Folder Structure
Folder Structure
AG Project Code-ClientName-ProjectName
Eg: 00AA-XXXXX-AAAAA
AG Engineering Project Folder Structure:
1. Corresponding
01_Site
Incoming
Date_Purpose
Outgoing
Date Purpose
02_Design
Incoming
Date Purpose
Outgoing
Date Purpose
2. Contracts
BEP/EIR/BIM Specifications/BIM Requirements
LOD Version
LOD Matrix
Reference Documents
3. BIM
01_BIM Templates
02_Models
Central Models
03_BIM Library
Families
04_Archive
05_CAD
CAD Reference
05_VIsualization References
Sketch up
3dx max
Render’s
4. Work Folders
Trackers
Drawing Log’s
Work Flows
RFI’s
5. Project Management
Monthly Reports
Project Schedules
Site Logistics
Resources Schedule
Material Tracker
Interface management Status
Payment status
Consultant Details
Statutory approval
Project Issue Register
6. Quality Management
QA/QC
Drawing Checklists
Model Audit.
7. Misc/References