Bill of Quantities - ANHS Road
Bill of Quantities - ANHS Road
8,250.00
6.30% 6.30%
AGGREGATE BASE
201.00 165,000.00 25.19%
COURSE
41,250.00 41,250.00
Portland Cement 14.71% 14.71% 14.71%
311.00 Concrete Pavement 481,790.00 73.55%
(PCCP)
96,358.00 96,358.00 96,358.00
8,250.00 41,250.00 137,608.00 96,358.00 96,358.00
GRAND TOTAL Php 655,040.00 100%
8,250.00 49,500.00 187,108.00 283,466.00 379,824.00
Scheduled Weekly Accomplishment 1.26% 6.30% 21.01% 14.71% 14.71%
Scheduled Weekly Cumulative 1.26% 7.56% 28.56% 43.27% 57.98%
Actual Weekly Accomplishment
Actual Weekly Cumulative
SLIPPAGE
W6 W7 W8
6.30% 6.30%
41,250.00 41,250.00
14.71% 14.71%
96,358.00 96,358.00
96,358.00 137,608.00 41,250.00
476,182.00 613,790.00 655,040.00
14.71% 21.01% 6.30%
72.70% 93.70% 100.00%
Noted by:
Municipality of Danao
Barangay Carbon
Sub-Project Tile CONCRETING OF 0.350 KM PUROK 4 TO PUROK 5 ACCESS ROAD (TIRE PATH)
Category Public Good
Physical Target 0.350 Kilometer
Total Sub-Project Cost Php 782,800.00
Item no. Scope of Work ( Direct Cost ) % Wt. Quantity Unit Unit Price Total Cost
Source of Fund
Breakdown of Estimated Project Cost KALAHI-CIDSS- Community BLGU MLGU Other Sources
Total Cost
MCC Grant Contribution Cash In-Kind Cash In-Kind Cash Cash
A. Direct Cost
Materials 460,011.50 - 81,178.50 - - - - - 541,190.00###
Equipment 44,412.50 - 7,837.50 - - - - - 52,250.00###
Labor
1) Skilled 15,400.00 - - - - - - - 15,400.00###
1) Unskilled 33,600.00 12,600.00 - - - - - - 46,200.00###
Sub-Total ( A ) 553,424.00 12,600.00 89,016.00 - - - - - 655,040.00###
B. Indirect cost
Pre-Engineering - - - - - 500.00 - - 500.00###
Pow Preparation - - - - - - - - - ###
TA in Project Implementation - - - - - 12,000.00 - - 12,000.00###
Project Supervision - 6,050.00 - - - - - - 6,050.00###
Project Billboard 6,830.63 - 5,169.37 - - - - - 12,000.00###
Material Testing 8,500.00 - 1,500.00 - - - - - 10,000.00###
Administrative/Operating Cost 16,452.80 - 6,015.80 - - - - - 22,468.60###
Hand Tools/PPE 8,126.00 - 1,434.00 - - - - - 9,560.00###
Treasurer's Bond - - 3,375.00 - - - - - 3,375.00###
Over Head Cost 9,867.63 - 4,132.37 - - - - - 14,000.00###
Filling Cabinet 4,250.00 - 750.00 - - - - - 5,000.00###
Environmental Mitigating Measure 4,250.00 - 750.00 - - - - - 5,000.00###
Sub-Total (B) 58,277.06 6,050.00 23,126.54 0.00 0.00 12,500.00 0.00 0.00 99,953.60###
Total (A & B) 611,701.06 18,650.00 112,142.54 0.00 0.00 12,500.00 0.00 0.00 754,993.60
###
Contingency 05% 22,528.94 0.00 5,277.46 0.00 0.00 0.00 0.00 0.00 27,806.40
###
634,230.00 148,570.00
Cost Sharing
81.02% 18.98%
Total Project Cost 634,230.00 18,650.00 117,420.00 0.00 0.00 12,500.00 0.00 0.00 782,800.00
###
ADD: O&M (Other Amenities)
Grand Total 634,230.00 18,650.00 117,420.00 0.00 0.00 12,500.00 0.00 0.00 782,800.00
###
Prepared by : Approved by :
###
RHIO SUAREZ RESTITUTO B. TORREON
YS CONSTRUCTION/Service Provider BSPMC Chairperson
Noted by :
RONILO T. GAUMA
Regional Community Infrastructure Specialist
MATERIALS SKILLED UNSKILLED EQUIPMENTS TOTAL
- 0
119,350.00 44000
421,840.00 8250
541,190.00 - - 52,250.00 -
0.00
127,760.00
NAME OF SUB-PROJECT: CONCRETING OF 0.350 KM PUROK 4 TO PUROK 5 ACCESS ROAD (TIRE PATH)
LOCATION: CARBON, DANAO, BOHOL NAME OF PROJECT:
BILL OF QUANTITIES
COST SHARING
ITEM NO.
