The document proposes locating a new generator room and converting an existing control room into a new battery room at a site. It shows the proposed layout including dimensions of the new generator room and battery room, and locations of equipment like generators, batteries, fuse panels, and rectifiers to support power systems at the site.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
83 views13 pages

PLDT Lipa

The document proposes locating a new generator room and converting an existing control room into a new battery room at a site. It shows the proposed layout including dimensions of the new generator room and battery room, and locations of equipment like generators, batteries, fuse panels, and rectifiers to support power systems at the site.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

A B D E F

PROP. LOCATION OF

33850
NEW GENSET ROOM

4872.57
C 14447.43 3050 3150
PROPOSED EXISTING C.R. TO BE
DISMANTLED AND CONVERT IT TO NEW

1
BATTERY ROOM
ALCATEL PR-2K18
SEL

DT-REC
ALCATEL
RECTI
CR

ARGUS FUSE 1

ALCATEL
BATTERY

REC
BATTERY

BANK 1
BANK 2
UTILITY

ACBEL

ACBEL
RECTI

PR-1A
ROOM

PACU-12
ARGUS
RECTI

STORAGE
CABLE CR

ARGUS FUSE 2

BATTERY
BATTERY
VAULT

ROOM
BANK 2
BANK 1
ACBEL

ARGUS
6090

RECTI

PACU-11
BATTERY RECTIFIER
ROOM ROOM

UP
MDF

2
HALLWAY
PROPOSED TO DISMANTLE
PR-1
PACU-E
(MAIN)
LP-1
EXISTING 100KW GENSET

GUARD
PP-1

HOUSE
MDP ATS
MTS
AND SURRENDER TO FASMAN

600AT
MTS
PR-2K18
ECB
4090
OFFICE GEN-SET A

GENSET

D-85 FUEL
TANK
3 ROOM

STEP
UP
STEP
UP
5550
DAY TANK

4 TV5 GENSET STORAGE STORAGE


ROOM

4858.86
5
ROOM

KALIPULAKO ROAD
TV5 EQP'T
ROOM

15701.58
STORAGE
PUMP
OFFICE OFFICE

KALIPULAKO ROAD
BUSINESS
CR OFFICE

10559.55
EXISTING SERVICE
ENTRANCE

7
KALIPULAKO ST. EXTENSION
VICINITY MAP

KALIPULAKO ROAD
EXISTING 3-100KVA
TRANSFORMER

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-01
GENERAL NOTES, VICINITY MAP &
CORPORATION
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY: EXISTING SITE DEVELOPMENT PLAN

SITE ADDRESS: LIPA BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
CE-13
SCALE: REVISION NUMBER.:
LONGITUDE: 13°56'55.5" LATITUDE: 121°9'31.68" PLACE ISSUE: DATE APPROVED: 1:500 .
A-1
4603
A-2 A-3 B 4873
C 14447
D E
3050 3150
F B 4873
C 14447
D E
3050 3150
F
4603

RISER DOWN TO

1 1
RISER UP TO 2ND FLOOR EXISTING FLOOR SLOT
EQUIPMENT ROOM 2280 450 270 315 250 620 110 415

ALCATEL E.F.
GB PR-2K18 P1 P3
SEL PROP. 1000AH PROP. 1000AH PROP. 1000AH PROP. 1000AH P2
WIRING FCU 4 FCU

600

600

600
PROPOSED

530
BATTERY BANK BATTERY BANK BATTERY BANK BATTERY BANK

DT-REC
600

DCPB 1&2
FCU
(DPC) (DPC) (DPC) (DPC) TNT-PR A
30AT.
ELPP 755 600 600 600 600 600 600 600 600 1050

PROP. 5TR
ACCU 1&2
2P ECB

ALCATEL
MANUAL
1000

1000

PROPOSED 500L FP ODF ODF

RECTI
PUMP

ARGUS FUSE 1
DAY TANK PROPOSED PROP. PROP. PROP. PROP. PROP. PROP. PROP. PROP.

ALCATEL
PROP. 1000AH PROP. 1000AH PROP. 1000AH PROP. 1000AH

BATTERY

600

600

600

600
TNT-PR B RECTIFIER RECTIFIER RECTIFIER RECTIFIER RECTIFIER RECTIFIER RECTIFIER RECTIFIER

BATTERY

REC
BATTERY BANK BATTERY BANK BATTERY BANK BATTERY BANK

DCPB 3&4
BANK 1
BANK 2
UTILITY

ACBEL
(DPC) (DPC) (DPC) (DPC) SYSTEM 1 SYSTEM 1 SYSTEM 1 SYSTEM 1 SYSTEM 2 SYSTEM 2 SYSTEM 2 SYSTEM 2

PCM ROOM
E.F.

2000

AG 2 AG 2 AG 2 AG 2

ACBEL
RECTI
20AT, 230V, 3P

CR
1500

PR-1A
MDF NEMA 1 ECB

PROP.
ROOM
PROP. 1000AH PROP.1000AH PROP. 500AH PROP. 500AH 40AT, 230V, 3P

600

600

600

600

PROP. 5TR

(STAND-BY)

PROP. 5TR
BATTERY BANK BATTERY BANK EXP TO 1000AH EXP TO 1000AH NEMA 4X ECB
1000

800
FCU 2

FCU 3
(DPC) (DPC) BATTERY BANK BATTERY BANK

FCU 3

506

506
FCU 1
SWITCHBOARD (DPC) (DPC)
HUAWEI

PACU-12
4790

ARGUS

PROP. 5TR
OPT

RECTI
CABLE
570 600 800 600 580 600 800 600 570
2000

ACCU 3
20AT, 230V, 3P
1850

288 NEMA 1 ECB


1000

HUAWEI
ARGUS FUSE 2
PROPOSED WALL

700

OPT
305

BATTERY
BATTERY
VAULT

BANK 1
AS AG 1

BANK 2
AG 1 AG 1

ACBEL
AG 1

ARGUS
6090

RECTI
ODF

6090
E.F.
1200

800

PROPOSED WALL
1750

PACU-11
40AT, 230V, 3P
NEMA 4X ECB

PROPOSED 300KW
1100

ODF
1.1
RENOVATED C.R.
OPEN TYPE GENSET PROP. ACU EQP'T ROOM
BATTERY RECTIFIER
PROP. ELVSG - TIE

MAIN PANEL 506

350
PROPOSED WALL NEMA 4X
305
3300 3910

PROP 5TR

ROOM

288
NEMA 1 ECB
20AT, 230V, 3P
ROOM
FCU1

DOWN
UP
(working)

1250
1050
2930

HUAWEI
EQUIP
1600

DCPB HUAWEI HUAWEI 300 1200


EQUIP EQUIP
MDF CR

DCPDB 2

(CISCO)

PROP.
PROP.

LOT 2

3100
600

600
HALLWAY SWITCHING

2 2

FCU 14

FCU 13

UP
ROOM
305

DCPDB 1

(CISCO)

PROP.
PROP.

LOT 2
600

600
680

PROP. CEN
PACU-E

PROPOSED 300KW LP-1


PROP. ATS-2 PROP. ATS-1 PROP.

PR-1
HUAWEI HUAWEI HUAWEI
(MAIN)
1100

(CISCO)
PP-1
MDP ODF

600
ATS
1000

EQUIP EQUIP EQUIP

PROP.
ODF
MTS

900
OPEN TYPE GENSET

600AT
4790

MTS

3900

ODF

600
305

300
3300 3910

OLT ROOM
1000

PR-2K18

EQUIP
ECB
2.1
4090

600
4090
OFFICE
1760

EQUIP

600
MOBILE BOX
1000

OFFICE
2700

MDP

DCPDB
E.F.

600
GENSET

D-85 FUEL

1050

PROP. LOT 1
TANK

350
1000

(CISCO)
3 3
ROOM SMART
1220

TNT ACU

600
ROOM 600
1100

600

300
STEP
UP

398

400
ACU ACU
6300

305
308
STEP

PROP 2.5HP
WACU
UP

(stand-by)

460 580 950 580 860


5550

5550
4 4
4859

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-02
PROPOSE GROUND FLOOR PLAN
CORPORATION
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY: PROPOSE SECOND FLOOR PLAN

SITE ADDRESS: LIPA BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
CE-13
SCALE: REVISION NUMBER.:
LONGITUDE: 13°56'55.5" LATITUDE: 121°9'31.68" PLACE ISSUE: DATE APPROVED: 1:500 .
SCHEDULE OF FINISHES

LOCATION FINISHES COLOR REMARKS BRAND

EPOXY PAINT SUBMIT COLOR SWATCH


FLOOR @ GENSET ROOM PLDT BLUE BOYSEN, DUTCH BOY OR APPROVED EQUAL
FOR APPROVAL
PLAIN CEMENT PLASTERED PAINTED FINISH OFF WHITE - SAME -
WALLS BOYSEN, DUTCH BOY OR APPROVED EQUAL
ALL CONC, PLASTER MIXED W/ SAHARA INTEGRAL WATERPROOFING
GENSET PAD EPOXY PAINT PLDT BLUE - SAME - BOYSEN, DUTCH BOY OR APPROVED EQUAL

METAL LOUVER PAINTED (ENAMEL PAINT) W/ RED LEAD PRIMER PLDT BLUE - SAME - BOYSEN, DUTCH BOY OR APPROVED EQUAL

CEILING PLAIN CEMENT PLASTERED PAINTED FINISH OFF WHITE - SAME - BOYSEN, DUTCH BOY OR APPROVED EQUAL

FLOOR PLATFORM EPOXY PAINT PLDT BLUE - SAME - BOYSEN, DUTCH BOY OR APPROVED EQUAL

ROOF SLAB HYDROFLEX BITUMEN MEMBRANE BLACK SUBMIT SAMPLE FOR APPROVAL BOYSEN, DUTCH BOY OR APPROVED EQUAL

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-03
ISOMETRIC VIEW, DETAILS DESIGN
CORPORATION
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY: CONTRACTOR'S SCOPE OF WORK

SITE ADDRESS: LIPA BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
CE-13
SCALE: REVISION NUMBER.:
LONGITUDE: 13°56'55.5" LATITUDE: 121°9'31.68" PLACE ISSUE: DATE APPROVED: N.T.S. .
A-1 A-1 A-1 A-1 A-1 A-1

9206 9206
4603 4603 4603 4603

1 1
CB GB CB
30AT.
2P ECB ELPP DD DD

1000

1000
MANUAL
PROPOSED 500L PUMP
FP
DAY TANK

2000
E.F.

1500

PROP. 2% E
SL OP

1000
SWITCHBOARD OP SL
E 2%

2000
1850
4790 4790

305

1200

800
L2

PROPOSED 300KW

1100
OPEN TYPE GENSET

PROP. ELVSG - TIE


2%
PE
4" DIA. PVC PIPE

4" DIA. PVC PIPE


O SL

305
3300 3910

SL OP
2% E
DD DD

2930
1.1 9580 CB CB 1.1 9580

1600
0.125M. THICK CONCRETE ROOF DECK WITH
SAHARA WATERPROOFING IN CONCRETE MIXTURES
305
2 2
PROPOSED 300KW
PROP. ATS-2 PROP. ATS-1 PROP.
1100
L2

1000

OPEN TYPE GENSET


4790 4790
305
3300 3910

1000

WALL LINE BELOW


1760

ROOF LINE

MOBILE BOX
2%
1000

PE E
O OP SL
2700

MDP

SL SL OP
E.F.

2% 2% E
1000

2.1 2.1
TAP TO NEAREST DRAINE PIPE

L1
1220
1100

DD DD DD
6300

6300
600
CB CB CB
600
4" DIA. PVC PIPE

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-04
PROPOSE GENSET ROOM
CORPORATION
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY: ROOF DECK PLAN

SITE ADDRESS: LIPA BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
CE-13
SCALE: REVISION NUMBER.:
LONGITUDE: 13°56'55.5" LATITUDE: 121°9'31.68" PLACE ISSUE: DATE APPROVED: 1:100 .
D' E' F F E' D'
9206
9206

650 4603 4603 650


650 4603 4603 650

125 900
1300
ROOF DECK LVL.
ROOF DECK LVL.

800
650 2700 1850 2053

4000
2500
2800
2800

300
F.F.L.
F.F.L.

800
800
N.G..L.
6300 N.G..L.

4' 5' 6' 6' 5' 4'


9580
9580
1150 4790 4790
4790 4790 1150

1300 1300
ROOF DECK LVL. ROOF DECK LVL.
200

600

3600
2500

F.F.L.300 F.F.L.
800 800
N.G..L. N.G..L.

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-06
ELEVATION VIEW
CORPORATION
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:

SITE ADDRESS: LIPA BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
CE-13
SCALE: REVISION NUMBER.:
LONGITUDE: 13°56'55.5" LATITUDE: 121°9'31.68" PLACE ISSUE: DATE APPROVED: 1:100 .
A-1 A-1 A-1 A-1 A-1 A-1

9206 9206
4603 4603 4603 4603

C-2/F-2 C-2/F-2 C-2/F-2


1 1
RB-3 RB-1 RB-1 RB-3

RB-2

RB-2

RB-2
4790 4790
WF-1

GENSET FOUNDATION

1.1 9580 C-1/F-1 C-1/F-1 C-1/F-1 1.1 9580 RB-3 RB-1 RB-1 RB-3

2 2
GENSET FOUNDATION

RB-2

RB-2

RB-2
WF-1
4790 4790

150mm THK SLAB ON FILL


12mm D.S.B. @ 300 O.C.B.W
1200
400

RB-3 RB-1 RB-1 RB-3


2.1 2.1
WF-1 WF-1

RB-3

RB-3

RB-3
C-1/F-1 C-1/F-1 C-1/F-1
400
1200

CONTRACTOR: OPERATOR: PROJECT NAME: TNT O ECT HASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: T ANSFO E AND GENSET U G ADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE 0
FOUNDATION PLAN
CORPORATION
SITE NAME: LDT LI A PRC No: PTR No: REVIEWED BY: ROOF FRAMING PLAN

SITE ADDRESS: LI A BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
CE 13
SCALE: REVISION NUMBER.:
LONGITUDE: 13°56'55.5" LATITUDE: 121°9'31.68" PLACE ISSUE: DATE APPROVED: 1:100 .
100mm CHB

75
900
4.5 kg/sqm. BITUMEN WATER
PROOFING MEMBRANE FLOOR TOPPING

T.O.S +4.125m

125
SLAB REINFORCEMENT(SEE PLAN)

400
RB-1 (SEE SCHEDULE)

100 700
800

COLUMN LINE

150mm CMW

1 SECTION DETAIL
CE 7 1:125

TOP STEEL AT MID SPAN TOP STEEL CURTAILED BARS TOP STEEL AT MID SPAN

L1/3 L1/3 L2/3


L2/3 L3/3

TOP STEEL AT SUPPORT TOP STEEL AT SUPPORT


CONTINUOUS REINFORCEMENT
CONTINUOUS REINFORCEMENT

STIRRUPS STIRRUPS STIRRUPS

137449(TYP.)

T25 MMØ BOTTOM STEEL BOTTOM STEEL


SPACERS@1MC/C CONTINUOUS REINFORCEMENT CONTINUOUS REINFORCEMENT
0.17 L2
0.17 L2

(TYPICAL)
400MM

BOTTOM STEEL CURTAILED BARS BOTTOM STEEL CURTAILED BARS


IF ANY IF ANY

SPAN L1 SPAN L2

TYPICAL BEAM DETAIL


SCALE NTS
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-07
BEAM SCHEDULE AND DETAILS
CORPORATION
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:

SITE ADDRESS: LIPA BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
CE-13
SCALE: REVISION NUMBER.:
LONGITUDE: 13°56'55.5" LATITUDE: 121°9'31.68" PLACE ISSUE: DATE APPROVED: N.T.S. .
SCHEDULE OF COLUMN
10mm∅ LATERAL TIES 10mm∅ LATERAL TIES
C1
4.8 m ROOF DECK
300

150mm THK SLAB ON FILL


125mm THK SLAB ON FILL

150

150
12mm D.S.B. @ 300 O.C.B.W
FFL 0.6m FFL 10mm D.S.B. @ 300 O.C.B.W

300
0.6m

SIZE: 300 x 300


8- ∅16mm MAIN
0.6 m GROUND FLOOR ∅10mm- @150- LATERAL TIES (3 sets)

500

500
300
NGL. 16mm∅ VERTICAL BARS 0.0m NGL. 16mm∅ VERTICAL BARS 0.0m

400

400
300

SIZE: 300 x 300


8- ∅16mm MAIN
-0.9 m TOP OF FOOTING ∅10mm- @150- LATERAL TIES (3 sets)

300
300
WALL FOOTING (SEE DETAIL) WALL FOOTING (SEE DETAIL)
Starter bars 8#16

TOP OF FOOTING TOP OF FOOTING

200
200
-0.9m -0.9m

300
150mm THK. CHB W/Ø10mmVERT.

300
BARS @ 0.80m
& 10mmØ HORZ.BAR 8-16mmØ BARS B.W.O.C.
8-16mmØ BARS B.W.O.C. 1200
@ EVERY 3 LAYERS OF CHB TOP & BOTTOM
NGL. 0.0m
1200

300 900
450 300 450
VARIES

450
450
250mm

8 - 16mm∅ BAR - B2
8 - 16mm∅ BAR - B2

1200

300
1200

300

3-12mmØ BARS
10mmØ TEMP. BARS
@ 300mm O.C. 8 - 16mm∅ BAR - B1
500 8 - 16mm∅ BAR - B1
450

450
PROVIDE 50mm THK. WELL-
COMPACTED GRAVEL FILL

TYPICAL DETAIL OF WF-1


SCALE NTS 2 TYPICAL DETAIL OF C1/F1 3 TYPICAL DETAIL OF C2/F2
CE 08 1:125 CE 08 1:125

CONTRACTOR: OPERATOR: PROJECT NAME: TNT O CT HAS 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: T ANSFO AND NS T AD PROFESSIONAL CIVIL ENGINEER CHECKED BY: C 0
WALL FOOTING SCHEDULE AND DETAILS
CORPORATION
SITE NAME: LDT LI A PRC No: PTR No: REVIEWED BY: COLUMN SCHEDULE AND DETAILS

SITE ADDRESS: LI A BATAN AS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
C 13
SCALE: REVISION NUMBER.:
LONGITUDE: 13°56'55.5" LATITUDE: 121°9'31.68" PLACE ISSUE: DATE APPROVED: 1:125 .
TEMPERATURE BARS

BEAM BEAM

CONTINOUS BARS
CONTINOUS BARS
EXTRA BOTTOM BARS EXTRA BOTTOM BARS

TOP BARS TOP BARS


BEAM

BEAM

BEAM

BEAM
BEAM BEAM

PLAN PLAN

TOP BARS EXTRA BOTTOM BARS TOP BARS EXTRA BOTTOM BARS TEMPERATURE BARS
(t)

(t)
CONTINOUS BARS CONTINOUS BARS
BEAM L/5 L/5
BEAM BEAM L/5 L/5
BEAM
L/4 L/4 L/4 L/4

L L

CROSS-SECTION CROSS-SECTION

TWO-WAY ONE-WAY

TYPICAL DETAIL OF RC SLAB


SCALE NTS

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-09
SLAB SCHEDULE AND DETAILS
CORPORATION
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:

SITE ADDRESS: LIPA BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
CE-13
SCALE: REVISION NUMBER.:
LONGITUDE: 13°56'55.5" LATITUDE: 121°9'31.68" PLACE ISSUE: DATE APPROVED: N.T.S. .
3910

500 450 2010 450 500

1710
700mm HIGH CONTAINMENT
WALL - 100mm THK CMU W/
10mmØ VERT. BARS @ 600mm +
10mmØ HOR. BARS @ EVERY 2ND
LAYER W/ 3 COATS ELASTOMERIC

5% SLOPE
WATERPROOFING PAINT(1 PRIME
COAT, 2 COATS OF TOP COAT) - 300L
KUSTURA FINISH 600 2910 600
5% SLOPE

FUEL TANK CONTAINMENT


(TOP VIEW)
50x50x3mm THK.
16mmØ TOP & BOTTOM BARS ANGLE BAR
150x150x5mm BASE
PLATE WITH 4 PCS.6mm DIA SPACED @ 150mm O.C. E.W. SCREWED AROUND
SELF DRILLING ANCHOR BOLT 500 450 2010 450 500 THE EDGES
1-10mmØ
CONT. BARS
100 FLOOR SLAB

200
100
400
700

100mm THK.
CMU WALL
200
50mm THK.

1000
MASTIC FILLER

10mmØ BARS 16mmØ INT. & EXT. BARS


@ 250mm O.C. SPACED @ 150mm O.C.
FUEL TANK CONTAINMENT

400 100mm THK.


GRAVEL BEDDING ON
600 450 2010 450 600 WELL-COMPACTED SOIL
4110

16mmØ TOP & BOTTOM BARS


SPACED @ 150mm O.C. E.W.

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-10
BUNDWALL DETAILS
CORPORATION
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY: GENSET FOUNDATION DETAILS
SITE ADDRESS: LIPA BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
CE-13
SCALE: REVISION NUMBER.:
LONGITUDE: 13°56'55.5" LATITUDE: 121°9'31.68" PLACE ISSUE: DATE APPROVED: N.T.S. .
2700 2700
2800

2800
0.10

125
16MM HANDHOLE
HANDLE

0.60 M
0.10
EXTERIOR INTERIOR

D-1 GENSET ROOM


0.40
DESIGNATION:DOOR 1 L=0.60M
DESCRIPTION: FRAME; 1.2MM ALUMINUM SHEET BLADE; DOUBLE SKIN BLADE TYPE W/ W=0.60M
OUTER FACE 0.7MM ALUMINUM SHEET AND INNER PERFORATED
FACE 0.9MM GALVANIZE STEEL SHEET ACOUSTIC FILL AND MILL
FINISH
CATCH BASIN DETAIL (CB) SECTIONAL DETAIL PLAN
NOT TO SCALE NOT TO SCALE
REQ: 1 SET

SCHEDULE OF DOOR 0.30 M


SCALE: NTS

75mm

12 MM REBARS CROSSWISE
AND LENGTHWISE @ 0.20 M OCBW
25mm

CROSSWISE REBAR CONNECT


100mm

CHB WALL
45°

1850 2700

25mm
BARREL BOLT
CHB WALL
GA # 14 2" x 4"
GA # 16 PLAN TUBULAR
SHEET LOUVER
HOT AIRFLOW FRAME ALL 0.20 M
BLADES AROUND EXISTING GRADE LINE
INSIDE GENSET
2500
2500

ROOM

GA # 14 2" x 4"
0.20M FOUNDATION 3 pcs 12mm rebars with
TUBULAR FRAME
10mm temp bars @ 0.20 OC

STAIR DETAIL
SCALE: NTS

TYPE: 2 BAYS, FIXED METAL, LOUVER TYPE: 2 BAYS, REMOVABLE METAL LOUVER
LOUVERED WINDOW CROSS SECTIONAL DETAIL
REQ: 1-SET REQ: 2-SETS
SCALE: NTS

SCHEDULE OF LOUVER (L1) SCHEDULE OF LOUVER (L2)


SCALE: NTS SCALE: NTS

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-11
LOUVER DOOR AND WINDOW DETAILS, DRAIN DETAILS
CORPORATION
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY: CATCH BASIN DETAILS, STAIR DETAILS

SITE ADDRESS: LIPA BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
CE-13
SCALE: REVISION NUMBER.:
LONGITUDE: 13°56'55.5" LATITUDE: 121°9'31.68" PLACE ISSUE: DATE APPROVED: N.T.S. .
4"THK CHB
1050 2000
C C

SECTION BB'
10mm REBAR 100mm anchored
DOOR DETAILS
10mm rebar
3 TOP VIEW DETAILS
CE-07 SCALE: NTS

epoxy/grout
2100

2100
FASTENER
CHB WALL
DOOR FRAME
FFL
DETAIL A
A NTS
DOOR DETAILS DOOR DETAILS PLASTER SCALE:
1 FRONT VIEW DETAILS 2 SECTION VIEW DETAILS
SCALE: NTS SCALE: NTS

100 x 50 x 3m TABULAR

DOOR HANDLE DOOR DETAILS


60MM THICK PLAIN METAL SHEET DEATAIL B
4
100 x 50 x 3m HORIZONTAL TUBULAR SCALE: NTS
100 x 50 x 3m VERTICAL TUBULAR

CHB IN 4'' THK


RSB 10mm GRADE 33, 600mm
SPACING BOTH WAYS
DOOR DETAILS
DETAIL A 1:4 CEMENT SAND MIXTURE
5
SCALE: NTS B
DOOR DETAILS
CHB WALL
7 ISOMETRIC VIEW
SCALE:
ISOMETRIC VIEW epoxy/grout
100 mm anchored
150
10mm rebar
SCALE: NTS
4" x 4.5"
HINGE
DOOR DETAILS CHB WALL
6 DETAIL C
SCALE: NTS
DETAIL B
SCALE: NTS

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-12
DOOR DETAILS
CORPORATION
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY: PARTITION WALL DETAILS

SITE ADDRESS: LIPA BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
CE-13
SCALE: REVISION NUMBER.:
LONGITUDE: 13°56'55.5" LATITUDE: 121°9'31.68" PLACE ISSUE: DATE APPROVED: N.T.S. .
BILL OF MATERIALS
MAN LADDER

B B

75
EMBEDMENT

600

A A

1200.4800

350

1 ISOMETRIC VIEW (MAN LADDER) 2 ELEVATION


CE-13 SCALE: NTS CE-13 SCALE: NTS

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-13
MAN LADDER DETAILS
CORPORATION
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:

SITE ADDRESS: LIPA BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
CE-12
SCALE: REVISION NUMBER.:
LONGITUDE: 13°56'55.5" LATITUDE: 121°9'31.68" PLACE ISSUE: DATE APPROVED: N.T.S. .