Mechanical WIP Checklists
Mechanical WIP Checklists
: F-QM-ME-001
PROJECT :
LOCATION :
PIPE SLEEVING CHECKLIST DATE PREPARED : CONTROL NO. :
GRIDLINE:
CHECK THAT THE FOLLOWING COMPLY WITH APPROVED SUBMITTALS , FOR CONSTRUCTION DRAWINGS AND TECHNICAL
SPECIFICATIONS :
Complied
CHECKLIST REMARKS
SC FE
A.) Pipe Sleeving to Beams
1. Materials Used
a. Rebars ( Horizontal )
b. Rebars ( Vertical )
c. Rebars ( Z-Bars )
2. Covering and Tagging
a. Covers @ every Pipe Sleeve
b. Painted Tagging "P" @ cover
3. Pipe to be Used
a. Schedule 20 B.I. Pipe
b. Coated by Primer Paint
B.) Pipe Sleeving to PC-Slab/Wall Casting Bed
1. Materials Used
a. Rebars ( Horizontal Trimmer )
b. Rebars ( Vertical Trimmer Bar )
2. Covering
a. Covering @ every Pipe Sleeve secured with tie wire
3. Layout
a. As per TSP
b. As per Survey Lay-outs
3. Pipe to be Used
a. Series 600 PVC Pipes
b. Size of Sleeve based on Pipes to be Penetrated
REMARKS:
NOTE : This form must be submitted to The OPERATIONS, duly accomplished and signed by the corresponding Contractor's Personnel-in-Charge at least 24
hours before actual INSPECTION.
PREPARED BY: INSPECTED BY: APPROVED BY:
GRIDLINE:
CHECK THAT THE FOLLOWING COMPLY WITH APPROVED SUBMITTALS , FOR CONSTRUCTION DRAWINGS AND TECHNICAL
SPECIFICATIONS :
Complied
CHECKLIST REMARKS
SC FE
A. Preplanning
1. Preplan the valve installation.
2. Perform required receiving inspection.
3. Check that valves are properly handled, stored and
maintained.
4. Check building areas for interference with valves
installation and operation.
5. Verify that valves are the correct size, type, and pressure
rating and are installed in their correct location and
orientation. (Read the manufacture tags and not the
vendors tags to verify valves information.)
6. Perform req'd valves installation in-process inspections.
7. Complete valve installation progress reporting.
8. Perform periodic valve inventories and initiate field
purchases of valve if necessary.
9. Monitor P&ID deviations and obtain required designs
approval for changes.
10. Ensure that extra valve stem packing, bonnet gaskets,
pressure seals, plugs, and flange gaskets needed for
repairs are available.
11. Review piping design drawings and vendor valve detail
sheets for compatibility including material and end preps.
12. Ensure required operating and setting instructions and
procedures are available.
13. Check that operating & setting activities are performed
per applicable instructions, procedures and valve/
operator manufacturer instructions.
14. Ensure that changes which may results in interference
or which may cause delays are coordinated with
other disciplines.
B. Installations
1. Ensure that required exception reports are prepared and
processed.
2. Verify that required valve operator supports are installed.
3. Make sure measures are taken to protect valve bodies
and internal form heat effect of welding.
C. Testing
1. Check valve pressures capacity and ensure it is greater
than the required piping pressure test.
REMARKS:
NOTE : This form must be submitted to The OPERATIONS, duly accomplished and signed by the corresponding Contractor's Personnel-in-Charge at least 24
hours before actual INSPECTION.
