1.0 SCOPE
This Inspection and Test Plan covers the minimum testing requirements for Welded Pipes.
SCOPE OF INSPECTION
SL QUTUM
AN
STAGE/ ACTIVITY CHARACTERISTICS RECORD SUB
NO. OF CHECK SUPPLIER EIL/TPIA
SUPPLIER
1.0 Procedure
Hydrostatic Test, Heat Procedure
1.1 Treatment, NDT and Documented Procedures 100% - R
Documents
Other Procedures
W- New
R- Existing
Welding Parameters & WPS,PQR
1.2 WPS,PQR & WPQ 100% - H ( Qualified
Qualification Record &WPQ under reputed
TPIA)
2.0 Material Inspection
Review of MTC for Chemical & Test
2.1 Raw Material Inspection 100% - H
Mechanical Properties Certificates
SCOPE OF INSPECTION
SL QUANTUM
STAGE/ ACTIVITY CHARACTERISTICS RECORD SUB
NO. OF CHECK SUPPLIER EIL/TPIA
SUPPLIER
Welding Parameters as per WPS / Inspection
3.1 Welding 100% - H -
PQR Reports
Stress Relieving, Normalising, •
Heat Treatment Tempering, Solution Annealing,
3.2 100% HT chart - H R
Stabilization Heat Treatment etc.
as applicable
Inspection
Ferrite Check of SS Pipes Random On
3.3 % Ferrite Check Report - H R
(as Applicable) Weld
UT / RT RT Films, R
PR / Purchase
3.4 As applicable Surface & Internal Imperfections Reports & UT - H (Film review for
Specification
Reports RT)
Product Chemical, Tensile,
Identification of Test Lot as per H
3.5 Hardness, Impact, IGC and Other Test Reports - H
Samples specification.
test as applicable
PR / Purchase
3.6 Product Analysis Chemical Composition Test Reports - H R
Specification
SCOPE OF INSPECTION
SL QUANTUM
STAGE/ ACTIVITY CHARACTERISTICS RECORD SUB
NO. OF CHECK SUPPLIER EIL/TPIA
SUPPLIER
Stamping of
Pipes which are Inspection
4.5 Final Stamping Stamping of Accepted Pipes - H H
witnessed by Report
EIL/TPIA.
5.0 Painting
SCOPE OF INSPECTION
SL QUANTUM
STAGE/ ACTIVITY CHARACTERISTICS RECORD SUB
NO. OF CHECK SUPPLIER EIL/TPIA
SUPPLIER
Rust Preventive Coating
Visual & Color Coding as Inspection
5.1 & Color Coding (As 100% - -
applicable Report
applicable)
Legend: H- Hold (Do not proceed without approval), P-Perform, RW - Random Witness (As specified or 10% ( min.1 no. of each size and type of Bulk item)), R-
Review, W-Witness (Give due notice, work may proceed after scheduled date).
44\9
fkturir trtuur
Abbreviations:
Members: Mr. Rajeev Kumar Mr. Himangshu Pal Mr. Neeraj Mathur
Mr. T Kamalakannan Mr. Mahendra Mittal Mr. Deepak Gupta (Project)
1.0 SCOPE
This Inspection and Test Plan covers the minimum testing requirements of Seamless Pipes.
SCOPE OF INSPECTION
SL. QU AN UM
STAGE/ACTIVITY CHARACTERISTICS RECORD SUB
NO. CHECK OF SUPPLIER EIL/ TPIA
SUPPLIER
1.0 Procedure
Hydrostatic Test, Heat Procedure
1.1 Treatment, NDT and Documented Procedures 100% - H R
Documents
Other Procedures
2.0 Material Inspection
Review of MTC for Chemical,
2.1 Raw Material Inspection Mechanical Properties, size & 100% Test - H
Certificates
steel making process, etc.
SCOPE OF INSPECTION
SL. QUANTUM OF
STAGE/ACTIVITY CHARACTERISTICS RECORD SUB
NO. CHECK SUPPLIER EIL/ TPIA
SUPPLIER
Normalizing, Tempering, Solution
Heat Treatment
3.1 Annealing, Stabilization Heat 100% HT chart - H R
Treatment etc. as applicable
NDT
3.2 PR / Purchase
As applicable Surface & Internal Imperfections NDT Reports - H R
Specification
Product Chemical, Tensile,
Identification of Test Lot as per H
3.3 Hardness, Impact, IGC and Other Test Reports - H
Samples specification (Note-1)
test as applicable
3.4 Product Analysis Lot as per
Chemical Composition Test Reports - H R
specification
Destructive Testing Tensile, Hardness, Impact, IGC Lot as per H
3.5 Test Reports - H
and Other test as applicable specification (Note-1)
Galvanizing Inspection
3.6 Integrity Of Galvanised Coating 100% Report - H R
(If Applicable)
4.0 Final Inspection
SCOPE OF INSPECTION
SL. • QUANTUM OF
STAGE/ACTIVITY CHARACTERISTICS RECORD SUB
NO. CHECK SUPPLIER EIL/ TPIA
SUPPLIER
Surface Condition,
Straightness,
End Finish,
Bevel Angle,
Root Face, RW
Visual and Dimensional 100% Inspection
4.2 Outer Dia., - H
Inspection (VDI) Report (Note 1)
Thickness,
Length, '
End Finish,
Marking,
End Caps etc
Weight Checking as Inspection
4.3 Weight 100% By Supplier - H -
applicable Report
As Per EIL, Spec.
pection RW
4.4 PMI Check Chemical Check 6-81-0001 - H
Inseport
r
Stamping of Pipes
which are
witnessed by
Inspection
4.5 Final Stamping Stamping of Accepted Pipes EIL/TPIA..0ther - H H
Report
pipes to have
suppliers
identification
5.0 Painting
Legend: H- Hold (Do not proceed without approval), P-Perform, RW - Random Witness (As specified or 10% ( min.1 no. of each size and type of Bulk item)),
R-Review, W-Witness (Give due notice, work may proceed after scheduled date).
curl *
Ml‘crar A trukTur 4 111
INSPECTION AND TEST PLAN
FOR
VALVES
6 14 11 2018 REVISED AND RE-ISSUED
Abbreviations:
Members:
Mr. Rajeev Kumar Mr. Neeraj Mathur Mr. Himangshu Pal Mr R Muthu Ramalingam (RPO Rep.)
Mr. T Kamalakannan Mr. Mahendra Mittal Mr Deepak Gupta (Projects)
1.0 SCOPE
This Inspection and Test Plan covers the minimum testing requirements of Valves.
SL SCOPE OF INSPECTION
QUANTUM
/ ACTIVITY CHARACTERISTICS RECORD
NO OFCHEC
KCECK SUB
SUPPLIER EIL/TPIA
SUPPLIER
1.0 Procedure
Hydrostatic Test,
Heat Treatment, NDT,
1.1 Procedure
Helium Leak Test Documented Procedures 100% H R
Documents
and
Other Procedures
SL SCOPE OF INSPECTION
QUANTUM
STAGE / ACTIVITY CHARACTERISTICS RECORD
NO OF CHECK SUB
SUPPLIER EIL/TPIA
SUPPLIER
Chemical, Mechanical,
Castings & Forgings Heat Treatment, NDT,
2.1 100% Test Certificates H R R
(Body, Bonnet, Disc, Stem, Body ring) IGC & Other Properties
as applicable
As per PR /
2.3 Radiography
Body and Bonnet Castings Purchase Films and report H R R
Examination
Specification
Gaskets, Gear units, Fasteners, Gland, Physical / Chemical Test Certificates &
2.5 100% H R
Packings, etc. Properties Lab Report
Performance,
2.6 Actuators as applicable Test Certificates,
Statutory Certificates as 100% H H R
Inspection report
applicable
SCOPE OF INSPECTION
SL QUANTUM
STAGE / ACTIVITY CHARACTERISTICS RECORD SUB
NO OF CHECK SUPPLIER EIL/TPIA
SUPPLIER
Welding Parameters as
3.1 Welding 100% Inspection Reports - H -
per WPS / PQR
As per PR /
Hydrostatic / Pneumatic Test and RW
4.1 Leak Check Purchase Test Report - H
Helium Leak test as applicable (Note 1)
Specification
Stamping of
4.6 Final Stamping Stamping of Accepted Valves which H
Valves Inspection Report - H
are witnessed by (Note-1)
EIL/TPIA.
