SPMS User's Manual With FAQs
SPMS User's Manual With FAQs
I. Introduction 1
1. DPWH Mandate 1
2. Vision 1
3. Mission 1
4. Core Values 2
3. Benefits of SPMS 6
6. Policy Guidelines 8
2. SPMS Calendar 24
1. Monitoring Performance 50
3. Performance Coaching 57
1. Appeals 88
2. Sanctions/Penalties 89
IX. Annex 91
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 1 of 142
Introduction
DPWH Mandate
The Department of Public Works and Highways (DPWH) is one of the three departments of
the government undertaking major infrastructure projects. The DPWH is mandated to
undertake: (a) the planning of infrastructure, such as national roads and bridges, flood
control, water resources projects and other public works, and (b) the design, construction,
and maintenance of national roads and bridges, and major flood control systems.
Vision
By 2030, DPWH is an effective and efficient government agency, improving the life of every
Filipino through quality infrastructure.
Mission
To provide and manage quality infrastructure facilities and services responsive to the needs
of the Filipino people in the pursuit of national development objectives.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 2 of 142
Core Values
1. Public Service: Anticipating and responding to the needs of all the stakeholders and
satisfying their needs through quality effort, DPWH officials and employees shall deliver
the kind of facilities and services that are responsive to the needs of Filipino people.
3. Professionalism: Taking pride in one’s work and committed to the pursuit of the
excellence, DPWH officials and employees shall act competently, ethically, diligently,
with accountability and dignity in their areas of expertise. They shall be given
challenging assignments and training, and promotions shall be based on merit.
4. Excellence: By continuously pursuing the highest quality of work in serving the public,
DPWH officials and employees shall deliver the highest quality results beyond what is
expected and required of them – on time, just-in-time, and all the time.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 3 of 142
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 4 of 142
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 5 of 142
Strategic Performance
Management System
(SPMS)
What is Performance Management
1.1. Goals are being met in the most efficient and effective manner;
1.2. Employees focus on work efforts towards achieving DPWH’s mandate, vision,
mission, and values.
3. A systematic approach for continuous and consistent work improvements and individual
growth.
Previous appraisal systems used by the Department, such the Management by Objective
and Result Evaluation (MORE), did not clearly establish the link of individual commitments
and performance to the DPWH mandate, vision, mission and Major Final Outputs.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 6 of 142
Benefits of SPMS
The SPMS focuses on total employee development, not just on how well they perform the
job. If implemented correctly, the SPMS can be a source of data that supervisors can use to
enhance the jobs and the competencies of the employee through:
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 7 of 142
Senior Management will have the accountability for running the SPMS, keeping it alive
and well. They should model the use of the system from the first to the last Stage.
There must be a change in mind-set from the old Performance Management System to
the new. Sense of urgency has to be created within the Department, in order for them
to meet the 2030 Vision which is for DPWH to be an effective and efficient government
agency, improving the life of every Filipino through quality infrastructure.
The roll out of the SPMS will be supported by a Change Management and
Communication Plan. Multiple communication vehicles should be used to effectively
communicate the SPMS DPWH-wide.
Accountability will be shared with all levels. Everyone in the organization needs to know
how the objectives will be achieved; allocate accountability across the organization for
each one of the strategic objectives.
5. Results-based Performance
The SPMS balances the results and the demonstration of the core competencies of
everyone in the organization. The SPMS is a system that evaluates organization
effectiveness regularly and identifies process improvements. This is done by the
Department PMT.
The SPMS encourages everyone to have the mind-set to always ask, “How else can I
improve what I am doing? What can I do better today?” Improve the accomplishments
year on year.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 8 of 142
1. Ensure that the performance contribution of each employee are geared towards the
attainment of the DPWH vision, mission and strategic performance goals.
2. Improve organizational and individual performance through target setting jointly by the
Head of Office and staff, and supervisors and employees; discussion and agreement of
performance objectives/ targets by supervisor and employee, and continuous
monitoring of performance by supervisor.
3. Provide an effective and objective tool for performance-based personnel actions which
would require the rating for a given period (i.e. promotion, training or scholarship grant
and performance enhanced bonus).
Policy Guidelines
As stated in Department Order No. 32, s. 2014, the DPWH SPMS has the following policy
guidelines:
1. The DPWH SPMS is an integral part of the human resource management and capacity
development program of the Department.
3. The DPWH SPMS focuses on the Major Final Outputs (MFOs) that contribute to the
realization of the organization’s mandate, vision, mission, strategic priorities, outputs
and outcomes.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 9 of 142
5. The forms for organizational and individual commitments are similar. The Office,
Division, and Individual MFOs and success indicators are aligned to cascade
organizational goals to individual employees and harmonize organizational and staff
performance ratings.
1. The DPWH Strategic Management System was pilot tested for the rating period July –
December 2014 and was strictly implemented effective July 1, 2015.
2. DPWH SPMS was declared approved and functional by the CSC-NCR, effective January
7, 2016.
3. SPMS Orientations were conducted by the Human Resource and Administrative Service
(HRAS) for the Administrative Officers, District Engineers, Section Chiefs and top brass.
4. Workflow and Database Matrices were crafted and submitted to HRAS for review and
approval.
6. In 2016, DPWH partnered with the Philippine Australian Human Resource and
Organization Development Facility (PAHRODF) to further strengthen the SPMS to
reflect the following outcomes:
6.1. The DPWH SPMS is a complete, functional and effective system that meets the
CSC PRIME-HRM standards.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 10 of 142
6.2. The DPWH SPMS is a tool that measures individual performance as aligned to the
organization’s mandate, vision, and mission.
6.3. The DPWH SPMS, once implemented over time, is an instrument that would
assist supervisors to identify clear-cut outputs of their respective units/offices
through specific success indicators (Quality, Efficiency and Timeliness).
6.4. The culture of performance management and development is reflected and lived
by DPWH leaders and supervisors.
At the top center of the framework, as seen in the succeeding page, is the Vision and
Mission of DPWH.
At the left-hand side is the “What” which refers to results that must be achieved for the
individual, office and organization to succeed. Strategic priorities and goals are broken
down into Organizational outcomes which then are translated into MFOs and objectives,
and individual success indicators. By aligning individual objectives with Organizational
outputs in this way ensures that each individual and unit contributes to organizational
success.
The SPMS focuses on the DPWH Major Final Outputs (MFOs) that contribute to the
realization of the organization’s mandate, vision, mission, strategic priorities and outcomes.
These DPWH MFOs are (1) National Road Network Services, (2) Flood Management
Services and (3) Construction & Maintenance Services of other Infrastructure. The list of
DPWH Major Final Outputs can be found in Annex B.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 11 of 142
At the right-hand side, referred to by the “How”, are the core values of DPWH and the
competencies needed for individuals do their jobs. If individuals and units possess required
competencies and demonstrate values consistent with strategic goals, the organizational
vision will be realized.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 12 of 142
HOW
VISION & MISSION
PERFORMANCE
INDIVIDUAL
EMPLOYEE
DPWH SPMS Framework:
WHAT
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 13 of 142
Societal Goal
Rapid, inclusive & sustained economic growth, integrity of the environment and climate
change mitigation and adaption
Organizational Outcomes
1. Safe, fast, economical and reliable inter-regional and inter-urban mobility of
people, goods, and services
2. Lives and properties protected against major floods and other disasters.
3. Living condition of population enhanced through other public infrastructure
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 14 of 142
1.1. The performance targets reflected in the OPCR are used to establish final outputs
of individual employees in the organizational unit, but will not be considered in
deriving performance rating in SPMS.