PREPARED BY: INSPECTED BY: APPROVED BY:
GRIDLINE:
CHECK THAT THE FOLLOWING COMPLY WITH APPROVED SUBMITTALS , FOR CONSTRUCTION DRAWINGS AND TECHNICAL
SPECIFICATIONS :
Complied
CHECKLIST REMARKS
SC FE
1. MATERIALS
a. Type, Size, Gauge, Brand
2. WELDED JOINTS
a. Jointing Material
b. Tested (Ultrasonic)
3. HANGERS
a. Complete/Correct Spacing
b. (Painted (Galvanized)
c. Size
d. Mounting
e. Seismic Connection
4. FITTINGS/FIXTURES
a. Type, Size, Brand, Class
5. FLANGE
a. Gasket
b. Flange Material
6. CORROSION PROTECTION (UNDERGROUND)
a. Material
b. Workmanship
7. PIPE LAYING
a. Alignment, Elevation
8. TESTING
a. Leak Tested
REMARKS:
NOTE : This form must be submitted to The OPERATIONS, duly accomplished and signed by the corresponding Contractor's Personnel-in-Charge at least 24 hours
before actual INSPECTION.
PREPARED BY: INSPECTED BY: APPROVED BY:
GRIDLINE:
CHECK THAT THE FOLLOWING COMPLY WITH APPROVED SUBMITTALS , FOR CONSTRUCTION DRAWINGS AND TECHNICAL
SPECIFICATIONS :
Water Closet Kitchen Faucet FITTINGS:
Shower Set w/ Mixer Floor Drain
FIXTURE Lavatory Sink Bath Tub w/ Drain
Lavatory Faucet Others
Kitchen Sink
Complied
CHECKLIST REMARKS
SC FE
1. MATERIALS
a. Type, Size, Gauge, Brand
2. WELDED JOINTS
a. Jointing Material
b. Tested (Ultrasonic)
3. HANGERS
a. Complete/Correct Spacing
b. (Painted (Galvanized)
c. Size
d. Mounting
e. Seismic Connection
4. FITTINGS/FIXTURES
a. Type, Size, Brand, Class
5. FLANGE
a. Gasket
b. Flange Material
6. CORROSION PROTECTION (UNDERGROUND)
a. Material
b. Workmanship
7. PIPE LAYING
a. Alignment, Elevation
8. TESTING
a. Leak Tested
b. Functionality Test Coducted
REMARKS:
NOTE : This form must be submitted to The OPERATIONS, duly accomplished and signed by the corresponding Contractor's Personnel-in-Charge at least 24 hours
before actual INSPECTION.
PREPARED BY: INSPECTED BY: APPROVED BY:
GRIDLINE:
CHECK THAT THE FOLLOWING COMPLY WITH APPROVED SUBMITTALS , FOR CONSTRUCTION DRAWINGS AND TECHNICAL SPECIFICATIONS :
Complied
CHECKLIST REMARKS
SC FE
A. Piping System
1. Ensure piping route/layout as per approved drawing
2. Ensure pipe size and material complied with the specification
3. Ensure pipe sleeves are installed on pipes passing through
wall/floor
4. Ensure pipe joints and fittings are properly installed
5. Ensure pipes are installed level and plumb
6. Ensure hanger and supports size and spacing is per NFPA
standard or per project specifications.
7. Ensure fire stopping material applied between pipe and sleeve
8. Ensure finished paint properly applied
9. Ensure escutheon plate installed on exposed piping passing
through wall/floor/ceiling openings
10. Ensure piping system passed hydrostatic pressure test
11. Ensure flushing and cleaning of piping system performed and
accepted
12. Ensure pipe identification and flow directional arrows installed
13. Ensure valve tags installed
B. Sprinkler Specialty fittings
Ensure the following sprinkler specialty fittings are approved product and
properly installed/connected to the system
1. Listed fire protection valves (ball, butterfly,gate, globe and check
valves)
2. Specialty valves and trim
a. Sprinkler system control valve
b. Main sprinkler check valve
c. Sprinkler test drain and alarm test fittings
d. Automatic drain valve
3. Sprinkler heads (concealed, pendent, sidewall and upright)
4. Hose connection
5. Fire department connection
6. Tamper switches, Flow switches and bells
7. Water flow indicator
8. Valve supervisory switch
9. Pressure gage w/ calibrated sticker
10. Inspector test connection
REMARKS :
NOTE : This form must be submitted to The OPERATIONS TEAM duly accomplished and signed by the corresponding Contractor's Personnel-in-Charge at
least 24 hours before actual INSPECTION.
