat Foundation & Engineering Ltd Project : Proposed Retaining Wall at Fat Yuen Ching Shea, 178B Tsing Shan Chuen, Tuen Mun, N.T. Lot 759, 765, 791,
2017-Pressent 830, and 853 in D.D. 131
Period Customer : K.H.Foundations Ltd Project : YLTL532, Junction of Wang Yip Street West and Hong Yip Street, Tung Tau Industrial Area, Yuen Long, N.T.
2017-Pressent
Project : Ura Redevelopment Project (H18-Site A) Peel St, Gage St. & Staveley St., at I.L.9064, Hong Kong

Project : Proposed Residential Development at 5-17 Western Street, Sai Ying Pun, Hong Kong

Period Customer : Wah Hing Metal Eng Co Ltd Project : Proposed Residential Development at Shatin Town Lot No.574 Lok Wo Sha, Ma On Shan
2017-Pressent
Period Customer : Chun Sing Waterworks Serice Ltd Project : Term Contract for Waterworks District E - New Territories East
2017-Pressent
Period Customer : Utilities Construction Ltd Project : Term Contract for Waterworks District E - New Territories East
2017-Pressent
Period Customer : Ming Chun Construction Co Ltd Project : EXXONMOBIL Tsing Yi East Terminal & West Terminal
2017-Pressent
Period Customer : Kin Sang Engineering Co Project : 1/F, No.69 Lee Garden Road, Po Wing Building, Causeway Bay
2017-Pressent
Project : The Block S on 1st Floor and 2nd Floor of Lee Kee Building, No.55 Ngau Tau Kok Road, Kowloon
Project : Proposed New Steel Spiral Staircase on Flat C, 25F, BLK22 Baguio Villa, 550-555 Victoria Road, Pok Fu Lam
Period Customer : Hing Long Design Works Ltd Project : Residential Redevelopment at 352 Blossom Terrace (Phase 1), Yau Kom Tau, Tsuen Wan
2017-Pressent
Project : Proposed Development of Two Storey Residential Houses on Lot No. 1848 in D.D.Cheung Chau
Project : Proposed A & A Works for Little Dalton School at G/F, Imperial Cullinan, 10 Hoi Fai Road, Tai Kok Tsui, Kowloon

Period Customer : Chun Tim Eng & Equirment Co Ltd Project : Proposed Property Development at KTIL No. 713, No.123 Hoi Bun Road Kwun Tong, Kowloon
2017-Pressent Project : Main Works Contract for Hong Kong Science Park Expansion State 1 (SPX 1)
Project : Design and Construction of West Kowloon Government Offices in Yau Ma Tei Kowloon
Project : Serial No. 4310 10C41 2017 0043 Model No. TD4036-24
Period Customer : Titan Foundation Limited Project : Proposed Development Lot No. 1066 in Demarcation District No.103
2017-Pressent
Period
Customer : UniVision Engineering Limited Project : K1791.01 ERL Platform CCTV Enhancement
2017-Pressent
Period
Customer : Union ad Engineering Co Project : G/F., Continental Place, 238 Des Voeux Road Central, Sheung Wan
2017-Pressent
Period
Customer : Universe Engineering (HK) Ltd Project : Harmony Redevelopment at Hysan Avenue – Chilled Water Pipe Installation at 12/F Main Chiller Plant
2017-Pressent
Period 東莞厚本實業有限公司 Project : Phase 2A Building Tai Koo Place, Quarry Bay, Hong Kong
2017-Pressent
Period
Customer : Teamrite International Limited Project : Hong Kong International Theme Parks Limited - 18M Christmas Tree
2017-Pressent
Period Customer : Shun Yip Construction Co Ltd Project : A & A Works for New Chiller Plant and VRV System for Victoria Shanghai Academy 19 Shum Wan Road,
2018-Pressent Aberdeen, HK

Page 8
Job Reference Non-Destructive Test

Period Customer : Tin Ho (H.K.) Engineering Development LtdProject : Term Contract for Waterworks District E - New Territories East
2018-Pressent
Period Customer : Perfect Match Trading & Engineering Ltd Project : Contract No. CV/2016/07 Queen's Hill Development Road and Drainage Works
2018-Pressent
Period Customer : Wong Tung Eng Co Ltd Project : 811B-Gammon-Leighton Joint Venture
2018-Pressent
Period Customer : Chiu & Lee Partners Construction Co Ltd Project : Proposed Residential Redevelopment on K.I.L.2341 Section E, at 195 Prince Edward Road West, Kowloon
2018-Pressent
Period Customer : Luen Hing Construction & Eng. Ltd. Project : P575 North Commercial District Main Infrastructure Works
2018-Pressent
Period Customer : CMD Construction Engineering Ltd Project : Proposed A & A Works on I.L.17734, No.9 Magazine Gap Road, Hong Kong
2018-Pressent
Project : 133 Fuk Wing Street, Sham Shui Po
Period Customer : ISP Curtain Wall and Aluminum Products Ltd
Project : Museum Plus (M+) of The West Kowloon Cultural District
2018-Pressent
Period Customer : D.E.Sign Co Project : Conversion into Hotel Development at 376-382 Lockhart Road, Wan Chai, Hong Kong
2018-Pressent
Period Customer : Lik Shing Engineering Co Ltd
Project : Works Contract No. PD/WC/195 Design and Construction of Foundations for Project A
2018-Pressent
Period Customer : Good Will Air-Conditioning & Project : Contract 1173 Building Services for HUH and HHS
2018-Pressent Refrigeration Engineering Co

Period Customer : Multi-Stone Limited Project : Exchange Square III Removation of Lift Lobby at 1/F
2018-Pressent
Period Customer : Fonk Wang Development Ltd Project : P271 T1 Capacity Enhancement Supporting Beam
2018-Pressent
Period Customer : Yiu Man Development Co Ltd Project : West Rail Yuen Long Station Property Development at YLTL No.510
2018-Pressent
Period Customer : Hip Lee Engineering Co Project : Contract No. HY/2014/16 Hiram's Highway Improvement Stage 1-Between Clear Water Bay Road & Marine Cove
2018-Pressent
Period Customer : Liebherr-Singapore Pte Ltd Project : TMTL539
2019-Pressent
Period Customer : Uniart Advertising Production Project : G/F, Shop No.1 & 2, Nos. 8-8A, Nelson Street, Mong Kok, Kowloon
2018-Pressent
Period Customer : Fook Lee Construuction Co Ltd Project : Re-distribution of Power Suppy System in Special Block
2019-Pressent
Period Customer : Billion Profit Engineering Ltd Project : Contract No.7/WSD/16 Uprating of Chai Wan Salt Water Supply System-Mainlaying and Upgrading of Siu Sai
2019-Pressent Wan Salt Water Pumping Station
Period Customer : Wing's Construction Co Ltd Project : District Cooling System (DCS) at Kai Tak Development (KTD) - Chilled Water Pipe Laying and Associated Works
2019-Pressent in North Apron
Period Customer : Wing Lee Construction Co
Project : St. Paul's Hospital Redevelopment 2 Eastern Hospital Road, I.L. No.1018 & No.2146
2019-Pressent
Period Customer : Air Technology Engineering Co Ltd
Project : Shatin 36C HKHS MVAC Project
2019-Pressent
Period Customer : China State Construction Eng (HK) Ltd
Project : The Hong Kong Palace Museum at West Kowloon Cultural District, Hong Kong
2019-Pressent
Period Customer : CEC-CCC Joint Venture Project : Contract No. KL/2014/01 Kai Tak Development - Stage 2 Intrastructure Works for Development at The Southern
2019-Pressent Part of The Former Runway
Period Customer : Lee Shing Foundation Eng Ltd
Project : Residential Development at Lot No.4328 in Demarcation District No.124 Hung Chi Road, Hung Yuen Road
2019-Pressent
Period Customer : Sunbon Engineering Limited Projectt : KCRC Sheung Shui Station Kiosk No. SHS10 Unpaid Concourse, KCRC Sheung Shui Station,
2019-Pressent Sheung Shui, N.T.
Period Customer : Ming Tak Air Condition Co Ltd
Project : Typical Lift Lobby Ceiling Replacement
2019-Pressent
Period Customer : Chong Kin Mechanical Eng Ltd
Project : Contract No. HY/2014/08 Central Kowloon Route-Yau Ma Tei East
2019-Pressent
Period Customer : Fai Lee Construction (HK) Limited
Project : Model / Type : ZX225 USR-3 Hydraulic Exacavator ID No. HCMIU500A00225597
2019-Pressent
Period Customer : New Ko Conditioning Eng Co Ltd
Project : Lohas Park Package Seven on TKOTL No.70, Site C2, N.T.
2019-Pressent
Period Customer : Vesta Engineering and Consulting Ltd
Project : Lots 194 S.A & RP and 195 in D.D.222 at Pak Kong Au, Sai Kung
2019-Pressent
Period Customer : Tung Wing Air Conditioning Eng Co
Project : China Unicom Data Hall 205
2019-Pressent
Period Customer : Pacific Winner Engineering Limited
Project : Design and Building for Data Centre for 11/F to 14/F, MCX 10 (Phase 1)
2019-Pressent
Period Customer : BIG View Corporation Limited Project : Lohas Park Package Seven at TKOTL No.70, Site C1, N.T.
2019-Pressent
Period Customer : Magnify Engineering Limited Project : LG4, High Block, Queensway Government Offices, 66 Queensway Hong Kong
2019-Pressent Project : Contract No. 1158EM18W Retrofiting of Seawater - Cooled Chillers in Tune Mun Hospital

Period
Customer : Kings View Airconditioning Eng Co Ltd Project : Proposed Improvement Works of Air-Conditioning System for Kowloon Tong Club at 133A Waterloon Road, Kln
2020-Pressent
Period
Customer : Champion E & M Limited Project : Contract No.2853EM17W District Cooling System (DCS) at Kai Tak Development (KTD)
2020-Pressent
Period
Customer : Golden Leap Construction Co Ltd Project : Proposed Residential Development at No. 16A-D Shouson Hill Road, Hong Kong
2020-Pressent
Period
Customer : Sunbright (Union) Engineering Ltd Project : The Papillons
2020-Pressent

Page 9
Job Reference Non-Destructive Test

Period Project : Building Services Installation for Construction of Open Space in Area 47 and 48, North District (NSC Contract
Customer : EcoSmart Energy Management Ltd
2020-Pressent No.SS G516) to Design, Supply & Installation of 7kW off Grid PV System
Period
Customer : Baily Building Engineering Co Ltd Project : R/F, Nos. 299-299A Queen's Road West, Hong Kong
2020-Pressent
Period
Customer : Mocon Co Ltd Project : Proposed Columbarium at 2-6 Wing Lap Street, Kwai Chung, on K.C.T.L.329
2020-Pressent
Period
Customer : Ling Lap Engineering Ltd Project : Contract No. SSG515 Construction of Open Space in Area 6, Tai Po
2020-Pressent
Period
Customer : Hop Shing Construction Co Ltd Project : Contract No. SSG515 Construction of Open Space in Area 6, Tai Po
2020-Pressent
Period
Customer : Wing Hang Hardware Engineering Project : Proposed Works for Renovation Shop No.G-36B, G/F, Fesitval Walk, Tat Chee Road
2020-Pressent
Period
Customer : Heng Ngai Engineering Co Project : Minor Work Item 1.22-Wall Signboard at 2/F Lee Kee Building, 55 Ngau Tau Kok Road
2020-Pressent
Period
Customer : Time Speed Engineering Ltd Project : Contract No.5/WSD/18 Water Supply to New Housing Developments in Sheung Shui and Fanling
2020-Pressent
Period
Customer : H.H. Robertson Limited Project : Contract No. SSG515 Construction of Open Space in Area 6, Tai Po
2020-Pressent
Period
Customer : Wang Kin Loy Eng. Co.Ltd Project : Data Center Conversion Project at SLC Stage 2, Fotan Main Contract Works - 5/F
2020-Pressent
Period
Customer : Harmony Construction Co Ltd Project : Proposed Commercial Development at No.2 Murray Road I.L.No.9051
2021-Pressent
Period
Customer : Raising Engineering Limited Project : Installation of Chiller Plants at Roof of Cable TV Tower, 9 Hoi Shing Road, Tsuen Wan, N.T.
2021-Pressent
Period Customer : Chun Tat Trading ( Air-Conditioning)
Project : Mongkok Station Chiller Plant Room
2021-Pressent Engineering Co Ltd
Period
Customer : Play Concept Limited Project : Design & Construction of Junior Police Officers Married Quarters at Fan Garden, Fanling, N.T.
2021-Pressent
Period Project : Contract No.9/WSD/11Upgrading of Wan Chai Salt Water Supply System Mainlaying Pipe Jacking
Customer : Bestwin Engineering Ltd Project : Contract No.1/WSD/19 In-Site re-provision for Shatin Water Treatment Works (South Works)
2021-Pressent
Period
Customer : Arnlee Engineering Ltd. Project : H.K.U.S.T. Shaw Auditorium Clearwater Bay, Kowloon
2021-Pressent
Period
Customer : Union ad Engineering Co Project : G/F Prime Mansion 183-187 Johnston Road, Wan Chai, HK
2021-Pressent
Period
Customer : Tin Yue Eng Development Co Ltd Project : Contract No.3508 Terminal 2 Expansion Works Area 13
2021-Pressent
Period
Customer : Prosperity Eng Service Ltd Project : A & A Works at HKG11 Data Centre Phase 1
2021-Pressent
Period
Customer : JCE (HK) LIMITED Project : BMU Haul-in Restraint Socket & Pin (Detail C) for Proposed Office Development at 2 Murray Road
2021-Pressent
Period
Customer : Foundation Engineering Ltd Project : Proposed Comprehensive Development at Pak Shek Kok, T.P.T.L.244, Tai Po, N.T.
2021-Pressent
Project : Tai Wai Station Property Development at Shatin Town Lot No.520

Period Project : Contract Ref : 8110089242 Addition of Lifts in Pamela Youde Nethersole Eastern Hospital for Minor
Customer : Power Three Structural Eng Co Ltd
2021-Pressent Capital Projects 16/17

Period
Project : Ngailik Air-Cond & Electrical Eng Project : 1/F, Hop Yick Commercial Centre, 33 Hop Choi Street, Yuen Long
2022-Pressent
Period
Customer : Tactful Building Co Ltd Project : Residential Development at Shatin Town Lot No.614 Lai Ping Road, Kau To Shatin
2022-Pressent

Period
Customer : Lets Change (Hong Kong) Ltd Project : Installation of Chilled Water Pipe & FCU at 9/F Shan Sum Columbarium
2022-Pressent
Period
Customer : Wellden Engineering Limited Project : F1804-Premium Modern Logistice Centre at Kwo Lo Wan Architectural
2022-Pressent

Page 10