3.balindong District Hospital-Completion of Ward, Pharmacy and Laboratory 6,970,000

This document is a bill of quantities for the completion of ward, pharmacy, and laboratory construction project in Balindong, Lanao del Sur. It outlines the various items, quantities, units, unit costs, and amounts needed for the project under parts including facilities for the engineer, general requirements, civil works, finishing works, plumbing/sanitary works, electrical works, and miscellaneous. The grand total cost is provided at the end in figures and words.

Uploaded by

Rexter Unabia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
126 views3 pages

3.balindong District Hospital-Completion of Ward, Pharmacy and Laboratory 6,970,000

This document is a bill of quantities for the completion of ward, pharmacy, and laboratory construction project in Balindong, Lanao del Sur. It outlines the various items, quantities, units, unit costs, and amounts needed for the project under parts including facilities for the engineer, general requirements, civil works, finishing works, plumbing/sanitary works, electrical works, and miscellaneous. The grand total cost is provided at the end in figures and words.

Uploaded by

Rexter Unabia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

MOH-BARMM, HEALTH FACILITY AND DEVELOPMENT DIVISION (TIYAKAP PROJECTS 2021)

Project Contract ID:


Project Name: Completion of Ward, Pharmacy & Laboratory
Project Location: Balindong, Lanao Del Sur

BILL OF QUANTITIES
ITEM NO. DESCRIPTION QTY UNIT UNIT. COST AMOUNT(Php)
PART I FACILITIES FOR THE ENGINEER
In Figures: In Figures:

A.1.1(8) Provision of Field Office for the Engineer (Rental Basis) 7.00 mo In Words:Pesos: In Words:Pesos:

PART II OTHER GENERAL REQUIREMENTS


In Figures: In Figures:

B.3 Permits and Clearances 1.00 l.s. In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

B.5 Project Billboard/ Sign Board 1.00 ea In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

B.7 (1) Occupational Safety and Health Program 7.00 l.s. In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

B.9 Mobilization and Demobilization 1.00 l.s. In Words:Pesos: In Words:Pesos:

PART III CIVIL, ELECTRICAL AND SANITARY/PLUMBING WORKS


PART A EARTHWORKS
In Figures: In Figures:

801(1) Removal of structures and Obstruction 1.00 I.s. In Words:Pesos: In Words:Pesos:

PART B PLAIN AND REINFORCED CONCRETE WORKS


In Figures: In Figures:

900(1)a Structural Concrete (Footing, Column, Tie beam, Slab on fill & Roof Beam) 115.00 m3 In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

902(1)a Reinforcement Bar 16mm (60 ksi) footing 14736.00 kg In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

903(2) Formworks and Falseworks 267.00 m2 In Words:Pesos: In Words:Pesos:

PART C FINISHING WORKS


C.1. Masonry Works
In Figures: In Figures:

1046 100mm& 150mm CHB Non Load Bearing Wall (including Reinforcing Steel) 765.00 m2 In Words:Pesos: In Words:Pesos:

C.2 Fabricated Materials


In Figures: In Figures:

1007 Aluminum Framed Glass Door, Swing Type (Double Swing Door) 17.00 m2 In Words:Pesos: In Words:Pesos:

Page 1
ITEM NO. DESCRIPTION QTY UNIT UNIT. COST AMOUNT(Php)

In Figures: In Figures:

1010(2)b Wooden Panel Door & PVC Panel Door 28.00 m2 In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1008 Aluminum Glass Window ( Sliding) 62.00 sq.m In Words:Pesos: In Words:Pesos:

C.3 Finishing Works


In Figures: In Figures:

1027(1) Cement Plaster Finish 765.00 m2 In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1018(1) Glazed Tiles and Trims 328.00 m2 In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1018(2) Unglazed Tiles 23.00 m2 In Words:Pesos: In Words:Pesos:

C.4 Painting Works


In Figures: In Figures:

1032(1)a Painting Works (Masonry/Concrete ) 765.00 m2 In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1032(1)b Painting Works (Wood ) 134.00 m2 In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1032(1)c Painting Works (Steel) 134.00 m2 In Words:Pesos: In Words:Pesos:

PART D PLUMBING/SANITARY WORKS


In Figures: In Figures:

1001(8) Sewer Line Works 1.00 l.s. In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1002(24) Cold Water Line Works 1.00 l.s. In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1001(9) Storm Drainage and Downspout 1.00 l.s. In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1002(4) Plumbing Fixtures 1.00 l.s. In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1001 (11) Septic Vault (Concrete/CHB) 1.00 l.s. In Words:Pesos: In Words:Pesos:

PART E ELECTRICAL WORKS


In Figures: In Figures:

1100(10) Conduits, Boxes, and Fittings (Conduit Works/ Conduit Rough-in) 1.00 l.s. In Words:Pesos: In Words:Pesos:

Page 2
ITEM NO. DESCRIPTION QTY UNIT UNIT. COST AMOUNT(Php)

In Figures: In Figures:

1101(33) Wires and Wiring Devices 1.00 l.s. In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1102(1) Panelboard with Main & Branch Breakers 1.00 l.s. In Words:Pesos: In Words:Pesos:

In Figures: In Figures:

1103(1) Lighting Fixtures and Lamps 1.00 l.s. In Words:Pesos: In Words:Pesos:

PART F MISCELLANEOUS
In Figures: In Figures:

605 Hospital Signage 1.00 l.s. In Words:Pesos: In Words:Pesos:

GRAND TOTAL

Amount in Words:
_________________________________________________________________________
_________________________________________________________________________

Submitted by:

_________________________________________
Name & Signature of Bidder's Representatives

____________________________________
Position

____________________________________
Name of Firm

____________________________________
Address

Page 3