PREPARED BY: INSPECTED BY: APPROVED BY:
GRIDLINE:
CHECK THAT THE FOLLOWING COMPLY WITH APPROVED SUBMITTALS , FOR CONSTRUCTION DRAWINGS AND TECHNICAL SPECIFICATIONS :
Complied
CHECKLIST REMARKS
SC FE
1. Check the sprinkler heads are installed as per approved drawing.
2. Check temperature & type of sprinkler heads as per approved submittal.
3. Check heads appears free of leakage and damage.
4. Check heads free of paint.
5. Check heads are in appropriate position.
6. Check escutheon is installed (if Applicable)
REMARKS :
NOTE : This form must be submitted to The OPERATIONS TEAM duly accomplished and signed by the corresponding Contractor's Personnel-in-Charge at least
24 hours before actual INSPECTION.
PREPARED BY: INSPECTED BY: APPROVED BY:
GRIDLINE:
CHECK THAT THE FOLLOWING COMPLY WITH APPROVED SUBMITTALS , FOR CONSTRUCTION DRAWINGS AND TECHNICAL SPECIFICATIONS :
Complied
CHECKLIST REMARKS
SC FE
1. Check the entire pipe work carried out as per approved drawing.
2. Check pipe supports and hangers are secured.
3. Check the pump unit is complete with all accessories.
4. Check the check valve direction and confirm the arrow shown as per
direction of water flow.
5. Check pump properly secured & bolted on foundation.
6. Check all bolts are tightening properly.
7. Check flow meter installation (2D and 5D rule)
8. Check the Jockey Pump installation for the piping & accessories are
9. Check sensing Lines.
10. Check Controller Cable Insulation / continuity Test.
11. Check all Electrical connections are connected.
12. Check Pump field alignment are done by the supplier.
13. Check cable installation and testing are completed.
14. Check all valves are in position and have no passing during the
REMARKS :
NOTE : This form must be submitted to The OPERATIONS TEAM duly accomplished and signed by the corresponding Contractor's Personnel-in-Charge at least
24 hours before actual INSPECTION.
PREPARED BY: INSPECTED BY: APPROVED BY:
GRIDLINE:
CHECK THAT THE FOLLOWING COMPLY WITH APPROVED SUBMITTALS , FOR CONSTRUCTION DRAWINGS AND TECHNICAL SPECIFICATIONS :
Complied
CHECKLIST REMARKS
SC FE
1. Check the fire extinguisher size and type in accordance with the
approved drawing and submittal.
2. Make sure the location is easily accessible and in accordance with
3. Check the bracket is properly installed.
4. Check the pressure & weight are normal.
5. Check the local seal and confirm if fully operational.
REMARKS :
NOTE : This form must be submitted to The OPERATIONS TEAM duly accomplished and signed by the corresponding Contractor's Personnel-in-Charge at least
24 hours before actual INSPECTION.
PREPARED BY: INSPECTED BY: APPROVED BY:
GRIDLINE:
CHECK THAT THE FOLLOWING COMPLY WITH APPROVED SUBMITTALS , FOR CONSTRUCTION DRAWINGS AND TECHNICAL SPECIFICATIONS :
