The document tracks SAR (Site Acceptance Report) progress data over multiple dates from March 2022 to September 2022. It includes totals of SARs by status - approved, rejected, pending approval. The status include validation by Nokia RF, approval by Nokia RF, rejection reasons. It also includes a running total by date.

Uploaded by

Tsehay Misrak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
86 views481 pages

SAR Tracker 07092022 V1 Update-1

The document tracks SAR (Site Acceptance Report) progress data over multiple dates from March 2022 to September 2022. It includes totals of SARs by status - approved, rejected, pending approval. The status include validation by Nokia RF, approval by Nokia RF, rejection reasons. It also includes a running total by date.

Uploaded by

Tsehay Misrak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 481

SAR Remarks_07.09.

2022 Count Daily Progress


Nominal With No candidate 2 22-Mar-2022
Nominal with SAR approved by RF 2 24-Mar-2022
Nominal with SAR approved by STEP RF 641 25-Mar-2022
Nominal with SAR Rejected by CW 0 29-Mar-2022
Nominal with SAR Rejected by RF 0 30-Mar-2022
Nominal with SAR Rejected by SAQ 11 31-Mar-2022
Nominal with SAR Rejected by STEP 10 01-Apr-2022
Under discussion with STEP RF/field visit 0 04-Apr-2022
Nominal with SAR Submitted STEP approval pending 2 05-Apr-2022
Nominal with only Tx site 5 06-Apr-2022
Grand Total 669 07-Apr-2022
08-Apr-2022
11-Apr-2022
Daily Progress 07.09.2022 Count 12-Apr-2022
SAR Received from subcon 2 13-Apr-2022
SAR Validated by Nokia RF 2 14-Apr-2022
SAR Approved by Nokia RF 2 18-Apr-2022
Subcon to Resubmit/Rejected 0 19-Apr-2022
SAR submitted with STEP RF 0 20-Apr-2022
SAR Validated by STEP RF 2 21-Apr-2022
22-Apr-2022
29-Apr-2022
30-Apr-2022
02-May-2022
03-May-2022
04-May-2022
05-May-2022
06-May-2022
07-May-2022
09-May-2022
10-May-2022
11-May-2022
12-May-2022
13-May-2022
14-May-2022
16-May-2022
17-May-2022
18-May-2022
19-May-2022
20-May-2022
21-May-2022
23-May-2022
24-May-2022
25-May-2022
26-May-2022
27-May-2022
28-May-2022
30-May-2022
31-May-2022
01-Jun-2022
02-Jun-2022
06-Jun-2022
07-Jun-2022
08-Jun-2022
09-Jun-2022
10-Jun-2022
11-Jun-2022
13-Jun-2022
14-Jun-2022
15-Jun-2022
16-Jun-2022
17-Jun-2022
18-Jun-2022
20-Jun-2022
21-Jun-2022
22-Jun-2022
23-Jun-2022
24-Jun-2022
25-Jun-2022
27-Jun-2022
28-Jun-2022
29-Jun-2022
30-Jun-2022
01-Jul-2022
02-Jul-2022
04-Jul-2022
05-Jul-2022
06-Jul-2022
07-Jul-2022
08-Jul-2022
11-Jul-2022
12-Jul-2022
13-Jul-2022
14-Jul-2022
15-Jul-2022
16-Jul-2022
18-Jul-2022
19-Jul-2022
20-Jul-2022
21-Jul-2022
22-Jul-2022
23-Jul-2022
25-Jul-2022
26-Jul-2022
27-Jul-2022
28-Jul-2022
29-Jul-2022
30-Jul-2022
01-Aug-2022
02-Aug-2022
03-Aug-2022
04-Aug-2022
05-Aug-2022
08-Aug-2022
09-Aug-2022
10-Aug-2022
11-Aug-2022
15-Aug-2022
16-Aug-2022
17-Aug-2022
18-Aug-2022
19-Aug-2022
22-Aug-2022
23-Aug-2022
24-Aug-2022
25-Aug-2022
26-Aug-2022
30-Aug-2022
31-Aug-2022
01-Sep-2022
02-Sep-2022
06-Sep-2022
06-Sep-2022
SAR Received from subcon SAR Validated by Nokia RF SAR Approved by NokiaSubcon
RF to Resubmit/Rejected
4 4 0 4
10 10 6 4
5 5 0 5
8 8 6 2
3 3 2 1
2 2 2 0
3 3 3 0
4 4 3 1
7 7 4 3
3 3 3 0
2 2 2 0
11 11 8 3
10 10 5 2
8 8 5 3
12 12 7 5
6 6 4 0
5 5 5 0
15 15 10 5
13 13 10 3
11 11 4 7
3 3 1 2
13 13 9 4
4 4 4 0
14 14 7 7
4 4 4 0
6 6 4 2
2 2 1 1
7 7 7 0
10 10 6 4
7 7 6 1
10 10 6 4
3 3 2 1
6 6 6 0
2 2 2 0
10 10 7 3
12 12 8 4
6 6 6 0
5 5 5 0
12 12 12 0
4 4 4 0
4 4 2 2
12 12 10 2
5 5 4 1
5 5 5 0
4 4 4 0
4 4 2 2
5 5 4 1
5 5 3 2
2 2 1 1
7 7 5 2
7 7 5 2
5 5 4 1
8 8 7 1
11 11 6 5
6 6 3 3
11 11 7 4
10 10 6 4
5 5 5 0
6 6 4 2
1 1 0 1
5 5 4 1
1 1 0 1
8 8 6 2
2 2 2 0
6 6 5 1
4 4 3 1
6 6 5 1
3 3 3 0
3 3 2 1
4 4 1 3
5 5 4 1
6 6 1 4
7 7 6 1
6 6 4 2
0 0 0 0
0 0 0 0
6 4 3 3
7 7 5 2
4 4 3 1
8 7 2 5
0 0 0 0
4 4 2 2
4 4 3 1
4 4 4 0
5 5 5 0
4 4 0 4
3 3 3 0
2 2 2 0
0 0 0 0
1 1 1 0
1 1 1 0
2 2 2 0
0 0 0 0
0 0 0 0
1 1 1 0
1 1 1 0
2 2 2 0
0 0 0 0
1 1 1 0
4 4 4 0
1 1 1 0
0 0 0 0
3 3 3 0
0 0 0 0
2 2 1 1
3 3 3 0
5 5 4 1
0 0 0 0
1 1 1 0
3 3 3 0
1 1 1 0
2 2 2 0
2 2 2 0
0 0 0 0
1 1 1 0
0 0 0 0
1 1 1 0
0 0 0 0
0 0 0 0
0 0 0 0
3 3 3 0
1 1 1 0
2 2 2 0
SAR submitted with STEP RF
SAR Validated by STEP RF
0 0
3 3
0 0
0 0
0 0
2 2
0 0
0 0
9 0
3 3
0 0
9 0
0 0
7 0
7 0
4 0
5 22
10 0
10 0
4 0
5 0
9 20
4 9
12 0
4 12
4 0
1 0
13 9
6 0
6 19
10 6
2 10
7 2
3 7
7 3
8 7
6 8
5 5
12 6
4 14
2 0
10 0
4 14
5 4
4 0
2 7
4 0
3 3
1 0
5 12
5 4
4 13
7 4
6 7
3 12
7 5
6 0
5 15
4 9
0 6
4 0
0 6
6 0
8 0
5 6
3 4
5 0
3 0
2 0
1 4
4 8
8 0
6 7
10 0
0 10
0 0
4 0
5 5
5 0
5 5
0 4
3 3
3 0
4 5
5 0
0 0
0 14
2 5
0 0
0 0
0 0
0 15
0 6
0 0
0 3
0 0
2 0
0 0
0 6
0 6
0 0
0 0
0 3
0 0
0 0
3 1
4 0
0 0
0 0
0 4
0 3
0 3
0 3
0 2
0 1
0 0
0 0
0 0
0 0
0 0
0 2
0 0
0 2
Physical Site Unique Site Unique Current Candidate
Site ID Unique Site Comment STEP ID Candidate ID
ID ID Candidate ID Candidate Status

AA_Site1 AA_Site1_0
SAR with Active Candidate
144001 144001_0
144001_Nominal_PH0
144001_0_Nominal_PH0 0 N Nominal
AA_Site1 AA_Site1_A
SAR with Active Candidate
144001 144001_A144001_FTK_PH0
144001_A_FTK_PH0 A N Backup
AA_Site1 AA_Site1_B
SAR with Active Candidate
144001 144001_B 144001_FTK_PH0
144001_B_FTK_PH0 B N Rejected
AA_Site1 AA_Site1_C
SAR with Active Candidate
144001 144001_C 144001_FTK_PH0
144001_C_FTK_PH0 C N Backup
AA_Site1 AA_Site1_D
SAR with Active Candidate
144001 144001_D144001_FTK_PH0
144001_D_FTK_PH0 D Y Active
AA_Site10 AA_Site10_0
SAR with Active Candidate
144002 144002_0
144002_Nominal_PH0
144002_0_Nominal_PH0 0 N Nominal
AA_Site10 AA_Site10_A
SAR with Active Candidate
144002 144002_A144002_FTK_PH0
144002_A_FTK_PH0 A N Rejected
AA_Site10 AA_Site10_B
SAR with Active Candidate
144002 144002_B 144002_FTK_PH0
144002_B_FTK_PH0 B N Backup
AA_Site10 AA_Site10_C
SAR with Active Candidate
144002 144002_C 144002_FTK_PH0
144002_C_FTK_PH0 C N Backup
AA_Site10 AA_Site10_D
SAR with Active Candidate
144002 144002_D144002_FTK_PH0
144002_D_FTK_PH0 D Y Active
AA_Site100 AA_Site100_0
SAR with Active Candidate
149001 149001_0
149001_Nominal_PH0
149001_0_Nominal_PH0 0 N Nominal
AA_Site100 AA_Site100_A
SAR with Active Candidate
149001 149001_A149001_FTK_PH0
149001_A_FTK_PH0 A N Rejected
AA_Site100 AA_Site100_B
SAR with Active Candidate
149001 149001_B 149001_FTK_PH0
149001_B_FTK_PH0 B N Rejected
AA_Site100 AA_Site100_X
SAR with Active Candidate
149001 149001_X149001_Colo_PH0
149001_X_Colo_PH0 X Y Active
AA_Site101 AA_Site101_0
SAR with Active Candidate
149002 149002_0
149002_Nominal_PH0
149002_0_Nominal_PH0 0 N Nominal
AA_Site101 AA_Site101_A
SAR with Active Candidate
149002 149002_A149002_FTK_PH0
149002_A_FTK_PH0 A N Backup
AA_Site101 AA_Site101_B
SAR with Active Candidate
149002 149002_B 149002_FTK_PH0
149002_B_FTK_PH0 B N Rejected
AA_Site101 AA_Site101_X
SAR with Active Candidate
149002 149002_X149002_Colo_PH0
149002_X_Colo_PH0 X Y Active
AA_Site102 AA_Site102_0
SAR with Active Candidate
147001 147001_0
147001_Nominal_PH0
147001_0_Nominal_PH0 0 N Nominal
AA_Site102 AA_Site102_A
SAR with Active Candidate
147001 147001_A147001_FTK_PH0
147001_A_FTK_PH0 A N Backup
AA_Site102 AA_Site102_B
SAR with Active Candidate
147001 147001_B 147001_FTK_PH0
147001_B_FTK_PH0 B Y Active
AA_Site103 AA_Site103_0
SAR with Active Candidate
140001 140001_0
140001_Nominal_PH0
140001_0_Nominal_PH0 0 N Nominal
AA_Site103 AA_Site103_A
SAR with Active Candidate
140001 140001_A140001_FTK_PH0
140001_A_FTK_PH0 A N Rejected
AA_Site103 AA_Site103_B
SAR with Active Candidate
140001 140001_B 140001_FTK_PH0
140001_B_FTK_PH0 B N Rejected
AA_Site103 AA_Site103_C
SAR with Active Candidate
140001 140001_C 140001_FTK_PH0
140001_C_FTK_PH0 C Y Active
AA_Site103 AA_Site103_P
SAR with Active Candidate
140001 140001_P 140001_FTK_PH0
140001_P_FTK_PH0 P N Rejected
AA_Site104 AA_Site104_0
SAR with Active Candidate
146001 146001_0
146001_Nominal_PH0
146001_0_Nominal_PH0 0 N Nominal
AA_Site104 AA_Site104_A
SAR with Active Candidate
146001 146001_A146001_FTK_PH0
146001_A_FTK_PH0 A N Backup
AA_Site104 AA_Site104_B
SAR with Active Candidate
146001 146001_B 146001_FTK_PH0
146001_B_FTK_PH0 B N Backup
AA_Site104 AA_Site104_D
SAR with Active Candidate
146001 146001_D146001_FTK_PH0
146001_D_FTK_PH0 D Y Active
AA_Site105 AA_Site105_0
SAR with Active Candidate
144003 144003_0
144003_Nominal_PH0
144003_0_Nominal_PH0 0 N Nominal
AA_Site105 AA_Site105_A
SAR with Active Candidate
144003 144003_A144003_FTK_PH0
144003_A_FTK_PH0 A N Rejected
AA_Site105 AA_Site105_B
SAR with Active Candidate
144003 144003_B 144003_FTK_PH0
144003_B_FTK_PH0 B N Rejected
AA_Site105 AA_Site105_C
SAR with Active Candidate
144003 144003_C 144003_FTK_PH0
144003_C_FTK_PH0 C N Backup
AA_Site105 AA_Site105_D
SAR with Active Candidate
144003 144003_D144003_FTK_PH0
144003_D_FTK_PH0 D N Rejected
AA_Site105 AA_Site105_E
SAR with Active Candidate
144003 144003_E 144003_FTK_PH0
144003_E_FTK_PH0 E Y Active
AA_Site106 AA_Site106_0
SAR with Active Candidate
142001 142001_0
142001_Nominal_PH0
142001_0_Nominal_PH0 0 N Nominal
AA_Site106 AA_Site106_A
SAR with Active Candidate
142001 142001_A142001_FTK_PH0
142001_A_FTK_PH0 A Y Active
AA_Site106 AA_Site106_B
SAR with Active Candidate
142001 142001_B 142001_FTK_PH0
142001_B_FTK_PH0 B N Backup
AA_Site107 AA_Site107_0
SAR with Active Candidate
142002 142002_0
142002_Nominal_PH0
142002_0_Nominal_PH0 0 N Nominal
AA_Site107 AA_Site107_B
SAR with Active Candidate
142002 142002_B 142002_FTK_PH0
142002_B_FTK_PH0 B Y Active
AA_Site107 AA_Site107_C
SAR with Active Candidate
142002 142002_C 142002_FTK_PH0
142002_C_FTK_PH0 C N Backup
AA_Site109 AA_Site109_A
SAR with Active Candidate
146002 146002_A146002_FTK_PH0
146002_A_FTK_PH0 A N Rejected
AA_Site109 AA_Site109_B
SAR with Active Candidate
146002 146002_B 146002_FTK_PH0
146002_B_FTK_PH0 B N Backup
AA_Site109 AA_Site109_C
SAR with Active Candidate
146002 146002_C 146002_FTK_PH0
146002_C_FTK_PH0 C N Backup
AA_Site109 AA_Site109_D
SAR with Active Candidate
146002 146002_D146002_FTK_PH0
146002_D_FTK_PH0 D N Rejected
AA_Site109 AA_Site109_E
SAR with Active Candidate
146002 146002_E 146002_FTK_PH0
146002_E_FTK_PH0 E Y Active
AA_Site11 AA_Site11_0
SAR with Active Candidate
145001 145001_0
145001_Nominal_PH0
145001_0_Nominal_PH0 0 N Nominal
AA_Site11 AA_Site11_A
SAR with Active Candidate
145001 145001_A145001_FTK_PH0
145001_A_FTK_PH0 A N Rejected
AA_Site11 AA_Site11_B
SAR with Active Candidate
145001 145001_B 145001_FTK_PH0
145001_B_FTK_PH0 B N Backup
AA_Site11 AA_Site11_C
SAR with Active Candidate
145001 145001_C 145001_FTK_PH0
145001_C_FTK_PH0 C Y Active
AA_Site110 AA_Site110_0
SAR with Active Candidate
146003 146003_0
146003_Nominal_PH0
146003_0_Nominal_PH0 0 N Nominal
AA_Site110 AA_Site110_A
SAR with Active Candidate
146003 146003_A146003_FTK_PH0
146003_A_FTK_PH0 A Y Active
AA_Site110 AA_Site110_B
SAR with Active Candidate
146003 146003_B 146003_FTK_PH0
146003_B_FTK_PH0 B N Backup
AA_Site110 AA_Site110_C
SAR with Active Candidate
146003 146003_C 146003_FTK_PH0
146003_C_FTK_PH0 C N Backup
AA_Site113 AA_Site113_0
SAR with Active Candidate
141002 141002_0
141002_Nominal_PH0
141002_0_Nominal_PH0 0 N Nominal
AA_Site113 AA_Site113_A
SAR with Active Candidate
141002 141002_A141002_FTK_PH0
141002_A_FTK_PH0 A N Rejected
AA_Site113 AA_Site113_B
SAR with Active Candidate
141002 141002_B 141002_FTK_PH0
141002_B_FTK_PH0 B N Rejected
AA_Site113 AA_Site113_C
SAR with Active Candidate
141002 141002_C 141002_FTK_PH0
141002_C_FTK_PH0 C N Rejected
AA_Site113 AA_Site113_D
SAR with Active Candidate
141002 141002_D141002_FTK_PH0
141002_D_FTK_PH0 D Y Active
AA_Site118 AA_Site118_0
SAR with Active Candidate
141049 141049_0
141049_Nominal_PH0
141049_0_Nominal_PH0 0 N Nominal
AA_Site118 AA_Site118_A
SAR with Active Candidate
141049 141049_A141049_FTK_PH0
141049_A_FTK_PH0 A Y Active
AA_Site118 AA_Site118_B
SAR with Active Candidate
141049 141049_B 141049_FTK_PH0
141049_B_FTK_PH0 B N Backup
AA_Site119 AA_Site119_0
SAR with Active Candidate
148001 148001_0
148001_Nominal_PH0
148001_0_Nominal_PH0 0 N Nominal
AA_Site119 AA_Site119_A
SAR with Active Candidate
148001 148001_A148001_FTK_PH0
148001_A_FTK_PH0 A N Rejected
AA_Site119 AA_Site119_B
SAR with Active Candidate
148001 148001_B 148001_FTK_PH0
148001_B_FTK_PH0 B N Rejected
AA_Site119 AA_Site119_C
SAR with Active Candidate
148001 148001_C 148001_FTK_PH0
148001_C_FTK_PH0 C N Backup
AA_Site119 AA_Site119_X
SAR with Active Candidate
148001 148001_X148001_Colo_PH0
148001_X_Colo_PH0 X Y Active
AA_Site12 AA_Site12_0
SAR with Active Candidate
142003 142003_0
142003_Nominal_PH0
142003_0_Nominal_PH0 0 N Nominal
AA_Site12 AA_Site12_A
SAR with Active Candidate
142003 142003_A142003_FTK_PH0
142003_A_FTK_PH0 A N Backup
AA_Site12 AA_Site12_B
SAR with Active Candidate
142003 142003_B 142003_FTK_PH0
142003_B_FTK_PH0 B N Rejected
AA_Site12 AA_Site12_C
SAR with Active Candidate
142003 142003_C 142003_FTK_PH0
142003_C_FTK_PH0 C N Backup
AA_Site12 AA_Site12_X
SAR with Active Candidate
142003 142003_X142003_Colo_PH0
142003_X_Colo_PH0 X Y Active
AA_Site120 AA_Site120_A
SAR with Active Candidate
144005 144005_A144005_FTK_PH0
144005_A_FTK_PH0 A Y Active
AA_Site120 AA_Site120_B
SAR with Active Candidate
144005 144005_B 144005_FTK_PH0
144005_B_FTK_PH0 B N Backup
AA_Site120 AA_Site120_C
SAR with Active Candidate
144005 144005_C 144005_FTK_PH0
144005_C_FTK_PH0 C N Backup
AA_Site122 AA_Site122_0
SAR with Active Candidate
141003 141003_0
141003_Nominal_PH0
141003_0_Nominal_PH0 0 N Nominal
AA_Site122 AA_Site122_A
SAR with Active Candidate
141003 141003_A141003_FTK_PH0
141003_A_FTK_PH0 A N Rejected
AA_Site122 AA_Site122_B
SAR with Active Candidate
141003 141003_B 141003_FTK_PH0
141003_B_FTK_PH0 B N Rejected
AA_Site122 AA_Site122_C
SAR with Active Candidate
141003 141003_C 141003_FTK_PH0
141003_C_FTK_PH0 C N Rejected
AA_Site122 AA_Site122_X
SAR with Active Candidate
141003 141003_X141003_Colo_PH0
141003_X_Colo_PH0 X Y Active
AA_Site128 AA_Site128_0
SAR with Active Candidate
144007 144007_0
144007_Nominal_PH0
144007_0_Nominal_PH0 0 N Nominal
AA_Site128 AA_Site128_A
SAR with Active Candidate
144007 144007_A144007_FTK_PH0
144007_A_FTK_PH0 A N Backup
AA_Site128 AA_Site128_B
SAR with Active Candidate
144007 144007_B 144007_FTK_PH0
144007_B_FTK_PH0 B N Rejected
AA_Site128 AA_Site128_C
SAR with Active Candidate
144007 144007_C 144007_FTK_PH0
144007_C_FTK_PH0 C N Rejected
AA_Site128 AA_Site128_X
SAR with Active Candidate
144007 144007_X144007_Colo_PH0
144007_X_Colo_PH0 X Y Active
AA_Site130 AA_Site130_0
SAR with Active Candidate
144008 144008_0
144008_Nominal_PH0
144008_0_Nominal_PH0 0 N Nominal
AA_Site130 AA_Site130_A
SAR with Active Candidate
144008 144008_A144008_FTK_PH0
144008_A_FTK_PH0 A N Backup
AA_Site130 AA_Site130_B
SAR with Active Candidate
144008 144008_B 144008_FTK_PH0
144008_B_FTK_PH0 B N Backup
AA_Site130 AA_Site130_C
SAR with Active Candidate
144008 144008_C 144008_FTK_PH0
144008_C_FTK_PH0 C Y Active
AA_Site131 AA_Site131_0
SAR with Active Candidate
147002 147002_0
147002_Nominal_PH0
147002_0_Nominal_PH0 0 N Nominal
AA_Site131 AA_Site131_A
SAR with Active Candidate
147002 147002_A147002_FTK_PH0
147002_A_FTK_PH0 A N Rejected
AA_Site131 AA_Site131_B
SAR with Active Candidate
147002 147002_B 147002_FTK_PH0
147002_B_FTK_PH0 B N Rejected
AA_Site131 AA_Site131_P
SAR with Active Candidate
147002 147002_P 147002_FTK_PH0
147002_P_FTK_PH0 P Y Active
AA_Site132 AA_Site132_0
SAR with Active Candidate
143004 143004_0
143004_Nominal_PH0
143004_0_Nominal_PH0 0 N Nominal
AA_Site132 AA_Site132_A
SAR with Active Candidate
143004 143004_A143004_FTK_PH0
143004_A_FTK_PH0 A Y Active
AA_Site132 AA_Site132_B
SAR with Active Candidate
143004 143004_B 143004_FTK_PH0
143004_B_FTK_PH0 B N Backup
AA_Site133 AA_Site133_0
SAR with Active Candidate
143005 143005_0
143005_Nominal_PH0
143005_0_Nominal_PH0 0 N Nominal
AA_Site133 AA_Site133_A
SAR with Active Candidate
143005 143005_A143005_FTK_PH0
143005_A_FTK_PH0 A N Rejected
AA_Site133 AA_Site133_B
SAR with Active Candidate
143005 143005_B 143005_FTK_PH0
143005_B_FTK_PH0 B N Rejected
AA_Site133 AA_Site133_C
SAR with Active Candidate
143005 143005_C 143005_FTK_PH0
143005_C_FTK_PH0 C N Rejected
AA_Site133 AA_Site133_D
SAR with Active Candidate
143005 143005_D143005_FTK_PH0
143005_D_FTK_PH0 D N Rejected
AA_Site133 AA_Site133_X
SAR with Active Candidate
143005 143005_X143005_Colo_PH0
143005_X_Colo_PH0 X Y Active
AA_Site134 AA_Site134_0
SAR with Active Candidate
144009 144009_0
144009_Nominal_PH0
144009_0_Nominal_PH0 0 N Nominal
AA_Site134 AA_Site134_A
SAR with Active Candidate
144009 144009_A144009_FTK_PH0
144009_A_FTK_PH0 A N Rejected
AA_Site134 AA_Site134_B
SAR with Active Candidate
144009 144009_B 144009_FTK_PH0
144009_B_FTK_PH0 B N Backup
AA_Site134 AA_Site134_C
SAR with Active Candidate
144009 144009_C 144009_FTK_PH0
144009_C_FTK_PH0 C N Rejected
AA_Site134 AA_Site134_X
SAR with Active Candidate
144009 144009_X144009_Colo_PH0
144009_X_Colo_PH0 X Y Active
AA_Site135 AA_Site135_0
SAR with Active Candidate
142080 142080_0
142080_Nominal_PH0
142080_0_Nominal_PH0 0 N Nominal
AA_Site135 AA_Site135_A
SAR with Active Candidate
142080 142080_A142080_FTK_PH0
142080_A_FTK_PH0 A N Rejected
AA_Site135 AA_Site135_B
SAR with Active Candidate
142080 142080_B 142080_FTK_PH0
142080_B_FTK_PH0 B N Rejected
AA_Site135 AA_Site135_C
SAR with Active Candidate
142080 142080_C 142080_FTK_PH0
142080_C_FTK_PH0 C N Rejected
AA_Site135 AA_Site135_D
SAR with Active Candidate
142080 142080_D142080_FTK_PH0
142080_D_FTK_PH0 D N Rejected
AA_Site135 AA_Site135_E
SAR with Active Candidate
142080 142080_E 142080_FTK_PH0
142080_E_FTK_PH0 E N Backup
AA_Site135 AA_Site135_X
SAR with Active Candidate
142080 142080_X142080_Colo_PH0
142080_X_Colo_PH0 X Y Active
AA_Site136 AA_Site136_0
SAR with Active Candidate
147003 147003_0
147003_Nominal_PH0
147003_0_Nominal_PH0 0 N Nominal
AA_Site136 AA_Site136_B
SAR with Active Candidate
147003 147003_B 147003_FTK_PH0
147003_B_FTK_PH0 B N Rejected
AA_Site136 AA_Site136_C
SAR with Active Candidate
147003 147003_C 147003_FTK_PH0
147003_C_FTK_PH0 C N Rejected
AA_Site136 AA_Site136_D
SAR with Active Candidate
147003 147003_D147003_FTK_PH0
147003_D_FTK_PH0 D N Rejected
AA_Site136 AA_Site136_E
SAR with Active Candidate
147003 147003_E 147003_FTK_PH0
147003_E_FTK_PH0 E N Rejected
AA_Site136 AA_Site136_F
SAR with Active Candidate
147003 147003_F 147003_FTK_PH0
147003_F_FTK_PH0 F N Rejected
AA_Site136 AA_Site136_P
SAR with Active Candidate
147003 147003_P 147003_FTK_PH0
147003_P_FTK_PH0 P Y Active
AA_Site138 AA_Site138_0
SAR with Active Candidate
140002 140002_0
140002_Nominal_PH0
140002_0_Nominal_PH0 0 N Nominal
AA_Site138 AA_Site138_A
SAR with Active Candidate
140002 140002_A140002_FTK_PH0
140002_A_FTK_PH0 A N Backup
AA_Site138 AA_Site138_B
SAR with Active Candidate
140002 140002_B 140002_FTK_PH0
140002_B_FTK_PH0 B Y Active
AA_Site138 AA_Site138_C
SAR with Active Candidate
140002 140002_C 140002_FTK_PH0
140002_C_FTK_PH0 C N Rejected
AA_Site14 AA_Site14_0
SAR with Active Candidate
141050 141050_0
141050_Nominal_PH0
141050_0_Nominal_PH0 0 N Nominal
AA_Site14 AA_Site14_A
SAR with Active Candidate
141050 141050_A141050_FTK_PH0
141050_A_FTK_PH0 A N Backup
AA_Site14 AA_Site14_B
SAR with Active Candidate
141050 141050_B 141050_FTK_PH0
141050_B_FTK_PH0 B N Backup
AA_Site14 AA_Site14_C
SAR with Active Candidate
141050 141050_C 141050_FTK_PH0
141050_C_FTK_PH0 C N Backup
AA_Site14 AA_Site14_D
SAR with Active Candidate
141050 141050_D141050_FTK_PH0
141050_D_FTK_PH0 D N Rejected
AA_Site14 AA_Site14_X
SAR with Active Candidate
141050 141050_X141050_Colo_PH0
141050_X_Colo_PH0 X Y Active
AA_Site140 AA_Site140_0
SAR with Active Candidate
140023 140023_0
140023_Nominal_PH0
140023_0_Nominal_PH0 0 N Nominal
AA_Site140 AA_Site140_A
SAR with Active Candidate
140023 140023_A140023_FTK_PH0
140023_A_FTK_PH0 A N Backup
AA_Site140 AA_Site140_B
SAR with Active Candidate
140023 140023_B 140023_FTK_PH0
140023_B_FTK_PH0 B N Backup
AA_Site140 AA_Site140_C
SAR with Active Candidate
140023 140023_C 140023_FTK_PH0
140023_C_FTK_PH0 C Y Active
AA_Site140 AA_Site140_D
SAR with Active Candidate
140023 140023_D140023_FTK_PH0
140023_D_FTK_PH0 D N Backup
AA_Site144 AA_Site144_0
SAR with Active Candidate
149006 149006_0
149006_Nominal_PH0
149006_0_Nominal_PH0 0 N Nominal
AA_Site144 AA_Site144_A
SAR with Active Candidate
149006 149006_A149006_FTK_PH0
149006_A_FTK_PH0 A Y Active
AA_Site144 AA_Site144_B
SAR with Active Candidate
149006 149006_B 149006_FTK_PH0
149006_B_FTK_PH0 B N Backup
AA_Site145 AA_Site145_0
SAR with Active Candidate
144091 144091_0
144091_Nominal_PH0
144091_0_Nominal_PH0 0 N Nominal
AA_Site145 AA_Site145_A
SAR with Active Candidate
144091 144091_A144091_FTK_PH0
144091_A_FTK_PH0 A N Rejected
AA_Site145 AA_Site145_B
SAR with Active Candidate
144091 144091_B 144091_FTK_PH0
144091_B_FTK_PH0 B N Backup
AA_Site145 AA_Site145_C
SAR with Active Candidate
144091 144091_C 144091_FTK_PH0
144091_C_FTK_PH0 C N Backup
AA_Site145 AA_Site145_X
SAR with Active Candidate
144091 144091_X144091_Colo_PH0
144091_X_Colo_PH0 X Y Active
AA_Site146 AA_Site146_0
SAR with Active Candidate
143057 143057_0
143057_Nominal_PH0
143057_0_Nominal_PH0 0 N Nominal
AA_Site146 AA_Site146_A
SAR with Active Candidate
143057 143057_A143057_FTK_PH0
143057_A_FTK_PH0 A N Rejected
AA_Site146 AA_Site146_B
SAR with Active Candidate
143057 143057_B 143057_FTK_PH0
143057_B_FTK_PH0 B N Rejected
AA_Site146 AA_Site146_C
SAR with Active Candidate
143057 143057_C 143057_FTK_PH0
143057_C_FTK_PH0 C Y Active
AA_Site146 AA_Site146_E
SAR with Active Candidate
143057 143057_E 143057_FTK_PH0
143057_E_FTK_PH0 E N Backup
AA_Site146 AA_Site146_D
SAR with Active Candidate
143057 143057_D143057_FTK_PH0
143057_D_FTK_PH0 D N Rejected
AA_Site147 AA_Site147_0
SAR with Active Candidate
144010 144010_0
144010_Nominal_PH0
144010_0_Nominal_PH0 0 N Nominal
AA_Site147 AA_Site147_A
SAR with Active Candidate
144010 144010_A144010_FTK_PH0
144010_A_FTK_PH0 A N Rejected
AA_Site147 AA_Site147_B
SAR with Active Candidate
144010 144010_B 144010_FTK_PH0
144010_B_FTK_PH0 B N Rejected
AA_Site147 AA_Site147_X
SAR with Active Candidate
144010 144010_X144010_Colo_PH0
144010_X_Colo_PH0 X Y Active
AA_Site148 AA_Site148_0
SAR with Active Candidate
144011 144011_0
144011_Nominal_PH0
144011_0_Nominal_PH0 0 N Nominal
AA_Site148 AA_Site148_X
SAR with Active Candidate
144011 144011_X144011_Colo_PH0
144011_X_Colo_PH0 X Y Active
AA_Site148 AA_Site148_B
SAR with Active Candidate
144011 144011_B 144011_FTK_PH0
144011_B_FTK_PH0 B N Rejected
AA_Site148 AA_Site148_A
SAR with Active Candidate
144011 144011_A144011_FTK_PH0
144011_A_FTK_PH0 A N Rejected
AA_Site148 AA_Site148_C
SAR with Active Candidate
144011 144011_C 144011_FTK_PH0
144011_C_FTK_PH0 C N Rejected
AA_Site15 AA_Site15_0
SAR with Active Candidate
147005 147005_0
147005_Nominal_PH0
147005_0_Nominal_PH0 0 N Nominal
AA_Site15 AA_Site15_A
SAR with Active Candidate
147005 147005_A147005_FTK_PH0
147005_A_FTK_PH0 A Y Active
AA_Site15 AA_Site15_B
SAR with Active Candidate
147005 147005_B 147005_FTK_PH0
147005_B_FTK_PH0 B N Backup
AA_Site150 AA_Site150_0
SAR with Active Candidate
144012 144012_0
144012_Nominal_PH0
144012_0_Nominal_PH0 0 N Nominal
AA_Site150 AA_Site150_A
SAR with Active Candidate
144012 144012_A144012_FTK_PH0
144012_A_FTK_PH0 A N Rejected
AA_Site150 AA_Site150_B
SAR with Active Candidate
144012 144012_B 144012_FTK_PH0
144012_B_FTK_PH0 B N Backup
AA_Site150 AA_Site150_C
SAR with Active Candidate
144012 144012_C 144012_FTK_PH0
144012_C_FTK_PH0 C N Rejected
AA_Site150 AA_Site150_D
SAR with Active Candidate
144012 144012_D144012_FTK_PH0
144012_D_FTK_PH0 D Y Active
AA_Site154 AA_Site154_0
SAR with Active Candidate
142005 142005_0
142005_Nominal_PH0
142005_0_Nominal_PH0 0 N Nominal
AA_Site154 AA_Site154_A
SAR with Active Candidate
142005 142005_A142005_FTK_PH0
142005_A_FTK_PH0 A Y Active
AA_Site154 AA_Site154_B
SAR with Active Candidate
142005 142005_B 142005_FTK_PH0
142005_B_FTK_PH0 B N Backup
AA_Site155 AA_Site155_0
SAR with Active Candidate
144013 144013_0
144013_Nominal_PH0
144013_0_Nominal_PH0 0 N Nominal
AA_Site155 AA_Site155_C
SAR with Active Candidate
144013 144013_C 144013_FTK_PH0
144013_C_FTK_PH0 C N Rejected
AA_Site155 AA_Site155_A
SAR with Active Candidate
144013 144013_A144013_FTK_PH0
144013_A_FTK_PH0 A N Rejected
AA_Site155 AA_Site155_D
SAR with Active Candidate
144013 144013_D144013_FTK_PH0
144013_D_FTK_PH0 D N Rejected
AA_Site155 AA_Site155_E
SAR with Active Candidate
144013 144013_E 144013_FTK_PH0
144013_E_FTK_PH0 E N Rejected
AA_Site155 AA_Site155_F
SAR with Active Candidate
144013 144013_F 144013_FTK_PH0
144013_F_FTK_PH0 F Y Active
AA_Site155 AA_Site155_G
SAR with Active Candidate
144013 144013_G144013_FTK_PH0
144013_G_FTK_PH0 G N Rejected
AA_Site155 AA_Site155_B
SAR with Active Candidate
144013 144013_B 144013_FTK_PH0
144013_B_FTK_PH0 B N Rejected
AA_Site157 AA_Site157_0
SAR with Active Candidate
145002 145002_0
145002_Nominal_PH0
145002_0_Nominal_PH0 0 N Nominal
AA_Site157 AA_Site157_A
SAR with Active Candidate
145002 145002_A145002_FTK_PH0
145002_A_FTK_PH0 A N Rejected
AA_Site157 AA_Site157_B
SAR with Active Candidate
145002 145002_B 145002_FTK_PH0
145002_B_FTK_PH0 B Y Active
AA_Site157 AA_Site157_C
SAR with Active Candidate
145002 145002_C 145002_FTK_PH0
145002_C_FTK_PH0 C N Backup
AA_Site157 AA_Site157_T
SAR with Active Candidate
145002 145002_T 145002_FTK_PH0
145002_T_FTK_PH0 T N Rejected
AA_Site158 AA_Site158_0
SAR with Active Candidate
148002 148002_0
148002_Nominal_PH0
148002_0_Nominal_PH0 0 N Nominal
AA_Site158 AA_Site158_A
SAR with Active Candidate
148002 148002_A148002_FTK_PH0
148002_A_FTK_PH0 A N Backup
AA_Site158 AA_Site158_B
SAR with Active Candidate
148002 148002_B 148002_FTK_PH0
148002_B_FTK_PH0 B N Backup
AA_Site158 AA_Site158_D
SAR with Active Candidate
148002 148002_D148002_FTK_PH0
148002_D_FTK_PH0 D N Backup
AA_Site158 AA_Site158_E
SAR with Active Candidate
148002 148002_E 148002_FTK_PH0
148002_E_FTK_PH0 E Y Active
AA_Site158 AA_Site158_C
SAR with Active Candidate
148002 148002_C 148002_FTK_PH0
148002_C_FTK_PH0 C N Backup
AA_Site159 AA_Site159_0
SAR with Active Candidate
140003 140003_0
140003_Nominal_PH0
140003_0_Nominal_PH0 0 N Nominal
AA_Site159 AA_Site159_A
SAR with Active Candidate
140003 140003_A140003_FTK_PH0
140003_A_FTK_PH0 A N Backup
AA_Site159 AA_Site159_B
SAR with Active Candidate
140003 140003_B 140003_FTK_PH0
140003_B_FTK_PH0 B N Backup
AA_Site162 AA_Site162_0
SAR with Active Candidate
145003 145003_0
145003_Nominal_PH0
145003_0_Nominal_PH0 0 N Nominal
AA_Site162 AA_Site162_A
SAR with Active Candidate
145003 145003_A145003_FTK_PH0
145003_A_FTK_PH0 A N Rejected
AA_Site162 AA_Site162_B
SAR with Active Candidate
145003 145003_B 145003_FTK_PH0
145003_B_FTK_PH0 B N Rejected
AA_Site162 AA_Site162_C
SAR with Active Candidate
145003 145003_C 145003_FTK_PH0
145003_C_FTK_PH0 C N Rejected
AA_Site162 AA_Site162_X
SAR with Active Candidate
145003 145003_X145003_Colo_PH0
145003_X_Colo_PH0 X Y Active
AA_Site163 AA_Site163_0
SAR with Active Candidate
143059 143059_0
143059_Nominal_PH0
143059_0_Nominal_PH0 0 N Nominal
AA_Site163 AA_Site163_A
SAR with Active Candidate
143059 143059_A143059_FTK_PH0
143059_A_FTK_PH0 A Y Active
AA_Site163 AA_Site163_B
SAR with Active Candidate
143059 143059_B 143059_FTK_PH0
143059_B_FTK_PH0 B N Backup
AA_Site164 AA_Site164_0
SAR with Active Candidate
147007 147007_0
147007_Nominal_PH0
147007_0_Nominal_PH0 0 N Nominal
AA_Site164 AA_Site164_A
SAR with Active Candidate
147007 147007_A147007_FTK_PH0
147007_A_FTK_PH0 A N Backup
AA_Site164 AA_Site164_B
SAR with Active Candidate
147007 147007_B 147007_FTK_PH0
147007_B_FTK_PH0 B N Rejected
AA_Site164 AA_Site164_C
SAR with Active Candidate
147007 147007_C 147007_FTK_PH0
147007_C_FTK_PH0 C N Rejected
AA_Site164 AA_Site164_D
SAR with Active Candidate
147007 147007_D147007_FTK_PH0
147007_D_FTK_PH0 D N Backup
AA_Site164 AA_Site164_E
SAR with Active Candidate
147007 147007_E 147007_FTK_PH0
147007_E_FTK_PH0 E N Backup
AA_Site164 AA_Site164_X
SAR with Active Candidate
147007 147007_X147007_Colo_PH0
147007_X_Colo_PH0 X Y Active
AA_Site166 AA_Site166_0
SAR with Active Candidate
144014 144014_0
144014_Nominal_PH0
144014_0_Nominal_PH0 0 N Nominal
AA_Site166 AA_Site166_A
SAR with Active Candidate
144014 144014_A144014_FTK_PH0
144014_A_FTK_PH0 A N Rejected
AA_Site166 AA_Site166_B
SAR with Active Candidate
144014 144014_B 144014_FTK_PH0
144014_B_FTK_PH0 B N Rejected
AA_Site166 AA_Site166_C
SAR with Active Candidate
144014 144014_C 144014_FTK_PH0
144014_C_FTK_PH0 C Y Active
AA_Site169 AA_Site169_0
SAR with Active Candidate
147008 147008_0
147008_Nominal_PH0
147008_0_Nominal_PH0 0 N Nominal
AA_Site169 AA_Site169_A
SAR with Active Candidate
147008 147008_A147008_FTK_PH0
147008_A_FTK_PH0 A Y Active
AA_Site17 AA_Site17_0
SAR with Active Candidate
140004 140004_0
140004_Nominal_PH0
140004_0_Nominal_PH0 0 N Nominal
AA_Site17 AA_Site17_A
SAR with Active Candidate
140004 140004_A140004_FTK_PH0
140004_A_FTK_PH0 A N Backup
AA_Site17 AA_Site17_B
SAR with Active Candidate
140004 140004_B 140004_FTK_PH0
140004_B_FTK_PH0 B N Backup
AA_Site17 AA_Site17_C
SAR with Active Candidate
140004 140004_C 140004_FTK_PH0
140004_C_FTK_PH0 C Y Active
AA_Site17 AA_Site17_D
SAR with Active Candidate
140004 140004_D140004_FTK_PH0
140004_D_FTK_PH0 D N Backup
AA_Site172 AA_Site172_0
SAR with Active Candidate
142007 142007_0
142007_Nominal_PH0
142007_0_Nominal_PH0 0 N Nominal
AA_Site172 AA_Site172_A
SAR with Active Candidate
142007 142007_A142007_FTK_PH0
142007_A_FTK_PH0 A N Backup
AA_Site172 AA_Site172_B
SAR with Active Candidate
142007 142007_B 142007_FTK_PH0
142007_B_FTK_PH0 B N Backup
AA_Site172 AA_Site172_C
SAR with Active Candidate
142007 142007_C 142007_FTK_PH0
142007_C_FTK_PH0 C N Rejected
AA_Site172 AA_Site172_D
SAR with Active Candidate
142007 142007_D142007_FTK_PH0
142007_D_FTK_PH0 D Y Active
AA_Site174 AA_Site174_0
SAR with Active Candidate
149003 149003_0
149003_Nominal_PH0
149003_0_Nominal_PH0 0 N Nominal
AA_Site174 AA_Site174_B
SAR with Active Candidate
149003 149003_B 149003_FTK_PH0
149003_B_FTK_PH0 B N Backup
AA_Site174 AA_Site174_C
SAR with Active Candidate
149003 149003_C 149003_FTK_PH0
149003_C_FTK_PH0 C N Rejected
AA_Site174 AA_Site174_D
SAR with Active Candidate
149003 149003_D149003_FTK_PH0
149003_D_FTK_PH0 D Y Active
AA_Site175 AA_Site175_0
SAR with Active Candidate
149035 149035_0
149035_Nominal_PH0
149035_0_Nominal_PH0 0 N Nominal
AA_Site175 AA_Site175_A
SAR with Active Candidate
149035 149035_A149035_FTK_PH0
149035_A_FTK_PH0 A N Rejected
AA_Site175 AA_Site175_B
SAR with Active Candidate
149035 149035_B 149035_FTK_PH0
149035_B_FTK_PH0 B N Rejected
AA_Site175 AA_Site175_X
SAR with Active Candidate
149035 149035_X149035_Colo_PH0
149035_X_Colo_PH0 X Y Active
AA_Site177 AA_Site177_0
SAR with Active Candidate
143069 143069_0
143069_Nominal_PH0
143069_0_Nominal_PH0 0 N Nominal
AA_Site177 AA_Site177_A
SAR with Active Candidate
143069 143069_A143069_FTK_PH0
143069_A_FTK_PH0 A N Backup
AA_Site177 AA_Site177_B
SAR with Active Candidate
143069 143069_B 143069_FTK_PH0
143069_B_FTK_PH0 B N Backup
AA_Site177 AA_Site177_C
SAR with Active Candidate
143069 143069_C 143069_FTK_PH0
143069_C_FTK_PH0 C N Rejected
AA_Site177 AA_Site177_D
SAR with Active Candidate
143069 143069_D143069_FTK_PH0
143069_D_FTK_PH0 D N Rejected
AA_Site177 AA_Site177_E
SAR with Active Candidate
143069 143069_E 143069_FTK_PH0
143069_E_FTK_PH0 E N Rejected
AA_Site177 AA_Site177_X
SAR with Active Candidate
143069 143069_X143069_Colo_PH0
143069_X_Colo_PH0 X Y Active
AA_site178 AA_site178_0
SAR with Active Candidate
143008 143008_0
143008_Nominal_PH0
143008_0_Nominal_PH0 0 N Nominal
AA_site178 AA_site178_A
SAR with Active Candidate
143008 143008_A143008_FTK_PH0
143008_A_FTK_PH0 A N Rejected
AA_site178 AA_site178_B
SAR with Active Candidate
143008 143008_B 143008_FTK_PH0
143008_B_FTK_PH0 B N Rejected
AA_site178 AA_site178_C
SAR with Active Candidate
143008 143008_C 143008_FTK_PH0
143008_C_FTK_PH0 C Y Active
AA_Site179 AA_Site179_0
SAR with Active Candidate
147010 147010_0
147010_Nominal_PH0
147010_0_Nominal_PH0 0 N Nominal
AA_Site179 AA_Site179_A
SAR with Active Candidate
147010 147010_A147010_FTK_PH0
147010_A_FTK_PH0 A Y Active
AA_Site179 AA_Site179_B
SAR with Active Candidate
147010 147010_B 147010_FTK_PH0
147010_B_FTK_PH0 B N Backup
AA_Site180 AA_Site180_0
SAR with Active Candidate
143009 143009_0
143009_Nominal_PH0
143009_0_Nominal_PH0 0 N Nominal
AA_Site180 AA_Site180_A
SAR with Active Candidate
143009 143009_A143009_FTK_PH0
143009_A_FTK_PH0 A N Rejected
AA_Site180 AA_Site180_B
SAR with Active Candidate
143009 143009_B 143009_FTK_PH0
143009_B_FTK_PH0 B N Rejected
AA_Site180 AA_Site180_X
SAR with Active Candidate
143009 143009_X143009_Colo_PH0
143009_X_Colo_PH0 X Y Active
AA_Site184 AA_Site184_0
SAR with Active Candidate
144109 144109_0
144109_Nominal_PH0
144109_0_Nominal_PH0 0 N Nominal
AA_Site184 AA_Site184_A
SAR with Active Candidate
144109 144109_A144109_FTK_PH0
144109_A_FTK_PH0 A N Rejected
AA_Site184 AA_Site184_C
SAR with Active Candidate
144109 144109_C 144109_FTK_PH0
144109_C_FTK_PH0 C N Rejected
AA_Site184 AA_Site184_D
SAR with Active Candidate
144109 144109_D144109_FTK_PH0
144109_D_FTK_PH0 D N Backup
AA_Site184 AA_Site184_E
SAR with Active Candidate
144109 144109_E 144109_FTK_PH0
144109_E_FTK_PH0 E Y Active
AA_Site184 AA_Site184_B
SAR with Active Candidate
144109 144109_B 144109_FTK_PH0
144109_B_FTK_PH0 B N Rejected
AA_Site186 AA_Site186_0
SAR with Active Candidate
147058 147058_0
147058_Nominal_PH0
147058_0_Nominal_PH0 0 N Nominal
AA_Site186 AA_Site186_A
SAR with Active Candidate
147058 147058_A147058_FTK_PH0
147058_A_FTK_PH0 A N Rejected
AA_Site186 AA_Site186_B
SAR with Active Candidate
147058 147058_B 147058_FTK_PH0
147058_B_FTK_PH0 B N Rejected
AA_Site186 AA_Site186_C
SAR with Active Candidate
147058 147058_C 147058_FTK_PH0
147058_C_FTK_PH0 C Y Active
AA_Site19 AA_Site19_0
SAR with Active Candidate
144017 144017_0
144017_Nominal_PH0
144017_0_Nominal_PH0 0 N Nominal
AA_Site19 AA_Site19_A
SAR with Active Candidate
144017 144017_A144017_FTK_PH0
144017_A_FTK_PH0 A N Rejected
AA_Site19 AA_Site19_B
SAR with Active Candidate
144017 144017_B 144017_FTK_PH0
144017_B_FTK_PH0 B N Rejected
AA_Site19 AA_Site19_C
SAR with Active Candidate
144017 144017_C 144017_FTK_PH0
144017_C_FTK_PH0 C N Backup
AA_Site19 AA_Site19_D
SAR with Active Candidate
144017 144017_D144017_FTK_PH0
144017_D_FTK_PH0 D N Backup
AA_Site19 AA_Site19_X
SAR with Active Candidate
144017 144017_X144017_Colo_PH0
144017_X_Colo_PH0 X Y Active
AA_Site190 AA_Site190_0
SAR with Active Candidate
147011 147011_0
147011_Nominal_PH0
147011_0_Nominal_PH0 0 N Nominal
AA_Site190 AA_Site190_A
SAR with Active Candidate
147011 147011_A147011_FTK_PH0
147011_A_FTK_PH0 A Y Active
AA_Site190 AA_Site190_B
SAR with Active Candidate
147011 147011_B 147011_FTK_PH0
147011_B_FTK_PH0 B N Backup
AA_Site191 AA_Site191_0
SAR with Active Candidate
147012 147012_0
147012_Nominal_PH0
147012_0_Nominal_PH0 0 N Nominal
AA_Site191 AA_Site191_A
SAR with Active Candidate
147012 147012_A147012_FTK_PH0
147012_A_FTK_PH0 A N Backup
AA_Site191 AA_Site191_B
SAR with Active Candidate
147012 147012_B 147012_FTK_PH0
147012_B_FTK_PH0 B Y Active
AA_Site20 AA_Site20_0
SAR with Active Candidate
146005 146005_0
146005_Nominal_PH0
146005_0_Nominal_PH0 0 N Nominal
AA_Site20 AA_Site20_A
SAR with Active Candidate
146005 146005_A146005_FTK_PH0
146005_A_FTK_PH0 A N Backup
AA_Site20 AA_Site20_B
SAR with Active Candidate
146005 146005_B 146005_FTK_PH0
146005_B_FTK_PH0 B N Rejected
AA_Site20 AA_Site20_C
SAR with Active Candidate
146005 146005_C 146005_FTK_PH0
146005_C_FTK_PH0 C N Backup
AA_Site20 AA_Site20_D
SAR with Active Candidate
146005 146005_D146005_FTK_PH0
146005_D_FTK_PH0 D N Rejected
AA_Site20 AA_Site20_E
SAR with Active Candidate
146005 146005_E 146005_FTK_PH0
146005_E_FTK_PH0 E N Rejected
AA_Site20 AA_Site20_F
SAR with Active Candidate
146005 146005_F 146005_FTK_PH0
146005_F_FTK_PH0 F N Backup
AA_Site20 AA_Site20_X
SAR with Active Candidate
146005 146005_X146005_Colo_PH0
146005_X_Colo_PH0 X Y Active
AA_Site21 AA_Site21_0
SAR with Active Candidate
141008 141008_0
141008_Nominal_PH0
141008_0_Nominal_PH0 0 N Nominal
AA_Site21 AA_Site21_A
SAR with Active Candidate
141008 141008_A141008_FTK_PH0
141008_A_FTK_PH0 A N Backup
AA_Site21 AA_Site21_B
SAR with Active Candidate
141008 141008_B 141008_FTK_PH0
141008_B_FTK_PH0 B N Rejected
AA_Site21 AA_Site21_C
SAR with Active Candidate
141008 141008_C 141008_FTK_PH0
141008_C_FTK_PH0 C N Backup
AA_Site21 AA_Site21_X
SAR with Active Candidate
141008 141008_X141008_Colo_PH0
141008_X_Colo_PH0 X Y Active
AA_Site211 AA_Site211_0
SAR with Active Candidate
143010 143010_0
143010_Nominal_PH0
143010_0_Nominal_PH0 0 N Nominal
AA_Site211 AA_Site211_A
SAR with Active Candidate
143010 143010_A143010_FTK_PH0
143010_A_FTK_PH0 A N Backup
AA_Site211 AA_Site211_B
SAR with Active Candidate
143010 143010_B 143010_FTK_PH0
143010_B_FTK_PH0 B N Rejected
AA_Site211 AA_Site211_C
SAR with Active Candidate
143010 143010_C 143010_FTK_PH0
143010_C_FTK_PH0 C Y Active
AA_Site211 AA_Site211_D
SAR with Active Candidate
143010 143010_D143010_FTK_PH0
143010_D_FTK_PH0 D N Rejected
AA_Site211 AA_Site211_E
SAR with Active Candidate
143010 143010_E 143010_FTK_PH0
143010_E_FTK_PH0 E N Rejected
AA_Site211 AA_Site211_F
SAR with Active Candidate
143010 143010_F 143010_FTK_PH0
143010_F_FTK_PH0 F N Rejected
AA_Site211 AA_Site211_G
SAR with Active Candidate
143010 143010_G143010_FTK_PH0
143010_G_FTK_PH0 G N Rejected
AA_Site213 AA_Site213_0
SAR with Active Candidate
142010 142010_0
142010_Nominal_PH0
142010_0_Nominal_PH0 0 N Nominal
AA_Site213 AA_Site213_A
SAR with Active Candidate
142010 142010_A142010_FTK_PH0
142010_A_FTK_PH0 A N Backup
AA_Site213 AA_Site213_B
SAR with Active Candidate
142010 142010_B 142010_FTK_PH0
142010_B_FTK_PH0 B N Backup
AA_Site213 AA_Site213_C
SAR with Active Candidate
142010 142010_C 142010_FTK_PH0
142010_C_FTK_PH0 C N Rejected
AA_Site213 AA_Site213_D
SAR with Active Candidate
142010 142010_D142010_FTK_PH0
142010_D_FTK_PH0 D Y Active
AA_Site213 AA_Site213_T
SAR with Active Candidate
142010 142010_T 142010_FTK_PH0
142010_T_FTK_PH0 T N Backup
AA_Site214 AA_Site214_0
SAR with Active Candidate
143011 143011_0
143011_Nominal_PH0
143011_0_Nominal_PH0 0 N Nominal
AA_Site214 AA_Site214_A
SAR with Active Candidate
143011 143011_A143011_FTK_PH0
143011_A_FTK_PH0 A N Rejected
AA_Site214 AA_Site214_B
SAR with Active Candidate
143011 143011_B 143011_FTK_PH0
143011_B_FTK_PH0 B N Rejected
AA_Site214 AA_Site214_C
SAR with Active Candidate
143011 143011_C 143011_FTK_PH0
143011_C_FTK_PH0 C N Rejected
AA_Site214 AA_Site214_D
SAR with Active Candidate
143011 143011_D143011_FTK_PH0
143011_D_FTK_PH0 D N Rejected
AA_Site214 AA_Site214_E
SAR with Active Candidate
143011 143011_E 143011_FTK_PH0
143011_E_FTK_PH0 E N Rejected
AA_Site214 AA_Site214_F
SAR with Active Candidate
143011 143011_F 143011_FTK_PH0
143011_F_FTK_PH0 F N Rejected
AA_Site214 AA_Site214_H
SAR with Active Candidate
143011 143011_H143011_FTK_PH0
143011_H_FTK_PH0 H Y Active
AA_Site216 AA_Site216_0
SAR with Active Candidate
143012 143012_0
143012_Nominal_PH0
143012_0_Nominal_PH0 0 N Nominal
AA_Site216 AA_Site216_A
SAR with Active Candidate
143012 143012_A143012_FTK_PH0
143012_A_FTK_PH0 A N Backup
AA_Site216 AA_Site216_B
SAR with Active Candidate
143012 143012_B 143012_FTK_PH0
143012_B_FTK_PH0 B N Rejected
AA_Site216 AA_Site216_C
SAR with Active Candidate
143012 143012_C 143012_FTK_PH0
143012_C_FTK_PH0 C N Rejected
AA_Site216 AA_Site216_D
SAR with Active Candidate
143012 143012_D143012_FTK_PH0
143012_D_FTK_PH0 D N Rejected
AA_Site216 AA_Site216_E
SAR with Active Candidate
143012 143012_E 143012_FTK_PH0
143012_E_FTK_PH0 E N Rejected
AA_Site216 AA_Site216_F
SAR with Active Candidate
143012 143012_F 143012_FTK_PH0
143012_F_FTK_PH0 F N Backup
AA_Site216 AA_Site216_X
SAR with Active Candidate
143012 143012_X143012_Colo_PH0
143012_X_Colo_PH0 X Y Active
AA_Site217 AA_Site217_0
SAR with Active Candidate
146006 146006_0
146006_Nominal_PH0
146006_0_Nominal_PH0 0 N Nominal
AA_Site217 AA_Site217_A
SAR with Active Candidate
146006 146006_A146006_FTK_PH0
146006_A_FTK_PH0 A Y Active
AA_Site217 AA_Site217_B
SAR with Active Candidate
146006 146006_B 146006_FTK_PH0
146006_B_FTK_PH0 B N Backup
AA_Site217 AA_Site217_C
SAR with Active Candidate
146006 146006_C 146006_FTK_PH0
146006_C_FTK_PH0 C N Backup
AA_site218 AA_site218_0
SAR with Active Candidate
143013 143013_0
143013_Nominal_PH0
143013_0_Nominal_PH0 0 N Nominal
AA_site218 AA_site218_A
SAR with Active Candidate
143013 143013_A143013_FTK_PH0
143013_A_FTK_PH0 A N Backup
AA_site218 AA_site218_B
SAR with Active Candidate
143013 143013_B 143013_FTK_PH0
143013_B_FTK_PH0 B N Rejected
AA_site218 AA_site218_C
SAR with Active Candidate
143013 143013_C 143013_FTK_PH0
143013_C_FTK_PH0 C N Backup
AA_site218 AA_site218_D
SAR with Active Candidate
143013 143013_D143013_FTK_PH0
143013_D_FTK_PH0 D N Backup
AA_site218 AA_site218_D
SAR with Active Candidate
143013 143013_E 143013_FTK_PH0
143013_E_FTK_PH0 E Y Active
AA_Site22 AA_Site22_0
SAR with Active Candidate
141009 141009_0
141009_Nominal_PH0
141009_0_Nominal_PH0 0 N Nominal
AA_Site22 AA_Site22_A
SAR with Active Candidate
141009 141009_A141009_FTK_PH0
141009_A_FTK_PH0 A N Rejected
AA_Site22 AA_Site22_B
SAR with Active Candidate
141009 141009_B 141009_FTK_PH0
141009_B_FTK_PH0 B N Rejected
AA_Site22 AA_Site22_C
SAR with Active Candidate
141009 141009_C 141009_FTK_PH0
141009_C_FTK_PH0 C N Rejected
AA_Site22 AA_Site22_D
SAR with Active Candidate
141009 141009_D141009_FTK_PH0
141009_D_FTK_PH0 D N Rejected
AA_Site22 AA_Site22_E
SAR with Active Candidate
141009 141009_E 141009_FTK_PH0
141009_E_FTK_PH0 E N Rejected
AA_Site22 AA_Site22_F
SAR with Active Candidate
141009 141009_F 141009_FTK_PH0
141009_F_FTK_PH0 F N Rejected
AA_Site22 AA_Site22_H
SAR with Active Candidate
141009 141009_H141009_FTK_PH0
141009_H_FTK_PH0 H Y Active
AA_Site22 AA_Site22_G
SAR with Active Candidate
141009 141009_G141009_FTK_PH0
141009_G_FTK_PH0 G N Rejected
AA_Site220 AA_Site220_0
SAR with Active Candidate
143014 143014_0
143014_Nominal_PH0
143014_0_Nominal_PH0 0 N Nominal
AA_Site220 AA_Site220_A
SAR with Active Candidate
143014 143014_A143014_FTK_PH0
143014_A_FTK_PH0 A N Backup
AA_Site220 AA_Site220_B
SAR with Active Candidate
143014 143014_B 143014_FTK_PH0
143014_B_FTK_PH0 B Y Active
AA_Site220 AA_Site220_C
SAR with Active Candidate
143014 143014_C 143014_FTK_PH0
143014_C_FTK_PH0 C N Backup
AA_Site221 AA_Site221_0
SAR with Active Candidate
143015 143015_0
143015_Nominal_PH0
143015_0_Nominal_PH0 0 N Nominal
AA_Site221 AA_Site221_B
SAR with Active Candidate
143015 143015_B 143015_FTK_PH0
143015_B_FTK_PH0 B Y Active
AA_Site221 AA_Site221_C
SAR with Active Candidate
143015 143015_C 143015_FTK_PH0
143015_C_FTK_PH0 C N Backup
AA_Site222 AA_Site222_0
SAR with Active Candidate
143016 143016_0
143016_Nominal_PH0
143016_0_Nominal_PH0 0 N Nominal
AA_Site222 AA_Site222_A
SAR with Active Candidate
143016 143016_A143016_FTK_PH0
143016_A_FTK_PH0 A N Backup
AA_Site222 AA_Site222_B
SAR with Active Candidate
143016 143016_B 143016_FTK_PH0
143016_B_FTK_PH0 B Y Active
AA_Site224 AA_Site224_0
SAR with Active Candidate
148004 148004_0
148004_Nominal_PH0
148004_0_Nominal_PH0 0 N Nominal
AA_Site224 AA_Site224_A
SAR with Active Candidate
148004 148004_A148004_FTK_PH0
148004_A_FTK_PH0 A N Backup
AA_Site224 AA_Site224_B
SAR with Active Candidate
148004 148004_B 148004_FTK_PH0
148004_B_FTK_PH0 B N Rejected
AA_Site224 AA_Site224_C
SAR with Active Candidate
148004 148004_C 148004_FTK_PH0
148004_C_FTK_PH0 C N Backup
AA_Site224 AA_Site224_D
SAR with Active Candidate
148004 148004_D148004_FTK_PH0
148004_D_FTK_PH0 D N Backup
AA_Site224 AA_Site224_X
SAR with Active Candidate
148004 148004_X148004_Colo_PH0
148004_X_Colo_PH0 X Y Active
AA_Site226 AA_Site226_0
SAR with Active Candidate
142011 142011_0
142011_Nominal_PH0
142011_0_Nominal_PH0 0 Nominal_Replacement
N with Y0_149017
AA_Site226 AA_Site226_A
SAR with Active Candidate
142011 142011_A142011_FTK_PH0
142011_A_FTK_PH0 A Y Active
AA_Site226 AA_Site226_B
SAR with Active Candidate
142011 142011_B 142011_FTK_PH0
142011_B_FTK_PH0 B N Backup
AA_Site226 AA_Site226_C
SAR with Active Candidate
142011 142011_C 142011_FTK_PH0
142011_C_FTK_PH0 C N Backup
AA_Site23 AA_Site23_0
SAR with Active Candidate
144018 144018_0
144018_Nominal_PH0
144018_0_Nominal_PH0 0 N Nominal
AA_Site23 AA_Site23_A
SAR with Active Candidate
144018 144018_A144018_FTK_PH0
144018_A_FTK_PH0 A N Backup
AA_Site23 AA_Site23_B
SAR with Active Candidate
144018 144018_B 144018_FTK_PH0
144018_B_FTK_PH0 B N Backup
AA_Site23 AA_Site23_C
SAR with Active Candidate
144018 144018_C 144018_FTK_PH0
144018_C_FTK_PH0 C N Rejected
AA_Site23 AA_Site23_D
SAR with Active Candidate
144018 144018_D144018_FTK_PH0
144018_D_FTK_PH0 D Y Active
AA_Site230 AA_Site230_0
SAR with Active Candidate
142012 142012_0
142012_Nominal_PH0
142012_0_Nominal_PH0 0 N Nominal
AA_Site230 AA_Site230_A
SAR with Active Candidate
142012 142012_A142012_FTK_PH0
142012_A_FTK_PH0 A N Rejected
AA_Site230 AA_Site230_B
SAR with Active Candidate
142012 142012_B 142012_FTK_PH0
142012_B_FTK_PH0 B N Rejected
AA_Site230 AA_Site230_C
SAR with Active Candidate
142012 142012_C 142012_FTK_PH0
142012_C_FTK_PH0 C N Rejected
AA_Site230 AA_Site230_X
SAR with Active Candidate
142012 142012_X142012_Colo_PH0
142012_X_Colo_PH0 X Y Active
AA_Site231 AA_Site231_0
SAR with Active Candidate
142013 142013_0
142013_Nominal_PH0
142013_0_Nominal_PH0 0 N Nominal
AA_Site231 AA_Site231_A
SAR with Active Candidate
142013 142013_A142013_FTK_PH0
142013_A_FTK_PH0 A N Backup
AA_Site231 AA_Site231_P
SAR with Active Candidate
142013 142013_P 142013_FTK_PH0
142013_P_FTK_PH0 P N Rejected
AA_Site231 AA_Site231_B
SAR with Active Candidate
142013 142013_B 142013_FTK_PH0
142013_B_FTK_PH0 B N Rejected
AA_Site231 AA_Site231_C
SAR with Active Candidate
142013 142013_C 142013_FTK_PH0
142013_C_FTK_PH0 C Y Active
AA_Site233 AA_Site233_0
SAR with Active Candidate
142014 142014_0
142014_Nominal_PH0
142014_0_Nominal_PH0 0 N Nominal
AA_Site233 AA_Site233_A
SAR with Active Candidate
142014 142014_A142014_FTK_PH0
142014_A_FTK_PH0 A Y Active
AA_Site233 AA_Site233_B
SAR with Active Candidate
142014 142014_B 142014_FTK_PH0
142014_B_FTK_PH0 B N Backup
AA_Site234 AA_Site234_0
SAR with Active Candidate
142015 142015_0
142015_Nominal_PH0
142015_0_Nominal_PH0 0 N Nominal
AA_Site234 AA_Site234_A
SAR with Active Candidate
142015 142015_A142015_FTK_PH0
142015_A_FTK_PH0 A N Rejected
AA_Site234 AA_Site234_B
SAR with Active Candidate
142015 142015_B 142015_FTK_PH0
142015_B_FTK_PH0 B N Rejected
AA_Site234 AA_Site234_C
SAR with Active Candidate
142015 142015_C 142015_FTK_PH0
142015_C_FTK_PH0 C Y Active
AA_Site236 AA_Site236_0
SAR with Active Candidate
142056 142056_0
142056_Nominal_PH0
142056_0_Nominal_PH0 0 N Nominal
AA_Site236 AA_Site236_A
SAR with Active Candidate
142056 142056_A142056_FTK_PH0
142056_A_FTK_PH0 A N Backup
AA_Site236 AA_Site236_B
SAR with Active Candidate
142056 142056_B 142056_FTK_PH0
142056_B_FTK_PH0 B Y Active
AA_Site238 AA_Site238_0
SAR with Active Candidate
146007 146007_0
146007_Nominal_PH0
146007_0_Nominal_PH0 0 N Nominal
AA_Site238 AA_Site238_A
SAR with Active Candidate
146007 146007_A146007_FTK_PH0
146007_A_FTK_PH0 A N Rejected
AA_Site238 AA_Site238_B
SAR with Active Candidate
146007 146007_B 146007_FTK_PH0
146007_B_FTK_PH0 B N Rejected
AA_Site238 AA_Site238_C
SAR with Active Candidate
146007 146007_C 146007_FTK_PH0
146007_C_FTK_PH0 C N Rejected
AA_Site238 AA_Site238_D
SAR with Active Candidate
146007 146007_D146007_FTK_PH0
146007_D_FTK_PH0 D Y Active
AA_Site239 AA_Site239_0
SAR with Active Candidate
144019 144019_0
144019_Nominal_PH0
144019_0_Nominal_PH0 0 N Nominal
AA_Site239 AA_Site239_A
SAR with Active Candidate
144019 144019_A144019_FTK_PH0
144019_A_FTK_PH0 A N Backup
AA_Site239 AA_Site239_C
SAR with Active Candidate
144019 144019_C 144019_FTK_PH0
144019_C_FTK_PH0 C N Rejected
AA_Site239 AA_Site239_D
SAR with Active Candidate
144019 144019_D144019_FTK_PH0
144019_D_FTK_PH0 D N Rejected
AA_Site239 AA_Site239_E
SAR with Active Candidate
144019 144019_E 144019_FTK_PH0
144019_E_FTK_PH0 E Y Active
AA_Site239 AA_Site239_B
SAR with Active Candidate
144019 144019_B 144019_FTK_PH0
144019_B_FTK_PH0 B N Backup
AA_Site24 AA_Site24_0
SAR with Active Candidate
143019 143019_0
143019_Nominal_PH0
143019_0_Nominal_PH0 0 N Nominal
AA_Site24 AA_Site24_A
SAR with Active Candidate
143019 143019_A143019_FTK_PH0
143019_A_FTK_PH0 A N Rejected
AA_Site24 AA_Site24_B
SAR with Active Candidate
143019 143019_B 143019_FTK_PH0
143019_B_FTK_PH0 B N Backup
AA_Site24 AA_Site24_C
SAR with Active Candidate
143019 143019_C 143019_FTK_PH0
143019_C_FTK_PH0 C N Rejected
AA_Site24 AA_Site24_D
SAR with Active Candidate
143019 143019_D143019_FTK_PH0
143019_D_FTK_PH0 D N Rejected
AA_Site24 AA_Site24_E
SAR with Active Candidate
143019 143019_E 143019_FTK_PH0
143019_E_FTK_PH0 E N Rejected
AA_Site24 AA_Site24_F
SAR with Active Candidate
143019 143019_F 143019_FTK_PH0
143019_F_FTK_PH0 F N Backup
AA_Site24 AA_Site24_X
SAR with Active Candidate
143019 143019_X143019_Colo_PH0
143019_X_Colo_PH0 X Y Active
AA_Site240 AA_Site240_0
SAR with Active Candidate
142016 142016_0
142016_Nominal_PH0
142016_0_Nominal_PH0 0 N Nominal
AA_Site240 AA_Site240_A
SAR with Active Candidate
142016 142016_A142016_FTK_PH0
142016_A_FTK_PH0 A N Backup
AA_Site240 AA_Site240_B
SAR with Active Candidate
142016 142016_B 142016_FTK_PH0
142016_B_FTK_PH0 B N Backup
AA_Site240 AA_Site240_D
SAR with Active Candidate
142016 142016_D142016_FTK_PH0
142016_D_FTK_PH0 D Y Active
AA_Site242 AA_Site242_0
SAR with Active Candidate
141010 141010_0
141010_Nominal_PH0
141010_0_Nominal_PH0 0 N Nominal
AA_Site242 AA_Site242_A
SAR with Active Candidate
141010 141010_A141010_FTK_PH0
141010_A_FTK_PH0 A Y Active
AA_Site242 AA_Site242_B
SAR with Active Candidate
141010 141010_B 141010_FTK_PH0
141010_B_FTK_PH0 B N Backup
AA_Site243 AA_Site243_0
SAR with Active Candidate
149008 149008_0
149008_Nominal_PH0
149008_0_Nominal_PH0 0 N Nominal
AA_Site243 AA_Site243_A
SAR with Active Candidate
149008 149008_A149008_FTK_PH0
149008_A_FTK_PH0 A N Rejected
AA_Site243 AA_Site243_B
SAR with Active Candidate
149008 149008_B 149008_FTK_PH0
149008_B_FTK_PH0 B N Backup
AA_Site243 AA_Site243_C
SAR with Active Candidate
149008 149008_C 149008_FTK_PH0
149008_C_FTK_PH0 C N Rejected
AA_Site243 AA_Site243_D
SAR with Active Candidate
149008 149008_D149008_FTK_PH0
149008_D_FTK_PH0 D Y Active
AA_Site245 AA_Site245_0
SAR with Active Candidate
141012 141012_0
141012_Nominal_PH0
141012_0_Nominal_PH0 0 N Nominal
AA_Site245 AA_Site245_B
SAR with Active Candidate
141012 141012_B 141012_FTK_PH0
141012_B_FTK_PH0 B N Rejected
AA_Site245 AA_Site245_C
SAR with Active Candidate
141012 141012_C 141012_FTK_PH0
141012_C_FTK_PH0 C N Rejected
AA_Site245 AA_Site245_D
SAR with Active Candidate
141012 141012_D141012_FTK_PH0
141012_D_FTK_PH0 D N Rejected
AA_Site245 AA_Site245_E
SAR with Active Candidate
141012 141012_E 141012_FTK_PH0
141012_E_FTK_PH0 E N Rejected
AA_Site245 AA_Site245_X
SAR with Active Candidate
141012 141012_X141012_Colo_PH0
141012_X_Colo_PH0 X Y Active
AA_Site249 AA_Site249_0
SAR with Active Candidate
141014 141014_0
141014_Nominal_PH0
141014_0_Nominal_PH0 0 Nominal_Replacement
N with Y0_141005
AA_Site249 AA_Site249_X
SAR with Active Candidate
141014 141014_X141014_Colo_PH0
141014_X_Colo_PH0 X Y Active
AA_Site249 AA_Site249_A
SAR with Active Candidate
141014 141014_A141014_FTK_PH0
141014_A_FTK_PH0 A N Backup
AA_Site249 AA_Site249_B
SAR with Active Candidate
141014 141014_B 141014_FTK_PH0
141014_B_FTK_PH0 B N Backup
AA_Site249 AA_Site249_C
SAR with Active Candidate
141014 141014_C 141014_FTK_PH0
141014_C_FTK_PH0 C N Backup
AA_Site25 AA_Site25_0
SAR with Active Candidate
146008 146008_0
146008_Nominal_PH0
146008_0_Nominal_PH0 0 N Nominal
AA_Site25 AA_Site25_A
SAR with Active Candidate
146008 146008_A146008_FTK_PH0
146008_A_FTK_PH0 A N Rejected
AA_Site25 AA_Site25_B
SAR with Active Candidate
146008 146008_B 146008_FTK_PH0
146008_B_FTK_PH0 B N Rejected
AA_Site25 AA_Site25_C
SAR with Active Candidate
146008 146008_C 146008_FTK_PH0
146008_C_FTK_PH0 C N Rejected
AA_Site25 AA_Site25_D
SAR with Active Candidate
146008 146008_D146008_FTK_PH0
146008_D_FTK_PH0 D Y Active
AA_Site250 AA_Site250_0
SAR with Active Candidate
144141 144141_0
144141_Nominal_PH0
144141_0_Nominal_PH0 0 Site N
ID changed from 145004 to 144141
AA_Site250 AA_Site250_A
SAR with Active Candidate
144141 144141_A144141_FTK_PH0
144141_A_FTK_PH0 A Site N
ID changed from 145004 to 144141
AA_Site250 AA_Site250_B
SAR with Active Candidate
144141 144141_B 144141_FTK_PH0
144141_B_FTK_PH0 B Site N
ID changed from 145004 to 144141
AA_Site250 AA_Site250_C
SAR with Active Candidate
144141 144141_C 144141_FTK_PH0
144141_C_FTK_PH0 C Site N
ID changed from 145004 to 144141
AA_Site250 AA_Site250_D
SAR with Active Candidate
144141 144141_D144141_FTK_PH0
144141_D_FTK_PH0 D Y Active
AA_Site251 AA_Site251_0
SAR with Active Candidate
141015 141015_0
141015_Nominal_PH0
141015_0_Nominal_PH0 0 N Nominal
AA_Site251 AA_Site251_A
SAR with Active Candidate
141015 141015_A141015_FTK_PH0
141015_A_FTK_PH0 A N Rejected
AA_Site251 AA_Site251_B
SAR with Active Candidate
141015 141015_B 141015_FTK_PH0
141015_B_FTK_PH0 B N Backup
AA_Site251 AA_Site251_C
SAR with Active Candidate
141015 141015_C 141015_FTK_PH0
141015_C_FTK_PH0 C Y Active
AA_Site252 AA_Site252_0
SAR with Active Candidate
141054 141054_0
141054_Nominal_PH0
141054_0_Nominal_PH0 0 N Nominal
AA_Site252 AA_Site252_A
SAR with Active Candidate
141054 141054_A141054_FTK_PH0
141054_A_FTK_PH0 A N Rejected
AA_Site252 AA_Site252_B
SAR with Active Candidate
141054 141054_B 141054_FTK_PH0
141054_B_FTK_PH0 B Y Active
AA_Site252 AA_Site252_P
SAR with Active Candidate
141054 141054_P 141054_FTK_PH0
141054_P_FTK_PH0 P N Backup
AA_Site253 AA_Site253_0
SAR with Active Candidate
141016 141016_0
141016_Nominal_PH0
141016_0_Nominal_PH0 0 N Nominal
AA_Site253 AA_Site253_A
SAR with Active Candidate
141016 141016_A141016_FTK_PH0
141016_A_FTK_PH0 A N Backup
AA_Site253 AA_Site253_B
SAR with Active Candidate
141016 141016_B 141016_FTK_PH0
141016_B_FTK_PH0 B N Rejected
AA_Site253 AA_Site253_X
SAR with Active Candidate
141016 141016_X141016_Colo_PH0
141016_X_Colo_PH0 X Y Active
AA_Site254 AA_Site254_0
SAR with Active Candidate
141017 141017_0
141017_Nominal_PH0
141017_0_Nominal_PH0 0 N Nominal
AA_Site254 AA_Site254_A
SAR with Active Candidate
141017 141017_A141017_FTK_PH0
141017_A_FTK_PH0 A N Backup
AA_Site254 AA_Site254_B
SAR with Active Candidate
141017 141017_B 141017_FTK_PH0
141017_B_FTK_PH0 B N Rejected
AA_Site254 AA_Site254_C
SAR with Active Candidate
141017 141017_C 141017_FTK_PH0
141017_C_FTK_PH0 C Y Active
AA_site255 AA_site255_0
SAR with Active Candidate
141018 141018_0
141018_Nominal_PH0
141018_0_Nominal_PH0 0 N Nominal
AA_site255 AA_site255_A
SAR with Active Candidate
141018 141018_A141018_FTK_PH0
141018_A_FTK_PH0 A Y Active
AA_site255 AA_site255_B
SAR with Active Candidate
141018 141018_B 141018_FTK_PH0
141018_B_FTK_PH0 B N Backup
AA_Site261 AA_Site261_0
SAR with Active Candidate
141020 141020_0
141020_Nominal_PH0
141020_0_Nominal_PH0 0 N Nominal
AA_Site261 AA_Site261_A
SAR with Active Candidate
141020 141020_A141020_FTK_PH0
141020_A_FTK_PH0 A N Backup
AA_Site261 AA_Site261_B
SAR with Active Candidate
141020 141020_B 141020_FTK_PH0
141020_B_FTK_PH0 B N Backup
AA_Site261 AA_Site261_D
SAR with Active Candidate
141020 141020_D141020_FTK_PH0
141020_D_FTK_PH0 D Y Active
AA_Site261 AA_Site261_C
SAR with Active Candidate
141020 141020_C 141020_FTK_PH0
141020_C_FTK_PH0 C N Backup
AA_Site262 AA_Site262_0
SAR with Active Candidate
141021 141021_0
141021_Nominal_PH0
141021_0_Nominal_PH0 0 N Nominal
AA_Site262 AA_Site262_A
SAR with Active Candidate
141021 141021_A141021_FTK_PH0
141021_A_FTK_PH0 A Y Active
AA_Site262 AA_Site262_B
SAR with Active Candidate
141021 141021_B 141021_FTK_PH0
141021_B_FTK_PH0 B N Rejected
AA_Site266 AA_Site266_0
SAR with Active Candidate
141022 141022_0
141022_Nominal_PH0
141022_0_Nominal_PH0 0 N Nominal
AA_Site266 AA_Site266_A
SAR with Active Candidate
141022 141022_A141022_FTK_PH0
141022_A_FTK_PH0 A N Rejected
AA_Site266 AA_Site266_B
SAR with Active Candidate
141022 141022_B 141022_FTK_PH0
141022_B_FTK_PH0 B N Rejected
AA_Site266 AA_Site266_C
SAR with Active Candidate
141022 141022_C 141022_FTK_PH0
141022_C_FTK_PH0 C N Backup
AA_Site266 AA_Site266_D
SAR with Active Candidate
141022 141022_D141022_FTK_PH0
141022_D_FTK_PH0 D Y Active
AA_Site267 AA_Site267_0
SAR with Active Candidate
144021 144021_0
144021_Nominal_PH0
144021_0_Nominal_PH0 0 N Nominal
AA_Site267 AA_Site267_A
SAR with Active Candidate
144021 144021_A144021_FTK_PH0
144021_A_FTK_PH0 A N Backup
AA_Site267 AA_Site267_B
SAR with Active Candidate
144021 144021_B 144021_FTK_PH0
144021_B_FTK_PH0 B Y Active
AA_Site267 AA_Site267_C
SAR with Active Candidate
144021 144021_C 144021_FTK_PH0
144021_C_FTK_PH0 C N Backup
AA_Site267 AA_Site267_D
SAR with Active Candidate
144021 144021_D144021_FTK_PH0
144021_D_FTK_PH0 D N Backup
AA_Site27 AA_Site27_0
SAR with Active Candidate
141057 141057_0
141057_Nominal_PH0
141057_0_Nominal_PH0 0 N Nominal
AA_Site27 AA_Site27_A
SAR with Active Candidate
141057 141057_A141057_FTK_PH0
141057_A_FTK_PH0 A N Rejected
AA_Site27 AA_Site27_B
SAR with Active Candidate
141057 141057_B 141057_FTK_PH0
141057_B_FTK_PH0 B N Rejected
AA_Site27 AA_Site27_C
SAR with Active Candidate
141057 141057_C 141057_FTK_PH0
141057_C_FTK_PH0 C N Backup
AA_Site27 AA_Site27_D
SAR with Active Candidate
141057 141057_D141057_FTK_PH0
141057_D_FTK_PH0 D Y Active
AA_Site27 AA_Site27_E
SAR with Active Candidate
141057 141057_E 141057_FTK_PH0
141057_E_FTK_PH0 E N Backup
AA_Site272 AA_Site272_0
SAR with Active Candidate
141025 141025_0
141025_Nominal_PH0
141025_0_Nominal_PH0 0 N Nominal
AA_Site272 AA_Site272_A
SAR with Active Candidate
141025 141025_A141025_FTK_PH0
141025_A_FTK_PH0 A N Rejected
AA_Site272 AA_Site272_B
SAR with Active Candidate
141025 141025_B 141025_FTK_PH0
141025_B_FTK_PH0 B N Backup
AA_Site272 AA_Site272_C
SAR with Active Candidate
141025 141025_C 141025_FTK_PH0
141025_C_FTK_PH0 C Y Active
AA_Site273 AA_Site273_0
SAR with Active Candidate
141026 141026_0
141026_Nominal_PH0
141026_0_Nominal_PH0 0 N Nominal
AA_Site273 AA_Site273_A
SAR with Active Candidate
141026 141026_A141026_FTK_PH0
141026_A_FTK_PH0 A N Backup
AA_Site273 AA_Site273_C
SAR with Active Candidate
141026 141026_C 141026_FTK_PH0
141026_C_FTK_PH0 C N Rejected
AA_Site273 AA_Site273_X
SAR with Active Candidate
141026 141026_X141026_Colo_PH0
141026_X_Colo_PH0 X Y Active
AA_Site276 AA_Site276_0
SAR with Active Candidate
144022 144022_0
144022_Nominal_PH0
144022_0_Nominal_PH0 0 N Nominal
AA_Site276 AA_Site276_A
SAR with Active Candidate
144022 144022_A144022_FTK_PH0
144022_A_FTK_PH0 A Y Active
AA_Site278 AA_Site278_0
SAR with Active Candidate
142017 142017_0
142017_Nominal_PH0
142017_0_Nominal_PH0 0 N Nominal
AA_Site278 AA_Site278_A
SAR with Active Candidate
142017 142017_A142017_FTK_PH0
142017_A_FTK_PH0 A N Rejected
AA_Site278 AA_Site278_C
SAR with Active Candidate
142017 142017_C 142017_FTK_PH0
142017_C_FTK_PH0 C N Rejected
AA_Site278 AA_Site278_D
SAR with Active Candidate
142017 142017_D142017_FTK_PH0
142017_D_FTK_PH0 D N Backup
AA_Site278 AA_Site278_E
SAR with Active Candidate
142017 142017_E 142017_FTK_PH0
142017_E_FTK_PH0 E N Rejected
AA_Site278 AA_Site278_F
SAR with Active Candidate
142017 142017_F 142017_FTK_PH0
142017_F_FTK_PH0 F Y Active
AA_Site278 AA_Site278_B
SAR with Active Candidate
142017 142017_B 142017_FTK_PH0
142017_B_FTK_PH0 B N Rejected
AA_Site279 AA_Site279_0
SAR with Active Candidate
142018 142018_0
142018_Nominal_PH0
142018_0_Nominal_PH0 0 N Nominal
AA_Site279 AA_Site279_A
SAR with Active Candidate
142018 142018_A142018_FTK_PH0
142018_A_FTK_PH0 A N Rejected
AA_Site279 AA_Site279_B
SAR with Active Candidate
142018 142018_B 142018_FTK_PH0
142018_B_FTK_PH0 B N Rejected
AA_Site279 AA_Site279_C
SAR with Active Candidate
142018 142018_C 142018_FTK_PH0
142018_C_FTK_PH0 C Y Active
AA_Site28 AA_Site28_0
SAR with Active Candidate
145005 145005_0
145005_Nominal_PH0
145005_0_Nominal_PH0 0 N Nominal
AA_Site28 AA_Site28_A
SAR with Active Candidate
145005 145005_A145005_FTK_PH0
145005_A_FTK_PH0 A N Rejected
AA_Site28 AA_Site28_B
SAR with Active Candidate
145005 145005_B 145005_FTK_PH0
145005_B_FTK_PH0 B N Rejected
AA_Site28 AA_Site28_C
SAR with Active Candidate
145005 145005_C 145005_FTK_PH0
145005_C_FTK_PH0 C N Backup
AA_Site28 AA_Site28_D
SAR with Active Candidate
145005 145005_D145005_FTK_PH0
145005_D_FTK_PH0 D N Rejected
AA_Site28 AA_Site28_E
SAR with Active Candidate
145005 145005_E 145005_FTK_PH0
145005_E_FTK_PH0 E Y Active
AA_Site280 AA_Site280_0
SAR with Active Candidate
149009 149009_0
149009_Nominal_PH0
149009_0_Nominal_PH0 0 N Nominal
AA_Site280 AA_Site280_A
SAR with Active Candidate
149009 149009_A149009_FTK_PH0
149009_A_FTK_PH0 A N Rejected
AA_Site280 AA_Site280_B
SAR with Active Candidate
149009 149009_B 149009_FTK_PH0
149009_B_FTK_PH0 B N Rejected
AA_Site280 AA_Site280_D
SAR with Active Candidate
149009 149009_D149009_FTK_PH0
149009_D_FTK_PH0 D N Rejected
AA_Site280 AA_Site280_E
SAR with Active Candidate
149009 149009_E 149009_FTK_PH0
149009_E_FTK_PH0 E N Rejected
AA_Site280 AA_Site280_C
SAR with Active Candidate
149009 149009_C 149009_FTK_PH0
149009_C_FTK_PH0 C N Rejected
AA_Site281 AA_Site281_0
SAR with Active Candidate
142019 142019_0
142019_Nominal_PH0
142019_0_Nominal_PH0 0 N Nominal
AA_Site281 AA_Site281_A
SAR with Active Candidate
142019 142019_A142019_FTK_PH0
142019_A_FTK_PH0 A N Rejected
AA_Site281 AA_Site281_B
SAR with Active Candidate
142019 142019_B 142019_FTK_PH0
142019_B_FTK_PH0 B N Backup
AA_Site281 AA_Site281_C
SAR with Active Candidate
142019 142019_C 142019_FTK_PH0
142019_C_FTK_PH0 C Y Active
AA_Site282 AA_Site282_0
SAR with Active Candidate
142020 142020_0
142020_Nominal_PH0
142020_0_Nominal_PH0 0 N Nominal
AA_Site282 AA_Site282_A
SAR with Active Candidate
142020 142020_A142020_FTK_PH0
142020_A_FTK_PH0 A N Backup
AA_Site282 AA_Site282_B
SAR with Active Candidate
142020 142020_B 142020_FTK_PH0
142020_B_FTK_PH0 B N Rejected
AA_Site282 AA_Site282_C
SAR with Active Candidate
142020 142020_C 142020_FTK_PH0
142020_C_FTK_PH0 C Y Active
AA_Site283 AA_Site283_0
SAR with Active Candidate
142021 142021_0
142021_Nominal_PH0
142021_0_Nominal_PH0 0 N Nominal
AA_Site283 AA_Site283_A
SAR with Active Candidate
142021 142021_A142021_FTK_PH0
142021_A_FTK_PH0 A N Backup
AA_Site283 AA_Site283_B
SAR with Active Candidate
142021 142021_B 142021_FTK_PH0
142021_B_FTK_PH0 B Y Active
AA_Site284 AA_Site284_0
SAR with Active Candidate
146009 146009_0
146009_Nominal_PH0
146009_0_Nominal_PH0 0 N Nominal
AA_Site284 AA_Site284_A
SAR with Active Candidate
146009 146009_A146009_FTK_PH0
146009_A_FTK_PH0 A N Rejected
AA_Site284 AA_Site284_B
SAR with Active Candidate
146009 146009_B 146009_FTK_PH0
146009_B_FTK_PH0 B N Rejected
AA_Site284 AA_Site284_C
SAR with Active Candidate
146009 146009_C 146009_FTK_PH0
146009_C_FTK_PH0 C Y Active
AA_Site284 AA_Site284_D
SAR with Active Candidate
146009 146009_D146009_FTK_PH0
146009_D_FTK_PH0 D N Rejected
AA_Site285 AA_Site285_0
SAR with Active Candidate
142022 142022_0
142022_Nominal_PH0
142022_0_Nominal_PH0 0 N Nominal
AA_Site285 AA_Site285_A
SAR with Active Candidate
142022 142022_A142022_FTK_PH0
142022_A_FTK_PH0 A N Rejected
AA_Site285 AA_Site285_B
SAR with Active Candidate
142022 142022_B 142022_FTK_PH0
142022_B_FTK_PH0 B N Backup
AA_Site285 AA_Site285_C
SAR with Active Candidate
142022 142022_C 142022_FTK_PH0
142022_C_FTK_PH0 C N Backup
AA_Site285 AA_Site285_D
SAR with Active Candidate
142022 142022_D142022_FTK_PH0
142022_D_FTK_PH0 D Y Active
AA_Site285 AA_Site285_P
SAR with Active Candidate
142022 142022_P 142022_FTK_PH0
142022_P_FTK_PH0 P N Rejected
AA_Site286 AA_Site286_0
SAR with Active Candidate
144023 144023_0
144023_Nominal_PH0
144023_0_Nominal_PH0 0 N Nominal
AA_Site286 AA_Site286_A
SAR with Active Candidate
144023 144023_A144023_FTK_PH0
144023_A_FTK_PH0 A N Backup
AA_Site286 AA_Site286_B
SAR with Active Candidate
144023 144023_B 144023_FTK_PH0
144023_B_FTK_PH0 B N Backup
AA_Site286 AA_Site286_C
SAR with Active Candidate
144023 144023_C 144023_FTK_PH0
144023_C_FTK_PH0 C N Backup
AA_Site286 AA_Site286_X
SAR with Active Candidate
144023 144023_X144023_Colo_PH0
144023_X_Colo_PH0 X Y Active
AA_Site287 AA_Site287_0
SAR with Active Candidate
146010 146010_0
146010_Nominal_PH0
146010_0_Nominal_PH0 0 N Nominal
AA_Site287 AA_Site287_A
SAR with Active Candidate
146010 146010_A146010_FTK_PH0
146010_A_FTK_PH0 A N Backup
AA_Site287 AA_Site287_B
SAR with Active Candidate
146010 146010_B 146010_FTK_PH0
146010_B_FTK_PH0 B N Backup
AA_Site287 AA_Site287_C
SAR with Active Candidate
146010 146010_C 146010_FTK_PH0
146010_C_FTK_PH0 C Y Active
AA_Site289 AA_Site289_0
SAR with Active Candidate
146011 146011_0
146011_Nominal_PH0
146011_0_Nominal_PH0 0 N Nominal
AA_Site289 AA_Site289_A
SAR with Active Candidate
146011 146011_A146011_FTK_PH0
146011_A_FTK_PH0 A N Rejected
AA_Site289 AA_Site289_B
SAR with Active Candidate
146011 146011_B 146011_FTK_PH0
146011_B_FTK_PH0 B N Rejected
AA_Site289 AA_Site289_C
SAR with Active Candidate
146011 146011_C 146011_FTK_PH0
146011_C_FTK_PH0 C N Rejected
AA_Site289 AA_Site289_D
SAR with Active Candidate
146011 146011_D146011_FTK_PH0
146011_D_FTK_PH0 D N Backup
AA_Site289 AA_Site289_X
SAR with Active Candidate
146011 146011_X146011_Colo_PH0
146011_X_Colo_PH0 X Y Active
AA_Site29 AA_Site29_0
SAR with Active Candidate
148005 148005_0
148005_Nominal_PH0
148005_0_Nominal_PH0 0 N Nominal
AA_Site29 AA_Site29_A
SAR with Active Candidate
148005 148005_A148005_FTK_PH0
148005_A_FTK_PH0 A N Rejected
AA_Site29 AA_Site29_B
SAR with Active Candidate
148005 148005_B 148005_FTK_PH0
148005_B_FTK_PH0 B N Rejected
AA_Site29 AA_Site29_X
SAR with Active Candidate
148005 148005_X148005_Colo_PH0
148005_X_Colo_PH0 X Y Active
AA_Site290 AA_Site290_0
SAR with Active Candidate
146012 146012_0
146012_Nominal_PH0
146012_0_Nominal_PH0 0 N Nominal
AA_Site290 AA_Site290_A
SAR with Active Candidate
146012 146012_A146012_FTK_PH0
146012_A_FTK_PH0 A N Backup
AA_Site290 AA_Site290_B
SAR with Active Candidate
146012 146012_B 146012_FTK_PH0
146012_B_FTK_PH0 B N Rejected
AA_Site290 AA_Site290_D
SAR with Active Candidate
146012 146012_D146012_FTK_PH0
146012_D_FTK_PH0 D Y Active
AA_Site291 AA_Site291_0
SAR with Active Candidate
146013 146013_0
146013_Nominal_PH0
146013_0_Nominal_PH0 0 N Nominal
AA_Site291 AA_Site291_A
SAR with Active Candidate
146013 146013_A146013_FTK_PH0
146013_A_FTK_PH0 A N Rejected
AA_Site291 AA_Site291_B
SAR with Active Candidate
146013 146013_B 146013_FTK_PH0
146013_B_FTK_PH0 B N Rejected
AA_Site291 AA_Site291_C
SAR with Active Candidate
146013 146013_C 146013_FTK_PH0
146013_C_FTK_PH0 C N Rejected
AA_Site291 AA_Site291_D
SAR with Active Candidate
146013 146013_D146013_FTK_PH0
146013_D_FTK_PH0 D N Rejected
AA_Site291 AA_Site291_X
SAR with Active Candidate
146013 146013_X146013_Colo_PH0
146013_X_Colo_PH0 X Y Active
AA_Site292 AA_Site292_0
SAR with Active Candidate
146014 146014_0
146014_Nominal_PH0
146014_0_Nominal_PH0 0 N Nominal
AA_Site292 AA_Site292_A
SAR with Active Candidate
146014 146014_A146014_FTK_PH0
146014_A_FTK_PH0 A N Rejected
AA_Site292 AA_Site292_B
SAR with Active Candidate
146014 146014_B 146014_FTK_PH0
146014_B_FTK_PH0 B N Rejected
AA_Site292 AA_Site292_C
SAR with Active Candidate
146014 146014_C 146014_FTK_PH0
146014_C_FTK_PH0 C N Rejected
AA_Site292 AA_Site292_T
SAR with Active Candidate
146014 146014_T 146014_FTK_PH0
146014_T_FTK_PH0 T N Rejected
AA_Site293 AA_Site293_A
SAR with No Active Candidate
146015 146015_A146015_FTK_PH0
146015_A_FTK_PH0 A N Rejected
AA_Site293 AA_Site293_B
SAR with Active Candidate
146015 146015_B 146015_FTK_PH0
146015_B_FTK_PH0 B N Rejected
AA_Site294 AA_Site294_0
SAR with Active Candidate
145006 145006_0
145006_Nominal_PH0
145006_0_Nominal_PH0 0 N Nominal
AA_Site294 AA_Site294_A
SAR with Active Candidate
145006 145006_A145006_FTK_PH0
145006_A_FTK_PH0 A N Backup
AA_Site294 AA_Site294_B
SAR with Active Candidate
145006 145006_B 145006_FTK_PH0
145006_B_FTK_PH0 B N Backup
AA_Site294 AA_Site294_C
SAR with Active Candidate
145006 145006_C 145006_FTK_PH0
145006_C_FTK_PH0 C N Rejected
AA_Site294 AA_Site294_X
SAR with Active Candidate
145006 145006_X145006_Colo_PH0
145006_X_Colo_PH0 X Y Active
AA_Site295 AA_Site295_0
SAR with Active Candidate
145007 145007_0
145007_Nominal_PH0
145007_0_Nominal_PH0 0 N Nominal
AA_Site295 AA_Site295_A
SAR with Active Candidate
145007 145007_A145007_FTK_PH0
145007_A_FTK_PH0 A Y Active
AA_Site295 AA_Site295_B
SAR with Active Candidate
145007 145007_B 145007_FTK_PH0
145007_B_FTK_PH0 B N Backup
AA_Site296 AA_Site296_0
SAR with Active Candidate
149010 149010_0
149010_Nominal_PH0
149010_0_Nominal_PH0 0 N Nominal
AA_Site296 AA_Site296_A
SAR with Active Candidate
149010 149010_A149010_FTK_PH0
149010_A_FTK_PH0 A N Backup
AA_Site296 AA_Site296_B
SAR with Active Candidate
149010 149010_B 149010_FTK_PH0
149010_B_FTK_PH0 B N Rejected
AA_Site296 AA_Site296_C
SAR with Active Candidate
149010 149010_C 149010_FTK_PH0
149010_C_FTK_PH0 C N Backup
AA_Site297 AA_Site297_0
SAR with Active Candidate
148006 148006_0
148006_Nominal_PH0
148006_0_Nominal_PH0 0 N Nominal
AA_Site297 AA_Site297_A
SAR with Active Candidate
148006 148006_A148006_FTK_PH0
148006_A_FTK_PH0 A N Backup
AA_Site297 AA_Site297_B
SAR with Active Candidate
148006 148006_B 148006_FTK_PH0
148006_B_FTK_PH0 B Y Active
AA_Site298 AA_Site298_0
SAR with Active Candidate
148007 148007_0
148007_Nominal_PH0
148007_0_Nominal_PH0 0 N Nominal
AA_Site298 AA_Site298_A
SAR with Active Candidate
148007 148007_A148007_FTK_PH0
148007_A_FTK_PH0 A Y Active
AA_Site298 AA_Site298_B
SAR with Active Candidate
148007 148007_B 148007_FTK_PH0
148007_B_FTK_PH0 B N Backup
AA_Site299 AA_Site299_A
SAR with Active Candidate
143020 143020_A143020_FTK_PH0
143020_A_FTK_PH0 A N Backup
AA_Site299 AA_Site299_B
SAR with Active Candidate
143020 143020_B 143020_FTK_PH0
143020_B_FTK_PH0 B Y Active
AA_Site3 AA_Site3_0
SAR with Active Candidate
142024 142024_0
142024_Nominal_PH0
142024_0_Nominal_PH0 0 N Nominal
AA_Site3 AA_Site3_B
SAR with Active Candidate
142024 142024_B 142024_FTK_PH0
142024_B_FTK_PH0 B N Rejected
AA_Site3 AA_Site3_C
SAR with Active Candidate
142024 142024_C 142024_FTK_PH0
142024_C_FTK_PH0 C N Rejected
AA_Site3 AA_Site3_D
SAR with Active Candidate
142024 142024_D142024_FTK_PH0
142024_D_FTK_PH0 D Y Active
AA_Site300 AA_Site300_0
SAR with Active Candidate
148008 148008_0
148008_Nominal_PH0
148008_0_Nominal_PH0 0 N Nominal
AA_Site300 AA_Site300_A
SAR with Active Candidate
148008 148008_A148008_FTK_PH0
148008_A_FTK_PH0 A N Rejected
AA_Site300 AA_Site300_B
SAR with Active Candidate
148008 148008_B 148008_FTK_PH0
148008_B_FTK_PH0 B N Rejected
AA_Site300 AA_Site300_X
SAR with Active Candidate
148008 148008_X148008_Colo_PH0
148008_X_Colo_PH0 X Y Active
AA_Site301 AA_Site301_0
SAR with Active Candidate
149011 149011_0
149011_Nominal_PH0
149011_0_Nominal_PH0 0 N Nominal
AA_Site301 AA_Site301_A
SAR with Active Candidate
149011 149011_A149011_FTK_PH0
149011_A_FTK_PH0 A N Rejected
AA_Site301 AA_Site301_B
SAR with Active Candidate
149011 149011_B 149011_FTK_PH0
149011_B_FTK_PH0 B N Rejected
AA_Site301 AA_Site301_C
SAR with Active Candidate
149011 149011_C 149011_FTK_PH0
149011_C_FTK_PH0 C N Backup
AA_Site301 AA_Site301_X
SAR with Active Candidate
149011 149011_X149011_Colo_PH0
149011_X_Colo_PH0 X Y Active
AA_Site302 AA_Site302_0
SAR with Active Candidate
140006 140006_0
140006_Nominal_PH0
140006_0_Nominal_PH0 0 N Nominal
AA_Site302 AA_Site302_A
SAR with Active Candidate
140006 140006_A140006_FTK_PH0
140006_A_FTK_PH0 A N Rejected
AA_Site302 AA_Site302_B
SAR with Active Candidate
140006 140006_B 140006_FTK_PH0
140006_B_FTK_PH0 B Y Active
AA_Site302 AA_Site302_C
SAR with Active Candidate
140006 140006_C 140006_FTK_PH0
140006_C_FTK_PH0 C N Backup
AA_Site302 AA_Site302_D
SAR with Active Candidate
140006 140006_D140006_FTK_PH0
140006_D_FTK_PH0 D N Backup
AA_Site303 AA_Site303_0
SAR with Active Candidate
140007 140007_0
140007_Nominal_PH0
140007_0_Nominal_PH0 0 N Nominal
AA_Site303 AA_Site303_A
SAR with Active Candidate
140007 140007_A140007_FTK_PH0
140007_A_FTK_PH0 A N Backup
AA_Site303 AA_Site303_C
SAR with Active Candidate
140007 140007_C 140007_FTK_PH0
140007_C_FTK_PH0 C Y Active
AA_Site303 AA_Site303_B
SAR with Active Candidate
140007 140007_B 140007_FTK_PH0
140007_B_FTK_PH0 B N Rejected
AA_Site304 AA_Site304_0
SAR with Active Candidate
149012 149012_0
149012_Nominal_PH0
149012_0_Nominal_PH0 0 N Nominal
AA_Site304 AA_Site304_A
SAR with Active Candidate
149012 149012_A149012_FTK_PH0
149012_A_FTK_PH0 A N Rejected
AA_Site304 AA_Site304_B
SAR with Active Candidate
149012 149012_B 149012_FTK_PH0
149012_B_FTK_PH0 B N Rejected
AA_Site304 AA_Site304_C
SAR with Active Candidate
149012 149012_C 149012_FTK_PH0
149012_C_FTK_PH0 C Y Active
AA_Site305 AA_Site305_0
SAR with Active Candidate
140025 140025_0
140025_Nominal_PH0
140025_0_Nominal_PH0 0 N Nominal
AA_Site305 AA_Site305_A
SAR with Active Candidate
140025 140025_A140025_FTK_PH0
140025_A_FTK_PH0 A Y Active
AA_Site305 AA_Site305_B
SAR with Active Candidate
140025 140025_B 140025_FTK_PH0
140025_B_FTK_PH0 B N Backup
AA_Site306 AA_Site306_0
SAR with Active Candidate
140008 140008_0
140008_Nominal_PH0
140008_0_Nominal_PH0 0 N Nominal
AA_Site306 AA_Site306_A
SAR with Active Candidate
140008 140008_A140008_FTK_PH0
140008_A_FTK_PH0 A N Rejected
AA_Site306 AA_Site306_B
SAR with Active Candidate
140008 140008_B 140008_FTK_PH0
140008_B_FTK_PH0 B N Rejected
AA_Site306 AA_Site306_D
SAR with Active Candidate
140008 140008_D140008_FTK_PH0
140008_D_FTK_PH0 D N Backup
AA_Site306 AA_Site306_X
SAR with Active Candidate
140008 140008_X140008_Colo_PH0
140008_X_Colo_PH0 X Y Active
AA_Site308 AA_Site308_0
SAR with Active Candidate
143021 143021_0
143021_Nominal_PH0
143021_0_Nominal_PH0 0 N Nominal
AA_Site308 AA_Site308_A
SAR with Active Candidate
143021 143021_A143021_FTK_PH0
143021_A_FTK_PH0 A N Backup
AA_Site308 AA_Site308_B
SAR with Active Candidate
143021 143021_B 143021_FTK_PH0
143021_B_FTK_PH0 B Y Active
AA_Site308 AA_Site308_C
SAR with Active Candidate
143021 143021_C 143021_FTK_PH0
143021_C_FTK_PH0 C N Backup
AA_Site309 AA_Site309_0
SAR with Active Candidate
143022 143022_0
143022_Nominal_PH0
143022_0_Nominal_PH0 0 N Nominal
AA_Site309 AA_Site309_A
SAR with Active Candidate
143022 143022_A143022_FTK_PH0
143022_A_FTK_PH0 A N Rejected
AA_Site309 AA_Site309_B
SAR with Active Candidate
143022 143022_B 143022_FTK_PH0
143022_B_FTK_PH0 B N Rejected
AA_Site309 AA_Site309_C
SAR with Active Candidate
143022 143022_C 143022_FTK_PH0
143022_C_FTK_PH0 C N Rejected
AA_Site309 AA_Site309_D
SAR with Active Candidate
143022 143022_D143022_FTK_PH0
143022_D_FTK_PH0 D N Rejected
AA_Site309 AA_Site309_E
SAR with Active Candidate
143022 143022_E 143022_FTK_PH0
143022_E_FTK_PH0 E N Backup
AA_Site309 AA_Site309_X
SAR with Active Candidate
143022 143022_X143022_Colo_PH0
143022_X_Colo_PH0 X Y Active
AA_Site31 AA_Site31_0
SAR with Active Candidate
143023 143023_0
143023_Nominal_PH0
143023_0_Nominal_PH0 0 N Nominal
AA_Site31 AA_Site31_A
SAR with Active Candidate
143023 143023_A143023_FTK_PH0
143023_A_FTK_PH0 A N Rejected
AA_Site31 AA_Site31_B
SAR with Active Candidate
143023 143023_B 143023_FTK_PH0
143023_B_FTK_PH0 B N Backup
AA_Site31 AA_Site31_C
SAR with Active Candidate
143023 143023_C 143023_FTK_PH0
143023_C_FTK_PH0 C N Rejected
AA_Site31 AA_Site31_D
SAR with Active Candidate
143023 143023_D143023_FTK_PH0
143023_D_FTK_PH0 D Y Active
AA_Site31 AA_Site31_E
SAR with Active Candidate
143023 143023_E 143023_FTK_PH0
143023_E_FTK_PH0 E N Rejected
AA_Site310 AA_Site310_0
SAR with Active Candidate
143024 143024_0
143024_Nominal_PH0
143024_0_Nominal_PH0 0 N Nominal
AA_Site310 AA_Site310_A
SAR with Active Candidate
143024 143024_A143024_FTK_PH0
143024_A_FTK_PH0 A N Backup
AA_Site310 AA_Site310_B
SAR with Active Candidate
143024 143024_B 143024_FTK_PH0
143024_B_FTK_PH0 B N Backup
AA_Site310 AA_Site310_C
SAR with Active Candidate
143024 143024_C 143024_FTK_PH0
143024_C_FTK_PH0 C Y Active
AA_Site311 AA_Site311_0
SAR with Active Candidate
143025 143025_0
143025_Nominal_PH0
143025_0_Nominal_PH0 0 N Nominal
AA_Site311 AA_Site311_A
SAR with Active Candidate
143025 143025_A143025_FTK_PH0
143025_A_FTK_PH0 A N Rejected
AA_Site311 AA_Site311_B
SAR with Active Candidate
143025 143025_B 143025_FTK_PH0
143025_B_FTK_PH0 B N Rejected
AA_Site311 AA_Site311_C
SAR with Active Candidate
143025 143025_C 143025_FTK_PH0
143025_C_FTK_PH0 C N Backup
AA_Site311 AA_Site311_D
SAR with Active Candidate
143025 143025_D143025_FTK_PH0
143025_D_FTK_PH0 D N Rejected
AA_Site311 AA_Site311_E
SAR with Active Candidate
143025 143025_E 143025_FTK_PH0
143025_E_FTK_PH0 E N Backup
AA_Site311 AA_Site311_X
SAR with Active Candidate
143025 143025_X143025_Colo_PH0
143025_X_Colo_PH0 X Y Active
AA_Site312 AA_Site312_0
SAR with Active Candidate
148009 148009_0
148009_Nominal_PH0
148009_0_Nominal_PH0 0 N Nominal
AA_Site312 AA_Site312_A
SAR with Active Candidate
148009 148009_A148009_FTK_PH0
148009_A_FTK_PH0 A Y Active
AA_Site312 AA_Site312_B
SAR with Active Candidate
148009 148009_B 148009_FTK_PH0
148009_B_FTK_PH0 B N Backup
AA_Site313 AA_Site313_0
SAR with Active Candidate
146016 146016_0
146016_Nominal_PH0
146016_0_Nominal_PH0 0 N Nominal
AA_Site313 AA_Site313_A
SAR with Active Candidate
146016 146016_A146016_FTK_PH0
146016_A_FTK_PH0 A Y Active
AA_Site313 AA_Site313_B
SAR with Active Candidate
146016 146016_B 146016_FTK_PH0
146016_B_FTK_PH0 B N Backup
AA_Site314 AA_Site314_0
SAR with Active Candidate
143026 143026_0
143026_Nominal_PH0
143026_0_Nominal_PH0 0 N Nominal
AA_Site314 AA_Site314_X
SAR with Active Candidate
143026 143026_X143026_Colo_PH0
143026_X_Colo_PH0 X Y Active
AA_Site314 AA_Site314_A
SAR with Active Candidate
143026 143026_A143026_FTK_PH0
143026_A_FTK_PH0 A N Backup
AA_Site314 AA_Site314_B
SAR with Active Candidate
143026 143026_B 143026_FTK_PH0
143026_B_FTK_PH0 B N Rejected
AA_Site314 AA_Site314_C
SAR with Active Candidate
143026 143026_C 143026_FTK_PH0
143026_C_FTK_PH0 C N Rejected
AA_Site32 AA_Site32_0
SAR with Active Candidate
144024 144024_0
144024_Nominal_PH0
144024_0_Nominal_PH0 0 N Nominal
AA_Site32 AA_Site32_A
SAR with Active Candidate
144024 144024_A144024_FTK_PH0
144024_A_FTK_PH0 A N Rejected
AA_Site32 AA_Site32_B
SAR with Active Candidate
144024 144024_B 144024_FTK_PH0
144024_B_FTK_PH0 B N Rejected
AA_Site32 AA_Site32_C
SAR with Active Candidate
144024 144024_C 144024_FTK_PH0