4. Job Orders, in the evaluation of their performance when renewing the Contract of
Services.
1. SPMS Champions
Together with the Department PMT and Office PMT, the DPWH Secretary is
responsible and accountable for the establishment and implementation of the
SPMS.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 15 of 142
1.2. The Undersecretaries, Assistant Secretaries, and Heads of Office have the
following responsibilities:
Reviews the Performance Commitment and Review Forms to ensure alignment with
the Department strategic goals and objectives before recommending for approval.
Acts as an appeal body and final arbiter for performance management issues of
DPWH and other issues arising from the implementation of SPMS, including
concerns on performance-based incentive system of this Department pursuant to
E.O. No. 80, dated 20 July 2012; and
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 16 of 142
2.2.1. Bureaus
2.2.2. Services
2.2.4. UPMO
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 17 of 142
Have the overall responsibility in overseeing the administration of the SPMS and
the custody of performance rating reports.
Provide staff assistance to supervisors and initiate and/or coordinate training for
Raters and Ratees to ensure effective implementation of the System.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 18 of 142
5. Raters
Discuss the Department strategic goals and Office objectives and measures with
the Ratees under their supervision.
Ensures that office performance targets and measures, as well as budget are
aligned with those of the Agency and that work distribution of Offices/Divisions is
rationalized.
Provide feedback and corrective actions when a lapse in the Ratee’s performance is
observed.
6. Ratees
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 19 of 142
Assist in the implementation and cascade of the SPMS in their respective offices.
Act as help desk in the clarification, information and explanation of the SPMS
process.
Approving Authority
Ratee Office (Stage 1)
Assistant Secretary
OPCR
Bureau Assistant Director Undersecretary (Usec)
Regional Director
Regional Office
Assistant Regional Director
Division Chiefs,
Assistant Division Chiefs UPMO Cluster UPMO Cluster Director
Regional Offices
DPCR
Regional Director
District Engineers,
Doc. No. DPWH-SPMS-MANUAL
Central Office
Eff. Date:
IPCR
20 of 142
Undersecretary N/A
DPWH Secretary
Central Office
OPCR
Bureau Assistant Director
Assistant Secretary Undersecretary
Regional Director
Regional Office
Assistant Regional Director
Process Owner: HRAS
Division Chiefs,
Assistant Division Chiefs UPMO Cluster UPMO Cluster Director Undersecretary
Regional Offices
DPCR
Rev. No. 0
Assistant Regional
Regional Director
District Engineers, District Engineering Director
Assistant District Engineers Offices
Division Chief
Director
Regional Offices
Section Chief
District Engineering
Page:
IPCR
Central Office
21 of 142
Division Chief
Regional Offices
Positions below Section Chief Section Chief
District Engineering
District Engineer
Offices
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 22 of 142
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 23 of 142
This stage is done at the start of the performance period where the Head of Offices meet
with the supervisors and staff and agree on the outputs that should be accomplished based
on the goals and objectives of the Department/Office. During this stage, success indicators
are determined and targets are set.
Done at the end of the performance period, this stage aims to assess both individual
employee and Office performance levels based on the performance targets and measures
agreed during Stage 1.
The results of the individual and Office Performance Evaluation shall be a base for rewards
and individual development planning.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 24 of 142
Next
Year
Jan
Dec
Nov
Second Semester
Oct
Sep
Aug
Current Year
Jul
Jun
May
First Semester
Apr
Mar
Feb
Jan
Dec
Previous
Year
Nov
SPMS Calendar
Oct
Rewarding and
and Coaching
Development
Planning and
Commitment
Operational
Review and
Monitoring
Evaluation
Strategic/
Planning
Planning
DPWH
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 25 of 142
Prior to Stage 1, the Planning Office/Corporate Planning and Management Division initiates
an overall review and setting of Department MFOs, strategic directions, goals and priorities
for the succeeding year. This involves the review of the DPWH Strategic Roadmap and
plans to ensure that the organizational outcome, outputs and goals are aligned with
government priorities.
The identified strategic directions and priorities for the succeeding year are cascaded down
to the Division and Individual levels. This cascading process ensures that targeted
organizational results are translated from Office to Division to Individual performance goals
and objectives with the aim of ensuring alignment and synergy in performing the mandate
of the Department.
Sample cascade of Office Performance Targets to Individual Staff for the Technical
Services:
Office Performance
Targets and Outputs
Division Performance
Targets and Outputs
Individual
Performance Targets
and Outputs
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 26 of 142
Stage 1:
Performance Planning and
Commitment
With the strategic directions, priorities, and final outputs for the year in place, the process
of performance management begins with Performance Planning and Commitment.
Head of Offices meet with the supervisors and staff and agree on the outputs that should
be accomplished based on the goals and objectives of the Department/Office. During this
stage, success indicators are determined and targets are set. The Rater and the Ratee
work together to identify, understand, and agree on what the employee is to be doing, how
it needs to be done, when, and why.
1. Preparing the Workflow and Database Matrices, which includes crafting Performance
Success Indicators
Once the strategic directions and priorities have been cascaded down to each office, the
Division Chiefs and Section Chiefs can now prepare the Workflow Matrix, Database Matrix,
and identify the Performance Success Indicators. This is done at the last quarter of the
preceding year, during the Strategic/Operational Planning session.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 27 of 142
Flowchart 1. Preparing the Workflow Matrix:
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 28 of 142
Purpose:
2. To determine the person/s responsible and the standard measurement for each
activity.
Positions involved:
1. Division Chief
2. Section Chief
3. Staff
Process:
1. The Division Chief and Section Chief identify the final outputs of the each Division/
Section based on the mandate of the Office and the approved strategic plan.
2. The Division Chief and Section Chief list all the action steps or workflow activities
required in order to produce each final output in the “Activity” column.
3. The Division Chief and Section Chief identify the specific individual/group responsible
for each action step in the “Person/s Responsible” column.
4. The Division Chief and Section Chief determine the minimum standard of performance
using Quality, Efficiency, and Timeliness (Q.E.T.) for each activity. This guides the
employee responsible on the level of performance that is expected for each activity.
5. The Division Chief and/or Section Chief discuss the identified Q.E.T. standards with the
employee/group involved for each activity to verify feasibility and ensure commitment.
6. The Division Chief and/or Section Chief collect, collate, and forward the accomplished
and complete WMs to the Head of Office for review and approval.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 29 of 142
Examples of
Dimension Description
Standards
Quality Refers to the accuracy of the output, or the Minor error
number of rework or revisions made per activity
The extent to which actual performance compares Minor deficiency
with targeted performance. (Actual vs. Planned)
How well, in what manner should the output be
accomplished
Efficiency The extent to which time or effort is well used for 100%-114%
the intended task or purpose. Ability to accomplish acted upon
a job with a minimum amount or quantity of
waste, expense, or unnecessary effort. (Number of Less than 50%
Appointments Acted Upon/ Appointments acted upon
Received)
Measures the amount of performance in terms of
numbers, percentage or ratio
How many of the output should be accomplished
Timeliness Measures whether deliverables were done on time On given
based on the agreed or established timeliness schedule
(requirements of the law and/or clients/
stakeholders) 49 seconds to 1
When, how long or how soon should the output be minute
accomplished
1 hour
3 working days
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 30 of 142
Person
Output Activity Quality Efficiency Timeliness
Responsible
Prepare
Juana Dela 80%-
Contractor's Minor Error 2 hours
Cruz 89.99%
Clearance
Contractor’s
Clearance Review/Sign
Andrew 80%-
Contractor's N/A 15 minutes
Garcia 89.99%
Clearance
Standard Q.E.T.
Note:
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 31 of 142
Flowchart 2. Preparing the Database Matrix:
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 32 of 142
Purpose:
Positions involved:
1. Division Chief
2. Section Chief
3. Staff
Process:
1. The Division Chief and Section Chief fill out the “Output” column based on the final
outputs identified in the WM.
2. The Division Chief and Section Chief formulate performance success indicators using
the Q.E.T Standards identified for each activity in the WM, and place them in the
appropriate column in the Database Matrix (DM). This is done by following the
sentence pattern:
A success indicator should incorporate any one, combination of, or all of the three
dimensions.
5 kms. of concrete road from Km2 to Km7 in Sariaya, Quezon Province completed
in accordance with DPWH specifications in 6 months or from February 1 to August
31, 2016.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 33 of 142
3. The success indicators for each output are placed under the second column of the
Database Matrix, and the Q.E.T Standard measures established in WM are placed under
the “Satisfactory (3)” column (except for 5/1 type of gradation or for Fixed Targets).
4. The Division Chief and Section Chief then calibrate the Q.E.T. standard measures and
reflect them under the remaining “Performance Rating” columns (Outstanding, Very
Satisfactory, Unsatisfactory and Poor). The calibrated Q.E.T. will be used in the
evaluation of the actual accomplishment of performance targets and giving of
performance rating at the end of the rating period.
6. The Division Chief, Section Chief, and the employee/group involved agree on the due
dates of each activity by indicating the exact period when the output must be
completed (days, weeks or months). This may not be filled out for performance targets
that can be done immediately or those activities that can be completed/accomplished in
minutes, hours, within the day or within the week.
7. The Division Chief and Section Chief discuss the calibrated Q.E.T. standards with the
employee/group involved to secure commitment.
8. The Division Chief and Section Chief forward the accomplished and complete DM to the
Head of Office for review and approval.
2. Quality standards for some Success Indicators may follow a 5/1 Rating (Outstanding or
Poor rating)
Example:
Checks for funds prepared with no error in 7 minutes after receipt of Disbursement
Voucher.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 34 of 142
3. For Efficiency standards, rating may depend on the nature of the output or target:
3.1. Fixed Targets – these are targets that cannot be exceeded; “as they come”
targets. These targets involve transactional activities or critical and mandated
outputs, such as governmental requirements and non-negotiable reports. The
Efficiency standard measures for these targets are placed under the
“Outstanding” or “5” column but are written as “100%” in the Success Indicator.
Calibration for Fixed Targets, particularly for critical and mandated outputs, may
follow a 5-2-1 rating where anything below 100% will immediately be considered
“Unsatisfactory” or “2”, since non-submission or non-accomplishment of the said
outputs indicates violation to an issued policy or order.
Example:
3.2. Quota-based Targets – the targets set during Stage 1 that can be exceeded over
the course of the performance period. The Efficiency standard measures for
Quota-based targets are placed under the “Satisfactory” or “3” column and are
written as “100%” in the Success Indicator. These targets can be calibrated to
130% for “Outstanding” efficiency rating.
Example:
Project implementation
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 35 of 142
Note:
Performance Rating
Major
Q No error Minor error
100% error
Contractor's
Clearance Below
prepared E 100% 90-99.99% 80-89.99% 70-79.99%
70%
with minor
error in 1
Process Owner: HRAS
Contractor's Below
Clearance E 100% 90-99.99% 80-89.99% 70-79.99%
70%
reviewed
and signed
in 45 Beyond
minutes T 10 minutes 12 minutes 15 minutes 18 minutes 20
Doc. No. DPWH-SPMS-MANUAL
Standard
Calibrated Q.E.T. Measures
36 of 142
Performance Rating
Not in
Completed in
accordance
accordance to
40% of 100 with DPWH
Q DPWH
km road standards
standards and
network and
specifications
specifications
Process Owner: HRAS
completed in
Completed
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
accordance to
Road Project
DPWH
standards and
specifications E 130% 115-129.99% 100-114% 51-99.99% Below 50%
Rev. No. 0
in 60 days.
Standard
37 of 142
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 38 of 142
Flowchart 3. Stage 1 – Office Performance Commitment and Review Form
Filling out the Performance Commitment and Review Forms
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 39 of 142
The OPCR is a planning and evaluation tool to be used by all Third level Official in
indicating their individual performance commitment and targets of their respective Office.
The final outputs, success indicators, and the Division/individual/s responsible that were
identified in the approved WM and DM are summarized in the OPCR.
Positions involved:
Process:
1. The Undersecretary, Assistant Secretary and Head of Office, as Ratees, fill out the
“Output,” “Success Indicator” and “Division Accountable” columns at the beginning of
the year, based on the WM and DM of each Division / Section.
2. The Ratees indicate the detailed budget requirements/allocation per activity in the third
column. The allotted budget will not include those under the General Appropriations Act
(GAA).
3. The Ratees submit the OPCR to the Approving Authority for approval of the
commitment.
4. The Approving Authority forwards the approved OPCR to the Planning Office/ Office of
Strategic Management.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 40 of 142
Flowchart 4. Stage 1 – Division/District Performance Commitment and Review Form
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 41 of 142
Based on the approved outputs of the Office, the Division Chiefs/District Engineers develop
their performance commitments and fill out the Division Performance Commitment and
Review Form (DPCR) at the beginning of each performance planning period.
Positions involved:
Approving
Ratees Office
Authority
Bureau / Service Bureau / Service Directors
Division Chiefs,
UPMO Cluster UPMO Cluster Director
Assistant Division Chiefs
Regional Offices
Regional Director
District Engineers,
District Engineering Offices
Assistant District Engineers
Process:
1. The Ratee fills out the “Output” and “Success Indicator” columns at the start of each
planning period (January and July) based on the WM and DM.
2. The Ratee lists the “Person/Group Accountable” and the “Allotted Budget” for each
output/activity in the appropriate columns.
3. The Ratee signs the DPCR at the top-right hand corner of the form, then submits the
DPCR to the Approving Authority for review and approval.
4. The Approving Authority forwards the approved and signed DPCR to the appropriate
Administrative Officer within two weeks from submission.
5. The Administrative Officer forwards copies of the DPCR to the Initial Rater and Ratee
for monitoring purposes, and retains the original DPCR for safekeeping until the start of
the rating period (June and December).
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 42 of 142
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 43 of 142
Based on the approved outputs of the Division/District Engineering Offices, the Section
Chiefs and individual employees develop their performance commitments. These individual
performance commitments are reflected in the Individual Performance Commitment and
Review Form (IPCR) at the beginning of each performance planning period.
Positions involved:
Process:
1. Raters and Ratees must conduct a planning meeting to jointly establish and agree
upon individual performance commitments based on the approved outputs and targets
of the Division/District Engineering Offices reflected in the DM.
2. The Ratee fills out the “Output” and “Success Indicator” columns at the start of each
planning period (January and July).
3. The Ratee signs the IPCR at the top-right hand corner of the form, then submits the
IPCR to the Approving Authority for review and approval.
4. The Approving Authority forwards the approved and signed IPCR to the appropriate
Administrative Officer within two weeks from submission.
5. The Administrative Officer forwards copies of the IPCR to the Initial Rater and Ratee
for monitoring purposes, and retains the original IPCR for safekeeping until the start of
the rating period (June and December).
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 44 of 142
Note:
Identifying Outputs
2.1. Tangible
1. Success Indicators incorporate any one, combination of, or all three of the Q.E.T.
Standards, and is written following the sentence pattern:
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 45 of 142
2. For outputs with no definite number (e.g. outputs that rely on other divisions/offices or
external factors outside of your control), use percentage.
3.1. Give the employee clear accountability. They will know what is expected of them.
During the year, they will know how their results/accomplishments measure up
to those expectations.
3.2. Enable employees to easily track and document performance better. Help to
ensure that jobs are rewarding, value-adding and manageable.
4.1. Specific: It should clearly indicate what should be achieved within the scope of
the job. Well written indicators are stated in specific terms to avoid confusion
about what is to occur or what is to improve.
Example: 5 kms of concrete road from Km2 to Km7 in Sariaya, Quezon Province
completed in accordance with DPWH specification in 6 months or from February
1 to August 31, 2017.
Example: 5 kms of concrete road from Km2 to Km7 in Sariaya, Quezon Province
completed in accordance with DPWH specification in 6 months or from February
1 to August 31, 2017.
Example: 5 kms of concrete road from Km2 to Km7 in Sariaya, Quezon Province
completed in accordance with DPWH specification in 6 months or from February
1 to August 31, 2017.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 46 of 142
Example: 5 kms of concrete road from Km2 to Km7 in Sariaya, Quezon Province
completed in accordance with DPWH specification in 6 months or from February
1 to August 31, 2017. (A major part of the Agency’s Mandate)
1.4. How the employee individually contribute to the office/unit’s goals (individual
performance objectives) – roles, responsibilities, accountabilities, performance
indicators for each output, competencies
5. Recap and set a follow-up date for clarifications and progress review.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 47 of 142
Stage 2:
Performance Monitoring and
Coaching
Performance Monitoring and Coaching is the core of the SPMS. This is done regularly
throughout the year by the Undersecretaries, Assistant Secretaries, Directors, Division
Heads, Section Heads, HRAS Section and staff. The focus is on creating an enabling
environment to improve and reinforce individual and team performance and develop
individual potentials.
Performance Monitoring and Coaching is not a one-time event, but a continuing process
that tracks both the performance gaps and the effectiveness of corrected actions taken to
address these gaps. Once feedback has been given and corrective actions committed to,
the Supervisor/Rater must continue to monitor the employee and/or team to ensure that
the gaps in performance are properly addressed.
1. Monitoring Performance
2. Performance Coaching
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 48 of 142
Flowchart 6. Stage 2 – Performance Monitoring
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 49 of 142
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 50 of 142
Monitoring Performance
Monitoring is the act of consistently observing outputs for the purpose of measuring
performance. It involves keeping track of and documenting the output and behaviors of
employees, and checking the progress of committed performance plans.
2. Facilitates feedback;
4. Provides evidence;
Performance targets as reflected in DPCR and IPCR are continuously monitored to track
progress.
2. Reviewing reports, documents and other outputs for Quality, Efficiency and Timeliness;
4. Observing how subordinates relate with employees of other Offices, Divisions, sections,
internal and external stakeholders;
5. Observing level of responsiveness to and soliciting feedback from internal & external
stakeholders.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 51 of 142
Depending on the nature and scope of the work, Immediate Supervisors can monitor the
individual employee’s progress and performance at a daily, weekly or bi-monthly basis.
Each employee is also encourage to have their own monitoring mechanism like the use of
quadrants, journal, etc.
Depending on the nature and scope of work of the employees (i.e. transactional activities),
the Daily Performance Monitoring Form can be used on a daily, weekly or bi-monthly basis
by Immediate Supervisor/Rater to track assignments and documents routed to officials/
employees concerned.
Process:
1. The Immediate Supervisor/Rater and/or the individual employee/Ratee fill out the
following:
1.1 Task ID No.: the control number of the document based on the Office recording
system.
1.2. Subject/Signatory: the subject of the document and the name of the signatory of
the document received.
1.3. Action Officer: the official/employee to whom the document was routed for
appropriate action.
1.4. Date Assigned: date when the document was routed/given to the action officer.
1.6. Status of Assigned Task: status of the assigned task or final action taken on the
document/task, i.e. not yet submitted with 2 days delay, submitted on due date
but returned for revision, submitted on due date with incomplete supporting
documents, submitted on due date, etc.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 52 of 142
Process:
1. The Immediate Supervisor/Rater and/or the individual employee/Ratee fill out the
following:
1.1. Tasks: the target activities to be done as reflected in the column of Success
Indicator in the DPCR and IPCR.
Example:
1.2. Assigned to: the official/employee to whom the tasks are assigned.
1.3. Duration: target date of accomplishment of the tasks assigned. This can be seen
in the Success Indicator reflected in the DPCR and IPCR.
Example:
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 53 of 142
2. At the end of month, the Rater meets with the Ratee and discusses the
accomplishments of the Ratee.
3. The Rater keeps the Monthly Performance Monitoring form of the Ratee as reference
for Stage 3: Performance Review and Evaluation.
1. Make sure you focus on outputs/targets and competencies that are important to
success.
3. Show where Ratees are making progress and where improvements can be made.
4. See patterns and trends in performance so that plan can be adjusted as necessary.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 54 of 142
1. Reports
2. Surveys
4. Evaluations
5. Quality specifications
6. Time logs
7. Complaint logs
8. Manager observation
9. Audit results
Note:
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 55 of 142
2. Self-reporting
2.1. Who has better or more frequent opportunity to observe the person in action
than the person himself?
2.2. The key to successful self-reporting is taking the time to (briefly but honestly)
asses and document how one has performed in the key actions, and plan hoe to
improve.
Reducing subjectivity
Critical Incidents
1. Critical incidents are an effective substitute in the absence of quantifiable data, and
observed evidence of desired attribute or trait.
3. Throughout the year, managers and employees do a lot of value-adding activities but
fail to capture them.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 56 of 142
STAR Approach
Critical incidents are noted down in the STAR format, which uses the following questions as
a guide:
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 57 of 142
Performance Coaching
Performance Coaching is at the core of the DPWH SPMS. It is an interactive and continuing
process by which an Immediate Supervisor/Rater/Coach helps an employee/team/Ratee/
Coachee learn to perform assigned task through direct discussions and guided activities. It
requires the skill of facilitating learning, development and performance of an employee. It
aims to engage the subordinate in recognizing their lapses/gaps in performance, identify
possible causes and prepare a plan of action to address them. Through Coaching, the
Supervisor/Rater/Coach helps the employee/Ratee/Coachee enhance their performance
and develop their knowledge and skills.
Performance Coaching is also done when critical incidents are observed and reported.
Critical incidents are specific events or situations when the employee/Ratee is observed to
have deviated from expected performance behaviors that have to be recognized right
away. The Immediate Supervisor/Rater must give immediate feedback to the employee
and/or team by conducting one-on-one and face-to-face discussion with them as necessary
to identify causes of performance gaps or issues. These critical incidents may be recorded
using the STAR (Situation, Tasks, Action, Results) format as a guide.
Written notice of these critical incidents must be submitted to Human Resource and
Administrative Service (HRAS) Director or Human Resource Management Division (HRMD)
within the week after the Supervisor/Rater has talked to the employee and/or team
involved. These critical incident reports will be included in the employees’/Ratees’ 201 Files.
Coaching Forms
Process:
1. The Immediate Supervisor/Rater monitors and tracks the performance of the individual
employee/team/Ratee in accomplishing assigned tasks.
2. The Rater observes and identifies performance gaps and/or critical incidents.
3. The Rater, as the Coach, gives feedback to the individual employee/team/Ratee, as the
Coachee, through one-on-one and face-to-face discussions.
4. The Rater/Coach, fills out the Coaching Journal Form (SPMS Form No. 6A) after
every coaching activity is conducted to document the discussion.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 58 of 142
4.1. Coaching Goal: the objective/s of the coaching session. The aim of coaching is to
engage the employee/team/Ratee/s, as the Coachee/s, in addressing the
ineffective performance, identify possible causes, and generating a plan of action
to address the performance gap/deficiency.
4.3. Options/Opportunity: the possible actions that will address the Coachee’s
performance gap. The Coach and the Coachee/s must be able to generate and
share ideas to address the gap between target and actual performance.
4.4. Committed Action: the agreed measurable plan of action that the Coachee/s
would do in able for them to deliver the results they are committed to do.
4.5. Who will do: the employee/team who will commit to the execution of the action
plan.
4.6. Resources Needed: the required resources in order to accomplish the action plan.
4.7. Date that Coachee/Team commits to: date when the agreed action should be
accomplished/completed.
4.8. Key Points of What was Shared: the summary of ideas presented/generated
during the coaching session.
4.9. Process Observation of the Coach: the observation on the behaviors of the
Coachee/s being coached, general disposition, level of coping with the demands
of work, and/or changes in attitude since the last coaching, if any.
5. The Coach and Coachee/s agree on a follow-up session and indicate the date on the
space provided.
6. The Coach keeps the Coaching Journal Form as reference for Stage 3: Performance
Review and Evaluation.
7. At the end of every quarter, the Immediate Supervisor/Rater fills out the Coaching
Report Form (SPMS Form No. 6B) to record and monitor all the coaching and/or
mentoring activities done for that quarter.
7.1. The Immediate Supervisor/Rater, as the Coach, places a check on which quarter
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 59 of 142
7.2. The Coach monitors the number of times the activities (e.g. Mentoring,
Coaching) were conducted and indicates the tallied number per activity under the
specified type of meeting, either one-on-one or by group.
7.3. The Coach also tallies all memoranda and other types of correspondence/
communication that were issued in line with the coaching/mentoring activity. The
number of memorandum or other documents released will be placed in the box
provided.
8. The Coach signs the Coaching Report form then forwards the form to the Head of
Office for review and signature.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 60 of 142
When to coach
1.4. After you’ve handled new/important task and want to know how you did and
how to improve.
3. Preserve self-esteem.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 61 of 142
Stage 3:
Performance Review and
Evaluation
The Performance Review and Evaluation is done at the end of every semester (June and
December) to assess both Office and individual employee’s performance based on the
agreed and approved objectives/targets and measures reflected in the Performance
Commitment and Review Forms (OPCR, DPCR, IPCR).
1. Reviewing Performance
2. Evaluating Performance
3. Rating Performance
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 62 of 142
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 63 of 142
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 64 of 142
Positions involved:
Process:
1. The Administrative Officer returns the IPCR to the Ratee at the start of the
performance rating period (June and December).
2. The Ratee fills out their actual accomplishments for each output that they committed to
in the appropriate column and attaches records/evidences of accomplishments (such as
reports, documents or any outputs as proofs of actual performance).
3. The Ratee submits to the Initial Rater for review and evaluation.
4.2. Rates the performance of the Ratee using the approved calibrated Q.E.T.
standards and operational definitions found in the Database Matrix.
4.3.1. Average rating per output: add the ratings and divide it by the number
of dimensions (Q.E.T.) used.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 65 of 142
4.3.3. Final average rating: add all the average ratings vertically and divide the
sum by the number of accomplishments/outputs.
4.4. In the “Remarks” column, the Initial Rater may describe the documents, records
or other evidences of performance (such as the performance monitoring forms,
coaching journal, or the individual/professional development). The Initial Rater
may also include other remarks, such as:
6. The Initial Rater conducts performance discussions with the Ratee to discuss their
assessment and performance rating. If the Ratee agrees with the performance rating,
both the Ratee and Initial Rater affix their signatures to the IPCR.
7. The Initial Rater then forwards the signed IPCR to the Final Rater for signature.
8. After signing the IPCR, the Final Rater forwards the form to the Administrative Officer.
9. The Administrative Officer gives the individual employees/Ratees and Initial Raters
copies of the approved performance rating.
10. The Administrative Officer submits the approved and signed IPCR to appropriate HR/
Administrative Office:
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 66 of 142
Flowchart 8. Stage 3 – Division/District Performance Commitment and Review Form
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 67 of 142
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 68 of 142
Positions involved:
Process:
1. The Administrative Officer returns the DPCR to the Ratee at the start of the
performance rating period (June and December).
2. The Ratee fills out their actual accomplishments for each output that they committed
to in the appropriate column and attaches records/evidences of accomplishments (such
as reports, documents or any outputs as proofs of actual performance).
3. The Ratee submits to the Initial Rater for review and evaluation.
4.2. Rates the performance of the Ratee using the approved calibrated Q.E.T.
standards and operational definitions found in the Database Matrix.
4.3.1. Average rating per output: add the ratings and divide it by the number
of dimensions (Q.E.T.) used.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 69 of 142
4.3.3. Final average rating: add all the average ratings vertically and divide the
sum by the number of accomplishments/outputs.
4.4. In the “Remarks” column, the Initial Rater may describe the documents, records
or other evidences of performance (such as the performance monitoring forms,
coaching journal, or the individual/professional development). The Initial Rater
may also include other remarks, such as:
6. The Initial Rater conducts performance discussions with the Ratee to discuss their
assessment and performance rating. If the Ratee agree with their performance ratings,
both the Ratee and Initial Rater affix their signatures to the DPCR.
7. The Initial Rater then forwards the signed DPCR to the Final Rater for signature.
8. After signing the DPCR, the Final Rater forwards the form to the Administrative Officer.
9. The Administrative Officer gives the individual employees/Ratees and Initial Raters
copies of the approved performance rating.
10. The Administrative Officer submits the approved and signed DPCR to appropriate HR/
Administrative Office:
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 70 of 142
Flowchart 9. Summary of Individual Ratings Form – Central Office/Regional Offices
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 71 of 142
Flowchart 10. Summary of Individual Ratings Form – District Engineering Offices
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 72 of 142
Positions involved:
1. Division Chief
Process:
1. The Division Chief collates all approved IPCRs of their respective Division and fills out
the Summary of Individual Ratings form:
1.1. The name of Office and the Performance Period of the Rating is indicated in the
spaces provided.
1.2. The name of the Division is indicated in the space provided; the names of each
staff in Division, and their numerical and qualitative ratings are listed in the space
provided, including the Division Chief’s own performance rating.
1.3. The “Numerical Rating” is the Final Average Rating of the employee as reflected
in the IPCR. The “Qualitative Rating” column reflects the corresponding
Adjectival Rating of the Average rating of the employee using the following scale:
5.00 Outstanding
3.00-3.99 Satisfactory
2.00-2.99 Unsatisfactory
1.00-1.99 Poor
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 73 of 142
For example:
2. The Division Chief gets the Average Rating of the Division by dividing the total
individual ratings by the number of individuals in the Division. The Division Chief’s
performance rating in the DPCR is also included in the computation of the Average
Rating.
3. The Division Chief forwards the Summary Ratings form and Average Rating of the
Division to the Bureau/Service/ UPMO Cluster/Regional Director.
Positions involved:
1. Section Chief
2. District Engineer
3. Regional Director
Process:
1. The Section Chief collates all approved IPCRs of their respective Sections and fills out
the Summary of Individual Ratings form:
1.1. The name of Office and the Performance Period of the Rating is indicated in the
spaces provided.
1.2. The name of the Section is indicated in the space provided; the names of each
staff in Section, and their numerical and qualitative ratings are listed in the space
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 74 of 142
1.3. The “Numerical Rating” is the Final Average Rating of the employee as reflected
in the IPCR. The “Qualitative Rating” column reflects the corresponding
Adjectival Rating of the Average rating of the employee using the
aforementioned scale.
2. The Section Chief gets the Average Rating of the Section by dividing the total individual
ratings by the number of individuals in the Section.
3. The Section Chief forwards the Summary of Individual Ratings and the Average Rating
of the Section to the District Engineer.
4. The District Engineer consolidates the Summary of Ratings Forms and gets the Average
Rating of the District Engineering Office using a separate Summary of Ratings form.
This is computed by getting the average of the Average Ratings of all the Sections. The
District Engineer’s performance rating in the DPCR is also included in the computation
of the Average Rating.
5. The District Engineer forwards the Summary Ratings form and Average Rating to the
Regional Director.
6. The Regional Director collates the Summary Ratings forms of the District Offices under
their supervision.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 75 of 142
Note:
Written notice shall be given to subordinates who obtain unsatisfactory performance during
a rating period not later than one (1) month from the end of the rating period, with a
warning that a succeeding unsatisfactory performance shall warrant his separation from the
service.
Supervisors shall inform employees with poor performance, in writing and no later than the
4th month of the Rating period, that failure to improve his performance shall warrant his
separation from the service.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 76 of 142
2.4.1. Ask him for ideas on how to resolve a problem or improve performance
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 77 of 142
2.4.4. Be supportive
2. Bias or Prejudice: Rater’s dislike for Ratee’s political leaning union affiliation, religion,
race and even physical features.
4. Similar-to-me effect: Tendency for Rater to judge more favourably those whom they
perceive similar to them.
2.3. A chance to wield power and authority: Performance reviews often make people
uncomfortable and defensive. Make the discussion positive. The key themes are
continuous improvement and development, even if a person wasn’t able to meet
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 78 of 142
2.4. Paper activity: Do not simply comply but manage the SPMS as a process and not
a one-time event.
2.5. An opportunity to gain “pogi points” with staff: the goal of the SPMS is to
improve performance and develop people.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 79 of 142
Stage 4:
Performance Rewarding
and Development Planning
The results of the individual and Office Performance Evaluation will be a basis for rewards
and development planning.
1. Heads of Offices in identifying and providing the kinds of interventions needed based
on the development needs identified;
2. Human Resource Management Division, HRAS and Human Resource and Administrative
Division, Regional Office and Human Resource and Administrative Section, District
Engineering Office in consolidating and coordinating development interventions that
will form part of the HR Plan and the basis for rewards and incentives;
3. Department and Office PMT in identifying potential Program on Awards and Incentives
for Service Excellence (PRAISE) Awards nominees for various awards categories; and
4. PRAISE Committee in determining top performers of the Agency who qualify for awards
and incentives, in relation to:
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 80 of 142
Flowchart 11. Individual Development Plan
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 81 of 142
The IDP is used to indicate the needed developmental interventions in terms of learning
and development, education and mentoring/coaching, and to record knowledge, skills,
attitudes (KSA)/competencies and development priorities over a 1-2 year period. It may be
derived from the Operations Plan of the Division concerned. It is mandatory for all
supervisors to fill out the IDP of their subordinate.
Process:
1. At the start of the year (January), the Immediate Supervisor, as the Rater, and the
individual employee, as the Ratee, discuss and jointly fill out the following fields:
1.2. Areas for Development: knowledge, skills, attitudes (KSA)/competencies that are
not demonstrated leading to non-attainment of performance outputs and targets.
1.4. Development Activity: one or more specific actions the Ratee can take to meet
the development target. Consider a variety of developmental approaches.
1.6. Tracking Method/Completion Date: how will the Ratee track the completion of
development activities (one or more observable results that will indicate success).
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 82 of 142
2. If applicable, the Rater may propose actions based on Ratee’s performance rating by
putting a check in the appropriate box in the “Rater Recommendation” portion.
3. The Rater and Ratee discuss and agree on the development activity, timelines, and
support needed, and sign the IDP.
4. The Ratee attaches the IDP form to their IPCR for the succeeding rating period, and
submits it to the Administrative Office.
5. The Administrative Officer collates and summarized the IDPs of all employees in the
Section/Division, and submits the summary to HRAS for training needs and budget
monitoring purposes.
6. The Individual Development Plan is reviewed at the end of every semester/year and
updated, as needed.
Strength lies in Recruitment and Selection. Richard uses all methods available in sourcing of
Key Strength
applicants, e.g., job fairs, referral system, social media, to meet the manpower requirements
positions, Richard almost did not meet standard set for Timeliness. He has to hone his
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
of his team, it would be good for him to be knowledgeable in MS Word and PowerPoint.
83 of 142
1. To improve his 1. Budget to attend 1. Attend Effective 1. Attended Effective 1. Submitted 2nd
presentation a public seminar Presentation Presentation Quarter
Title: SPMS User’s Manual
Activity Report
in Word
document, and
slide
PowerPoint with
minimal
assistance from
staff – to be
submitted by
July 10, 2017.
Process Owner: HRAS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Rev. No. 0
Doc. No. DPWH-SPMS-MANUAL
Page:
Eff. Date:
85 of 142
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 86 of 142
3.2. Resources/support
4. Implement Plans
5. Evaluate
Note:
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 87 of 142
Example:
1. Benchmarking
2. Seminars/workshops
3. Formal education/classes
5. Job enhancements/redesign
6. Functional cross-posting/reassignment
7. Geographical cross-posting/reassignment
8. Coaching/mentoring
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 88 of 142
1. Individual employees who feel aggrieved or dissatisfied with their final performance
rating.
2. Office or Unit where it is believed that the overall rating does not represent a true
evaluation of work performance.
Note:
1. Informal appeal shall be done within 5 working days upon receipt of the signed copy of
the performance rating, the employee should meet with the Immediate Supervisor, in
attempt to resolve the disagreement before filing a formal appeal.
2. The employee will use the Performance Rating Appeal Form during the discussion with
the Immediate Supervisor, wherein the employees:
2.4. Describe the specific facts and evidences that supports the appeal.
3. The immediate supervisor will use the Performance Rating Appeal Report to indicate:
3.3. Whether they did not resolve the appeal and recommends it to be elevated to the
PMT.
4. If not resolved in by informal discussion, the employee may formally appeal to the
Office PMT. The Formal Appeal should be within 10 working days after the informal
discussion.
5. A copy of the duly accomplished IPCR/DPCR with ratings must be submitted together
with the accomplished Performance Appeal Form, Performance Appeal Report and
Evidence to support the appeal.
6. The Office PMT shall decide on the appeals within 15 working days from receipt of the
appeal. If it cannot decide, the appeal may be forwarded to the Department PMT and
decide within 15 days upon receipt.
7. Appeals lodged to the PMT shall follow the hierarchical jurisdiction of various PMTs in
the Department. For example, the decision of the DEO PMT is appealable to the
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Doc. No. DPWH-SPMS-MANUAL Eff. Date:
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 90 of 142
Regional PMT which decision is in turn appealable to the Department PMT in the
Central Office.
Appeal on Separation
Sanctions/Penalties
Unless justified and accepted by the Department PMT, non-submission of the DPCR and
IPCR to the HRM Office within the specified dates shall be a ground for:
2. An administrative sanction for violation of reasonable office rules and regulations and
simple neglect of duty for the supervisors or employees responsible for the delay and
non-submission of the division and individual performance commitment and review
report.
3. Failure on the part of the Head of Office to comply with the required notices to their
subordinates for the unsatisfactory or poor performance during a rating period shall be
a ground for an administrative offense for neglect of duty.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 93 of 142
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 94 of 142
MFO 1 covers the following programs, activities and projects that are being delivered by
the DPWH in terms of the construction and maintenance of the national road network.
2. Network Development
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 95 of 142
MFO 2 covers the following programs, activities and projects that are being delivered by
the DPWH in terms of the construction and maintenance of the structures for flood
management:
3. Construction/ Rehabilitation of flood mitigation facilities along Major River Basins and
Principal Rivers;
The projects included under MFO 3 are those funded under the local roads and other
infrastructure funded under the Convergence Programs with Other National Government
Agencies (NGAs). MFO 3 covers the following programs, activities and projects that are
being delivered by the DPWH in terms of construction and maintenance of other
infrastructure:
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 96 of 142
Support to Operations refer to activities that provide technical and substantive support to
the operations and projects of DPWH. By themselves, these activities do not produce
MFOs but they contribute or enhance the delivery of goods and services.
Examples:
Statistical services
Preparation of plans
Equipment Management
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 97 of 142
General Administration and Support Services refers to activities that deal with the provision
of overall administrative support to the agency operation.
Examples:
Legal service
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 98 of 142
Major error Means irrelevant citation of legal basis, inappropriate entry of names,
erroneous recommendation of period accredited/not accredited/
resolution/opinion, and inappropriate recommendation.
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 99 of 142
Checks for funds prepared with no error in 7 minutes after receipt of Disbursement
Voucher:
Plans:
Note:
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 100 of 142
(5) – no error
(3) – with minor error
(1) – with major error
(5) – no error
(4) – with 1-3 minor errors
(3) – with 4-6 minor error
(2) – with 1-2 major errors
(1) – with more than 2 major errors
< 1 hr 46 mins 1.4 hrs – 1.8 hrs 1.81 hrs – 3.59 hrs 3.6 hrs - 4.2 hrs > 4 hrs 14 mins
< 4 hrs 43 mins 4.8 hrs – 6.4 hrs 6.41 hrs – 1.19 wd 1.2 wd – 1.4 wd > 1 wd 3.28 hrs
< 4 wd 1.4 hr 4.2 wd– 5.8 wd 5.81 wd – 6.39 wd 6.4 wd – 9.8 wd > 9 wd 7 hrs
Process Owner: HRAS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
2 wd 3 wd 5 wd 7 wd 8 wd
4 wd 5 wd 7 wd 8 wd 10 wd
5 wd 7 wd 10 wd 13 wd 15 wd
Annex
Annex D: Workflow Matrix
Annex
Workflow of Activities
Office: ___________________________
Section/Division: ___________________
Title: SPMS User’s Manual
Person/s
Output Activities Q E T
Responsible
1.1
1.2
Process Owner: HRAS
1.3
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
1.4
1.5
1.6
Rev. No. 0
1.7
2.1
2.2
2.3
Doc. No. DPWH-SPMS-MANUAL
2.4
2.5
Page:
2.6
Eff. Date:
3.1
3.2
102 of 142
3.3
3.4
Database Matrix
T
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Q
E
T
Rev. No. 0
Q
E
T
Q
Doc. No. DPWH-SPMS-MANUAL
E
T
Q
Page:
E
Eff. Date:
Q
103 of 142
Annex
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Doc. No. DPWH-SPMS-MANUAL Eff. Date:
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 104 of 142
Annex F: Individual Performance Commitment and Review Form
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 105 of 142
Annex F: Individual Performance Commitment and Review Form
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 106 of 142
Annex G: Division/District Performance Commitment and Review Form
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 107 of 142
Annex G: Division/District Performance Commitment and Review Form
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 108 of 142
Annex H: Office Performance Commitment and Review Form
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 109 of 142
Annex H: Office Performance Commitment and Review Form
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 110 of 142
Annex I: Daily Performance Monitoring Form
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 111 of 142
Annex I: Daily Performance Monitoring Form
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 112 of 142
Annex J: Monthly Performance Monitoring Form
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 113 of 142
Annex J: Monthly Performance Monitoring Form
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 114 of 142
Annex K: Coaching Journal Form
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 115 of 142
Annex K: Coaching Journal Form
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 116 of 142
Annex L: Coaching Report Form
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 117 of 142
Annex L: Coaching Report Form
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 118 of 142
Annex M: Summary of Individual Rating Form
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 119 of 142
Annex M: Summary of Individual Rating Form
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 120 of 142
Annex N: Individual Development Plan
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 121 of 142
Annex N: Individual Development Plan
Title: SPMS User’s Manual Process Owner: HRAS Rev. No. 0 Page: 122 of 142
Annex N: Individual Development Plan
Rev. No. 0
123 of 142
___________________________________ ____________________
Signature of Appellant Date
Annex
Annex O: Appeals Forms
Annex
PERFORMANCE RATING APPEAL REPORT
Title: SPMS User’s Manual
The following solution/s was/were agreed during the discussion of the appellant and immediate supervisor:
We have not resolved the appeal: The appeal may be elevated to the Performance Management Team
Page:
Eff. Date:
Immediate Supervisor’s
Appellant Signature:
Signature:
Date: Date:
124 of 142
VISION &
MISSION
WHAT HOW
EMPLOYEE
INDIVIDUAL
It is an organization-wide process to ensure that employees focus on work efforts that are
contributing to the achievement of the DPWH mandate, vision, mission and values. It has 4
stages:
Previous appraisal systems used by the Department, such MORE did not clearly establish
the link of individual commitments and performance to the DPWH mandate, vision, mission
and Major Final Outputs.
1. Ensure that the performance contribution of each employee are geared towards the
attainment of the DPWH vision, mission and strategic performance goals.
2. Provide an effective and objective tool to track accomplishments and provide feedback
on employee’s work progress
The “What” are results that must be achieved for the individual, office and organization to
succeed.
The “How” are the core values of DPWH and the competencies needed for individuals do
their jobs.
1. Review the Office Performance Commitment and Review Form (OPCR) to ensure
alignment with the Department strategic goals and objectives before recommending for
approval.
2. Acts as an appeal body and final arbiter for performance management issues /
concerns of DPWH and other issues arising from the implementation of SPMS, including
concerns on performance-based incentive system of this Department pursuant to E.O.
No. 80, dated 20 July 2012
The PMT, whether Department or Office, serves as the “clearing house” for all issues/
concerns regarding the SPMS.
The Office PMT serves as the first escalation level for SPMS issues/concerns and if the
issue/concern needs to be addressed by the Department, this will be escalated to the
DPMT.
The SPMS is an annual cycle covering the calendar year. Two performance ratings will be
conducted within the year, January to June and July to December. Final Rating will be on
December of the calendar year.
2. Assuring that the Workflow Matrix (WM) and Database Matrix (DM) covers all
mandated/core and support functions of each Office/Division/District/Section.
Yes. DPWH SPMS was declared approved and functional by the CSC-NCR, effective January
7, 2016.
This is done at the start of the performance period where supervisors and subordinates
agree on:
2. Success Indicators
Forms used: Workflow Matrix, Database Matrix, Performance Commitment and Review
Forms (IPCR, DPCR, OPCR)
This is done throughout the year and it involves continuous tracking and documentation of
performance and progress.
Forms used: Daily Monitoring Form, Monthly Monitoring Form, Coaching Forms, other
monitoring documents / mechanisms
This is done at the end of the performance period and aims to assess both individual
employee and Office performance levels based on the performance targets and measures
agreed during Stage 1.
Forms used: Filled-out Performance Review and Commitment Forms (IPCR, DPCR, OPCR),
Summary of Individual Ratings
The results of the individual and Office Performance Evaluation shall be a base for rewards
and individual development planning.
MFOs are goods and services that the DPWH is mandated to deliver to external clients
through implementation of its programs, project and activities. It may be a single output or
group of outputs that are similar in nature, targeted at the same organizational sector
outcome and/or being summarized by a common performance indicator.
1. Tangible
Success Indicators are benchmarks for the targeted outputs and criteria for rating actual
accomplishment. It is characterized by three (3) performance standards: Quality, Efficiency,
and Timeliness.
1. Clearly indicate what can be achieved within the scope of the job
Example:
5 kms of concrete road from Km2 to Km7 in Sariaya, Quezon Province completed in
accordance with DPWH specification in 6 months or from February 1 to August 31,
2017
Example:
5 kms of concrete road from Km2 to Km7 in Sariaya, Quezon Province completed in
1. Realistic
Example:
5 kms of concrete road from Km2 to Km7 in Sariaya, Quezon Province completed in
accordance with DPWH specification in 6 months or from February 1 to August 31,
2017
Results-oriented outputs:
Example:
5 kms of concrete road from Km2 to Km7 in Sariaya, Quezon Province completed in
accordance with DPWH specification in 6 months or from February 1 to August 31, 2017.
(a major part of the Agency’s Mandate)
Time-bound outputs:
Example:
5 kms of concrete road from Km2 to Km7 in Sariaya, Quezon Province completed in
accordance with DPWH specification in 6 months or from February 1 to August 31,
2017.
Do I need to fill out all the Q.E.T. fields for each activity?
If not applicable, not all activities need complete Q.E.T. Standards, there should be at least
2 measures per activity.
Fixed Targets are targets that cannot be exceeded. They are also known as “as they come”
targets. These targets involve transactional activities or critical and mandated outputs, such
as governmental requirements and non-negotiable reports. For Fixed Targets, an
Outstanding score (5.00) will be given for Efficiency if the performance meets 100% of the
planned targets. Calibration for Fixed Targets, particularly for critical and mandated
outputs, may follow a 5-2-1 rating where anything below 100% will immediately be
considered “Unsatisfactory” or “2”, since non-submission or non-accomplishment of the
said outputs indicates violation to an issued policy or order.
Example:
Quota-based Targets are the targets set during Stage 1 that can be exceeded. These
targets follow the Rating Scale, where 100% completion of the target will merit a
“Satisfactory” rating.
During mid-year performance rating, Success Indicators may be adjusted, especially for
Outputs affected by approved by the Initial and Final Rater.
Any expected expense, outside of the General Appropriations Act (GAA), is required to be
included here. These include operational and maintenance costs (supplies, fixed
expenditures, travel allowances, overtime pay, etc.), and total cost of expenses in the
division/office. This will serve as basis for computing fixed expenditures, manpower
requirements such as job orders, and other expenses at the end of the year.
If there is a need to adjust the performance targets, employees must accomplish a new
IPCR or DPCR and label it as “amended” to document any change in the performance
targets and the corresponding approval by the Office PMT.
What is Monitoring?
1. The act of observing over a period of time for the purpose of measuring performance.
2. It facilitates feedback.
1. Observe how employee relate with other employee of other Offices Divisions, Sections,
internal and external stakeholders and customers.
2. Observe level of responsiveness to and asking for feedback from you and others.
2. Evaluation Reports
3. Quality Specifications
4. Time Logs
6. Manager Observations
7. Audit Reports
8. Certificates of Completion
9. Others
3. Provides guidance.
4. Builds enthusiasm.
3. Timely
4. Balanced – Lets people know what they are doing well and what they can improve on
Performance Evaluation is a dialogue between Rater and Ratee aimed at assessing current
work performance and behavior and improving these in the future work performance and
behavior. It is a summary of feedback and coaching discussions done throughout the year.
The Rating Scale is non-negotiable. This is mandated by the Civil Service Commission
(CSC) for all government agencies.
The Rater in the other Section/Division will rate the Ratee’s performance for that specific
task/work.
The Ratee will not be faulted but must create an incident report/memo and submit the
incident report and the evidences of their along with their IPCR/DPCR. The Ratee should
also reflect in the “remarks” column of the IPCR/DPCR the external factors that affected
the attainment of the output.
You may print the form with your accomplishments and attach it to the original IPCR. It is
preferred that the accomplishments be written in the original IPCR.
Central Office and Regional Offices: The Division Chief gets the average rating of all
employees under their Division. The Head of Office then gets the average rating of all
Divisions under their supervision.
District Engineering Office: The Section Chief gets the average rating of all employees
under their Section. The Division Chief then gets the average rating of all Sections under
their supervision and forwards the Average Rating to the Regional Director.
The office performance rating is only used as basis for giving rewards and incentives.
No, the Average Ratings are only used for incentives and rewards purposes. The Heads of
Office and Division/Section Chiefs are rated based on their actual accomplishments on their
own targets and commitments.
2. Get the big picture – the core message clearly in mind by asking:
2.1. What is the single most important message I want to communicate about the
individual’s performance through the IPCR?
4. Implement plans
1. Benchmarking
2. Seminars/workshop
3. Formal Education/Classes
5. Job enhancement/redesign
6. Functional/Geographical Cross-posting/Reassignment
7. Coaching/counselling
9. Self-managed learning
4. Prepare self-assessment.