Material Pipa

This document is a budget proposal for a spam job expansion project involving piping in a rural area. It lists 41 items needed for the project, including pipes of various sizes, valves, fittings, and water meters. The total planned expenditure is Rp 191,386,960.

Uploaded by

dimas sacca
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views1 page

Material Pipa

This document is a budget proposal for a spam job expansion project involving piping in a rural area. It lists 41 items needed for the project, including pipes of various sizes, valves, fittings, and water meters. The total planned expenditure is Rp 191,386,960.

Uploaded by

dimas sacca
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PEMAKETAN PEKERJAAN SPAM BAGIAN PEMIPAAN

NAMA TPS- KSM : KSM NEGERI SAKTI KEC. : SUNGKAI UTARA


LOKASI : KAB/KOTA : LAMPUNG UTARA
KEL./DESA : NEGERI SAKTI PROVINSI : LAMPUNG
JENIS PEKERJAAN : PERLUASAN SPAM JARINGAN PERPIPAAN
DI KAWASAN PEDESAAN

No Uraian/ Material M1 Jumlah Satuan Rencana Belanja Harga Satuan Jumlah Biaya (Rp)
1 2 3 4 5 6 7 8=6*7
1 Pipa PVC 2" RRJ (S-12.5) 590 98 Btg Rp 279.180,00 Rp 27.359.640,00
2 Pipa PVC 1 1/2" SCJ (S-10) 990 165 Btg Rp 219.010,00 Rp 36.136.650,00
3 Pipa Gip 1 1/2" Untuk Crossing Jalan 1 1 Btg Rp 862.640,30 Rp 862.640,30
4 Pipa Gip 2" Untuk Crossing Jalan 2 1 Btg Rp 1.220.082,15 Rp 1.220.082,15
7 - Knee PVC Ø 11/2 " SCJ 2 Bh Rp 18.700,00 Rp 37.400,00
8 - Knee PVC Ø 2" 2 Bh Rp 78.600,00 Rp 157.200,00
9 - Flange Las 2" 8 Bh Rp 269.280,00 Rp 2.154.240,00
10 - Flange Socket RRJ 2" 8 Bh Rp 372.700,00 Rp 2.981.600,00
11 - Tee All Socket RRJ 3 " 2 Bh Rp 781.800,00 Rp 1.563.600,00
12 - Reducer SCJ 2" > 1 1/2 " 2 Bh Rp 81.800,00 Rp 163.600,00
13 - Tee All Socket SCJ 2" 4 Bh Rp 83.300,00 Rp 333.200,00
14 - Gate Valve 2" 2 Bh Rp 2.300.000,00 Rp 4.600.000,00
15 - Stop Kran 1 1/2" kuningan 1 Bh Rp 500.000,00 Rp 500.000,00
16 - Baut Mur 2" 12 Set Rp 40.900,00 Rp 490.800,00
17 - Street Box CI 2 Bh Rp 225.000,00 Rp 450.000,00
18 - Dop 1 1/2" 3 Bh Rp 35.000,00 Rp 105.000,00
19 - Dop 2" 2 Bh Rp 36.900,00 Rp 73.800,00
20 Pipa GI 3 " 12 2 Btg Rp 2.029.883,40 Rp 4.059.766,80
21 Water Meter Induk 3 " 1 Unit Rp 3.500.000,00 Rp 3.500.000,00
22 Gate Valve 3" 1 Bh Rp 2.900.000,00 Rp 2.900.000,00
23 Flange Las 3" 1 Bh Rp 150.000,00 Rp 150.000,00
24 Flange Socket RRJ 3" 1 Bh Rp 372.700,00 Rp 372.700,00
25 Sock GI 3" 1 Bh Rp 100.000,00 Rp 100.000,00
26 Double Nepple Ø 3 " 4 Bh Rp 100.000,00 Rp 400.000,00
27 Bend All Socket 3 " 2 Bh Rp 131.500,00 Rp 263.000,00
28 Pengadaan Pompa Submersible 2 Pk - H=60 1 Unit Rp 9.750.000,00 Rp 9.750.000,00
29 Pipa Gip [ 1/2 ' (Galvanis) 873 146 Btg Rp 290.615,35 Rp 42.429.841,10
30 Pengadaan Penutup Water Meter 97 Unit Rp 100.000,00 Rp 9.700.000,00
31 Clam Saddle Ø 1 1/2 " - 3/4" 53 Unit Rp 24.000,00 Rp 1.272.000,00
32 Clam Saddle Ø 2" - 3/4" 44 Unit Rp 26.250,00 Rp 1.155.000,00
33 Over Ring Ø 3/4 " x 1/2 " 97 Unit Rp 18.000,00 Rp 1.746.000,00
34 Knee GI Ø 1/2 " 582 Unit Rp 10.000,00 Rp 5.820.000,00
35 Double Nepple Ø 1/2 " 97 Unit Rp 8.400,00 Rp 814.800,00
36 Stop Kran GI Ø 1/2 " 97 Unit Rp 75.600,00 Rp 7.333.200,00
37 Tee GI Ø 1/2 " 97 Unit Rp 7.300,00 Rp 708.100,00
38 Flug Ø 1/2 " 97 Unit Rp 7.300,00 Rp 708.100,00
39 Handle Kran Ø 1/2 " 97 Unit Rp 45.000,00 Rp 4.365.000,00
40 Seal Tape 20 Unit Rp 5.000,00 Rp 100.000,00
41 Water Meter 97 Unit Rp 150.000,00 Rp 14.550.000,00

Total Rencana Belanja


Rp 191.386.960,00
Terbilang: