►None of given
►Program
►Change sizing
►All of given
►Program WBS
►
►
►Gantt Charts
► PERT
►CPM
► PERT and CPM (page 296)
►Software Engineer
►Software tester
►Project life-cycle-based
►Scheduled
►None of given
►None of given
►Problem
►
►
Lessons learned are important to document because on organization can use them to improve future
projects and the Project Management process. Therefore, in project closing procedures, it is helpful to
review the:
Original contract
All of given
►None of given
►None of given
►Manage
►None of given
►
►
Question No: 12 ( Marks: 1 ) - Please choose one
A________ is defined as "the work breakdown that covers the acquisition of a specific defense material
item and is related to contractual effort."
►None of given
►One
►
►
Question No: 14 ( Marks: 1 ) - Please choose one
A change in the arrangement of tasks can occur on the basis of ______ theories of WBS.
►Four
►Single
►Change sizing
►All of given
________ theory when the deliverables of a project are more important than its phases. This normally
happens when the deliverables are decided before the project begins.
►Project life-cycle-based
►
►Scheduled
►None of given
Over the course of the project, a comparison of the due date and the date delivered provides a metric
for how well deliverable dates are ______ by the project team.
A ______ extends the Program WBS to a lower level in order to provide management and cost
information to the Government.
►Programs WBS
►None of given
Software project ______ is an activity that distributes estimated effort across the planned project duration
by allocating the effort to specific software engineering tasks.
►Risk Management
Using PERT and CPM______, helps you complete a project on time. By using these techniques, you can
determine the latest time by when an activity should start to be completed on time.
► Individually ►
Combination
► Begins
►None of given
CS615 Quizzes
1) The overall role of Software in a larger system is identified during
Requirements engineering
Process engineering
System engineering
All of given
“Quality is in the eye of the beholder, a matter, of the client's judgment.” All of the
given
3) McCall (MCC77) and his colleagues proposed some software quality factors based on _______ most important
aspects of a software product:
3
6
Product-related problems
Technology-related problems
Process-related problems
People-related problems
5) Upon evaluating current problems and desired information (input and output), the analyst begins to ______
Synthesize solutions
Model
Specification
All of given
Maintainability
Flexibility
Testability
7) We can classify the problems that affect software projects into _______ categories
4
5
Best control
Component control
SCI control
Synchronization control
Process-related problems
People-related problems
Product-related problems
11) A meeting is conducted at a _______ and attended by both software engineers and customers.
Software engineer site
Neutral site
Customer site
Company site
Design
Coding
All of given
13) All given below are the problems that affect software projects except:
Product-related problems
Technology-related problems
Procedure-related problems
People-related problems
Design
Implementation
Testing
Requirement Analysis
15) Both the software engineer and customer take an active role in software requirements engineering-a set of
activities that is often referred to as
Analysis
Design
Specification
System acceptance
16) The model serves as the basis for the creation of ______ for the Software.
Design
Maintenance
Testing
Specifications
17) Before requirements can be analyzed, modeled, or specified they must be gathered through a/an _______
Elicitation process
Interviewing
Meeting
None of given
Overestimated savings from reusable components and new tools and methods
All of given
Technology-related problems
Process-related problems
People-related problems
Product-related problems
20) Throughout evaluation and solution synthesis, the analyst's primary focus is on
______
Requirements engineering
Process engineering
System engineering
All of given
22) In problem evaluation area of effort, once problems have been identified, the ___________determines what
information is to be produced by the new system and what data will be provided to the system.
Analyst
Designer
Coder
Manager
Customer
A developer
An outsider
All of given
24) Version control combines ______ to manage different versions of configuration objects that are
created during software product development.
Procedure
Tools
Product scope changed toward the end of the project life cycle
Fuzzy users
26) When you build a product or system, it's important to go through a series of predictable steps – a
road map that helps you create a timely, high-quality result, The road map that you follow is called
a ________
Software design
Software process
Software schedule
Framework
27) Before requirements can be analyzed, modeled, or specified they must be gathered through a/an
_______
Elicitation process
Interviewing
Meeting
None of given
Technology-related problems
Product-related problems
Process-related problems
People-related problems
CS615 MCQ
1) Which of the items listed below is not one of the software engineering layers?
Process
Tools
2) The software quality assurance activity which is performed to check errors in logic, function, or implementation
for any representation of the software is called:
Inspection
Auditing
Complexity (page 4, 7)
Content
Determinacy
4) Extent to which the program can be used in more than one program or system is called -------
Portability
Configurability
5) Cost, effort, risks, and resources are the factors included in--------
Development
Maintenance
6) Which of the following tools and techniques shows the impacts of one decision over another as well as the
probability and cost of each risk along a logical path?
Simulation
Decision tree
Probability / impact risk matrix
Sensitivity analysis
Four
None of given
Gantt
Cost baseline
Critical path
PERT
9) To aid planning, scheduling, and monitoring a project, you can use tools______
11) The DID s (Data Item Description) includes a section called ________
Formal Documentation
Effective Resolution
12) ________ is identifying the specific activities that must be performed to produce the various project
deliverables.
Scope Planning
Scope Definition
Lead by example
Are visionary
All of given
Resource Planning
15) To expand or contract project scope, to modify cost, or schedule estimates are examples of ________
Work results
Change request (page 156)
Change schedule
Change scope
16) ______ is based on soft skills and relies more on human factors, such as collecting information during group
discussions.
17) The Data Item Descriptions define the formal documentation standards for all required documents generated
during the development of software according to standard:
2276
2267
Ten
Thirteen
19) Lessons learned are important to document because an organization can use them to improve
future projects and the Project Management process. Therefore, in project closing procedures, it is
helpful to review the,
WBS
Original contract
All of given
20) __________ technique used to integrate the project‘s scope, schedule, and resources and to
measure and report project performance from initiation to closeout:
PMIS
PV
Project execution
Project Quality
2) All given below are the problems that affect software projects except:
Product-related problems
Technology-related problems
True (page268)
False
4) Software engineers do not need to consider hardware when designing a computer-based system.
Schedule
Effort
6) Adding more people to a project that is already behind schedule is a good way to catch up.
7) Discrete portions of the project that can be charged to a single organization are called -----------------
Tasks
Activities
8) The --------------- decomposition of a software project is a division of the system into its operational components
as they are seen by the user.
Design
Planning
9) Efficiency with which a program runs on different platforms or operating systems is called -------
Configurability
Reusability
Interoperability
Reusability
True
Managing
Recognition
13) Which one the following components are purchased from a third party, are ready for use on the current project
and have been fully validated?
Software
Off – the – shelf
Hardware
Microsoft
14) Function Points are language dependent approach to estimating software development effort.
True
False
16) Describe where the work must be performed. Specify the location of hardware and software and where the
people must perform the work is called __________
Scope of work
Deliverables Schedule
17) Faizan is the project manager working on the Resource Planning process. He should consider all of the
following when developing the resource requirements output except:
WBS
Resource rates
Special knowledge and talents
18) All of the following are true regarding the tools and techniques of activity sequencing except:
19) Faisal Dar is a project manager for Changing Tides Video games. He has produced a project network diagram
and has updated the activity list. Which process have he just finished?
The Activity Sequencing process, which identifies all the specific activities of the project The Activity
Sequencing process, which identifies all the activities dependences The activity duration
Estimating process, which diagram project network time estimates? The activity duration Estimating
process, which identifies all the dependent activities of the project?
20) Faisal Dar is a project manager for Changing Tides Video games. He has gathered the inputs of for the Activity
Duration Estimation process. He will employ which tools and techniques to produce the outputs for this
process?
Activity list, analogous estimating, quality based durations, and alternatives identification
Activity list, analogous estimating, expert judgment, and quality based durations
Expert judgment, analogous estimating, quality based durations, and reserve time Expert judgment,
alternative identification, quality based durations, and reserve time
21) As a project manager, you know that all of the following are true concerning analogous estimating techniques
except:
It‘s a tool and technique of Activity Duration Estimating and Cost Estimating
22) All of the following are true regarding parametric modeling except:
Start to finish
Start to start
Finish to finish
24) One of the most powerful leadership tools a project manager is has his/her_______
Own knowledge
Own experience
Own behavior
Own reference
25) The organization structure that provides the project manager with the most authority over the project team
is:
Functional
Balanced matrix
Strong matrix
You cannot override the project management software decisions regarding schedule
28) If you know expected value is 500 and the standard deviation is 12, you can ay with approximately a 95 percent
confidence rating which of the following?
There is approximately a 99 percent chance of completing this activity between 86 and 134 days
There is approximately a 68 percent chance of completing this activity between 98 and 122 days
There is approximately a 95 percent chance of completing this activity between 98 and 122 days There is
approximately a 75 percent chance of completing this activity between 86 and 134 days
30) All of the following strategies are tools and techniques of Risk Response Planning used to reduce or control risk
except?
Mitigation
Acceptance
31) Object points are measurable code sections in an object-oriented programming language, such as________
C++
Ada
Java
32) __________ involves determining what qualities are to be used to perform project activities.
Cost budgeting
Cost control
33) The resources assigned to them will significantly influences the duration of most activities.
True
False
Two-step process
36) Hasnain is a project manager for VU International. Since he doesn‘t sleep much, he gets a lot of project work
done. He is considering recommending a project that costs Rs. 575‘000, and expected inflows are Rs. 25000
per quarter for the first 2 years, then Rs. 75000 per quarter thereafter. What is the pay back period?
40 months
38 months
39 months
41 months
37) Mathematical models using linear, dynamic, integer, or algorithm models are considered:
The WBS should contains 100% of the work defined by the scope or contract
39) COMSAT project selection committee used a weighted scoring model and found that project BAT, with a score
of 54, should be chosen over the other competing projects. Which of the following is true?
Weighted scoring models are a benefit measurement method, which is tool and technique in the Initiation
process
Weighted scoring models are constraint optimization method, which is output of the Initiation process
Weighted scoring models are constraint optimization method, which is tool and technique in the
Initiation process
Weighted scoring models are a benefit measurement method, which is output of the Initiation
process
40) Obtaining forma project plan approval and sign-off is important for all of the following reason except:
Stakeholders are aware of the specific details regarding project schedule, budgets, and risk.
Stakeholders are aware of the project details, which makes them more likely to participate in future project
decisions.
Stakeholders are able to recommend a project planning methodology to follow throughout the remaining
process group.
41) All of the following are true regarding the project plan except:
It‘s used to guide the project Executing and Controlling processes and it is the baseline used to measure
project performance
It consists of one document that should be formally approved and signed by stakeholder It contains
things like the WBS, project schedule, and resource assignment
43) Always remember that projects are in dynamic working environments, so try to maintain flexibility in the work
breakdown structure.
Always true (page 283)
Always false
Depends on condition
Gantt charts
Network-scheduling techniques
PERT
45) Usman is project manager for a new website for a local zoo. He needs to perform Quantitative Risk Analysis.
He will use all of the following tools and techniques to accomplish this except:
46) Which of the following describes the cost of quality associated with scrapping, rework, and downtime?
Internal failure
External failure
47) Choudhary & Brothers hardware vendor left you voicemail saying that a snowstorm in the Midwest will
prevent your equipment from arriving on time. You identified a risk response for this risk and have arranged
for a local company to lease you the needed equipment until yours arrives. This is an example of which risk
response strategy?
Transference
Acceptance
Mitigation
Avoidance
48) What document outlines the action steps to be taken if an identified risk event should occur?
Project plan
Contingency Plan
49) Tools and techniques for risk identification include all but:
Checklist
Risk assessment
Interviewing
Assumption analysis
Performance review
Variance analysis
Trend analysis
Delphi method
Computerized estimating
Analogous estimating
Work package
Historical information
Lesson learned
54) Receivers in the communications model filter their information through all of the following except:
Culture
Knowledge of subject
Conflict
Language
55) The presence of which of the given factors is mandatory in a quality assured software
Change adaptive
Faulty
Correctness
White box
Gray box
Blue box
57) Which of the following testing techniques is usually used during implementation of individual modules?
White Box
Black Box
Integration testing
None of given
58) How do the dynamic testers confirm that the executions of a program (other than the expected execution
of a program) are running accurately?
Some important program input are selected from the set of all and executed
It is hard to confirm that
The execution of the program other that the intended execution is useless to test None of given
Formal testing
Dynamic testing
Static testing
Unit testing
Formal methods aim at verification and proving correctness, while testing can only show the presence
of errors.
Testing is done only in the third phase of SDLC whereas Formal methods are done in all the phases
of SDLC except Testing phase.
Testing can only be done after the requirements gathering phase of SDLC whereas Formal methods can be
applied before that.
61) The main idea behind symbolic execution is to use symbolic values, instead of actual data, as input values,
and to represent the values of program variables as symbolic expressions.
True
False
To locate weaknesses in the test data used for the program never accessed during execution
To locate weaknesses in the test data used in sections of the code that are seldom accessed
during execution All of given
Replace each arithmetic operation with another one, e.g. + with *, - and /.
Replace each boolean relation with another one, e.g. > with >=, == and <=. All of given
64) Which of the following testing approach is used to test the software functionality that previously worked as
desired, stops working or no longer works in the same way that was previously planned?
Integration testing
Unit testing
Regression testing
Dynamic testing
All of given
66) Which of the following testing is required when it needs to test the software after combining the modules
into a group?
Unit
Regression
White box
68) The process of software quality assurance (SQA) is designed to prevent software defects and inefficiencies.
True
False
69) There is no difference between software quality assurance and software testing
True
False
70) The Project Management Institute (PMI) is the industry-recognized standard for project management
practices.
The VP of marketing approaches you and requests that you change the visitor logon screen on the
company's website to include a username with at least six characters. This is considered:
Project initiation
Ongoing operations
A project
Project execution
71) Your company manufactures small kitchen appliances. They are introducing a new product
line of appliances in designer colors with distinctive features for kitchens in small spaces. These
new products will be offered indefinitely starting with the spring catalog release. Which of the
following is true?
This is a project because this new product line has never been manufactured and sold by this
company before.
This is an ongoing operation because the company is in the business of manufacturing kitchen
appliances. Introducing designer colors and features is simply a new twist on an existing process.
This is an ongoing operation because the new product line will be sold indefinitely. It's not temporary.
This is not a project or an ongoing operation. This is a new product introduction not affecting ongoing
operations.
72) Your company manufactures small kitchen appliances. They are introducing a new product
line of appliances in designer colors with distinctive features for kitchens in small spaces. These
new products will be offered indefinitely starting with the spring catalog release. In order to
determine the characteristics and features of the new product line, you will have to perform
which of the following?
Fast tracking
Progressive elaboration
The product of the project is turned over to the operations area to handle the ongoing aspects of the
project.
74) The VP of customer service has expressed concern over a project you're involved in. His
specific concern is that if the project is implemented as planned, he'll have to purchase
additional equipment to staff his customer service center. The cost is substantial and was not
taken into consideration in the project budget. The project sponsor insists that the project
must go forward as originally planned or the customer will suffer. Which of the following is
true?
1. The VP of customer service is correct. Since the cost was not taken into account at the beginning of the project,
the project should not go forward as planned. Project initiation should be revisited to examine the project plan
and determine how changes can be made to accommodate customer service.
75) Which of the following brings together a set of tools and techniques used to describe,
organize, and monitor the work of project activities?
Project managers
Project management
Stakeholders
77) You are the project manager for a large construction project. The project objective is to
construct a set of outbuildings to house the Olympic support team that will be arriving in your
city 18 months from the project start date. You've been given a budget of $12 million to
complete this project. Resources are easily attained. Which of the triple constraints is the
primary constraint for this project?
78) You are the project manager for a large construction project. The project objective is to
construct a set of outbuildings to house the Olympic support team that will be arriving in your
city 18 months from the project start date. Resources are not readily available as they are
currently assigned to other projects. Jack, an expert crane operator, is needed for this project
two months from today. Which of the following skills will you use to get Jack assigned to your
project?
Communication skills
Problem-solving skills
79) You are a project manager with technical expertise in the pharmaceutical industry. You've
decided to try your hand at project management in the entertainment industry. Which of the
following is true?
I. You will likely be successful because communication skills are your strong suit. You
anticipate having technical experts on your project team to address industry specifics that
you're not familiar with.
II. You will likely be successful because your organizational skills are excellent. You anticipate
having technical experts on your project team to address industry specifics that you're not familiar
with.
III. You will probably be successful because you have a friend in the entertainment industry that
has briefed you on all the important aspects of this project that you'll need to know. You anticipate
having technical experts on your project team to address industry specifics that you're not familiar
with.
IV. You will probably not be successful because you have little knowledge of the entertainment
industry even though you anticipate having technical experts on your project team to address
industry specifics that you're not familiar with
80) You are managing a project to install a new postage software system that will automatically print
labels and administer postage for certified mailings, overnight packages, and other special mailing
needs. You've attempted to gain the cooperation of the business analyst working on this project and
need some answers. She is elusive and tells you that this project is not her top priority. To avoid
situations like this in the future, you should:
A. Establish the business analyst's duties well ahead of due dates and tell her you'll be reporting
on her performance to her functional manager.
B. Establish the business analyst's duties well ahead of due dates and tell her you are expecting
her to meet these expectations because the customer is counting on the project meeting due dates
to save significant costs on their annual mailings.
C. Negotiate with the business analyst's functional manager during the planning process to
establish expectations and request to participate in the business analyst's annual performance
review.
D. Negotiate with the business analyst's functional manager during the planning process to
establish expectations and inform the functional manager of the requirements of the project.
Agreement from the functional manager will assure the cooperation of the business analyst.
81) The amount of authority a project manager possesses can be related to:
The project manager's communication skills
All employees report to one manager and have a clear chain of command.
All employees report to two or more managers, but project team members show loyalty to functional
managers.
83) You have been assigned to a project in which the objectives are to direct customer calls to an Interactive Voice
Response system before being connected to a live agent. You are in charge of the media communications for
this project. You report to the project manager in charge of this project and the VP of marketing, who share
responsibility for this project. Which organizational structure do you work in?
Functional organization
Projectized organization
84) You have been assigned to a project in which the objectives are to expand three miles of the north-south
highway through your city by two lanes in each direction. You are in charge of the demolition phase of this
project, and you report to the project manager in charge of this project. You have been hired on contract and
will be released at the completion of the demolition phase. What type of organizational structure does this
represent?
Functional organization
Projectized organization
Balanced matrix organization
85) What are the five project management process groups, in order?
Initiation, Executing, Planning, Controlling, and Closing
86) You have been assigned to a project in which the objectives are to expand three miles of the north-south
highway through your city by two lanes in each direction. You are interested in implementing a new project
process called design-build in order to speed up the project schedule. The idea is that the construction team
will work on the first mile of the highway reconstruction at the same time the design team is coming up with
plans for the third mile of the reconstructionrather than completing all design before any construction begins.
This is an example of:
Collocation
87) During which project management process are risk and stake holder‘s ability to influence project outcomes the
highest at the beginning of the process?
Planning
Executing
Initiation Controlling
88) You are a project manager working on gathering requirements and establishing estimates for the project.
Which process group are you in?
Planning
Executing
Initiation
Controlling
None of given
Technology-related problems
Product-related problems
91) ________of the system is an effort to better understand data and control flow, functional processing,
operational behavior, and information content.
Specifications
Design
Interoperability
Configurability
Expandability
Product-related problems
Technology-related problems
Process-related problems
94) Software design is actually a multi step process that focuses on distinct attributes of a program, these are:
Data structure, and Software architecture
5 (page 93)
6
96) __________contains an analysis of what went wrong, what went right, and what you could have
done better in the software project.
97) Project Quality Management includes the --------------- required to ensure that the project will satisfy
the needs for which it was undertaken
Time
Cost
98) -------------- completion and settlement of the contract, including resolution of any open items.
Contract Administration
Source Selection
Source Selection
Contract Closeout
100) Decisions also have a --------------------- element to them—the ―right‖ decision may not be the
―best‖ decision if it is made too early or too late.
Cost
Quality
101) -----------is the ability to encourage by "push or pull" technical people to produce to their best ability.
Evaluating
Monitoring
Technology-related problems
Process-related problems
103) Strong leadership motivation may sound an obvious trait for a ---------------------.
104) We can classify the problems that affect software projects into _________ categories.
4 (page 85)
5
Overestimated savings from reusable components and new tools and methods
Best control
Component control
SCI control
107) McCall (MCC77) and his colleagues proposed some software quality factors based on most important aspects
of a software product:
Product operation
Product transition
108) Synchronization control helps to ensure that parallel changes performed by two different people do
___________.
Not overwrite one another (page 114)
Overwrite one another
None of given
110) Before requirements can be analyzed, modeled, or specified they must be gathered through a/an _________
Meeting
None of given
Standards and procedures, defined for the product (page 118) Design defined
for product
113) Efficiency with which a program runs on different platforms or operating systems is reusability.
True
False
114) All of the following are types of project closures or endings except:
115) The primary focus of _______________ is to ensure that the final software product offers all the
functionality and performance that the customer wanted.
Training test
Support test
Technology-related problems
Process-related problems
117) Both the software engineer and customer take an active role in software requirements engineering-a set
of activities that is often referred to as
Design
System acceptance
118) Which of the following is not true?
It is important to select the best people for jobs and then instruct them in the best methods
The team leader need not assess the training needs of his team members
It is good to improve productivity by encouraging reuse of existing software components (Not Sure) It would be
good if the employees consider work as natural as rest or play and they like it
________ identifying which quality standards are relevant to the project and determining how to satisfy
them.
► Quality Planning (page 139 )
►Communications Planning
►Organization Planning
►Staff Acquisition
►Constraints
►Seven
Question No: 4 ( Marks: 1 ) - Please choose one
Product quality depends on its conformance to ______
►Software requirements
►Development standards
►Implicit requirements
► All of given (page 119)
►Requirements analysis
►Testing
►Quality
►Timeliness and
►Completeness of SW product
►Bibliography
- Please choose one
►Appendix
► Both Bibliography and Appendix (page 103)
►Reference
►Manager
►Software developer
►Customer
► Both the software developer and the customer (page 106)
►Top level management
►Company site
- Please choose one
►Design
►Maintenance
►Testing
► Specifications (page 95)
►Specification
In problem evaluation area of effort, once problems have been identified, the
___________determines what information is to be produced by the new system and what data
will be provided to the system.
►Coder
►Manager
►Correctness
- Please choose one
►None of given
►Project quality
►Process
►None of given
-
►Output Design
►Input Design
►Software Selection
Which organization has set the de facto standards for project management techniques?
►PMBOK
►PMO
McCall (MCC77) and his colleagues proposed some software quality factors based on _________ most
important aspects of a software product:
►4
► 3 (page 120)
►6
►5
( Marks: 1 ) - Please choose one
The model serves as a foundation for software design and as the basis for the creation of _________
for the Software.
►Design
►Maintenance
►Testing
► Specifications (page 95)
►Customer
►A developer
►An outsider
► All of the given (page100)
►Manager
Upon evaluating current problems and desired information (input and output), the analyst begins to
_________.
►Specification
►Flexibility
►Testability
►Information Hiding
►Abstraction
►Inheritance
Question No: 28
The US DOD (1988) defines software quality rather simply as:
( Marks: 1 ) - Please choose one
► The ability of a software product to satisfy its specified requirements. (Page 118)
►―An inherent or distinguishing characteristic or a property‖
—defining and refining objectives and selecting the best of the alternative courses of action to
attain the objectives that the project was undertaken to address
►Initial Process
► Planning Process (page 131)
►Executing Process
►Controlling Process
When you build a product or system, it‘s important to go through a series of predictable steps – a
road map that helps you create a timely, high-quality result, The road map that you follow is called
—
►Software Design
►Framework
( Marks: 1 ) - Please choose one
►Inputs
►Outputs
►4
► 3 (page 120)
►6
►5
— ensures that appropriate steps to follow the product development procedures are carried out
►Quality Management ►
Design
► Process monitoring (page 123)
►Quality control
( Marks: 1 ) - Please choose one
►Manager
Synchronization control helps to ensure that parallel changes performed by two different people
do_________.
►None of given
Question No: 36
These all are Product Transition Factors except.
►Interoperability
►Configurability
►Expandability
► Testability (page 121)
( Marks: 1 ) - Please choose one
►Goals
►Objective
►Design
► Goals and objectives of the software (page 104)
► “Quality is in the eye of the beholder, a matter, of the client's judgment.” (Page 118) ►
All of the given
( Marks: 1 ) - Please choose one
►Best control
►FTR control
►SCI control
You can use the Item Traceability Matrix to identify _______ at the end of each phase
►Design
► Construction
( Marks: 1 ) - Please choose one
Defined scope is a
►Technology-related problems
► People-related problems
►Discovery
►Refinement
Question No: 45
The model serves as the basis for the creation of ________ for the Software.
►Design
► Maintenance
►Testing
► Specifications (page 95)
Most software project manager‘s practice a lot of management techniques that are of doubtful
authenticity are called
►Goals
►Objective
►Design
► Goals and objectives of the software (page 104)
Both the software engineer and customer take an active role in software requirements engineering-a
set of activities that is often referred to as Requirement:
►Managing
( Marks: 1 ) - Please choose one
► Recognition ►
Analysis (page 92)
► Modeling
Question No: 50
The Efficiency with which a program runs on different platforms or operating systems is called :
► Configurability
► Interoperability
Efficiency with which a program runs on different platforms or operating systems is Reusability
►True
► False (page 121)
________ is a software engineering task that bridges the gap between system level requirements
engineering and software design.
►Cost Analysis
► Design analysis
► Risk analysis
► Requirements analysis (page 93)
( Marks: 1 ) - Please choose one
► Management, Leadership
► Manager, Management
( Marks: 1 ) - Please choose one
►Project life-cycle-based
► Scheduled
► Deliverable-based (page 277)
► None of given
►Start
► Scheduled
► End page (page 297)
► None of given
►Program
► Task (page 275)
►Project
► None of given
►Individually
►Combination
►Changed
► None of given
►Problem
► None of given
►Begins
►Ends
► Begins or Ends (page 297)
► None of given
( Marks: 1 ) - Please choose one
►End Manage
► None of given
►True
► False (page 73)
Question No: 63 ( Marks: 1 ) - Please choose one
During the Implementation phase the software modules are coded and initial unit tests are performed.
►True
► False