RATE PER
No. of LGU
DAY/
ITEM DESCRIPTION QUANTITY UNIT Crew / Total KALAHI- COMMUNITY OTHERS
UNIT BRGY. MUN.
Labor CIDSS-MCC CONTRIBUTIO
COST
GRANT N
CASH IN-KIND CASH IN-KIND
Page 7
COST SHARING
ITEM NO.
RATE PER
No. of LGU
DAY/
ITEM DESCRIPTION QUANTITY UNIT Crew / Total KALAHI- COMMUNITY OTHERS
UNIT BRGY. MUN.
Labor CIDSS-MCC CONTRIBUTIO
COST
GRANT N
10mm dia. X 6.0m DSB 10.00 lngths 175.00 1,750.00 1,487.50 262.50
Empty Drums (200 liters) 2.00 pcs 1,000.00 2,000.00 1,700.00 300.00
Angle Bar 1/4" x 3" x 3" x 20' 2.00 pc 700.00 1,400.00 1,190.00 210.00
Trapal thk ( 15' X 18') 1.00 pc 1,500.00 1,500.00 1,275.00 225.00
Asphalt Sealant 32.00 ltrs 125.00 4,000.00 3,400.00 600.00
CW Nails # 4 10.00 kls 75.00 750.00 637.50 112.50
44-2"x6"x8' Form Lumber 352.00 bd.ft 25.00 8,800.00 7,480.00 1,320.00
Sub-Total 421,840.00 358,564.00 0.00 63,276.00 0.00 0.00 0.00 0.00
B. Labor
1 Gang of Workers = 75.00 bags./day
Carpenter / Mason 11.00 Day/s 3.00 350.00 11,550.00 11,550.00
Operator 11.00 Day/s 1.00 350.00 3,850.00 3,850.00
Laborer 11.00 Day/s 12.00 275.00 36,300.00 26,400.00 9,900.00
Sub-Total 51,700.00 41,800.00 9,900.00 0.00 0.00 0.00 0.00 0.00
C. Equipment
1-Bagger Concrete Mixer = 75.00 bags./day 11.00 Day/s 1.00 750.00 8,250.00 7,012.50 1,237.50
Sub-Total 8,250.00 7,012.50 0.00 1,237.50 0.00 0.00 0.00 0.00
TOTAL FOR PCCP 481,790.00 407,376.50 9,900.00 64,513.50 0.00 0.00 0.00 0.00
A. DIRECT COST
MATERIALS 541,190.00 460,011.50 - 81,178.50 - - - -
EQUIPMENT 52,250.00 44,412.50 - 7,837.50 - - - -
LABOR COST
SKILLED 15,400.00 15,400.00 - - - - - -
UN-SKILLED 46,200.00 33,600.00 12,600.00 - - - - -
TOTAL DIRECT COST 655,040.00 553,424.00 12,600.00 89,016.00 - - - -
B. INDIRECT COST
Pre-Engineering
Municipal Engineer 0.50 PD 1.00 1,000.00 500.00 0.00 500.00
Sub-Total 500.00 - - - - - 500.00 -
Pow Preparation Chargeable to TAF
Sub-Total - - - - - - - -
Page 8
COST SHARING
ITEM NO.
RATE PER
No. of LGU
DAY/
ITEM DESCRIPTION QUANTITY UNIT Crew / Total KALAHI- COMMUNITY OTHERS
UNIT BRGY. MUN.
Labor CIDSS-MCC CONTRIBUTIO
COST
TA in Project Implementation GRANT N
- -
Page 9
COST SHARING
ITEM NO.
RATE PER
No. of LGU
DAY/
ITEM DESCRIPTION QUANTITY UNIT Crew / Total KALAHI- COMMUNITY OTHERS
UNIT BRGY. MUN.
Labor CIDSS-MCC CONTRIBUTIO
COST
GRANT N
Prepared by : Approved by :
117,420.00
RHIO SUAREZ 0.00 RESTITUTO TORREON
YS CONSTRUCTION/ Service Provider 81.68% 0.82 81.02% 0.8102 0.0000 BSPMC Chairperson
18.32% 18.98% 0.1898 0.0000
RONILO T. GAUMA
Regional Community Infrastructure Specialist
Page 10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 13
88.62
Page 14
Project CONCRETING OF 0.350 KM PUROK 4 TO PUROK 5 ACCESS ROAD (TIRE PATH)
Location : Carbon, Danao, Bohol
Item 200
Item 200 (for base correction)
(for shouldering)
Station
Volume Volume
Area Fill Distance Area Fill Distance
(m3) (m3)
0+ 0 - - 0.300 - -
0+ 20 0.230 20.00 2.30 0.300 20.00 6.00
0+ 40 0.450 20.00 6.80 0.300 20.00 6.00
0+ 60 0.650 20.00 11.00 0.300 20.00 6.00
0+ 80 0.270 20.00 9.20 0.300 20.00 6.00
0+ 100 0.230 20.00 5.00 0.300 20.00 6.00
0+ 120 0.150 20.00 3.80 0.300 20.00 6.00
0+ 140 0.210 20.00 3.60 0.300 20.00 6.00
0+ 160 0.160 20.00 3.70 0.300 20.00 6.00
0+ 180 0.270 20.00 4.30 0.300 20.00 6.00
0+ 200 0.250 20.00 5.20 0.300 20.00 6.00
0+ 220 0.320 20.00 5.70 0.300 20.00 6.00
0+ 240 0.110 20.00 4.30 0.300 20.00 6.00
0+ 260 0.240 20.00 3.50 0.300 20.00 6.00
0+ 280 0.210 20.00 4.50 0.300 20.00 6.00
0+ 300 0.220 20.00 4.30 0.300 20.00 6.00
0+ 320 0.300 20.00 5.20 0.300 20.00 6.00
0+ 340 0.270 20.00 5.70 0.300 20.00 6.00
0+ 350 0.068 10.00 1.69 0.300 10.00 3.00
Total 89.79 105.00
99.77 116.67
Noted by:
Volume
Area Fill Distance
(m3)
0.255 - - 0.225
0.255 20.00 5.10
0.255 20.00 5.10
0.255 20.00 5.10
0.255 20.00 5.10
0.255 20.00 5.10
0.255 20.00 5.10
0.255 20.00 5.10
0.255 20.00 5.10
0.255 20.00 5.10
0.255 20.00 5.10
0.255 20.00 5.10
0.255 20.00 5.10
0.255 20.00 5.10
0.255 20.00 5.10
0.255 20.00 5.10
0.255 20.00 5.10
0.255 20.00 5.10
0.255 10.00 2.55
89.25
89.25
VALENTIN M. DOROY
MCT-DAC/ME
Date Prepared : June 1, 2015 Name of Proposed Sub-Project : CONCRETING OF 0.350 KM PUROK 4 TO PUROK 5 ACCESS ROAD (TIRE PATH)
Barangay : Carbon Total Cash (Php) : 782,800.00
Municipality : Danao Sub-project Duration : 60 C.D .
AMOUNT
Province : Bohol SOURCES OF FUNDS PERCENTAGE WEIGHT FUND SOURCE
(PESO)
DESCRIPTION TOTAL LEGEND:
KC Grant: LCC: TO KC GRANT TO LCC CASH KC GRANT 634,230.00
1st Tranche (Php) 507,384.00 93,936.00 601,320.00 80.00% 80% TOTAL LCC 148,570.00
2nd Tranche (Php) 63,423.00 11,742.00 75,165.00 10.00% 10% LCC - In-kind 31,150.00
3rd Tranche (Php) 63,423.00 11,742.00 75,165.00 10.00% 10% LCC - Cash 117,420.00
Mode of Implementation : Community Force Account (CFA) TOTAL CASH (Php) 634,230.00 117,420.00 751,650.00 100% 100% TOTAL 782,800.00
PROPOSED
PACKAGES
REMARKS
PROC TRANCHING SCHEDULE IMPLEMENTATION
PACKAGE ITEMS QTY UNIT UNIT COST TOTAL METHO TOTAL SCHEDULE
D 1st Tranche 2nd Tranche 3rd Tranche TOTAL MONTHS
KC Grant LCC Cash KC Grant LCC Cash KC Grant LCC Cash KC Grant LCC Cash 1 2 3
PACKAGE ITEM I.HARDWARE
a. Materials
Portland Cement Type 1 810.00 bags 290.00 290.00 234,900.00 199,665.00 35,235.00 199,665.00 35,235.00 234,900.00
16mm dia. X 6.0m DSB 10.00 lngths 474.00 474.00 4,740.00 4,029.00 711.00 4,029.00 711.00 4,740.00
10mm dia. X 6.0m DSB 10.00 lngths 175.00 175.00 1,750.00 1,487.50 262.50 1,487.50 262.50 1,750.00
Empty Drums (200 liters) 2.00 pcs 1,000.00 1,000.00 2,000.00 1,700.00 300.00 1,700.00 300.00 2,000.00
Angle Bar 1/4" x 3" x 3" x 20' 2.00 pc 700.00 700.00 1,400.00 1,190.00 210.00 1,190.00 210.00 1,400.00
Trapal thk ( 15' X 18') 1.00 pc 1,500.00 1,500.00 1,500.00 1,275.00 225.00 1,275.00 225.00 1,500.00
Asphalt Sealant 32.00 ltrs 125.00 125.00 4,000.00
Package 1
LSG
CW Nails # 4 10.00 kls 75.00 75.00 750.00 637.50 112.50 637.50 112.50 750.00
44-2"x6"x8' Form Lumber 352.00 bd.ft 25.00 25.00 8,800.00 7,480.00 1,320.00 7,480.00 1,320.00 8,800.00
Shovel w/ handle 3.00 pc 450.00 450.00 1,350.00 1,147.50 202.50 1,147.50 202.50 1,350.00
Crow Bar 2.00 pc 500.00 500.00 1,000.00 850.00 150.00 850.00 150.00 1,000.00
Wheel Barrow 1.00 pc 800.00 800.00 800.00 680.00 120.00 680.00 120.00 800.00
Sledge Hammer (5kg) w/ handle 1.00 pc 700.00 700.00 700.00 595.00 105.00 595.00 105.00 700.00
Concrete Pail 10.00 pc 115.00 115.00 1,150.00 977.50 172.50 977.50 172.50 1,150.00
Hard Hat 8.00 pcs 150.00 150.00 1,200.00 1,020.00 180.00 1,020.00 180.00 1,200.00
Safety Boots 8.00 pcs 420.00 420.00 3,360.00 2,856.00 504.00 2,856.00 504.00 3,360.00
Sub-Total 269,400.00 228,990.00 40,410.00 - - - - 228,990.00 40,410.00 269,400.00
a. Materials
Package 2
LSG
Aggregate Sub-Base Course 100.00 cu.m. 550.00 550.00 55,000.00 46,750.00 8,250.00 46,750.00 8,250.00 55,000.00
Fine Aggregates ( Approved Source) 45.00 cu.m. 1,200.00 1,200.00 54,000.00 45,900.00 8,100.00 45,900.00 8,100.00 54,000.00
Crushed Stone ( Approved Source) 3/4" di 90.00 cu.m. 1,200.00 1,200.00 108,000.00 91,800.00 16,200.00 91,800.00 16,200.00 108,000.00
Sub-Total 217,000.00 184,450.00 32,550.00 - - - - 184,450.00 32,550.00 217,000.00
PACKAGE ITEM III - BILLBOARD
Package 3
a. Materials
LSG
LSG
Road Grader 1.00 day 1.00 24,000.00 24,000.00 24,000.00 20,400.00 3,600.00 20,400.00 3,600.00 24,000.00
Vibratory Roller 1.00 day 1.00 20,000.00 20,000.00 20,000.00 17,000.00 3,000.00 17,000.00 3,000.00 20,000.00
Sub-Total 44,000.00 37,400.00 6,600.00 - - - - 37,400.00 6,600.00 44,000.00
LSG
1-Bagger Mixer 11.00 day/s 1.00 750.00 750.00 8,250.00 7,012.50 1,237.50 7,012.50 1,237.50 8,250.00
Page 17 of 38
PROPOSED
PACKAGES
REMARKS
PROC TRANCHING SCHEDULE IMPLEMENTATION
5
SCHEDULE
Package
PACKAGE ITEMS QTY UNIT UNIT COST TOTAL METHO TOTAL
LSG
D 1st Tranche 2nd Tranche 3rd Tranche TOTAL MONTHS
KC Grant LCC Cash KC Grant LCC Cash KC Grant LCC Cash KC Grant LCC Cash 1 2 3
Sub-Total 8,250.00 7,012.50 1,237.50 - - - - 7,012.50 1,237.50 8,250.00
Page 18 of 38
PROPOSED
PACKAGES
REMARKS
PROC TRANCHING SCHEDULE IMPLEMENTATION
PACKAGE ITEMS QTY UNIT UNIT COST TOTAL METHO TOTAL SCHEDULE
D 1st Tranche 2nd Tranche 3rd Tranche TOTAL MONTHS
KC Grant LCC Cash KC Grant LCC Cash KC Grant LCC Cash KC Grant LCC Cash 1 2 3
LSG
Filing Cabinet 1.00 unit 1.00 5,000.00 5,000.00 5,000.00 4,250.00 750.00 4,250.00 750.00 5,000.00
a. Materials
LSG
Aggregate Sub-Base Course 117.00 cu.m. 550.00 550.00 64,350.00 - 54,697.50 9,652.50 54,697.50 9,652.50 64,350.00
- - - - - - - -
Sub-Total 64,350.00 - - 54,697.50 9,652.50 - - 54,697.50 9,652.50 64,350.00
Labor -
Skilled 15,400.00 7,000.00 1,000.00 7,400.00 15,400.00 - 15,400.00
CFA
P8
CFA
P9
MATERIAL TESTING 10,000.00 3,162.00 520.00 5,338.00 980.00 8,500.00 1,500.00 10,000.00
TREASURER'S BOND 3,375.00 3,375.00 - 3,375.00 3,375.00
CONTINGENCY 27,806.40 22,528.94 5,277.46 22,528.94 5,277.46 27,806.40
TOTAL INDIRECT COST 82,650.00 16,450.87 7,219.13 4,725.50 2,089.50 40,423.00 11,742.00 61,599.37 21,050.63 82,650.00
GRAND TOTAL CASH 751,650.00 507,384.00 93,936.00 63,423.00 11,742.00 63,423.00 11,742.00 634,230.00 117,420.00 751,650.00
SAY 507,384.00 93,936.00 63,423.00 11,742.00 63,423.00 11,742.00 634,230.00 117,420.00
% 80.00% - 10.00% - 10.00% -
-
Workshop output of: Checked by: - Reviewed by: - Submitted by: Noted by:
Page 19 of 38
PROPOSED PROCUREMENT ACTION PLAN (PAP)
Sub-Project Title: CONCRETING OF 0.350 KM PUROK 4 TO PUROK 5 ACCESS ROAD (TIRE PATH)
Location: Carbon, Danao, Bohol
Timeline to
Venue of meeting and
complete the Responsible Volunteer/s and
Procurement Activities place/s to conduct
activity (Inclusive Project Staff ( Complete Name)
procurement
Dates)
RESTITUTO TORREON-BSPMC
Chair, GENALYN TORREON,
FRANCISCO REBOTOC,
CLEOFAS AÑORA-BAC,
1. Preparation of Planned
BIENVENIDO BIODOT, MONICO Brgy. Hall/BSPMC
Community Procurement
GONZAGA, SILVESTRA Office
Packages
GONZAGA-PT, ZOILO
LOFRANCO-ASST DAC, JEAN
AILEEN TORRES -CF and ENGR.
VALENTIN M. DOROY- M.E.
RESTITUTO TORREON-BSPMC
Chair, GENALYN TORREON,
FRANCISCO REBOTOC,
CLEOFAS AÑORA-BAC, AGAPITO
SENDRIJAS-PIT, BIENVENIDO
3. Conduct of Pre- BIODOT, MONICO GONZAGA, Brgy. Hall/BSPMC
procurement Conference SILVESTRA GONZAGA-PT, Office
HENRY B. YAP JR. -ACT DAC,
ZOILO LOFRANCO - ASST MCT-
DAC, JEAN AILEEN TORRES -CF
and ENGR. VALENTIN M. DOROY-
M.E.
RESTITUTO TORREON-BSPMC
Chair, BIENVENIDO BIODOT,
MONICO GONZAGA, SILVESTRA
5. Preparation of Brgy. Hall/BSPMC
GONZAGA-PT, ZOILO LOFRANCO
Procurement Documents Office
- ASST. DAC, JEAN AILEEN
TORRES -CF and VALENTIN R.
DOROY-M.E.
6. Serving of
Canvass/Request for
Qoutation
6.1 Serving of
Canvass/Request for
Qoutation (for 1st tranche)
Supplier's Office,
Package 1: Hardware
Establishment
Supplier's Office,
Package 2: Aggregates
Establishment
Supplier's Office,
Package 4: Heavy Equipment
Establishment
Supplier's Office,
Package 5: Light Equipment
Establishment
Supplier's Office,
Package 6: Filing Cabinet
Establishment
6.2 Serving of
Canvass/Request for
Qoutation
Package 7: Aggregates
Brgy. Hall/BSPMC
9. Evaluation of Canvass
Office
Package 1: Hardware, Package
2: Aggregates, Package 3:
Project Billboard, RESTITUTO TORREON-BSPMC
Package 4: Chair, BIENVENIDO BIODOT,
Heavy Equipment, Package 5: MONICO GONZAGA, SILVESTRA
Light Equipment 6: GONZAGA-PT,GENALYN
Filing Cabinet TORREON, FRANCISCO Brgy. Hall/BSPMC
REBOTOC, CLEOFAS AÑORA- Office
BAC, ZOILO LOFRANCO - ASST.
DAC, JEAN AILEEN TORRES -CF
Package 7: Aggregates and -ENGR. VALENTIN M.
DOROY-M.E.
RESTITUTO TORREON-BSPMC
Chair, BIENVENIDO BIODOT,
MONICO GONZAGA, SILVESTRA
GONZAGA-PT,GENALYN
12. Approving of Purchased TORREON, FRANCISCO Brgy. Hall/BSPMC
Order REBOTOC, CLEOFAS AÑORA- Office
BAC, ZOILO LOFRANCO - ASST.
DAC, JEAN AILEEN TORRES -CF
and -ENGR. VALENTIN M.
DOROY-M.E.
Package 1: Hardware, Package
2: Aggregates, Package 3:
Project Billboard,
Package 4:
Heavy Equipment, Package 5: RESTITUTO TORREON- BSPMC Brgy. Hall/BSPMC
Light Equipment 6: CHAIR Office
Filing Cabinet
Package 7: Aggregates
13. Serving of Purchased Brgy. Hall/BSPMC
Order to Winning Suppliers Office
Package 7: Aggregates
Supplier's Office,
14. Delivery of Goods
Establishment
Package 1: Hardware, Package
2: Aggregates, Package 3:
Project Billboard,
Package 4: TERISITA BAUTISTA, ANECITO
Heavy Equipment, Package 5: TORREGOSA, IVAN BAUSTISTA- Project Site
Light Equipment 6: MIT
Filing Cabinet
Package 7: Aggregates
RESTITUTO TORREON-BSPMC,
15. Mobilization and Start of VALERIANO AÑORA- PIT Chair
Project Site
SPI and PIT Members, Community
Workers
Name of Potential
Resources Expected outputs/
Suppliers
Requirement Remarks
Contractors
POW/Detailed
Draft PCPP
Estimates
Invitation to Bid/Bid
POW & Final PCPP
Documents
YY Trading, Lava
Construction
Supplies, Malmis Canvass
Canvass
Construction Supply, Form/Request for
Form/Request for
C. Jansen Qoutation,
Qoutation Served,
Construction Acknowledgement
Signed AR
Supplies, Flores Receipt
Construction
Supplies
YS Construction, Canvass
Canvass
Form/Request for
BNYU Construction, Form/Request for
Qoutation,
JJF Builders, Bensan Acknowledgement Qoutation Served,
General Merchandise Signed AR
Receipt
ALTURAS Mall, Canvass
Canvass
Paquibot Lumber Form/Request for
Form/Request for
and Furniture, Qoutation,
Qoutation Served,
JBOGS & REEZ Gen. Acknowledgement Signed AR
Mdse. Receipt
Submitted Canvass
Form/Request for Abstract of Canvass
Qoutation
Office Supplies Minutes of Opening
Office Supplies
Submitted Canvass
Form/Request for Minutes of Evaluation
Quotation
Submitted Canvass
Form/Request for Minutes of Evaluation
Quotation
Submitted Canvass
Form/Request for Abstract of Canvass
Quotation
Submitted Canvass
Form/Request for Abstract of Canvass
Quotation
Approved Purchased
Purchased Order
Order
Delivery
Receipt/Delivered Goods Received
Goods
Delivery
Receipt/Delivered Goods Received
Goods
Approved by:
1st Tranche
PACKAGE ITEMS
Cash In-Kind
Planned Actual Planned Actual
PACKAGE ITEM I.HARDWARE
a. Materials
a. Materials
Package 2
a. Materials
Supply and Install Community Project Steel Billboard 5,169.37 5,169.37
sub-total 5,169.37 5,169.37 - -
PACKAGE ITEM IV- HEAVY EQUIPMENT
0
Package 4
0
Package 5
0
Filing Cabinet 750.00 750.00
sub-total 750.00 750.00 - -
PACKAGE ITEM VII - AGGREGATES
Package 7
a. Materials
Aggregate Sub-Base Course
sub-total - - - -
Labor
Skilled
P9
Unskilled 10,080.00
sub-total - - 10,080.00 -
r. Indirect Cost
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
9,652.50 9,652.50
9,652.50 9,652.50 - - - - - -
1,260.00 1,260.00
- - 1,260.00 - - - 1,260.00 -
1,200.00 1,200.00
605.00 605.00
520.00 520.00 980.00 980.00
- - - -
- - 5,277.46 5,277.46
2,089.50 2,089.50 1,805.00 - 11,742.00 11,742.00 1,805.00 -
11,742.00 11,742.00 3,065.00 - 11,742.00 11,742.00 3,065.00 -
Noted by:
35,235.00 35,235.00
711.00 711.00
262.50 262.50
300.00 300.00
210.00 210.00
225.00 225.00
600.00 600.00
112.50 112.50
1,320.00 1,320.00
202.50 202.50
150.00 150.00
120.00 120.00
105.00 105.00
172.50 172.50
180.00 180.00
504.00 504.00
40,410.00 40,410.00 - -
8,250.00 8,250.00
8,100.00 8,100.00
16,200.00 16,200.00
32,550.00 32,550.00 - -
5,169.37 5,169.37
5,169.37 5,169.37 - -
3,600.00 3,600.00
3,000.00 3,000.00
6,600.00 6,600.00 - -
1,237.50 1,237.50
- -
1,237.50 1,237.50 - -
750.00 750.00
750.00 750.00 - -
- -
9,652.50 9,652.50
9,652.50 9,652.50 - -
- -
- 12,600.00
- - 12,600.00 -
4,132.37 4,132.37
6,015.80 6,015.80
500.00 500.00
12,000.00
6,050.00
1,500.00 1,500.00
3,375.00 3,375.00
750.00 750.00
5,277.46 5,277.46
21,050.63 21,050.63 18,550.00 500.00
117,420.00 117,420.00 31,150.00 500.00
Prepared by : Approved by :
Unit No. of Per Unit Total Sub- Grant Fund Local Counterpart Contribution (LCC)
Budget Item LCC Cash
Used Units Cost Project Cost Alocation 1st Tranche 2nd Tranche 3rd Tranche Total Inkind
1. Direct Cost
Materials 541,190.00 460,011.50 81,178.50 -
Labor -
Skilled 15,400.00 15,400.00 - - - -
Unskilled 46,200.00 33,600.00 10,080.00 1,260.00 1,260.00 12,600.00
Equipment 52,250.00 44,412.50 7,837.50
II. Indirect Cost - - - -
Pre-Engineering 500.00 - - 500.00 - - 500.00
Pow Preparation - - - - - -
TA in Project Implementation 12,000.00 - - 9,600.00 1,200.00 1,200.00 12,000.00
Project Supervision 6,050.00 - - 4,840.00 605.00 605.00 6,050.00
Project Billboard 12,000.00 6,830.63 5,169.37 -
Material Testing 10,000.00 8,500.00 1,500.00
Administrative/Operating Cost 22,468.60 16,452.80 6,015.80
Hand Tools/PPE 9,560.00 8,126.00 1,434.00 -
Treasurer's Bond 3,375.00 - 3,375.00 -
Over Head Cost 14,000.00 9,867.63 4,132.37 -
Filling Cabinet 5,000.00 4,250.00 750.00 -
Contingency 27,806.40 22,528.94 5,277.46 -
Total 777,800.00 629,980.00 116,670.00 25,020.00 3,065.00 3,065.00 31,150.00
Target Delivery
Date of LCC
June-September
April
June-October
June-October
ADMINISTRATIVE COST DERIVATION
Fare/
No of
Sub-project Activities Destination/Description Allowance/ Qty. Unit Amount
transactions
Unit Price
Sub-Total 2,080.00
2. TE for procurement
transactions of CVs
BSPMC office to Danao (vice
Serving of Canvass versa)
80.00 x 3 persons x 3 times = 720.00
meals 80.00 x 3 persons x 3 times = 720.00
BSPMC office to Danao (vice
Serving of PO & Payments versa)
80.00 x 2 persons x 3 times = 480.00
meals 80.00 x 2 persons x 3 times = 480.00
Sub-Total 2,400.00
3. Project Meetings
Supplies 50.00 x 12 meetings = 600.00
Snacks 20.00 20 persons x 12 times = 4,800.00
Sub-Total 5,400.00
4. MCT-Initiated Meetings
BSPMC office to MCT Office
(vice versa) 80.00 x 5 persons x 3 times = 1,200.00
meals 80.00 x 5 persons x 3 times = 1,200.00
Sub-Total 2,400.00
5. Treasurer Payroll Processing
BSPMC office to Tagbilaran LBP
(vice versa)
380.00 x 1 persons x 3 times = 1,140.00
Meals 80.00 x 1 persons x 3 times = 240.00
Sub-Total 1,380.00
6. Forms/Supplies and
Reproduction
Bondpaper long 350.00 x 5 reams = 1,750.00
Ballpens 5.00 x 5 pcs = 25.00
Reproduction 2.00 x 2070 sheets = 4,140.00
Petty cash box w/ padlock 1,200.00 x 1 set = 1,200.00
Rubber Stamp 50.00 x 1 pc = 50.00
Stampad 50.00 x 1 pc = 50.00
Stamping Ink 50.00 x 1 pc = 50.00
Stapler 100.00 x 1 pc = 100.00
Stapler Remover 15.00 x 1 pc = 15.00
Staple Wire 30.00 x 4 boxes = 120.00
Calculator 500.00 x 1 pc = 500.00
Columnar Book 50.00 x 4 pcs = 200.00
Liquid Eraser 35.00 x 1 ps = 35.00
Paste/Glue 20.00 x 1 pc = 20.00
Folder long 3.00 x 40 pcs = 120.00
Paper clip 20.00 x 1 box = 20.00
Pentil pen 30.00 x 1 pc = 30.00
Log book 83.40 x 4 pcs = 333.60
Fastener 50.00 x 1 box = 50.00
Sub-Total 8,808.60
TOTAL FOR ADMIN COST 22,468.60
55,568.60
Prepared by : Approved by : 33,100.00
Concurred by :
HENRY B. YAP JR.
Deputy Area Coordinator - ACT DIOSDADO MELENCION
Noted by: Barangay Chairperson
RONILO T. GAUMA
Regional Community Infrastructure Specialist