Concrete Mix Design M20 - MMR
Concrete Mix Design M20 - MMR
DOCUMENT NAME
CONCRETE MIX DESIGN
CLIENT NAME
KICO SA
PROJECT NAME
KIPUSHI ZN PROJECT-0045
Preface
Concrete mix design is a procedure of selecting the suitable ingredients of concrete and
their relative proportions with an objective to prepare concrete of certain minimum
strength, desired workability and durability as economically (value engineered) as possible.
As we decide to go for a concrete mix design, collect the following data beforehand as few
designs’ stipulation are feezed on the basis of these data.
i.e. Estimated water content for 100 Slump = 186+(6/100) X 186 = 197 liter
1. Volume of concrete = 1 m3
2. Volume of cement = (Mass of cement / Specific gravity of cement) x (1/100) = (328.33/3.15)
x (1/1000) = 0.104 m3
3. Volume of water = (Mass of water / Specific gravity of water) x (1/1000) = (197/1) x (1/1000)
= 0.197 m3
4. Total Volume of Aggregates = 1- (b+c) =1- (0.104+0.197) = 0.699m3
5. Mass of coarse aggregates = d X Volume of Coarse Aggregate X Specific Gravity of Coarse
Aggregate X 1000 = 0.669 X 0.60 X 2.80 X 1000 = 1123.92 kgs/m3
6. Mass of fine aggregates = d X Volume of Fine Aggregate X Specific Gravity of Coarse
Aggregate X 1000 = 0.669 X 0.40 X 2.70 X 1000 = 722.52 kgs/m3
1. Volume of concrete = 1 m3
2. Volume of cement = (Mass of cement / Specific gravity of cement) x (1/1000) = (308/3.15) x
(1/1000) = 0.098 m3
3. Volume of water = (Mass of water / Specific gravity of water) x (1/1000) = (185.18/1) x
(1/1000) = 0.185 m3
4. Total Volume of Aggregates = 1- (b+c) =1- (0.098+0.185) = 0.717m3
5. Mass of coarse aggregates = d X Volume of Coarse Aggregate X Specific Gravity of Coarse
Aggregate X 1000 = 0.717X 0.60 X 2.80 X 1000 = 1204.56 kg/m3
6. Mass of fine aggregates = d X Volume of Fine Aggregate X Specific Gravity of Coarse
Aggregate X 1000 = 0.717 X 0.40 X 2.70 X 1000 = 774.36 kg/m3
On trial no. 02
Determination of Consistency of fresh concrete (As per IS 1199-2018 Part -2
Quantity Representing sample
MINING CHEMICAL SUPPLIERS
Date: - 07/09/2022 Starting time: - 11:00 am
Slump test
Initial stage - 150
30 minutes - 110
60 minutes - 80
17.03
CONCLUSION: The 07 days compression strength of C20 cube test results are achieved as per
requirement.
RAMBABU.ADUSUMALLI
Sr. Manager QA/QC (HOD)
CONCLUSION: The 07 days compression strength of C20 cube test results are achieved as per
requirement.
MINING CHEMICAL SUPPLIERS
CONCLUSION: