0% found this document useful (0 votes)
34 views1 page

JN-Q-BKCC-220426 Musnorman Anti Rodent Mesh For B1-25A

The document is a quotation from Orchard Turn Retail Investment Pte Ltd to install anti-rodent mesh at B1-25A. It provides pricing details for supplying and installing stainless steel mesh, including scaffolding, labor costs, supervision, and a 7% GST and adjustment. The total quoted price is $4,903.37. Standard terms and conditions are listed at the bottom relating to payment, scope of work, cancellation fees, and supplier price changes.

Uploaded by

Vincent Low
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views1 page

JN-Q-BKCC-220426 Musnorman Anti Rodent Mesh For B1-25A

The document is a quotation from Orchard Turn Retail Investment Pte Ltd to install anti-rodent mesh at B1-25A. It provides pricing details for supplying and installing stainless steel mesh, including scaffolding, labor costs, supervision, and a 7% GST and adjustment. The total quoted price is $4,903.37. Standard terms and conditions are listed at the bottom relating to payment, scope of work, cancellation fees, and supplier price changes.

Uploaded by

Vincent Low
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

The Subsidiary Management Corporation No. 1 -Strata Title Plan No.

3646

QUOTATION
ORCHARD TURN RETAIL INVESTMENT PTE LTD Date: 26/4/2022
2 Orchard Turn Quotation No: JN/Q/BKCC/
#05-03 ION Orchard 220426
Singapore 238801

Requested By: Mr. Musnorman


Email: [email protected]

Job Scope: Installation of Anti-Rodent Mesh


At B1-25A

Item SOR No. Description Qty Unit Rate Amount


Supply, Tools, Labours and Materials for the followings :

1 * Supply and deliver specified stainless steel mesh (China Made) 22.92 m2 $ 80.00 $ 1,833.60
2 15% over star rate (item 1) $ 275.04
3 13.44 Scaffold for the job (3 metres X 3 Nights) 9 m $ 15.00 $ 135.00
4 13.4 Steel workers to fabricate and install anti rodent mesh 96 Hours $ 8.40 $ 806.40
(4 men X 8 hours X 3 nights)
5 14.45.1b Supervisor cum WAH spervisor for the job (8 hours X 3 nights) 24 Hours $ 25.00 $ 600.00

6 7.2 Night Work 1.5 Times Over Sor Rate (item 3 to 5) $ 770.70
7 Add 7% over SOR Adjustment (items 3 to 6) $ 161.85

SUB-TOTAL $ 4,582.59
7% GST $ 320.78
GRAND TOTAL $4,903.37

Terms and conditions:


Any variation and/or additional works contrary to the above quoted shall be quoted and charged separately
1 Quotation validity period : 30 days
2 All invoiced payment shall be duly paid according to terms of payment from date of invoice and delays in remitting payment shall
3 render works being interrupted site and/or premature termination of this contract
Deposit/downpayments are not refundable in the event of cancellation of the contract by the buyer/owner
4 Any parts of works remaining unpaid remains the property of BK Civil & Construction Pte Ltd
5 No retention. Full payment upon completion
6 The contractor have the right not the carry out any works not mentioned in the quote
7 All works shall be carried out only during normal office hours unless specified
8 Rate is only valid till our supplier next price revision, without prior notice to us
9

___________________________________________________________________________________________________________________________________________
Kindly confirm by using of work order

YK LEE
_____________________________________ Issued by Lee Yeow Koon
Verified & Accepted by Customer

You might also like