TR 513
TR 513
DOCUMENT TR-513
SECOND EDITION
JULY - 2021
DOCUMENT AMENDMENT PAGE
01 00 DEC
2016
02 01 JUNE TR-513-2:
Modify as below:
2021 SECTION 8.2
Replace “AED” with “Dirhams”.
(PAGE-
118)
Page ii
© Copyright 2021, by the Department of Municipalities and Transport. All Rights Reserved. This
document, or parts thereof, may not be reproduced in any form without written permission of the
publisher
Page iii
TABLE OF CONTENTS
List of Figures ............................................................................................................................. vii
List of Tables................................................................................................................................ ix
Glossary ....................................................................................................................................... xi
abbreviations and acronyms..................................................................................................... xvi
1 Introduction ............................................................................................................................ 1
1.1 Overview........................................................................................................................... 1
1.2 Purpose and scope ........................................................................................................... 1
1.3 Application of this manual ................................................................................................. 2
1.4 Content and format ........................................................................................................... 2
1.5 Pavement structure design ............................................................................................... 3
1.5.1 Pavement structure.................................................................................................... 3
1.5.2 Pavement design methods ........................................................................................ 5
1.6 General Requirements for Pavement Design .................................................................... 7
2 Pavement Design Components ............................................................................................ 8
2.1 Overview........................................................................................................................... 8
2.2 Environment ..................................................................................................................... 8
2.2.1 Environmental factors for empirical design................................................................. 8
2.2.2 Environmental factors for mechanistic-empirical design ........................................... 10
2.3 Traffic analysis procedures ............................................................................................. 13
2.3.1 Design life ................................................................................................................ 13
2.3.2 Vehicle classification ................................................................................................ 14
2.3.3 Axle group configuration .......................................................................................... 15
2.3.4 Tire pressure ........................................................................................................... 16
2.3.5 Vehicle count ........................................................................................................... 17
2.3.6 Traffic projections .................................................................................................... 17
2.3.7 Design lanes ............................................................................................................ 18
2.3.8 Directional factor ...................................................................................................... 18
2.3.9 Percentage of trucks ................................................................................................ 18
2.3.10 Equivalent axle load factor ....................................................................................... 18
2.3.11 Truck factor.............................................................................................................. 19
2.3.12 ESAL calculation...................................................................................................... 20
2.3.13 Mechanistic-Empirical traffic analysis....................................................................... 20
3 Pavement Materials ............................................................................................................. 22
3.1 Subgrade materials ......................................................................................................... 23
3.1.1 Empirical design for subgrade materials .................................................................. 23
3.1.2 Mechanistic-Empirical design for subgrade materials .............................................. 24
Page i
Page ii
Page vi
LIST OF FIGURES
Figure 1-1: Conventional asphalt pavement .................................................................................... 4
Figure 1-2: Full depth asphalt pavements ....................................................................................... 4
Figure 1-3: Rigid pavements ........................................................................................................... 5
Figure 1-4: Composite pavements .................................................................................................. 5
Figure 2-1: Relative damage calculation ......................................................................................... 9
Figure 2-2: Abu Dhabi cumulative annual rainfall .......................................................................... 10
Figure 2-3: Abu Dhabi mean annual air temperature ..................................................................... 12
Figure 2-4: FHWA vehicle classification ........................................................................................ 15
Figure 2-5: Axle Group Configuration ............................................................................................ 16
Figure 2-6: Tire Pressure Distribution............................................................................................ 17
Figure 2-7: 80 kN Standard Axle ................................................................................................... 19
Figure 3-1: Layer coefficient for granular base layer ..................................................................... 26
Figure 3-2: Layer coefficient for granular subbase layer ................................................................ 27
Figure 3-3: Cement treated base layer coefficient ......................................................................... 30
Figure 3-4: Asphalt treated base layer coefficient.......................................................................... 31
Figure 3-5: Dense graded asphalt concrete layer coefficient ......................................................... 33
Figure 3-6: Nomograph to determine conventional asphalt binder modulus .................................. 36
Figure 3-7: Nomograph to determine asphalt concrete modulus ................................................... 37
Figure 4-1: AASHTO's flexible pavement design chart .................................................................. 46
Figure 4-2: Layered design analyses ............................................................................................ 48
Figure 4-3: Mechanistic-Empirical design flowchart....................................................................... 50
Figure 4-4: Critical locations for mechanistic design ...................................................................... 50
Figure 4-5: 1993 AASHTO design equation for rigid pavement ..................................................... 56
Figure 4-6: Design equations for rigid pavement (part 1)............................................................... 59
Figure 4-7: Design equations for rigid pavement (part 2)............................................................... 60
Figure 4-8: Design equations for rigid pavement (part 3)............................................................... 61
Figure 4-9: Design equations for rigid pavement (part 4)............................................................... 62
Figure 4-10: Linear Elastic Analysis Results for the M-E Example ................................................ 80
Figure 6-1: Flexible LVR cross section ........................................................................................ 103
Figure 6-2: Cross section of an aggregate surface for a LVR ...................................................... 104
Figure 7-1: Typical subsurface drain for draining pavement layers – kerbed road section .......... 109
Figure 7-2: Typical examples of pavement edge drains .............................................................. 110
Figure 7-3: General view of pattern drainage .............................................................................. 110
Figure 7-4: Typical vertical/trench drains for lowering groundwater ............................................. 111
Figure 7-5: Typical subsurface drain for sub-base water removal in widened roadway section ... 113
Figure 7-6: Typical example of agricultural fill blocking the pavement surface and subbase drainage
................................................................................................................................................... 114
Figure 7-7: Method for providing pavement drainage where edge of rural roadway has been
backfilled and landscaped – typical section ................................................................................. 114
Figure 8-1: Categories of pavement maintenance ....................................................................... 117
Figure 8-2: Performance of preventive maintenance treatments ................................................. 118
Figure 8-3: Pavement preservation and rehabilitation tool box .................................................... 132
Figure 8-4: Crack sealing operation ............................................................................................ 136
Figure 8-5: Scrub seal application ............................................................................................... 138
Figure 8-6: Slurry seal surface .................................................................................................... 139
Figure 8-7: Chip seal application ................................................................................................. 140
Figure 8-8: Microsurfacing placement ......................................................................................... 141
Figure 8-9: CIPR train on a southern California project ............................................................... 142
Page vii
Page viii
LIST OF TABLES
Table 2-1: Abu Dhabi cumulative annual rainfall ........................................................................... 11
Table 2-2: Weighted mean temperatures ...................................................................................... 13
Table 2-3: Standard axle load by axle group ................................................................................. 19
Table 2-4: Load damage exponent ............................................................................................... 19
Table 3-1: Structural and functional requirements for pavement layers ......................................... 22
Table 3-2: Granular base layer modulus – Austroads 2008........................................................... 28
Table 3-3: Stabilized bases flexural modulus default values ......................................................... 32
Table 3-4: Relationship to determine T800 pen and PI values ........................................................... 35
Table 4-1: Typical Reliability levels ............................................................................................... 44
Table 4-2: Typical Initial and terminal serviceability levels............................................................. 45
Table 4-3: AASHTO material coefficient ........................................................................................ 47
Table 4-4: Minimum asphalt concrete (AC) layer thicknesses for granular base pavements ......... 48
Table 4-5: RF to determine cemented materials' fatigue criteria .................................................... 53
Table 4-6: RF for asphalt materials fatigue criteria ........................................................................ 54
Table 4-7: Required Pavement Dowel Bar .................................................................................... 63
Table 4-8: Minimum subbase thickness for rigid pavements ......................................................... 65
Table 4-9: Load safety factor for rigid pavements.......................................................................... 66
Table 4-10: Coefficients for prediction of equivalent stresses ........................................................ 68
Table 4-11: Coefficients for prediction of erosion factors for un-dowelled slabs ............................ 68
Table 4-12: Minimum concrete slab thickness ............................................................................... 69
Table 4-13: Gradation for bedding sand ........................................................................................ 71
Table 4-14: Vehicle classification distribution ................................................................................ 72
Table 4-15: Single axle load distribution........................................................................................ 73
Table 4-16: Tandem axle load distribution .................................................................................... 74
Table 4-17: Tridem axle load distribution ...................................................................................... 75
Table 4-18: Asphalt material properties for M-E design ................................................................. 79
Table 4-19: Calculated strain and N for M-E design ...................................................................... 79
Table 5-1: Causes and solutions for rutting ................................................................................... 86
Table 5-2: Repairs needed before overlay .................................................................................... 91
Table 6-1: Layer coefficients for pavement materials .................................................................. 103
Table 8-1: Example of State of Iowa customised preservation treatments .................................. 119
Table 8-2: Index of pavement distresses..................................................................................... 119
Table 8-3: Flexible pavement decision matrix ............................................................................. 133
Table 8-4: Pavement treatments ................................................................................................. 134
Table 8-5: Pavement treatment cost and expected life ................................................................ 135
Table 8-6: Preservation and rehabilitation treatments ................................................................. 135
Table 8-7: Chip seal aggregate gradation limits .......................................................................... 139
Table 9-1: Potential design alternatives for LCC ......................................................................... 149
Table 9-2: LCC analysis period ................................................................................................... 150
Table 9-3: Pavement treatments expected life ............................................................................ 150
Table 9-4: LCC summary with agency and user costs ................................................................ 153
Table 9-5: User cost ($/Vehicle-Hr) based on NCHRP-133 study ............................................... 153
Table 9-6: Recommended values of time and value.................................................................... 153
Table 9-7: Conversion of future costs to present value ............................................................... 155
Table 9-8: Project summary ........................................................................................................ 156
Table 9-9: Potential design alternatives for LCC ......................................................................... 157
Table 9-10: LCC analysis period ................................................................................................. 157
Table 9-11: Pavement treatments expected life .......................................................................... 157
Page ix
Table 9-12: Rehabilitation and preservation alternatives over a 20-year analysis period ............. 158
Table 9-13: LCC result (alternative 1) ......................................................................................... 160
Table 9-14: LCC result (alternative 2) ......................................................................................... 161
Table 9-15 : LCC result (alternative 3) ........................................................................................ 162
Table 9-16: LCC summary table ................................................................................................. 163
Table 11-1: Pavement distress types .......................................................................................... 183
Table 11-2: Pavement condition rating for different severity levels and threshold levels.............. 185
Table 11-3: Assigned severity levels for pavement condition rating criteria levels ....................... 185
Table 11-4: IRI maximum limits and severity ............................................................................... 186
Table 11-5: Skid resistance criteria ............................................................................................. 186
Page x
GLOSSARY
Analysis Period: the period of time for which the economic analysis is to be made.
Annual Average Daily Traffic (AADT): The total annual volume of traffic passing a point or segment
of a road in both directions divided by the number of days in a year.
Asphalt base course: an asphalt layer under the wearing surface layer and above the aggregate
base/Subbase courses. It is a uniform, non-erodible, and stable construction platform. It is designed
to resist fatigue cracking.
Asphalt binder (intermediate) course: the second asphalt layer following the surface layer. Its
properties are coarser than the surface layer. It is designed to resist permanent deformation.
Asphalt binder: It is a viscous material that binds the aggregate particles together to form the
asphalt concrete mixture. It is referred to as Asphalt, Bitumen, or asphalt cement
Asphalt concrete: is a mixture of aggregate (about 96% by weight) and asphalt binder (about 4 %
by weight). It is also referred to as Hot Mix Asphalt (HMA) since hot ingredients and heat is used for
mixing.
Asphalt structural course: A separation layer that prevents fine soils from entering the ATB or
CTB.
Asphalt wearing course (Surface): one or more layers of a pavement structure designed to
accommodate the traffic load. The top layer resists skidding, traffic abrasion, and the disintegrating
effects of climate. Sometimes referred to as surface course.
Average Daily Traffic: The total volume during a given time period, in whole days, greater than one
day and less than one year, divided by the number of days in the time period.
Base course: the layer or layers of specified or selected material of designed thickness placed on
a Subbase or a subgrade to support a surface course.
Change in serviceability (ΔPSI): A value that indicates the degradation in a road’s condition over
time, which is the difference between the road’s initial serviceability rating and its terminal
serviceability.
Chip seal: asphalt surface treatment to improve Rideability and seal surface. It consists of applying
asphaltic emulsions or liquid paving grade asphalts and covers with aggregate and rolling.
Climatic (Environmental) conditions: parameters that impact the pavement performance and are
related to the environment, such as temperature and rainfall.
Concrete modulus of rupture (S'c): A 28-day flexural strength based on third point loading that
indicates the extreme fibre stress under the breaking load in a beam-breaking test. In accordance
with section 2.3.4 of the 1993 AASHTO Guide for Design of Pavement Structures (4), pavement
designs for department projects use a standard S’c value of 635 psi.
Page xi
Concrete pavement slab: Normally consisting of plain cement concrete pavement, slabs serve as
the main structural element in the rigid pavement system. Such slabs must be at least 8 inches thick.
Construction Joint: a joint made necessary by a prolonged interruption in the placing of concrete.
Contraction Joint: a joint normally placed at recurrent intervals in a rigid slab to control transverse
cracking.
Crack seal: is the placement of materials into working cracks to fill and seal the crack.
Dowel: a load transfer device in a rigid slab, usually consisting of a plain round steel bar.
Drainage coefficients: Factors used to modify layer coefficients in flexible pavements or stresses
in rigid pavements as a function of how well the pavement structure can handle the adverse effect
of water infiltration.
Drainage factor (CD): A pavement subsurface’s ability to drain over a period from 1 hour to 72 hours.
In accordance with section 2.4.1 of the 1993 AASHTO Guide for Design of Pavement Structures (4),
pavement designs for department projects use a standard CD value of 1.0.
Empirical Pavement Design: methodology to design pavement based on test sections or empirical
models.
Equivalent Single Axle load (ESAL): the accumulation of the damage caused by mixed truck traffic
during the design period compared to the damage caused by equivalent single axle load.
Expansion joint: a joint located to provide for expansion of a rigid slab, without damage of itself,
adjacent slabs, or structures.
Fatigue cracking: a series of interconnected cracks that is caused by fatigue failure of the asphalt
surface (or the stabilized base) under repeated traffic loading.
Finite element analysis: the use of Finite element analysis to model and analyze a pavement
structure under traffic loads.
Flexible pavements: a pavement structure which distributes loads to the subgrade by means of
aggregate interlock, particle friction, and cohesion for stability. Asphalt concrete is mainly used at
the surface layer.
Fog seal: A fog seal is a light application of a slow-setting asphalt emulsion diluted with water to
seal the pavement surface.
Initial serviceability (PI): A value, generally between 4.2 and 4.5, that indicates the condition of a
newly constructed roadway.
Joint transfer factor (J): A concrete joint’s ability to transfer load. In accordance with section 2.4.2
of the 1993 AASHTO Guide for Design of Pavement Structures (4), pavement designs for
department projects use a standard J value of 3.2.
Layer coefficients: the empirical relationship between structural number (SN) and layer thickness
which expresses the relative ability of a material to function as a structural component of the
pavement.
Life Cycle Cost (LCC): the estimated cost of the pavement during its life span. The cost includes
construction, maintenance, and other user related costs.
Page xii
Linear elastic analysis: the use of fundaments material properties to estimate how will deform and
stress due to load application. The analysis is based on assumed linear and elastic behaviour of the
material.
Load transfer device: a mechanical means designed to carry loads across a joint in a rigid slab.
Longitudinal joint: a joint normally placed between traffic lanes in rigid pavements to control
longitudinal cracking.
Low Volume Road (LVR): a roadway generally subjected to low levels of traffic.
Material Characterization: the use of testing or prediction models to obtain material properties that
is needed in the design methodology.
Mechanistic-Empirical (M-E) Pavement Design: pavement design that is based on the use of
fundamental properties (such as stiffness) in mechanistic model to obtain material response
(deformation and stresses) due to applied loads. The material response is then used in empirical
models to predict pavement performance.
Modulus of subgrade reaction (k-value): Westerfaard’s modulus of subgrade reaction for use in
rigid pavement design (the load in pounds per square inch on a loaded area of the roadbed soil or
subbase divided by the deflection in inches or the roadbed soil or subbase. The default value is 200
lbs/inch2/in for special select soil material (sand).
Natural ground or fill: Natural material or embankment material that resides under the constructed
pavement structure.
Pavement condition survey: a survey that is conducted on existing pavements to access the
pavement condition. The survey includes visual and physical measurement of the pavement distress.
Pavement distress: is the failure of the pavement to provide its purpose of a smooth and stable
ride-able surface. The distresses have different types such as roughness, fatigue cracking,
permanent deformation, pot holes and others.
Pavement maintenance: the preservation of the entire roadway, including surface, shoulders,
roadsides, structures, and such traffic control devices as are necessary for it safe and efficient
utilization
Pavement Management Systems (PMS): a tool for designers and decision makers to collect a
comprehensive database of current and historical information on pavement conditions, pavement
structures, and traffic. Then analyze the data to determine existing and future pavement conditions,
predict financial needs, and identify and prioritize pavement preservation and maintenance plans.
Pavement structural capacity: the carrying load capacity of a pavement structure. This can be
measured by deflection testing, amount of distress, material properties and layer thickness.
Page xiii
Pavement structural design: a process to estimate the layers thickness for a pavement structure.
Performance period: the period of time that an initially constructed or rehabilitated pavement
structure will perform before reaching its terminal serviceability.
Permanent deformation (rutting): Surface depression in the wheel path that might be
accompanied by pavement uplift (shearing) along the sides of the rut.
Present serviceability index (PSI): A roadway’s ability to serve the traffic that uses the related
facility. A roadway’s PSI can rate from 0 to 5, with 5 being the best and 0 being the worst. As a road’s
smoothness deteriorates, its PSI decreases.
Pumping: The ejection of foundation material through joints or cracks or along edges of rigid slabs,
resulting from vertical movements of the slab under traffic.
Reinforcement: steel embedded in a rigid slab to resist tensile stresses and detrimental opening of
cracks.
Reliability (%R): Statistical probability that a facility will achieve its desired design life. This factor
that enables design engineers to tailor designs to more closely match the needs of the project. A
high reliability value, however, may substantially increase concrete depth. Reliability models are
based on serviceability rather than specific failure mechanisms, such as cracking and pumping. In
accordance with section 2.1.3 of the 1993 AASHTO Guide for Design of Pavement Structures (4),
recommended values range from 75% to 95%. Reliability, however, is not an input value for the
AASHTO design equation. Rather, engineers input the standard normal deviate (ZR) into the
equation.
Required depth (DR): A pavement structure’s required strength, represented by the slab depth as
determined from traffic load information and roadbed soil strength.
Resilient modulus (Mr): a measure of the modulus of elasticity of subgrade soil or other pavement
material.
Rigid pavement: a pavement structure which distributes loads to the subgrade, having as one
course a Portland cement concrete slab of relatively high bending resistance.
Selected material: a suitable native material obtained from a specified source such as a particular
roadway cut or borrow area, of a suitable material having specified characteristics to be used for a
specific purpose.
Serviceability: the ability of time of observation of a pavement to serve traffic which uses the facility.
Slurry seal: is a mixture of slow-setting emulsified asphalt, well-graded fine aggregate, mineral filler,
and water. It will fill fine cracks in the pavement surface.
Standard deviation (SO): A value used in design calculations to represent the variability in
construction and loading prediction for rigid pavements. The pavement designs use a fixed value of
0.35.
Standard normal deviate (ZR): A value derived by converting a corresponding Reliability (%R) value
into logarithmic form.
Page xiv
Structural Number (SN): an index number derived from an analysis of traffic, roadbed soil
conditions, and environment which may be converted to thickness of flexible pavement layers
thought the use of suitable layer coefficients related to the type of material being used in each layer
of the pavement structure.
Subbase: A vertically drainable and stable layer or layers, at least 6 inches thick, of specified or
selected material of designed thickness placed on a subgrade to support a base course or the
concrete slab.
Subgrade: the top surface of a roadbed upon which the pavement structure and shoulders are
constructed.
Tandem axle load: the total load transmitted to the road by two consecutive axles extending across
the full width of the vehicle.
Terminal serviceability (PT): A value, generally between 2.0 and 2.5, that indicates that a road
requires some type of rehabilitation or reconstruction.
Tie bar: a deformed steel bar or connector embedded across a joint in a rigid slab to prevent
separation of abutting slabs.
Traffic equivalence factor: a numerical factor that expresses the relationship of a given axle load
to another axle load in terms of their effect on the serviceability of a pavement structure.
Traffic studies: Studies that are conducted to obtain vehicle count and distribution, vehicle
classification and axle loads.
Treated permeable base: A non-structural layer underneath the pavement slab that provides lateral
drainage for water that infiltrates through pavement joints. Many types of material, including asphalt
treated permeable base (ATB) and cement treated permeable base (CTB), are available for this
base layer.
Tridem Axle load: the total load transmitted to the road by three consecutive axles extending across
the full width of the vehicle.
Page xv
Austroads: Association of Australian and New Zealand road transport and traffic authorities
R%: Reliability
T: percentage of trucks
T800 pen: temperature, in degrees Celsius, when binder penetration (100 g, 5 s) is 800.
Page xvii
WIM: Weigh-in-motion
Page xviii
1 INTRODUCTION
1.1 Overview
In 2010, the Department of Transport (DoT) in Abu Dhabi commenced with the “Unifying and
Standardizing of Road Engineering Practices” Project. The objective of the project was to enhance
the management, planning, design, construction, maintenance and operation of all roads and related
infrastructures in the Emirate and ensure a safe and uniform operational and structural capacity
throughout the road network.
To achieve this objective a set of standards, specifications, guidelines and manuals were developed
in consultation with all relevant authorities in the Abu Dhabi Emirate including the Department of
Municipal Affairs and Transport (DMAT) and Urban Planning Council (UPC). In future, all authorities
or agencies involved in roads and road infrastructures in the Emirate shall exercise their functions
and responsibilities in accordance with these documents. The purpose, scope and applicability of
each document are clearly indicated in each document.
It is recognized that there are already published documents with similar objectives and contents
prepared by other authorities. Such related publications are mentioned in each new document and
are being superseded by the publication of the new document, except in cases where previously
published documents are recognized and referenced in the new document.
This manual provides comprehensive information needed to develop complete structural pavement
designs. Topics include required data, material characterization, new pavement design,
rehabilitation techniques, pavement maintenance, pavement management, low volume roads (LVR),
and life cycle cost (LCC) analysis. This manual also covers the empirical and mechanistic-empirical
(M-E) design methods. Using the information in this manual, a designer can apply several design
methods and select a final design based on LCC analysis.
Several pavement design methods are currently used by different agencies and countries. These
methods vary somewhat for differing local conditions and resources. The procedures range from
empirical to M-E approaches. New M-E pavement design analysis procedures developed over the
last 20 years focus on the design and construction of high quality, long-lasting and well-performing
highways that accommodate the increase in traffic volumes and loads in ways that exceed the
empirical methods. These new approaches are challenging in that they require advanced analysis
methods and material characterization. In response to these technical advances and increasingly
easy computation, DMAT has replaced the older empirical methodologies for pavement engineering
with newer and more fundamental mechanistic design approaches.
Combining information about conditions and resources from different international manuals, while
including ways to use sustainable and economical materials, this manual is highly applicable to Abu
Dhabi. It covers different options for obtaining traffic count and loads, environmental factors, and
advanced material characterizations that apply to Abu Dhabi.
Page 1
This manual provides only brief descriptions for some pavement design topics. It frequently includes
references to other DMAT manuals that cover such topics in more detail.
Structural calculations for pavement design require knowledge of existing traffic flow, predictions of
anticipated future traffic, and environmental factors at the road’s location. Pavement designers must
also obtain information about the properties of the materials (such as asphalt, Portland cement, or
granular road base) that will be used in each pavement layer. Designs must account for these
material properties in conjunction with the material specifications and asphalt mixture designs, as
detailed in the DMAT Standard Specifications Volume 1 for Road Works (1).
Completing the pavement design process involves using either the 1993 American Association of
State Highway and Transportation Officials (AASHTO) (4) nomograph or Association of Australian
and New Zealand Road Transport and Traffic Authorities (6) (Austroads) software to determine the
required layer thickness. After generating several designs using different methods, a pavement
engineer shall conduct an LCC analysis to compare the designs for cost effectiveness. For details
about LCC analysis, refer to Chapter 9, Life-cycle Cost Analysis, in this manual, as well as the
DMAT’s Project Cost Estimating Manual (2) and Bill of Quantities Manual for Road Projects (3).
Pavement design requires not only designing new pavements, but also evaluating existing
pavement. Ensuring that existing pavement facilities have sufficient functional capacity and ride
quality involves maintenance, possibly including the construction of additional layers. Optional
methods for maintaining existing pavements such as chip sealing, fog sealing, slurry sealing, and
crack sealing are described in Chapter 8. Such maintenance or rehabilitation requires conducting
pavement condition surveys to get information about the condition of the existing pavement. Refer
to Chapter 10, Pavement Management Systems, in this manual for information about the pavement
management system and Chapter 11 for the existing pavement evaluation and pavement condition
surveys.
Evaluating existing pavements requires significant engineering judgement and effective application
of the backcalculation procedure. Based on the pavement design guidelines in this manual, design
engineers apply their own methodologies and experienced judgment to arrive at final rehabilitation
methods.
This manual provides guidelines for the design of new and rehabilitation of asphalt and concrete
pavements. The concrete pavement design guidelines are given in less detail. Applicable
international standards for concrete pavement design are followed in the manual.
Because different design methodologies deal with inputs in different ways, this manual advises
designers on how to estimate these inputs and how to obtain valid condition inputs for Abu Dhabi. It
also includes ways to ensure that pavement designs support sustainability.
Page 2
• Chapter 1 – Introduction: Outlines the purpose, scope, intended users, and application of
this manual.
• Chapter 2 – Pavement design components: Describes elements, such as environmental
and traffic factors, that must be considered in pavement design, and provides instructions on
how to determine such factors.
• Chapter 3 – Pavement material : Identifies properties of pavement materials and provides
instructions on how to determine such properties through tests of the use of models.
• Chapter 4 – New Pavement Design: Details the rehabilitation of flexible and rigid pavement
structures.
• Chapter 5 – Rehabilitation Design : Details the design of new flexible and rigid pavement
structures.
• Chapter 6 – Low-volume roads: Covers the design of LVR.
• Chapter 7 – Drainage design: Focuses on the design of granular drainage layer in a
pavement structure.
• Chapter 8 – Pavement maintenance: Offers different maintenance options.
• Chapter 9 – Life-cycle cost analysis: Details LCC analysis for pavement structures.
• Chapter 10 – Pavement management systems: Provides an overview of the Abu Dhabi
PMS and summarises related concepts.
• Chapter 11 - Existing Pavement Evaluation: Provides overview of different methods to
conduct pavement condition surveys and how to analysis the collected distress data.
The appendices of this manual provide supplementary charts and tables for the design on the rigid
pavements.
About 90% of the roads in the world are flexible, asphalt. In United Arab Emirates (UAE), 99% of
road surfaces are asphalt pavements. Flexible pavements are standard practice in UAE because
the required binder materials are relatively inexpensive and readily availability, and because
contractors who are familiar with this process are also readily available. Flexible pavements typically
require more extensive maintenance.
Page 3
Analysis of flexible pavement involves applying a multilayer elastic theory that assesses deflections
and strains. Major distresses occur in flexible pavements because they have either structural or
functional deficiencies. Permanent deformation and fatigue cracking (both area and longitudinal) are
caused by structural deficiencies, while low temperature, non-wheel path and block cracking result
from functional deficiencies. In UAE, prevalent major distresses include permanent deformation,
fatigue cracking, and asphalt pavement oxidation. Thermal cracking is not a concern in UAE,
because it occurs when temperatures drop below zero degrees.
In rigid pavement analysis, which is based on plate theory, the flexural stress in concrete as the
major design factor. Concrete slabs in the rigid pavement can be plain jointed concrete pavement
(JPCP), jointed reinforced concrete pavement (JRCP), and continuous reinforced concrete
pavement (CRCP).
Page 4
Major distresses that occur in rigid pavements include faulting, longitudinal and transverse cracking,
corner breaks, spalling, and polished aggregate.
Analysis of composite pavements is based on a combination of layered and plate theory. Initially,
engineers develop a rigid pavement design to ascertain the cracking in the concrete layer, then apply
layered theory to design the top asphalt layer. For composite pavements, critical distress
predominantly involves reflective cracking, in which cracks in the upper concrete layer result from
cracks in the underlying asphalt layer.
Page 5
methods often face issues when the traffic conditions exceed those upon which the methods were
based.
Advances in technology have enabled designers to use computers to easily perform related
complicated computations. New technology has also enabled designers to better assess and predict
traffic loads and traffic counts, characterize materials, and model environmental factors. To adjust to
increasing traffic loads, however, agencies have started to use mechanistic-empirical (M-E) methods
that, based on fundamental properties and advanced material characterization, enable engineers to
more effectively design economical pavement structures.
To develop the Guide for Design of Pavement Structures (4), AASHTO compiled results from road
tests conducted from 1958 to 1960 in Ottawa, Illinois, U.S.A. Data from these tests reflect one
climatic condition, one foundation type, and one million equivalent single axle loads (ESALs). From
1960 to 1993, AASHTO added several enhancements, such increased reliance on traffic data and a
limiting layer approach.
Covering both flexible and rigid pavement design, The 1993 AASHTO Guide for Design of Pavement
Structures (4) describes material characterization, equivalent traffic estimation, life cycle costs, and
existing pavement evaluation. It applies an ESAL as the basic unit for traffic estimation. Its material
characterizations use an empirical factor to reflect layer stiffness.
Pavement designers around the world have used this guide successfully for many years. Reasons
for designers’ success with this guide include the following:
Applying the fundamental stresses and strains of the materials in different layers at different depths
of the pavement structure, the mechanistic method enables designers to evaluate the validity of
proposed layer thicknesses. Designers calculate stresses and strains using either linear elastic
analysis or a more complicated model that focuses on finite elements under actual traffic loads.
Analysis using the mechanistic method also depends on detailed material characterizations, which
vary based on temperature (for hot mix asphalt layers), ground water table depth, and moisture
content (for granular layers). All M-E methods involve using a software package to analyse and
design the pavement structure.
Austroads, the association of Australian and New Zealand road transport and traffic authorities, has
developed an M-E pavement design guide, Guide to Pavement Technology, Part 2: Pavement
Structural Design (6). This manual contains ten different sections that cover all aspects of pavement
design, including structural design, surfacing, materials, pavement evaluation and treatment,
Page 6
maintenance, construction work practices, and drainage. Austroads also has a software package for
pavement analysis.
According to the Austroads guide (6), engineers apply structural analysis of the trial pavement
configuration to quantify critical strains and stresses that are caused by traffic loads. They can vary
the method to consider pavement layers as either fully elastic (visco-elastic), uniform in lateral extent,
or variable, with either full friction or no friction between the layers. By using these variations,
engineers attempt to establish theoretical estimates that agree with observed reactions to traffic
loading.
In addition, engineers can analyse pavement designs based on varying traffic loads, from a single
vertical load with uniform tire contact stress to multiple loads with multi-directional components and
non-uniform stress distribution. They can also vary traffic speeds to further assess potential traffic
loads. Engineers must be careful, however, to ensure that the sophistication of the analysis method
is compatible with the quality of the input data. Otherwise, they need to make too many assumptions
to fill the gaps, resulting in misleading, if not worthless, analysis.
Austroads (6) states that engineers can reliably obtain required input for analysis based on the M-E
method. Results from such analysis provide predictions of pavement performance that reasonably
match pavement performance in Australasian.
Upon completing the structural analysis, engineers can use the results to estimate the allowable
loading of the pavement configuration. Austroads (6) states that, in the M-E method, most
performance criteria assigned to pavement materials and to the subgrade relate the level of strain
induced by a standard single axle load and the number of such loads that exceed the pavement’s
tolerance level, based on material characteristics.
Page 7
This chapter addresses both environment and traffic. Refer to Chapter 3, Pavement Material
Characterization, for information about the subgrade. This manual includes details about the required
input and data collection needed for designs using the empirical method and the M-E method.
Two major environmental factors that influence pavement are water and temperature. Temperature
affects the properties of the asphalt layer. Water affects the performance and stiffness of the
unbound base, subbase, and subgrade layers. Water can infiltrate from the surface as a result of
rainfall or from high-ground water tables.
Traffic is another major uncontrolled factor that impacts pavement design. Mathematically, traffic is
represented in terms of applied loads on pavement structures. Vehicle classification, loads, and
traffic studies are crucial for designing adequate pavement cross sections. This chapter explains
both the traffic details that are required for M-E design and the equivalent axle load calculations that
empirical design requires.
2.2 Environment
Environment includes many variables, including temperature, rainfall, sunshine, humidity, and wind.
These factors impact a road’s performance and condition over time. Changing temperatures can
change the properties of materials in hot mix asphalt (HMA); higher temperatures result in a softer
asphalt mixture for the same binder type. Wet soils have a lower strength (less stiffness) than dry
soils. A good design accounts for known and anticipated environmental influences.
Designers can perform Mr testing to consider seasonal variations in the subgrade modulus. By
developing a relationship between moisture changes and the Mr, then comparing this relationship
with the in-situ moisture content, they can determine the corresponding modulus. Designers can
apply Equation 2-1 to determine a relative damage factor (Uf) that accounts for seasonal variations.
Page 8
Designers can also graphically determine a relative damage factor (Uf) that accounts for seasonal
variations, as shown in Figure 2-1. Using this method, a designer determines the subgrade resilient
modulus for each seasonal period and calculates the relative damage for the same period.
A seasonal period can be a single month or up to several months, depending on how much these
factors change for different periods. When all the seasonal figures are available, a designer
calculates the average relative damage and applies this average to back-calculate the corresponding
modulus of the subgrade.
Page 9
According to UAE National Centre of Meteorology and Seismology (7), the average value for rainfall
in Abu Dhabi Emirate and the Western Region is 56.3 mm, based on cumulative annual rainfall for
28 different weather stations in the area. Figure 2-2 shows a contour of the cumulative annual rainfall,
in mm.
Table 2-1 provides details about annual rainfall in Abu Dhabi, as reflected by the rainfall values for
the 28 weather locations.
Page 10
Cumulative Cumulative
Station Annual Rainfall Station Annual Rainfall
(mm) (mm)
Madinat Zayed 40.8 Abu Dhabi 60.7
AL Gheweifat 47.5 Al Wathbah 78.1
Al jazeera BG 27.3 Al Khazna 82.9
Mukhariz 31.6 Al Rowdah 51.9
Owtaid 61.7 Al Arad 69.3
Mezaira 26.6 Unknown 80.5
Hamim 33.9 Jabal Hafeet 95.3
Um Azimul 42.5 Um Ghafa 44.1
Bu Hamrah 32.3 Khatam Al Shadah 121.6
Al Qlaa 29.0 Al Ain 43.9
Sir Bani Yas 47.5 Al Qattara 20.3
Rezeen 69.9 Al Foah 128.0
Al Quaa 44.1 Raknah 75.9
Abu Abyad 45.2 Sweihan 44.6
2.2.2.2 Temperature
Changes in temperature mainly affect the asphalt layer. Asphalt becomes stiff and brittle at low
temperatures. Higher temperatures accelerate the aging of the asphalt materials, causing the asphalt
mixture to become stiffer with time. Refer to Chapter 3, Pavement Material Characterization, for an
asphalt layer modulus calculation, which accounts for temperature effects.
Considering temperature effects is also important when selecting the binder for a road design.
Typically, designers follow the binder performance grade in the Superpave mix design system to
select the binder. Given Abu Dhabi Emirate’s relatively insignificant temperature changes, however,
designers can select the same binder grade for all road designs for the region.
According to Austroads Guide to Pavement Technology, Part 2: Pavement Structural Design (6),
designers consider the effects of temperature on the asphalt layer modulus by estimating the
weighted mean annual pavement temperature (WMAPT). To estimate the WMAPT, perform the
following steps:
1. Obtain the monthly average daily maximum air temperature and the annual monthly daily
minimum air temperature.
2. Calculate the monthly average air temperatures by averaging the maximum and minimum air
temperatures.
3. Using Equation 2-2 and the monthly average air temperature, calculate the temperature
weighting factors (WF) for each month.
4. For each site, average the 12 WFs obtained in step 3.
5. Using the average WF from step 4, apply Equation 2-3 to estimate the weighted mean annual
air temperature (WMAAT) for each site.
6. Using the WMAAT, apply Equation 2-4 to estimate the WMAPT for each site.
The following equations are based on the Shell International Petroleum Company’s Pavement
Design Manual: Asphalt pavement and overlays for road traffic, 1978 (8).
Page 11
2
WF=10(-1.224+0.06508*Tair-0.000145*Tair)
2
WMAAT=19.66+16.91*log(WF+0.3117*(log(WF))
According to UAE National Center of Meteorology and Seismology (7), temperature changes in Abu
Dhabi Emirate are generally not significant, based on maximum and minimum air temperatures
recorded at 30 different weather stations in the area. Figure 2-3 shows the mean annual air
temperature in the Abu Dhabi Emirate.
Table 2-2 provides details about annual air temperatures in Abu Dhabi, based on the data gathered
at 30 area weather stations. The WMAPT values in this table are based on the steps provided above.
The WAMPT values are based on the calculation in Equation 2-4 WMAPT values in the region range
from 45.0° C to 38.7° C, with an average value of 43.5° C. The average value is representative for
the entire Abu Dhabi Emirate.
Page 12
Page 13
properly without major rehabilitation or reconstruction that is why it might be referred to as analysis
period.
Engineers select a road’s DL based on the pavement’s intended function. Typically, flexible
pavements have a DL of 20 years, while rigid pavements have a DL of 30 years. For temporary
pavements, such as detours, however, DLs range from six months to a maximum of two years.
Designers can propose DLs that exceed 20 years for pavement structures for important roads or for
roads that will require less frequent maintenance. DMAT must approve such proposed DL increases
before further pavement design activities can proceed.
Figure 2-4 shows vehicle classifications for pavement designs, as defined in the USA Federal
Highway Administration’s (FHWA) Guide to LTPP Traffic Data Collection and Processing (9). These
classifications are as follows:
1. Motorcycle
2. Passenger cars
3. Other two-axle, four-tire single units
4. Buses
5. Two-axle, six-tire single units
6. Three-axle single units
7. Four or more axle single units
8. Four or less axle single trailers
9. Five-axle single trailers
10. Six or more axle single trailers
11. Five or less axle multi-trailer
12. Six-axle multi-trailer
13. Seven or more axle multi-trailer
Vehicles in classes 4 to 13 (buses to multi-trailer vehicles with seven or more axles) are the most
critical vehicles for pavement design. Motorcycles and passenger cars cause insignificant pavement
damage.
Page 14
Based on the axle grouping, engineers can use the axle group load to calculate the damage factor,
how much damage a vehicle will cause, which will be explained later in this section.
Page 15
1) Single Axle Single Tire 2) Single Axle dual Tires 3) Tandem Axle Single Tire
4) Tandem Axle dual Tires 5) Tridem Axle dual Tires 6) Quad Axle dual Tires
q = P/A
Where,
The actual shape of the tire imprint depends on the tire load. A tire’s imprint might be rectangular,
trapezoidal, circular, or some irregular shape. Calculating the relationship between contact stress
and load, as shown in Equation 2-5, assumes a circular tire imprint to facilitate the calculation
process in a mechanistic model for the interaction between tire and pavement.
Typical tire pressures recorded by tire manufactures for heavy trucks range from 500 kPa to 1000
kPa, with an average value of 700 kPa.
Page 16
P
q
Refer to Abu Dhabi DMAT Road Structures Design Manual (10) for directions on how to conduct
traffic surveys to obtain vehicle counts. In such surveys, engineers count traffic over several days,
then calculate an Average Daily Traffic (ADT) factor that serves as a base current two-way traffic
volume. For new roadways for which engineers can’t obtain actual vehicle counts, engineers can
apply traffic forecasting and trip generation models.
If a model projection is not available, a designer shall assume a rational growth factor (GF), based
on the current ADT, to estimate future traffic. To predict future traffic, use either the general GF, as
shown in Equation 2-6, or one of the GF formulas. According to the Abu Dhabi Municipality’s
Roadway Design Manual, engineers can use either the linear GF formula, as shown in Equation 2-7,
or the compound GF formula, as shown in Equation 2-8, to estimate traffic.
GF = 1 + (GR/100)*DL
GF = (1 + (GR/100))DL
Page 17
Where
GF ranges from 0 (which indicates no growth) to 10%. Engineers should base assumed GFs on a
highway’s functional classification, as well as vehicle ownership, population, employment rates, and
land uses within the area.
Practice in Abu Dhabi Emirates requires trucks to use the outer lane, for which the lane distribution
factor (LDF) should be 1.
Page 18
EALF = (L/SL)m
Where:
Load Damage
Design Method
Exponent (m)
Empirical 4
Mechanistic – Control Fatigue 5
Mechanistic – Control Rutting 7
Engineers can obtain actual axle loads from a weigh-in-motion (WIM) system data or from a traffic
survey that collects axle loads in addition to vehicle counts.
TF = (∑ p*EALF)
Page 19
Where:
• TF = Truck factor
• p = Percent of each truck class
• EALF = Equivalent axle load factor
A sample EALF calculation sheet for a typical public bus based on the AASHTO (appendix D,
table D.4) is attached in the Annex 2.
ESAL calculations shall be in accordance with AASHTO pavement design manual and the final
design to be verified using Mechanistic Method.
Engineers can apply Equation 2-11 to convert the accumulation of the mixed traffic load passes to
ESALs (a standard axle load for an 80-kN single axle vehicle).
ESAL = ADT(current)*T*TF*GF*LDF*DF*DL*365
Where:
a. Number axles/trucks
b. Axle configuration
c. Wheel base
d. Lateral traffic wander
Engineers can obtain this data from automatic vehicle classification (AVC) and weigh-in-motion
(WIM) stations. Engineers shall sort this data by axle type and vehicle class to be used in the M-E
design methodology. If site-specific data are not available, use the M-E design procedure’s default
values.
Using load spectra enhances pavement design, enabling the direct analysis of mixed traffic and
avoiding the need for load equivalency factors. Additional advantages of applying the load spectra
approach include the possibility of special vehicle analyses, analysis of the impact on performance
of overloaded trucks, and analysis of weight limit changes during critical climate conditions.
Page 21
3 PAVEMENT MATERIALS
Actual materials properties shall be used in the design, however if it is not available assume
properties of materials as per the standard specifications and calculate the factors from the relevant
formula or charts as per AASHTO.
In addition to external factors, such as traffic and environment, materials are critical elements that
impact pavement designs. Designers, however, can make the best use of pavement materials by
knowing their properties through testing. To obtain properties for different pavement materials,
designers may conduct laboratory tests or use empirical material characterization models. This
chapter covers the material characterizations for all types of materials used in pavement structures.
It details material characterizations related to pavement structural design and compliments material
specifications in the DMAT Standard Specifications Volume 1 for Road Works manual (1).
The following sections describe the material properties that are needed for pavement design when
applying either the empirical method or M-E method. Because these two design methods have
different approaches and models, methods to account for material properties in the pavement design
process also differ.
Page 22
A structural pavement design’s most critical parameter is stiffness, which is represented by resilient
modulus or CBR (a factor that is related to the resilient modulus). In assessing stiffness, a designer
needs to consider a subgrade’s variability, which is reflected through changes in soil types and
drainage conditions along a road’s alignment. For consistency, a design must sustain a minimum
CBR of 10% throughout a road’s entire length. If a sample’s CBR is lower than the CBR required by
the design, designers shall consider improvements to the subgrade to increase stiffness. A pavement
must sustain its required subgrade stiffness at least 45 cm below the existing subgrade level. If a
weak layer exists in the subgrade, designers shall consider improving the weak material for the top
90 cm.
In case soil investigation indicates that soil subgrade is suspected to liquefaction and/or
excessive/differential settlement more than tolerable limit due to unsuitable material/weak ground
condition and/or presence of water soluble content/pure salt layer underneath of other hazards that
may affect the stability of Road/pavement then ground improvement measure shall be taken into
account to mitigate effect of both liquefaction and settlement. Ground
investigation, recommendations and requirements of TR-509 shall be followed in this regard.
Similarly, mitigation due to shallow ground water table condition (such as capillary break, subsurface
drainage etc.) shall also be adopted at design stage. For the provision of capillary break layer, the
criteria of design ground water table of minimum 1.5m below formation ground surface shall be
followedSubgrade varies based on different topography and soil types. Weak subgrade exits in some
areas. Designers shall properly investigate the effects of weak soils. Weak soils shall be treated by
soil stabilization methods to sufficiently support pavement structures.
Page 23
Mr = 1500 * CBR
Mr = 10 * CBR
Mr = Resilient Modulus in pounds per square inch (psi) for first equation
or
Mr = 2555 * CBR0.64
There is no seasonal adjustment for subgrade Mr for Abu Dhabi, because the region’s moisture
content is consistent all year long.
Rigid pavement designs use the modulus of subgrade reaction (k) instead of the resilient modulus.
A modulus of subgrade reaction is related to the resilient modulus, as shown in Equation 3-3, when
there is no subbase layer between the subgrade and the PCC slab.
2Mr
k=
π(1-γ2 )a
ᵧ = Poisson ratio
Refer to Chapter 4, New Pavement Design, for additional details on the modulus of subgrade
reaction calculation.
In situ field tests for CBR are difficult. Accordingly, DMAT recommends either Dynamic Cone
Penetrometer (DCP) (ASTM D 5778) tests or deflection tests using Falling Weight Deflectometer
(FWD), which are easier to perform. The test results are correlated to the subgrade stiffness or CBR
value.
Equation 3-4 shows the correlation between the DCP and the CBR, as given in Austroads’ Guide to
Pavement Technology, Part 2: Pavement Structural Design (6).
The deflection test is better suited for pavement rehabilitation design than for new design. Several
commercial programs, including Dynatest’s ELMOD, use the deflection data obtained from FWD
testing to backcalculate the resilient modulus of a subgrade.
A designer then correlates the subgrade modulus to the CBR using Equation 3-2. This equation is
applicable with a maximum value of 150 MPa. Poisson’s ratio is assumed to have a default value of
0.35 for non-cohesive materials and 0.45 for cohesive materials.
Designers can use Equation 3-5, from AASHTO’s Guide for Design of Pavement Structures (4), to
determine the granular base layer coefficient. Figure 3-1 provides additional detail. The AASHO
Road Test basis of these correlations is that a granular base has a layer coefficient of 0.14, which
corresponds to a modulus of 30,000 psi and a CBR of 100 (4). A designer can use either Equation
3-5 or Figure 3-1 to obtain the layer coefficient, applying the CBR from laboratory testing, which
complies with AASHTO’s Standard Method of Test for the California Bearing Ratio (AASHTO T-193)
(14).
a2 = 0.249(log10EBS) – 0.977
Where:
Page 25
0.20
0.18
40
0.16
70 80
0.12 60 25
R-value
50
CB
Texas Triaxial
40 2.5
R
70
0.10 30 20
60
0.08 3.5
20 15
0.06
50
4.0
0.04
0.02
Designers can use Equation 3-6, from AASHTO’s Guide for Design of Pavement Structures (4), to
determine the granular subbase layer coefficient. Figure 3-2 provides additional detail. The AASHO
Road Test basis of these correlations is that a granular subbase has a base layer coefficient of 0.11,
which corresponds to a modulus of 15,000 psi and a CBR of 30 (4). A designer can use either
Equation 3-6 or Figure 3-2 to obtain the layer coefficient, applying the CBR from laboratory testing,
which complies with AASHTO’s Standard Method of Test for the California Bearing Ratio (AASHTO
T-193) (14).
a3 = 0.227(log10ESB) – 0.839
Where:
0.20
0.14 100 2 20
70 80
R-value
Texas Triaxial
0.12 50 3
40 70 15
30
CBR
60 14
0.10 13
20
50 12
0.08 10 4 11
40 10
0.06
30 5
25
Key elastic parameters are the modulus and Poisson’s ratio. Because variations in Poisson’s ratio
have limited effect on structural pavement designs, designers can assume a Poisson’s ratio of 0.35.
Variations in the resilient modulus, however, are very critical, because they are affected by aggregate
composition, moisture content, density, and stress levels. Designers can obtain the modulus through
repeated load triaxial testing of subbase materials at their in situ density, moisture content, and stress
levels. Tests to determine the modulus for unbound granular material are sophisticated, hard to
Page 27
perform, and not available locally in Abu Dhabi. Designers in Abu Dhabi should use a simpler method
for local material.
As another method to determine the modulus for the granular layer, designers can use default values
until testing yields more precise values. In 2008, Austroads provided two tables, shown below in
Table 3-2, that designers can use to estimate the modulus for a granular base layer (6). The top half
of Table 3-2 is applicable for granular material that has a CBR greater than 30% (6).
Table 3-2 requires designers to know the modulus of the overlying bound layers, which can be
obtained for each material type (asphalt or cement). For pavement that is composed of different
bound layers overlying a granular base layer, designers shall use Equation 3-7 to obtain an
equivalent modulus for the total overlying layers.
∑i ti Ei
Ee =
T
Where:
Based on the values of Ee and T, designers can use Table 3-2 to obtain the modulus for a granular
layer.
Suggested vertical modulus (MPa) of top sublayer of normal standard base material
Suggested vertical modulus (MPa) of top sublayer of high standard base material
Page 28
Because the characterizations for modified granular materials are similar to those of unbound
granular materials, designers can apply empirical and M-E design methods in the same ways for
both types of materials. Accordingly, designers can assume a Poisson’s ratio of 0.35 and default
values as shown in Table 3-2.
Stabilized materials are affected by mixture proportions, moisture content, the extent of cracking and
ageing, and curing.
A CTB is a granular base treated with Portland cement. According to ASTM’s Standard Test Method
for Compressive Strength of Molded Soil-Cement Cylinders (ASTM D-1633) (15), a CTB’s elastic
modulus is related to a material’s seven-day unconfined compressive strength. Designers use either
the modulus or the unconfined compressive strength to obtain a CTB’s layer coefficient, as shown
in Figure 3-3.
Similarly, designers use an ATB’s elastic modulus or Marshall Stability to obtain its layer coefficient.
Designers can use either AASHTO’s Standard Method of Test for Resistance to Plastic Flow of
Bituminous Mixtures Using Marshall Apparatus (AASHTO T-245) (16) or ASTM’s Test Method for
Resistance of Plastic Flow of Bituminous Mixtures Using Marshall Apparatus (ASTM D 1559) (17) to
Page 29
determine an ATB’s Marshall Stability. Figure 3-4 shows the correlation between an ATB’s modulus,
Marshall Stability, and layer coefficient.
0.28
0.26 10.0
1000
0.24 9.0
600
0.18 7.0
Modulus – 10 psi
0.16
5
400 6.0
0.14
0.12 200
5.0
0.10
Page 30
1800 4.0
0.30 1600
1400
3.0
1200
2.5
1200
1000
2.0
800
0.20
Structural Coefficient (a2)
600 1.5
Marshall Stability – lb
400
Modulus – 10 psi
5
200
1.0
0.10
0
As another method to estimate a material’s flexural modulus, designers can conduct a 28-day,
unconfined compressive strength (UCS) test, using Equation 3-8 to correlate to the UCS to the
flexural modulus.
Eflex = k UCS
Where:
Table 3-3, from Austroads’ Guide to Pavement Technology, Part 2: Pavement Structural Design (6),
provides the default flexural modulus values for stabilized bases.
Subbase Subbase
quality quality
Lean Mix Base 4-5%
Property crushed crushed
Concrete cement
rock 2-4% rock 4-5%
cement cement
Range of Modulus (MPa) 5000-15000 3000-8000 2000-5000 1500-3000
Typical Modulus (MPa) 7000 5000 3500 2000
Degree of anisotropy 1 1 1 1
Range of Poisson’s ratio 0.1-0.3 0.1-0.3 0.1-0.3 0.1-0.3
Typical value of Poisson’s ratio 0.2 0.2 0.2 0.2
Each course in a pavement structure serves a different function, which determines a course’s
required properties. For example, a surface layer should be stiff to resist permanent deformation. A
base course, however, should be soft to resist fatigue cracking. AC stiffness results from interlocking
friction between aggregate particles, binder viscosity, and adhesion between the binder and
aggregate. The follow factors affect an AC mixture:
An asphalt binder in the AC mixture can be a conventional binder or polymer modified binder,
depending on the required stiffness of the AC layer. An asphalt wearing course that is heavily loaded
uses a polymer modified asphalt, which is resistant to permanent deformation. Refer to DMAT
Standard Specifications Volume 1 for Road Works manual (1) for asphalt and aggregate
specifications and details about HMA mixture design.
Page 32
Material characterization for HMA has advanced significantly through testing protocols, such as the
Dynamic Modulus testing (AASHTO TP62-03), that measure mechanical properties. This manual,
however, focuses only on material characterizations as described by AASHTO’s empirical design
method (4) and Austroads’ M-E design method (6).
The structural coefficient of AC varies between 0.2 and 0.44. AC with a layer coefficient of 0.44
corresponds to an AC resilient modulus of 3.1 GPa (450,000 psi) (4).
0.5
0.4
Structural Layer Coefficient, a1 For
Asphalt Concrete Surface Course
0.3
0.2
0.1
0.0
0 100,000 200,000 300,000 400,000 500,000
laboratory testing and its variability has limited impact on a pavement’s structural design, Austroads
recommends using a Poisson’s ratio value of 0.4 (6).
• Measure the resilient modulus using a standard indirect tensile test (ITT), adjusted for in-
service temperatures (WMAPT) and for the rate of loading in the road-bed.
• Estimate the resilient modulus based on the bitumen properties and mix volumetric, using
Shell nomographs (refer to Figure 3-6 and Figure 3-7), the in-service temperature (WMAPT),
and the rate of loading in the road-bed.
This manual assumes that designers shall estimate an AC pavement’s modulus until a testing
protocol is available and DMAT has gained a full understanding of local materials. In 1978, Shell
International Petroleum Company developed a method to obtain the modulus of a conventional AC
mixture, as outlined in their Pavement Design Manual: Asphalt pavement and overlays for road traffic
(8).
1. Determine the modulus of the asphalt binder from traffic speed and operating temperature.
2. Determine the modulus of the asphalt concrete from the asphalt binder modulus and
volumetric properties of the mixture.
Figure 3-6 and Figure 3-7 show the two nomographs developed by Shell. The first nomograph
(Figure 3-6) requires the following inputs:
• Time of loading: This is the duration of a step load for which the bitumen modulus equals
the stiffness under traffic loading. Designers may take this value as 1/V, where V (km/h) is
the design heavy vehicle speed.
• Operating temperature: This is the effective temperature, in degrees Celsius (°C), of the
asphalt (WMAPT).
• T800 pen: This is the temperature, in degrees Celsius (°C), at which the penetration (100 g, 5
s) of the bitumen is 800 (0.1 mm).
• Penetration Index (PI): This is an index of the bitumen’s susceptibility to penetration at
different temperatures.
According to Austroads, a designer can refer to the relationships shown in Table 3-4 to determine
T800 pen and PI values based on bitumen penetration or viscosity data (6). Binder properties on Table
3-4 are for short term aged binders and are based on Rolling Thin Film Oven (RFTO) tests (AASHTO
T-240 and ASTM D 2872).
Shell’s nomograph for determining an asphalt modulus (as shown in Figure 3-7) requires the
following input:
• Equivalent built-in temperature (EBIT) modulus of the bitumen at the assumed temperature
and loading rate, as derived from the nomograph.
• Volume of the binder (Vb), as the percentage of bitumen in the asphalt, by volume. For a
typical mix that contains 5% bitumen by mass, designers can assume a Vb of 11%.
• Volume of mineral aggregate (Vg), as the percentage of aggregate in the mix, by volume. A
typical mix that contains 5% bitumen by mass, when compacted so that it contains 6% air
voids, has a Vg of approximately 83%.
Page 34
When a pavement uses polymer modified binders rather than conventional binders, the modulus of
the asphalt will differ significantly. To develop an adjustment factor to obtain the modulus of asphalt
with polymer modified binders, designers must conduct laboratory testing to compare the polymer
modified binders with the conventional binders. Such adjustments will vary based on the types of
modifiers and the amount of each such modifier used (as a percentage of the total mix).
Page 35
Page 36
Page 37
To ensure durability, concrete has a minimum 28-day compressive strength of 32 MPa. Equation 3-9
shows the typical conversion of compressive strength to flexural strength.
Where:
Equation 3-10 shows the relationship between indirect tensile strength and flexural strength.
fci = 1.37 fc
Equation 3-10: Relationship between indirect tensile strength and flexural strength
Where:
Although concrete properties vary with different constituent types and aggregate sizes, designers
can use Equation 3-10 to effectively estimate the required properties.
Using AASHTO’s empirical design method (4), Equation 3-11 predicts the modulus of elasticity for
PCC.
'
Ec =57,000√fc
Where:
Page 38
Because geo-textiles use different synthetics and different products, their properties and
characteristics vary. Modern pavement designers have limited understanding of how the inclusion of
geo-grids impacts pavement design. In general, DMAT recommends avoiding the inclusion of geo-
grids as structural elements in pavement designs until the industry better understands their
fundamental properties and has developed proven standards for their inclusion.
Some designers, however, may want to use geo-grids on a small scale and monitor the pavement
performance over time to better understand their impact on pavement designs. According to
AASHTO’s Recommended Practice for Geosynthetic Reinforcement of the Aggregate Base Course
of Flexible Pavement Structures (AASHTO R 50-09) (18), designers should conduct field tests by
including geo-grids to reinforce sections of aggregate base layers in pavement structures. Suppliers
of geo-grids should follow this process to provide sufficient evidence of such materials’ potential
adequacy in pavement structures.
Austroads defines a SAMI as a sprayed seal which is applied to the surface prior to overlay with
asphalt A SAMI contains bitumen that is either modified with polymer or crumb rubber or reinforced
with a geo-textile. SAMI treatments over cracked pavements or pavements with high deflections can
waterproof the pavement and delay or reduce reflective cracking. Waterproofing, crack propagation
resistance, and strain alleviating capabilities are achieved through a combination of high binder
application rates and polymer modified binders or reinforcement of a seal using geo-textile fabric.
Some research suggests that geo-grids may also reduce rutting in asphalt layers or improve
structural performance to allow a reduced thickness of asphalt. Design criteria for such applications
are not well defined and selection is largely based on reports of observed performance.
To avoid void spaces between a geo-grid and an underlying surface, designers generally place a
geo-grid on an asphalt corrective layer or use a sprayed seal to hold it in place. Some fibreglass
geo-grids have an adhesive backing to hold them in place while crews place asphalt. Sliding and
buckling of polyester and polypropylene geo-grids during the placing of asphalt can be difficult to
control unless a sprayed seal holds a geo-grid in place.
A geo-grid normally resides directly under a wearing course. DMAT recommends a minimum
covering thickness of 50 to 70 mm to ensure that a geo-grid is firmly held within an asphalt structure.
Moreover, pavement designers utilizing mechanically stabilized flexible pavement using Geo-grids
shall comply with Acceptance criteria given in ANNEX 3.
Page 39
The value of recycled products, in terms of energy savings and environmental benefits, is growing.
There are now a number of industry by-products, including the following that are regularly used in
the manufacture of pavement materials:
• Slag products
• Coal combustion products
• Recycled building materials
• Recycled rubber products
• Recycled asphalt products
Although the use of recycled material is relatively new in pavement development, several different
types of asphalt recycling, including recycled asphalt product (RAP), hot in-place recycling, and cold
in-place recycling, are available. Each type of recycling handles different material compositions and
mixtures.
RAP recycling can impact 10-20% of new asphalt mixtures. Testing and properties required for
pavement designs to support RAP are similar to tests for conventional asphalt concrete mixtures.
Nomographs used to predict the modulus of conventional asphalt modulus, however, do not apply
for RAP mixtures, because recycled materials vary too much. Designers shall subject RAP mixtures
to laboratory testing to determine material properties.
Recycled concrete is concrete that has been broken into smaller pieces, making it available for use
in granular layers. Designers shall perform laboratory testing to estimate the modulus of recycled
concrete before including it in pavement structural designs. Such materials have different properties
based on the size and gradation of the crushed concrete.
Page 40
• Significantly reduces emissions of toxic and non-toxic gases that contribute to global warming
and ozone depletion
• Saves energy and energy costs by reducing related fuel burning by up to 25%
• Improves the workability of the asphalt
• Extends the paving season
• Allows for paving during cooler temperatures
• Enables hauling over longer distances
• Improves compaction of the pavement
• Improves road smoothness, reduces International Roughness Index (IRI) values, and
enhances ride quality
• Reduces fumes and poly-cyclic aromatic hydrocarbons (PAHs) that are produced during
construction by up to 50% when compared to HMA pavements
• Reduces binder aging
• Reduces plant wear
• Increases plant production
• Enables longer storage durations
• Supports easier compaction
• Enables paving during colder weather
For more information, refer to Payne and Dolan Incorporated’s presentation to an AASHTO
subcommittee, Warm Mix Asphalt – a Contractor’s Perspective (19).
In addition to the benefits brought about by the materials that constitute a WMA mixture, lower
temperatures ensure that WMA-paved roads are more quickly available for use by traffic, which is a
significant benefit when time schedules are tight or critical.
• Creating a foaming effect in the asphalt binder through the addition of synthetic zeolite,
known as Aspha-Min®, at the plant while mixing.
• Creating a soft binder and hard foamed binder during the plant production at various stages
through the addition of a two-component binder system called WAM-Foam®.
• Using organic additives such as Sasobit®, a Fischer-Tropsch paraffin wax, and Asphaltan
B®, a low molecular weight esterified wax.
• Using Evotherm™, an asphalt emulsion product that uses a chemical additive technology
and a “dispersed asphalt technology” delivery system, during plant production.
• Creating a foaming effect in the binder through the addition of Advera® WMA, a synthetic
zeolite, at the plant during mixing.
Plants that produce HMA may also produce WMA. The only necessary adjustments are the lower
temperatures and additional additives. Some installations, modifications, and alterations may be
introduced to a plant to account for these changes, facilitate production, and support procedures.
Page 41
Page 42
Pavement design is primarily a matter of soundly applying acceptable engineering criteria and
standards. Standards in this manual provide a general basis for uniform design practices for typical
pavement design situations.
Design procedures incorporated into this document are based on the 1993 AASHTO Guide for
Design of Pavement Structures (4) and the Guide to Pavement Technology, Part 2: Pavement
Structural Design (6) from Austroads. This manual applies AASHTO’s empirical design methodology
and Austroads’ M-E design methodology.
This chapter discusses the design of new flexible and rigid pavements, with descriptions on how to
apply the empirical method and M-E method for each type. This chapter also outlines methodology
that designers can use to design new pavements functionally and, more importantly, structurally.
The flexible pavement design is based on layered system analysis. The layered system analysis
approach is to use the better quality material with a higher modulus on the top. The asphalt layer
has higher modulus than the granular base. While, the granular base has better material than the
granular subbase, which supersedes the subgrade in quality. According to layered system, the
asphalt should be on the top of the granular base and the subbase beneath the base. This approach
is followed in almost all designs except in cases where a lower quality material is needed on top of
another layer for a specific purpose. For example, a granular base layer might be used between two
asphalt layers to prevent cracking the lower asphalt layer to reflect to the surface, the granular base
in this case is known as crack arresting layer.
When following an empirical design process, a designer will typically produce a number of designs
for comparison and consideration. Abu Dhabi DMAT recommends that designers apply LCC, as
Page 43
described in Chapter 9, Life-cycle Cost Analysis, to compare different alternative and come up with
an economical and structurally safe design.
Applying AASHTO’s empirical design method, designers estimate the required structural capacity,
based on an array of inputs, including traffic loads and subgrade strength. Designers check the
estimate for required structural capacity against a presumptive pavement structure, which they can
adjust or modify based on the required structural capacity and LCC. When applying AASHTO’s
empirical method, pavement designers shall conduct the following actions:
1. Determine values for the parameters required to calculate a structural number (SN) for the
pavement design.
- An overall standard deviation (So), which accounts for variability in determining all
parameters in the design process. Flexible pavement designs typically use an overall
standard deviation of 0.45.
- An effective resilient modulus (Mr) for the subgrade material, which reflects the
strength of the subgrade foundation upon which the pavement will reside. As
mentioned in Chapter 3, Pavement Materials, because Mr testing is difficult to
conduct. Designers should perform a California Bearing Ratio (CBR) test and use the
results to estimate a pavement subgrade’s Mr, as given in Equation 3-1.
A design serviceability loss ( PSI) rating for the pavement. This parameter reflects the
difference between a pavement’s initial serviceability rating immediately after
construction and the lowest serviceability at which the pavement will require
maintenance.
Table 4.2 shows typical initial, terminal, and loss in serviceability ratings for each roadway
class (based on traffic load).
Page 44
Designers can use Equation 2-5, from the 1993 AASHTO Guide for Design of Pavement
Structures (4), to calculate a pavement’s SN. Figure 4-1, however, shows a chart from
AASHTO that designers can use to solve the equation graphically. DMAT recommends using
the equation, which provides a more accurate value.
∆PSI
log10 [
]
4.2-1.5
log10 W18 = ZR *So +9.36*log10 (SN+1)-0.20+ +2.32*log10 Mr -8.07
1094
0.4+
(SN+1)5.19
Where:
Page 45
Page 46
In designing pavement thickness, begin with a pavement layer thickness that, when
combined, meets a pavement’s required structural capacity (SN). Equation 4-2 relates a
pavement’s design SN to layer thicknesses.
SN = (a1t1+a2t2m2+a3t3m3+⋯+antnmn) / 2.54
where:
For Abu Dhabi, apply a drainage coefficient of 1.0 for typical designs. For designs which
utilize a drainage layer, use a coefficient of 1.2.
Flexible pavement is a layered structure that requires different SN values for different layers.
Determine a different SN for subgrade, subbase, and base layers. For each SN, use the
modulus of a carrying layer to solve of the equation. For example, to determine SN2 over the
subbase, use the subbase modulus as the Mr in Equation 2-5. Figure 4-2, from AASHTO’s
Guide for Design of Pavement Structures (4), shows their procedure for layered design
analysis. Layered design analysis shall confirm that each layer in the pavement structure has
sufficient strength to carry the applied load safely, without any weak layers in the middle of
the pavement structure.
Page 47
Although many pavement designs will meet calculated requirements, not all designs meet
the needs of local conditions, such as underground utilities close to the surface, poor
drainage, or flooding, equally. One design might function more efficiently than another.
Pavement designers shall use construction consideration and judgement, based on past
experience, to select a final pavement design.
Consider practical aspects for the construction process, which require a minimum thickness
for each layer type. These minimum thicknesses are governed by the aggregate size and
constructability considerations. Minimum thickness for an aggregate base layer is 15 cm.
Table 4-4 shows the minimum thickness (in cm) for asphalt concrete (AC) layers for different
road classes (based on traffic loads) for roads using aggregate base layers. An AC layer is
divided into 3 courses, a wearing course, a binder course, and a base course. Minimum
thicknesses in table 4-4 are for an entire AC layer; do not confuse these values with the
required minimum thickness for different courses. Each course requires a minimum thickness
based on the maximum aggregate size used in its AC mixture. A course has a maximum
thickness, which is the thickness it requires to achieve its specified level of compaction. Refer
to the DMAT Standard Specification Volume 1 for Road Works manual (1), for more
information on maximum aggregate sizes and lift thicknesses.
Table 4-4: Minimum asphalt concrete (AC) layer thicknesses for granular base pavements
Page 48
To start Austroads process, a designer selects a section of pavement for initial trials, then applies
M-E pavement analysis to the trial section to predict critical strains. Applying the computed critical
strains, a designer then predicts the number of load repetitions that will cause failure for each type
of distress. Finally, a designer compares the predicted load repetitions to actual estimated traffic
repetitions. If the predicted loads exceed the actual loads, a designer can accept the design used
for the trial section; if actual loads exceed predicted loads, however, a designer shall revised the
design. In summary, this procedure consists of the following steps:
Using Austroads’ M-E pavement analysis, a designer applies fundamental material properties, using
the relationship between applied load and a material’s modulus to calculate strains at critical
locations. Critical locations for analysis of a multiple layer pavement are those that yield the highest
strains due to applied loads. Figure 4-4, from Austroads’ Guide to Pavement Technology (6), shows
the critical locations in a multi-layer pavement structure. Designers then use the critical strains to
predict the following pavement distresses and future performance:
• Tensile strain at the bottom of an AC layer, from which a designer can compute fatigue
cracking for the AC layer
• Tensile strain at the bottom of a stabilised layer, from which a designer can compute fatigue
cracking for the stabilised layer
• Compressive strains at the top of a subgrade to determine permanent deformation
Page 49
No
Accept
Yes
Comparison of Designs
Selection
Viable Design
Select Design
To determine a flexible pavement’s response to traffic loads, a designer shall fully model this
complicated process. According to Austroads, a designer can do the following to simplify this
modelling effort:
• Consider pavement materials to be homogeneous, elastic, and isotropic (except for unbound
granular materials and subgrade, which are anisotropic).
• Use the linear elastic model to calculate response to load.
Page 50
• Assess the following critical responses for pavement and subgrade materials:
Note: Austroads’ M-E method does not consider unbound granular materials.
• Assume that a standard axle load reflects a dual-wheeled single axle that applies a load of
80 kN. For flexible pavements, critical responses occur either along the vertical axis directly
below the inner-most wheel of the dual wheel group or along the vertical axis located
symmetrically between a pair of dual wheels.
• Assume that a standard axle load is represented by four uniformly-loaded circular areas of
equal area that are separated by centre-to-centre distances of 330 mm, 1470 mm, and 330
mm, respectively, as illustrated in Figure 4-4.
• Assume that contact stress is uniform over the loaded area and, for the purpose of design,
has a consistent value of 750 kPa. Contact stress relates to tire pressure; for highway traffic,
assumed contact stress levels from 500 to 1000 kPa.
• Vary the values in the previous bullet items for pavements that support unusual axle types
and loadings. For example, for pavements in which sharp turning movements, acceleration,
or braking will occur, adopt a model that more closely corresponds to the actual axle
configuration and loading. For most pavement design, however, such adjustments are
unnecessary.
• For some projects, M-E modelling may indicate that a pavement with a thin asphalt surface,
with a thickness less than 40 mm, will suffice. DMAT, however, cautions against selecting
pavement with a thin asphalt surface as a design option, because M-E design does not
effectively address dominant damage types.
Page 51
(EH) = 0.5 * Ev
(ᵧ) = 0.35
(f) = Ev / (1+ ᵧ)
Subgrade parameters vary based on both the stiffness of the upper layer and the properties of
underlying layers. Select an appropriate thickness (not greater than 6m) for the entire subgrade, then
divide this thickness into 5 equal thicknesses for five equivalent sublayers. Use the CBR test and
equation 3-1 in Chapter 3, Pavement Materials, to determine the modulus of each sublayer.
To determine a granular base layer’s elastic parameters, refer to the explanations in chapter 3,
Pavement Materials, section 3.2.2, and the following equations.
• Use the default values in Table 3-2 to determine a granular base layer’s vertical modulus
(Ev).
• Use Equation 4-4 to determine a granular base layer’s horizontal modulus (EH).
• Use Equation 4-5 to determine a granular base layer’s Poisson’s ratio (ᵧ).
• Use Equation 4-6 to determine a granular base layer’s stress parameter (f).
Page 52
Designers can use Equation 4-7, which applies calculated strains, to obtain the allowable number of
load repetitions for a subgrade.
9300 7
N= [ ]
με
Where:
12
113000
(
0.804 +191)
N=RF [ E ]
με
Where:
RF = Reliability factor for cemented materials fatigue; refer to Table 4-5 for
appropriate values
Shell laboratory conducted testing to relate fatigue cracking to axle load repetitions and included this
information in their 1978 Pavement Design Manual: Asphalt pavement and overlays for road traffic
(8). Austroads adjusted Shell’s findings and included these results in their 2008 Guide to Pavement
Technology (6). Austroads added a reliability factor (RF) to the laboratory model to shift the
laboratory results into field fatigue life.
5
6918(0.856Vb +1.08)
N=RF [ 0.36
]
Smix *με
Where:
RF = Reliability factor for cemented materials fatigue; refer to Table 4-6 for
appropriate values
Page 54
Pavement Design Components, for methods to collect actual traffic data). If predicted loads exceed
actual loads, a designer can accept the design used for the trial section; if actual loads exceed
predicted loads, however, a designer must revised the design.
The following sections describe the process for determining the necessary rigid pavement thickness
in a pavement design.
Design engineers obtain equivalent single axle load value (18-kip ESALs) from surveys of actual
traffic survey or from planning offices based on patterns of land use. Refer to section 4.5 of this
chapter for a simple example for calculating the accumulated 18-kip ESALs for a mixed traffic.
Truck equivalency factors are approximately fifty percent (50%) higher for rigid pavements than for
flexible pavements. Design engineers can also use an actual axle load survey to estimate truck
equivalency factors.
• ESALD = Accumulated 18-kip equivalent single axle loads over the life of the project.
• ZR = Standard normal deviate from the normal distribution table for design reliability (R). This
equation does not include a reliability factor, (%R), which is replaced by the corresponding
standard normal deviate.
• KG = Modulus of sub grade reaction (lbs/inch2/in)
• SO = Standard deviation.
• PI = Initial serviceability.
• PT = Terminal serviceability.
• ΔPSI = Change in serviceability.
Page 55
1. Determine the base types (asphalt Base, treated permeable base, or special select
embankment soils).
2. Determine the traffic load forecasts (ESALS).
3. Evaluate concrete material properties, which are generally constant for design purposes,
including the following:
Page 56
4. Determine what type of subgrade drainage system is required. If the area lacks a strong
history of successful construction and performance using special select soils under concrete
pavements, use the other base types.
5. Calculate the pavement thickness using the design formula above with all input parameters
outlined in Section 4.3.1.1. As an alternative, apply the design chart in Appendix B to
determine pavement thickness.
6. Develop remaining pavement design details, including the following:
Because pavement design details are as important as the design of the pavement depth, designers
must focus adequate attention on these details.
The latest AASHTO design equation uses only the elastic k-value, the measurement of soil on top
of the subgrade or embankment. Previous versions of the 1993 AASHTO Guide for Design of
Pavement Structures (4) incorporate the gross k-value, which represents not only elastic deformation
of the subgrade under a loading plate, but also substantial permanent deformation. Only the elastic
component of this deformation represents the response of the subgrade to traffic loads on the
pavement. Recent AASHTO tests focused extensively on the elastic k-value test as the main
subgrade test. When AASHTO used the elastic k-value in structural analysis of pavements, they
determined that slab stresses computed with a three-dimensional finite element model were
approximately equal to those measured in the field under full-scale truck axle loadings at creep
speed. These results justify the use of the elastic k-value in pavement design.
To determine the k-value input required for this design method, an engineer should perform the
following steps.
1. Select a subgrade k-value for each season, using any of the three following methods:
AASHTO’s design methodology requires the mean k-value, not the lowest value measured or some
other conservative value. Do not apply any additional adjustment to the k-value for loss of support.
Because substantial loss of support existed for many road sections involved in AASHTO tests, the
AASHTO model already reflects such effects.
• Estimated ESALS (W18) for the performance period in the design lane
• Design reliability (%R)
• Overall standard deviation, SO
• Design serviceability loss, PSI = PI – P2
• Effective (seasonally adjusted) elastic k-value of the subgrade, psi/inch
• Concrete modulus of rupture, S’C psi
• Concrete elastic modulus, EC psi
• Joint spacing, L, inches
• Base modulus, Eb, psi (section 2.3.3)
• Slab/base friction coefficient, f
• Base thickness, Hb , inches
• Effective positive temperature differential through concrete slab, TD, OF
• Lane edge support condition:
Refer to Glossary for definitions of many of these input parameters for the AASHTO design equation.
Figure 4-6, Figure 4-7, Figure 4-8, and Figure 4-9 provide more details about the design equations
for rigid pavement as given by the Supplement to the AASHTO Guide for Design of Pavement
Structures, Part II for rigid pavements (31).
Page 58
Page 59
Page 60
Page 61
For details, refer to section 3.3, Rigid Pavement Joint Design, in the 1993 AASHTO Guide for Design
of Pavement Structures (4).
Page 62
Dowel bars should be spaced 30 centimetre (cm) apart from each other, unless otherwise indicated
due to some special reason. Dowel bars should be 45 cm long. Using a dowel bar basket, place
dowel bars before the concrete pouring operation.
Page 63
Applying a M-E method, designers base their analyses of rigid pavement on a principle of liquid
foundations, an assumption that the mechanical pressure between a slab and its subgrade at any
point is proportional to the deflection at that point, independent of deflections at any other points. M-
E pavement design requires application of the following parameters:
• Predicted traffic volumes; refer to Chapter 2, Pavement Design Components, for details on
how to obtain this information.
• Subgrade strength in terms of California Bearing Ratio (CBR); refer to Chapter 3, Pavement
Materials, for details on how to obtain this information.
• Flexural strength of a concrete slab; refer to Chapter 3, Pavement Materials, for details on
how to obtain this information.
Concrete thickness also depends on the type of joint reinforcement adopted for a slab. Thickness
design uses analytical models and field testing of pavements with typical spacing between joints and
thickness ranges.
Page 64
Rigid pavement requires a subbase layer under the concrete slab to provide uniform support and
sufficient resistance to traffic and environmental conditions. Austroads recommends using a
stabilized subbase layer of either cement or treated asphalt (6). Table 4-8 indicates the minimum
sub base thickness based on the estimated future traffic.
Strength of Subgrade
M-E pavement designers use CBR to assess the strength of materials in a sub grade down to 1
meter below the subbase. Refer to Chapter 3, Pavement Materials, for details on sub grade strength
testing and characterization. If the top 1 meter of material in a subgrade shows different CBRs, use
Equation 4-10 to determine an equivalent subgrade strength (CBRE).
3
∑i hi CBR0.333
i
CBRE = [ ]
∑i hi
where:
• Layers of thickness less than 200 mm must be combined with an adjacent layer. The lower
CBR value must be adopted for the combined layer.
• It is assumed that higher CBR materials will be used in the upper layers. The formula is not
applicable where weaker layers are located in the upper part of the subgrade.
• The maximum CBR from the use of this formula is 15%.
Traffic
Methods for estimating design traffic are explained in details in Chapter 2, Pavement Design
Components. An equivalent single axle load (ESAL) is the standard unit for design traffic for rigid
pavement. A rigid pavement’s design traffic value reflects a cumulative number of ESALs, applied at
each axle group load for each axle group type, over a pavement’s design life period.
Page 65
Project reliability
To determine concrete slab thickness, a designer multiplies axle group loads by a load safety factor
(LSF). Refer to Table 4-9 to determine an LSF based on project reliability. Refer to Table 4-1 to
determine project reliability.
Thickness design for rigid pavement requires information on axle group types, the distribution of
each axle group types, and the number of repetitions of each axle type or load combination
throughout a pavement’s design life. Designers should round a calculated base thickness up to the
nearest 5 mm. Any thickness so derived serves as a minimum value and is referred to as a
pavement’s design base thickness.
A designer uses an assumed or estimated concrete slab thickness to determine the allowable axle
load repetitions and estimate fatigue and erosion damage over a pavement’s design life period. A
designer compares a pavement’s allowable axle load repetitions to its design traffic. If either fatigue
or erosion damage exceeds 100%, designer shall increase the design thickness and repeat this
process.
0.9719-Sr
log(Nf ) = [ ]
0.0828
Equation 4-11: Allowable axle load repetitions when stress (Sr) is greater than 0.55
Designers shall use Equation 4-12 when stress is from 0.45 to 0.55.
Page 66
4.258 3.268
Nf = [ ]
Sr -0.4325
Equation 4-12: Allowable axle load repetitions when stress (Sr) is from 0.45 to 0.55
0.94
Se P*LSF
Sr = [ ]
0.944*fcf 4.45*F1
Where:
Designers can apply Equation 4-14 to determine equivalent stress (Se) and erosion factor (F3), using
the coefficients a to j, as shown in Table 4-10 and Table 4-11.
b d
Se or F3 =a+ +c* ln(Ef ) + 2 +e* ln(Ef )2 +
D D
ln(Ef ) g 3
ln(Ef )2 ln(Ef )
f* + 3 +h* ln(Ef ) + i* +j*
D D D D2
Where:
Page 67
Table 4-11: Coefficients for prediction of erosion factors for un-dowelled slabs
Erosion distress
Designers shall use Equation 4-15 to calculate the allowable load repetitions (Ne) for a given axle
load.
Page 68
2 0.103
P*LSF 10F3
log(F2 Ne ) = 14.524 - 6.777 [max (0, ( ) * -9.0)]
4.45*F4 41.35
Where:
Axle load inputs and load safety factors have no set limits, however, advises caution when using
allowable loadings calculated with values of (4.5*P*LSF/F1) or (4.5*P*LSF/F4) that exceed 65 kN.
Page 69
After estimating the design factors the steps explained in section 4.2.1 and the 1993 AASHTO chart
Figure 4-1 shall be used to estimate the required SN.
The final step is to use the required SN and the material properties of the paver blocks and the
bedding sand to calculate the thickness of the aggregate base and subbase layers. The typical paver
Page 70
block thickness is 80 mm and 25 to 50 mm for the bedding sand. Tests had shown that after initial
trafficking, the interlocking between the blocks increases and the layer stiffens. The measured
modulus for the paver block and sand bedding reaches about 3,000 MPa which is equivalent to that
of the asphalt concrete layer. Accordingly, the AASHTO layer coefficient for the 130 mm paver blocks
and sand bedding will be taken as 0.44 as given in Table 4-3. The sand bedding gradation should
follow ASTM C 33 as shown below in Table 4-13
The structural design of the interlocking paver blocks has lower impact on the pavement performance
compared to the construction procedure. It is very critical to emphasize the importance of the
construction procedure and quality, such as gradation of bedding sand, blocks laying pattern,
vibration/compaction of blocks and bedding sand and filling the joints with sand. These factors if not
considered correctly will cause dislocation of blocks and formation of holes in the pavement surface,
even if the structure design was safe.
The example is a 4 lane highway that will link Adu Dhabi Island to Al Ain. The soil is mainly
characterized as A-3 Silty-Sand soil with a CBR of 10%. The traffic study shows that the current one
way Average Annual Daily Traffic (AADT) is about 1700 vehicle with 60% Buses and trucks (Classes
4 to 13). Flexible pavement is recommended for this road. However, two scenarios will be used to
compare the most economical option of the two. The first option is to use typical multi layer structure
with aggregate granular base layer. While, the second option is to use a deep strength structure,
which includes cement stabilized base layer.
The following are the required inputs for the pavement design.
4.5.1 Environment
The ground water table (GWT) along the roadway is deep and will not impact the moisture content
of the subgrade layer. Accordingly, no correction is need for the subgrade modulus.
Page 71
4.5.2 Traffic
Traffic is very important and requires accurate data. A traffic survey was conducted in a nearby
existing road. Both vehicle count and vehicle classification was conducted in the survey in addition
to an axle load survey. The following parameters are taken for the pavement design:
• Vehicle Classifications: From the traffic survey it was found that the traffic is divided into
different vehicle classes as given Table 4-14. The AADT per vehicle class is shown in the
third column. The truck traffic from this would be the summation of the vehicle counts from
class 4 to class 13. This would yield an Annual Average Daily Truck Traffic (AADTT) of
1700*0.6= 1020 vehicle per day.
• Axle load distribution: the Axle load survey gave the percentage of axle load distributions for
each of the single, tandem and Tridem axles, as shown in Table 4-15,
• Table 4-16Table 4-16, and Table 4-17, respectivel.These loads were used to calculate the
EALF as given in Equation 2-9. The standard axle load from Table 2-3 for the single, tandem
and Tridem axles were 80, 135 and 181 kN, respectively. Also, the power used in the
calculation is 4 for the empirical design method as given in Table 2-4. The EALF for each
load group is given in the third column. The EALF is then multiplied by the percentage of this
axle load to obtain the individual truck factor (TF) as shown in the fourth column. The
individual values are then summed up to obtain the total TF for each axle. The total TF for all
axles types summation of the three values i.e. 0.3069+0.7984+1.2914 = 2.3967.
• Design life: 20 years
• The growth rate was taken to be 6.5%. Using a linear growth factor (GF) as given in Equation
2-7 will give a GF of 2.3.
• The lane factor (LDF) and direction factor (DF) were both taken as 100% i.e. 1.
The previous parameters are used to calculate the total equivalent single axle load (ESAL) as
given in Equation 2-11.
ESAL = 1700*0.6*2.3967*2.3*1*1*20*365 = 41,046,106.
Page 72
Page 73
Page 74
Equivalent Axle
Axle Load Percentage
Load Factor TF
(KN) (%)
(EALF) Tridem
53.38 29.409 0.0 0.0022
66.72 6.9 0.0 0.0013
80.07 5.725 0.0 0.0022
93.41 5.212 0.1 0.0037
106.76 3.423 0.1 0.0041
120.10 3.376 0.2 0.0065
133.45 4.24 0.3 0.0125
146.79 3.318 0.4 0.0144
160.14 5.169 0.6 0.0317
173.48 3.728 0.8 0.0315
186.83 6.634 1.1 0.0753
200.17 4.2 1.5 0.0628
213.51 3.268 1.9 0.0633
226.86 3.073 2.5 0.0758
240.20 2.864 3.1 0.0888
253.55 1.955 3.9 0.0753
266.89 1.252 4.7 0.0592
280.24 1.071 5.7 0.0615
293.58 1.12 6.9 0.0775
306.93 1.312 8.3 0.1085
320.27 0.812 9.8 0.0796
333.62 0.32 11.5 0.0369
346.96 0.318 13.5 0.0429
360.31 0.41 15.7 0.0644
373.65 0.461 18.2 0.0837
387.00 0.097 20.9 0.0203
400.34 0.056 23.9 0.0134
413.68 0.083 27.3 0.0226
427.03 0.017 31.0 0.0053
440.37 0.132 35.0 0.0463
453.72 0.045 39.5 0.0178
Total 100 1.2914
4.5.3 Materials
Flexible pavement structure can be composed of several layers such as the subgrade, granular
base/subbase, cement stabilized base and asphalt concrete layer. In the following section the
modulus of each possible layer will be estimated using the models given in Chapter 3 of this manual.
Page 75
Figure 3-1 is then used to estimate the layer coefficient for the granular base layer (a2) which is yield
to be 0.13.
• Reliability level (%) = 99.9 % as given in Table 4-1 for Rural Roads.
• Standard normal deviate = -3.09052 for the 99.9 % reliability
• Initial serviceability = 4.2
• Terminal Serviceability = 3.0
• Overall standard deviation = 0.45
In addition to:
• ESAL = 41,046,106
• Subgrade Mr = 15,000 psi
• Base Mr = 36,953 psi
• CTB Mr = 850,000 psi
• Layer coefficient for AC a1 = 0.44
Page 76
Equation 4-1 is then used to calculate the required structure number (SN) at the top of the subgrade
(SN2) and base layer (SN1).
The required SN2 is equal to 6.93, while, SN1 is equal to 5.18. SN1 is obtained by using the MR of
the base layer as the input to the 1993 AASHTO equation.
The total thickness of the AC layer = SN1 * 2.54 / a1 = 5.18 * 2.54 /0.44 = 30.5 cm i.e. 31 cm. This
can be divided into 6 cm surface course and 25 cm base course. Then, actual SN1 = 5.37.
The thickness of the base layer = (SN2 – SN1)* 2.54 /a2 = (6.93 – 5.37)*2.54 /0.13 = 30.5 cm i.e. 35
cm. This can be divided into 15 cm granular base layer and 20 cm granular subbase layer.
Total SN = (31*0.44+35*0.13)/2.54=7.16, which exceeds the 6.93 required from the 1993 AASHTO
equation.
In case of using the CTB, a new SN1 could have been obtained to reduce the AC thickness.
However, in this example the AC thickness is kept the same at 31 cm, and makes the modification
in the base layer thickness.
The thickness of the base layer = (SN2 – SN1)/a2 = (6.93 – 5.37)*2.54 /0.24 = 16.51 cm i.e. 17 cm
of a CTB base layer.
Total SN = (31*0.44+17*0.24)/2.54 = 6.98, which exceeds the 6.93 required from the 1993 AASHTO
equation.
The AC cost will be the same since the AC thickness was kept constant. The cost of the 30 cm of
the aggregate base costs 50 AED per unit area. The cost of the 17 cm of CTB is 40 AED per unit
area. The total area of the project is 10 km with 4 lane road (10*1000*4*3.65 = 146,000 square
meter). Accordingly, the expected cost saving in only the initial construction cost is 10*146,000,
which is about 1.5 million AED.
Page 77
The M-E design requires the assumption of a pavement section before conduction the analysis. If
the assumed section satisfies the traffic requirement then the section can be used if it did not then
the layer thickness can be revised and the analysis should be rerun. Since the empirical example is
being used, then the design section from the empirical example will be used as the initial section for
the M-E example.
4.6.1 Climate
For the M-E design procedure the Mean Annual air temperature (MAAT) need to know to estimate
the WMAPT. The average WMAPT for Abu Dhabi Emirate is 43.5 °C. However for Abu Dhabi Island,
the MAAT calculated value in Table 2-2 is 30.6 °C and the WMAPT is 44.2 °C. The 43.5 °C will be
used for this example.
4.6.2 Materials
In the following section the modulus of each layer will be estimated using the models given for the
M-E design as explained in Chapter 3 of this manual.
Figure 4-10 4-10 shows the output file for the linear elastic analysis with the critical locations.
The strains obtained from the linear elastic analysis are then used in conjunction with Equation 4-7
for the permanent deformation and Equation 4-9 for asphalt fatigue cracking to calculate the
allowable number of load repetitions before failure.
Table 4-19 shows the critical strains from the analysis and the corresponding allowable number of
axle repetitions. The allowable axle repetitions are then compared to the expected traffic that is
Page 78
estimated at 41 million ESAL. From the table it can be seen that the assumed pavement section is
very safe and over designed. The most critical location is the asphalt fatigue cracking at the bottom
of the asphalt base course layer, with 100 million repetitions.
The difference between the empirical and M-E design can be related to the use of the actual stiffness
of each layer especially, the asphalt layer. In the empirical method the layer coefficient was the same
for both asphalt layers. While, the estimated modulus values from the nomographs gave a modulus
for the base course half of that for the surface course.
Smix Vb Strain N
AC Surface Layer 3000 8 4.74E-05 1,712,553,784
AC Base Layer 1800 7 8.92E-05 102,951,808
Subgrade 5.48E-04 404,913,284
Page 79
Figure 4-10: Linear Elastic Analysis Results for the M-E Example
Page 80
5 REHABILITATION DESIGN
5.1 Purpose and scope
This chapter provides methods and guidance for pavement design engineers to rehabilitate flexible
and rigid pavements. Pavement engineers shall ensure that designs are in accordance with the
client’s policies, procedures, standards, and guidelines, as well as good engineering practices.
Design procedures incorporated into this document are based on the 1993 AASHTO Guide for
Design of Pavement Structures (4) and the Guide to Pavement Technology, Part 2: Pavement
Structural Design (6) from Austroads. This manual applies AASHTO’s empirical design methodology
and Austroads’ M-E design methodology.
This chapter discuss flexible pavement rehabilitation and rigid pavement rehabilitation, with
descriptions on how to apply the empirical method and M-E method for each type.
This chapter also outlines overlays that designers can use to remedy functional or structural
deficiencies of existing pavements. A pavement’s deterioration can help designers determine
whether it has a functional or structural deficiency.
Functional deficiencies that adversely affect highway users include poor surface friction and texture,
hydroplaning and splash from wheel path rutting, and excess surface distortions (such as potholes,
corrugation, faulting, blowups, settlements, and heaves).
Structural deficiencies such as inadequate thickness, cracking, distortion, and disintegration, arise
from conditions that adversely affect the load-carrying capability of the pavement structure. Several
types of distress are not directly caused by traffic loads, but become increasingly severe under traffic.
Distress can become so severe that it detracts from a pavement’s load carrying capability.
Pavement rehabilitation sometimes includes the placement of maintenance overlays and surface
treatments that serve as preventive measures to slow the rate of deterioration.
• Availability of adequate funds for construction of the overlay. Funding is basically a constraint.
• Construction feasibility of the overlay, including the following factors:
- Traffic control
- Availability of materials and equipment
- Climatic conditions
- Construction problems such as noise, pollution, subsurface utilities, overhead bridge
clearance, shoulder thickness, and, in the case of limited right-of-way, side slope
extensions
- Traffic disruptions and user delays
Page 81
• Required future design life of the overlay. Many factors will affect the life of an overlay, such
as the following.
A designer shall consider all of these factors and specific site conditions to determine the suitability
of an overlay.
• Pre-overlay repair
• Reflection crack control
• Traffic loadings
• Drainage
• Rutting in AC pavements
• Milling AC surfaces
• Recycling existing pavement
• Need for structural or functional overlay
• Overlay materials
• Shoulders
• Durability of PCC
• Overlay joints for PCC
• Overlay reinforcement for PCC
• Overlay bonding and separation layers for PCC
• Overlay design reliability and overall standard deviation
• Pavement widening
• Potential errors and possible adjustments to thickness
Page 82
5.3.4 Drainage
Designers should evaluate the impact of drainage on an existing pavement to determine how
anticipated drainage will influence an overlay’s performance. An overlay’s performance can be
improved by reducing poor drainage and removing excess water, which improves base and subbase
strength by reducing erosion.
5.3.10 Shoulders
Overlays for shoulders should match any overlays for corresponding traffic lanes. To select the
thickness and material for an overlay on a shoulder, consider the amount of traffic that is anticipated
to use the shoulder and the shoulder’s condition. If a pavement is in good condition, designers may
limit shoulder rehabilitation to patching only deteriorated areas before overlaying the shoulder to
match the grade of traffic lanes. If a shoulder has severely deteriorated and patching will not be cost-
effective, rehabilitation crews shall remove and replace it.
Page 83
• An overlay and corresponding widening should have the same service life to avoid
rehabilitations at different times.
• Materials, thickness, reinforcement, and joint spacing for a widened shoulder should match
those of existing pavement, although a widened shoulder can have a shorter joint spacing.
• Crews should use deformed bars to securely tie and anchor a widened PCC section to an
existing PCC slab.
• Crews may place reflection crack relief fabric along a longitudinal widening joint.
• An overlay’s thickness should match that of the traffic lanes.
• Designers should determine necessary positions for longitudinal drainage.
• Pavement deterioration may be caused by factors that are not associated with traffic loads.
If a calculated thickness is less than or equal to zero, structural improvement is not needed.
For functional deficiencies, an overlay should have the least constructible thickness that is
still sufficient to remedy the problem.
• Designers may need to modify calculations to satisfy agency procedures, applying the
following typical inputs and outputs:
Page 84
• Uniform section approach: A designer divides a project into sections with relatively uniform
designs and conditions and considers each uniform section independently from others. A
designer obtains inputs for overlay design from each section to represent each section’s
average condition. Using each section’s mean inputs, a designer determines a single overlay
thickness for the entire length of each section.
• Point-by-point approach: A designer uses specific points along a uniform design section to
determine the overlay thickness, determining all of the required calculation input data for
each point. Factors such as deflection, thickness, and condition commonly vary from point to
point. This approach requires more effort for the design procedure, although field work for
both is relatively similar. Based on the point by point overlay thicknesses, a designer can
either divide the project into sections with different overlay thicknesses or determine one
thickness that is sufficient for use throughout the whole project. A designer may investigate
sections with high thicknesses to determine whether they warrant more extensive repair.
• Possible remedies for surface friction and hydroplaning include the following:
- For all pavement types, designers may use a thin overlay that is suitable for the level
of traffic to repair inadequate micro and macro texture in pavement through polishing
surfaces.
- For AC-surfaced pavement, milling may be necessary to remove the bleeding
material, prevent further bleeding through the overlay, and eliminate rutting caused
by poor friction. Designers may use an open-graded friction course or an overlay
thickness that is sufficient for the level of traffic.
- For AC-surfaced pavement, designers may need to take additional corrective action
to remedy rutting that has resulted from hydroplaning and wheel path splashing.
- For all pavement types, designers can correct long wavelength surface distortions,
heaves, and swells by levelling an overlay with various thicknesses.
- For AC-surfaced pavement, designers can repair deteriorated areas to their full
depths and apply a thicker AC overlay that integrates a reflection crack control
treatment to treat roughness from deteriorated transverse cracks, longitudinal cracks,
and potholes. Conventional overlays are only temporary remedies, lasting only until
cracks reflect through.
Page 85
• Refer to Table 5-1 for primary causes and solutions for rutting.
A designer may apply preventive overlays, such as thin AC and various surface treatments to a
pavement surface to slow the rate of deterioration. Preventative overlays are also options for
pavements with no current deformation, but for which deterioration is anticipated.
Designers require sound engineering knowledge and experience to ensure that overlay designs
address functional problems and prevent their recurrence. Refer to Chapter 8, Flexible Pavement
Maintenance, for more information on surface treatments.
Although there isn’t a specific method for evaluating structural capacity, effective capacity considers
the existing pavement in addition to how materials behave in the future. Client would recommend
one of the following three optional assessment measures to determine effective structural capacity:
These measures do not offer similar estimates due to the uncertainties involved; therefore, the
engineer should use all measures and chose the best estimate based on judgment.
Page 86
• A visual survey is the most important factor, starting with a review of all available information
regarding the design, construction, and maintenance of the pavement. Designers should
create a detailed inventory of the types, amounts, severity levels, and locations of distresses,
including the following main types of distress that indicate structural deficiencies.
• A drainage survey identifies moisture related problems in pavement and locations where
improvements need to be made for overlays.
• A coring and materials testing program identifies causes behind distresses and determines
material thicknesses and conditions. A testing program should determine how the existing
pavement compares with similar materials and how old and new materials will react.
NDTs offer the following analysis and functions for flexible pavement:
NDTs offer the following analyses and functions for rigid pavement:
Page 87
Designers may also use NDTs to quantify variability along a project due to deflection, and to divide
the project into smaller sections of similar structural strength. Back calculation enables designers to
estimate resilient modulus values for different pavement layers.
Designers can use the following equation to obtain a pavement’s effective structural number.
SNeff = a1 * D1 + a2 * m2 * D2 + a3 * m3 * D3
Where
NP
RL=100 [1- ( )]
N1.5
Where
SCn
CF=
SCo
Where
SNeff =CF*SNo
Page 88
Where
A designer can use pavement design equations or nomographs, as described in Chapter 4, New
Pavement Design, to estimate N1.5, remaining life. AASHTO recommends 1.5 failure present
serviceability index (PSI) and 50% reliability (4). When a pavement has a negative remaining life
(the traffic to date, NP, exceeds the expected traffic load for failure, N1.5), an engineer shall either use
a minimum value of 0.5 for CF or discard use of the remaining life approach. Errors have the following
main sources.
If either of the following two tremendous faults arises, designers must account for them in further
calculations:
• A pavement with a short or negative calculated remaining life exhibits only minor distress
caused by traffic load.
• A pavement with a high or very high calculated remaining life exhibits moderate to severe
distress caused by traffic load.
• Laboratory testing
• NDT back calculation
• Estimation from resilient modulus correlation studies
• Original design and construction data
Values for a pavement’s subgrade should be consistent regardless of the method used. Because
values obtained by back calculating are relatively higher, designers must adjust the SNf value to be
more conservative to avoid poor overlay performance.
0.24P
Mr =
d*r
Where:
Equation 5-6 uses an adjustment factor, C, which is required if the backcalculated value is less than
0.33.
0.24P
Design Mr =C ( )
d*r
AASHTO road tests used a subgrade Mr value of 3000 psi, because it was consistent with laboratory
tests of soil samples in the site (4). However, data from those tests illustrates that soil is stress
dependent and rapidly increases for deviator stresses less than 6 psi. A subgrade deviator is almost
always less than 6 psi, resulting in a subgrade’s Mr being much higher than 3000 psi. Back
calculation of Mr values from deflection data and Mr values from laboratory tests confirm AASHTO’s
findings. Back calculated Mr values are at least three times higher than Mr values from laboratory
tests.
5.5.1 Feasibility
AC overlays are not effective to resolve the following conditions:
• Large quantities of highly severe alligator cracking (which requires the complete removal and
replacement of the existing surface)
• Excessive surface rutting caused by insufficient stability of existing materials
• Grave deterioration of an existing stabilized base, which requires extensive repair to obtain
uniform support
• Infiltration and contamination of a soft subgrade, which requires removal and replacement of
an existing granular base
• Stripping in a pavement’s existing AC surface, which should be removed and replaced
Page 90
• Crack relief layers thicker than 3 inches can controls reflective cracks under greater
movements.
• Sawing and sealing joints in an AC overlay can control straight cracks in the underlying AC.
• Increasing the thickness of an AC overlay reduces bending, shearing, and temperature
variations in existing pavement.
Page 91
Where:
Designers shall take the following steps to estimate the required thickness of an overlay:
1. Evaluate the existing pavement design. Collect the thickness, material type, and subgrade
soil information from construction records and reports for the existing pavement.
2. Analyse traffic. Estimate the past ESAL in the design lane to determine remaining life, in
accordance with the method as explained in section 5.4.3.3, Structural capacity based on
remaining life. In addition, predict the future required ESAL as explained in Chapter 2,
Pavement Design Components.
3. Conduct a condition survey. Survey the existing pavement to record different distress types
and their severities. Refer to Chapter 8, Flexible Pavement Maintenance, for more details on
pavement distresses.
4. Perform deflection testing at uniform intervals of 200 meters along the pavement to assess
the extent of deterioration in the existing pavement structure. Use FWDs. Apply the results
of deflection testing to back calculate the modulus of the existing layers.
5. Perform material core tests. Take core samples of existing pavement to assess the extent
and type of cracks in the AC layer. If you did not perform deflection testing (as instructed in
step 4), use samples from the subgrade to obtain the pavement’s CBR, which yields the
modulus of the subgrade, as described in Chapter 3, Pavement Materials.
6. Determine the pavement’s future structural number, using the following parameters:
- Effective subgrade modulus, which can be estimated either from sample testing,
deflection testing, or soil information
- Future traffic (as determined in step 2)
- Loss in present serviceability index (PSI), as described in Chapter 4, New Pavement
Design.
- Design reliability, as described in Chapter 4, New Pavement Design.
- Overall standard deviation (So), with a value of 0.45, as described in Chapter 4, New
Pavement Design.
After collecting these inputs, obtain the pavement’s future structure number (SNf) either by
solving the AASHTO equation or by using the flexible pavement nomographs shown in
Chapter 4, New Pavement Design.
Page 92
7. Determine the pavement’s effective structural number (SNeff), as explained in section 5.4.3,
Structural evaluation of existing pavement, either from non-destructive testing, a condition
survey, or calculation of remaining life.
8. Determine the overlay’s required thickness, using Equation 5-8, applying the appropriate
values from previous equations in this chapter.
Austroads’ GMP assumes that existing asphalt layers are completely cracked and have no remaining
fatigue life. Using the GMP, designers only consider fatigue cracking of the overlay layer in their
analyses.
Overlay design uses the following performance criteria, which are the same as those used for new
pavement design:
• Designers evaluate tensile strains occurring under a standard axle load at the base of the
proposed asphalt overlay to predict asphalt fatigue.
• Designers evaluate vertical compressive strains at the top of a subgrade under a standard
axle load to predict permanent deformation.
Overlay design requires knowledge of parameters such as the amount of traffic the pavement was
designed to support, past traffic, and design life, as described in Chapter 2, Pavement Design
Components. These parameters are similar to those needed for new pavement design. Overlay
design also requires the original modulus for the existing pavement materials and subgrade, which
designers can back calculate from deflection testing. An overlay shall resist fatigue cracking and
reduce permanent deformation in a pavement.
A designer shall divide a stretch of pavement over which overlay will be applied into homogenous
sections with relatively uniform deterioration levels and strengths. Designers can use deflection data
to identify these sections and to calculate the modulus of existing pavement layers.
Austroads’ GMP requires that designers know the structural composition and conditions of existing
pavement, which designers can obtain from construction records and reports or pavement
investigation. An existing layer’s design modulus will differ from that of a new asphalt layer, because
traffic and environmental effects have caused it to deteriorate. Accordingly, the design modulus of
an existing asphalt layer shall not exceed 700 MPa, based on the average WMAPT temperature
(43.5 °C) for Abu Dhabi Emirates.
After determining all the required parameters, a designer shall use a trial overlay thickness, in
accordance with the process explained for flexible pavement in Chapter 4, New Pavement Design,
Page 93
to determine the allowable number of standard axle repetitions for each distress mode. Comparing
the allowable axle repetition to the design traffic loading, a designer then decides whether to accept
the design or, if the allowable traffic loading exceeds the design, to revise the design with a new
overlay thickness.
In the UAE, rigid pavements have been used mainly for airports, not for highways. Therefore,
designers in the UAE do not need a detailed methodology for rigid pavement overlay design.
Regardless, this section provides some details on rigid pavement overlays, with references to
international manuals.
This section provides details for one empirical method and one M-E design method.
1. Conduct a base data inventory. Collection and collate road inventory data, data on the
pavement’s construction, and a maintenance history from secondary sources.
2. Gather the following pavement information:
3. Perform traffic surveys to obtain classified traffic volume counts, the spectrum of axle loads,
roadside development, and growth potentials.
4. Evaluate pavement for the following functional characteristics:
6. Design and formulate a strategy, including cost economics, prioritisation, and the following
elements:
Page 94
- A pavement condition table (showing remaining life versus current condition) for
homogeneous sections
- An alternative rehabilitation programme for each homogeneous section that defines
an appropriate approach for each section (whether preventive maintenance,
corrective maintenance, repair, or complete reconstruction)
- A cost estimate for each programme
- A strategy formulation and least cost proposals
- Scheduling for alternative strategies
- Economic and financial analyses of strategies
- A priority strategy for each homogeneous section
a. After implementing the selected strategy, evaluate pavement for operation in all
weather conditions.
b. Assess increase in net asset value and reduction in vehicle operation costs.
c. Conduct a road user satisfaction survey (feedback) for the quality level of service and
increased revenue due to Pavement Management Systems (PMS) implementation.
d. Compile data for research and development after the implementation of the strategy.
5.6.1.1 Definition
Pavement definitions for rehabilitation projects are the same as those listed in Chapter 4, New
Pavement Design, and as referenced in AASHTO’s 1993 Guide for Design of Pavement Structures
(4).
Each proposed rehabilitation method shall comply with AASHTO’s 1993 Guide for Design of
Pavement Structures (4), especially chapter 5, Rehabilitation Methods with Overlays, and the
following clauses:
Designers can use Equation 5-9 to determine the overlay thickness required to increase a
pavement’s structural capacity sufficiently to carrying future traffic.
Page 95
Dol = Df – Deff
Where:
For a detailed method to determine rehabilitation overlay thicknesses, refer to AASHTO’s 1993
Guide for Design of Pavement Structures (4), especially clause 5.8: Bonded Concrete Overlays of
JPCP, JRCP, and CRCP in chapter 5, Rehabilitation Methods with Overlays.
Depending on the condition of a pavement’s existing PCC layer, rehabilitation can combine
mechanical and chemical bonding methodologies. Bonded overlays may suffer heavily if adequate
pre-overlay repair is not performed to the existing PCC pavement.
Designers can use Equation 5-10 to determine the thickness that an overlay requires to increase a
pavement’s structural capacity for carrying future traffic.
Where:
For a detailed method to determine rehabilitation overlay thicknesses, refer to AASHTO’s 1993
Guide for Design of Pavement Structures (4), especially clause 5.9: Unbonded JPCP, JRCP, or
CRCP Overlays of JPCP, JRCP, and CRCP, in chapter 5, Rehabilitation Methods with Overlays.
Unbonded rehabilitation requires a separation layer between the existing and new overlays.
Materials in the separation layer should prevent the transfer of reflective cracking from the exiting
PCC to the new PCC.
Page 96
Chapter 4, New Pavement Design, for details. Designers need to know the condition of an existing
pavement to decide which type of concrete overlay to use.
• Traffic loads for which the existing pavement was designed, as described in Chapter 3,
Pavement Materials, expressed in terms of heavy vehicle axle groups and axle group
distribution.
• Minimum subbase requirements with an asphalt modulus, per design, of 2,000 MPa at the
WMAPT and design speed. If an existing subbase does not meet the minimum requirement,
rehabilitation requires the addition of a 50 mm correction layer of dense graded asphalt.
• An equivalent CBR, per design, for the subgrade, treating existing pavement layers below
the AC layer as part of the subgrade. Designers can use Equation 5-11 to calculate an
equivalent CBR for existing layers in any 100 m section of a homogenous pavement.
3
∑i hi CBR0.333
i
CBRm = [ ]
∑i hi
Equation 5-11: Equivalent subgrade CBR for homogenous 100 m pavement section
Where:
• A rigid overlay must combine any layer with thicknesses less than 200 mm with an adjacent
layer, adopting the lower CBR value for the combined layer.
• Use materials with higher CBR ratings in the upper layers. Do not apply Equation 5-11 if
weaker layers reside in the upper part of a subgrade.
• Include filter layers in the calculation.
• Equation 5-11 has a maximum CBR of 20%.
Calculating the required thickness of a concrete overlay in accordance with figures given in Chapter
4, New Pavement Design, requires knowing a pavement’s equivalent design subgrade strength and
effective CBR.
If the existing pavement is in good condition with few or no cracks, the existing slab can serve as a
subbase for the new overlay. Such an overlay design shall follow the same method as new rigid
pavement design, as explained in Chapter 4, New Pavement Design.
Page 97
Page 98
6 LOW-VOLUME ROADS
6.1 Introduction
A low-volume road (LVR) has relatively low amounts of traffic that travel at low speeds. Most roads
in rural areas are LVRs. A LVR in the right location, based on a good plan and design, with effective
construction and maintenance is essential for community development, the flow of goods and
services between communities, and management of resources. Roads and road construction,
however, can create significant soil erosion. Proper planning and design of a road system minimize
adverse impacts to water quality. Poorly planned road systems can have high maintenance and
repair costs, contribute to excessive erosion, and fail to meet the needs of the communities they
support.
This chapter describes types of LVRs and design considerations as applicable to conditions in Abu
Dhabi. Other types of LVRs, such as rigid pavement LVRs, are not applicable to Abu Dhabi.
1. Flexible pavements
2. Aggregate-surfaced roads
Selecting one of these types of roads for a particular project requires assessing several factors,
including traffic volume, land use, traffic speeds, and traffic loads.
Designs for LVRs shall be based on standards in the AASHTO Guide for Design of Pavement
Structures, 1993 (4), and the specifications in Chapter 4, Pavement rehabilitation. Designers can
refer to design charts in Appendix B and alternative design catalogues to simplify the design process.
In urban areas, local roads in residential communities are considered to be LVRs. Such areas need
sections of asphalt concrete pavement or sealed pavement to make driving and riding comfortable.
In rural areas, sections of unsealed pavement are sufficient.
Page 99
5, Rigid Pavement Design. A LVR shall support a minimum ESAL of 10,000. Refer to Chapter 2,
Pavement Design Components, for traffic volume estimation details.
Roads and streets with low-volume traffic suffer pavement distress more from environmental affects
than from traffic loading. Regardless of the sources of distress, however, a pavement’s structure is
critical. Even with low traffic volumes, a road with inadequately designed and constructed pavement
may suffer premature distress.
6.2.5 Reliability
LVR designs shall apply low reliability percentages. Refer to Chapter 4, Pavement Rehabilitation, for
reliability specifications for different road categories. Roads with low traffic volumes have a reliability
factor of 50%. Designs for roads that require higher reliability should follow the procedures listed in
chapter 4 as regular roads.
• Traffic loading (which encompasses the number of vehicles and types of vehicles in regard
to their number of axles and the resulting stress caused by the contact of their tires with
pavement)
• Climate
• Pavement configuration, cross-section, and drainage
• Whether the intended use is base or subbase
• Strategic importance of the road
For example, marginal or non-standard materials can more successfully be used for LVRs in dry
environments than roads with high traffic volumes in wet environments. Pavement designs shall use
such materials only after designers have carefully considered the following criteria:
Page 100
Designers shall obtain advice from specialists regarding appropriate laboratory characterizations
procedures for non-standard materials. Marginal or non-standard materials are generally less stiff
(that is, they have lower modulus) and are less durable than standard granular materials. In addition,
because the stiffness and strength of a non-standard material are usually more sensitive to moisture
content that standard materials, non-standard materials must be thicker than standard materials to
provide equivalent subgrade protection. Although both standard and non-standard materials exhibit
similar degrees of rutting, the use of the non-standard materials may result in greater rutting of the
pavement materials under traffic loading. Therefore, controlling moisture entry into these pavements
is a significant design consideration.
The surfaces of pavements with thin bituminous surfacing need higher quality materials. For LVRs
base and subbase, the minimum CBR required is 65%.
Asphalts for LVR are generally more flexible and durable and less permeable than those for heavier
traffic applications. These properties make such asphalts useful in thinner layers on more resilient
pavements and less likely to compact after construction, but make them more susceptible to common
distress modes of cracking and ravelling, which are related to the oxidation of the binder rather than
vehicle loads.
Asphalt mixes for light traffic applications generally have a lower air void content than asphalts for
more heavily trafficked applications. For Abu Dhabi, designers shall follow the general specification
for asphalt concrete mixture design with the air voids closer to the lower value of the given range.
Rural roads require maintenance during active use, after periodic operations have been completed,
and after major storm events to ensure that the drainage structures are functioning properly. Heavy
rainstorms cause cut slope failures that block ditches, water flow on road surfaces, and erosion to
road surfaces and fill slopes. Debris that moves down natural channels during heavy rains can block
Page 101
drainage structures, causing water to overtop the road and erode the fill. Ruts, washboards, and
potholes in the road surface will pond water, weaken the roadway structural section, accelerate
surface damage, and make driving difficult. All roads need routine maintenance to remain
serviceable with properly working drainage systems. A well-maintained road will reduce road user
costs, prevent road damage, and minimize sediment production.
Refer to Chapter 8, Flexible Pavement Maintenance, for maintenance details, including methods to
repair damaged asphalt surface roads. Maintenance methods outlined in chapter 8 include patching
and surface sealing techniques, such as micro surfacing, fog sealing, and chip sealing.
For a road with an aggregate surface, routine maintenance can involve compacting the surface to
regain level surface, patching potholes, and reapplying surface stabilization treatments.
For many years, gravelling has been the preferred option for surfacing when upgrading from earth
roads. Natural gravel materials are usually excavated from borrows pits or quarries and hauled by
trucks to be laid on the previously shaped formation or road surface. A gravel road surface can be
appropriate and cost effective in many specific circumstances, including the following:
• Sufficient quantities of gravel are available that meets the required surfacing specifications
• Haul distances are relatively short
• Rainfall is low or moderate
• Traffic is relatively low
Even for sections of AC pavement, it is sustainable to use minimum AC pavement section, which is
totally controlled by construction factors and is usually used in residential development communities.
Using surface stabilization treatments, such as cement or asphalt, reduces the environmental impact
of dust and air pollution. Surface treatments increase the life of a road and reduce the amount of
maintenance that is required over its life span.
LVRs can also use sustainable materials such as recycled aggregate material that can be used for
base or subbase layers or stabilized aggregate surface layers.
For flexible LVRs, designers shall use the empirical design method described in AASHTO’s Guide
for Design of Pavement Structures, 1993 (4), with the following parameters:
1. Calculate the expected traffic volume (ESAL), as described in Chapter 2, Pavement Design
Components, for the pavement’s design life.
2. Obtain the CBR for the subgrade as described in Chapter 3, Pavement Material
Characterization. LVRs require a minimum CBR of 10%.
3. Use AASHTO’s design chart for flexible pavement design to estimate the required SN. Refer
to Appendix B for this chart.
4. If the SN is less than 2, use a value of 2.
5. Obtain the layers thicknesses, applying the SN equation.
6. For proper construction, asphalt layers for LVRs should be at least 60 mm thick.
For the minimum SN of 2, given a minimum asphalt thickness of 60 mm, a LVR’s granular base layer
should be at least 200 mm thick. Figure 6-1 shows a cross section diagram of flexible pavement for
a LVR.
Asphalt Surface
Aggregate Base
Prepared Subgrade
Page 103
Designs for aggregate surfaced roads comply with the LVR design catalogue in AASHTO’s Guide
for Design of Pavement Structures, 1993 (4). Roads with aggregate surfaces require CBRs that are
not less than 50% for their aggregate layer.
Three levels of traffic levels (in ESALs), as follows, apply for aggregate surface roads:
Based on good quality subgrade, with a CBR of 10%, and dry climate such as in Abu Dhabi,
aggregate surface layers require the following thicknesses:
Figure 6-2 shows a typical cross section of an aggregate surface for a LVR.
Aggregate Base
Prepared Subgrade
Maintenance crews can stabilize aggregate surface using lime, cement, or asphalt to get the
following benefits:
For more details on cement stabilization, refer to Chapter 3, Pavement Material Characterization. A
single chip seal or double chip seal application can stabilize asphalt, providing a good surface for a
higher ride quality. Refer to Chapter 8, Flexible Pavement Maintenance, for details on chip seal
application.
Page 104
7 DRAINAGE DESIGN
7.1 General considerations
Design engineers provide stormwater management for road projects for the following reasons:
1. Stormwater management for road projects is important from a traffic and public safety
standpoint. Removal of stormwater:
• From traffic pavement Is imperative for vehicular safety
• From pedestrian pavement is important for maintaining public access
• Is important to help minimize potential public health and nuisance elements of
standing water
2. Road facilities must consider the effects of ground water and provide for the proper collection
and removal of it wherever:
• Subsurface water levels or flow may cause damage or reduced life to the pavement
and the associated structures
• High groundwater levels cause detrimental effects upon the adjacent landscaping, an
important aspect of the roadway corridor.
The storm water and subsurface drainage designs shall be performed in accordance with the criteria
and requirements included in the DMAT Storm Water and Subsurface Drainage Manual (21).
Drainage facilities must be designed to convey the water across, along or away from the roadway in
the most economical, efficient and safest manner without damaging the roadway or adjacent
properties. Furthermore, care must be taken to ensure that the roadway construction work do not
interfere with or damage any of these facilities.
Manholes / covers must not be designed within the road limit, and if a must it should not be under
the wheel track but in the middle of the lanes.
Design engineers shall also incorporate the Owner’s sustainability goals by protecting and
preserving natural resources and other environmental assets, as well as its citizens’ health and
safety.
These goals are integrated with other vital interests entrusted to the Owner including the cost-
effective delivery and operation of transportation systems and services that meet public needs.
1. Surface water: Rainfall on the pavement is removed by providing suitable pavement cross
and longitudinal slopes, where the pavement runoff is either allowed to sheet flow off of the
shoulder (typical for non-kerbed rural roads) or collected by a system of gutters, inlets, storm
Page 105
drains and ditches for delivery to an suitable outfall. Hydraulic design of this collection and
conveyance system is done in a balanced way such that the overall system provides the
necessary capacity for the “design” storm. Design storm is the amount of precipitation that
has been determined as a minimum amount that should be removed from the driving lanes
for safety of the traffic and is described by its statistical chance of occurring (i.e. 10-yr storm)
as predicted from analysis of long term rainfall records.
Surface drainage design is based on the science of hydrology and hydraulics and is usually
performed by engineers with speciality experience. Design engineer shall follow the detailed
requirements and criteria listed in Chapters 3 and 4 of the DMAT Storm Water and
Subsurface Drainage Manual (21).
2. Ground water: Ground water is a particular problem for the pavement design engineer.
Saturation of pavement bases and subgrades soften and reduce the strengths of the various
pavement structure materials. This and a phenomenon called “hydraulic pumping” will lead
to the rapid deterioration of the pavement structure. Hydraulic pumping occurs when wheel
loads slightly depress the pavement creating a localised increase in hydraulic pressure in the
saturated layers. This causes surges of flow within the pores and voids of the pavement and
base courses. This repeated hydraulic pumping moves the material particles, which causes
voids and delaminates the various layers. Results of saturated pavement are a shortened
pavement life with loss of pavement foundation support and ultimately cracking and potholing
of the pavement surface.
Accordingly, the bottom of the pavement aggregate base courses should be located above
high water table levels or systems provided to drain the pavement structure. High water levels
become a concern where:
• Soil investigations may identify seasonal or permanent high ground water levels.
These conditions often occur along the Emirate’s low elevation coastal areas (tidal
influence), in sabkha soils and where underlying impermeable soil strata trap the
rainfall.
• Existing or project developed landscape irrigation may saturate the soil adjacent to
the pavement with excess irrigation, filling the voids of the pavement base layers.
• Project road drainage will collect and convey runoff flows, such as in ditches and
culverts, which may cause a water surface that is higher than the pavement layers,
thus saturating them.
• Rainfall drains into the underlying pavement layers and if it becomes trapped by the
compacted and low-permeable subgrade, it will saturate the material voids in the base
and asphalt layers.
Drainage collection and conveyance systems are designed to maintain a maximum safe
water surface elevation below the existing or proposed pavement base level by a minimum
clearance. This clearance is required to mitigate the effect of soil capillary rise between the
free water table surface and the bottom of the pavement structure. This maximum high water
level is sometimes called design high water (DHW).
Page 106
Maintaining the DHW is achieved by constructing the pavement to appropriate elevations, providing
roadside and/or median ditches, or providing subsurface drainage systems per the following
summaries:
In general, roadside or median ditches are relatively shallow trapezoidal channels located
along the pavement area to collect runoff from the roadway. They are designed to handle
local surface runoff from roadway surfaces and/or to lower water table elevations by
intercepting groundwater. Typically, the design of the pavement aggregate base courses will
allow groundwater to drain freely to the roadside ditches.
Roadside ditches are sized to maintain the design water surface below the road base course
level. The roadside ditch is also designed to operate at stable velocities for the peak design
storm flows, discharging to a main channel or storm drain at the outlet.
Storm drain systems consist of a series of drain pipes connecting various surface inlets, catch
basins, and manholes for collecting pavement area runoff and conveying it to a suitable
outfall. Most urban area roadways with kerb and gutters will require storm drainage systems,
which are also used on embankments, such as approaches to bridges, to protect the side
slopes from erosion.
3. Subsurface drains:
The main purpose of subsurface drains is to control water saturation of the pavement base
courses, fills behind walls, and reinforced earth fills. Subsurface drains are also used to
maintain the groundwater surface at a level that allows for the proper root growing depth of
landscape plantings.
Subsurface drains consist of a system of perforated pipes usually buried within a bedding
and surround of uniformly graded, free draining aggregate, all wrapped in a geotextile fabric
filter material. Subsurface drains will typically outlet to either a roadside ditch or into a storm
drain system structure, as appropriate for the situation.
Subsurface discharge depends on the effective hydraulic head and the permeability, depth,
slope, thickness, and extent of the soil layers. Solving subsurface drainage problems often
calls for specialised knowledge of geology and the application of soil mechanics. The
designer should refer to the project geotechnical engineering reports regarding geological
and soil parameters.
General requirements for subsurface drainage are discussed in the following subsections. The
design engineer shall follow the detailed requirements and criteria listed in Chapter 4 of the DMAT
Storm Water and Subsurface Drainage Manual (21).
1. Subsurface drains for roadways are provided where the pavement aggregate sub-base
layers immediately above the subgrade level have no free outlet to the side of the road cross
section. This applies to roads built on low permeability soils or with high groundwater tables
and is particularly applicable to kerbed roadways in an urban setting.
2. Subsurface drains are placed at locations and depths required to intercept groundwater
flowing horizontally into the roadway embankment prism.
3. Subsurface drains are placed at depths and locations to maintain the free groundwater at a
level below the pavement subgrade elevation and/or to provide for landscaping root depth.
4. Subsurface drains are used as hydrostatic pressure relief drains located at the toe of backfill
behind retaining walls and face of mechanically stabilised earth fills. Structural designer
usually provides the design; however, the roadway or drainage design engineers will need to
coordinate the location of the drain outlet for proper discharge. For the design of this type of
subsurface drain, refer to DMAT Road Structures Design Manual (10).
Subsurface drains will typically be placed where there are groundwater issues along the following:
Depths of the subsurface drains will be such that the precipitation runoff entering the pavement sub-
base layers will rapidly drain out to the low point subgrade level immediately after the storm has
ceased. For locations requiring subsurface drainage interception, or areas having a high water table,
the subsurface drain level should be such that the free groundwater is maintained below the
pavement subgrade level. A minimum clearance depth is also need to minimise saturation due to
soil capillary action (fine grain and sabkha soils are more prone to this condition).
Ground water and stormwater surface elevations in culverts and roadway side ditches (includes any
potential adjacent-to-roadway ponding conditions) shall be no higher than the roadway edge of
pavement elevation, minus the pavement layer and aggregate base coarse layer thickness, minus
0.3 metres. All stormwater and ground water drainage facilities shall be design to maintain this
minimum clearance below the pavement subgrade level, for roadways in both cut and fill section.
These subsurface drains for groundwater control may also need to address the dual purpose of
protecting landscaped areas by placing them to a depth below the required root zone as specified in
DMAT Road Landscaping Manual (22).
Subsurface drainage systems can be classified in terms of their location and geometry, typically
divided into the following five distinct types:
• Interceptor drains
• Longitudinal edge drains
• Transverse and horizontal drains
• Permeable bases
• Deep drains
Page 108
Each type may be designed to control several sources of moisture and may perform several different
functions. In addition, the different types of subsurface drainage systems may be used in
combination to address the specific needs of the pavement being designed. The need for, and design
data for, placing these subsurface drains shall be addressed as part of the geotechnical investigation
of the project corridor. Various types of subsurface drains are described in more detail as follows:
1. Interceptor drains:
Also known as trench drains, this system primarily intercepts horizontally moving
groundwater and is generally used at the following instances:
Depth is such as to intercept the groundwater flow to the bottom of the soil layer that is flowing
water, or to the base course clearance level described in Figure 7-1.
2. Edge drains:
Edge drains are provided along the low edge of pavement, just below the subgrade level, to
provide an outlet for water in the pavement base courses. A more recent form of the edge
drain is the permeable geo-composite edge drain (PGED), also known as fin drains. They
consist of a synthetic collector encapsulated within a geo-synthetic filter material, and offer
advantages such as economy, narrow trenches, speed, and ease of construction. Several
examples of pavement edge drains are shown in Figure 7-2.
Page 109
Sometimes called herringbone or pattern drain layouts, these pattern systems primarily
reduce a high groundwater level to an acceptable level. They are typically used in flat terrain
having either a permanent or seasonal high groundwater table and are usually installed below
the roadway prism. Placement is to a depth that maintains the free water surface below the
base course clearance levels. These may also be used in landscape areas to control high
groundwater due to excess precipitation and irrigation with low underlying soil permeability.
Page 110
This system is a permeable aggregate course laid over the top of the prepared roadway
subgrade. A layer drain acts as a permeable filter and intercepts surface water that seeps
through the road surface. Generally, a geo-synthetic filter fabric is placed at the interface
between the permeable layer — including sand, gravel, or aggregate — and the subgrade to
prevent intermixing of two dissimilar materials. Oftentimes the lower layer of the aggregate
base course will act as this layer, providing a flow path for water to outlet to the lower edge
of the pavement subgrade.
These types of drains are similar to the trench drain described in Item 1. They are generally
located along the low edges of pavement in areas of high water table at a depth to control
the free water surface at the required roadway base clearance. They can also be placed
along landscape areas in the medians or side of the road to maintain the water table below
the plant rooting depth.
A typical subsurface drainage system consists of perforated pipe, uniformly graded aggregate pipe
bedding or surround, and a filter fabric. Pipe materials generally used are high-density polyethylene
(HDPE) and PVC. Pipe perforations should be such that the smaller sized particle of the aggregate
material should be larger than the largest size openings, slots, or perforations of pipes.
Filter fabric is required in any permanent subsurface drainage system to prevent fine soil particles
from washing into the system. The overall installation consists of a uniformly graded gravel bedding
and backfill (pipe surround) wrapped fully in a fine grade geo-textile filter fabric. Filter and perforated
pipe surround must be more permeable than the surrounding material to convey water from the
adjacent soil to the pipe.
1. Review the geotechnical site investigation reports regarding project groundwater issues.
2. Prepare the surface drainage design as appropriate for the project. Keep in mind where the
surface drainage system may have to act as an outlet for any required subsurface drains.
Page 111
3. Select the subsurface drain type to match the groundwater condition. Generally, there are
three basic groundwater conditions:
a. Groundwater with hydraulic gradient less than the slope of the ground: Typical
observations are wet patches or visible outflows on the side of the cut. Interception
drains are usually required for these situations.
b. Groundwater that is too close to the surface: Generally observed by collapsing wet
spots in flat areas or landscape plant loss. The geotechnical report should identify the
permanent or seasonal water levels. Layer drainage coupled with deep drains or
trench drains along the low-side edges of pavement are usually required for this
condition.
c. Water trapped in the pavement aggregate base course: Provide side of road ditches,
longitudinal under drains or pavement edge drains along the low-side base course
will provide an outlet for trapped water. This condition is typical of urban conditions
with kerb and adjacent paved surfaces. It can also occur at widened areas where the
pavement structure design is shallower than the original ground surface. Problems
also occur where fill has been placed at the edge of the roadway fill embankment
such as often done for agricultural planting or for adjacent to roadway developments.
5. Identify cut-fill lines and locate the transverse drains. Select appropriate locations for
subsurface drains, including location of outlets. Where the storm drain system structures are
used as outlets for the subsurface drains, the design water surface in the storm drains shall
be lower than the invert of the subsurface drain pipe so backflow does not occur.
6. Size the subsurface drain lines in accordance with hydraulic principles. Refer to Sections
4.5.3 and 4.5.4 of the DMAT Storm Water and Subsurface Drainage Manual (21) for criteria
and requirements of designing subsurface drains.
If the roadway is over saturated with fine grained embankments, the height of the capillary rise should
be calculated to ensure that the excess water does not enter the pavement layers. As can be
expected, the finer the soil, the greater the capillary effect and rise. Gravels are so coarse that there
will be negligible capillary effects. Clays have the most capillary rise, which can be a few millimetres
in sands to several metres in clays.
Design methods and criteria used to control groundwater free water surface are discussed in
Sections 4.5.3 and 4.5.4 of the DMAT Storm Water and Subsurface Drainage Manual (21).
The pavement is widened and/or shoulders added; however, the design pavement section
may not be the same thickness as the original pavement. In the case where the widened
pavement section is different than existing, water in the aggregate base course may be
trapped depending on the layer thicknesses and the cross slope direction. For this case, a
subsurface sub-base drain should be constructed. Refer to Figure 7-5 for a typical example.
This condition can occur for both pavements widened to the outside or to the inside
depending on the pavement cross slope direction at the widened locations.
2. Providing drainage for rural roadways that have been filled and landscaped:
Many older roadways in the Emirate were constructed as a fill section where the drainage
was designed to simply sheet-flow off the shoulder down the fill slope. However, later, many
of the sides and medians of these roads were backfilled with sweet sand, planted, and
irrigated. This causes the following problems:
• Roadway surface runoff has no place to drain, so it ponds on the road pavement
during periods of rain.
• Any water in the pavement layers is trapped and cannot drain rapidly.
• Excess irrigation and precipitation raises the groundwater in areas of low permeability
and/or otherwise high water table to a level where the base course may be saturated.
Page 113
Figure 7-6: Typical example of agricultural fill blocking the pavement surface and subbase
drainage
During pavement rehabilitation, an alternative solution for providing drainage in these areas
is to create a shallow swale at the edge of pavement shoulder. The swale should have a
gravel-type surfacing at least 200 mm thick. A trench drain should be constructed under the
swale, along the edge of low-side pavement. Combination of the gravel surfacing and
uniformly graded aggregate surround around the subsurface drain pipe will allow for the rapid
infiltration and removal of the stormwater runoff. Refer to Figure 7-7 for a typical example.
The bottom of the subsurface drain pipe should be placed to a depth that not only assures
the pavement base course will rapidly drain, but also that the groundwater surface is
maintained below the minimum DHW clearance level, or to a depth required for maintenance
of the landscape plant root zones, whichever is lower.
Figure 7-7: Method for providing pavement drainage where edge of rural roadway has been
backfilled and landscaped – typical section
Pavement rehabilitation designs should consist of all work necessary to renew the roadway
for the desired life span. The design engineer will need to investigate the existing stormwater
drainage and groundwater problems and include repair of any deficiencies in the
rehabilitation design.
The required remedies for drainage and groundwater issues will depend partly on the type of
rehabilitation project, such as widening, simple resurfacing, total reconstruction, changing
type from rural to urban with kerbing, etc., and the type of historical drainage or groundwater
problems. For example, where widening involves the revision of a roadway from a rural
section, such as a shoulder with sheet flow drainage, to a kerb and gutter section, then the
provision of new edge drains would be appropriate for rapid drainage of water that may now
be trapped in the pavement base courses. This type of sub-base drainage would also need
Page 114
to be supplemented with a new stormwater system, including kerb inlets and storm drain
pipes, which also act as the outlet for the subsurface edge drains.
Page 115
8 PAVEMENT MAINTENANCE
8.1 Introduction
This chapter provides guidelines for the selection of consistent, cost-effective, and efficient
maintenance strategies to ensure uniform, high-quality maintenance practices. Numerous factors
such as expected service life, traffic, weather, soil type, availability of equipment and crews, etc.,
need to be considered in the selection of the right preservation treatment at the right time to the right
pavement.
Please refer to Chapter 11 for details on pavement evaluation data collection and analysis that
included function and structural condition surveys. This chapter presents an overview of the purpose,
concepts, benefits, and optimum timing for pavement preservation and treatments based on the
decision matrix.
8.1.3 Definition
Pavement preservation is a program that enhances pavement performance by using an integrated,
cost-effective set of practices to extend pavement life, improve safety, and meet motorist
expectations. A pavement preservation program consists primarily of three components: preventive
maintenance, corrective maintenance, and emergency maintenance. A pavement preservation
program does not include pavements that require major rehabilitation or reconstruction.
Preventive maintenance is the most cost-effective preservation program that addresses pavements
while they are still in good condition and before the onset of damage. By applying a cost-effective
treatment at the right time, the pavement can be restored almost to its original condition.
Page 116
Figure 8-1 shows the timing of different maintenance treatments, and Figure 8-2 shows the benefits
of maintenance treatments in extending pavement service life. Both figures are excerpts from the
Nebraska Department of Roads Pavement Maintenance Manual (23).
Page 117
DMAT is currently working towards integrating PMS into the pavement preservation program, which
will enable the agency to maintain its current infrastructure in a proactive and cost-effective manner.
However, this effort requires considerable coordination with the construction industry, consultants,
and researchers to address items such as development of performance models for different
maintenance treatments, proper design, construction, and materials. Technology transfer is also
required to bring new technology into the region. Although this effort may be cumbersome at first,
the outcome will result in millions of Dirham of future savings for the client. Additional benefits of
integrating PMS into the pavement preservation program is achieving sustainability goals by
minimising the use of natural resources.
Table 8-1 is an example of an agency customized performance model used to measure the benefit/
cost ratio of different treatments and justify the use of these treatments. This figure is from a study
in 2000 conducted by Omar Smadi, Zachary Hans, and Aemal Khattak for the State of Iowa
Department of Transportation, as cited in Supporting Preventive Maintenance Programs with
Pavement Management by Kathryn A. Zimmerman, P.E., and David G. Peshkin, P.E. (24).
Page 118
Because pavement distress types and causes of distress are universal, the Washington State
Department of Transportation (WSDOT) Pavement Evaluation – Flexible Pavement Distress Manual
(25) was used to determine flexible pavement distress types, potential causes, and potential
remedies. Information from the WSDOT manual was modified to customise the information for Abu
Dhabi’s environmental condition. The WSDOT manual not only discusses types of pavement
distress, it also provides an explanation of potential causes and recommendations on how to address
pavement distresses. Refer to http://training.ce.washington.edu/WSDOT/.
There are other distress identification manuals used by agencies to collect consistent pavement
distress data. Most widely used in the United States is the Distress Identification Manual for the
Long-term Pavement Performance Program (26) developed for the Federal Highway Administration
(FHWA) as part of a strategic highway research program. Below is the link to this manual, which
provides types of pavement distress. However, it does not discuss potential causes and corrective
measures.
http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/ltpp/reports/03031/
Page 119
Description: A series of interconnected cracks caused by fatigue failure of the hot mix asphalt
(HMA) surface (or the stabilised base) under repeated traffic loading. In thin pavements, cracking
initiates at the bottom of the HMA layer where the tensile stress is the highest, then propagates to
the surface in the form of one or more longitudinal cracks. This is commonly referred to as "bottom-
up" or "classical" fatigue cracking. In thick pavements, the cracks most likely initiate from the top in
areas of high localised tensile stresses resulting from tire-pavement interaction and asphalt binder
aging (top-down cracking). After repeated loading, the longitudinal cracks connect forming multi-
sided, sharp-angled pieces that develop into a pattern resembling the back of an alligator or
crocodile.
Problem: Indicator of structural failure; cracks allow moisture infiltration; roughness; may further
deteriorate to potholes.
Possible causes: Inadequate structural support, which can be caused by a myriad of factors. A few
of the more common factors are:
- Loss of base, sub-base, or subgrade support (e.g., poor drainage or spring thaw
resulting in a less stiff base)
- Stripping on the bottom of the HMA layer (the stripped portion contributes little to the
pavement strength so the effective HMA thickness decreases)
Page 120
Repair: A fatigue-cracked pavement should be investigated to determine the root cause of failure.
Any investigation should involve digging a pit or coring the pavement to determine the pavement's
structural makeup, as well as determining whether or not subsurface moisture is a contributing factor.
Once the characteristic alligator pattern is apparent, repair by crack sealing is usually ineffective.
Fatigue crack repair generally falls into one of two categories:
• Small, localised fatigue cracking indicative of a loss of subgrade support. Remove the
cracked pavement area then dig out and replace the area of poor subgrade and improve the
drainage of that area, if necessary. Patch over the repaired subgrade.
• Large fatigue-cracked areas indicative of general structural failure. Either place a structural
overlay over the entire pavement surface or reconstruct the pavement. The overlay option
must be strong enough structurally to carry the anticipated loading because the underlying
fatigue-cracked pavement most likely contributes little or no strength (15). Another strategy
that has gained popularity is full depth reclamation of existing pavement. Full depth
reclamation is very cost-effective and sustainable since it uses the in-place base and hot mix.
Full depth reclamation operation consists of pulverising the existing base and hot mix in-
place to a depth of 150 mm to 300 mm, followed by mixing an additive to the pulverised
material such as cement, fly ash, or emulsion; compaction of the stabilised material; curing;
and finally, placing hot mix over the stabilised base course.
8.3.3 Bleeding
Description: A film of asphalt binder on the pavement surface. It usually creates a shiny, glass-like
reflecting surface (as in the second photo) that can become quite sticky.
Possible causes: Bleeding occurs when asphalt binder fills the aggregate voids during hot weather
and then expands onto the pavement surface. Since bleeding is not reversible during cold weather,
asphalt binder will accumulate on the pavement surface over time. This can be caused by one or a
combination of the following factors:
• Excessive asphalt binder in the HMA (either due to mix design or manufacturing)
• Excessive application of asphalt binder during preservation treatment such as fog seal or
chip seal (as in the photos above)
• Low HMA air void content (e.g., not enough void space for the asphalt to expand into during
hot weather)
Page 121
Repair: Although the following repair measures may eliminate or reduce the asphalt binder film on
the pavement surface, they may not correct the underlying problem that caused the bleeding:
• Minor bleeding can often be corrected by applying coarse sand to blot up the excess asphalt
binder
• Major bleeding can be corrected on a low volume road by removing excess asphalt with
milling or micro-milling followed by a surface treatment or thin or thick overlay depending on
traffic and truck volume
• Hot-in-place asphalt recycling (HIPAR) or cold-in-place recycling (CIPR) of roadway where
there is more than 7 to 10 km of pavement bleeding
Block cracks
Description: Interconnected cracks that divide the pavement into rectangular pieces. Blocks range
in size from approximately 0.1 m2 to 9 m2. Larger blocks are generally classified as longitudinal and
transverse cracking. Block cracking normally occurs over a large portion of pavement area, but
sometimes occurs only in non-traffic areas.
Possible causes: HMA shrinkage and daily temperature cycling. Block cracks are typically caused
by an inability of asphalt binder to expand and contract with temperature cycles because of:
Repair: Strategies depend upon the severity and extent of the block cracking:
• Low severity cracks (<13 mm wide). Seal cracks to prevent the entry of moisture into the
subgrade through the cracks and further ravelling of the crack edges. HMA can provide years
of satisfactory service after developing small cracks if they are kept sealed (15).
• High severity cracks (>13 mm wide and cracks with ravelled edges). Remove and replace
the cracked pavement layer with an overlay. A stress relief layer, a fine mix with high binder
content, or Geogrid is required to retard reflective cracking coming through new HMA overlay.
Page 122
• Another strategy that has gained popularity is in-situ CIPR due to its cost-effectiveness and
sustainability. In this process, the existing HMA is recycled to a depth of 50 mm to 100 mm
followed by an HMA overlay.
Corrugation Shoving
Possible causes: Usually caused by traffic action (starting and stopping) combined with:
• An unstable (i.e., low stiffness) HMA layer caused by mix contamination, poor mix design,
poor HMA manufacturing, or lack of aeration of liquid asphalt emulsions
• Combination of high pavement temperature, over-loaded trucks with high axle loading at the
intersections
• Excessive moisture in the subgrade
Repair: A heavily corrugated or shoved pavement should be investigated to determine the root
cause of failure. Repair strategies generally fall into one of two categories:
• Small, localised areas of corrugation or shoving. Remove the distorted pavement and patch.
• Large corrugated or shoved areas indicative of general HMA failure. Remove the damaged
pavement and overlay.
Page 123
Reflection cracking
Description: Cracks in a flexible overlay of a rigid pavement or existing oxidized flexible pavement.
The cracks occur directly over the underlying rigid or flexible pavement joints.
Possible causes: Movement of the pavement beneath the HMA surface because of thermal and
moisture changes. Generally not load-initiated; however, loading can hasten deterioration.
Repair: Strategies depend upon the severity and extent of the cracking:
• Low severity cracks (<13 mm wide and infrequent cracks). Seal cracks to prevent entry of
moisture into the subgrade through the cracks and further ravelling of the crack edges.
• High severity cracks (>13 mm wide and numerous cracks). Mill, place a stress relief layer
(fine aggregate graded hot mix with high binder content or geotextile fabric), and place an
overlay with hot mix. Another strategy that has gained popularity is in-situ CIPR due to its
cost-effectiveness and sustainability. In this process, the existing HMA is recycled to a depth
of 50 mm to 100 mm followed by an HMA overlay.
Longitudinal cracking as the onset of fatigue Longitudinal cracking from poor joint
cracking construction
Description: Cracks parallel to the pavement's centreline or lay-down direction. Usually a type of
fatigue cracking.
Page 124
Problem: Allows moisture infiltration; roughness indicates the possible onset of alligator cracking
and structural failure.
Possible causes:
• Poor joint construction or location. Joints are generally the least dense areas of a pavement;
therefore, they should be constructed outside the wheel path so that they are only
infrequently loaded. Joints in the wheel path, such as those shown in photos three through
five (from left to right) above, will general fail prematurely.
• A reflective crack from an underlying layer.
• HMA fatigue, which indicates the onset of future alligator cracking.
• Top-down cracking.
• Low severity cracks (<13 mm wide and infrequent cracks). Seal cracks to prevent entry of
moisture into the subgrade through the cracks and further ravelling of the crack edges. HMA
can provide years of satisfactory service after developing small cracks if they are kept sealed
(26).
• High severity cracks (>13 mm wide and numerous cracks). Remove and replace the cracked
pavement layer with an overlay. Geotextile fabric may be used directly over the crack to
retarded reflective cracking in the overlay.
8.3.8 Patching
Description: An area of pavement that has been replaced with new material to repair the existing
pavement. A patch is considered a defect no matter how well it performs.
Problem: Roughness.
Possible causes:
• Previous localised pavement deterioration that has been removed and patched
• Utility cuts
Repair: Patches are themselves a repair action. They can only be removed from a pavement surface
by an overlay (structural or non-structural).
Page 125
Polished Aggregate
Description: Areas of HMA pavement where the portion of aggregate extending above the asphalt
binder is either very small or there are no rough or angular aggregate particles at the pavement
surface.
Possible causes: Repeated traffic applications. Generally, as pavement ages, the protruding rough,
angular particles become polished. This can occur quicker if the aggregate is susceptible to abrasion.
8.3.10 Potholes
Description: Small, bowl-shaped depressions in the pavement surface that penetrate through the
HMA layer down to the base course. They generally have sharp edges and vertical sides near the
top of the hole. Potholes are most likely to occur on roads with thin HMA surfaces (25 to 50 mm) and
seldom occur on roads with 100 mm or deeper HMA surfaces (26).
Problem: Roughness (serious vehicular damage can result from driving across potholes at higher
speeds); moisture infiltration.
Page 126
Possible causes: Generally, potholes are the end result of alligator cracking. As alligator cracking
becomes severe, the interconnected cracks create small chunks of pavement, which can be
dislodged as vehicles drive over them. The remaining hole after the pavement chunk is dislodged is
called a pothole.
8.3.11 Ravelling
Description: Progressive disintegration of an HMA layer from the surface downward as a result of
aggregate particles being dislodged.
Problem: Loose debris on the pavement; roughness; water collecting in the ravelled locations
resulting in vehicle hydroplaning; loss of skid resistance.
• Loss of bond between aggregate particles and the asphalt binder as a result of:
- A dust coating on the aggregate particles that prevents the asphalt binder to bond
with the aggregate.
- Aggregate segregation. If fine particles are missing from the aggregate matrix, then
the asphalt binder is only able to bind the remaining coarse particles at their relatively
few contact points.
- Inadequate compaction during construction. High density is required to develop
sufficient cohesion within the HMA.
Repair: A ravelled pavement should be investigated to determine the root cause of failure. Repair
strategies generally fall into one of three categories:
• Small, localised areas of ravelling. Remove the ravelled pavement and patch.
• Large ravelled areas indicative of general HMA failure. Remove the damaged pavement and
overlay.
• Low severity. Apply a surface treatment such as fog seal or microsurfacing.
Page 127
8.3.12 Rutting
Description: Surface depression in the wheel path. Pavement uplift (shearing) may occur along the
sides of the rut. Ruts are particularly evident after a rain when they are filled with water. There are
two basic types of rutting: mix rutting and subgrade rutting. Mix rutting occurs when the pavement
surface exhibits wheel path depressions as a result of compaction/mix design problems. Subgrade
rutting occurs when the subgrade exhibits wheel path depressions due to loading. In this case, the
pavement settles into the subgrade and ruts causing surface depressions in the wheel path. This is
the most predominate type of distress in Abu Dhabi, especially at the intersections.
Problem: Ruts filled with water can cause vehicle hydroplaning, which can be hazardous because
ruts tend to pull a vehicle towards the rut path as it is steered across the rut.
Possible causes: Permanent deformation in any of the pavement layers or subgrade usually caused
by consolidation or lateral movement of the materials due to traffic loading. Specific causes of rutting
can be:
Repair: A heavily rutted pavement should be investigated to determine the root cause of failure
(e.g., insufficient compaction, subgrade rutting, poor mix design, or studded tire wear). Slight ruts
(<8 mm deep) can generally be left untreated. Pavement with deeper ruts should be levelled and
overlaid with a rut-resistance mix.
Page 128
Slippage cracking
Description: Crescent or half-moon shaped cracks generally having two ends pointed into the
direction of traffic.
Possible causes: Braking or turning wheels can cause the pavement surface to slide and deform.
The resulting sliding and deformation is caused by a low-strength surface mix or poor bonding
between the surface HMA layer and the next underlying layer in the pavement structure.
8.3.14 Stripping
Core hole showing stripping at the bottom Fatigue failure from stripping
Description: The loss of bond between aggregates and asphalt binder that typically begins at the
bottom of the HMA layer and progresses upward. When stripping begins at the surface and
progresses downward, it is usually called ravelling. The photo on the right shows the surface effects
of underlying stripping.
Possible causes: Bottom-up stripping is very difficult to recognise because it manifests itself on the
pavement surface as other forms of distress including rutting, shoving/corrugations, ravelling, or
cracking. Typically, a core must be taken to positively identify stripping as a pavement distress.
Possible causes include:
Page 129
Repair: A stripped pavement should be investigated to determine the root cause of failure (i.e.,
determine how the moisture entered the pavement). Generally, the stripped pavement needs to be
removed and replaced after correction of any subsurface drainage issues.
Transverse Crack
Description: Cracks perpendicular to the pavement's centreline or lay-down direction, usually a type
of thermal cracking.
• Shrinkage of the HMA surface due to low temperatures or hardening of the asphalt binder
• Reflective crack caused by cracks beneath the surface HMA layer
• Top-down cracking
• Low severity cracks (<13 mm wide and infrequent cracks). Seal cracks to prevent entry of
moisture into the subgrade through the cracks and further ravelling of the crack edges. HMA
can provide years of satisfactory service after developing small cracks if the cracks are kept
sealed (26).
• High severity cracks (>13 mm wide and numerous cracks). Remove the cracked pavement
layer, place a fine-graded hot mix stress relief or a geotextile fabric over the transverse crack,
and place an overlay.
Page 130
Edge cracking
Description: Longitudinal or crescent shaped cracks usually within 0.6 m of the pavement edge,
adjacent to an unpaved shoulder.
Problem: Allows moisture infiltration; roughness; indicates possible onset of alligator cracking and
structural failure.
Possible causes: Overloading at the edge of the pavement; shear failure; or erosion of the shoulder.
• Low severity cracks (<13 mm wide and infrequent cracks). Seal cracks to prevent entry of
moisture into the subgrade through the cracks and further ravelling of the crack edges.
• High severity cracks (>13 mm wide and numerous cracks). Widen the roadway and re-grade
drainage ditches to ensure positive drainage exists.
Figure 8-3 shows a pavement performance curve and a list of preservation or rehabilitation tools that
can be used to extend pavement life.
Page 131
8.4.3.1 Environmental-related
Some of the flexible pavement distresses that are normally environmental-related include transverse
cracking, random/block cracking, and ravelling/weathering. Others such as edge cracking,
longitudinal cracking, and distortion may be due to either environmental or loading influence.
8.4.3.2 Load-related
Some of the distresses commonly associated with loading include alligator cracking, longitudinal
cracking in wheel paths, and rutting. Preventive maintenance will not correct most load-related
distresses.
Page 132
Table 8-4 shows a numbered list of common preservation and rehabilitation alternatives. These
numbers correspond with the numbers in the “Low”, “Moderate”, and “High” columns in Table 8-3.
Table 8-5 contains a life-expectancy and cost of each treatment. A unit price for each treatment
should be established in the future by the DMAT when these strategies become part of a standard
way of doing business.
Page 133
Pavement Treatments
1. Do nothing
2. Crack seal/fill
3. Fog seal
4. Scrub seal (broom seal)
5. Slurry seal
6. Chip seal
7. Microsurfacing
8. Micro-mill
9. CIPR
10. HIPAR
11. Thin hot mix overlay
12. Patching
13. Thick overlay
14. Full-depth reclamation
15. Total reconstruction
Page 134
Page 135
Crack sealing is the placement of materials into working cracks. Crack sealing requires thorough
preparation of the crack and often requires the use of specialised, high-quality materials placed either
into or above working cracks to prevent the intrusion of water and incompressible materials. Crack
sealing is generally considered to be a longer-term treatment than crack filling.
Due to the moving nature of working cracks, a suitable crack sealant must be capable of:
Crack filling is the placement of materials into non-working or low-movement cracks to reduce
infiltration of water and incompressible materials into the crack. Filling typically involves less crack
preparation than sealing and performance requirements may be lower for the filler materials.
According to the Nebraska Department of Roads (23), filling is often considered a short-term
treatment to help hold the pavement together between major maintenance operations or until a
scheduled rehabilitation activity.
levelling, utility outs, etc., be performed prior to surface treatments being placed. Seal coats
commonly used in roadway maintenance are fog seals, scrub seals, slurry seals, and chip seals.
Seal coats should not be placed over flexible pavement mixes with a history of moisture sensitivity
or stripping problems.
According to the Nebraska Department of Roads (23), a type of seal coat selected should be dictated
by the following guidelines and site-specific conditions.
A fog seal should be considered for application four years after asphalt overlay. It is important that a
fog seal not be applied until sealed cracks have undergone at least two seasons of oxidation. Also,
a fog seal should not be applied to any pavement with existing low skid numbers (signed slippery
when wet). A fog seal can be a valuable maintenance aid when used for its intended purpose. It is
not a substitute for an asphalt surface treatment or other types of seal coats. It is used to renew old
asphalt surfaces that have become dry and brittle with age and to seal very small cracks and surface
voids. This corrective action will prolong pavement life and may delay the time when major
maintenance or reconstruction is needed. Typically, fog seals are used to seal shoulders and dikes,
dig outs, and patches. Also, they are used as a flush coat on newly applied chip seals to provide
better rock retention, which can assist in preventing broken windshields and other damage to
vehicles. Normally, sand is used as a cover material after applying a flush coat. Care should be taken
to keep traffic off of the newly sealed surface until the emulsion has broken. According to the
Nebraska Department of Roads (23), even though the application is light, special care must be used
when going around curves to keep traffic away from the oil, which has a tendency to flow because
of the super elevation.
This operation proceeds rapidly, and daily productivity is approximately 5 to 7 lane km per day.
Page 137
Normally, slurry seals are not placed if the wheel paths on the surface to be treated have depressions
greater than 15 mm, or if the treatment must be placed at night. According to the Nebraska
Department of Roads (23), if these two conditions exist, the use of a slurry seal should be evaluated
on a case-by-case basis.
Page 138
Chip seals provide skid resistance and seal the roadway. They generally consist of applying asphaltic
emulsions or liquid paving grade asphalts (with additives), and then covering them with aggregate
and rolling. Chip seals are a very good surface treatment if they are placed correctly. Consideration
should be given to placement at non-sensitive areas (e.g., high average daily traffic due to special
events) and places with a high percentage of truck traffic. All cracks should be sealed prior to chip
sealing, as chip sealing is not a substitute for crack sealing. Also, centerline tabs must be placed
before chip sealing.
According to the Nebraska Department of Roads (23), sand/gravel aggregate should be crushed to
provide the gradation shown in Table 8-7.
It is important that clean and crushed aggregate with only a small percent passing No. 200 sieve is
used for chip seal.
Page 139
8.5.2.5 Microsurfacing
Microsurfacing refers to a mixture of polymer modified asphalt emulsion, mineral aggregate, mineral
filler, water, and other additives properly proportioned, mixed, and spread on a paved surface.
Microsurfacing differs from slurry seal in that it can be used on high volume roads to correct minor
wheel path rutting (<12 mm) and provide a skid-resistant pavement surface.
In quick-traffic applications as thin as 10 mm, microsurfacing can increase skid resistance, provide
colour contrast, restore pavement surface, and extend pavement life. Microsurfacing projects are
often re-opened to traffic within an hour.
This treatment requires use of modern, continuous-load pavers capable of laying 5 lane km per day
for surfacing applications, with minimum traffic delays. As a thin, surface treatment on heavy traffic
intersections, microsurfacing does not alter drainage and there is no loss of curb reveal. According
to the Nebraska Department of Roads (23), because microsurfacing can be effectively applied to
most surfaces at 10 mm or less, more area per ton of mix is covered, resulting in cost-effective
surfacing.
Page 140
If rutting is caused by poor materials or a weak base, milling should be considered as a “temporary
fix”, since the ruts will likely reappear in one to three years. Also, caution must be used if the surface
thickness is marginal for the traffic loading. Determining whether milling is the proper treatment is
often a judgment call, considering the severity of the ruts, the cause of the ruts, and the overall
condition of the road. According to the Nebraska Department of Roads (23), when wheel rutting is
greater than 12.5 mm deep and the asphalt pavement has sufficient thickness, profile milling may
be performed to restore roadways with average daily traffic of less than 20,000 and very low percent
truck traffic.
1. Milling. A milling machine pulverises a thin surface layer of pavement, usually from 50 to
100 mm deep.
2. Gradation control. This pulverised material is further crushed and graded to produce the
desired gradation and maximum particle size. On some jobs, this step is omitted; however,
on other jobs a trailer-mounted screening and crushing plant is used to further crush and
Page 141
grade the pulverised pavement. If needed, virgin aggregate can be added to the recycled
material.
3. Additive incorporation. Then the graded, pulverised material is mixed with a binding
additive (usually emulsified asphalt, lime, Portland cement, or fly ash). On some jobs, this is
performed by the milling machine; however, on other jobs, a trailer-mounted pug mill mixer
is used.
4. Mixture placement. This pulverised, graded pavement and additive combination is placed
back over the previously milled pavement and graded to the final elevation. Mixture
placement is most often performed with a traditional asphalt paver (either through windrow
pickup or by depositing the mixture directly into the paver hopper).
5. Compaction. This placed mixture is compacted to the desired density. Typical compaction
efforts involve a large pneumatic and a large vibratory steel wheel roller. If an emulsion
additive is used, rolling is typically delayed until the emulsion begins to break. If a Portland
cement or fly ash additive is used, rolling should begin immediately after placement.
6. Fog seal. A fog seal is necessary over CIPR using a Portland cement or fly ash additive not
only to delay surface ravelling, but also to provide a curing membrane for the additive to
properly set.
7. Surface course construction. The cold recycled mix should be covered with either a thin
surface treatment such as chip seal or HMA overlay. The type and thickness of the overlay
should be based on future projected traffic.
CIR Train
EMULSION
MILLING
PUG MILL TANK
MACHINE CRUSHER
HIPAR has been used in Canada and Europe. It is now starting to be implemented in the United
States. Recycling of existing asphalt returns the pavement to a near-new condition, giving many
Page 142
more years of life at a reduced cost over normal reconstruction processes. Recycling of granular
pavements using specialised equipment has led to much better surface finishes and consistently
good performance in recent years. The additives used in the process are lime, cement, slag, fly ash,
and various blends of these materials.
The pavement surface is heated by infrared radiation and milled in two steps to a desired depth of
20 to 65 mm. The mix of the old asphalt layer can be changed directly by adding virgin asphalt and
a new type of asphalt binder or rejuvenator. The two-stage recycling means the sequential heating
and removing of two separate layers of asphalt in one continuous operation. Alternatively, working
widths are 3.5 m and 4.2 m.
HIPAR technology offers tremendous benefits in terms of cost savings in material and labour, as
well as a reduction in duration of the repair activities. Another benefit from HIPAR is that it can turn
a traditionally environmentally damaging process into a process having only minimal environmental
effects. Materials savings are realised from the reduction in new asphalt and aggregate. Energy
savings result primarily from reduced aggregate haul and drying, and asphalt transportation. Cost
savings are greatly influenced by length of aggregate haul and distance from the plant to the job site.
First step of full depth patching is to cut an area 0.5 to 1.0 m larger than the distressed area needing
repair by using a wheel cutter or pavement saw. Equipment such as a backhoe, milling machine, or
front-end loader is required to remove as much of the pavement as needed. If the subgrade is
unstable, re-stabilise it and compact the subgrade to a proper depth using a plate packer. Tack coat
should be applied to all the vertical edges and to the base. HMA should be placed directly into the
excavated area and a proper roller should be used to adequately compact the HMA. Edges should
be compacted first, followed by compaction of the low to the high side of the mat, overlapping
Page 143
approximately 15 to 25 cm with each pass. All compacted patch should match the existing adjacent
surface.
This section describes the methods and techniques used to prolong the life of concrete pavement
by slowing its deterioration rate. Performance of concrete pavement similar to hot mix asphalt is
directly tied to the timing, type, and quality of the maintenance it receives. However, rigid pavements
perform and crack differently from flexible pavements. For details on rigid pavement types, refer to
Chapter 5, Rigid Pavement Design. For different rigid pavement distresses, refer to the FHWA’s
Distress Identification Manual for the Long-term Pavement Performance Program (26).
(http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/ltpp/reports/03031/)
Materials used for creak sealing are hot-pour seals, compression seals, and silicone seals. Sealant
performance is dependent upon proper joint design and cleanliness.
Crack sealant is typically used on early stage, isolated panel cracks. Extensive or advanced panel
cracking is a symptom of a larger problem (e.g., lack of panel support, inadequate structural design,
or poor construction) that cannot be addressed by simple crack sealing.
cause other problems such as faulting and corner breaks or cracking, according to the American
Concrete Pavement Association (ACPA) Construction of Portland Cement Concrete Pavements,
1995 (27). Voids are typically filled by pumping grout through holes drilled through the slab.
Grinding heads are cooled with water creating a slurry composed of ground PCC particles and water.
Most of this slurry is picked up by vacuums within the grinding machine and either deposited along
the shoulder of the highway or collected in trucks for off-site disposal.
Diamond grinding addresses serviceability problems, but not their root cause, (i.e., it will reduce the
roughness on a faulted pavement, but will not address the cause of the faulting).
8.6.4 Patches
Rigid pavement patches are used to treat localised slab problems such as spalling, scaling (e.g.,
reactive aggregate distress, over-finishing the surface), joint deterioration, corner breaks, or punch
outs. If the problem is limited in depth, then a partial depth patch may be appropriate, otherwise a
full depth patch is recommended. A high-quality patch can be considered a permanent repair,
although all patches are treated as a form of pavement distress. Sometimes HMA is used for
emergency patches, but PCC should be used for permanent patches. Fast-setting PCC can minimise
setting time.
Page 145
• Locating the area to be patched (the patch should be extended beyond the damaged area
by 75 to 100 mm)
• Removing the damaged material by sawing and chipping deep enough to remove all of the
damaged material
• Cleaning the area to be patched by sand or water blasting to remove loose particles and
create a rough texture to which the bonding agent can adhere
• Applying a bonding agent such as a cementitious grout that helps the patch material bond to
the original slab
New PCC should be placed so that the patch elevation is the same as the surrounding slab and
finished by working from the centre to the edges in order to push the new material firmly against the
existing slab, creating a higher potential for a high-strength bond.
• Locating the area to be patched (if located too close to an existing joint or crack, it should be
extended to an existing transverse joint; if it falls on an existing crack, but away from the joint,
then it should be extended beyond by 0.15 m)
• Removing the damaged material by isolating the repair area using full depth saw cuts, then
lifting out the isolated section
Page 146
• Preparing the patch area by compacting and drying the subgrade and base material and
inserting dowel bars into the holes drilled into the adjacent slab transverse sections to provide
load transfer across the patch boundary (replacements longer than 4.5 m require longitudinal
tie bars as well)
• Applying a bonding agent such as a cementitious grout that helps the patch material bond to
the original slab unless the edge of the patch material is located at the working joint (in this
case, the joint should be sawed to re-establish the working crack)
New PCC should be placed so that the patch elevation is the same as the surrounding slab. Vibratory
screeds are often used to strike off and finish full-depth patches. Any edge of patching material
located at the concrete joint should be sawed to re-establish the working crack at the joint.
Page 147
LCC is an engineering analysis tool that uses economic principles to evaluate long-term investment
options. LCC is an integral part of the decision-making process for selecting the preferred pavement
types, rehabilitation strategies, and the optimum pavement design life. When feasible, LCC should
include both agency and user costs over the service life of the infrastructure. The LCC process helps
decision-makers select the preferred alternative based on the lowest cost over the analysis period,
while meeting project objectives. Taking into consideration available budget, constructability and
maintenance issues, and environmental concerns, the lowest LCC may not ultimately be selected,
in some cases.
There are two different approaches to LCC — deterministic and probabilistic. The deterministic
approach is the traditional methodology in which the user assigns each LCC input variable a fixed
value usually based on historical data and user judgment. The probabilistic approach is a relatively
new methodology and accounts for the uncertainty and variation associated with input values. The
probabilistic approach allows for simultaneous computation of differing assumptions for many
variables by defining uncertain input variables with probability distributions of possible values. The
following link to the Federal Highway Administration (FHWA) LCC assessment Web site (28) can be
used to obtain the latest advancements in LCC. RealCost software, developed by FHWA, can be
used to conduct either deterministic or probabilistic LCC.
http://www.fhwa.dot.gov/infrastructure/asstmgmt/lcca.cfm
Because there is no historical probability distribution of individual LCC input variables at this time,
the deterministic LCC approach is used by DMAT.
1. Establish alternatives
2. Determine an analysis period
3. Determine a discount rate
4. Determine maintenance and rehabilitation frequencies
5. Estimate costs
6. Calculate LCCs
7. Analyze LCC results
Page 148
versus 20-year design life rehabilitation. Each competing alternative must be properly designed to
meet the project goals and requirements.
Table 9-1 provides examples of some possible alternatives to consider for new construction,
widening, rehabilitation, and pavement preservation projects. This table may be expanded in the
future as more rehabilitation tools become available in Abu Dhabi.
Pavement
Alternative I Alternative II Alternative III
Project Type
40-year flexible 20-year flexible
New 40-year rigid pavement
pavement pavement
Remaining service
40-year flexible
Widening life of existing 20-year flexible pavement
pavement
pavement
• Cold or hot-in-place
recycling and overlay or
Rehabilitation Mill and overlay Overlay
• Geotextile fabric and
overlay
Crack sealing and/or
Preservation Do nothing Scrub seal and microsurfacing
microsurfacing
The LCC analysis period should be sufficiently long to reflect long-term cost differences associated
with the reasonable design strategies. The analysis period should be longer than the pavement
design period, as shown in Figure 9-1. As a general rule, the analysis period should be long enough
to incorporate at least one rehabilitation activity. Figure 9-1 shows a typical analysis period for a
pavement design alternative. Regardless of alternatives, the analysis period used should be the
same for all alternatives.
Table 9-2 provides recommended analysis periods to be used when comparing two alternatives
designed with the same or different design lives. For example, a minimum analysis period of 35
Page 149
years should be considered if 10-year and 20-year pavement design life alternatives are compared,
or if two different pavement design alternatives with the same 20-year design life are compared. The
reason for the 35-year analysis period is to allow for at least one rehabilitation to be performed for
each alternative over the analysis period.
Alternative
5-Year 10-Year 20-Year 40-Year
Design Life
5-year 20 years 20 years N/A N/A
10-year 20 years 20 years 35 years 55 years
20-year N/A 35 years 35 years 55 years
40-year N/A 55 years 55 years 55 years
The LCC assumes that the pavement will be properly maintained and rehabilitated to carry the
projected traffic over the specified analysis period. As the pavement ages, its condition will gradually
deteriorate to a point where some type of maintenance or rehabilitation treatment is warranted. Thus,
after the initial construction, reasonable maintenance and rehabilitation strategies must be
established for the analysis period.
Table 9-3 provides suggested values for different rehabilitation and preservation treatments.
However, when conducting LCC, expected service life for these treatments should be adjusted
based on local experience, existing pavement conditions, future average daily traffic (ADT) and truck
traffic, and project information and goals.
Page 150
Figure 9-2 illustrates different costs that should be considered when conducting LCC such as the
initial, rehabilitation, and maintenance costs, as well as the remaining service life. It is very important
that agency and user costs are not combined and are reported separately.
Page 151
shows an example of LCC with both agency and user costs. As can be seen from this figure, the
user costs are several times higher than the agency costs because of very high ADT and long
construction duration. It is important to note that in this example, the rigid pavement alternative has
the highest user costs because of longer construction duration and curing time required for concrete
pavement.
Page 152
280 mm
Complete
JPCP over
Reconst. 1.84 42,545 72,960 119,012 2.07 104,570 10
100 mm
With JPCP
GBC
40 mm
Complete SMA, 220
Reconst. mm HMA, 1.30 203,169 246,038 92,724 1.85 93,088 6
With HMA 100 mm
GBC
40 mm
SMA, 130
mm HMA,
Mill & Fill 0.83 203,169 246,038 92,724 1.37 69,204 3
25-150 mm
profile
milling
Of all of the user cost rates, the cost rate assigned to user delay (i.e., the value of time) is by far the
most controversial. Table 9-5 shows user costs value based on the research conducted by the
National Cooperative Highway Research Program (NCHRP-133) and guidance provided by the
Office of the Secretary of Transportation, as well as updated values used by FHWA in its Highway
Economic Requirements System Model. The values in this figure were last updated in 1996.
Trucks
Value of Time Pass Cars
Single Unit Combination
Value 1970 $3.00 $5.00 $5.00
Factor 8/96 3.928 3.928 3.928
Value 8/96 11.78 19.64 19.64
Table 9-6 shows the suggested values when calculating user costs in the Emirate until local user
costs values can be developed. These values were converted from U.S. dollars to UAE AED and
are based on the recommendations from FHWA.
The following equation may be used to determine user costs for different alternatives.
Page 153
AVT = Average value of time (use values from Table 9-4 or a value determined by a
more detailed analysis)
L = Project Length
ADT = Average daily traffic in current year (only portion of ADT affected by the
project
PT = Percent of the traffic affected by the construction project. Perform traffic study
to determine percent of traffic using facility during the period.
A number of techniques based upon the concept of discounting are available. FHWA recommends
the present value approach, which brings initial and future costs to a single point in time, usually the
present or the time of the first cost outlay. The equation to discount future costs to present value is
as follows:
1
(Equation 1) PV = F n
(1+i)
n = Number of years
The equivalent uniform annual cost approach is also used, which produces the yearly costs of an
alternative as if they occurred uniformly throughout the analysis period. The most common method
used to report LCC is the net present value.
Table 9-7 shows discount factors for different discount rates. The future costs can be converted to
present value by either using Equation 9-1 or Table 9-7. It is important to note that future cost, F, is
the present agency unit price used for the engineer’s estimate.
If the lowest agency cost alternative has a disproportionately high user cost impact, this information
should be used either to revisit the alternative’s traffic management aspect or to reconsider an
alternative that might have somewhat higher agency costs but much lower user costs. The lowest
agency cost alternative may not necessarily be the best solution since there are also other factors
that should be addressed, such as safety and air pollution, and non-user and business impacts
resulting from reduced or restricted traffic. If a higher LCC alternative is selected over a less costly
alternative, justification for the decision should be explained in the project document. However, for
analysis purposes, project alternatives whose LCCs are within 10 percent of each other will be
Page 155
considered to be equivalent, meaning that any one of the alternatives can be considered to have the
lower LCC.
In this example, the project requires rehabilitation or preservation to address rutting caused by a
combination of heavy axle loads and high pavement temperature. It is assumed that structural
overlay is not required based on the FWD testing, coring, and projected future loading.
Page 156
Table 9-9 is used to determine several potential rehabilitation and preservation alternatives. The
following alternatives are selected based on the extent and severity of rutting on this highway:
Pavement
Alternative I Alternative II Alternative III
Project Type
40-year flexible 20-year flexible
New 40-year rigid pavement
pavement pavement
Remaining service
40-year flexible
Widening life of existing 20-year flexible pavement
pavement
pavement
• Cold or hot-in-place
recycling and overlay or
Rehabilitation Mill and overlay Overlay
• Geotextile fabric and
overlay
Crack sealing
Scrub seal and
Preservation Do nothing and/or
microsurfacing
microsurfacing
Using Table 9-10, a 20-year analysis period is selected based on the expected service lives of 10
years or less for the proposed alternatives.
Alternative
5-Year 10-Year 20-Year 40-Year
Design Life
5-year 20 years 20 years N/A N/A
10-year 20 years 20 years 35 years 55 years
20-year N/A 35 years 35 years 55 years
40-year N/A 55 years 55 years 55 years
Based on the existing pavement condition, projected future traffic, engineering judgment, and
guidelines from Table 9-3, the following values shown in the right column of Table 9-11 were
estimated for the expected service lives.
Page 157
1) 50 mm overlay 7-10
2) 50 mm mill and overlay 10-15 10
3) Scrub seal 2-5
4) Slurry seal 3-8
5) Chip seal 3-6
6) Microsurfacing 3-8 5
7) Micro mill(25 mm) 1-4
8) Cold-in-place recycling and 10-15
overlay
10) Hot-in-place recycling 5-7 7
11) Thin hot-mix 5-8
overlay(<50 mm)
12) Patching 3-5
13) Thick overlay (125 mm) 8-15
14) Full depth reclamation and 20+
100 mm overlay
15) Complete reconstruction 20+
Based on the information gathered in Steps 1 and 3, Table 9-12 was created showing the type and
timing of different rehabilitation/preservation over the 20-year analysis period.
Table 9-12: Rehabilitation and preservation alternatives over a 20-year analysis period
The unit prices for cold planning and asphalt concrete Type II wearing surface were selected from
the DMAT’s reasonable unit prices document, shown in Figure 9-4. For strategies such as hot-in-
place recycling and microsurfacing where there are no DMAT unit prices, reasonable unit prices from
the United States were used. These unit prices should be verified to prior to use.
Page 158
User costs were not calculated for this project since all three alternatives require very similar traffic
control and lane closures. However, it is very important that user costs are included for higher volume
roadways when there are heavy traffic interruptions and user costs can be significantly different
alternatives.
Both present worth and uniform annual costs were calculated for all three alternatives. Table 9-13,
Table 9-14, and Table 9-15 each shows a result of LCC for one of the alternatives.
Page 159
Page 160
Total
Width Pavement
Length (meter)
(meter) Area
(sq. meter)
50,000 23 1,150,000
Unit Price
Unit Description
(Dh)
50 mm Asphalt Concrete Wearing Course 30.00 Sq. meter AD Unit Prices
50 mm Cold Planing 2.50 Sq. meter AD Unit Prices
Microsurfacing 10.00 Sq. meter US Unit Prices
Hot In-Place Recycling 25.00 Sq. meter US Unit Prices
Page 161
Alternative 3: Microsurfacing
Year 0: Microsurfacing
Year 5: Hot In-Place Recycling
Year 12: 50 mm Mill and Fill
Total
Length Width Pavement
(meter) (meter) Area
(sq. meter)
50,000 23 1,150,000
Unit Price
Unit Description
(Dh)
50 mm Asphalt Concrete Wearing Course 30.00 Sq. meter AD Unit Prices
50 mm Cold Planing 2.50 Sq. meter AD Unit Prices
Microsurfacing 10.00 Sq. meter US Unit Prices
Hot In-Place Recycling 25.00 Sq. meter US Unit Prices
Alternative 3: Microsurfacing
4% Total
PW
Year Description Discount Price
(Dh)
Factor (Dh)
0 Microsurfacing 1.0000 11,500,000
Initial Construction Cost 11,500,000
Alternative 3 provides the lowest initial cost and LCC over the 20-year analysis period as shown in
Table 9-16 and Figure 9-5.
The important conclusion that can be drawn from the LCC is that the lowest LCC was accomplished
through use of proactive preservation treatment; microsurfacing, which allowed the agency to delay
a more expensive treatment; and mill and fill to year 12.
Page 162
Uniform
Present
Rehabilitation Initial cost Annual
Alternative Worth
Alternatives (Dh) Cost
(Dh)
(Dh)
50 mm Hot In-Place
Alternative 2 - - 61,085,010
Recycling
As can be seen from Table 9-16, Alternative 3 provides a cost savings of over 6M AED as compared
to Alternative 1, while providing the travelling public with a high-quality roadway.
LCCA Summary
120,000,000
100,000,000
80,000,000
60,000,000
PW (Dh)
Initial Cost (Dh)
40,000,000
20,000,000
-
Alternative Alternative Alternative
1 2 3
Based on the results of the LCC, Alternative 3 is recommended for this project.
Page 163
According to the 1993 AASHTO Guide for Design of Pavement Structures (4), a PMS is “a set of
tools or methods that assist decision makers in finding optimum strategies for providing, evaluating,
and maintaining pavements in a serviceable condition over a given period of time.” Tools within a
PMS include systematic procedures for scheduling maintenance and rehabilitation activities that are
related to pavement design.
Because keeping a road in good condition is far less costly than repairing it after it has deteriorated,
pavement management systems prioritise preventive maintenance over road reconstruction.
According to the DMAT’s Road Structures Design Manual (10), focusing on preventive maintenance
over repair reduces costs and ensures better overall condition over a road’s design life.
Page 164
Engineers apply network-level approaches to produce optimum solutions for entire pavement
networks. Key elements in a network-level approach include the following:
Page 165
A purely network-level approach may not always provide sufficient data about individual roadway
sections to enable designers to make fully-informed project decisions. Although a network-level
approach is powerful and sophisticated, it requires large amounts of data and resources, as well as
attention to detail, to ensure effective pavement management.
Refer to the Highway Design and Maintenance Standards Model (HDM-4) (30), developed by the
World Bank, as a good example of a network-level PMS.
1. Network-level pavement management establishes an optimal solution for the entire network.
A network-level approach optimizes the cost-benefit ratio for the entire network, focusing on
the overall system rather than any individual project. Project-level approaches can support
network-level pavement management by assigning project priorities that are commensurate
with network-level programs, decisions, or budgets. However, because projects are already
planned before such high-level decisions are made, project-level decisions and priorities may
be inconsistent with network-level decisions and priorities, resulting in a system that does not
fully meet the requirements of the network as a whole.
2. Network-level methods enable quick and accurate production of conditional scenarios.
Engineers use software models based on a network-level approach to adjust top-level budget
and policy inputs, then quickly calculate the resulting network-wide effects of these top-level
decisions. For example, a designer using a network-level model could calculate how a
proposed law to lower axle load limits might affect economic or pavement conditions. A
designer could also evaluate long-term network performance under varying levels of funding.
Using project-level software, however, is often more laborious than network-level software.
To determine how a top-level budget or policy change would impact individual projects, a
designer must modify many lower-level inputs.
3. A network-level approach facilitates prioritisation of broad areas of maintenance. Because
network-level analysis provides target maintenance treatments and costs, designers can
easily and consistently apply such values to individual projects. To obtain the same results
with a project-level approach, designers must receive network-level targets before making
need project-level decisions.
4. Network-level pavement management enables the use of consistent inputs to scenarios,
which ensures consistent comparisons. Using a network-level model, different can model
different scenarios on the same system. By applying consistent assumptions across all
scenarios, a designer can generate outcomes with qualitative and comparative results. With
project-level approaches, designers must input such assumptions for individual projects,
making comparisons across different scenarios more difficult. Because project-level
approaches involve many groups across an agency, communication problems, personal
Page 166
differences, and regional biases can create inconsistent input across different scenarios and
different projects.
5. A network-level approach facilitates getting attention from top management. Designers can
use network-level software’s ability to evaluate conditional scenarios to easily demonstrate
the fiscal importance of pavement management and the implications of various decisions to
executive management and key stakeholders.
Most pavement management systems in operation today apply a project-level approach. Many state
and local pavement management systems are project-level systems.
Although less able to produce optimum solutions and conditional scenarios than network-level
pavement management, the project-level approach is advantageous because it maintains detailed
project-level information needed to make project-level decisions.
Page 167
Project-level approaches can be simpler and more easily understood, making getting buy-in easier.
Network-level approaches typically use sophisticated models that make many generalisations and
assumptions.
Page 168
This section should be used in conjunction with the distress definition detailed in Section 8.3 and the
pavement evaluation for overlay design described in Section 5.4, and Chapter 9 of the DMAT’s
Geotechnical Investigation and Design Manual Part 2.
11.1 Overview
Pavement evaluation is needed to access the current condition of the existing pavement.
Investigation outputs will aid the Engineer’s decision on the proper maintenance or rehabilitation
strategy to be used. Pavement evaluation procedures shall be conducted by first collecting data
through distress surveys, material testing, structural evaluation, and functional testing. Collected
data are then analysed using software or manual analyses procedures. Then, the result of the
analysis is fed into a PMS, or given to the agency to help decide the proper action to be taken.
1. Identify the road properly with kilometre posts, direction, dates, and anything to make the
survey referenced easily.
2. Conduct a windshield survey to identify the critical location and extent of the pavement
condition.
3. Based on the length of the road, and the available funds, a walking survey or automatic
survey can be conducted.
4. Data collected from the distress survey shall then be analysed to identify the main distresses
observed and to recommend further testing.
5. If the major distress is cracking, then non-destructive structural capacity testing shall be used
to access the pavement layers stiffness.
6. If the major distress is rutting, then trench, cores, and asphalt mixture testing shall be
conducted to identify the weak soil that caused the deformation.
7. Roughness and skid resistance testing shall be conducted if the condition survey reported
the presence of these distresses in the pavement.
8. Based on the severity levels assigned to each distress, the proper maintenance technique
shall be adopted.
9. Maintenance techniques can vary from surface sealing to fixing minor cracks and skid
resistance to the removing and replacing portions of the pavement structure.
This section also focuses on the data collection and manual analysis for the pavement evaluation.
Data collection is detailed in the first section, whilst the second section will detail the data analysis.
Different maintenance techniques are described in Chapter 8, and rehabilitation structural design is
detailed in Chapter 5 of this manual.
Page 169
accuracy of the data collection vary from a visual limited survey to a comprehensive investigation.
Different types of pavement condition surveys include the following:
• Distress survey;
• Structural capacity using non-destructive or destructive testing;
• Roughness testing (ride quality); and
• Skid resistance (surface texture).
It is not necessary to have the same detail at each survey; however, it is important to use the same
general definitions. It is not necessary to collect all of the data. Some measures, such as structural
evaluation, may only be collected at certain projects. Additional measures, such as surface friction,
may only be used when a specific problem has been identified. Each type of survey shall be detailed
in the following sections.
Distress surveys are conducted automatically or manually. Automated surveys are more accurate
and faster, but are also costly. Manual surveys, which vary from a walking survey of the entire or a
portion of the read to windshield surveys, require trained Inspectors to conduct the survey accurately.
Walking surveys are accurate in accessing the type and severity of the distress but might require
road closures for crew safety. Windshield surveys are similar to the automated survey but less
accurate because they are conducted by a person in a moving vehicle; however, the windshield
survey can be used as a first step to identify locations for walking surveys, especially if the road is
long.
In general, the cost, required accuracy, precision, and resolution will decide the type of distress
survey to be used. Walking or windshield surveys are extensively used; however, in recent years,
more agencies are beginning to move towards automated surveys.
The Inspector inspects the sample unit by walking the pavement and whilst standing on the shoulder.
During this process, each distress type, its severity, and amount present is identified and recorded,
and their amounts must correspond to those defined in the distress identification. Quantities and
severities are normally estimated using accurate wheel and tape measuring techniques.
Page 170
Manual distress survey procedures are slow, labour intensive, and subject to transcription errors.
Consistency between classification and quantification of the distresses observed by different
inspectors can also be a problem. Once the data has been summarized and corrected for
transcription errors, the only recourse for checking apparent anomalies in the data is a return visit to
the field. Safety of field crews is also another concern.
Automated surveys use a high-resolution video camera mounted on a vehicle that captures a video
of the road while driving at road speed. These videos are then analysed to measure values of each
distress. Additional automated surveys use lasers to map the pavement surface.
Camera resolution is a function of the equipment used to make the image. Precision is a function of
the number of measuring devices and the location differences between repeat runs. These
equipments need periodic calibration. Additionally, precision and accuracy are functions of the
interpretations, the lighting, and the placement of the imaging during repeat runs. Laser-based
systems have more precision problems because they view small areas that are combined to give
estimated distress information. Figure 11-1 shows the digital survey vehicle, whilst, Figure 11-2
shows a software snapshot used for automated cracking mapping.
For the imaging systems, the images can be affected by shadows and the direction of the sun.
Lighting conditions shall be controlled either by enclosing the camera and pavement with fixed
lighting or by completing all surveys at night and using fixed lighting. Lights can be set at an angle
so that known shadows can be used to help identify crack widths and elevation differences.
Automated distress survey procedures are less subjective than manual surveys. In the simplest form,
the images are interpreted manually. Distress identification is still manual; the Inspector identifies,
quantifies, and records distress from the image rather than from the pavement surface. This takes
the Inspector off the road and reduces traffic interruption, both of which are extremely important for
safety on high volume highways, but subjectivity is still present.
Automated analysis of the images is the least subjective system; however, image analysis by
automated means has been found to be quite complex. At the current time, any distress information
collected and reduced using automated procedures needs to be analysed carefully to determine the
accuracy, precision, and resolution.
Page 171
Non-destructive deflection testing of the pavement is a simple and reliable method to assist in making
this evaluation; however, destructive testing, such as coring and trench studies, may also be used.
Pavement structural evaluation is important in the selection of treatments, especially if cracking
exists. The selection of which structural capacity test to carry depends on the importance of the
roadway, value of the Project, and availability of equipments to conduct the test.
Page 172
Trench Studies
Trench studies are saw-cut deep enough in the asphalt layers with minimal disturbance to the
aggregate base course. Trench dimensions shall be approximately 1 m by 4 m, or as seen suitable
to cover the area of investigation. Asphalt layer samples need to be separated by layer, surface,
binder, or asphalt base course for analysis of each layer separately. After the asphalt layer is
removed and samples collected, aggregate base course tests can be conducted. If needed, after
testing and sampling, the aggregate base course can be dug out to access, sample, and test the
subgrade soil.
For example, Figure 11-3 shows a picture of a trench cut out for a road section that suffered from
severe rutting. The trench was needed to detect the deformation in different layers. It can be seen
from the figure that the deformation was mainly in the surface layer. This leads to the conclusion that
the asphalt mix design for the surface layer was incorrect. Milling the surface layer and replacing it
with a properly designed asphalt surface will fix this pavement failure.
Asphalt Cores
Asphalt layers are testing by taking a coring rig and water for cooling. Rigs shall be lowered gradually
until they reach the end of the asphalt layer. If there is a chemically treated base layer, the coring
should continue in the base to obtain an intact sample. Cores can measure 10 cm or 15 cm in
diameter. Figure 11-4 shows a core with a 5-cm asphalt surface and 14-cm base course. Asphalt
cores are used to check the thickness of pavement layer and to compare it to the as-build details
because the overlay might have been carried out and the asphalt layer thickness was increased.
Core locations are decided based on the extent of the Project. Cores shall be taken from locations
that represent the entire pavement at 500-m intervals for long roads.
Page 173
Aggregate base and subgrade soil tests, such as in situ plate load testing. Additionally, field CBR,
moisture content, Atterberg limits, and permeability can be conducted on soil samples. Asphalt
samples taken from the trench or cores can be used to conduct the following testing:
Exact location and frequency of structural testing within specified road sections should be carefully
determined prior to seeking testing services. Tests shall be limited to locations where distress
condition survey and roughness surveys indicate structural problems and areas where overlays are
anticipated.
Several NDT devices are available; however, they are not all available in UAE. These NDT devices
include the following:
• Benkelman Beam;
• Dynaflect;
• Road Rater;
• Falling Weight Deflectometer (FWD);
• Ground Penetrating Radar (GPR);
• Rolling Deflectometer;
• Seismic Pavement Analyser (SPA); and
• Dynamic Cone Penetrometer (DCP).
Page 174
All devices, except the GPR and DCP, operate by measuring the pavement response to an imposed
force. Responses are generally in terms of surface deflections at one or more points on the
pavement. Major differences between these devices include the load levels; the way the load is
applied to the pavement, such as steady, vibratory, or impulse; and the number of points at which
deflections are measured. GRP uses energy waves to estimate the layers’ thickness. DCP is used
on unbound pavement layers to obtain stiffness of the layer. This Project’s NDT will focus on the
FWD, DCP, and GPR — each of which are available in the UAE.
The Operator drives the DCP tip into the soil by lifting the sliding mass (hammer) with one hand to
the handle then releasing it, whilst the other hand holds the instrument by the handle to maintain an
approximate vertical position.
Initial depth readings are made using a measuring stick between the bottom of the sliding mass and
a stationary surface, such as a pavement surface or ground level. Total penetration for a set of blows
is measured and recorded by an assistant, who will generate a graph of depth versus cumulative
blows and shall fit a trend line to the data points for each tested layer. Penetration rates, measured
in mm/blow, are determined as the slope of the trend line.
The number of blows in a set can vary. For softer soils, 1 to 3 blows may be a set, whereas for stiffer
soils, 5 to 10 blows may be a set. Some soils may be so stiff that little to no penetration is recorded
in a given set.
The U.S. Army Corps of Engineers has developed a number of correlations relating rate of
penetration to soil stiffness in terms of the CBR. For most applications, the following relationship is
adequate for approximating in situ stiffness:
CBR = 292/PR1.12
Where:
CBR = California Bearing Ratio
PR = penetration rate, mm/blow.
This relationship has been further correlated to elastic modulus (E) using the following relationship:
E = 2555 CBR0.64
Page 175
Testing intervals are set every 200 m, or at 30 locations per project. Where a divided roadbed exists,
surveys shall be taken in both directions — if the Project includes improvements in both directions.
Temperature data, collected at the time of testing, is necessary for all flexible pavements because
the modulus of bituminous materials is temperature-dependent.
FWD requires the use of computer software for backcalculation of deflection data collected.
Software, such as MODULUS 6.0, ELMOD 5.0, and EVERCALC 5.0, is Windows compatible and
include analyses and graphing features.
Page 176
Inputs required for the backcalculation are the raw deflection file, pavement layer thicknesses, layer
Poisson ratios, probable layer moduli ranges, and asphalt temperatures at the time of testing. This
process works on the assumption that the pavement structure is a linear elastic layered system.
Knowing the layer thickness, deflection, and Poisson ratio, the modulus can be approximated. Once
a reasonable match is made, the moduli that allow this match are reported as the individual layer
moduli.
There are precautions and limitations to the backcalculation procedure that the user must consider.
In the end, engineering judgment will be needed to decide on the viability of solutions generated.
Advice for using MODULUS 6.0, as reported by the Texas Department of Transportation
(http://onlinemanuals.txdot.gov/txdotmanuals/pdm/pavement_evaluation.htm) includes the
following:
GPRs are mounted on a van in a self-contained system that is suspended above the roadway. This
allows for uninterrupted data collection at near-highway speeds. Figure 11-7 shows the GPR.
GPR is a valuable tool to the pavement engineer to assist in determining the following:
Page 177
Roughness can be generated by localised surface or subsurface distress and poor construction
quality, including compaction, grade control, and poor bonding of the surface HMA layer to the
underlying HMA layer. New or reconstructed pavements shall be as smooth as practical. Roughness
will accelerate deterioration. Roughness is important because it affects not only ride quality but also
vehicle delay costs, fuel consumption, and maintenance costs.
Roughness equipments range from very simple to very complex techniques. Different techniques
are listed below and are arranged from very simple to very complex:
Rod and level surveys provide an accurate profile measurement; however, they take a long time and
require road closures, which are not practical for major long roads. To reduce the time and increase
accuracy, a dipstick profiler can be used, as seen in Figure 11-8; however, the length of the road
needs to be relatively small.
For longer road stretches, Profilographs, which have a sensing wheel mounted to provide free
vertical movement at the centre of the frame, may be used. Refer to Figure 11-9, for an example.
Deviation against a reference plane, established from the profilograph frame, is recorded on graph
paper from the motion of the sensing wheel. Profilographs can detect slight surface deviations or
undulations up to approximately 6 m in length.
Page 178
Roughness can also be measured using the RTRRMs, often-called road meters. RTRRM systems
are adequate for routine monitoring of a pavement network and providing an overall picture of the
condition of the network.
RTRRMs measure the vertical movements of the rear axle of an automobile or the axle of a trailer
relative to the vehicle frame. These meters are installed in vehicles with a displacement transducer
on the body, located between the middle of the axle and the body of a passenger car or trailer.
Transducers detect small increments of axle movement relative to the vehicle body and the output
data consists of a strip chart plot of the actual axle body movement versus the time of travel.
The disadvantage of a RTRRM is that it depends on the dynamics of the particular measurement
vehicle, which results in unstable and unrepeatable measurements.
Profiling devices, which range from manual straightedge measure to automatic profilometers, are
the most-used roughness techniques. Straightedge measure was improved by mounting it on
wheels, which is the profilograph. Examples of automated profilometers include the Automated Road
Page 179
Analyser Vehicle (ARAN), which is equipped to measure the road profile expressed by the IRI, as
seen in Figure 11-10.
Each roughness measuring technique uses a different parameter to detect the road roughness, and
there is no correlation between these devices. It is recommended to use the IRI because it is widely
used for roughness measurement, as it is fast, accurate, and measured automatically. IRI is
computed from longitudinal profiles using an automatic profilometer mounted on a vehicle that
operates at traffic speed.
To measure skid resistance, an index, referred to as a skid number, shall be used. As the skid
number decreases, the surface friction decreases. Low skid numbers are an indicator of accident
potential.
Skid resistance is measured with different methods. These methods vary according to measuring
technique and they include the following:
Mu-Meters use a triangle frame with three un-braked wheels, a load cell, and a recorder to document
the distance and the coefficient of friction, as friction is encountered on the pavement. Test wheel
speeds range from 60 km to 160 km per hour. A water delivery system is available to distribute water
in front of the two wheels. Laser testers measure only the macro texture and need to be adjusted for
Page 180
the micro texture that influences the skid resistance. At the same time, the laser device is more
expensive to operate compared to the locked wheel tester; however, the portable devices are
relatively cheaper and are less accurate.
On highway pavements, skid measurements are usually made with the locked wheel tester, which
is the most common method used. For this method, a trailer is towed, normally at 60 km per hour.
Water is applied in front of the test wheels, and the test wheels are locked. The force required to
drag a tire that is prevented from rolling over the wet pavement is measured after the test wheel has
been sliding on the pavement for a certain distance. Skid numbers (SN = 100 x Friction Factor) are
calculated for that part of the pavement. Skid numbers are the standard procedure for evaluating the
coefficient of friction between a tire and pavement and its calculation depends on temperature.
Figure 11-11 shows the locked wheel tester.
For any distress survey, manual, or automated, the following data analysis procedure is applicable.
Sections of the road corridor need to be identified for delineation for uniformity and for comparable
attributes. The delineation can follow the method described as “Analysis Unit Delineation by
Cumulative Differences,” 1993 AASHTO Guide, Appendix- J (4).
Pavement condition surveys shall be conducted considering the five major distress types covering
surface deformation and surface distresses, which are primary responsible symptoms for pavement
failures. Different distress types and their main cause are explained in Section 8.3 of these manual,
which includes pictures to document the shape of the distress. Table 11-1 lists the five major
distresses.
These distress types are indexed for severity level into six levels for better mapping of the
problems at site covering from Failed (Level 5) to Excellent (Level 0) condition of the pavement.
Pavement condition data shall be collected and the pavement thoroughly investigated for each unit
Page 181
of 100 m long and full-lane width for distress types, according to condition rating as defined in
Table 11.2
Note that the Severity Levels should be assessed for each 100m lane and then pegged at each
kilometre. The most severe location is identified judiciously within 100m lane and is representative
for the pavement distress types for the 100m stretch. The kilometre severity level is summed up for
the determination of the homogeneous section Severity Level.
The intensity by distress type and severity levels should be calculated as per the criteria listed in
Table 11-3. Data are recorded either by mapping, as shown in Figure 11-12, or in a tabular form, as
given in Figure 11-13. Tabular forms are recommended for the pavement distress survey because
they provide data that are more accurate; however, the mapping shall be easier to use with the
windshield survey. Figure 11-14 shows an example of the delineation of a pavement road in both
directions.
Considerations for roughness are made by using the IRI limits and severity, as given in
Table 11-4. Similarly, the skid resistance (skid number) severity levels are shown in Table 11-5.
These limits shall be considered for all roads as a pavement distress indicator that will trigger
maintenance of the pavement surface.
Once all the distresses and its severity levels are obtained, the data can be summarized by using
an average called Aggregate Severity Level (ASL), which is calculated using the following equation.
The ASL can be modified to have a weighted average by giving more emphasis on some distresses
over the other as seen applicable by the agency. Using the weighted average and the weights to be
given to each distress will be project dependent and shall be approved by the agency before being
used.
This methodology calculates the difference between the cumulative area under a uniform stretch
and the overall average cumulative area for the same stretch. Differences between these two areas
are called the cumulative difference variable Zx.
Zx is calculated for a discontinuous data of equal testing interval by the following equation:
n nt
n
Zx = ∑ ai - ∑ ai
ni
i=1 i=1
Accordingly, the value of Zx can be a positive or a negative value, depending on the difference of
the two areas.
Based on the summarized data, the pavement designer shall refer to Chapter 5 to select the
appropriate rehabilitation or Chapter 8 for maintenance techniques.
Distress Type
S. No. (Functional Response Characteristics
Parameters)
Deformation
1. Rutting
Distress
2. Cracking
3. Ravelling
Surface Distress
4. Potholing
5. Edge Break
Page 183
0.000 0.200
0.200 0.400
… 0.400 0.600
0.600 0.800
0.800 1.000
0.000 0.200
0.200 0.400
… 0.400 0.600
0.600 0.800
0.800 1.000
0.000 0.200
0.200 0.400
… 0.400 0.600
0.600 0.800
0.800 1.000
Page 184
Table 11-2: Pavement condition rating for different severity levels and threshold levels
Page 185
< 30 5 (Failed)
31 – 34 3 (Fair)
≥ 30 2 (Good) – LVRs
Page 186
CITED REFERENCES
1. Abu Dhabi Department of Transport. Standard Specifications Volume 1 for Road Works
Manual. Abu Dhabi, UAE: Abu Dhabi Department of Transport, 2013, Manual No AD-C-01.
2. Abu Dhabi Department of Transport. Project Cost Estimating Manual. Abu Dhabi, UAE: Abu
Dhabi Department of Transport, 2013, Manual No AD-C-03.
3. Abu Dhabi Department of Transport. Bill of Quantities Manual for Road Projects. Abu Dhabi,
UAE: Abu Dhabi Department of Transport, 2013, Manual No AD-C-02.
4. American Association of State Highway and Transportation. AASHTO Guide for Design of
Pavement Structures. Washington, D.C., USA: American Association of State Highway and
Transportation Officials, 1993. 1-56051-055-2.
5. Municipality, Abu Dhabi. Roadway Design Manual. Abu Dhabi UAE : Abu Dhabi Municipality,
2000.
7. United Arab Emirates, Ministry of Presidential Affairs. National Center of Meteorology and
Seismology. [Online] [Cited: June 1, 2011.] www.ncms.ae/english/.
8. Ltd, Shell International Petroleum Co. Pavement Design Manual: Asphalt pavement and
overlays for road traffic. London: s.n., 1978.
9. Federal Highway Administration (FHWA). Guide to LTPP Traffic Data Collection and
Processing. Mclean, Virginia, USA : Federal Highway Administration, 2001.
10. Abu Dhabi Department of Transport. Road Structures Design Manual. Abu Dhabi : Department
of Transport, 2013 Manual No. AD-D-06.
11. Institute, Asphalt. Asphalt Pavements for highways & Streets Manual Series 1 (MS-1).
Lexington, KY USA : Asphalt Institute, 2008. 978-1-934154-01-4.
12. ASTM. Standard Test Method for CBR (California Bearing Ratio) of Laboratory-Compacted Soils.
(D1883-07e2).
13. ASTM. Standard Test Method for CBR (California Bearing Ratio) of Soils in Place (D4429).
14. American Association of State Highway and Transportation. AASHTO Standard Method of
Test for The California Bearing Ratio (AASHTO T-193).
15. ASTM. Standard Test Method for Compressive Strength of Molded Soil-Cement Cylinders.
(ASTM D-1633)
16. American Association of State Highway and Transportation. AASHTO Standard Method of
Test for Resistance to Plastic Flow of Bituminous Mixtures Using Marshall Apparatus. (AASHTO T-
245)
17. ASTM. Test Method for Resistance of Plastic Flow of Bituminous Mixtures Using Marshall
Apparatus. (ASTM D 1559)
Page 187
19. Payne and Dolan Incorporated. Warm Mix Asphalt – a Contractor’s Perspective, a presentation
to an AASHTO subcommittee.
20. USA Portland Cement Association. Thickness Design for Concrete Highway and Street
Pavements, 1984. (EB109P)
21. Abu Dhabi Department of Transport. Road Drainage Manual. Abu Dhabi, UAE: Department
of Transport, 2013. Manual No. AD-D-07.
22. Abu Dhabi Department of Transport. Road Landscaping Manual. Abu Dhabi, UAE:
Department of Transport, 2013. Manual No. AD-D-08.
24. Kathryn A. Zimmerman, P.E., and David G. Peshkin, P.E. Supporting Preventive Maintenance
Programs with Pavement Management, 6th International Conference on Managing Pavements
(2004)
26. FHWA: Miller and Bellinger. Distress Identification Manual for the Long-term Pavement
Performance Program (Fourth Edition). Federal Highway Administration, 2003.
http://www.fhwa.dot.gov/publications/research/infrastructure/pavements/ltpp/reports/03031/
27. American Concrete Pavement Association (ACPA), (1995). Construction of Portland Cement
Concrete Pavements. National Highway Institute Course No. 13133. AASHTO/FHWA/Industry joint
training. Federal Highway Administration, Department of Transportation. Washington, D.C.
28. Federal Highway Administration (FHWA). Life-cycle Cost Analysis resource page. [Online]
http://www.fhwa.dot.gov/infrastructure/asstmgmt/lcca.cfm.
30. World Bank. Highway Design and Maintenance Standards Model (HDM-4). [Online] [Cited: 2001]
http://www.worldbank.org/transport/roads/rd_tools/hdm4.htm.
31. American Association of State Highway and Transportation. Supplement to the AASHTO
Guide for Design of Pavement Structures, Part II-Rigid Pavement Design and Rigid Pavement Joint
Design. Washington, D.C., USA: American Association of State Highway and Transportation
Officials, 1998.
32. Austroads. Guide to Pavement Technology, Part 5: Pavement Evaluation and Treatment
Design. Sydney, Australia: Austroads Incorporated, 2009. 978-1-921551-22-2.
OTHER REFERENCES
Page 188
1. Department of Municipal Affairs and Transport. Consultant Management Manual. Abu Dhabi,
UAE: Department of Transport, 2013. Manual No. DOT-M-03.
2. Federal Highway Administration (FHWA). Life-cycle Cost Analysis Primer, 2002, available
online through the FHWA’s life-cycle cost analysis resource page at
http://www.fhwa.dot.gov/infrastructure/asstmgmt/lcca.cfm.
Page 189
INDEX
A D
AASHTO, xi, xii, xiv, xvi, 2, 6, 8, 18, 23, 25, Damage, xii, 8, 9, 10, 14, 15, 18, 19, 52, 59,
26, 30, 34, 35, 39, 40, 42, 44, 45, 46, 47, 67, 84, 93, 97, 104, 107, 118, 129, 132,
48, 56, 57, 58, 59, 60, 64, 65, 71, 72, 78, 138, 139, 148, 172, 176
79, 83, 91, 92, 94, 95, 96, 98, 99, 101, 104,
105, 106, 166, 183, 184, 189, 190, 195, Delineation, 183, 184, 186
210, 212 Department of Transport, i, 1, 189, 190,
Aggregate, xi, xii, xiv, 5, 28, 30, 33, 34, 36, 191
39, 40, 49, 64, 71, 72, 78, 79, 80, 103, 104, Distress, xiii, xiv, 3, 5, 50, 55, 56, 67, 70, 83,
106, 108, 109, 110, 113, 114, 115, 116, 84, 89, 91, 92, 93, 94, 96, 102, 103, 121,
122, 123, 126, 128, 129, 130, 132, 139, 127, 130, 131, 132, 134, 135, 145, 148,
140, 141, 142, 144, 145, 148, 167, 168, 171, 172, 173, 174, 176, 180, 183, 184,
169, 175 185
Analysis Period, xi, 160
E
Asphalt Empirical, xii, xiii, 1, 5, 6, 8, 10, 14, 22, 24,
base, xi 25, 30, 34, 39, 44, 45, 72, 73, 78, 80, 81,
83, 96, 104, 183
concrete, xi, xii, xvi, 33, 48, 78, 80, 103
ESAL, xii, xvi, 6, 18, 20, 46, 66, 72, 73, 79,
Asphalt treated base, xi, xv, xvi, 30 81, 90, 91, 94, 102, 105, 106
Climatic, xi, 83 Joint, xii, xiii, xv, 58, 59, 63, 64, 65, 85, 86,
126, 127, 146, 148, 149, 190
Condition Survey, xiii, 94, 95, 166, 171,
173, 176, 183, 185, 186 K
Page 190
L R
Life Cycle Cost, xii, xvii, 1, 2, 3, 4, 44, 45, Rehabilitation, xiii, xv, 1, 2, 3, 14, 25, 83, 85,
79, 118, 146, 150, 151, 152, 153, 154, 155, 93, 96, 97, 98, 99, 100, 101, 103, 115, 116,
156, 157, 158, 159, 161, 162, 163, 164, 117, 118, 119, 133, 134, 135, 136, 137,
165 138, 143, 150, 151, 152, 153, 154, 156,
159, 160, 166, 167, 169, 170, 171, 185
Low Volume Roads, xiii, xvii, 1, 2, 3, 101,
102, 103, 105, 106 Reliability, xiv, 45, 50, 55, 56, 59, 67, 78, 84,
86, 91, 95, 102, 105
M
Resilient Modulus, xiv, 8, 9, 23, 24, 25, 28,
Maintenance, xii, xiii, 1, 2, 3, 4, 6, 14, 41, 45, 34, 35, 45, 46, 78, 80, 86, 89, 90, 91, 92
71, 79, 83, 89, 93, 96, 97, 101, 103, 104,
106, 116, 118, 119, 120, 134, 135, 136, Roughness, xiii, xvi, 87, 88, 97, 122, 124,
137, 138, 139, 146, 147, 150, 152, 153, 126, 127, 129, 131, 132, 133, 134, 147,
154, 160, 166, 167, 168, 169, 170, 171, 176, 180, 182, 183, 184
180, 182, 184, 185
Rutting, xiv, 33, 40, 43, 54, 83, 85, 87, 88,
Material, xi, xii, xiii, xiv, xv, 1, 2, 3, 6, 7, 8, 22, 92, 93, 103, 119, 130, 131, 135, 142, 143,
23, 25, 28, 29, 30, 32, 34, 39, 41, 44, 45, 146, 158, 159, 171, 175, 176
48, 50, 53, 54, 58, 64, 66, 71, 78, 80, 81,
85, 87, 88, 89, 92, 93, 94, 95, 102, 103, S
104, 106, 108, 109, 111, 113, 123, 127, Serviceability, xi, xii, xiv, xv, xvii, 18, 45, 46,
139, 144, 145, 148, 149, 166, 171, 179 56, 57, 59, 78, 91, 95, 105, 106, 119, 136,
Mechanistic-Empirical, xiii, xvii, 1, 6, 7, 8, 147
10, 14, 20, 21, 22, 24, 28, 30, 32, 34, 35, Slurry seal, vii, xiv, 136, 137, 140, 141, 153,
44, 50, 52, 54, 56, 65, 66, 80, 81, 82, 83,
160
95, 96, 183
SN, xii, xv, xvii, 45, 46, 48, 71, 72, 79, 88, 94,
N 105, 183
Nomograph, xiii, 5, 6, 37, 38 Strength, xi, xiv, xviii, 8, 10, 30, 32, 33, 39,
Non-destructive test, xvii, 88, 89, 91, 94, 40, 45, 48, 56, 65, 66, 68, 71, 72, 78, 85,
174, 176, 177, 179, 185 88, 90, 100, 102, 103, 119, 123, 131, 136,
148
P
Structural Capacity, xiii, xiv, 1, 2, 45, 48, 71,
Pavement Management Systems, xiii, xvii, 88, 89, 91, 94, 98, 106, 118, 136, 171, 174
3, 97, 120, 166, 167, 168, 171
Structural Design, xiv, 2, 6, 22, 35, 59, 72,
Pavement performance, xi, xiii, xvii, 7, 40, 123, 146, 171
56, 58, 72, 118, 133, 152
Subbase, xiii, xv, 3, 4, 8, 24, 25, 26, 27, 28,
PCC, xi, xvii, 4, 24, 39, 84, 85, 86, 88, 89, 96, 44, 48, 64, 65, 66, 67, 71, 72, 77, 79, 85,
98, 99, 121, 147, 148, 149 88, 90, 99, 100, 102, 103, 104, 116, 153
Permanent Deformation, xi, xiii, 4, 33, 50, Subgrade, xi, xii, xiii, xiv, xv, xvii, 3, 4, 7, 8,
54, 55, 58, 80, 81, 95, 96, 176 9, 10, 23, 24, 25, 44, 45, 48, 50, 52, 53, 54,
56, 58, 59, 64, 65, 66, 71, 72, 77, 78, 79,
Present Serviceability Index, xiv, xvii, 45, 80, 84, 86, 90, 91, 92, 93, 94, 95, 96, 97,
46, 59, 91, 95, 180 99, 100, 102, 103, 105, 106, 108, 110, 111,
113, 122, 123, 125, 126, 127, 130, 132,
Page 191
133, 146, 149, 175, 176, 179, 195, 196, Traffic, xi, xii, xiii, xiv, xv, xvi, 1, 2, 3, 4, 5, 6,
197, 198, 199, 200, 201, 202, 203, 204, 7, 8, 12, 14, 17, 18, 19, 20, 21, 22, 35, 42,
205, 206, 207, 208, 209 44, 45, 49, 50, 52, 54, 55, 56, 58, 59, 60,
65, 66, 67, 70, 71, 72, 73, 78, 80, 81, 83,
Subsurface, xii, 64, 83, 93, 107, 109, 110, 84, 85, 86, 87, 90, 91, 94, 95, 96, 97, 98,
111, 113, 114, 115, 116, 117, 123, 132, 99, 101, 102, 103, 104, 105, 106, 107, 108,
180 118, 119, 120, 122, 124, 125, 128, 130,
T 131, 135, 138, 139, 141, 142, 143, 144,
146, 152, 153, 154, 156, 157, 158, 160,
Temperature, xi, xvii, xviii, 4, 5, 6, 8, 10, 11, 161, 166, 167, 169, 173, 174, 182, 189
12, 35, 41, 55, 59, 65, 80, 93, 94, 96, 124,
125, 130, 146, 159, 178, 183 W
Page 192
Page 193
Page 194
Page 195
Page 197
Page 198
Page 199
Page 200
Page 201
Page 202
Page 203
Page 204
Page 205
Page 206
Page 207
Page 208
Page 209
Page 210
Page 211
Page 212
Page 213
Page 214
Page 215
Page 216
Page 217
Page 218
Page 219
Page 220
Page 221
Page 222
Page 223
Page 224
Page 225
Page 226
Page 227
ANNEX 1
General Requirements for the Pavement Design
The following requirements should be fulfilled for road pavement design for Abu Dhabi Emirate
projects;
A. The designed pavement layer thickness should be based on full design calculations (as
specified in this manual) and not referring to tables to estimate minimum Asphalt layer
requirement for the project. The values of minimum required asphalt layer thickness for
different road class addressed in this manual, should be used as a final check after
conducting full design calculation as per this manual.
B. As per this manual, Empirical Pavement Design procedure shall be conducted, and
design check to be applier using the Mechanistic – Empirical Design Method,
D. Several pavement design options should be studied and value engineering optimized
(Technically, Financially and Environmentally) based on sustainability criteria to
achieve the following;
▪ Longer Pavement Service Life,
▪ Less overall Life-Cycle Cost,
▪ Faster and more economical Constructability.
▪ Faster and more sustainable Maintenance Activities,
▪ Saving in raw material, water and energy consumption,
▪ Have Less Carbon Emissions and Less Impact on Natural Environment,
▪ Studying the Utilization of non-traditional solutions (such as Pavement Recycling,
Asphalt Mix Additives, Recycled Materials, Design Using Geosynthetics ….) to
achieve more sustainable pavement design on project basis
A. To review and issue No Objection on pavement design for any project in Abu Dhabi
Emirate, an Geotechnical Study (approved by the relevant governmental Engineer /
Authority) is a major requirement. The relevant Geotechnical information should be
submitted to the Abu Dhabi Emirate relevant authority, then reviewed and an official No
Objection should be issued accordingly, attached with conditions (if any), then the
accepted geotechnical report, attached with the geotechnical No Objection conditions
to be submitted to Road Pavement Design Reviewer for consideration. In some cases
(if any) that no need for geotechnical study, or some previous geotechnical information
are used in the pavement design, this should be accepted by the relevant
governmental geotechnical specialist.
B. Traffic Study of the project area including ; The existing and expected ADT (Average
Daily Traffic) or PHV (Peak Hour Volume) and the traffic classification(Composition) of
Page 228
different traffic vehicles that expected to utilize the project area along the pavement life
and Traffic Growth Factor along the road design life (In addition to all other
requirements of the project traffic Study as required by Abu Dhabi Emirate relevant
Traffic Specialist / Authority). In case of Non – Available Traffic Study, Traffic Estimates
should be accepted by the Abu Dhabi Government relevant specialist / Authority.
C. Any other study (or information) that may be required as an input data for Pavement
Design Analysis, should be submitted, Reviewed and Accepted by the Governmental
relevant Specialist / Authority.
The pavement design report (or section in an overall design report) should fulfill (but Not
limited to) the minimum standard required contents as follows;
1 Introduction,
- Project Information (Location, Area, scope, objective, etc)
- Land Use of Project area and adjacent areas,
- Road Hierarchy of roads included in project scope,
The following geotechnical data are considered as minimum requirement for pavement
design purpose. Further testing and Geo-Physical / Geotechnical requirements that may
be required by Abu Dhabi Emirate Geotechnical Specialist to fulfill the Geo-Physical /
Geotechnical scope should be fulfilled by the consultant.
5 Pavement Layers Material Properties, (As Per this Manual and Abu Dhabi
Emirates relevant Standard Specifications).
- Mr value of Supporting Soil,
- Mr value of Pavement layers,
- Layer coefficient (a) for different pavement layers,
- Drainage factor of granular base course and sub-base layer.
6 Design Traffic Data, (As Per this Manual and as agreed with the relevant
authority design reviewer);
- Summary of Approved Traffic Study results,
- Selected peak hour traffic volume,
- Calculated Average Daily Traffic ADT,
Page 229
8 Recommendations,
- Recommended Pavement Section(s), Considering Standard Drawings and
Specifications,
9 After Getting No – Objection on Final Pavement Design for the Project, the
consultant is requested to submit the project pavement design data in GIS
format. The GIS format to be discussed and agreed with the Abu Dhabi
Government related Pavement Design Reviewer and GIS Specialist.
10 Appendices,
- Appendix (A),
i. Project Location Map & Satellite Image,
ii. Land Use Plan (for Different land use inside the project),
iii. Road Hierarchy Plan,
Page 230
The following checklist should be followed by the consultant during pavement design of
road projects as a part of pavement design quality assurance process, and to be included
in the pavement design report submitted to the relevant Abu Dhabi Government Authority
– Pavement Design reviewer, for review and acceptance.
Page 231
Page 232
Page 233
ANNEX 2
A sample EALF calculation sheet for typical public bus
Check
Subject: Load Equivalency Factor Public Bus
B y:
References/Results
Design Vehicle - Public Bus
Estimated
7.25 10.00 Axle w eight (tonnes)
15,972 22,046 Axle w eight (lbs)
15.97 22.05 Axle w eight (Kips)
42% 58% Weight distribution (%)
ESAL/veh = 0.62 2.20 2.82 ESAL/veh LEF equation (tab LEF Calcs)
Page 234
ANNEX 3
ACCEPTANCE CRITERIA FOR MECHANICALLY STABILIZED FLEXIBLE
PAVEMENTS USING GEOGRIDS
1. General
1.1 INTRODUCTION
The primary mechanism of the Geogrid contribution in a full depth pavement structure
can be summarized as lateral confinement of aggregate particles, increasing the modulus
of the aggregate layer, which in turn increases the load-carrying capacity and improves
pavement structural performance.
Abu Dhabi experience from actual projects has shown that the use of Geogrid in
sustainable pavement design has provided:
• Longer service life and/or reduced required pavement thickness for the same
pavement design life.
• Reduction of pavement construction costs and life cycle cost.
• Reduction in construction time for pavement works.
• Reduced risk related to construction quality of pavements.
• Savings in raw materials and energy during construction.
• Reduced carbon emissions during construction.
However, the application of these benefits is not simply based on the product
characteristics of the Geogrid product alone. The effect of the Geogrid on the individual
pavement layer in which it is included (i.e. granular base or sub-base material), must be
correctly identified and quantified for inclusion in pavement calculations. Combining a
stabilization Geogrid with a granular material results in a composite layer known as a
“mechanically stabilized layer”, which will have improved performance properties. It has
become clear that these performance properties can be quantified from laboratory testing
but must be verified by full scale trafficking trials carried out by an internationally
recognized testing facility.
The following provides information for pavement designers who wish to use Geogrid
products within Abu Dhabi Emirate road pavement projects, as well as guidance on the
criteria Abu Dhabi Government relevant authority will use to determine suitability of the
Geogrid products selected.
Page 235
Geogrid – An open grid-like mesh formed of polymer materials with stiff integral junctions
or ribs and apertures, sufficiently large to allow strikethrough of soil particles, used to
reinforce or stabilize soils.
Interlock - The mechanism by which the stabilization Geogrid and the aggregate interact
under applied load. During the placement and compaction of a granular layer over a
Geogrid, the aggregate particles partially penetrate into the apertures and abut against
the ribs of the Geogrid.
Confinement - The effect of the mechanism of interlock by which the structure of the
stabilization geogrid restrains the aggregate particles.
Stabilization Geogrid - A Geogrid where the specific function of stabilization has been
identified and associated with a product line by an independent approvals authority as
being distinct from the reinforcement function. The stabilization Geogrid will be defined
by specific stabilization-based product characteristics.
Geogrid Product Line - The class of manufactured products that vary by no more than
one product parameter (e.g. sheet thickness in the case of punched and drawn Geogrids
or number of filaments in the case of woven or knitted Geogrids). All other parameters
remain the same with respect to the manner in which the elements associated with the
final product are assembled into a stable geometry.
Note:
International studies are currently seeking to characterize the stabilized layer
enhancement utilizing Resilient Modulus. Characterization of layer enhancement is
subject to continuous review and update to include international recognized studies
addressing different material characterization methods.
Page 236
Layer Coefficient Ratio (LCR) - The effect of the stabilization Geogrid on a granular
layer, resulting in a MSL whose effect is evaluated and defined by various combinations
of pavement layer thickness, aggregate type and subgrade strength. The LCR is
dependent on evaluation of a variety of full-scale trafficking trials to allow predicted
trafficking performance to be verified with actual trafficking trial data. The LCR can then
applied to directly affect the “Structural Number” of the base or sub-base material
component of any pavement design case.
Base Course Reduction Factor (BCR) - The percentage reduction in stabilized base or
sub-base thickness from the non-stabilized thickness with the same material constituents
for the same defined trafficking load.
Traffic Benefit Ratio (TBR) - The ratio of the number of load cycles on a stabilized
pavement section to reach a defined trafficking load to the number of load cycles on a
non-stabilized pavement section with the same material properties and geometry (layer
thicknesses), sometimes referred to as the Traffic Improvement Factor (TIF). The TBR
concept can be helpful in quantifying and comparing results of trafficking trials.
TBR values are only relevant to the specific pavement section tested. TBR values derived
for one pavement section cannot be applied to a pavement section with differing material
properties or geometry. If TBR values are to be used in the evaluation of an Abu Dhabi
pavement, they must be derived from full-scale trials based upon the specific pavement
materials, geometry and subgrade condition that apply to the project.
In order to standardize material and design requirements for utilizing Geogrids in the
mechanical stabilization of granular pavement layers of Abu Dhabi roads, the Abu Dhabi
Municipality Technical Team developed the first revision of “ADM Approval Process of
Geogrid Materials, Utilized in Stabilization/Reinforcement of Base Course (and/or) Sub-
base Layers of Flexible Pavements” in June 2012. This included material and design
requirements that should be fulfilled by supplier, designer and contractor. This document
is under continuous update and development, according to continuous research studies
and communications with material suppliers and pavement specialists. Material and
design requirements are summarized in the following sections:
It is essential to confirm that a Geogrid material is accepted by Abu Dhabi Emirate and
has “Approval for Application” for utilization in the mechanical stabilization of paved roads.
In order to be accepted by Abu Dhabi Government, it should comply with both the Material
Criteria and Design Procedures. In cases where a material meets only the Material
Criteria or Design Procedures but not both, the material is not considered suitable for Abu
Dhabi Government “Approval for Application”.
Page 237
Previous Geogrid material approvals for similar applications in previous projects are
required to be included in a comprehensive material submittal to relevant Abu Dhabi
Authority- Material Quality Section for review and approval (previous case studies in the
UAE and GCC are preferred).
The ability for engineers to assess the performance of Geogrids in flexible pavements
has been facilitated in recent years with the availability of full-scale accelerated pavement
test (APT) facilities, located at a number internationally recognized testing laboratories
around the world.
AASHTO document (Ref.: R50-09) provides the most recent advice to pavement
designers interested in incorporating Geogrids in their pavements. There is recognition
that as pavement design procedures used experimentally derived input parameters which
are Geogrid specific, engineers are encouraged to affirm their designs with field
verification of the pavement performance. For practical purposes, full-scale accelerated
pavement testing is considered acceptable as “Field Verification”.
Therefore, the primary source to quantify the effect of the stabilization Geogrid to be used
within the Abu Dhabi pavement design process should be full-scale accelerated
pavement testing.
These tests are required to evaluate performance of a pavement incorporating the MSL
under moving wheel loads and develop design parameters for use in a pavement design.
The proposed supplier shall present evidence of at least two full-scale APT trials.
The wheel loads shall be equivalent to or exceed an 80kN (18 kip) single axle. Geogrid
stabilized sections must be compared with a non-stabilized paved control section. The
test must extend to sufficient ESAL’s to provide a realistic indication of whole-life
performance. The rutting performance of the sections must be assessed by trenching.
Design procedures which incorporate the benefit of a particular geogrid line shall require
the supplier and/or manufacturer to demonstrate to the design engineer of record that
Page 238
FS/APT results for one or more products within that product line meet or exceed results
generated by the design procedure.
1.3.4 Large-Scale Laboratory Testing
Whilst the primary source of performance data for Geogrids must be full-scale accelerated
pavement testing, large-scale laboratory performance testing can be conducted to
demonstrate performance differences between the behavior of an Abu Dhabi previously
- approved Geogrid evaluated in full-scale testing, and other products within the same
product line, in order to seek Abu Dhabi Government approval for these additional
products.
This information can be used to develop design parameters for additional members of a
product line from those included in APT and it must be recorded within the independent
review and validation report.
1.3.5 Acceptance Criteria of Pavement Design
A - General Design Requirements
For an acceptable design of a mechanically-stabilized flexible pavement with Geogrid,
the following should be followed:
2. The design submission shall include all design steps, geosynthetic benefit
verifications and justification including supporting testing results provided by the
Geogrid Material Supplier or Manufacturer and fulfilling all required material and
design procedures summarized in this document.
3. The design process should assess several options, including conventional design
(without Geogrid material) and other options, in order to optimize the most suitable
design option for each particular project (case by case basis).
4. Optimization of the most suitable design option should be based on:
• Longer service life.
• Less overall life cycle cost.
• Less expected pavement distresses and better serviceability.
• Easier and more sustainable maintenance activities.
• Easier and faster construction process.
• Saving in construction raw materials, water and energy consumption.
• Less carbon footprint.
• Any Other design considerations defined by relevant Abu Dhabi Governmental
Authority Pavement Design Reviewer.
Page 239
7. The items described below must be performed either by, or on behalf of, the Geogrid
Material Supplier or Manufacturer, then reviewed and approved by the pavement
design specialist.
Design software is ideally suited for pavement analysis with a variety of programs
available from Geogrid manufacturers. ADM encourages the use of this proprietary
software, but any software package incorporating design parameters representing the
Geogrid performance must be approved by the relevant Abu Dhabi Governmental
Authority . Approval will be granted for proprietary software that has been independently
evaluated and validated by an internationally recognized pavement design specialist with
software development expertise recognized and accepted by Abu Dhabi Government
Engineer. Validation shall include the design methodology, design parameters and
software functionality.
Design of Mechanically Stabilized Asphalt Pavement with Geogrids shall refer to the
following references, in addition to any other reference that may be directed by ADM
Technical Staff:
Page 240
Step 2
With the same design input parameters for pavement performance and material
properties used in Step 1, hand calculations or an approved proprietary design
software is to be used to carry out the design of the flexible pavement incorporating
the stabilization Geogrid benefit, appropriate to increase life and/or reduce pavement
thickness resulting from the enhanced modulus of the resulting MSL.
All design parameters reflecting the performance and contribution of the MSL in a
pavement shall be reviewed and validated by an independent internationally
recognized pavement design specialist accepted by relevant Abu Dhabi
Governmental Authority. See Independent Review and Validation in Section 5.3.6.
Note: TBR values are only relevant to the specific pavement section tested - see
definition of TBR in Section 5.2.
Step 3
Carry out layered analysis as defined in the AASHTO 1993 method to ensure
adequate layer thickness for each pavement component, considering the modified
Resilient Modulus of the stabilized road base course to determine the minimum
required layer thickness for the stabilized pavement section.
Step 4
Conduct life cycle cost analyses of non-stabilized and stabilized pavement sections.
Step 5
Evaluate the carbon footprints of non-stabilized and stabilized pavement sections.
Step 6
Conduct a study comparing the non-stabilized and stabilized pavement designs
described in Steps 1 to 5 above from technical, financial and environmental
viewpoints, to assess the overall benefits to the project. This should include:
• Expected pavement service life.
• Construction cost savings.
• Life cycle cost analysis.
• Evaluation of the effect on carbon footprint of pavement construction.
Step 7
Prepare a performance-based specification detailing the requirements of the selected
flexible pavement design. This should include:
• Project performance criteria.
• Pavement analysis and evaluation.
• Conforming design.
• Stabilization Geogrid performance-related product characteristics.
• Stabilization Geogrid product identification characteristics (for on-site verification
purposes).
• Stabilization Geogrid durability requirements.
• Guidelines for alternative proposals (see note below).
Page 241
Note:
Submission of alternative proposals incorporating a Geogrid must follow all of the
criteria included in this document. No proposal for an alternative Geogrid will be
accepted based on product characteristics (material index properties) or explanations
of performance based on product characteristics.
Proposals shall be accompanied by documented independently reviewed evidence of
the associated design along with pavement design calculations by hand or using an
approved proprietary software demonstrating performance equivalent or superior to
that stated in the performance based specification (from Step 7 above).
1.3.6 Independent Review and Validation
An independent review by an internationally recognized pavement engineering
services company (approved by relevant Abu Dhabi Authority before review) is
required before a Geogrid product can be considered as a qualified product by Abu
Dhabi Government or utilized in a design procedure. Refer to NCHRP Report 512.
The third party shall be able to demonstrate familiarity with both the role of Geogrids
and AASHTO pavement design principles, as well as performance evaluation of
pavements.
Independent review will examine the design methodology and proposed calculation
of stabilization effect, product characteristics, quality assurance procedures and
documentation, supporting performance testing and field experience documentation.
In a written report, the reviewer shall validate that the design methodology proposed
for use with the specific stabilization Geogrid product family is correct, that underlying
calculations are supported by appropriate experimental procedures and that the
manufacturer’s research supports the protocols and intent of AASHTO R-50.
The review document shall accompany all final design proposals once complete.
1.4 REFERENCES
Page 242
Page 243