SCHEDULE RISK & OPPORTUNITY REGISTER
Risk Probability Schedule Impact Risk Ranking Matrix : Schedule Impact
VH : Very High 71% to 100% VH : Very High Above 40 days Probability VH H M L VL H : High 51% to 70% H : High 31 days to 40 days VH VH VH H H M M : Medium 31% to 50% M : Medium 21 days to 30 days H VH H H M M L : Low 11% to 30% L : Low 10 day to 20 days M H H M M L VL : Very Low 1% to 10% VL : Very Low 1 to 10 days L H M M L L N : Negligible 0% N : Negligible 0 days VL M L L VL VL
Pre-mitigation Mitigation Post Mitigation
Original Duration of Risk ID Risk Description Threat / Opportunity Responsibility Risk Effect Schedule Risk Schedule Risk Status Effected Activities Minimum Duration Most Likely Duration Maximum Duration Sucessor Activity Risk Probability Risk Ranking Action (Taken / To be Taken) Action By Response Effected Activity Impact Probability Impact Ranking
1> Identified backup Construction
equipment availability, whenever Construction equipment failure during Delay in subsequent construction 1 T L L required. Reduce VL VL Open construction activitiy 2> Ensure proper maintance for the equipments
Reliability in Automotive and Mechanical Engineering Determination of Component and System Reliability 1st edition by Bernd Bertsche ISBN 3642070493 978-3642070495 - Own the ebook now and start reading instantly