Activity: Electrical Conducting & Installation Work
Activity: Electrical Conducting & Installation Work
Non-Significant (NS)
Non-Significant (NS)
Measure
Legal Yes/No
Significant (S) /
Significant (S) /
Sr.
Activity Hazard Risk ( Probable Outcome) Existing Control Additional Control Measure Remark
No.
Probability(P)
Probability(P)
Risk(R) : P*S
Risk(R) : P*S
Severity(S)
Severity(S)
1. Competent rigger shall be
engaged for material shifting & lifting
activity
2) Deployment of
1) Wrong approach 2)
competent operator & signalmen
Bad Housekeeping 3)
3) Mobile phone shall be prohibited
Wrong Sling use 4)
during operation of tower crane and
Damage wire rope 5)
1)Tilt of F-15 F-15
Material Unauthorized operator &
2) Fall of material 4) Illumination level should be good
Shifting by F- Signalmen
1 15 or Tower 6) Unwanted swing
3) Hit by object Yes P4 S3 S Yes P1 S3 D S
4) Material damage
crane crane 7) Wrong
5)Personal Injury 5) supervision should be strict
siglingiling 8) All
6) Medical screening shall be
management requirement
ensured for all operator &
Risk(R) : P*S
not full field in F-15 & tower
signalmen.
crane.
7) Daily inspection by operator,
weekly by P&M & fortnightly by
Existing Control safety Dept.
Severity (s) A : Hazards must be avoided (or the level of risk reduced significantly and reliable by controls)
S1 : Negligible B : Hazards should be avoided (or the level of risk reduced significantly and reliable by controls)
S2 : Minor C : Risk to be controlled as far as reasonably practicable
S3 : Sever D : Risk is controlled as far as reasonably practicable .
S4 : Extreme -- : Acceptable risk
LEGAL : If activity come under legal implecation (significant) than additional control
measures is to be taken and has to be reviewed periodically.
S : Significant
NS : Non - Significant.
Preapared By : HIRA Team ____________________________________________________________________________________
Approved By:
________________________________________________
GPL Project Manager
FOREMAT HAZARD IDENTIFICATION & RISK ASSESSMENT
Project Name: Godrej Aqua
Date:25.12.2018 Ref No. : GPL/AQUA/ELITE/HIRA/16 Revision No. : R - 00
Non-Significant (NS)
Non-Significant (NS)
existing existing
Legal Yes/No
Significant (S) /
Significant (S) /
Control Control
Measure Measure
Sr.
Activity Hazard Risk ( Probable Outcome) Existing Control Additional Control Measure Remark
Probability(P)
Probability(P)
No.
Risk(R) : P*S
Risk(R) : P*S
Severity(S)
Severity(S)
1) Proper accesses as compact
leveled surface shall be maintained for 1. Competent rigger shall be
movement for F-15. 2) Pre- engaged for material shifting & lifting
inspection checklist shall be ensured activity
before engagement of F-15 2) Deployment of
1) Wrong approach 2)
3) competent operator & signalmen
Bad Housekeeping 3)
Deployment of competent operator & 3) Mobile phone shall be prohibited
Wrong Sling use 4)
signalmen during operation of tower crane and
Damage wire rope 5)
1)Tilt of F-15 4) Load chart F-15
Material Unauthorized operator &
2) Fall of material should be display in to the cabin of the F- 4) Illumination level should be good
Shifting by F- Signalmen
1 15 or Tower 6) Unwanted swing
3) Hit by object 15 & tower crane Yes P4 S3 A S Yes P1 S3 D S
4) Material damage 5) Valid
crane crane 7) Wrong
5)Personal Injury TPI certificate shall be available for tower 5) supervision should be strict
siglingiling 8) All
crane & F- 15 as well as all lifting tools & 6) Medical screening shall be
management requirement
tackles 6) Tag line should be ensured for all operator &
not full field in F-15 & tower
provided signalmen.
crane.
7) Daily inspection by operator,
7) Use of all required weekly by P&M & fortnightly by
PPE'S safety Dept.
Severity (s) A : Hazards must be avoided (or the level of risk reduced significantly and reliable by controls)
S1 : Negligible B : Hazards should be avoided (or the level of risk reduced significantly and reliable by controls)
S2 : Minor C : Risk to be controlled as far as reasonably practicable
S3 : Sever D : Risk is controlled as far as reasonably practicable .
S4 : Extreme -- : Acceptable risk
LEGAL : If activity come under legal implecation (significant) than additional control
measures is to be taken and has to be reviewed periodically.
S : Significant
NS : Non - Significant.
Preapared By : HIRA Team ____________________________________________________________________________________
Approved By:
________________________________________________
GPL Project Manager