CQHP - Electrical Works
CQHP - Electrical Works
CONSTRUCTION PROJECTS
1. Guideline!
(A) Project Organization Chart (Electrical) 1
(B) Minimum Qualification Requirements for Various
Positions (Electrical) 2
2. Guideline II
Site Inspection 4
3. Guidelineill
Checking ofElectrical Installation Design
4. Guideline IV
Testing ofElectrical Installation 8
5. GuidelineV
Checking of Design and Testing of
General Works
6. Guideline VI
Checking oflnstallation Design and Testing of
Electric Elevators and Others. 12
7. Guideline VII
Checking and Testing ofAC. Electric Generators 13
8, Guideline vm
Checking of External Electrical Installation
Design and Testing 15
9. Guideline IX
Electric Lighting and illumination 16
10. Guideline X
Checking and Testing ofTemporary Electrical
Installations at Construction Sites 17
11. Guideline XI
Checking and Testing ofBuilding Lightning Arrester
Installations 19
12. Guideline XII
Commissioning, Operation, Maintenance and
Repair of Completed Electrical Installation Works 21
COMMITTEE FOR QUALITY CONTROL OF HIGH-RISE BUILDING
CONSTRUCTION PROJECTS
GUIDELINES FOR ELECTRICAL WORKS
GUIDELINE IA
PROJECT -
V:anous --- DIRECTOR I MANAGER
,,.
~
\I/
DESIGNER
sections (ELECTRICAL)
II
0 fthe \ !/ I
PROJECT (EXTERNAL INSPECTION)
Company ------·-·--·- -
ENGINEER GOVT. ELECT. INSP. DEPT.
\[/
SUPERVISION ENGINEER
1
(INTERNAL INSPECTION)
(ELECTRICAL) ELECTRICAL ENGINEER (S)
\/
SUPERVISION TECHNICIAN (S)/ WORK - CHARGE (S)
(ELECTRICAL)
,11
FOREMEN
(ELECTRICAL)
\ I
SKILLED WORKERS
LABOUR (ELECTRICAL)
Remarks:
0 Subject to approval by CQHP.
(1) Experience means Construction- Related experience after obtaining Degree I Diploma
(2) Category will be determined by the Committee based on number of storeys, size of the
tions.
(3) The qualification requirements shown in the table are subject to change as and when
required.
Category Classification
Building Category A- Buildings with more than 20 storeys but not more than 100m in
Building Category B - Buildings with 13 to 20 storeys and other buildings with special
considerations
Building Category C - Buildings with 9 to 12 storeys and other buildings with special
considerations
page(4)
CONSTRUCTION PROJECTS
GUIDELINE II
CONSTRUCTION PROJECTS
GUIDELINE III
1.1 Designed Voltage Rating of incoming overhead line or underground cable and its
capacity shall be clearly shown. (M)
1.2 Overcutrent and Ground fault protection provided in High Tension Receiving.
(a) Either built-in overcurrent and Ground Fault trip protection shall be provided
in the circuit breaker or overcurrent and Ground Fault trip relay with prot-
ection current transformer operated system shall be provided seperately. (M)
(b) Protection provided for transformer should be as·per attached detail schedule
and drawing (Table. III - 1) (R).
2. Low Tension Receiving and Distribution System, Circuit Diagrams and Design
Drawings shall be in accordance with Rules and Regulations adopted in
Myanmar (Fig. III- 3) (Fig.III - 2)(R).
2.2 Mention how much percent of total load is needed to take the emergency
load by stand-by Electric Generator in theeventofNormalpowersupplyfailure
and also explain the essential load.(R)
2.3 Typical Low Voltage interconnection between different sources of supply and stand-
by Generator Power Supply should be as per attached Drawing (Fig. III- 1)(R).
3.1 State estimated lagging power factor equipment k VA load, that is percentage
inductive kVA load connected in the Electrical Installation and state also the
installed Power Factor Improvement static capacitor kVAR capacity.
page(6)
5.1 From the load demand, select transformer kVA capacity and the quantity of
transformer required. Explain the justification of Transformer/ Transformers and
the capacity selected.
6.1 List the different types and sizes of Wires and Cables shown in the Design
Drawing. Explain their application and location in accordance with their type
and ampere rating.
7. Earthing System(M)
7.1 System of Earthing used shall be T-T Earthing System , that is , all exposed
conductive parts of an installation are connected to an earth elecrode which is
independent of the Source Earth. Its electrode resistance to earth shall not
be more than 2 ohms (Fig. III - 4).(M)
7.2 Direct Earthing of Neutral at transformer neutral point shall not be more than
2ohms.(M)
8. Design Checlqng
8.1 Design checking of item 1.1 and 1.2 are subject to confirmation by MEPE.(M)
9. Electric Room
9.1 Enough space of Electric room for installation of switchgear, meter panel eic. Shal
be provided in every. Floor along the line ofvertical shaft preferably near the lift
sha:ft(M)
CONSTRUCTION PROJECTS
GUIDELINE IV
2.5 Quality and type of all metal conduit and trunking should comply with relevant
British Standard or equivalent. Preferably all locally manufactured conduit
and trunking should be of Unplastizied Polyvinyl Chloride conduit of
standard quality. It shall be at least practically acceptable for use in
embedding or passing through structural elements; such works shall' be
approved by the structural designer.(R)
3. The minimum of site tests to be carried out on each completed section of the
electrical installation shall be as follows:- (M)
3.4 Polarity Tests to verify that single pole switches are installed in the phase or Live
Conductor of each circuit and not in the neutral conductor
3. 5 Insulation Resistance tests to earth and between conductors before and after fitting
of lamps or equipment
3.7 Check correct CT ratio and polarity and correct operation of all prokctive
gears and accuracies of all type of meters installed
3.8 Tests to prove correct operation of interlocks , tripping and closing circuits ,
indications, etc. including operation in conjuction with the stand-by generator,
fire alarm circuits and lifts where applicable
3.10 Battery tests on specific gravity, correct output voltage and charging equipment
CONSTRUCTION PROJECTS
GUIDELINE V
1. Electrical Motor Driven Water Pump, Motor Wiring, Water Level Control and
Others
1.1 Proper 3 phase motor starter which can protect from overload , undervoltage
and single phasing should be installed. The starter operating voltage shall be within
the normal supply rating. (M)
1.2 A three phase or single phase motor wiring should be installed with the wire si:ie
based on starting condition.(R)
1.3 Automatic water pump operation by installing water tank level control switches
can be installed, but overriding switch for manual control should also be
provided. Insulation rating of level control switches and contacts should be of
400 Volt rating.(R)
4. Related Technical Aspects (Telephone, Fax, Internet, Satellite T.V, Master Antena
and CCTV System etc.)
4.1 (a)Design checking and perfonnance test for the telecommunication instrwnents and other
electronic devices are to be undertaken by corresponding government technical depart-
ment.Installation work is to be done by others.(R)
(b)Source of electric power supply is to be given by electrical contractor.
is to be done by others.(R.)
page(] I)
CONSTRUCTION PROJECTS
GUIDELINE VII
5. Electromagnetic Interferences(R)
5.1 Requirement for this is as stated in 1-3 above.
CONSTRUCTION PROJECTS
GUIDELINE VIII
l. Previous items of checking and testing from Guideline IV which are applicable
for external electrical installation
1.1 Design shall be checked and installation shall be tested, such as overhead line
or underground cable way. (M)
2. Any other items of checking and testing for the external electrical installation
2.1 Design shall be checked and installation shall be tested, such as swimming
pool, tennis court lighting. etc. (M)
page(16)
CONSTRUCTION PROJECTS
GUIDELINE IX
CONSTRUCTION PROJECTS
(GUIDELINE FOR ELECTRICAL WORKS)
GUIDELINE X
AT CONSTRUCTION SITES
I. Items of checking and testing from GUIDELINE IV which are applicable for
temporary electrical installations shall be conducted in every 3 months or as
required. (M)
2. All main, secondary and final sub-circuit switch board shall be fitted with
500 mA, 300 mA, 100 mA earth leakage sensitivity circuit breaker respec-
tively to protect the personnel from electric shock and electric fire. (M)
4. Indicate clearly the location of switches and alarms which are to be opened
or closed in case of emergency (e.g electric shock to personnel or
electric fire). (M)
5. Person assigned for the safety of the !emporary electrical installations shall
maintain the wiring , switches, equipment, etc., so that there is no insulation
failure of cables, equipment, faulty switches, etc., through use of construction
equipment. Daily report shall be submitted to the Project Engineer. (M)
6. Safety hat, hand gloves , belt, boots , safety glasses , etc., complete with
essential hand tools for electrical workers shall be provided at site. (M)
7. Safety sign board , (danger board) and resuscitation diagram together with
first aid box shall be kept in a place distinctly known and easily accessable
to every worker (Fig. X - 1) (M)
CONSTRUCTION PROJECTS
GUIDELINE XI
ARRESTER INSTALLATIONS
7. Lightning Arrester(R)
7.1 Building lightning arrester installation should be in accordance with British
Standard Code of Practice for protection of structures against lightning.
page(20)
CONSTRUCTION PROJECTS
GUIDELINE XII
COMMISSIONING , OPERATION , MAINTENANCE AND REPAIRS OF
COMPLETED ELECTRICAL INSTALLATION WORKS
12. Commissioning of the above is to be· done by authorised person together with
installation contractor and the client. (M)
page(22)
1. Rules and regulations adopted for design, installation and operation shall be
in accordance with I.E.E. Rules and Regulations, British Standard and Local
Rule andRegulations.(M)
RECOMMENDED SYMBOLS(R)
Conductors
PEN Protective Earthed Neutral.
cpc Circuit Protective Conductor.
s Cross-sectional area of live conductor.
Sp Cross-sectional area of protective, conductor.
Current
Current causing automatic operation of a protective device in a specified time.
Design or load current.
Nominal rating or setting of protective device.
Iz Current-carrying capacity of the circuit conductor.
Current causing the effective operation of an overload device(with overload cu:.-rent).
Earth fault current= Uo + Zs.
Prospective short circuit current . Also used to indicate a 3 phase symmetrical
short circuit current.
I pp Prospective short circuit current between two phases.
I pn Prospective short circuit current between a phase and neutral conductor.
I delta(a) Earth leakage current.
J delta(n) Rated residual operating current of an RCD.
It The tabulated current required for a conductor.
Jtab The actual tabulated current for a conductor given m the tables.
mA Milliamp ( 0.001 A)
Voltage
VL Line voltage.
Vph phase voltage.
uo Nominal voltage to earth.
mV millivolts ( 0.001 V)
Devices
FBA Factory_built assembly.
gG General purpose fuse having the full range breaking capacity also suitabl.: for
motor protection.
gM A full range breaking capacity fuse suitable only for motor protection .
mcb Miniature circuit breaker.
mccb Moulded case circuit breaker.
RCD Residual current device.
rccb Residual current circuit breaker.
page(24)
Systems
T Source of energy directly connected with earth, or installation directly connected
with earth.
N Installation's exposed conductive parts connected to the source earth.
C Protective conductor connecting the installation's exposed conductive parts to the
source earth, the protective conductor being combined with the neutral.
s Protective conductor connecting the installation's exposed conductive parts to the
source earth by a separate conductor.
I The source of energy is either not connected with earth, or 1s connected to
earth through a high impedance.
TN-C Combined neutral and protective conductor system.
page(~j)
TN-S Separate neutral and protective conductor system.
TN-C-S Neutral and protective conductor combined from the source to the origin of
the in_stallation , and separate within the installation.
IT System earthed at source , but installation is earthed locally, ( i.e no protective
conductor from source to origin ).
IT Source isolated from earth or through an impedance , installation earthed locally.
LEGEND
Service cutout
Circuit breaker
Isolator/ Switch
Metering C. T
kWh meter
Generator
3-phase 4-wire
O><O Fuse
Link
"
--0 0 - Miniature circuit breaker
13 A socket outlet
page(26)
Detail of Guideline Ill item No.1 (R).
Table Ill - 1 Detail Data of H.T. Receiving for the Transformer and Required Accessories.
Installation should be as follows:
Transf. H.T
Transf.
Transf. Receiving
Cooling Transf. LT. standard
capacity control switch Location of
system of Main accessories Remarks
KVA range. gear Transf.
Transf. switch. with the
11/6.6/0.4 kV. type + rating
following
11/6.6 kV
Disconecting
Pressure
switch, Basement
M.C.C.B. Relief Device;
ONAN Fuse.Lightning or
( Moulded Oil conservator.
50 - 315 kVA ( Oil Natural, Arrester Ground
Case Circuit Dehydrating
Air Natural ) preferrably Floor.
Breaker) breather with
with Earth
silicagel
Fault Trip
Press. Relief
Circuit Breaker
Basement Device, Oil
OR
A.C.B or conservator.
> 315 -1000 ONAN OIL FUSED
( Air Circuit Ground Dehydrating
kVA LOAD BREAK
Breaker) Floor. breather with
SWITCH.
silicagel
Buchholz Relay
Cast-Resin
Non
flammable In between
- Halo cool - - the Floors
-
Hermetically
sealed.
At the
> 2000 KVA - - - - - Discretion
ofMEPE
Individual Room
LT Main or Final sub-
L.T. Main Receiving Switch circuit Main switch D.B.
Receiving Switch Protection with Earth (Distribution Remarks.
Ampere Range with Earth Leakage Board) location
Leakage Protection
Type
.,
>1600 - 3000
>1600 A-3000A
Single Phase 100
In and no. of out- .
4P adjustable going capacity
Amp mA OR
over current _and and rating to be
{>1000-2000 3 Phase 4 wire
Ground within practical
kVA) 100 - 500 mA.
Fault Trip limit, etc.
Specific
Discussion
will be made
> 3000 A
{> 2000 kVA)
- - - - - for this.
3et;
design(,, a~d
CQHP
page(28)
Types of supply to which the protective Current rating of back-up Minimum three phase breaking
devices are connected fuses ( if provided ) to BS 88 capacities of the protective
or equivalent devices
exceeding 400 A
(ii) Supply tapped from busbar rising mains not exceeding 160 A 4.5 kA (with back-up fuses)
( for cable rising mains, the breaking
capacities may be smaller in value exceeding 160 A but not 23 kA (with back-up fuses)
depending on the design )
exceeding 400 A
exceeding 400 A
Note: The single phase breaking capacity should be assessed by registered electrical engineers of
OTHER COMMUNAL
CUSTOMER INSTALLATION
ESSENTIAL
SERVICES
CUSTOMER
MAIN
S/v/
I ,----7
BUILDING
MAIN METER FDR
S/v/ COMMUNAL 8c
ESSENTIAL
SERVICES
CUSTOMER
Sv/ITCH ROOM
H.T RECEIVING
AND TRANS. ROOM
( MEPE SIDE ) GEN-SET
Flg,III-1 <R)
METERING ARRANGEMENT FOR
BUILDING PO'v/ER SUPPLY
(ESSENTIAL SERVICES FROM
STAND-BY GENERATOR ,)
TYPICAL DRA'v/ING
page(30)
TENANT
a!SER
METERS FOR
DOMESTIC UNITS
FUSE
METER1NG FOR
lNDJVIDUAL
COMMUNAL
COMMBRCIAIJSHOPS
lNSTALLATION
COMMUNAL COMMON
MA1N
Sf\V
L.TMJS
CONSUMER SIDE
-----'---------------------
RBCEIVlNCJ AND
TRANS.ROOM
(MEPBSIDE)
-
- -
z
..... z
..... z
......
<( <( <(
::.:: ::.:: ::.::
l!) l'.) l!)
z
..... z
...... z
.....
.....
"'Ck:
(/)
......
Ck: "'....Ck:
LOCAL
RISER
S\./ITCHES
/ / 1,-v
f;< ~K ll
¥1
COMMUNAL INS rALLATI □ N
¥1
I l
I
TR , RM
<M EPD
@ (2?l .
I
\
r- ; ~ • V
\
f' • f' , ~ -~Q~'
\
nA C□MM□N TD MAIN
S\./ITCH
ALL COMMUNAL
CONTROL
INSTALLATION
A BLDG MAIN
MAIN S/\.1 S/\./ RM
(CONSUMER)
L2
L3
conswners'
installations
I \_ --,
I' :-i
I '
I I
I I I I
source of earth
I I equipment in
I I
I installation I
I
L
installation
earth
eledctrode
exposed-
conductive-
/-----=-_J I
installation
earth
eledctrode
parts-
All exposed-conductive-parts of an installation are connected to an earth electrode which is electrically independent of the source earth.
Fig.ill-4 TT System(M)
'"O
~
~
,......._
w
,._,
N
,r
Down conductors
(in these cases
st.eel reinforcing
or steel frame
of building)
.
cJ
~
§1§~§
Earth termination
ring conductor
below grolllld Bonds to lift shaft at
level to improve ........._ · " TEST vertical intervals: not
earthing ~(
<.._.._____ J W: ,,•., ~-
TERMn-1
AL
exceeding 20 m
- .... , , , .... <
- ,.
,,..;
I•~Earth electrode
Lighting protection system for tall buildings (over 20m high) showing air terminations, down conductors,
bonds to projections above roof (including bonds to lift motor room and lift shaft)
(Typical drawing)
Fig.Xl-l(R)
I
l,J
~