0% found this document useful (0 votes)
136 views

Schedule Risk Anaysis Sample

Uploaded by

odunze1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
136 views

Schedule Risk Anaysis Sample

Uploaded by

odunze1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

SCHEDULE RISK & OPPORTUNITY REGISTER

Risk Probability Schedule Impact Risk Ranking Matrix : Schedule Impact


VH : Very High 71% to 100% VH : Very High Above 40 days Probability VH H M L VL
H : High 51% to 70% H : High 31 days to 40 days VH VH VH H H M
M : Medium 31% to 50% M : Medium 21 days to 30 days H VH H H M M
L : Low 11% to 30% L : Low 10 day to 20 days M H H M M L
VL : Very Low 1% to 10% VL : Very Low 1 to 10 days L H M M L L
N : Negligible 0% N : Negligible 0 days VL M L L VL VL

Pre-mitigation Mitigation Post Mitigation


Original Duration of
Risk ID Risk Description Threat / Opportunity Responsibility Risk Effect Schedule Risk Schedule Risk Status Effected Activities Minimum Duration Most Likely Duration Maximum Duration Sucessor Activity
Risk Probability Risk Ranking Action (Taken / To be Taken) Action By Response Effected Activity
Impact Probability Impact Ranking

1> Identified backup Construction


equipment availability, whenever
Construction equipment failure during Delay in subsequent construction
1 T L L required. Reduce VL VL Open
construction activitiy
2> Ensure proper maintance for the
equipments