144024_C_FTK_PH0 C N Rejected
AA_Site32 AA_Site32_D
SAR with Active Candidate
144024 144024_D144024_FTK_PH0
144024_D_FTK_PH0 D N Rejected
AA_Site32 AA_Site32_E
SAR with Active Candidate
144024 144024_E 144024_FTK_PH0
144024_E_FTK_PH0 E N Rejected
AA_Site32 AA_Site32_X
SAR with Active Candidate
144024 144024_X144024_Colo_PH0
144024_X_Colo_PH0 X Y Active
AA_Site320 AA_Site320_0
SAR with Active Candidate
140010 140010_0
140010_Nominal_PH0
140010_0_Nominal_PH0 0 N Nominal
AA_Site320 AA_Site320_A
SAR with Active Candidate
140010 140010_A140010_FTK_PH0
140010_A_FTK_PH0 A N Rejected
AA_Site320 AA_Site320_B
SAR with Active Candidate
140010 140010_B 140010_FTK_PH0
140010_B_FTK_PH0 B N Backup
AA_Site320 AA_Site320_D
SAR with Active Candidate
140010 140010_D140010_FTK_PH0
140010_D_FTK_PH0 D N Backup
AA_Site320 AA_Site320_C
SAR with Active Candidate
140010 140010_C 140010_FTK_PH0
140010_C_FTK_PH0 C Y Active
AA_Site321 AA_Site321_0
SAR with Active Candidate
140011 140011_0
140011_Nominal_PH0
140011_0_Nominal_PH0 0 N Nominal
AA_Site321 AA_Site321_A
SAR with Active Candidate
140011 140011_A140011_FTK_PH0
140011_A_FTK_PH0 A N Backup
AA_Site321 AA_Site321_B
SAR with Active Candidate
140011 140011_B 140011_FTK_PH0
140011_B_FTK_PH0 B N Backup
AA_Site321 AA_Site321_C
SAR with Active Candidate
140011 140011_C 140011_FTK_PH0
140011_C_FTK_PH0 C N Rejected
AA_Site321 AA_Site321_D
SAR with Active Candidate
140011 140011_D140011_FTK_PH0
140011_D_FTK_PH0 D Y Active
AA_Site322 AA_Site322_0
SAR with Active Candidate
140012 140012_0
140012_Nominal_PH0
140012_0_Nominal_PH0 0 N Nominal
AA_Site322 AA_Site322_A
SAR with Active Candidate
140012 140012_A140012_FTK_PH0
140012_A_FTK_PH0 A N Backup
AA_Site322 AA_Site322_C
SAR with Active Candidate
140012 140012_C 140012_FTK_PH0
140012_C_FTK_PH0 C Y Active
AA_Site322 AA_Site322_D
SAR with Active Candidate
140012 140012_D140012_FTK_PH0
140012_D_FTK_PH0 D N Rejected
AA_Site322 AA_Site322_E
SAR with Active Candidate
140012 140012_E 140012_FTK_PH0
140012_E_FTK_PH0 E N Rejected
AA_Site322 AA_Site322_B
SAR with Active Candidate
140012 140012_B 140012_FTK_PH0
140012_B_FTK_PH0 B N Rejected
AA_Site323 AA_Site323_0
SAR with Active Candidate
140013 140013_0
140013_Nominal_PH0
140013_0_Nominal_PH0 0 N Nominal
AA_Site323 AA_Site323_A
SAR with Active Candidate
140013 140013_A140013_FTK_PH0
140013_A_FTK_PH0 A N Rejected
AA_Site323 AA_Site323_C
SAR with Active Candidate
140013 140013_C 140013_FTK_PH0
140013_C_FTK_PH0 C Y Active
AA_Site323 AA_Site323_B
SAR with Active Candidate
140013 140013_B 140013_FTK_PH0
140013_B_FTK_PH0 B N Rejected
AA_Site324 AA_Site324_0
SAR with Active Candidate
140014 140014_0
140014_Nominal_PH0
140014_0_Nominal_PH0 0 N Nominal
AA_Site324 AA_Site324_A
SAR with Active Candidate
140014 140014_A140014_FTK_PH0
140014_A_FTK_PH0 A N Rejected
AA_Site324 AA_Site324_B
SAR with Active Candidate
140014 140014_B 140014_FTK_PH0
140014_B_FTK_PH0 B N Backup
AA_Site324 AA_Site324_C
SAR with Active Candidate
140014 140014_C 140014_FTK_PH0
140014_C_FTK_PH0 C N Backup
AA_Site324 AA_Site324_X
SAR with Active Candidate
140014 140014_X140014_Colo_PH0
140014_X_Colo_PH0 X Y Active
AA_Site325 AA_Site325_0
SAR with Active Candidate
140015 140015_0
140015_Nominal_PH0
140015_0_Nominal_PH0 0 N Nominal
AA_Site325 AA_Site325_A
SAR with Active Candidate
140015 140015_A140015_FTK_PH0
140015_A_FTK_PH0 A N Backup
AA_Site325 AA_Site325_C
SAR with Active Candidate
140015 140015_C 140015_FTK_PH0
140015_C_FTK_PH0 C Y Active
AA_Site325 AA_Site325_D
SAR with Active Candidate
140015 140015_D140015_FTK_PH0
140015_D_FTK_PH0 D N Backup
AA_Site325 AA_Site325_B
SAR with Active Candidate
140015 140015_B 140015_FTK_PH0
140015_B_FTK_PH0 B N Backup
AA_Site326 AA_Site326_0
SAR with Active Candidate
147014 147014_0
147014_Nominal_PH0
147014_0_Nominal_PH0 0 N Nominal
AA_Site326 AA_Site326_A
SAR with Active Candidate
147014 147014_A147014_FTK_PH0
147014_A_FTK_PH0 A N Rejected
AA_Site326 AA_Site326_B
SAR with Active Candidate
147014 147014_B 147014_FTK_PH0
147014_B_FTK_PH0 B N Backup
AA_Site326 AA_Site326_C
SAR with Active Candidate
147014 147014_C 147014_FTK_PH0
147014_C_FTK_PH0 C N Backup
AA_Site326 AA_Site326_D
SAR with Active Candidate
147014 147014_D147014_FTK_PH0
147014_D_FTK_PH0 D N Rejected
AA_Site326 AA_Site326_X
SAR with Active Candidate
147014 147014_X147014_Colo_PH0
147014_X_Colo_PH0 X Y Active
AA_site327 AA_site327_0
SAR with Active Candidate
149013 149013_0
149013_Nominal_PH0
149013_0_Nominal_PH0 0 N Nominal
AA_site327 AA_site327_A
SAR with Active Candidate
149013 149013_A149013_FTK_PH0
149013_A_FTK_PH0 A N Backup
AA_site327 AA_site327_B
SAR with Active Candidate
149013 149013_B 149013_FTK_PH0
149013_B_FTK_PH0 B N Rejected
AA_site327 AA_site327_C
SAR with Active Candidate
149013 149013_C 149013_FTK_PH0
149013_C_FTK_PH0 C Y Active
AA_site328 AA_site328_A
SAR with Active Candidate
149014 149014_A149014_FTK_PH0
149014_A_FTK_PH0 A N Rejected
AA_site328 AA_site328_B
SAR with Active Candidate
149014 149014_B 149014_FTK_PH0
149014_B_FTK_PH0 B N Backup
AA_site328 AA_site328_C
SAR with Active Candidate
149014 149014_C 149014_FTK_PH0
149014_C_FTK_PH0 C N Rejected
AA_site328 AA_site328_D
SAR with Active Candidate
149014 149014_D149014_FTK_PH0
149014_D_FTK_PH0 D Y Active
AA_site328 AA_site328_T
SAR with Active Candidate
149014 149014_T 149014_FTK_PH0
149014_T_FTK_PH0 T N Rejected
AA_Site329 AA_Site329_0
SAR with Active Candidate
147015 147015_0
147015_Nominal_PH0
147015_0_Nominal_PH0 0 N Nominal
AA_Site329 AA_Site329_B
SAR with Active Candidate
147015 147015_B 147015_FTK_PH0
147015_B_FTK_PH0 B N Rejected
AA_Site329 AA_Site329_X
SAR with Active Candidate
147015 147015_X147015_Colo_PH0
147015_X_Colo_PH0 X Y Active
AA_Site330 AA_Site330_0
SAR with Active Candidate
146017 146017_0
146017_Nominal_PH0
146017_0_Nominal_PH0 0 N Nominal
AA_Site330 AA_Site330_A
SAR with Active Candidate
146017 146017_A146017_FTK_PH0
146017_A_FTK_PH0 A N Rejected
AA_Site330 AA_Site330_B
SAR with Active Candidate
146017 146017_B 146017_FTK_PH0
146017_B_FTK_PH0 B Y Active
AA_Site330 AA_Site330_C
SAR with Active Candidate
146017 146017_C 146017_FTK_PH0
146017_C_FTK_PH0 C N Rejected
AA_Site331 AA_Site331_0
SAR with Active Candidate
147016 147016_0
147016_Nominal_PH0
147016_0_Nominal_PH0 0 N Nominal
AA_Site331 AA_Site331_A
SAR with Active Candidate
147016 147016_A147016_FTK_PH0
147016_A_FTK_PH0 A N Rejected
AA_Site331 AA_Site331_B
SAR with Active Candidate
147016 147016_B 147016_FTK_PH0
147016_B_FTK_PH0 B N Backup
AA_Site331 AA_Site331_C
SAR with Active Candidate
147016 147016_C 147016_FTK_PH0
147016_C_FTK_PH0 C N Backup
AA_Site331 AA_Site331_X
SAR with Active Candidate
147016 147016_X147016_Colo_PH0
147016_X_Colo_PH0 X Y Active
AA_Site332 AA_Site332_0
SAR with Active Candidate
147017 147017_0
147017_Nominal_PH0
147017_0_Nominal_PH0 0 N Nominal
AA_Site332 AA_Site332_A
SAR with Active Candidate
147017 147017_A147017_FTK_PH0
147017_A_FTK_PH0 A N Backup
AA_Site332 AA_Site332_B
SAR with Active Candidate
147017 147017_B 147017_FTK_PH0
147017_B_FTK_PH0 B Y Active
AA_Site332 AA_Site332_P
SAR with Active Candidate
147017 147017_P 147017_FTK_PH0
147017_P_FTK_PH0 P N Rejected
AA_Site333 AA_Site333_0
SAR with Active Candidate
147018 147018_0
147018_Nominal_PH0
147018_0_Nominal_PH0 0 N Nominal
AA_Site333 AA_Site333_X
SAR with Active Candidate
147018 147018_X147018_Colo_PH0
147018_X_Colo_PH0 X Y Active
AA_Site333 AA_Site333_A
SAR with Active Candidate
147018 147018_A147018_FTK_PH0
147018_A_FTK_PH0 A N Backup
AA_Site333 AA_Site333_B
SAR with Active Candidate
147018 147018_B 147018_FTK_PH0
147018_B_FTK_PH0 B N Rejected
AA_Site333 AA_Site333_C
SAR with Active Candidate
147018 147018_C 147018_FTK_PH0
147018_C_FTK_PH0 C N Rejected
AA_site334 AA_site334_0
SAR with Active Candidate
149015 149015_0
149015_Nominal_PH0
149015_0_Nominal_PH0 0 N Nominal
AA_site334 AA_site334_A
SAR with Active Candidate
149015 149015_A149015_FTK_PH0
149015_A_FTK_PH0 A N Backup
AA_site334 AA_site334_B
SAR with Active Candidate
149015 149015_B 149015_FTK_PH0
149015_B_FTK_PH0 B N Rejected
AA_site334 AA_site334_C
SAR with Active Candidate
149015 149015_C 149015_FTK_PH0
149015_C_FTK_PH0 C N Rejected
AA_site334 AA_site334_D
SAR with Active Candidate
149015 149015_D149015_FTK_PH0
149015_D_FTK_PH0 D N Rejected
AA_site334 AA_site334_X
SAR with Active Candidate
149015 149015_X149015_Colo_PH0
149015_X_Colo_PH0 X Y Active
AA_Site335 AA_Site335_0
SAR with Active Candidate
147019 147019_0
147019_Nominal_PH0
147019_0_Nominal_PH0 0 N Nominal
AA_Site335 AA_Site335_A
SAR with Active Candidate
147019 147019_A147019_FTK_PH0
147019_A_FTK_PH0 A Y Active
AA_Site335 AA_Site335_B
SAR with Active Candidate
147019 147019_B 147019_FTK_PH0
147019_B_FTK_PH0 B N Backup
AA_Site336 AA_Site336_0
SAR with Active Candidate
147020 147020_0
147020_Nominal_PH0
147020_0_Nominal_PH0 0 N Nominal
AA_Site336 AA_Site336_A
SAR with Active Candidate
147020 147020_A147020_FTK_PH0
147020_A_FTK_PH0 A N Rejected
AA_Site336 AA_Site336_B
SAR with Active Candidate
147020 147020_B 147020_FTK_PH0
147020_B_FTK_PH0 B N Rejected
AA_Site336 AA_Site336_C
SAR with Active Candidate
147020 147020_C 147020_FTK_PH0
147020_C_FTK_PH0 C N Rejected
AA_Site336 AA_Site336_D
SAR with Active Candidate
147020 147020_D147020_FTK_PH0
147020_D_FTK_PH0 D N Backup
AA_Site336 AA_Site336_E
SAR with Active Candidate
147020 147020_E 147020_FTK_PH0
147020_E_FTK_PH0 E Y Active
AA_Site336 AA_Site336_F
SAR with Active Candidate
147020 147020_F 147020_FTK_PH0
147020_F_FTK_PH0 F N Backup
AA_Site337 AA_Site337_0
SAR with Active Candidate
147021 147021_0
147021_Nominal_PH0
147021_0_Nominal_PH0 0 N Nominal
AA_Site337 AA_Site337_X
SAR with Active Candidate
147021 147021_X147021_Colo_PH0
147021_X_Colo_PH0 X Y Active
AA_Site337 AA_Site337_A
SAR with Active Candidate
147021 147021_A147021_FTK_PH0
147021_A_FTK_PH0 A N Backup
AA_Site337 AA_Site337_C
SAR with Active Candidate
147021 147021_C 147021_FTK_PH0
147021_C_FTK_PH0 C N Rejected
AA_Site337 AA_Site337_E
SAR with Active Candidate
147021 147021_E 147021_FTK_PH0
147021_E_FTK_PH0 E N Backup
AA_Site337 AA_Site337_F
SAR with Active Candidate
147021 147021_F 147021_FTK_PH0
147021_F_FTK_PH0 F N Backup
AA_Site337 AA_Site337_D
SAR with Active Candidate
147021 147021_D147021_FTK_PH0
147021_D_FTK_PH0 D N Backup
AA_Site337 AA_Site337_B
SAR with Active Candidate
147021 147021_B 147021_FTK_PH0
147021_B_FTK_PH0 B N Backup
AA_Site338 AA_Site338_0
SAR with Active Candidate
147022 147022_0
147022_Nominal_PH0
147022_0_Nominal_PH0 0 N Nominal
AA_Site338 AA_Site338_A
SAR with Active Candidate
147022 147022_A147022_FTK_PH0
147022_A_FTK_PH0 A N Backup
AA_Site338 AA_Site338_B
SAR with Active Candidate
147022 147022_B 147022_FTK_PH0
147022_B_FTK_PH0 B N Backup
AA_Site338 AA_Site338_C
SAR with Active Candidate
147022 147022_C 147022_FTK_PH0
147022_C_FTK_PH0 C N Backup
AA_Site338 AA_Site338_T
SAR with Active Candidate
147022 147022_T 147022_FTK_PH0
147022_T_FTK_PH0 T Y Active
AA_Site34 AA_Site34_0
SAR with Active Candidate
146018 146018_0
146018_Nominal_PH0
146018_0_Nominal_PH0 0 N Nominal
AA_Site34 AA_Site34_A
SAR with Active Candidate
146018 146018_A146018_FTK_PH0
146018_A_FTK_PH0 A Y Active
AA_Site34 AA_Site34_B
SAR with Active Candidate
146018 146018_B 146018_FTK_PH0
146018_B_FTK_PH0 B N Backup
AA_Site340 AA_Site340_0
SAR with Active Candidate
147023 147023_0
147023_Nominal_PH0
147023_0_Nominal_PH0 0 N Nominal
AA_Site340 AA_Site340_A
SAR with Active Candidate
147023 147023_A147023_FTK_PH0
147023_A_FTK_PH0 A N Rejected
AA_Site340 AA_Site340_B
SAR with Active Candidate
147023 147023_B 147023_FTK_PH0
147023_B_FTK_PH0 B N Backup
AA_Site340 AA_Site340_C
SAR with Active Candidate
147023 147023_C 147023_FTK_PH0
147023_C_FTK_PH0 C N Backup
AA_Site340 AA_Site340_D
SAR with Active Candidate
147023 147023_D147023_FTK_PH0
147023_D_FTK_PH0 D Y Active
AA_Site341 AA_Site341_0
SAR with Active Candidate
144025 144025_0
144025_Nominal_PH0
144025_0_Nominal_PH0 0 N Nominal
AA_Site341 AA_Site341_A
SAR with Active Candidate
144025 144025_A144025_FTK_PH0
144025_A_FTK_PH0 A N Rejected
AA_Site341 AA_Site341_B
SAR with Active Candidate
144025 144025_B 144025_FTK_PH0
144025_B_FTK_PH0 B N Rejected
AA_Site341 AA_Site341_C
SAR with Active Candidate
144025 144025_C 144025_FTK_PH0
144025_C_FTK_PH0 C N Rejected
AA_Site341 AA_Site341_D
SAR with Active Candidate
144025 144025_D144025_FTK_PH0
144025_D_FTK_PH0 D N Rejected
AA_Site341 AA_Site341_E
SAR with Active Candidate
144025 144025_E 144025_FTK_PH0
144025_E_FTK_PH0 E Y Active
AA_Site342 AA_Site342_0
SAR with Active Candidate
144026 144026_0
144026_Nominal_PH0
144026_0_Nominal_PH0 0 N Nominal
AA_Site342 AA_Site342_A
SAR with Active Candidate
144026 144026_A144026_FTK_PH0
144026_A_FTK_PH0 A N Rejected
AA_Site342 AA_Site342_B
SAR with Active Candidate
144026 144026_B 144026_FTK_PH0
144026_B_FTK_PH0 B N Rejected
AA_Site342 AA_Site342_X
SAR with Active Candidate
144026 144026_X144026_Colo_PH0
144026_X_Colo_PH0 X Y Active
AA_Site343 AA_Site343_A
SAR with Active Candidate
144027 144027_A144027_FTK_PH0
144027_A_FTK_PH0 A N Backup
AA_Site343 AA_Site343_B
SAR with Active Candidate
144027 144027_B 144027_FTK_PH0
144027_B_FTK_PH0 B N Backup
AA_Site343 AA_Site343_C
SAR with Active Candidate
144027 144027_C 144027_FTK_PH0
144027_C_FTK_PH0 C N Rejected
AA_Site343 AA_Site343_D
SAR with Active Candidate
144027 144027_D144027_FTK_PH0
144027_D_FTK_PH0 D N Rejected
AA_Site343 AA_Site343_E
SAR with Active Candidate
144027 144027_E 144027_FTK_PH0
144027_E_FTK_PH0 E N Rejected
AA_Site343 AA_Site343_F
SAR with Active Candidate
144027 144027_F 144027_FTK_PH0
144027_F_FTK_PH0 F N Rejected
AA_Site343 AA_Site343_G
SAR with Active Candidate
144027 144027_G144027_FTK_PH0
144027_G_FTK_PH0 G N Backup
AA_Site343 AA_Site343_H
SAR with Active Candidate
144027 144027_H144027_FTK_PH0
144027_H_FTK_PH0 H Y Active
AA_Site345 AA_Site345_A
SAR with Active Candidate
144029 144029_A144029_FTK_PH0
144029_A_FTK_PH0 A N Backup
AA_Site345 AA_Site345_B 144029
SAR with Active Candidate 144029_B 144029_FTK_PH0
144029_B_FTK_PH0 B N Rejected
AA_Site345 AA_Site345_C
SAR with Active Candidate
144029 144029_C 144029_FTK_PH0
144029_C_FTK_PH0 C Y Active
AA_Site345 AA_Site345_T
SAR with Active Candidate
144029 144029_T 144029_FTK_PH0
144029_T_FTK_PH0 T N Backup
AA_Site345 AA_Site345_P
SAR with Active Candidate
144029 144029_P 144029_FTK_PH0
144029_P_FTK_PH0 P N Rejected
AA_Site346 AA_Site346_0
SAR with Active Candidate
144030 144030_0
144030_Nominal_PH0
144030_0_Nominal_PH0 0 N Nominal
AA_Site346 AA_Site346_A
SAR with Active Candidate
144030 144030_A144030_FTK_PH0
144030_A_FTK_PH0 A N Rejected
AA_Site346 AA_Site346_X
SAR with Active Candidate
144030 144030_X144030_FTK_PH0
144030_X_FTK_PH0 X Y Active
AA_Site346 AA_Site346_C
SAR with Active Candidate
144030 144030_C 144030_FTK_PH0
144030_C_FTK_PH0 C N Backup
AA_Site346 AA_Site346_B
SAR with Active Candidate
144030 144030_B 144030_FTK_PH0
144030_B_FTK_PH0 B N Rejected
AA_Site347 AA_Site347_0
SAR with Active Candidate
144031 144031_0
144031_Nominal_PH0
144031_0_Nominal_PH0 0 N Nominal
AA_Site347 AA_Site347_A
SAR with Active Candidate
144031 144031_A144031_FTK_PH0
144031_A_FTK_PH0 A N Backup
AA_Site347 AA_Site347_B
SAR with Active Candidate
144031 144031_B 144031_FTK_PH0
144031_B_FTK_PH0 B N Rejected
AA_Site347 AA_Site347_T
SAR with Active Candidate
144031 144031_T 144031_FTK_PH0
144031_T_FTK_PH0 T Y Active
AA_Site348 AA_Site348_0
SAR with Active Candidate
144032 144032_0
144032_Nominal_PH0
144032_0_Nominal_PH0 0 N Nominal
AA_Site348 AA_Site348_A
SAR with Active Candidate
144032 144032_A144032_FTK_PH0
144032_A_FTK_PH0 A N Rejected
AA_Site348 AA_Site348_C
SAR with Active Candidate
144032 144032_C 144032_FTK_PH0
144032_C_FTK_PH0 C N Rejected
AA_Site348 AA_Site348_B
SAR with Active Candidate
144032 144032_B 144032_FTK_PH0
144032_B_FTK_PH0 B Y Active
AA_Site349 AA_Site349_0
SAR with Active Candidate
144033 144033_0
144033_Nominal_PH0
144033_0_Nominal_PH0 0 N Nominal
AA_Site349 AA_Site349_A
SAR with Active Candidate
144033 144033_A144033_FTK_PH0
144033_A_FTK_PH0 A N Rejected
AA_Site349 AA_Site349_B
SAR with Active Candidate
144033 144033_B 144033_FTK_PH0
144033_B_FTK_PH0 B N Rejected
AA_Site349 AA_Site349_X
SAR with Active Candidate
144033 144033_X144033_Colo_PH0
144033_X_Colo_PH0 X Y Active
AA_Site35 AA_Site35_0
SAR with Active Candidate
146019 146019_0
146019_Nominal_PH0
146019_0_Nominal_PH0 0 N Nominal
AA_Site35 AA_Site35_A
SAR with Active Candidate
146019 146019_A146019_FTK_PH0
146019_A_FTK_PH0 A Y Active
AA_Site35 AA_Site35_B
SAR with Active Candidate
146019 146019_B 146019_FTK_PH0
146019_B_FTK_PH0 B N Backup
AA_Site35 AA_Site35_C
SAR with Active Candidate
146019 146019_C 146019_FTK_PH0
146019_C_FTK_PH0 C N Backup
AA_Site350 AA_Site350_0
SAR with Active Candidate
144034 144034_0
144034_Nominal_PH0
144034_0_Nominal_PH0 0 N Nominal
AA_Site350 AA_Site350_A
SAR with Active Candidate
144034 144034_A144034_FTK_PH0
144034_A_FTK_PH0 A N Rejected
AA_Site350 AA_Site350_B
SAR with Active Candidate
144034 144034_B 144034_FTK_PH0
144034_B_FTK_PH0 B N Rejected
AA_Site350 AA_Site350_C
SAR with Active Candidate
144034 144034_C 144034_FTK_PH0
144034_C_FTK_PH0 C Y Active
AA_Site351 AA_Site351_0
SAR with Active Candidate
144035 144035_0
144035_Nominal_PH0
144035_0_Nominal_PH0 0 N Nominal
AA_Site351 AA_Site351_A
SAR with Active Candidate
144035 144035_A144035_FTK_PH0
144035_A_FTK_PH0 A N Rejected
AA_Site351 AA_Site351_B
SAR with Active Candidate
144035 144035_B 144035_FTK_PH0
144035_B_FTK_PH0 B N Rejected
AA_Site351 AA_Site351_C
SAR with Active Candidate
144035 144035_C 144035_FTK_PH0
144035_C_FTK_PH0 C N Rejected
AA_Site351 AA_Site351_D
SAR with Active Candidate
144035 144035_D144035_FTK_PH0
144035_D_FTK_PH0 D N Backup
AA_Site351 AA_Site351_X
SAR with Active Candidate
144035 144035_X144035_Colo_PH0
144035_X_Colo_PH0 X Y Active
AA_Site355 AA_Site355_0
SAR with Active Candidate
143027 143027_0
143027_Nominal_PH0
143027_0_Nominal_PH0 0 N Nominal
AA_Site355 AA_Site355_A
SAR with Active Candidate
143027 143027_A143027_FTK_PH0
143027_A_FTK_PH0 A N Rejected
AA_Site355 AA_Site355_B
SAR with Active Candidate
143027 143027_B 143027_FTK_PH0
143027_B_FTK_PH0 B N Backup
AA_Site355 AA_Site355_C
SAR with Active Candidate
143027 143027_C 143027_FTK_PH0
143027_C_FTK_PH0 C N Backup
AA_Site355 AA_Site355_X
SAR with Active Candidate
143027 143027_X143027_Colo_PH0
143027_X_Colo_PH0 X Y Active
AA_Site356 AA_Site356_0
SAR with Active Candidate
143028 143028_0
143028_Nominal_PH0
143028_0_Nominal_PH0 0 N Nominal
AA_Site356 AA_Site356_A
SAR with Active Candidate
143028 143028_A143028_FTK_PH0
143028_A_FTK_PH0 A N Backup
AA_Site356 AA_Site356_B
SAR with Active Candidate
143028 143028_B 143028_FTK_PH0
143028_B_FTK_PH0 B N Rejected
AA_Site356 AA_Site356_C
SAR with Active Candidate
143028 143028_C 143028_FTK_PH0
143028_C_FTK_PH0 C Y Active
AA_Site357 AA_Site357_0
SAR with Active Candidate
145008 145008_0
145008_Nominal_PH0
145008_0_Nominal_PH0 0 N Nominal
AA_Site357 AA_Site357_A
SAR with Active Candidate
145008 145008_A145008_FTK_PH0
145008_A_FTK_PH0 A Y Active
AA_Site357 AA_Site357_C
SAR with Active Candidate
145008 145008_C 145008_FTK_PH0
145008_C_FTK_PH0 C N Backup
AA_Site358 AA_Site358_0
SAR with Active Candidate
143062 143062_0
143062_Nominal_PH0
143062_0_Nominal_PH0 0 N Nominal
AA_Site358 AA_Site358_A
SAR with Active Candidate
143062 143062_A143062_FTK_PH0
143062_A_FTK_PH0 A N Backup
AA_Site358 AA_Site358_B
SAR with Active Candidate
143062 143062_B 143062_FTK_PH0
143062_B_FTK_PH0 B N Backup
AA_Site358 AA_Site358_C
SAR with Active Candidate
143062 143062_C 143062_FTK_PH0
143062_C_FTK_PH0 C Y Active
AA_Site359 AA_Site359_0
SAR with Active Candidate
143029 143029_0
143029_Nominal_PH0
143029_0_Nominal_PH0 0 N Nominal
AA_Site359 AA_Site359_A
SAR with Active Candidate
143029 143029_A143029_FTK_PH0
143029_A_FTK_PH0 A N Backup
AA_Site359 AA_Site359_B
SAR with Active Candidate
143029 143029_B 143029_FTK_PH0
143029_B_FTK_PH0 B Y Active
AA_Site360 AA_Site360_0
SAR with Active Candidate
143030 143030_0
143030_Nominal_PH0
143030_0_Nominal_PH0 0 N Nominal
AA_Site360 AA_Site360_A
SAR with Active Candidate
143030 143030_A143030_FTK_PH0
143030_A_FTK_PH0 A N Backup
AA_Site360 AA_Site360_B
SAR with Active Candidate
143030 143030_B 143030_FTK_PH0
143030_B_FTK_PH0 B N Backup
AA_Site360 AA_Site360_C
SAR with Active Candidate
143030 143030_C 143030_FTK_PH0
143030_C_FTK_PH0 C Y Active
AA_Site362 AA_Site362_0
SAR with Active Candidate
144037 144037_0
144037_Nominal_PH0
144037_0_Nominal_PH0 0 N Nominal
AA_Site362 AA_Site362_A
SAR with Active Candidate
144037 144037_A144037_FTK_PH0
144037_A_FTK_PH0 A N Backup
AA_Site362 AA_Site362_B
SAR with Active Candidate
144037 144037_B 144037_FTK_PH0
144037_B_FTK_PH0 B N Backup
AA_Site362 AA_Site362_C
SAR with Active Candidate
144037 144037_C 144037_FTK_PH0
144037_C_FTK_PH0 C N Rejected
AA_Site362 AA_Site362_D
SAR with Active Candidate
144037 144037_D144037_FTK_PH0
144037_D_FTK_PH0 D N Rejected
AA_Site362 AA_Site362_F
SAR with Active Candidate
144037 144037_F 144037_FTK_PH0
144037_F_FTK_PH0 F Y Active
AA_Site362 AA_Site362_E
SAR with Active Candidate
144037 144037_E 144037_FTK_PH0
144037_E_FTK_PH0 E N Rejected
AA_Site363 AA_Site363_0
SAR with Active Candidate
144038 144038_0
144038_Nominal_PH0
144038_0_Nominal_PH0 0 N Nominal
AA_Site363 AA_Site363_A
SAR with Active Candidate
144038 144038_A144038_FTK_PH0
144038_A_FTK_PH0 A N Backup
AA_Site363 AA_Site363_B
SAR with Active Candidate
144038 144038_B 144038_FTK_PH0
144038_B_FTK_PH0 B N Rejected
AA_Site363 AA_Site363_X
SAR with Active Candidate
144038 144038_X144038_Colo_PH0
144038_X_Colo_PH0 X Y Active
AA_Site364 AA_Site364_A
SAR with Active Candidate
146020 146020_A146020_FTK_PH0
146020_A_FTK_PH0 A N Rejected
AA_Site364 AA_Site364_B
SAR with Active Candidate
146020 146020_B 146020_FTK_PH0
146020_B_FTK_PH0 B N Rejected
AA_Site364 AA_Site364_C
SAR with Active Candidate
146020 146020_C 146020_FTK_PH0
146020_C_FTK_PH0 C N Rejected
AA_Site365 AA_Site365_0
SAR with Active Candidate
146021 146021_0
146021_Nominal_PH0
146021_0_Nominal_PH0 0 N Nominal
AA_Site365 AA_Site365_A
SAR with Active Candidate
146021 146021_A146021_FTK_PH0
146021_A_FTK_PH0 A N Rejected
AA_Site365 AA_Site365_C
SAR with Active Candidate
146021 146021_C 146021_FTK_PH0
146021_C_FTK_PH0 C Y Active
AA_Site365 AA_Site365_D
SAR with Active Candidate
146021 146021_D146021_FTK_PH0
146021_D_FTK_PH0 D N Rejected
AA_Site365 AA_Site365_E
SAR with Active Candidate
146021 146021_E 146021_FTK_PH0
146021_E_FTK_PH0 E N Rejected
AA_Site365 AA_Site365_B
SAR with Active Candidate
146021 146021_B 146021_FTK_PH0
146021_B_FTK_PH0 B N Rejected
AA_Site366 AA_Site366_A
SAR with Active Candidate
144039 144039_A144039_FTK_PH0
144039_A_FTK_PH0 A Y Active
AA_Site366 AA_Site366_B
SAR with Active Candidate
144039 144039_B 144039_FTK_PH0
144039_B_FTK_PH0 B N Backup
AA_Site366 AA_Site366_C
SAR with Active Candidate
144039 144039_C 144039_FTK_PH0
144039_C_FTK_PH0 C N Rejected
AA_Site366 AA_Site366_D
SAR with Active Candidate
144039 144039_D144039_FTK_PH0
144039_D_FTK_PH0 D N Rejected
AA_Site366 AA_Site366_T
SAR with Active Candidate
144039 144039_T 144039_FTK_PH0
144039_T_FTK_PH0 T N Backup
AA_Site367 AA_Site367_0
SAR with Active Candidate
144040 144040_0
144040_Nominal_PH0
144040_0_Nominal_PH0 0 N Nominal
AA_Site367 AA_Site367_A
SAR with Active Candidate
144040 144040_A144040_FTK_PH0
144040_A_FTK_PH0 A N Rejected
AA_Site367 AA_Site367_C
SAR with Active Candidate
144040 144040_C 144040_FTK_PH0
144040_C_FTK_PH0 C Y Active
AA_Site367 AA_Site367_B
SAR with Active Candidate
144040 144040_B 144040_FTK_PH0
144040_B_FTK_PH0 B N Backup
AA_Site368 AA_Site368_0
SAR with Active Candidate
146022 146022_0
146022_Nominal_PH0
146022_0_Nominal_PH0 0 N Nominal
AA_Site368 AA_Site368_A
SAR with Active Candidate
146022 146022_A146022_FTK_PH0
146022_A_FTK_PH0 A Y Active
AA_Site369 AA_Site369_0
SAR with Active Candidate
142025 142025_0
142025_Nominal_PH0
142025_0_Nominal_PH0 0 N Nominal
AA_Site369 AA_Site369_A
SAR with Active Candidate
142025 142025_A142025_FTK_PH0
142025_A_FTK_PH0 A N Rejected
AA_Site369 AA_Site369_C
SAR with Active Candidate
142025 142025_C 142025_FTK_PH0
142025_C_FTK_PH0 C Y Active
AA_Site369 AA_Site369_B
SAR with Active Candidate
142025 142025_B 142025_FTK_PH0
142025_B_FTK_PH0 B N Rejected
AA_Site37 AA_Site37_0
SAR with Active Candidate
144041 144041_0
144041_Nominal_PH0
144041_0_Nominal_PH0 0 N Nominal
AA_Site37 AA_Site37_A
SAR with Active Candidate
144041 144041_A144041_FTK_PH0
144041_A_FTK_PH0 A Y Active
AA_Site37 AA_Site37_B
SAR with Active Candidate
144041 144041_B 144041_FTK_PH0
144041_B_FTK_PH0 B N Backup
AA_Site370 AA_Site370_0
SAR with Active Candidate
146023 146023_0
146023_Nominal_PH0
146023_0_Nominal_PH0 0 N Nominal
AA_Site370 AA_Site370_A
SAR with Active Candidate
146023 146023_A146023_FTK_PH0
146023_A_FTK_PH0 A N Backup
AA_Site370 AA_Site370_B
SAR with Active Candidate
146023 146023_B 146023_FTK_PH0
146023_B_FTK_PH0 B N Rejected
AA_Site370 AA_Site370_C
SAR with Active Candidate
146023 146023_C 146023_FTK_PH0
146023_C_FTK_PH0 C Y Active
AA_Site371 AA_Site371_0
SAR with Active Candidate
145009 145009_0
145009_Nominal_PH0
145009_0_Nominal_PH0 0 N Nominal
AA_Site371 AA_Site371_B
SAR with Active Candidate
145009 145009_B 145009_FTK_PH0
145009_B_FTK_PH0 B Y Active
AA_Site371 AA_Site371_A
SAR with Active Candidate
145009 145009_A145009_FTK_PH0
145009_A_FTK_PH0 A N Backup
AA_Site371 AA_Site371_C
SAR with Active Candidate
145009 145009_C 145009_FTK_PH0
145009_C_FTK_PH0 C N Backup
AA_Site372 AA_Site372_0
SAR with Active Candidate
143031 143031_0
143031_Nominal_PH0
143031_0_Nominal_PH0 0 N Nominal
AA_Site372 AA_Site372_A
SAR with Active Candidate
143031 143031_A143031_FTK_PH0
143031_A_FTK_PH0 A N Rejected
AA_Site372 AA_Site372_B
SAR with Active Candidate
143031 143031_B 143031_FTK_PH0
143031_B_FTK_PH0 B N Backup
AA_Site372 AA_Site372_C
SAR with Active Candidate
143031 143031_C 143031_FTK_PH0
143031_C_FTK_PH0 C N Backup
AA_Site372 AA_Site372_X
SAR with Active Candidate
143031 143031_X143031_Colo_PH0
143031_X_Colo_PH0 X Y Active
AA_Site373 AA_Site373_0
SAR with Active Candidate
143032 143032_0
143032_Nominal_PH0
143032_0_Nominal_PH0 0 N Nominal
AA_Site373 AA_Site373_A
SAR with Active Candidate
143032 143032_A143032_FTK_PH0
143032_A_FTK_PH0 A N Rejected
AA_Site373 AA_Site373_B
SAR with Active Candidate
143032 143032_B 143032_FTK_PH0
143032_B_FTK_PH0 B N Rejected
AA_Site373 AA_Site373_D
SAR with Active Candidate
143032 143032_D143032_FTK_PH0
143032_D_FTK_PH0 D Y Active
AA_Site374 AA_Site374_0
SAR with Active Candidate
142026 142026_0
142026_Nominal_PH0
142026_0_Nominal_PH0 0 N Nominal
AA_Site374 AA_Site374_X
SAR with Active Candidate
142026 142026_X142026_Colo_PH0
142026_X_Colo_PH0 X Y Active
AA_Site374 AA_Site374_A
SAR with Active Candidate
142026 142026_A142026_FTK_PH0
142026_A_FTK_PH0 A N Rejected
AA_Site374 AA_Site374_C
SAR with Active Candidate
142026 142026_C 142026_FTK_PH0
142026_C_FTK_PH0 C N Rejected
AA_Site374 AA_Site374_D
SAR with Active Candidate
142026 142026_D142026_FTK_PH0
142026_D_FTK_PH0 D N Rejected
AA_Site374 AA_Site374_E
SAR with Active Candidate
142026 142026_E 142026_FTK_PH0
142026_E_FTK_PH0 E N Rejected
AA_Site374 AA_Site374_F
SAR with Active Candidate
142026 142026_F 142026_FTK_PH0
142026_F_FTK_PH0 F N Rejected
AA_Site374 AA_Site374_B
SAR with Active Candidate
142026 142026_B 142026_FTK_PH0
142026_B_FTK_PH0 B N Rejected
AA_Site376 AA_Site376_0
SAR with Active Candidate
143034 143034_0
143034_Nominal_PH0
143034_0_Nominal_PH0 0 N Nominal
AA_Site376 AA_Site376_X
SAR with Active Candidate
143034 143034_X143034_Colo_PH0
143034_X_Colo_PH0 X Y Active
AA_Site376 AA_Site376_A
SAR with Active Candidate
143034 143034_A143034_FTK_PH0
143034_A_FTK_PH0 A N Backup
AA_Site376 AA_Site376_B
SAR with Active Candidate
143034 143034_B 143034_FTK_PH0
143034_B_FTK_PH0 B N Rejected
AA_Site376 AA_Site376_C
SAR with Active Candidate
143034 143034_C 143034_FTK_PH0
143034_C_FTK_PH0 C N Rejected
AA_Site379 AA_Site379_0
SAR with Active Candidate
147024 147024_0
147024_Nominal_PH0
147024_0_Nominal_PH0 0 N Nominal
AA_Site379 AA_Site379_A
SAR with Active Candidate
147024 147024_A147024_FTK_PH0
147024_A_FTK_PH0 A Y Active
AA_Site379 AA_Site379_B
SAR with Active Candidate
147024 147024_B 147024_FTK_PH0
147024_B_FTK_PH0 B N Backup
AA_Site380 AA_Site380_0
SAR with Active Candidate
147025 147025_0
147025_Nominal_PH0
147025_0_Nominal_PH0 0 N Nominal
AA_Site380 AA_Site380_A
SAR with Active Candidate
147025 147025_A147025_FTK_PH0
147025_A_FTK_PH0 A N Backup
AA_Site380 AA_Site380_B
SAR with Active Candidate
147025 147025_B 147025_FTK_PH0
147025_B_FTK_PH0 B Y Active
AA_Site381 AA_Site381_0
SAR with Active Candidate
147026 147026_0
147026_Nominal_PH0
147026_0_Nominal_PH0 0 N Nominal
AA_Site381 AA_Site381_X
SAR with Active Candidate
147026 147026_X147026_Colo_PH0
147026_X_Colo_PH0 X Y Active
AA_Site381 AA_Site381_A
SAR with Active Candidate
147026 147026_A147026_FTK_PH0
147026_A_FTK_PH0 A N Rejected
AA_Site381 AA_Site381_C
SAR with Active Candidate
147026 147026_C 147026_FTK_PH0
147026_C_FTK_PH0 C N Rejected
AA_Site381 AA_Site381_B
SAR with Active Candidate
147026 147026_B 147026_FTK_PH0
147026_B_FTK_PH0 B N Rejected
AA_Site385 AA_Site385_0
SAR with Active Candidate
140016 140016_0
140016_Nominal_PH0
140016_0_Nominal_PH0 0 N Nominal
AA_Site385 AA_Site385_A
SAR with Active Candidate
140016 140016_A140016_FTK_PH0
140016_A_FTK_PH0 A N Backup
AA_Site385 AA_Site385_B
SAR with Active Candidate
140016 140016_B 140016_FTK_PH0
140016_B_FTK_PH0 B Y Active
AA_Site385 AA_Site385_C
SAR with Active Candidate
140016 140016_C 140016_FTK_PH0
140016_C_FTK_PH0 C N Rejected
AA_Site39 AA_Site39_0
SAR with Active Candidate
141027 141027_0
141027_Nominal_PH0
141027_0_Nominal_PH0 0 N Nominal
AA_Site39 AA_Site39_A
SAR with Active Candidate
141027 141027_A141027_FTK_PH0
141027_A_FTK_PH0 A N Backup
AA_Site39 AA_Site39_B
SAR with Active Candidate
141027 141027_B 141027_FTK_PH0
141027_B_FTK_PH0 B N Backup
AA_Site39 AA_Site39_D
SAR with Active Candidate
141027 141027_D141027_FTK_PH0
141027_D_FTK_PH0 D Y Active
AA_Site39 AA_Site39_C
SAR with Active Candidate
141027 141027_C 141027_FTK_PH0
141027_C_FTK_PH0 C N Backup
AA_Site392 AA_Site392_0
SAR with No Active Candidate
145010 145010_0
145010_Nominal_PH0
145010_0_Nominal_PH0 0 N Nominal
AA_Site392 AA_Site392_A
SAR with No Active Candidate
145010 145010_A145010_FTK_PH0
145010_A_FTK_PH0 A N Rejected
AA_Site392 AA_Site392_B
SAR with No Active Candidate
145010 145010_B 145010_FTK_PH0
145010_B_FTK_PH0 B N Rejected
AA_Site393 AA_Site393_0
SAR with Active Candidate
146024 146024_0
146024_Nominal_PH0
146024_0_Nominal_PH0 0 N Nominal
AA_Site393 AA_Site393_A
SAR with Active Candidate
146024 146024_A146024_FTK_PH0
146024_A_FTK_PH0 A Y Active
AA_Site393 AA_Site393_B
SAR with Active Candidate
146024 146024_B 146024_FTK_PH0
146024_B_FTK_PH0 B N Backup
AA_Site393 AA_Site393_C
SAR with Active Candidate
146024 146024_C 146024_FTK_PH0
146024_C_FTK_PH0 C N Backup
AA_Site394 AA_Site394_0
SAR with Active Candidate
146025 146025_0
146025_Nominal_PH0
146025_0_Nominal_PH0 0 N Nominal
AA_Site394 AA_Site394_A
SAR with Active Candidate
146025 146025_A146025_FTK_PH0
146025_A_FTK_PH0 A N Backup
AA_Site394 AA_Site394_B
SAR with Active Candidate
146025 146025_B 146025_FTK_PH0
146025_B_FTK_PH0 B Y Active
AA_Site394 AA_Site394_C
SAR with Active Candidate
146025 146025_C 146025_FTK_PH0
146025_C_FTK_PH0 C N Backup
AA_Site395 AA_Site395_0
SAR with Active Candidate
146026 146026_0
146026_Nominal_PH0
146026_0_Nominal_PH0 0 N Nominal
AA_Site395 AA_Site395_A
SAR with Active Candidate
146026 146026_A146026_FTK_PH0
146026_A_FTK_PH0 A N Backup
AA_Site395 AA_Site395_B
SAR with Active Candidate
146026 146026_B 146026_FTK_PH0
146026_B_FTK_PH0 B N Backup
AA_Site395 AA_Site395_C
SAR with Active Candidate
146026 146026_C 146026_FTK_PH0
146026_C_FTK_PH0 C N Backup
AA_Site395 AA_Site395_D
SAR with Active Candidate
146026 146026_D146026_FTK_PH0
146026_D_FTK_PH0 D Y Active
AA_Site397 AA_Site397_0
SAR with Active Candidate
146046 146046_0
146046_Nominal_PH0
146046_0_Nominal_PH0 0 N Nominal
AA_Site397 AA_Site397_A
SAR with Active Candidate
146046 146046_A146046_FTK_PH0
146046_A_FTK_PH0 A N Rejected
AA_Site397 AA_Site397_B
SAR with Active Candidate
146046 146046_B 146046_FTK_PH0
146046_B_FTK_PH0 B N Rejected
AA_Site397 AA_Site397_C
SAR with Active Candidate
146046 146046_C 146046_FTK_PH0
146046_C_FTK_PH0 C N Rejected
AA_Site397 AA_Site397_D
SAR with Active Candidate
146046 146046_D146046_FTK_PH0
146046_D_FTK_PH0 D N Rejected
AA_Site397 AA_Site397_E
SAR with Active Candidate
146046 146046_E 146046_FTK_PH0
146046_E_FTK_PH0 E N Rejected
AA_Site397 AA_Site397_F
SAR with Active Candidate
146046 146046_F 146046_FTK_PH0
146046_F_FTK_PH0 F Y Active
AA_Site398 AA_Site398_0
SAR with Active Candidate
144101 144101_0
144101_Nominal_PH0
144101_0_Nominal_PH0 0 N Nominal
AA_Site398 AA_Site398_A
SAR with Active Candidate
144101 144101_A144101_FTK_PH0
144101_A_FTK_PH0 A N Rejected
AA_Site398 AA_Site398_C
SAR with Active Candidate
144101 144101_C 144101_FTK_PH0
144101_C_FTK_PH0 C Y Active
AA_Site398 AA_Site398_B
SAR with Active Candidate
144101 144101_B 144101_FTK_PH0
144101_B_FTK_PH0 B N Rejected
AA_Site399 AA_Site399_0
SAR with Active Candidate
144042 144042_0
144042_Nominal_PH0
144042_0_Nominal_PH0 0 N Nominal
AA_Site399 AA_Site399_X
SAR with Active Candidate
144042 144042_X144042_Colo_PH0
144042_X_Colo_PH0 X Y Active
AA_Site399 AA_Site399_A
SAR with Active Candidate
144042 144042_A144042_FTK_PH0
144042_A_FTK_PH0 A N Rejected
AA_Site399 AA_Site399_B
SAR with Active Candidate
144042 144042_B 144042_FTK_PH0
144042_B_FTK_PH0 B N Rejected
AA_Site400 AA_Site400_0
SAR with Active Candidate
144043 144043_0
144043_Nominal_PH0
144043_0_Nominal_PH0 0 N Nominal
AA_Site400 AA_Site400_A
SAR with Active Candidate
144043 144043_A144043_FTK_PH0
144043_A_FTK_PH0 A N Rejected
AA_Site400 AA_Site400_B
SAR with Active Candidate
144043 144043_B 144043_FTK_PH0
144043_B_FTK_PH0 B N Rejected
AA_Site400 AA_Site400_C
SAR with Active Candidate
144043 144043_C 144043_FTK_PH0
144043_C_FTK_PH0 C N Rejected
AA_Site400 AA_Site400_D
SAR with Active Candidate
144043 144043_D144043_FTK_PH0
144043_D_FTK_PH0 D Y Active
AA_Site401 AA_Site401_0
SAR with Active Candidate
144044 144044_0
144044_Nominal_PH0
144044_0_Nominal_PH0 0 N Nominal
AA_Site401 AA_Site401_A
SAR with Active Candidate
144044 144044_A144044_FTK_PH0
144044_A_FTK_PH0 A N Rejected
AA_Site401 AA_Site401_B
SAR with Active Candidate
144044 144044_B 144044_FTK_PH0
144044_B_FTK_PH0 B N Backup
AA_Site401 AA_Site401_C
SAR with Active Candidate
144044 144044_C 144044_FTK_PH0
144044_C_FTK_PH0 C Y Active
AA_Site403 AA_Site403_0
SAR with No Active Candidate
144046 144046_0
144046_Nominal_PH0
144046_0_Nominal_PH0 0 N Nominal
AA_Site403 AA_Site403_A
SAR with No Active Candidate
144046 144046_A144046_FTK_PH0
144046_A_FTK_PH0 A N Rejected
AA_Site403 AA_Site403_B
SAR with No Active Candidate
144046 144046_B 144046_FTK_PH0
144046_B_FTK_PH0 B N Rejected
AA_Site403 AA_Site403_C
SAR with No Active Candidate
144046 144046_C 144046_FTK_PH0
144046_C_FTK_PH0 C N Rejected
AA_Site409 AA_Site409_0
SAR with Active Candidate
141029 141029_0
141029_Nominal_PH0
141029_0_Nominal_PH0 0 N Nominal
AA_Site409 AA_Site409_A
SAR with Active Candidate
141029 141029_A141029_FTK_PH0
141029_A_FTK_PH0 A N Rejected
AA_Site409 AA_Site409_B
SAR with Active Candidate
141029 141029_B 141029_FTK_PH0
141029_B_FTK_PH0 B N Backup
AA_Site409 AA_Site409_X
SAR with Active Candidate
141029 141029_X141029_FTK_PH0
141029_X_FTK_PH0 X Y Active
AA_Site409 AA_Site409_C
SAR with Active Candidate
141029 141029_C 141029_FTK_PH0
141029_C_FTK_PH0 C N Backup
AA_Site41 AA_Site41_0
SAR with Active Candidate
147028 147028_0
147028_Nominal_PH0
147028_0_Nominal_PH0 0 N Nominal
AA_Site41 AA_Site41_X
SAR with Active Candidate
147028 147028_X147028_Colo_PH0
147028_X_Colo_PH0 X Y Active
AA_Site41 AA_Site41_A
SAR with Active Candidate
147028 147028_A147028_FTK_PH0
147028_A_FTK_PH0 A N Backup
AA_Site41 AA_Site41_C
SAR with Active Candidate
147028 147028_C 147028_FTK_PH0
147028_C_FTK_PH0 C N Backup
AA_Site41 AA_Site41_D
SAR with Active Candidate
147028 147028_D147028_FTK_PH0
147028_D_FTK_PH0 D N Backup
AA_Site41 AA_Site41_B
SAR with Active Candidate
147028 147028_B 147028_FTK_PH0
147028_B_FTK_PH0 B N Backup
AA_Site410 AA_Site410_A
SAR with Active Candidate
141030 141030_A141030_FTK_PH0
141030_A_FTK_PH0 A Y Active
AA_Site410 AA_Site410_B
SAR with Active Candidate
141030 141030_B 141030_FTK_PH0
141030_B_FTK_PH0 B N Backup
AA_Site410 AA_Site410_C
SAR with Active Candidate
141030 141030_C 141030_FTK_PH0
141030_C_FTK_PH0 C N Backup
AA_Site411 AA_Site411_0
SAR with Active Candidate
141031 141031_0
141031_Nominal_PH0
141031_0_Nominal_PH0 0 N Nominal
AA_Site411 AA_Site411_A
SAR with Active Candidate
141031 141031_A141031_FTK_PH0
141031_A_FTK_PH0 A N Backup
AA_Site411 AA_Site411_C
SAR with Active Candidate
141031 141031_C 141031_FTK_PH0
141031_C_FTK_PH0 C N Backup
AA_Site411 AA_Site411_B
SAR with Active Candidate
141031 141031_B 141031_FTK_PH0
141031_B_FTK_PH0 B Y Active
AA_Site414 AA_Site414_0
SAR with Active Candidate
144048 144048_0
144048_Nominal_PH0
144048_0_Nominal_PH0 0 N Nominal
AA_Site414 AA_Site414_A
SAR with Active Candidate
144048 144048_A144048_FTK_PH0
144048_A_FTK_PH0 A Y Active
AA_Site414 AA_Site414_B
SAR with Active Candidate
144048 144048_B 144048_FTK_PH0
144048_B_FTK_PH0 B N Backup
AA_Site415 AA_Site415_0
SAR with Active Candidate
141032 141032_0
141032_Nominal_PH0
141032_0_Nominal_PH0 0 N Nominal
AA_Site415 AA_Site415_A
SAR with Active Candidate
141032 141032_A141032_FTK_PH0
141032_A_FTK_PH0 A N Backup
AA_Site415 AA_Site415_B
SAR with Active Candidate
141032 141032_B 141032_FTK_PH0
141032_B_FTK_PH0 B N Backup
AA_Site415 AA_Site415_C
SAR with Active Candidate
141032 141032_C 141032_FTK_PH0
141032_C_FTK_PH0 C Y Active
AA_Site418 AA_Site418_0
SAR with Active Candidate
143035 143035_0
143035_Nominal_PH0
143035_0_Nominal_PH0 0 N Nominal
AA_Site418 AA_Site418_A
SAR with Active Candidate
143035 143035_A143035_FTK_PH0
143035_A_FTK_PH0 A N Rejected
AA_Site418 AA_Site418_B
SAR with Active Candidate
143035 143035_B 143035_FTK_PH0
143035_B_FTK_PH0 B N Rejected
AA_Site418 AA_Site418_C
SAR with Active Candidate
143035 143035_C 143035_FTK_PH0
143035_C_FTK_PH0 C N Rejected
AA_Site418 AA_Site418_D
SAR with Active Candidate
143035 143035_D143035_FTK_PH0
143035_D_FTK_PH0 D N Rejected
AA_Site418 AA_Site418_P
SAR with Active Candidate
143035 143035_P 143035_FTK_PH0
143035_P_FTK_PH0 P Y Active
AA_Site420 AA_Site420_0
SAR with Active Candidate
146047 146047_0
146047_Nominal_PH0
146047_0_Nominal_PH0 0 N Nominal
AA_Site420 AA_Site420_A
SAR with Active Candidate
146047 146047_A146047_FTK_PH0
146047_A_FTK_PH0 A N Backup
AA_Site420 AA_Site420_B
SAR with Active Candidate
146047 146047_B 146047_FTK_PH0
146047_B_FTK_PH0 B N Backup
AA_Site420 AA_Site420_C
SAR with Active Candidate
146047 146047_C 146047_FTK_PH0
146047_C_FTK_PH0 C Y Active
AA_Site422 AA_Site422_0
SAR with Active Candidate
143038 143038_0
143038_Nominal_PH0
143038_0_Nominal_PH0 0 N Nominal
AA_Site422 AA_Site422_A
SAR with Active Candidate
143038 143038_A143038_FTK_PH0
143038_A_FTK_PH0 A N Rejected
AA_Site422 AA_Site422_B
SAR with Active Candidate
143038 143038_B 143038_FTK_PH0
143038_B_FTK_PH0 B N Rejected
AA_Site422 AA_Site422_C
SAR with Active Candidate
143038 143038_C 143038_FTK_PH0
143038_C_FTK_PH0 C N Rejected
AA_Site422 AA_Site422_D
SAR with Active Candidate
143038 143038_D143038_FTK_PH0
143038_D_FTK_PH0 D N Rejected
AA_Site422 AA_Site422_E
SAR with Active Candidate
143038 143038_E 143038_FTK_PH0
143038_E_FTK_PH0 E Y Active
AA_Site427 AA_Site427_0
SAR with Active Candidate
143040 143040_0
143040_Nominal_PH0
143040_0_Nominal_PH0 0 N Nominal
AA_Site427 AA_Site427_A
SAR with Active Candidate
143040 143040_A143040_FTK_PH0
143040_A_FTK_PH0 A N Rejected
AA_Site427 AA_Site427_B
SAR with Active Candidate
143040 143040_B 143040_FTK_PH0
143040_B_FTK_PH0 B N Rejected
AA_Site427 AA_Site427_C
SAR with Active Candidate
143040 143040_C 143040_FTK_PH0
143040_C_FTK_PH0 C N Rejected
AA_Site427 AA_Site427_D
SAR with Active Candidate
143040 143040_D143040_FTK_PH0
143040_D_FTK_PH0 D N Backup
AA_Site427 AA_Site427_X
SAR with Active Candidate
143040 143040_X143040_Colo_PH0
143040_X_Colo_PH0 X Y Active
AA_Site429 AA_Site429_0
SAR with Active Candidate
143041 143041_0
143041_Nominal_PH0
143041_0_Nominal_PH0 0 N Nominal
AA_Site429 AA_Site429_A
SAR with Active Candidate
143041 143041_A143041_FTK_PH0
143041_A_FTK_PH0 A N Rejected
AA_Site429 AA_Site429_B
SAR with Active Candidate
143041 143041_B 143041_FTK_PH0
143041_B_FTK_PH0 B N Rejected
AA_Site429 AA_Site429_X
SAR with Active Candidate
143041 143041_X143041_Colo_PH0
143041_X_Colo_PH0 X Y Active
AA_Site430 AA_Site430_0
SAR with Active Candidate
140018 140018_0
140018_Nominal_PH0
140018_0_Nominal_PH0 0 N Nominal
AA_Site430 AA_Site430_A
SAR with Active Candidate
140018 140018_A140018_FTK_PH0
140018_A_FTK_PH0 A Y Active
AA_Site430 AA_Site430_B
SAR with Active Candidate
140018 140018_B 140018_FTK_PH0
140018_B_FTK_PH0 B N Backup
AA_Site431 AA_Site431_0
SAR with Active Candidate
143042 143042_0
143042_Nominal_PH0
143042_0_Nominal_PH0 0 N Nominal
AA_Site431 AA_Site431_A
SAR with Active Candidate
143042 143042_A143042_FTK_PH0
143042_A_FTK_PH0 A N Backup
AA_Site431 AA_Site431_B
SAR with Active Candidate
143042 143042_B 143042_FTK_PH0
143042_B_FTK_PH0 B N Rejected
AA_Site431 AA_Site431_C
SAR with Active Candidate
143042 143042_C 143042_FTK_PH0
143042_C_FTK_PH0 C N Backup
AA_Site431 AA_Site431_D
SAR with Active Candidate
143042 143042_D143042_FTK_PH0
143042_D_FTK_PH0 D N Backup
AA_Site431 AA_Site431_E
SAR with Active Candidate
143042 143042_E 143042_FTK_PH0
143042_E_FTK_PH0 E Y Active
AA_Site433 AA_Site433_0
SAR with Active Candidate
142029 142029_0
142029_Nominal_PH0
142029_0_Nominal_PH0 0 N Nominal
AA_Site433 AA_Site433_A
SAR with Active Candidate
142029 142029_A142029_FTK_PH0
142029_A_FTK_PH0 A N Rejected
AA_Site433 AA_Site433_B
SAR with Active Candidate
142029 142029_B 142029_FTK_PH0
142029_B_FTK_PH0 B N Rejected
AA_Site433 AA_Site433_C
SAR with Active Candidate
142029 142029_C 142029_FTK_PH0
142029_C_FTK_PH0 C Y Active
AA_Site433 AA_Site433_D
SAR with Active Candidate
142029 142029_D142029_FTK_PH0
142029_D_FTK_PH0 D N Backup
AA_Site435 AA_Site435_0
SAR with Active Candidate
143043 143043_0
143043_Nominal_PH0
143043_0_Nominal_PH0 0 N Nominal
AA_Site435 AA_Site435_A
SAR with Active Candidate
143043 143043_A143043_FTK_PH0
143043_A_FTK_PH0 A N Backup
AA_Site435 AA_Site435_B
SAR with Active Candidate
143043 143043_B 143043_FTK_PH0
143043_B_FTK_PH0 B N Backup
AA_Site435 AA_Site435_C
SAR with Active Candidate
143043 143043_C 143043_FTK_PH0
143043_C_FTK_PH0 C Y Active
AA_Site438 AA_Site438_0
SAR with Active Candidate
145012 145012_0
145012_Nominal_PH0
145012_0_Nominal_PH0 0 N Nominal
AA_Site438 AA_Site438_A
SAR with Active Candidate
145012 145012_A145012_FTK_PH0
145012_A_FTK_PH0 A Y Active
AA_Site438 AA_Site438_C
SAR with Active Candidate
145012 145012_C 145012_FTK_PH0
145012_C_FTK_PH0 C N Backup
AA_Site439 AA_Site439_0
SAR with Active Candidate
145013 145013_0
145013_Nominal_PH0
145013_0_Nominal_PH0 0 N Nominal
AA_Site439 AA_Site439_A
SAR with Active Candidate
145013 145013_A145013_FTK_PH0
145013_A_FTK_PH0 A N Backup
AA_Site439 AA_Site439_D
SAR with Active Candidate
145013 145013_D145013_FTK_PH0
145013_D_FTK_PH0 D N Rejected
AA_Site439 AA_Site439_X
SAR with Active Candidate
145013 145013_X145013_Colo_PH0
145013_X_Colo_PH0 X Y Active
AA_Site439 AA_Site439_B
SAR with Active Candidate
145013 145013_B 145013_FTK_PH0
145013_B_FTK_PH0 B N Backup
AA_Site439 AA_Site439_C
SAR with Active Candidate
145013 145013_C 145013_FTK_PH0
145013_C_FTK_PH0 C N Backup
AA_Site44 AA_Site44_0
SAR with Active Candidate
144049 144049_0
144049_Nominal_PH0
144049_0_Nominal_PH0 0 N Nominal
AA_Site44 AA_Site44_A
SAR with Active Candidate
144049 144049_A144049_FTK_PH0
144049_A_FTK_PH0 A Y Active
AA_Site44 AA_Site44_B
SAR with Active Candidate
144049 144049_B 144049_FTK_PH0
144049_B_FTK_PH0 B N Backup
AA_Site440 AA_Site440_0
SAR with No Active Candidate
146028 146028_0
146028_Nominal_PH0
146028_0_Nominal_PH0 0 N Nominal
AA_Site440 AA_Site440_A
SAR with No Active Candidate
146028 146028_A146028_FTK_PH0
146028_A_FTK_PH0 A N Rejected
AA_Site440 AA_Site440_B
SAR with No Active Candidate
146028 146028_B 146028_FTK_PH0
146028_B_FTK_PH0 B N Rejected
AA_Site440 AA_Site440_C
SAR with No Active Candidate
146028 146028_C 146028_FTK_PH0
146028_C_FTK_PH0 C N Rejected
AA_Site442 AA_Site442_0
SAR with Active Candidate
144050 144050_0
144050_Nominal_PH0
144050_0_Nominal_PH0 0 N Nominal
AA_Site442 AA_Site442_A
SAR with Active Candidate
144050 144050_A144050_FTK_PH0
144050_A_FTK_PH0 A N Backup
AA_Site442 AA_Site442_C
SAR with Active Candidate
144050 144050_C 144050_FTK_PH0
144050_C_FTK_PH0 C N Rejected
AA_Site442 AA_Site442_D
SAR with Active Candidate
144050 144050_D144050_FTK_PH0
144050_D_FTK_PH0 D Y Active
AA_Site442 AA_Site442_B
SAR with Active Candidate
144050 144050_B 144050_FTK_PH0
144050_B_FTK_PH0 B N Rejected
AA_Site443 AA_Site443_0
SAR with Active Candidate
144051 144051_0
144051_Nominal_PH0
144051_0_Nominal_PH0 0 N Nominal
AA_Site443 AA_Site443_A
SAR with Active Candidate
144051 144051_A144051_FTK_PH0
144051_A_FTK_PH0 A Y Active
AA_Site443 AA_Site443_C
SAR with Active Candidate
144051 144051_C 144051_FTK_PH0
144051_C_FTK_PH0 C N Backup
AA_Site443 AA_Site443_B
SAR with Active Candidate
144051 144051_B 144051_FTK_PH0
144051_B_FTK_PH0 B N Rejected
AA_Site444 AA_Site444_0
SAR with Active Candidate
144052 144052_0
144052_Nominal_PH0
144052_0_Nominal_PH0 0 N Nominal
AA_Site444 AA_Site444_A
SAR with Active Candidate
144052 144052_A144052_FTK_PH0
144052_A_FTK_PH0 A N Rejected
AA_Site444 AA_Site444_B
SAR with Active Candidate
144052 144052_B 144052_FTK_PH0
144052_B_FTK_PH0 B N Rejected
AA_Site444 AA_Site444_C
SAR with Active Candidate
144052 144052_C 144052_FTK_PH0
144052_C_FTK_PH0 C N Rejected
AA_Site444 AA_Site444_D
SAR with Active Candidate
144052 144052_D144052_FTK_PH0
144052_D_FTK_PH0 D N Backup
AA_Site444 AA_Site444_E
SAR with Active Candidate
144052 144052_E 144052_FTK_PH0
144052_E_FTK_PH0 E Y Active
AA_Site445 AA_Site445_0
SAR with Active Candidate
147030 147030_0
147030_Nominal_PH0
147030_0_Nominal_PH0 0 N Nominal
AA_Site445 AA_Site445_X
SAR with Active Candidate
147030 147030_X147030_Colo_PH0
147030_X_Colo_PH0 X Y Active
AA_Site445 AA_Site445_A
SAR with Active Candidate
147030 147030_A147030_FTK_PH0
147030_A_FTK_PH0 A N Rejected
AA_Site445 AA_Site445_B
SAR with Active Candidate
147030 147030_B 147030_FTK_PH0
147030_B_FTK_PH0 B N Backup
AA_Site445 AA_Site445_C
SAR with Active Candidate
147030 147030_C 147030_FTK_PH0
147030_C_FTK_PH0 C N Rejected
AA_Site445 AA_Site445_D
SAR with Active Candidate
147030 147030_D147030_FTK_PH0
147030_D_FTK_PH0 D N Backup
AA_Site448 AA_Site448_0
SAR with Active Candidate
144054 144054_0
144054_Nominal_PH0
144054_0_Nominal_PH0 0 N Nominal
AA_Site448 AA_Site448_A
SAR with Active Candidate
144054 144054_A144054_FTK_PH0
144054_A_FTK_PH0 A Y Active
AA_Site448 AA_Site448_B
SAR with Active Candidate
144054 144054_B 144054_FTK_PH0
144054_B_FTK_PH0 B N Backup
AA_Site45 AA_Site45_0
SAR with Active Candidate
141033 141033_0
141033_Nominal_PH0
141033_0_Nominal_PH0 0 N Nominal
AA_Site45 AA_Site45_A
SAR with Active Candidate
141033 141033_A141033_FTK_PH0
141033_A_FTK_PH0 A N Backup
AA_Site45 AA_Site45_B
SAR with Active Candidate
141033 141033_B 141033_FTK_PH0
141033_B_FTK_PH0 B N Rejected
AA_Site45 AA_Site45_C
SAR with Active Candidate
141033 141033_C 141033_FTK_PH0
141033_C_FTK_PH0 C Y Active
AA_Site451 AA_Site451_0
SAR with Active Candidate
142030 142030_0
142030_Nominal_PH0
142030_0_Nominal_PH0 0 N Nominal
AA_Site451 AA_Site451_A
SAR with Active Candidate
142030 142030_A142030_FTK_PH0
142030_A_FTK_PH0 A N Rejected
AA_Site451 AA_Site451_B
SAR with Active Candidate
142030 142030_B 142030_FTK_PH0
142030_B_FTK_PH0 B N Backup
AA_Site451 AA_Site451_D
SAR with Active Candidate
142030 142030_D142030_FTK_PH0
142030_D_FTK_PH0 D N Rejected
AA_Site451 AA_Site451_X
SAR with Active Candidate
142030 142030_X142030_Colo_PH0
142030_X_Colo_PH0 X Y Active
AA_Site452 AA_Site452_0
SAR with Active Candidate
142031 142031_0
142031_Nominal_PH0
142031_0_Nominal_PH0 0 N Nominal
AA_Site452 AA_Site452_A
SAR with Active Candidate
142031 142031_A142031_FTK_PH0
142031_A_FTK_PH0 A N Rejected
AA_Site452 AA_Site452_B
SAR with Active Candidate
142031 142031_B 142031_FTK_PH0
142031_B_FTK_PH0 B Y Active
AA_Site454 AA_Site454_0
SAR with Active Candidate
149018 149018_0
149018_Nominal_PH0
149018_0_Nominal_PH0 0 N Nominal
AA_Site454 AA_Site454_A
SAR with Active Candidate
149018 149018_A149018_FTK_PH0
149018_A_FTK_PH0 A N Backup
AA_Site454 AA_Site454_B
SAR with Active Candidate
149018 149018_B 149018_FTK_PH0
149018_B_FTK_PH0 B Y Active
AA_Site454 AA_Site454_C
SAR with Active Candidate
149018 149018_C 149018_FTK_PH0
149018_C_FTK_PH0 C N Backup
AA_Site455 AA_Site455_0
SAR with Active Candidate
149019 149019_0
149019_Nominal_PH0
149019_0_Nominal_PH0 0 N Nominal
AA_Site455 AA_Site455_A
SAR with Active Candidate
149019 149019_A149019_FTK_PH0
149019_A_FTK_PH0 A N Rejected
AA_Site455 AA_Site455_B
SAR with Active Candidate
149019 149019_B 149019_FTK_PH0
149019_B_FTK_PH0 B N Backup
AA_Site455 AA_Site455_C
SAR with Active Candidate
149019 149019_C 149019_FTK_PH0
149019_C_FTK_PH0 C Y Active
AA_Site456 AA_Site456_0
SAR with Active Candidate
149020 149020_0
149020_Nominal_PH0
149020_0_Nominal_PH0 0 N Nominal
AA_Site456 AA_Site456_A
SAR with Active Candidate
149020 149020_A149020_FTK_PH0
149020_A_FTK_PH0 A N Backup
AA_Site456 AA_Site456_B
SAR with Active Candidate
149020 149020_B 149020_FTK_PH0
149020_B_FTK_PH0 B N Rejected
AA_Site456 AA_Site456_C
SAR with Active Candidate
149020 149020_C 149020_FTK_PH0
149020_C_FTK_PH0 C N Backup
AA_Site456 AA_Site456_D
SAR with Active Candidate
149020 149020_D149020_FTK_PH0
149020_D_FTK_PH0 D N Rejected
AA_Site456 AA_Site456_E
SAR with Active Candidate
149020 149020_E 149020_FTK_PH0
149020_E_FTK_PH0 E N Rejected
AA_Site456 AA_Site456_F
SAR with Active Candidate
149020 149020_F 149020_FTK_PH0
149020_F_FTK_PH0 F N Backup
AA_Site456 AA_Site456_G
SAR with Active Candidate
149020 149020_G149020_FTK_PH0
149020_G_FTK_PH0 G Y Active
AA_Site457 AA_Site457_0
SAR with Active Candidate
140019 140019_0
140019_Nominal_PH0
140019_0_Nominal_PH0 0 N Nominal
AA_Site457 AA_Site457_A
SAR with Active Candidate
140019 140019_A140019_FTK_PH0
140019_A_FTK_PH0 A N Backup
AA_Site457 AA_Site457_B
SAR with Active Candidate
140019 140019_B 140019_FTK_PH0
140019_B_FTK_PH0 B N Rejected
AA_Site457 AA_Site457_X
SAR with Active Candidate
140019 140019_X140019_Colo_PH0
140019_X_Colo_PH0 X Y Active
AA_Site458 AA_Site458_0
SAR with Active Candidate
149021 149021_0
149021_Nominal_PH0
149021_0_Nominal_PH0 0 N Nominal
AA_Site458 AA_Site458_A
SAR with Active Candidate
149021 149021_A149021_FTK_PH0
149021_A_FTK_PH0 A N Rejected
AA_Site458 AA_Site458_B
SAR with Active Candidate
149021 149021_B 149021_FTK_PH0
149021_B_FTK_PH0 B N Backup
AA_Site458 AA_Site458_X
SAR with Active Candidate
149021 149021_X149021_Colo_PH0
149021_X_Colo_PH0 X Y Active
AA_Site459 AA_Site459_0
SAR with Active Candidate
149022 149022_0
149022_Nominal_PH0
149022_0_Nominal_PH0 0 N Nominal
AA_Site459 AA_Site459_A
SAR with Active Candidate
149022 149022_A149022_FTK_PH0
149022_A_FTK_PH0 A Y Active
AA_Site459 AA_Site459_B
SAR with Active Candidate
149022 149022_B 149022_FTK_PH0
149022_B_FTK_PH0 B N Rejected
AA_Site46 AA_Site46_0
SAR with Active Candidate
148010 148010_0
148010_Nominal_PH0
148010_0_Nominal_PH0 0 N Nominal
AA_Site46 AA_Site46_A
SAR with Active Candidate
148010 148010_A148010_FTK_PH0
148010_A_FTK_PH0 A N Rejected
AA_Site46 AA_Site46_B
SAR with Active Candidate
148010 148010_B 148010_FTK_PH0
148010_B_FTK_PH0 B N Rejected
AA_Site46 AA_Site46_C
SAR with Active Candidate
148010 148010_C 148010_FTK_PH0
148010_C_FTK_PH0 C N Rejected
AA_Site46 AA_Site46_X
SAR with Active Candidate
148010 148010_X148010_Colo_PH0
148010_X_Colo_PH0 X Y Active
AA_Site46 AA_Site46_T
SAR with Active Candidate
148010 148010_T 148010_FTK_PH0
148010_T_FTK_PH0 T N Rejected
AA_Site460 AA_Site460_0
SAR with Active Candidate
148011 148011_0
148011_Nominal_PH0
148011_0_Nominal_PH0 0 N Nominal
AA_Site460 AA_Site460_A
SAR with Active Candidate
148011 148011_A148011_FTK_PH0
148011_A_FTK_PH0 A N Backup
AA_Site460 AA_Site460_B
SAR with Active Candidate
148011 148011_B 148011_FTK_PH0
148011_B_FTK_PH0 B N Backup
AA_Site460 AA_Site460_C
SAR with Active Candidate
148011 148011_C 148011_FTK_PH0
148011_C_FTK_PH0 C N Backup
AA_Site460 AA_Site460_T
SAR with Active Candidate
148011 148011_T 148011_FTK_PH0
148011_T_FTK_PH0 T Y Active
AA_Site461 AA_Site461_0
SAR with Active Candidate
145014 145014_0
145014_Nominal_PH0
145014_0_Nominal_PH0 0 N Nominal
AA_Site461 AA_Site461_A
SAR with Active Candidate
145014 145014_A145014_FTK_PH0
145014_A_FTK_PH0 A N Backup
AA_Site461 AA_Site461_B
SAR with Active Candidate
145014 145014_B 145014_FTK_PH0
145014_B_FTK_PH0 B N Backup
AA_Site461 AA_Site461_T
SAR with Active Candidate
145014 145014_T 145014_FTK_PH0
145014_T_FTK_PH0 T Y Active
AA_Site462 AA_Site462_0
SAR with Active Candidate
149023 149023_0
149023_Nominal_PH0
149023_0_Nominal_PH0 0 N Nominal
AA_Site462 AA_Site462_A
SAR with Active Candidate
149023 149023_A149023_FTK_PH0
149023_A_FTK_PH0 A N Rejected
AA_Site462 AA_Site462_B
SAR with Active Candidate
149023 149023_B 149023_FTK_PH0
149023_B_FTK_PH0 B N Backup
AA_Site462 AA_Site462_C
SAR with Active Candidate
149023 149023_C 149023_FTK_PH0
149023_C_FTK_PH0 C Y Active
AA_Site463 AA_Site463_0
SAR with Active Candidate
144055 144055_0
144055_Nominal_PH0
144055_0_Nominal_PH0 0 N Nominal
AA_Site463 AA_Site463_A
SAR with Active Candidate
144055 144055_A144055_FTK_PH0
144055_A_FTK_PH0 A Y Active
AA_Site465 AA_Site465_0
SAR with Active Candidate
144056 144056_0
144056_Nominal_PH0
144056_0_Nominal_PH0 0 N Nominal
AA_Site465 AA_Site465_A
SAR with Active Candidate
144056 144056_A144056_FTK_PH0
144056_A_FTK_PH0 A Y Active
AA_Site465 AA_Site465_B
SAR with Active Candidate
144056 144056_B 144056_FTK_PH0
144056_B_FTK_PH0 B N Rejected
AA_Site466 AA_Site466_0
SAR with Active Candidate
147031 147031_0
147031_Nominal_PH0
147031_0_Nominal_PH0 0 N Nominal
AA_Site466 AA_Site466_A
SAR with Active Candidate
147031 147031_A147031_FTK_PH0
147031_A_FTK_PH0 A N Rejected
AA_Site466 AA_Site466_B
SAR with Active Candidate
147031 147031_B 147031_FTK_PH0
147031_B_FTK_PH0 B N Rejected
AA_Site466 AA_Site466_C
SAR with Active Candidate
147031 147031_C 147031_FTK_PH0
147031_C_FTK_PH0 C N Backup
AA_Site466 AA_Site466_D
SAR with Active Candidate
147031 147031_D147031_FTK_PH0
147031_D_FTK_PH0 D N Backup
AA_Site466 AA_Site466_E
SAR with Active Candidate
147031 147031_E 147031_FTK_PH0
147031_E_FTK_PH0 E N Rejected
AA_Site466 AA_Site466_X
SAR with Active Candidate
147031 147031_X147031_Colo_PH0
147031_X_Colo_PH0 X Y Active
AA_Site467 AA_Site467_0
SAR with Active Candidate
147032 147032_0
147032_Nominal_PH0
147032_0_Nominal_PH0 0 N Nominal
AA_Site467 AA_Site467_A
SAR with Active Candidate
147032 147032_A147032_FTK_PH0
147032_A_FTK_PH0 A Y Active
AA_Site467 AA_Site467_B
SAR with Active Candidate
147032 147032_B 147032_FTK_PH0
147032_B_FTK_PH0 B N Backup
AA_Site469 AA_Site469_0
SAR with Active Candidate
144057 144057_0
144057_Nominal_PH0
144057_0_Nominal_PH0 0 N Nominal
AA_Site469 AA_Site469_A
SAR with Active Candidate
144057 144057_A144057_FTK_PH0
144057_A_FTK_PH0 A N Rejected
AA_Site469 AA_Site469_B
SAR with Active Candidate
144057 144057_B 144057_FTK_PH0
144057_B_FTK_PH0 B N Backup
AA_Site469 AA_Site469_X
SAR with Active Candidate
144057 144057_X144057_Colo_PH0
144057_X_Colo_PH0 X Y Active
AA_Site47 AA_Site47_0
SAR with Active Candidate
142032 142032_0
142032_Nominal_PH0
142032_0_Nominal_PH0 0 N Nominal
AA_Site47 AA_Site47_A
SAR with Active Candidate
142032 142032_A142032_FTK_PH0
142032_A_FTK_PH0 A N Backup
AA_Site47 AA_Site47_B
SAR with Active Candidate
142032 142032_B 142032_FTK_PH0
142032_B_FTK_PH0 B Y Active
AA_Site472 AA_Site472_0
SAR with Active Candidate
149024 149024_0
149024_Nominal_PH0
149024_0_Nominal_PH0 0 N Nominal
AA_Site472 AA_Site472_A
SAR with Active Candidate
149024 149024_A149024_FTK_PH0
149024_A_FTK_PH0 A N Rejected
AA_Site472 AA_Site472_B
SAR with Active Candidate
149024 149024_B 149024_FTK_PH0
149024_B_FTK_PH0 B N Rejected
AA_Site472 AA_Site472_C
SAR with Active Candidate
149024 149024_C 149024_FTK_PH0
149024_C_FTK_PH0 C N Rejected
AA_Site472 AA_Site472_D
SAR with Active Candidate
149024 149024_D149024_FTK_PH0
149024_D_FTK_PH0 D N Rejected
AA_Site472 AA_Site472_E
SAR with Active Candidate
149024 149024_E 149024_FTK_PH0
149024_E_FTK_PH0 E N Rejected
AA_Site472 AA_Site472_X
SAR with Active Candidate
149024 149024_X149024_Colo_PH0
149024_X_Colo_PH0 X Y Active
AA_Site475 AA_Site475_0
SAR with Active Candidate
142033 142033_0
142033_Nominal_PH0
142033_0_Nominal_PH0 0 N Nominal
AA_Site475 AA_Site475_A
SAR with Active Candidate
142033 142033_A142033_FTK_PH0
142033_A_FTK_PH0 A N Backup
AA_Site475 AA_Site475_B
SAR with Active Candidate
142033 142033_B 142033_FTK_PH0
142033_B_FTK_PH0 B Y Active
AA_Site476 AA_Site476_0
SAR with Active Candidate
144059 144059_0
144059_Nominal_PH0
144059_0_Nominal_PH0 0 N Nominal
AA_Site476 AA_Site476_A
SAR with Active Candidate
144059 144059_A144059_FTK_PH0
144059_A_FTK_PH0 A N Backup
AA_Site476 AA_Site476_D
SAR with Active Candidate
144059 144059_D144059_FTK_PH0
144059_D_FTK_PH0 D Y Active
AA_Site478 AA_Site478_0
SAR with Active Candidate
144105 144105_0
144105_Nominal_PH0
144105_0_Nominal_PH0 0 N Nominal
AA_Site478 AA_Site478_A
SAR with Active Candidate
144105 144105_A144105_FTK_PH0
144105_A_FTK_PH0 A N Rejected
AA_Site478 AA_Site478_B
SAR with Active Candidate
144105 144105_B 144105_FTK_PH0
144105_B_FTK_PH0 B N Rejected
AA_Site479 AA_Site479_0
SAR with Active Candidate
143044 143044_0
143044_Nominal_PH0
143044_0_Nominal_PH0 0 N Nominal
AA_Site479 AA_Site479_A
SAR with Active Candidate
143044 143044_A143044_FTK_PH0
143044_A_FTK_PH0 A Y Active
AA_Site479 AA_Site479_B
SAR with Active Candidate
143044 143044_B 143044_FTK_PH0
143044_B_FTK_PH0 B N Backup
AA_Site480 AA_Site480_0
SAR with Active Candidate
143045 143045_0
143045_Nominal_PH0
143045_0_Nominal_PH0 0 N Nominal
AA_Site480 AA_Site480_A
SAR with Active Candidate
143045 143045_A143045_FTK_PH0
143045_A_FTK_PH0 A N Backup
AA_Site480 AA_Site480_B
SAR with Active Candidate
143045 143045_B 143045_FTK_PH0
143045_B_FTK_PH0 B N Rejected
AA_Site480 AA_Site480_X
SAR with Active Candidate
143045 143045_X143045_Colo_PH0
143045_X_Colo_PH0 X Y Active
AA_Site481 AA_Site481_0
SAR with Active Candidate
143046 143046_0
143046_Nominal_PH0
143046_0_Nominal_PH0 0 N Nominal
AA_Site481 AA_Site481_B
SAR with Active Candidate
143046 143046_B 143046_FTK_PH0
143046_B_FTK_PH0 B N Rejected
AA_Site481 AA_Site481_C
SAR with Active Candidate
143046 143046_C 143046_FTK_PH0
143046_C_FTK_PH0 C N Rejected
AA_Site481 AA_Site481_D
SAR with Active Candidate
143046 143046_D143046_FTK_PH0
143046_D_FTK_PH0 D N Backup
AA_Site481 AA_Site481_X
SAR with Active Candidate
143046 143046_X143046_Colo_PH0
143046_X_Colo_PH0 X Y Active
AA_Site482 AA_Site482_0
SAR with Active Candidate
143047 143047_0
143047_Nominal_PH0
143047_0_Nominal_PH0 0 N Nominal
AA_Site482 AA_Site482_A
SAR with Active Candidate
143047 143047_A143047_FTK_PH0
143047_A_FTK_PH0 A N Backup
AA_Site482 AA_Site482_B
SAR with Active Candidate
143047 143047_B 143047_FTK_PH0
143047_B_FTK_PH0 B N Rejected
AA_Site482 AA_Site482_C
SAR with Active Candidate
143047 143047_C 143047_FTK_PH0
143047_C_FTK_PH0 C Y Active
AA_Site483 AA_Site483_0
SAR with Active Candidate
145015 145015_0
145015_Nominal_PH0
145015_0_Nominal_PH0 0 N Nominal
AA_Site483 AA_Site483_X
SAR with Active Candidate
145015 145015_X145015_Colo_PH0
145015_X_Colo_PH0 X Y Active
AA_Site483 AA_Site483_A
SAR with Active Candidate
145015 145015_A145015_FTK_PH0
145015_A_FTK_PH0 A N Backup
AA_Site483 AA_Site483_B
SAR with Active Candidate
145015 145015_B 145015_FTK_PH0
145015_B_FTK_PH0 B N Backup
AA_Site484 AA_Site484_0
SAR with Active Candidate
148012 148012_0
148012_Nominal_PH0
148012_0_Nominal_PH0 0 N Nominal
AA_Site484 AA_Site484_X
SAR with Active Candidate
148012 148012_X148012_Colo_PH0
148012_X_Colo_PH0 X Y Active
AA_Site484 AA_Site484_A
SAR with Active Candidate
148012 148012_A148012_FTK_PH0
148012_A_FTK_PH0 A N Rejected
AA_Site485 AA_Site485_0
SAR with Active Candidate
143078 143078_0
143078_Nominal_PH0
143078_0_Nominal_PH0 0 N Nominal
AA_Site485 AA_Site485_A
SAR with Active Candidate
143078 143078_A143078_FTK_PH0
143078_A_FTK_PH0 A N Rejected
AA_Site485 AA_Site485_B
SAR with Active Candidate
143078 143078_B 143078_FTK_PH0
143078_B_FTK_PH0 B N Backup
AA_Site485 AA_Site485_X
SAR with Active Candidate
143078 143078_X143078_Colo_PH0
143078_X_Colo_PH0 X Y Active
AA_Site49 AA_Site49_0
SAR with Active Candidate
144060 144060_0
144060_Nominal_PH0
144060_0_Nominal_PH0 0 N Nominal
AA_Site49 AA_Site49_B
SAR with Active Candidate
144060 144060_B 144060_FTK_PH0
144060_B_FTK_PH0 B Y Active
AA_Site49 AA_Site49_A
SAR with Active Candidate
144060 144060_A144060_FTK_PH0
144060_A_FTK_PH0 A N Backup
AA_Site491 AA_Site491_0
SAR with Active Candidate
143063 143063_0
143063_Nominal_PH0
143063_0_Nominal_PH0 0 N Nominal
AA_Site491 AA_Site491_A
SAR with Active Candidate
143063 143063_A143063_FTK_PH0
143063_A_FTK_PH0 A N Rejected
AA_Site491 AA_Site491_B
SAR with Active Candidate
143063 143063_B 143063_FTK_PH0
143063_B_FTK_PH0 B N Backup
AA_Site491 AA_Site491_C
SAR with Active Candidate
143063 143063_C 143063_FTK_PH0
143063_C_FTK_PH0 C N Rejected
AA_Site491 AA_Site491_D
SAR with Active Candidate
143063 143063_D143063_FTK_PH0
143063_D_FTK_PH0 D N Rejected
AA_Site491 AA_Site491_E
SAR with Active Candidate
143063 143063_E 143063_FTK_PH0
143063_E_FTK_PH0 E Y Active
AA_Site491 AA_Site491_P
SAR with Active Candidate
143063 143063_P 143063_FTK_PH0
143063_P_FTK_PH0 P N Rejected
AA_Site492 AA_Site492_0
SAR with Active Candidate
143048 143048_0
143048_Nominal_PH0
143048_0_Nominal_PH0 0 N Nominal
AA_Site492 AA_Site492_A
SAR with Active Candidate
143048 143048_A143048_FTK_PH0
143048_A_FTK_PH0 A N Rejected
AA_Site492 AA_Site492_B
SAR with Active Candidate
143048 143048_B 143048_FTK_PH0
143048_B_FTK_PH0 B Y Active
AA_Site493 AA_Site493_0
SAR with Active Candidate
148013 148013_0
148013_Nominal_PH0
148013_0_Nominal_PH0 0 N Nominal
AA_Site493 AA_Site493_A
SAR with Active Candidate
148013 148013_A148013_FTK_PH0
148013_A_FTK_PH0 A Y Active
AA_Site493 AA_Site493_B
SAR with Active Candidate
148013 148013_B 148013_FTK_PH0
148013_B_FTK_PH0 B N Backup
AA_Site493 AA_Site493_C
SAR with Active Candidate
148013 148013_C 148013_FTK_PH0
148013_C_FTK_PH0 C N Backup
AA_Site494 AA_Site494_0
SAR with Active Candidate
145016 145016_0
145016_Nominal_PH0
145016_0_Nominal_PH0 0 N Nominal
AA_Site494 AA_Site494_A
SAR with Active Candidate
145016 145016_A145016_FTK_PH0
145016_A_FTK_PH0 A Y Active
AA_Site494 AA_Site494_B
SAR with Active Candidate
145016 145016_B 145016_FTK_PH0
145016_B_FTK_PH0 B N Backup
AA_Site495 AA_Site495_0
SAR with Active Candidate
145017 145017_0
145017_Nominal_PH0
145017_0_Nominal_PH0 0 N Nominal
AA_Site495 AA_Site495_B
SAR with Active Candidate
145017 145017_B 145017_FTK_PH0
145017_B_FTK_PH0 B N Backup
AA_Site495 AA_Site495_C
SAR with Active Candidate
145017 145017_C 145017_FTK_PH0
145017_C_FTK_PH0 C N Backup
AA_Site495 AA_Site495_D
SAR with Active Candidate
145017 145017_D145017_FTK_PH0
145017_D_FTK_PH0 D N Rejected
AA_Site495 AA_Site495_X
SAR with Active Candidate
145017 145017_X145017_Colo_PH0
145017_X_Colo_PH0 X Y Active
AA_Site496 AA_Site496_0
SAR with Active Candidate
146029 146029_0
146029_Nominal_PH0
146029_0_Nominal_PH0 0 N Nominal
AA_Site496 AA_Site496_A
SAR with Active Candidate
146029 146029_A146029_FTK_PH0
146029_A_FTK_PH0 A N Rejected
AA_Site496 AA_Site496_B
SAR with Active Candidate
146029 146029_B 146029_FTK_PH0
146029_B_FTK_PH0 B N Rejected
AA_Site496 AA_Site496_C
SAR with Active Candidate
146029 146029_C 146029_FTK_PH0
146029_C_FTK_PH0 C N Rejected
AA_Site496 AA_Site496_D
SAR with Active Candidate
146029 146029_D146029_FTK_PH0
146029_D_FTK_PH0 D N Backup
AA_Site496 AA_Site496_E
SAR with Active Candidate
146029 146029_E 146029_FTK_PH0
146029_E_FTK_PH0 E Y Active
AA_Site497 AA_Site497_0
SAR with Active Candidate
146030 146030_0
146030_Nominal_PH0
146030_0_Nominal_PH0 0 N Nominal
AA_Site497 AA_Site497_A
SAR with Active Candidate
146030 146030_A146030_FTK_PH0
146030_A_FTK_PH0 A N Backup
AA_Site497 AA_Site497_B
SAR with Active Candidate
146030 146030_B 146030_FTK_PH0
146030_B_FTK_PH0 B N Rejected
AA_Site497 AA_Site497_C
SAR with Active Candidate
146030 146030_C 146030_FTK_PH0
146030_C_FTK_PH0 C N Rejected
AA_Site497 AA_Site497_X
SAR with Active Candidate
146030 146030_X146030_Colo_PH0
146030_X_Colo_PH0 X Y Active
AA_Site498 AA_Site498_0
SAR with Active Candidate
144061 144061_0
144061_Nominal_PH0
144061_0_Nominal_PH0 0 N Nominal
AA_Site498 AA_Site498_A
SAR with Active Candidate
144061 144061_A144061_FTK_PH0
144061_A_FTK_PH0 A N Rejected
AA_Site498 AA_Site498_B
SAR with Active Candidate
144061 144061_B 144061_FTK_PH0
144061_B_FTK_PH0 B N Rejected
AA_Site498 AA_Site498_C
SAR with Active Candidate
144061 144061_C 144061_FTK_PH0
144061_C_FTK_PH0 C N Rejected
AA_Site498 AA_Site498_X
SAR with Active Candidate
144061 144061_X144061_Colo_PH0
144061_X_Colo_PH0 X Y Active
AA_Site499 AA_Site499_0
SAR with Active Candidate
144062 144062_0
144062_Nominal_PH0
144062_0_Nominal_PH0 0 N Nominal
AA_Site499 AA_Site499_A
SAR with Active Candidate
144062 144062_A144062_FTK_PH0
144062_A_FTK_PH0 A Y Active
AA_Site499 AA_Site499_B
SAR with Active Candidate
144062 144062_B 144062_FTK_PH0
144062_B_FTK_PH0 B N Backup
AA_Site5 AA_Site5_0
SAR with Active Candidate
143049 143049_0
143049_Nominal_PH0
143049_0_Nominal_PH0 0 N Nominal
AA_Site5 AA_Site5_A
SAR with Active Candidate
143049 143049_A143049_FTK_PH0
143049_A_FTK_PH0 A N Backup
AA_Site5 AA_Site5_B
SAR with Active Candidate
143049 143049_B 143049_FTK_PH0
143049_B_FTK_PH0 B Y Active
AA_Site5 AA_Site5_C
SAR with Active Candidate
143049 143049_C 143049_FTK_PH0
143049_C_FTK_PH0 C N Backup
AA_Site5 AA_Site5_D
SAR with Active Candidate
143049 143049_D143049_FTK_PH0
143049_D_FTK_PH0 D N Rejected
AA_Site5 AA_Site5_E
SAR with Active Candidate
143049 143049_E 143049_FTK_PH0
143049_E_FTK_PH0 E N Backup
AA_Site50 AA_Site50_X
SAR with Active Candidate
140020 140020_X140020_Colo_PH0
140020_X_Colo_PH0 X Y Active
AA_Site50 AA_Site50_A
SAR with Active Candidate
140020 140020_A140020_FTK_PH0
140020_A_FTK_PH0 A N Rejected
AA_Site50 AA_Site50_C
SAR with Active Candidate
140020 140020_C 140020_FTK_PH0
140020_C_FTK_PH0 C N Backup
AA_Site50 AA_Site50_B
SAR with Active Candidate
140020 140020_B 140020_FTK_PH0
140020_B_FTK_PH0 B N Backup
AA_Site500 AA_Site500_0
SAR with Active Candidate
142034 142034_0
142034_Nominal_PH0
142034_0_Nominal_PH0 0 N Nominal
AA_Site500 AA_Site500_A
SAR with Active Candidate
142034 142034_A142034_FTK_PH0
142034_A_FTK_PH0 A N Rejected
AA_Site500 AA_Site500_C
SAR with Active Candidate
142034 142034_C 142034_FTK_PH0
142034_C_FTK_PH0 C Y Active
AA_Site500 AA_Site500_B
SAR with Active Candidate
142034 142034_B 142034_FTK_PH0
142034_B_FTK_PH0 B N Rejected
AA_Site502 AA_Site502_0
SAR with Active Candidate
142035 142035_0
142035_Nominal_PH0
142035_0_Nominal_PH0 0 N Nominal
AA_Site502 AA_Site502_A
SAR with Active Candidate
142035 142035_A142035_FTK_PH0
142035_A_FTK_PH0 A N Rejected
AA_Site502 AA_Site502_B
SAR with Active Candidate
142035 142035_B 142035_FTK_PH0
142035_B_FTK_PH0 B N Rejected
AA_Site502 AA_Site502_T
SAR with Active Candidate
142035 142035_T 142035_FTK_PH0
142035_T_FTK_PH0 T N Rejected
AA_Site502 AA_Site502_D
SAR with Active Candidate
142035 142035_D142035_FTK_PH0
142035_D_FTK_PH0 D Y Active
AA_Site503 AA_Site503_0
SAR with Active Candidate
142036 142036_0
142036_Nominal_PH0
142036_0_Nominal_PH0 0 N Nominal
AA_Site503 AA_Site503_A
SAR with Active Candidate
142036 142036_A142036_FTK_PH0
142036_A_FTK_PH0 A N Backup
AA_Site503 AA_Site503_B
SAR with Active Candidate
142036 142036_B 142036_FTK_PH0
142036_B_FTK_PH0 B N Rejected
AA_Site503 AA_Site503_C
SAR with Active Candidate
142036 142036_C 142036_FTK_PH0
142036_C_FTK_PH0 C N Backup
AA_Site503 AA_Site503_D
SAR with Active Candidate
142036 142036_D142036_FTK_PH0
142036_D_FTK_PH0 D N Backup
AA_Site503 AA_Site503_X
SAR with Active Candidate
142036 142036_X142036_Colo_PH0
142036_X_Colo_PH0 X Y Active
AA_Site508 AA_Site508_0
SAR with Active Candidate
141037 141037_0
141037_Nominal_PH0
141037_0_Nominal_PH0 0 N Nominal
AA_Site508 AA_Site508_X
SAR with Active Candidate
141037 141037_X141037_Colo_PH0
141037_X_Colo_PH0 X Y Active
AA_Site508 AA_Site508_A
SAR with Active Candidate
141037 141037_A141037_FTK_PH0
141037_A_FTK_PH0 A N Backup
AA_Site510 AA_Site510_0
SAR with Active Candidate
141038 141038_0
141038_Nominal_PH0
141038_0_Nominal_PH0 0 N Nominal
AA_Site510 AA_Site510_A
SAR with Active Candidate
141038 141038_A141038_FTK_PH0
141038_A_FTK_PH0 A N Rejected
AA_Site510 AA_Site510_B
SAR with Active Candidate
141038 141038_B 141038_FTK_PH0
141038_B_FTK_PH0 B N Rejected
AA_Site510 AA_Site510_C
SAR with Active Candidate
141038 141038_C 141038_FTK_PH0
141038_C_FTK_PH0 C N Rejected
AA_Site510 AA_Site510_D
SAR with Active Candidate
141038 141038_D141038_FTK_PH0
141038_D_FTK_PH0 D N Rejected
AA_Site510 AA_Site510_E
SAR with Active Candidate
141038 141038_E 141038_FTK_PH0
141038_E_FTK_PH0 E N Rejected
AA_Site511 AA_Site511_0
SAR with Active Candidate
146032 146032_0
146032_Nominal_PH0
146032_0_Nominal_PH0 0 N Nominal
AA_Site511 AA_Site511_X
SAR with Active Candidate
146032 146032_X146032_Colo_PH0
146032_X_Colo_PH0 X Y Active
AA_Site514 AA_Site514_0
SAR with Active Candidate
147033 147033_0
147033_Nominal_PH0
147033_0_Nominal_PH0 0 N Nominal
AA_Site514 AA_Site514_A
SAR with Active Candidate
147033 147033_A147033_FTK_PH0
147033_A_FTK_PH0 A Y Active
AA_Site514 AA_Site514_B
SAR with Active Candidate
147033 147033_B 147033_FTK_PH0
147033_B_FTK_PH0 B N Rejected
AA_Site517 AA_Site517_0
SAR with Active Candidate
143050 143050_0
143050_Nominal_PH0
143050_0_Nominal_PH0 0 N Nominal
AA_Site517 AA_Site517_A
SAR with Active Candidate
143050 143050_A143050_FTK_PH0
143050_A_FTK_PH0 A N Rejected
AA_Site517 AA_Site517_B
SAR with Active Candidate
143050 143050_B 143050_FTK_PH0
143050_B_FTK_PH0 B N Backup
AA_Site517 AA_Site517_C
SAR with Active Candidate
143050 143050_C 143050_FTK_PH0
143050_C_FTK_PH0 C Y Active
AA_Site522 AA_Site522_0
SAR with Active Candidate
142039 142039_0
142039_Nominal_PH0
142039_0_Nominal_PH0 0 N Nominal
AA_Site522 AA_Site522_A
SAR with Active Candidate
142039 142039_A142039_FTK_PH0
142039_A_FTK_PH0 A N Backup
AA_Site522 AA_Site522_D
SAR with Active Candidate
142039 142039_D142039_FTK_PH0
142039_D_FTK_PH0 D Y Active
AA_Site522 AA_Site522_B
SAR with Active Candidate
142039 142039_B 142039_FTK_PH0
142039_B_FTK_PH0 B N Backup
AA_Site524 AA_Site524_0
SAR with Active Candidate
142060 142060_0
142060_Nominal_PH0
142060_0_Nominal_PH0 0 N Nominal
AA_Site524 AA_Site524_A
SAR with Active Candidate
142060 142060_A142060_FTK_PH0
142060_A_FTK_PH0 A Y Active
AA_Site524 AA_Site524_B
SAR with Active Candidate
142060 142060_B 142060_FTK_PH0
142060_B_FTK_PH0 B N Backup
AA_Site525 AA_Site525_0
SAR with Active Candidate
142040 142040_0
142040_Nominal_PH0
142040_0_Nominal_PH0 0 N Nominal
AA_Site525 AA_Site525_A
SAR with Active Candidate
142040 142040_A142040_FTK_PH0
142040_A_FTK_PH0 A N Backup
AA_Site525 AA_Site525_B
SAR with Active Candidate
142040 142040_B 142040_FTK_PH0
142040_B_FTK_PH0 B Y Active
AA_Site526 AA_Site526_0
SAR with Active Candidate
142041 142041_0
142041_Nominal_PH0
142041_0_Nominal_PH0 0 N Nominal
AA_Site526 AA_Site526_A
SAR with Active Candidate
142041 142041_A142041_FTK_PH0
142041_A_FTK_PH0 A N Backup
AA_Site526 AA_Site526_B
SAR with Active Candidate
142041 142041_B 142041_FTK_PH0
142041_B_FTK_PH0 B N Backup
AA_Site526 AA_Site526_C
SAR with Active Candidate
142041 142041_C 142041_FTK_PH0
142041_C_FTK_PH0 C Y Active
AA_Site527 AA_Site527_0
SAR with Active Candidate
142042 142042_0
142042_Nominal_PH0
142042_0_Nominal_PH0 0 N Nominal
AA_Site527 AA_Site527_A
SAR with Active Candidate
142042 142042_A142042_FTK_PH0
142042_A_FTK_PH0 A N Rejected
AA_Site527 AA_Site527_B
SAR with Active Candidate
142042 142042_B 142042_FTK_PH0
142042_B_FTK_PH0 B N Rejected
AA_Site527 AA_Site527_D
SAR with Active Candidate
142042 142042_D142042_FTK_PH0
142042_D_FTK_PH0 D Y Active
AA_Site527 AA_Site527_C
SAR with Active Candidate
142042 142042_C 142042_FTK_PH0
142042_C_FTK_PH0 C N Rejected
AA_Site528 AA_Site528_0
SAR with Active Candidate
142043 142043_0
142043_Nominal_PH0
142043_0_Nominal_PH0 0 N Nominal
AA_Site528 AA_Site528_A
SAR with Active Candidate
142043 142043_A142043_FTK_PH0
142043_A_FTK_PH0 A N Rejected
AA_Site528 AA_Site528_B
SAR with Active Candidate
142043 142043_B 142043_FTK_PH0
142043_B_FTK_PH0 B N Rejected
AA_Site528 AA_Site528_C
SAR with Active Candidate
142043 142043_C 142043_FTK_PH0
142043_C_FTK_PH0 C Y Active
AA_Site529 AA_Site529_0
SAR with Active Candidate
147034 147034_0
147034_Nominal_PH0
147034_0_Nominal_PH0 0 N Nominal
AA_Site529 AA_Site529_A
SAR with Active Candidate
147034 147034_A147034_FTK_PH0
147034_A_FTK_PH0 A Y Active
AA_Site529 AA_Site529_B
SAR with Active Candidate
147034 147034_B 147034_FTK_PH0
147034_B_FTK_PH0 B N Rejected
AA_Site53 AA_Site53_0
SAR with Active Candidate
141040 141040_0
141040_Nominal_PH0
141040_0_Nominal_PH0 0 N Nominal
AA_Site53 AA_Site53_A
SAR with Active Candidate
141040 141040_A141040_FTK_PH0
141040_A_FTK_PH0 A N Rejected
AA_Site53 AA_Site53_B
SAR with Active Candidate
141040 141040_B 141040_FTK_PH0
141040_B_FTK_PH0 B N Backup
AA_Site53 AA_Site53_X
SAR with Active Candidate
141040 141040_X141040_Colo_PH0
141040_X_Colo_PH0 X Y Active
AA_Site530 AA_Site530_0
SAR with Active Candidate
147035 147035_0
147035_Nominal_PH0
147035_0_Nominal_PH0 0 N Nominal
AA_Site530 AA_Site530_A
SAR with Active Candidate
147035 147035_A147035_FTK_PH0
147035_A_FTK_PH0 A N Backup
AA_Site530 AA_Site530_B
SAR with Active Candidate
147035 147035_B 147035_FTK_PH0
147035_B_FTK_PH0 B Y Active
AA_Site530 AA_Site530_C
SAR with Active Candidate
147035 147035_C 147035_FTK_PH0
147035_C_FTK_PH0 C N Backup
AA_Site532 AA_Site532_0
SAR with Active Candidate
147036 147036_0
147036_Nominal_PH0
147036_0_Nominal_PH0 0 N Nominal
AA_Site532 AA_Site532_A
SAR with Active Candidate
147036 147036_A147036_FTK_PH0
147036_A_FTK_PH0 A N Rejected
AA_Site532 AA_Site532_B
SAR with Active Candidate
147036 147036_B 147036_FTK_PH0
147036_B_FTK_PH0 B N Rejected
AA_Site532 AA_Site532_E
SAR with Active Candidate
147036 147036_E 147036_FTK_PH0
147036_E_FTK_PH0 E Y Active
AA_Site532 AA_Site532_C
SAR with Active Candidate
147036 147036_C 147036_FTK_PH0
147036_C_FTK_PH0 C N Rejected
AA_Site533 AA_Site533_0
SAR with Active Candidate
147037 147037_0
147037_Nominal_PH0
147037_0_Nominal_PH0 0 N Nominal
AA_Site533 AA_Site533_A
SAR with Active Candidate
147037 147037_A147037_FTK_PH0
147037_A_FTK_PH0 A Y Active
AA_Site533 AA_Site533_B
SAR with Active Candidate
147037 147037_B 147037_FTK_PH0
147037_B_FTK_PH0 B N Backup
AA_Site535 AA_Site535_0
SAR with Active Candidate
144064 144064_0
144064_Nominal_PH0
144064_0_Nominal_PH0 0 N Nominal
AA_Site535 AA_Site535_A
SAR with Active Candidate
144064 144064_A144064_FTK_PH0
144064_A_FTK_PH0 A N Rejected
AA_Site535 AA_Site535_B
SAR with Active Candidate
144064 144064_B 144064_FTK_PH0
144064_B_FTK_PH0 B N Backup
AA_Site535 AA_Site535_C
SAR with Active Candidate
144064 144064_C 144064_FTK_PH0
144064_C_FTK_PH0 C N Backup
AA_Site535 AA_Site535_X
SAR with Active Candidate
144064 144064_X144064_Colo_PH0
144064_X_Colo_PH0 X Y Active
AA_Site535 AA_Site535_D
SAR with Active Candidate
144064 144064_D144064_FTK_PH0
144064_D_FTK_PH0 D N Backup
AA_Site543 AA_Site543_0
SAR with Active Candidate
147040 147040_0
147040_Nominal_PH0
147040_0_Nominal_PH0 0 N Nominal
AA_Site543 AA_Site543_A
SAR with Active Candidate
147040 147040_A147040_FTK_PH0
147040_A_FTK_PH0 A N Backup
AA_Site543 AA_Site543_B
SAR with Active Candidate
147040 147040_B 147040_FTK_PH0
147040_B_FTK_PH0 B N Backup
AA_Site543 AA_Site543_P
SAR with Active Candidate
147040 147040_P 147040_FTK_PH0
147040_P_FTK_PH0 P Y Active
AA_Site545 AA_Site545_0
SAR with Active Candidate
147063 147063_0
147063_Nominal_PH0
147063_0_Nominal_PH0 0 N Nominal
AA_Site545 AA_Site545_A
SAR with Active Candidate
147063 147063_A147063_FTK_PH0
147063_A_FTK_PH0 A N Backup
AA_Site545 AA_Site545_B
SAR with Active Candidate
147063 147063_B 147063_FTK_PH0
147063_B_FTK_PH0 B N Backup
AA_Site545 AA_Site545_D
SAR with Active Candidate
147063 147063_D147063_FTK_PH0
147063_D_FTK_PH0 D N Rejected
AA_Site545 AA_Site545_E
SAR with Active Candidate
147063 147063_E 147063_FTK_PH0
147063_E_FTK_PH0 E N Rejected
AA_Site545 AA_Site545_X
SAR with Active Candidate
147063 147063_X147063_Colo_PH0
147063_X_Colo_PH0 X Y Active
AA_Site546 AA_Site546_0
SAR with Active Candidate
147042 147042_0
147042_Nominal_PH0
147042_0_Nominal_PH0 0 N Nominal
AA_Site546 AA_Site546_A
SAR with Active Candidate
147042 147042_A147042_FTK_PH0
147042_A_FTK_PH0 A N Backup
AA_Site546 AA_Site546_B
SAR with Active Candidate
147042 147042_B 147042_FTK_PH0
147042_B_FTK_PH0 B Y Active
AA_Site547 AA_Site547_0
SAR with Active Candidate
144066 144066_0
144066_Nominal_PH0
144066_0_Nominal_PH0 0 N Nominal
AA_Site547 AA_Site547_A
SAR with Active Candidate
144066 144066_A144066_FTK_PH0
144066_A_FTK_PH0 A N Rejected
AA_Site547 AA_Site547_C
SAR with Active Candidate
144066 144066_C 144066_FTK_PH0
144066_C_FTK_PH0 C N Backup
AA_Site547 AA_Site547_X
SAR with Active Candidate
144066 144066_X144066_Colo_PH0
144066_X_Colo_PH0 X Y Active
AA_Site548 AA_Site548_0
SAR with Active Candidate
144067 144067_0
144067_Nominal_PH0
144067_0_Nominal_PH0 0 N Nominal
AA_Site548 AA_Site548_A
SAR with Active Candidate
144067 144067_A144067_FTK_PH0
144067_A_FTK_PH0 A N Rejected
AA_Site548 AA_Site548_B
SAR with Active Candidate
144067 144067_B 144067_FTK_PH0
144067_B_FTK_PH0 B N Rejected
AA_Site548 AA_Site548_D
SAR with Active Candidate
144067 144067_D144067_FTK_PH0
144067_D_FTK_PH0 D Y Active
AA_Site551 AA_Site551_0
SAR with Active Candidate
144069 144069_0
144069_Nominal_PH0
144069_0_Nominal_PH0 0 N Nominal
AA_Site551 AA_Site551_A
SAR with Active Candidate
144069 144069_A144069_FTK_PH0
144069_A_FTK_PH0 A Y Active
AA_Site551 AA_Site551_B
SAR with Active Candidate
144069 144069_B 144069_FTK_PH0
144069_B_FTK_PH0 B N Backup
AA_Site552 AA_Site552_0
SAR with Active Candidate
144070 144070_0
144070_Nominal_PH0
144070_0_Nominal_PH0 0 N Nominal
AA_Site552 AA_Site552_A
SAR with Active Candidate
144070 144070_A144070_FTK_PH0
144070_A_FTK_PH0 A Y Active
AA_Site552 AA_Site552_B
SAR with Active Candidate
144070 144070_B 144070_FTK_PH0
144070_B_FTK_PH0 B N Backup
AA_Site553 AA_Site553_0
SAR with Active Candidate
146033 146033_0
146033_Nominal_PH0
146033_0_Nominal_PH0 0 N Nominal
AA_Site553 AA_Site553_A
SAR with Active Candidate
146033 146033_A146033_FTK_PH0
146033_A_FTK_PH0 A Y Active
AA_Site553 AA_Site553_B
SAR with Active Candidate
146033 146033_B 146033_FTK_PH0
146033_B_FTK_PH0 B N Backup
AA_Site554 AA_Site554_0
SAR with No Active Candidate
142044 142044_0
142044_Nominal_PH0
142044_0_Nominal_PH0 0 N Nominal
AA_Site554 AA_Site554_A
SAR with No Active Candidate
142044 142044_A142044_FTK_PH0
142044_A_FTK_PH0 A N Rejected
AA_Site554 AA_Site554_B
SAR with No Active Candidate
142044 142044_B 142044_FTK_PH0
142044_B_FTK_PH0 B N Rejected
AA_Site554 AA_Site554_C
SAR with No Active Candidate
142044 142044_C 142044_FTK_PH0
142044_C_FTK_PH0 C N Rejected
AA_Site554 AA_Site554_D
SAR with No Active Candidate
142044 142044_D142044_FTK_PH0
142044_D_FTK_PH0 D N Rejected
AA_Site555 AA_Site555_0
SAR with Active Candidate
142045 142045_0
142045_Nominal_PH0
142045_0_Nominal_PH0 0 N Nominal
AA_Site555 AA_Site555_B
SAR with Active Candidate
142045 142045_B 142045_FTK_PH0
142045_B_FTK_PH0 B N Rejected
AA_Site555 AA_Site555_C
SAR with Active Candidate
142045 142045_C 142045_FTK_PH0
142045_C_FTK_PH0 C Y Active
AA_Site555 AA_Site555_A
SAR with Active Candidate
142045 142045_A142045_FTK_PH0
142045_A_FTK_PH0 A N Rejected
AA_Site556 AA_Site556_0
SAR with Active Candidate
148014 148014_0
148014_Nominal_PH0
148014_0_Nominal_PH0 0 N Nominal
AA_Site556 AA_Site556_A
SAR with Active Candidate
148014 148014_A148014_FTK_PH0
148014_A_FTK_PH0 A N Rejected
AA_Site556 AA_Site556_B
SAR with Active Candidate
148014 148014_B 148014_FTK_PH0
148014_B_FTK_PH0 B N Rejected
AA_Site556 AA_Site556_C
SAR with Active Candidate
148014 148014_C 148014_FTK_PH0
148014_C_FTK_PH0 C N Rejected
AA_Site556 AA_Site556_X
SAR with Active Candidate
148014 148014_X148014_Colo_PH0
148014_X_Colo_PH0 X Y Active
AA_Site557 AA_Site557_0
SAR with Active Candidate
148015 148015_0
148015_Nominal_PH0
148015_0_Nominal_PH0 0 N Nominal
AA_Site557 AA_Site557_A
SAR with Active Candidate
148015 148015_A148015_FTK_PH0
148015_A_FTK_PH0 A N Rejected
AA_Site557 AA_Site557_B
SAR with Active Candidate
148015 148015_B 148015_FTK_PH0
148015_B_FTK_PH0 B N Rejected
AA_Site557 AA_Site557_X
SAR with Active Candidate
148015 148015_X148015_Colo_PH0
148015_X_Colo_PH0 X Y Active
AA_Site558 AA_Site558_0
SAR with Active Candidate
147069 147069_0
147069_Nominal_PH0
147069_0_Nominal_PH0 0 N Nominal
AA_Site558 AA_Site558_A
SAR with Active Candidate
147069 147069_A147069_FTK_PH0
147069_A_FTK_PH0 A N Backup
AA_Site558 AA_Site558_B
SAR with Active Candidate
147069 147069_B 147069_FTK_PH0
147069_B_FTK_PH0 B N Backup
AA_Site558 AA_Site558_C
SAR with Active Candidate
147069 147069_C 147069_FTK_PH0
147069_C_FTK_PH0 C N Backup
AA_Site558 AA_Site558_X
SAR with Active Candidate
147069 147069_X147069_Colo_PH0
147069_X_Colo_PH0 X Y Active
AA_Site559 AA_Site559_0
SAR with Active Candidate
140021 140021_0
140021_Nominal_PH0
140021_0_Nominal_PH0 0 N Nominal
AA_Site559 AA_Site559_A
SAR with Active Candidate
140021 140021_A140021_FTK_PH0
140021_A_FTK_PH0 A N Backup
AA_Site559 AA_Site559_B
SAR with Active Candidate
140021 140021_B 140021_FTK_PH0
140021_B_FTK_PH0 B N Rejected
AA_Site559 AA_Site559_C
SAR with Active Candidate
140021 140021_C 140021_FTK_PH0
140021_C_FTK_PH0 C Y Active
AA_Site559 AA_Site559_D
SAR with Active Candidate
140021 140021_D140021_FTK_PH0
140021_D_FTK_PH0 D N Backup
AA_Site560 AA_Site560_0
SAR with Active Candidate
148016 148016_0
148016_Nominal_PH0
148016_0_Nominal_PH0 0 N Nominal
AA_Site560 AA_Site560_A
SAR with Active Candidate
148016 148016_A148016_FTK_PH0
148016_A_FTK_PH0 A N Backup
AA_Site560 AA_Site560_B
SAR with Active Candidate
148016 148016_B 148016_FTK_PH0
148016_B_FTK_PH0 B N Rejected
AA_Site560 AA_Site560_C
SAR with Active Candidate
148016 148016_C 148016_FTK_PH0
148016_C_FTK_PH0 C N Backup
AA_Site560 AA_Site560_T
SAR with Active Candidate
148016 148016_T 148016_FTK_PH0
148016_T_FTK_PH0 T N Rejected
AA_Site563 AA_Site563_0
SAR with Active Candidate
147076 147076_0
147076_Nominal_PH0
147076_0_Nominal_PH0 0 N Nominal
AA_Site563 AA_Site563_A
SAR with Active Candidate
147076 147076_A147076_FTK_PH0
147076_A_FTK_PH0 A N Backup
AA_Site563 AA_Site563_B
SAR with Active Candidate
147076 147076_B 147076_FTK_PH0
147076_B_FTK_PH0 B Y Active
AA_Site564 AA_Site564_0
SAR with Active Candidate
147043 147043_0
147043_Nominal_PH0
147043_0_Nominal_PH0 0 N Nominal
AA_Site564 AA_Site564_A
SAR with Active Candidate
147043 147043_A147043_FTK_PH0
147043_A_FTK_PH0 A N Backup
AA_Site564 AA_Site564_B
SAR with Active Candidate
147043 147043_B 147043_FTK_PH0
147043_B_FTK_PH0 B N Backup
AA_Site564 AA_Site564_C
SAR with Active Candidate
147043 147043_C 147043_FTK_PH0
147043_C_FTK_PH0 C N Rejected
AA_Site564 AA_Site564_X
SAR with Active Candidate
147043 147043_X147043_Colo_PH0
147043_X_Colo_PH0 X Y Active
AA_Site565 AA_Site565_0
SAR with Active Candidate
144071 144071_0
144071_Nominal_PH0
144071_0_Nominal_PH0 0 N Nominal
AA_Site565 AA_Site565_A
SAR with Active Candidate
144071 144071_A144071_FTK_PH0
144071_A_FTK_PH0 A N Rejected
AA_Site565 AA_Site565_B
SAR with Active Candidate
144071 144071_B 144071_FTK_PH0
144071_B_FTK_PH0 B N Backup
AA_Site565 AA_Site565_C
SAR with Active Candidate
144071 144071_C 144071_FTK_PH0
144071_C_FTK_PH0 C N Rejected
AA_Site565 AA_Site565_D
SAR with Active Candidate
144071 144071_D144071_FTK_PH0
144071_D_FTK_PH0 D N Rejected
AA_Site565 AA_Site565_X
SAR with Active Candidate
144071 144071_X144071_Colo_PH0
144071_X_Colo_PH0 X Y Active
AA_Site566 AA_Site566_0
SAR with Active Candidate
144072 144072_0
144072_Nominal_PH0
144072_0_Nominal_PH0 0 N Nominal
AA_Site566 AA_Site566_A
SAR with Active Candidate
144072 144072_A144072_FTK_PH0
144072_A_FTK_PH0 A N Rejected
AA_Site566 AA_Site566_B
SAR with Active Candidate
144072 144072_B 144072_FTK_PH0
144072_B_FTK_PH0 B Y Active
AA_Site569 AA_Site569_0
SAR with Active Candidate
144073 144073_0
144073_Nominal_PH0
144073_0_Nominal_PH0 0 N Nominal
AA_Site569 AA_Site569_A
SAR with Active Candidate
144073 144073_A144073_FTK_PH0
144073_A_FTK_PH0 A N Rejected
AA_Site569 AA_Site569_B
SAR with Active Candidate
144073 144073_B 144073_FTK_PH0
144073_B_FTK_PH0 B N Rejected
AA_Site569 AA_Site569_C
SAR with Active Candidate
144073 144073_C 144073_FTK_PH0
144073_C_FTK_PH0 C N Rejected
AA_Site569 AA_Site569_D
SAR with Active Candidate
144073 144073_D144073_FTK_PH0
144073_D_FTK_PH0 D N Rejected
AA_Site569 AA_Site569_E
SAR with Active Candidate
144073 144073_E 144073_FTK_PH0
144073_E_FTK_PH0 E N Backup
AA_Site569 AA_Site569_X
SAR with Active Candidate
144073 144073_X144073_Colo_PH0
144073_X_Colo_PH0 X Y Active
AA_Site573 AA_Site573_0
SAR with Active Candidate
145018 145018_0
145018_Nominal_PH0
145018_0_Nominal_PH0 0 N Nominal
AA_Site573 AA_Site573_A
SAR with Active Candidate
145018 145018_A145018_FTK_PH0
145018_A_FTK_PH0 A N Backup
AA_Site573 AA_Site573_X
SAR with Active Candidate
145018 145018_X145018_Colo_PH0
145018_X_Colo_PH0 X Y Active
AA_Site573 AA_Site573_B
SAR with Active Candidate
145018 145018_B 145018_FTK_PH0
145018_B_FTK_PH0 B N Rejected
AA_Site573 AA_Site573_C
SAR with Active Candidate
145018 145018_C 145018_FTK_PH0
145018_C_FTK_PH0 C N Rejected
AA_Site574 AA_Site574_0
SAR with Active Candidate
147044 147044_0
147044_Nominal_PH0
147044_0_Nominal_PH0 0 N Nominal
AA_Site574 AA_Site574_A
SAR with Active Candidate
147044 147044_A147044_FTK_PH0
147044_A_FTK_PH0 A N Rejected
AA_Site574 AA_Site574_B
SAR with Active Candidate
147044 147044_B 147044_FTK_PH0
147044_B_FTK_PH0 B N Rejected
AA_Site574 AA_Site574_C
SAR with Active Candidate
147044 147044_C 147044_FTK_PH0
147044_C_FTK_PH0 C N Rejected
AA_Site574 AA_Site574_D
SAR with Active Candidate
147044 147044_D147044_FTK_PH0
147044_D_FTK_PH0 D N Rejected
AA_Site574 AA_Site574_E
SAR with Active Candidate
147044 147044_E 147044_FTK_PH0
147044_E_FTK_PH0 E N Rejected
AA_Site574 AA_Site574_F
SAR with Active Candidate
147044 147044_F 147044_FTK_PH0
147044_F_FTK_PH0 F Y Active
AA_Site575 AA_Site575_0
SAR with Active Candidate
144074 144074_0
144074_Nominal_PH0
144074_0_Nominal_PH0 0 N Nominal
AA_Site575 AA_Site575_A
SAR with Active Candidate
144074 144074_A144074_FTK_PH0
144074_A_FTK_PH0 A N Rejected
AA_Site575 AA_Site575_B
SAR with Active Candidate
144074 144074_B 144074_FTK_PH0
144074_B_FTK_PH0 B Y Active
AA_Site576 AA_Site576_0
SAR with Active Candidate
144075 144075_0
144075_Nominal_PH0
144075_0_Nominal_PH0 0 N Nominal
AA_Site576 AA_Site576_A
SAR with Active Candidate
144075 144075_A144075_FTK_PH0
144075_A_FTK_PH0 A N Backup
AA_Site576 AA_Site576_B
SAR with Active Candidate
144075 144075_B 144075_FTK_PH0
144075_B_FTK_PH0 B N Backup
AA_Site576 AA_Site576_C
SAR with Active Candidate
144075 144075_C 144075_FTK_PH0
144075_C_FTK_PH0 C Y Active
AA_Site577 AA_Site577_0
SAR with Active Candidate
144076 144076_0
144076_Nominal_PH0
144076_0_Nominal_PH0 0 N Nominal
AA_Site577 AA_Site577_A
SAR with Active Candidate
144076 144076_A144076_FTK_PH0
144076_A_FTK_PH0 A Y Active
AA_Site577 AA_Site577_B
SAR with Active Candidate
144076 144076_B 144076_FTK_PH0
144076_B_FTK_PH0 B N Backup
AA_Site578 AA_Site578_0
SAR with No Active Candidate
144108 144108_0
144108_Nominal_PH0
144108_0_Nominal_PH0 0 N Nominal
AA_Site578 AA_Site578_A
SAR with No Active Candidate
144108 144108_A144108_FTK_PH0
144108_A_FTK_PH0 A N Rejected
AA_Site578 AA_Site578_B
SAR with No Active Candidate
144108 144108_B 144108_FTK_PH0
144108_B_FTK_PH0 B N Rejected
AA_Site578 AA_Site578_C
SAR with No Active Candidate
144108 144108_C 144108_FTK_PH0
144108_C_FTK_PH0 C N Rejected
AA_Site578 AA_Site578_D
SAR with No Active Candidate
144108 144108_D144108_FTK_PH0
144108_D_FTK_PH0 D N Rejected
AA_Site578 AA_Site578_E
SAR with No Active Candidate
144108 144108_E 144108_FTK_PH0
144108_E_FTK_PH0 E N Rejected
AA_Site579 AA_Site579_0
SAR with Active Candidate
147045 147045_0
147045_Nominal_PH0
147045_0_Nominal_PH0 0 N Nominal
AA_Site579 AA_Site579_A
SAR with Active Candidate
147045 147045_A147045_FTK_PH0
147045_A_FTK_PH0 A N Rejected
AA_Site579 AA_Site579_B
SAR with Active Candidate
147045 147045_B 147045_FTK_PH0
147045_B_FTK_PH0 B N Rejected
AA_Site579 AA_Site579_C
SAR with Active Candidate
147045 147045_C 147045_FTK_PH0
147045_C_FTK_PH0 C Y Active
AA_Site580 AA_Site580_0
SAR with No Active Candidate
146034 146034_0
146034_Nominal_PH0
146034_0_Nominal_PH0 0 N Nominal
AA_Site580 AA_Site580_A
SAR with No Active Candidate
146034 146034_A146034_FTK_PH0
146034_A_FTK_PH0 A N Rejected
AA_Site580 AA_Site580_B
SAR with No Active Candidate
146034 146034_B 146034_FTK_PH0
146034_B_FTK_PH0 B N Rejected
AA_Site580 AA_Site580_C
SAR with No Active Candidate
146034 146034_C 146034_FTK_PH0
146034_C_FTK_PH0 C N Rejected
AA_Site580 AA_Site580_D
SAR with No Active Candidate
146034 146034_D146034_FTK_PH0
146034_D_FTK_PH0 D N Rejected
AA_Site580 AA_Site580_E
SAR with No Active Candidate
146034 146034_E 146034_FTK_PH0
146034_E_FTK_PH0 E N Rejected
AA_Site580 AA_Site580_F
SAR with No Active Candidate
146034 146034_F 146034_FTK_PH0
146034_F_FTK_PH0 F N Rejected
AA_Site580 AA_Site580_T
SAR with No Active Candidate
146034 146034_T 146034_FTK_PH0
146034_T_FTK_PH0 T N Rejected
AA_Site582 AA_Site582_0
SAR with Active Candidate
147046 147046_0
147046_Nominal_PH0
147046_0_Nominal_PH0 0 N Nominal
AA_Site582 AA_Site582_A
SAR with Active Candidate
147046 147046_A147046_FTK_PH0
147046_A_FTK_PH0 A N Rejected
AA_Site582 AA_Site582_B
SAR with Active Candidate
147046 147046_B 147046_FTK_PH0
147046_B_FTK_PH0 B N Rejected
AA_Site582 AA_Site582_X
SAR with Active Candidate
147046 147046_X147046_Colo_PH0
147046_X_Colo_PH0 X Y Active
AA_Site584 AA_Site584_0
SAR with Active Candidate
147047 147047_0
147047_Nominal_PH0
147047_0_Nominal_PH0 0 N Nominal
AA_Site584 AA_Site584_A
SAR with Active Candidate
147047 147047_A147047_FTK_PH0
147047_A_FTK_PH0 A N Backup
AA_Site584 AA_Site584_B
SAR with Active Candidate
147047 147047_B 147047_FTK_PH0
147047_B_FTK_PH0 B Y Active
AA_Site589 AA_Site589_0
SAR with Active Candidate
143052 143052_0
143052_Nominal_PH0
143052_0_Nominal_PH0 0 N Nominal
AA_Site589 AA_Site589_A
SAR with Active Candidate
143052 143052_A143052_FTK_PH0
143052_A_FTK_PH0 A N Backup
AA_Site589 AA_Site589_B
SAR with Active Candidate
143052 143052_B 143052_FTK_PH0
143052_B_FTK_PH0 B Y Active
AA_Site590 AA_Site590_0
SAR with Active Candidate
147048 147048_0
147048_Nominal_PH0
147048_0_Nominal_PH0 0 N Nominal
AA_Site590 AA_Site590_A
SAR with Active Candidate
147048 147048_A147048_FTK_PH0
147048_A_FTK_PH0 A N Backup
AA_Site590 AA_Site590_B
SAR with Active Candidate
147048 147048_B 147048_FTK_PH0
147048_B_FTK_PH0 B N Backup
AA_Site590 AA_Site590_C
SAR with Active Candidate
147048 147048_C 147048_FTK_PH0
147048_C_FTK_PH0 C Y Active
AA_Site590 AA_Site590_D
SAR with Active Candidate
147048 147048_D147048_FTK_PH0
147048_D_FTK_PH0 D N Rejected
AA_Site591 AA_Site591_0
SAR with Active Candidate
144077 144077_0
144077_Nominal_PH0
144077_0_Nominal_PH0 0 N Nominal
AA_Site591 AA_Site591_B
SAR with Active Candidate
144077 144077_B 144077_FTK_PH0
144077_B_FTK_PH0 B N Backup
AA_Site591 AA_Site591_C
SAR with Active Candidate
144077 144077_C 144077_FTK_PH0
144077_C_FTK_PH0 C Y Active
AA_Site594 AA_Site594_0
SAR with Active Candidate
141042 141042_0
141042_Nominal_PH0
141042_0_Nominal_PH0 0 N Nominal
AA_Site594 AA_Site594_X
SAR with Active Candidate
141042 141042_X141042_Colo_PH0
141042_X_Colo_PH0 X Y Active
AA_Site594 AA_Site594_A
SAR with No Active Candidate
141042 141042_A141042_FTK_PH0
141042_A_FTK_PH0 A N Rejected
AA_Site595 AA_Site595_0
SAR with Active Candidate
142047 142047_0
142047_Nominal_PH0
142047_0_Nominal_PH0 0 N Nominal
AA_Site595 AA_Site595_A
SAR with Active Candidate
142047 142047_A142047_FTK_PH0
142047_A_FTK_PH0 A N Rejected
AA_Site595 AA_Site595_B
SAR with Active Candidate
142047 142047_B 142047_FTK_PH0
142047_B_FTK_PH0 B N Rejected
AA_Site595 AA_Site595_C
SAR with Active Candidate
142047 142047_C 142047_FTK_PH0
142047_C_FTK_PH0 C N Rejected
AA_Site595 AA_Site595_D
SAR with Active Candidate
142047 142047_D142047_FTK_PH0
142047_D_FTK_PH0 D N Rejected
AA_Site595 AA_Site595_E
SAR with Active Candidate
142047 142047_E 142047_FTK_PH0
142047_E_FTK_PH0 E N Backup
AA_Site595 AA_Site595_F
SAR with Active Candidate
142047 142047_F 142047_FTK_PH0
142047_F_FTK_PH0 F N Backup
AA_Site595 AA_Site595_X
SAR with Active Candidate
142047 142047_X142047_Colo_PH0
142047_X_Colo_PH0 X Y Active
AA_Site596 AA_Site596_0
SAR with Active Candidate
142048 142048_0
142048_Nominal_PH0
142048_0_Nominal_PH0 0 N Nominal
AA_Site596 AA_Site596_A
SAR with Active Candidate
142048 142048_A142048_FTK_PH0
142048_A_FTK_PH0 A N Rejected
AA_Site596 AA_Site596_B
SAR with Active Candidate
142048 142048_B 142048_FTK_PH0
142048_B_FTK_PH0 B N Rejected
AA_Site596 AA_Site596_C
SAR with Active Candidate
142048 142048_C 142048_FTK_PH0
142048_C_FTK_PH0 C N Rejected
AA_Site596 AA_Site596_D
SAR with Active Candidate
142048 142048_D142048_FTK_PH0
142048_D_FTK_PH0 D N Rejected
AA_Site596 AA_Site596_E
SAR with Active Candidate
142048 142048_E 142048_FTK_PH0
142048_E_FTK_PH0 E N Backup
AA_Site596 AA_Site596_X
SAR with Active Candidate
142048 142048_X142048_Colo_PH0
142048_X_Colo_PH0 X Y Active
AA_Site596 AA_Site596_T
SAR with Active Candidate
142048 142048_T 142048_FTK_PH0
142048_T_FTK_PH0 T N Rejected
AA_Site597 AA_Site597_0
SAR with Active Candidate
146035 146035_0
146035_Nominal_PH0
146035_0_Nominal_PH0 0 N Nominal
AA_Site597 AA_Site597_A
SAR with Active Candidate
146035 146035_A146035_FTK_PH0
146035_A_FTK_PH0 A N Backup
AA_Site597 AA_Site597_B
SAR with Active Candidate
146035 146035_B 146035_FTK_PH0
146035_B_FTK_PH0 B Y Active
AA_Site599 AA_Site599_0
SAR with Active Candidate
142049 142049_0
142049_Nominal_PH0
142049_0_Nominal_PH0 0 N Nominal
AA_Site599 AA_Site599_C
SAR with Active Candidate
142049 142049_C 142049_FTK_PH0
142049_C_FTK_PH0 C N Backup
AA_Site599 AA_Site599_A
SAR with Active Candidate
142049 142049_A142049_FTK_PH0
142049_A_FTK_PH0 A N Rejected
AA_Site599 AA_Site599_B
SAR with Active Candidate
142049 142049_B 142049_FTK_PH0
142049_B_FTK_PH0 B N Backup
AA_Site599 AA_Site599_D
SAR with Active Candidate
142049 142049_D142049_FTK_PH0
142049_D_FTK_PH0 D Y Active
AA_Site6 AA_Site6_0
SAR with Active Candidate
144079 144079_0
144079_Nominal_PH0
144079_0_Nominal_PH0 0 N Nominal
AA_Site6 AA_Site6_A
SAR with Active Candidate
144079 144079_A144079_FTK_PH0
144079_A_FTK_PH0 A N Backup
AA_Site6 AA_Site6_B
SAR with Active Candidate
144079 144079_B 144079_FTK_PH0
144079_B_FTK_PH0 B N Backup
AA_Site6 AA_Site6_X
SAR with Active Candidate
144079 144079_X144079_Colo_PH0
144079_X_Colo_PH0 X Y Active
AA_Site600 AA_Site600_0
SAR with Active Candidate
148017 148017_0
148017_Nominal_PH0
148017_0_Nominal_PH0 0 N Nominal
AA_Site600 AA_Site600_A
SAR with Active Candidate
148017 148017_A148017_FTK_PH0
148017_A_FTK_PH0 A Y Active
AA_Site600 AA_Site600_B
SAR with Active Candidate
148017 148017_B 148017_FTK_PH0
148017_B_FTK_PH0 B N Backup
AA_Site600 AA_Site600_C
SAR with Active Candidate
148017 148017_C 148017_FTK_PH0
148017_C_FTK_PH0 C N Backup
AA_Site600 AA_Site600_T
SAR with Active Candidate
148017 148017_T 148017_FTK_PH0
148017_T_FTK_PH0 T N Rejected
AA_Site601 AA_Site601_0
SAR with Active Candidate
147049 147049_0
147049_Nominal_PH0
147049_0_Nominal_PH0 0 N Nominal
AA_Site601 AA_Site601_A
SAR with Active Candidate
147049 147049_A147049_FTK_PH0
147049_A_FTK_PH0 A N Rejected
AA_Site601 AA_Site601_B
SAR with Active Candidate
147049 147049_B 147049_FTK_PH0
147049_B_FTK_PH0 B N Rejected
AA_Site601 AA_Site601_C
SAR with Active Candidate
147049 147049_C 147049_FTK_PH0
147049_C_FTK_PH0 C N Backup
AA_Site601 AA_Site601_X
SAR with Active Candidate
147049 147049_X147049_Colo_PH0
147049_X_Colo_PH0 X Y Active
AA_Site603 AA_Site603_0
SAR with Active Candidate
146036 146036_0
146036_Nominal_PH0
146036_0_Nominal_PH0 0 N Nominal
AA_Site603 AA_Site603_A
SAR with Active Candidate
146036 146036_A146036_FTK_PH0
146036_A_FTK_PH0 A N Backup
AA_Site603 AA_Site603_B
SAR with Active Candidate
146036 146036_B 146036_FTK_PH0
146036_B_FTK_PH0 B Y Active
AA_Site603 AA_Site603_C
SAR with Active Candidate
146036 146036_C 146036_FTK_PH0
146036_C_FTK_PH0 C N Backup
AA_Site605 AA_Site605_0
SAR with Active Candidate
142051 142051_0
142051_Nominal_PH0
142051_0_Nominal_PH0 0 N Nominal
AA_Site605 AA_Site605_A
SAR with Active Candidate
142051 142051_A142051_FTK_PH0
142051_A_FTK_PH0 A N Rejected
AA_Site605 AA_Site605_B
SAR with Active Candidate
142051 142051_B 142051_FTK_PH0
142051_B_FTK_PH0 B N Backup
AA_Site605 AA_Site605_C
SAR with Active Candidate
142051 142051_C 142051_FTK_PH0
142051_C_FTK_PH0 C N Backup
AA_Site605 AA_Site605_D
SAR with Active Candidate
142051 142051_D142051_FTK_PH0
142051_D_FTK_PH0 D Y Active
AA_Site606 AA_Site606_0
SAR with Active Candidate
149025 149025_0
149025_Nominal_PH0
149025_0_Nominal_PH0 0 N Nominal
AA_Site606 AA_Site606_A
SAR with Active Candidate
149025 149025_A149025_FTK_PH0
149025_A_FTK_PH0 A N Backup
AA_Site606 AA_Site606_B
SAR with Active Candidate
149025 149025_B 149025_FTK_PH0
149025_B_FTK_PH0 B N Backup
AA_Site606 AA_Site606_C
SAR with Active Candidate
149025 149025_C 149025_FTK_PH0
149025_C_FTK_PH0 C N Backup
AA_Site606 AA_Site606_T
SAR with Active Candidate
149025 149025_T 149025_FTK_PH0
149025_T_FTK_PH0 T N Rejected
AA_Site607 AA_Site607_0
SAR with Active Candidate
147050 147050_0
147050_Nominal_PH0
147050_0_Nominal_PH0 0 N Nominal
AA_Site607 AA_Site607_A
SAR with Active Candidate
147050 147050_A147050_FTK_PH0
147050_A_FTK_PH0 A N Backup
AA_Site607 AA_Site607_B
SAR with Active Candidate
147050 147050_B 147050_FTK_PH0
147050_B_FTK_PH0 B N Backup
AA_Site607 AA_Site607_C
SAR with Active Candidate
147050 147050_C 147050_FTK_PH0
147050_C_FTK_PH0 C Y Active
AA_Site608 AA_Site608_0
SAR with Active Candidate
144140 144140_0
144140_Nominal_PH0
144140_0_Nominal_PH0 0 N Nominal
AA_Site608 AA_Site608_A
SAR with Active Candidate
144140 144140_A144140_FTK_PH0
144140_A_FTK_PH0 A Site N
ID changed from 145019 to 144140
AA_Site608 AA_Site608_B
SAR with Active Candidate
144140 144140_B 144140_FTK_PH0
144140_B_FTK_PH0 B Site N
ID changed from 145019 to 144140
AA_Site608 AA_Site608_C
SAR with Active Candidate
144140 144140_C 144140_FTK_PH0
144140_C_FTK_PH0 C Site N
ID changed from 145019 to 144140
AA_Site608 AA_Site608_D
SAR with Active Candidate
144140 144140_D144140_FTK_PH0
144140_D_FTK_PH0 D Site N
ID changed from 145019 to 144140
AA_Site608 AA_Site608_E
SAR with Active Candidate
144140 144140_E 144140_FTK_PH0
144140_E_FTK_PH0 E Y Active
AA_Site608 AA_Site608_T
SAR with Active Candidate
144140 144140_T 144140_FTK_PH0
144140_T_FTK_PH0 T Site N
ID changed from 145019 to 144140
AA_Site609 AA_Site609_0
SAR with Active Candidate
145031 145031_0
145031_Nominal_PH0
145031_0_Nominal_PH0 0 N Nominal
AA_Site609 AA_Site609_A
SAR with Active Candidate
145031 145031_A145031_FTK_PH0
145031_A_FTK_PH0 A N Backup
AA_Site609 AA_Site609_B
SAR with Active Candidate
145031 145031_B 145031_FTK_PH0
145031_B_FTK_PH0 B N Backup
AA_Site609 AA_Site609_C
SAR with Active Candidate
145031 145031_C 145031_FTK_PH0
145031_C_FTK_PH0 C N Rejected
AA_Site609 AA_Site609_D
SAR with Active Candidate
145031 145031_D145031_FTK_PH0
145031_D_FTK_PH0 D N Rejected
AA_Site609 AA_Site609_E
SAR with Active Candidate
145031 145031_E 145031_FTK_PH0
145031_E_FTK_PH0 E Y Active
AA_Site613 AA_Site613_0
SAR with Active Candidate
144081 144081_0
144081_Nominal_PH0
144081_0_Nominal_PH0 0 N Nominal
AA_Site613 AA_Site613_A
SAR with Active Candidate
144081 144081_A144081_FTK_PH0
144081_A_FTK_PH0 A N Rejected
AA_Site613 AA_Site613_B
SAR with Active Candidate
144081 144081_B 144081_FTK_PH0
144081_B_FTK_PH0 B N Rejected
AA_Site613 AA_Site613_C
SAR with Active Candidate
144081 144081_C 144081_FTK_PH0
144081_C_FTK_PH0 C N Rejected
AA_Site613 AA_Site613_X
SAR with Active Candidate
144081 144081_X144081_Colo_PH0
144081_X_Colo_PH0 X Y Active
AA_Site615 AA_Site615_0
SAR with Active Candidate
144083 144083_0
144083_Nominal_PH0
144083_0_Nominal_PH0 0 N Nominal
AA_Site615 AA_Site615_X
SAR with Active Candidate
144083 144083_X144083_Colo_PH0
144083_X_Colo_PH0 X Y Active
AA_Site615 AA_Site615_A
SAR with Active Candidate
144083 144083_A144083_FTK_PH0
144083_A_FTK_PH0 A N Backup
AA_Site615 AA_Site615_B
SAR with Active Candidate
144083 144083_B 144083_FTK_PH0
144083_B_FTK_PH0 B N Rejected
AA_Site615 AA_Site615_D
SAR with Active Candidate
144083 144083_D144083_FTK_PH0
144083_D_FTK_PH0 D N Rejected
AA_Site615 AA_Site615_C
SAR with Active Candidate
144083 144083_C 144083_FTK_PH0
144083_C_FTK_PH0 C N Rejected
AA_Site616 AA_Site616_0
SAR with Active Candidate
148018 148018_0
148018_Nominal_PH0
148018_0_Nominal_PH0 0 N Nominal
AA_Site616 AA_Site616_A
SAR with Active Candidate
148018 148018_A148018_FTK_PH0
148018_A_FTK_PH0 A N Rejected
AA_Site616 AA_Site616_B
SAR with Active Candidate
148018 148018_B 148018_FTK_PH0
148018_B_FTK_PH0 B N Rejected
AA_Site616 AA_Site616_C
SAR with Active Candidate
148018 148018_C 148018_FTK_PH0
148018_C_FTK_PH0 C Y Active
AA_Site617 AA_Site617_0
SAR with Active Candidate
143054 143054_0
143054_Nominal_PH0
143054_0_Nominal_PH0 0 N Nominal
AA_Site617 AA_Site617_A
SAR with Active Candidate
143054 143054_A143054_FTK_PH0
143054_A_FTK_PH0 A N Backup
AA_Site617 AA_Site617_B
SAR with Active Candidate
143054 143054_B 143054_FTK_PH0
143054_B_FTK_PH0 B N Rejected
AA_Site617 AA_Site617_C
SAR with Active Candidate
143054 143054_C 143054_FTK_PH0
143054_C_FTK_PH0 C Y Active
AA_Site618 AA_Site618_0
SAR with Active Candidate
149027 149027_0
149027_Nominal_PH0
149027_0_Nominal_PH0 0 N Nominal
AA_Site618 AA_Site618_A
SAR with Active Candidate
149027 149027_A149027_FTK_PH0
149027_A_FTK_PH0 A Y Active
AA_Site618 AA_Site618_B
SAR with Active Candidate
149027 149027_B 149027_FTK_PH0
149027_B_FTK_PH0 B N Backup
AA_Site618 AA_Site618_C
SAR with Active Candidate
149027 149027_C 149027_FTK_PH0
149027_C_FTK_PH0 C N Backup
AA_Site619 AA_Site619_0
SAR with Active Candidate
148019 148019_0
148019_Nominal_PH0
148019_0_Nominal_PH0 0 N Nominal
AA_Site619 AA_Site619_A
SAR with Active Candidate
148019 148019_A148019_FTK_PH0
148019_A_FTK_PH0 A N Backup
AA_Site619 AA_Site619_B
SAR with Active Candidate
148019 148019_B 148019_FTK_PH0
148019_B_FTK_PH0 B Y Active
AA_Site619 AA_Site619_C
SAR with Active Candidate
148019 148019_C 148019_FTK_PH0
148019_C_FTK_PH0 C N Backup
AA_Site620 AA_Site620_0
SAR with Active Candidate
147052 147052_0
147052_Nominal_PH0
147052_0_Nominal_PH0 0 N Nominal
AA_Site620 AA_Site620_A
SAR with Active Candidate
147052 147052_A147052_FTK_PH0
147052_A_FTK_PH0 A N Rejected
AA_Site620 AA_Site620_X
SAR with Active Candidate
147052 147052_X147052_Colo_PH0
147052_X_Colo_PH0 X Y Active
AA_Site621 AA_Site621_0
SAR with Active Candidate
149028 149028_0
149028_Nominal_PH0
149028_0_Nominal_PH0 0 N Nominal
AA_Site621 AA_Site621_A
SAR with Active Candidate
149028 149028_A149028_FTK_PH0
149028_A_FTK_PH0 A N Rejected
AA_Site621 AA_Site621_B
SAR with Active Candidate
149028 149028_B 149028_FTK_PH0
149028_B_FTK_PH0 B N Rejected
AA_Site621 AA_Site621_C
SAR with Active Candidate
149028 149028_C 149028_FTK_PH0
149028_C_FTK_PH0 C Y Active
AA_Site622 AA_Site622_0
SAR with Active Candidate
148020 148020_0
148020_Nominal_PH0
148020_0_Nominal_PH0 0 N Nominal
AA_Site622 AA_Site622_A
SAR with Active Candidate
148020 148020_A148020_FTK_PH0
148020_A_FTK_PH0 A Y Active
AA_Site622 AA_Site622_B
SAR with Active Candidate
148020 148020_B 148020_FTK_PH0
148020_B_FTK_PH0 B N Backup
AA_Site622 AA_Site622_C
SAR with Active Candidate
148020 148020_C 148020_FTK_PH0
148020_C_FTK_PH0 C N Backup
AA_Site623 AA_Site623_0
SAR with Active Candidate
145021 145021_0
145021_Nominal_PH0
145021_0_Nominal_PH0 0 N Nominal
AA_Site623 AA_Site623_A
SAR with Active Candidate
145021 145021_A145021_FTK_PH0
145021_A_FTK_PH0 A N Backup
AA_Site623 AA_Site623_B
SAR with Active Candidate
145021 145021_B 145021_FTK_PH0
145021_B_FTK_PH0 B N Rejected
AA_Site623 AA_Site623_D
SAR with Active Candidate
145021 145021_D145021_FTK_PH0
145021_D_FTK_PH0 D N Backup
AA_Site623 AA_Site623_E
SAR with Active Candidate
145021 145021_E 145021_FTK_PH0
145021_E_FTK_PH0 E Y Active
AA_Site623 AA_Site623_C
SAR with Active Candidate
145021 145021_C 145021_FTK_PH0
145021_C_FTK_PH0 C N Backup
AA_Site626 AA_Site626_0
SAR with Active Candidate
144084 144084_0
144084_Nominal_PH0
144084_0_Nominal_PH0 0 N Nominal
AA_Site626 AA_Site626_B
SAR with Active Candidate
144084 144084_B 144084_FTK_PH0
144084_B_FTK_PH0 B Y Active
AA_Site626 AA_Site626_C
SAR with Active Candidate
144084 144084_C 144084_FTK_PH0
144084_C_FTK_PH0 C N Backup
AA_Site627 AA_Site627_0
SAR with Active Candidate
144085 144085_0
144085_Nominal_PH0
144085_0_Nominal_PH0 0 N Nominal
AA_Site627 AA_Site627_B
SAR with Active Candidate
144085 144085_B 144085_FTK_PH0
144085_B_FTK_PH0 B N Backup
AA_Site627 AA_Site627_C
SAR with Active Candidate
144085 144085_C 144085_FTK_PH0
144085_C_FTK_PH0 C N Backup
AA_Site627 AA_Site627_D
SAR with Active Candidate
144085 144085_D144085_FTK_PH0
144085_D_FTK_PH0 D N Rejected
AA_Site627 AA_Site627_E
SAR with Active Candidate
144085 144085_E 144085_FTK_PH0
144085_E_FTK_PH0 E N Rejected
AA_Site628 AA_Site628_0
SAR with Active Candidate
148021 148021_0
148021_Nominal_PH0
148021_0_Nominal_PH0 0 N Nominal
AA_Site628 AA_Site628_A
SAR with Active Candidate
148021 148021_A148021_FTK_PH0
148021_A_FTK_PH0 A N Backup
AA_Site628 AA_Site628_B
SAR with Active Candidate
148021 148021_B 148021_FTK_PH0
148021_B_FTK_PH0 B N Backup
AA_Site628 AA_Site628_D
SAR with Active Candidate
148021 148021_D148021_FTK_PH0
148021_D_FTK_PH0 D Y Active
AA_Site628 AA_Site628_C
SAR with Active Candidate
148021 148021_C 148021_FTK_PH0
148021_C_FTK_PH0 C N Rejected
AA_Site630 AA_Site630_0
SAR with Active Candidate
146037 146037_0
146037_Nominal_PH0
146037_0_Nominal_PH0 0 N Nominal
AA_Site630 AA_Site630_A
SAR with Active Candidate
146037 146037_A146037_FTK_PH0
146037_A_FTK_PH0 A N Rejected
AA_Site630 AA_Site630_B
SAR with Active Candidate
146037 146037_B 146037_FTK_PH0
146037_B_FTK_PH0 B N Rejected
AA_Site630 AA_Site630_C
SAR with Active Candidate
146037 146037_C 146037_FTK_PH0
146037_C_FTK_PH0 C N Rejected
AA_Site632 AA_Site632_0
SAR with Active Candidate
146038 146038_0
146038_Nominal_PH0
146038_0_Nominal_PH0 0 N Nominal
AA_Site632 AA_Site632_A
SAR with Active Candidate
146038 146038_A146038_FTK_PH0
146038_A_FTK_PH0 A N Backup
AA_Site632 AA_Site632_B
SAR with Active Candidate
146038 146038_B 146038_FTK_PH0
146038_B_FTK_PH0 B N Backup
AA_Site632 AA_Site632_C
SAR with Active Candidate
146038 146038_C 146038_FTK_PH0
146038_C_FTK_PH0 C N Rejected
AA_Site632 AA_Site632_D
SAR with Active Candidate
146038 146038_D146038_FTK_PH0
146038_D_FTK_PH0 D N Rejected
AA_Site632 AA_Site632_E
SAR with Active Candidate
146038 146038_E 146038_FTK_PH0
146038_E_FTK_PH0 E N Rejected
AA_Site632 AA_Site632_F
SAR with Active Candidate
146038 146038_F 146038_FTK_PH0
146038_F_FTK_PH0 F Y Active
AA_Site636 AA_Site636_0
SAR with Active Candidate
149029 149029_0
149029_Nominal_PH0
149029_0_Nominal_PH0 0 N Nominal
AA_Site636 AA_Site636_A
SAR with Active Candidate
149029 149029_A149029_FTK_PH0
149029_A_FTK_PH0 A Y Active
AA_Site636 AA_Site636_B
SAR with Active Candidate
149029 149029_B 149029_FTK_PH0
149029_B_FTK_PH0 B N Backup
AA_Site636 AA_Site636_C
SAR with Active Candidate
149029 149029_C 149029_FTK_PH0
149029_C_FTK_PH0 C N Backup
AA_Site637 AA_Site637_0
SAR with Active Candidate
149030 149030_0
149030_Nominal_PH0
149030_0_Nominal_PH0 0 N Nominal
AA_Site637 AA_Site637_A
SAR with Active Candidate
149030 149030_A149030_FTK_PH0
149030_A_FTK_PH0 A N Rejected
AA_Site637 AA_Site637_B
SAR with Active Candidate
149030 149030_B 149030_FTK_PH0
149030_B_FTK_PH0 B N Backup
AA_Site637 AA_Site637_C
SAR with Active Candidate
149030 149030_C 149030_FTK_PH0
149030_C_FTK_PH0 C N Rejected
AA_Site637 AA_Site637_D
SAR with Active Candidate
149030 149030_D149030_FTK_PH0
149030_D_FTK_PH0 D N Backup
AA_Site637 AA_Site637_E
SAR with Active Candidate
149030 149030_E 149030_FTK_PH0
149030_E_FTK_PH0 E Y Active
AA_Site638 AA_Site638_0
SAR with Active Candidate
141044 141044_0
141044_Nominal_PH0
141044_0_Nominal_PH0 0 N Nominal
AA_Site638 AA_Site638_A
SAR with Active Candidate
141044 141044_A141044_FTK_PH0
141044_A_FTK_PH0 A N Rejected
AA_Site638 AA_Site638_B
SAR with Active Candidate
141044 141044_B 141044_FTK_PH0
141044_B_FTK_PH0 B N Rejected
AA_Site638 AA_Site638_P
SAR with Active Candidate
141044 141044_P 141044_FTK_PH0
141044_P_FTK_PH0 P Y Active
AA_Site68 AA_Site68_0
SAR with Active Candidate
147053 147053_0
147053_Nominal_PH0
147053_0_Nominal_PH0 0 N Nominal
AA_Site68 AA_Site68_A
SAR with Active Candidate
147053 147053_A147053_FTK_PH0
147053_A_FTK_PH0 A N Rejected
AA_Site68 AA_Site68_B
SAR with Active Candidate
147053 147053_B 147053_FTK_PH0
147053_B_FTK_PH0 B N Rejected
AA_Site68 AA_Site68_D
SAR with Active Candidate
147053 147053_D147053_FTK_PH0
147053_D_FTK_PH0 D N Rejected
AA_Site68 AA_Site68_E
SAR with Active Candidate
147053 147053_E 147053_FTK_PH0
147053_E_FTK_PH0 E N Rejected
AA_Site7 AA_Site7_0
SAR with Active Candidate
143055 143055_0
143055_Nominal_PH0
143055_0_Nominal_PH0 0 N Nominal
AA_Site7 AA_Site7_A
SAR with Active Candidate
143055 143055_A143055_FTK_PH0
143055_A_FTK_PH0 A N Backup
AA_Site7 AA_Site7_B
SAR with Active Candidate
143055 143055_B 143055_FTK_PH0
143055_B_FTK_PH0 B N Rejected
AA_Site7 AA_Site7_C
SAR with Active Candidate
143055 143055_C 143055_FTK_PH0
143055_C_FTK_PH0 C N Rejected
AA_Site7 AA_Site7_D
SAR with Active Candidate
143055 143055_D143055_FTK_PH0
143055_D_FTK_PH0 D N Backup
AA_Site7 AA_Site7_X
SAR with Active Candidate
143055 143055_X143055_Colo_PH0
143055_X_Colo_PH0 X Y Active
AA_Site700 AA_Site700_0
SAR with Active Candidate
147071 147071_0
147071_Nominal_PH0
147071_0_Nominal_PH0 0 N Nominal
AA_Site700 AA_Site700_A
SAR with Active Candidate
147071 147071_A147071_FTK_PH0
147071_A_FTK_PH0 A N Rejected
AA_Site700 AA_Site700_B
SAR with Active Candidate
147071 147071_B 147071_FTK_PH0
147071_B_FTK_PH0 B N Rejected
AA_Site700 AA_Site700_D
SAR with Active Candidate
147071 147071_D147071_FTK_PH0
147071_D_FTK_PH0 D N Backup
AA_Site700 AA_Site700_E
SAR with Active Candidate
147071 147071_E 147071_FTK_PH0
147071_E_FTK_PH0 E Y Active
AA_Site700 AA_Site700_C
SAR with Active Candidate
147071 147071_C 147071_FTK_PH0
147071_C_FTK_PH0 C N Rejected
AA_Site702 AA_Site702_0
SAR with Active Candidate
146048 146048_0
146048_Nominal_PH0
146048_0_Nominal_PH0 0 N Nominal
AA_Site702 AA_Site702_A
SAR with Active Candidate
146048 146048_A146048_FTK_PH0
146048_A_FTK_PH0 A Y Active
AA_Site703 AA_Site703_0
SAR with Active Candidate
146050 146050_0
146050_Nominal_PH0
146050_0_Nominal_PH0 0 N Nominal
AA_Site703 AA_Site703_T
SAR with Active Candidate
146050 146050_T 146050_FTK_PH0
146050_T_FTK_PH0 T N Rejected
AA_Site703 AA_Site703_A
SAR with Active Candidate
146050 146050_A146050_FTK_PH0
146050_A_FTK_PH0 A N Rejected
AA_Site703 AA_Site703_B
SAR with Active Candidate
146050 146050_B 146050_FTK_PH0
146050_B_FTK_PH0 B Y Active
AA_Site704 AA_Site704_0
SAR with Active Candidate
146051 146051_0
146051_Nominal_PH0
146051_0_Nominal_PH0 0 N Nominal
AA_Site704 AA_Site704_A
SAR with Active Candidate
146051 146051_A146051_FTK_PH0
146051_A_FTK_PH0 A N Rejected
AA_Site704 AA_Site704_X
SAR with Active Candidate
146051 146051_X146051_Colo_PH0
146051_X_Colo_PH0 X Y Active
AA_Site707 AA_Site707_0
SAR with No Active Candidate
148024 148024_0
148024_Nominal_PH0
148024_0_Nominal_PH0 0 N Nominal
AA_Site707 AA_Site707_A
SAR with No Active Candidate
148024 148024_A148024_FTK_PH0
148024_A_FTK_PH0 A N Rejected
AA_Site707 AA_Site707_B
SAR with No Active Candidate
148024 148024_B 148024_FTK_PH0
148024_B_FTK_PH0 B N Rejected
AA_site708 AA_site708_0
SAR with Active Candidate
148027 148027_0
148027_Nominal_PH0
148027_0_Nominal_PH0 0 N Nominal
AA_site708 AA_site708_A
SAR with Active Candidate
148027 148027_A148027_FTK_PH0
148027_A_FTK_PH0 A N Backup
AA_site708 AA_site708_B
SAR with Active Candidate
148027 148027_B 148027_FTK_PH0
148027_B_FTK_PH0 B Y Active
AA_site708 AA_site708_C
SAR with Active Candidate
148027 148027_C 148027_FTK_PH0
148027_C_FTK_PH0 C N Backup
AA_site709 AA_site709_0
SAR with Active Candidate
148028 148028_0
148028_Nominal_PH0
148028_0_Nominal_PH0 0 N Nominal
AA_site709 AA_site709_A
SAR with Active Candidate
148028 148028_A148028_FTK_PH0
148028_A_FTK_PH0 A Y Active
AA_site709 AA_site709_B
SAR with Active Candidate
148028 148028_B 148028_FTK_PH0
148028_B_FTK_PH0 B N Backup
AA_site709 AA_site709_C
SAR with Active Candidate
148028 148028_C 148028_FTK_PH0
148028_C_FTK_PH0 C N Backup
AA_Site71 AA_Site71_0
SAR with Active Candidate
141045 141045_0
141045_Nominal_PH0
141045_0_Nominal_PH0 0 N Nominal
AA_Site71 AA_Site71_A
SAR with Active Candidate
141045 141045_A141045_FTK_PH0
141045_A_FTK_PH0 A N Rejected
AA_Site71 AA_Site71_B
SAR with Active Candidate
141045 141045_B 141045_FTK_PH0
141045_B_FTK_PH0 B N Rejected
AA_Site71 AA_Site71_C
SAR with Active Candidate
141045 141045_C 141045_FTK_PH0
141045_C_FTK_PH0 C Y Active
AA_Site71 AA_Site71_T
SAR with Active Candidate
141045 141045_T 141045_FTK_PH0
141045_T_FTK_PH0 T N Backup
AA_Site710 AA_Site710_0
SAR with Active Candidate
146052 146052_0
146052_Nominal_PH0
146052_0_Nominal_PH0 0 N Nominal
AA_Site710 AA_Site710_A
SAR with Active Candidate
146052 146052_A146052_FTK_PH0
146052_A_FTK_PH0 A Y Active
AA_Site712 AA_Site712_0
SAR with Active Candidate
144110 144110_0
144110_Nominal_PH0
144110_0_Nominal_PH0 0 N Nominal
AA_Site712 AA_Site712_A
SAR with Active Candidate
144110 144110_A144110_FTK_PH0
144110_A_FTK_PH0 A N Rejected
AA_Site712 AA_Site712_T
SAR with Active Candidate
144110 144110_T 144110_FTK_PH0
144110_T_FTK_PH0 T N Rejected
AA_Site712 AA_Site712_C
SAR with Active Candidate
144110 144110_C 144110_FTK_PH0
144110_C_FTK_PH0 C N Rejected
AA_Site712 AA_Site712_B
SAR with Active Candidate
144110 144110_B 144110_FTK_PH0
144110_B_FTK_PH0 B Y Active
AA_Site713 AA_Site713_0
SAR with Active Candidate
144111 144111_0
144111_Nominal_PH0
144111_0_Nominal_PH0 0 N Nominal
AA_Site713 AA_Site713_A
SAR with Active Candidate
144111 144111_A144111_FTK_PH0
144111_A_FTK_PH0 A N Rejected
AA_Site713 AA_Site713_B
SAR with Active Candidate
144111 144111_B 144111_FTK_PH0
144111_B_FTK_PH0 B N Backup
AA_Site713 AA_Site713_C
SAR with Active Candidate
144111 144111_C 144111_FTK_PH0
144111_C_FTK_PH0 C N Backup
AA_Site713 AA_Site713_X
SAR with Active Candidate
144111 144111_X144111_Colo_PH0
144111_X_Colo_PH0 X Y Active
AA_Site714 AA_Site714_0
SAR with Active Candidate
144112 144112_0
144112_Nominal_PH0
144112_0_Nominal_PH0 0 N Nominal
AA_Site714 AA_Site714_B
SAR with Active Candidate
144112 144112_B 144112_FTK_PH0
144112_B_FTK_PH0 B N Backup
AA_Site714 AA_Site714_C
SAR with Active Candidate
144112 144112_C 144112_FTK_PH0
144112_C_FTK_PH0 C N Rejected
AA_Site714 AA_Site714_D
SAR with Active Candidate
144112 144112_D144112_FTK_PH0
144112_D_FTK_PH0 D N Rejected
AA_Site714 AA_Site714_E
SAR with Active Candidate
144112 144112_E 144112_FTK_PH0
144112_E_FTK_PH0 E Y Active
AA_Site715 AA_Site715_A
SAR with Active Candidate
144113 144113_A144113_FTK_PH0
144113_A_FTK_PH0 A N Backup
AA_Site715 AA_Site715_B
SAR with Active Candidate
144113 144113_B 144113_FTK_PH0
144113_B_FTK_PH0 B N Rejected
AA_Site715 AA_Site715_C
SAR with Active Candidate
144113 144113_C 144113_FTK_PH0
144113_C_FTK_PH0 C N Rejected
AA_Site715 AA_Site715_D
SAR with Active Candidate
144113 144113_D144113_FTK_PH0
144113_D_FTK_PH0 D Y Active
AA_site717 AA_site717_0
SAR with Active Candidate
148025 148025_0
148025_Nominal_PH0
148025_0_Nominal_PH0 0 N Nominal
AA_site717 AA_site717_A
SAR with Active Candidate
148025 148025_A148025_FTK_PH0
148025_A_FTK_PH0 A N Rejected
AA_site717 AA_site717_B
SAR with Active Candidate
148025 148025_B 148025_FTK_PH0
148025_B_FTK_PH0 B N Rejected
AA_site717 AA_site717_C
SAR with Active Candidate
148025 148025_C 148025_FTK_PH0
148025_C_FTK_PH0 C N Backup
AA_site717 AA_site717_D
SAR with Active Candidate
148025 148025_D148025_FTK_PH0
148025_D_FTK_PH0 D N Rejected
AA_site717 AA_site717_E
SAR with Active Candidate
148025 148025_E 148025_FTK_PH0
148025_E_FTK_PH0 E Y Active
AA_Site718 AA_Site718_0
SAR with Active Candidate
148026 148026_0
148026_Nominal_PH0
148026_0_Nominal_PH0 0 N Nominal
AA_Site718 AA_Site718_A
SAR with Active Candidate
148026 148026_A148026_FTK_PH0
148026_A_FTK_PH0 A N Rejected
AA_Site718 AA_Site718_B
SAR with Active Candidate
148026 148026_B 148026_FTK_PH0
148026_B_FTK_PH0 B N Backup
AA_Site718 AA_Site718_C
SAR with Active Candidate
148026 148026_C 148026_FTK_PH0
148026_C_FTK_PH0 C Y Active
AA_Site718 AA_Site718_D
SAR with Active Candidate
148026 148026_D148026_FTK_PH0
148026_D_FTK_PH0 D N Backup
AA_Site718 AA_Site718_T
SAR with Active Candidate
148026 148026_T 148026_FTK_PH0
148026_T_FTK_PH0 T N Backup
AA_Site722 AA_Site722_0
SAR with No Active Candidate
145028 145028_0
145028_Nominal_PH0
145028_0_Nominal_PH0 0 N Nominal
AA_Site723 AA_Site723_0
SAR with Active Candidate
144114 144114_0
144114_Nominal_PH0
144114_0_Nominal_PH0 0 N Nominal
AA_Site723 AA_Site723_A
SAR with Active Candidate
144114 144114_A144114_FTK_PH0
144114_A_FTK_PH0 A Y Active
AA_Site726 AA_Site726_0
SAR with Active Candidate
144116 144116_0
144116_Nominal_PH0
144116_0_Nominal_PH0 0 N Nominal
AA_Site726 AA_Site726_A
SAR with Active Candidate
144116 144116_A144116_FTK_PH0
144116_A_FTK_PH0 A N Rejected
AA_Site726 AA_Site726_B
SAR with Active Candidate
144116 144116_B 144116_FTK_PH0
144116_B_FTK_PH0 B N Rejected
AA_Site726 AA_Site726_C
SAR with Active Candidate
144116 144116_C 144116_FTK_PH0
144116_C_FTK_PH0 C N Rejected
AA_Site726 AA_Site726_E
SAR with Active Candidate
144116 144116_E 144116_FTK_PH0
144116_E_FTK_PH0 E N Rejected
AA_Site726 AA_Site726_F
SAR with Active Candidate
144116 144116_F 144116_FTK_PH0
144116_F_FTK_PH0 F N Rejected
AA_Site726 AA_Site726_D
SAR with Active Candidate
144116 144116_D144116_FTK_PH0
144116_D_FTK_PH0 D N Backup
AA_Site73 AA_Site73_0
SAR with Active Candidate
147054 147054_0
147054_Nominal_PH0
147054_0_Nominal_PH0 0 N Nominal
AA_Site73 AA_Site73_A
SAR with Active Candidate
147054 147054_A147054_FTK_PH0
147054_A_FTK_PH0 A N Rejected
AA_Site73 AA_Site73_B
SAR with Active Candidate
147054 147054_B 147054_FTK_PH0
147054_B_FTK_PH0 B N Backup
AA_Site73 AA_Site73_C
SAR with Active Candidate
147054 147054_C 147054_FTK_PH0
147054_C_FTK_PH0 C N Rejected
AA_Site737 AA_Site737_0
SAR with Active Candidate
149033 149033_0
149033_Nominal_PH0
149033_0_Nominal_PH0 0 N Nominal
AA_Site737 AA_Site737_A
SAR with Active Candidate
149033 149033_A149033_FTK_PH0
149033_A_FTK_PH0 A N Rejected
AA_Site737 AA_Site737_B
SAR with Active Candidate
149033 149033_B 149033_FTK_PH0
149033_B_FTK_PH0 B N Backup
AA_Site737 AA_Site737_C
SAR with Active Candidate
149033 149033_C 149033_FTK_PH0
149033_C_FTK_PH0 C N Rejected
AA_Site737 AA_Site737_D
SAR with Active Candidate
149033 149033_D149033_FTK_PH0
149033_D_FTK_PH0 D N Backup
AA_Site737 AA_Site737_X
SAR with Active Candidate
149033 149033_X149033_Colo_PH0
149033_X_Colo_PH0 X Y Active
AA_Site741 AA_Site741_0
SAR with Active Candidate
149034 149034_0
149034_Nominal_PH0
149034_0_Nominal_PH0 0 N Nominal
AA_Site741 AA_Site741_A
SAR with Active Candidate
149034 149034_A149034_FTK_PH0
149034_A_FTK_PH0 A N Backup
AA_Site741 AA_Site741_B
SAR with Active Candidate
149034 149034_B 149034_FTK_PH0
149034_B_FTK_PH0 B Y Active
AA_Site741 AA_Site741_P
SAR with Active Candidate
149034 149034_P 149034_FTK_PH0
149034_P_FTK_PH0 P N Rejected
AA_Site751 AA_Site751_0
SAR with Active Candidate
145029 145029_0
145029_Nominal_PH0
145029_0_Nominal_PH0 0 N Nominal
AA_Site751 AA_Site751_A
SAR with Active Candidate
145029 145029_A145029_FTK_PH0
145029_A_FTK_PH0 A Y Active
AA_Site751 AA_Site751_B
SAR with Active Candidate
145029 145029_B 145029_FTK_PH0
145029_B_FTK_PH0 B N Backup
AA_Site751 AA_Site751_C
SAR with Active Candidate
145029 145029_C 145029_FTK_PH0
145029_C_FTK_PH0 C N Backup
AA_Site76 AA_Site76_0
SAR with Active Candidate
140022 140022_0
140022_Nominal_PH0
140022_0_Nominal_PH0 0 N Nominal
AA_Site76 AA_Site76_A
SAR with Active Candidate
140022 140022_A140022_FTK_PH0
140022_A_FTK_PH0 A Y Active
AA_Site8 AA_Site8_0
SAR with Active Candidate
147056 147056_0
147056_Nominal_PH0
147056_0_Nominal_PH0 0 N Nominal
AA_Site8 AA_Site8_A
SAR with Active Candidate
147056 147056_A147056_FTK_PH0
147056_A_FTK_PH0 A N Backup
AA_Site8 AA_Site8_B
SAR with Active Candidate
147056 147056_B 147056_FTK_PH0
147056_B_FTK_PH0 B N Rejected
AA_Site8 AA_Site8_C
SAR with Active Candidate
147056 147056_C 147056_FTK_PH0
147056_C_FTK_PH0 C N Rejected
AA_Site8 AA_Site8_D
SAR with Active Candidate
147056 147056_D147056_FTK_PH0
147056_D_FTK_PH0 D N Backup
AA_Site8 AA_Site8_X
SAR with Active Candidate
147056 147056_X147056_Colo_PH0
147056_X_Colo_PH0 X Y Active
AA_Site9 AA_Site9_0
SAR with Active Candidate
142062 142062_0
142062_Nominal_PH0
142062_0_Nominal_PH0 0 N Nominal
AA_Site9 AA_Site9_X
SAR with Active Candidate
142062 142062_X142062_Colo_PH0
142062_X_Colo_PH0 X Y Active
AA_Site9 AA_Site9_A
SAR with Active Candidate
142062 142062_A142062_FTK_PH0
142062_A_FTK_PH0 A N Backup
AA_Site9 AA_Site9_B
SAR with Active Candidate
142062 142062_B 142062_FTK_PH0
142062_B_FTK_PH0 B N Rejected
AA_Site9 AA_Site9_C
SAR with Active Candidate
142062 142062_C 142062_FTK_PH0
142062_C_FTK_PH0 C N Backup
AA_Site93 AA_Site93_0
SAR with Active Candidate
144087 144087_0
144087_Nominal_PH0
144087_0_Nominal_PH0 0 N Nominal
AA_Site93 AA_Site93_X
SAR with Active Candidate
144087 144087_X144087_Colo_PH0
144087_X_Colo_PH0 X Y Active
AA_Site93 AA_Site93_A
SAR with Active Candidate
144087 144087_A144087_FTK_PH0
144087_A_FTK_PH0 A N Rejected
AA_Site93 AA_Site93_C
SAR with Active Candidate
144087 144087_C 144087_FTK_PH0
144087_C_FTK_PH0 C N Backup
AA_Site93 AA_Site93_B
SAR with Active Candidate
144087 144087_B 144087_FTK_PH0
144087_B_FTK_PH0 B N Rejected
AA_Site94 AA_Site94_0
SAR with Active Candidate
146042 146042_0
146042_Nominal_PH0
146042_0_Nominal_PH0 0 N Nominal
AA_Site94 AA_Site94_A
SAR with Active Candidate
146042 146042_A146042_FTK_PH0
146042_A_FTK_PH0 A N Rejected
AA_Site94 AA_Site94_X
SAR with Active Candidate
146042 146042_X146042_Colo_PH0
146042_X_Colo_PH0 X Y Active
AA_Site95 AA_Site95_0
SAR with Active Candidate
145025 145025_0
145025_Nominal_PH0
145025_0_Nominal_PH0 0 N Nominal
AA_Site95 AA_Site95_A
SAR with Active Candidate
145025 145025_A145025_FTK_PH0
145025_A_FTK_PH0 A N Rejected
AA_Site95 AA_Site95_B
SAR with Active Candidate
145025 145025_B 145025_FTK_PH0
145025_B_FTK_PH0 B N Rejected
AA_Site95 AA_Site95_C
SAR with Active Candidate
145025 145025_C 145025_FTK_PH0
145025_C_FTK_PH0 C Y Active
AA_Site96 AA_Site96_0
SAR with Active Candidate
143056 143056_0
143056_Nominal_PH0
143056_0_Nominal_PH0 0 N Nominal
AA_Site96 AA_Site96_A
SAR with Active Candidate
143056 143056_A143056_FTK_PH0
143056_A_FTK_PH0 A N Rejected
AA_Site96 AA_Site96_B
SAR with Active Candidate
143056 143056_B 143056_FTK_PH0
143056_B_FTK_PH0 B N Rejected
AA_Site96 AA_Site96_C
SAR with Active Candidate
143056 143056_C 143056_FTK_PH0
143056_C_FTK_PH0 C N Rejected
AA_Site96 AA_Site96_D
SAR with Active Candidate
143056 143056_D143056_FTK_PH0
143056_D_FTK_PH0 D N Rejected
AA_Site96 AA_Site96_X
SAR with Active Candidate
143056 143056_X143056_Colo_PH0
143056_X_Colo_PH0 X Y Active
AA_Site97 AA_Site97_0
SAR with Active Candidate
144088 144088_0
144088_Nominal_PH0
144088_0_Nominal_PH0 0 N Nominal
AA_Site97 AA_Site97_A
SAR with Active Candidate
144088 144088_A144088_FTK_PH0
144088_A_FTK_PH0 A Y Active
AA_Site97 AA_Site97_B
SAR with Active Candidate
144088 144088_B 144088_FTK_PH0
144088_B_FTK_PH0 B N Backup
AA_Site97 AA_Site97_C
SAR with Active Candidate
144088 144088_C 144088_FTK_PH0
144088_C_FTK_PH0 C N Backup
AA_Site98 AA_Site98_0
SAR with Active Candidate
147057 147057_0
147057_Nominal_PH0
147057_0_Nominal_PH0 0 N Nominal
AA_Site98 AA_Site98_A
SAR with Active Candidate
147057 147057_A147057_FTK_PH0
147057_A_FTK_PH0 A N Rejected
AA_Site98 AA_Site98_B
SAR with Active Candidate
147057 147057_B 147057_FTK_PH0
147057_B_FTK_PH0 B N Rejected
AA_Site98 AA_Site98_C
SAR with Active Candidate
147057 147057_C 147057_FTK_PH0
147057_C_FTK_PH0 C Y Active
AA_Site99 AA_Site99_0
SAR with Active Candidate
149031 149031_0
149031_Nominal_PH0
149031_0_Nominal_PH0 0 N Nominal
AA_Site99 AA_Site99_A
SAR with Active Candidate
149031 149031_A149031_FTK_PH0
149031_A_FTK_PH0 A N Backup
AA_Site99 AA_Site99_B
SAR with Active Candidate
149031 149031_B 149031_FTK_PH0
149031_B_FTK_PH0 B N Rejected
AA_Site99 AA_Site99_C
SAR with Active Candidate
149031 149031_C 149031_FTK_PH0
149031_C_FTK_PH0 C N Backup
AA_Site99 AA_Site99_D
SAR with Active Candidate
149031 149031_D149031_FTK_PH0
149031_D_FTK_PH0 D N Backup
AA_Site99 AA_Site99_E
SAR with Active Candidate
149031 149031_E 149031_FTK_PH0
149031_E_FTK_PH0 E N Backup
AA_Site99 AA_Site99_F
SAR with Active Candidate
149031 149031_F 149031_FTK_PH0
149031_F_FTK_PH0 F Y Active
GAM_Site122GAM_Site122_0
SAR with Active Candidate
122001 122001_0
122001_Nominal_PH0
122001_0_Nominal_PH0 0 N Nominal
GAM_Site122GAM_Site122_T
SAR with Active Candidate
122001 122001_T 122001_FTK_PH0
122001_T_FTK_PH0 T Y Active
GAM_Site143GAM_Site143_0
SAR with Active Candidate
122003 122003_0
122003_Nominal_PH0
122003_0_Nominal_PH0 0 N Nominal
GAM_Site143GAM_Site143_T
SAR with Active Candidate
122003 122003_T 122003_FTK_PH0
122003_T_FTK_PH0 T Y Active
GAM_Site42 GAM_Site42_0
SAR with Active Candidate
122011 122011_0
122011_Nominal_PH0
122011_0_Nominal_PH0 0 N Nominal
GAM_Site42 GAM_Site42_A
SAR with Active Candidate
122011 122011_A122011_FTK_PH0
122011_A_FTK_PH0 A Y Active
GAM_Site43 GAM_Site43_0
SAR with Active Candidate
122004 122004_0
122004_Nominal_PH0
122004_0_Nominal_PH0 0 N Nominal
GAM_Site43 GAM_Site43_A
SAR with Active Candidate
122004 122004_A122004_FTK_PH0
122004_A_FTK_PH0 A Y Active
GAM_Site45 GAM_Site45_0
SAR with Active Candidate
122006 122006_0
122006_Nominal_PH0
122006_0_Nominal_PH0 0 N Nominal
GAM_Site45 GAM_Site45_A
SAR with Active Candidate
122006 122006_A122006_FTK_PH0
122006_A_FTK_PH0 A Y Active
GAM_Site72 GAM_Site72_0
SAR with Active Candidate
122007 122007_0
122007_Nominal_PH0
122007_0_Nominal_PH0 0 N Nominal
GAM_Site72 GAM_Site72_A
SAR with Active Candidate
122007 122007_A122007_FTK_PH0
122007_A_FTK_PH0 A Y Active
GAM_Site73 GAM_Site73_0
SAR with Active Candidate
122008 122008_0
122008_Nominal_PH0
122008_0_Nominal_PH0 0 N Nominal
GAM_Site73 GAM_Site73_T
SAR with Active Candidate
122008 122008_T 122008_FTK_PH0
122008_T_FTK_PH0 T Y Active
GAM_Site91 GAM_Site91_0
SAR with Active Candidate
122010 122010_0
122010_Nominal_PH0
122010_0_Nominal_PH0 0 N Nominal
GAM_Site91 GAM_Site91_B
SAR with Active Candidate
122010 122010_B 122010_FTK_PH0
122010_B_FTK_PH0 B Y Active
GAM_Site91 GAM_Site91_A
SAR with Active Candidate
122010 122010_A122010_FTK_PH0
122010_A_FTK_PH0 A N Rejected
ORO_Site10 ORO_Site10_0
SAR with Active Candidate
705037 705037_0
705037_Nominal_PH0
705037_0_Nominal_PH0 0 N Nominal
ORO_Site10 ORO_Site10_A
SAR with Active Candidate
705037 705037_A705037_FTK_PH0
705037_A_FTK_PH0 A Y Active
ORO_Site10 ORO_Site10_T
SAR with Active Candidate
705037 705037_T 705037_FTK_PH0
705037_T_FTK_PH0 T N Rejected
ORO_Site100 ORO_Site100_0
SAR with Active Candidate
404014 404014_0
404014_Nominal_PH0
404014_0_Nominal_PH0 0 N Nominal
ORO_Site100ORO_Site100_A
SAR with Active Candidate
404014 404014_A404014_FTK_PH0
404014_A_FTK_PH0 A Y Active
ORO_Site100ORO_Site100_B
SAR with Active Candidate
404014 404014_B 404014_FTK_PH0
404014_B_FTK_PH0 B N Backup
ORO_Site1064ORO_Site1064_0
SAR with Active Candidate
417034 417034_0
417034_Nominal_PH0
417034_0_Nominal_PH0 0 N Nominal
ORO_Site1064ORO_Site1064_A
SAR with Active Candidate
417034 417034_A417034_FTK_PH0
417034_A_FTK_PH0 A Y Active
ORO_Site11 ORO_Site11_0
SAR with Active Candidate
414115 414115_0
414115_Nominal_PH0
414115_0_Nominal_PH0 0 N Nominal
ORO_Site11 ORO_Site11_A
SAR with Active Candidate
414115 414115_A414115_FTK_PH0
414115_A_FTK_PH0 A Y Active
ORO_Site1186ORO_Site1186_0
SAR with Active Candidate
407002 407002_0
407002_Nominal_PH0
407002_0_Nominal_PH0 0 N Nominal
ORO_Site1186ORO_Site1186_A
SAR with Active Candidate
407002 407002_A407002_FTK_PH0
407002_A_FTK_PH0 A N Rejected
ORO_Site1186ORO_Site1186_B
SAR with Active Candidate
407002 407002_B 407002_FTK_PH0
407002_B_FTK_PH0 B N Rejected
ORO_Site1186ORO_Site1186_C
SAR with Active Candidate
407002 407002_C 407002_FTK_PH0
407002_C_FTK_PH0 C N Rejected
ORO_Site1186ORO_Site1186_D
SAR with Active Candidate
407002 407002_D407002_FTK_PH0
407002_D_FTK_PH0 D Y Active
ORO_Site155 ORO_Site155_0
SAR with Active Candidate
403003 403003_0
403003_Nominal_PH0
403003_0_Nominal_PH0 0 N Nominal
ORO_Site155ORO_Site155_A
SAR with Active Candidate
403003 403003_A403003_FTK_PH0
403003_A_FTK_PH0 A Y Active
ORO_Site160 ORO_Site160_0
SAR with Active Candidate
403005 403005_0
403005_Nominal_PH0
403005_0_Nominal_PH0 0 N Nominal
ORO_Site160ORO_Site160_A
SAR with Active Candidate
403005 403005_A403005_FTK_PH0
403005_A_FTK_PH0 A Y Active
ORO_Site166 ORO_Site166_0
SAR with Active Candidate
140029 140029_0
140029_Nominal_PH0
140029_0_Nominal_PH0 0 N Nominal
ORO_Site166ORO_Site166_B
SAR with Active Candidate
140029 140029_B 140029_FTK_PH0
140029_B_FTK_PH0 B N Backup
ORO_Site166ORO_Site166_C
SAR with Active Candidate
140029 140029_C 140029_FTK_PH0
140029_C_FTK_PH0 C N Backup
ORO_Site166ORO_Site166_D
SAR with Active Candidate
140029 140029_D140029_FTK_PH0
140029_D_FTK_PH0 D Y Active
ORO_Site167 ORO_Site167_0
SAR with Active Candidate
407004 407004_0
407004_Nominal_PH0
407004_0_Nominal_PH0 0 N Nominal
ORO_Site167ORO_Site167_A
SAR with Active Candidate
407004 407004_A407004_FTK_PH0
407004_A_FTK_PH0 A N Rejected
ORO_Site167ORO_Site167_B
SAR with Active Candidate
407004 407004_B 407004_FTK_PH0
407004_B_FTK_PH0 B N Rejected
ORO_Site167 ORO_Site167_T
SAR with Active Candidate
407004 407004_T 407004_FTK_PH0
407004_T_FTK_PH0 T Y Active
ORO_Site168 ORO_Site168_0
SAR with Active Candidate
408001 408001_0
408001_Nominal_PH0
408001_0_Nominal_PH0 0 N Nominal
ORO_Site168ORO_Site168_A
SAR with Active Candidate
408001 408001_A408001_FTK_PH0
408001_A_FTK_PH0 A N Rejected
ORO_Site168ORO_Site168_B
SAR with Active Candidate
408001 408001_B 408001_FTK_PH0
408001_B_FTK_PH0 B N Rejected
ORO_Site168ORO_Site168_C
SAR with Active Candidate
408001 408001_C 408001_FTK_PH0
408001_C_FTK_PH0 C N Rejected
ORO_Site168ORO_Site168_D
SAR with Active Candidate
408001 408001_D408001_FTK_PH0
408001_D_FTK_PH0 D Y Active
ORO_Site170 ORO_Site170_0
SAR with Active Candidate
408003 408003_0
408003_Nominal_PH0
408003_0_Nominal_PH0 0 N Nominal
ORO_Site170ORO_Site170_B
SAR with Active Candidate
408003 408003_B 408003_FTK_PH0
408003_B_FTK_PH0 B N Rejected
ORO_Site170ORO_Site170_C
SAR with Active Candidate
408003 408003_C 408003_FTK_PH0
408003_C_FTK_PH0 C N Rejected
ORO_Site170ORO_Site170_D
SAR with Active Candidate
408003 408003_D408003_FTK_PH0
408003_D_FTK_PH0 D Y Active
ORO_Site171 ORO_Site171_0
SAR with Active Candidate
408004 408004_0
408004_Nominal_PH0
408004_0_Nominal_PH0 0 N Nominal
ORO_Site171ORO_Site171_B
SAR with Active Candidate
408004 408004_B 408004_FTK_PH0
408004_B_FTK_PH0 B N Rejected
ORO_Site171ORO_Site171_A
SAR with Active Candidate
408004 408004_A408004_FTK_PH0
408004_A_FTK_PH0 A N Rejected
ORO_Site171ORO_Site171_C
SAR with Active Candidate
408004 408004_C 408004_FTK_PH0
408004_C_FTK_PH0 C Y Active
ORO_Site172 ORO_Site172_0
SAR with Active Candidate
407005 407005_0
407005_Nominal_PH0
407005_0_Nominal_PH0 0 N Nominal
ORO_Site172ORO_Site172_A
SAR with Active Candidate
407005 407005_A407005_FTK_PH0
407005_A_FTK_PH0 A N Rejected
ORO_Site172ORO_Site172_B
SAR with Active Candidate
407005 407005_B 407005_FTK_PH0
407005_B_FTK_PH0 B N Rejected
ORO_Site172ORO_Site172_C
SAR with Active Candidate
407005 407005_C 407005_FTK_PH0
407005_C_FTK_PH0 C N Backup
ORO_Site172 ORO_Site172_X
SAR with Active Candidate
407005 407005_X407005_Colo_PH0
407005_X_Colo_PH0 X Y Active
ORO_Site173 ORO_Site173_0
SAR with Active Candidate
417001 417001_0
417001_Nominal_PH0
417001_0_Nominal_PH0 0 N Nominal
ORO_Site173 ORO_Site173_T
SAR with Active Candidate
417001 417001_T 417001_FTK_PH0
417001_T_FTK_PH0 T Y Active
ORO_Site1737ORO_Site1737_0
SAR with Active Candidate
407006 407006_0
407006_Nominal_PH0
407006_0_Nominal_PH0 0 N Nominal
ORO_Site1737ORO_Site1737_A
SAR with Active Candidate
407006 407006_A407006_FTK_PH0
407006_A_FTK_PH0 A N Rejected
ORO_Site1737ORO_Site1737_B
SAR with Active Candidate
407006 407006_B 407006_FTK_PH0
407006_B_FTK_PH0 B N Rejected
ORO_Site1737ORO_Site1737_C
SAR with Active Candidate
407006 407006_C 407006_FTK_PH0
407006_C_FTK_PH0 C Y Active
ORO_Site1737ORO_Site1737_T
SAR with Active Candidate
407006 407006_T 407006_FTK_PH0
407006_T_FTK_PH0 T N Rejected
ORO_Site174 ORO_Site174_0
SAR with Active Candidate
407007 407007_0
407007_Nominal_PH0
407007_0_Nominal_PH0 0 N Nominal
ORO_Site174ORO_Site174_A
SAR with Active Candidate
407007 407007_A407007_FTK_PH0
407007_A_FTK_PH0 A N Backup
ORO_Site174ORO_Site174_B
SAR with Active Candidate
407007 407007_B 407007_FTK_PH0
407007_B_FTK_PH0 B Y Active
ORO_Site176 ORO_Site176_0
SAR with Active Candidate
407009 407009_0
407009_Nominal_PH0
407009_0_Nominal_PH0 0 N Nominal
ORO_Site176ORO_Site176_A
SAR with Active Candidate
407009 407009_A407009_FTK_PH0
407009_A_FTK_PH0 A N Rejected
ORO_Site176ORO_Site176_B
SAR with Active Candidate
407009 407009_B 407009_FTK_PH0
407009_B_FTK_PH0 B N Rejected
ORO_Site176ORO_Site176_C
SAR with Active Candidate
407009 407009_C 407009_FTK_PH0
407009_C_FTK_PH0 C Y Active
ORO_Site176 ORO_Site176_T
SAR with Active Candidate
407009 407009_T 407009_FTK_PH0
407009_T_FTK_PH0 T N Rejected
ORO_Site178 ORO_Site178_0
SAR with Active Candidate
407010 407010_0
407010_Nominal_PH0
407010_0_Nominal_PH0 0 N Nominal
ORO_Site178ORO_Site178_A
SAR with Active Candidate
407010 407010_A407010_FTK_PH0
407010_A_FTK_PH0 A N Backup
ORO_Site178ORO_Site178_B
SAR with Active Candidate
407010 407010_B 407010_FTK_PH0
407010_B_FTK_PH0 B N Backup
ORO_Site178ORO_Site178_C
SAR with Active Candidate
407010 407010_C 407010_FTK_PH0
407010_C_FTK_PH0 C N Backup
ORO_Site178ORO_Site178_D
SAR with Active Candidate
407010 407010_D407010_FTK_PH0
407010_D_FTK_PH0 D Y Active
ORO_Site178 ORO_Site178_T
SAR with Active Candidate
407010 407010_T 407010_FTK_PH0
407010_T_FTK_PH0 T N Backup
ORO_Site179 ORO_Site179_0
SAR with Active Candidate
407011 407011_0
407011_Nominal_PH0
407011_0_Nominal_PH0 0 N Nominal
ORO_Site179ORO_Site179_A
SAR with Active Candidate
407011 407011_A407011_FTK_PH0
407011_A_FTK_PH0 A N Backup
ORO_Site179ORO_Site179_B
SAR with Active Candidate
407011 407011_B 407011_FTK_PH0
407011_B_FTK_PH0 B N Backup
ORO_Site179ORO_Site179_C
SAR with Active Candidate
407011 407011_C 407011_FTK_PH0
407011_C_FTK_PH0 C N Backup
ORO_Site179 ORO_Site179_T
SAR with Active Candidate
407011 407011_T 407011_FTK_PH0
407011_T_FTK_PH0 T Y Active
ORO_Site180 ORO_Site180_0
SAR with Active Candidate
407012 407012_0
407012_Nominal_PH0
407012_0_Nominal_PH0 0 N Nominal
ORO_Site180ORO_Site180_A
SAR with Active Candidate
407012 407012_A407012_FTK_PH0
407012_A_FTK_PH0 A N Backup
ORO_Site180ORO_Site180_B
SAR with Active Candidate
407012 407012_B 407012_FTK_PH0
407012_B_FTK_PH0 B N Backup
ORO_Site180ORO_Site180_C
SAR with Active Candidate
407012 407012_C 407012_FTK_PH0
407012_C_FTK_PH0 C N Backup
ORO_Site180 ORO_Site180_E
SAR with Active Candidate
407012 407012_E 407012_FTK_PH0
407012_E_FTK_PH0 E Y Active
ORO_Site180ORO_Site180_D
SAR with Active Candidate
407012 407012_D407012_FTK_PH0
407012_D_FTK_PH0 D N Rejected
ORO_Site181 ORO_Site181_0
SAR with Active Candidate
407013 407013_0
407013_Nominal_PH0
407013_0_Nominal_PH0 0 N Nominal
ORO_Site181ORO_Site181_A
SAR with Active Candidate
407013 407013_A407013_FTK_PH0
407013_A_FTK_PH0 A N Backup
ORO_Site181ORO_Site181_B
SAR with Active Candidate
407013 407013_B 407013_FTK_PH0
407013_B_FTK_PH0 B N Backup
ORO_Site181ORO_Site181_C
SAR with Active Candidate
407013 407013_C 407013_FTK_PH0
407013_C_FTK_PH0 C N Backup
ORO_Site181 ORO_Site181_X
SAR with Active Candidate
407013 407013_X407013_Colo_PH0
407013_X_Colo_PH0 X Y Active
ORO_Site181 ORO_Site181_T
SAR with Active Candidate
407013 407013_T 407013_FTK_PH0
407013_T_FTK_PH0 T N Backup
ORO_Site185 ORO_Site185_0
SAR with Active Candidate
407014 407014_0
407014_Nominal_PH0
407014_0_Nominal_PH0 0 N Nominal
ORO_Site185ORO_Site185_A
SAR with Active Candidate
407014 407014_A407014_FTK_PH0
407014_A_FTK_PH0 A N Backup
ORO_Site185ORO_Site185_B
SAR with Active Candidate
407014 407014_B 407014_FTK_PH0
407014_B_FTK_PH0 B Y Active
ORO_Site186 ORO_Site186_0
SAR with Active Candidate
407015 407015_0
407015_Nominal_PH0
407015_0_Nominal_PH0 0 N Nominal
ORO_Site186ORO_Site186_A
SAR with Active Candidate
407015 407015_A407015_FTK_PH0
407015_A_FTK_PH0 A Y Active
ORO_Site186ORO_Site186_B
SAR with Active Candidate
407015 407015_B 407015_FTK_PH0
407015_B_FTK_PH0 B N Backup
ORO_Site189 ORO_Site189_0
SAR with Active Candidate
407017 407017_0
407017_Nominal_PH0
407017_0_Nominal_PH0 0 N Nominal
ORO_Site189ORO_Site189_A
SAR with Active Candidate
407017 407017_A407017_FTK_PH0
407017_A_FTK_PH0 A N Backup
ORO_Site189ORO_Site189_B
SAR with Active Candidate
407017 407017_B 407017_FTK_PH0
407017_B_FTK_PH0 B N Backup
ORO_Site189ORO_Site189_D
SAR with Active Candidate
407017 407017_D407017_FTK_PH0
407017_D_FTK_PH0 D Y Active
ORO_Site189ORO_Site189_C
SAR with Active Candidate
407017 407017_C 407017_FTK_PH0
407017_C_FTK_PH0 C N Backup
ORO_Site194 ORO_Site194_0
SAR with Active Candidate
407020 407020_0
407020_Nominal_PH0
407020_0_Nominal_PH0 0 N Nominal
ORO_Site194ORO_Site194_A
SAR with Active Candidate
407020 407020_A407020_FTK_PH0
407020_A_FTK_PH0 A N Rejected
ORO_Site194ORO_Site194_B
SAR with Active Candidate
407020 407020_B 407020_FTK_PH0
407020_B_FTK_PH0 B N Rejected
ORO_Site194ORO_Site194_C
SAR with Active Candidate
407020 407020_C 407020_FTK_PH0
407020_C_FTK_PH0 C Y Active
ORO_Site1976ORO_Site1976_0
SAR with Active Candidate
407021 407021_0
407021_Nominal_PH0
407021_0_Nominal_PH0 0 N Nominal
ORO_Site1976ORO_Site1976_A
SAR with Active Candidate
407021 407021_A407021_FTK_PH0
407021_A_FTK_PH0 A N Rejected
ORO_Site1976ORO_Site1976_B
SAR with Active Candidate
407021 407021_B 407021_FTK_PH0
407021_B_FTK_PH0 B N Rejected
ORO_Site1976ORO_Site1976_C
SAR with Active Candidate
407021 407021_C 407021_FTK_PH0
407021_C_FTK_PH0 C Y Active
ORO_Site2318ORO_Site2318_0
SAR with Active Candidate
407023 407023_0
407023_Nominal_PH0
407023_0_Nominal_PH0 0 N Nominal
ORO_Site2318ORO_Site2318_B
SAR with Active Candidate
407023 407023_B 407023_FTK_PH0
407023_B_FTK_PH0 B N Rejected
ORO_Site2318ORO_Site2318_C
SAR with Active Candidate
407023 407023_C 407023_FTK_PH0
407023_C_FTK_PH0 C N Rejected
ORO_Site2318ORO_Site2318_D
SAR with Active Candidate
407023 407023_D407023_FTK_PH0
407023_D_FTK_PH0 D N Rejected
ORO_Site2318ORO_Site2318_E
SAR with Active Candidate
407023 407023_E 407023_FTK_PH0
407023_E_FTK_PH0 E N Rejected
ORO_Site2318ORO_Site2318_F
SAR with Active Candidate
407023 407023_F 407023_FTK_PH0
407023_F_FTK_PH0 F Y Active
ORO_Site2628ORO_Site2628_0
SAR with Active Candidate
408025 408025_0
408025_Nominal_PH0
408025_0_Nominal_PH0 0 N Nominal
ORO_Site2628ORO_Site2628_A
SAR with Active Candidate
408025 408025_A408025_FTK_PH0
408025_A_FTK_PH0 A N Rejected
ORO_Site2628ORO_Site2628_B
SAR with Active Candidate
408025 408025_B 408025_FTK_PH0
408025_B_FTK_PH0 B Y Active
ORO_Site2628ORO_Site2628_C
SAR with Active Candidate
408025 408025_C 408025_FTK_PH0
408025_C_FTK_PH0 C N Backup
ORO_Site2642ORO_Site2642_0
SAR with Active Candidate
408031 408031_0
408031_Nominal_PH0
408031_0_Nominal_PH0 0 N Nominal
ORO_Site2642ORO_Site2642_A
SAR with Active Candidate
408031 408031_A408031_FTK_PH0
408031_A_FTK_PH0 A N Rejected
ORO_Site2642ORO_Site2642_B
SAR with Active Candidate
408031 408031_B 408031_FTK_PH0
408031_B_FTK_PH0 B N Rejected
ORO_Site2642ORO_Site2642_C
SAR with Active Candidate
408031 408031_C 408031_FTK_PH0
408031_C_FTK_PH0 C Y Active
ORO_Site2765ORO_Site2765_0
SAR with Active Candidate
417003 417003_0
417003_Nominal_PH0
417003_0_Nominal_PH0 0 N Nominal
ORO_Site2765ORO_Site2765_T
SAR with Active Candidate
417003 417003_T 417003_FTK_PH0
417003_T_FTK_PH0 T N Rejected
ORO_Site2765ORO_Site2765_A
SAR with Active Candidate
417003 417003_A417003_FTK_PH0
417003_A_FTK_PH0 A Y Active
ORO_Site2767ORO_Site2767_0
SAR with Active Candidate
417004 417004_0
417004_Nominal_PH0
417004_0_Nominal_PH0 0 N Nominal
ORO_Site2767ORO_Site2767_A
SAR with Active Candidate
417004 417004_A417004_FTK_PH0
417004_A_FTK_PH0 A N Rejected
ORO_Site2767ORO_Site2767_B
SAR with Active Candidate
417004 417004_B 417004_FTK_PH0
417004_B_FTK_PH0 B Y Active
ORO_Site2767ORO_Site2767_C
SAR with Active Candidate
417004 417004_C 417004_FTK_PH0
417004_C_FTK_PH0 C N Backup
ORO_Site2810ORO_Site2810_0
SAR with Active Candidate
417005 417005_0
417005_Nominal_PH0
417005_0_Nominal_PH0 0 N Nominal
ORO_Site2810ORO_Site2810_T
SAR with Active Candidate
417005 417005_T 417005_FTK_PH0
417005_T_FTK_PH0 T Y Active
ORO_Site2918ORO_Site2918_0
SAR with Active Candidate
417006 417006_0
417006_Nominal_PH0
417006_0_Nominal_PH0 0 N Nominal
ORO_Site2918ORO_Site2918_T
SAR with Active Candidate
417006 417006_T 417006_FTK_PH0
417006_T_FTK_PH0 T Y Active
ORO_Site3006ORO_Site3006_0
SAR with Active Candidate
407024 407024_0
407024_Nominal_PH0
407024_0_Nominal_PH0 0 N Nominal
ORO_Site3006ORO_Site3006_A
SAR with Active Candidate
407024 407024_A407024_FTK_PH0
407024_A_FTK_PH0 A N Rejected
ORO_Site3006ORO_Site3006_B
SAR with Active Candidate
407024 407024_B 407024_FTK_PH0
407024_B_FTK_PH0 B N Rejected
ORO_Site3006ORO_Site3006_C
SAR with Active Candidate
407024 407024_C 407024_FTK_PH0
407024_C_FTK_PH0 C N Rejected
ORO_Site3006ORO_Site3006_D
SAR with Active Candidate
407024 407024_D407024_FTK_PH0
407024_D_FTK_PH0 D N Rejected
ORO_Site3006ORO_Site3006_X
SAR with Active Candidate
407024 407024_X407024_Colo_PH0
407024_X_Colo_PH0 X Y Active
ORO_Site3363ORO_Site3363_0
SAR with Active Candidate
407025 407025_0
407025_Nominal_PH0
407025_0_Nominal_PH0 0 N Nominal
ORO_Site3363ORO_Site3363_A
SAR with Active Candidate
407025 407025_A407025_FTK_PH0
407025_A_FTK_PH0 A N Rejected
ORO_Site3363ORO_Site3363_B
SAR with Active Candidate
407025 407025_B 407025_FTK_PH0
407025_B_FTK_PH0 B N Backup
ORO_Site3363ORO_Site3363_C
SAR with Active Candidate
407025 407025_C 407025_FTK_PH0
407025_C_FTK_PH0 C Y Active
ORO_Site340 ORO_Site340_0
SAR with No Active Candidate
404003 404003_0
404003_Nominal_PH0
404003_0_Nominal_PH0 0 N Nominal
ORO_Site340 ORO_Site340_T
SAR with No Active Candidate
404003 404003_T 404003_FTK_PH0
404003_T_FTK_PH0 T N Rejected
ORO_Site340ORO_Site340_A
SAR with Active Candidate
404003 404003_A404003_FTK_PH0
404003_A_FTK_PH0 A Y Active
ORO_Site3451ORO_Site3451_0
SAR with Active Candidate
140030 140030_0
140030_Nominal_PH0
140030_0_Nominal_PH0 0 N Nominal
ORO_Site3451ORO_Site3451_A
SAR with Active Candidate
140030 140030_A140030_FTK_PH0
140030_A_FTK_PH0 A N Rejected
ORO_Site3451ORO_Site3451_B
SAR with Active Candidate
140030 140030_B 140030_FTK_PH0
140030_B_FTK_PH0 B N Rejected
ORO_Site3451ORO_Site3451_T
SAR with Active Candidate
140030 140030_T 140030_FTK_PH0
140030_T_FTK_PH0 T N Backup
ORO_Site3451ORO_Site3451_C
SAR with Active Candidate
140030 140030_C 140030_FTK_PH0
140030_C_FTK_PH0 C N Rejected
ORO_Site3451ORO_Site3451_D
SAR with Active Candidate
140030 140030_D140030_FTK_PH0
140030_D_FTK_PH0 D Y Active
ORO_Site3473ORO_Site3473_0
SAR with Active Candidate
407123 407123_0
407123_Nominal_PH0
407123_0_Nominal_PH0 0 N Nominal
ORO_Site3473ORO_Site3473_A
SAR with Active Candidate
407123 407123_A407123_FTK_PH0
407123_A_FTK_PH0 A N Backup
ORO_Site3473ORO_Site3473_B
SAR with Active Candidate
407123 407123_B 407123_FTK_PH0
407123_B_FTK_PH0 B N Backup
ORO_Site3473ORO_Site3473_C
SAR with Active Candidate
407123 407123_C 407123_FTK_PH0
407123_C_FTK_PH0 C Y Active
ORO_Site3478ORO_Site3478_0
SAR with Active Candidate
407026 407026_0
407026_Nominal_PH0
407026_0_Nominal_PH0 0 N Nominal
ORO_Site3478ORO_Site3478_A
SAR with Active Candidate
407026 407026_A407026_FTK_PH0
407026_A_FTK_PH0 A N Backup
ORO_Site3478ORO_Site3478_B
SAR with Active Candidate
407026 407026_B 407026_FTK_PH0
407026_B_FTK_PH0 B N Rejected
ORO_Site3478ORO_Site3478_C
SAR with Active Candidate
407026 407026_C 407026_FTK_PH0
407026_C_FTK_PH0 C Y Active
ORO_Site3480ORO_Site3480_0
SAR with Active Candidate
407027 407027_0
407027_Nominal_PH0
407027_0_Nominal_PH0 0 N Nominal
ORO_Site3480ORO_Site3480_A
SAR with Active Candidate
407027 407027_A407027_FTK_PH0
407027_A_FTK_PH0 A N Rejected
ORO_Site3480ORO_Site3480_B
SAR with Active Candidate
407027 407027_B 407027_FTK_PH0
407027_B_FTK_PH0 B N Backup
ORO_Site3480ORO_Site3480_C
SAR with Active Candidate
407027 407027_C 407027_FTK_PH0
407027_C_FTK_PH0 C Y Active
ORO_Site3483ORO_Site3483_0
SAR with Active Candidate
407028 407028_0
407028_Nominal_PH0
407028_0_Nominal_PH0 0 N Nominal
ORO_Site3483ORO_Site3483_A
SAR with Active Candidate
407028 407028_A407028_FTK_PH0
407028_A_FTK_PH0 A Y Active
ORO_Site3483ORO_Site3483_C
SAR with Active Candidate
407028 407028_C 407028_FTK_PH0
407028_C_FTK_PH0 C N Rejected
ORO_Site3484ORO_Site3484_0
SAR with Active Candidate
407029 407029_0
407029_Nominal_PH0
407029_0_Nominal_PH0 0 N Nominal
ORO_Site3484ORO_Site3484_A
SAR with Active Candidate
407029 407029_A407029_FTK_PH0
407029_A_FTK_PH0 A N Rejected
ORO_Site3484ORO_Site3484_B
SAR with Active Candidate
407029 407029_B 407029_FTK_PH0
407029_B_FTK_PH0 B N Rejected
ORO_Site3484ORO_Site3484_D
SAR with Active Candidate
407029 407029_D407029_FTK_PH0
407029_D_FTK_PH0 D Y Active
ORO_Site3484ORO_Site3484_C
SAR with Active Candidate
407029 407029_C 407029_FTK_PH0
407029_C_FTK_PH0 C N Backup
ORO_Site3486ORO_Site3486_0
SAR with Active Candidate
407030 407030_0
407030_Nominal_PH0
407030_0_Nominal_PH0 0 N Nominal
ORO_Site3486ORO_Site3486_A
SAR with Active Candidate
407030 407030_A407030_FTK_PH0
407030_A_FTK_PH0 A N Rejected
ORO_Site3486ORO_Site3486_B
SAR with Active Candidate
407030 407030_B 407030_FTK_PH0
407030_B_FTK_PH0 B N Rejected
ORO_Site3486ORO_Site3486_C
SAR with Active Candidate
407030 407030_C 407030_FTK_PH0
407030_C_FTK_PH0 C Y Active
ORO_Site3486ORO_Site3486_T
SAR with Active Candidate
407030 407030_T 407030_FTK_PH0
407030_T_FTK_PH0 T N Backup
ORO_Site3488ORO_Site3488_0
SAR with Active Candidate
407031 407031_0
407031_Nominal_PH0
407031_0_Nominal_PH0 0 N Nominal
ORO_Site3488ORO_Site3488_A
SAR with Active Candidate
407031 407031_A407031_FTK_PH0
407031_A_FTK_PH0 A Y Active
ORO_Site3488ORO_Site3488_B
SAR with Active Candidate
407031 407031_B 407031_FTK_PH0
407031_B_FTK_PH0 B N Backup
ORO_Site3489ORO_Site3489_0
SAR with Active Candidate
407032 407032_0
407032_Nominal_PH0
407032_0_Nominal_PH0 0 N Nominal
ORO_Site3489ORO_Site3489_A
SAR with Active Candidate
407032 407032_A407032_FTK_PH0
407032_A_FTK_PH0 A N Rejected
ORO_Site3489ORO_Site3489_B
SAR with Active Candidate
407032 407032_B 407032_FTK_PH0
407032_B_FTK_PH0 B N Rejected
ORO_Site3489ORO_Site3489_C
SAR with Active Candidate
407032 407032_C 407032_FTK_PH0
407032_C_FTK_PH0 C Y Active
ORO_Site349 ORO_Site349_0
SAR with Active Candidate
404058 404058_0
404058_Nominal_PH0
404058_0_Nominal_PH0 0 N Nominal
ORO_Site349ORO_Site349_A
SAR with Active Candidate
404058 404058_A404058_FTK_PH0
404058_A_FTK_PH0 A Y Active
ORO_Site3493ORO_Site3493_0
SAR with Active Candidate
407033 407033_0
407033_Nominal_PH0
407033_0_Nominal_PH0 0 N Nominal
ORO_Site3493ORO_Site3493_A
SAR with Active Candidate
407033 407033_A407033_FTK_PH0
407033_A_FTK_PH0 A N Backup
ORO_Site3493ORO_Site3493_B
SAR with Active Candidate
407033 407033_B 407033_FTK_PH0
407033_B_FTK_PH0 B N Backup
ORO_Site3493ORO_Site3493_C
SAR with Active Candidate
407033 407033_C 407033_FTK_PH0
407033_C_FTK_PH0 C Y Active
ORO_Site3494ORO_Site3494_0
SAR with Active Candidate
407034 407034_0
407034_Nominal_PH0
407034_0_Nominal_PH0 0 N Nominal
ORO_Site3494ORO_Site3494_A
SAR with Active Candidate
407034 407034_A407034_FTK_PH0
407034_A_FTK_PH0 A N Rejected
ORO_Site3494ORO_Site3494_B
SAR with Active Candidate
407034 407034_B 407034_FTK_PH0
407034_B_FTK_PH0 B N Backup
ORO_Site3494ORO_Site3494_C
SAR with Active Candidate
407034 407034_C 407034_FTK_PH0
407034_C_FTK_PH0 C N Rejected
ORO_Site3494ORO_Site3494_D
SAR with Active Candidate
407034 407034_D407034_FTK_PH0
407034_D_FTK_PH0 D N Backup
ORO_Site3494ORO_Site3494_E
SAR with Active Candidate
407034 407034_E 407034_FTK_PH0
407034_E_FTK_PH0 E Y Active
ORO_Site3495ORO_Site3495_0
SAR with Active Candidate
407035 407035_0
407035_Nominal_PH0
407035_0_Nominal_PH0 0 N Nominal
ORO_Site3495ORO_Site3495_A
SAR with Active Candidate
407035 407035_A407035_FTK_PH0
407035_A_FTK_PH0 A N Rejected
ORO_Site3495ORO_Site3495_B
SAR with Active Candidate
407035 407035_B 407035_FTK_PH0
407035_B_FTK_PH0 B N Rejected
ORO_Site3495ORO_Site3495_T
SAR with Active Candidate
407035 407035_T 407035_FTK_PH0
407035_T_FTK_PH0 T Y Active
ORO_Site3496ORO_Site3496_0
SAR with Active Candidate
407036 407036_0
407036_Nominal_PH0
407036_0_Nominal_PH0 0 N Nominal
ORO_Site3496ORO_Site3496_T
SAR with Active Candidate
407036 407036_T 407036_FTK_PH0
407036_T_FTK_PH0 T N Rejected
ORO_Site3496ORO_Site3496_A
SAR with Active Candidate
407036 407036_A407036_FTK_PH0
407036_A_FTK_PH0 A N Backup
ORO_Site3496ORO_Site3496_B
SAR with Active Candidate
407036 407036_B 407036_FTK_PH0
407036_B_FTK_PH0 B N Rejected
ORO_Site3496ORO_Site3496_C
SAR with Active Candidate
407036 407036_C 407036_FTK_PH0
407036_C_FTK_PH0 C Y Active
ORO_Site3498ORO_Site3498_0
SAR with Active Candidate
407037 407037_0
407037_Nominal_PH0
407037_0_Nominal_PH0 0 N Nominal
ORO_Site3498ORO_Site3498_A
SAR with Active Candidate
407037 407037_A407037_FTK_PH0
407037_A_FTK_PH0 A N Backup
ORO_Site3498ORO_Site3498_B
SAR with Active Candidate
407037 407037_B 407037_FTK_PH0
407037_B_FTK_PH0 B N Backup
ORO_Site3498ORO_Site3498_C
SAR with Active Candidate
407037 407037_C 407037_FTK_PH0
407037_C_FTK_PH0 C Y Active
ORO_Site3500ORO_Site3500_0
SAR with Active Candidate
407038 407038_0
407038_Nominal_PH0
407038_0_Nominal_PH0 0 N Nominal
ORO_Site3500ORO_Site3500_A
SAR with Active Candidate
407038 407038_A407038_FTK_PH0
407038_A_FTK_PH0 A N Rejected
ORO_Site3500ORO_Site3500_B
SAR with Active Candidate
407038 407038_B 407038_FTK_PH0
407038_B_FTK_PH0 B Y Active
ORO_Site3500ORO_Site3500_T
SAR with Active Candidate
407038 407038_T 407038_FTK_PH0
407038_T_FTK_PH0 T N Rejected
ORO_Site3502ORO_Site3502_0
SAR with Active Candidate
407039 407039_0
407039_Nominal_PH0
407039_0_Nominal_PH0 0 N Nominal
ORO_Site3502ORO_Site3502_A
SAR with Active Candidate
407039 407039_A407039_FTK_PH0
407039_A_FTK_PH0 A Y Active
ORO_Site3502ORO_Site3502_B
SAR with Active Candidate
407039 407039_B 407039_FTK_PH0
407039_B_FTK_PH0 B N Backup
ORO_Site3508ORO_Site3508_0
SAR with Active Candidate
407086 407086_0
407086_Nominal_PH0
407086_0_Nominal_PH0 0 N Nominal
ORO_Site3508ORO_Site3508_A
SAR with Active Candidate
407086 407086_A407086_FTK_PH0
407086_A_FTK_PH0 A Y Active
ORO_Site3508ORO_Site3508_B
SAR with Active Candidate
407086 407086_B 407086_FTK_PH0
407086_B_FTK_PH0 B N Rejected
ORO_Site3508ORO_Site3508_C
SAR with Active Candidate
407086 407086_C 407086_FTK_PH0
407086_C_FTK_PH0 C N Rejected
ORO_Site3512ORO_Site3512_0
SAR with Active Candidate
407040 407040_0
407040_Nominal_PH0
407040_0_Nominal_PH0 0 N Nominal
ORO_Site3512ORO_Site3512_B
SAR with Active Candidate
407040 407040_B 407040_FTK_PH0
407040_B_FTK_PH0 B N Backup
ORO_Site3512ORO_Site3512_C
SAR with Active Candidate
407040 407040_C 407040_FTK_PH0
407040_C_FTK_PH0 C N Backup
ORO_Site3512ORO_Site3512_A
SAR with Active Candidate
407040 407040_A407040_FTK_PH0
407040_A_FTK_PH0 A Y Active
ORO_Site3513ORO_Site3513_0
SAR with Active Candidate
407041 407041_0
407041_Nominal_PH0
407041_0_Nominal_PH0 0 N Nominal
ORO_Site3513ORO_Site3513_A
SAR with Active Candidate
407041 407041_A407041_FTK_PH0
407041_A_FTK_PH0 A N Backup
ORO_Site3513ORO_Site3513_B
SAR with Active Candidate
407041 407041_B 407041_FTK_PH0
407041_B_FTK_PH0 B N Backup
ORO_Site3513ORO_Site3513_C
SAR with Active Candidate
407041 407041_C 407041_FTK_PH0
407041_C_FTK_PH0 C Y Active
ORO_Site3515ORO_Site3515_0
SAR with Active Candidate
407088 407088_0
407088_Nominal_PH0
407088_0_Nominal_PH0 0 N Nominal
ORO_Site3515ORO_Site3515_A
SAR with Active Candidate
407088 407088_A407088_FTK_PH0
407088_A_FTK_PH0 A N Rejected
ORO_Site3515ORO_Site3515_B
SAR with Active Candidate
407088 407088_B 407088_FTK_PH0
407088_B_FTK_PH0 B N Rejected
ORO_Site3515ORO_Site3515_C
SAR with Active Candidate
407088 407088_C 407088_FTK_PH0
407088_C_FTK_PH0 C Y Active
ORO_Site3517ORO_Site3517_0
SAR with Active Candidate
407042 407042_0
407042_Nominal_PH0
407042_0_Nominal_PH0 0 N Nominal
ORO_Site3517ORO_Site3517_A
SAR with Active Candidate
407042 407042_A407042_FTK_PH0
407042_A_FTK_PH0 A N Rejected
ORO_Site3517ORO_Site3517_B
SAR with Active Candidate
407042 407042_B 407042_FTK_PH0
407042_B_FTK_PH0 B N Backup
ORO_Site3517ORO_Site3517_C
SAR with Active Candidate
407042 407042_C 407042_FTK_PH0
407042_C_FTK_PH0 C N Rejected
ORO_Site3517ORO_Site3517_D
SAR with Active Candidate
407042 407042_D407042_FTK_PH0
407042_D_FTK_PH0 D Y Active
ORO_Site3518ORO_Site3518_0
SAR with Active Candidate
407043 407043_0
407043_Nominal_PH0
407043_0_Nominal_PH0 0 N Nominal
ORO_Site3518ORO_Site3518_A
SAR with Active Candidate
407043 407043_A407043_FTK_PH0
407043_A_FTK_PH0 A N Rejected
ORO_Site3518ORO_Site3518_B
SAR with Active Candidate
407043 407043_B 407043_FTK_PH0
407043_B_FTK_PH0 B N Rejected
ORO_Site3518ORO_Site3518_C
SAR with Active Candidate
407043 407043_C 407043_FTK_PH0
407043_C_FTK_PH0 C Y Active
ORO_Site3521_0
ORO_Site3521 SAR with Active Candidate
407045 407045_0
407045_Nominal_PH0
407045_0_Nominal_PH0 0 N Nominal
ORO_Site3521_A
ORO_Site3521 SAR with Active Candidate
407045 407045_A407045_FTK_PH0
407045_A_FTK_PH0 A N Backup
ORO_Site3521_B
ORO_Site3521 SAR with Active Candidate
407045 407045_B 407045_FTK_PH0
407045_B_FTK_PH0 B Y Active
ORO_Site3521_C
ORO_Site3521 SAR with Active Candidate
407045 407045_C 407045_FTK_PH0
407045_C_FTK_PH0 C N Rejected
ORO_Site3521ORO_Site3521_T
SAR with Active Candidate
407045 407045_T 407045_FTK_PH0
407045_T_FTK_PH0 T N Rejected
ORO_Site3533ORO_Site3533_0
SAR with Active Candidate
407092 407092_0
407092_Nominal_PH0
407092_0_Nominal_PH0 0 N Nominal
ORO_Site3533ORO_Site3533_A
SAR with Active Candidate
407092 407092_A407092_FTK_PH0
407092_A_FTK_PH0 A N Backup
ORO_Site3533ORO_Site3533_B
SAR with Active Candidate
407092 407092_B 407092_FTK_PH0
407092_B_FTK_PH0 B N Backup
ORO_Site3533ORO_Site3533_C
SAR with Active Candidate
407092 407092_C 407092_FTK_PH0
407092_C_FTK_PH0 C Y Active
ORO_Site3538ORO_Site3538_0
SAR with Active Candidate
407093 407093_0
407093_Nominal_PH0
407093_0_Nominal_PH0 0 N Nominal
ORO_Site3538ORO_Site3538_A
SAR with Active Candidate
407093 407093_A407093_FTK_PH0
407093_A_FTK_PH0 A N Rejected
ORO_Site3538ORO_Site3538_B
SAR with Active Candidate
407093 407093_B 407093_FTK_PH0
407093_B_FTK_PH0 B N Rejected
ORO_Site3538ORO_Site3538_T
SAR with Active Candidate
407093 407093_T 407093_FTK_PH0
407093_T_FTK_PH0 T Y Active
ORO_Site3545ORO_Site3545_0
SAR with Active Candidate
407096 407096_0
407096_Nominal_PH0
407096_0_Nominal_PH0 0 N Nominal
ORO_Site3545ORO_Site3545_A
SAR with Active Candidate
407096 407096_A407096_FTK_PH0
407096_A_FTK_PH0 A Y Active
ORO_Site3545ORO_Site3545_B
SAR with Active Candidate
407096 407096_B 407096_FTK_PH0
407096_B_FTK_PH0 B N Rejected
ORO_Site3547ORO_Site3547_0
SAR with Active Candidate
407046 407046_0
407046_Nominal_PH0
407046_0_Nominal_PH0 0 N Nominal
ORO_Site3547ORO_Site3547_A
SAR with Active Candidate
407046 407046_A407046_FTK_PH0
407046_A_FTK_PH0 A N Rejected
ORO_Site3547ORO_Site3547_B
SAR with Active Candidate
407046 407046_B 407046_FTK_PH0
407046_B_FTK_PH0 B N Backup
ORO_Site3547ORO_Site3547_C
SAR with Active Candidate
407046 407046_C 407046_FTK_PH0
407046_C_FTK_PH0 C Y Active
ORO_Site3596ORO_Site3596_0
SAR with Active Candidate
407048 407048_0
407048_Nominal_PH0
407048_0_Nominal_PH0 0 N Nominal
ORO_Site3596ORO_Site3596_A
SAR with Active Candidate
407048 407048_A407048_FTK_PH0
407048_A_FTK_PH0 A N Backup
ORO_Site3596ORO_Site3596_B
SAR with Active Candidate
407048 407048_B 407048_FTK_PH0
407048_B_FTK_PH0 B N Backup
ORO_Site3596ORO_Site3596_C
SAR with Active Candidate
407048 407048_C 407048_FTK_PH0
407048_C_FTK_PH0 C Y Active
ORO_Site3599ORO_Site3599_0
SAR with Active Candidate
407049 407049_0
407049_Nominal_PH0
407049_0_Nominal_PH0 0 N Nominal
ORO_Site3599ORO_Site3599_A
SAR with Active Candidate
407049 407049_A407049_FTK_PH0
407049_A_FTK_PH0 A N Backup
ORO_Site3599ORO_Site3599_B
SAR with Active Candidate
407049 407049_B 407049_FTK_PH0
407049_B_FTK_PH0 B N Rejected
ORO_Site3599ORO_Site3599_D
SAR with Active Candidate
407049 407049_D407049_FTK_PH0
407049_D_FTK_PH0 D Y Active
ORO_Site3601ORO_Site3601_0
SAR with Active Candidate
407050 407050_0
407050_Nominal_PH0
407050_0_Nominal_PH0 0 N Nominal
ORO_Site3601ORO_Site3601_A
SAR with Active Candidate
407050 407050_A407050_FTK_PH0
407050_A_FTK_PH0 A N Rejected
ORO_Site3601ORO_Site3601_B
SAR with Active Candidate
407050 407050_B 407050_FTK_PH0
407050_B_FTK_PH0 B N Rejected
ORO_Site3601ORO_Site3601_C
SAR with Active Candidate
407050 407050_C 407050_FTK_PH0
407050_C_FTK_PH0 C Y Active
ORO_Site3603ORO_Site3603_0
SAR with Active Candidate
407051 407051_0
407051_Nominal_PH0
407051_0_Nominal_PH0 0 N Nominal
ORO_Site3603ORO_Site3603_A
SAR with Active Candidate
407051 407051_A407051_FTK_PH0
407051_A_FTK_PH0 A N Rejected
ORO_Site3603ORO_Site3603_B
SAR with Active Candidate
407051 407051_B 407051_FTK_PH0
407051_B_FTK_PH0 B N Rejected
ORO_Site3603ORO_Site3603_T
SAR with Active Candidate
407051 407051_T 407051_FTK_PH0
407051_T_FTK_PH0 T Y Active
ORO_Site3653ORO_Site3653_0
SAR with Active Candidate
140031 140031_0
140031_Nominal_PH0
140031_0_Nominal_PH0 0 N Nominal
ORO_Site3653ORO_Site3653_A
SAR with Active Candidate
140031 140031_A140031_FTK_PH0
140031_A_FTK_PH0 A N Backup
ORO_Site3653ORO_Site3653_B
SAR with Active Candidate
140031 140031_B 140031_FTK_PH0
140031_B_FTK_PH0 B Y Active
ORO_Site3653ORO_Site3653_C
SAR with Active Candidate
140031 140031_C 140031_FTK_PH0
140031_C_FTK_PH0 C N Backup
ORO_Site3653ORO_Site3653_T
SAR with Active Candidate
140031 140031_T 140031_FTK_PH0
140031_T_FTK_PH0 T N Rejected
ORO_Site3654ORO_Site3654_0
SAR with Active Candidate
407052 407052_0
407052_Nominal_PH0
407052_0_Nominal_PH0 0 N Nominal
ORO_Site3654ORO_Site3654_A
SAR with Active Candidate
407052 407052_A407052_FTK_PH0
407052_A_FTK_PH0 A N Rejected
ORO_Site3654ORO_Site3654_B
SAR with Active Candidate
407052 407052_B 407052_FTK_PH0
407052_B_FTK_PH0 B N Rejected
ORO_Site3654ORO_Site3654_C
SAR with Active Candidate
407052 407052_C 407052_FTK_PH0
407052_C_FTK_PH0 C N Rejected
ORO_Site3654ORO_Site3654_D
SAR with Active Candidate
407052 407052_D407052_FTK_PH0
407052_D_FTK_PH0 D N Backup
ORO_Site3654ORO_Site3654_X
SAR with Active Candidate
407052 407052_X407052_Colo_PH0
407052_X_Colo_PH0 X Y Active
ORO_Site3700ORO_Site3700_0
SAR with Active Candidate
407053 407053_0
407053_Nominal_PH0
407053_0_Nominal_PH0 0 N Nominal
ORO_Site3700ORO_Site3700_A
SAR with Active Candidate
407053 407053_A407053_FTK_PH0
407053_A_FTK_PH0 A N Rejected
ORO_Site3700ORO_Site3700_B
SAR with Active Candidate
407053 407053_B 407053_FTK_PH0
407053_B_FTK_PH0 B N Rejected
ORO_Site3700ORO_Site3700_C
SAR with Active Candidate
407053 407053_C 407053_FTK_PH0
407053_C_FTK_PH0 C Y Active
ORO_Site3724ORO_Site3724_0
SAR with Active Candidate
407056 407056_0
407056_Nominal_PH0
407056_0_Nominal_PH0 0 N Nominal
ORO_Site3724ORO_Site3724_A
SAR with Active Candidate
407056 407056_A407056_FTK_PH0
407056_A_FTK_PH0 A N Rejected
ORO_Site3724ORO_Site3724_B
SAR with Active Candidate
407056 407056_B 407056_FTK_PH0
407056_B_FTK_PH0 B N Rejected
ORO_Site3724ORO_Site3724_C
SAR with Active Candidate
407056 407056_C 407056_FTK_PH0
407056_C_FTK_PH0 C N Rejected
ORO_Site3724ORO_Site3724_D
SAR with Active Candidate
407056 407056_D407056_FTK_PH0
407056_D_FTK_PH0 D N Rejected
ORO_Site3724ORO_Site3724_E
SAR with Active Candidate
407056 407056_E 407056_FTK_PH0
407056_E_FTK_PH0 E Y Active
ORO_Site3732ORO_Site3732_0
SAR with Active Candidate
407057 407057_0
407057_Nominal_PH0
407057_0_Nominal_PH0 0 N Nominal
ORO_Site3732ORO_Site3732_A
SAR with Active Candidate
407057 407057_A407057_FTK_PH0
407057_A_FTK_PH0 A N Backup
ORO_Site3732ORO_Site3732_B
SAR with Active Candidate
407057 407057_B 407057_FTK_PH0
407057_B_FTK_PH0 B N Rejected
ORO_Site3732ORO_Site3732_C
SAR with Active Candidate
407057 407057_C 407057_FTK_PH0
407057_C_FTK_PH0 C Y Active
ORO_Site3733ORO_Site3733_0
SAR with Active Candidate
407058 407058_0
407058_Nominal_PH0
407058_0_Nominal_PH0 0 N Nominal
ORO_Site3733ORO_Site3733_A
SAR with Active Candidate
407058 407058_A407058_FTK_PH0
407058_A_FTK_PH0 A N Backup
ORO_Site3733ORO_Site3733_B
SAR with Active Candidate
407058 407058_B 407058_FTK_PH0
407058_B_FTK_PH0 B N Backup
ORO_Site3733ORO_Site3733_C
SAR with Active Candidate
407058 407058_C 407058_FTK_PH0
407058_C_FTK_PH0 C N Backup
ORO_Site3733ORO_Site3733_T
SAR with Active Candidate
407058 407058_T 407058_FTK_PH0
407058_T_FTK_PH0 T Y Active
ORO_Site3734_0
ORO_Site3734 SAR with Active Candidate
407105 407105_0
407105_Nominal_PH0
407105_0_Nominal_PH0 0 N Nominal
ORO_Site3734_A
ORO_Site3734 SAR with Active Candidate
407105 407105_A407105_FTK_PH0
407105_A_FTK_PH0 A Y Active
ORO_Site3734_B
ORO_Site3734 SAR with Active Candidate
407105 407105_B 407105_FTK_PH0
407105_B_FTK_PH0 B N Backup
ORO_Site3734_C
ORO_Site3734 SAR with Active Candidate
407105 407105_C 407105_FTK_PH0
407105_C_FTK_PH0 C N Backup
ORO_Site3737ORO_Site3737_0
SAR with Active Candidate
407059 407059_0
407059_Nominal_PH0
407059_0_Nominal_PH0 0 N Nominal
ORO_Site3737ORO_Site3737_A
SAR with Active Candidate
407059 407059_A407059_FTK_PH0
407059_A_FTK_PH0 A N Rejected
ORO_Site3737ORO_Site3737_B
SAR with Active Candidate
407059 407059_B 407059_FTK_PH0
407059_B_FTK_PH0 B N Backup
ORO_Site3737ORO_Site3737_C
SAR with Active Candidate
407059 407059_C 407059_FTK_PH0
407059_C_FTK_PH0 C N Rejected
ORO_Site3737ORO_Site3737_D
SAR with Active Candidate
407059 407059_D407059_FTK_PH0
407059_D_FTK_PH0 D Y Active
ORO_Site3738ORO_Site3738_0
SAR with Active Candidate
407060 407060_0
407060_Nominal_PH0
407060_0_Nominal_PH0 0 N Nominal
ORO_Site3738ORO_Site3738_A
SAR with Active Candidate
407060 407060_A407060_FTK_PH0
407060_A_FTK_PH0 A N Rejected
ORO_Site3738ORO_Site3738_B
SAR with Active Candidate
407060 407060_B 407060_FTK_PH0
407060_B_FTK_PH0 B N Rejected
ORO_Site3738ORO_Site3738_C
SAR with Active Candidate
407060 407060_C 407060_FTK_PH0
407060_C_FTK_PH0 C Y Active
ORO_Site3738ORO_Site3738_T
SAR with Active Candidate
407060 407060_T 407060_FTK_PH0
407060_T_FTK_PH0 T N Rejected
ORO_Site3739ORO_Site3739_0
SAR with Active Candidate
407061 407061_0
407061_Nominal_PH0
407061_0_Nominal_PH0 0 N Nominal
ORO_Site3739ORO_Site3739_A
SAR with Active Candidate
407061 407061_A407061_FTK_PH0
407061_A_FTK_PH0 A N Rejected
ORO_Site3739ORO_Site3739_B
SAR with Active Candidate
407061 407061_B 407061_FTK_PH0
407061_B_FTK_PH0 B N Rejected
ORO_Site3739ORO_Site3739_T
SAR with Active Candidate
407061 407061_T 407061_FTK_PH0
407061_T_Innovis_FTK T Y Active
ORO_Site3741ORO_Site3741_A
SAR with Active Candidate
407062 407062_A407062_FTK_PH0
407062_A_FTK_PH0 A N Rejected
ORO_Site3741ORO_Site3741_B
SAR with Active Candidate
407062 407062_B 407062_FTK_PH0
407062_B_FTK_PH0 B Y Active
ORO_Site3741ORO_Site3741_0
SAR with Active Candidate
407062 407062_0
407062_Nominal_PH0
407062_0_Nominal_PH0 0 N Nominal
ORO_Site3747ORO_Site3747_0
SAR with Active Candidate
407063 407063_0
407063_Nominal_PH0
407063_0_Nominal_PH0 0 N Nominal
ORO_Site3747ORO_Site3747_A
SAR with Active Candidate
407063 407063_A407063_FTK_PH0
407063_A_FTK_PH0 A N Backup
ORO_Site3747ORO_Site3747_B
SAR with Active Candidate
407063 407063_B 407063_FTK_PH0
407063_B_FTK_PH0 B N Backup
ORO_Site3747ORO_Site3747_C
SAR with Active Candidate
407063 407063_C 407063_FTK_PH0
407063_C_FTK_PH0 C N Rejected
ORO_Site3747ORO_Site3747_D
SAR with Active Candidate
407063 407063_D407063_FTK_PH0
407063_D_FTK_PH0 D Y Active
ORO_Site3751ORO_Site3751_0
SAR with Active Candidate
407064 407064_0
407064_Nominal_PH0
407064_0_Nominal_PH0 0 N Nominal
ORO_Site3751ORO_Site3751_A
SAR with Active Candidate
407064 407064_A407064_FTK_PH0
407064_A_FTK_PH0 A N Rejected
ORO_Site3751ORO_Site3751_B
SAR with Active Candidate
407064 407064_B 407064_FTK_PH0
407064_B_FTK_PH0 B N Rejected
ORO_Site3751ORO_Site3751_C
SAR with Active Candidate
407064 407064_C 407064_FTK_PH0
407064_C_FTK_PH0 C N Rejected
ORO_Site3751ORO_Site3751_T
SAR with Active Candidate
407064 407064_T 407064_FTK_PH0
407064_T_FTK_PH0 T Y Active
ORO_Site3754ORO_Site3754_0
SAR with Active Candidate
407173 407173_0
407173_Nominal_PH0
407173_0_Nominal_PH0 0 N Nominal
ORO_Site3754ORO_Site3754_A
SAR with Active Candidate
407173 407173_A407173_FTK_PH0
407173_A_FTK_PH0 A Y Active
ORO_Site3754ORO_Site3754_B
SAR with Active Candidate
407173 407173_B 407173_FTK_PH0
407173_B_FTK_PH0 B N Backup
ORO_Site377 ORO_Site377_0
SAR with Active Candidate
408041 408041_0
408041_Nominal_PH0
408041_0_Nominal_PH0 0 N Nominal
ORO_Site377ORO_Site377_B
SAR with Active Candidate
408041 408041_B 408041_FTK_PH0
408041_B_FTK_PH0 B N Rejected
ORO_Site377ORO_Site377_C
SAR with Active Candidate
408041 408041_C 408041_FTK_PH0
408041_C_FTK_PH0 C N Rejected
ORO_Site377ORO_Site377_D
SAR with Active Candidate
408041 408041_D408041_FTK_PH0
408041_D_FTK_PH0 D N Rejected
ORO_Site377ORO_Site377_A
SAR with Active Candidate
408041 408041_A408041_FTK_PH0
408041_A_FTK_PH0 A Y Active
ORO_Site380 ORO_Site380_0
SAR with Active Candidate
408005 408005_0
408005_Nominal_PH0
408005_0_Nominal_PH0 0 N Nominal
ORO_Site380ORO_Site380_A
SAR with Active Candidate
408005 408005_A408005_FTK_PH0
408005_A_FTK_PH0 A N Rejected
ORO_Site380ORO_Site380_B
SAR with Active Candidate
408005 408005_B 408005_FTK_PH0
408005_B_FTK_PH0 B N Backup
ORO_Site380ORO_Site380_C
SAR with Active Candidate
408005 408005_C 408005_FTK_PH0
408005_C_FTK_PH0 C Y Active
ORO_Site3811ORO_Site3811_0
SAR with Active Candidate
407065 407065_0
407065_Nominal_PH0
407065_0_Nominal_PH0 0 N Nominal
ORO_Site3811ORO_Site3811_A
SAR with Active Candidate
407065 407065_A407065_FTK_PH0
407065_A_FTK_PH0 A N Backup
ORO_Site3811ORO_Site3811_B
SAR with Active Candidate
407065 407065_B 407065_FTK_PH0
407065_B_FTK_PH0 B N Backup
ORO_Site3811ORO_Site3811_C
SAR with Active Candidate
407065 407065_C 407065_FTK_PH0
407065_C_FTK_PH0 C N Backup
ORO_Site3811ORO_Site3811_T
SAR with Active Candidate
407065 407065_T 407065_FTK_PH0
407065_T_FTK_PH0 T Y Active
ORO_Site3813_0
ORO_Site3813 SAR with Active Candidate
407066 407066_0
407066_Nominal_PH0
407066_0_Nominal_PH0 0 N Nominal
ORO_Site3813_A
ORO_Site3813 SAR with Active Candidate
407066 407066_A407066_FTK_PH0
407066_A_FTK_PH0 A N Backup
ORO_Site3813_B
ORO_Site3813 SAR with Active Candidate
407066 407066_B 407066_FTK_PH0
407066_B_FTK_PH0 B N Backup
ORO_Site3813_C
ORO_Site3813 SAR with Active Candidate
407066 407066_C 407066_FTK_PH0
407066_C_FTK_PH0 C N Backup
ORO_Site3813_D
ORO_Site3813 SAR with Active Candidate
407066 407066_D407066_FTK_PH0
407066_D_FTK_PH0 D Y Active
ORO_Site3813_E
ORO_Site3813 SAR with Active Candidate
407066 407066_E 407066_FTK_PH0
407066_E_FTK_PH0 E N Backup
ORO_Site3813ORO_Site3813_T
SAR with Active Candidate
407066 407066_T 407066_FTK_PH0
407066_T_FTK_PH0 T N Rejected
ORO_Site382 ORO_Site382_0
SAR with Active Candidate
408006 408006_0
408006_Nominal_PH0
408006_0_Nominal_PH0 0 N Nominal
ORO_Site382ORO_Site382_A
SAR with Active Candidate
408006 408006_A408006_FTK_PH0
408006_A_FTK_PH0 A N Rejected
ORO_Site382ORO_Site382_B
SAR with Active Candidate
408006 408006_B 408006_FTK_PH0
408006_B_FTK_PH0 B N Rejected
ORO_Site382ORO_Site382_D
SAR with Active Candidate
408006 408006_D408006_FTK_PH0
408006_D_FTK_PH0 D N Backup
ORO_Site382 ORO_Site382_T
SAR with Active Candidate
408006 408006_T 408006_FTK_PH0
408006_T_FTK_PH0 T N Rejected
ORO_Site382 ORO_Site382_X
SAR with Active Candidate
408006 408006_X408006_Colo_PH0
408006_X_Colo_PH0 X Y Active
ORO_Site383 ORO_Site383_0
SAR with Active Candidate
408007 408007_0
408007_Nominal_PH0
408007_0_Nominal_PH0 0 N Nominal
ORO_Site383ORO_Site383_A
SAR with Active Candidate
408007 408007_A408007_FTK_PH0
408007_A_FTK_PH0 A N Rejected
ORO_Site383ORO_Site383_B
SAR with Active Candidate
408007 408007_B 408007_FTK_PH0
408007_B_FTK_PH0 B N Rejected
ORO_Site383ORO_Site383_C
SAR with Active Candidate
408007 408007_C 408007_FTK_PH0
408007_C_FTK_PH0 C Y Active
ORO_Site384 ORO_Site384_0
SAR with Active Candidate
408008 408008_0
408008_Nominal_PH0
408008_0_Nominal_PH0 0 N Nominal
ORO_Site384ORO_Site384_A
SAR with Active Candidate
408008 408008_A408008_FTK_PH0
408008_A_FTK_PH0 A Y Active
ORO_Site384ORO_Site384_B
SAR with Active Candidate
408008 408008_B 408008_FTK_PH0
408008_B_FTK_PH0 B N Backup
ORO_Site384ORO_Site384_C
SAR with Active Candidate
408008 408008_C 408008_FTK_PH0
408008_C_FTK_PH0 C N Backup
ORO_Site384 ORO_Site384_T
SAR with Active Candidate
408008 408008_T 408008_FTK_PH0
408008_T_FTK_PH0 T N Rejected
ORO_Site385 ORO_Site385_0
SAR with Active Candidate
408009 408009_0
408009_Nominal_PH0
408009_0_Nominal_PH0 0 N Nominal
ORO_Site385ORO_Site385_A
SAR with Active Candidate
408009 408009_A408009_FTK_PH0
408009_A_FTK_PH0 A N Rejected
ORO_Site385ORO_Site385_B
SAR with Active Candidate
408009 408009_B 408009_FTK_PH0
408009_B_FTK_PH0 B N Rejected
ORO_Site385 ORO_Site385_T
SAR with Active Candidate
408009 408009_T 408009_FTK_PH0
408009_T_FTK_PH0 T Y Active
ORO_Site387 ORO_Site387_0
SAR with Active Candidate
417007 417007_0
417007_Nominal_PH0
417007_0_Nominal_PH0 0 N Nominal
ORO_Site387 ORO_Site387_T
SAR with Active Candidate
417007 417007_T 417007_FTK_PH0
417007_T_FTK_PH0 T Y Active
ORO_Site388 ORO_Site388_0
SAR with Active Candidate
417048 417048_0
417048_Nominal_PH0
417048_0_Nominal_PH0 0 N Nominal
ORO_Site388ORO_Site388_A
SAR with Active Candidate
417048 417048_A417048_FTK_PH0
417048_A_FTK_PH0 A N Rejected
ORO_Site388ORO_Site388_B
SAR with Active Candidate
417048 417048_B 417048_FTK_PH0
417048_B_FTK_PH0 B Y Active
ORO_Site389 ORO_Site389_0
SAR with Active Candidate
417008 417008_0
417008_Nominal_PH0
417008_0_Nominal_PH0 0 N Nominal
ORO_Site389ORO_Site389_A
SAR with Active Candidate
417008 417008_A417008_FTK_PH0
417008_A_FTK_PH0 A Y Active
ORO_Site390 ORO_Site390_0
SAR with Active Candidate
417009 417009_0
417009_Nominal_PH0
417009_0_Nominal_PH0 0 N Nominal
ORO_Site390 ORO_Site390_T
SAR with Active Candidate
417009 417009_T 417009_FTK_PH0
417009_T_FTK_PH0 T N Rejected
ORO_Site390ORO_Site390_A
SAR with Active Candidate
417009 417009_A417009_FTK_PH0
417009_A_FTK_PH0 A Y Active
ORO_Site391 ORO_Site391_0
SAR with Active Candidate
417010 417010_0
417010_Nominal_PH0
417010_0_Nominal_PH0 0 N Nominal
ORO_Site391 ORO_Site391_T
SAR with Active Candidate
417010 417010_T 417010_FTK_PH0
417010_T_FTK_PH0 T Y Active
ORO_Site392 ORO_Site392_0
SAR with Active Candidate
417011 417011_0
417011_Nominal_PH0
417011_0_Nominal_PH0 0 N Nominal
ORO_Site392 ORO_Site392_T
SAR with Active Candidate
417011 417011_T 417011_FTK_PH0
417011_T_FTK_PH0 T N Backup
ORO_Site392 ORO_Site392_X
SAR with Active Candidate
417011 417011_X417011_Colo_PH0
417011_X_Colo_PH0 X Y Active
ORO_Site394 ORO_Site394_0
SAR with Active Candidate
417012 417012_0
417012_Nominal_PH0
417012_0_Nominal_PH0 0 N Nominal
ORO_Site394 ORO_Site394_T
SAR with Active Candidate
417012 417012_T 417012_FTK_PH0
417012_T_FTK_PH0 T Y Active
ORO_Site395 ORO_Site395_0
SAR with Active Candidate
417013 417013_0
417013_Nominal_PH0
417013_0_Nominal_PH0 0 N Nominal
ORO_Site395 ORO_Site395_T
SAR with Active Candidate
417013 417013_T 417013_FTK_PH0
417013_T_FTK_PH0 T Y Active
ORO_Site396 ORO_Site396_0
SAR with Active Candidate
417014 417014_0
417014_Nominal_PH0
417014_0_Nominal_PH0 0 N Nominal
ORO_Site396ORO_Site396_A
SAR with Active Candidate
417014 417014_A417014_FTK_PH0
417014_A_FTK_PH0 A Y Active
ORO_Site397 ORO_Site397_0
SAR with Active Candidate
417015 417015_0
417015_Nominal_PH0
417015_0_Nominal_PH0 0 N Nominal
ORO_Site397 ORO_Site397_T
SAR with Active Candidate
417015 417015_T 417015_FTK_PH0
417015_T_FTK_PH0 T Y Active
ORO_Site3978ORO_Site3978_0
SAR with Active Candidate
407067 407067_0
407067_Nominal_PH0
407067_0_Nominal_PH0 0 N Nominal
ORO_Site3978ORO_Site3978_A
SAR with Active Candidate
407067 407067_A407067_FTK_PH0
407067_A_FTK_PH0 A N Rejected
ORO_Site3978ORO_Site3978_B
SAR with Active Candidate
407067 407067_B 407067_FTK_PH0
407067_B_FTK_PH0 B N Rejected
ORO_Site3978ORO_Site3978_T
SAR with Active Candidate
407067 407067_T 407067_FTK_PH0
407067_T_FTK_PH0 T Y Active
ORO_Site3980ORO_Site3980_0
SAR with Active Candidate
407068 407068_0
407068_Nominal_PH0
407068_0_Nominal_PH0 0 N Nominal
ORO_Site3980ORO_Site3980_A
SAR with Active Candidate
407068 407068_A407068_FTK_PH0
407068_A_FTK_PH0 A N Backup
ORO_Site3980ORO_Site3980_B
SAR with Active Candidate
407068 407068_B 407068_FTK_PH0
407068_B_FTK_PH0 B N Backup
ORO_Site3980ORO_Site3980_T
SAR with Active Candidate
407068 407068_T 407068_FTK_PH0
407068_T_FTK_PH0 T Y Active
ORO_Site3986ORO_Site3986_0
SAR with Active Candidate
408043 408043_0
408043_Nominal_PH0
408043_0_Nominal_PH0 0 N Nominal
ORO_Site3986ORO_Site3986_A
SAR with Active Candidate
408043 408043_A408043_FTK_PH0
408043_A_FTK_PH0 A N Rejected
ORO_Site3986ORO_Site3986_B
SAR with Active Candidate
408043 408043_B 408043_FTK_PH0
408043_B_FTK_PH0 B N Backup
ORO_Site3986ORO_Site3986_C
SAR with Active Candidate
408043 408043_C 408043_FTK_PH0
408043_C_FTK_PH0 C Y Active
ORO_Site4014ORO_Site4014_0
SAR with Active Candidate
407069 407069_0
407069_Nominal_PH0
407069_0_Nominal_PH0 0 N Nominal
ORO_Site4014ORO_Site4014_A
SAR with Active Candidate
407069 407069_A407069_FTK_PH0
407069_A_FTK_PH0 A N Rejected
ORO_Site4014ORO_Site4014_B
SAR with Active Candidate
407069 407069_B 407069_FTK_PH0
407069_B_FTK_PH0 B N Rejected
ORO_Site4014ORO_Site4014_C
SAR with Active Candidate
407069 407069_C 407069_FTK_PH0
407069_C_FTK_PH0 C N Rejected
ORO_Site4014ORO_Site4014_D
SAR with Active Candidate
407069 407069_D407069_FTK_PH0
407069_D_FTK_PH0 D N Rejected
ORO_Site4014ORO_Site4014_E
SAR with Active Candidate
407069 407069_E 407069_FTK_PH0
407069_E_FTK_PH0 E N Rejected
ORO_Site4014ORO_Site4014_F
SAR with Active Candidate
407069 407069_F 407069_FTK_PH0
407069_F_FTK_PH0 F N Backup
ORO_Site4014ORO_Site4014_X
SAR with Active Candidate
407069 407069_X407069_Colo_PH0
407069_X_Colo_PH0 X Y Active
ORO_Site4017ORO_Site4017_0
SAR with Active Candidate
407116 407116_0
407116_Nominal_PH0
407116_0_Nominal_PH0 0 N Nominal
ORO_Site4017ORO_Site4017_A
SAR with Active Candidate
407116 407116_A407116_FTK_PH0
407116_A_FTK_PH0 A N Backup
ORO_Site4017ORO_Site4017_B
SAR with Active Candidate
407116 407116_B 407116_FTK_PH0
407116_B_FTK_PH0 B N Backup
ORO_Site4017ORO_Site4017_C
SAR with Active Candidate
407116 407116_C 407116_FTK_PH0
407116_C_FTK_PH0 C Y Active
ORO_Site4019ORO_Site4019_0
SAR with Active Candidate
407070 407070_0
407070_Nominal_PH0
407070_0_Nominal_PH0 0 N Nominal
ORO_Site4019ORO_Site4019_A
SAR with Active Candidate
407070 407070_A407070_FTK_PH0
407070_A_FTK_PH0 A N Backup
ORO_Site4019ORO_Site4019_B
SAR with Active Candidate
407070 407070_B 407070_FTK_PH0
407070_B_FTK_PH0 B N Backup
ORO_Site4019ORO_Site4019_C
SAR with Active Candidate
407070 407070_C 407070_FTK_PH0
407070_C_FTK_PH0 C N Backup
ORO_Site4019ORO_Site4019_T
SAR with Active Candidate
407070 407070_T 407070_FTK_PH0
407070_T_FTK_PH0 T Y Active
ORO_Site4019ORO_Site4019_D
SAR with Active Candidate
407070 407070_D407070_FTK_PH0
407070_D_FTK_PH0 D N Backup
ORO_Site403 ORO_Site403_0
SAR with Active Candidate
408010 408010_0
408010_Nominal_PH0
408010_0_Nominal_PH0 0 N Nominal
ORO_Site403ORO_Site403_A
SAR with Active Candidate
408010 408010_A408010_FTK_PH0
408010_A_FTK_PH0 A N Rejected
ORO_Site403ORO_Site403_B
SAR with Active Candidate
408010 408010_B 408010_FTK_PH0
408010_B_FTK_PH0 B N Rejected
ORO_Site403ORO_Site403_C
SAR with Active Candidate
408010 408010_C 408010_FTK_PH0
408010_C_FTK_PH0 C N Rejected
ORO_Site403ORO_Site403_D
SAR with Active Candidate
408010 408010_D408010_FTK_PH0
408010_D_FTK_PH0 D Y Active
ORO_Site4058ORO_Site4058_0
SAR with Active Candidate
407071 407071_0
407071_Nominal_PH0
407071_0_Nominal_PH0 0 N Nominal
ORO_Site4058ORO_Site4058_A
SAR with Active Candidate
407071 407071_A407071_FTK_PH0
407071_A_FTK_PH0 A N Backup
ORO_Site4058ORO_Site4058_C
SAR with Active Candidate
407071 407071_C 407071_FTK_PH0
407071_C_FTK_PH0 C N Backup
ORO_Site4058ORO_Site4058_X
SAR with Active Candidate
407071 407071_X407071_Colo_PH0
407071_X_Colo_PH0 X Y Active
ORO_Site407 ORO_Site407_0
SAR with Active Candidate
417115 417115_0
417115_Nominal_PH0
417115_0_Nominal_PH0 0 N Nominal
ORO_Site407ORO_Site407_A
SAR with Active Candidate
417115 417115_A417115_FTK_PH0
417115_A_FTK_PH0 A N Rejected
ORO_Site407ORO_Site407_B
SAR with Active Candidate
417115 417115_B 417115_FTK_PH0
417115_B_FTK_PH0 B Y Active
ORO_Site407ORO_Site407_C
SAR with Active Candidate
417115 417115_C 417115_FTK_PH0
417115_C_FTK_PH0 C N Backup
ORO_Site4097ORO_Site4097_0
SAR with Active Candidate
140033 140033_0
140033_Nominal_PH0
140033_0_Nominal_PH0 0 N Nominal
ORO_Site4097ORO_Site4097_A
SAR with Active Candidate
140033 140033_A140033_FTK_PH0
140033_A_FTK_PH0 A N Rejected
ORO_Site4097ORO_Site4097_B
SAR with Active Candidate
140033 140033_B 140033_FTK_PH0
140033_B_FTK_PH0 B N Rejected
ORO_Site4097ORO_Site4097_C
SAR with Active Candidate
140033 140033_C 140033_FTK_PH0
140033_C_FTK_PH0 C N Rejected
ORO_Site4097ORO_Site4097_D
SAR with Active Candidate
140033 140033_D140033_FTK_PH0
140033_D_FTK_PH0 D Y Active
ORO_Site4097ORO_Site4097_T
SAR with Active Candidate
140033 140033_T 140033_FTK_PH0
140033_T_FTK_PH0 T N Rejected
ORO_Site4158ORO_Site4158_0
SAR with Active Candidate
407072 407072_0
407072_Nominal_PH0
407072_0_Nominal_PH0 0 N Nominal
ORO_Site4158ORO_Site4158_C
SAR with Active Candidate
407072 407072_C 407072_FTK_PH0
407072_C_FTK_PH0 C Y Active
ORO_Site4158ORO_Site4158_B
SAR with Active Candidate
407072 407072_B 407072_FTK_PH0
407072_B_FTK_PH0 B N Backup
ORO_Site4167ORO_Site4167_0
SAR with Active Candidate
407073 407073_0
407073_Nominal_PH0
407073_0_Nominal_PH0 0 N Nominal
ORO_Site4167ORO_Site4167_A
SAR with Active Candidate
407073 407073_A407073_FTK_PH0
407073_A_FTK_PH0 A N Rejected
ORO_Site4167ORO_Site4167_B
SAR with Active Candidate
407073 407073_B 407073_FTK_PH0
407073_B_FTK_PH0 B N Backup
ORO_Site4167ORO_Site4167_T
SAR with Active Candidate
407073 407073_T 407073_FTK_PH0
407073_T_FTK_PH0 T Y Active
ORO_Site4168ORO_Site4168_0
SAR with Active Candidate
407074 407074_0
407074_Nominal_PH0
407074_0_Nominal_PH0 0 N Nominal
ORO_Site4168ORO_Site4168_A
SAR with Active Candidate
407074 407074_A407074_FTK_PH0
407074_A_FTK_PH0 A N Backup
ORO_Site4168ORO_Site4168_B
SAR with Active Candidate
407074 407074_B 407074_FTK_PH0
407074_B_FTK_PH0 B N Backup
ORO_Site4168ORO_Site4168_C
SAR with Active Candidate
407074 407074_C 407074_FTK_PH0
407074_C_FTK_PH0 C Y Active
ORO_Site4183ORO_Site4183_0
SAR with Active Candidate
407118 407118_0
407118_Nominal_PH0
407118_0_Nominal_PH0 0 N Nominal
ORO_Site4183ORO_Site4183_A
SAR with Active Candidate
407118 407118_A407118_FTK_PH0
407118_A_FTK_PH0 A Y Active
ORO_Site4183ORO_Site4183_B
SAR with Active Candidate
407118 407118_B 407118_FTK_PH0
407118_B_FTK_PH0 B N Backup
ORO_Site4194ORO_Site4194_0
SAR with Active Candidate
407075 407075_0
407075_Nominal_PH0
407075_0_Nominal_PH0 0 N Nominal
ORO_Site4194ORO_Site4194_A
SAR with Active Candidate
407075 407075_A407075_FTK_PH0
407075_A_FTK_PH0 A N Rejected
ORO_Site4194ORO_Site4194_B
SAR with Active Candidate
407075 407075_B 407075_FTK_PH0
407075_B_FTK_PH0 B N Rejected
ORO_Site4194ORO_Site4194_T
SAR with Active Candidate
407075 407075_T 407075_FTK_PH0
407075_T_FTK_PH0 T N Rejected
ORO_Site4194ORO_Site4194_D
SAR with Active Candidate
407075 407075_D407075_FTK_PH0
407075_D_FTK_PH0 D N Backup
ORO_Site4194ORO_Site4194_E
SAR with Active Candidate
407075 407075_E 407075_FTK_PH0
407075_E_FTK_PH0 E N Backup
ORO_Site4194ORO_Site4194_C
SAR with Active Candidate
407075 407075_C 407075_FTK_PH0
407075_C_FTK_PH0 C N Rejected
ORO_Site4217ORO_Site4217_0
SAR with Active Candidate
407076 407076_0
407076_Nominal_PH0
407076_0_Nominal_PH0 0 N Nominal
ORO_Site4217ORO_Site4217_A
SAR with Active Candidate
407076 407076_A407076_FTK_PH0
407076_A_FTK_PH0 A N Backup
ORO_Site4217ORO_Site4217_B
SAR with Active Candidate
407076 407076_B 407076_FTK_PH0
407076_B_FTK_PH0 B N Backup
ORO_Site4217ORO_Site4217_C
SAR with Active Candidate
407076 407076_C 407076_FTK_PH0
407076_C_FTK_PH0 C Y Active
ORO_Site431 ORO_Site431_0
SAR with Active Candidate
408011 408011_0
408011_Nominal_PH0
408011_0_Nominal_PH0 0 N Nominal
ORO_Site431ORO_Site431_A
SAR with Active Candidate
408011 408011_A408011_FTK_PH0
408011_A_FTK_PH0 A N Rejected
ORO_Site431ORO_Site431_B
SAR with Active Candidate
408011 408011_B 408011_FTK_PH0
408011_B_FTK_PH0 B N Rejected
ORO_Site431ORO_Site431_C
SAR with Active Candidate
408011 408011_C 408011_FTK_PH0
408011_C_FTK_PH0 C Y Active
ORO_Site4508ORO_Site4508_0
SAR with Active Candidate
140034 140034_0
140034_Nominal_PH0
140034_0_Nominal_PH0 0 N Nominal
ORO_Site4508ORO_Site4508_A
SAR with Active Candidate
140034 140034_A140034_FTK_PH0
140034_A_FTK_PH0 A N Rejected
ORO_Site4508ORO_Site4508_B
SAR with Active Candidate
140034 140034_B 140034_FTK_PH0
140034_B_FTK_PH0 B N Rejected
ORO_Site4508ORO_Site4508_C
SAR with Active Candidate
140034 140034_C 140034_FTK_PH0
140034_C_FTK_PH0 C N Rejected
ORO_Site4508ORO_Site4508_D
SAR with Active Candidate
140034 140034_D140034_FTK_PH0
140034_D_FTK_PH0 D N Backup
ORO_Site4508ORO_Site4508_E
SAR with Active Candidate
140034 140034_E 140034_FTK_PH0
140034_E_FTK_PH0 E Y Active
ORO_Site4511ORO_Site4511_0
SAR with Active Candidate
140035 140035_0
140035_Nominal_PH0
140035_0_Nominal_PH0 0 N Nominal
ORO_Site4511ORO_Site4511_A
SAR with Active Candidate
140035 140035_A140035_FTK_PH0
140035_A_FTK_PH0 A N Backup
ORO_Site4511ORO_Site4511_B
SAR with Active Candidate
140035 140035_B 140035_FTK_PH0
140035_B_FTK_PH0 B N Backup
ORO_Site4511ORO_Site4511_C
SAR with Active Candidate
140035 140035_C 140035_FTK_PH0
140035_C_FTK_PH0 C Y Active
ORO_Site4511ORO_Site4511_T
SAR with Active Candidate
140035 140035_T 140035_FTK_PH0
140035_T_FTK_PH0 T N Rejected
ORO_Site4514ORO_Site4514_0
SAR with Active Candidate
140038 140038_0
140038_Nominal_PH0
140038_0_Nominal_PH0 0 N Nominal
ORO_Site4514ORO_Site4514_A
SAR with Active Candidate
140038 140038_A140038_FTK_PH0
140038_A_FTK_PH0 A N Rejected
ORO_Site4514ORO_Site4514_B
SAR with Active Candidate
140038 140038_B 140038_FTK_PH0
140038_B_FTK_PH0 B N Rejected
ORO_Site4514ORO_Site4514_C
SAR with Active Candidate
140038 140038_C 140038_FTK_PH0
140038_C_FTK_PH0 C N Backup
ORO_Site4514ORO_Site4514_D
SAR with Active Candidate
140038 140038_D140038_FTK_PH0
140038_D_FTK_PH0 D N Rejected
ORO_Site4514ORO_Site4514_E
SAR with Active Candidate
140038 140038_E 140038_FTK_PH0
140038_E_FTK_PH0 E N Rejected
ORO_Site4514ORO_Site4514_F
SAR with Active Candidate
140038 140038_F 140038_FTK_PH0
140038_F_FTK_PH0 F N Backup
ORO_Site4514ORO_Site4514_X
SAR with Active Candidate
140038 140038_X140038_Colo_PH0
140038_X_Colo_PH0 X Y Active
ORO_Site4517ORO_Site4517_0
SAR with Active Candidate
140039 140039_0
140039_Nominal_PH0
140039_0_Nominal_PH0 0 N Nominal
ORO_Site4517ORO_Site4517_A
SAR with Active Candidate
140039 140039_A140039_FTK_PH0
140039_A_FTK_PH0 A N Rejected
ORO_Site4517ORO_Site4517_B
SAR with Active Candidate
140039 140039_B 140039_FTK_PH0
140039_B_FTK_PH0 B N Backup
ORO_Site4517ORO_Site4517_C
SAR with Active Candidate
140039 140039_C 140039_FTK_PH0
140039_C_FTK_PH0 C N Rejected
ORO_Site4517ORO_Site4517_D
SAR with Active Candidate
140039 140039_D140039_FTK_PH0
140039_D_FTK_PH0 D Y Active
ORO_SITE4523_0
ORO_SITE4523 SAR with Active Candidate
140041 140041_0
140041_Nominal_PH0
140041_0_Nominal_PH0 0 N Nominal
ORO_SITE4523_A
ORO_SITE4523 SAR with Active Candidate
140041 140041_A140041_FTK_PH0
140041_A_FTK_PH0 A N Backup
ORO_SITE4523_B
ORO_SITE4523 SAR with Active Candidate
140041 140041_B 140041_FTK_PH0
140041_B_FTK_PH0 B N Backup
ORO_SITE4523_D
ORO_SITE4523 SAR with Active Candidate
140041 140041_D140041_FTK_PH0
140041_D_FTK_PH0 D Y Active
ORO_SITE4523_C
ORO_SITE4523 SAR with Active Candidate
140041 140041_C 140041_FTK_PH0
140041_C_FTK_PH0 C N Backup
ORO_Site4524_0
ORO_Site4524 SAR with Active Candidate
140042 140042_0
140042_Nominal_PH0
140042_0_Nominal_PH0 0 N Nominal
ORO_Site4524_A
ORO_Site4524 SAR with Active Candidate
140042 140042_A140042_FTK_PH0
140042_A_FTK_PH0 A N Rejected
ORO_Site4524_C
ORO_Site4524 SAR with Active Candidate
140042 140042_C 140042_FTK_PH0
140042_C_FTK_PH0 C Y Active
ORO_Site4524_B
ORO_Site4524 SAR with Active Candidate
140042 140042_B 140042_FTK_PH0
140042_B_FTK_PH0 B N Backup
ORO_Site4526_0
ORO_Site4526 SAR with Active Candidate
140043 140043_0
140043_Nominal_PH0
140043_0_Nominal_PH0 0 N Nominal
ORO_Site4526_A
ORO_Site4526 SAR with Active Candidate
140043 140043_A140043_FTK_PH0
140043_A_FTK_PH0 A N Backup
ORO_Site4526_B
ORO_Site4526 SAR with Active Candidate
140043 140043_B 140043_FTK_PH0
140043_B_FTK_PH0 B N Backup
ORO_Site4526_C
ORO_Site4526 SAR with Active Candidate
140043 140043_C 140043_FTK_PH0
140043_C_FTK_PH0 C N Backup
ORO_Site4526_D
ORO_Site4526 SAR with Active Candidate
140043 140043_D140043_FTK_PH0
140043_D_FTK_PH0 D Y Active
ORO_Site4526_E
ORO_Site4526 SAR with Active Candidate
140043 140043_E 140043_FTK_PH0
140043_E_FTK_PH0 E N Rejected
ORO_Site4526ORO_Site4526_T
SAR with Active Candidate
140043 140043_T 140043_FTK_PH0
140043_T_FTK_PH0 T N Rejected
ORO_Site4527ORO_Site4527_0
SAR with Active Candidate
140044 140044_0
140044_Nominal_PH0
140044_0_Nominal_PH0 0 N Nominal
ORO_Site4527ORO_Site4527_A
SAR with Active Candidate
140044 140044_A140044_FTK_PH0
140044_A_FTK_PH0 A N Rejected
ORO_Site4527ORO_Site4527_B
SAR with Active Candidate
140044 140044_B 140044_FTK_PH0
140044_B_FTK_PH0 B N Rejected
ORO_Site4527ORO_Site4527_C
SAR with Active Candidate
140044 140044_C 140044_FTK_PH0
140044_C_FTK_PH0 C Y Active
ORO_Site4531ORO_Site4531_0
SAR with Active Candidate
140047 140047_0
140047_Nominal_PH0
140047_0_Nominal_PH0 0 N Nominal
ORO_Site4531ORO_Site4531_A
SAR with Active Candidate
140047 140047_A140047_FTK_PH0
140047_A_FTK_PH0 A N Rejected
ORO_Site4531ORO_Site4531_B
SAR with Active Candidate
140047 140047_B 140047_FTK_PH0
140047_B_FTK_PH0 B N Rejected
ORO_Site4531ORO_Site4531_C
SAR with Active Candidate
140047 140047_C 140047_FTK_PH0
140047_C_FTK_PH0 C N Rejected
ORO_Site4531ORO_Site4531_D
SAR with Active Candidate
140047 140047_D140047_FTK_PH0
140047_D_FTK_PH0 D Y Active
ORO_Site4532ORO_Site4532_0
SAR with Active Candidate
140068 140068_0
140068_Nominal_PH0
140068_0_Nominal_PH0 0 N Nominal
ORO_Site4532ORO_Site4532_A
SAR with Active Candidate
140068 140068_A140068_FTK_PH0
140068_A_FTK_PH0 A N Rejected
ORO_Site4532ORO_Site4532_B
SAR with Active Candidate
140068 140068_B 140068_FTK_PH0
140068_B_FTK_PH0 B Y Active
ORO_Site4533ORO_Site4533_0
SAR with Active Candidate
140048 140048_0
140048_Nominal_PH0
140048_0_Nominal_PH0 0 N Nominal
ORO_Site4533ORO_Site4533_A
SAR with Active Candidate
140048 140048_A140048_FTK_PH0
140048_A_FTK_PH0 A N Rejected
ORO_Site4533ORO_Site4533_B
SAR with Active Candidate
140048 140048_B 140048_FTK_PH0
140048_B_FTK_PH0 B N Rejected
ORO_Site4533ORO_Site4533_C
SAR with Active Candidate
140048 140048_C 140048_FTK_PH0
140048_C_FTK_PH0 C N Rejected
ORO_Site4533ORO_Site4533_D
SAR with Active Candidate
140048 140048_D140048_FTK_PH0
140048_D_FTK_PH0 D Y Active
ORO_Site4536ORO_Site4536_0
SAR with Active Candidate
140049 140049_0
140049_Nominal_PH0
140049_0_Nominal_PH0 0 N Nominal
ORO_Site4536ORO_Site4536_A
SAR with Active Candidate
140049 140049_A140049_FTK_PH0
140049_A_FTK_PH0 A N Backup
ORO_Site4536ORO_Site4536_B
SAR with Active Candidate
140049 140049_B 140049_FTK_PH0
140049_B_FTK_PH0 B N Rejected
ORO_Site4536ORO_Site4536_C
SAR with Active Candidate
140049 140049_C 140049_FTK_PH0
140049_C_FTK_PH0 C Y Active
ORO_Site4539ORO_Site4539_0
SAR with Active Candidate
140051 140051_0
140051_Nominal_PH0
140051_0_Nominal_PH0 0 N Nominal
ORO_Site4539ORO_Site4539_A
SAR with Active Candidate
140051 140051_A140051_FTK_PH0
140051_A_FTK_PH0 A N Rejected
ORO_Site4539ORO_Site4539_B
SAR with Active Candidate
140051 140051_B 140051_FTK_PH0
140051_B_FTK_PH0 B N Rejected
ORO_Site4539ORO_Site4539_C
SAR with Active Candidate
140051 140051_C 140051_FTK_PH0
140051_C_FTK_PH0 C N Rejected
ORO_Site4539ORO_Site4539_D
SAR with Active Candidate
140051 140051_D140051_FTK_PH0
140051_D_FTK_PH0 D Y Active
ORO_Site4540ORO_Site4540_0
SAR with Active Candidate
140052 140052_0
140052_Nominal_PH0
140052_0_Nominal_PH0 0 N Nominal
ORO_Site4540ORO_Site4540_A
SAR with Active Candidate
140052 140052_A140052_FTK_PH0
140052_A_FTK_PH0 A N Rejected
ORO_Site4540ORO_Site4540_B
SAR with Active Candidate
140052 140052_B 140052_FTK_PH0
140052_B_FTK_PH0 B N Rejected
ORO_Site4540ORO_Site4540_C
SAR with Active Candidate
140052 140052_C 140052_FTK_PH0
140052_C_FTK_PH0 C Y Active
ORO_Site4540ORO_Site4540_T
SAR with Active Candidate
140052 140052_T 140052_FTK_PH0
140052_T_FTK_PH0 T N Backup
ORO_Site4542ORO_Site4542_0
SAR with Active Candidate
140054 140054_0
140054_Nominal_PH0
140054_0_Nominal_PH0 0 N Nominal
ORO_Site4542ORO_Site4542_A
SAR with Active Candidate
140054 140054_A140054_FTK_PH0
140054_A_FTK_PH0 A N Rejected
ORO_Site4542ORO_Site4542_B
SAR with Active Candidate
140054 140054_B 140054_FTK_PH0
140054_B_FTK_PH0 B N Backup
ORO_Site4542ORO_Site4542_C
SAR with Active Candidate
140054 140054_C 140054_FTK_PH0
140054_C_FTK_PH0 C Y Active
ORO_Site4544_0
ORO_Site4544 SAR with Active Candidate
140055 140055_0
140055_Nominal_PH0
140055_0_Nominal_PH0 0 N Nominal
ORO_Site4544_A
ORO_Site4544 SAR with Active Candidate
140055 140055_A140055_FTK_PH0
140055_A_FTK_PH0 A N Backup
ORO_Site4544_B
ORO_Site4544 SAR with Active Candidate
140055 140055_B 140055_FTK_PH0
140055_B_FTK_PH0 B N Backup
ORO_Site4544_C
ORO_Site4544 SAR with Active Candidate
140055 140055_C 140055_FTK_PH0
140055_C_FTK_PH0 C Y Active
ORO_Site4546_0
ORO_Site4546 SAR with Active Candidate
140057 140057_0
140057_Nominal_PH0
140057_0_Nominal_PH0 0 N Nominal
ORO_Site4546_A
ORO_Site4546 SAR with Active Candidate
140057 140057_A140057_FTK_PH0
140057_A_FTK_PH0 A N Backup
ORO_Site4546_B
ORO_Site4546 SAR with Active Candidate
140057 140057_B 140057_FTK_PH0
140057_B_FTK_PH0 B N Backup
ORO_Site4546_C
ORO_Site4546 SAR with Active Candidate
140057 140057_C 140057_FTK_PH0
140057_C_FTK_PH0 C N Backup
ORO_Site4546ORO_Site4546_T
SAR with Active Candidate
140057 140057_T 140057_FTK_PH0
140057_T_FTK_PH0 T Y Active
ORO_Site479 ORO_Site479_0
SAR with Active Candidate
417054 417054_0
417054_Nominal_PH0
417054_0_Nominal_PH0 0 N Nominal
ORO_Site479ORO_Site479_A
SAR with Active Candidate
417054 417054_A417054_FTK_PH0
417054_A_FTK_PH0 A Y Active
ORO_Site501 ORO_Site501_0
SAR with Active Candidate
417061 417061_0
417061_Nominal_PH0
417061_0_Nominal_PH0 0 N Nominal
ORO_Site501 ORO_Site501_T
SAR with Active Candidate
417061 417061_T 417061_FTK_PH0
417061_T_FTK_PH0 T Y Active
ORO_Site507 ORO_Site507_0
SAR with Active Candidate
417019 417019_0
417019_Nominal_PH0
417019_0_Nominal_PH0 0 N Nominal
ORO_Site507 ORO_Site507_T
SAR with Active Candidate
417019 417019_T 417019_FTK_PH0
417019_T_FTK_PH0 T N Rejected
ORO_Site507ORO_Site507_A
SAR with Active Candidate
417019 417019_A417019_FTK_PH0
417019_A_FTK_PH0 A Y Active
ORO_Site511 ORO_Site511_0
SAR with Active Candidate
417022 417022_0
417022_Nominal_PH0
417022_0_Nominal_PH0 0 N Nominal
ORO_Site511 ORO_Site511_T
SAR with Active Candidate
417022 417022_T 417022_FTK_PH0
417022_T_FTK_PH0 T Y Active
ORO_Site516 ORO_Site516_0
SAR with Active Candidate
417065 417065_0
417065_Nominal_PH0
417065_0_Nominal_PH0 0 N Nominal
ORO_Site516 ORO_Site516_T
SAR with Active Candidate
417065 417065_T 417065_FTK_PH0
417065_T_FTK_PH0 T Y Active
ORO_Site521 ORO_Site521_0
SAR with Active Candidate
417023 417023_0
417023_Nominal_PH0
417023_0_Nominal_PH0 0 N Nominal
ORO_Site521ORO_Site521_A
SAR with Active Candidate
417023 417023_A417023_FTK_PH0
417023_A_FTK_PH0 A Y Active
ORO_Site522 ORO_Site522_0
SAR with Active Candidate
417024 417024_0
417024_Nominal_PH0
417024_0_Nominal_PH0 0 N Nominal
ORO_Site522 ORO_Site522_T
SAR with Active Candidate
417024 417024_T 417024_FTK_PH0
417024_T_FTK_PH0 T Y Active
ORO_Site579 ORO_Site579_0
SAR with Active Candidate
408050 408050_0
408050_Nominal_PH0
408050_0_Nominal_PH0 0 N Nominal
ORO_Site579ORO_Site579_A
SAR with Active Candidate
408050 408050_A408050_FTK_PH0
408050_A_FTK_PH0 A Y Active
ORO_Site579ORO_Site579_B
SAR with Active Candidate
408050 408050_B 408050_FTK_PH0
408050_B_FTK_PH0 B N Backup
ORO_Site6 ORO_Site6_0
SAR with Active Candidate
417028 417028_0
417028_Nominal_PH0
417028_0_Nominal_PH0 0 N Nominal
ORO_Site6 ORO_Site6_A
SAR with Active Candidate
417028 417028_A417028_FTK_PH0
417028_A_FTK_PH0 A Y Active
ORO_Site6 ORO_Site6_B
SAR with Active Candidate
417028 417028_B 417028_FTK_PH0
417028_B_FTK_PH0 B N Backup
ORO_Site6 ORO_Site6_C
SAR with Active Candidate
417028 417028_C 417028_FTK_PH0
417028_C_FTK_PH0 C N Rejected
ORO_Site90 ORO_Site90_0
SAR with Active Candidate
404008 404008_0
404008_Nominal_PH0
404008_0_Nominal_PH0 0 N Nominal
ORO_Site90 ORO_Site90_T
SAR with Active Candidate
404008 404008_T 404008_FTK_PH0
404008_T_FTK_PH0 T Y Active
ORO_Site91 ORO_Site91_0
SAR with Active Candidate
404009 404009_0
404009_Nominal_PH0
404009_0_Nominal_PH0 0 N Nominal
ORO_Site91 ORO_Site91_T
SAR with Active Candidate
404009 404009_T 404009_FTK_PH0
404009_T_FTK_PH0 T Y Active
ORO_Site93 ORO_Site93_0
SAR with Active Candidate
404010 404010_0
404010_Nominal_PH0
404010_0_Nominal_PH0 0 N Nominal
ORO_Site93 ORO_Site93_T
SAR with Active Candidate
404010 404010_T 404010_FTK_PH0
404010_T_FTK_PH0 T Y Active
ORO_Site96 ORO_Site96_0
SAR with Active Candidate
404011 404011_0
404011_Nominal_PH0
404011_0_Nominal_PH0 0 N Nominal
ORO_Site96 ORO_Site96_T
SAR with Active Candidate
404011 404011_T 404011_FTK_PH0
404011_T_FTK_PH0 T N Rejected
ORO_Site96 ORO_Site96_A
SAR with Active Candidate
404011 404011_A404011_FTK_PH0
404011_A_FTK_PH0 A N Rejected
ORO_Site96 ORO_Site96_B
SAR with Active Candidate
404011 404011_B 404011_FTK_PH0
404011_B_FTK_PH0 B N Backup
ORO_Site96 ORO_Site96_X
SAR with Active Candidate
404011 404011_X404011_Colo_PH0
404011_X_Colo_PH0 X Y Active
ORO_Site97 ORO_Site97_0
SAR with Active Candidate
404012 404012_0
404012_Nominal_PH0
404012_0_Nominal_PH0 0 N Nominal
ORO_Site97 ORO_Site97_T
SAR with Active Candidate
404012 404012_T 404012_FTK_PH0
404012_T_FTK_PH0 T Y Active
ORO_Site98 ORO_Site98_0
SAR with Active Candidate
404061 404061_0
404061_Nominal_PH0
404061_0_Nominal_PH0 0 N Nominal
ORO_Site98 ORO_Site98_T
SAR with Active Candidate
404061 404061_T 404061_FTK_PH0
404061_T_FTK_PH0 T N Rejected
ORO_Site98 ORO_Site98_A
SAR with Active Candidate
404061 404061_A404061_FTK_PH0
404061_A_FTK_PH0 A N Rejected
ORO_Site98 ORO_Site98_B
SAR with Active Candidate
404061 404061_B 404061_FTK_PH0
404061_B_FTK_PH0 B Y Active
SNNPR_Site1010
SNNPR_Site1010_0
SAR with Active Candidate
702001 702001_0
702001_Nominal_PH0
702001_0_Nominal_PH0 0 N Nominal
SNNPR_Site1010
SNNPR_Site1010_T
SAR with Active Candidate
702001 702001_T 702001_FTK_PH0
702001_T_FTK_PH0 T N Rejected
SNNPR_Site1010
SNNPR_Site1010_A
SAR with Active Candidate
702001 702001_A702001_FTK_PH0
702001_A_FTK_PH0 A Y Active
SNNPR_Site1012
SNNPR_Site1012_0
SAR with Active Candidate
710001 710001_0
710001_Nominal_PH0
710001_0_Nominal_PH0 0 N Nominal
SNNPR_Site1012
SNNPR_Site1012_T
SAR with Active Candidate
710001 710001_T 710001_FTK_PH0
710001_T_FTK_PH0 T Y Active
SNNPR_Site1015
SNNPR_Site1015_0
SAR with Active Candidate
702002 702002_0
702002_Nominal_PH0
702002_0_Nominal_PH0 0 N Nominal
SNNPR_Site1015
SNNPR_Site1015_A
SAR with Active Candidate
702002 702002_A702002_FTK_PH0
702002_A_FTK_PH0 A Y Active
SNNPR_Site1018
SNNPR_Site1018_0
SAR with Active Candidate
706010 706010_0
706010_Nominal_PH0
706010_0_Nominal_PH0 0 N Nominal
SNNPR_Site1018
SNNPR_Site1018_A
SAR with Active Candidate
706010 706010_A706010_FTK_PH0
706010_A_FTK_PH0 A N Rejected
SNNPR_Site1018
SNNPR_Site1018_B
SAR with Active Candidate
706010 706010_B 706010_FTK_PH0
706010_B_FTK_PH0 B Y Active
SNNPR_Site1022
SNNPR_Site1022_0
SAR with Active Candidate
701010 701010_0
701010_Nominal_PH0
701010_0_Nominal_PH0 0 N Nominal
SNNPR_Site1022
SNNPR_Site1022_A
SAR with Active Candidate
701010 701010_A701010_FTK_PH0
701010_A_FTK_PH0 A N Rejected
SNNPR_Site1022
SNNPR_Site1022_B
SAR with Active Candidate
701010 701010_B 701010_FTK_PH0
701010_B_FTK_PH0 B N Rejected
SNNPR_Site1022
SNNPR_Site1022_C
SAR with Active Candidate
701010 701010_C 701010_FTK_PH0
701010_C_FTK_PH0 C Y Active
SNNPR_Site1022
SNNPR_Site1022_D
SAR with Active Candidate
701010 701010_D701010_FTK_PH0
701010_D_FTK_PH0 D N Rejected
SNNPR_Site1027
SNNPR_Site1027_0
SAR with Active Candidate
701001 701001_0
701001_Nominal_PH0
701001_0_Nominal_PH0 0 N Nominal
SNNPR_Site1027
SNNPR_Site1027_A
SAR with Active Candidate
701001 701001_A701001_FTK_PH0
701001_A_FTK_PH0 A N Backup
SNNPR_Site1027
SNNPR_Site1027_T
SAR with Active Candidate
701001 701001_T 701001_FTK_PH0
701001_T_FTK_PH0 T Y Active
SNNPR_Site1027
SNNPR_Site1027_B
SAR with Active Candidate
701001 701001_B 701001_FTK_PH0
701001_B_FTK_PH0 B N Rejected
SNNPR_Site1029
SNNPR_Site1029_0
SAR with Active Candidate
701003 701003_0
701003_Nominal_PH0
701003_0_Nominal_PH0 0 N Nominal
SNNPR_Site1029
SNNPR_Site1029_A
SAR with Active Candidate
701003 701003_A701003_FTK_PH0
701003_A_FTK_PH0 A N Backup
SNNPR_Site1029
SNNPR_Site1029_B
SAR with Active Candidate
701003 701003_B 701003_FTK_PH0
701003_B_FTK_PH0 B N Rejected
SNNPR_Site1029
SNNPR_Site1029_T
SAR with Active Candidate
701003 701003_T 701003_FTK_PH0
701003_T_FTK_PH0 T Y Active
SNNPR_Site1031
SNNPR_Site1031_0
SAR with Active Candidate
701004 701004_0
701004_Nominal_PH0
701004_0_Nominal_PH0 0 N Nominal
SNNPR_Site1031
SNNPR_Site1031_A
SAR with Active Candidate
701004 701004_A701004_FTK_PH0
701004_A_FTK_PH0 A N Rejected
SNNPR_Site1031
SNNPR_Site1031_B
SAR with Active Candidate
701004 701004_B 701004_FTK_PH0
701004_B_FTK_PH0 B N Rejected
SNNPR_Site1031
SNNPR_Site1031_C
SAR with Active Candidate
701004 701004_C 701004_FTK_PH0
701004_C_FTK_PH0 C N Rejected
SNNPR_Site1031
SNNPR_Site1031_T
SAR with Active Candidate
701004 701004_T 701004_FTK_PH0
701004_T_FTK_PH0 T Y Active
SNNPR_Site1044
SNNPR_Site1044_0
SAR with Active Candidate
701014 701014_0
701014_Nominal_PH0
701014_0_Nominal_PH0 0 N Nominal
SNNPR_Site1044
SNNPR_Site1044_A
SAR with Active Candidate
701014 701014_A701014_FTK_PH0
701014_A_FTK_PH0 A Y Active
SNNPR_Site1044
SNNPR_Site1044_B
SAR with Active Candidate
701014 701014_B 701014_FTK_PH0
701014_B_FTK_PH0 B N Backup
SNNPR_Site1047
SNNPR_Site1047_0
SAR with No Active Candidate
701016 701016_0
701016_Nominal_PH0
701016_0_Nominal_PH0 0 N Nominal
SNNPR_Site1047
SNNPR_Site1047_A
SAR with No Active Candidate
701016 701016_A701016_FTK_PH0
701016_A_FTK_PH0 A N Rejected
SNNPR_Site1047
SNNPR_Site1047_B
SAR with No Active Candidate
701016 701016_B 701016_FTK_PH0
701016_B_FTK_PH0 B N Rejected
SNNPR_Site1047
SNNPR_Site1047_C
SAR with No Active Candidate
701016 701016_C 701016_FTK_PH0
701016_C_FTK_PH0 C N Rejected
SNNPR_Site1047
SNNPR_Site1047_D
SAR with Active Candidate
701016 701016_D701016_FTK_PH0
701016_D_FTK_PH0 D Y Active
SNNPR_Site1050
SNNPR_Site1050_0
SAR with Active Candidate
701018 701018_0
701018_Nominal_PH0
701018_0_Nominal_PH0 0 N Nominal
SNNPR_Site1050
SNNPR_Site1050_A
SAR with Active Candidate
701018 701018_A701018_FTK_PH0
701018_A_FTK_PH0 A N Rejected
SNNPR_Site1050
SNNPR_Site1050_B
SAR with Active Candidate
701018 701018_B 701018_FTK_PH0
701018_B_FTK_PH0 B N Rejected
SNNPR_Site1050
SNNPR_Site1050_C
SAR with Active Candidate
701018 701018_C 701018_FTK_PH0
701018_C_FTK_PH0 C N Rejected
SNNPR_Site1050
SNNPR_Site1050_D
SAR with Active Candidate
701018 701018_D701018_FTK_PH0
701018_D_FTK_PH0 D Y Active
SNNPR_Site1074
SNNPR_Site1074_0
SAR with Active Candidate
721002 721002_0
721002_Nominal_PH0
721002_0_Nominal_PH0 0 N Nominal
SNNPR_Site1074
SNNPR_Site1074_A
SAR with Active Candidate
721002 721002_A721002_FTK_PH0
721002_A_FTK_PH0 A Y Active
SNNPR_Site108
SNNPR_Site108_0
SAR with Active Candidate
710009 710009_0
710009_Nominal_PH0
710009_0_Nominal_PH0 0 N Nominal
SNNPR_Site108
SNNPR_Site108_A
SAR with Active Candidate
710009 710009_A710009_FTK_PH0
710009_A_FTK_PH0 A Y Active
SNNPR_Site1085
SNNPR_Site1085_0
SAR with Active Candidate
710003 710003_0
710003_Nominal_PH0
710003_0_Nominal_PH0 0 N Nominal
SNNPR_Site1085
SNNPR_Site1085_T
SAR with Active Candidate
710003 710003_T 710003_FTK_PH0
710003_T_FTK_PH0 T Y Active
SNNPR_Site109
SNNPR_Site109_0
SAR with Active Candidate
710005 710005_0
710005_Nominal_PH0
710005_0_Nominal_PH0 0 N Nominal
SNNPR_Site109
SNNPR_Site109_T
SAR with Active Candidate
710005 710005_T 710005_FTK_PH0
710005_T_FTK_PH0 T Y Active
SNNPR_Site110
SNNPR_Site110_0
SAR with Active Candidate
710014 710014_0
710014_Nominal_PH0
710014_0_Nominal_PH0 0 N Nominal
SNNPR_Site110
SNNPR_Site110_A
SAR with Active Candidate
710014 710014_A710014_FTK_PH0
710014_A_FTK_PH0 A N Rejected
SNNPR_Site110
SNNPR_Site110_B
SAR with Active Candidate
710014 710014_B 710014_FTK_PH0
710014_B_FTK_PH0 B Y Active
SNNPR_Site1110
SNNPR_Site1110_0
SAR with Active Candidate
706001 706001_0
706001_Nominal_PH0
706001_0_Nominal_PH0 0 N Nominal
SNNPR_Site1110
SNNPR_Site1110_T
SAR with Active Candidate
706001 706001_T 706001_FTK_PH0
706001_T_FTK_PH0 T Y Active
SNNPR_Site1145
SNNPR_Site1145_0
SAR with Active Candidate
704002 704002_0
704002_Nominal_PH0
704002_0_Nominal_PH0 0 N Nominal
SNNPR_Site1145
SNNPR_Site1145_A
SAR with Active Candidate
704002 704002_A704002_FTK_PH0
704002_A_FTK_PH0 A N Rejected
SNNPR_Site1145
SNNPR_Site1145_B
SAR with Active Candidate
704002 704002_B 704002_FTK_PH0
704002_B_FTK_PH0 B N Rejected
SNNPR_Site1145
SNNPR_Site1145_C
SAR with Active Candidate
704002 704002_C 704002_FTK_PH0
704002_C_FTK_PH0 C Y Active
SNNPR_Site1145
SNNPR_Site1145_T
SAR with Active Candidate
704002 704002_T 704002_FTK_PH0
704002_T_FTK_PH0 T N Rejected
SNNPR_Site1174
SNNPR_Site1174_0
SAR with Active Candidate
702003 702003_0
702003_Nominal_PH0
702003_0_Nominal_PH0 0 N Nominal
SNNPR_Site1174
SNNPR_Site1174_A
SAR with Active Candidate
702003 702003_A702003_FTK_PH0
702003_A_FTK_PH0 A Y Active
SNNPR_Site119
SNNPR_Site119_0
SAR with Active Candidate
704031 704031_0
704031_Nominal_PH0
704031_0_Nominal_PH0 0 N Nominal
SNNPR_Site119
SNNPR_Site119_A
SAR with Active Candidate
704031 704031_A704031_FTK_PH0
704031_A_FTK_PH0 A N Backup
SNNPR_Site119
SNNPR_Site119_B
SAR with Active Candidate
704031 704031_B 704031_FTK_PH0
704031_B_FTK_PH0 B Y Active
SNNPR_Site1220
SNNPR_Site1220_0
SAR with Active Candidate
711003 711003_0
711003_Nominal_PH0
711003_0_Nominal_PH0 0 N Nominal
SNNPR_Site1220
SNNPR_Site1220_A
SAR with Active Candidate
711003 711003_A711003_FTK_PH0
711003_A_FTK_PH0 A Y Active
SNNPR_Site1240
SNNPR_Site1240_0
SAR with Active Candidate
704003 704003_0
704003_Nominal_PH0
704003_0_Nominal_PH0 0 N Nominal
SNNPR_Site1240
SNNPR_Site1240_T
SAR with Active Candidate
704003 704003_T 704003_FTK_PH0
704003_T_FTK_PH0 T Y Active
SNNPR_Site1245
SNNPR_Site1245_0
SAR with Active Candidate
704004 704004_0
704004_Nominal_PH0
704004_0_Nominal_PH0 0 N Nominal
SNNPR_Site1245
SNNPR_Site1245_A
SAR with Active Candidate
704004 704004_A704004_FTK_PH0
704004_A_FTK_PH0 A N Rejected
SNNPR_Site1245
SNNPR_Site1245_B
SAR with Active Candidate
704004 704004_B 704004_FTK_PH0
704004_B_FTK_PH0 B N Rejected
SNNPR_Site1245
SNNPR_Site1245_C
SAR with Active Candidate
704004 704004_C 704004_FTK_PH0
704004_C_FTK_PH0 C N Rejected
SNNPR_Site1245
SNNPR_Site1245_T
SAR with Active Candidate
704004 704004_T 704004_FTK_PH0
704004_T_FTK_PH0 T Y Active
SNNPR_Site1247
SNNPR_Site1247_0
SAR with Active Candidate
702006 702006_0
702006_Nominal_PH0
702006_0_Nominal_PH0 0 N Nominal
SNNPR_Site1247
SNNPR_Site1247_T
SAR with Active Candidate
702006 702006_T 702006_FTK_PH0
702006_T_FTK_PH0 T Y Active
SNNPR_Site127
SNNPR_Site127_0
SAR with Active Candidate
710039 710039_0
710039_Nominal_PH0
710039_0_Nominal_PH0 0 N Nominal
SNNPR_Site127
SNNPR_Site127_A
SAR with Active Candidate
710039 710039_A710039_FTK_PH0
710039_A_FTK_PH0 A N Backup
SNNPR_Site127
SNNPR_Site127_X
SAR with Active Candidate
710039 710039_X710039_Colo_PH0
710039_X_Colo_PH0 X Y Active
SNNPR_Site145
SNNPR_Site145_0
SAR with Active Candidate
710020 710020_0
710020_Nominal_PH0
710020_0_Nominal_PH0 0 N Nominal
SNNPR_Site145
SNNPR_Site145_A
SAR with Active Candidate
710020 710020_A710020_FTK_PH0
710020_A_FTK_PH0 A Y Active
SNNPR_Site145
SNNPR_Site145_T
SAR with Active Candidate
710020 710020_T 710020_FTK_PH0
710020_T_FTK_PH0 T N Rejected
SNNPR_Site147
SNNPR_Site147_0
SAR with Active Candidate
702007 702007_0
702007_Nominal_PH0
702007_0_Nominal_PH0 0 N Nominal
SNNPR_Site147
SNNPR_Site147_A
SAR with Active Candidate
702007 702007_A702007_FTK_PH0
702007_A_FTK_PH0 A Y Active
SNNPR_Site164
SNNPR_Site164_0
SAR with Active Candidate
701005 701005_0
701005_Nominal_PH0
701005_0_Nominal_PH0 0 N Nominal
SNNPR_Site164
SNNPR_Site164_A
SAR with Active Candidate
701005 701005_A701005_FTK_PH0
701005_A_FTK_PH0 A N Backup
SNNPR_Site164
SNNPR_Site164_B
SAR with Active Candidate
701005 701005_B 701005_FTK_PH0
701005_B_FTK_PH0 B N Rejected
SNNPR_Site164
SNNPR_Site164_T
SAR with Active Candidate
701005 701005_T 701005_FTK_PH0
701005_T_FTK_PH0 T Y Active
SNNPR_Site184
SNNPR_Site184_0
SAR with Active Candidate
704005 704005_0
704005_Nominal_PH0
704005_0_Nominal_PH0 0 N Nominal
SNNPR_Site184
SNNPR_Site184_A
SAR with Active Candidate
704005 704005_A704005_FTK_PH0
704005_A_FTK_PH0 A N Backup
SNNPR_Site184
SNNPR_Site184_B
SAR with Active Candidate
704005 704005_B 704005_FTK_PH0
704005_B_FTK_PH0 B N Rejected
SNNPR_Site184
SNNPR_Site184_C
SAR with Active Candidate
704005 704005_C 704005_FTK_PH0
704005_C_FTK_PH0 C Y Active
SNNPR_Site185
SNNPR_Site185_0
SAR with Active Candidate
704006 704006_0
704006_Nominal_PH0
704006_0_Nominal_PH0 0 N Nominal
SNNPR_Site185
SNNPR_Site185_A
SAR with Active Candidate
704006 704006_A704006_FTK_PH0
704006_A_FTK_PH0 A N Rejected
SNNPR_Site185
SNNPR_Site185_B
SAR with Active Candidate
704006 704006_B 704006_FTK_PH0
704006_B_FTK_PH0 B N Rejected
SNNPR_Site185
SNNPR_Site185_C
SAR with Active Candidate
704006 704006_C 704006_FTK_PH0
704006_C_FTK_PH0 C Y Active
SNNPR_Site194
SNNPR_Site194_0
SAR with Active Candidate
702008 702008_0
702008_Nominal_PH0
702008_0_Nominal_PH0 0 N Nominal
SNNPR_Site194
SNNPR_Site194_A
SAR with Active Candidate
702008 702008_A702008_FTK_PH0
702008_A_FTK_PH0 A Y Active
SNNPR_Site194
SNNPR_Site194_T
SAR with Active Candidate
702008 702008_T 702008_FTK_PH0
702008_T_FTK_PH0 T N Rejected
SNNPR_Site195
SNNPR_Site195_0
SAR with Active Candidate
706004 706004_0
706004_Nominal_PH0
706004_0_Nominal_PH0 0 N Nominal
SNNPR_Site195
SNNPR_Site195_A
SAR with Active Candidate
706004 706004_A706004_FTK_PH0
706004_A_FTK_PH0 A Y Active
SNNPR_Site195
SNNPR_Site195_T
SAR with Active Candidate
706004 706004_T 706004_FTK_PH0
706004_T_FTK_PH0 T N Rejected
SNNPR_Site197
SNNPR_Site197_0
SAR with Active Candidate
705001 705001_0
705001_Nominal_PH0
705001_0_Nominal_PH0 0 N Nominal
SNNPR_Site197
SNNPR_Site197_A
SAR with Active Candidate
705001 705001_A705001_FTK_PH0
705001_A_FTK_PH0 A Y Active
SNNPR_Site197
SNNPR_Site197_T
SAR with Active Candidate
705001 705001_T 705001_FTK_PH0
705001_T_FTK_PH0 T N Rejected
SNNPR_Site201
SNNPR_Site201_0
SAR with Active Candidate
704035 704035_0
704035_Nominal_PH0
704035_0_Nominal_PH0 0 N Nominal
SNNPR_Site201
SNNPR_Site201_A
SAR with Active Candidate
704035 704035_A704035_FTK_PH0
704035_A_FTK_PH0 A Y Active
SNNPR_Site202
SNNPR_Site202_0
SAR with Active Candidate
704132 704132_0
704132_Nominal_PH0
704132_0_Nominal_PH0 0 N Nominal
SNNPR_Site202
SNNPR_Site202_A
SAR with Active Candidate
704132 704132_A704132_FTK_PH0
704132_A_FTK_PH0 A N Rejected
SNNPR_Site202
SNNPR_Site202_B
SAR with Active Candidate
704132 704132_B 704132_FTK_PH0
704132_B_FTK_PH0 B N Rejected
SNNPR_Site202
SNNPR_Site202_D
SAR with Active Candidate
704132 704132_D704132_FTK_PH0
704132_D_FTK_PH0 D Y Active
SNNPR_Site202
SNNPR_Site202_T
SAR with Active Candidate
704132 704132_T 704132_FTK_PH0
704132_T_FTK_PH0 T N Rejected
SNNPR_Site203
SNNPR_Site203_0
SAR with Active Candidate
704007 704007_0
704007_Nominal_PH0
704007_0_Nominal_PH0 0 N Nominal
SNNPR_Site203
SNNPR_Site203_A
SAR with Active Candidate
704007 704007_A704007_FTK_PH0
704007_A_FTK_PH0 A N Rejected
SNNPR_Site203
SNNPR_Site203_B
SAR with Active Candidate
704007 704007_B 704007_FTK_PH0
704007_B_FTK_PH0 B N Rejected
SNNPR_Site203
SNNPR_Site203_C
SAR with Active Candidate
704007 704007_C 704007_FTK_PH0
704007_C_FTK_PH0 C Y Active
SNNPR_Site203
SNNPR_Site203_T
SAR with Active Candidate
704007 704007_T 704007_FTK_PH0
704007_T_FTK_PH0 T N Rejected
SNNPR_Site204
SNNPR_Site204_0
SAR with Active Candidate
704008 704008_0
704008_Nominal_PH0
704008_0_Nominal_PH0 0 N Nominal
SNNPR_Site204
SNNPR_Site204_A
SAR with Active Candidate
704008 704008_A704008_FTK_PH0
704008_A_FTK_PH0 A N Rejected
SNNPR_Site204
SNNPR_Site204_B
SAR with Active Candidate
704008 704008_B 704008_FTK_PH0
704008_B_FTK_PH0 B N Rejected
SNNPR_Site204
SNNPR_Site204_C
SAR with Active Candidate
704008 704008_C 704008_FTK_PH0
704008_C_FTK_PH0 C N Rejected
SNNPR_Site204
SNNPR_Site204_T
SAR with Active Candidate
704008 704008_T 704008_FTK_PH0
704008_T_FTK_PH0 T Y Active
SNNPR_Site205
SNNPR_Site205_0
SAR with Active Candidate
704009 704009_0
704009_Nominal_PH0
704009_0_Nominal_PH0 0 N Nominal
SNNPR_Site205
SNNPR_Site205_A
SAR with Active Candidate
704009 704009_A704009_FTK_PH0
704009_A_FTK_PH0 A N Rejected
SNNPR_Site205
SNNPR_Site205_B
SAR with Active Candidate
704009 704009_B 704009_FTK_PH0
704009_B_FTK_PH0 B N Rejected
SNNPR_Site205
SNNPR_Site205_T
SAR with Active Candidate
704009 704009_T 704009_FTK_PH0
704009_T_FTK_PH0 T N Rejected
SNNPR_Site205
SNNPR_Site205_C
SAR with Active Candidate
704009 704009_C 704009_FTK_PH0
704009_C_FTK_PH0 C N Backup
SNNPR_Site205
SNNPR_Site205_X
SAR with Active Candidate
704009 704009_X704009_Colo_PH0
704009_X_Colo_PH0 X Y Active
SNNPR_Site206
SNNPR_Site206_0
SAR with Active Candidate
704010 704010_0
704010_Nominal_PH0
704010_0_Nominal_PH0 0 N Nominal
SNNPR_Site206
SNNPR_Site206_A
SAR with Active Candidate
704010 704010_A704010_FTK_PH0
704010_A_FTK_PH0 A N Rejected
SNNPR_Site206
SNNPR_Site206_B
SAR with Active Candidate
704010 704010_B 704010_FTK_PH0
704010_B_FTK_PH0 B N Rejected
SNNPR_Site206
SNNPR_Site206_C
SAR with Active Candidate
704010 704010_C 704010_FTK_PH0
704010_C_FTK_PH0 C N Backup
SNNPR_Site206
SNNPR_Site206_X
SAR with Active Candidate
704010 704010_X704010_Colo_PH0
704010_X_Colo_PH0 X Y Active
SNNPR_Site207
SNNPR_Site207_0
SAR with Active Candidate
704011 704011_0
704011_Nominal_PH0
704011_0_Nominal_PH0 0 N Nominal
SNNPR_Site207
SNNPR_Site207_A
SAR with Active Candidate
704011 704011_A704011_FTK_PH0
704011_A_FTK_PH0 A N Rejected
SNNPR_Site207
SNNPR_Site207_B
SAR with Active Candidate
704011 704011_B 704011_FTK_PH0
704011_B_FTK_PH0 B N Rejected
SNNPR_Site207
SNNPR_Site207_C
SAR with Active Candidate
704011 704011_C 704011_FTK_PH0
704011_C_FTK_PH0 C N Rejected
SNNPR_Site207
SNNPR_Site207_D
SAR with Active Candidate
704011 704011_D704011_FTK_PH0
704011_D_FTK_PH0 D Y Active
SNNPR_Site207
SNNPR_Site207_T
SAR with Active Candidate
704011 704011_T 704011_FTK_PH0
704011_T_FTK_PH0 T N Rejected
SNNPR_Site208
SNNPR_Site208_0
SAR with Active Candidate
704012 704012_0
704012_Nominal_PH0
704012_0_Nominal_PH0 0 N Nominal
SNNPR_Site208
SNNPR_Site208_A
SAR with Active Candidate
704012 704012_A704012_FTK_PH0
704012_A_FTK_PH0 A N Rejected
SNNPR_Site208
SNNPR_Site208_B
SAR with Active Candidate
704012 704012_B 704012_FTK_PH0
704012_B_FTK_PH0 B N Rejected
SNNPR_Site208
SNNPR_Site208_C
SAR with Active Candidate
704012 704012_C 704012_FTK_PH0
704012_C_FTK_PH0 C N Backup
SNNPR_Site208
SNNPR_Site208_X
SAR with Active Candidate
704012 704012_X704012_Colo_PH0
704012_X_Colo_PH0 X Y Active
SNNPR_Site209
SNNPR_Site209_A
SAR with Active Candidate
704013 704013_A704013_FTK_PH0
704013_A_FTK_PH0 A N Rejected
SNNPR_Site209
SNNPR_Site209_B
SAR with Active Candidate
704013 704013_B 704013_FTK_PH0
704013_B_FTK_PH0 B N Rejected
SNNPR_Site209
SNNPR_Site209_C
SAR with Active Candidate
704013 704013_C 704013_FTK_PH0
704013_C_FTK_PH0 C N Rejected
SNNPR_Site209
SNNPR_Site209_T
SAR with Active Candidate
704013 704013_T 704013_FTK_PH0
704013_T_FTK_PH0 T Y Active
SNNPR_Site210
SNNPR_Site210_A
SAR with Active Candidate
704014 704014_A704014_FTK_PH0
704014_A_FTK_PH0 A N Rejected
SNNPR_Site210
SNNPR_Site210_B
SAR with Active Candidate
704014 704014_B 704014_FTK_PH0
704014_B_FTK_PH0 B N Rejected
SNNPR_Site210
SNNPR_Site210_T
SAR with Active Candidate
704014 704014_T 704014_FTK_PH0
704014_T_FTK_PH0 T N Rejected
SNNPR_Site210
SNNPR_Site210_C
SAR with Active Candidate
704014 704014_C 704014_FTK_PH0
704014_C_FTK_PH0 C N Rejected
SNNPR_Site210
SNNPR_Site210_P
SAR with Active Candidate
704014 704014_P 704014_FTK_PH0
704014_P_FTK_PH0 P Y Active
SNNPR_Site211
SNNPR_Site211_A
SAR with Active Candidate
704015 704015_A704015_FTK_PH0
704015_A_FTK_PH0 A N Rejected
SNNPR_Site211
SNNPR_Site211_B
SAR with Active Candidate
704015 704015_B 704015_FTK_PH0
704015_B_FTK_PH0 B N Rejected
SNNPR_Site211
SNNPR_Site211_C
SAR with Active Candidate
704015 704015_C 704015_FTK_PH0
704015_C_FTK_PH0 C N Backup
SNNPR_Site211
SNNPR_Site211_D
SAR with Active Candidate
704015 704015_D704015_FTK_PH0
704015_D_FTK_PH0 D Y Active
SNNPR_Site212
SNNPR_Site212_A
SAR with Active Candidate
704016 704016_A704016_FTK_PH0
704016_A_FTK_PH0 A N Backup
SNNPR_Site212
SNNPR_Site212_B
SAR with Active Candidate
704016 704016_B 704016_FTK_PH0
704016_B_FTK_PH0 B Y Active
SNNPR_Site213
SNNPR_Site213_A
SAR with Active Candidate
704017 704017_A704017_FTK_PH0
704017_A_FTK_PH0 A N Backup
SNNPR_Site213
SNNPR_Site213_B
SAR with Active Candidate
704017 704017_B 704017_FTK_PH0
704017_B_FTK_PH0 B Y Active
SNNPR_Site213
SNNPR_Site213_C
SAR with Active Candidate
704017 704017_C 704017_FTK_PH0
704017_C_FTK_PH0 C N Rejected
SNNPR_Site214
SNNPR_Site214_A
SAR with Active Candidate
704036 704036_A704036_FTK_PH0
704036_A_FTK_PH0 A N Rejected
SNNPR_Site214
SNNPR_Site214_B
SAR with Active Candidate
704036 704036_B 704036_FTK_PH0
704036_B_FTK_PH0 B N Rejected
SNNPR_Site214
SNNPR_Site214_C
SAR with Active Candidate
704036 704036_C 704036_FTK_PH0
704036_C_FTK_PH0 C Y Active
SNNPR_Site217
SNNPR_Site217_0
SAR with Active Candidate
704018 704018_0
704018_Nominal_PH0
704018_0_Nominal_PH0 0 N Nominal
SNNPR_Site217
SNNPR_Site217_A
SAR with Active Candidate
704018 704018_A704018_FTK_PH0
704018_A_FTK_PH0 A N Rejected
SNNPR_Site217
SNNPR_Site217_B
SAR with Active Candidate
704018 704018_B 704018_FTK_PH0
704018_B_FTK_PH0 B N Rejected
SNNPR_Site217
SNNPR_Site217_C
SAR with Active Candidate
704018 704018_C 704018_FTK_PH0
704018_C_FTK_PH0 C Y Active
SNNPR_Site218
SNNPR_Site218_0
SAR with Active Candidate
705002 705002_0
705002_Nominal_PH0
705002_0_Nominal_PH0 0 N Nominal
SNNPR_Site218
SNNPR_Site218_T
SAR with Active Candidate
705002 705002_T 705002_FTK_PH0
705002_T_FTK_PH0 T Y Active
SNNPR_Site219
SNNPR_Site219_0
SAR with Active Candidate
705003 705003_0
705003_Nominal_PH0
705003_0_Nominal_PH0 0 N Nominal
SNNPR_Site219
SNNPR_Site219_A
SAR with Active Candidate
705003 705003_A705003_FTK_PH0
705003_A_FTK_PH0 A Y Active
SNNPR_Site219
SNNPR_Site219_T
SAR with Active Candidate
705003 705003_T 705003_FTK_PH0
705003_T_FTK_PH0 T N Rejected
SNNPR_Site220
SNNPR_Site220_0
SAR with Active Candidate
705009 705009_0
705009_Nominal_PH0
705009_0_Nominal_PH0 0 N Nominal
SNNPR_Site220
SNNPR_Site220_A
SAR with Active Candidate
705009 705009_A705009_FTK_PH0
705009_A_FTK_PH0 A Y Active
SNNPR_Site223
SNNPR_Site223_0
SAR with Active Candidate
704019 704019_0
704019_Nominal_PH0
704019_0_Nominal_PH0 0 N Nominal
SNNPR_Site223
SNNPR_Site223_A
SAR with Active Candidate
704019 704019_A704019_FTK_PH0
704019_A_FTK_PH0 A N Rejected
SNNPR_Site223
SNNPR_Site223_B
SAR with Active Candidate
704019 704019_B 704019_FTK_PH0
704019_B_FTK_PH0 B N Backup
SNNPR_Site223
SNNPR_Site223_X
SAR with Active Candidate
704019 704019_X704019_Colo_PH0
704019_X_Colo_PH0 X Y Active
SNNPR_Site223
SNNPR_Site223_C
SAR with Active Candidate
704019 704019_C 704019_FTK_PH0
704019_C_FTK_PH0 C N Backup
SNNPR_Site224
SNNPR_Site224_0
SAR with Active Candidate
704020 704020_0
704020_Nominal_PH0
704020_0_Nominal_PH0 0 N Nominal
SNNPR_Site224
SNNPR_Site224_A
SAR with Active Candidate
704020 704020_A704020_FTK_PH0
704020_A_FTK_PH0 A N Rejected
SNNPR_Site224
SNNPR_Site224_B
SAR with Active Candidate
704020 704020_B 704020_FTK_PH0
704020_B_FTK_PH0 B N Rejected
SNNPR_Site224
SNNPR_Site224_C
SAR with Active Candidate
704020 704020_C 704020_FTK_PH0
704020_C_FTK_PH0 C N Rejected
SNNPR_Site224
SNNPR_Site224_X
SAR with Active Candidate
704020 704020_X704020_Colo_PH0
704020_X_Colo_PH0 X Y Active
SNNPR_Site232
SNNPR_Site232_0
SAR with Active Candidate
705005 705005_0
705005_Nominal_PH0
705005_0_Nominal_PH0 0 N Nominal
SNNPR_Site232
SNNPR_Site232_T
SAR with Active Candidate
705005 705005_T 705005_FTK_PH0
705005_T_FTK_PH0 T Y Active
SNNPR_Site233
SNNPR_Site233_0
SAR with Active Candidate
704022 704022_0
704022_Nominal_PH0
704022_0_Nominal_PH0 0 N Nominal
SNNPR_Site233
SNNPR_Site233_T
SAR with Active Candidate
704022 704022_T 704022_FTK_PH0
704022_T_FTK_PH0 T Y Active
SNNPR_Site256
SNNPR_Site256_0
SAR with Active Candidate
704046 704046_0
704046_Nominal_PH0
704046_0_Nominal_PH0 0 N Nominal
SNNPR_Site256
SNNPR_Site256_A
SAR with Active Candidate
704046 704046_A704046_FTK_PH0
704046_A_FTK_PH0 A Y Active
SNNPR_Site286
SNNPR_Site286_0
SAR with Active Candidate
704024 704024_0
704024_Nominal_PH0
704024_0_Nominal_PH0 0 N Nominal
SNNPR_Site286
SNNPR_Site286_A
SAR with Active Candidate
704024 704024_A704024_FTK_PH0
704024_A_FTK_PH0 A N Backup
SNNPR_Site286
SNNPR_Site286_B
SAR with Active Candidate
704024 704024_B 704024_FTK_PH0
704024_B_FTK_PH0 B N Rejected
SNNPR_Site286
SNNPR_Site286_C
SAR with Active Candidate
704024 704024_C 704024_FTK_PH0
704024_C_FTK_PH0 C N Backup
SNNPR_Site286
SNNPR_Site286_X
SAR with Active Candidate
704024 704024_X704024_Colo_PH0
704024_X_Colo_PH0 X Y Active
SNNPR_Site351
SNNPR_Site351_0
SAR with Active Candidate
704025 704025_0
704025_Nominal_PH0
704025_0_Nominal_PH0 0 N Nominal
SNNPR_Site351
SNNPR_Site351_A
SAR with Active Candidate
704025 704025_A704025_FTK_PH0
704025_A_FTK_PH0 A N Rejected
SNNPR_Site351
SNNPR_Site351_B
SAR with Active Candidate
704025 704025_B 704025_FTK_PH0
704025_B_FTK_PH0 B N Rejected
SNNPR_Site351
SNNPR_Site351_C
SAR with Active Candidate
704025 704025_C 704025_FTK_PH0
704025_C_FTK_PH0 C N Rejected
SNNPR_Site351
SNNPR_Site351_T
SAR with Active Candidate
704025 704025_T 704025_FTK_PH0
704025_T_FTK_PH0 T N Rejected
SNNPR_Site351
SNNPR_Site351_D
SAR with Active Candidate
704025 704025_D704025_FTK_PH0
704025_D_FTK_PH0 D Y Active
SNNPR_Site352
SNNPR_Site352_0
SAR with Active Candidate
704026 704026_0
704026_Nominal_PH0
704026_0_Nominal_PH0 0 N Nominal
SNNPR_Site352
SNNPR_Site352_A
SAR with Active Candidate
704026 704026_A704026_FTK_PH0
704026_A_FTK_PH0 A N Rejected
SNNPR_Site352
SNNPR_Site352_B
SAR with Active Candidate
704026 704026_B 704026_FTK_PH0
704026_B_FTK_PH0 B N Rejected
SNNPR_Site352
SNNPR_Site352_T
SAR with Active Candidate
704026 704026_T 704026_FTK_PH0
704026_T_FTK_PH0 T Y Active
SNNPR_Site353
SNNPR_Site353_0
SAR with Active Candidate
705007 705007_0
705007_Nominal_PH0
705007_0_Nominal_PH0 0 N Nominal
SNNPR_Site353
SNNPR_Site353_T
SAR with Active Candidate
705007 705007_T 705007_FTK_PH0
705007_T_FTK_PH0 T Y Active
SNNPR_Site355
SNNPR_Site355_0
SAR with Active Candidate
701024 701024_0
701024_Nominal_PH0
701024_0_Nominal_PH0 0 N Nominal
SNNPR_Site355
SNNPR_Site355_A
SAR with Active Candidate
701024 701024_A701024_FTK_PH0
701024_A_FTK_PH0 A N Rejected
SNNPR_Site355
SNNPR_Site355_B
SAR with Active Candidate
701024 701024_B 701024_FTK_PH0
701024_B_FTK_PH0 B N Rejected
SNNPR_Site355
SNNPR_Site355_C
SAR with Active Candidate
701024 701024_C 701024_FTK_PH0
701024_C_FTK_PH0 C Y Active
SNNPR_Site369
SNNPR_Site369_0
SAR with Active Candidate
706027 706027_0
706027_Nominal_PH0
706027_0_Nominal_PH0 0 N Nominal
SNNPR_Site369
SNNPR_Site369_A
SAR with Active Candidate
706027 706027_A706027_FTK_PH0
706027_A_FTK_PH0 A N Rejected
SNNPR_Site369
SNNPR_Site369_B
SAR with Active Candidate
706027 706027_B 706027_FTK_PH0
706027_B_FTK_PH0 B N Rejected
SNNPR_Site369
SNNPR_Site369_C
SAR with Active Candidate
706027 706027_C 706027_FTK_PH0
706027_C_FTK_PH0 C Y Active
SNNPR_Site375
SNNPR_Site375_0
SAR with Active Candidate
705008 705008_0
705008_Nominal_PH0
705008_0_Nominal_PH0 0 N Nominal
SNNPR_Site375
SNNPR_Site375_T
SAR with Active Candidate
705008 705008_T 705008_FTK_PH0
705008_T_FTK_PH0 T Y Active
SNNPR_Site376
SNNPR_Site376_0
SAR with Active Candidate
710050 710050_0
710050_Nominal_PH0
710050_0_Nominal_PH0 0 N Nominal
SNNPR_Site376
SNNPR_Site376_A
SAR with Active Candidate
710050 710050_A710050_FTK_PH0
710050_A_FTK_PH0 A N Rejected
SNNPR_Site376
SNNPR_Site376_B
SAR with Active Candidate
710050 710050_B 710050_FTK_PH0
710050_B_FTK_PH0 B Y Active
SNNPR_Site440
SNNPR_Site440_0
SAR with Active Candidate
704027 704027_0
704027_Nominal_PH0
704027_0_Nominal_PH0 0 N Nominal
SNNPR_Site440
SNNPR_Site440_A
SAR with Active Candidate
704027 704027_A704027_FTK_PH0
704027_A_FTK_PH0 A N Rejected
SNNPR_Site440
SNNPR_Site440_B
SAR with Active Candidate
704027 704027_B 704027_FTK_PH0
704027_B_FTK_PH0 B N Rejected
SNNPR_Site440
SNNPR_Site440_T
SAR with Active Candidate
704027 704027_T 704027_FTK_PH0
704027_T_FTK_PH0 T Y Active
SNNPR_Site475
SNNPR_Site475_0
SAR with Active Candidate
702012 702012_0
702012_Nominal_PH0
702012_0_Nominal_PH0 0 N Nominal
SNNPR_Site475
SNNPR_Site475_T
SAR with Active Candidate
702012 702012_T 702012_FTK_PH0
702012_T_FTK_PH0 T N Rejected
SNNPR_Site475
SNNPR_Site475_A
SAR with Active Candidate
702012 702012_A702012_FTK_PH0
702012_A_FTK_PH0 A Y Active
SNNPR_Site53SNNPR_Site53_0
SAR with Active Candidate
711006 711006_0
711006_Nominal_PH0
711006_0_Nominal_PH0 0 N Nominal
SNNPR_Site53SNNPR_Site53_A
SAR with Active Candidate
711006 711006_A711006_FTK_PH0
711006_A_FTK_PH0 A Y Active
SNNPR_Site60SNNPR_Site60_0
SAR with Active Candidate
710008 710008_0
710008_Nominal_PH0
710008_0_Nominal_PH0 0 N Nominal
SNNPR_Site60SNNPR_Site60_A
SAR with Active Candidate
710008 710008_A710008_FTK_PH0
710008_A_FTK_PH0 A Y Active
SNNPR_Site63SNNPR_Site63_0
SAR with Active Candidate
706005 706005_0
706005_Nominal_PH0
706005_0_Nominal_PH0 0 N Nominal
SNNPR_Site63SNNPR_Site63_A
SAR with Active Candidate
706005 706005_A706005_FTK_PH0
706005_A_FTK_PH0 A Y Active
SNNPR_Site63SNNPR_Site63_T
SAR with Active Candidate
706005 706005_T 706005_FTK_PH0
706005_T_FTK_PH0 T N Rejected
SNNPR_Site65SNNPR_Site65_0
SAR with Active Candidate
706007 706007_0
706007_Nominal_PH0
706007_0_Nominal_PH0 0 N Nominal
SNNPR_Site65SNNPR_Site65_T
SAR with Active Candidate
706007 706007_T 706007_FTK_PH0
706007_T_FTK_PH0 T N Rejected
SNNPR_Site65SNNPR_Site65_A
SAR with Active Candidate
706007 706007_A706007_FTK_PH0
706007_A_FTK_PH0 A Y Active
SNNPR_Site67SNNPR_Site67_0
SAR with Active Candidate
702013 702013_0
702013_Nominal_PH0
702013_0_Nominal_PH0 0 N Nominal
SNNPR_Site67SNNPR_Site67_A
SAR with Active Candidate
702013 702013_A702013_FTK_PH0
702013_A_FTK_PH0 A Y Active
SNNPR_Site67SNNPR_Site67_T
SAR with Active Candidate
702013 702013_T 702013_FTK_PH0
702013_T_FTK_PH0 T N Rejected
SNNPR_Site68SNNPR_Site68_0
SAR with Active Candidate
702014 702014_0
702014_Nominal_PH0
702014_0_Nominal_PH0 0 N Nominal
SNNPR_Site68SNNPR_Site68_T
SAR with Active Candidate
702014 702014_T 702014_FTK_PH0
702014_T_FTK_PH0 T Y Active
SNNPR_Site69SNNPR_Site69_0
SAR with Active Candidate
702015 702015_0
702015_Nominal_PH0
702015_0_Nominal_PH0 0 N Nominal
SNNPR_Site69SNNPR_Site69_T
SAR with Active Candidate
702015 702015_T 702015_FTK_PH0
702015_T_FTK_PH0 T N Rejected
SNNPR_Site69SNNPR_Site69_A
SAR with Active Candidate
702015 702015_A702015_FTK_PH0
702015_A_FTK_PH0 A N Rejected
SNNPR_Site69SNNPR_Site69_B
SAR with Active Candidate
702015 702015_B 702015_FTK_PH0
702015_B_FTK_PH0 B N Rejected
SNNPR_Site69SNNPR_Site69_C
SAR with Active Candidate
702015 702015_C 702015_FTK_PH0
702015_C_FTK_PH0 C N Rejected
SNNPR_Site763
SNNPR_Site763_0
SAR with Active Candidate
704028 704028_0
704028_Nominal_PH0
704028_0_Nominal_PH0 0 N Nominal
SNNPR_Site763
SNNPR_Site763_A
SAR with Active Candidate
704028 704028_A704028_FTK_PH0
704028_A_FTK_PH0 A N Backup
SNNPR_Site763
SNNPR_Site763_B
SAR with Active Candidate
704028 704028_B 704028_FTK_PH0
704028_B_FTK_PH0 B Y Active
SNNPR_Site772
SNNPR_Site772_0
SAR with Active Candidate
702016 702016_0
702016_Nominal_PH0
702016_0_Nominal_PH0 0 N Nominal
SNNPR_Site772
SNNPR_Site772_A
SAR with Active Candidate
702016 702016_A702016_FTK_PH0
702016_A_FTK_PH0 A N Rejected
SNNPR_Site772
SNNPR_Site772_B
SAR with Active Candidate
702016 702016_B 702016_FTK_PH0
702016_B_FTK_PH0 B N Backup
SNNPR_Site772
SNNPR_Site772_T
SAR with Active Candidate
702016 702016_T 702016_FTK_PH0
702016_T_FTK_PH0 T N Rejected
SNNPR_Site772
SNNPR_Site772_X
SAR with Active Candidate
702016 702016_X702016_Colo_PH0
702016_X_Colo_PH0 X Y Active
SNNPR_Site824
SNNPR_Site824_0
SAR with Active Candidate
701008 701008_0
701008_Nominal_PH0
701008_0_Nominal_PH0 0 N Nominal
SNNPR_Site824
SNNPR_Site824_A
SAR with Active Candidate
701008 701008_A701008_FTK_PH0
701008_A_FTK_PH0 A N Rejected
SNNPR_Site824
SNNPR_Site824_B
SAR with Active Candidate
701008 701008_B 701008_FTK_PH0
701008_B_FTK_PH0 B N Backup
SNNPR_Site824
SNNPR_Site824_T
SAR with Active Candidate
701008 701008_T 701008_FTK_PH0
701008_T_FTK_PH0 T Y Active
SNNPR_Site96SNNPR_Site96_0
SAR with Active Candidate
706008 706008_0
706008_Nominal_PH0
706008_0_Nominal_PH0 0 N Nominal
SNNPR_Site96SNNPR_Site96_T
SAR with Active Candidate
706008 706008_T 706008_FTK_PH0
706008_T_FTK_PH0 T Y Active
AA_Site585 AA_Site585_A
SAR with Active Candidate
141041 141041_A141041_FTK_PH0
141041_A_FTK_PH0 A N Rejected
AA_Site585 AA_Site585_B
SAR with Active Candidate
141041 141041_B 141041_FTK_PH0
141041_B_FTK_PH0 B Y Active
AA_Site585 AA_Site585_0
SAR with Active Candidate
141041 141041_0
141041_Nominal_PH0
141041_0_Nominal_PH0 0 N Nominal
ORO_Site3982ORO_Site3982_A
SAR with Active Candidate
407111 407111_A407111_FTK_PH0
407111_A_FTK_PH0 A N Rejected
ORO_Site2289ORO_Site2289_A
SAR with Active Candidate
408129 408129_A408129_FTK_PH0
408129_A_FTK_PH0 A Y Active
ORO_Site2289ORO_Site2289_0
SAR with Active Candidate
408129 408129_0
408129_Nominal_PH0
408129_0_Nominal_PH0 0 N Nominal
AA_Site244 AA_Site244_0
SAR with Active Candidate
141011 141011_0
141011_Nominal_PH0
141011_0_Nominal_PH0 0 N Nominal
AA_Site244 AA_Site244_A
SAR with Active Candidate
141011 141011_A141011_FTK_PH0
141011_A_FTK_PH0 A Y Active
AA_Site513 AA_Site513_0
SAR with Active Candidate
141074 141074_0
141074_Nominal_PH0
141074_0_Nominal_PH0 0 N Nominal
AA_Site513 AA_Site513_B
SAR with Active Candidate
141074 141074_B 141074_FTK_PH0
141074_B_FTK_PH0 B N Rejected
AA_Site513 AA_Site513_X
SAR with Active Candidate
141074 141074_X141074_Colo_PH0
141074_X_Colo_PH0 X Y Active
AA_Site513 AA_Site513_A
SAR with Active Candidate
141074 141074_A141074_FTK_PH0
141074_A_FTK_PH0 A N Backup
AA_Site534 AA_Site534_0
SAR with Active Candidate
144063 144063_0
144063_Nominal_PH0
144063_0_Nominal_PH0 0 N Nominal
AA_Site534 AA_Site534_X
SAR with Active Candidate
144063 144063_X144063_Colo_PH0
144063_X_Colo_PH0 X Y Active
AA_Site534 AA_Site534_A
SAR with Active Candidate
144063 144063_A144063_FTK_PH0
144063_A_FTK_PH0 A N Rejected
AA_Site536 AA_Site536_0
SAR with Active Candidate
144065 144065_0
144065_Nominal_PH0
144065_0_Nominal_PH0 0 N Nominal
AA_Site536 AA_Site536_X
SAR with Active Candidate
144065 144065_X144065_Colo_PH0
144065_X_Colo_PH0 X Y Active
AA_Site536 AA_Site536_A
SAR with Active Candidate
144065 144065_A144065_FTK_PH0
144065_A_FTK_PH0 A N Backup
AA_Site549 AA_Site549_0
SAR with Active Candidate
144068 144068_0
144068_Nominal_PH0
144068_0_Nominal_PH0 0 N Nominal
AA_Site549 AA_Site549_X
SAR with Active Candidate
144068 144068_X144068_Colo_PH0
144068_X_Colo_PH0 X Y Active
AA_Site549 AA_Site549_A
SAR with Active Candidate
144068 144068_A144068_FTK_PH0
144068_A_FTK_PH0 A N Backup
AA_Site571 AA_Site571_A
SAR with Active Candidate
142075 142075_A142075_FTK_PH0
142075_A_FTK_PH0 A Y Active
AA_Site571 AA_Site571_0
SAR with Active Candidate
142075 142075_0
142075_Nominal_PH0
142075_0_Nominal_PH0 0 N Nominal
AA_Site59 AA_Site59_0
SAR with Active Candidate
142046 142046_0
142046_Nominal_PH0
142046_0_Nominal_PH0 0 N Nominal
AA_Site59 AA_Site59_A
SAR with Active Candidate
142046 142046_A142046_FTK_PH0
142046_A_FTK_PH0 A Y Active
AA_Site634 AA_Site634_A
SAR with Active Candidate
143064 143064_A143064_FTK_PH0
143064_A_FTK_PH0 A N Rejected
AA_Site634 AA_Site634_X
SAR with Active Candidate
143064 143064_X143064_FTK_PH0
143064_X_FTK_PH0 X Y Active
AA_Site634 AA_Site634_0
SAR with Active Candidate
143064 143064_0
143064_Nominal_PH0
143064_0_Nominal_PH0 0 N Nominal
ORO_Site1145ORO_Site1145_0
SAR with Active Candidate
407001 407001_0
407001_Nominal_PH0
407001_0_Nominal_PH0 0 N Nominal
ORO_Site1145ORO_Site1145_A
SAR with Active Candidate
407001 407001_A407001_FTK_PH0
407001_A_FTK_PH0 A Y Active
ORO_Site175 ORO_Site175_0
SAR with Active Candidate
407008 407008_0
407008_Nominal_PH0
407008_0_Nominal_PH0 0 N Nominal
ORO_Site175ORO_Site175_A
SAR with Active Candidate
407008 407008_A407008_FTK_PH0
407008_A_FTK_PH0 A Y Active
ORO_Site2288ORO_Site2288_T
SAR with Active Candidate
407022 407022_T 407022_FTK_PH0
407022_T_FTK_PH0 T N Rejected
ORO_Site2288ORO_Site2288_A
SAR with Active Candidate
407022 407022_A407022_FTK_PH0
407022_A_FTK_PH0 A N Rejected
ORO_Site2288ORO_Site2288_B
SAR with Active Candidate
407022 407022_B 407022_FTK_PH0
407022_B_FTK_PH0 B Y Active
ORO_Site2288ORO_Site2288_0
SAR with Active Candidate
407022 407022_0
407022_Nominal_PH0
407022_0_Nominal_PH0 0 N Nominal
ORO_Site2319ORO_Site2319_A
SAR with Active Candidate
408071 408071_A408071_FTK_PH0
408071_A_FTK_PH0 A Y Active
ORO_Site2319ORO_Site2319_0
SAR with Active Candidate
408071 408071_0
408071_Nominal_PH0
408071_0_Nominal_PH0 0 N Nominal
ORO_Site2410ORO_Site2410_0
SAR with Active Candidate
408183 408183_0
408183_Nominal_PH0
408183_0_Nominal_PH0 0 N Nominal
ORO_Site2410ORO_Site2410_A
SAR with Active Candidate
408183 408183_A408183_FTK_PH0
408183_A_FTK_PH0 A Y Active
ORO_Site3723ORO_Site3723_0
SAR with Active Candidate
407055 407055_0
407055_Nominal_PH0
407055_0_Nominal_PH0 0 N Nominal
ORO_Site3723ORO_Site3723_A
SAR with Active Candidate
407055 407055_A407055_FTK_PH0
407055_A_FTK_PH0 A Y Active
AA_Site352 AA_Site352_0
SAR with Active Candidate
144036 144036_0
144036_Nominal_PH0
144036_0_Nominal_PH0 0 N Nominal
AA_Site352 AA_Site352_X
SAR with Active Candidate
144036 144036_X144036_Colo_PH0
144036_X_Colo_PH0 X Y Active
AA_Site352 AA_Site352_A
SAR with Active Candidate
144036 144036_A144036_FTK_PH0
144036_A_FTK_PH0 A N Backup
AA_Site109 AA_Site109_0
SAR with Active Candidate
146002 146002_0
146002_Nominal_PH0
146002_0_Nominal_PH0 0 N Nominal
AA_Site120 AA_Site120_0
SAR with Active Candidate
144005 144005_0
144005_Nominal_PH0
144005_0_Nominal_PH0 0 N Nominal
AA_Site293 AA_Site293_C
SAR with Active Candidate
146015 146015_C 146015_FTK_PH0
146015_C_FTK_PH0 C N Rejected
AA_Site293 AA_Site293_E
SAR with Active Candidate
146015 146015_E 146015_FTK_PH0
146015_E_FTK_PH0 E Y Active
AA_Site293 AA_Site293_D
SAR with Active Candidate
146015 146015_D146015_FTK_PH0
146015_D_FTK_PH0 D N Rejected
AA_Site293 AA_Site293_0
SAR with Active Candidate
146015 146015_0
146015_Nominal_PH0
146015_0_Nominal_PH0 0 N Nominal
AA_Site299 AA_Site299_C
SAR with Active Candidate
143020 143020_C 143020_FTK_PH0
143020_C_FTK_PH0 C N Rejected
AA_Site299 AA_Site299_0
SAR with Active Candidate
143020 143020_0
143020_Nominal_PH0
143020_0_Nominal_PH0 0 N Nominal
AA_site328 AA_site328_0
SAR with Active Candidate
149014 149014_0
149014_Nominal_PH0
149014_0_Nominal_PH0 0 N Nominal
AA_Site343 AA_Site343_0
SAR with Active Candidate
144027 144027_0
144027_Nominal_PH0
144027_0_Nominal_PH0 0 N Nominal
AA_Site364 AA_Site364_D
SAR with Active Candidate
146020 146020_D146020_FTK_PH0
146020_D_FTK_PH0 D Y Active
AA_Site364 AA_Site364_0
SAR with Active Candidate
146020 146020_0
146020_Nominal_PH0
146020_0_Nominal_PH0 0 N Nominal
AA_Site410 AA_Site410_0
SAR with Active Candidate
141030 141030_0
141030_Nominal_PH0
141030_0_Nominal_PH0 0 N Nominal
AA_Site50 AA_Site50_D
SAR with Active Candidate
140020 140020_D140020_FTK_PH0
140020_D_FTK_PH0 D N Backup
AA_Site50 AA_Site50_0
SAR with Active Candidate
140020 140020_0
140020_Nominal_PH0
140020_0_Nominal_PH0 0 N Nominal
AA_Site715 AA_Site715_0
SAR with Active Candidate
144113 144113_0
144113_Nominal_PH0
144113_0_Nominal_PH0 0 N Nominal
SNNPR_Site209
SNNPR_Site209_0
SAR with Active Candidate
704013 704013_0
704013_Nominal_PH0
704013_0_Nominal_PH0 0 N Nominal
SNNPR_Site210
SNNPR_Site210_0
SAR with Active Candidate
704014 704014_0
704014_Nominal_PH0
704014_0_Nominal_PH0 0 N Nominal
SNNPR_Site211
SNNPR_Site211_0
SAR with Active Candidate
704015 704015_0
704015_Nominal_PH0
704015_0_Nominal_PH0 0 N Nominal
SNNPR_Site212
SNNPR_Site212_0
SAR with Active Candidate
704016 704016_0
704016_Nominal_PH0
704016_0_Nominal_PH0 0 N Nominal
SNNPR_Site213
SNNPR_Site213_0
SAR with Active Candidate
704017 704017_0
704017_Nominal_PH0
704017_0_Nominal_PH0 0 N Nominal
SNNPR_Site214
SNNPR_Site214_0
SAR with Active Candidate
704036 704036_0
704036_Nominal_PH0
704036_0_Nominal_PH0 0 N Nominal
ORO_Site3982ORO_Site3982_B
SAR with Active Candidate
407111 407111_B 407111_FTK_PH0
407111_B_FTK_PH0 B N Rejected
ORO_Site3982ORO_Site3982_C
SAR with Active Candidate
407111 407111_C 407111_FTK_PH0
407111_C_FTK_PH0 C N Rejected
ORO_Site3982ORO_Site3982_D
SAR with Active Candidate
407111 407111_D407111_FTK_PH0
407111_D_FTK_PH0 D Y Active
ORO_Site3982ORO_Site3982_0
SAR with Active Candidate
407111 407111_0
407111_Nominal_PH0
407111_0_Nominal_PH0 0 N Nominal
