Gephi 0.9 Planning
Gephi 0.9 Planning
- Resolve preview bugs (DONE) - Resolve Data Laboratory bugs - Reintegrate filter module - Resolve visualization bugs - Resolve dynamic statistics - Write GEXF 1.3 final schema - Remove old unused modules
- Finish adapting Data (DONE) (DONE) (DONE) issues (DONE) - Resolve Appearance issues (DONE)
Laboratory to Timestamp and - General UI bug fixing (LATE) - Finalize GEXF 1.3 - Reintegrate timeline module - Improve support for multi- (DONE) - Test Attribute property
Dev GraphStore (DONE) implementation (DONE) (DONE) graphs + datalab edge type - Reintegrate Spigot module editors (DONE)
- Resolve Data Laboratory - - Resolve dynamic estimator (DONE) (CANCELLED) - Datalab: manage column
Graphstore integration bugs issues (DONE) estimators (DONE)
- Update Mac OS certificate (DONE) - Update Transifex (DONE) - Update splash screen image - Resolve version checker,
(DONE) - Start translating new strings (DONE): Available at update URL and settings
- Package JRE in Mac OS App (french), (spanish DONE) https://www.dropbox.com/s/c upgrader
Integration (DONE) 4ztictqosvb2d8/splash09beta.p
ng?dl=0
- Convert gephi-plugins master - Develop plugins Maven plugin Update linkfluence plugin Update neo4j plugin (wishlist, - Write new plugin dev
to use Maven (DONE) (DONE) (DONE) need basic rewrite without documentation
delegate system, after release?)
Plugins
- Make an inventory of what we - Fix gephi.org redirect (DONE) - Update wiki documentation - Update gexf.net website - Update Gephi README
want to update on Gephi's
website (LATE)
Documentation
- Start marcom plan for release - Contact journalists - Write email to plugin - Write release blog article
developers
Communication
Time available
mbastian 20% 20% 30% 50% 50% 70% 75%
eduramiba 6-8 hours 6-8 hours 6-8 hours 6-8 hours 6-8 hours 6-8 hours 6-8 hours
jacomyma 10% (8h) 2% (marginal) 2% (marginal) 10% (8h) 10% (8h) 20% (16h) 15% (12h)
jersub (hours) 4 4 4 0 4 4 4
seinecle
ID Category Task GitHub
1 Plugins Develop Maven plugin to configure and migrate plugins
2 Plugins Convert gephi-plugins repository to use Maven-based build
3 Plugins Clean gephi-plugins issues and pull request
4 Plugins Develop Travis-based plugins building with upload to Git
5 Plugins Write documentation on the new plugin lifecycle
6 Plugins Convert existing plugins to new build system
7 Plugins Develop legacy DBDrivers as plugins
8 Communication Write blog article about new plugins lifecycle (new marketplace, plugin validation)
9 Developers Write email to all plugin developers about how to convert their plugins
###Dev (integration)Update Splash screen image
###Dev (integration)Update Mac OS certificate and sign bundle
###Dev (integration)Update build configuration to package JRE #1170
### Dev Resolve Visualization bugs and issues
### Dev Resolve Appearance bugs and issues
### Dev Reintegrate filter module
### Dev Reintegrate timeline module
### Dev Resolve dynamic statistics issues
### Dev Test AttributeProperty editors, resolve issues if necessary
### Dev Remove old and unused modules from source code
### Dev Finalize GEXF 1.3 implementation (import/export)
### Dev Write new GEXF 1.3 schema in RelaxNG
### Dev Reintegrate spigot module
### Dev Resolve Preview bugs and issues
Dev Resolve dynamic estimator issues
###Dev (integration)Resolve version checker, update URL and settings upgrader issues
###Documentation Update links and documentation on Gephi README
Documentation Update Wiki documentation #993
### Dev Resolve Data Laboratory bugs and issues
### Dev Finish adapating Data Laboratory to support Timestamps #1169
###Documentation Update gexf.net website
###Communication Publish 0.9 version annoucement blog article
### Dev Improve support for multi-graphs (Data laboratory, Visualization labels, Partition)
###Dev (integration)Repair the whole Transifex thing What is broken?