PLDT Lipa
PLDT Lipa
PROP. LOCATION OF
33850
NEW GENSET ROOM
4872.57
C 14447.43 3050 3150
PROPOSED EXISTING C.R. TO BE
DISMANTLED AND CONVERT IT TO NEW
1
BATTERY ROOM
ALCATEL PR-2K18
SEL
DT-REC
ALCATEL
RECTI
CR
ARGUS FUSE 1
ALCATEL
BATTERY
REC
BATTERY
BANK 1
BANK 2
UTILITY
ACBEL
ACBEL
RECTI
PR-1A
ROOM
PACU-12
ARGUS
RECTI
STORAGE
CABLE CR
ARGUS FUSE 2
BATTERY
BATTERY
VAULT
ROOM
BANK 2
BANK 1
ACBEL
ARGUS
6090
RECTI
PACU-11
BATTERY RECTIFIER
ROOM ROOM
UP
MDF
2
HALLWAY
PROPOSED TO DISMANTLE
PR-1
PACU-E
(MAIN)
LP-1
EXISTING 100KW GENSET
GUARD
PP-1
HOUSE
MDP ATS
MTS
AND SURRENDER TO FASMAN
600AT
MTS
PR-2K18
ECB
4090
OFFICE GEN-SET A
GENSET
D-85 FUEL
TANK
3 ROOM
STEP
UP
STEP
UP
5550
DAY TANK
4858.86
5
ROOM
KALIPULAKO ROAD
TV5 EQP'T
ROOM
15701.58
STORAGE
PUMP
OFFICE OFFICE
KALIPULAKO ROAD
BUSINESS
CR OFFICE
10559.55
EXISTING SERVICE
ENTRANCE
7
KALIPULAKO ST. EXTENSION
VICINITY MAP
KALIPULAKO ROAD
EXISTING 3-100KVA
TRANSFORMER
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-01
GENERAL NOTES, VICINITY MAP &
CORPORATION
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY: EXISTING SITE DEVELOPMENT PLAN
SITE ADDRESS: LIPA BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
CE-13
SCALE: REVISION NUMBER.:
LONGITUDE: 13°56'55.5" LATITUDE: 121°9'31.68" PLACE ISSUE: DATE APPROVED: 1:500 .
A-1
4603
A-2 A-3 B 4873
C 14447
D E
3050 3150
F B 4873
C 14447
D E
3050 3150
F
4603
RISER DOWN TO
1 1
RISER UP TO 2ND FLOOR EXISTING FLOOR SLOT
EQUIPMENT ROOM 2280 450 270 315 250 620 110 415
ALCATEL E.F.
GB PR-2K18 P1 P3
SEL PROP. 1000AH PROP. 1000AH PROP. 1000AH PROP. 1000AH P2
WIRING FCU 4 FCU
600
600
600
PROPOSED
530
BATTERY BANK BATTERY BANK BATTERY BANK BATTERY BANK
DT-REC
600
DCPB 1&2
FCU
(DPC) (DPC) (DPC) (DPC) TNT-PR A
30AT.
ELPP 755 600 600 600 600 600 600 600 600 1050
PROP. 5TR
ACCU 1&2
2P ECB
ALCATEL
MANUAL
1000
1000
RECTI
PUMP
ARGUS FUSE 1
DAY TANK PROPOSED PROP. PROP. PROP. PROP. PROP. PROP. PROP. PROP.
ALCATEL
PROP. 1000AH PROP. 1000AH PROP. 1000AH PROP. 1000AH
BATTERY
600
600
600
600
TNT-PR B RECTIFIER RECTIFIER RECTIFIER RECTIFIER RECTIFIER RECTIFIER RECTIFIER RECTIFIER
BATTERY
REC
BATTERY BANK BATTERY BANK BATTERY BANK BATTERY BANK
DCPB 3&4
BANK 1
BANK 2
UTILITY
ACBEL
(DPC) (DPC) (DPC) (DPC) SYSTEM 1 SYSTEM 1 SYSTEM 1 SYSTEM 1 SYSTEM 2 SYSTEM 2 SYSTEM 2 SYSTEM 2
PCM ROOM
E.F.
2000
AG 2 AG 2 AG 2 AG 2
ACBEL
RECTI
20AT, 230V, 3P
CR
1500
PR-1A
MDF NEMA 1 ECB
PROP.
ROOM
PROP. 1000AH PROP.1000AH PROP. 500AH PROP. 500AH 40AT, 230V, 3P
600
600
600
600
PROP. 5TR
(STAND-BY)
PROP. 5TR
BATTERY BANK BATTERY BANK EXP TO 1000AH EXP TO 1000AH NEMA 4X ECB
1000
800
FCU 2
FCU 3
(DPC) (DPC) BATTERY BANK BATTERY BANK
FCU 3
506
506
FCU 1
SWITCHBOARD (DPC) (DPC)
HUAWEI
PACU-12
4790
ARGUS
PROP. 5TR
OPT
RECTI
CABLE
570 600 800 600 580 600 800 600 570
2000
ACCU 3
20AT, 230V, 3P
1850
HUAWEI
ARGUS FUSE 2
PROPOSED WALL
700
OPT
305
BATTERY
BATTERY
VAULT
BANK 1
AS AG 1
BANK 2
AG 1 AG 1
ACBEL
AG 1
ARGUS
6090
RECTI
ODF
6090
E.F.
1200
800
PROPOSED WALL
1750
PACU-11
40AT, 230V, 3P
NEMA 4X ECB
PROPOSED 300KW
1100
ODF
1.1
RENOVATED C.R.
OPEN TYPE GENSET PROP. ACU EQP'T ROOM
BATTERY RECTIFIER
PROP. ELVSG - TIE
350
PROPOSED WALL NEMA 4X
305
3300 3910
PROP 5TR
ROOM
288
NEMA 1 ECB
20AT, 230V, 3P
ROOM
FCU1
DOWN
UP
(working)
1250
1050
2930
HUAWEI
EQUIP
1600
DCPDB 2
(CISCO)
PROP.
PROP.
LOT 2
3100
600
600
HALLWAY SWITCHING
2 2
FCU 14
FCU 13
UP
ROOM
305
DCPDB 1
(CISCO)
PROP.
PROP.
LOT 2
600
600
680
PROP. CEN
PACU-E
PR-1
HUAWEI HUAWEI HUAWEI
(MAIN)
1100
(CISCO)
PP-1
MDP ODF
600
ATS
1000
PROP.
ODF
MTS
900
OPEN TYPE GENSET
600AT
4790
MTS
3900
ODF
600
305
300
3300 3910
OLT ROOM
1000
PR-2K18
EQUIP
ECB
2.1
4090
600
4090
OFFICE
1760
EQUIP
600
MOBILE BOX
1000
OFFICE
2700
MDP
DCPDB
E.F.
600
GENSET
D-85 FUEL
1050
PROP. LOT 1
TANK
350
1000
(CISCO)
3 3
ROOM SMART
1220
TNT ACU
600
ROOM 600
1100
600
300
STEP
UP
398
400
ACU ACU
6300
305
308
STEP
PROP 2.5HP
WACU
UP
(stand-by)
5550
4 4
4859
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-02
PROPOSE GROUND FLOOR PLAN
CORPORATION
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY: PROPOSE SECOND FLOOR PLAN
SITE ADDRESS: LIPA BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
CE-13
SCALE: REVISION NUMBER.:
LONGITUDE: 13°56'55.5" LATITUDE: 121°9'31.68" PLACE ISSUE: DATE APPROVED: 1:500 .
SCHEDULE OF FINISHES
METAL LOUVER PAINTED (ENAMEL PAINT) W/ RED LEAD PRIMER PLDT BLUE - SAME - BOYSEN, DUTCH BOY OR APPROVED EQUAL
CEILING PLAIN CEMENT PLASTERED PAINTED FINISH OFF WHITE - SAME - BOYSEN, DUTCH BOY OR APPROVED EQUAL
FLOOR PLATFORM EPOXY PAINT PLDT BLUE - SAME - BOYSEN, DUTCH BOY OR APPROVED EQUAL
ROOF SLAB HYDROFLEX BITUMEN MEMBRANE BLACK SUBMIT SAMPLE FOR APPROVAL BOYSEN, DUTCH BOY OR APPROVED EQUAL
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-03
ISOMETRIC VIEW, DETAILS DESIGN
CORPORATION
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY: CONTRACTOR'S SCOPE OF WORK
SITE ADDRESS: LIPA BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
CE-13
SCALE: REVISION NUMBER.:
LONGITUDE: 13°56'55.5" LATITUDE: 121°9'31.68" PLACE ISSUE: DATE APPROVED: N.T.S. .
A-1 A-1 A-1 A-1 A-1 A-1
9206 9206
4603 4603 4603 4603
1 1
CB GB CB
30AT.
2P ECB ELPP DD DD
1000
1000
MANUAL
PROPOSED 500L PUMP
FP
DAY TANK
2000
E.F.
1500
PROP. 2% E
SL OP
1000
SWITCHBOARD OP SL
E 2%
2000
1850
4790 4790
305
1200
800
L2
PROPOSED 300KW
1100
OPEN TYPE GENSET
305
3300 3910
SL OP
2% E
DD DD
2930
1.1 9580 CB CB 1.1 9580
1600
0.125M. THICK CONCRETE ROOF DECK WITH
SAHARA WATERPROOFING IN CONCRETE MIXTURES
305
2 2
PROPOSED 300KW
PROP. ATS-2 PROP. ATS-1 PROP.
1100
L2
1000
1000
ROOF LINE
MOBILE BOX
2%
1000
PE E
O OP SL
2700
MDP
SL SL OP
E.F.
2% 2% E
1000
2.1 2.1
TAP TO NEAREST DRAINE PIPE
L1
1220
1100
DD DD DD
6300
6300
600
CB CB CB
600
4" DIA. PVC PIPE
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-04
PROPOSE GENSET ROOM
CORPORATION
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY: ROOF DECK PLAN
SITE ADDRESS: LIPA BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
CE-13
SCALE: REVISION NUMBER.:
LONGITUDE: 13°56'55.5" LATITUDE: 121°9'31.68" PLACE ISSUE: DATE APPROVED: 1:100 .
D' E' F F E' D'
9206
9206
125 900
1300
ROOF DECK LVL.
ROOF DECK LVL.
800
650 2700 1850 2053
4000
2500
2800
2800
300
F.F.L.
F.F.L.
800
800
N.G..L.
6300 N.G..L.
1300 1300
ROOF DECK LVL. ROOF DECK LVL.
200
600
3600
2500
F.F.L.300 F.F.L.
800 800
N.G..L. N.G..L.
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-06
ELEVATION VIEW
CORPORATION
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: LIPA BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
CE-13
SCALE: REVISION NUMBER.:
LONGITUDE: 13°56'55.5" LATITUDE: 121°9'31.68" PLACE ISSUE: DATE APPROVED: 1:100 .
A-1 A-1 A-1 A-1 A-1 A-1
9206 9206
4603 4603 4603 4603
RB-2
RB-2
RB-2
4790 4790
WF-1
GENSET FOUNDATION
1.1 9580 C-1/F-1 C-1/F-1 C-1/F-1 1.1 9580 RB-3 RB-1 RB-1 RB-3
2 2
GENSET FOUNDATION
RB-2
RB-2
RB-2
WF-1
4790 4790
RB-3
RB-3
RB-3
C-1/F-1 C-1/F-1 C-1/F-1
400
1200
CONTRACTOR: OPERATOR: PROJECT NAME: TNT O ECT HASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: T ANSFO E AND GENSET U G ADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE 0
FOUNDATION PLAN
CORPORATION
SITE NAME: LDT LI A PRC No: PTR No: REVIEWED BY: ROOF FRAMING PLAN
SITE ADDRESS: LI A BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
CE 13
SCALE: REVISION NUMBER.:
LONGITUDE: 13°56'55.5" LATITUDE: 121°9'31.68" PLACE ISSUE: DATE APPROVED: 1:100 .
100mm CHB
75
900
4.5 kg/sqm. BITUMEN WATER
PROOFING MEMBRANE FLOOR TOPPING
T.O.S +4.125m
125
SLAB REINFORCEMENT(SEE PLAN)
400
RB-1 (SEE SCHEDULE)
100 700
800
COLUMN LINE
150mm CMW
1 SECTION DETAIL
CE 7 1:125
TOP STEEL AT MID SPAN TOP STEEL CURTAILED BARS TOP STEEL AT MID SPAN
137449(TYP.)
(TYPICAL)
400MM
SPAN L1 SPAN L2
SITE ADDRESS: LIPA BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
CE-13
SCALE: REVISION NUMBER.:
LONGITUDE: 13°56'55.5" LATITUDE: 121°9'31.68" PLACE ISSUE: DATE APPROVED: N.T.S. .
SCHEDULE OF COLUMN
10mm∅ LATERAL TIES 10mm∅ LATERAL TIES
C1
4.8 m ROOF DECK
300
150
150
12mm D.S.B. @ 300 O.C.B.W
FFL 0.6m FFL 10mm D.S.B. @ 300 O.C.B.W
300
0.6m
500
500
300
NGL. 16mm∅ VERTICAL BARS 0.0m NGL. 16mm∅ VERTICAL BARS 0.0m
400
400
300
300
300
WALL FOOTING (SEE DETAIL) WALL FOOTING (SEE DETAIL)
Starter bars 8#16
200
200
-0.9m -0.9m
300
150mm THK. CHB W/Ø10mmVERT.
300
BARS @ 0.80m
& 10mmØ HORZ.BAR 8-16mmØ BARS B.W.O.C.
8-16mmØ BARS B.W.O.C. 1200
@ EVERY 3 LAYERS OF CHB TOP & BOTTOM
NGL. 0.0m
1200
300 900
450 300 450
VARIES
450
450
250mm
8 - 16mm∅ BAR - B2
8 - 16mm∅ BAR - B2
1200
300
1200
300
3-12mmØ BARS
10mmØ TEMP. BARS
@ 300mm O.C. 8 - 16mm∅ BAR - B1
500 8 - 16mm∅ BAR - B1
450
450
PROVIDE 50mm THK. WELL-
COMPACTED GRAVEL FILL
CONTRACTOR: OPERATOR: PROJECT NAME: TNT O CT HAS 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: T ANSFO AND NS T AD PROFESSIONAL CIVIL ENGINEER CHECKED BY: C 0
WALL FOOTING SCHEDULE AND DETAILS
CORPORATION
SITE NAME: LDT LI A PRC No: PTR No: REVIEWED BY: COLUMN SCHEDULE AND DETAILS
SITE ADDRESS: LI A BATAN AS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
C 13
SCALE: REVISION NUMBER.:
LONGITUDE: 13°56'55.5" LATITUDE: 121°9'31.68" PLACE ISSUE: DATE APPROVED: 1:125 .
TEMPERATURE BARS
BEAM BEAM
CONTINOUS BARS
CONTINOUS BARS
EXTRA BOTTOM BARS EXTRA BOTTOM BARS
BEAM
BEAM
BEAM
BEAM BEAM
PLAN PLAN
TOP BARS EXTRA BOTTOM BARS TOP BARS EXTRA BOTTOM BARS TEMPERATURE BARS
(t)
(t)
CONTINOUS BARS CONTINOUS BARS
BEAM L/5 L/5
BEAM BEAM L/5 L/5
BEAM
L/4 L/4 L/4 L/4
L L
CROSS-SECTION CROSS-SECTION
TWO-WAY ONE-WAY
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-09
SLAB SCHEDULE AND DETAILS
CORPORATION
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: LIPA BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
CE-13
SCALE: REVISION NUMBER.:
LONGITUDE: 13°56'55.5" LATITUDE: 121°9'31.68" PLACE ISSUE: DATE APPROVED: N.T.S. .
3910
1710
700mm HIGH CONTAINMENT
WALL - 100mm THK CMU W/
10mmØ VERT. BARS @ 600mm +
10mmØ HOR. BARS @ EVERY 2ND
LAYER W/ 3 COATS ELASTOMERIC
5% SLOPE
WATERPROOFING PAINT(1 PRIME
COAT, 2 COATS OF TOP COAT) - 300L
KUSTURA FINISH 600 2910 600
5% SLOPE
200
100
400
700
100mm THK.
CMU WALL
200
50mm THK.
1000
MASTIC FILLER
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-10
BUNDWALL DETAILS
CORPORATION
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY: GENSET FOUNDATION DETAILS
SITE ADDRESS: LIPA BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
CE-13
SCALE: REVISION NUMBER.:
LONGITUDE: 13°56'55.5" LATITUDE: 121°9'31.68" PLACE ISSUE: DATE APPROVED: N.T.S. .
2700 2700
2800
2800
0.10
125
16MM HANDHOLE
HANDLE
0.60 M
0.10
EXTERIOR INTERIOR
75mm
12 MM REBARS CROSSWISE
AND LENGTHWISE @ 0.20 M OCBW
25mm
CHB WALL
45°
1850 2700
25mm
BARREL BOLT
CHB WALL
GA # 14 2" x 4"
GA # 16 PLAN TUBULAR
SHEET LOUVER
HOT AIRFLOW FRAME ALL 0.20 M
BLADES AROUND EXISTING GRADE LINE
INSIDE GENSET
2500
2500
ROOM
GA # 14 2" x 4"
0.20M FOUNDATION 3 pcs 12mm rebars with
TUBULAR FRAME
10mm temp bars @ 0.20 OC
STAIR DETAIL
SCALE: NTS
TYPE: 2 BAYS, FIXED METAL, LOUVER TYPE: 2 BAYS, REMOVABLE METAL LOUVER
LOUVERED WINDOW CROSS SECTIONAL DETAIL
REQ: 1-SET REQ: 2-SETS
SCALE: NTS
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-11
LOUVER DOOR AND WINDOW DETAILS, DRAIN DETAILS
CORPORATION
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY: CATCH BASIN DETAILS, STAIR DETAILS
SITE ADDRESS: LIPA BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
CE-13
SCALE: REVISION NUMBER.:
LONGITUDE: 13°56'55.5" LATITUDE: 121°9'31.68" PLACE ISSUE: DATE APPROVED: N.T.S. .
4"THK CHB
1050 2000
C C
SECTION BB'
10mm REBAR 100mm anchored
DOOR DETAILS
10mm rebar
3 TOP VIEW DETAILS
CE-07 SCALE: NTS
epoxy/grout
2100
2100
FASTENER
CHB WALL
DOOR FRAME
FFL
DETAIL A
A NTS
DOOR DETAILS DOOR DETAILS PLASTER SCALE:
1 FRONT VIEW DETAILS 2 SECTION VIEW DETAILS
SCALE: NTS SCALE: NTS
100 x 50 x 3m TABULAR
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-12
DOOR DETAILS
CORPORATION
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY: PARTITION WALL DETAILS
SITE ADDRESS: LIPA BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
CE-13
SCALE: REVISION NUMBER.:
LONGITUDE: 13°56'55.5" LATITUDE: 121°9'31.68" PLACE ISSUE: DATE APPROVED: N.T.S. .
BILL OF MATERIALS
MAN LADDER
B B
75
EMBEDMENT
600
A A
1200.4800
350
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-13
MAN LADDER DETAILS
CORPORATION
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: LIPA BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
CE-12
SCALE: REVISION NUMBER.:
LONGITUDE: 13°56'55.5" LATITUDE: 121°9'31.68" PLACE ISSUE: DATE APPROVED: N.T.S. .