Complied
CHECKLIST REMARKS
SC FE
1. Ensure piping route/layout as per approved drawing
2. Ensure pipe size and material comply with the specification
3. Ensure pipe sleeves are installed on pipes passing through wall/floor
4. Ensure pipe joints and fittings are properly installed
5. Ensure eccentric reducer fittings installed with level side up
6. Ensure piping are installed level and plumb
7. Ensure dielectric fittings installed where copper piping is connected to steel
piping
8. Ensure pipe hangers and supports' size and spacing are correct.
9. Ensure location and installation of seismic pipe support are correct
10. Ensure fire stopping material applied between pipes and sleeves
11. Ensure finished paint propoerly applied
12. Ensure piping system passed hydrostatic pressure test
13. Ensure flushing and cleaning of piping performed and accepted
14. Ensure pipe identification and flow indication arrows installed
15. Ensure valve tags are installed
16. Ensure the following valves and accessories are properly installed/connected to
the piping system:
a. Valves (Butterfly, Ball, Check)
b. Flexible connector
c. Wye Strainer
d. Auto air vent
e. 2-way motorized valve
f. Balancing valve with measuring ports
g. Thermometer w/ calibration sticker
h. Pressure gage w/ calibration sticker
REMARKS :
NOTE : This form must be submitted to The OPERATIONS TEAM duly accomplished and signed by the corresponding Contractor's Personnel-in-Charge at least
24 hours before actual INSPECTION.
PREPARED BY: INSPECTED BY: APPROVED BY:
GRIDLINE:
CHECK THAT THE FOLLOWING COMPLY WITH APPROVED SUBMITTALS , FOR CONSTRUCTION DRAWINGS AND TECHNICAL SPECIFICATIONS :
Complied
CHECKLIST REMARKS
SC FE
1. Ensure pipe layout have been inspected/approved
2. Ensure insulation thickness and material complied with the specification
3. Ensure adhesives are properly applied to pipe and insulation
4. Ensure insulation are properly applied to pipe
5. Ensure insulation seams and end joints are properly bonded and taped
6. Ensure insulation are continuously applied through wall/floor/ceiling openings
7. Ensure insulation are properly applied to flanges and fittings
8. Ensure insulation are properly applied to valves and specialties
9. Ensure fire stopping material applied between pipe and sleeves
10. Ensure insulation jacket material and thickness complied with the specs
11. Ensure pipe identification and flow directional arrows are installed.
12. Ensure valve tags are installed.
13. Ensure piping system passed hydrostatic pressure test before insulating the
pipe.
REMARKS :
NOTE : This form must be submitted to The OPERATIONS TEAM duly accomplished and signed by the corresponding Contractor's Personnel-in-Charge at least
24 hours before actual INSPECTION.
PREPARED BY: INSPECTED BY: APPROVED BY:
GRIDLINE:
CHECK THAT THE FOLLOWING COMPLY WITH APPROVED SUBMITTALS , FOR CONSTRUCTION DRAWINGS AND TECHNICAL SPECIFICATIONS :
Complied
CHECKLIST REMARKS
SC FE
1. Check dimension and location as per drawing.
2. Anti- vibration mounting has correct location. (If applicable)
3. Clean up the unit and surroundings.
4. Check the duct connection dampers.
5. Check drain line connection
6. Check filters are provided.
7. Ensure that control cables are connected and completed.
8. Check unit access doors to be air tight.
9. Remove transit bolts.
10. Check piping connection is completed.
11. Check voltage / Ph/Hz.
12. Check motor F-L-A (name plate)
13. Check motor and fan free movement.
14. Check indoor pulley alignment.
15. Check pulley tightness to shaft.
16. Check belt tension.
17. Check thermostat fixing and interconnection.
18. Check fresh air intake fixing and exhaust air is completed.
19. Check overload protection is set to motor FLC, switch on main power and check
voltage and motor amps.
20. Check motor direction and current.
21. Check unit air discharge connection to main duct.
22. Check valves & accessories are properly and completely install.
23. Check fan nameplate as per approved model.
24. Check unit model nameplate is per approved submittal.
25.Check the installation of Fire Damper & Volume Damper as per drawing.
REMARKS :
NOTE : This form must be submitted to The OPERATIONS TEAM duly accomplished and signed by the corresponding Contractor's Personnel-in-Charge at least
24 hours before actual INSPECTION.
PREPARED BY: INSPECTED BY: APPROVED BY:
GRIDLINE:
CHECK THAT THE FOLLOWING COMPLY WITH APPROVED SUBMITTALS , FOR CONSTRUCTION DRAWINGS AND TECHNICAL SPECIFICATIONS :
Complied
CHECKLIST REMARKS
SC FE
1. Check dimension and location as per drawing.
2. Anti- vibration mounting has correct location. (If applicable)
3. Check motor voltage and capacity to suit requirement.
4. Check fan nameplate as per approved model.
5. Check unit model nameplate is per approved submittal.
6. Check filters are provided.
7. Ensure that power & control cables are connected and completed.
8. Check drain line connection is completed.
9. Check piping connection is completed.
10. Check voltage / Ph/Hz.
11. Check motor F-L-A (name plate)
12. Check motor and fan free movement.
13. Check thermostat fixing and interconnection.
14. Check valves & accessories are properly and completely install.
15. Ensure isolation valves are closed if system is to be pressure tested.
16. Service area round available and obstruction free.
17. Check the installation of Fire Damper & Volume Damper as per drawing.
18. Check unit access doors to be air tight.
19. Fan coil unit is securely hanged or located in position.
REMARKS :
NOTE : This form must be submitted to The OPERATIONS TEAM duly accomplished and signed by the corresponding Contractor's Personnel-in-Charge at least
24 hours before actual INSPECTION.
PREPARED BY: INSPECTED BY: APPROVED BY:
GRIDLINE:
CHECK THAT THE FOLLOWING COMPLY WITH APPROVED SUBMITTALS , FOR CONSTRUCTION DRAWINGS AND TECHNICAL SPECIFICATIONS :
Complied
CHECKLIST REMARKS
SC FE
1. Check dimension and location as per drawing.
2. Anti- vibration mounting has correct location. (If applicable)
3. Check motor voltage and capacity to suit requirement.
4. Check fan nameplate as per approved model.
5. Check unit model nameplate is per approved submittal.
6. Check filters are provided.
7. Ensure that power & control cables are connected and completed.
8. Check drain line connection is completed.
9. Check copper piping connection is completed.
10. Check voltage/Ph/Hz.
11. Check motor F-L-A (name plate)
12. Check motor and fan free movement.
13. Service area round available and obstruction free.
REMARKS :
NOTE : This form must be submitted to The OPERATIONS TEAM duly accomplished and signed by the corresponding Contractor's Personnel-in-Charge at least
24 hours before actual INSPECTION.
PREPARED BY: INSPECTED BY: APPROVED BY:
CHECKLIST
AREA /FLOOR LEVEL : INSPECTION DATE/TIME :
GRIDLINE:
CHECK THAT THE FOLLOWING COMPLY WITH APPROVED SUBMITTALS , FOR CONSTRUCTION DRAWINGS AND TECHNICAL SPECIFICATIONS :
Complied
CHECKLIST REMARKS
SC FE
1. Check dimension and location as per drawing.
2. Anti- vibration mounting has correct location. (If applicable)
3. Clean up the unit and surroundings.
4. Ensure that control cables are connected and completed.
5. Check unit access doors to be air tight.
6. Remove transit bolts.
7. Check voltage / Ph/Hz.
8. Check motor F-L-A (name plate)
9. Check motor and fan free movement.
10. Check indoor pulley alignment.
11. Check pulley tightness to shaft.
12. Check belt tension.
13. Check overload protection is set to motor FLC, switch on main power and check
voltage and motor amps.
14. Check motor direction and current.
15. Check unit air discharge connection to main duct.
16. Check fan nameplate as per approved model.
17. Check unit model nameplate is per approved submittal.
18. Check the installation of Fire Damper & Volume Damper as per drawing.
19. Fan is securely hanged or located in position.
REMARKS :
NOTE : This form must be submitted to The OPERATIONS TEAM duly accomplished and signed by the corresponding Contractor's Personnel-in-Charge at least
24 hours before actual INSPECTION.
PREPARED BY: INSPECTED BY: APPROVED BY:
DUCTWORKS LOCATION :
GRIDLINE:
CHECK THAT THE FOLLOWING COMPLY WITH APPROVED SUBMITTALS , FOR CONSTRUCTION DRAWINGS AND TECHNICAL SPECIFICATIONS :
Complied
CHECKLIST REMARKS
SC FE
1. Check duct routing / size as per drawing.
2. Check duct material as approved.
3. Check duct insulation.
4. Check duct supports and hangers are secured and spacing is correct.
5. Check duct liners proper fixing.
6. Check duct flexible connection installed if applicable.
7. Check duct internally clean and no foreign matters left inside.
8. Inspect all inspection access door sizes, location and accessibility.
9. Check duct finishes / aluminum sheet cladding (where required).
10. Ensure that dust is "capped off" with plastic sheeting if not connected.
11. Check that all volume control dampers have been installed as per drawing and
recommendation by consultant.
12. Check that all fire dampers have been installed as per drawing and
recommendation by consultant.
13. Check that all VAV (Variable Air Volume) have been installed as per drawing
and recommendation by consultant.
14. Check that all duct smoke detector have been installed per drawing and
recommendation by consultant.
15. Ensure fire stopping material applied
16. Ensure ducting system passed air duct leakage test
REMARKS :
NOTE : This form must be submitted to The OPERATIONS TEAM duly accomplished and signed by the corresponding Contractor's Personnel-in-Charge at least
24 hours before actual INSPECTION.
PREPARED BY: INSPECTED BY: APPROVED BY:
GRIDLINE:
CHECK THAT THE FOLLOWING COMPLY WITH APPROVED SUBMITTALS , FOR CONSTRUCTION DRAWINGS AND TECHNICAL SPECIFICATIONS :
Complied
CHECKLIST REMARKS
SC FE
1. Ensure duct layout have been inspected and approved
2. Ensure duct insulation thickness is correct (40mm)
3. Ensure duct pins are complete and properly installed
4. Ensure insulation adhesives are properly applied
5. Ensure insulation are properly applied to ducts and duct joints
6. Ensure duct corner plate and plastic strap are properly installed
7. Ensure insulation are continuously applied throungh wall/floor/ceiling openings
8. Ensure insulation are applied at duct mounted access doors
9. Ensure fire stopping material applied.
10. Ensure duct markers and directional air flow installed.
11. Ensure ducting system passed air duct leakage test.
12. Ensure cleaning of duct system performed, inspected and approved.
REMARKS :
NOTE : This form must be submitted to The OPERATIONS TEAM duly accomplished and signed by the corresponding Contractor's Personnel-in-Charge at least
24 hours before actual INSPECTION.
PREPARED BY: INSPECTED BY: APPROVED BY:
GRIDLINE:
CHECK THAT THE FOLLOWING COMPLY WITH APPROVED SUBMITTALS , FOR CONSTRUCTION DRAWINGS AND TECHNICAL SPECIFICATIONS :
Complied
CHECKLIST REMARKS
SC FE
1. Check damper location/size as per drawing.
2. Check damper as per approved submittal.
3. Check all dampers are free to move.
4. Check all fire dampers are fully open.
5. Check all motorized dampers are securely fixed to duct.
6. Check damper shaft - motor connection.
7. Check airflow direction is correct.
8. Check pressure relief dampers operation if any.
9. Check duct finishes / aluminum sheet cladding (where required).
10. Check electric wiring or motorized dampers.
11. Check fire damper is encased properly in wall. Ensure there are no gaps
between damper casing and wall for fire / gas / smoke passage.
12. Ensure that access door are adequate for resetting of fire dampers.
REMARKS :
NOTE : This form must be submitted to The OPERATIONS TEAM duly accomplished and signed by the corresponding Contractor's Personnel-in-Charge at least
24 hours before actual INSPECTION.
PREPARED BY: INSPECTED BY: APPROVED BY:
GRIDLINE:
CHECK THAT THE FOLLOWING COMPLY WITH APPROVED SUBMITTALS , FOR CONSTRUCTION DRAWINGS AND TECHNICAL SPECIFICATIONS :
Complied
CHECKLIST REMARKS
SC FE
1. Check grilles & diffusers location as per approved shop drawing.
2. Check air terminals are fitted and secured.
3. Check grilles & diffusers as per approved submittal.
4. Check air terminals are fully open.
5. Check alignment and levelling of the grilles.
6. Check that blades, bars and dampers do not vibrate.
7. Check that each air terminal should be with opposed blade damper adjustable
from face of terminal.
8. Ensure no leakage between plenum box and outlet / inlet.
9. Check grilles & diffusers supports and hangers are secured.
REMARKS :
NOTE : This form must be submitted to the OPERATIONS TEAM, duly accomplished and signed by the corresponding Contractor's Personnel-in-Charge at least
24 hours before actual INSPECTION.
PREPARED BY: INSPECTED BY: APPROVED BY:
GRIDLINE:
CHECK THAT THE FOLLOWING COMPLY WITH APPROVED SUBMITTALS , FOR CONSTRUCTION DRAWINGS AND TECHNICAL SPECIFICATIONS :
Complied
CHECKLIST REMARKS
SC FE
1. Ensure piping route/layout as per approved drawing
2. Ensure pipe size and material complied with the specification
3. Ensure pipe sleeves are installed on pipes passing through wall/floor
4. Ensure pipe joints and fittings are properly installed
5. Ensure piping are installed level and plumb
6. Ensure dielectric fittings are installed where copper piping is connected to steel
piping
7. Ensure valves 50mm diameter and smaller are provided with unions
8. Ensure pipe hangers and supports' size and spacing are correct
9. Ensure location and installation of seismic pipe support are correct
10. Ensure fire stopping material applied between pipes and sleeves
11. Ensure piping system passed hydrostatic pressure test
12. Ensure piping system passed cleaning, flushing and disinfection
13. Ensure pipe identification and flow indication arrows installed
14. Ensure valve tags installed
15. Ensure the following valves and accessories are properly installed/connected to
the piping system:
a. Valves (Butterfly, Ball, Check)
b. Flexible connector
c. Wye Strainer
d. Auto air vent
e. Water hammer arrester
f. Balancing valve with measuring ports
g. Backflow preventer
h. Plumbing fixture
i. Hose bibb
j. Water regulator
REMARKS :
NOTE : This form must be submitted to OPERATIONS TEAM, duly accomplished and signed by the corresponding Contractor's Personnel-in-Charge at least 24
hours before actual INSPECTION.
PREPARED BY: INSPECTED BY: APPROVED BY:
GRIDLINE:
CHECK THAT THE FOLLOWING COMPLY WITH APPROVED SUBMITTALS , FOR CONSTRUCTION DRAWINGS AND TECHNICAL SPECIFICATIONS :
Complied
CHECKLIST REMARKS
SC FE
1. Size of pipe, location and elevation checked as per approved drawings.
2. Materials checked as per specifications.
3. Check all pipe and fittings jointing method as per vendors requirements.
4. Ensure pipe joints and fittings are properly installed
5. Pipe run rodded, cleaned and protection on both ends from entry of foreign
materials was provided.
6. Trench formation rigid and well compacted, and pipe were securely supported
as per requirements.
7. Backfilling performed in layers and as per approved material and specification.
8. Pipe gravity test as per approved method.
9. All inspection activities were checked, recorded and reviewed.
REMARKS :
NOTE : This form must be submitted to OPERATION STEAM, duly accomplished and signed by the corresponding Contractor's Personnel-in-Charge at least 24
hours before actual INSPECTION.
PREPARED BY: INSPECTED BY: APPROVED BY: