This document provides details on the dimensions, quantities, and volume calculations for various structural components of a steel truss roof, concrete hollow block wall, and pump/power house. It includes tables specifying the dimensions, lengths, and quantities of different angle bars and steel members. It also shows volume computations for elements like footings, columns, slabs, and hollow blocks. Concrete and mortar volume requirements are calculated based on the dimensions of walls, number of blocks, and mortar ratios.

Uploaded by

Jhoe Sam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
91 views

ESTIMATES

This document provides details on the dimensions, quantities, and volume calculations for various structural components of a steel truss roof, concrete hollow block wall, and pump/power house. It includes tables specifying the dimensions, lengths, and quantities of different angle bars and steel members. It also shows volume computations for elements like footings, columns, slabs, and hollow blocks. Concrete and mortar volume requirements are calculated based on the dimensions of walls, number of blocks, and mortar ratios.

Uploaded by

Jhoe Sam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

DIMENSION LENGTH TOTAL TOTAL NO.

OF
DESCRIPTION (ANGLE BAR)
LENGTH CLASSIFICATION OF CUT NO. OF CUT ANGLE BARS

T VERTICAL 1.85 m 40 pcs. 14 pcs.


WEB MEMBERS 2" X 2" X 1/4" 6m
R DIAGONAL 2.20 m 45 pcs. 23 pcs.
U KING POST 3" X 3" X 1/4" 6m VERTICAL 2.00 m 10 pcs. 4 pcs.
S TOP & BOTTOM HORIZONTAL 9.10 m 10 pcs. 20 pcs.
S 3" X 3" X 1/4" 6m
CHORDS DIAGONAL 9.23 m 10 pcs. 20 pcs.
VERTICAL 0.20 m 5 pcs. 1 pcs.
FRAME 1 1/2" X 1 1/2" X 1/8" 6m
STEEL HORIZONTAL 3.00 m 8 pcs. 4 pcs.
GIRT VERTICAL 0.20 m 56 pcs. 2 pcs.
WEB MEMBERS 1" X 1" X 1/8" 6m
DIAGONAL 0.30 m 60 pcs. 3 pcs.
GIRDER 2" X 2" X 1/4" 6m HORIZONTAL 12.50 m 1 pc. 3 pcs.
CEE PURLINS 2" X 3" 6m HORIZONTAL 13.70 m 12 pcs. 36 pcs.
CEE BAR RAFTER 2" X 3" 6m VERTICAL 9.90 m 4 pcs. 8 pcs.
ANGLE BAR BRACING 2" X 2" X 1/4" 6m HORIZONTAL 13.70 m 1 pc. 3 pcs.
VOLUME COMPUTATIONS:
RESERVOIR COLUMN & FOOTING
FOR BM: FOR COLUMN 1:
ALONG HORIZONTAL: V= [0.25(0.25)(4)](9)
V= [0.25(0.2)(6)](3) V= 2.25 m3
V= 0.9 m3
FOR FOOTING 1:
ALONG VERTICAL: V= [1(1)(0.25)](9)
V= [0.25(0.2)(9)](3) V= 2.25 m3
V= 1.35 m3
FOR COLUMN 2:
FOR CBM: V= [0.25(0.25)(1.6)](6)
V= [0.25(0.2)(1.5)](3) V= 0.6 m3
V= 0.23 m3
FOR FOOTING 1:
FOR BASE SLAB: V= [1(1)(0.25)](6)
V= 10.25(7.25)(0.15) V= 1.5 m3
V= 11.15 m3
FOR FILLING CHB HOLES:
3
TOTAL VOLUME: 23.98 m V= 150(0.025)
V= 3.75 m3

For Class A Concrete mixture ratio: 1:2:4


Cement : 3.43 m3 = 98 bags 50kgs.
3
Sand : 6.86 m
Gravel : 13.71 m3
CONCRETE HOLLOW BLOCKS AND MORTAR

FOR CHB WALL:


A= [9(3) + 6(3)](2)
A= 90 m2

NO. OF CHB:
NO. OF CHB = 1125 pcs. of 40cm X 20cm CHB

FOR CEMENT MORTAR:


V= 0.12(0.10)(30)
V= 0.36 m3 (per layer)
Total layer = 3/0.20
Total layer = 15 layers
VT = 15(0.36)
VT = 5.4 m3

CEMENT MORTAR FOR PLASTERING:


VT = 90(2)(0.016)
VT = 2.88 m3

TOTAL VOLUME: 8.28 m3

For mixture of Cement mortar the ratio will be 1:6, therefore;


Cement : 1.19 m3 = 34 bags 50kgs.
3
Sand : 7.10 m
PUMP/ POWER HOUSE COLUMN & FOOTING
WALL: FOR COLUMN 3:
A= 3.60(2.5)(4)-[2.10(0.80)+1.20(0.60)] V= [0.20(0.15)(4.20)](4)
A= 33.6 m3 V= 0.51 m3

NO. OF CHB: FOR FOOTING 3:


NO. OF CHB = 420 pcs. of 40cm X 20cm CHB V= [0.60(0.60)(0.20)](4)
V= 0.29 m3
FOR CEMENT MORTAR:
V= 0.12(0.10)(10) FOR SLAB:
V= 0.12 m3 (per layer) V= 2.5(2.5)(0.15)
Total layer = 3.6/0.20 V= 0.94 m3
Total layer = 18 layers
VT = 18(0.12) FOR CONCRETE STAIRS:
3
VT = 2.16 m V= 1.40[(0.4)(0.15)+(2)(0.2)(0.15)+(0.3)(0.15)
(2)+(0.5)(0.15)+(0.15)(0.30)]
CEMENT MORTAR FOR PLASTERING: V= 0.47 m3
VT = 33.6(2)(0.016)+(0.60)(2.5)(4)(0.15)
VT = 1.98 m3 TOTAL VOLUME: 2.21 m3

TOTAL VOLUME: 4.14 m3 For Class A Concrete mixture ratio: 1:2:4


For mixture of Cement mortar the ratio will be 1:6, therefore; Cement : 0.32 m3 = 10 bags 50kgs.
Cement : 0.60 m3 = 18 bags 50kgs. Sand : 0.64 m3
3
Sand : 3.55 m Gravel : 1.27 m3