5.0 Painting
5.1 Painting and Color coding as applicable Visual / DFT Check 100% Inspection Report FI
Review of Stage
6.1 Documentation & Inspection Certificate Inspection Reports /
(IC) Test Reports & Issue of 100% Supplier TC & IC - H H
IC
Legend: H- Hold (Do not proceed without approval), P-Perform, RW - Random Witness (As specified or 10% ( min.1 no. of each size and type of Bulk item)), R-
Review, W-Witness (Give due notice, work may proceed after scheduled date).
1. Non NACE & Non Hydrogen service Carbon Steel Cast Valves up to size 12"-300ANSI Class and Carbon Steel Forged Valves up to size 1.5"- 800 ANSI Class will
be accepted on review of Supplier Test Certificates. Supplier Test Certificate along with back up reports to be reviewed by EIL/TPIA
2. This document describes the generic test requirements. Any additional test or Inspection scope if specified in contract documents shall also be applicable. (Unless
otherwise agreed upon)
3. Acceptance Norms for all the activities shall be as per PO/PR/STANDARDS referred therein /Job Specification /Approved Documents.
Abbreviations:
Members:
Mr. Rajesh Sinha Mr. Himangshu Pal Mr. Chandrashekhar
Mr. Muthuramalingam Mr. Avdhesh Agrawal Mr. Deepak Gupta- Project
Mr. Mahendra Mittal
1.0 SCOPE
This Inspection and Test Plan covers the minimum testing requirements of Forged, Seamless & Welded Fittings.
SCOPE OF INSPECTION
SL QUANTUM OF
STAGE/ ACTIVITY CHARACTERISTICS RECORD SUB
NO. CHECK SUPPLIER EIL/TPIA
SUPPLIER
1.0 Procedure
Procedure H R
1.1 Heat Treatment / NDT Documented Procedures 100% -
Documents
SCOPE OF INSPECTION
SL QUANTUM OF
STAGE/ ACTIVITY CHARACTERISTICS RECORD SUB
NO. CHECK SUPPLIER EIL/TPIA
SUPPLIER
R
NDT-RT Surface & Internal As per PR/Purchase RT Films (Films
3.4 - H
As Applicable Imperfections Specification & Reports Review)
SCOPE OF INSPECTION
SL QUANTUM OF
STAGE/ ACTIVITY CHARACTERISTICS RECORD SUB
NO. CHECK SUPPLIER EIL/TPIA
SUPPLIER
As per PR/Purchase Test R
3.8 Product Analysis Chemical Composition - H
Specification Reports
Mechanical, Impact, IGC,
Destructive Testing Test H
3.9 Hardness and Other test as 100% - H
Reports
applicable
Inspection
Galvanizing Integrity Of Galvanized Report - H R
3.10 100%
(If Applicable) Coating
SCOPE OF INSPECTION
SL QUANTUM OF
STAGE/ ACTIVITY CHARACTERISTICS RECORD SUB
NO. CHECK SUPPLIER EIL/TPIA
SUPPLIER
Stamping of Fittings H
Stamping Of Accepted Inspection
4.4 Final Stamping which are witnessed - H
Fittings Report
by EIL/TPIA.
5.0 Painting
Rust Preventive Coating & Color Visual & Color Coding as Inspection -
5.1 100% - W
Coding applicable Report
Abbreviations:
Members:
Mr. Rajeev Kumar Mr. Neeraj Mathur Mr. Himangshu Pal Mr R Muthu Ramalingam (RPO Rep )
Mr T Kamalakannan Mr. Mahendra Mittal Mr Deepak Gupta (Projects)
1.0 SCOPE
This Inspection and Test Plan covers the minimum testing requirements of Flanges, Spectacle Blinds & Drip Rings.
SL SCOPE OF INSPECTION
STAGE / ACTIVITY QUANTUM OF
NO. CHARACTERISTICS RECORD
CHECK SUB
SUPPLIER EIL/TPIA
SUPPLIER
1.0 Procedure
SCOPE OF INSPECTION
SL QUANTUM OF
STAGE / ACTIVITY CHARACTERISTICS RECORD
NO. CHECK SUB
SUPPLIER EIL/TPIA
SUPPLIER
Forging /Welding
3.1 Welding / Forging 100% Inspection Reports - El
Parameters
Stress Relieving,
Normalising, Tempering,
Solution Annealing,
3.2 Heat Treatment 100% HT chart - H R
Stabilization Heat
Treatment etc. as
applicable
Product Chemical,
Identification of Test H
33 Mechanical, Impact, IGC 100% Test Reports - H
Samples (Note-1)
and Other test as applicable
As per
Product Analysis
3.4 Chemical Composition PR/Purchase Test Reports - H R
(As applicable)
Specification
As per
Surface & Internal
36 NDT as applicable PR/Purchase NDT Reports H R
Imperfections
Specification
1. Visual
4.1 2 Dimensions H
Final Inspection 100% Inspection Report H
3. Hardness (Note-1)
4. Marking etc
Stamping of
4.3 Stamping of Accepted Items which are H
Final Stamping Inspection Report - H
Items witnessed by (Note — 1)
EIL/TPIA.
5.0 Painting
SCOPE OF INSPECTION
SL QUANTUM
STAGE / ACTIVITY CHARACTERISTICS RECORD
NO. CHECK OF SUB
SUPPLIER EIL/TPIA
SUPPLIER
Legend: H- Hold (Do not proceed without approval), P-Perform, RW - Random Witness (As specified or 10% ( min.1 no. of each size and type of Bulk item)), R-
Review, W-Witness (Give due notice, work may proceed after scheduled date).
I. Non NACE & Non Hydrogen service Carbon Steel Flanges, Spectacle Blinds & Drip Rings up to size 24"-300ANSI Class Will be accepted on review of Supplier
Test Certificates. Supplier Test Certificate along with back up reports to be reviewed by EIL/TPIA
2. This document describes the generic test requirements. Any additional test or Inspection scope if specified in contract documents shall also be applicable. (unless
otherwise agreed upon)
3. Acceptance Norms for all the activities shall be as per PO/PR/STANDARDS referred therein /Job Specification /Approved Documents.
tr"e4r AaRqm
fkftut a trftur
INSPECTION AND TEST PLAN
FOR
BOLTING MATERIAL
Convenor Chairman
Rev. Prepared Checked
Date Purpose Standards Committee Standards Bureau
No. by by
Approved by
Abbreviations:
Members:
Mr. Rajeev Kumar Mr. Himangshu Pal Mr. Neeraj Mathur
Mr. T Kamalakannan Mr. Mahendra Mittal Mr. Deepak Gupta (Project)
1.0 SCOPE:
This Inspection and Test Plan covers the minimum testing requirements of Bolting Material.
SCOPE OF INSPECTION
SL NO. QUANTUM
STAGE/ ACTIVITY CHARACTERISTICS RECORD SUB
OF CHECK SUPPLIER EIL/TPIA
SUPPLIER
1.0 Procedure
SCOPE OF INSPECTION
SL NO. QUANTUM
STAGE/ ACTIVITY CHARACTERISTICS RECORD SUB
OF CHECK SUPPLIER EIL/TPIA
SUPPLIER
Normalising & Tempering,
Quenching & Tempering
Solution Annealing,
Heat Treatment Inspection
3.2 Stabilization Heat 100% - H R
Report
Treatment, Strain
Hardening, Nitriding etc.
as applicable
3.3 NDT (as applicable) Defects detection 100% Test Reports - H R
Product Chemical, Proof
Load Test, Stress Rupture,
Identification of Test Lot as per
3.4 Tensile, Hardness, Impact, Test Reports - H W
Samples specification.
and Other test as
applicable
Product Chemical, Proof
Destructive Testing Load Test , Stress Rupture, Lot as per
3.5 Test Reports - H W
Mechanical, Impact and specification.
Other test as applicable
.
Galvanizing Inspection
3.6 Integrity Of Galvanised
(If Applicable) 100% Report - H R
Coating
SCOPE OF INSPECTION
QUANTUM
SL NO. STAGE/ ACTIVITY CHARACTERISTICS RECORD SUB
OF CHECK SUPPLIER EIL/TPIA
SUPPLIER
100% by
Visual Marking & supplier & Inspection RW
4.1 Visual & Dimension -
Dimensions Random by EIL Report (Note-3)
/ TPIA
Stamping of
bolting material
which are
Stamping of Accepted witnessed by Inspection _
4.2 Final Stamping H W
Bolting Material EIL/TPIA. Report
Others to have
suppliers
identification.
As Per ElL
PMI Check Inspection _
4.3 Chemical Check Spec. - H W
report
repo
6-81-0001
5.0 Painting
SCOPE OF INSPECTION
QUANTUM
SL NO. STAGE/ ACTIVITY CHARACTERISTICS RECORD SUB
OF CHECK SUPPLIER EIL/TPIA
SUPPLIER
Review of Stage
Documentation & Supplier TC
6.1 Inspection Reports / Test 100% - H H
Inspection Certificate(IC) & IC
Reports & Issue of IC
Legend: H- Hold (Do not proceed without approval), P-Perform, RW - Random Witness {As specified or 10% Max. ( min.1 no. of each size and type of Bulk
item)), R-Review, W-Witness (Give due notice, work may proceed after scheduled date).
Notes (as applicable):
1. This document describes the generic test requirements. Any additional test or Inspection scope if specified in contract documents shall also be
applicable.( unless otherwise agreed upon)
2. Acceptance Norms for all the activities shall be as per PO/PR/STANDARDS referred there in /Job Specification /Approved Documents.
3. Final visual and dimension shall be checked as per below sampling plan:
ill et' *
fitvur ISTuf I All
Abbreviations:
Members:
Mr. Rajeev Kumar Mr. Neeraj Mathur Mr. Himangshu Pal Mr. R Muthu Ramalingam (RPO Rep.)
Mr. T Kamalakannan Mr. Mahendra Mittal Mr Deepak Gupta (Projects)
1.0 SCOPE
This Inspection and Test Plan covers the minimum testing requirements of Gaskets.
SCOPE OF INSPECTION
SL Q UANTUM
STAGE / ACTIVITY CHARACTERISTICS RECORD
NO. OF CHECK SUB
SUPPLIER EIL/TPIA
SUPPLIER
1.0 Procedure
Procedure
1.1 HT & Test Procedure Documented Procedures 100% H R
Documents
2.0 Material Inspection
Chemical, Physical and other
2.1 Raw Material Inspection properties as per applicable 100% Test Certificates H H -
material specification
3.1 Punching & Finishing Finish & Dimension 100% Inspection Report - H -
Compressibility, Recovery,
Final Visual, Dimension & Seal ability, Groove Hardness
41 Testing for Ring & Tongue Joint etc as 100% Inspection Report - H R
applicable and Visual /
Dimension
Legend: H- Hold (Do not proceed without approval), P-Perform, RW - Random Witness (As specified or 10% ( min.! no. of each size and type of Bulk item)), R-
Review, W-Witness (Give due notice, work may proceed after scheduled date).
1. This document describes the generic test requirements. Any additional test or Inspection scope if specified in contract documents shall also be applicable. (unless
otherwise agreed upon)
2. Acceptance Norms for all the activities shall be as per PO/PR/STANDARDS referred therein /Job Specification /Approved Documents.
1-41-TR miik•H *
ft-Tar A. Sr 43.111
Abbreviations:
Members:
Mr. Rajeev Kumar Mr. Neerai Mathur Mr. Himangshu Pal Mr. R Muthu Ramalingam (RPO Rep.)
Mr. T Kamalakannan Mr. Mahendra Mittal Mr Deepak Gupta (Projects)
1.0 SCOPE
This Inspection and Test Plan covers the minimum testing requirements of small sizes and Assorted length Pipes.
SCOPE OF INSPECTION
SL QUANTUM
STAGE / ACTIVITY CHARACTERISTICS RECORD SUB
NO. OF CHECK SUPPLIER EIL/TPIA
SUPPLIER
1.0 Procedure
Hydrostatic Test, Heat
Procedure
1.1 Treatment, NDT and Other Documented Procedures 100% - H R
Documents
Procedures
Welding Parameters & W- New
1.2 WPS, PQR & WPQ 100% WPS, PQR &WPQ - H
Qualification Record R- Existing
SL SCOPE OF INSPECTION
QUANTUM
STAGE / ACTIVITY CHARACTERISTICS RECORD SUB
NO. OF CHECK SUPPLIER EIL/TPIA
SUPPLIER
Stress Relieving, Normalising,
Heat Treatment Tempering, Solution
32 100% HT chart H R
Annealing, Stabilization Heat
Treatment etc. as applicable
Ferrite Check of SS Pipes Random On
3.3 % Ferrite Check Inspection Report - H W
(If Applicable) Weld
3.6 PR /Purchase
Product Analysis Chemical Composition Test Reports - H R
Specification
SCOPE OF INSPECTION
SL QUANTUM
STAGE / ACTIVITY CHARACTERISTICS RECORD SUB
NO. OF CHECK SUPPLIER EIL/TPIA
SUPPLIER
Surface Condition,
Straightness,
Visual and Dimensional End Finish, Bevel Angle, 100% RW
4.2 Inspection Report - H
Inspection (VDI) Root Face, Outer Dia., (Note-1)
Thickness, Length,
End Finish, Marking etc
Weight Checking as
4.3 Weight 100% Inspection Report - H -
applicable
As Per EIL
RW
4.4 PMI Check Chemical Check Spec. Inspection report - H
(Note-1)
6-81-0001
Stamping of
Pipes which are H
4.5 Final Stamping Stamping Of Accepted Pipes Inspection Report H
witnessed by (Note-1)
EIL/TPIA.
5.0 Painting
Legend: H- Hold (Do not proceed without approval), P-Perform, RW - Random Witness (As specified or 10% (min.1 no. of each size and type of Bulk item)), R-
Review, W-Witness (Give due notice, work may proceed after scheduled date).
1. Non NACE & Non Hydrogen service Carbon Steel Pipes up to size 12" will be accepted on review of Supplier Test Certificates. Supplier Test Certificate along
with backup reports to be reviewed by EIL/TPIA.
2. This document describes the generic test requirements. Any additional test or Inspection scope if specified in contract documents shall also be applicable.
(unless otherwise agreed upon).
3. Acceptance Norms for all the activities shall be as per PO/PR/STANDARDS referred therein /Job Specification /Approved Documents.
4. For orders placed on stockist, items shall be accepted based on manufacturer's TC with EN310204 type 3.2 certification from EIL approved suppliers.
1
-44Tur TRI.k-Tur
INSPECTION AND TEST PLAN
FOR
SMALL SIZE BALL VALVES (< 1 i/2")
4 14.11.2018 REVISED AND RE-ISSUED
KC
3 17.06.2013 REVISED AND RE-ISSUED TKK RKS SCG DM
Abbreviations:
Members:
Mr. Rajeev Kumar Mr. Neeraj Mathur Mr. Himangshu Pal Mr. R Muthu Ramalingam (RPO Rep.)
Mr. T Kamalakannan Mr. Mahendra Mittal Mr Deepak Gupta (Projects)
1.0 SCOPE
This Inspection and Test Plan covers the minimum testing requirements of Small Size Ball Valves (< 1 '/2")
SL SCOPE OF INSPECTION
QUANTUM
STAGE / ACTIVITY CHARACTERISTICS RECORD SUB
NO. OF CHECK SUPPLIER EIL/TPIA
SUPPLIER
1.0 Procedure
SCOPE OF INSPECTION
SL QUANTUM
STAGE / ACTIVITY CHARACTERISTICS RECORD SUB
NO. OF CHECK SUPPLIER EIL/TPIA
SUPPLIER
3.2 Inspection -
Machining of components Visual / Dimension 100% - H
Reports
Page 5 of 6
SCOPE OF INSPECTION
SL QUANTUM
STAGE / ACTIVITY CHARACTERISTICS RECORD SUB
NO. OF CHECK SUPPLIER EIL/TPIA
SUPPLIER
4.0 Final Inspection
As p
per PR /
Hydrostatic / Pneumatic RW
4.1 Leak Check Purchase Test Report - H
Test as applicable (Note-1)
Specification
As per PR /
Helium Leak test as
4.2 Leak Check Purchase Test Report - H RW
applicable
Specification
RW
4.3 Visual / Dimension Surface & Dimension Check 100% Test Report - H
(Note-1)
SCOPE OF INSPECTION
SL QUANTUM
STAGE / ACTIVITY CHARACTERISTICS RECORD SUB
NO. OF CHECK SUPPLIER EIL/TPIA
SUPPLIER
Painting and Color coding 100% By
5.1 Visual / DFT Check Inspection Report - H R
as applicable Supplier
6.0 Documentation & IC
Review of Stage Inspection
Documentation &
6.1 Reports / Test Reports & Issue of 100% Supplier TC & IC - H H
Inspection Certificate (IC)
IC
Legend: H- Hold (Do not proceed without approval), P-Perform, RW - Random Witness (As specified or 10% ( min.1 no. of each size and type of Bulk item)), R-
Review, W-Witness (Give due notice, work may proceed after scheduled date).
1. Non NACE & Non Hydrogen service Carbon Steel Valves will be accepted based on review of Supplier TCs. Supplier Test Certificate to be reviewed by EIL/TPIA.
2. This document describes the generic test requirements. Any additional test or Inspection scope if specified in contract documents shall also be applicable. (unless
otherwise agreed upon)
3. Acceptance Norms for all the activities shall be as per PO/PR/STANDARDS referred there in /Job Specification /Approved Documents.
Abbreviations:
Members:
Mr. Rajeev Kumar Mr. Neeraj Mathur Mr. Himangshu Pal Mr. R Muthu Ramalingam (RPO Rep.)
Mr. T Kamalakannan Mr. Mahendra Mittal Mr Deepak Gupta (Projects)
1.0 SCOPE
This Inspection and Test Plan covers the minimum testing requirements of Onshore CS Flanges and Seamless Fittings (Up to 16" NB)
SL SCOPE OF INSPECTION
QUANTUM
STAGE / ACTIVITY CHARACTERISTICS RECORD SUB
NO. OF CHECK SUPPLIER EIL/TPIA
SUPPLIER
1.0 Procedure
SL SCOPE OF INSPECTION
STAGE / ACTIVITY QUANTUM
CHARACTERISTICS RECORD SUB
NO. OF CHECK SUPPLIER EIL/TPIA
SUPPLIER
NDT Surface & Internal PR / Purchase
3.2 Test Reports - H R
as applicable Imperfections Specification
Product Chemical, Mechanical,
3.3 Identification of Test Samples PR / Purchase H
Impact, and other test as Test Reports - H
Specification (Note-1)
applicable
Stamping of
4.2 Final Stamping Items which are H
Stamping of Accepted Items Inspection Report - H
witnessed by (Note-1)
EIL/TPIA.
As per Ell,
4.3 PMI Check Chemical Check Spec. Inspection Report RW
- H
6-81-0001 (Note-1)
SCOPE OF INSPECTION
SL QUANTUM
STAGE / ACTIVITY CHARACTERISTICS RECORD SUB
NO. OF CHECK SUPPLIER EIL/TPIA
SUPPLIER
5.0 Painting
Legend: H- Hold (Do not proceed without approval), P-Perform, RW - Random Witness (As specified or 10% ( min.1 no. of each size and type of Bulk item)), R-
Review, W-Witness (Give due notice, work may proceed after scheduled date).
1. Non NACE & Non Hydrogen service, Carbon Steel Flanges up to size 16"-300ANSI Class and Fittings upto 14" will be accepted on review of Supplier Test
Certificates. Supplier Test Certificate along with back up reports to be reviewed by EIL/TPIA.
2. This document describes the generic test requirements. Any additional test or Inspection scope if specified in contract documents shall also be applicable (unless
otherwise agreed upon)
3. Acceptance Norms for all the activities shall be as per PO/PR/STANDARDS referred therein /Job Specification /Approved Documents.