0% found this document useful (0 votes)
146 views9 pages

Renewable Hydrogen - Nikolaos LYMPEROPOULOS (ID 13339910)

This document outlines 10 topics for funding renewable hydrogen production projects through the European Union. The topics focus on improving electrolyzer efficiency and reducing costs, scaling up electrolyzer size for industrial and offshore applications, and advancing high-temperature electrolysis technologies. Project requirements include multi-MW demonstrations, cost and performance targets, operational hours, and integrating renewable hydrogen into offshore or industrial systems.

Uploaded by

valentino alaia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
146 views9 pages

Renewable Hydrogen - Nikolaos LYMPEROPOULOS (ID 13339910)

This document outlines 10 topics for funding renewable hydrogen production projects through the European Union. The topics focus on improving electrolyzer efficiency and reducing costs, scaling up electrolyzer size for industrial and offshore applications, and advancing high-temperature electrolysis technologies. Project requirements include multi-MW demonstrations, cost and performance targets, operational hours, and integrating renewable hydrogen into offshore or industrial systems.

Uploaded by

valentino alaia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

1

Topics in the call 2022

Renewable Hydrogen
Production

N. Lymperopoulos, D. Tsimis,
C. Pavel
2

Renewable Hydrogen Production


Overview
Main Focus
ƒ Cost reduction and efficiency increase for renewable hydrogen production routes:
ƒ New LT and HT electrolyser designs for high pressure operation
ƒ Larger cell electrolyser stacks
ƒ Large scale electrolysers in industry, off-grid and offshore
ƒ Improved efficiency solar thermochemical H2 production.

What is new

ƒ Circularity
ƒ Improved electrolyser manufacturing
3

Renewable Hydrogen Overview


Topic Ind.
Type of
Budget Deadline
Action
(M€)

HORIZON-JTI-CLEANH2-2022 -01-01: Development and validation of pressurised


RIA 2.5 31/05/2022
high temperature steam electrolysis stacks (Solid Oxide Electrolysis)

HORIZON-JTI-CLEANH2-2022 -01-02: Development and validation of pressurised


RIA 2.5 31/05/2022
high temperature steam electrolysis stacks (Proton Conducting Ceramic Electrolysis)

HORIZON-JTI-CLEANH2-2022 -01-03: Development of low temperature water


RIA 2 x 2.5 31/05/2022
electrolysers for highly pressurised hydrogen production

HORIZON-JTI-CLEANH2-2022 -01-04: Design for advanced and scalable


RIA 2x2 20/09/2022
manufacturing of electrolysers

HORIZON-JTI-CLEANH2-2022 -01-05: Scaling up of cells and stacks for large


RIA 6 20/09/2022
electrolysers

HORIZON-JTI-CLEANH2-2022-01-06: Efficiency boost of solar thermochemical water


RIA 4 31/05/2022
splitting
4

Renewable Hydrogen Overview


Topic Ind.
Type of
Budget Deadline
Action
(M€)

HORIZON-JTI-CLEANH2-2022-01-07: Bringing renewable hydrogen MW scale off-


IA 9 31/05/2022
grid installations closer to technical and financial maturity

HORIZON-JTI-CLEANH2-2022-01-08: Integration of multi-MW electrolysers in


IA 18 20/09/2022
industrial applications

HORIZON-JTI-CLEANH2-2022-01-09: Scaling-up technologies for SOEL RIA 2x3 31/05/2022

HORIZON-JTI-CLEANH2-2022-01-10: Demonstrating offshore production of


IA 20 20/09/2022
renewable hydrogen
5

Renewable Hydrogen - Topics

HORIZON-JTI-CLEANH2-2022 -01-01: Development and validation of pressurised high


temperature steam electrolysis stacks (Solid Oxide Electrolysis)

Game changer SOELs

ƒ Stack design for >5 bar , >10kW, > 2,000 hours, current density 0.85 A/cm2 - check degradation
ƒ CAPEX< 2,000 €/(kg/d), electricity consumption < 39kWh/kgH2 for 9kWh/kgH2 of heat input
ƒ circularity by design for materials

HORIZON-JTI-CLEANH2-2022-01-02: Development and validation of pressurised high


temperature steam electrolysis stacks (Proton Conducting Ceramic Electrolysis)
Game changer PCCELs

ƒ Stack design for >5 bar, >5kW > 2,000 hours, current density 0.5 A/cm2 - check degradation
ƒ CAPEX< 2,000 €/(kg/d), Faradaic efficiency > 90%
ƒ circularity by design for materials
6

Renewable Hydrogen - Topics

HORIZON-JTI-CLEANH2-2022-01-03: Development of low temperature water electrolysers for


highly pressurised hydrogen production
LTELs for gas grid injection and avoidance of mechanical compressors

ƒ Pressure > 50 bar for AEL & AEMEL and > 80 bar for PEMEL, Temp < 150oC
ƒ >50kW AEL & PEMEL, >25kW AEMEL (larger cell areas)
ƒ Efficiency increase by 2-4% (LHV) compared to the use of a mechanical compressor
ƒ Breakthroughs in stack design, materials, cell components

HORIZON-JTI-CLEANH2-2022-01-04: Design for advanced and scalable manufacturing of


electrolysers
Novel component(s) or manufacturing process(es) integrated in a demonstrator stack

ƒ New surface coating technologies and advanced manufacturing processes (e.g., 3D printing)
ƒ Improvement of manufacturing throughput and level of automation to produce a stack, reduced manufacturing times and costs
ƒ Consortia should include > 1 electrolyser OEM, one actor from the manufacturing sector and > 1 SME
ƒ Explore synergies with Made in Europe partnership (Cluster 7).
7

Renewable Hydrogen - Topics

HORIZON-JTI-CLEANH2-2022-01-05: Scaling up of cells and stacks for large electrolysers

Design & construct cells to test the viability of building a single 10MW stack

ƒ Scale-up of cell active areas by > 2x, higher current densities


ƒ Appropriately scale-up BoP, ensure compact design, minimise weight and footprint
ƒ Build and test several short stacks, identifying optimal sizes for larger cells and stacks from scientific, engineering, logistics and
economic perspectives.

HORIZON-JTI-CLEANH2-2022-01-06: Efficiency boost of solar thermochemical water


splitting
Solar thermochemical cycles as a viable and competitive hydrogen production technology

ƒ Solar to H2 efficiency > 10% - 0.75 kg/year per m2 land area used for solar concentration factor of 1,000
ƒ H2 production cost < 5 €/kg
ƒ On-sun operation of 50-300kW plant for 6 months
ƒ Seek collaboration with EIC Pathfinder Challenge projects
8

Renewable Hydrogen - Topics

HORIZON-JTI-CLEANH2-2022-01-07: Bringing renewable hydrogen MW scale off grid


installations closer to technical and financial maturity
Demonstrate complete value chain of off-grid hydrogen production, storage and end-use installations at MW scale

ƒ Direct coupling of 3-5 MW-scale RES and H2 production installations – potential changes in RES technologies
ƒ Highly flexible electrolyser with suitable BoP and coupled to electricity storage
ƒ Eligible costs along the value chain

HORIZON-JTI-CLEANH2-2022-01-08: Integration of multi-MW electrolysers in industrial


applications
Demonstrate electrolyser technologies beyond state-of-the-art in a specific industrial application

ƒ >25MW electrolyser, LT or HT
ƒ Possible innovations: possibly supply two customers; use of O2 and heat; grid services; footprint reduction
ƒ Includes a go-no go decision, then 2-year operation
ƒ Investigate synergies with Process4Planet or Clean Steel Partnerships
9

Renewable Hydrogen - Topics

HORIZON-JTI-CLEANH2-2022-01-09: Scaling-up technologies for SOEL

Scalability of cells, stacks and modules, in terms of design, manufacturing & assembly into modules;

ƒ Optimal stack assembly layout into modules of > 250 kW capacity– build downscaled module of at least 80 kW
ƒ Footprint < 150 m²/MW, current density > 0.85 A/cm² , degradation < 1%/1,000 hours;
ƒ Operate for > 2,000h
ƒ Demonstrate appropriate production methods

HORIZON-JTI-CLEANH2-2022-01-10: Demonstrating offshore production of renewable


hydrogen
Design, construct and integrate a > 5MW electrolyser in an offshore infrastructure

ƒ Re-use existing offshore oil/gas infrastructure or develop new – export wind energy as H2
ƒ Safety aspects, remote control, autonomous operation, inspection & maintenance
ƒ Design, construction & 2 years operation, assessment of performance (degradation, OPEX and maintenance
costs), economic viability of using existing offshore infrastructure or building new

You might also like