ORO_Site188 ORO_Site188_P
SAR with Active Candidate
407077 407077_P 407077_FTK_PH0
407077_P_FTK_PH0 P Y Active
ORO_Site188 ORO_Site188_0
SAR with Active Candidate
407077 407077_0
407077_Nominal_PH0
407077_0_Nominal_PH0 0 Nominal_Replacement with Y0
ORO_Site4580ORO_Site4580_P
SAR with Active Candidate
140102 140102_P 140102_FTK_PH0
140102_P_FTK_PH0 P Y Active
ORO_Site4580ORO_Site4580_0
SAR with Active Candidate
140102 140102_0
140102_Nominal_PH0
140102_0_Nominal_PH0 0 Nominal_Replacement with Y0
AA_Site248 AA_Site248_A
SAR with Active Candidate
141013 141013_A141013_FTK_PH0
141013_A_FTK_PH0 A Y Active
AA_Site248 AA_Site248_0
SAR with Active Candidate
141013 141013_0
141013_Nominal_PH0
141013_0_Nominal_PH0 0 Nominal_Replacement
N with Y0_141043
AA_Site768 AA_Site768_A
SAR with Active Candidate
140076 140076_A140076_FTK_PH0
140076_A_FTK_PH0 A N Backup
AA_Site768 AA_Site768_B
SAR with Active Candidate
140076 140076_B 140076_FTK_PH0
140076_B_FTK_PH0 B N Backup
AA_Site768 AA_Site768_X
SAR with Active Candidate
140076 140076_X140076_Colo_PH0
140076_X_Colo_PH0 X Y Active
AA_Site768 AA_Site768_0
SAR with Active Candidate
140076 140076_0
140076_Nominal_PH0
140076_0_Nominal_PH0 0 N Nominal
AA_Site769 AA_Site769_0
SAR with Active Candidate
140077 140077_0
140077_Nominal_PH0
140077_0_Nominal_PH0 0 Nominal_Replacement
N with Y0_143042
AA_Site769 AA_Site769_A
SAR with Active Candidate
140077 140077_A140077_FTK_PH0
140077_A_FTK_PH0 A N Rejected
AA_Site769 AA_Site769_B
SAR with Active Candidate
140077 140077_B 140077_FTK_PH0
140077_B_FTK_PH0 B N Rejected
AA_Site769 AA_Site769_X
SAR with Active Candidate
140077 140077_X140077_Colo_PH0
140077_X_Colo_PH0 X Y Active
AA_Site769 AA_Site769_C
SAR with Active Candidate
140077 140077_C 140077_FTK_PH0
140077_C_FTK_PH0 C N Rejected
AA_Site772 AA_Site772_X
SAR with Active Candidate
140080 140080_X140080_Colo_PH0
140080_X_Colo_PH0 X Y Active
AA_Site772 AA_Site772_0
SAR with Active Candidate
140080 140080_0
140080_Nominal_PH0
140080_0_Nominal_PH0 0 Nominal_Replacement
N with Y0_144028
AA_Site87 AA_Site87_0
SAR with Active Candidate
144137 144137_0
144137_Nominal_PH0
144137_0_Nominal_PH0 0 Nominal_Replacement
N with Y0_144080
AA_Site763 AA_Site763_0
SAR with Active Candidate
147079 147079_0
147079_Nominal_PH0
147079_0_Nominal_PH0 0 Nominal_Replacement
N with Y0_146054
AA_Site763 AA_Site763_A
SAR with Active Candidate
147079 147079_A147079_FTK_PH0
147079_A_FTK_PH0 A N Backup
AA_Site763 AA_Site763_X
SAR with Active Candidate
147079 147079_X147079_FTK_PH0
147079_X_FTK_PH0 X Y Active
AA_Site763 AA_Site763_B
SAR with Active Candidate
147079 147079_B 147079_FTK_PH0
147079_B_FTK_PH0 B N Backup
AA_Site800 AA_Site800_0
SAR with Active Candidate
146055 146055_0 146055_Tx_PH0
146055_0_Tx_PH0 0 N Nominal(Tx only)
AA_Site800 AA_Site800_A
SAR with Active Candidate
146055 146055_A 146055_Tx_PH0
146055_A_Tx_PH0 A Y Active
TX site TX site_A
SAR with Active Candidate
144136 144136_A 144136_Tx_PH0
144136_A_Tx_PH0 A Y Active
TX site TX site_A
SAR with Active Candidate
141081 141081_A 141081_Tx_PH0
141081_A_Tx_PH0 A Y Active
TX site TX site_A
SAR with Active Candidate
142089 142089_A 142089_Tx_PH0
142089_A_Tx_PH0 A Y Active
TX site TX site_A
SAR with Active Candidate
144135 144135_A 144135_Tx_PH0
144135_A_Tx_PH0 A Y Active
AA_Site532 AA_Site532_D
SAR with Active Candidate
147036 147036_D147036_FTK_PH0
147036_D_FTK_PH0 D N Rejected
AA_Site87 AA_Site87_A
SAR with Active Candidate
144137 144137_A144137_FTK_PH0
144137_A_FTK_PH0 A N Backup
AA_Site87 AA_Site87_B
SAR with Active Candidate
144137 144137_B 144137_FTK_PH0
144137_B_FTK_PH0 B Y Active
AA_Site87 AA_Site87_C
SAR with Active Candidate
144137 144137_C 144137_FTK_PH0
144137_C_FTK_PH0 C N Rejected
AA_Site296 AA_Site296_D
SAR with Active Candidate
149010 149010_D149010_FTK_PH0
149010_D_FTK_PH0 D Y Active
AA_Site560 AA_Site560_D
SAR with Active Candidate
148016 148016_D148016_FTK_PH0
148016_D_FTK_PH0 D Y Active
AA_Site249 AA_Site249_D
SAR with Active Candidate
141014 141014_D141014_FTK_PH0
141014_D_FTK_PH0 D N Backup
AA_Site377 AA_Site377_0
SAR with Active Candidate
149016 149016_0
149016_Nominal_PH0
149016_0_Nominal_PH0 0 N Nominal
AA_Site377 AA_Site377_A
SAR with Active Candidate
149016 149016_A149016_FTK_PH0
149016_A_FTK_PH0 A N Backup
AA_Site377 AA_Site377_B
SAR with Active Candidate
149016 149016_B 149016_FTK_PH0
149016_B_FTK_PH0 B N Backup
AA_Site377 AA_Site377_X
SAR with Active Candidate
149016 149016_X149016_Colo_PH0
149016_X_Colo_PH0 X Y Active
AA_Site478 AA_Site478_C
SAR with Active Candidate
144105 144105_C 144105_FTK_PH0
144105_C_FTK_PH0 C Y Active
AA_Site333 AA_Site333_D
SAR with Active Candidate
147018 147018_D147018_FTK_PH0
147018_D_FTK_PH0 D N Rejected
AA_Site304 AA_Site304_D
SAR with Active Candidate
149012 149012_D149012_FTK_PH0
149012_D_FTK_PH0 D N Backup
ORO_Site1119_0
ORO_Site1119 SAR with Active Candidate
417175 417175_0
417175_Nominal_PH0
417175_0_Nominal_PH0 0 N Nominal
ORO_Site1119_X
ORO_Site1119 SAR with Active Candidate
417175 417175_X417175_Colo_PH0
417175_X_Colo_PH0 X Y Active
SNNPR_Site751_0
SNNPR_Site751 SAR with Active Candidate
705035 705035_0
705035_Nominal_PH0
705035_0_Nominal_PH0 0 N Nominal
SNNPR_Site751_X
SNNPR_Site751 SAR with Active Candidate
705035 705035_X705035_Colo_PH0
705035_X_Colo_PH0 X Y Active
SNNPR_Site1114_0
SNNPR_Site1114 SAR with Active Candidate
706014 706014_0
706014_Nominal_PH0
706014_0_Nominal_PH0 0 N Nominal
SNNPR_Site1114_X
SNNPR_Site1114 SAR with Active Candidate
706014 706014_X706014_Colo_PH0
706014_X_Colo_PH0 X Y Active
SNNPR_Site859_0
SNNPR_Site859 SAR with Active Candidate
710077 710077_0
710077_Nominal_PH0
710077_0_Nominal_PH0 0 N Nominal
SNNPR_Site859_X
SNNPR_Site859 SAR with Active Candidate
710077 710077_X710077_Colo_PH0
710077_X_Colo_PH0 X Y Active
GAM_Site92 GAM_Site92_0
SAR with Active Candidate
122015 122015_0
122015_Nominal_PH0
122015_0_Nominal_PH0 0 N Nominal
GAM_Site92 GAM_Site92_X
SAR with Active Candidate
122015 122015_X122015_Colo_PH0
122015_X_Colo_PH0 X Y Active
ORO_Site339ORO_Site339_0
SAR with Active Candidate
404002 404002_0
404002_Nominal_PH0
404002_0_Nominal_PH0 0 N Nominal
ORO_Site339ORO_Site339_X
SAR with Active Candidate
404002 404002_X404002_Colo_PH0
404002_X_Colo_PH0 X Y Active
ORO_Site472ORO_Site472_0
SAR with Active Candidate
408158 408158_0
408158_Nominal_PH0
408158_0_Nominal_PH0 0 N Nominal
Candidate Ref Phase
Nominal Lat Nominal longCandidate as per DPR Convention Subcity
(X for Colo) Region Site TX function TX priority Category
ID

9.00394 38.8196 0 0 Bole Addis South Mw Hub 7 95 priority PH0


9.00394 38.8196 A A Bole Addis South Mw Hub 7 95 priority PH0
9.00394 38.8196 B B Bole Addis South Mw Hub 7 95 priority PH0
9.00394 38.8196 C C Bole Addis South Mw Hub 7 95 priority PH0
9.00394 38.8196 D D Bole Addis South Mw Hub 7 95 priority PH0
9.00971 38.8056 0 0 Bole Addis South Mw Access 7 95 priority PH0
9.00971 38.8056 A A Bole Addis South Mw Access 7 95 priority PH0
9.00971 38.8056 B B Bole Addis South Mw Access 7 95 priority PH0
9.00971 38.8056 C C Bole Addis South Mw Access 7 95 priority PH0
9.00971 38.8056 D D Bole Addis South Mw Access 7 95 priority PH0
9.0377895 38.7688308 0 0 Arada Addis North Mw Access 9 410 priority PH0
9.0377895 38.7688308 A A Arada Addis North Mw Access 9 410 priority PH0
9.0377895 38.7688308 B B Arada Addis North Mw Access 9 410 priority PH0
9.0377895 38.7688308 X X Arada Addis North Mw Access 9 410 priority PH0
9.04344 38.75084 0 0 Arada Addis North Mw Access 11 410 priority PH0
9.04344 38.75084 A A Arada Addis North Mw Access 11 410 priority PH0
9.04344 38.75084 B B Arada Addis North Mw Access 11 410 priority PH0
9.04344 38.75084 X X Arada Addis North Mw Access 11 410 priority PH0
9.05869 38.7812 0 0 Yeka Addis North Mw Access 11 95 priority PH0
9.05869 38.7812 A A Yeka Addis North Mw Access 11 95 priority PH0
9.05869 38.7812 B B Yeka Addis North Mw Access 11 95 priority PH0
9.05963 38.751 0 0 Gulele Addis North Mw Hub 9 75 Priority PH0
9.05963 38.751 A A Gulele Addis North Mw Hub 9 75 Priority PH0
9.05963 38.751 B B Gulele Addis North Mw Hub 9 75 Priority PH0
9.05963 38.751 C C Gulele Addis North Mw Hub 9 75 Priority PH0
9.05963 38.751 P P Gulele Addis North Mw Hub 9 75 Priority PH0
8.99365 38.7511 0 0 Kirkos Addis South Mw Hub 5 45 priority PH0
8.99365 38.7511 A A Kirkos Addis South Mw Hub 5 45 priority PH0
8.99365 38.7511 B B Kirkos Addis South Mw Hub 5 45 priority PH0
8.99365 38.7511 D D Kirkos Addis South Mw Hub 5 45 priority PH0
8.95438 38.7814 0 0 Bole Addis South Mw Hub 2 45 priority PH0
8.95438 38.7814 A A Bole Addis South Mw Hub 2 45 priority PH0
8.95438 38.7814 B B Bole Addis South Mw Hub 2 45 priority PH0
8.95438 38.7814 C C Bole Addis South Mw Hub 2 45 priority PH0
8.95438 38.7814 D D Bole Addis South Mw Hub 2 45 priority PH0
8.95438 38.7814 E E Bole Addis South Mw Hub 2 45 priority PH0
8.97673 38.7486 0 0 Nefas Silk Addis South Mw Access 4 45 priority PH0
8.97673 38.7486 A A Nefas Silk Addis South Mw Access 4 45 priority PH0
8.97673 38.7486 B B Nefas Silk Addis South Mw Access 4 45 priority PH0
8.96466 38.74919 0 0 Nefas Silk Addis South Mw Access 6 410 priority PH0
8.96466 38.74919 B B Nefas Silk Addis South Mw Access 6 410 priority PH0
8.96466 38.74919 C C Nefas Silk Addis South Mw Access 6 410 priority PH0
9.00902 38.775 A A Kirkos Addis South Mw Access 7 45 priority PH0
9.00902 38.775 B B Kirkos Addis South Mw Access 7 45 priority PH0
9.00902 38.775 C C Kirkos Addis South Mw Access 7 45 priority PH0
9.00902 38.775 D D Kirkos Addis South Mw Access 7 45 priority PH0
9.00902 38.775 E E Kirkos Addis South Mw Access 7 45 priority PH0
9.01059 38.7181 0 0 Lideta Addis North Mw Access 7 75 Priority PH0
9.01059 38.7181 A A Lideta Addis North Mw Access 7 75 Priority PH0
9.01059 38.7181 B B Lideta Addis North Mw Access 7 75 Priority PH0
9.01059 38.7181 C C Lideta Addis North Mw Access 7 75 Priority PH0
9.00495 38.7527 0 0 Kirkos Addis South Mw Access 8 45 priority PH0
9.00495 38.7527 A A Kirkos Addis South Mw Access 8 45 priority PH0
9.00495 38.7527 B B Kirkos Addis South Mw Access 8 45 priority PH0
9.00495 38.7527 C C Kirkos Addis South Mw Access 8 45 priority PH0
8.92055556 38.7772222 0 0 Akaki - Kalit Addis South Mw Access 3 410 priority PH0
8.92055556 38.7772222 A A Akaki - Kalit Addis South Mw Access 3 410 priority PH0
8.92055556 38.7772222 B B Akaki - Kalit Addis South Mw Access 3 410 priority PH0
8.92055556 38.7772222 C C Akaki - Kalit Addis South Mw Access 3 410 priority PH0
8.92055556 38.7772222 D D Akaki - Kalit Addis South Mw Access 3 410 priority PH0
8.866956 38.786639 0 0 Akaki - Kalit Addis South Mw Hub 4 410 priority PH0
8.866956 38.786639 A A Akaki - Kalit Addis South Mw Hub 4 410 priority PH0
8.866956 38.786639 B B Akaki - Kalit Addis South Mw Hub 4 410 priority PH0
9.032657 38.718894 0 0 Addis Ketema (AA)
Addis North Mw Access 9 664 Priority PH0
9.032657 38.718894 A A Addis Ketema (AA)
Addis North Mw Access 9 664 Priority PH0
9.032657 38.718894 B B Addis Ketema (AA)
Addis North Mw Access 9 664 Priority PH0
9.032657 38.718894 C C Addis Ketema (AA)
Addis North Mw Access 9 664 Priority PH0
9.032657 38.718894 X X Addis Ketema (AA)
Addis North Mw Access 9 664 Priority PH0
8.91801207 38.7348655 0 0 Nefas Silk Addis South Mw Access 5 664 Priority PH0
8.91801207 38.7348655 A A Nefas Silk Addis South Mw Access 5 664 Priority PH0
8.91801207 38.7348655 B B Nefas Silk Addis South Mw Access 5 664 Priority PH0
8.91801207 38.7348655 C C Nefas Silk Addis South Mw Access 5 664 Priority PH0
8.91801207 38.7348655 X X Nefas Silk Addis South Mw Access 5 664 Priority PH0
9.01091 38.88318 A A Bole Addis South Mw Access 12 410 priority PH0
9.01091 38.88318 B B Bole Addis South Mw Access 12 410 priority PH0
9.01091 38.88318 C C Bole Addis South Mw Access 12 410 priority PH0
8.8788371 38.8115187 0 0 Akaki - Kalit Addis South Mw Access 7 410 priority PH0
8.8788371 38.8115187 A A Akaki - Kalit Addis South Mw Access 7 410 priority PH0
8.8788371 38.8115187 B B Akaki - Kalit Addis South Mw Access 7 410 priority PH0
8.8788371 38.8115187 C C Akaki - Kalit Addis South Mw Access 7 410 priority PH0
8.8788371 38.8115187 X X Akaki - Kalit Addis South Mw Access 7 410 priority PH0
9.00253961 38.8577685 0 0 Bole Addis South Mw Access 10 664 Priority PH0
9.00253961 38.8577685 A A Bole Addis South Mw Access 10 664 Priority PH0
9.00253961 38.8577685 B B Bole Addis South Mw Access 10 664 Priority PH0
9.00253961 38.8577685 C C Bole Addis South Mw Access 10 664 Priority PH0
9.00253961 38.8577685 X X Bole Addis South Mw Access 10 664 Priority PH0
8.94862 38.7898 0 0 Bole Addis South Mw Access 4 45 priority PH0
8.94862 38.7898 A A Bole Addis South Mw Access 4 45 priority PH0
8.94862 38.7898 B B Bole Addis South Mw Access 4 45 priority PH0
8.94862 38.7898 C C Bole Addis South Mw Access 4 45 priority PH0
9.032619 38.823732 0 0 Yeka Addis North Mw Access 9 664 Priority PH0
9.032619 38.823732 A A Yeka Addis North Mw Access 9 664 Priority PH0
9.032619 38.823732 B B Yeka Addis North Mw Access 9 664 Priority PH0
9.032619 38.823732 P P Yeka Addis North Mw Access 9 664 Priority PH0
8.99347 38.7091 0 0 Kolfe - Keran Addis North Mw Access 8 75 Priority PH0
8.99347 38.7091 A A Kolfe - Keran Addis North Mw Access 8 75 Priority PH0
8.99347 38.7091 B B Kolfe - Keran Addis North Mw Access 8 75 Priority PH0
9.00244 38.70545 0 0 Kolfe - Keran Addis North Mw Access 7 410 priority PH0
9.00244 38.70545 A A Kolfe - Keran Addis North Mw Access 7 410 priority PH0
9.00244 38.70545 B B Kolfe - Keran Addis North Mw Access 7 410 priority PH0
9.00244 38.70545 C C Kolfe - Keran Addis North Mw Access 7 410 priority PH0
9.00244 38.70545 C C Kolfe - Keran Addis North Mw Access 7 410 priority PH0
9.00244 38.70545 X X Kolfe - Keran Addis North Mw Access 7 410 priority PH0
9.00311 38.7831 0 0 Bole Addis South Mw Access 9 75 Priority PH0
9.00311 38.7831 A A Bole Addis South Mw Access 9 75 Priority PH0
9.00311 38.7831 B B Bole Addis South Mw Access 9 75 Priority PH0
9.00311 38.7831 C C Bole Addis South Mw Access 9 75 Priority PH0
9.00311 38.7831 X X Bole Addis South Mw Access 9 75 Priority PH0
8.94828 38.71394 0 0 Nefas Silk Addis South Mw Access 5 410 priority PH0
8.94828 38.71394 A A Nefas Silk Addis South Mw Access 5 410 priority PH0
8.94828 38.71394 B B Nefas Silk Addis South Mw Access 5 410 priority PH0
8.94828 38.71394 C C Nefas Silk Addis South Mw Access 5 410 priority PH0
8.94828 38.71394 D D Nefas Silk Addis South Mw Access 5 410 priority PH0
8.94828 38.71394 E E Nefas Silk Addis South Mw Access 5 410 priority PH0
8.94828 38.71394 X X Nefas Silk Addis South Mw Access 5 410 priority PH0
9.026143 38.868951 0 0 Yeka Addis North Mw Access 11 664 Priority PH0
9.026143 38.868951 B B Yeka Addis North Mw Access 11 664 Priority PH0
9.026143 38.868951 C C Yeka Addis North Mw Access 11 664 Priority PH0
9.026143 38.868951 D D Yeka Addis North Mw Access 11 664 Priority PH0
9.026143 38.868951 E E Yeka Addis North Mw Access 11 664 Priority PH0
9.026143 38.868951 F F Yeka Addis North Mw Access 11 664 Priority PH0
9.026143 38.868951 P P Yeka Addis North Mw Access 11 664 Priority PH0
9.06097 38.72649 0 0 Gulele Addis North Mw Access 10 410 priority PH0
9.06097 38.72649 A A Gulele Addis North Mw Access 10 410 priority PH0
9.06097 38.72649 B B Gulele Addis North Mw Access 10 410 priority PH0
9.06097 38.72649 C C Gulele Addis North Mw Access 10 410 priority PH0
8.93234 38.766 0 0 Akaki - Kalit Addis South Mw Access 2 95 priority PH0
8.93234 38.766 A A Akaki - Kalit Addis South Mw Access 2 95 priority PH0
8.93234 38.766 B B Akaki - Kalit Addis South Mw Access 2 95 priority PH0
8.93234 38.766 C C Akaki - Kalit Addis South Mw Access 2 95 priority PH0
8.93234 38.766 D D Akaki - Kalit Addis South Mw Access 2 95 priority PH0
8.93234 38.766 X X Akaki - Kalit Addis South Mw Access 2 95 priority PH0
9.06653952 38.7633466 0 0 Gulele Addis North Mw Access 11 410 priority PH0
9.06653952 38.7633466 A A Gulele Addis North Mw Access 11 410 priority PH0
9.06653952 38.7633466 B B Gulele Addis North Mw Access 11 410 priority PH0
9.06653952 38.7633466 C C Gulele Addis North Mw Access 11 410 priority PH0
9.06653952 38.7633466 D D Gulele Addis North Mw Access 11 410 priority PH0
9.05174 38.739 0 0 Arada Addis North Mw Hub 11 95 priority PH0
9.05174 38.739 B B Arada Addis North Mw Hub 11 95 priority PH0
9.05174 38.739 C C Arada Addis North Mw Hub 11 95 priority PH0
8.99954 38.83575 0 0 Bole Addis South Mw Access 10 664 Priority PH0
8.99954 38.83575 A A Bole Addis South Mw Access 10 664 Priority PH0
8.99954 38.83575 B B Bole Addis South Mw Access 10 664 Priority PH0
8.99954 38.83575 C C Bole Addis South Mw Access 10 664 Priority PH0
8.99954 38.83575 X X Bole Addis South Mw Access 10 664 Priority PH0
8.9614 38.6728 0 0 Kolfe - Keran Addis North Mw Hub 9 95 priority PH0
8.9614 38.6728 A A Kolfe - Keran Addis North Mw Hub 9 95 priority PH0
8.9614 38.6728 B B Kolfe - Keran Addis North Mw Hub 9 95 priority PH0
8.9614 38.6728 C C Kolfe - Keran Addis North Mw Hub 9 95 priority PH0
8.9614 38.6728 E E Kolfe - Keran Addis North Mw Hub 9 95 priority PH0
8.9614 38.6728 D D Kolfe - Keran Addis North Mw Hub 9 95 priority PH0
8.99326 38.8083 0 0 Bole Addis South Mw Access 7 95 priority PH0
8.99326 38.8083 A A Bole Addis South Mw Access 7 95 priority PH0
8.99326 38.8083 B B Bole Addis South Mw Access 7 95 priority PH0
8.99326 38.8083 X X Bole Addis South Mw Access 7 95 priority PH0
8.97807 38.7744 0 0 Bole Addis South Mw Access 6 75 Priority PH0
8.97807 38.7744 X X Bole Addis South Mw Access 6 75 Priority PH0
8.97807 38.7744 B B Bole Addis South Mw Access 6 75 Priority PH0
8.97807 38.7744 A A Bole Addis South Mw Access 6 75 Priority PH0
8.97807 38.7744 C C Bole Addis South Mw Access 6 75 Priority PH0
9.04103 38.8614 0 0 Yeka Addis North Mw Access 9 95 priority PH0
9.04103 38.8614 A A Yeka Addis North Mw Access 9 95 priority PH0
9.04103 38.8614 B B Yeka Addis North Mw Access 9 95 priority PH0
9.01228 38.8641111 0 0 Bole Addis South Mw Access 11 664 Priority PH0
9.01228 38.8641111 A A Bole Addis South Mw Access 11 664 Priority PH0
9.01228 38.8641111 B B Bole Addis South Mw Access 11 664 Priority PH0
9.01228 38.8641111 C C Bole Addis South Mw Access 11 664 Priority PH0
9.01228 38.8641111 D D Bole Addis South Mw Access 11 664 Priority PH0
8.98215 38.7354 0 0 Nefas Silk Addis South Mw Hub 4 75 Priority PH0
8.98215 38.7354 A A Nefas Silk Addis South Mw Hub 4 75 Priority PH0
8.98215 38.7354 B B Nefas Silk Addis South Mw Hub 4 75 Priority PH0
9.01733 38.7968 0 0 Bole Addis South Mw Access 9 95 priority PH0
9.01733 38.7968 C C Bole Addis South Mw Access 9 95 priority PH0
9.01733 38.7968 A A Bole Addis South Mw Access 9 95 priority PH0
9.01733 38.7968 D D Bole Addis South Mw Access 9 95 priority PH0
9.01733 38.7968 E E Bole Addis South Mw Access 9 95 priority PH0
9.01733 38.7968 F F Bole Addis South Mw Access 9 95 priority PH0
9.01733 38.7968 G G Bole Addis South Mw Access 9 95 priority PH0
9.01733 38.7968 B B Bole Addis South Mw Access 9 95 priority PH0
9.02123 38.7337 0 0 Lideta Addis North Mw Access 10 75 Priority PH0
9.02123 38.7337 A A Lideta Addis North Mw Access 10 75 Priority PH0
9.02123 38.7337 B B Lideta Addis North Mw Access 10 75 Priority PH0
9.02123 38.7337 C C Lideta Addis North Mw Access 10 75 Priority PH0
9.02123 38.7337 T T Lideta Addis North Mw Access 10 75 Priority PH0
9.03144 38.7348 0 0 Addis Ketema (AA)
Addis North Mw Access 9 95 priority PH0
9.03144 38.7348 A A Addis Ketema (AA)
Addis North Mw Access 9 95 priority PH0
9.03144 38.7348 B B Addis Ketema (AA)
Addis North Mw Access 9 95 priority PH0
9.03144 38.7348 D D Addis Ketema (AA)
Addis North Mw Access 9 95 priority PH0
9.03144 38.7348 E E Addis Ketema (AA)
Addis North Mw Access 9 95 priority PH0
9.03144 38.7348 C C Addis Ketema (AA)
Addis North Mw Access 9 95 priority PH0
9.04901 38.73021 0 0 Gulele Addis North Mw Access 12 410 priority PH0
9.04901 38.73021 A A Gulele Addis North Mw Access 12 410 priority PH0
9.04901 38.73021 B B Gulele Addis North Mw Access 12 410 priority PH0
9.018454 38.747065 0 0 Lideta Addis North Mw Access 8 664 Priority PH0
9.018454 38.747065 A A Lideta Addis North Mw Access 8 664 Priority PH0
9.018454 38.747065 B B Lideta Addis North Mw Access 8 664 Priority PH0
9.018454 38.747065 C C Lideta Addis North Mw Access 8 664 Priority PH0
9.018454 38.747065 X X Lideta Addis North Mw Access 8 664 Priority PH0
8.98691 38.6974 0 0 Kolfe - Keran Addis North Mw Hub 6 75 Priority PH0
8.98691 38.6974 A A Kolfe - Keran Addis North Mw Hub 6 75 Priority PH0
8.98691 38.6974 B B Kolfe - Keran Addis North Mw Hub 6 75 Priority PH0
9.03554034 38.8544312 0 0 Yeka Addis North Mw Access 10 664 Priority PH0
9.03554034 38.8544312 A A Yeka Addis North Mw Access 10 664 Priority PH0
9.03554034 38.8544312 B B Yeka Addis North Mw Access 10 664 Priority PH0
9.03554034 38.8544312 C C Yeka Addis North Mw Access 10 664 Priority PH0
9.03554034 38.8544312 D D Yeka Addis North Mw Access 10 664 Priority PH0
9.03554034 38.8544312 E E Yeka Addis North Mw Access 10 664 Priority PH0
9.03554034 38.8544312 X X Yeka Addis North Mw Access 10 664 Priority PH0
9.00242 38.8463 0 0 Bole Addis South Mw Access 9 95 priority PH0
9.00242 38.8463 A A Bole Addis South Mw Access 9 95 priority PH0
9.00242 38.8463 B B Bole Addis South Mw Access 9 95 priority PH0
9.00242 38.8463 C C Bole Addis South Mw Access 9 95 priority PH0
9.04055 38.8447 0 0 Yeka Addis North Mw Access 9 95 priority PH0
9.04055 38.8447 A A Yeka Addis North Mw Access 9 95 priority PH0
9.06614987 38.7377086 0 0 Gulele Addis North Mw Access 11 410 priority PH0
9.06614987 38.7377086 A A Gulele Addis North Mw Access 11 410 priority PH0
9.06614987 38.7377086 B B Gulele Addis North Mw Access 11 410 priority PH0
9.06614987 38.7377086 C C Gulele Addis North Mw Access 11 410 priority PH0
9.06614987 38.7377086 D D Gulele Addis North Mw Access 11 410 priority PH0
8.97027 38.76644 0 0 Nefas Silk Addis South Mw Access 5 410 priority PH0
8.97027 38.76644 A A Nefas Silk Addis South Mw Access 5 410 priority PH0
8.97027 38.76644 B B Nefas Silk Addis South Mw Access 5 410 priority PH0
8.97027 38.76644 C C Nefas Silk Addis South Mw Access 5 410 priority PH0
8.97027 38.76644 D D Nefas Silk Addis South Mw Access 5 410 priority PH0
9.03465 38.744 0 0 Arada Addis North Mw Access 10 75 Priority PH0
9.03465 38.744 B B Arada Addis North Mw Access 10 75 Priority PH0
9.03465 38.744 C C Arada Addis North Mw Access 10 75 Priority PH0
9.03465 38.744 D D Arada Addis North Mw Access 10 75 Priority PH0
9.03369037 38.7682918 0 0 Arada Addis North Mw Access 10 410 priority PH0
9.03369037 38.7682918 A A Arada Addis North Mw Access 10 410 priority PH0
9.03369037 38.7682918 B B Arada Addis North Mw Access 10 410 priority PH0
9.03369037 38.7682918 X X Arada Addis North Mw Access 10 410 priority PH0
9.02138 38.70768 0 0 Kolfe - Keran Addis North Mw Access 8 664 Priority PH0
9.02138 38.70768 A A Kolfe - Keran Addis North Mw Access 8 664 Priority PH0
9.02138 38.70768 B B Kolfe - Keran Addis North Mw Access 8 664 Priority PH0
9.02138 38.70768 C C Kolfe - Keran Addis North Mw Access 8 664 Priority PH0
9.02138 38.70768 D D Kolfe - Keran Addis North Mw Access 8 664 Priority PH0
9.02138 38.70768 E E Kolfe - Keran Addis North Mw Access 8 664 Priority PH0
9.02138 38.70768 X X Kolfe - Keran Addis North Mw Access 8 664 Priority PH0
8.98456 38.7074 0 0 Kolfe - Keran Addis North Mw Access 7 95 priority PH0
8.98456 38.7074 A A Kolfe - Keran Addis North Mw Access 7 95 priority PH0
8.98456 38.7074 B B Kolfe - Keran Addis North Mw Access 7 95 priority PH0
8.98456 38.7074 C C Kolfe - Keran Addis North Mw Access 7 95 priority PH0
9.02902 38.7969 0 0 Yeka Addis North Mw Access 10 95 priority PH0
9.02902 38.7969 A A Yeka Addis North Mw Access 10 95 priority PH0
9.02902 38.7969 B B Yeka Addis North Mw Access 10 95 priority PH0
8.967051 38.67298 0 0 Kolfe - Keran Addis North Mw Access 9 410 priority PH0
8.967051 38.67298 A A Kolfe - Keran Addis North Mw Access 9 410 priority PH0
8.967051 38.67298 B B Kolfe - Keran Addis North Mw Access 9 410 priority PH0
8.967051 38.67298 X X Kolfe - Keran Addis North Mw Access 9 410 priority PH0
9.0031 38.7975 0 0 Bole Addis South Mw Access 7 95 priority PH0
9.0031 38.7975 A A Bole Addis South Mw Access 7 95 priority PH0
9.0031 38.7975 C C Bole Addis South Mw Access 7 95 priority PH0
9.0031 38.7975 D D Bole Addis South Mw Access 7 95 priority PH0
9.0031 38.7975 E E Bole Addis South Mw Access 7 95 priority PH0
9.0031 38.7975 B B Bole Addis South Mw Access 7 95 priority PH0
9.06329 38.77715 0 0 Yeka Addis North Mw Access 12 664 Priority PH0
9.06329 38.77715 A A Yeka Addis North Mw Access 12 664 Priority PH0
9.06329 38.77715 B B Yeka Addis North Mw Access 12 664 Priority PH0
9.06329 38.77715 C C Yeka Addis North Mw Access 12 664 Priority PH0
8.99064 38.81849 0 0 Bole Addis South Mw Access 7 410 priority PH0
8.99064 38.81849 A A Bole Addis South Mw Access 7 410 priority PH0
8.99064 38.81849 B B Bole Addis South Mw Access 7 410 priority PH0
8.99064 38.81849 C C Bole Addis South Mw Access 7 410 priority PH0
8.99064 38.81849 D D Bole Addis South Mw Access 7 410 priority PH0
8.99064 38.81849 X X Bole Addis South Mw Access 7 410 priority PH0
9.02754 38.792 0 0 Yeka Addis North Mw Access 9 75 Priority PH0
9.02754 38.792 A A Yeka Addis North Mw Access 9 75 Priority PH0
9.02754 38.792 B B Yeka Addis North Mw Access 9 75 Priority PH0
9.02563 38.7872 0 0 Yeka Addis North Mw Hub 8 75 Priority PH0
9.02563 38.7872 A A Yeka Addis North Mw Hub 8 75 Priority PH0
9.02563 38.7872 B B Yeka Addis North Mw Hub 8 75 Priority PH0
8.995 38.7529 0 0 Kirkos Addis South Mw Access 6 75 Priority PH0
8.995 38.7529 A A Kirkos Addis South Mw Access 6 75 Priority PH0
8.995 38.7529 B B Kirkos Addis South Mw Access 6 75 Priority PH0
8.995 38.7529 C C Kirkos Addis South Mw Access 6 75 Priority PH0
8.995 38.7529 D D Kirkos Addis South Mw Access 6 75 Priority PH0
8.995 38.7529 E E Kirkos Addis South Mw Access 6 75 Priority PH0
8.995 38.7529 F F Kirkos Addis South Mw Access 6 75 Priority PH0
8.995 38.7529 X X Kirkos Addis South Mw Access 6 75 Priority PH0
8.91729 38.82234 0 0 Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.91729 38.82234 A A Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.91729 38.82234 B B Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.91729 38.82234 C C Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.91729 38.82234 X X Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.95394 38.68615 0 0 Kolfe - Keran Addis North Mw Hub 5 410 priority PH0
8.95394 38.68615 A A Kolfe - Keran Addis North Mw Hub 5 410 priority PH0
8.95394 38.68615 B B Kolfe - Keran Addis North Mw Hub 5 410 priority PH0
8.95394 38.68615 C C Kolfe - Keran Addis North Mw Hub 5 410 priority PH0
8.95394 38.68615 D D Kolfe - Keran Addis North Mw Hub 5 410 priority PH0
8.95394 38.68615 E E Kolfe - Keran Addis North Mw Hub 5 410 priority PH0
8.95394 38.68615 F F Kolfe - Keran Addis North Mw Hub 5 410 priority PH0
8.95394 38.68615 G G Kolfe - Keran Addis North Mw Hub 5 410 priority PH0
8.95822 38.70715 0 0 Nefas Silk Addis South Mw Hub 4 410 priority PH0
8.95822 38.70715 A A Nefas Silk Addis South Mw Hub 4 410 priority PH0
8.95822 38.70715 B B Nefas Silk Addis South Mw Hub 4 410 priority PH0
8.95822 38.70715 C C Nefas Silk Addis South Mw Hub 4 410 priority PH0
8.95822 38.70715 D D Nefas Silk Addis South Mw Hub 4 410 priority PH0
8.95822 38.70715 T T Nefas Silk Addis South Mw Hub 4 410 priority PH0
8.96236 38.68658 0 0 Kolfe - Keran Addis North Mw Access 10 410 priority PH0
8.96236 38.68658 A A Kolfe - Keran Addis North Mw Access 10 410 priority PH0
8.96236 38.68658 B B Kolfe - Keran Addis North Mw Access 10 410 priority PH0
8.96236 38.68658 C C Kolfe - Keran Addis North Mw Access 10 410 priority PH0
8.96236 38.68658 D D Kolfe - Keran Addis North Mw Access 10 410 priority PH0
8.96236 38.68658 E E Kolfe - Keran Addis North Mw Access 10 410 priority PH0
8.96236 38.68658 F F Kolfe - Keran Addis North Mw Access 10 410 priority PH0
8.96236 38.68658 H H Kolfe - Keran Addis North Mw Access 10 410 priority PH0
8.9753 38.68612 0 0 Kolfe - Keran Addis North Mw Access 9 410 priority PH0
8.9753 38.68612 A A Kolfe - Keran Addis North Mw Access 9 410 priority PH0
8.9753 38.68612 B B Kolfe - Keran Addis North Mw Access 9 410 priority PH0
8.9753 38.68612 C C Kolfe - Keran Addis North Mw Access 9 410 priority PH0
8.9753 38.68612 D D Kolfe - Keran Addis North Mw Access 9 410 priority PH0
8.9753 38.68612 E E Kolfe - Keran Addis North Mw Access 9 410 priority PH0
8.9753 38.68612 F F Kolfe - Keran Addis North Mw Access 9 410 priority PH0
8.9753 38.68612 X X Kolfe - Keran Addis North Mw Access 9 410 priority PH0
9.0197 38.77 0 0 Kirkos Addis South Mw Access 8 45 priority PH0
9.0197 38.77 A A Kirkos Addis South Mw Access 8 45 priority PH0
9.0197 38.77 B B Kirkos Addis South Mw Access 8 45 priority PH0
9.0197 38.77 C C Kirkos Addis South Mw Access 8 45 priority PH0
8.98069 38.69422 0 0 Kolfe - Keran Addis North Mw Access 8 410 priority PH0
8.98069 38.69422 A A Kolfe - Keran Addis North Mw Access 8 410 priority PH0
8.98069 38.69422 B B Kolfe - Keran Addis North Mw Access 8 410 priority PH0
8.98069 38.69422 C C Kolfe - Keran Addis North Mw Access 8 410 priority PH0
8.98069 38.69422 D D Kolfe - Keran Addis North Mw Access 8 410 priority PH0
8.98069 38.69422 E E Kolfe - Keran Addis North Mw Access 8 410 priority PH0
8.86951 38.808635 0 0 Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.86951 38.808635 A A Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.86951 38.808635 B B Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.86951 38.808635 C C Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.86951 38.808635 D D Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.86951 38.808635 E E Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.86951 38.808635 F F Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.86951 38.808635 H H Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.86951 38.808635 G G Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.99038 38.6865 0 0 Kolfe - Keran Addis North Mw Access 8 95 priority PH0
8.99038 38.6865 A A Kolfe - Keran Addis North Mw Access 8 95 priority PH0
8.99038 38.6865 B B Kolfe - Keran Addis North Mw Access 8 95 priority PH0
8.99038 38.6865 C C Kolfe - Keran Addis North Mw Access 8 95 priority PH0
8.98691 38.6763 0 0 Kolfe - Keran Addis North Mw Access 8 75 Priority PH0
8.98691 38.6763 B B Kolfe - Keran Addis North Mw Access 8 75 Priority PH0
8.98691 38.6763 C C Kolfe - Keran Addis North Mw Access 8 75 Priority PH0
8.99603 38.6831 0 0 Kolfe - Keran Addis North Mw Access 9 95 priority PH0
8.99603 38.6831 A A Kolfe - Keran Addis North Mw Access 9 95 priority PH0
8.99603 38.6831 B B Kolfe - Keran Addis North Mw Access 9 95 priority PH0
9.04425 38.7275556 0 0 Addis Ketema (AA)
Addis North Mw Access 14 410 priority PH0
9.04425 38.7275556 A A Addis Ketema (AA)
Addis North Mw Access 14 410 priority PH0
9.04425 38.7275556 B B Addis Ketema (AA)
Addis North Mw Access 14 410 priority PH0
9.04425 38.7275556 C C Addis Ketema (AA)
Addis North Mw Access 14 410 priority PH0
9.04425 38.7275556 D D Addis Ketema (AA)
Addis North Mw Access 14 410 priority PH0
9.04425 38.7275556 X X Addis Ketema (AA)
Addis North Mw Access 14 410 priority PH0
8.972272652 38.70555011 0 0 Arada Addis North Mw Access 9 410 priority PH0
8.972272652 38.70555011 A A Arada Addis North Mw Access 9 410 priority PH0
8.972272652 38.70555011 B B Arada Addis North Mw Access 9 410 priority PH0
8.972272652 38.70555011 C C Arada Addis North Mw Access 9 410 priority PH0
8.9834476 38.7951918 0 0 Bole Addis South Mw Access 7 664 Priority PH0
8.9834476 38.7951918 A A Bole Addis South Mw Access 7 664 Priority PH0
8.9834476 38.7951918 B B Bole Addis South Mw Access 7 664 Priority PH0
8.9834476 38.7951918 C C Bole Addis South Mw Access 7 664 Priority PH0
8.9834476 38.7951918 D D Bole Addis South Mw Access 7 664 Priority PH0
8.95219 38.72243 0 0 Nefas Silk Addis South Mw Access 4 410 priority PH0
8.95219 38.72243 A A Nefas Silk Addis South Mw Access 4 410 priority PH0
8.95219 38.72243 B B Nefas Silk Addis South Mw Access 4 410 priority PH0
8.95219 38.72243 C C Nefas Silk Addis South Mw Access 4 410 priority PH0
8.95219 38.72243 X X Nefas Silk Addis South Mw Access 4 410 priority PH0
8.94903 38.7287 0 0 Nefas Silk Addis South Mw Hub 3 75 Priority PH0
8.94903 38.7287 A A Nefas Silk Addis South Mw Hub 3 75 Priority PH0
8.94903 38.7287 P P Nefas Silk Addis South Mw Hub 3 75 Priority PH0
8.94903 38.7287 B B Nefas Silk Addis South Mw Hub 3 75 Priority PH0
8.94903 38.7287 C C Nefas Silk Addis South Mw Hub 3 75 Priority PH0
8.95363 38.745 0 0 Nefas Silk Addis South Mw Access 4 95 priority PH0
8.95363 38.745 A A Nefas Silk Addis South Mw Access 4 95 priority PH0
8.95363 38.745 B B Nefas Silk Addis South Mw Access 4 95 priority PH0
8.93855529 38.7219505 0 0 Nefas Silk Addis South Mw Access 5 664 Priority PH0
8.93855529 38.7219505 A A Nefas Silk Addis South Mw Access 5 664 Priority PH0
8.93855529 38.7219505 B B Nefas Silk Addis South Mw Access 5 664 Priority PH0
8.93855529 38.7219505 C C Nefas Silk Addis South Mw Access 5 664 Priority PH0
8.9357 38.7465 0 0 Nefas Silk Addis South Mw Hub 2 75 Priority PH0
8.9357 38.7465 A A Nefas Silk Addis South Mw Hub 2 75 Priority PH0
8.9357 38.7465 B B Nefas Silk Addis South Mw Hub 2 75 Priority PH0
9.00848982 38.7694282 0 0 Kirkos Addis South Mw Access 8 664 Priority PH0
9.00848982 38.7694282 A A Kirkos Addis South Mw Access 8 664 Priority PH0
9.00848982 38.7694282 B B Kirkos Addis South Mw Access 8 664 Priority PH0
9.00848982 38.7694282 C C Kirkos Addis South Mw Access 8 664 Priority PH0
9.00848982 38.7694282 D D Kirkos Addis South Mw Access 8 664 Priority PH0
9.00184285 38.8077772 0 0 Bole Addis South Mw Access 8 664 Priority PH0
9.00184285 38.8077772 A A Bole Addis South Mw Access 8 664 Priority PH0
9.00184285 38.8077772 C C Bole Addis South Mw Access 8 664 Priority PH0
9.00184285 38.8077772 D D Bole Addis South Mw Access 8 664 Priority PH0
9.00184285 38.8077772 E E Bole Addis South Mw Access 8 664 Priority PH0
9.00184285 38.8077772 B B Bole Addis South Mw Access 8 664 Priority PH0
9.02356 38.6856 0 0 Kolfe - Keran Addis North Mw Access 9 410 priority PH0
9.02356 38.6856 A A Kolfe - Keran Addis North Mw Access 9 410 priority PH0
9.02356 38.6856 B B Kolfe - Keran Addis North Mw Access 9 410 priority PH0
9.02356 38.6856 C C Kolfe - Keran Addis North Mw Access 9 410 priority PH0
9.02356 38.6856 D D Kolfe - Keran Addis North Mw Access 9 410 priority PH0
9.02356 38.6856 E E Kolfe - Keran Addis North Mw Access 9 410 priority PH0
9.02356 38.6856 F F Kolfe - Keran Addis North Mw Access 9 410 priority PH0
9.02356 38.6856 X X Kolfe - Keran Addis North Mw Access 9 410 priority PH0
8.93301 38.7533 0 0 Nefas Silk Addis South Mw Access 2 45 priority PH0
8.93301 38.7533 A A Nefas Silk Addis South Mw Access 2 45 priority PH0
8.93301 38.7533 B B Nefas Silk Addis South Mw Access 2 45 priority PH0
8.93301 38.7533 D D Nefas Silk Addis South Mw Access 2 45 priority PH0
8.92503 38.7655 0 0 Akaki - Kalit Addis South Mw Hub 1 45 priority PH0
8.92503 38.7655 A A Akaki - Kalit Addis South Mw Hub 1 45 priority PH0
8.92503 38.7655 B B Akaki - Kalit Addis South Mw Hub 1 45 priority PH0
9.03126 38.763 0 0 Arada Addis North Mw Access 8 45 priority PH0
9.03126 38.763 A A Arada Addis North Mw Access 8 45 priority PH0
9.03126 38.763 C C Arada Addis North Mw Access 8 45 priority PH0
9.03126 38.763 C C Arada Addis North Mw Access 8 45 priority PH0
9.03126 38.763 C C Arada Addis North Mw Access 8 45 priority PH0
8.91533 38.76825 0 0 Akaki - Kalit Addis South Mw Access 2 410 priority PH0
8.91533 38.76825 B B Akaki - Kalit Addis South Mw Access 2 410 priority PH0
8.91533 38.76825 C C Akaki - Kalit Addis South Mw Access 2 410 priority PH0
8.91533 38.76825 D D Akaki - Kalit Addis South Mw Access 2 410 priority PH0
8.91533 38.76825 E E Akaki - Kalit Addis South Mw Access 2 410 priority PH0
8.91533 38.76825 X X Akaki - Kalit Addis South Mw Access 2 410 priority PH0
8.890773087 38.7768828 0 0 Akaki - Kalit Addis South Mw Hub 4 95 priority PH0
8.890773087 38.7768828 X X Akaki - Kalit Addis South Mw Hub 4 95 priority PH0
8.890773087 38.7768828 A A Akaki - Kalit Addis South Mw Hub 4 95 priority PH0
8.890773087 38.7768828 B B Akaki - Kalit Addis South Mw Hub 4 95 priority PH0
8.890773087 38.7768828 C C Akaki - Kalit Addis South Mw Hub 4 95 priority PH0
8.99907211 38.7683547 0 0 Kirkos Addis South Mw Access 6 410 priority PH0
8.99907211 38.7683547 A A Kirkos Addis South Mw Access 6 410 priority PH0
8.99907211 38.7683547 B B Kirkos Addis South Mw Access 6 410 priority PH0
8.99907211 38.7683547 C C Kirkos Addis South Mw Access 6 410 priority PH0
8.99907211 38.7683547 D D Kirkos Addis South Mw Access 6 410 priority PH0
8.984909 38.80067 0 0 Lideta Addis North Mw Access 11 95 priority PH0
8.984909 38.80067 A A Lideta Addis North Mw Access 11 95 priority PH0
8.984909 38.80067 B B Lideta Addis North Mw Access 11 95 priority PH0
8.984909 38.80067 C C Lideta Addis North Mw Access 11 95 priority PH0
8.984909 38.80067 D D Bole Addis North Mw Access 11 95 priority PH0
8.88091 38.77486 0 0 Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.88091 38.77486 A A Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.88091 38.77486 B B Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.88091 38.77486 C C Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.89658 38.7721 0 0 Akaki - Kalit Addis South Mw Hub 3 95 priority PH0
8.89658 38.7721 A A Akaki - Kalit Addis South Mw Hub 3 95 priority PH0
8.89658 38.7721 B B Akaki - Kalit Addis South Mw Hub 3 95 priority PH0
8.89658 38.7721 P P Akaki - Kalit Addis South Mw Hub 3 95 priority PH0
8.8815298 38.7827726 0 0 Akaki - Kalit Addis South Mw Access 5 410 priority PH0
8.8815298 38.7827726 A A Akaki - Kalit Addis South Mw Access 5 410 priority PH0
8.8815298 38.7827726 B B Akaki - Kalit Addis South Mw Access 5 410 priority PH0
8.8815298 38.7827726 X X Akaki - Kalit Addis South Mw Access 5 410 priority PH0
8.87045 38.77124 0 0 Akaki - Kalit Addis South Mw Access 5 410 priority PH0
8.87045 38.77124 A A Akaki - Kalit Addis South Mw Access 5 410 priority PH0
8.87045 38.77124 B B Akaki - Kalit Addis South Mw Access 5 410 priority PH0
8.87045 38.77124 C C Akaki - Kalit Addis South Mw Access 5 410 priority PH0
8.865054 38.782211 0 0 Akaki - Kalit Addis South Mw Access 5 410 priority PH0
8.865054 38.782211 A A Akaki - Kalit Addis South Mw Access 5 410 priority PH0
8.865054 38.782211 B B Akaki - Kalit Addis South Mw Access 5 410 priority PH0
8.86363 38.81775 0 0 Akaki - Kalit Addis South Mw Hub 5 664 Priority PH0
8.86363 38.81775 A A Akaki - Kalit Addis South Mw Hub 5 664 Priority PH0
8.86363 38.81775 B B Akaki - Kalit Addis South Mw Hub 5 664 Priority PH0
8.86363 38.81775 D D Akaki - Kalit Addis South Mw Hub 5 664 Priority PH0
8.86363 38.81775 C C Akaki - Kalit Addis South Mw Hub 5 664 Priority PH0
8.86577 38.80207 0 0 Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.86577 38.80207 A A Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.86577 38.80207 B B Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.898688 38.813904 0 0 Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.898688 38.813904 A A Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.898688 38.813904 B B Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.898688 38.813904 C C Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.898688 38.813904 D D Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.98002 38.7737 0 0 Bole Addis South Mw Hub 4 45 priority PH0
8.98002 38.7737 A A Bole Addis South Mw Hub 4 45 priority PH0
8.98002 38.7737 B B Bole Addis South Mw Hub 4 45 priority PH0
8.98002 38.7737 C C Bole Addis South Mw Hub 4 45 priority PH0
8.98002 38.7737 D D Bole Addis South Mw Hub 4 45 priority PH0
8.92016971 38.7625021 0 0 Akaki - Kalit Addis South Mw Access 2 410 priority PH0
8.92016971 38.7625021 A A Akaki - Kalit Addis South Mw Access 2 410 priority PH0
8.92016971 38.7625021 B B Akaki - Kalit Addis South Mw Access 2 410 priority PH0
8.92016971 38.7625021 C C Akaki - Kalit Addis South Mw Access 2 410 priority PH0
8.92016971 38.7625021 D D Akaki - Kalit Addis South Mw Access 2 410 priority PH0
8.92016971 38.7625021 E E Akaki - Kalit Addis South Mw Access 2 410 priority PH0
8.94513 38.7689 0 0 Akaki - Kalit Addis South Mw Access 3 95 priority PH0
8.94513 38.7689 A A Akaki - Kalit Addis South Mw Access 3 95 priority PH0
8.94513 38.7689 B B Akaki - Kalit Addis South Mw Access 3 95 priority PH0
8.94513 38.7689 C C Akaki - Kalit Addis South Mw Access 3 95 priority PH0
8.94026 38.7709 0 0 Akaki - Kalit Addis South Mw Access 4 95 priority PH0
8.94026 38.7709 A A Akaki - Kalit Addis South Mw Access 4 95 priority PH0
8.94026 38.7709 C C Akaki - Kalit Addis South Mw Access 4 95 priority PH0
8.94026 38.7709 X X Akaki - Kalit Addis South Mw Access 4 95 priority PH0
8.95078 38.7783 0 0 Bole Addis South Mw Access 3 45 priority PH0
8.95078 38.7783 A A Bole Addis South Mw Access 3 45 priority PH0
8.95583 38.7639 0 0 Akaki - Kalit Addis South Mw Access 4 95 priority PH0
8.95583 38.7639 A A Akaki - Kalit Addis South Mw Access 4 95 priority PH0
8.95583 38.7639 C C Akaki - Kalit Addis South Mw Access 4 95 priority PH0
8.95583 38.7639 D D Akaki - Kalit Addis South Mw Access 4 95 priority PH0
8.95583 38.7639 E E Akaki - Kalit Addis South Mw Access 4 95 priority PH0
8.95583 38.7639 F F Akaki - Kalit Addis South Mw Access 4 95 priority PH0
8.95583 38.7639 B B Akaki - Kalit Addis South Mw Access 4 95 priority PH0
8.96304967 38.7570988 0 0 Nefas Silk Addis South Mw Access 3 410 priority PH0
8.96304967 38.7570988 A A Nefas Silk Addis South Mw Access 3 410 priority PH0
8.96304967 38.7570988 B B Nefas Silk Addis South Mw Access 3 410 priority PH0
8.96304967 38.7570988 C C Nefas Silk Addis South Mw Access 3 410 priority PH0
8.99578 38.7157 0 0 Lideta Addis North Mw Access 7 75 Priority PH0
8.99578 38.7157 A A Lideta Addis North Mw Access 7 75 Priority PH0
8.99578 38.7157 B B Lideta Addis North Mw Access 7 75 Priority PH0
8.99578 38.7157 C C Lideta Addis North Mw Access 7 75 Priority PH0
8.99578 38.7157 D D Lideta Addis North Mw Access 7 75 Priority PH0
8.99578 38.7157 E E Lideta Addis North Mw Access 7 75 Priority PH0
9.03995 38.7472 0 0 Arada Addis North Mw Access 10 75 Priority PH0
9.03995 38.7472 A A Arada Addis North Mw Access 10 75 Priority PH0
9.03995 38.7472 B B Arada Addis North Mw Access 10 75 Priority PH0
9.03995 38.7472 D D Arada Addis North Mw Access 10 75 Priority PH0
9.03995 38.7472 E E Arada Addis North Mw Access 10 75 Priority PH0
9.03995 38.7472 C C Arada Addis North Mw Access 10 75 Priority PH0
8.97230007 38.759403 0 0 Nefas Silk Addis South Mw Access 4 410 priority PH0
8.97230007 38.759403 A A Nefas Silk Addis South Mw Access 4 410 priority PH0
8.97230007 38.759403 B B Nefas Silk Addis South Mw Access 4 410 priority PH0
8.97230007 38.759403 C C Nefas Silk Addis South Mw Access 4 410 priority PH0
8.97252 38.74002 0 0 Nefas Silk Addis South Mw Access 5 410 priority PH0
8.97252 38.74002 A A Nefas Silk Addis South Mw Access 5 410 priority PH0
8.97252 38.74002 B B Nefas Silk Addis South Mw Access 5 410 priority PH0
8.97252 38.74002 C C Nefas Silk Addis South Mw Access 5 410 priority PH0
8.97021 38.7498 0 0 Nefas Silk Addis South Mw Hub 3 45 priority PH0
8.97021 38.7498 A A Nefas Silk Addis South Mw Hub 3 45 priority PH0
8.97021 38.7498 B B Nefas Silk Addis South Mw Hub 3 45 priority PH0
8.9819 38.7642 0 0 Kirkos Addis South Mw Access 5 75 Priority PH0
8.9819 38.7642 A A Kirkos Addis South Mw Access 5 75 Priority PH0
8.9819 38.7642 B B Kirkos Addis South Mw Access 5 75 Priority PH0
8.9819 38.7642 C C Kirkos Addis South Mw Access 5 75 Priority PH0
8.9819 38.7642 D D Kirkos Addis South Mw Access 5 75 Priority PH0
8.975645 38.759287 0 0 Nefas Silk Addis South Mw Access 5 410 priority PH0
8.975645 38.759287 A A Nefas Silk Addis South Mw Access 5 410 priority PH0
8.975645 38.759287 B B Nefas Silk Addis South Mw Access 5 410 priority PH0
8.975645 38.759287 C C Nefas Silk Addis South Mw Access 5 410 priority PH0
8.975645 38.759287 D D Nefas Silk Addis South Mw Access 5 410 priority PH0
8.975645 38.759287 P P Nefas Silk Addis South Mw Access 5 410 priority PH0
8.97685 38.7683 0 0 Bole Addis South Mw Access 6 75 Priority PH0
8.97685 38.7683 A A Bole Addis South Mw Access 6 75 Priority PH0
8.97685 38.7683 B B Bole Addis South Mw Access 6 75 Priority PH0
8.97685 38.7683 C C Bole Addis South Mw Access 6 75 Priority PH0
8.97685 38.7683 X X Bole Addis South Mw Access 6 75 Priority PH0
8.984009 38.75457 0 0 Kirkos Addis South Mw Access 5 410 priority PH0
8.984009 38.75457 A A Kirkos Addis South Mw Access 5 410 priority PH0
8.984009 38.75457 B B Kirkos Addis South Mw Access 5 410 priority PH0
8.984009 38.75457 D D Kirkos Addis South Mw Access 5 410 priority PH0
8.988645 38.753272 0 0 Kirkos Addis South Mw Access 5 410 priority PH0
8.988645 38.753272 A A Kirkos Addis South Mw Access 5 410 priority PH0
8.988645 38.753272 B B Kirkos Addis South Mw Access 5 410 priority PH0
8.988645 38.753272 C C Kirkos Addis South Mw Access 5 410 priority PH0
8.988645 38.753272 D D Kirkos Addis South Mw Access 5 410 priority PH0
8.988645 38.753272 X X Kirkos Addis South Mw Access 5 410 priority PH0
9.02327 38.7234 0 0 Addis Ketema (AA)
Addis North Mw Access 7 95 priority PH0
9.02327 38.7234 B B Addis Ketema (AA)
Addis North Mw Access 7 95 priority PH0
9.02327 38.7234 C C Addis Ketema (AA)
Addis North Mw Access 7 95 priority PH0
9.02327 38.7234 X X Addis Ketema (AA)
Addis North Mw Access 7 95 priority PH0
8.99073 38.7577 0 0 Kirkos Addis South Mw Access 5 75 Priority PH0
8.99073 38.7577 B B Kirkos Addis South Mw Access 5 75 Priority PH0
8.99073 38.7577 C C Kirkos Addis South Mw Access 5 75 Priority PH0
8.99073 38.7577 D D Kirkos Addis South Mw Access 5 75 Priority PH0
9.001855 38.74928 0 0 Kirkos Addis South Mw Access 8 664 Priority PH0
9.001855 38.74928 A A Kirkos Addis South Mw Access 8 664 Priority PH0
9.001855 38.74928 B B Kirkos Addis South Mw Access 8 664 Priority PH0
9.001855 38.74928 C C Kirkos Addis South Mw Access 8 664 Priority PH0
9.001855 38.74928 D D Kirkos Addis South Mw Access 8 664 Priority PH0
9.001855 38.74928 X X Kirkos Addis South Mw Access 8 664 Priority PH0
9.00392 38.7583 0 0 Kirkos Addis South Mw Access 7 45 priority PH0
9.00392 38.7583 A A Kirkos Addis South Mw Access 7 45 priority PH0
9.00392 38.7583 B B Kirkos Addis South Mw Access 7 45 priority PH0
9.00392 38.7583 C C Kirkos Addis South Mw Access 7 45 priority PH0
9.00392 38.7583 T T Kirkos Addis South Mw Access 7 45 priority PH0
9.007026 38.766518 A A Kirkos Addis South Mw Access 8 664 Priority PH0
9.007026 38.766518 B B Kirkos Addis South Mw Access 8 664 Priority PH0
9.00589257 38.7402958 0 0 Lideta Addis North Mw Access 8 410 priority PH0
9.00589257 38.7402958 A A Lideta Addis North Mw Access 8 410 priority PH0
9.00589257 38.7402958 B B Lideta Addis North Mw Access 8 410 priority PH0
9.00589257 38.7402958 C C Lideta Addis North Mw Access 8 410 priority PH0
9.00589257 38.7402958 X X Lideta Addis North Mw Access 8 410 priority PH0
9.02161 38.7381 0 0 Lideta Addis North Mw Access 10 75 Priority PH0
9.02161 38.7381 B B Lideta Addis North Mw Access 10 75 Priority PH0
9.02161 38.7381 C C Lideta Addis North Mw Access 10 75 Priority PH0
9.03287 38.7483 0 0 Arada Addis North Mw Hub 9 75 Priority PH0
9.03287 38.7483 A A Arada Addis North Mw Hub 9 75 Priority PH0
9.03287 38.7483 B B Arada Addis North Mw Hub 9 75 Priority PH0
9.03287 38.7483 C C Arada Addis North Mw Hub 9 75 Priority PH0
9.02833024 38.7293498 0 0 Addis Ketema (AA)
Addis North Mw Access 8 664 Priority PH0
9.02833024 38.7293498 B B Addis Ketema (AA)
Addis North Mw Access 8 664 Priority PH0
9.02833024 38.7293498 C C Addis Ketema (AA)
Addis North Mw Access 8 664 Priority PH0
9.03271 38.7253 0 0 Addis Ketema (AA)
Addis North Mw Hub 7 75 Priority PH0
9.03271 38.7253 A A Addis Ketema (AA)
Addis North Mw Hub 7 75 Priority PH0
9.03271 38.7253 B B Addis Ketema (AA)
Addis North Mw Hub 7 75 Priority PH0
9.0331 38.7138 A A Kolfe - Keran Addis North Mw Access 8 95 priority PH0
9.0331 38.7138 B B Kolfe - Keran Addis North Mw Access 8 95 priority PH0
8.97222 38.71322 0 0 Nefas Silk Addis South Mw Access 8 410 priority PH0
8.97222 38.71322 B B Nefas Silk Addis South Mw Access 8 410 priority PH0
8.97222 38.71322 C C Nefas Silk Addis South Mw Access 8 410 priority PH0
8.97222 38.71322 D D Nefas Silk Addis South Mw Access 8 410 priority PH0
9.045464 38.733123 0 0 Addis Ketema (AA)
Addis North Mw Access 13 410 priority PH0
9.045464 38.733123 B B Addis Ketema (AA)
Addis North Mw Access 13 410 priority PH0
9.045464 38.733123 C C Addis Ketema (AA)
Addis North Mw Access 13 410 priority PH0
9.045464 38.733123 X X Addis Ketema (AA)
Addis North Mw Access 13 410 priority PH0
9.04425 38.7421 0 0 Arada Addis North Mw Access 12 95 priority PH0
9.04425 38.7421 A A Arada Addis North Mw Access 12 95 priority PH0
9.04425 38.7421 B B Arada Addis North Mw Access 12 95 priority PH0
9.04425 38.7421 C C Arada Addis North Mw Access 12 95 priority PH0
9.04425 38.7421 X X Arada Addis North Mw Access 12 95 priority PH0
9.05436111 38.7283333 0 0 Gulele Addis North Mw Access 12 410 priority PH0
9.05436111 38.7283333 A A Gulele Addis North Mw Access 12 410 priority PH0
9.05436111 38.7283333 B B Gulele Addis North Mw Access 12 410 priority PH0
9.05436111 38.7283333 C C Gulele Addis North Mw Access 12 410 priority PH0
9.05436111 38.7283333 D D Gulele Addis North Mw Access 12 410 priority PH0
9.05932778 38.7348944 0 0 Gulele Addis North Mw Access 11 410 priority PH0
9.05932778 38.7348944 A A Gulele Addis North Mw Access 11 410 priority PH0
9.05932778 38.7348944 C C Gulele Addis North Mw Access 11 410 priority PH0
9.05932778 38.7348944 B B Gulele Addis North Mw Access 11 410 priority PH0
9.05238 38.7461 0 0 Arada Addis North Mw Hub 10 95 priority PH0
9.05238 38.7461 A A Arada Addis North Mw Hub 10 95 priority PH0
9.05238 38.7461 B B Arada Addis North Mw Hub 10 95 priority PH0
9.05238 38.7461 C C Arada Addis North Mw Hub 10 95 priority PH0
9.06522 38.73102 0 0 Gulele Addis North Mw Access 10 410 priority PH0
9.06522 38.73102 A A Gulele Addis North Mw Access 10 410 priority PH0
9.06522 38.73102 B B Gulele Addis North Mw Access 10 410 priority PH0
9.06278063 38.7194414 0 0 Gulele Addis North Mw Access 10 410 priority PH0
9.06278063 38.7194414 A A Gulele Addis North Mw Access 10 410 priority PH0
9.06278063 38.7194414 B B Gulele Addis North Mw Access 10 410 priority PH0
9.06278063 38.7194414 D D Gulele Addis North Mw Access 10 410 priority PH0
9.06278063 38.7194414 X X Gulele Addis North Mw Access 10 410 priority PH0
9.05575 38.71123 0 0 Kolfe - Keran Addis North Mw Hub 10 410 priority PH0
9.05575 38.71123 A A Kolfe - Keran Addis North Mw Hub 10 410 priority PH0
9.05575 38.71123 B B Kolfe - Keran Addis North Mw Hub 10 410 priority PH0
9.05575 38.71123 C C Kolfe - Keran Addis North Mw Hub 10 410 priority PH0
9.05633017 38.7056208 0 0 Kolfe - Keran Addis North Mw Access 11 664 Priority PH0
9.05633017 38.7056208 A A Kolfe - Keran Addis North Mw Access 11 664 Priority PH0
9.05633017 38.7056208 B B Kolfe - Keran Addis North Mw Access 11 664 Priority PH0
9.05633017 38.7056208 C C Kolfe - Keran Addis North Mw Access 11 664 Priority PH0
9.05633017 38.7056208 D D Kolfe - Keran Addis North Mw Access 11 664 Priority PH0
9.05633017 38.7056208 E E Kolfe - Keran Addis North Mw Access 11 664 Priority PH0
9.05633017 38.7056208 X X Kolfe - Keran Addis North Mw Access 11 664 Priority PH0
8.97589 38.6763 0 0 Kolfe - Keran Addis North Mw Hub 8 95 priority PH0
8.97589 38.6763 A A Kolfe - Keran Addis North Mw Hub 8 95 priority PH0
8.97589 38.6763 B B Kolfe - Keran Addis North Mw Hub 8 95 priority PH0
8.97589 38.6763 C C Kolfe - Keran Addis North Mw Hub 8 95 priority PH0
8.97589 38.6763 D D Kolfe - Keran Addis North Mw Hub 8 95 priority PH0
8.97589 38.6763 E E Kolfe - Keran Addis North Mw Hub 8 95 priority PH0
9.05323 38.69231 0 0 Kolfe - Keran Addis North Mw Access 12 410 priority PH0
9.05323 38.69231 A A Kolfe - Keran Addis North Mw Access 12 410 priority PH0
9.05323 38.69231 B B Kolfe - Keran Addis North Mw Access 12 410 priority PH0
9.05323 38.69231 C C Kolfe - Keran Addis North Mw Access 12 410 priority PH0
9.04635269 38.711918 0 0 Kolfe - Keran Addis North Mw Access 10 410 priority PH0
9.04635269 38.711918 A A Kolfe - Keran Addis North Mw Access 10 410 priority PH0
9.04635269 38.711918 B B Kolfe - Keran Addis North Mw Access 10 410 priority PH0
9.04635269 38.711918 C C Kolfe - Keran Addis North Mw Access 10 410 priority PH0
9.04635269 38.711918 D D Kolfe - Keran Addis North Mw Access 10 410 priority PH0
9.04635269 38.711918 E E Kolfe - Keran Addis North Mw Access 10 410 priority PH0
9.04635269 38.711918 X X Kolfe - Keran Addis North Mw Access 10 410 priority PH0
9.04907778 38.7216361 0 0 Addis Ketema (AA)
Addis North Mw Access 10 664 Priority PH0
9.04907778 38.7216361 A A Addis Ketema (AA)
Addis North Mw Access 10 664 Priority PH0
9.04907778 38.7216361 B B Addis Ketema (AA)
Addis North Mw Access 10 664 Priority PH0
9.01335 38.7542 0 0 Kirkos Addis South Mw Access 7 45 priority PH0
9.01335 38.7542 A A Kirkos Addis South Mw Access 7 45 priority PH0
9.01335 38.7542 B B Kirkos Addis South Mw Access 7 45 priority PH0
9.06428362 38.697774 0 0 Kolfe - Keran Addis North Mw Access 12 664 Priority PH0
9.06428362 38.697774 X X Kolfe - Keran Addis North Mw Access 12 664 Priority PH0
9.06428362 38.697774 A A Kolfe - Keran Addis North Mw Access 12 664 Priority PH0
9.06428362 38.697774 B B Kolfe - Keran Addis North Mw Access 12 664 Priority PH0
9.06428362 38.697774 C C Kolfe - Keran Addis North Mw Access 12 664 Priority PH0
9.01431989 38.8496387 0 0 Bole Addis South Mw Access 10 664 Priority PH0
9.01431989 38.8496387 A A Bole Addis South Mw Access 10 664 Priority PH0
9.01431989 38.8496387 B B Bole Addis South Mw Access 10 664 Priority PH0
9.01431989 38.8496387 C C Bole Addis South Mw Access 10 664 Priority PH0
9.01431989 38.8496387 D D Bole Addis South Mw Access 10 664 Priority PH0
9.01431989 38.8496387 E E Bole Addis South Mw Access 10 664 Priority PH0
9.01431989 38.8496387 X X Bole Addis South Mw Access 10 664 Priority PH0
9.06584894 38.7493149 0 0 Gulele Addis North Mw Access 10 664 Priority PH0
9.06584894 38.7493149 A A Gulele Addis North Mw Access 10 664 Priority PH0
9.06584894 38.7493149 B B Gulele Addis North Mw Access 10 664 Priority PH0
9.06584894 38.7493149 D D Gulele Addis North Mw Access 10 664 Priority PH0
9.06584894 38.7493149 C C Gulele Addis North Mw Access 10 664 Priority PH0
9.05829018 38.7571527 0 0 Gulele Addis North Mw Access 10 664 Priority PH0
9.05829018 38.7571527 A A Gulele Addis North Mw Access 10 664 Priority PH0
9.05829018 38.7571527 B B Gulele Addis North Mw Access 10 664 Priority PH0
9.05829018 38.7571527 C C Gulele Addis North Mw Access 10 664 Priority PH0
9.05829018 38.7571527 D D Gulele Addis North Mw Access 10 664 Priority PH0
9.06931 38.7604 0 0 Gulele Addis North Mw Access 10 95 priority PH0
9.06931 38.7604 A A Gulele Addis North Mw Access 10 95 priority PH0
9.06931 38.7604 C C Gulele Addis North Mw Access 10 95 priority PH0
9.06931 38.7604 D D Gulele Addis North Mw Access 10 95 priority PH0
9.06931 38.7604 E E Gulele Addis North Mw Access 10 95 priority PH0
9.06931 38.7604 B B Gulele Addis North Mw Access 10 95 priority PH0
9.06116 38.7619 0 0 Gulele Addis North Mw Access 11 95 priority PH0
9.06116 38.7619 A A Gulele Addis North Mw Access 11 95 priority PH0
9.06116 38.7619 C C Gulele Addis North Mw Access 11 95 priority PH0
9.06116 38.7619 B B Gulele Addis North Mw Access 11 95 priority PH0
9.04842 38.7519 0 0 Gulele Addis North Mw Access 11 410 priority PH0
9.04842 38.7519 A A Gulele Addis North Mw Access 11 410 priority PH0
9.04842 38.7519 B B Gulele Addis North Mw Access 11 410 priority PH0
9.04842 38.7519 C C Gulele Addis North Mw Access 11 410 priority PH0
9.04842 38.7519 X X Gulele Addis North Mw Access 11 410 priority PH0
9.05525 38.73888 0 0 Gulele Addis North Mw Hub 10 664 Priority PH0
9.05525 38.73888 A A Gulele Addis North Mw Hub 10 664 Priority PH0
9.05525 38.73888 C C Gulele Addis North Mw Hub 10 664 Priority PH0
9.05525 38.73888 D D Gulele Addis North Mw Hub 10 664 Priority PH0
9.05525 38.73888 B B Gulele Addis North Mw Hub 10 664 Priority PH0
9.04624 38.7699 0 0 Yeka Addis North Mw Access 10 95 priority PH0
9.04624 38.7699 A A Yeka Addis North Mw Access 10 95 priority PH0
9.04624 38.7699 B B Yeka Addis North Mw Access 10 95 priority PH0
9.04624 38.7699 C C Yeka Addis North Mw Access 10 95 priority PH0
9.04624 38.7699 D D Yeka Addis North Mw Access 10 95 priority PH0
9.04624 38.7699 X X Yeka Addis North Mw Access 10 95 priority PH0
9.03542974 38.7728777 0 0 Arada Addis North Mw Access 10 410 priority PH0
9.03542974 38.7728777 A A Arada Addis North Mw Access 10 410 priority PH0
9.03542974 38.7728777 B B Arada Addis North Mw Access 10 410 priority PH0
9.03542974 38.7728777 C C Arada Addis North Mw Access 10 410 priority PH0
9.03205 38.7708 A A Arada Addis North Mw Access 11 95 priority PH0
9.03205 38.7708 B B Arada Addis North Mw Access 11 95 priority PH0
9.03205 38.7708 C C Arada Addis North Mw Access 11 95 priority PH0
9.03205 38.7708 D D Arada Addis North Mw Access 11 95 priority PH0
9.03205 38.7708 T T Arada Addis North Mw Access 11 95 priority PH0
9.02369444 38.7678583 0 0 Yeka Addis North Mw Access 8 664 Priority PH0
9.02369444 38.7678583 B B Yeka Addis North Mw Access 8 664 Priority PH0
9.02369444 38.7678583 X X Yeka Addis North Mw Access 8 664 Priority PH0
9.01603 38.77204 0 0 Kirkos Addis South Mw Access 7 664 Priority PH0
9.01603 38.77204 A A Kirkos Addis South Mw Access 7 664 Priority PH0
9.01603 38.77204 B B Kirkos Addis South Mw Access 7 664 Priority PH0
9.01603 38.77204 C C Kirkos Addis South Mw Access 7 664 Priority PH0
9.0176 38.7815 0 0 Yeka Addis North Mw Access 9 75 Priority PH0
9.0176 38.7815 A A Yeka Addis North Mw Access 9 75 Priority PH0
9.0176 38.7815 B B Yeka Addis North Mw Access 9 75 Priority PH0
9.0176 38.7815 C C Yeka Addis North Mw Access 9 75 Priority PH0
9.0176 38.7815 X X Yeka Addis North Mw Access 9 75 Priority PH0
9.02187 38.7885 0 0 Yeka Addis North Mw Access 9 95 priority PH0
9.02187 38.7885 A A Yeka Addis North Mw Access 9 95 priority PH0
9.02187 38.7885 B B Yeka Addis North Mw Access 9 95 priority PH0
9.02187 38.7885 P P Yeka Addis North Mw Access 9 95 priority PH0
9.01978 38.8008 0 0 Yeka Addis North Mw Access 9 95 priority PH0
9.01978 38.8008 X X Yeka Addis North Mw Access 9 95 priority PH0
9.01978 38.8008 A A Yeka Addis North Mw Access 9 95 priority PH0
9.01978 38.8008 B B Yeka Addis North Mw Access 9 95 priority PH0
9.01978 38.8008 C C Yeka Addis North Mw Access 9 95 priority PH0
9.03063 38.7775 0 0 Arada Addis North Mw Access 10 95 priority PH0
9.03063 38.7775 A A Arada Addis North Mw Access 10 95 priority PH0
9.03063 38.7775 B B Arada Addis North Mw Access 10 95 priority PH0
9.03063 38.7775 C C Arada Addis North Mw Access 10 95 priority PH0
9.03063 38.7775 D D Arada Addis North Mw Access 10 95 priority PH0
9.03063 38.7775 X X Arada Addis North Mw Access 10 95 priority PH0
9.04273 38.775 0 0 Yeka Addis North Mw Access 11 95 priority PH0
9.04273 38.775 A A Yeka Addis North Mw Access 11 95 priority PH0
9.04273 38.775 B B Yeka Addis North Mw Access 11 95 priority PH0
9.05204 38.7801 0 0 Yeka Addis North Mw Access 12 95 priority PH0
9.05204 38.7801 A A Yeka Addis North Mw Access 12 95 priority PH0
9.05204 38.7801 B B Yeka Addis North Mw Access 12 95 priority PH0
9.05204 38.7801 C C Yeka Addis North Mw Access 12 95 priority PH0
9.05204 38.7801 D D Yeka Addis North Mw Access 12 95 priority PH0
9.05204 38.7801 E E Yeka Addis North Mw Access 12 95 priority PH0
9.05204 38.7801 F F Yeka Addis North Mw Access 12 95 priority PH0
9.06444 38.76917 0 0 Yeka Addis North Mw Access 10 410 priority PH0
9.06444 38.76917 X X Yeka Addis North Mw Access 10 410 priority PH0
9.06444 38.76917 A A Yeka Addis North Mw Access 10 410 priority PH0
9.06444 38.76917 C C Yeka Addis North Mw Access 10 410 priority PH0
9.06444 38.76917 E E Yeka Addis North Mw Access 10 410 priority PH0
9.06444 38.76917 F F Yeka Addis North Mw Access 10 410 priority PH0
9.06444 38.76917 D D Yeka Addis North Mw Access 10 410 priority PH0
9.06444 38.76917 B B Yeka Addis North Mw Access 10 410 priority PH0
9.05905 38.7893 0 0 Yeka Addis North Mw Access 12 95 priority PH0
9.05905 38.7893 A A Yeka Addis North Mw Access 12 95 priority PH0
9.05905 38.7893 B B Yeka Addis North Mw Access 12 95 priority PH0
9.05905 38.7893 C C Yeka Addis North Mw Access 12 95 priority PH0
9.05905 38.7893 T T Yeka Addis North Mw Access 12 95 priority PH0
8.98612 38.7606 0 0 Kirkos Addis South Mw Hub 4 45 priority PH0
8.98612 38.7606 A A Kirkos Addis South Mw Hub 4 45 priority PH0
8.98612 38.7606 B B Kirkos Addis South Mw Hub 4 45 priority PH0
9.02459 38.7954 0 0 Yeka Addis North Mw Access 9 75 Priority PH0
9.02459 38.7954 A A Yeka Addis North Mw Access 9 75 Priority PH0
9.02459 38.7954 B B Yeka Addis North Mw Access 9 75 Priority PH0
9.02459 38.7954 C C Yeka Addis North Mw Access 9 75 Priority PH0
9.02459 38.7954 D D Yeka Addis North Mw Access 9 75 Priority PH0
9.00825 38.7874 0 0 Bole Addis South Mw Access 9 75 Priority PH0
9.00825 38.7874 A A Bole Addis South Mw Access 9 75 Priority PH0
9.00825 38.7874 B B Bole Addis South Mw Access 9 75 Priority PH0
9.00825 38.7874 C C Bole Addis South Mw Access 9 75 Priority PH0
9.00825 38.7874 D D Bole Addis South Mw Access 9 75 Priority PH0
9.00825 38.7874 E E Bole Addis South Mw Access 9 75 Priority PH0
9.00671667 38.7989472 0 0 Bole Addis South Mw Access 7 664 Priority PH0
9.00671667 38.7989472 A A Bole Addis South Mw Access 7 664 Priority PH0
9.00671667 38.7989472 B B Bole Addis South Mw Access 7 664 Priority PH0
9.00671667 38.7989472 X X Bole Addis South Mw Access 7 664 Priority PH0
9.01948 38.8144 A A Bole Addis South Mw Access 8 95 priority PH0
9.01948 38.8144 B B Bole Addis South Mw Access 8 95 priority PH0
9.01948 38.8144 C C Bole Addis South Mw Access 8 95 priority PH0
9.01948 38.8144 D D Bole Addis South Mw Access 8 95 priority PH0
9.01948 38.8144 E E Bole Addis South Mw Access 8 95 priority PH0
9.01948 38.8144 F F Bole Addis South Mw Access 8 95 priority PH0
9.01948 38.8144 G G Bole Addis South Mw Access 8 95 priority PH0
9.01948 38.8144 H H Bole Addis South Mw Access 8 95 priority PH0
9.00368 38.8116 A A Bole Addis South Mw Hub 6 75 Priority PH0
9.00368 38.8116 B B Bole Addis South Mw Hub 6 75 Priority PH0
9.00368 38.8116 C C Bole Addis South Mw Hub 6 75 Priority PH0
9.00368 38.8116 T T Bole Addis South Mw Hub 6 75 Priority PH0
9.00368 38.8116 P P Bole Addis South Mw Hub 6 75 Priority PH0
9.01207 38.7961 0 0 Bole Addis South Mw Access 9 95 priority PH0
9.01207 38.7961 A A Bole Addis South Mw Access 9 95 priority PH0
9.01207 38.7961 X X Bole Addis South Mw Access 9 95 priority PH0
9.01207 38.7961 C C Bole Addis South Mw Access 9 95 priority PH0
9.01207 38.7961 B B Bole Addis South Mw Access 9 95 priority PH0
8.99803 38.8209 0 0 Bole Addis South Mw Hub 8 95 priority PH0
8.99803 38.8209 A A Bole Addis South Mw Hub 8 95 priority PH0
8.99803 38.8209 B B Bole Addis South Mw Hub 8 95 priority PH0
8.99803 38.8209 T T Bole Addis South Mw Hub 8 95 priority PH0
8.98542 38.83385 0 0 Bole Addis South Mw Hub 9 410 priority PH0
8.98542 38.83385 A A Bole Addis South Mw Hub 9 410 priority PH0
8.98542 38.83385 C C Bole Addis South Mw Hub 9 410 priority PH0
8.98542 38.83385 B B Bole Addis South Mw Hub 9 410 priority PH0
8.99404042 38.82922 0 0 Bole Addis South Mw Access 10 664 Priority PH0
8.99404042 38.82922 A A Bole Addis South Mw Access 10 664 Priority PH0
8.99404042 38.82922 B B Bole Addis South Mw Access 10 664 Priority PH0
8.99404042 38.82922 X X Bole Addis South Mw Access 10 664 Priority PH0
9.02108 38.7654 0 0 Kirkos Addis South Mw Access 7 45 priority PH0
9.02108 38.7654 A A Kirkos Addis South Mw Access 7 45 priority PH0
9.02108 38.7654 B B Kirkos Addis South Mw Access 7 45 priority PH0
9.02108 38.7654 C C Kirkos Addis South Mw Access 7 45 priority PH0
9.00879 38.85179 0 0 Bole Addis South Mw Access 10 664 Priority PH0
9.00879 38.85179 A A Bole Addis South Mw Access 10 664 Priority PH0
9.00879 38.85179 B B Bole Addis South Mw Access 10 664 Priority PH0
9.00879 38.85179 C C Bole Addis South Mw Access 10 664 Priority PH0
9.00607 38.8348 0 0 Bole Addis South Mw Access 9 95 priority PH0
9.00607 38.8348 A A Bole Addis South Mw Access 9 95 priority PH0
9.00607 38.8348 B B Bole Addis South Mw Access 9 95 priority PH0
9.00607 38.8348 C C Bole Addis South Mw Access 9 95 priority PH0
9.00607 38.8348 D D Bole Addis South Mw Access 9 95 priority PH0
9.00607 38.8348 X X Bole Addis South Mw Access 9 95 priority PH0
9.03255401 38.6937181 0 0 Kolfe - Keran Addis North Mw Access 11 410 priority PH0
9.03255401 38.6937181 A A Kolfe - Keran Addis North Mw Access 11 410 priority PH0
9.03255401 38.6937181 B B Kolfe - Keran Addis North Mw Access 11 410 priority PH0
9.03255401 38.6937181 C C Kolfe - Keran Addis North Mw Access 11 410 priority PH0
9.03255401 38.6937181 X X Kolfe - Keran Addis North Mw Access 11 410 priority PH0
9.02865 38.7137 0 0 Kolfe - Keran Addis North Mw Access 8 95 priority PH0
9.02865 38.7137 A A Kolfe - Keran Addis North Mw Access 8 95 priority PH0
9.02865 38.7137 B B Kolfe - Keran Addis North Mw Access 8 95 priority PH0
9.02865 38.7137 C C Kolfe - Keran Addis North Mw Access 8 95 priority PH0
9.01843 38.7166 0 0 Kolfe - Keran Addis North Mw Access 8 75 Priority PH0
9.01843 38.7166 A A Kolfe - Keran Addis North Mw Access 8 75 Priority PH0
9.01843 38.7166 C C Kolfe - Keran Addis North Mw Access 8 75 Priority PH0
9.00907 38.68022 0 0 Kolfe - Keran Addis North Mw Access 9 410 priority PH0
9.00907 38.68022 A A Kolfe - Keran Addis North Mw Access 9 410 priority PH0
9.00907 38.68022 B B Kolfe - Keran Addis North Mw Access 9 410 priority PH0
9.00907 38.68022 C C Kolfe - Keran Addis North Mw Access 9 410 priority PH0
9.01913 38.69427 0 0 Kolfe - Keran Addis North Mw Access 10 410 priority PH0
9.01913 38.69427 A A Kolfe - Keran Addis North Mw Access 10 410 priority PH0
9.01913 38.69427 B B Kolfe - Keran Addis North Mw Access 10 410 priority PH0
9.00455 38.69918 0 0 Kolfe - Keran Addis North Mw Access 8 410 priority PH0
9.00455 38.69918 A A Kolfe - Keran Addis North Mw Access 8 410 priority PH0
9.00455 38.69918 B B Kolfe - Keran Addis North Mw Access 8 410 priority PH0
9.00455 38.69918 C C Kolfe - Keran Addis North Mw Access 8 410 priority PH0
8.95992 38.7856 0 0 Bole Addis South Mw Hub 3 45 priority PH0
8.95992 38.7856 A A Bole Addis South Mw Hub 3 45 priority PH0
8.95992 38.7856 B B Bole Addis South Mw Hub 3 45 priority PH0
8.95992 38.7856 C C Bole Addis South Mw Hub 3 45 priority PH0
8.95992 38.7856 D D Bole Addis South Mw Hub 3 45 priority PH0
8.95992 38.7856 F F Bole Addis South Mw Hub 3 45 priority PH0
8.95992 38.7856 E E Bole Addis South Mw Hub 3 45 priority PH0
8.98549 38.7744 0 0 Bole Addis South Mw Access 6 45 priority PH0
8.98549 38.7744 A A Bole Addis South Mw Access 6 45 priority PH0
8.98549 38.7744 B B Bole Addis South Mw Access 6 45 priority PH0
8.98549 38.7744 X X Bole Addis South Mw Access 6 45 priority PH0
8.99341 38.7667 A A Kirkos Addis South Mw Access 6 45 priority PH0
8.99341 38.7667 B B Kirkos Addis South Mw Access 6 45 priority PH0
8.99341 38.7667 C C Kirkos Addis South Mw Access 6 45 priority PH0
8.99629 38.7722 0 0 Kirkos Addis South Mw Hub 5 45 priority PH0
8.99629 38.7722 A A Kirkos Addis South Mw Hub 5 45 priority PH0
8.99629 38.7722 C C Kirkos Addis South Mw Hub 5 45 priority PH0
8.99629 38.7722 D D Kirkos Addis South Mw Hub 5 45 priority PH0
8.99629 38.7722 E E Kirkos Addis South Mw Hub 5 45 priority PH0
8.99629 38.7722 B B Kirkos Addis South Mw Hub 5 45 priority PH0
8.98976 38.7849 A A Bole Addis South Mw Access 9 45 priority PH0
8.98976 38.7849 B B Bole Addis South Mw Access 9 45 priority PH0
8.98976 38.7849 C C Bole Addis South Mw Access 9 45 priority PH0
8.98976 38.7849 D D Bole Addis South Mw Access 9 45 priority PH0
8.98976 38.7849 T T Bole Addis South Mw Access 9 45 priority PH0
8.99886 38.778 0 0 Bole Addis South Mw Access 6 95 priority PH0
8.99886 38.778 A A Bole Addis South Mw Access 6 95 priority PH0
8.99886 38.778 C C Bole Addis South Mw Access 6 95 priority PH0
8.99886 38.778 B B Bole Addis South Mw Access 6 95 priority PH0
8.995475 38.759283 0 0 Kirkos Addis South Mw Access 6 410 priority PH0
8.995475 38.759283 A A Kirkos Addis South Mw Access 6 410 priority PH0
8.99182 38.7338 0 0 Nefas Silk Addis South Mw Access 6 75 Priority PH0
8.99182 38.7338 A A Nefas Silk Addis South Mw Access 6 75 Priority PH0
8.99182 38.7338 C C Nefas Silk Addis South Mw Access 6 75 Priority PH0
8.99182 38.7338 B B Nefas Silk Addis South Mw Access 6 75 Priority PH0
9.01714 38.8075 0 0 Bole Addis South Mw Access 8 95 priority PH0
9.01714 38.8075 A A Bole Addis South Mw Access 8 95 priority PH0
9.01714 38.8075 B B Bole Addis South Mw Access 8 95 priority PH0
8.99671 38.7436 0 0 Kirkos Addis South Mw Access 7 95 priority PH0
8.99671 38.7436 A A Kirkos Addis South Mw Access 7 95 priority PH0
8.99671 38.7436 B B Kirkos Addis South Mw Access 7 95 priority PH0
8.99671 38.7436 C C Kirkos Addis South Mw Access 7 95 priority PH0
9.00574 38.716 0 0 Lideta Addis North Mw Hub 6 75 Priority PH0
9.00574 38.716 B B Lideta Addis North Mw Hub 6 75 Priority PH0
9.00574 38.716 A A Lideta Addis North Mw Hub 6 75 Priority PH0
9.00574 38.716 C C Lideta Addis North Mw Hub 6 75 Priority PH0
8.99743 38.7033 0 0 Kolfe - Keran Addis North Mw Access 9 75 Priority PH0
8.99743 38.7033 A A Kolfe - Keran Addis North Mw Access 9 75 Priority PH0
8.99743 38.7033 B B Kolfe - Keran Addis North Mw Access 9 75 Priority PH0
8.99743 38.7033 C C Kolfe - Keran Addis North Mw Access 9 75 Priority PH0
8.99743 38.7033 X X Kolfe - Keran Addis North Mw Access 9 75 Priority PH0
8.97943 38.71379 0 0 Kolfe - Keran Addis North Mw Access 8 664 Priority PH0
8.97943 38.71379 B B Kolfe - Keran Addis North Mw Access 8 664 Priority PH0
8.97943 38.71379 C C Kolfe - Keran Addis North Mw Access 8 664 Priority PH0
8.97943 38.71379 D D Kolfe - Keran Addis North Mw Access 8 664 Priority PH0
8.98586 38.7297 0 0 Nefas Silk Addis South Mw Access 6 75 Priority PH0
8.98586 38.7297 X X Nefas Silk Addis South Mw Access 6 75 Priority PH0
8.98586 38.7297 A A Nefas Silk Addis South Mw Access 6 75 Priority PH0
8.98586 38.7297 C C Nefas Silk Addis South Mw Access 6 75 Priority PH0
8.98586 38.7297 D D Nefas Silk Addis South Mw Access 6 75 Priority PH0
8.98586 38.7297 E E Nefas Silk Addis South Mw Access 6 75 Priority PH0
8.98586 38.7297 F F Nefas Silk Addis South Mw Access 6 75 Priority PH0
8.98586 38.7297 B B Nefas Silk Addis South Mw Access 6 75 Priority PH0
9.03304 38.6851 0 0 Kolfe - Keran Addis North Mw Access 10 410 priority PH0
9.03304 38.6851 X X Kolfe - Keran Addis North Mw Access 10 410 priority PH0
9.03304 38.6851 A A Kolfe - Keran Addis North Mw Access 10 410 priority PH0
9.03304 38.6851 B B Kolfe - Keran Addis North Mw Access 10 410 priority PH0
9.03304 38.6851 C C Kolfe - Keran Addis North Mw Access 10 410 priority PH0
9.02781 38.8324 0 0 Yeka Addis North Mw Access 10 664 Priority PH0
9.02781 38.8324 A A Yeka Addis North Mw Access 10 664 Priority PH0
9.02781 38.8324 B B Yeka Addis North Mw Access 10 664 Priority PH0
9.03447 38.8357 0 0 Yeka Addis North Mw Access 9 95 priority PH0
9.03447 38.8357 A A Yeka Addis North Mw Access 9 95 priority PH0
9.03447 38.8357 B B Yeka Addis North Mw Access 9 95 priority PH0
9.02832 38.8485 0 0 Yeka Addis North Mw Access 10 95 priority PH0
9.02832 38.8485 X X Yeka Addis North Mw Access 10 95 priority PH0
9.02832 38.8485 A A Yeka Addis North Mw Access 10 95 priority PH0
9.02832 38.8485 C C Yeka Addis North Mw Access 10 95 priority PH0
9.02832 38.8485 B B Yeka Addis North Mw Access 10 95 priority PH0
9.069044 38.716226 0 0 Gulele Addis North Mw Access 9 410 priority PH0
9.069044 38.716226 A A Gulele Addis North Mw Access 9 410 priority PH0
9.069044 38.716226 B B Gulele Addis North Mw Access 9 410 priority PH0
9.069044 38.716226 C C Gulele Addis North Mw Access 9 410 priority PH0
8.89584 38.80458 0 0 Akaki - Kalit Addis South Mw Hub 5 410 priority PH0
8.89584 38.80458 A A Akaki - Kalit Addis South Mw Hub 5 410 priority PH0
8.89584 38.80458 B B Akaki - Kalit Addis South Mw Hub 5 410 priority PH0
8.89584 38.80458 D D Akaki - Kalit Addis South Mw Hub 5 410 priority PH0
8.89584 38.80458 C C Akaki - Kalit Addis South Mw Hub 5 410 priority PH0
9.0167 38.7504 0 0 Lideta Addis North Mw Access 12 75 Priority PH0
9.0167 38.7504 A A Lideta Addis North Mw Access 12 75 Priority PH0
9.0167 38.7504 B B Lideta Addis North Mw Access 12 75 Priority PH0
9.01155 38.7561 0 0 Kirkos Addis South Mw Access 8 45 priority PH0
9.01155 38.7561 A A Kirkos Addis South Mw Access 8 45 priority PH0
9.01155 38.7561 B B Kirkos Addis South Mw Access 8 45 priority PH0
9.01155 38.7561 C C Kirkos Addis South Mw Access 8 45 priority PH0
9.01232 38.7624 0 0 Kirkos Addis South Mw Access 7 45 priority PH0
9.01232 38.7624 A A Kirkos Addis South Mw Access 7 45 priority PH0
9.01232 38.7624 B B Kirkos Addis South Mw Access 7 45 priority PH0
9.01232 38.7624 C C Kirkos Addis South Mw Access 7 45 priority PH0
9.00198 38.7694 0 0 Kirkos Addis South Mw Access 7 45 priority PH0
9.00198 38.7694 A A Kirkos Addis South Mw Access 7 45 priority PH0
9.00198 38.7694 B B Kirkos Addis South Mw Access 7 45 priority PH0
9.00198 38.7694 C C Kirkos Addis South Mw Access 7 45 priority PH0
9.00198 38.7694 D D Kirkos Addis South Mw Access 7 45 priority PH0
8.99046 38.7731 0 0 Kirkos Addis South Mw Access 5 45 priority PH0
8.99046 38.7731 A A Kirkos Addis South Mw Access 5 45 priority PH0
8.99046 38.7731 B B Kirkos Addis South Mw Access 5 45 priority PH0
8.99046 38.7731 C C Kirkos Addis South Mw Access 5 45 priority PH0
8.99046 38.7731 D D Kirkos Addis South Mw Access 5 45 priority PH0
8.99046 38.7731 E E Kirkos Addis South Mw Access 5 45 priority PH0
8.99046 38.7731 F F Kirkos Addis South Mw Access 5 45 priority PH0
8.99243 38.78871 0 0 Bole Addis South Mw Access 7 664 Priority PH0
8.99243 38.78871 A A Bole Addis South Mw Access 7 664 Priority PH0
8.99243 38.78871 C C Bole Addis South Mw Access 7 664 Priority PH0
8.99243 38.78871 B B Bole Addis South Mw Access 7 664 Priority PH0
8.98547222 38.7853611 0 0 Bole Addis South Mw Access 5 664 Priority PH0
8.98547222 38.7853611 X X Bole Addis South Mw Access 5 664 Priority PH0
8.98547222 38.7853611 A A Bole Addis South Mw Access 5 664 Priority PH0
8.98547222 38.7853611 B B Bole Addis South Mw Access 5 664 Priority PH0
8.99623 38.7857 0 0 Bole Addis South Mw Access 9 45 priority PH0
8.99623 38.7857 A A Bole Addis South Mw Access 9 45 priority PH0
8.99623 38.7857 B B Bole Addis South Mw Access 9 45 priority PH0
8.99623 38.7857 C C Bole Addis South Mw Access 9 45 priority PH0
8.99623 38.7857 D D Bole Addis South Mw Access 9 45 priority PH0
8.98838 38.7917 0 0 Bole Addis South Mw Access 6 75 Priority PH0
8.98838 38.7917 A A Bole Addis South Mw Access 6 75 Priority PH0
8.98838 38.7917 B B Bole Addis South Mw Access 6 75 Priority PH0
8.98838 38.7917 C C Bole Addis South Mw Access 6 75 Priority PH0
8.96479 38.84068 0 0 Bole Addis South Mw Access 10 410 priority PH0
8.96479 38.84068 A A Bole Addis South Mw Access 10 410 priority PH0
8.96479 38.84068 B B Bole Addis South Mw Access 10 410 priority PH0
8.96479 38.84068 C C Bole Addis South Mw Access 10 410 priority PH0
8.87604 38.822382 0 0 Akaki - Kalit Addis South Mw Access 7 664 Priority PH0
8.87604 38.822382 A A Akaki - Kalit Addis South Mw Access 7 664 Priority PH0
8.87604 38.822382 B B Akaki - Kalit Addis South Mw Access 7 664 Priority PH0
8.87604 38.822382 X X Akaki - Kalit Addis South Mw Access 7 664 Priority PH0
8.87604 38.822382 C C Akaki - Kalit Addis South Mw Access 7 664 Priority PH0
9.06463 38.87683 0 0 Yeka Addis North Mw Access 17 664 Priority PH0
9.06463 38.87683 X X Yeka Addis North Mw Access 17 664 Priority PH0
9.06463 38.87683 A A Yeka Addis North Mw Access 17 664 Priority PH0
9.06463 38.87683 C C Yeka Addis North Mw Access 17 664 Priority PH0
9.06463 38.87683 D D Yeka Addis North Mw Access 17 664 Priority PH0
9.06463 38.87683 B B Yeka Addis North Mw Access 17 664 Priority PH0
8.87222 38.8146 A A Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.87222 38.8146 B B Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.87222 38.8146 C C Akaki - Kalit Addis South Mw Access 6 410 priority PH0
8.8601 38.80664 0 0 Akaki - Kalit Addis South Mw Access 4 410 priority PH0
8.8601 38.80664 A A Akaki - Kalit Addis South Mw Access 4 410 priority PH0
8.8601 38.80664 C C Akaki - Kalit Addis South Mw Access 4 410 priority PH0
8.8601 38.80664 B B Akaki - Kalit Addis South Mw Access 4 410 priority PH0
8.98761 38.78 0 0 Bole Addis South Mw Access 7 45 priority PH0
8.98761 38.78 A A Bole Addis South Mw Access 7 45 priority PH0
8.98761 38.78 B B Bole Addis South Mw Access 7 45 priority PH0
8.90917 38.7626 0 0 Akaki - Kalit Addis South Mw Hub 1 45 priority PH0
8.90917 38.7626 A A Akaki - Kalit Addis South Mw Hub 1 45 priority PH0
8.90917 38.7626 B B Akaki - Kalit Addis South Mw Hub 1 45 priority PH0
8.90917 38.7626 C C Akaki - Kalit Addis South Mw Hub 1 45 priority PH0
8.98123 38.6844 0 0 Kolfe - Keran Addis North Mw Hub 7 75 Priority PH0
8.98123 38.6844 A A Kolfe - Keran Addis North Mw Hub 7 75 Priority PH0
8.98123 38.6844 B B Kolfe - Keran Addis North Mw Hub 7 75 Priority PH0
8.98123 38.6844 C C Kolfe - Keran Addis North Mw Hub 7 75 Priority PH0
8.98123 38.6844 D D Kolfe - Keran Addis North Mw Hub 7 75 Priority PH0
8.98123 38.6844 P P Kolfe - Keran Addis North Mw Hub 7 75 Priority PH0
9.00316 38.7465 0 0 Kirkos Addis South Mw Access 7 75 Priority PH0
9.00316 38.7465 A A Kirkos Addis South Mw Access 7 75 Priority PH0
9.00316 38.7465 B B Kirkos Addis South Mw Access 7 75 Priority PH0
9.00316 38.7465 C C Kirkos Addis South Mw Access 7 75 Priority PH0
9.016806 38.701861 0 0 Kolfe - Keran Addis North Mw Access 7 410 priority PH0
9.016806 38.701861 A A Kolfe - Keran Addis North Mw Access 7 410 priority PH0
9.016806 38.701861 B B Kolfe - Keran Addis North Mw Access 7 410 priority PH0
9.016806 38.701861 C C Kolfe - Keran Addis North Mw Access 7 410 priority PH0
9.016806 38.701861 D D Kolfe - Keran Addis North Mw Access 7 410 priority PH0
9.016806 38.701861 E E Kolfe - Keran Addis North Mw Access 7 410 priority PH0
9.05218 38.6998 0 0 Kolfe - Keran Addis North Mw Access 11 410 priority PH0
9.05218 38.6998 A A Kolfe - Keran Addis North Mw Access 11 410 priority PH0
9.05218 38.6998 B B Kolfe - Keran Addis North Mw Access 11 410 priority PH0
9.05218 38.6998 C C Kolfe - Keran Addis North Mw Access 11 410 priority PH0
9.05218 38.6998 D D Kolfe - Keran Addis North Mw Access 11 410 priority PH0
9.05218 38.6998 X X Kolfe - Keran Addis North Mw Access 11 410 priority PH0
9.04653 38.70449 0 0 Kolfe - Keran Addis North Mw Access 11 410 priority PH0
9.04653 38.70449 A A Kolfe - Keran Addis North Mw Access 11 410 priority PH0
9.04653 38.70449 B B Kolfe - Keran Addis North Mw Access 11 410 priority PH0
9.04653 38.70449 X X Kolfe - Keran Addis North Mw Access 11 410 priority PH0
9.053286 38.7198 0 0 Gulele Addis North Mw Access 9 410 priority PH0
9.053286 38.7198 A A Gulele Addis North Mw Access 9 410 priority PH0
9.053286 38.7198 B B Gulele Addis North Mw Access 9 410 priority PH0
9.05072 38.709879 0 0 Kolfe - Keran Addis North Mw Hub 9 664 Priority PH0
9.05072 38.709879 A A Kolfe - Keran Addis North Mw Hub 9 664 Priority PH0
9.05072 38.709879 B B Kolfe - Keran Addis North Mw Hub 9 664 Priority PH0
9.05072 38.709879 C C Kolfe - Keran Addis North Mw Hub 9 664 Priority PH0
9.05072 38.709879 D D Kolfe - Keran Addis North Mw Hub 9 664 Priority PH0
9.05072 38.709879 E E Kolfe - Keran Addis North Mw Hub 9 664 Priority PH0
8.9508 38.7416 0 0 Nefas Silk Addis South Mw Access 4 95 priority PH0
8.9508 38.7416 A A Nefas Silk Addis South Mw Access 4 95 priority PH0
8.9508 38.7416 B B Nefas Silk Addis South Mw Access 4 95 priority PH0
8.9508 38.7416 C C Nefas Silk Addis South Mw Access 4 95 priority PH0
8.9508 38.7416 D D Nefas Silk Addis South Mw Access 4 95 priority PH0
9.01432 38.71203 0 0 Kolfe - Keran Addis North Mw Access 8 664 Priority PH0
9.01432 38.71203 A A Kolfe - Keran Addis North Mw Access 8 664 Priority PH0
9.01432 38.71203 B B Kolfe - Keran Addis North Mw Access 8 664 Priority PH0
9.01432 38.71203 C C Kolfe - Keran Addis North Mw Access 8 664 Priority PH0
9.01182 38.7265 0 0 Lideta Addis North Mw Access 8 75 Priority PH0
9.01182 38.7265 A A Lideta Addis North Mw Access 8 75 Priority PH0
9.01182 38.7265 C C Lideta Addis North Mw Access 8 75 Priority PH0
9.01553 38.7376 0 0 Lideta Addis North Mw Access 8 95 priority PH0
9.01553 38.7376 A A Lideta Addis North Mw Access 8 95 priority PH0
9.01553 38.7376 D D Lideta Addis North Mw Access 8 95 priority PH0
9.01553 38.7376 X X Lideta Addis North Mw Access 8 95 priority PH0
9.01553 38.7376 B B Lideta Addis North Mw Access 8 95 priority PH0
9.01553 38.7376 C C Lideta Addis North Mw Access 8 95 priority PH0
8.95195 38.7867 0 0 Bole Addis South Mw Access 3 45 priority PH0
8.95195 38.7867 A A Bole Addis South Mw Access 3 45 priority PH0
8.95195 38.7867 B B Bole Addis South Mw Access 3 45 priority PH0
9.01382 38.74755 0 0 Lideta Addis South Mw Access 7 410 priority PH0
9.01382 38.74755 A A Lideta Addis South Mw Access 7 410 priority PH0
9.01382 38.74755 B B Lideta Addis South Mw Access 7 410 priority PH0
9.01382 38.74755 C C Lideta Addis South Mw Access 7 410 priority PH0
9.01607 38.7996 0 0 Bole Addis South Mw Access 10 95 priority PH0
9.01607 38.7996 A A Bole Addis South Mw Access 10 95 priority PH0
9.01607 38.7996 C C Bole Addis South Mw Access 10 95 priority PH0
9.01607 38.7996 D D Bole Addis South Mw Access 10 95 priority PH0
9.01607 38.7996 B B Bole Addis South Mw Access 10 95 priority PH0
9.01391 38.8371 0 0 Bole Addis South Mw Access 9 95 priority PH0
9.01391 38.8371 A A Bole Addis South Mw Access 9 95 priority PH0
9.01391 38.8371 C C Bole Addis South Mw Access 9 95 priority PH0
9.01391 38.8371 B B Bole Addis South Mw Access 9 95 priority PH0
9.01636 38.87283 0 0 Bole Addis South Mw Hub 11 410 priority PH0
9.01636 38.87283 A A Bole Addis South Mw Hub 11 410 priority PH0
9.01636 38.87283 B B Bole Addis South Mw Hub 11 410 priority PH0
9.01636 38.87283 C C Bole Addis South Mw Hub 11 410 priority PH0
9.01636 38.87283 D D Bole Addis South Mw Hub 11 410 priority PH0
9.01636 38.87283 E E Bole Addis South Mw Hub 11 410 priority PH0
9.04605512 38.8577415 0 0 Yeka Addis North Mw Access 10 664 Priority PH0
9.04605512 38.8577415 X X Yeka Addis North Mw Access 10 664 Priority PH0
9.04605512 38.8577415 A A Yeka Addis North Mw Access 10 664 Priority PH0
9.04605512 38.8577415 B B Yeka Addis North Mw Access 10 664 Priority PH0
9.04605512 38.8577415 C C Yeka Addis North Mw Access 10 664 Priority PH0
9.04605512 38.8577415 D D Yeka Addis North Mw Access 10 664 Priority PH0
8.98366993 38.8602523 0 0 Bole Addis South Mw Access 10 410 priority PH0
8.98366993 38.8602523 A A Bole Addis South Mw Access 10 410 priority PH0
8.98366993 38.8602523 B B Bole Addis South Mw Access 10 410 priority PH0
8.850949 38.811851 0 0 Akaki - Kalit Addis South Mw Access 2 410 priority PH0
8.850949 38.811851 A A Akaki - Kalit Addis South Mw Access 2 410 priority PH0
8.850949 38.811851 B B Akaki - Kalit Addis South Mw Access 2 410 priority PH0
8.850949 38.811851 C C Akaki - Kalit Addis South Mw Access 2 410 priority PH0
8.95934019 38.7709014 0 0 Nefas Silk Addis South Mw Access 5 410 priority PH0
8.95934019 38.7709014 A A Nefas Silk Addis South Mw Access 5 410 priority PH0
8.95934019 38.7709014 B B Nefas Silk Addis South Mw Access 5 410 priority PH0
8.95934019 38.7709014 D D Nefas Silk Addis South Mw Access 5 410 priority PH0
8.95934019 38.7709014 X X Nefas Silk Addis South Mw Access 5 410 priority PH0
8.9649296 38.7437096 0 0 Nefas Silk Addis South Mw Access 4 410 priority PH0
8.9649296 38.7437096 A A Nefas Silk Addis South Mw Access 4 410 priority PH0
8.9649296 38.7437096 B B Nefas Silk Addis South Mw Access 4 410 priority PH0
9.0298 38.7522 0 0 Arada Addis North Mw Access 10 75 Priority PH0
9.0298 38.7522 A A Arada Addis North Mw Access 10 75 Priority PH0
9.0298 38.7522 B B Arada Addis North Mw Access 10 75 Priority PH0
9.0298 38.7522 C C Arada Addis North Mw Access 10 75 Priority PH0
9.03459 38.748 0 0 Arada Addis North Mw Access 10 75 Priority PH0
9.03459 38.748 A A Arada Addis North Mw Access 10 75 Priority PH0
9.03459 38.748 B B Arada Addis North Mw Access 10 75 Priority PH0
9.03459 38.748 C C Arada Addis North Mw Access 10 75 Priority PH0
9.02842 38.7559 0 0 Arada Addis North Mw Hub 7 45 priority PH0
9.02842 38.7559 A A Arada Addis North Mw Hub 7 45 priority PH0
9.02842 38.7559 B B Arada Addis North Mw Hub 7 45 priority PH0
9.02842 38.7559 C C Arada Addis North Mw Hub 7 45 priority PH0
9.02842 38.7559 D D Arada Addis North Mw Hub 7 45 priority PH0
9.02842 38.7559 E E Arada Addis North Mw Hub 7 45 priority PH0
9.02842 38.7559 F F Arada Addis North Mw Hub 7 45 priority PH0
9.02842 38.7559 G G Arada Addis North Mw Hub 7 45 priority PH0
9.04382 38.75874 0 0 Gulele Addis North Mw Access 10 410 priority PH0
9.04382 38.75874 A A Gulele Addis North Mw Access 10 410 priority PH0
9.04382 38.75874 B B Gulele Addis North Mw Access 10 410 priority PH0
9.04382 38.75874 X X Gulele Addis North Mw Access 10 410 priority PH0
9.04073 38.7615 0 0 Arada Addis North Mw Hub 9 75 Priority PH0
9.04073 38.7615 A A Arada Addis North Mw Hub 9 75 Priority PH0
9.04073 38.7615 B B Arada Addis North Mw Hub 9 75 Priority PH0
9.04073 38.7615 X X Arada Addis North Mw Hub 9 75 Priority PH0
9.04179 38.7439 0 0 Arada Addis North Mw Access 11 75 Priority PH0
9.04179 38.7439 A A Arada Addis North Mw Access 11 75 Priority PH0
9.04179 38.7439 B B Arada Addis North Mw Access 11 75 Priority PH0
9.0381 38.7255 0 0 Addis Ketema (AA)
Addis North Mw Access 9 95 priority PH0
9.0381 38.7255 A A Addis Ketema (AA)
Addis North Mw Access 9 95 priority PH0
9.0381 38.7255 B B Addis Ketema (AA)
Addis North Mw Access 9 95 priority PH0
9.0381 38.7255 C C Addis Ketema (AA)
Addis North Mw Access 9 95 priority PH0
9.0381 38.7255 X X Addis Ketema (AA)
Addis North Mw Access 9 95 priority PH0
9.0381 38.7255 T T Addis Ketema (AA)
Addis North Mw Access 9 95 priority PH0
9.02698 38.7394 0 0 Addis Ketema (AA)
Addis North Mw Access 10 75 Priority PH0
9.02698 38.7394 A A Addis Ketema (AA)
Addis North Mw Access 10 75 Priority PH0
9.02698 38.7394 B B Addis Ketema (AA)
Addis North Mw Access 10 75 Priority PH0
9.02698 38.7394 C C Addis Ketema (AA)
Addis North Mw Access 10 75 Priority PH0
9.02698 38.7394 T T Addis Ketema (AA)
Addis North Mw Access 10 75 Priority PH0
9.01586 38.729 0 0 Lideta Addis North Mw Access 7 75 Priority PH0
9.01586 38.729 A A Lideta Addis North Mw Access 7 75 Priority PH0
9.01586 38.729 B B Lideta Addis North Mw Access 7 75 Priority PH0
9.01586 38.729 T T Lideta Addis North Mw Access 7 75 Priority PH0
9.021135 38.752721 0 0 Arada Addis North Mw Access 8 664 Priority PH0
9.021135 38.752721 A A Arada Addis North Mw Access 8 664 Priority PH0
9.021135 38.752721 B B Arada Addis North Mw Access 8 664 Priority PH0
9.021135 38.752721 C C Arada Addis North Mw Access 8 664 Priority PH0
8.99179 38.84632 0 0 Bole Addis South Mw Access 10 410 priority PH0
8.99179 38.84632 A A Bole Addis South Mw Access 10 410 priority PH0
9.02149 38.8322 0 0 Bole Addis South Mw Access 10 95 priority PH0
9.02149 38.8322 A A Bole Addis South Mw Access 10 95 priority PH0
9.02149 38.8322 B B Bole Addis South Mw Access 10 95 priority PH0
9.02205 38.87434 0 0 Yeka Addis North Mw Hub 12 410 priority PH0
9.02205 38.87434 A A Yeka Addis North Mw Hub 12 410 priority PH0
9.02205 38.87434 B B Yeka Addis North Mw Hub 12 410 priority PH0
9.02205 38.87434 C C Yeka Addis North Mw Hub 12 410 priority PH0
9.02205 38.87434 D D Yeka Addis North Mw Hub 12 410 priority PH0
9.02205 38.87434 E E Yeka Addis North Mw Hub 12 410 priority PH0
9.02205 38.87434 X X Yeka Addis North Mw Hub 12 410 priority PH0
9.024889 38.8857 0 0 Yeka Addis North Mw Access 13 410 priority PH0
9.024889 38.8857 A A Yeka Addis North Mw Access 13 410 priority PH0
9.024889 38.8857 B B Yeka Addis North Mw Access 13 410 priority PH0
8.9724 38.85485 0 0 Bole Addis South Mw Access 10 664 Priority PH0
8.9724 38.85485 A A Bole Addis South Mw Access 10 664 Priority PH0
8.9724 38.85485 B B Bole Addis South Mw Access 10 664 Priority PH0
8.9724 38.85485 X X Bole Addis South Mw Access 10 664 Priority PH0
8.97942 38.7225 0 0 Nefas Silk Addis South Mw Access 7 95 priority PH0
8.97942 38.7225 A A Nefas Silk Addis South Mw Access 7 95 priority PH0
8.97942 38.7225 B B Nefas Silk Addis South Mw Access 7 95 priority PH0
9.04402998 38.7547811 0 0 Arada Addis North Mw Access 10 410 priority PH0
9.04402998 38.7547811 A A Arada Addis North Mw Access 10 410 priority PH0
9.04402998 38.7547811 B B Arada Addis North Mw Access 10 410 priority PH0
9.04402998 38.7547811 C C Arada Addis North Mw Access 10 410 priority PH0
9.04402998 38.7547811 D D Arada Addis North Mw Access 10 410 priority PH0
9.04402998 38.7547811 E E Arada Addis North Mw Access 10 410 priority PH0
9.04402998 38.7547811 X X Arada Addis North Mw Access 10 410 priority PH0
8.93294 38.7256 0 0 Nefas Silk Addis South Mw Access 4 75 Priority PH0
8.93294 38.7256 A A Nefas Silk Addis South Mw Access 4 75 Priority PH0
8.93294 38.7256 B B Nefas Silk Addis South Mw Access 4 75 Priority PH0
9.00869 38.8146 0 0 Bole Addis South Mw Access 8 95 priority PH0
9.00869 38.8146 A A Bole Addis South Mw Access 8 95 priority PH0
9.00869 38.8146 D D Bole Addis South Mw Access 8 95 priority PH0
9.00437 38.78 0 0 Bole Addis South Mw Access 8 45 priority PH0
9.00437 38.78 A A Bole Addis South Mw Access 8 45 priority PH0
9.00437 38.78 B B Bole Addis South Mw Access 8 45 priority PH0
8.969531 38.665992 0 0 Kolfe - Keran Addis North Mw Access 9 664 Priority PH0
8.969531 38.665992 A A Kolfe - Keran Addis North Mw Access 9 664 Priority PH0
8.969531 38.665992 B B Kolfe - Keran Addis North Mw Access 9 664 Priority PH0
8.9798 38.7082 0 0 Kolfe - Keran Addis North Mw Access 7 95 priority PH0
8.9798 38.7082 A A Kolfe - Keran Addis North Mw Access 7 95 priority PH0
8.9798 38.7082 B B Kolfe - Keran Addis North Mw Access 7 95 priority PH0
8.9798 38.7082 X X Kolfe - Keran Addis North Mw Access 7 95 priority PH0
9.00284 38.6754 0 0 Kolfe - Keran Addis North Mw Access 9 95 priority PH0
9.00284 38.6754 B B Kolfe - Keran Addis North Mw Access 9 95 priority PH0
9.00284 38.6754 C C Kolfe - Keran Addis North Mw Access 9 95 priority PH0
9.00284 38.6754 D D Kolfe - Keran Addis North Mw Access 9 95 priority PH0
9.00284 38.6754 X X Kolfe - Keran Addis North Mw Access 9 95 priority PH0
9.00398 38.6855 0 0 Kolfe - Keran Addis North Mw Hub 8 95 priority PH0
9.00398 38.6855 A A Kolfe - Keran Addis North Mw Hub 8 95 priority PH0
9.00398 38.6855 B B Kolfe - Keran Addis North Mw Hub 8 95 priority PH0
9.00398 38.6855 C C Kolfe - Keran Addis North Mw Hub 8 95 priority PH0
9.0162441 38.7216759 0 0 Lideta Addis North Mw Access 8 664 Priority PH0
9.0162441 38.7216759 X X Lideta Addis North Mw Access 8 664 Priority PH0
9.0162441 38.7216759 B B Lideta Addis North Mw Access 8 664 Priority PH0
9.0162441 38.7216759 C C Lideta Addis North Mw Access 8 664 Priority PH0
9.02829 38.7233 0 0 Addis Ketema (AA)
Addis North Mw Access 9 95 priority PH0
9.02829 38.7233 X X Addis Ketema (AA)
Addis North Mw Access 9 95 priority PH0
9.02829 38.7233 A A Addis Ketema (AA)
Addis North Mw Access 9 95 priority PH0
9.0393 38.70038 0 0 Kolfe - Keran Addis North Mw Access 11 410 priority PH0
9.0393 38.70038 A A Kolfe - Keran Addis North Mw Access 11 410 priority PH0
9.0393 38.70038 B B Kolfe - Keran Addis North Mw Access 11 410 priority PH0
9.0393 38.70038 X X Kolfe - Keran Addis North Mw Access 11 410 priority PH0
9.00962 38.8395 0 0 Bole Addis South Mw Hub 8 95 priority PH0
9.00962 38.8395 B B Bole Addis South Mw Hub 8 95 priority PH0
9.00962 38.8395 A A Bole Addis South Mw Hub 8 95 priority PH0
9.05272006 38.7123492 0 0 Kolfe - Keran Addis North Mw Access 10 664 Priority PH0
9.05272006 38.7123492 A A Kolfe - Keran Addis North Mw Access 10 664 Priority PH0
9.05272006 38.7123492 B B Kolfe - Keran Addis North Mw Access 10 664 Priority PH0
9.05272006 38.7123492 C C Kolfe - Keran Addis North Mw Access 10 664 Priority PH0
9.05272006 38.7123492 D D Kolfe - Keran Addis North Mw Access 10 664 Priority PH0
9.05272006 38.7123492 E E Kolfe - Keran Addis North Mw Access 10 664 Priority PH0
9.05272006 38.7123492 P P Kolfe - Keran Addis North Mw Access 10 664 Priority PH0
9.03991944 38.7134444 0 0 Kolfe - Keran Addis North Mw Access 10 410 priority PH0
9.03991944 38.7134444 A A Kolfe - Keran Addis North Mw Access 10 410 priority PH0
9.03991944 38.7134444 B B Kolfe - Keran Addis North Mw Access 10 410 priority PH0
9.029 38.7367 0 0 Addis Ketema (AA)
Addis North Mw Access 9 75 Priority PH0
9.029 38.7367 A A Addis Ketema (AA)
Addis North Mw Access 9 75 Priority PH0
9.029 38.7367 B B Addis Ketema (AA)
Addis North Mw Access 9 75 Priority PH0
9.029 38.7367 C C Addis Ketema (AA)
Addis North Mw Access 9 75 Priority PH0
9.00772 38.7336 0 0 Lideta Addis North Mw Access 8 75 Priority PH0
9.00772 38.7336 B B Lideta Addis North Mw Access 8 75 Priority PH0
9.00772 38.7336 C C Lideta Addis North Mw Access 8 75 Priority PH0
9.01349 38.74423 0 0 Lideta Addis North Mw Access 8 410 priority PH0
9.01349 38.74423 B B Lideta Addis North Mw Access 8 410 priority PH0
9.01349 38.74423 C C Lideta Addis North Mw Access 8 410 priority PH0
9.01349 38.74423 D D Lideta Addis North Mw Access 8 410 priority PH0
9.01349 38.74423 X X Lideta Addis North Mw Access 8 410 priority PH0
9.00013 38.74274 0 0 Kirkos Addis South Mw Access 7 410 priority PH0
9.00013 38.74274 A A Kirkos Addis South Mw Access 7 410 priority PH0
9.00013 38.74274 B B Kirkos Addis South Mw Access 7 410 priority PH0
9.00013 38.74274 C C Kirkos Addis South Mw Access 7 410 priority PH0
9.00013 38.74274 D D Kirkos Addis South Mw Access 7 410 priority PH0
9.00013 38.74274 E E Kirkos Addis South Mw Access 7 410 priority PH0
8.98731667 38.7697639 0 0 Kirkos Addis South Mw Access 5 664 Priority PH0
8.98731667 38.7697639 A A Kirkos Addis South Mw Access 5 664 Priority PH0
8.98731667 38.7697639 B B Kirkos Addis South Mw Access 5 664 Priority PH0
8.98731667 38.7697639 C C Kirkos Addis South Mw Access 5 664 Priority PH0
8.98731667 38.7697639 X X Kirkos Addis South Mw Access 5 664 Priority PH0
8.99656 38.7948 0 0 Bole Addis South Mw Access 6 75 Priority PH0
8.99656 38.7948 A A Bole Addis South Mw Access 6 75 Priority PH0
8.99656 38.7948 B B Bole Addis South Mw Access 6 75 Priority PH0
8.99656 38.7948 C C Bole Addis South Mw Access 6 75 Priority PH0
8.99656 38.7948 X X Bole Addis South Mw Access 6 75 Priority PH0
8.98805 38.7989 0 0 Bole Addis South Mw Access 7 95 priority PH0
8.98805 38.7989 A A Bole Addis South Mw Access 7 95 priority PH0
8.98805 38.7989 B B Bole Addis South Mw Access 7 95 priority PH0
9.01009 38.69578 0 0 Kolfe - Keran Addis North Mw Access 8 410 priority PH0
9.01009 38.69578 A A Kolfe - Keran Addis North Mw Access 8 410 priority PH0
9.01009 38.69578 B B Kolfe - Keran Addis North Mw Access 8 410 priority PH0
9.01009 38.69578 C C Kolfe - Keran Addis North Mw Access 8 410 priority PH0
9.01009 38.69578 D D Kolfe - Keran Addis North Mw Access 8 410 priority PH0
9.01009 38.69578 E E Kolfe - Keran Addis North Mw Access 8 410 priority PH0
9.0496 38.76464 X X Gulele Addis North Mw Access 11 410 priority PH0
9.0496 38.76464 A A Gulele Addis North Mw Access 11 410 priority PH0
9.0496 38.76464 C C Gulele Addis North Mw Access 11 410 priority PH0
9.0496 38.76464 B B Gulele Addis North Mw Access 11 410 priority PH0
8.96103 38.73503 0 0 Nefas Silk Addis South Mw Access 4 410 priority PH0
8.96103 38.73503 A A Nefas Silk Addis South Mw Access 4 410 priority PH0
8.96103 38.73503 C C Nefas Silk Addis South Mw Access 4 410 priority PH0
8.96103 38.73503 B B Nefas Silk Addis South Mw Access 4 410 priority PH0
8.97142 38.72059 0 0 Nefas Silk Addis South Mw Access 8 410 priority PH0
8.97142 38.72059 A A Nefas Silk Addis South Mw Access 8 410 priority PH0
8.97142 38.72059 B B Nefas Silk Addis South Mw Access 8 410 priority PH0
8.97142 38.72059 T T Nefas Silk Addis South Mw Access 8 410 priority PH0
8.97142 38.72059 D D Nefas Silk Addis South Mw Access 8 410 priority PH0
8.97678 38.73176 0 0 Nefas Silk Addis South Mw Access 6 664 Priority PH0
8.97678 38.73176 A A Nefas Silk Addis South Mw Access 6 664 Priority PH0
8.97678 38.73176 B B Nefas Silk Addis South Mw Access 6 664 Priority PH0
8.97678 38.73176 C C Nefas Silk Addis South Mw Access 6 664 Priority PH0
8.97678 38.73176 D D Nefas Silk Addis South Mw Access 6 664 Priority PH0
8.97678 38.73176 X X Nefas Silk Addis South Mw Access 6 664 Priority PH0
8.90186 38.7789 0 0 Akaki - Kalit Addis South Mw Access 3 410 priority PH0
8.90186 38.7789 X X Akaki - Kalit Addis South Mw Access 3 410 priority PH0
8.90186 38.7789 A A Akaki - Kalit Addis South Mw Access 3 410 priority PH0
8.87288 38.80119 0 0 Akaki - Kalit Addis South Mw Access 7 410 priority PH0
8.87288 38.80119 A A Akaki - Kalit Addis South Mw Access 7 410 priority PH0
8.87288 38.80119 B B Akaki - Kalit Addis South Mw Access 7 410 priority PH0
8.87288 38.80119 C C Akaki - Kalit Addis South Mw Access 7 410 priority PH0
8.87288 38.80119 D D Akaki - Kalit Addis South Mw Access 7 410 priority PH0
8.87288 38.80119 E E Akaki - Kalit Addis South Mw Access 7 410 priority PH0
9.008922 38.762342 0 0 Kirkos Addis South Mw Access 7 664 Priority PH0
9.008922 38.762342 X X Kirkos Addis South Mw Access 7 664 Priority PH0
9.04333333 38.7791667 0 0 Yeka Addis North Mw Access 11 410 priority PH0
9.04333333 38.7791667 A A Yeka Addis North Mw Access 11 410 priority PH0
9.04333333 38.7791667 B B Yeka Addis North Mw Access 11 410 priority PH0
9.02992026 38.7081586 0 0 Kolfe - Keran Addis North Mw Access 9 410 priority PH0
9.02992026 38.7081586 A A Kolfe - Keran Addis North Mw Access 9 410 priority PH0
9.02992026 38.7081586 B B Kolfe - Keran Addis North Mw Access 9 410 priority PH0
9.02992026 38.7081586 C C Kolfe - Keran Addis North Mw Access 9 410 priority PH0
8.94726 38.7445 0 0 Nefas Silk Addis South Mw Hub 2 45 priority PH0
8.94726 38.7445 A A Nefas Silk Addis South Mw Hub 2 45 priority PH0
8.94726 38.7445 D D Nefas Silk Addis South Mw Hub 2 45 priority PH0
8.94726 38.7445 B B Nefas Silk Addis South Mw Hub 2 45 priority PH0
8.95226 38.7618 0 0 Akaki - Kalit Addis South Mw Hub 2 45 priority PH0
8.95226 38.7618 A A Akaki - Kalit Addis South Mw Hub 2 45 priority PH0
8.95226 38.7618 B B Akaki - Kalit Addis South Mw Hub 2 45 priority PH0
8.96423 38.72685 0 0 Nefas Silk Addis South Mw Access 6 410 priority PH0
8.96423 38.72685 A A Nefas Silk Addis South Mw Access 6 410 priority PH0
8.96423 38.72685 B B Nefas Silk Addis South Mw Access 6 410 priority PH0
8.96594954 38.7128702 0 0 Nefas Silk Addis South Mw Access 9 410 priority PH0
8.96594954 38.7128702 A A Nefas Silk Addis South Mw Access 9 410 priority PH0
8.96594954 38.7128702 B B Nefas Silk Addis South Mw Access 9 410 priority PH0
8.96594954 38.7128702 C C Nefas Silk Addis South Mw Access 9 410 priority PH0
8.99341 38.728 0 0 Nefas Silk Addis South Mw Hub 5 75 Priority PH0
8.99341 38.728 A A Nefas Silk Addis South Mw Hub 5 75 Priority PH0
8.99341 38.728 B B Nefas Silk Addis South Mw Hub 5 75 Priority PH0
8.99341 38.728 D D Nefas Silk Addis South Mw Hub 5 75 Priority PH0
8.99341 38.728 C C Nefas Silk Addis South Mw Hub 5 75 Priority PH0
8.98735 38.723 0 0 Nefas Silk Addis South Mw Access 7 95 priority PH0
8.98735 38.723 A A Nefas Silk Addis South Mw Access 7 95 priority PH0
8.98735 38.723 B B Nefas Silk Addis South Mw Access 7 95 priority PH0
8.98735 38.723 C C Nefas Silk Addis South Mw Access 7 95 priority PH0
9.03221 38.7826 0 0 Yeka Addis North Mw Access 10 95 priority PH0
9.03221 38.7826 A A Yeka Addis North Mw Access 10 95 priority PH0
9.03221 38.7826 B B Yeka Addis North Mw Access 10 95 priority PH0
8.94731 38.76883 0 0 Akaki - Kalit Addis South Mw Access 4 664 Priority PH0
8.94731 38.76883 A A Akaki - Kalit Addis South Mw Access 4 664 Priority PH0
8.94731 38.76883 B B Akaki - Kalit Addis South Mw Access 4 664 Priority PH0
8.94731 38.76883 X X Akaki - Kalit Addis South Mw Access 4 664 Priority PH0
9.02373 38.8113 0 0 Yeka Addis North Mw Access 9 95 priority PH0
9.02373 38.8113 A A Yeka Addis North Mw Access 9 95 priority PH0
9.02373 38.8113 B B Yeka Addis North Mw Access 9 95 priority PH0
9.02373 38.8113 C C Yeka Addis North Mw Access 9 95 priority PH0
9.02456 38.8233 0 0 Yeka Addis North Mw Hub 7 410 priority PH0
9.02456 38.8233 A A Yeka Addis North Mw Hub 7 410 priority PH0
9.02456 38.8233 B B Yeka Addis North Mw Hub 7 410 priority PH0
9.02456 38.8233 E E Yeka Addis North Mw Hub 7 410 priority PH0
9.02456 38.8233 C C Yeka Addis North Mw Hub 7 410 priority PH0
9.02328 38.8416 0 0 Yeka Addis North Mw Access 9 95 priority PH0
9.02328 38.8416 A A Yeka Addis North Mw Access 9 95 priority PH0
9.02328 38.8416 B B Yeka Addis North Mw Access 9 95 priority PH0
8.97680007 38.8927803 0 0 Bole Addis South Mw Access 12 664 Priority PH0
8.97680007 38.8927803 A A Bole Addis South Mw Access 12 664 Priority PH0
8.97680007 38.8927803 B B Bole Addis South Mw Access 12 664 Priority PH0
8.97680007 38.8927803 C C Bole Addis South Mw Access 12 664 Priority PH0
8.97680007 38.8927803 X X Bole Addis South Mw Access 12 664 Priority PH0
8.97680007 38.8927803 D D Bole Addis South Mw Access 12 664 Priority PH0
9.041095 38.878244 0 0 Yeka Addis North Mw Hub 14 410 priority PH0
9.041095 38.878244 A A Yeka Addis North Mw Hub 14 410 priority PH0
9.041095 38.878244 B B Yeka Addis North Mw Hub 14 410 priority PH0
9.041095 38.878244 P P Yeka Addis North Mw Hub 14 410 priority PH0
9.02782 38.8538 0 0 Yeka Addis North Mw Access 9 95 priority PH0
9.02782 38.8538 A A Yeka Addis North Mw Access 9 95 priority PH0
9.02782 38.8538 B B Yeka Addis North Mw Access 9 95 priority PH0
9.02782 38.8538 D D Yeka Addis North Mw Access 9 95 priority PH0
9.02782 38.8538 E E Yeka Addis North Mw Access 9 95 priority PH0
9.02782 38.8538 X X Yeka Addis North Mw Access 9 95 priority PH0
9.0294 38.87816 0 0 Yeka Addis North Mw Hub 13 410 priority PH0
9.0294 38.87816 A A Yeka Addis North Mw Hub 13 410 priority PH0
9.0294 38.87816 B B Yeka Addis North Mw Hub 13 410 priority PH0
9.01707 38.89541 0 0 Bole Addis South Mw Access 13 664 Priority PH0
9.01707 38.89541 A A Bole Addis South Mw Access 13 664 Priority PH0
9.01707 38.89541 C C Bole Addis South Mw Access 13 664 Priority PH0
9.01707 38.89541 X X Bole Addis South Mw Access 13 664 Priority PH0
9.01694 38.88134 0 0 Bole Addis South Mw Access 12 410 priority PH0
9.01694 38.88134 A A Bole Addis South Mw Access 12 410 priority PH0
9.01694 38.88134 B B Bole Addis South Mw Access 12 410 priority PH0
9.01694 38.88134 D D Bole Addis South Mw Access 12 410 priority PH0
9.00671 38.7948 0 0 Bole Addis South Mw Access 6 75 Priority PH0
9.00671 38.7948 A A Bole Addis South Mw Access 6 75 Priority PH0
9.00671 38.7948 B B Bole Addis South Mw Access 6 75 Priority PH0
9.00814 38.7811 0 0 Bole Addis South Mw Access 7 45 priority PH0
9.00814 38.7811 A A Bole Addis South Mw Access 7 45 priority PH0
9.00814 38.7811 B B Bole Addis South Mw Access 7 45 priority PH0
8.98789 38.7446 0 0 Nefas Silk Addis South Mw Access 6 75 Priority PH0
8.98789 38.7446 A A Nefas Silk Addis South Mw Access 6 75 Priority PH0
8.98789 38.7446 B B Nefas Silk Addis South Mw Access 6 75 Priority PH0
8.99794 38.731209 0 0 Nefas Silk Addis South Mw Access 6 664 Priority PH0
8.99794 38.731209 A A Nefas Silk Addis South Mw Access 6 664 Priority PH0
8.99794 38.731209 B B Nefas Silk Addis South Mw Access 6 664 Priority PH0
8.99794 38.731209 C C Nefas Silk Addis South Mw Access 6 664 Priority PH0
8.99794 38.731209 D D Nefas Silk Addis South Mw Access 6 664 Priority PH0
9.00072 38.7193 0 0 Nefas Silk Addis South Mw Access 7 95 priority PH0
9.00072 38.7193 B B Nefas Silk Addis South Mw Access 7 95 priority PH0
9.00072 38.7193 C C Nefas Silk Addis South Mw Access 7 95 priority PH0
9.00072 38.7193 A A Nefas Silk Addis South Mw Access 7 95 priority PH0
9.03748 38.7324 0 0 Addis Ketema (AA)
Addis North Mw Access 8 95 priority PH0
9.03748 38.7324 A A Addis Ketema (AA)
Addis North Mw Access 8 95 priority PH0
9.03748 38.7324 B B Addis Ketema (AA)
Addis North Mw Access 8 95 priority PH0
9.03748 38.7324 C C Addis Ketema (AA)
Addis North Mw Access 8 95 priority PH0
9.03748 38.7324 X X Addis Ketema (AA)
Addis North Mw Access 8 95 priority PH0
9.03876 38.7194 0 0 Addis Ketema (AA)
Addis North Mw Access 9 95 priority PH0
9.03876 38.7194 A A Addis Ketema (AA)
Addis North Mw Access 9 95 priority PH0
9.03876 38.7194 B B Addis Ketema (AA)
Addis North Mw Access 9 95 priority PH0
9.03876 38.7194 X X Addis Ketema (AA)
Addis North Mw Access 9 95 priority PH0
9.05887 38.77005 0 0 Yeka Addis North Mw Access 11 410 priority PH0
9.05887 38.77005 A A Yeka Addis North Mw Access 11 410 priority PH0
9.05887 38.77005 B B Yeka Addis North Mw Access 11 410 priority PH0
9.05887 38.77005 C C Yeka Addis North Mw Access 11 410 priority PH0
9.05887 38.77005 X X Yeka Addis North Mw Access 11 410 priority PH0
9.05405 38.7555 0 0 Gulele Addis North Mw Access 10 75 Priority PH0
9.05405 38.7555 A A Gulele Addis North Mw Access 10 75 Priority PH0
9.05405 38.7555 B B Gulele Addis North Mw Access 10 75 Priority PH0
9.05405 38.7555 C C Gulele Addis North Mw Access 10 75 Priority PH0
9.05405 38.7555 D D Gulele Addis North Mw Access 10 75 Priority PH0
9.0332 38.7326 0 0 Addis Ketema (AA)
Addis North Mw Hub 8 75 Priority PH0
9.0332 38.7326 A A Addis Ketema (AA)
Addis North Mw Hub 8 75 Priority PH0
9.0332 38.7326 B B Addis Ketema (AA)
Addis North Mw Hub 8 75 Priority PH0
9.0332 38.7326 C C Addis Ketema (AA)
Addis North Mw Hub 8 75 Priority PH0
9.0332 38.7326 T T Addis Ketema (AA)
Addis North Mw Hub 8 75 Priority PH0
9.058253 38.871579 0 0 Yeka Addis North Mw Access 16 410 priority PH0
9.058253 38.871579 A A Yeka Addis North Mw Access 16 410 priority PH0
9.058253 38.871579 B B Yeka Addis North Mw Access 16 410 priority PH0
9.06595898 38.8707491 0 0 Yeka Addis North Mw Access 16 664 Priority PH0
9.06595898 38.8707491 A A Yeka Addis North Mw Access 16 664 Priority PH0
9.06595898 38.8707491 B B Yeka Addis North Mw Access 16 664 Priority PH0
9.06595898 38.8707491 C C Yeka Addis North Mw Access 16 664 Priority PH0
9.06595898 38.8707491 X X Yeka Addis North Mw Access 16 664 Priority PH0
9.01854 38.8444 0 0 Bole Addis South Mw Access 9 95 priority PH0
9.01854 38.8444 A A Bole Addis South Mw Access 9 95 priority PH0
9.01854 38.8444 B B Bole Addis South Mw Access 9 95 priority PH0
9.01854 38.8444 C C Bole Addis South Mw Access 9 95 priority PH0
9.01854 38.8444 D D Bole Addis South Mw Access 9 95 priority PH0
9.01854 38.8444 X X Bole Addis South Mw Access 9 95 priority PH0
9.0137 38.85748 0 0 Bole Addis South Mw Hub 10 410 priority PH0
9.0137 38.85748 A A Bole Addis South Mw Hub 10 410 priority PH0
9.0137 38.85748 B B Bole Addis South Mw Hub 10 410 priority PH0
9.01085015 38.8261702 0 0 Bole Addis South Mw Access 9 664 Priority PH0
9.01085015 38.8261702 A A Bole Addis South Mw Access 9 664 Priority PH0
9.01085015 38.8261702 B B Bole Addis South Mw Access 9 664 Priority PH0
9.01085015 38.8261702 C C Bole Addis South Mw Access 9 664 Priority PH0
9.01085015 38.8261702 D D Bole Addis South Mw Access 9 664 Priority PH0
9.01085015 38.8261702 E E Bole Addis South Mw Access 9 664 Priority PH0
9.01085015 38.8261702 X X Bole Addis South Mw Access 9 664 Priority PH0
9.022399 38.729777 0 0 Lideta Addis North Mw Access 7 664 Priority PH0
9.022399 38.729777 A A Lideta Addis North Mw Access 7 664 Priority PH0
9.022399 38.729777 X X Lideta Addis North Mw Access 7 664 Priority PH0
9.022399 38.729777 B B Lideta Addis North Mw Access 7 664 Priority PH0
9.022399 38.729777 C C Lideta Addis North Mw Access 7 664 Priority PH0
9.01543 38.7836 0 0 Yeka Addis North Mw Access 8 95 priority PH0
9.01543 38.7836 A A Yeka Addis North Mw Access 8 95 priority PH0
9.01543 38.7836 B B Yeka Addis North Mw Access 8 95 priority PH0
9.01543 38.7836 C C Yeka Addis North Mw Access 8 95 priority PH0
9.01543 38.7836 D D Yeka Addis North Mw Access 8 95 priority PH0
9.01543 38.7836 E E Yeka Addis North Mw Access 8 95 priority PH0
9.01543 38.7836 F F Yeka Addis North Mw Access 8 95 priority PH0
9.01543 38.7891 0 0 Bole Addis South Mw Access 9 95 priority PH0
9.01543 38.7891 A A Bole Addis South Mw Access 9 95 priority PH0
9.01543 38.7891 B B Bole Addis South Mw Access 9 95 priority PH0
9.00356 38.7887 0 0 Bole Addis South Mw Access 9 75 Priority PH0
9.00356 38.7887 A A Bole Addis South Mw Access 9 75 Priority PH0
9.00356 38.7887 B B Bole Addis South Mw Access 9 75 Priority PH0
9.00356 38.7887 C C Bole Addis South Mw Access 9 75 Priority PH0
8.99706 38.8137 0 0 Bole Addis South Mw Access 9 95 priority PH0
8.99706 38.8137 A A Bole Addis South Mw Access 9 95 priority PH0
8.99706 38.8137 B B Bole Addis South Mw Access 9 95 priority PH0
9.01065027 38.8469707 0 0 Bole Addis South Mw Hub 9 664 Priority PH0
9.01065027 38.8469707 A A Bole Addis South Mw Hub 9 664 Priority PH0
9.01065027 38.8469707 B B Bole Addis South Mw Hub 9 664 Priority PH0
9.01065027 38.8469707 C C Bole Addis South Mw Hub 9 664 Priority PH0
9.01065027 38.8469707 D D Bole Addis South Mw Hub 9 664 Priority PH0
9.01065027 38.8469707 E E Bole Addis South Mw Hub 9 664 Priority PH0
9.02299 38.85369 0 0 Yeka Addis North Mw Access 10 664 Priority PH0
9.02299 38.85369 A A Yeka Addis North Mw Access 10 664 Priority PH0
9.02299 38.85369 B B Yeka Addis North Mw Access 10 664 Priority PH0
9.02299 38.85369 C C Yeka Addis North Mw Access 10 664 Priority PH0
9.01359 38.769 0 0 Kirkos Addis South Mw Hub 6 45 priority PH0
9.01359 38.769 A A Kirkos Addis South Mw Hub 6 45 priority PH0
9.01359 38.769 B B Kirkos Addis South Mw Hub 6 45 priority PH0
9.01359 38.769 C C Kirkos Addis South Mw Hub 6 45 priority PH0
9.01359 38.769 D D Kirkos Addis South Mw Hub 6 45 priority PH0
9.01359 38.769 E E Kirkos Addis South Mw Hub 6 45 priority PH0
9.01359 38.769 F F Kirkos Addis South Mw Hub 6 45 priority PH0
9.01359 38.769 T T Kirkos Addis South Mw Hub 6 45 priority PH0
9.04096 38.8195 0 0 Yeka Addis North Mw Access 8 95 priority PH0
9.04096 38.8195 A A Yeka Addis North Mw Access 8 95 priority PH0
9.04096 38.8195 B B Yeka Addis North Mw Access 8 95 priority PH0
9.04096 38.8195 X X Yeka Addis North Mw Access 8 95 priority PH0
9.03285 38.84348 0 0 Yeka Addis North Mw Access 9 410 priority PH0
9.03285 38.84348 A A Yeka Addis North Mw Access 9 410 priority PH0
9.03285 38.84348 B B Yeka Addis North Mw Access 9 410 priority PH0
8.99117 38.7149 0 0 Kolfe - Keran Addis North Mw Access 8 664 Priority PH0
8.99117 38.7149 A A Kolfe - Keran Addis North Mw Access 8 664 Priority PH0
8.99117 38.7149 B B Kolfe - Keran Addis North Mw Access 8 664 Priority PH0
9.03842 38.8314 0 0 Yeka Addis North Mw Access 8 95 priority PH0
9.03842 38.8314 A A Yeka Addis North Mw Access 8 95 priority PH0
9.03842 38.8314 B B Yeka Addis North Mw Access 8 95 priority PH0
9.03842 38.8314 C C Yeka Addis North Mw Access 8 95 priority PH0
9.03842 38.8314 D D Yeka Addis North Mw Access 8 95 priority PH0
8.99944 38.8291 0 0 Bole Addis South Mw Access 9 95 priority PH0
8.99944 38.8291 B B Bole Addis South Mw Access 9 95 priority PH0
8.99944 38.8291 C C Bole Addis South Mw Access 9 95 priority PH0
8.947291 38.689225 0 0 Nefas Silk Addis South Mw Access 6 410 priority PH0
8.947291 38.689225 X X Nefas Silk Addis South Mw Access 6 410 priority PH0
8.947291 38.689225 A A Nefas Silk Addis South Mw Access 6 410 priority PH0
8.95138 38.75542 0 0 Nefas Silk Addis South Mw Access 3 410 priority PH0
8.95138 38.75542 A A Nefas Silk Addis South Mw Access 3 410 priority PH0
8.95138 38.75542 B B Nefas Silk Addis South Mw Access 3 410 priority PH0
8.95138 38.75542 C C Nefas Silk Addis South Mw Access 3 410 priority PH0
8.95138 38.75542 D D Nefas Silk Addis South Mw Access 3 410 priority PH0
8.95138 38.75542 E E Nefas Silk Addis South Mw Access 3 410 priority PH0
8.95138 38.75542 F F Nefas Silk Addis South Mw Access 3 410 priority PH0
8.95138 38.75542 X X Nefas Silk Addis South Mw Access 3 410 priority PH0
8.97875 38.7635 0 0 Nefas Silk Addis South Mw Access 6 75 Priority PH0
8.97875 38.7635 A A Nefas Silk Addis South Mw Access 6 75 Priority PH0
8.97875 38.7635 B B Nefas Silk Addis South Mw Access 6 75 Priority PH0
8.97875 38.7635 C C Nefas Silk Addis South Mw Access 6 75 Priority PH0
8.97875 38.7635 D D Nefas Silk Addis South Mw Access 6 75 Priority PH0
8.97875 38.7635 E E Nefas Silk Addis South Mw Access 6 75 Priority PH0
8.97875 38.7635 X X Nefas Silk Addis South Mw Access 6 75 Priority PH0
8.97875 38.7635 T T Nefas Silk Addis South Mw Access 6 75 Priority PH0
8.99288 38.7414 0 0 Kirkos Addis South Mw Access 6 75 Priority PH0
8.99288 38.7414 A A Kirkos Addis South Mw Access 6 75 Priority PH0
8.99288 38.7414 B B Kirkos Addis South Mw Access 6 75 Priority PH0
8.9371 38.7409 0 0 Nefas Silk Addis South Mw Access 3 75 Priority PH0
8.9371 38.7409 C C Nefas Silk Addis South Mw Access 3 75 Priority PH0
8.9371 38.7409 A A Nefas Silk Addis South Mw Access 3 75 Priority PH0
8.9371 38.7409 B B Nefas Silk Addis South Mw Access 3 75 Priority PH0
8.9371 38.7409 D D Nefas Silk Addis South Mw Access 3 75 Priority PH0
8.99663 38.84747 0 0 Bole Addis South Mw Access 10 664 Priority PH0
8.99663 38.84747 A A Bole Addis South Mw Access 10 664 Priority PH0
8.99663 38.84747 B B Bole Addis South Mw Access 10 664 Priority PH0
8.99663 38.84747 X X Bole Addis South Mw Access 10 664 Priority PH0
9.02067 38.7234 0 0 Addis Ketema (AA)
Addis North Mw Access 8 95 priority PH0
9.02067 38.7234 A A Addis Ketema (AA)
Addis North Mw Access 8 95 priority PH0
9.02067 38.7234 B B Addis Ketema (AA)
Addis North Mw Access 8 95 priority PH0
9.02067 38.7234 C C Addis Ketema (AA)
Addis North Mw Access 8 95 priority PH0
9.02067 38.7234 T T Addis Ketema (AA)
Addis North Mw Access 8 95 priority PH0
9.02719 38.784 0 0 Yeka Addis North Mw Access 9 664 Priority PH0
9.02719 38.784 A A Yeka Addis North Mw Access 9 664 Priority PH0
9.02719 38.784 B B Yeka Addis North Mw Access 9 664 Priority PH0
9.02719 38.784 C C Yeka Addis North Mw Access 9 664 Priority PH0
9.02719 38.784 X X Yeka Addis North Mw Access 9 664 Priority PH0
9.01587 38.7656 0 0 Kirkos Addis South Mw Access 7 45 priority PH0
9.01587 38.7656 A A Kirkos Addis South Mw Access 7 45 priority PH0
9.01587 38.7656 B B Kirkos Addis South Mw Access 7 45 priority PH0
9.01587 38.7656 C C Kirkos Addis South Mw Access 7 45 priority PH0
8.92264962 38.7461708 0 0 Nefas Silk Addis South Mw Access 3 410 priority PH0
8.92264962 38.7461708 A A Nefas Silk Addis South Mw Access 3 410 priority PH0
8.92264962 38.7461708 B B Nefas Silk Addis South Mw Access 3 410 priority PH0
8.92264962 38.7461708 C C Nefas Silk Addis South Mw Access 3 410 priority PH0
8.92264962 38.7461708 D D Nefas Silk Addis South Mw Access 3 410 priority PH0
9.02663 38.7694 0 0 Arada Addis North Mw Access 12 95 priority PH0
9.02663 38.7694 A A Arada Addis North Mw Access 12 95 priority PH0
9.02663 38.7694 B B Arada Addis North Mw Access 12 95 priority PH0
9.02663 38.7694 C C Arada Addis North Mw Access 12 95 priority PH0
9.02663 38.7694 T T Arada Addis North Mw Access 12 95 priority PH0
9.03647 38.8402 0 0 Yeka Addis North Mw Hub 8 95 priority PH0
9.03647 38.8402 A A Yeka Addis North Mw Hub 8 95 priority PH0
9.03647 38.8402 B B Yeka Addis North Mw Hub 8 95 priority PH0
9.03647 38.8402 C C Yeka Addis North Mw Hub 8 95 priority PH0
8.982632 38.7897 0 0 Lideta Addis North Mw Hub 6 75 Priority PH0
8.982632 38.7897 A A Lideta Addis North Mw Hub 6 75 Priority PH0
8.982632 38.7897 B B Lideta Addis North Mw Hub 6 75 Priority PH0
8.982632 38.7897 C C Lideta Addis North Mw Hub 6 75 Priority PH0
8.982632 38.7897 D D Lideta Addis North Mw Hub 6 75 Priority PH0
8.982632 38.7897 E E Bole Addis North Mw Hub 6 PH0
8.982632 38.7897 T T Lideta Addis North Mw Hub 6 75 Priority PH0
9.01091 38.7413 0 0 Lideta Addis North Mw Access 7 75 Priority PH0
9.01091 38.7413 A A Lideta Addis North Mw Access 7 75 Priority PH0
9.01091 38.7413 B B Lideta Addis North Mw Access 7 75 Priority PH0
9.01091 38.7413 C C Lideta Addis North Mw Access 7 75 Priority PH0
9.01091 38.7413 D D Lideta Addis North Mw Access 7 75 Priority PH0
9.01091 38.7413 E E Lideta Addis North Mw Access 7 75 Priority PH0
9.01634 38.8119 0 0 Bole Addis South Mw Access 7 75 Priority PH0
9.01634 38.8119 A A Bole Addis South Mw Access 7 75 Priority PH0
9.01634 38.8119 B B Bole Addis South Mw Access 7 75 Priority PH0
9.01634 38.8119 C C Bole Addis South Mw Access 7 75 Priority PH0
9.01634 38.8119 X X Bole Addis South Mw Access 7 75 Priority PH0
8.99775 38.80545 0 0 Bole Addis South Mw Access 7 664 Priority PH0
8.99775 38.80545 X X Bole Addis South Mw Access 7 664 Priority PH0
8.99775 38.80545 A A Bole Addis South Mw Access 7 664 Priority PH0
8.99775 38.80545 B B Bole Addis South Mw Access 7 664 Priority PH0
8.99775 38.80545 D D Bole Addis South Mw Access 7 664 Priority PH0
8.99775 38.80545 C C Bole Addis South Mw Access 7 664 Priority PH0
9.02697 38.7334 0 0 Addis Ketema (AA)
Addis North Mw Access 9 75 Priority PH0
9.02697 38.7334 A A Addis Ketema (AA)
Addis North Mw Access 9 75 Priority PH0
9.02697 38.7334 B B Addis Ketema (AA)
Addis North Mw Access 9 75 Priority PH0
9.02697 38.7334 C C Addis Ketema (AA)
Addis North Mw Access 9 75 Priority PH0
9.00192 38.69496 0 0 Kolfe - Keran Addis North Mw Access 9 410 priority PH0
9.00192 38.69496 A A Kolfe - Keran Addis North Mw Access 9 410 priority PH0
9.00192 38.69496 B B Kolfe - Keran Addis North Mw Access 9 410 priority PH0
9.00192 38.69496 C C Kolfe - Keran Addis North Mw Access 9 410 priority PH0
9.04015 38.7405 0 0 Arada Addis North Mw Access 10 75 Priority PH0
9.04015 38.7405 A A Arada Addis North Mw Access 10 75 Priority PH0
9.04015 38.7405 B B Arada Addis North Mw Access 10 75 Priority PH0
9.04015 38.7405 C C Arada Addis North Mw Access 10 75 Priority PH0
9.04003 38.7349 0 0 Addis Ketema (AA)
Addis North Mw Access 10 75 Priority PH0
9.04003 38.7349 A A Addis Ketema (AA)
Addis North Mw Access 10 75 Priority PH0
9.04003 38.7349 B B Addis Ketema (AA)
Addis North Mw Access 10 75 Priority PH0
9.04003 38.7349 C C Addis Ketema (AA)
Addis North Mw Access 10 75 Priority PH0
9.02302 38.781 0 0 Yeka Addis North Mw Access 10 95 priority PH0
9.02302 38.781 A A Yeka Addis North Mw Access 10 95 priority PH0
9.02302 38.781 X X Yeka Addis North Mw Access 10 95 priority PH0
9.03745 38.7526 0 0 Arada Addis North Mw Access 11 75 Priority PH0
9.03745 38.7526 A A Arada Addis North Mw Access 11 75 Priority PH0
9.03745 38.7526 B B Arada Addis North Mw Access 11 75 Priority PH0
9.03745 38.7526 C C Arada Addis North Mw Access 11 75 Priority PH0
9.0316 38.7396 0 0 Addis Ketema (AA)
Addis North Mw Access 11 75 Priority PH0
9.0316 38.7396 A A Addis Ketema (AA)
Addis North Mw Access 11 75 Priority PH0
9.0316 38.7396 B B Addis Ketema (AA)
Addis North Mw Access 11 75 Priority PH0
9.0316 38.7396 C C Addis Ketema (AA)
Addis North Mw Access 11 75 Priority PH0
9.02758 38.7443 0 0 Lideta Addis North Mw Access 10 75 Priority PH0
9.02758 38.7443 A A Lideta Addis North Mw Access 10 75 Priority PH0
9.02758 38.7443 B B Lideta Addis North Mw Access 10 75 Priority PH0
9.02758 38.7443 D D Lideta Addis North Mw Access 10 75 Priority PH0
9.02758 38.7443 E E Lideta Addis North Mw Access 10 75 Priority PH0
9.02758 38.7443 C C Lideta Addis North Mw Access 10 75 Priority PH0
9.01673 38.825 0 0 Bole Addis South Mw Access 8 95 priority PH0
9.01673 38.825 B B Bole Addis South Mw Access 8 95 priority PH0
9.01673 38.825 C C Bole Addis South Mw Access 8 95 priority PH0
9.019668 38.819594 0 0 Bole Addis South Mw Access 8 664 Priority PH0
9.019668 38.819594 B B Bole Addis South Mw Access 8 664 Priority PH0
9.019668 38.819594 C C Bole Addis South Mw Access 8 664 Priority PH0
9.019668 38.819594 D D Bole Addis South Mw Access 8 664 Priority PH0
9.019668 38.819594 E E Bole Addis South Mw Access 8 664 Priority PH0
9.04363 38.7193 0 0 Addis Ketema (AA)
Addis North Mw Hub 8 95 priority PH0
9.04363 38.7193 A A Addis Ketema (AA)
Addis North Mw Hub 8 95 priority PH0
9.04363 38.7193 B B Addis Ketema (AA)
Addis North Mw Hub 8 95 priority PH0
9.04363 38.7193 D D Addis Ketema (AA)
Addis North Mw Hub 8 95 priority PH0
9.04363 38.7193 C C Addis Ketema (AA)
Addis North Mw Hub 8 95 priority PH0
9.01309 38.7508 0 0 Kirkos Addis South Mw Hub 6 45 priority PH0
9.01309 38.7508 A A Kirkos Addis South Mw Hub 6 45 priority PH0
9.01309 38.7508 B B Kirkos Addis South Mw Hub 6 45 priority PH0
9.01309 38.7508 C C Kirkos Addis South Mw Hub 6 45 priority PH0
9.00574 38.7716 0 0 Kirkos Addis South Mw Access 6 45 priority PH0
9.00574 38.7716 A A Kirkos Addis South Mw Access 6 45 priority PH0
9.00574 38.7716 B B Kirkos Addis South Mw Access 6 45 priority PH0
9.00574 38.7716 C C Kirkos Addis South Mw Access 6 45 priority PH0
9.00574 38.7716 D D Kirkos Addis South Mw Access 6 45 priority PH0
9.00574 38.7716 E E Kirkos Addis South Mw Access 6 45 priority PH0
9.00574 38.7716 F F Kirkos Addis South Mw Access 6 45 priority PH0
9.04767 38.7463 0 0 Arada Addis North Mw Access 11 75 Priority PH0
9.04767 38.7463 A A Arada Addis North Mw Access 11 75 Priority PH0
9.04767 38.7463 B B Arada Addis North Mw Access 11 75 Priority PH0
9.04767 38.7463 C C Arada Addis North Mw Access 11 75 Priority PH0
9.0353 38.7553 0 0 Arada Addis North Mw Hub 8 45 priority PH0
9.0353 38.7553 A A Arada Addis North Mw Hub 8 45 priority PH0
9.0353 38.7553 B B Arada Addis North Mw Hub 8 45 priority PH0
9.0353 38.7553 C C Arada Addis North Mw Hub 8 45 priority PH0
9.0353 38.7553 D D Arada Addis North Mw Hub 8 45 priority PH0
9.0353 38.7553 E E Arada Addis North Mw Hub 8 45 priority PH0
8.88485 38.75781 0 0 Akaki - Kalit Addis South Mw Access 2 410 priority PH0
8.88485 38.75781 A A Akaki - Kalit Addis South Mw Access 2 410 priority PH0
8.88485 38.75781 B B Akaki - Kalit Addis South Mw Access 2 410 priority PH0
8.88485 38.75781 P P Akaki - Kalit Addis South Mw Access 2 410 priority PH0
9.01324 38.7782 0 0 Yeka Addis North Mw Access 8 75 Priority PH0
9.01324 38.7782 A A Yeka Addis North Mw Access 8 75 Priority PH0
9.01324 38.7782 B B Yeka Addis North Mw Access 8 75 Priority PH0
9.01324 38.7782 D D Yeka Addis North Mw Access 8 75 Priority PH0
9.01324 38.7782 E E Yeka Addis North Mw Access 8 75 Priority PH0
8.99508 38.67603 0 0 Kolfe - Keran Addis North Mw Access 10 664 Priority PH0
8.99508 38.67603 A A Kolfe - Keran Addis North Mw Access 10 664 Priority PH0
8.99508 38.67603 B B Kolfe - Keran Addis North Mw Access 10 664 Priority PH0
8.99508 38.67603 C C Kolfe - Keran Addis North Mw Access 10 664 Priority PH0
8.99508 38.67603 D D Kolfe - Keran Addis North Mw Access 10 664 Priority PH0
8.99508 38.67603 X X Kolfe - Keran Addis North Mw Access 10 664 Priority PH0
9.02068 38.7771 0 0 Yeka Addis North Mw Access 11 95 priority PH0
9.02068 38.7771 A A Yeka Addis North Mw Access 11 95 priority PH0
9.02068 38.7771 B B Yeka Addis North Mw Access 11 95 priority PH0
9.02068 38.7771 D D Yeka Addis North Mw Access 11 95 priority PH0
9.017023 38.777701 E E Yeka Addis North Mw Access 11 95 priority PH0
9.02068 38.7771 C C Yeka Addis North Mw Access 11 95 priority PH0
8.99706 38.7647 0 0 Kirkos Addis South Mw Access 7 410 priority PH0
8.99706 38.7647 A A Kirkos Addis South Mw Access 7 410 priority PH0
9.00436 38.7643 0 0 Kirkos Addis South Mw Access 8 410 priority PH0
9.00436 38.7643 T T Kirkos Addis South Mw Access 8 410 priority PH0
9.00436 38.7643 A A Kirkos Addis South Mw Access 8 410 priority PH0
9.00436 38.7643 B B Kirkos Addis South Mw Access 8 410 priority PH0
9.01731 38.75716 0 0 Kirkos Addis South Mw Access 7 664 Priority PH0
9.01731 38.75716 A A Kirkos Addis South Mw Access 7 664 Priority PH0
9.01731 38.75716 X X Kirkos Addis South Mw Access 7 664 Priority PH0
9.02632 38.7411 0 0 Lideta Addis North Mw Access 11 75 Priority PH0
9.02632 38.7411 A A Lideta Addis North Mw Access 11 75 Priority PH0
9.02632 38.7411 B B Lideta Addis North Mw Access 11 75 Priority PH0
9.03007 38.7407 0 0 Addis Ketema (AA)
Addis North Mw Access 10 75 Priority PH0
9.03007 38.7407 A A Addis Ketema (AA)
Addis North Mw Access 10 75 Priority PH0
9.03007 38.7407 B B Addis Ketema (AA)
Addis North Mw Access 10 75 Priority PH0
9.03007 38.7407 C C Addis Ketema (AA)
Addis North Mw Access 10 75 Priority PH0
9.03399 38.7384 0 0 Addis Ketema (AA)
Addis North Mw Access 10 75 Priority PH0
9.03399 38.7384 A A Addis Ketema (AA)
Addis North Mw Access 10 75 Priority PH0
9.03399 38.7384 B B Addis Ketema (AA)
Addis North Mw Access 10 75 Priority PH0
9.03399 38.7384 C C Addis Ketema (AA)
Addis North Mw Access 10 75 Priority PH0
8.85762 38.79175 0 0 Akaki - Kalit Addis South Mw Access 3 410 priority PH0
8.85762 38.79175 A A Akaki - Kalit Addis South Mw Access 3 410 priority PH0
8.85762 38.79175 B B Akaki - Kalit Addis South Mw Access 3 410 priority PH0
8.85762 38.79175 C C Akaki - Kalit Addis South Mw Access 3 410 priority PH0
8.85762 38.79175 T T Akaki - Kalit Addis South Mw Access 3 410 priority PH0
9.00885027 38.7443382 0 0 Kirkos Addis South Mw Access 8 410 priority PH0
9.00885027 38.7443382 A A Kirkos Addis South Mw Access 8 410 priority PH0
9.0059 38.7847 0 0 Bole Addis South Mw Access 8 75 Priority PH0
9.0059 38.7847 A A Bole Addis South Mw Access 8 75 Priority PH0
9.0059 38.7847 T T Bole Addis South Mw Access 8 75 Priority PH0
9.0059 38.7847 C C Bole Addis South Mw Access 8 75 Priority PH0
9.0059 38.7847 B B Bole Addis South Mw Access 8 75 Priority PH0
9.000053 38.784467 0 0 Bole Addis South Mw Access 6 664 Priority PH0
9.000053 38.784467 A A Bole Addis South Mw Access 6 664 Priority PH0
9.000053 38.784467 B B Bole Addis South Mw Access 6 664 Priority PH0
9.000053 38.784467 C C Bole Addis South Mw Access 6 664 Priority PH0
9.000053 38.784467 X X Bole Addis South Mw Access 6 664 Priority PH0
8.99174 38.79597 0 0 Bole Addis South Mw Access 6 410 priority PH0
8.99174 38.79597 B B Bole Addis South Mw Access 6 410 priority PH0
8.99174 38.79597 C C Bole Addis South Mw Access 6 410 priority PH0
8.99174 38.79597 D D Bole Addis South Mw Access 6 410 priority PH0
8.99174 38.79597 E E Bole Addis South Mw Access 6 410 priority PH0
8.99604 38.7915 A A Bole Addis South Mw Hub 5 75 Priority PH0
8.99604 38.7915 B B Bole Addis South Mw Hub 5 75 Priority PH0
8.99604 38.7915 C C Bole Addis South Mw Hub 5 75 Priority PH0
8.99604 38.7915 D D Bole Addis South Mw Hub 5 75 Priority PH0
9.02941 38.7388 0 0 Addis Ketema (AA)
Addis North Mw Access 10 95 priority PH0
9.02941 38.7388 A A Addis Ketema (AA)
Addis North Mw Access 10 95 priority PH0
9.02941 38.7388 B B Addis Ketema (AA)
Addis North Mw Access 10 95 priority PH0
9.02941 38.7388 C C Addis Ketema (AA)
Addis North Mw Access 10 95 priority PH0
9.02941 38.7388 D D Addis Ketema (AA)
Addis North Mw Access 10 95 priority PH0
9.02941 38.7388 E E Addis Ketema (AA)
Addis North Mw Access 10 95 priority PH0
9.03395 38.7338 0 0 Addis Ketema (AA)
Addis North Mw Access 9 75 Priority PH0
9.03395 38.7338 A A Addis Ketema (AA)
Addis North Mw Access 9 75 Priority PH0
9.03395 38.7338 B B Addis Ketema (AA)
Addis North Mw Access 9 75 Priority PH0
9.03395 38.7338 C C Addis Ketema (AA)
Addis North Mw Access 9 75 Priority PH0
9.03395 38.7338 D D Addis Ketema (AA)
Addis North Mw Access 9 75 Priority PH0
9.03395 38.7338 T T Addis Ketema (AA)
Addis North Mw Access 9 75 Priority PH0
9.021782 38.744253 0 0 PH0
8.98439 38.7805 0 0 Bole Addis South Mw Access 6 45 priority PH0
8.98439 38.7805 A A Bole Addis South Mw Access 6 45 priority PH0
9.01112 38.7832 0 0 Bole Addis South Mw Hub 7 45 priority PH0
9.01112 38.7832 A A Bole Addis South Mw Hub 7 45 priority PH0
9.01112 38.7832 B B Bole Addis South Mw Hub 7 45 priority PH0
9.01112 38.7832 C C Bole Addis South Mw Hub 7 45 priority PH0
9.01112 38.7832 E E Bole Addis South Mw Hub 7 45 priority PH0
9.01112 38.7832 F F Bole Addis South Mw Hub 7 45 priority PH0
9.01112 38.7832 D D Bole Addis South Mw Hub 7 45 priority PH0
9.052001 38.772394 0 0 Yeka Addis North Mw Access 12 410 priority PH0
9.052001 38.772394 A A Yeka Addis North Mw Access 12 410 priority PH0
9.052001 38.772394 B B Yeka Addis North Mw Access 12 410 priority PH0
9.052001 38.772394 C C Yeka Addis North Mw Access 12 410 priority PH0
9.04202 38.76663 0 0 Arada Addis North Mw Access 10 410 priority PH0
9.04202 38.76663 A A Arada Addis North Mw Access 10 410 priority PH0
9.04202 38.76663 B B Arada Addis North Mw Access 10 410 priority PH0
9.04202 38.76663 C 0 Arada Addis North Mw Access 10 410 priority PH0
9.04202 38.76663 D D Arada Addis North Mw Access 10 410 priority PH0
9.04202 38.76663 X X Arada Addis North Mw Access 10 410 priority PH0
9.04506 38.78201 0 0 Yeka Addis North Mw Access 10 410 priority PH0
9.04506 38.78201 A A Yeka Addis North Mw Access 10 410 priority PH0
9.04506 38.78201 B B Yeka Addis North Mw Access 10 410 priority PH0
9.04506 38.78201 P P Yeka Addis North Mw Access 10 410 priority PH0
9.01867 38.7382 0 0 Lideta Addis North Mw Access 7 95 priority PH0
9.01867 38.7382 A A Lideta Addis North Mw Access 7 95 priority PH0
9.01867 38.7382 B B Lideta Addis North Mw Access 7 95 priority PH0
9.01867 38.7382 C C Lideta Addis North Mw Access 7 95 priority PH0
9.05231526 38.7334776 0 0 Gulele Addis North Mw Access 11 410 priority PH0
9.05231526 38.7334776 A A Gulele Addis North Mw Access 11 410 priority PH0
9.04635999 38.8743694 0 0 Yeka Addis North Mw Access 15 410 priority PH0
9.04635999 38.8743694 A A Yeka Addis North Mw Access 15 410 priority PH0
9.04635999 38.8743694 B B Yeka Addis North Mw Access 15 410 priority PH0
9.04635999 38.8743694 C C Yeka Addis North Mw Access 15 410 priority PH0
9.04635999 38.8743694 D D Yeka Addis North Mw Access 15 410 priority PH0
9.04635999 38.8743694 X X Yeka Addis North Mw Access 15 410 priority PH0
8.95956 38.72237 0 0 Nefas Silk Addis South Mw Access 5 410 priority PH0
8.95956 38.72237 X X Nefas Silk Addis South Mw Access 5 410 priority PH0
8.95956 38.72237 A A Nefas Silk Addis South Mw Access 5 410 priority PH0
8.95956 38.72237 B B Nefas Silk Addis South Mw Access 5 410 priority PH0
8.95956 38.72237 C C Nefas Silk Addis South Mw Access 5 410 priority PH0
8.97184024 38.8280971 0 0 Bole Addis South Mw Access 11 664 Priority PH0
8.97184024 38.8280971 X X Bole Addis South Mw Access 11 664 Priority PH0
8.97184024 38.8280971 A A Bole Addis South Mw Access 11 664 Priority PH0
8.97184024 38.8280971 C C Bole Addis South Mw Access 11 664 Priority PH0
8.97184024 38.8280971 B B Bole Addis South Mw Access 11 664 Priority PH0
9.01207 38.77185 0 0 Kirkos Addis South Mw Access 7 664 Priority PH0
9.01207 38.77185 A A Kirkos Addis South Mw Access 7 664 Priority PH0
9.01207 38.77185 X X Kirkos Addis South Mw Access 7 664 Priority PH0
9.01293 38.73296 0 0 Lideta Addis North Mw Access 7 664 Priority PH0
9.01293 38.73296 A A Lideta Addis North Mw Access 7 664 Priority PH0
9.01293 38.73296 B B Lideta Addis North Mw Access 7 664 Priority PH0
9.01293 38.73296 C C Lideta Addis North Mw Access 7 664 Priority PH0
9.03365 38.70483 0 0 Kolfe - Keran Addis North Mw Access 10 410 priority PH0
9.03365 38.70483 A A Kolfe - Keran Addis North Mw Access 10 410 priority PH0
9.03365 38.70483 B B Kolfe - Keran Addis North Mw Access 10 410 priority PH0
9.03365 38.70483 C C Kolfe - Keran Addis North Mw Access 10 410 priority PH0
9.03365 38.70483 D D Kolfe - Keran Addis North Mw Access 10 410 priority PH0
9.03365 38.70483 X X Kolfe - Keran Addis North Mw Access 10 410 priority PH0
8.9929 38.7781 0 0 Bole Addis South Mw Access 5 45 priority PH0
8.9929 38.7781 A A Bole Addis South Mw Access 5 45 priority PH0
8.9929 38.7781 B B Bole Addis South Mw Access 5 45 priority PH0
8.9929 38.7781 C C Bole Addis South Mw Access 5 45 priority PH0
9.02386337 38.7757748 0 0 Yeka Addis North Mw Access 10 664 Priority PH0
9.02386337 38.7757748 A A Yeka Addis North Mw Access 10 664 Priority PH0
9.02386337 38.7757748 B B Yeka Addis North Mw Access 10 664 Priority PH0
9.02386337 38.7757748 C C Yeka Addis North Mw Access 10 664 Priority PH0
9.02556 38.7523 0 0 Arada Addis North Mw Access 8 95 priority PH0
9.02556 38.7523 A A Arada Addis North Mw Access 8 95 priority PH0
9.02556 38.7523 B B Arada Addis North Mw Access 8 95 priority PH0
9.02556 38.7523 C C Arada Addis North Mw Access 8 95 priority PH0
9.02556 38.7523 D D Arada Addis North Mw Access 8 95 priority PH0
9.02556 38.7523 E E Arada Addis North Mw Access 8 95 priority PH0
9.02556 38.7523 F F Arada Addis North Mw Access 8 95 priority PH0
8.22889 34.58294 0 0 Gambela town South West Mw Access 3 664 Priority PH0
8.22889 34.58294 T T Gambela town South West Mw Access 3 664 Priority PH0
8.2456 34.60615 0 0 Gambela town South West Mw Hub 1 664 Priority PH0
8.2456 34.60615 T T Gambela town South West Mw Hub 1 664 Priority PH0
8.24103 34.58352 0 0 Gambela town South West Mw Access 3 664 Priority PH0
8.24103 34.58352 A A Gambela town South West Mw Access 3 664 Priority PH0
8.27094 34.58666 0 0 Gambela Zuria South West Mw Access 3 664 Priority PH0
8.27094 34.58666 A A Gambela Zuria South West Mw Access 3 664 Priority PH0
8.25649 34.59138 0 0 Gambela town South West Mw Access 2 664 Priority PH0
8.25649 34.59138 A A Gambela town South West Mw Access 2 664 Priority PH0
8.24652 34.59427 0 0 Gambela town South West Mw Access 2 664 Priority PH0
8.24652 34.59427 A A Gambela town South West Mw Access 2 664 Priority PH0
8.23603 34.60221 0 0 Gambela town South West Mw Access 2 664 Priority PH0
8.23603 34.60221 T T Gambela town South West Mw Access 2 664 Priority PH0
8.25384 34.58313 0 0 Gambela town South West Mw Access 3 664 Priority PH0
8.25384 34.58313 B B Gambela town South West Mw Access 3 664 Priority PH0
8.25384 34.58313 A A Gambela town South West Mw Access 3 664 Priority PH0
6.42416 38.28026 0 0 Abaya South West Mw Access 2 664 Priority PH0
6.42416 38.28026 A A Abaya South West Mw Access 2 664 Priority PH0
6.42416 38.28026 T T Abaya South West Mw Access 2 664 Priority PH0
7.85504 36.58598 0 0 Agaro town South West Mw Access 1 664 Priority PH0
7.85504 36.58598 A A Agaro town South West Mw Access 1 664 Priority PH0
7.85504 36.58598 B B Agaro town South West Mw Access 1 664 Priority PH0
7.07313 38.7911 0 0 Kofele South East Mw Access 2 664 Priority PH0
7.07313 38.7911 A A Kofele South East Mw Access 2 664 Priority PH0
5.63672 38.2383 0 0 Bule Hora town South West Mw Access 1 664 Priority PH0
5.63672 38.2383 A A Bule Hora town South West Mw Access 1 664 Priority PH0
8.53232 39.25548 0 0 Adama town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.53232 39.25548 A A Adama town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.53232 39.25548 B B Adama town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.53232 39.25548 C C Adama town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.53232 39.25548 D D Adama town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.30756 35.58373 0 0 Metu town South West Mw Access 2 664 Priority PH0
8.30756 35.58373 A A Metu town South West Mw Access 2 664 Priority PH0
8.29745 35.5831 0 0 Metu town South West Mw Access 1 664 Priority PH0
8.29745 35.5831 A A Metu town South West Mw Access 1 664 Priority PH0
8.821479 38.869749 0 0 Akaki South East Mw Access 4 P1 Project B: 18 Road SitesPH0
8.821479 38.869749 B B Akaki South East Mw Access 4 P1 Project B: 18 Road SitesPH0
8.821479 38.869749 C C Akaki South East Mw Access 4 P1 Project B: 18 Road SitesPH0
8.821479 38.869749 D D Akaki South East Mw Access 4 P1 Project B: 18 Road SitesPH0
8.74593 38.96451 0 0 Bishoftu town South East Mw Hub 2P3 Project C: 76 Corridor Sites
PH0
8.74593 38.96451 A A Bishoftu town South East Mw Hub 2P3 Project C: 76 Corridor Sites
PH0
8.74593 38.96451 B B Bishoftu town South East Mw Hub 2P3 Project C: 76 Corridor Sites
PH0
8.74593 38.96451 T T Bishoftu town South East Mw Hub 2P3 Project C: 76 Corridor Sites
PH0
7.91578 39.12826 0 0 Tiyo South East Mw Hub 4 664 Priority PH0
7.91578 39.12826 A A Tiyo South East Mw Hub 4 664 Priority PH0
7.91578 39.12826 B B Tiyo South East Mw Hub 4 664 Priority PH0
7.91578 39.12826 C C Tiyo South East Mw Hub 4 664 Priority PH0
7.91578 39.12826 D D Tiyo South East Mw Hub 4 664 Priority PH0
7.94156 39.12287 0 0 Tiyo South East Mw Access 4 664 Priority PH0
7.94156 39.12287 B B Tiyo South East Mw Access 4 664 Priority PH0
7.94156 39.12287 C C Tiyo South East Mw Access 4 664 Priority PH0
7.94156 39.12287 D D Tiyo South East Mw Access 4 664 Priority PH0
7.95428 39.12714 0 0 Tiyo South East Mw Access 4 664 Priority PH0
7.95428 39.12714 B B Tiyo South East Mw Access 4 664 Priority PH0
7.95428 39.12714 A A Tiyo South East Mw Access 4 664 Priority PH0
7.95428 39.12714 C C Tiyo South East Mw Access 4 664 Priority PH0
8.57932 39.28573 0 0 Adama town South East Mw Access 6P3 Project C: 76 Corridor Sites
PH0
8.57932 39.28573 A A Adama town South East Mw Access 6P3 Project C: 76 Corridor Sites
PH0
8.57932 39.28573 B B Adama town South East Mw Access 6P3 Project C: 76 Corridor Sites
PH0
8.57932 39.28573 C C Adama town South East Mw Access 6P3 Project C: 76 Corridor Sites
PH0
8.57932 39.28573 X X Adama town South East Mw Access 6P3 Project C: 76 Corridor Sites
PH0
7.19592 38.60793 0 0 Shashemene townSouth West Mw Hub 1 664 Priority PH0
7.19592 38.60793 T T Shashemene townSouth West Mw Hub 1 664 Priority PH0
8.5039 39.25197 0 0 Adama town South East Mw Access 2P3 Project C: 76 Corridor Sites
PH0
8.5039 39.25197 A A Adama town South East Mw Access 2P3 Project C: 76 Corridor Sites
PH0
8.5039 39.25197 B B Adama town South East Mw Access 2P3 Project C: 76 Corridor Sites
PH0
8.5039 39.25197 C C Adama town South East Mw Access 2P3 Project C: 76 Corridor Sites
PH0
8.5039 39.25197 T T Adama town South East Mw Access 2P3 Project C: 76 Corridor Sites
PH0
8.544665 39.269023 0 0 Adama town South East Mw Hub 3 P0 Project A: 15 RT PH0
8.544665 39.269023 A A Adama town South East Mw Hub 3 P0 Project A: 15 RT PH0
8.544665 39.269023 B B Adama town South East Mw Hub 3 P0 Project A: 15 RT PH0
8.50215 39.2936 0 0 Adama town South East Mw Access 6P3 Project C: 76 Corridor Sites
PH0
8.50215 39.2936 A A Adama town South East Mw Access 6P3 Project C: 76 Corridor Sites
PH0
8.50215 39.2936 B B Adama town South East Mw Access 6P3 Project C: 76 Corridor Sites
PH0
8.50215 39.2936 C C Adama town South East Mw Access 6P3 Project C: 76 Corridor Sites
PH0
8.50215 39.2936 T T Adama town South East Mw Access 6P3 Project C: 76 Corridor Sites
PH0
8.56632 39.16768 0 0 Lome (OR) South East Mw Access 2 P1 Project B: 18 Road SitesPH0
8.56632 39.16768 A A Lome (OR) South East Mw Access 2 P1 Project B: 18 Road SitesPH0
8.56632 39.16768 B B Lome (OR) South East Mw Access 2 P1 Project B: 18 Road SitesPH0
8.56632 39.16768 C C Lome (OR) South East Mw Access 2 P1 Project B: 18 Road SitesPH0
8.56632 39.16768 D D Lome (OR) South East Mw Access 2 P1 Project B: 18 Road SitesPH0
8.56632 39.16768 T T Lome (OR) South East Mw Access 2 P1 Project B: 18 Road SitesPH0
8.5774 39.14508 0 0 Lome (OR) South East Mw Hub 1 P1 Project B: 18 Road SitesPH0
8.5774 39.14508 A A Lome (OR) South East Mw Hub 1 P1 Project B: 18 Road SitesPH0
8.5774 39.14508 B B Lome (OR) South East Mw Hub 1 P1 Project B: 18 Road SitesPH0
8.5774 39.14508 C C Lome (OR) South East Mw Hub 1 P1 Project B: 18 Road SitesPH0
8.5774 39.14508 T T Lome (OR) South East Mw Hub 1 P1 Project B: 18 Road SitesPH0
8.58099 39.13192 0 0 Mojo Town South East Mw Hub 2 P1 Project B: 18 Road SitesPH0
8.58099 39.13192 A A Mojo Town South East Mw Hub 2 P1 Project B: 18 Road SitesPH0
8.58099 39.13192 B B Mojo Town South East Mw Hub 2 P1 Project B: 18 Road SitesPH0
8.58099 39.13192 C C Mojo Town South East Mw Hub 2 P1 Project B: 18 Road SitesPH0
8.58099 39.13192 E E Mojo Town South East Mw Hub 2 P1 Project B: 18 Road SitesPH0
8.58099 39.13192 D D Mojo Town South East Mw Hub 2 P1 Project B: 18 Road SitesPH0
8.60565 39.12105 0 0 Mojo Town South East Mw Access 5 P1 Project B: 18 Road SitesPH0
8.60565 39.12105 A A Mojo Town South East Mw Access 5 P1 Project B: 18 Road SitesPH0
8.60565 39.12105 B B Mojo Town South East Mw Access 5 P1 Project B: 18 Road SitesPH0
8.60565 39.12105 C C Mojo Town South East Mw Access 5 P1 Project B: 18 Road SitesPH0
8.60565 39.12105 X X Mojo Town South East Mw Access 5 P1 Project B: 18 Road SitesPH0
8.60565 39.12105 T T Mojo Town South East Mw Access 5 P1 Project B: 18 Road SitesPH0
8.74803 38.97394 0 0 Bishoftu town South East Mw Hub 4 P0 Project A: 15 RT PH0
8.74803 38.97394 A A Bishoftu town South East Mw Hub 4 P0 Project A: 15 RT PH0
8.74803 38.97394 B B Bishoftu town South East Mw Hub 4 P0 Project A: 15 RT PH0
8.55241 39.26979 0 0 Adama town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.55241 39.26979 A A Adama town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.55241 39.26979 B B Adama town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.55501 39.29677 0 0 Adama town South East Mw Access 4 P0 Project A: 15 RT PH0
8.55501 39.29677 A A Adama town South East Mw Access 4 P0 Project A: 15 RT PH0
8.55501 39.29677 B B Adama town South East Mw Access 4 P0 Project A: 15 RT PH0
8.55501 39.29677 D D Adama town South East Mw Access 4 P0 Project A: 15 RT PH0
8.55501 39.29677 C C Adama town South East Mw Access 4 P0 Project A: 15 RT PH0
8.55441 39.28448 0 0 Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.55441 39.28448 A A Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.55441 39.28448 B B Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.55441 39.28448 C C Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.53411 39.23894 0 0 Adama town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.53411 39.23894 A A Adama town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.53411 39.23894 B B Adama town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.53411 39.23894 C C Adama town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.53476 39.27683 0 0 Adama town South East Mw Hub 3 P0 Project A: 15 RT PH0
8.53476 39.27683 B B Adama town South East Mw Hub 3 P0 Project A: 15 RT PH0
8.53476 39.27683 C C Adama town South East Mw Hub 3 P0 Project A: 15 RT PH0
8.53476 39.27683 D D Adama town South East Mw Hub 3 P0 Project A: 15 RT PH0
8.53476 39.27683 E E Adama town South East Mw Hub 3 P0 Project A: 15 RT PH0
8.53476 39.27683 F F Adama town South East Mw Hub 3 P0 Project A: 15 RT PH0
8.33149 39.32213 0 0 Dodota South East Mw Access 1 664 Priority PH0
8.33149 39.32213 A A Dodota South East Mw Access 1 664 Priority PH0
8.33149 39.32213 B B Dodota South East Mw Access 1 664 Priority PH0
8.33149 39.32213 C C Dodota South East Mw Access 1 664 Priority PH0
8.13499 39.23373 0 0 Hitosa South East Mw Access 3 664 Priority PH0
8.13499 39.23373 A A Hitosa South East Mw Access 3 664 Priority PH0
8.13499 39.23373 B B Hitosa South East Mw Access 3 664 Priority PH0
8.13499 39.23373 C C Hitosa South East Mw Access 3 664 Priority PH0
7.2364 38.60999 0 0 Shashemene ZuriaSouth West Mw Access 4 664 Priority PH0
7.2364 38.60999 T T Shashemene ZuriaSouth West Mw Access 4 664 Priority PH0
7.194342 38.59732 A A Shashemene townSouth West Mw Access 4 664 Priority PH0
7.2033 36.6117 0 0 Arsi Negele South West Mw Access 4 664 Priority PH0
7.2033 36.6117 A A Arsi Negele South West Mw Access 4 664 Priority PH0
7.2033 36.6117 B B Arsi Negele South West Mw Access 4 664 Priority PH0
7.2033 36.6117 C C Arsi Negele South West Mw Access 4 664 Priority PH0
9.097363 38.76216 0 0 Shashemene ZuriaSouth West Mw Access 4 664 Priority PH0
7.185364 38.655001 T T Shashemene ZuriaSouth West Mw Access 4 664 Priority PH0
7.17016 38.65451 0 0 Shashemene ZuriaSouth West Mw Access 3 664 Priority PH0
7.17016 38.65451 T T Shashemene ZuriaSouth West Mw Access 3 664 Priority PH0
8.57208 39.26688 0 0 Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.57208 39.26688 A A Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.57208 39.26688 B B Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.57208 39.26688 C C Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.57208 39.26688 D D Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.57208 39.26688 X X Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.75475 38.97354 0 0 Bishoftu town South East Mw Access 2P3 Project C: 76 Corridor Sites
PH0
8.75475 38.97354 A A Bishoftu town South East Mw Access 2P3 Project C: 76 Corridor Sites
PH0
8.75475 38.97354 B B Bishoftu town South East Mw Access 2P3 Project C: 76 Corridor Sites
PH0
8.75475 38.97354 C C Bishoftu town South East Mw Access 2P3 Project C: 76 Corridor Sites
PH0
7.67481 36.81372 0 0 Jimma town South West Mw Hub 2 664 Priority PH0
7.67481 36.81372 T T Jimma town South West Mw Hub 2 664 Priority PH0
7.67481 36.81372 A A Jimma town South West Mw Hub 2 664 Priority PH0
8.82307 38.86588 0 0 Akaki South East Mw Access 3 P1 Project B: 18 Road SitesPH0
8.82307 38.86588 A A Akaki South East Mw Access 3 P1 Project B: 18 Road SitesPH0
8.82307 38.86588 B B Akaki South East Mw Access 3 P1 Project B: 18 Road SitesPH0
8.82307 38.86588 T T Akaki South East Mw Access 3 P1 Project B: 18 Road SitesPH0
8.82307 38.86588 C C Akaki South East Mw Access 3 P1 Project B: 18 Road SitesPH0
8.82307 38.86588 D D Akaki South East Mw Access 3 P1 Project B: 18 Road SitesPH0
8.5979 39.1142 0 0 Mojo Town South East Mw Access 6 P1 Project B: 18 Road SitesPH0
8.5979 39.1142 A A Mojo Town South East Mw Access 6 P1 Project B: 18 Road SitesPH0
8.5979 39.1142 B B Mojo Town South East Mw Access 6 P1 Project B: 18 Road SitesPH0
8.5979 39.1142 C C Mojo Town South East Mw Access 6 P1 Project B: 18 Road SitesPH0
8.77412 38.99318 0 0 Bishoftu town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.77412 38.99318 A A Bishoftu town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.77412 38.99318 B B Bishoftu town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.77412 38.99318 C C Bishoftu town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.74919 38.95871 0 0 Bishoftu town South East Mw Hub 1P3 Project C: 76 Corridor Sites
PH0
8.74919 38.95871 A A Bishoftu town South East Mw Hub 1P3 Project C: 76 Corridor Sites
PH0
8.74919 38.95871 B B Bishoftu town South East Mw Hub 1P3 Project C: 76 Corridor Sites
PH0
8.74919 38.95871 C C Bishoftu town South East Mw Hub 1P3 Project C: 76 Corridor Sites
PH0
8.54866 39.29126 0 0 Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.54866 39.29126 A A Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.54866 39.29126 C C Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.553243 39.277837 0 0 Adama town South East Mw Access 4 P0 Project A: 15 RT PH0
8.553243 39.277837 A A Adama town South East Mw Access 4 P0 Project A: 15 RT PH0
8.553243 39.277837 B B Adama town South East Mw Access 4 P0 Project A: 15 RT PH0
8.553243 39.277837 D D Adama town South East Mw Access 4 P0 Project A: 15 RT PH0
8.553243 39.277837 C C Adama town South East Mw Access 4 P0 Project A: 15 RT PH0
8.5114 39.27833 0 0 Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.5114 39.27833 A A Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.5114 39.27833 B B Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.5114 39.27833 C C Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.5114 39.27833 T T Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.53607 39.25225 0 0 Adama town South East Mw Hub 2 P0 Project A: 15 RT PH0
8.53607 39.25225 A A Adama town South East Mw Hub 2 P0 Project A: 15 RT PH0
8.53607 39.25225 B B Adama town South East Mw Hub 2 P0 Project A: 15 RT PH0
8.52391 39.25066 0 0 Adama town South East Mw Access 2P3 Project C: 76 Corridor Sites
PH0
8.52391 39.25066 A A Adama town South East Mw Access 2P3 Project C: 76 Corridor Sites
PH0
8.52391 39.25066 B B Adama town South East Mw Access 2P3 Project C: 76 Corridor Sites
PH0
8.52391 39.25066 C C Adama town South East Mw Access 2P3 Project C: 76 Corridor Sites
PH0
7.75801 37.22344 0 0 Omo Nada South West Mw Access 1 664 Priority PH0
7.75801 37.22344 A A Omo Nada South West Mw Access 1 664 Priority PH0
8.56863 39.2793 0 0 Adama town South East Mw Access 6P3 Project C: 76 Corridor Sites
PH0
8.56863 39.2793 A A Adama town South East Mw Access 6P3 Project C: 76 Corridor Sites
PH0
8.56863 39.2793 B B Adama town South East Mw Access 6P3 Project C: 76 Corridor Sites
PH0
8.56863 39.2793 C C Adama town South East Mw Access 6P3 Project C: 76 Corridor Sites
PH0
8.53949 39.26336 0 0 Adama town South East Mw Hub 2 P0 Project A: 15 RT PH0
8.53949 39.26336 A A Adama town South East Mw Hub 2 P0 Project A: 15 RT PH0
8.53949 39.26336 B B Adama town South East Mw Hub 2 P0 Project A: 15 RT PH0
8.53949 39.26336 C C Adama town South East Mw Hub 2 P0 Project A: 15 RT PH0
8.53949 39.26336 D D Adama town South East Mw Hub 2 P0 Project A: 15 RT PH0
8.53949 39.26336 E E Adama town South East Mw Hub 2 P0 Project A: 15 RT PH0
8.52548 39.28195 0 0 Adama town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.52548 39.28195 A A Adama town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.52548 39.28195 B B Adama town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.52548 39.28195 T T Adama town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.55784 39.26438 0 0 Adama town South East Mw Hub 4P3 Project C: 76 Corridor Sites
PH0
8.55784 39.26438 T T Adama town South East Mw Hub 4P3 Project C: 76 Corridor Sites
PH0
8.55784 39.26438 A A Adama town South East Mw Hub 4P3 Project C: 76 Corridor Sites
PH0
8.55784 39.26438 B B Adama town South East Mw Hub 4P3 Project C: 76 Corridor Sites
PH0
8.55784 39.26438 C C Adama town South East Mw Hub 4P3 Project C: 76 Corridor Sites
PH0
8.53346 39.26137 0 0 Adama town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.53346 39.26137 A A Adama town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.53346 39.26137 B B Adama town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.53346 39.26137 C C Adama town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.546622 39.270589 0 0 Adama town South East Mw Access 4 P0 Project A: 15 RT PH0
8.546622 39.270589 A A Adama town South East Mw Access 4 P0 Project A: 15 RT PH0
8.546622 39.270589 B B Adama town South East Mw Access 4 P0 Project A: 15 RT PH0
8.546622 39.270589 T T Adama town South East Mw Access 4 P0 Project A: 15 RT PH0
8.5283318 39.2713165 0 0 Adama town South East Mw Hub 2P3 Project C: 76 Corridor Sites
PH0
8.5283318 39.2713165 A A Adama town South East Mw Hub 2P3 Project C: 76 Corridor Sites
PH0
8.5283318 39.2713165 B B Adama town South East Mw Hub 2P3 Project C: 76 Corridor Sites
PH0
8.14615 38.81595 0 0 Dugda South East Mw Access 3 664 Priority PH0
8.14615 38.81595 A A Dugda South East Mw Access 3 664 Priority PH0
8.14615 38.81595 B B Dugda South East Mw Access 3 664 Priority PH0
8.14615 38.81595 C C Dugda South East Mw Access 3 664 Priority PH0
8.7591 38.94556 0 0 Bishoftu town South East Mw Access 2 P0 Project A: 15 RT PH0
8.7591 38.94556 B B Bishoftu town South East Mw Access 2 P0 Project A: 15 RT PH0
8.7591 38.94556 C C Bishoftu town South East Mw Access 2 P0 Project A: 15 RT PH0
8.7591 38.94556 A A Bishoftu town South East Mw Access 2 P0 Project A: 15 RT PH0
8.75216 38.96679 0 0 Bishoftu town South East Mw Access 2P3 Project C: 76 Corridor Sites
PH0
8.75216 38.96679 A A Bishoftu town South East Mw Access 2P3 Project C: 76 Corridor Sites
PH0
8.75216 38.96679 B B Bishoftu town South East Mw Access 2P3 Project C: 76 Corridor Sites
PH0
8.75216 38.96679 C C Bishoftu town South East Mw Access 2P3 Project C: 76 Corridor Sites
PH0
8.74285 38.97361 0 0 Bishoftu town South East Mw Hub 3P3 Project C: 76 Corridor Sites
PH0
8.74285 38.97361 A A Bishoftu town South East Mw Hub 3P3 Project C: 76 Corridor Sites
PH0
8.74285 38.97361 B B Bishoftu town South East Mw Hub 3P3 Project C: 76 Corridor Sites
PH0
8.74285 38.97361 C C Bishoftu town South East Mw Hub 3P3 Project C: 76 Corridor Sites
PH0
8.74379 38.99247 0 0 Bishoftu town South East Mw Access 7P3 Project C: 76 Corridor Sites
PH0
8.74379 38.99247 A A Bishoftu town South East Mw Access 7P3 Project C: 76 Corridor Sites
PH0
8.74379 38.99247 B B Bishoftu town South East Mw Access 7P3 Project C: 76 Corridor Sites
PH0
8.74379 38.99247 C C Bishoftu town South East Mw Access 7P3 Project C: 76 Corridor Sites
PH0
8.74379 38.99247 D D Bishoftu town South East Mw Access 7P3 Project C: 76 Corridor Sites
PH0
8.76431 38.99958 0 0 Bishoftu town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.76431 38.99958 A A Bishoftu town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.76431 38.99958 B B Bishoftu town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.76431 38.99958 C C Bishoftu town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.78785 38.9029 0 0 Ada'a South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.78785 38.9029 A A Ada'a South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.78785 38.9029 B B Ada'a South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.78785 38.9029 C C Ada'a South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.78785 38.9029 T T Ada'a South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.29696 38.94883 0 0 Bora (OR) South East Mw Access 2 664 Priority PH0
8.29696 38.94883 A A Bora (OR) South East Mw Access 2 664 Priority PH0
8.29696 38.94883 B B Bora (OR) South East Mw Access 2 664 Priority PH0
8.29696 38.94883 C C Bora (OR) South East Mw Access 2 664 Priority PH0
8.67653 39.03706 0 0 Ada'a South East Mw Access 3 P1 Project B: 18 Road SitesPH0
8.67653 39.03706 A A Ada'a South East Mw Access 3 P1 Project B: 18 Road SitesPH0
8.67653 39.03706 B B Ada'a South East Mw Access 3 P1 Project B: 18 Road SitesPH0
8.67653 39.03706 T T Ada'a South East Mw Access 3 P1 Project B: 18 Road SitesPH0
7.91913 38.71391 0 0Adama Tulu Jido Kombolcha
South East Mw Access 1 664 Priority PH0
7.91913 38.71391 A AAdama Tulu Jido Kombolcha
South East Mw Access 1 664 Priority PH0
7.91913 38.71391 B BAdama Tulu Jido Kombolcha
South East Mw Access 1 664 Priority PH0
8.59718 39.12534 0 0 Mojo Town South East Mw Access 4 P1 Project B: 18 Road SitesPH0
8.59718 39.12534 A A Mojo Town South East Mw Access 4 P1 Project B: 18 Road SitesPH0
8.59718 39.12534 B B Mojo Town South East Mw Access 4 P1 Project B: 18 Road SitesPH0
8.59718 39.12534 C C Mojo Town South East Mw Access 4 P1 Project B: 18 Road SitesPH0
8.7491131 38.9821854 0 0 Bishoftu town South East Mw Hub 5P3 Project C: 76 Corridor Sites
PH0
8.7491131 38.9821854 A A Bishoftu town South East Mw Hub 5P3 Project C: 76 Corridor Sites
PH0
8.7491131 38.9821854 B B Bishoftu town South East Mw Hub 5P3 Project C: 76 Corridor Sites
PH0
8.7491131 38.9821854 C C Bishoftu town South East Mw Hub 5P3 Project C: 76 Corridor Sites
PH0
8.74274 39.00264 0 0 Bishoftu town South East Mw Access 7P3 Project C: 76 Corridor Sites
PH0
8.74274 39.00264 A A Bishoftu town South East Mw Access 7P3 Project C: 76 Corridor Sites
PH0
8.74274 39.00264 B B Bishoftu town South East Mw Access 7P3 Project C: 76 Corridor Sites
PH0
8.74274 39.00264 D D Bishoftu town South East Mw Access 7P3 Project C: 76 Corridor Sites
PH0
8.57471 39.28044 0 0 Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.57471 39.28044 A A Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.57471 39.28044 B B Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.57471 39.28044 C C Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.53931 39.29166 0 0 Adama town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.53931 39.29166 A A Adama town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.53931 39.29166 B B Adama town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.53931 39.29166 T T Adama town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.81489 38.88307 0 0 Akaki South East Mw Access 5 P1 Project B: 18 Road SitesPH0
8.81489 38.88307 A A Akaki South East Mw Access 5 P1 Project B: 18 Road SitesPH0
8.81489 38.88307 B B Akaki South East Mw Access 5 P1 Project B: 18 Road SitesPH0
8.81489 38.88307 C C Akaki South East Mw Access 5 P1 Project B: 18 Road SitesPH0
8.81489 38.88307 T T Akaki South East Mw Access 5 P1 Project B: 18 Road SitesPH0
8.56252 39.28511 0 0 Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.56252 39.28511 A A Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.56252 39.28511 B B Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.56252 39.28511 C C Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.56252 39.28511 D D Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.56252 39.28511 X X Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.54603 39.25828 0 0 Adama town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.54603 39.25828 A A Adama town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.54603 39.25828 B B Adama town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.54603 39.25828 C C Adama town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.74865 38.9912 0 0 Bishoftu town South East Mw Hub 6 P0 Project A: 15 RT PH0
8.74865 38.9912 A A Bishoftu town South East Mw Hub 6 P0 Project A: 15 RT PH0
8.74865 38.9912 B B Bishoftu town South East Mw Hub 6 P0 Project A: 15 RT PH0
8.74865 38.9912 C C Bishoftu town South East Mw Hub 6 P0 Project A: 15 RT PH0
8.74865 38.9912 D D Bishoftu town South East Mw Hub 6 P0 Project A: 15 RT PH0
8.74865 38.9912 E E Bishoftu town South East Mw Hub 6 P0 Project A: 15 RT PH0
8.75076 38.94261 0 0 Bishoftu town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.75076 38.94261 A A Bishoftu town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.75076 38.94261 B B Bishoftu town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.75076 38.94261 C C Bishoftu town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.79111 39.0025 0 0 Bishoftu town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.79111 39.0025 A A Bishoftu town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.79111 39.0025 B B Bishoftu town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.79111 39.0025 C C Bishoftu town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.79111 39.0025 T T Bishoftu town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.794142 38.991074 0 0 Bishoftu town South East Mw Hub 2P3 Project C: 76 Corridor Sites
PH0
8.794142 38.991074 A A Bishoftu town South East Mw Hub 2P3 Project C: 76 Corridor Sites
PH0
8.794142 38.991074 B B Bishoftu town South East Mw Hub 2P3 Project C: 76 Corridor Sites
PH0
8.794142 38.991074 C C Bishoftu town South East Mw Hub 2P3 Project C: 76 Corridor Sites
PH0
8.78377 38.9986 0 0 Bishoftu town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.78377 38.9986 A A Bishoftu town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.78377 38.9986 B B Bishoftu town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.78377 38.9986 C C Bishoftu town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.78377 38.9986 D D Bishoftu town South East Mw Access 3P3 Project C: 76 Corridor Sites
PH0
8.78126 39.03047 0 0 Ada'a South East Mw Access 4 P1 Project B: 18 Road SitesPH0
8.78126 39.03047 A A Ada'a South East Mw Access 4 P1 Project B: 18 Road SitesPH0
8.78126 39.03047 B B Ada'a South East Mw Access 4 P1 Project B: 18 Road SitesPH0
8.78126 39.03047 C C Ada'a South East Mw Access 4 P1 Project B: 18 Road SitesPH0
8.78126 39.03047 T T Ada'a South East Mw Access 4 P1 Project B: 18 Road SitesPH0
8.75111 39.02722 0 0 Ada'a South East Mw Access 8P3 Project C: 76 Corridor Sites
PH0
8.75111 39.02722 A A Ada'a South East Mw Access 8P3 Project C: 76 Corridor Sites
PH0
8.75111 39.02722 B B Ada'a South East Mw Access 8P3 Project C: 76 Corridor Sites
PH0
8.75111 39.02722 T T Ada'a South East Mw Access 8P3 Project C: 76 Corridor Sites
PH0
8.727751 38.995543 A A Bishoftu town South East Mw Access 7P3 Project C: 76 Corridor Sites
PH0
8.727751 38.995543 B B Bishoftu town South East Mw Access 7P3 Project C: 76 Corridor Sites
PH0
8.727751 38.995543 0 0 Bishoftu town South East Mw Access 7P3 Project C: 76 Corridor Sites
PH0
8.75856 38.9565 0 0 Bishoftu town South East Mw Access 3 P0 Project A: 15 RT PH0
8.75856 38.9565 A A Bishoftu town South East Mw Access 3 P0 Project A: 15 RT PH0
8.75856 38.9565 B B Bishoftu town South East Mw Access 3 P0 Project A: 15 RT PH0
8.75856 38.9565 C C Bishoftu town South East Mw Access 3 P0 Project A: 15 RT PH0
8.75856 38.9565 D D Bishoftu town South East Mw Access 3 P0 Project A: 15 RT PH0
8.78367 38.91366 0 0 Ada'a South East Mw Access 2P3 Project C: 76 Corridor Sites
PH0
8.78367 38.91366 A A Ada'a South East Mw Access 2P3 Project C: 76 Corridor Sites
PH0
8.78367 38.91366 B B Ada'a South East Mw Access 2P3 Project C: 76 Corridor Sites
PH0
8.78367 38.91366 C C Ada'a South East Mw Access 2P3 Project C: 76 Corridor Sites
PH0
8.78367 38.91366 T T Ada'a South East Mw Access 2P3 Project C: 76 Corridor Sites
PH0
8.7892 38.91176 0 0 Ada'a South East Mw Access 3 P0 Project A: 15 RT PH0
8.7892 38.91176 A A Ada'a South East Mw Access 3 P0 Project A: 15 RT PH0
8.7892 38.91176 B B Ada'a South East Mw Access 3 P0 Project A: 15 RT PH0
7.95657 39.14144 0 0 Asela town South East Mw Access 3 664 Priority PH0
7.95657 39.14144 B B Asela town South East Mw Access 3 664 Priority PH0
7.95657 39.14144 C C Asela town South East Mw Access 3 664 Priority PH0
7.95657 39.14144 D D Asela town South East Mw Access 3 664 Priority PH0
7.95657 39.14144 A A Asela town South East Mw Access 3 664 Priority PH0
7.95755 39.12339 0 0 Tiyo South East Mw Access 3 664 Priority PH0
7.95755 39.12339 A A Tiyo South East Mw Access 3 664 Priority PH0
7.95755 39.12339 B B Tiyo South East Mw Access 3 664 Priority PH0
7.95755 39.12339 C C Tiyo South East Mw Access 3 664 Priority PH0
8.66112 39.0552 0 0 Ada'a South East Mw Access 2 P1 Project B: 18 Road SitesPH0
8.66112 39.0552 A A Ada'a South East Mw Access 2 P1 Project B: 18 Road SitesPH0
8.66112 39.0552 B B Ada'a South East Mw Access 2 P1 Project B: 18 Road SitesPH0
8.66112 39.0552 C C Ada'a South East Mw Access 2 P1 Project B: 18 Road SitesPH0
8.66112 39.0552 T T Ada'a South East Mw Access 2 P1 Project B: 18 Road SitesPH0
8.80337 38.92754 0 0 Ada'a South East Mw Access 4 P1 Project B: 18 Road SitesPH0
8.80337 38.92754 A A Ada'a South East Mw Access 4 P1 Project B: 18 Road SitesPH0
8.80337 38.92754 B B Ada'a South East Mw Access 4 P1 Project B: 18 Road SitesPH0
8.80337 38.92754 C C Ada'a South East Mw Access 4 P1 Project B: 18 Road SitesPH0
8.80337 38.92754 D D Ada'a South East Mw Access 4 P1 Project B: 18 Road SitesPH0
8.80337 38.92754 E E Ada'a South East Mw Access 4 P1 Project B: 18 Road SitesPH0
8.80337 38.92754 T T Ada'a South East Mw Access 4 P1 Project B: 18 Road SitesPH0
7.96956 39.13291 0 0 Asela town South East Mw Access 2 664 Priority PH0
7.96956 39.13291 A A Asela town South East Mw Access 2 664 Priority PH0
7.96956 39.13291 B B Asela town South East Mw Access 2 664 Priority PH0
7.96956 39.13291 D D Asela town South East Mw Access 2 664 Priority PH0
7.96956 39.13291 T T Asela town South East Mw Access 2 664 Priority PH0
7.96956 39.13291 X X Asela town South East Mw Access 2 664 Priority PH0
7.97266 39.14838 0 0 Tiyo South East Mw Access 3 664 Priority PH0
7.97266 39.14838 A A Tiyo South East Mw Access 3 664 Priority PH0
7.97266 39.14838 B B Tiyo South East Mw Access 3 664 Priority PH0
7.97266 39.14838 C C Tiyo South East Mw Access 3 664 Priority PH0
7.96337 39.14018 0 0 Asela town South East Mw Hub 2 664 Priority PH0
7.96337 39.14018 A A Asela town South East Mw Hub 2 664 Priority PH0
7.96337 39.14018 B B Asela town South East Mw Hub 2 664 Priority PH0
7.96337 39.14018 C C Asela town South East Mw Hub 2 664 Priority PH0
7.96337 39.14018 T T Asela town South East Mw Hub 2 664 Priority PH0
7.94745 39.13496 0 0 Asela town South East Mw Hub 3 664 Priority PH0
7.94745 39.13496 A A Asela town South East Mw Hub 3 664 Priority PH0
7.94745 39.13496 B B Asela town South East Mw Hub 3 664 Priority PH0
7.94745 39.13496 T T Asela town South East Mw Hub 3 664 Priority PH0
7.20058 38.6028 0 0 Shashemene townSouth West Mw Access 2 664 Priority PH0
7.20058 38.6028 T T Shashemene townSouth West Mw Access 2 664 Priority PH0
7.20621 38.61648 0 0 Shashemene ZuriaSouth West Mw Access 2 664 Priority PH0
7.20621 38.61648 A A Shashemene ZuriaSouth West Mw Access 2 664 Priority PH0
7.20621 38.61648 B B Shashemene ZuriaSouth West Mw Access 2 664 Priority PH0
7.20162 38.59881 0 0 Shashemene townSouth West Mw Access 3 664 Priority PH0
7.20162 38.59881 A A Shashemene townSouth West Mw Access 3 664 Priority PH0
7.19822 38.62285 0 0 Shashemene ZuriaSouth West Mw Hub 2 664 Priority PH0
7.19822 38.62285 T T Shashemene ZuriaSouth West Mw Hub 2 664 Priority PH0
7.19822 38.62285 A A Shashemene ZuriaSouth West Mw Hub 2 664 Priority PH0
7.18452 38.61203 0 0 Shashemene ZuriaSouth West Mw Access 2 664 Priority PH0
7.18452 38.61203 T T Shashemene ZuriaSouth West Mw Access 2 664 Priority PH0
7.20256 38.58896 0 0 Shashemene townSouth West Mw Access 3 664 Priority PH0
7.20256 38.58896 T T Shashemene townSouth West Mw Access 3 664 Priority PH0
7.20256 38.58896 X X Shashemene townSouth West Mw Access 3 664 Priority PH0
7.21019 38.61003 0 0 Shashemene townSouth West Mw Access 3 664 Priority PH0
7.21019 38.61003 T T Shashemene townSouth West Mw Access 3 664 Priority PH0
7.21091 38.59342 0 0 Shashemene townSouth West Mw Access 3 664 Priority PH0
7.21091 38.59342 T T Shashemene townSouth West Mw Access 3 664 Priority PH0
7.18228 38.58548 0 0 Shashemene ZuriaSouth West Mw Access 3 664 Priority PH0
7.18228 38.58548 A A Shashemene ZuriaSouth West Mw Access 3 664 Priority PH0
7.19498 38.57906 0 0 Shashemene ZuriaSouth West Mw Access 2 664 Priority PH0
7.19498 38.57906 T T Shashemene ZuriaSouth West Mw Access 2 664 Priority PH0
8.526 39.23539 0 0 Adama town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.526 39.23539 A A Adama town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.526 39.23539 B B Adama town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.526 39.23539 T T Adama town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.54297 39.28012 0 0 Adama town South East Mw Access 5 P0 Project A: 15 RT PH0
8.54297 39.28012 A A Adama town South East Mw Access 5 P0 Project A: 15 RT PH0
8.54297 39.28012 B B Adama town South East Mw Access 5 P0 Project A: 15 RT PH0
8.54297 39.28012 T T Adama town South East Mw Access 5 P0 Project A: 15 RT PH0
8.40399 39.33649 0 0 Adama South East Mw Access 1 664 Priority PH0
8.40399 39.33649 A A Adama South East Mw Access 1 664 Priority PH0
8.40399 39.33649 B B Adama South East Mw Access 1 664 Priority PH0
8.40399 39.33649 C C Adama South East Mw Access 1 664 Priority PH0
8.54969 39.28002 0 0 Adama town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.54969 39.28002 A A Adama town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.54969 39.28002 B B Adama town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.54969 39.28002 C C Adama town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.54969 39.28002 D D Adama town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.54969 39.28002 E E Adama town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.54969 39.28002 F F Adama town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.54969 39.28002 X X Adama town South East Mw Access 4P3 Project C: 76 Corridor Sites
PH0
8.55287 39.19873 0 0 Lome (OR) South East Mw Access 5 P1 Project B: 18 Road SitesPH0
8.55287 39.19873 A A Lome (OR) South East Mw Access 5 P1 Project B: 18 Road SitesPH0
8.55287 39.19873 B B Lome (OR) South East Mw Access 5 P1 Project B: 18 Road SitesPH0
8.55287 39.19873 C C Lome (OR) South East Mw Access 5 P1 Project B: 18 Road SitesPH0
8.63095 39.08855 0 0 Mojo Town South East Mw Access 1 P1 Project B: 18 Road SitesPH0
8.63095 39.08855 A A Mojo Town South East Mw Access 1 P1 Project B: 18 Road SitesPH0
8.63095 39.08855 B B Mojo Town South East Mw Access 1 P1 Project B: 18 Road SitesPH0
8.63095 39.08855 C C Mojo Town South East Mw Access 1 P1 Project B: 18 Road SitesPH0
8.63095 39.08855 T T Mojo Town South East Mw Access 1 P1 Project B: 18 Road SitesPH0
8.63095 39.08855 D D Mojo Town South East Mw Access 1 P1 Project B: 18 Road SitesPH0
7.95771 39.13509 0 0 Asela town South East Mw Access 3 664 Priority PH0
7.95771 39.13509 A A Asela town South East Mw Access 3 664 Priority PH0
7.95771 39.13509 B B Asela town South East Mw Access 3 664 Priority PH0
7.95771 39.13509 C C Asela town South East Mw Access 3 664 Priority PH0
7.95771 39.13509 D D Asela town South East Mw Access 3 664 Priority PH0
8.76512 38.95546 0 0 Bishoftu town South East Mw Access 2 P0 Project A: 15 RT PH0
8.76512 38.95546 A A Bishoftu town South East Mw Access 2 P0 Project A: 15 RT PH0
8.76512 38.95546 C C Bishoftu town South East Mw Access 2 P0 Project A: 15 RT PH0
8.76512 38.95546 X X Bishoftu town South East Mw Access 2 P0 Project A: 15 RT PH0
6.9782 39.1869 0 0 Dodola town South East Mw Access 1 664 Priority PH0
6.9782 39.1869 A A Dodola town South East Mw Access 1 664 Priority PH0
6.9782 39.1869 B B Dodola town South East Mw Access 1 664 Priority PH0
6.9782 39.1869 C C Dodola town South East Mw Access 1 664 Priority PH0
8.83787 38.83414 0 0 Gelana (Finfine) South East Mw Hub 1 P1 Project B: 18 Road SitesPH0
8.83787 38.83414 A A Gelana (Finfine) South East Mw Hub 1 P1 Project B: 18 Road SitesPH0
8.83787 38.83414 B B Gelana (Finfine) South East Mw Hub 1 P1 Project B: 18 Road SitesPH0
8.83787 38.83414 C C Gelana (Finfine) South East Mw Hub 1 P1 Project B: 18 Road SitesPH0
8.83787 38.83414 D D Gelana (Finfine) South East Mw Hub 1 P1 Project B: 18 Road SitesPH0
8.83787 38.83414 T T Gelana (Finfine) South East Mw Hub 1 P1 Project B: 18 Road SitesPH0
8.5886 39.12903 0 0 Mojo Town South East Mw Access 3 P1 Project B: 18 Road SitesPH0
8.5886 39.12903 C C Mojo Town South East Mw Access 3 P1 Project B: 18 Road SitesPH0
8.5886 39.12903 B B Mojo Town South East Mw Access 3 P1 Project B: 18 Road SitesPH0
8.56644 39.29857 0 0 Adama town South East Mw Access 5 P0 Project A: 15 RT PH0
8.56644 39.29857 A A Adama town South East Mw Access 5 P0 Project A: 15 RT PH0
8.56644 39.29857 B B Adama town South East Mw Access 5 P0 Project A: 15 RT PH0
8.56644 39.29857 T T Adama town South East Mw Access 5 P0 Project A: 15 RT PH0
8.557803 39.27407 0 0 Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.557803 39.27407 A A Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.557803 39.27407 B B Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
8.557803 39.27407 C C Adama town South East Mw Access 5P3 Project C: 76 Corridor Sites
PH0
7.93141 38.71513 0 0Adama Tulu Jido Kombolcha
South East Mw Access 2 664 Priority PH0
7.93141 38.71513 A AAdama Tulu Jido Kombolcha
South East Mw Access 2 664 Priority PH0
7.93141 38.71513 B BAdama Tulu Jido Kombolcha
South East Mw Access 2 664 Priority PH0
8.5167 39.24786 0 0 Adama town South East Mw Hub 1P3 Project C: 76 Corridor Sites
PH0
8.5167 39.24786 A A Adama town South East Mw Hub 1P3 Project C: 76 Corridor Sites
PH0
8.5167 39.24786 B B Adama town South East Mw Hub 1P3 Project C: 76 Corridor Sites
PH0
8.5167 39.24786 T T Adama town South East Mw Hub 1P3 Project C: 76 Corridor Sites
PH0
8.5167 39.24786 D D Adama town South East Mw Hub 1P3 Project C: 76 Corridor Sites
PH0
8.5167 39.24786 E E Adama town South East Mw Hub 1P3 Project C: 76 Corridor Sites
PH0
8.5167 39.24786 C C Adama town South East Mw Hub 1P3 Project C: 76 Corridor Sites
PH0
8.76801 38.94159 0 0 Bishoftu town South East Mw Hub 1P3 Project C: 76 Corridor Sites
PH0
8.76801 38.94159 A A Bishoftu town South East Mw Hub 1P3 Project C: 76 Corridor Sites
PH0
8.76801 38.94159 B B Bishoftu town South East Mw Hub 1P3 Project C: 76 Corridor Sites
PH0
8.76801 38.94159 C C Bishoftu town South East Mw Hub 1P3 Project C: 76 Corridor Sites
PH0
7.981766 39.134405 0 0 Tiyo South East Mw Hub 1 664 Priority PH0
7.981766 39.134405 A A Tiyo South East Mw Hub 1 664 Priority PH0
7.981766 39.134405 B B Tiyo South East Mw Hub 1 664 Priority PH0
7.981766 39.134405 C C Tiyo South East Mw Hub 1 664 Priority PH0
8.92203 38.65113 0 0 Sebeta town South East Mw Access 10 664 Priority PH0
8.92203 38.65113 A A Sebeta town South East Mw Access 10 664 Priority PH0
8.92203 38.65113 B B Sebeta town South East Mw Access 10 664 Priority PH0
8.92203 38.65113 C C Sebeta town South East Mw Access 10 664 Priority PH0
8.92203 38.65113 D D Sebeta town South East Mw Access 10 664 Priority PH0
8.92203 38.65113 E E Sebeta town South East Mw Access 10 664 Priority PH0
8.93333 38.65046 0 0 Sebeta town South East Mw Hub 9 664 Priority PH0
8.93333 38.65046 A A Sebeta town South East Mw Hub 9 664 Priority PH0
8.93333 38.65046 B B Sebeta town South East Mw Hub 9 664 Priority PH0
8.93333 38.65046 C C Sebeta town South East Mw Hub 9 664 Priority PH0
8.93333 38.65046 T T Sebeta town South East Mw Hub 9 664 Priority PH0
8.947033 38.679328 0 0 Sebeta town South East Mw Access 10 664 Priority PH0
8.947033 38.679328 A A Sebeta town South East Mw Access 10 664 Priority PH0
8.947033 38.679328 B B Sebeta town South East Mw Access 10 664 Priority PH0
8.947033 38.679328 C C Sebeta town South East Mw Access 10 664 Priority PH0
8.947033 38.679328 D D Sebeta town South East Mw Access 10 664 Priority PH0
8.947033 38.679328 E E Sebeta town South East Mw Access 10 664 Priority PH0
8.947033 38.679328 F F Sebeta town South East Mw Access 10 664 Priority PH0
8.947033 38.679328 X X Sebeta town South East Mw Access 10 664 Priority PH0
8.917089 38.652484 0 0 Sebeta town South East Mw Access 9 664 Priority PH0
8.917089 38.652484 A A Sebeta town South East Mw Access 9 664 Priority PH0
8.917089 38.652484 B B Sebeta town South East Mw Access 9 664 Priority PH0
8.917089 38.652484 C C Sebeta town South East Mw Access 9 664 Priority PH0
8.917089 38.652484 D D Sebeta town South East Mw Access 9 664 Priority PH0
8.907267 38.605003 0 0 Sebeta town South East Mw Access 13 664 Priority PH0
8.907267 38.605003 A A Sebeta town South East Mw Access 13 664 Priority PH0
8.907267 38.605003 B B Sebeta town South East Mw Access 13 664 Priority PH0
8.907267 38.605003 D D Sebeta town South East Mw Access 13 664 Priority PH0
8.907267 38.605003 C C Sebeta town South East Mw Access 13 664 Priority PH0
8.9152 38.63989 0 0 Sebeta town South East Mw Access 10 664 Priority PH0
8.9152 38.63989 A A Sebeta town South East Mw Access 10 664 Priority PH0
8.9152 38.63989 C C Sebeta town South East Mw Access 10 664 Priority PH0
8.9152 38.63989 B B Sebeta town South East Mw Access 10 664 Priority PH0
8.92387 38.63129 0 0 Sebeta town South East Mw Hub 10 664 Priority PH0
8.92387 38.63129 A A Sebeta town South East Mw Hub 10 664 Priority PH0
8.92387 38.63129 B B Sebeta town South East Mw Hub 10 664 Priority PH0
8.92387 38.63129 C C Sebeta town South East Mw Hub 10 664 Priority PH0
8.92387 38.63129 D D Sebeta town South East Mw Hub 10 664 Priority PH0
8.92387 38.63129 E E Sebeta town South East Mw Hub 10 664 Priority PH0
8.92387 38.63129 T T Sebeta town South East Mw Hub 10 664 Priority PH0
8.92646 38.64075 0 0 Sebeta town South East Mw Access 11 664 Priority PH0
8.92646 38.64075 A A Sebeta town South East Mw Access 11 664 Priority PH0
8.92646 38.64075 B B Sebeta town South East Mw Access 11 664 Priority PH0
8.92646 38.64075 C C Sebeta town South East Mw Access 11 664 Priority PH0
8.924495 38.651748 0 0 Sebeta town South East Mw Access 9 664 Priority PH0
8.924495 38.651748 A A Sebeta town South East Mw Access 9 664 Priority PH0
8.924495 38.651748 B B Sebeta town South East Mw Access 9 664 Priority PH0
8.924495 38.651748 C C Sebeta town South East Mw Access 9 664 Priority PH0
8.924495 38.651748 D D Sebeta town South East Mw Access 9 664 Priority PH0
8.936737 38.66995 0 0 Sebeta town South East Mw Access 11 664 Priority PH0
8.936737 38.66995 A A Sebeta town South East Mw Access 11 664 Priority PH0
8.936737 38.66995 B B Sebeta town South East Mw Access 11 664 Priority PH0
8.928829 38.661398 0 0 Sebeta town South East Mw Hub 8 664 Priority PH0
8.928829 38.661398 A A Sebeta town South East Mw Hub 8 664 Priority PH0
8.928829 38.661398 B B Sebeta town South East Mw Hub 8 664 Priority PH0
8.928829 38.661398 C C Sebeta town South East Mw Hub 8 664 Priority PH0
8.928829 38.661398 D D Sebeta town South East Mw Hub 8 664 Priority PH0
8.92939 38.67595 0 0 Sebeta town South East Mw Hub 7 664 Priority PH0
8.92939 38.67595 A A Sebeta town South East Mw Hub 7 664 Priority PH0
8.92939 38.67595 B B Sebeta town South East Mw Hub 7 664 Priority PH0
8.92939 38.67595 C C Sebeta town South East Mw Hub 7 664 Priority PH0
8.930682 38.684811 0 0 Sebeta town South East Mw Hub 6 664 Priority PH0
8.930682 38.684811 A A Sebeta town South East Mw Hub 6 664 Priority PH0
8.930682 38.684811 B B Sebeta town South East Mw Hub 6 664 Priority PH0
8.930682 38.684811 C C Sebeta town South East Mw Hub 6 664 Priority PH0
8.930682 38.684811 D D Sebeta town South East Mw Hub 6 664 Priority PH0
8.82949 38.84245 0 0 Gelana (Finfine) South East Mw Access 2 P1 Project B: 18 Road SitesPH0
8.82949 38.84245 A A Gelana (Finfine) South East Mw Access 2 P1 Project B: 18 Road SitesPH0
8.82949 38.84245 B B Gelana (Finfine) South East Mw Access 2 P1 Project B: 18 Road SitesPH0
8.82949 38.84245 C C Gelana (Finfine) South East Mw Access 2 P1 Project B: 18 Road SitesPH0
8.82949 38.84245 T T Gelana (Finfine) South East Mw Access 2 P1 Project B: 18 Road SitesPH0
8.95057 38.6669 0 0 Sebeta town South East Mw Access 10 664 Priority PH0
8.95057 38.6669 A A Sebeta town South East Mw Access 10 664 Priority PH0
8.95057 38.6669 B B Sebeta town South East Mw Access 10 664 Priority PH0
8.95057 38.6669 C C Sebeta town South East Mw Access 10 664 Priority PH0
8.91297 38.625798 0 0 Sebeta town South East Mw Access 11 664 Priority PH0
8.91297 38.625798 A A Sebeta town South East Mw Access 11 664 Priority PH0
8.91297 38.625798 B B Sebeta town South East Mw Access 11 664 Priority PH0
8.91297 38.625798 C C Sebeta town South East Mw Access 11 664 Priority PH0
8.91166 38.61721 0 0 Sebeta town South East Mw Access 12 664 Priority PH0
8.91166 38.61721 A A Sebeta town South East Mw Access 12 664 Priority PH0
8.91166 38.61721 B B Sebeta town South East Mw Access 12 664 Priority PH0
8.91166 38.61721 C C Sebeta town South East Mw Access 12 664 Priority PH0
8.91166 38.61721 T T Sebeta town South East Mw Access 12 664 Priority PH0
6.9964 39.32241 0 0 Dodola South East Mw Access 2 664 Priority PH0
6.9964 39.32241 A A Dodola South East Mw Access 2 664 Priority PH0
7.35949 38.66807 0 0 Arsi Negele town South East Mw Access 6 664 Priority PH0
7.35949 38.66807 T T Arsi Negele town South East Mw Access 6 664 Priority PH0
7.3405 38.66602 0 0 Arsi Negele town South East Mw Access 6 664 Priority PH0
7.3405 38.66602 T T Arsi Negele town South East Mw Access 6 664 Priority PH0
7.3405 38.66602 A A Arsi Negele town South East Mw Access 6 664 Priority PH0
7.26936 38.66062 0 0 Shashemene ZuriaSouth West Mw Access 4 664 Priority PH0
7.26936 38.66062 T T Shashemene ZuriaSouth West Mw Access 4 664 Priority PH0
7.35802 38.67569 0 0 Arsi Negele town South East Mw Access 5 664 Priority PH0
7.35802 38.67569 T T Arsi Negele town South East Mw Access 5 664 Priority PH0
7.23543 38.6364 0 0 Shashemene ZuriaSouth West Mw Hub 3 664 Priority PH0
7.23543 38.6364 A A Shashemene ZuriaSouth West Mw Hub 3 664 Priority PH0
7.21667 38.58385 0 0 Shashemene ZuriaSouth West Mw Access 3 664 Priority PH0
7.21667 38.58385 T T Shashemene ZuriaSouth West Mw Access 3 664 Priority PH0
8.03136 39.18934 0 0 Hitosa South East Mw Access 2 664 Priority PH0
8.03136 39.18934 A A Hitosa South East Mw Access 2 664 Priority PH0
8.03136 39.18934 B B Hitosa South East Mw Access 2 664 Priority PH0
7.0984 38.48012 0 0 Bishan Guracha South West Mw Access 8 664 Priority PH0
7.0984 38.48012 A A Bishan Guracha South West Mw Access 8 664 Priority PH0
7.0984 38.48012 B B Bishan Guracha South West Mw Access 8 664 Priority PH0
7.0984 38.48012 C C Bishan Guracha South West Mw Access 8 664 Priority PH0
7.67598 36.84597 0 0 Jimma town South West Mw Access 2 664 Priority PH0
7.67598 36.84597 T T Jimma town South West Mw Access 2 664 Priority PH0
7.66114 36.84504 0 0 Jimma town South West Mw Access 4 664 Priority PH0
7.66114 36.84504 T T Jimma town South West Mw Access 4 664 Priority PH0
7.66815 36.84001 0 0 Jimma town South West Mw Access 3 664 Priority PH0
7.66815 36.84001 T T Jimma town South West Mw Access 3 664 Priority PH0
7.66695 36.83 0 0 Jimma town South West Mw Access 3 664 Priority PH0
7.66695 36.83 T T Jimma town South West Mw Access 3 664 Priority PH0
7.66695 36.83 A A Jimma town South West Mw Access 3 664 Priority PH0
7.66695 36.83 B B Jimma town South West Mw Access 3 664 Priority PH0
7.66695 36.83 X X Jimma town South West Mw Access 3 664 Priority PH0
7.67298 36.83 0 0 Jimma town South West Mw Access 2 664 Priority PH0
7.67298 36.83 T T Jimma town South West Mw Access 2 664 Priority PH0
7.6916 36.832716 0 0 Jimma town South West Mw Hub 1 664 Priority PH0
7.6916 36.832716 T T Jimma town South West Mw Hub 1 664 Priority PH0
7.6916 36.832716 A A Jimma town South West Mw Hub 1 664 Priority PH0
7.6916 36.832716 B B Jimma town South West Mw Hub 1 664 Priority PH0
7.56335 37.84524 0 0 Hosaena town South West Mw Access 3 664 Priority PH0
7.56335 37.84524 T T Hosaena town South West Mw Access 3 664 Priority PH0
7.56335 37.84524 A A Hosaena town South West Mw Access 3 664 Priority PH0
6.03771 37.55327 0 0 Arba Minch town South West Mw Access 2 664 Priority PH0
6.03771 37.55327 T T Arba Minch town South West Mw Access 2 664 Priority PH0
7.54069 37.85391 0 0 Hosaena town South West Mw Access 3 664 Priority PH0
7.54069 37.85391 A A Hosaena town South West Mw Access 3 664 Priority PH0
6.8284 37.75342 0 0 Sodo Town South West Mw Hub 1 664 Priority PH0
6.8284 37.75342 A A Sodo Town South West Mw Hub 1 664 Priority PH0
6.8284 37.75342 B B Sodo Town South West Mw Hub 1 664 Priority PH0
8.12109 37.92955 0 0 Emdebir town South West Mw Access 3 664 Priority PH0
8.12109 37.92955 A A Emdebir town South West Mw Access 3 664 Priority PH0
8.12109 37.92955 B B Emdebir town South West Mw Access 3 664 Priority PH0
8.12109 37.92955 C C Emdebir town South West Mw Access 3 664 Priority PH0
8.12109 37.92955 D D Emdebir town South West Mw Access 3 664 Priority PH0
8.11101 38.37588 0 0 Butajira town South West Mw Access 3 664 Priority PH0
8.11101 38.37588 A A Butajira town South West Mw Access 3 664 Priority PH0
8.11101 38.37588 T T Butajira town South West Mw Access 3 664 Priority PH0
8.11101 38.37588 B B Butajira town South West Mw Access 3 664 Priority PH0
8.11906 38.39039 0 0 Butajira town South West Mw Hub 1 664 Priority PH0
8.11906 38.39039 A A Butajira town South West Mw Hub 1 664 Priority PH0
8.11906 38.39039 B B Butajira town South West Mw Hub 1 664 Priority PH0
8.11906 38.39039 T T Butajira town South West Mw Hub 1 664 Priority PH0
8.12142 38.37414 0 0 Butajira town South West Mw Access 3 664 Priority PH0
8.12142 38.37414 A A Butajira town South West Mw Access 3 664 Priority PH0
8.12142 38.37414 B B Butajira town South West Mw Access 3 664 Priority PH0
8.12142 38.37414 C C Butajira town South West Mw Access 3 664 Priority PH0
8.12142 38.37414 T T Butajira town South West Mw Access 3 664 Priority PH0
8.20427 37.79256 0 0 Cheha South West Mw Access 2 664 Priority PH0
8.20427 37.79256 A A Cheha South West Mw Access 2 664 Priority PH0
8.20427 37.79256 B B Cheha South West Mw Access 2 664 Priority PH0
8.29159 37.78246 0 0 Welkite town South West Mw Access 2 664 Priority PH0
8.29159 37.78246 A A Welkite town South West Mw Access 2 664 Priority PH0
8.29159 37.78246 B B Welkite town South West Mw Access 2 664 Priority PH0
8.29159 37.78246 C C Welkite town South West Mw Access 2 664 Priority PH0
8.29159 37.78246 D D Welkite town South West Mw Access 2 664 Priority PH0
8.28145113 37.7760521 0 0 Welkite town South West Mw Hub 1 664 Priority PH0
8.28145113 37.7760521 A A Welkite town South West Mw Hub 1 664 Priority PH0
8.28145113 37.7760521 B B Welkite town South West Mw Hub 1 664 Priority PH0
8.28145113 37.7760521 C C Welkite town South West Mw Hub 1 664 Priority PH0
8.28145113 37.7760521 D D Welkite town South West Mw Hub 1 664 Priority PH0
7.30812 38.09312 0 0 Kulito town South West Mw Access 1 664 Priority PH0
7.30812 38.09312 A A Kulito town South West Mw Access 1 664 Priority PH0
6.04075 37.54915 0 0 Arba Minch town South West Mw Access 3 664 Priority PH0
6.04075 37.54915 A A Arba Minch town South West Mw Access 3 664 Priority PH0
6.05431 37.55302 0 0 Arba Minch town South West Mw Access 2 664 Priority PH0
6.05431 37.55302 T T Arba Minch town South West Mw Access 2 664 Priority PH0
6.02279 37.5545 0 0 Arba Minch town South West Mw Access 2 664 Priority PH0
6.02279 37.5545 T T Arba Minch town South West Mw Access 2 664 Priority PH0
6.01873 37.55045 0 0 Arba Minch town South West Mw Access 3 664 Priority PH0
6.01873 37.55045 A A Arba Minch town South West Mw Access 3 664 Priority PH0
6.01873 37.55045 B B Arba Minch town South West Mw Access 3 664 Priority PH0
6.84359 37.75959 0 0 Sodo Town South West Mw Hub 2 664 Priority PH0
6.84359 37.75959 T T Sodo Town South West Mw Hub 2 664 Priority PH0
7.02389 38.47812 0 0 Hawasa town South West Mw Access 4 664 Priority PH0
7.02389 38.47812 A A Hawasa town South West Mw Access 4 664 Priority PH0
7.02389 38.47812 B B Hawasa town South West Mw Access 4 664 Priority PH0
7.02389 38.47812 C C Hawasa town South West Mw Access 4 664 Priority PH0
7.02389 38.47812 T T Hawasa town South West Mw Access 4 664 Priority PH0
7.555431 37.858443 0 0 Hosaena town South West Mw Hub 1 664 Priority PH0
7.555431 37.858443 A A Hosaena town South West Mw Hub 1 664 Priority PH0
7.042387 38.4976 0 0 Hawasa town South West Mw Hub 2 664 Priority PH0
7.042387 38.4976 A A Hawasa town South West Mw Hub 2 664 Priority PH0
7.042387 38.4976 B B Hawasa town South West Mw Hub 2 664 Priority PH0
7.002893 35.576192 0 0 Mizan Aman townSouth West Mw Access 1 664 Priority PH0
7.002893 35.576192 A A Mizan Aman townSouth West Mw Access 1 664 Priority PH0
7.0949 38.38846 0 0 Hawassa Zuria South West Mw Access 7 664 Priority PH0
7.0949 38.38846 T T Hawassa Zuria South West Mw Access 7 664 Priority PH0
7.01509 38.46892 0 0 Hawasa town South West Mw Access 5 664 Priority PH0
7.01509 38.46892 A A Hawasa town South West Mw Access 5 664 Priority PH0
7.01509 38.46892 B B Hawasa town South West Mw Access 5 664 Priority PH0
7.01509 38.46892 C C Hawasa town South West Mw Access 5 664 Priority PH0
7.01509 38.46892 T T Hawasa town South West Mw Access 5 664 Priority PH0
7.54574 37.87352 0 0 Hosaena town South West Mw Access 2 664 Priority PH0
7.54574 37.87352 T T Hosaena town South West Mw Access 2 664 Priority PH0
6.04246 37.5899 0 0 Arba Minch town South West Mw Access 2 664 Priority PH0
6.04246 37.5899 A A Arba Minch town South West Mw Access 2 664 Priority PH0
6.04246 37.5899 X X Arba Minch town South West Mw Access 2 664 Priority PH0
6.04020068 37.568842 0 0 Arba Minch town South West Mw Hub 1 664 Priority PH0
6.04020068 37.568842 A A Arba Minch town South West Mw Hub 1 664 Priority PH0
6.04020068 37.568842 T T Arba Minch town South West Mw Hub 1 664 Priority PH0
7.570851 37.858856 0 0 Hosaena town South West Mw Access 2 664 Priority PH0
7.570851 37.858856 A A Hosaena town South West Mw Access 2 664 Priority PH0
8.12076 38.38243 0 0 Butajira town South West Mw Access 2 664 Priority PH0
8.12076 38.38243 A A Butajira town South West Mw Access 2 664 Priority PH0
8.12076 38.38243 B B Butajira town South West Mw Access 2 664 Priority PH0
8.12076 38.38243 T T Butajira town South West Mw Access 2 664 Priority PH0
7.03922 38.48975 0 0 Hawasa town South West Mw Access 2 664 Priority PH0
7.03922 38.48975 A A Hawasa town South West Mw Access 2 664 Priority PH0
7.03922 38.48975 B B Hawasa town South West Mw Access 2 664 Priority PH0
7.03922 38.48975 C C Hawasa town South West Mw Access 2 664 Priority PH0
7.04801 38.47805 0 0 Hawasa town South West Mw Access 3 664 Priority PH0
7.04801 38.47805 A A Hawasa town South West Mw Access 3 664 Priority PH0
7.04801 38.47805 B B Hawasa town South West Mw Access 3 664 Priority PH0
7.04801 38.47805 C C Hawasa town South West Mw Access 3 664 Priority PH0
7.55867 37.85343 0 0 Hosaena town South West Mw Access 2 664 Priority PH0
7.55867 37.85343 A A Hosaena town South West Mw Access 2 664 Priority PH0
7.55867 37.85343 T T Hosaena town South West Mw Access 2 664 Priority PH0
6.85014 37.75273 0 0 Sodo Town South West Mw Access 2 664 Priority PH0
6.85014 37.75273 A A Sodo Town South West Mw Access 2 664 Priority PH0
6.85014 37.75273 T T Sodo Town South West Mw Access 2 664 Priority PH0
6.41373 38.29381 0 0 Dila town South West Mw Hub 2 664 Priority PH0
6.41373 38.29381 A A Dila town South West Mw Hub 2 664 Priority PH0
6.41373 38.29381 T T Dila town South West Mw Hub 2 664 Priority PH0
6.6031 38.42529 0 0 Aleta Wondo townSouth West Mw Access 1 664 Priority PH0
6.6031 38.42529 A A Aleta Wondo townSouth West Mw Access 1 664 Priority PH0
7.087 38.49453 0 0 Hawasa town South West Mw Access 9 664 Priority PH0
7.087 38.49453 A A Hawasa town South West Mw Access 9 664 Priority PH0
7.087 38.49453 B B Hawasa town South West Mw Access 9 664 Priority PH0
7.087 38.49453 D D Hawasa town South West Mw Access 9 664 Priority PH0
7.087 38.49453 T T Hawasa town South West Mw Access 9 664 Priority PH0
7.04504 38.50746 0 0 Hawasa town South West Mw Access 2 664 Priority PH0
7.04504 38.50746 A A Hawasa town South West Mw Access 2 664 Priority PH0
7.04504 38.50746 B B Hawasa town South West Mw Access 2 664 Priority PH0
7.04504 38.50746 C C Hawasa town South West Mw Access 2 664 Priority PH0
7.04504 38.50746 T T Hawasa town South West Mw Access 2 664 Priority PH0
7.06583 38.4805 0 0 Hawasa town South West Mw Access 8 664 Priority PH0
7.06583 38.4805 A A Hawasa town South West Mw Access 8 664 Priority PH0
7.06583 38.4805 B B Hawasa town South West Mw Access 8 664 Priority PH0
7.06583 38.4805 C C Hawasa town South West Mw Access 8 664 Priority PH0
7.06583 38.4805 T T Hawasa town South West Mw Access 8 664 Priority PH0
7.05547 38.48994 0 0 Hawasa town South West Mw Access 3 664 Priority PH0
7.05547 38.48994 A A Hawasa town South West Mw Access 3 664 Priority PH0
7.05547 38.48994 B B Hawasa town South West Mw Access 3 664 Priority PH0
7.05547 38.48994 T T Hawasa town South West Mw Access 3 664 Priority PH0
7.05547 38.48994 C C Hawasa town South West Mw Access 3 664 Priority PH0
7.05547 38.48994 X X Hawasa town South West Mw Access 3 664 Priority PH0
7.04027 38.4751 0 0 Hawasa town South West Mw Hub 5 664 Priority PH0
7.04027 38.4751 A A Hawasa town South West Mw Hub 5 664 Priority PH0
7.04027 38.4751 B B Hawasa town South West Mw Hub 5 664 Priority PH0
7.04027 38.4751 C C Hawasa town South West Mw Hub 5 664 Priority PH0
7.04027 38.4751 X X Hawasa town South West Mw Hub 5 664 Priority PH0
7.03037 38.48952 0 0 Hawasa town South West Mw Access 2 664 Priority PH0
7.03037 38.48952 A A Hawasa town South West Mw Access 2 664 Priority PH0
7.03037 38.48952 B B Hawasa town South West Mw Access 2 664 Priority PH0
7.03037 38.48952 C C Hawasa town South West Mw Access 2 664 Priority PH0
7.03037 38.48952 D D Hawasa town South West Mw Access 2 664 Priority PH0
7.03037 38.48952 T T Hawasa town South West Mw Access 2 664 Priority PH0
7.0452 38.482 0 0 Hawasa town South West Mw Access 3 664 Priority PH0
7.0452 38.482 A A Hawasa town South West Mw Access 3 664 Priority PH0
7.0452 38.482 B B Hawasa town South West Mw Access 3 664 Priority PH0
7.0452 38.482 C C Hawasa town South West Mw Access 3 664 Priority PH0
7.0452 38.482 X X Hawasa town South West Mw Access 3 664 Priority PH0
7.07957 38.49598 A A Hawasa town South West Mw Access 5 664 Priority PH0
7.07957 38.49598 B B Hawasa town South West Mw Access 5 664 Priority PH0
7.07957 38.49598 C C Hawasa town South West Mw Access 5 664 Priority PH0
7.07957 38.49598 T T Hawasa town South West Mw Access 5 664 Priority PH0
7.0352 38.510912 A A Hawasa town South West Mw Hub 1 664 Priority PH0
7.0352 38.510912 B B Hawasa town South West Mw Hub 1 664 Priority PH0
7.0352 38.510912 T T Hawasa town South West Mw Hub 1 664 Priority PH0
7.0352 38.510912 C C Hawasa town South West Mw Hub 1 664 Priority PH0
7.0352 38.510912 P P Hawasa town South West Mw Hub 1 664 Priority PH0
7.0227 38.5008 A A Hawasa town South West Mw Hub 2 664 Priority PH0
7.0227 38.5008 B B Hawasa town South West Mw Hub 2 664 Priority PH0
7.0227 38.5008 C C Hawasa town South West Mw Hub 2 664 Priority PH0
7.0227 38.5008 D D Hawasa town South West Mw Hub 2 664 Priority PH0
7.0597 38.4744 A A Hawasa town South West Mw Access 7 664 Priority PH0
7.0597 38.4744 B B Hawasa town South West Mw Access 7 664 Priority PH0
7.061172 38.4869 A A Hawasa town South West Mw Access 4 664 Priority PH0
7.061172 38.4869 B B Hawasa town South West Mw Access 4 664 Priority PH0
7.061172 38.4869 C C Hawasa town South West Mw Access 4 664 Priority PH0
7.029212 38.4727 A A Hawasa town South West Mw Hub 4 664 Priority PH0
7.029212 38.4727 B B Hawasa town South West Mw Hub 4 664 Priority PH0
7.029212 38.4727 C C Hawasa town South West Mw Hub 4 664 Priority PH0
7.0451 38.46526 0 0 Hawasa town South West Mw Access 6 664 Priority PH0
7.0451 38.46526 A A Hawasa town South West Mw Access 6 664 Priority PH0
7.0451 38.46526 B B Hawasa town South West Mw Access 6 664 Priority PH0
7.0451 38.46526 C C Hawasa town South West Mw Access 6 664 Priority PH0
6.4056 38.3091 0 0 Dila town South West Mw Access 3 664 Priority PH0
6.4056 38.3091 T T Dila town South West Mw Access 3 664 Priority PH0
6.41258 38.31111 0 0 Dila town South West Mw Access 2 664 Priority PH0
6.41258 38.31111 A A Dila town South West Mw Access 2 664 Priority PH0
6.41258 38.31111 T T Dila town South West Mw Access 2 664 Priority PH0
6.3189 38.2598 0 0 Wenago South West Mw Hub 3 664 Priority PH0
6.3189 38.2598 A A Wenago South West Mw Hub 3 664 Priority PH0
7.067549 38.500095 0 0 Hawasa town South West Mw Access 4 664 Priority PH0
7.067549 38.500095 A A Hawasa town South West Mw Access 4 664 Priority PH0
7.067549 38.500095 B B Hawasa town South West Mw Access 4 664 Priority PH0
7.067549 38.500095 B B Hawasa town South West Mw Access 4 664 Priority PH0
7.067549 38.500095 C C Hawasa town South West Mw Access 4 664 Priority PH0
7.045912 38.490708 0 0 Hawasa town South West Mw Access 3 664 Priority PH0
7.045912 38.490708 A A Hawasa town South West Mw Access 3 664 Priority PH0
7.045912 38.490708 B B Hawasa town South West Mw Access 3 664 Priority PH0
7.045912 38.490708 C C Hawasa town South West Mw Access 3 664 Priority PH0
7.045912 38.490708 X X Hawasa town South West Mw Access 3 664 Priority PH0
6.42589 38.29106 0 0 Dila town South West Mw Hub 1 664 Priority PH0
6.42589 38.29106 T T Dila town South West Mw Hub 1 664 Priority PH0
6.43681 38.29637 0 0 Dara South West Mw Access 2 664 Priority PH0
6.43681 38.29637 T T Dara South West Mw Access 2 664 Priority PH0
6.88493 38.41753 0 0 Shebe Dino South West Mw Access 1 664 Priority PH0
6.88493 38.41753 A A Shebe Dino South West Mw Access 1 664 Priority PH0
7.052542 38.4721 0 0 Hawasa town South West Mw Hub 6 664 Priority PH0
7.052542 38.4721 A A Hawasa town South West Mw Hub 6 664 Priority PH0
7.052542 38.4721 B B Hawasa town South West Mw Hub 6 664 Priority PH0
7.052542 38.4721 C C Hawasa town South West Mw Hub 6 664 Priority PH0
7.052542 38.4721 X X Hawasa town South West Mw Hub 6 664 Priority PH0
7.02336 38.4892 0 0 Hawasa town South West Mw Hub 3 664 Priority PH0
7.02336 38.4892 A A Hawasa town South West Mw Hub 3 664 Priority PH0
7.02336 38.4892 B B Hawasa town South West Mw Hub 3 664 Priority PH0
7.02336 38.4892 C C Hawasa town South West Mw Hub 3 664 Priority PH0
7.02336 38.4892 T T Hawasa town South West Mw Hub 3 664 Priority PH0
7.02336 38.4892 D D Hawasa town South West Mw Hub 4 664 Priority PH0
7.03521 38.46491 0 0 Hawasa town South West Mw Access 5 664 Priority PH0
7.03521 38.46491 A A Hawasa town South West Mw Access 5 664 Priority PH0
7.03521 38.46491 B B Hawasa town South West Mw Access 5 664 Priority PH0
7.03521 38.46491 T T Hawasa town South West Mw Access 5 664 Priority PH0
6.4095 38.30375 0 0 Dila town South West Mw Access 3 664 Priority PH0
6.4095 38.30375 T T Dila town South West Mw Access 3 664 Priority PH0
8.1282 38.3811 0 0 Butajira town South West Mw Access 2 664 Priority PH0
8.1282 38.3811 A A Butajira town South West Mw Access 2 664 Priority PH0
8.1282 38.3811 B B Butajira town South West Mw Access 2 664 Priority PH0
8.1282 38.3811 C C Butajira town South West Mw Access 2 664 Priority PH0
6.85852 37.77346 0 0 Sodo Town South West Mw Access 3 664 Priority PH0
6.85852 37.77346 A A Sodo Town South West Mw Access 3 664 Priority PH0
6.85852 37.77346 B B Sodo Town South West Mw Access 3 664 Priority PH0
6.85852 37.77346 C C Sodo Town South West Mw Access 3 664 Priority PH0
6.38961 38.31017 0 0 Dila town South West Mw Access 3 664 Priority PH0
6.38961 38.31017 T T Dila town South West Mw Access 3 664 Priority PH0
6.02866 37.54569 0 0 Arba Minch town South West Mw Access 3 664 Priority PH0
6.02866 37.54569 A A Arba Minch town South West Mw Access 3 664 Priority PH0
6.02866 37.54569 B B Arba Minch town South West Mw Access 3 664 Priority PH0
7.01915 38.4974 0 0 Hawasa town South West Mw Access 3 664 Priority PH0
7.01915 38.4974 A A Hawasa town South West Mw Access 3 664 Priority PH0
7.01915 38.4974 B B Hawasa town South West Mw Access 3 664 Priority PH0
7.01915 38.4974 T T Hawasa town South West Mw Access 3 664 Priority PH0
7.5664 37.85125 0 0 Hosaena town South West Mw Access 2 664 Priority PH0
7.5664 37.85125 T T Hosaena town South West Mw Access 2 664 Priority PH0
7.5664 37.85125 A A Hosaena town South West Mw Access 2 664 Priority PH0
6.99128 35.59357 0 0 Mizan Aman townSouth West Mw Access 2 664 Priority PH0
6.99128 35.59357 A A Mizan Aman townSouth West Mw Access 2 664 Priority PH0
6.00401 37.54141 0 0 Arba Minch town South West Mw Access 4 664 Priority PH0
6.00401 37.54141 A A Arba Minch town South West Mw Access 4 664 Priority PH0
6.86628 37.75853 0 0 Sodo Town South West Mw Access 5 664 Priority PH0
6.86628 37.75853 A A Sodo Town South West Mw Access 5 664 Priority PH0
6.86628 37.75853 T T Sodo Town South West Mw Access 5 664 Priority PH0
6.85614 37.7627 0 0 Sodo Town South West Mw Access 4 664 Priority PH0
6.85614 37.7627 T T Sodo Town South West Mw Access 4 664 Priority PH0
6.85614 37.7627 A A Sodo Town South West Mw Access 4 664 Priority PH0
7.53257 37.86382 0 0 Hosaena town South West Mw Access 4 664 Priority PH0
7.53257 37.86382 A A Hosaena town South West Mw Access 4 664 Priority PH0
7.53257 37.86382 T T Hosaena town South West Mw Access 4 664 Priority PH0
7.54385 37.86341 0 0 Hosaena town South West Mw Access 3 664 Priority PH0
7.54385 37.86341 T T Hosaena town South West Mw Access 3 664 Priority PH0
7.55195 37.85659 0 0 Hosaena town South West Mw Access 2 664 Priority PH0
7.55195 37.85659 T T Hosaena town South West Mw Access 2 664 Priority PH0
7.55195 37.85659 A A Hosaena town South West Mw Access 2 664 Priority PH0
7.55195 37.85659 B B Hosaena town South West Mw Access 2 664 Priority PH0
7.55195 37.85659 C C Hosaena town South West Mw Access 3 664 Priority PH0
7.05038 38.51297 0 0 Hawasa town South West Mw Access 3 664 Priority PH0
7.05038 38.51297 A A Hawasa town South West Mw Access 3 664 Priority PH0
7.05038 38.51297 B B Hawasa town South West Mw Access 3 664 Priority PH0
7.56526 37.89193 0 0 Lemmo South West Mw Access 3 664 Priority PH0
7.56526 37.89193 A A Lemmo South West Mw Access 3 664 Priority PH0
7.56526 37.89193 B B Lemmo South West Mw Access 3 664 Priority PH0
7.56526 37.89193 T T Lemmo South West Mw Access 3 664 Priority PH0
7.56526 37.89193 X X Lemmo South West Mw Access 3 664 Priority PH0
8.10292 38.3744 0 0 Meskan South West Mw Access 2 664 Priority PH0
8.10292 38.3744 A A Meskan South West Mw Access 2 664 Priority PH0
8.10292 38.3744 B B Meskan South West Mw Access 2 664 Priority PH0
8.10292 38.3744 T T Meskan South West Mw Access 2 664 Priority PH0
6.86287 37.76635 0 0 Sodo Town South West Mw Access 4 664 Priority PH0
6.86287 37.76635 T T Sodo Town South West Mw Access 4 664 Priority PH0
8.921065 38.768908 A A Akaki - Kalit Addis South Mw Hub 1 45 priority PH0
8.921065 38.768908 B B Akaki - Kalit Addis South Mw Hub 1 45 priority PH0
8.921065 38.768908 0 0 Akaki - Kalit Addis South Mw Hub 1 45 priority PH0
8.561108 39.290272 A A Adama town South East Mw Access 5 664 Priority PH0
8.54787 39.26726 A A Adama town South East Mw Hub 3 664 Priority PH0
8.54787 39.26726 0 0 Adama town South East Mw Hub 3 664 Priority PH0
8.878666 38.766486 0 0 Akaki - Kalit Addis South Mw Access 3 410 priority PH0
8.878666 38.766486 A A Akaki - Kalit Addis South Mw Access 3 410 priority PH0
8.866949 38.824317 0 0 Akaki - Kalit Addis South Mw Access 6 664 Priority PH0
8.866949 38.824317 B B Akaki - Kalit Addis South Mw Access 6 664 Priority PH0
8.866949 38.824317 X X Akaki - Kalit Addis South Mw Access 6 664 Priority PH0
8.866949 38.824317 A A Akaki - Kalit Addis South Mw Access 6 664 Priority PH0
8.98474005 38.8790675 0 0 Bole Addis South Mw Access 11 664 Priority PH0
8.98474005 38.8790675 X X Bole Addis South Mw Access 11 664 Priority PH0
8.98474005 38.8790675 A A Bole Addis South Mw Access 11 664 Priority PH0
8.9709599 38.8733318 0 0 Bole Addis South Mw Access 11 664 Priority PH0
8.9709599 38.8733318 X X Bole Addis South Mw Access 11 664 Priority PH0
8.9709599 38.8733318 A A Bole Addis South Mw Access 11 664 Priority PH0
8.99372 38.88368 0 0 Bole Addis South Mw Access 11 664 Priority PH0
8.99372 38.88368 X X Bole Addis South Mw Access 11 664 Priority PH0
8.99372 38.88368 A A Bole Addis South Mw Access 11 664 Priority PH0
8.957254 38.697073 A A Nefas Silk Addis South Mw Access 5 410 priority PH0
8.957254 38.697073 0 0 Nefas Silk Addis South Mw Access 5 410 priority PH0
8.955459 38.691698 0 0 Kolfe - Keran Addis South Mw Access 6 410 priority PH0
8.955459 38.691698 A A Kolfe - Keran Addis South Mw Access 6 410 priority PH0
8.980043 38.671254 A A Kolfe - Keran Addis North Mw Access 9 664 Priority PH0
8.980043 38.671254 X X Kolfe - Keran Addis North Mw Access 9 664 Priority PH0
8.980043 38.671254 0 0 Kolfe - Keran Addis North Mw Access 9 664 Priority PH0
8.54019 39.269009 0 0 Adama town South East Mw Access 3 664 Priority PH0
8.54019 39.269009 A A Adama town South East Mw Access 3 664 Priority PH0
8.519807 39.262957 0 0 Adama town South East Mw Access 2 664 Priority PH0
8.519807 39.262957 A A Adama town South East Mw Access 2 664 Priority PH0
8.51582 39.269032 T T Adama town South East Mw Access 3 664 Priority PH0
8.51582 39.269032 A A Adama town South East Mw Access 3 664 Priority PH0
8.51582 39.269032 B B Adama town South East Mw Access 3 664 Priority PH0
8.51582 39.269032 0 0 Adama town South East Mw Access 3 664 Priority PH0
8.551598 39.262322 A A Adama town South East Mw Access 4 664 Priority PH0
8.551598 39.262322 0 0 Adama town South East Mw Access 4 664 Priority PH0
8.55991 39.281454 0 0 Adama town South East Mw Access 5 664 Priority PH0
8.55991 39.281454 A A Adama town South East Mw Access 5 664 Priority PH0
8.75242 38.99522 0 0 Bishoftu town South East Mw Access 6 664 Priority PH0
8.75242 38.99522 A A Bishoftu town South East Mw Access 6 664 Priority PH0
8.99144 38.860392 0 0 Bole Addis South Mw Access 11 664 Priority PH0
8.99144 38.860392 X X Bole Addis South Mw Access 11 664 Priority PH0
8.99144 38.860392 A A Bole Addis South Mw Access 11 664 Priority PH0
9.00902 38.775 0 0 Kirkos Addis South Mw Access 7 45 priority PH0
9.01091 38.88318 0 0 Bole Addis South Mw Access 12 410 priority PH0
9.007026 38.766518 C C Kirkos Addis South Mw Access 8 664 Priority PH0
9.007026 38.766518 E E Kirkos Addis South Mw Access 8 664 Priority PH0
9.007026 38.766518 D D Kirkos Addis South Mw Access 8 664 Priority PH0
9.007026 38.766518 0 0 Kirkos Addis South Mw Access 8 664 Priority PH0
9.0331 38.7138 C C Kolfe - Keran Addis North Mw Access 8 95 priority PH0
9.0331 38.7138 0 0 Kolfe - Keran Addis North Mw Access 8 95 priority PH0
9.03205 38.7708 0 0 Arada Addis North Mw Access 11 95 priority PH0
9.01948 38.8144 0 0 Bole Addis South Mw Access 8 95 priority PH0
8.99341 38.7667 D D Kirkos Addis South Mw Access 6 45 priority PH0
8.99341 38.7667 0 0 Kirkos Addis South Mw Access 6 45 priority PH0
8.87222 38.8146 0 0 Akaki - Kalit Addis South Mw Access 6 410 priority PH0
9.0496 38.76464 D D Gulele Addis North Mw Access 11 410 priority PH0
9.0496 38.76464 0 0 Gulele Addis North Mw Access 11 410 priority PH0
8.99604 38.7915 0 0 Bole Addis South Mw Hub 5 75 Priority PH0
7.07957 38.49598 0 0 Hawasa town South West Mw Access 5 664 Priority PH0
7.0352 38.510912 0 0 Hawasa town South West Mw Hub 1 664 Priority PH0
7.0227 38.5008 0 0 Hawasa town South West Mw Hub 2 664 Priority PH0
7.0597 38.4744 0 0 Hawasa town South West Mw Access 7 664 Priority PH0
7.061172 38.4869 0 0 Hawasa town South West Mw Access 4 664 Priority PH0
7.029212 38.4727 0 0 Hawasa town South West Mw Hub 4 664 Priority PH0
8.561108 39.290272 B B Adama town South East Mw Access 5 664 Priority PH0
8.561108 39.290272 C C Adama town South East Mw Access 5 664 Priority PH0
8.561108 39.290272 D D Adama town South East Mw Access 5 664 Priority PH0
8.561108 39.290272 0 0 Adama town South East Mw Access 5 664 Priority PH0
8.516567 39.24786 P P East Shewa South East Mw Access 11 664 Priority PH0
8.516567 39.24786 0 0 East Shewa South East Mw Access 11 664 Priority PH0
9.069718 38.663564 Finfine
P P Special South East Mw Access 11 664 Priority PH0
9.069718 38.663564 Finfine
0 0 Special South East Mw Access 11 664 Priority PH0
8.901181 38.75766 A A Akaki - Kalit Addis South Mw Hub 1 95 priority PH0
8.901181 38.75766 0 0 Akaki - Kalit Addis South Mw Hub 2 95 priority PH0
9.084564 38.761354 A A Kolfe - Keran Addis North Mw Access 9 664 Priority PH0
9.084564 38.761354 B B Kolfe - Keran Addis North Mw Access 9 664 Priority PH0
9.084564 38.761354 X X Kolfe - Keran Addis North Mw Access 9 664 Priority PH0
9.084564 38.761354 0 0 Kolfe - Keran Addis North Mw Access 9 664 Priority PH0
9.075694 38.758476 0 0 Kolfe - Keran Addis North Mw Hub 9 664 Priority PH0
9.075694 38.758476 A A Kolfe - Keran Addis North Mw Hub 9 664 Priority PH0
9.075694 38.758476 B B Kolfe - Keran Addis North Mw Hub 9 664 Priority PH0
9.075694 38.758476 X X Kolfe - Keran Addis North Mw Hub 9 664 Priority PH0
9.075694 38.758476 C C Kolfe - Keran Addis North Mw Hub 9 664 Priority PH0
9.080942 38.729463 X X Bole Addis South Mw Access 8 95 priority PH0
9.080942 38.729463 0 0 Bole Addis South Mw Access 8 95 priority PH0
8.9321658 38.714446 0 0 Bole Addis South Mw Access 8 95 priority PH0
9.065994 38.864187 0 0 Kirkos Addis South Mw Access 7 75 Priority PH0
9.065994 38.864187 A A Kirkos Addis South Mw Access 7 75 Priority PH0
9.065994 38.864187 X X Kirkos Addis South Mw Access 7 75 Priority PH0
9.065994 38.864187 B B Kirkos Addis South Mw Access 7 75 Priority PH0
8.99706 38.7647 0 0 Kirkos Addis South Mw Access 7 410 priority PH0
8.99706 38.7647 A A Kirkos Addis South Mw Access 7 410 priority PH0
9.02112 38.84186 A A Yeka Addis North Mw Access 1 Tx site PH0
8.923243 38.802014 A A Akaki - Kalit Addis South Mw Access 1 Tx site PH0
8.960216 38.712533 A A Nefas Silk Addis South Mw Access 1 Tx site PH0
8.993261 38.775296 A A Bole Addis South Mw Access 1 Tx site PH0
9.02456 38.8233 D D Yeka Addis North Mw Hub 7 410 priority PH0
8.9321658 38.714446 A A Bole Addis South Mw Access 8 95 priority PH0
8.9321658 38.714446 B B Bole Addis South Mw Access 8 95 priority PH0
8.9321658 38.714446 B B Bole Addis South Mw Access 8 95 priority PH0
9.03287 38.7483 D D Arada Addis North Mw Hub 9 75 Priority PH0
9.0332 38.7326 D D Addis Ketema (AA)
Addis North Mw Hub 8 75 Priority PH0
8.890773087 38.7768828 D D Akaki - Kalit Addis South Mw Hub 4 95 priority PH0
9.03361 38.7502 0 0 Arada Addis North Mw Access 11 95 priority PH0
9.03361 38.7502 A A Arada Addis North Mw Access 11 95 priority PH0
9.03361 38.7502 B B Arada Addis North Mw Access 11 95 priority PH0
9.03361 38.7502 X X Arada Addis North Mw Access 11 95 priority PH0
9.00437 38.78 C C Bole Addis South Mw Access 8 45 priority PH0
9.01978 38.8008 D D Yeka Addis North Mw Access 9 95 priority PH0
9.05238 38.7461 D D Arada Addis North Mw Hub 10 95 priority PH0
7.191548 38.587783 0 0 Shashemene Zuria Oromia Mw Access PH0
7.191548 38.587783 X X Shashemene Zuria Oromia Mw Access PH0
6.288449 38.346337 0 0 Dila Zuria SNNP Mw Access PH0
6.288449 38.346337 X X Dila Zuria SNNP Mw Access PH0
6.850028 37.831356 0 0 Sodo Zuria SNNP Mw Access PH0
6.850028 37.831356 X X Sodo Zuria SNNP Mw Access PH0
5.879166 37.339405 0 0 Gerese SNNP Mw Access PH0
5.879166 37.339405 X X Gerese SNNP Mw Access PH0
8.183725 34.851051 0 0 Gambela Zuria Gambela Mw Access PH0
8.2488 34.597825 X X Gambela Zuria Gambela Mw Access PH0
7.665089 36.853073 0 0 Jimma town Oromia Mw Access PH0
7.665089 36.853073 X X Jimma town Oromia Mw Access PH0
7.173728 39.458121 0 0 Limu Bilbilo Oromia Mw Access PH0
Scope Candidate STEP Region
Subcon Nom Colo Cluster Candidate Lat Candidate X Candidate Y GF-RT
long

Nominal Maktech Hamza Bole 9.003944 38.819583 480169.8316 995293.1259 A1_South GF


FTK Maktech Hamza Bole 9.0036876 38.819151 480122.3351 995264.8023 A1_South RT
FTK Maktech Revanth Bole 9.0034983 38.8193583 480145.1 995243.9 A1_South RT
FTK I-Engg Logesh Bole 9.00413 38.81988333 480202.852 995313.6734 A1_South RT
FTK Revanth Bole 9.00367 38.81915 480129.9 995248.5 A1_South RT
Nominal Maktech Hamza Bole 9.00901 38.8063 478710.1489 995853.958 A1_South RT
FTK Maktech Hamza Bole 9.00971 38.80559 478632.1526 995931.3899 A1_South RT
FTK Maktech Hamza Bole 9.00988 38.80568 478642.0547 995950.1795 A1_South RT
FTK Maktech Hamza Bole 9.00741 38.80623 478702.3614 995677.0695 A1_South RT
FTK Fireside Beakal Bole 9.007849 38.805258 478595.552 995725.661 A1_South RT
Nominal Innovis Prashant Arada 9.0377895 38.76883078 474593.8458 999038.1593 A1_North GF
FTK Innovis Prashant Arada 9.037226 38.768715 474581.0817 998975.8677 A1_North GF
FTK Innovis Prashant Arada 9.0377 38.7695 474667.3891 999028.2177 A1_North GF
Colo Innovis Prashant Arada 9.037705 38.768945 474606.393 999028.8091 A1_North GF
Nominal Innovis Prashant Arada 9.04344 38.75084 472617.0233 999664.1718 A1_North GF
FTK Innovis Prashant Arada 9.042974 38.749615 472482.3582 999612.7438 A1_North RT
FTK Innovis Prashant Arada 9.04461 38.750992 472633.8168 999793.5138 A1_North RT
Colo Innovis Prashant Arada 9.0434 38.7509 472623.6144 999659.7449 A1_North GF
Nominal Innovis Logesh Yeka 9.0590841 38.78028 475853.5735 1001391.676 A1_North RT
FTK Innovis Logesh Yeka 9.057909 38.779351 475751.4006 1001261.821 A1_North RT
FTK Innovis Logesh Yeka 9.058694 38.781165 475950.8063 1001348.489 A1_North RT
Nominal Maktech Logesh Gulele 9.05877976 38.74944962 472465.3847 1001360.218 A1_North GF
FTK Maktech Logesh Gulele 9.059631 38.750992 472634.9523 1001454.213 A1_North RT
FTK Maktech Logesh Gulele 9.05887 38.75063 472595.112 1001370.106 A1_North GF
FTK Revanth Gulele 9.058568 38.752298 472778.4 1001337 A1_North RT
FTK Gulele 9.0574 38.7473 472229.0415 1001207.837 A1_North GF
Nominal Zagwe Hamza Kirkos 8.99232 38.75076 472604.3776 994012.4363 A1_South RT
FTK Zagwe Hamza Kirkos 8.993072 38.750915 472621.4712 994095.5644 A1_South GF
FTK Zagwe Hamza Kirkos 8.993096 38.750435 472568.7128 994098.2537 A1_South GF
FTK Zagwe Hamza Kirkos 8.994554 38.74903 472414.3897 994259.553 A1_South RT
Nominal     Bole 8.95991 38.7804 475860.1802 990427.1729 A1_South GF
FTK Maktech Hamza Bole 8.9603703283 38.77984154 475798.821 990478.1024 A1_South GF
FTK Maktech Hamza Bole 8.9612529846 38.779465025 475757.4904 990575.7117 A1_South GF
FTK Maktech Hamza Bole 8.95721 38.78074 475897.3775 990128.6447 A1_South RT
FTK Maktech Hamza Bole 8.960731 38.783599 476211.8895 990517.7324 A1_South RT
FTK Innovis Hamza Bole 8.954378 38.781428 475972.8217 989815.5002 A1_South RT
Nominal Innovis Logesh Nefas Silk 8.97698 38.748834 472391.5158 992316.6189 A1_South GF
FTK Innovis Logesh Nefas Silk 8.976727 38.748563 472361.7078 992288.6681 A1_South RT
FTK Innovis Logesh Nefas Silk 8.976671 38.747862 472284.6482 992282.5296 A1_South RT
Nominal     Nefas Silk 8.96466 38.74919 472429.7182 990954.5169 A1_South GF
FTK Maktech Hamza Nefas Silk 8.964069 38.748906 472398.4547 990889.1984 A1_South RT
FTK Maktech Hamza Nefas Silk 8.964647 38.748966 472405.0939 990953.0964 A1_South RT
FTK Innovis Hamza Kirkos 9.009926 38.774584 475224.2432 995957.2257 A1_South RT
FTK Innovis Hamza Kirkos 9.0083458 38.7751501 475286.357 995782.4835 A1_South RT
FTK Innovis Hamza Kirkos 9.0090186 38.774984 475268.1463 995856.8782 A1_South RT
FTK Zagwe Logesh Kirkos 9.00924 38.77511 475282.0102 995881.3473 A1_South RT
FTK Zagwe Nuhamin Kirkos 9.008141 38.776395 475423.1729 995759.7574 A1_South RT
Nominal Zagwe Jeff Lideta 9.01097 38.71833 469041.3411 996076.9337 A1_North GF
FTK Zagwe Jeff Lideta 9.010587 38.718132 469019.5459 996034.6066 A1_North RT
FTK Zagwe Jeff Lideta 9.011243 38.718945 469108.9602 996107.0642 A1_North GF
FTK Zagwe Logesh Lideta 9.01051 38.718068 469012.505 996026.099 A1_North RT
Nominal Innovis Arun Kirkos 9.00470399 38.75273746 472822.6588 995381.4406 A1_South RT
FTK Innovis Arun Kirkos 9.004947 38.752681 472816.4712 995408.3115 A1_South RT
FTK Innovis Arun Kirkos 9.005345 38.753159 472869.0395 995452.2783 A1_South RT
FTK Innovis Arun Kirkos 9.005468 38.752664 472814.6416 995465.9136 A1_South RT
Nominal Innovis   14 Moved to ATC8.914495584 38.77942163 475749.6282 985406.3272 A1_South GF
FTK Innovis Revanth 14 Moved to ATC 8.92082 38.77788 475580.5609 986105.6404 A1_South GF
FTK Innovis Revanth 14 Moved to ATC 8.920815 38.77768 475558.5728 986105.1009 A1_South GF
FTK Zagwe Revanth 14 Moved to ATC 8.92085 38.77827 475623.4 986108.9 A1_South GF
FTK Zagwe Nuhamin 14 Moved to ATC 8.919407 38.7777 475560.678 985949.4345 A1_South GF
Nominal Zagwe Logesh Akaki - Kalit 8.867417 38.789361 476839.4093 980200.8097 A1_South RT
FTK Zagwe Logesh Akaki - Kalit 8.866956 38.786639 476540.0841 980150.0136 A1_South RT
FTK Zagwe Logesh Akaki - Kalit 8.866238 38.79073 476989.8636 980070.3778 A1_South GF
Nominal Innovis Prashant Addis Ketema 9.033898155 38.71960058 469182.9385 998611.7316 A1_North GF
FTK Innovis Prashant Addis Ketema 9.032657 38.718894 469105.1761 998474.5708 A1_North GF
FTK Innovis Prashant Addis Ketema 9.032803 38.719714 469195.3109 998490.6431 A1_North GF
FTK Innovis Prashant Addis Ketema 9.033516 38.718816 469096.6767 998569.5473 A1_North GF
Colo Innovis Prashant Addis Ketema 9.0326 38.7187 469083.8496 998468.2854 A1_North GF
Nominal     Nefas Silk 8.91801207 38.73486547 470851.375 985798.3198 A1_South GF
FTK Revanth Nefas Silk 8.918209 38.734225 470781 985820.1 A1_South GF
FTK Maktech Hamza Nefas Silk 8.917943 38.734402 470800.4157 985790.7202 A1_South GF
FTK Maktech Hamza Nefas Silk 8.918184 38.734721 470835.5056 985817.3394 A1_South GF
Colo Maktech Hamza Nefas Silk 8.91801207 38.73486547 470851.375 985798.3198 A1_South GF
FTK Maktech Hamza Bole 9.01091 38.88318 487160.2245 996060.4317 A1_South RT
FTK Maktech Hamza Bole 9.00927 38.88296 487135.986 995879.1251 A1_South RT
FTK Maktech Hamza Bole 9.01098 38.88317 487159.1278 996068.171 A1_South RT
Nominal Innovis   40 Init Sites 8.875676043 38.80934867 479037.6094 981112.7187 A1_South GF
FTK Innovis Revanth 40 Init Sites 8.879242 38.81134 479256.7601 981506.8486 A1_South GF
FTK Innovis Revanth 40 Init Sites 8.878868 38.81173 479299.62 981465.4784 A1_South GF
FTK Innovis Beakal 40 Init Sites 8.877003 38.811033 479222.879 981259.328 A1_South RT
Colo Innovis Revanth 40 Init Sites 8.878823 38.81152 479276.5277 981460.5151 A1_South GF
Nominal Maktech Hamza Bole 9.00253961 38.85776848 484366.8602 995136.0105 A1_South GF
FTK Fireside Revanth Bole 9.0024133333 38.85677333 484257.5 995122.1 A1_South GF
FTK Maktech Hamza Bole 9.00097 38.856375 484213.6298 994962.538 A1_South RT
FTK Maktech Hamza Bole 9.00253607 38.85791704 484383.1888 995135.6128 A1_South GF
Colo Maktech Hamza Bole 9.00253961 38.85776848 484366.8602 995136.0105 A1_South GF
Nominal Zagwe Logesh Bole 8.9461089 38.7883322 476731.2644 988900.8445 A1_South GF
FTK Zagwe Logesh Bole 8.94486 38.78735 476623.2106 988762.8313 A1_South GF
FTK Zagwe Logesh Bole 8.946931 38.78961 476871.7861 988991.6534 A1_South GF
FTK Zagwe Revanth Bole 8.94862 38.7898 476892.7794 989178.3733 A1_South RT
Nominal     Yeka 9.0213537 38.82629151 480908.1003 997217.547 A1_North GF
FTK Maktech Hamza Yeka 9.021131 38.827449 481035.3061 997192.8655 A1_North RT
FTK Maktech Hamza Yeka 9.021048 38.826464 480927.0422 997183.7405 A1_North GF
FTK Yeka 9.031475 38.824805 480907.9341 997217.1381 A1_North GF
Nominal Innovis Revanth Kolfe - Keran 8.99361092 38.70872001 467983.5613 994158.5654 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.99347 38.709143 468030.0429 994142.9485 A1_North RT
FTK Innovis Revanth Kolfe - Keran 8.9936366 38.7082917 467936.4849 994161.4419 A1_North GF
Nominal Innovis Revanth Kolfe - Keran 9.00201016 38.70591726 467676.2361 995087.4196 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.002706 38.706015 467687.0409 995164.342 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.002435 38.705449 467624.8052 995134.4307 A1_North GF
FTK Tesla Logesh Kolfe - Keran 9.001275 38.70374 467436.8573 995006.3342 A1_North RT
FTK Innovis Beakal Kolfe - Keran 9.000975 38.708493 467959.257 994972.747 A1_North RT
Colo Innovis Revanth Kolfe - Keran 9.0021 38.7059 467674.3469 995097.3537 A1_North GF
Nominal Zagwe Logesh Bole 9.003622 38.783765 476232.9314 995259.659 A1_South GF
FTK Zagwe Logesh Bole 9.003109 38.783049 476154.1997 995202.9893 A1_South RT
FTK Zagwe Logesh Bole 9.002823 38.783603 476215.0732 995171.3336 A1_South RT
FTK Revanth Bole 9.004317 38.783222 476173.3 995336.5 A1_South RT
Colo Zagwe Logesh Bole 9.003622 38.783765 476232.9314 995259.659 A1_South GF
Nominal     Arada 8.949708 38.70441 467505.9116 989305.1056 A1_South GF
FTK Innovis Hamza Arada 8.950787 38.704091 467470.9396 989424.4262 A1_South GF
FTK Innovis Hamza Arada 8.950562 38.704801 467548.9701 989399.488 A1_South GF
FTK Innovis Hamza Arada 8.950969 38.703394 467394.3344 989444.6095 A1_South GF
FTK Innovis Revanth Arada 8.94838 38.7149 468619.8 989269.3 A1_South RT
FTK Innovis Nuhamin Arada 8.948263 38.713834 468541.7723 989144.5308 A1_South RT
Colo Innovis Revanth Arada 8.94681 38.7202 469241.47 988983.352 A1_South GF
Nominal     Yeka 9.02228 38.86428 485083.3742 997318.1887 A1_North GF
FTK Maktech Hamza Yeka 9.022331 38.864108 485064.4722 997323.8342 A1_North GF
FTK Maktech Hamza Yeka 9.02364 38.864084 485061.8882 997468.5552 A1_North GF
FTK Igado Revanth Yeka 9.026717 38.8689 485591.323 997808.55 A1_North RT
FTK Igado Revanth Yeka 9.026634 38.868593 485557.579 997799.38 A1_North RT
FTK Igado Revanth Yeka 9.026777 38.869242 485557.249 997799.38 A1_North RT
FTK     Yeka 9.0259 38.86866 485564.9131 997718.2315 A1_North GF
Nominal     Gulele 9.06097 38.72649 469942.3668 1001604.185 A1_North GF
FTK Maktech Logesh Gulele 9.06097 38.72649 469942.3668 1001604.185 A1_North GF
FTK Maktech Logesh Gulele 9.0592 38.72723 470023.5436 1001408.435 A1_North RT
FTK Revanth Gulele 9.0078491 38.8052581 478595.552 995725.661 A1_North RT
Nominal     Akaki - Kalit 8.93213527 38.76243028 473882.8447 987357.6871 A1_South GF
FTK Maktech Hamza Akaki - Kalit 8.931552 38.762371 473876.2862 987293.2063 A1_South GF
FTK Maktech Hamza Akaki - Kalit 8.9319888889 38.762049085 473840.9275 987341.5306 A1_South GF
FTK Maktech Revanth Akaki - Kalit 8.935712 38.76412 474068.8574 987753.0031 A1_South RT
FTK Maktech Hamza Akaki - Kalit 8.93234 38.76598 474273.0985 987380.0722 A1_South RT
Colo Maktech Hamza Akaki - Kalit 8.93213527 38.76243028 473882.8447 987357.6871 A1_South GF
Nominal     Gulele 9.06653952 38.76334656 473993.1768 1002217.103 A1_North GF
FTK Maktech Hamza Gulele 9.066464 38.763112 473967.3944 1002208.77 A1_North GF
FTK Maktech Hamza Gulele 9.066428 38.764275 474095.1994 1002204.707 A1_North GF
FTK Igado Revanth Gulele 9.064874 38.76243 473892.3 1002033 A1_North RT
FTK Igado Revanth Gulele 9.066378 38.76055 473685.8 1002199 A1_North RT
Nominal Innovis Prashant Arada 9.05135967 38.73829704 471239.1572 1000540.725 A1_North GF
FTK Innovis Prashant Arada 9.051735 38.738951 471311.0569 1000582.17 A1_North RT
FTK Innovis Prashant Arada 9.05169 38.739086 471325.8897 1000577.184 A1_North GF
Nominal Zagwe Logesh Bole 8.99954 38.83575 481946.5811 994805.3935 A1_South GF
FTK Zagwe Logesh Bole 8.999793 38.836258 482002.4302 994833.3396 A1_South RT
FTK Zagwe Logesh Bole 8.999966 38.835556 481925.2789 994852.5006 A1_South RT
FTK Fireside Revanth Bole 9.001047 38.835941 481967.6 994972 A1_South GF
Colo Zagwe Logesh Bole 8.99954 38.83575 481946.5811 994805.3935 A1_South GF
Nominal Innovis Revanth Kolfe - Keran 8.96072977 38.6726796 464018.8507 990526.6077 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.9614 38.6728 464032.1519 990600.6957 A1_North RT
FTK Innovis Revanth Kolfe - Keran 8.9617 38.6724 463988.2105 990633.9025 A1_North RT
FTK Igado Revanth Kolfe - Keran 8.958041 38.6719984 463943.7 990229.4 A1_North RT
FTK Igado Revanth Kolfe - Keran 8.9603067 38.6709942 463833.5 990480 A1_North RT
FTK Zagwe Logesh Kolfe - Keran 8.9606 38.674 464163.9863 990512.1316 A1_North GF
Nominal Zagwe Logesh Bole 8.99330998 38.80896301 479001.9398 994118.0443 A1_South GF
FTK Zagwe Logesh Bole 8.99326 38.808264 478925.1042 994112.5587 A1_South RT
FTK Fireside Revanth Bole 8.993326 38.809609 479072.9 994119.8 A1_South RT
Colo Zagwe Logesh Bole 8.99330998 38.80896301 479001.9398 994118.0443 A1_South GF
Nominal Zagwe Logesh Bole 8.97698 38.77558 475331.4852 992314.7149 A1_South GF
Colo Zagwe Logesh Bole 8.97698 38.77538 475309.5008 992314.7284 A1_South GF
FTK Zagwe Logesh Bole 8.975251 38.775684 475342.8002 992123.5534 A1_South GF
FTK Zagwe Logesh Bole 8.978067 38.774416 475203.6101 992434.9698 A1_South RT
FTK ACME Logesh Bole 8.97796 38.775445 475316.712 992423.0707 A1_South RT
Nominal     Yeka 9.04153 38.86109 484733.5791 999446.5566 A1_North GF
FTK Maktech Hamza Yeka 9.041028 38.861379 484765.3196 999391.0445 A1_North RT
FTK Maktech Hamza Yeka 9.040727 38.861499 484778.4952 999357.7616 A1_North GF
Nominal     Bole 9.01228 38.86411111 485064.4009 996212.6195 A1_South GF
FTK Zagwe Hamza Bole 9.013032 38.864889 485149.93 996295.7271 A1_South RT
FTK Zagwe Hamza Bole 9.012947 38.864777 485137.6165 996286.3343 A1_South RT
FTK Zagwe Hamza Bole 9.013007 38.862949 484936.7029 996293.0425 A1_South RT
FTK Igado Revanth Bole 9.011996 38.865272 485192 996181.2 A1_South RT
Nominal     Nefas Silk 8.982583 38.736028 470984.3002 992937.064 A1_South GF
FTK Maktech Logesh Nefas Silk 8.982147 38.735367 470911.6081 992888.9129 A1_South RT
FTK Maktech Logesh Nefas Silk 8.982179 38.736285 471012.5176 992892.3781 A1_South RT
Nominal Innovis Logesh Bole 9.01834 38.79621 477601.7127 996886.0662 A1_South GF
FTK Innovis Logesh Bole 9.019087 38.79777 477773.2166 996968.5578 A1_South RT
FTK Innovis Logesh Bole 9.019263 38.796942 477682.2228 996988.0665 A1_South RT
FTK Revanth Bole 9.018625 38.795637 477538.8 996917.6 A1_South RT
FTK Revanth Bole 9.017329 38.796359 477618 996774.3 A1_South RT
FTK Fireside Beakal Bole 9.020746 38.795826 477559.656 997152.092 A1_South RT
FTK Innovis Nuhamin Bole 9.017155 38.796608 477645.3836 996755.0306 A1_South RT
FTK Innovis Logesh Bole 9.017326 38.796758 477661.8805 996773.9269 A1_South RT
Nominal Zagwe Jeff Lideta 9.021587936 38.73325705 470682.8577 997249.6066 A1_North RT
FTK Zagwe Jeff Lideta 9.021357 38.734319 470799.5566 997223.9896 A1_North RT
FTK Zagwe Jeff Lideta 9.021234 38.733724 470734.151 997210.4385 A1_North RT
FTK Zagwe Jeff Lideta 9.021104 38.73283 470635.8821 997196.1376 A1_North GF
FTK Lideta 9.021608 38.73321 470677.6881 997251.8286 A1_North RT
Nominal Innovis Prashant Addis Ketema 9.034149 38.736396 471028.8579 998638.0886 A1_North RT
FTK Innovis Prashant Addis Ketema 9.034144 38.736776 471070.6213 998637.5057 A1_North RT
FTK Innovis Prashant Addis Ketema 9.03387 38.736878 471081.8097 998607.2046 A1_North RT
FTK Innovis Revanth Addis Ketema 9.031444 38.73478 470851.0344 998339.1565 A1_North RT
FTK Maktech Logesh Addis Ketema 9.031316 38.733863 470750.2406 998325.0783 A1_North RT
FTK Innovis Prashant Addis Ketema 9.033321 38.73699 471094.0753 998546.4991 A1_North RT
Nominal Maktech Logesh Gulele 9.04901 38.73021 470350.2026 1000281.597 A1_North GF
FTK Maktech Logesh Gulele 9.049145 38.7295 470272.1844 1000296.581 A1_North RT
FTK Maktech Logesh Gulele 9.04901 38.73021 470350.2026 1000281.597 A1_North GF
Nominal Innovis Prashant 40 Init Sites 8.91247 38.804338 478488.8247 985180.8422 A1_North GF
FTK Innovis Prashant 40 Init Sites 8.912296 38.804408 478496.5104 985161.6011 A1_North GF
FTK Innovis Prashant 40 Init Sites 8.91204 38.80409 478461.5342 985133.317 A1_North GF
FTK Innovis Prashant 40 Init Sites 8.91249 38.804695 478528.0747 985183.0326 A1_North GF
Colo Innovis Prashant 40 Init Sites 9.01845 38.74707 472200.7789 996901.6019 A1_North GF
Nominal Innovis Revanth Kolfe - Keran 8.98647998 38.69701945 466696.8155 993371.221 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.986915 38.697398 466738.4652 993419.2818 A1_North RT
FTK Innovis Revanth Kolfe - Keran 8.9861 38.698 466804.5625 993329.122 A1_North GF
Nominal     Yeka 9.03554034 38.85443124 484001.5054 998784.6385 A1_North GF
FTK Maktech Hamza Yeka 9.03497496 38.85582114 484154.2357 998722.0707 A1_North GF
FTK Maktech Hamza Yeka 9.0353968 38.855452 484113.6843 998768.7245 A1_North GF
FTK Igado Revanth Yeka 9.03493 38.852087 483743.8 998717.3 A1_North RT
FTK Revanth Yeka 9.035301 38.855398 484107.7 998758.1 A1_North GF
FTK Revanth Yeka 9.035454 38.850607 483581.2038 998775.2629 A1_North RT
Colo Maktech Hamza Yeka 9.03554034 38.85443124 484001.5054 998784.6385 A1_North GF
Nominal Zagwe Logesh Bole 9.00269962 38.84884372 483385.9153 995154.0938 A1_South GF
FTK Zagwe Logesh Bole 9.002417 38.846315 483107.9616 995122.9637 A1_South RT
FTK Zagwe Logesh Bole 9.002542 38.84694 483176.6634 995136.7547 A1_South GF
FTK ACME Revanth Bole 9.00258 38.84363 482812.8512 995141.1096 A1_South RT
Nominal     Yeka 9.04072 38.84429 482887.1911 999357.7507 A1_North GF
FTK Maktech hamza Yeka 9.040548 38.844666 482928.5062 999338.7171 A1_North RT
Nominal Gulele 9.06614987 38.73770864 471175.6709 1002175.957 A1_North GF
FTK Maktech Hamza Gulele 9.0663465 38.738709 471285.6212 1002197.617 A1_North GF
FTK Maktech Hamza Gulele 9.0668 38.73933 471353.9019 1002247.706 A1_North GF
FTK Igado Revanth Gulele 9.068043 38.73608 470996.8 1002385 A1_North RT
FTK Igado Revanth Gulele 9.0691389 38.736362778 471028 1002507 A1_North RT
Nominal     Nefas Silk 8.97027 38.76644 474326.3285 991573.4977 A1_South GF
FTK Maktech Hamza Nefas Silk 8.969291 38.766529 474336.043 991465.2553 A1_South GF
FTK Maktech Hamza Nefas Silk 8.970177 38.766529 474336.1052 991563.2096 A1_South GF
FTK Nefas Silk 8.97223 38.7656 474336.1052 991563.2096 A1_South RT
FTK Innovies Nuhamin Nefas Silk 8.97286 38.76404 474062.6952 991860.0113 A1_South RT
Nominal Innovis Prashant Arada 9.03475993 38.74432923 471900.8048 998705.0117 A1_North RT
FTK Innovis Prashant Arada 9.034551 38.74327 471784.3743 998681.9945 A1_North RT
FTK Innovis Prashant Arada 9.034646 38.743955 471859.6664 998692.4446 A1_North RT
FTK Innovis Logesh Arada 9.036847 38.742508 471700.8062 998935.8958 A1_North RT
Nominal Innovis Prashant Arada 9.0336904 38.76829 474534.1244 998585.0075 A1_North GF
FTK Innovis Prashant Arada 9.034267 38.767923 474493.8299 998648.781 A1_North GF
FTK Innovis Prashant Arada 9.034976 38.76961 474679.2883 998727.0493 A1_North RT
Colo Innovis Prashant Arada 9.03375 38.76871 474580.289 998591.567 A1_North GF
Nominal Innovis Revanth Kolfe - Keran 9.02138 38.70768 467871.6986 997228.768 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.02116 38.70789 467894.76 997204.4267 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.0222 38.70752 467854.1858 997319.4403 A1_North GF
FTK Revanth Kolfe - Keran 9.020367 38.709364 468056.7 997116.6 A1_North RT
FTK Revanth Kolfe - Keran 9.020969 38.709645 468087.6 997183.2 A1_North RT
FTK Revanth Kolfe - Keran 9.021113 38.705538 467636.2 997199.4 A1_North RT
Colo Innovis Revanth Kolfe - Keran 9.02145 38.70753 467855.2185 997236.5203 A1_North GF
Nominal Innovis Hamza Kolfe - Keran 8.976627 38.660574 462689.7343 992285.3938 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.9845 38.70929 468045.4145 993151.2259 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.984555 38.70736 467833.2737 993157.4752 A1_North RT
FTK Zagwe Revanth Kolfe - Keran 8.984204 38.707009 467794.7 993118.7 A1_North RT
Nominal Innovis Logesh 40 Init Sites 9.028415 38.79721 477712.2401 997999.8771 A1_North RT
FTK Innovis Logesh 40 Init Sites 9.029019 38.796914 477679.745 998066.6723 A1_North RT
FTK Innovis Logesh 40 Init Sites 9.028924 38.796483 477632.3698 998056.1956 A1_North GF
Nominal Innovis Revanth Kolfe - Keran 8.967051 38.67298 464052.4944 991225.4455 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.967305 38.67362 464122.8718 991253.4649 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.966235 38.673135 464069.4527 991135.2144 A1_North GF
Colo Innovis Revanth Kolfe - Keran 8.967051 38.67298 464052.4944 991225.4455 A1_North GF
Nominal Innovis Logesh Bole 9.00255982 38.79852908 477855.6399 995141.3008 A1_South GF
FTK Innovis Logesh Bole 9.0031 38.7975 477742.5628 995201.0844 A1_South RT
FTK Innovis Revanth Bole 9.00357 38.79778 477773.4 995253 A1_South RT
FTK Fireside Beakal Bole 9.00409833 38.79794 477790.986 995311.431 A1_South RT
FTK Fireside Nuhamin Bole 9.003493 38.797198 477709.3929 995244.552 A1_South RT
FTK Innovis Logesh Bole 9.0039 38.7975 477742.6117 995289.5307 A1_South RT
Nominal     Yeka 9.06329 38.77715 475509.8811 1001856.883 A1_North GF
FTK Maktech Hamza Yeka 9.063188 38.776756 475466.5753 1001845.632 A1_North GF
FTK Maktech Hamza Yeka 9.063522 38.776836 475475.3897 1001882.553 A1_North GF
FTK Maktech Revanth Yeka 9.063307 38.778688 475678.9 1001859 A1_North GF
Nominal Zagwe Logesh Bole 8.98949888 38.822568 480497.1495 993695.9463 A1_South GF
FTK Zagwe Logesh Bole 8.989744 38.821778 480410.3277 993723.0883 A1_South GF
FTK Zagwe Logesh Bole 8.989435 38.821922 480426.1392 993688.9183 A1_South GF
FTK I-Engg Revanth Bole 8.98977 38.82246 480485.3 993725.9 A1_South RT
FTK Fireside Revanth Bole 8.989807 38.816981 479883.1 993730.3 A1_South RT
Colo Zagwe Logesh Bole 8.98902 38.81593 479767.489 993643.362 A1_South GF
Nominal Innovis Logesh Yeka 9.02828027 38.79105959 477036.2641 997985.3628 A1_North GF
FTK Innovis Logesh Yeka 9.0275418 38.791967 477135.9476 997903.662 A1_North RT
FTK Innovis Logesh Yeka 9.0289901 38.79187535 477125.9659 998063.789 A1_North RT
Nominal Innovis Logesh Yeka 9.0255 38.78611 476492.0937 997678.2963 A1_North GF
FTK Innovis Logesh Yeka 9.02454033 38.784859 476354.5375 997572.2778 A1_North GF
FTK Innovis Logesh Yeka 9.025627 38.7872 476611.9005 997692.2672 A1_North RT
Nominal Innovis   14 Moved to ATC8.997752611 38.75462592 473029.7112 994612.769 A1_South GF
FTK Innovis Revanth 14 Moved to ATC 8.994632 38.75475 473043.1186 994267.7509 A1_South GF
FTK Innovis Revanth 14 Moved to ATC 8.995 38.75295 472845.2961 994308.5692 A1_South RT
FTK Innovis Revanth 40 Init Sites 8.99478 38.75332 472885.9489 994284.219 A1_South GF
FTK Fireside Revanth 40 Init Sites 8.997724 38.754595 473026.3104 994609.6081 A1_South RT
FTK Fireside Revanth 40 Init Sites 8.998881 38.715809 468763.2 994740.6 A1_South RT
FTK Fireside Nuhamin 40 Init Sites 8.998881 38.755809 473159.8333 994737.4348 A1_South RT
Colo Innovis Revanth 14 Moved to ATC 9.001339 38.754661 473033.833 995009.271 A1_South GF
Nominal Zagwe Logesh Akaki - Kalit 8.91729 38.82234 480468.2358 985712.729 A1_South GF
FTK Zagwe Logesh Akaki - Kalit 8.917993 38.822642 480501.4747 985790.4348 A1_South GF
FTK Zagwe Logesh Akaki - Kalit 8.917197 38.821735 480401.7175 985702.4792 A1_South GF
FTK Innovis Revanth Akaki - Kalit 8.91627038 38.82175441 480403.8 985600 A1_South GF
Colo Zagwe Logesh Akaki - Kalit 8.91729 38.82234 480468.2358 985712.729 A1_South GF
Nominal     Kolfe - Keran 8.95394019 38.68614984 465498.9598 989774.6711 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.953813 38.68599 465481.3767 989760.6242 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.954328 38.68647 465534.1913 989817.5168 A1_North GF
FTK Igado Beakal Kolfe - Keran 8.951524 38.687029 465595.4 989507.5 A1_North RT
FTK Igado Beakal Kolfe - Keran 8.950748 38.686208 465505.052 989421.742 A1_North RT
FTK Igado Beakal Kolfe - Keran 8.95436 38.68589 465470.435 989821.109 A1_North RT
FTK Igado Revanth Kolfe - Keran 8.95334 38.68358 465216.4 989708.6 A1_North RT
FTK Fireside Nuhamin Kolfe - Keran 8.956711 38.680439 464871.4362 990081.5481 A1_North GF
Nominal     Nefas Silk 8.95822 38.70715 467807.8698 990245.9375 A1_South GF
FTK Maktech Hamza Nefas Silk 8.958286 38.707266 467820.6273 990253.2242 A1_South GF
FTK Maktech Hamza Nefas Silk 8.95774 38.70764 467861.6924 990192.8266 A1_South GF
FTK Revanth Nefas Silk 8.957031 38.707501 467846.4 990114.5 A1_South GF
FTK Zagwe Beakal Nefas Silk 8.95936 38.70587 467667.263 990372.086 A1_South RT
FTK Zagwe Logesh Nefas Silk 8.95774 38.70746 467841.9053 990192.8423 A1_South GF
Nominal     Kolfe - Keran 8.96236021 38.68658103 465547.1532 990705.5359 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.961447 38.687166 465611.3712 990604.518 A1_North RT
FTK Innovis Revanth Kolfe - Keran 8.961897 38.68673 465563.4854 990654.3101 A1_North RT
FTK Fireside Nuhamin Kolfe - Keran 8.962123 38.6865983 465549.0293 990679.3087 A1_North RT
FTK Fireside Nuhamin Kolfe - Keran 8.964893 38.686224 465508.1449 990985.5911 A1_North RT
FTK Fireside Beakal Kolfe - Keran 8.96116 38.68757 465655.755 990572.75 A1_North RT
FTK Fireside Beakal Kolfe - Keran 8.96367 38.68655 465543.866 990850.347 A1_North GF
FTK Fireside Nuhamin Kolfe - Keran 8.958364 38.689668 465886.1 990263.4 A1_North RT
Nominal Innovis Revanth Kolfe - Keran 8.975300443 38.68611839 465497.5185 992136.2336 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.97501 38.68641 465529.5457 992104.0952 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.975768 38.686295 465516.9761 992187.9095 A1_North GF
FTK Igado Revanth Kolfe - Keran 8.975607 38.68192 465036 992170.5 A1_North RT
FTK Igado Revanth Kolfe - Keran 8.976635 38.68074 464906.4 992284.3 A1_North RT
FTK Igado Revanth Kolfe - Keran 8.975147 38.684867 465359.9 992119.4 A1_North RT
FTK Igado Revanth Kolfe - Keran 8.975059 38.688674 465778.4 992109.3 A1_North RT
Colo Innovis Revanth Kolfe - Keran 8.975300443 38.68611839 465497.5185 992136.2336 A1_North GF
Nominal Fireside Logesh Kirkos 9.01933 38.77088 474817.7813 996997.1675 A1_South GF
FTK Fireside Logesh Kirkos 9.019699 38.769993 474720.3177 997038.0247 A1_South RT
FTK Fireside Hamza Kirkos 9.020183 38.771666 474904.2287 997091.4195 A1_South GF
FTK Fireside Hamza Kirkos 9.018402 38.771379 474872.5617 996894.5351 A1_South GF
Nominal Kolfe - Keran 8.98069 38.69422 466388.5678 992731.3441 A1_North Nominal
FTK Innovis Revanth Kolfe - Keran 8.981321 38.69404 466368.8401 992801.1231 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.981694 38.69378 466340.295 992842.3853 A1_North GF
FTK Igado Revanth Kolfe - Keran 8.982194 38.697 466694.3 992897.4 A1_North RT
FTK Igado Revanth Kolfe - Keran 8.982217 38.696157 466601.6 992900 A1_North RT
FTK Igado Revanth Kolfe - Keran 8.9810416 38.6977084 466772 992769.9 A1_North RT
Nominal Innovis   40 Init Sites 8.885522 38.792412 477175.9993 982202.2586 A1_South GF
FTK Innovis   40 Init Sites 8.88557 38.79336 477280.2339 982207.5072 A1_South GF
FTK Innovis   40 Init Sites 8.88573 38.79273 477210.9759 982225.235 A1_South GF
FTK Innovis   40 Init Sites 8.88512 38.79257 477193.346 982157.805 A1_South GF
FTK Innovis Revanth 40 Init Sites 8.868599 38.809098 479009.6 980330.3 A1_South RT
FTK Innovis Revanth 40 Init Sites 8.867535 38.810635 479178.6 980212.6 A1_South RT
FTK Innovis Revanth 40 Init Sites 8.870779 38.811121 479232.2 980571.2 A1_South RT
FTK Innovis Revanth 40 Init Sites 8.868129 38.808577 478952.3 980278.4 A1_South RT
FTK Innovis Revanth 40 Init Sites 8.868225 38.808328 478925 980289 A1_South RT
Nominal Innovis Revanth Kolfe - Keran 8.98973 38.6859 465474.8779 993731.5672 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.989948 38.686389 465528.6487 993755.623 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.990382 38.686484 465539.132 993803.5965 A1_North RT
FTK Innovis Revanth Kolfe - Keran 8.990614 38.686279 465516.6207 993829.2655 A1_North RT
Nominal Innovis Logesh Kolfe - Keran 8.98643 38.67554 464335.7971 993367.7146 A1_North GF
FTK Innovis Logesh Kolfe - Keran 8.986907 38.676257 464414.6562 993420.3815 A1_North RT
FTK Innovis Logesh Kolfe - Keran 8.985742 38.675762 464360.1321 993291.6285 A1_North GF
Nominal Innovis Revanth Kolfe - Keran 8.99762 38.68296 465152.4715 994604.1542 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.998953 38.6834 465200.9621 994751.4873 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.996028 38.683127 465170.6753 994428.1287 A1_North RT
Nominal Zagwe Prashant Addis Ketema 9.04425 38.72755556 470058.0853 999755.5552 A1_North GF
FTK Zagwe Prashant Addis Ketema 9.044144 38.728349 470145.277 999743.7709 A1_North GF
FTK Zagwe Prashant Addis Ketema 9.038094 38.725494 469831.0037 999075.126 A1_North GF
FTK Igado Revanth Addis Ketema 9.040182 38.728919 470207.6 999305.7 A1_North RT
FTK Igado Revanth Addis Ketema 9.044084 38.730838 470418.8 999736.9 A1_North RT
Colo Zagwe Prashant Addis Ketema 9.04425 38.72755556 470058.0853 999755.5552 A1_North GF
Nominal Innovis Prashant 40 Init Sites 8.972272652 38.70555011 467633.2415 991799.7166 A1_South RT
FTK Igado Nuhamin 40 Init Sites 8.970491 38.705895 467670.9954 991602.7096 A1_South RT
FTK Innovis Prashant 40 Init Sites 8.972381 38.705841 467665.2268 991811.6698 A1_South GF
FTK Innovis Prashant 40 Init Sites 8.973024 38.704979 467570.5296 991882.8349 A1_South GF
Nominal     Bole 8.9834476 38.79519184 477487.6503 993028.4984 A1_South GF
FTK Zagwe Nuhamin Bole 8.983175 38.789955 476912.0013 992998.6857 A1_South GF
FTK Zagwe Nuhamin Bole 8.984285 38.79667 477650.1804 993120.9891 A1_South GF
FTK Zagwe Nuhamin Bole 8.983677 38.797028 477689.4943 993053.7482 A1_South RT
FTK Fireside Nuhamin Bole 8.98114 38.79925 477933.6 992773.1 A1_South GF
Nominal     Nefas Silk 8.95219 38.72243 469487.065 989577.9696 A1_South GF
FTK Maktech Hamza Nefas Silk 8.952183 38.722395 469483.2169 989577.1986 A1_South GF
FTK Maktech Hamza Nefas Silk 8.9516390254 38.72322949 469574.9069 989516.9887 A1_South GF
FTK Maktech Revanth Nefas Silk 8.9511 38.7201 469230.8 989457.7 A1_South RT
Colo Maktech Hamza Nefas Silk 8.95219 38.72243 469487.065 989577.9696 A1_South GF
Nominal Innovis Logesh Nefas Silk 8.94886 38.72913 470223.3225 989209.2626 A1_South GF
FTK Innovis Logesh Nefas Silk 8.948367 38.729498 470263.7369 989154.7277 A1_South RT
FTK Nefas Silk 8.94869 38.7356 470934.5595 989189.9509 A1_South GF
FTK Innovis Logesh Nefas Silk 8.9490331 38.728751 470181.5629 989228.4199 A1_South RT
FTK Innovis Logesh Nefas Silk 8.949033 38.72875 470181.5629 989228.4199 A1_South RT
Nominal     Nefas Silk 8.95266795 38.74497601 471965.5736 989629.0182 A1_South GF
FTK Maktech Logesh Nefas Silk 8.95363 38.745044 471973.1214 989735.3754 A1_South RT
FTK Maktech Logesh Nefas Silk 8.953661 38.744811 471947.5103 989738.8204 A1_South RT
Nominal     Nefas Silk 8.93855529 38.7219505 469433.2163 988070.5812 A1_South GF
FTK Maktech Logesh Nefas Silk 8.938595 38.721817 469418.5434 988074.9826 A1_South GF
FTK Maktech Logesh Nefas Silk 8.938148 38.72189 469426.5313 988025.557 A1_South GF
FTK I-Engg Logesh Nefas Silk 8.939584 38.723493 469602.8743 988184.1859 A1_South RT
Nominal Innovis Logesh Nefas Silk 8.9359503 38.74750926 472242.7856 987780.5578 A1_South GF
FTK Innovis Logesh Nefas Silk 8.936601 38.747153 472203.6698 987852.5247 A1_South GF
FTK Innovis Logesh Nefas Silk 8.935699 38.746469 472128.4063 987752.8531 A1_South RT
Nominal Innovis Arun 40 Init Sites 8.905181046 38.738806 471283.594 984379.4417 A1_South GF
FTK Innovis Arun 40 Init Sites 8.905258 38.739359 471344.3988 984387.9067 A1_South GF
FTK Innovis Arun 40 Init Sites 8.905454 38.737264 471114.0825 984409.7389 A1_South GF
FTK Innovis Arun 40 Init Sites 8.905549 38.739595 471370.3681 984420.0608 A1_South GF
FTK Innovis Arun 40 Init Sites 9.008956 38.766985 474388.955 995850.508 A1_South RT
Nominal Zagwe Logesh Bole 9.00184285 38.80777723 478872.0979 995061.4877 A1_South RT
FTK Zagwe Logesh Bole 9.001498 38.808403 478940.8589 995023.3258 A1_South GF
FTK I-Engg Revanth Bole 9.00339 38.80633 478640.3 994776.1 A1_South RT
FTK Zagwe Nuhamin Bole 9.00335 38.81418 478640.3 994776.1 A1_South RT
FTK Igado Nuhamin Bole 9.0011 38.813686 479521.5127 994979.0242 A1_South RT
FTK Zagwe Logesh Bole 9.00121 38.808464 478947.547 994991.4817 A1_South GF
Nominal Innovis Revanth Kolfe - Keran 9.02356019 38.68560186 465445.3197 997471.8221 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.022858 38.686024 465491.6497 997394.1488 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.022343 38.685165 465397.1891 997337.2922 A1_North GF
FTK Igado Revanth Kolfe - Keran 9.021023 38.682479 465101.8 997191.6 A1_North RT
FTK Igado Revanth Kolfe - Keran 9.020863 38.686268 465518.3 997173.6 A1_North RT
FTK Igado Revanth Kolfe - Keran 9.020913 38.68677 465573.5 997179 A1_North RT
FTK Fireside Nuhamin Kolfe - Keran 9.02353 38.6861 465500.0666 997468.4373 A1_North GF
Colo Innovis Revanth Kolfe - Keran 9.02356 38.685602 465445.3351 997471.8011 A1_North GF
Nominal Innovis Logesh Nefas Silk 8.93124 38.75402 472958.1918 987259.3138 A1_South GF
FTK Innovis Logesh Nefas Silk 8.932236 38.755553 473126.796 987369.3174 A1_South RT
FTK Innovis Logesh Nefas Silk 8.932053 38.753562 472907.9013 987349.2309 A1_South GF
FTK Innovis Hamza Nefas Silk 8.933007 38.753311 472880.378 987454.7215 A1_South RT
Nominal Zagwe Logesh Akaki - Kalit 8.92635 38.76317 473963.7557 986718.0287 A1_South GF
FTK Igado Logesh Akaki - Kalit 8.925029 38.765468 474216.2982 986571.8208 A1_South RT
FTK Zagwe Logesh Akaki - Kalit 8.926002 38.76295 473939.5448 986679.5702 A1_South GF
Nominal Innovis Prashant Arada 9.0307102 38.7632 473974.4958 998255.8807 A1_North RT
FTK Innovis Prashant Arada 9.031265 38.76297 473949.2573 998317.2349 A1_North RT
FTK Innovis Prashant Arada 9.031447 38.762658 473914.9799 998337.3788 A1_North RT
FTK Innovis Beakal Arada 9.031558 38.762139 473857.947 998349.688 A1_North RT
FTK Innovis Beakal Arada 9.030733 38.761445 473781.613 998258.527 A1_North RT
Nominal Zagwe Logesh Akaki - Kalit 8.91533 38.76825 474521.4715 985499.3295 A1_South GF
FTK Zagwe Logesh Akaki - Kalit 8.915093 38.768738 474575.106 985473.0938 A1_South GF
FTK Zagwe Logesh Akaki - Kalit 8.915411 38.769415 474649.5575 985508.2046 A1_South GF
FTK Zagwe Revanth Akaki - Kalit 8.91125 38.76967 474677.3 985048.2 A1_South RT
FTK Zagwe Revanth Akaki - Kalit 8.91247 38.769205 474626.3 985183.1 A1_South RT
Colo Zagwe Logesh Akaki - Kalit 8.91533 38.76825 474521.4715 985499.3295 A1_South GF
Nominal Innovis Arun 40 Init Sites 8.890773087 38.7768828 475468.9275 982783.7962 A1_South GF
Colo Innovis Beakal 40 Init Sites 8.892018 38.78275 476114.092 982921.047 A1_South GF
FTK Innovis Arun 40 Init Sites 8.89133 38.775526 475319.7879 982845.4571 A1_South GF
FTK Innovis Arun 40 Init Sites 8.890371 38.77655 475432.3102 982739.3645 A1_South GF
FTK Innovis Arun 40 Init Sites 8.8914209 38.776084 475381.1447 982855.4696 A1_South GF
Nominal     Kirkos 8.99907211 38.76835467 474538.8069 994757.6679 A1_South GF
FTK Elite Revanth Kirkos 9.004284 38.772711 475018 995333.6 A1_South RT
FTK Elite Nuhamin Kirkos 9.001241 38.767428 474437.1041 994997.521 A1_South RT
FTK Elite Nuhamin Kirkos 9.001057 38.765398 474214 994977.3 A1_South RT
FTK Fireside Nuhamin Kirkos 8.99834 38.76949 474663.546 994676.648 A1_South RT
Nominal Innovis Jeff Lideta 8.984909 38.80067 478089.895 993189.736 #N/A RT
FTK Innovis Jeff Lideta 9.023671 38.7436 471819.7981 997479.093 #N/A RT
FTK Innovis Jeff Lideta 9.024579 38.745218 471997.699 997579.3556 #N/A GF
FTK Innovis Jeff Lideta 9.0234 38.7462 472105.5377 997448.9322 #N/A GF
FTK Fireside Nuhamin Bole 8.9839 38.801111 478138.37 993189.71 #N/A GF
Nominal Zagwe Logesh Akaki - Kalit 8.88455556 38.77233333 474968.3023 982096.7068 A1_South GF
FTK Zagwe Logesh Akaki - Kalit 8.884811 38.772267 474961.0267 982124.952 A1_South GF
FTK Zagwe Logesh Akaki - Kalit 8.883757 38.772377 474973.0496 982008.4171 A1_South GF
FTK I-Engg Revanth Akaki - Kalit 8.8842 38.7762 475393.4 982057.1 A1_South RT
Nominal     Akaki - Kalit 8.89471988 38.77258124 474996.2492 983220.4308 A1_South GF
FTK Maktech Hamza Akaki - Kalit 8.894414 38.77241 474977.4012 983186.625 A1_South RT
FTK Maktech Hamza Akaki - Kalit 8.896584 38.772114 474945.0045 983426.5547 A1_South RT
FTK Akaki - Kalit 8.8933 38.7717 474899.2633 983063.5121 A1_South GF
Nominal Innovis   40 Init Sites 8.878627128 38.77945999 475751.4849 981440.802 A1_South GF
FTK Innovis Revanth 40 Init Sites 8.88188 38.78331 476175.0079 981800.1813 A1_South GF
FTK Innovis Revanth 40 Init Sites 8.881185 38.78315 476157.371 981723.3543 A1_South GF
Colo Innovis Revanth 40 Init Sites 8.883847 38.78258 476094.8717 982017.6945 A1_South GF
Nominal Zagwe Logesh Akaki - Kalit 8.87045 38.77124 474847.1304 980537.3076 A1_South GF
FTK Zagwe Logesh Akaki - Kalit 8.869961 38.771211 474843.9085 980483.2471 A1_South GF
FTK Zagwe Logesh Akaki - Kalit 8.870568 38.771637 474890.79 980550.3266 A1_South GF
FTK I-Engg Revanth Akaki - Kalit 8.8729 38.7699 474700 980808.3 A1_South RT
Nominal Zagwe Logesh Akaki - Kalit 8.86546792 38.78293433 476132.6425 979985.7315 A1_South RT
FTK Zagwe Logesh Akaki - Kalit 8.865054 38.782211 476053.0819 979940.0162 A1_South RT
FTK Zagwe Logesh Akaki - Kalit 8.863637 38.782616 476097.5222 979783.3306 A1_South GF
Nominal Innovis Prashant 40 Init Sites 8.863029 38.817184 479898.4303 979714.0666 A1_South GF
FTK Innovis Prashant 40 Init Sites 8.863626 38.817754 479961.1373 979780.0383 A1_South GF
FTK Innovis Prashant 40 Init Sites 8.864264 38.815901 479757.4249 979850.674 A1_South GF
FTK I-Engg Revanth 40 Init Sites 8.8648 38.8161 479779.3 979909.9 A1_South RT
FTK Innovis Prashant 40 Init Sites 8.863293 38.814823 479638.8398 979743.3821 A1_South GF
Nominal Zagwe Logesh Akaki - Kalit 8.87073 38.80524 478585.5668 980566.133 A1_South RT
FTK Zagwe Logesh Akaki - Kalit 8.870571 38.805088 478568.8447 980548.5632 A1_South RT
FTK Zagwe Logesh Akaki - Kalit 8.869812 38.804817 478539.0032 980464.6661 A1_South GF
Nominal Innovis Prashant 40 Init Sites 8.898839 38.81439 479593.1945 983673.2672 A1_South GF
FTK Innovis Prashant 40 Init Sites 8.898688 38.813904 479539.7529 983656.5999 A1_South GF
FTK Innovis Prashant 40 Init Sites 8.898454 38.813646 479511.3741 983630.7438 A1_South GF
FTK Innovis Prashant 40 Init Sites 8.898107 38.814401 479594.3633 983592.3387 A1_South GF
FTK Innovis Beakal 40 Init Sites 8.885949 38.815224 479684.178 982248.14 A1_South RT
Nominal Zagwe Logesh Bole 8.98075278 38.77538889 475310.7332 992731.8384 A1_South GF
FTK Zagwe Logesh Bole 8.980024 38.773748 475130.3159 992651.3768 A1_South RT
FTK Zagwe Logesh Bole 8.98199 38.773933 475150.7852 992868.7212 A1_South RT
FTK Zagwe Logesh Bole 8.979419 38.772397 474981.7714 992584.5811 A1_South RT
FTK Zagwe Revanth Bole 8.980201 38.77473 475238.2702 992670.8792 A1_South RT
Nominal Zagwe Logesh Akaki - Kalit 8.92016971 38.76250214 473889.8938 986034.7974 A1_South RT
FTK Zagwe Logesh Akaki - Kalit 8.921547 38.763428 473991.7793 986187.0021 A1_South RT
FTK Zagwe Logesh Akaki - Kalit 8.919302 38.761978 473832.2086 985938.9025 A1_South GF
FTK Fireside Logesh Akaki - Kalit 8.919934 38.761981 473832.6 986008.8 A1_South GF
FTK I-Engg Revanth Akaki - Kalit 8.9206038 38.7627033 473912 986082.8 A1_South RT
FTK I-Engg Revanth Akaki - Kalit 8.92207 38.76368 474019.5 986244.8 A1_South RT
Nominal Zagwe Logesh Akaki - Kalit 8.94188889 38.76466111 474128.7797 988435.8681 A1_South GF
FTK Zagwe Revanth Akaki - Kalit 8.935712 38.76413 474069.9567 987753.0024 A1_South RT
FTK Zagwe Logesh Akaki - Kalit 8.942959 38.764979 474163.8015 988554.1548 A1_South GF
FTK Zagwe Hamza Akaki - Kalit 8.945134 38.768951 474600.6023 988794.3418 A1_South RT
Nominal Zagwe Logesh Akaki - Kalit 8.94096 38.77478 475241.11 988332.4772 A1_South GF
FTK Zagwe Logesh Akaki - Kalit 8.940368 38.773781 475131.2472 988267.0943 A1_South GF
FTK Zagwe Revanth Akaki - Kalit 8.94026 38.77088 474812.3249 988255.351 A1_South RT
Colo Zagwe Logesh Akaki - Kalit 8.93681 38.7702 474737.333 987873.973 A1_South GF
Nominal Zagwe logesh Bole 8.94979 38.77666 475448.375 989308.5759 A1_South GF
FTK Zagwe logesh Bole 8.950779 38.778293 475627.9563 989417.8091 A1_South RT
Nominal Innovis Logesh Nefas Silk 8.964665 38.762731 473918.221 990954.0817 A1_South GF
FTK Innovis Revanth Nefas Silk 8.966174 38.76323 473973.1813 991120.8783 A1_South RT
FTK Innovis Revanth Nefas Silk 8.967596 38.76206 473844.6707 991278.1747 A1_South RT
FTK Innovis Revanth Nefas Silk 8.955828 38.763877 474043.5686 989977.0007 A1_South RT
FTK Innovis Revanth Nefas Silk 8.960967 38.763142 473963.1371 990545.2095 A1_South RT
FTK Innovis Nuhamin Nefas Silk 8.95773 38.76599 474275.9805 990187.1333 A1_South RT
FTK Innovis Revanth Nefas Silk 8.965858 38.76338 473989.6476 991085.9313 A1_South RT
Nominal     Nefas Silk 8.96304967 38.75709878 473298.9781 990775.8984 A1_South GF
FTK Maktech Hamza Nefas Silk 8.962651 38.756278 473208.7238 990731.882 A1_South RT
FTK Maktech Hamza Nefas Silk 8.962842 38.757271 473317.8944 990752.9264 A1_South GF
FTK fireside Revanth Nefas Silk 8.96218 38.7563 473211.1077 990679.8076 A1_South RT
Nominal Zagwe Jeff Lideta 8.9957844 38.71575 468756.4648 994398.2553 A1_North RT
FTK Zagwe Jeff Lideta 8.9957844 38.71575 468756.4648 994398.2553 A1_North RT
FTK Zagwe Jeff Lideta 8.995622 38.716248 468811.1894 994380.2582 A1_North GF
FTK Zagwe Jeff Lideta 8.995438 38.716248 468811.1736 994359.9154 A1_North GF
FTK Zagwe Nuhamin Lideta 8.995932 38.715779 467794.6608 993118.7 A1_North RT
FTK Zagwe Nuhamin Lideta 8.9953 38.71421 468587.1515 994344.8325 A1_North RT
Nominal Innovis Prashant Arada 9.0395603 38.74785062 472288.1883 999235.4639 A1_North RT
FTK Innovis Prashant Arada 9.039954 38.747186 472215.1747 999279.0414 A1_North RT
FTK Innovis Prashant Arada 9.039159 38.747984 472302.8165 999191.0867 A1_North GF
FTK Maktech Revanth Arada 9.040778 38.747766 472279 999370.1 A1_North RT
FTK Fireside Beakal Arada 9.0397448 38.746489 472138.556 999255.966 A1_North RT
FTK Innovis Prashant Arada 9.040753 38.747451 472244.3601 999367.3574 A1_North RT
Nominal Innovis Logesh Nefas Silk 8.97230007 38.75940296 473552.937 991798.4372 A1_South GF
FTK Innovis Logesh Nefas Silk 8.972289 38.759423 473555.139 991797.2119 A1_South GF
FTK Innovis Logesh Nefas Silk 8.971663 38.758794 473485.9518 991728.0479 A1_South GF
FTK Innovis Nuhamin Nefas Silk 8.967596 38.76206 473844.7 991278.1747 A1_South RT
Nominal Innovis Logesh Nefas Silk 8.97183 38.74011 471432.1536 991747.9117 A1_South GF
FTK Innovis Logesh Nefas Silk 8.973427 38.739196 471331.8088 991924.5443 A1_South RT
FTK Innovis Logesh Nefas Silk 8.972521 38.740015 471421.7649 991824.3148 A1_South RT
FTK Innovis Nuhamin Nefas Silk 8.974258 38.73895 471304.833 992016.4373 A1_South RT
Nominal     Nefas Silk 8.97113 38.74963 472478.5728 991669.7944 A1_South GF
FTK     Nefas Silk 8.971204 38.74983 472500.5631 991677.9607 A1_South RT
FTK     Nefas Silk 8.97021 38.749828 472500.2684 991568.0662 A1_South RT
Nominal Zagwe Revanth Kirkos 8.98293 38.76465 474130.4619 992973.2872 A1_South RT
FTK Zagwe Revanth Kirkos 8.982923 38.764693 474135.188 992972.5102 A1_South RT
FTK Zagwe Revanth Kirkos 8.981904 38.76424 474085.3218 992859.8836 A1_South RT
FTK Zagwe Revanth Kirkos 8.98104 38.76344 473997.3 992764.4 A1_South RT
FTK Zagwe Logesh Kirkos 8.981929 38.765088 474085.3218 992859.8836 A1_South RT
Nominal Innovis Logesh Nefas Silk 8.97971667 38.75836111 473438.9529 992618.477 A1_South GF
FTK Innovis Logesh Nefas Silk 8.980107 38.75744 473337.7321 992661.6979 A1_South GF
FTK Innovis Logesh Nefas Silk 8.979272 38.758052 473404.9428 992569.3375 A1_South GF
FTK I-Engg Revanth Nefas Silk 8.975372 38.758218 473422.9 992138.1 A1_South GF
FTK Innovis Beakal Nefas Silk 8.97621 38.76199 473837.593 992230.526 A1_South RT
FTK Nefas Silk 8.9756 38.7587 473475.905 992163.3216 A1_South GF
Nominal Zagwe Logesh Bole 8.97666667 38.7675 474443.2954 992280.6264 A1_South GF
FTK Zagwe Logesh Bole 8.976854 38.768299 474531.136 992301.2817 A1_South RT
FTK Zagwe Logesh Bole 8.9755 38.767994 474497.5153 992151.6074 A1_South GF
FTK Fireside Revanth Bole 8.97752 38.76718 474408.2 992375 A1_South GF
Colo Zagwe Logesh Bole 8.976027 38.766686 474353.774 992209.963 A1_South GF
Nominal Zagwe Hamza Kirkos 8.984009 38.75457 473022.5475 993093.3052 A1_South GF
FTK Zagwe Hamza Kirkos 8.983431 38.754708 473037.6737 993029.3925 A1_South GF
FTK Zagwe Hamza Kirkos 8.984322 38.754495 473014.3267 993127.9154 A1_South GF
FTK Zagwe Hamza Kirkos 8.98288 38.754059 472966.2948 992968.5227 A1_South RT
Nominal Zagwe Hamza Kirkos 8.988645 38.753272 472880.2164 993605.9483 A1_South GF
FTK Zagwe Hamza Kirkos 8.989585 38.752333 472777.0732 993709.9425 A1_South RT
FTK Zagwe Hamza Kirkos 8.989822 38.753947 472954.4986 993736.0254 A1_South RT
FTK Fireside Revanth Kirkos 8.989945 38.753939 472953.6284 993749.6246 A1_South RT
FTK Zagwe Logesh Kirkos 8.98934 38.751537 472689.6 993682.9 A1_South RT
Colo Zagwe Hamza Kirkos 8.988645 38.753272 472880.2164 993605.9483 A1_South GF
Nominal Zagwe Arun Addis Ketema 9.02361296 38.7226933 469521.9802 997474.3548 A1_North GF
FTK Zagwe Arun Addis Ketema 9.023275 38.723433 469603.2509 997436.9287 A1_North RT
FTK Zagwe Prashant Addis Ketema 9.022977 38.722624 469514.3101 997404.0497 A1_North RT
Colo Zagwe Arun Addis Ketema 9.023613 38.722693 469521.9472 997474.3592 A1_North GF
Nominal Zagwe Hamza Kirkos 8.990617 38.758964 473506.015 993823.5528 A1_South RT
FTK Zagwe Hamza Kirkos 8.988417 38.757824 473380.5482 993580.4075 A1_South RT
FTK Zagwe Hamza Kirkos 8.990734 38.757665 473363.2404 993836.5822 A1_South RT
FTK Innovis Logesh Kirkos 8.99021 38.75696 473285.71 993778.701 A1_South RT
Nominal Innovis Hamza Kirkos 9.001855 38.74928 472442.4213 995066.7197 A1_South GF
FTK Innovis Hamza Kirkos 9.00227 38.748611 472368.9201 995112.6518 A1_South GF
FTK Innovis Hamza Kirkos 9.003069 38.748065 472308.9676 995201.0291 A1_South GF
FTK Innovis Revanth Kirkos 9.00209 38.749238 472437.8 995092.7 A1_South GF
FTK Revanth Kirkos 8.996898 38.748712 472379.6 994518.7 A1_South RT
Colo Innovis Hamza Kirkos 9.001855 38.74928 472442.4213 995066.7197 A1_South GF
Nominal Innovis Arun 14 Moved to ATC9.003922699 38.75831247 473435.3707 995294.6533 A1_South GF
FTK Innovis Arun 14 Moved to ATC 9.00692 38.759801 473599.1981 995625.9217 A1_South GF
FTK Innovis Arun 14 Moved to ATC 9.008709 38.760687 473696.7102 995823.6465 A1_South GF
FTK Innovis Beakal 14 Moved to ATC 9.00315 38.755081 473080.131 995209.461 A1_South GF
FTK 14 Moved to ATC 9.00392 38.7583 473433.9999 995294.3558 A1_South RT
FTK Innovis Hamza Kirkos 9.006394 38.766289 474312.2752 995567.3064 A1_South RT
FTK Innovis Hamza Kirkos 9.005712 38.768137 474515.3465 995491.7766 A1_South RT
Nominal Zagwe Jeff Lideta 9.00589257 38.74029579 471455.2433 995513.795 A1_North GF
FTK Zagwe Jeff Lideta 9.00585 38.739727 471392.7224 995509.1329 A1_North GF
FTK Igado Jeff Lideta 9.006799 38.739728 471392.9069 995614.0527 A1_North GF
FTK Innovis Revanth Lideta 9.005422 38.742775 471727.7 995461.6 A1_North RT
Colo Zagwe Jeff Lideta 9.00589257 38.74029579 471455.2433 995513.795 A1_North GF
Nominal Zagwe Jeff Lideta 9.02230984 38.73903815 471318.3072 997328.9603 A1_North GF
FTK Zagwe Jeff Lideta 9.021614 38.738074 471212.2839 997252.1052 A1_North RT
FTK Zagwe Jeff Lideta 9.023779 38.738054 471210.2574 997491.4658 A1_North RT
Nominal Innovis Prashant Arada 9.03230809 38.74771587 472272.8244 998433.681 A1_North RT
FTK Innovis Prashant Arada 9.032126 38.747713 472272.495 998413.5496 A1_North RT
FTK Innovis Prashant Arada 9.032872 38.748287 472335.6375 998495.9827 A1_North RT
FTK Innovis Prashant Arada 9.033251 38.74692 472185.4264 998537.9882 A1_North RT
Nominal Innovis Jeff Addis Ketema 9.02833024 38.72934982 470253.9718 997995.3417 A1_North GF
FTK Innovis Jeff Addis Ketema 9.028761 38.731944 470539.1242 998042.7556 A1_North RT
FTK Innovis Jeff Addis Ketema 9.0254607 38.727999 470105.2715 997678.1998 A1_North RT
Nominal Zagwe Arun Addis Ketema 9.03244 38.72548 469828.9947 998450.0286 A1_North RT
FTK Zagwe Arun Addis Ketema 9.032715 38.725322 469811.6525 998480.4453 A1_North RT
FTK Zagwe Arun Addis Ketema 9.032615 38.725869 469871.7624 998469.3442 A1_North GF
FTK Innovis Hamza Kolfe - Keran 9.0333 38.7138 468545.3738 998546.0952 A1_North RT
FTK Innovis Hamza Kolfe - Keran 9.0331 38.7138 468545.3564 998523.9835 A1_North RT
Nominal     Nefas Silk 8.97222 38.71322 468476.3396 991793.2286 A1_South GF
FTK Maktech Hamza Nefas Silk 8.972095 38.713349 468490.509 991779.3977 A1_South GF
FTK Maktech Hamza Nefas Silk 8.97204 38.714181 468581.9608 991773.2457 A1_South GF
FTK Maktech Logesh Nefas Silk 8.97147 38.71696 468887.3902 991709.991 A1_South RT
Nominal Innovis Arun Addis Ketema 9.045464 38.733123 470670.055 999889.3207 A1_North RT
FTK Innovis Arun Addis Ketema 9.044939 38.733462 470707.2691 999831.2501 A1_North RT
FTK Innovis Arun Addis Ketema 9.044902 38.732731 470626.9281 999827.2183 A1_North RT
Colo Innovis Arun Addis Ketema 9.045464 38.733123 470670.055 999889.3207 A1_North GF
Nominal Innovis Logesh Arada 9.04478 38.74158 471599.437 999813.0288 A1_North RT
FTK Innovis Logesh Arada 9.044254 38.742111 471657.7535 999754.8337 A1_North RT
FTK Innovis Logesh Arada 9.045646 38.741835 471627.5297 999908.7526 A1_North GF
FTK Zagwe Nuhamin Arada 9.047984 38.741309 471569.9051 1000167.28 A1_North RT
Colo Innovis Logesh Arada 9.044645 38.7416 471601.6244 999798.1018 A1_North GF
Nominal     Gulele 9.05436111 38.72833333 470144.3973 1000873.363 A1_North GF
FTK Maktech Hamza Gulele 9.0545652 38.728918 470208.6685 1000895.879 A1_North GF
FTK Igado Revanth Gulele 9.055625 38.728817 470197.7 1001013 A1_North RT
FTK Igado Revanth Gulele 9.056648 38.729429 470265 1001126 A1_North RT
FTK Igado Revanth Gulele 9.053743 38.72986 470312.1 1000805 A1_North RT
Nominal Maktech Logesh Gulele 9.05932778 38.73489444 470865.8545 1001421.94 A1_North GF
FTK Maktech Logesh Gulele 9.0593277 38.73489444 470865.8545 1001421.931 A1_North GF
FTK Maktech Logesh Gulele 9.0595 38.7338 470745.6 1001441 A1_North RT
FTK Maktech Logesh Gulele 9.059074 38.735567 470939.7466 1001393.828 A1_North RT
Nominal Zagwe Logesh Arada 9.053195 38.74604 472090.2462 1000743.034 A1_North GF
FTK Zagwe Logesh Arada 9.053646 38.743733 471836.7445 1000793.074 A1_North RT
FTK Zagwe Logesh Arada 9.052378 38.746077 472094.2495 1000652.705 A1_North GF
FTK Fireside Revanth Arada 9.0538366 38.743603 471822.5 1000814 A1_North RT
Nominal Maktech Logesh Gulele 9.06463004 38.73060746 470395.1617 1002008.497 A1_North GF
FTK Maktech Logesh Gulele 9.065215 38.73102 470440.5459 1002073.136 A1_North RT
FTK Maktech Logesh Gulele 9.064718 38.730397 470372.0403 1002018.239 A1_North GF
Nominal     Gulele 9.06278063 38.7194414 469167.9029 1001804.956 A1_North GF
FTK Maktech Hamza Gulele 9.065605 38.721162 469357.2298 1002117.07 A1_North RT
FTK Maktech Hamza Gulele 9.06312667 38.7194263 469166.273 1001843.215 A1_North GF
FTK Maktech Logesh Gulele 9.0615 38.721 469339.1 1001663 A1_North RT
Colo Maktech Hamza Gulele 9.06278063 38.7194414 469167.9029 1001804.956 A1_North GF
Nominal Innovis Revanth Kolfe - Keran 9.05644167 38.71180278 468327.892 1001104.784 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.056188 38.711987 468348.1153 1001076.722 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.05575 38.711229 468264.7739 1001028.364 A1_North RT
FTK Innovis Revanth Kolfe - Keran 9.055747 38.711244 468266.4221 1001028.031 A1_North GF
Nominal Innovis Arun 40 Init Sites 9.06030736 38.7054237 467627.1882 1001532.732 A1_North GF
FTK Innovis Revanth 40 Init Sites 9.057102 38.70528 467611.109 1001178.363 A1_North GF
FTK Innovis Revanth 40 Init Sites 9.057433 38.70515 467596.8519 1001214.97 A1_North GF
FTK Innovis Revanth 40 Init Sites 9.054565 38.70545 467629.5647 1000897.86 A1_North GF
FTK Tesla Revanth 40 Init Sites 9.0567511 38.70544 467628.7 1001140 A1_North GF
FTK Tesla Nuhamin 40 Init Sites 9.0569452 38.705782 467666.2638 1001160.983 A1_North GF
Colo Innovis Revanth 40 Init Sites 9.056474 38.70565 467651.7151 1001108.899 A1_North GF
Nominal Innovis Revanth Kolfe - Keran 8.97646994 38.67668609 464460.805 992266.4312 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.975892 38.676308 464419.188 992202.5714 A1_North RT
FTK Innovis Revanth Kolfe - Keran 8.976723 38.677055 464501.3812 992294.3735 A1_North GF
FTK Innovis Nuhamin Kolfe - Keran 8.976863 38.678823 464695.738 992309.6813 A1_North RT
FTK Innovis Nuhamin Kolfe - Keran 8.97592 38.67636 464424.9067 992205.6621 A1_North RT
FTK Innovis Nuhamin Kolfe - Keran 8.975587 38.67973 464795.3148 992168.5212 A1_North RT
Nominal     Kolfe - Keran 9.05297047 38.69262669 466220.148 1000722.735 A1_North GF
FTK     Kolfe - Keran 9.052599 38.692722 466230.5878 1000681.657 A1_North GF
FTK     Kolfe - Keran 9.052768 38.692402 466195.4357 1000700.371 A1_North GF
FTK     Kolfe - Keran 9.053226 38.69231 466185.3678 1000751.016 A1_North RT
Nominal Innovis Revanth Kolfe - Keran 9.04635269 38.71191801 468339.6733 999989.3476 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.04686 38.71228 468379.5007 1000045.404 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.04734 38.71183 468330.0872 1000098.511 A1_North GF
FTK Innovis Logesh Kolfe - Keran 9.04646 38.71189 468336.6043 1000001.214 A1_North GF
FTK Igado Revanth Kolfe - Keran 9.045485 38.712597 468414.2 999893.4 A1_North RT
FTK Igado Revanth Kolfe - Keran 9.045454 38.711447 468287.8 999890 A1_North RT
Colo Innovis Revanth Kolfe - Keran 9.04643 38.71187 468334.4037 999997.8991 A1_North GF
Nominal Zagwe Prashant Addis Ketema 9.04907778 38.72163611 469407.9347 1000289.8 A1_North GF
FTK Zagwe Prashant Addis Ketema 9.048497 38.720198 469249.8366 1000225.711 A1_North RT
FTK Zagwe Prashant Addis Ketema 9.049679 38.721334 469374.7836 1000356.296 A1_North GF
Nominal Innovis Hamza Kirkos 9.060217491 38.68373073 465243.1825 1001524.797 A1_South GF
FTK Innovis Revanth Kirkos 9.013352 38.75423 472987.3513 996337.4389 A1_South RT
FTK Innovis Revanth Kirkos 9.014776 38.75369 472928.1055 996494.9138 A1_South RT
Nominal Innovis Logesh Kolfe - Keran 9.06428362 38.69777404 466786.8776 1001973.033 A1_North GF
Colo Innovis Logesh Kolfe - Keran 9.06428362 38.69777404 466786.8776 1001973.033 A1_North GF
FTK Innovis Logesh Kolfe - Keran 9.064137 38.698032 466815.2129 1001956.799 A1_North GF
FTK Innovis Logesh Kolfe - Keran 9.06513 38.69702 466704.0896 1002066.677 A1_North GF
FTK Innovis Beakal Kolfe - Keran 9.06665 38.694982 466480.263 1002234.91 A1_North GF
Nominal Zagwe Logesh Bole 9.01431989 38.84963873 483473.8256 996438.7674 A1_South GF
FTK Zagwe Logesh Bole 9.013097 38.849769 483488.088 996303.5616 A1_South GF
FTK Zagwe Logesh Bole 9.015438 38.856321 484208.3 996562.1 A1_South GF
FTK I-Engg Revanth Bole 9.012304 38.850464 483564.4 996215.9 A1_South RT
FTK Zagwe Revanth Bole 9.014751 38.84768 483258.6 996486.5 A1_South RT
FTK Zagwe Beakal Bole 9.012419 38.849147 483419.693 996228.632 A1_South RT
Colo Zagwe Beakal Bole 9.01431989 38.84963873 483473.8256 996438.7674 A1_South GF
Nominal Maktech Logesh Gulele 9.06584894 38.74931488 472451.1157 1002141.787 A1_North GF
FTK Maktech Logesh Gulele 9.06555 38.749017 472418.3574 1002108.759 A1_North GF
FTK Igado Revanth Gulele 9.06555 38.751528 472694.3 1002109 A1_North RT
FTK Igado Revanth Gulele 9.06556 38.750579 472590 1002110 A1_North RT
FTK Tesla Logesh Gulele 9.065541 38.750511 472582.5 1002108 A1_North RT
Nominal     Gulele 9.05829018 38.75715268 473311.893 1001305.517 A1_North GF
FTK Maktech Hamza Gulele 9.058016 38.756767 473269.4875 1001275.232 A1_North GF
FTK Maktech Hamza Gulele 9.0582076 38.756766 473269.3918 1001296.415 A1_North GF
FTK Igado Revanth Gulele 9.060074 38.75764 473365.6 1001503 A1_North RT
FTK Igado Revanth Gulele 9.06017 38.758 473405.1 1001513 A1_North RT
Nominal Maktech Logesh Gulele 9.06955 38.75912 473528.9206 1002550.242 A1_North GF
FTK Maktech Logesh Gulele 9.070137 38.758665 473478.962 1002615.173 A1_North GF
FTK Igado Revanth Gulele 9.069347 38.76048 473678.4 1002528 A1_North RT
FTK Igado Revanth Gulele 9.066764 38.75957 473578.2 1002242 A1_North RT
FTK Igado Nuhamin Gulele 9.0674257 38.7591839 473535.7872 1002315.378 A1_North RT
FTK Maktech Logesh Gulele 9.069314 38.760415 473671.2159 1002524.056 A1_North RT
Nominal Innovis Hamza Gulele 9.05643 38.762536 473903.3709 1001099.468 A1_North GF
FTK Innovis Revanth Gulele 9.055575 38.76258 473908.1448 1001004.937 A1_North GF
FTK Revanth Gulele 9.062033 38.760767 473709.369 1001719.054 A1_North RT
FTK Innovis Revanth Gulele 9.061157 38.76194 473838.2137 1001622.12 A1_North RT
Nominal     Gulele 9.04842 38.7519 472733.8941 1000214.674 A1_North GF
FTK Maktech Hamza Gulele 9.049232 38.7524 472788.9053 1000304.41 A1_North RT
FTK Maktech Hamza Gulele 9.0460738 38.75130074 472667.8582 999955.3261 A1_North GF
FTK Maktech Revanth Gulele 9.05022 38.75 472525.2 1000414 A1_North RT
Colo Maktech Hamza Gulele 9.04842 38.7519 472733.8941 1000214.674 A1_North GF
Nominal Maktech Logesh Gulele 9.05525 38.73888 471303.5327 1000970.789 A1_North GF
FTK Maktech Logesh Gulele 9.0534 38.737553 471157.5501 1000766.36 A1_North RT
FTK Igado Revanth Gulele 9.057576 38.738278 471237.6 1001228 A1_North RT
FTK Igado Revanth Gulele 9.057107 38.737861 471191.7 1001176 A1_North RT
FTK Maktech Logesh Gulele 9.055567 38.738695 471283.2267 1001005.851 A1_North GF
Nominal Hamza Yeka 9.04668001 38.77055105 474783.5279 1000020.96 A1_North GF
FTK Maktech Hamza Yeka 9.046243 38.769881 474709.8585 999972.691 A1_North RT
FTK Maktech Hamza Yeka 9.046447 38.769712 474691.2995 999995.2567 A1_North RT
FTK Zagwe Yeka 9.04668 38.770551 474783.5224 1000020.959 A1_North GF
FTK Zagwe Revanth Yeka 9.0454 38.76545 474222.8 999879.8 A1_North RT
Colo Maktech Hamza Yeka 9.04668001 38.77055105 474783.5279 1000020.96 A1_North GF
Nominal Zagwe Revanth Arada 9.03543 38.77288 475038.7064 998777.0174 A1_North GF
FTK Zagwe Revanth Arada 9.03543 38.77288 475038.7064 998777.0174 A1_North GF
FTK Zagwe Revanth Arada 9.035268 38.77439 475204.6505 998759.004 A1_North RT
FTK Tesla Logesh Arada 9.03616 38.77403 475165.1461 998857.6465 A1_North RT
FTK Zagwe Hamza Arada 9.032053 38.770822 474812.2893 998403.8036 A1_North RT
FTK Zagwe Hamza Arada 9.031891 38.773244 475078.4683 998385.7269 A1_North RT
FTK Zagwe Hamza Arada 9.032647 38.773591 475116.6573 998469.2853 A1_North RT
FTK Zagwe Revanth Arada 9.031937 38.773361 475091.3 998390.8 A1_North RT
FTK Zagwe Arada 9.032404 38.77457 475224.2376 998442.353 A1_North RT
Nominal     Yeka 9.02369444 38.76785833 474485.9792 997479.9017 A1_North GF
FTK Innovis   Yeka 9.023885 38.767352 474430.343 997501.0051 A1_North GF
Colo Innovis   Yeka 9.023694444 38.76785833 474485.979 997479.902 A1_North GF
Nominal     Kirkos 9.01603 38.77204 474945.0482 996632.2458 A1_South GF
FTK Igado Revanth Kirkos 9.015542 38.77363 475119.8 996578.2 A1_South RT
FTK Igado Revanth Kirkos 9.01517 38.773609 475117.4 996537.1 A1_South RT
FTK Igado Revanth Kirkos 9.017166 38.770029 474724.1 996758 A1_South RT
Nominal Innovis Logesh Yeka 9.01735 38.78181 476018.9554 996777.5273 A1_North RT
FTK Innovis Logesh Yeka 9.0176 38.7815 475984.9 996805.1872 A1_North RT
FTK Innovis Logesh Yeka 9.0168 38.7817 476006.8291 996716.7276 A1_North GF
FTK Innovis Logesh Yeka 9.0175 38.7816 475995.8844 996794.1248 A1_North RT
Colo Innovis Logesh Yeka 9.02068 38.78436 476299.442 997145.519 A1_North RT
Nominal Fireside Logesh Yeka 9.02063 38.789 476809.414 997139.6938 A1_North GF
FTK Fireside Logesh Yeka 9.02056 38.7905 476974.2722 997131.8599 A1_North RT
FTK Fireside Logesh Yeka 9.02187 38.7885 476754.5391 997276.8176 A1_North RT
FTK Yeka 9.0202 38.786 476479.6607 997092.3455 A1_North GF
Nominal Innovis Logesh Yeka 9.0203313 38.80119258 478149.4633 997105.9187 A1_North RT
Colo Innovis Beakal Yeka 9.02281 38.80266 478310.893 997379.871 A1_North RT
FTK Innovis Logesh Yeka 9.020271 38.799808 477997.2826 997099.3351 A1_North RT
FTK Innovis Logesh Yeka 9.018787 38.800733 478098.8585 996935.2115 A1_North RT
FTK Innovis Logesh Yeka 9.019781 38.800848 478111.5579 997045.0993 A1_North RT
Nominal Zagwe Revanth Arada 9.03117 38.77652 475438.4688 998305.7924 A1_North GF
FTK Zagwe Revanth Arada 9.03117 38.77652 475438.4688 998305.7924 A1_North GF
FTK Zagwe Revanth Arada 9.030631 38.777468 475542.6228 998246.1379 A1_North RT
FTK Zagwe Revanth Arada 9.030843 38.777546 475551.2097 998269.571 A1_North RT
FTK Fireside Nuhamin Arada 9.03249 38.77482 475251.7197 998451.8441 A1_North RT
Colo Zagwe Revanth Arada 9.03117 38.77652 475438.4688 998305.7924 A1_North GF
Nominal Innovis Logesh Yeka 9.04225 38.77457 475224.9104 999530.9096 A1_North GF
FTK Innovis Logesh Yeka 9.042733 38.775033 475275.828 999584.2779 A1_North RT
FTK Innovis Logesh Yeka 9.042173 38.774153 475179.076 999522.425 A1_North GF
Nominal Innovis Prashant 40 Init Sites 9.051578 38.7802 475844.2807 1000561.819 A1_North RT
FTK Innovis Prashant 40 Init Sites 9.0516 38.780244 475849.1178 1000564.249 A1_North GF
FTK Innovis Prashant 40 Init Sites 9.052044 38.780135 475837.1684 1000613.344 A1_North RT
FTK Innovis Prashant 40 Init Sites 9.052121 38.780853 475916.081 1000621.809 A1_North RT
FTK ACME Logesh 40 Init Sites 9.051802 38.77937 475753.0794 1000586.64 A1_North GF
FTK Igado Revanth 40 Init Sites 9.051944 38.780833 475913.9 1000602 A1_North RT
FTK Igado Revanth 40 Init Sites 9.053056 38.783611 476219.2 1000725 A1_North RT
Nominal Fireside Logesh Yeka 9.06444 38.76917 474632.9946 1001984.572 A1_North GF
Colo Fireside Logesh Yeka 9.06444 38.76917 474632.9946 1001984.572 A1_North GF
FTK Fireside Logesh Yeka 9.065277 38.76944 474662.725 1002077.09 A1_North GF
FTK Igado Revanth Yeka 9.065582 38.771372 474875.1 1002111 A1_North RT
FTK Fireside Nuhamin Yeka 9.06601 38.76781 474483.6478 1002158.244 A1_North GF
FTK Fireside Nuhamin Yeka 9.065017 38.768919 474605.4514 1002048.382 A1_North GF
FTK Igado Revanth Yeka 9.064192 38.771438 474882.2 1001957 A1_North RT
FTK Fireside Logesh Yeka 9.06417 38.76806 474510.9918 1001954.799 A1_North GF
Nominal Innovis Logesh Yeka 9.05947 38.78918 476831.6801 1001433.762 A1_North GF
FTK Innovis Logesh Yeka 9.059124 38.789306 476845.5049 1001395.501 A1_North RT
FTK Innovis Logesh Yeka 9.059387 38.790164 476939.8131 1001424.523 A1_North RT
FTK Innovis Logesh Yeka 9.059218 38.789217 476835.7301 1001405.899 A1_North RT
FTK Innovis Logesh Yeka 9.05905 38.78926 476840.4449 1001387.322 A1_North RT
Nominal Zagwe Logesh Kirkos 8.986458 38.76083 473710.8217 993363.6074 A1_South RT
FTK Zagwe Logesh Kirkos 8.986125 38.760619 473687.6047 993326.8067 A1_South RT
FTK Zagwe Logesh Kirkos 8.986928 38.759628 473578.7331 993415.6561 A1_South RT
Nominal Innovis Logesh Yeka 9.02481 38.79509 477479.0156 997601.4454 A1_North RT
FTK Innovis Logesh Yeka 9.024592 38.795357 477508.3473 997577.3273 A1_North RT
FTK Innovis Logesh Yeka 9.025533 38.795173 477488.1827 997681.3738 A1_North RT
FTK Innovis Logesh Yeka 9.024852 38.794601 477425.2736 997606.1191 A1_North RT
FTK Fireside Logesh Yeka 9.0257 38.79548 477521.9345 997699.8181 A1_North RT
Nominal Zagwe Logesh Bole 9.00916667 38.7875 476643.8148 995872.4261 A1_South GF
FTK Zagwe Logesh Bole 9.00825 38.787382 476630.7863 995771.0884 A1_South RT
FTK Zagwe Logesh Bole 9.00873 38.78825 476726.2 995824.1 A1_South RT
FTK Zagwe Beakal Bole 9.010911 38.787753 476671.734 996065.26 A1_South RT
FTK Zagwe Nuhamin Bole 9.007284 38.789209 476831.5344 995664.1733 A1_South RT
FTK Fireside Beakal Bole 9.008 38.7886 476764.643 995743.371 A1_South RT
Nominal Zagwe Logesh Bole 9.00671667 38.79894722 477901.8517 995600.8482 A1_South GF
FTK Zagwe Logesh Bole 9.00608 38.798821 477887.9398 995530.4669 A1_South GF
FTK Zagwe Logesh Bole 9.007827 38.799505 477963.226 995723.5703 A1_South GF
Colo Zagwe Logesh Bole 9.00671657 38.7989472 477901.8495 995600.8371 A1_South GF
FTK Innovis Hamza Bole 9.020207 38.813772 479532.0407 997091.448 A1_South RT
FTK Innovis Hamza Bole 9.019348 38.813167 479465.4975 996996.5127 A1_South GF
FTK Innovis Hamza Bole 9.019475 38.814391 479600.0329 997010.485 A1_South RT
FTK Fireside Revanth Bole 9.019518 38.814669 479630.6 997015.2 A1_South RT
FTK Fireside Nuhamin Bole 9.020565 38.811017 479229.2634 997131.1832 A1_South RT
FTK Fireside Beakal Bole 9.021598 38.815009 479668.075 997245.165 A1_South RT
FTK Fireside Nuhamin Bole 9.021531 38.818193 480018.0186 997237.582 A1_South RT
FTK Fireside Beakal Bole 9.0226 38.8177 479963.893 997355.795 A1_South GF
FTK Zagwe Logesh Bole 9.003679 38.811644 479297.2145 995264.2676 A1_South RT
FTK   Revanth Bole 9.0038 38.8115 995277.653 479281.394 A1_South RT
FTK Maktech Nuhamin Bole 9.0051 38.8089 995421.5266 478995.7 A1_South RT
FTK Zagwe Logesh Bole 9.00309039 38.811101 479237.498 995199.2229 A1_South GF
FTK Bole 9.004312 38.809116 479019.3898 995334.3946 A1_South GF
Nominal Zagwe Logesh Bole 9.0116401 38.79761729 477755.9767 996145.253 A1_South GF
FTK Zagwe Logesh Bole 9.010443 38.799135 477922.7172 996012.8121 A1_South RT
FTK Beakal Bole 9.01242 38.7943 477391.418 996231.681 A1_South GF
FTK Igado Nuhamin Bole 9.011296 38.798784 477884.1902 996107.1392 A1_South RT
FTK Zagwe Logesh Bole 9.012087 38.796247 477586.4886 996193.3182 A1_South RT
Nominal Zagwe Logesh Bole 8.99745963 38.82144959 480374.6452 994576.1281 A1_South GF
FTK Zagwe Logesh Bole 8.997662 38.820637 480285.3401 994598.5453 A1_South RT
FTK Zagwe Logesh Bole 8.998026 38.82093 480317.565 994638.7725 A1_South RT
FTK Zagwe Nuhamin Bole 8.998938 38.821681 480400.1603 994739.5609 A1_South RT
Nominal Zagwe Logesh Bole 8.98642 38.83335 481682.1267 993354.9967 A1_South RT
FTK Zagwe Logesh Bole 8.986073 38.832602 481599.8901 993316.6706 A1_South RT
FTK Revanth Bole 8.98618 38.834036 481757.5188 993328.4287 A1_South RT
FTK Zagwe Logesh Bole 8.986223 38.834056 481759.7193 993333.1817 A1_South RT
Nominal Zagwe Logesh Bole 8.99404042 38.82922002 481228.5577 994197.701 A1_South GF
FTK Zagwe Logesh Bole 8.994157 38.828535 481153.2689 994210.625 A1_South GF
FTK Zagwe Logesh Bole 8.994424 38.828599 481160.3174 994240.1406 A1_South GF
Colo Zagwe Logesh Bole 8.99404042 38.82922002 481228.5577 994197.701 A1_South GF
Nominal Innovis Hamza Kirkos 9.020614 38.76448 474114.4551 997139.5713 A1_South RT
FTK Innovis Hamza Kirkos 9.021078 38.765392 474214.7248 997190.8059 A1_South RT
FTK Innovis Hamza Kirkos 9.019834 38.765499 474226.3967 997053.2639 A1_South RT
FTK Innovis Hamza Kirkos 9.020614 38.76448 474114.4551 997139.5713 A1_South RT
Nominal Zagwe Logesh Bole 9.00879 38.85179 483710.024 995827.2993 A1_South GF
FTK Zagwe Logesh Bole 9.009499 38.851115 483635.8655 995905.7147 A1_South RT
FTK Zagwe Logesh Bole 9.007665 38.851292 483655.2374 995702.9442 A1_South GF
FTK Zagwe Logesh Bole 9.00963 38.85062 483581.5 995920.2 A1_South RT
Nominal Zagwe Logesh Bole 9.00731 38.83545 481913.9928 995664.4414 A1_South GF
FTK Zagwe Logesh Bole 9.00607 38.834814 481844.0268 995527.3814 A1_South RT
FTK Zagwe Logesh Bole 9.007385 38.835097 481875.1976 995672.7507 A1_South GF
FTK Zagwe Revanth Bole 9.00683 38.83272 481613.9 995611.5 A1_South RT
FTK Zagwe Nuhamin Bole 9.00759 38.8335 481699.6781 995695.4945 A1_South RT
Colo Zagwe Logesh Bole 9.00731 38.83545 481913.9928 995664.4414 A1_South GF
Nominal Innovis Revanth Kolfe - Keran 9.03255401 38.69371814 466338.2012 998465.4111 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.03319 38.69452 466426.389 998535.6516 A1_North RT
FTK Innovis Revanth Kolfe - Keran 9.0319 38.69269 466225.1419 998393.1995 A1_North RT
FTK Innovis Beakal Kolfe - Keran 9.03213 38.69224 466175.706 998418.67 A1_North GF
Colo Innovis Revanth Kolfe - Keran 9.03243 38.69367 466332.8989 998451.7052 A1_North GF
Nominal Innovis Revanth Kolfe - Keran 9.02788 38.71399 468565.7863 997946.8506 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.028505 38.71365 468528.4721 998015.9791 A1_North RT
FTK Innovis Revanth Kolfe - Keran 9.028648 38.71372 468536.178 998031.783 A1_North RT
FTK Zagwe Logesh Kolfe - Keran 9.029742 38.714283 468598.1501 998152.6857 A1_North RT
Nominal Zagwe Jeff Lideta 9.01905513 38.71694408 468889.7039 996970.9319 A1_North RT
FTK Zagwe Jeff Lideta 9.018426 38.716595 468851.2828 996901.4059 A1_North RT
FTK Zagwe Jeff Lideta 9.019263 38.716947 468890.0427 996993.9135 A1_North GF
Nominal Innovis Revanth Kolfe - Keran 9.0090698 38.68022096 464852.5119 995870.293 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.008438 38.680712 464906.4226 995800.3948 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.009214 38.679544 464778.1193 995886.3007 A1_North GF
FTK Tesla Nuhamin Kolfe - Keran 9.009805 38.680932 464930.7353 995951.5077 A1_North RT
Nominal Innovis Revanth Kolfe - Keran 9.01912981 38.69427061 466397.6784 996981.1957 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.019278 38.693456 466308.1586 996997.6544 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.019989 38.694373 466409.0115 997076.1774 A1_North RT
Nominal Innovis Revanth Kolfe - Keran 9.00455 38.69918 466935.9422 995368.8225 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.004982 38.698639 466876.518 995416.6328 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.004458 38.698449 466855.5866 995358.7172 A1_North GF
FTK Tesla Revanth Kolfe - Keran 9.004143 38.697651 466767.8 995324 A1_North RT
Nominal Zagwe Logesh Bole 8.9585 38.78630556 476509.2691 990270.9042 A1_South GF
FTK Zagwe Logesh Bole 8.959661 38.784854 476349.7782 990399.3547 A1_South RT
FTK Zagwe Logesh Bole 8.959896 38.786288 476507.4284 990425.2439 A1_South RT
FTK Zagwe Revanth Bole 8.957752 38.78681 476564.6729 990188.1749 A1_South RT
FTK Zagwe Revanth Bole 8.959918 38.78558 476429.6017 990427.7214 A1_South RT
FTK Igado Nuhamin Bole 8.9579 38.787 476585.5685 990204.5253 A1_South RT
FTK Zagwe Hamza Bole 8.962164 38.786725 476555.6118 990675.9609 A1_South RT
Nominal Zagwe Logesh Bole 8.98488996 38.7755906 475333.185 993189.2229 A1_South GF
FTK Zagwe Logesh Bole 8.985866 38.776719 475457.2837 993297.0562 A1_South RT
FTK Zagwe Logesh Bole 8.98549 38.774408 475203.2352 993255.6418 A1_South RT
Colo Zagwe Logesh Bole 8.98488996 38.7755906 475333.185 993189.2229 A1_South GF
FTK Zagwe Logesh Kirkos 8.995764 38.766991 474388.6863 994392.0247 A1_South RT
FTK Zagwe Logesh Kirkos 8.992622 38.766957 474384.7283 994044.6536 A1_South RT
FTK Zagwe Logesh Kirkos 8.99341 38.7667 474356.535 994131.7913 A1_South RT
Nominal Zagwe Logesh Kirkos 8.996892 38.7727 475016.2748 994516.34 A1_South RT
FTK Zagwe Logesh Kirkos 8.997099 38.77246 474989.9092 994539.2419 A1_South RT
FTK Zagwe Revanth Kirkos 8.99625 38.773267 475078.6 994445.3 A1_South RT
FTK Igado Beakal Kirkos 8.999061 38.77144 474877.931 994756.227 A1_South RT
FTK Igado Beakal Kirkos 8.995794 38.774258 475187.449 994394.841 A1_South RT
FTK Zagwe Logesh Kirkos 8.996287 38.77219 474960.1761 994449.4872 A1_South RT
FTK Fireside Beakal Bole 8.990372 38.784974 476364.957 993794.688 A1_South RT
FTK Zagwe Logesh Bole 8.992385 38.783359 476187.5718 994017.3455 A1_South RT
FTK Fireside Nuhamin Bole 8.990174 38.7845597 476319.4055 993772.8242 A1_South RT
FTK Fireside Nuhamin Bole 8.9904 38.78198 476035.8657 993797.9779 A1_South RT
FTK Zagwe Logesh Bole 8.99177218 38.78323526 476173.9306 993949.6015 A1_South RT
Nominal Zagwe Logesh Bole 8.99809575 38.77904013 475713.2351 994648.9978 A1_South RT
FTK Zagwe Logesh Bole 8.99886 38.778042 475603.5764 994733.5581 A1_South RT
FTK Zagwe Revanth Bole 8.99943 38.77963 475778.2 994796.5 A1_South RT
FTK Zagwe Logesh Bole 8.996622 38.779456 475758.8475 994486.0355 A1_South RT
Nominal Zagwe Logesh Kirkos 8.9966 38.76015 473636.8103 994484.9364 A1_South GF
FTK Zagwe Logesh Kirkos 8.995475 38.759283 473541.4315 994360.621 A1_South RT
Nominal Fireside Logesh Nefas Silk 8.99108721 38.73478463 470848.3084 993877.3733 A1_South GF
FTK Fireside Logesh Nefas Silk 8.99147666 38.733344 470689.9888 993920.5451 A1_South RT
FTK Zagwe Revanth Nefas Silk 8.991947 38.733328 470688.3 993972.5 A1_South RT
FTK Fireside Logesh Nefas Silk 8.991783 38.733 470652.2018 993954.441 A1_South RT
Nominal Zagwe Logesh Bole 9.01702 38.80674 478758.9781 996739.5012 A1_South GF
FTK Zagwe Logesh Bole 9.017137 38.807542 478847.1323 996752.3899 A1_South RT
FTK Zagwe Logesh Bole 9.016303 38.806541 478737.0642 996660.2427 A1_South GF
Nominal Zagwe Logesh Kirkos 8.99614 38.74363 471820.9624 994435.3092 A1_South RT
FTK Zagwe Logesh Kirkos 8.996707 38.743586 471816.17 994497.9991 A1_South RT
FTK Zagwe Logesh Kirkos 8.996707 38.743586 471816.17 994497.9991 A1_South RT
FTK Zagwe Nuhamin Kirkos 8.99556 38.744886 471958.9725 994371.0891 A1_South RT
Nominal Zagwe Prashant Lideta 9.00605988 38.71637815 468826.3887 995534.2437 A1_North RT
FTK Zagwe Prashant Lideta 9.005743 38.715962 468780.621 995499.2453 A1_North RT
FTK Zagwe Prashant Lideta 9.006236 38.71609 468794.7323 995553.7398 A1_North GF
FTK Zagwe Prashant Lideta 9.006089 38.716297 468817.4717 995537.47 A1_North GF
Nominal Innovis Revanth Kolfe - Keran 8.99714017 38.70465064 467536.5817 994549.1122 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.997434 38.703309 467389.1399 994581.7168 A1_North RT
FTK Innovis Revanth Kolfe - Keran 8.996084 38.704765 467549.0576 994432.3334 A1_North GF
FTK Fireside Nuhamin Kolfe - Keran 8.998469 38.703577 467418.69 994696.1212 A1_North GF
Colo Innovis Revanth Kolfe - Keran 8.99714017 38.70465064 467536.5817 994549.1122 A1_North GF
Nominal     Kolfe - Keran 8.98344 38.71532 468708.1411 993033.5142 A1_North GF
FTK     Kolfe - Keran 8.9833 38.7149 468661.9626 993018.0718 A1_North GF
FTK     Kolfe - Keran 8.984 38.7153 468705.9907 993095.4286 A1_North GF
FTK Tesla Logesh Kolfe - Keran 8.979495 38.714086 468572.1597 992597.4667 A1_North GF
Nominal Fireside Logesh Nefas Silk 8.98660967 38.72868956 470177.9853 993382.8341 A1_South GF
Colo Fireside Hamza Nefas Silk 8.98660967 38.72868956 470177.9853 993382.8341 A1_South GF
FTK Fireside Logesh Nefas Silk 8.985861 38.729658 470284.3744 993299.9838 A1_South RT
FTK Revanth Nefas Silk 8.98596 38.73133 470468.2 993310.8 A1_South RT
FTK Revanth Nefas Silk 8.986766 38.729427 470259.1 993400.1 A1_South RT
FTK Fireside Nuhamin Nefas Silk 8.9856 38.7298 470299.96 993271.12 A1_South RT
FTK Fireside Nuhamin Nefas Silk 8.9827 38.7301 470332.7017 992950.4733 A1_South RT
FTK Fireside Hamza Nefas Silk 8.98656429 38.728538917 470161.4229 993377.8292 A1_South GF
Nominal Innovis Revanth Kolfe - Keran 9.03304 38.6851 465391.065 998519.9478 A1_North GF
Colo Innovis Beakal Kolfe-Keran 9.03304 38.6851 465391.065 998519.9478 A1_North GF
FTK Innovis Revanth Kolfe-Keran 9.03381 38.684649 465341.5711 998605.121 A1_North GF
FTK Innovis Revanth Kolfe-Keran 9.033766 38.68599 465488.95 998600.1294 A1_North GF
FTK Fireside Nuhamin Kolfe-Keran 9.0337 38.6836 465226.2699 998593.0594 A1_North GF
Nominal     Yeka 9.02781 38.8324 481579.7997 997931.0279 A1_North GF
FTK Fireside Hamza Yeka 9.027913 38.830993 481425.1672 997942.4866 A1_North RT
FTK Fireside Hamza Yeka 9.027887 38.832053 481541.6662 997939.5584 A1_North GF
Nominal Innovis Logesh Yeka 9.032787 38.835118 481878.7728 998481.1383 A1_North GF
FTK Innovis Logesh Yeka 9.032217 38.835263 481894.6805 998418.1131 A1_North RT
FTK Innovis Logesh Yeka 9.034472 38.835711 481944.03 998667.3988 A1_North RT
Nominal Fireside Logesh Yeka 9.02807927 38.84806667 483301.6729 997960.0444 A1_North GF
Colo Fireside Logesh Yeka 9.02807927 38.84806667 483301.6729 997960.0444 A1_North GF
FTK Fireside Logesh Yeka 9.0283216 38.848536 483353.2662 997986.8144 A1_North RT
FTK Zagwe Revanth Yeka 9.0283216 38.848536 483353.3 997986.8 A1_North RT
FTK Fireside Logesh Yeka 9.027975099 38.84477464 482939.8546 997948.6797 A1_North GF
Nominal Innovis Revanth East Shewa 9.06731 38.7171 468910.9814 1002305.917 A1_North GF
FTK Innovis Revanth East Shewa 9.06731 38.7171 468910.9814 1002305.917 A1_North GF
FTK Innovis Revanth East Shewa 9.069044 38.716226 468815.0829 1002497.701 A1_North RT
FTK Innovis Revanth East Shewa 9.066729 38.717758 468983.2424 1002241.627 A1_North GF
Nominal Zagwe logesh Akaki - Kalit 8.89584 38.80458 478514.4598 983342.2609 A1_South GF
FTK Zagwe logesh Akaki - Kalit 8.895885 38.804581 478514.5723 983347.2359 A1_South GF
FTK Zagwe logesh Akaki - Kalit 8.896279 38.804641 478521.192 983390.7919 A1_South GF
FTK I-Engg Revanth Akaki - Kalit 8.89243 38.802443 478279.3 982965.4 A1_South RT
FTK Zagwe logesh Akaki - Kalit 8.895668 38.803941 478444.1943 983323.2821 A1_South GF
Nominal Innovis jeff Lideta 9.01729 38.75049 472576.5815 996773.0959 A1_North RT
FTK Innovis jeff Lideta 9.016683 38.749721 472492.015 996706.0448 A1_North RT
FTK Innovis jeff Lideta 9.0167 38.7504 472566.6451 996707.8732 A1_North RT
Nominal Zagwe Logesh Kirkos 9.011695 38.73634 471020.9116 996155.6131 A1_South RT
FTK Zagwe Logesh Kirkos 9.011546 38.756047 473186.9263 996137.637 A1_South RT
FTK Zagwe Logesh Kirkos 9.01153 38.756735 473262.5442 996135.8177 A1_South RT
FTK Zagwe Logesh Kirkos 9.011695 38.75511 473083.9503 996154.179 A1_South RT
Nominal Zagwe Logesh Kirkos 9.0130129 38.76276 473924.8669 996299.3295 A1_South RT
FTK Zagwe Logesh Kirkos 9.013005 38.762442 473889.9147 996298.4788 A1_South RT
FTK Zagwe Logesh Kirkos 9.012318 38.762442 473889.8653 996222.5253 A1_South RT
FTK Zagwe Logesh Kirkos 9.012838 38.763274 473981.3486 996279.9563 A1_South GF
Nominal Zagwe Logesh Kirkos 9.002855 38.76938 474651.7695 995175.8258 A1_South RT
FTK Zagwe Logesh Kirkos 9.003528 38.768485 474553.4436 995250.2935 A1_South RT
FTK Zagwe Logesh Kirkos 9.003518 38.768546 474560.1476 995249.1837 A1_South RT
FTK Zagwe Logesh Kirkos 9.001979 38.769427 474656.8745 995078.9737 A1_South RT
FTK Fireside Revanth Kirkos 9.003127 38.769112 474622.3315 995205.9162 A1_South RT
Nominal     Kirkos 8.99224997 38.77401855 475160.8877 994003.0367 A1_South GF
FTK Fireside Revanth Kirkos 8.99039 38.7732 475070.8 993797.5 A1_South RT
FTK Fireside Hamza Kirkos 8.990458 38.773064 475055.8437 993804.9849 A1_South RT
FTK Fireside Hamza Kirkos 8.992854 38.773514 475105.4703 994069.8513 A1_South RT
FTK Zagwe Logesh Kirkos 8.993854 38.773642 475119.6079 994180.4006 A1_South RT
FTK Zagwe Nuhamin Kirkos 8.991894 38.772445 474987.9032 993963.7884 A1_South RT
FTK Zagwe Beakal Kirkos 8.991732 38.773832 475140.347 993945.784 A1_South RT
Nominal Innovis Logesh Bole 8.99243 38.78871 476775.7406 994021.9773 A1_South GF
FTK Innovis Logesh Bole 8.991767 38.789883 476904.6313 993948.6033 A1_South RT
FTK Revanth Bole 8.9915824 38.7880713 476705.5 993928.3 A1_South RT
FTK Innovis Logesh Bole 8.9914 38.788 476697.6337 993908.1478 A1_South RT
Nominal Zagwe logesh Bole 8.98547222 38.78536111 476407.1905 993252.9537 A1_South GF
Colo Zagwe logesh Bole 8.98547222 38.78536111 476407.1905 993252.9537 A1_South GF
FTK Zagwe logesh Bole 8.986094 38.784136 476272.5679 993321.7754 A1_South RT
FTK   Revanth Bole 8.9873733 38.784858 993463.165 476352.012 A1_South RT
Nominal Innovis Logesh Bole 8.995776 38.7883 476730.8884 994391.9301 A1_South RT
FTK Innovis Revanth Bole 8.996229 38.78565 476439.6403 994442.1821 A1_South RT
FTK Innovis Revanth Bole 8.99551 38.78542 476414.3131 994362.7058 A1_South RT
FTK I-Engg Revanth Bole 8.9948 38.7857 476445 994284.2 A1_South RT
FTK I-Engg Nuhamin Bole 8.99676 38.785365 476408.3487 994500.9068 A1_South RT
Nominal Innovis Logesh Bole 8.988412 38.79178 477112.9335 993577.5628 A1_South RT
FTK Innovis Logesh Bole 8.988384 38.791742 477108.7548 993574.4695 A1_South RT
FTK Fireside Beakal Bole 8.9877583 38.7785549 475659.21 993506.143 A1_South RT
FTK Fireside Nuhamin Bole 8.987814 38.788561 476759.0687 993511.6516 A1_South RT
Nominal Zagwe Logesh Bole 8.96437974 38.83924971 482329.5475 990917.9916 A1_South GF
FTK Zagwe Logesh Bole 8.96479 38.840675 482486.2423 990963.2806 A1_South RT
FTK Zagwe Logesh Bole 8.964531 38.839422 482348.4938 990934.7062 A1_South RT
FTK Zagwe Logesh Bole 8.964767 38.83937 482342.7891 990960.8002 A1_South GF
Nominal Innovis Arun 40 Init Sites 8.875939 38.822469 480480.2272 981141.0752 A1_South GF
FTK Innovis Arun 40 Init Sites 8.87604 38.822382 480470.6668 981152.2461 A1_South GF
FTK Innovis Arun 40 Init Sites 8.876384 38.822371 480469.4755 981190.2782 A1_South GF
FTK Innovis Beakal 40 Init Sites 8.86997 38.8203 480241.423 980481.275 A1_South GF
FTK Innovis Arun 40 Init Sites 8.876369 38.822868 480524.1206 981188.5938 A1_South GF
Nominal Innovis Logesh Yeka 9.06463 38.87683 486464.2957 1001999.82 A1_North GF
Colo Innovis Logesh Yeka 9.06463 38.87683 486464.2957 1001999.82 A1_North GF
FTK Innovis Logesh Yeka 9.064025 38.87623 486398.3361 1001932.954 A1_North GF
FTK Revanth Yeka 9.064809 38.875049 486268.6 1002020 A1_North RT
FTK Revanth Yeka 9.062936 38.874652 486224.9 1001813 A1_North RT
FTK Innovis Logesh Yeka 9.06415 38.877208 486505.818 1001946.738 A1_North GF
FTK Maktech Hamza Akaki - Kalit 8.871857 38.813715 479517.4836 980690.253 A1_South RT
FTK Maktech Hamza Akaki - Kalit 8.8731 38.81475 479631.3534 980827.6184 A1_South RT
FTK Maktech Hamza Akaki - Kalit 8.87297 38.81644 479817.1662 980813.1538 A1_South RT
Nominal Maktech Hamza Akaki - Kalit 8.860185 38.806286 478699.9705 979400.2491 A1_South GF
FTK Maktech Hamza Akaki - Kalit 8.860185 38.80675 478750.9903 979400.2226 A1_South GF
FTK Maktech Hamza Akaki - Kalit 8.85977 38.80675 478750.9665 979354.3414 A1_South GF
FTK Maktech Hamza Akaki - Kalit 8.8601 38.80664 478738.8903 979390.8315 A1_South RT
Nominal Innovis   40 Init Sites 8.899185 38.749045 472408.8563 983715.7541 A1_South GF
FTK Innovis Revanth 40 Init Sites 8.987615 38.77996 475813.6473 993490.2067 A1_South RT
FTK Innovis Revanth 40 Init Sites 8.987384 38.78091 475918.0546 993464.6053 A1_South RT
Nominal Maktech Hamza Akaki - Kalit 8.9097451 38.76046509 473665.1961 984882.4218 A1_South GF
FTK Maktech Hamza Akaki - Kalit 8.9097451 38.76046509 473665.1961 984882.4218 A1_South GF
FTK Maktech Hamza Akaki - Kalit 8.90953291 38.7607479 473696.2736 984858.9424 A1_South GF
FTK Maktech Hamza Akaki - Kalit 8.90917 38.762574 473897.0131 984818.6906 A1_South RT
Nominal Innovis Revanth Kolfe - Keran 8.98293893 38.68469457 465341.7332 992980.8688 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.982486 38.684486 465318.764 992930.8131 A1_North RT
FTK Innovis Revanth Kolfe - Keran 8.982783 38.683827 465246.3544 992963.7114 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.981233 38.684375 465306.4436 992792.2936 A1_North RT
FTK Maktech Revanth Kolfe - Keran 8.982479 38.683441 465203.9 992930.1 A1_North RT
FTK Maktech Logesh Kolfe - Keran 8.9792 38.6803 464858.3187 992567.9153 A1_North GF
Nominal     Kirkos 9.00533618 38.7459956 472081.6853 995451.8418 A1_South GF
FTK Fireside Revanth Kirkos 9.007343 38.74665 472153.7663 995673.6625 A1_South RT
FTK Fireside Revanth Kirkos 9.003407 38.74681 472171.0513 995238.493 A1_South RT
FTK Fireside Revanth Kirkos 9.003164 38.74646 472132.5628 995211.6539 A1_South RT
Nominal Innovis Revanth Kolfe - Keran 9.016806 38.701861 467231.7261 996723.589 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.016258 38.70171 467215.0802 996663.0163 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.016623 38.70137 467177.7436 996703.4008 A1_North GF
FTK Revanth Kolfe - Keran 9.018476 38.698303 466840.8 996908.5 A1_North RT
FTK Revanth Kolfe - Keran 9.018273 38.700966 467133.5 996885.9 A1_North RT
FTK Innovis Nuhamin Kolfe - Keran 9.018509 38.700315 467061.959 996912.0095 A1_North GF
Nominal Innovis Revanth Kolfe - Keran 9.05218 38.6998 467008.4186 1000634.684 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.052426 38.700032 467033.9377 1000661.861 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.05186 38.699493 466974.6502 1000599.333 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.052694 38.699858 467014.8396 1000691.506 A1_North GF
FTK Innovis Logesh Kolfe - Keran 9.051324 38.698442 466859.0965 1000540.169 A1_North GF
Colo Innovis Revanth Kolfe - Keran 9.05218 38.6998 467008.4186 1000634.684 A1_North GF
Nominal Maktech Logesh Kolfe - Keran 9.05 38.7045 467524.7512 1000393.243 A1_North RT
FTK Maktech Logesh Kolfe - Keran 9.05005 38.704497 467524.426 1000398.771 A1_North GF
FTK Maktech Logesh Kolfe - Keran 9.049226 38.70369 467435.6624 1000307.743 A1_North GF
Colo Maktech logesh Kolfe - Keran 9.04653 38.7045 467524.44 1000009.604 A1_North GF
Nominal Fireside Logesh Gulele 9.05372 38.72007 469236.2131 1000803.17 A1_North GF
FTK Fireside Logesh Gulele 9.053286 38.719761 469202.2174 1000755.214 A1_North RT
FTK Fireside Hamza Gulele 9.053213 38.719049 469123.963 1000747.203 A1_North RT
Nominal Innovis Prashant 40 Init Sites 9.049725 38.707706 467877.067 1000362.555 A1_North GF
FTK Innovis Prashant 40 Init Sites 9.050608 38.70859 467974.2969 1000460.101 A1_North GF
FTK Innovis Prashant 40 Init Sites 9.04933 38.70828 467940.1148 1000318.834 A1_North GF
FTK Innovis Prashant 40 Init Sites 9.04976 38.70883 468000.598 1000366.326 A1_North GF
FTK Tesla Revanth 40 Init Sites 9.05024 38.70897 468016 1000419 A1_North RT
FTK Revanth 40 Init Sites 9.0503 38.708877 468005.8 1000426 A1_North RT
Nominal     Nefas Silk 8.94938012 38.74105038 471533.7763 989265.8235 A1_South GF
FTK Fireside Hamza Nefas Silk 8.950803 38.741602 471594.5264 989423.0917 A1_South RT
FTK Fireside Revanth Nefas Silk 8.948558 38.74152 471585.338 989174.8953 A1_South RT
FTK Igado Revanth Nefas Silk 8.949605 38.742231 471663.6 989290.6 A1_South RT
FTK Igado Revanth Nefas Silk 8.949809 38.738883 471295.5 989313.4 A1_South RT
Nominal Innovis Revanth Kolfe - Keran 9.01432 38.71203 468349.1873 996447.8443 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.014087 38.71233 468382.1403 996422.0581 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.014343 38.71243 468393.1537 996450.3525 A1_North GF
FTK Tesla Revanth Kolfe - Keran 9.013374 38.7107475 468208.1 996343.4 A1_North RT
Nominal Zagwe Arun Lideta 9.01096 38.72726 470022.8536 996075.0844 A1_North RT
FTK Zagwe Arun Lideta 9.011822 38.726488 469938.0729 996170.4491 A1_North RT
FTK Zagwe Arun Lideta 9.011098 38.72753 470052.5412 996090.3193 A1_North GF
Nominal Innovis Arun Lideta 9.017571 38.73817 471222.5149 996805.1098 A1_North RT
FTK Innovis Arun Lideta 9.017632 38.738055 471209.8801 996811.863 A1_North RT
FTK Innovis Arun Lideta 9.015527 38.73764 471164.1006 996579.1702 A1_North RT
Colo Beakal Lideta 8.99851 38.73637 471023.159 994697.899 A1_North RT
FTK Innovis Arun Lideta 9.017378 38.73808 471212.6078 996783.7792 A1_North RT
FTK Innovis Arun Lideta 9.017343 38.737974 471200.9545 996779.918 A1_North RT
Nominal Zagwe Logesh Bole 8.95275217 38.78780769 476674.0277 989635.3419 A1_South GF
FTK Zagwe Logesh Bole 8.951952 38.786682 476550.2305 989546.9485 A1_South RT
FTK Zagwe Logesh Bole 8.951765 38.788572 476757.9848 989526.1544 A1_South RT
Nominal     Kirkos 9.012770296 38.74868156 472377.4729 996273.5411 A1_South GF
FTK Igado Revanth Kirkos 9.015071 38.747366 472233.1 996528 A1_South RT
FTK Igado Revanth Kirkos 9.013875 38.747464 472243.7 996395.8 A1_South RT
FTK Igado Revanth Kirkos 9.01261 38.746792 472169.8 996256 A1_South RT
Nominal Innovis Logesh Bole 9.01504977 38.79993045 478010.4249 996522.0792 A1_South GF
FTK Innovis Logesh Bole 9.014347 38.799818 477998.023 996444.3892 A1_South RT
FTK Fireside Beakal Bole 9.0156 38.80152 478185.165 996582.816 A1_South RT
FTK Fireside Beakal Bole 9.01465 38.800861 478112.678 996477.826 A1_South RT
FTK Innovis Logesh Bole 9.016073 38.799639 477978.4536 996635.223 A1_South RT
Nominal Zagwe logesh Bole 9.01433 38.83578 481950.6123 996440.5403 A1_South GF
FTK Zagwe logesh Bole 9.013905 38.837078 482093.2546 996393.4894 A1_South RT
FTK fireside Revanth Bole 9.013911 38.837718 482163.6 996394.1 A1_South RT
FTK Zagwe logesh Bole 9.014553 38.83704 482089.11 996465.1327 A1_South GF
Nominal Zagwe Logesh Bole 9.01309987 38.87206966 485939.1613 996302.9468 A1_South GF
FTK Zagwe Logesh Bole 9.017041 38.867557 485443.3313 996738.8452 A1_South GF
FTK Zagwe Logesh Bole 9.015901 38.866725 485351.841 996612.8428 A1_South GF
FTK fireside Revanth Bole 9.01747 38.87396 486147.1 996786 A1_South RT
FTK Igado Beakal Bole 9.015947 38.871686 485897.104 996617.733 A1_South RT
FTK Igado Beakal Bole 9.01559 38.871627 485890.605 996578.267 A1_South RT
Nominal Fireside Logesh Yeka 9.04605512 38.85774153 484365.7717 999946.9858 A1_North GF
Colo Fireside hamza Yeka 9.04605512 38.85774153 484365.7717 999946.9858 A1_North GF
FTK Fireside Logesh Yeka 9.04605 38.857563 484346.1509 999946.4274 A1_North GF
FTK Fireside Logesh Yeka 9.045601 38.856971 484281.0704 999896.8124 A1_North GF
FTK Fireside Logesh Yeka 9.045454 38.856743 484256.0067 999880.5703 A1_North RT
FTK Fireside Nuhamin Yeka 9.046432 38.8588 484482.1141 999988.6076 A1_North GF
Nominal Zagwe Logesh Bole 8.98366993 38.86025232 484639.0725 993049.7209 A1_South GF
FTK Zagwe Logesh Bole 8.982891 38.860409 484656.2619 992963.5979 A1_South RT
FTK Zagwe Logesh Bole 8.984256 38.859959 484606.8557 993114.5276 A1_South GF
Nominal Innovis Hamza Akaki - Kalit 8.85093 38.81168 479292.5579 978376.7402 A1_South GF
FTK Innovis Hamza Akaki - Kalit 8.85156 38.812392 479370.884 978446.3515 A1_South GF
FTK Innovis Hamza Akaki - Kalit 8.850949 38.811851 479311.362 978378.8313 A1_South GF
FTK Innovis Hamza Akaki - Kalit 8.851209 38.812002 479327.9804 978407.5677 A1_South GF
Nominal     Nefas Silk 8.95934019 38.77090139 474815.9885 990364.8127 A1_South GF
FTK Fireside Hamza Nefas Silk 8.959605 38.77104 474831.2438 990394.08 A1_South GF
FTK     Nefas Silk 8.961072 38.77226 474965.4551 990556.1851 A1_South RT
FTK Maktech Logesh Nefas Silk 8.959882 38.769478 474659.557 990424.8118 A1_South RT
Colo Fireside Hamza Nefas Silk 8.96006 38.77117 474815.8357 990364.7918 A1_South GF
Nominal     Nefas Silk 8.9649296 38.7437096 471827.3024 990984.7388 A1_South GF
FTK Fireside Revanth Nefas Silk 8.966386 38.74321 471772.496 991145.7939 A1_South GF
FTK Fireside Revanth Nefas Silk 8.965191 38.74368 471824.0687 991013.6409 A1_South GF
Nominal Innovis Prashant Arada 9.02942899 38.75269703 472820.0642 998114.9977 A1_North RT
FTK Innovis Prashant Arada 9.028973 38.751828 472724.5182 998064.649 A1_North RT
FTK Innovis Prashant Arada 9.0298 38.752162 472761.289 998156.0558 A1_North RT
FTK Innovis Prashant Arada 9.029095 38.753775 472938.5147 998077.9922 A1_North RT
Nominal Zagwe Logesh Arada 9.0358427 38.74844 472352.6795 998824.407 A1_North RT
FTK Zagwe Logesh Arada 9.034593 38.747952 472298.9508 998686.2792 A1_North RT
FTK Zagwe Logesh Arada 9.034259 38.74918 472433.8882 998649.2596 A1_North RT
FTK Zagwe Arun Arada 9.03492 38.747173 472213.3602 998722.491 A1_North RT
Nominal Zagwe logesh Arada 9.0284579 38.756286 473214.442 998007.3703 A1_North RT
FTK Zagwe logesh Arada 9.027474 38.757789 473379.5591 997898.482 A1_North RT
FTK Zagwe logesh Arada 9.028423 38.755883 473170.1472 998003.5414 A1_North RT
FTK Zagwe logesh Arada 9.028705 38.755824 473163.6836 998034.7232 A1_North RT
FTK Maktech Revanth Arada 9.026671 38.757998 473402.5 997809.7 A1_North RT
FTK Maktech Nuhamin Arada 9.026438 38.756062 473189.67 997784.07 A1_North RT
FTK Igado Beakal Arada 9.028698 38.756374 473224.132 998033.909 A1_North RT
FTK Igado Beakal Arada 9.026346 38.755206 473095.587 997773.962 A1_North RT
Nominal     Gulele 9.04382 38.75874 473485.2754 999705.5999 A1_North GF
FTK Fireside Revanth Gulele 9.043665 38.75986 473608.354 999688.3821 A1_North RT
FTK Fireside Revanth Gulele 9.043351 38.758472 473455.5676 999653.7677 A1_North GF
Colo Fireside Revanth Gulele 9.04382 38.75874 473485.2754 999705.5999 A1_North RT
Nominal Zagwe Arun Arada 9.04086 38.76113 473747.7259 999378.1741 A1_North RT
FTK Zagwe Arun Arada 9.04073 38.761544 473793.2162 999363.7717 A1_North RT
FTK Zagwe Arun Arada 9.04088 38.762267 473872.6865 999380.3036 A1_North GF
Colo Zagwe Arun Arada 9.03969 38.76408 474071.855 999248.61 A1_North GF
Nominal Zagwe Arun Arada 9.0422537 38.744605 471931.6933 999533.4904 A1_North RT
FTK Zagwe Arun Arada 9.04227 38.74459 471930.046 999535.2937 A1_North RT
FTK Zagwe Arun Arada 9.04179 38.743883 471852.3079 999482.2801 A1_North RT
Nominal Zagwe Jeff Addis Ketema 9.038104535 38.72550267 469831.9575 999076.29 A1_North RT
FTK Zagwe Jeff Addis Ketema 9.0381045 38.725503 469831.9937 999076.2861 A1_North RT
FTK Zagwe Jeff Addis Ketema 9.038675 38.725292 469808.8515 999139.3773 A1_North GF
FTK Zagwe Jeff Addis Ketema 9.037584 38.725316 469811.3984 999018.7558 A1_North GF
Colo Addis Ketema 9.038927 38.726238 469912.841 999167.16 A1_North RT
FTK Addis Ketema 9.03815 38.72548 469829.4697 999081.3184 A1_North RT
Nominal Innovis   Addis Ketema 9.026969731 38.73936051 471354.1049 997844.1254 A1_North RT
FTK Innovis   Addis Ketema 9.026969 38.73936 471354.0488 997844.0446 A1_North RT
FTK Innovis   Addis Ketema 9.027038 38.739175 471333.7214 997851.6877 A1_North RT
FTK Innovis   Addis Ketema 9.027534 38.738771 471289.3583 997906.5564 A1_North RT
FTK Addis Ketema 9.026978 38.73935 471352.9504 997845.0404 A1_North RT
Nominal Innovis   14 Moved to ATC 9.015856 38.729036 470218.4581 996616.2336 A1_North Nominal
FTK Innovis   Lideta 9.015773 38.727126 470008.5225 996607.2134 A1_North RT
FTK Innovis Arun Lideta 9.015138 38.728213 470127.9429 996536.9198 A1_North GF
FTK Innovis Arun Lideta 9.015856 38.729036 470218.4581 996616.2336 A1_North RT
Nominal Innovis   14 Moved to ATC 9.021135 38.752721 472822.0778 997198.026 A1_North RT
FTK Innovis   14 Moved to ATC 9.021679 38.753013 472854.2118 997258.148 A1_North RT
FTK Innovis   14 Moved to ATC 9.020733 38.751705 472710.3805 997153.6573 A1_North GF
FTK Innovis   14 Moved to ATC 9.020005 38.752618 472810.6727 997073.1028 A1_North RT
Nominal Zagwe Logesh Bole 8.99179 38.84632 483108.0184 993948.0681 A1_South GF
FTK Zagwe Logesh Bole 8.992673 38.84672 483152.0259 994045.672 A1_South RT
Nominal Innovis Logesh Bole 9.0214615 38.83337922 481687.1017 997229.1024 A1_South GF
FTK Innovis Logesh Bole 9.021575 38.832695 481591.1223 997216.9296 A1_South RT
FTK Innovis Logesh Bole 9.0214919 38.832166 481553.7607 997232.5244 A1_South RT
Nominal     Yeka 9.02205 38.87434 486189.0352 997292.365 A1_North GF
FTK Fireside Hamza Yeka 9.02205 38.87399 486150.5675 997292.3782 A1_North GF
FTK Fireside Revanth Yeka 9.017472 38.873525 486099.2853 996786.2632 A1_North RT
FTK Fireside Revanth Yeka 9.018875 38.874867 486246.8363 996941.3248 A1_North GF
FTK Fireside Revanth Yeka 9.023945 38.876989 486480.2509 997501.7726 A1_North GF
FTK Zagwe Nuhamin Yeka 9.022239 38.876777 486456.887 997313.1692 A1_North RF
Colo Fireside Hamza Yeka 9.02205 38.87434 486189.0352 997292.365 A1_North GF
Nominal     Yeka 9.02596992 38.88512218 487374.2145 997725.3518 A1_North GF
FTK Fireside Revanth Yeka 9.024889 38.88574 487442.0795 997605.8266 A1_North RT
FTK Fireside Revanth Yeka 9.025974 38.88503 487364.0835 997725.806 A1_North RT
Nominal Zagwe Logesh Bole 8.9724 38.85485 484044.761 991803.9771 A1_South GF
FTK Zagwe Logesh Bole 8.972481 38.85482 484041.4669 991812.9335 A1_South GF
FTK Zagwe Logesh Bole 8.972888 38.85482 484041.4846 991857.9304 A1_South GF
Colo Zagwe Logesh Bole 8.9724 38.85485 484044.761 991803.9771 A1_South GF
Nominal Innovis Logesh Nefas Silk 8.97966 38.72271 469520.136 992614.9816 A1_South GF
FTK Innovis Logesh Nefas Silk 8.979532 38.7221 469453.0732 992600.8808 A1_South RT
FTK Innovis Logesh Nefas Silk 8.979423 38.722451 469491.6465 992588.8008 A1_South RT
Nominal Zagwe Arun Arada 9.04403 38.754781 473050.1903 999729.1075 A1_North GF
FTK Zagwe Arun Arada 9.0443 38.754677 473038.7806 999758.966 A1_North GF
FTK Zagwe Arun Arada 9.04403 38.754781 473050.1903 999729.1075 A1_North GF
FTK Tesla Revanth Arada 9.043374 38.752987 472853 999656.7 A1_North RT
FTK Tesla Revanth Arada 9.043348 38.753012 472855.7232 999653.8379 A1_North RT
FTK Tesla Nuhamin Arada 9.043098 38.755867 473169.4744 999625.9869 A1_North RT
Colo Zagwe Arun Arada 9.04399 38.754699 473041.1754 999724.6913 A1_North GF
Nominal Innovis Logesh Nefas Silk 8.9329999 38.72612038 469891.1705 987456.0451 A1_South GF
FTK Innovis Logesh Nefas Silk 8.932646 38.725703 469845.2567 987416.9527 A1_South RT
FTK Innovis Logesh Nefas Silk 8.932936 38.725623 469836.4857 987449.0211 A1_South RT
Nominal Zagwe Logesh Bole 9.0068605 38.81390824 479546.2638 995615.88 A1_South GF
FTK Zagwe Logesh Bole 9.008691 38.814602 479622.6192 995818.2174 A1_South RT
FTK Maktech Abhishek Bole 9.0086 38.8155 479721.315 995808.1067 A1_South RT
Nominal Innovis Logesh Bole 9.00544 38.78011 475831.3178 995460.8927 A1_South GF
FTK Innovis Logesh Bole 9.0045098 38.7801038 475830.5745 995358.0521 A1_South RT
FTK Innovis Logesh Bole 9.004373 38.779975 475816.4086 995342.9362 A1_South RT
Nominal     Kolfe - Keran 8.969531 38.665992 463284.583 991500.322 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.969872 38.66613 463299.7869 991538.0088 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.969047 38.66602 463287.6123 991446.8088 A1_North GF
Nominal Innovis Revanth Kolfe - Keran 8.97963987 38.7067527 467766.085 992614.1192 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.9794 38.7074 467837.2161 992587.5427 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.9798 38.7082 467925.1885 992631.6961 A1_North RT
Colo Innovis Revanth Kolfe - Keran 8.97963987 38.7067527 467766.085 992614.1192 A1_North GF
Nominal     Kolfe - Keran 9.00327005 38.67413038 464182.5076 995229.6693 A1_North GF
FTK     Kolfe - Keran 9.00284 38.675413 464323.4442 995181.9982 A1_North RT
FTK     Kolfe - Keran 9.002103 38.673877 464154.5425 995100.6663 A1_North RT
FTK Fireside Nuhamin Kolfe - Keran 9.002367 38.674514 464224.5843 995129.7915 A1_North RT
Colo     Kolfe - Keran 9.00327005 38.67413038 464182.5076 995229.6693 A1_North GF
Nominal Innovis Logesh Kolfe - Keran 9.00449962 38.68546263 465428.2046 995364.5198 A1_North GF
FTK Innovis Logesh Kolfe - Keran 9.004327 38.685515 465433.9444 995345.4302 A1_North RT
FTK Innovis Logesh Kolfe - Keran 9.003983 38.685542 465436.8795 995307.3954 A1_North RT
FTK Zagwe Logesh Kolfe - Keran 9.004376 38.685127 465391.3024 995350.8842 A1_North RT
Nominal Innovis Arun Lideta 9.0162 38.72175 469417.6799 996654.8672 A1_North GF
Colo Innovis Arun Lideta 9.0162441 38.7216759 469409.5392 996659.7491 A1_North GF
FTK Innovis Arun Lideta 9.0158 38.7221 469456.1149 996610.6146 A1_North GF
FTK Innovis Arun Lideta 9.0162077 38.7223954 469488.6166 996655.6646 A1_North GF
Nominal Zagwe Jeff Addis Ketema 9.02889955 38.72239686 469489.8433 998058.8576 A1_North GF
Colo Zagwe Jeff Addis Ketema 9.02889955 38.72239686 469489.8433 998058.8576 A1_North GF
FTK Zagwe Jeff Addis Ketema 9.02829 38.723322 469591.4711 997991.3894 A1_North RT
Nominal Innovis Revanth Kolfe - Keran 9.03929979 38.70037915 467070.8962 999210.6093 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.039187 38.700865 467124.2826 999198.0955 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.039427 38.701031 467142.5483 999224.6147 A1_North GF
Colo Innovis Revanth Kolfe - Keran 9.03929979 38.70037915 467070.8962 999210.6093 A1_North GF
Nominal Zagwe logesh Bole 9.00938702 38.83995938 482409.7292 995893.8521 A1_South GF
FTK Zagwe Revanth Bole 9.011015 38.840397 482457.9 996073.8 A1_South RT
FTK Zagwe logesh Bole 9.009622 38.839472 482356.1719 995919.8544 A1_South RT
Nominal Innovis Revanth Kolfe - Keran 9.05272006 38.7123492 468387.6175 1000693.279 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.052584 38.71235 468387.6935 1000678.237 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.052115 38.71286 468443.7013 1000626.34 A1_North GF
FTK Revanth Kolfe - Keran 9.053295 38.710993 468238.6 1000757 A1_North RT
FTK Innovis Nuhamin Kolfe - Keran 9.05268 38.713429 468506.2833 1000688.757 A1_North GF
Kolfe - Keran 38.713967 468565.3399 1000600 A1_North
FTK Innovis Nuhamin 9.051882 GF
FTK Kolfe - Keran 9.0298 38.713 468457.1453 998159.2087 A1_North GF
Nominal Maktech logesh Kolfe - Keran 9.0406 38.71349 468511.9371 999353.2009 A1_North RT
FTK Maktech logesh Kolfe - Keran 9.041432 38.713087 468467.7185 999445.2207 A1_North RT
FTK Maktech logesh Kolfe - Keran 9.0415 38.7123 468381.231 999452.8068 A1_North RT
Nominal Innovis Prashant Addis Ketema 9.028673957 38.73642954 471032.107 998032.7733 A1_North RT
FTK Innovis Prashant Addis Ketema 9.028632 38.73625 471012.371 998028.1488 A1_North RT
FTK Innovis Prashant Addis Ketema 9.029169 38.736239 471011.2049 998087.5196 A1_North RT
FTK Innovis Prashant Addis Ketema 9.029001 38.736704 471062.298 998068.9089 A1_North RT
Nominal Innovis Arun Lideta 9.00776 38.73372 470732.6266 995720.7743 A1_North GF
FTK Innovis Arun Lideta 9.007717 38.733622 470721.8517 995716.0282 A1_North RT
FTK Innovis Arun Lideta 9.007167 38.734289 470795.1194 995655.1678 A1_North RT
Nominal Innovis Arun Lideta 9.01349 38.74423 471888.2524 996353.4496 A1_North GF
FTK Innovis Arun Lideta 9.013569 38.744802 471951.1276 996362.1398 A1_North GF
FTK Innovis Arun Lideta 9.014795 38.744736 471943.9681 996497.6894 A1_North RT
FTK Revanth Lideta 9.01616 38.743192 471774.4 996648.7 A1_North RT
Colo Innovis Arun Lideta 9.01349 38.74423 471888.2524 996353.4496 A1_North GF
Nominal     Kirkos 9.00013 38.74274 471723.4468 994876.5053 A1_South GF
FTK Innovis Revanth Kirkos 9.001808 38.73926 471341.0746 995062.2926 A1_South RT
FTK Innovis Revanth Kirkos 8.9995 38.74011 471434.3209 994807.0576 A1_South RT
FTK Fireside Nuhamin Kirkos 8.999 38.7409 471521.1148 994751.717 A1_South RT
FTK Fireside Beakal Kirkos 9.002826 38.742723 471721.788 995174.572 A1_South RT
FTK Fireside Nuhamin Kirkos 9.0028 38.7426 471708.2662 995171.7067 A1_South RT
Nominal Zagwe Logesh Kirkos 8.987317 38.76976 474692.4575 993457.9487 A1_South RT
FTK Zagwe Logesh Kirkos 8.987972 38.771076 474837.1557 993530.2736 A1_South RT
FTK Zagwe Revanth Kirkos 8.98591 38.76592 474270.3 993302.7 A1_South RT
FTK Zagwe Nuhamin Kirkos 8.986553 38.768732 474579.4079 993373.5535 A1_South RT
Colo Zagwe Logesh Kirkos 8.987317 38.76976 474692.4575 993457.9487 A1_South GF
Nominal Zagwe Logesh Bole 8.99675 38.79483333 477449.0659 994499.205 A1_South GF
FTK Zagwe Logesh Bole 8.996622 38.794596 477422.9717 994485.0682 A1_South RT
FTK Zagwe Logesh Bole 8.996564 38.794781 477443.3025 994478.6444 A1_South RT
FTK Fireside Beakal Bole 8.995647 38.793629 477316.622 994377.334 A1_South RT
Colo Zagwe Logesh Bole 8.99675 38.79483333 477449.0659 994499.205 A1_South GF
Nominal Zagwe Logesh Bole 8.98858 38.79953 477964.8093 993595.6618 A1_South GF
FTK Zagwe Logesh Bole 8.988054 38.798863 477891.4621 993537.5485 A1_South RT
FTK Zagwe Logesh Bole 8.98901 38.799717 477985.39 993643.1904 A1_South GF
Nominal Innovis Revanth Kolfe - Keran 9.01009276 38.69577528 466562.225 995981.9324 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.010683 38.69611 466599.0691 996047.158 A1_North RT
FTK Innovis Revanth Kolfe - Keran 9.009175 38.69547 466528.5864 995880.4939 A1_North RT
FTK Innovis Revanth Kolfe - Keran 9.009175 38.69547 466528.5864 995880.4939 A1_North RT
FTK Innovis Revanth Kolfe - Keran 9.007008 38.69093 466029.3803 995641.3314 A1_North RT
FTK Innovis Revanth Kolfe - Keran 9.008752 38.69169 466113.077 995834.0755 A1_North RT
Colo Innovis Revanth Kolfe - Keran 9.050041 38.764325 474099.521 1000392.98 A1_North GF
FTK Fireside Hamza Gulele 9.0504 38.7647 474140.7589 1000432.646 A1_North GF
FTK Fireside Revanth Gulele 9.0496 38.76464 474134.1 1000344 A1_North GF
FTK Fireside Revanth Gulele 9.050476 38.76449 474117.6854 1000441.063 A1_North GF
Nominal Innovis Logesh Nefas Silk 8.96103 38.73503 470872.8812 990554.2826 A1_South GF
FTK Innovis Logesh Nefas Silk 8.960805 38.735162 470887.3736 990529.3966 A1_South GF
FTK I-Engg Revanth Nefas Silk 8.960638 38.732566 470602 990511.1 A1_South RT
FTK Innovis Logesh Nefas Silk 8.961268 38.735011 470870.8115 990580.5969 A1_South GF
Nominal Fireside Logesh Nefas Silk 8.97427 38.72469 469737.3334 992018.9085 A1_South GF
FTK Fireside Logesh Nefas Silk 8.974478 38.725397 469815.0662 992041.8465 A1_South RT
FTK Fireside hamza Nefas Silk 8.973121 38.725086 469780.7679 991891.8445 A1_South RT
FTK ATC Revanth Nefas Silk 8.971416 38.72058 469285.31 991703.7163 A1_South RT
FTK Maktech Logesh Nefas Silk 8.971587 38.722043 469446.1429 991722.4997 A1_South RT
Nominal     Nefas Silk 8.97678 38.73176 470514.6912 992295.8346 A1_South GF
FTK Fireside Revanth Nefas Silk 8.977286 38.731723 470510.665 992351.7801 A1_South GF
FTK Fireside Revanth Nefas Silk 8.9756057 38.73335 470689.3732 992165.8788 A1_South RT
FTK Fireside Nuhamin Nefas Silk 8.97474 38.73104 470435.3821 992070.3537 A1_South RT
FTK Fireside Nuhamin Nefas Silk 8.97664 38.73215 470557.5496 992280.3252 A1_South GF
Colo Fireside Revanth Nefas Silk 8.97678 38.73176 470514.6912 992295.8346 A1_South GF
Nominal Maktech Hamza Akaki - Kalit 8.90186 38.7789 475691.4452 984009.4034 A1_South GF
Colo Maktech Hamza Akaki - Kalit 8.90186 38.7789 475691.4452 984009.4034 A1_South GF
FTK Maktech Hamza Akaki - Kalit 8.902154 38.778284 475623.739 984041.9478 A1_South GF
Nominal Innovis Prashant 40 Init Sites 8.87288 38.80119 478140.383 980804.067 A1_South GF
FTK Innovis Revanth 40 Init Sites 8.876254 38.79624 477596.3215 981177.3813 A1_South GF
FTK Innovis Revanth 40 Init Sites 8.876533 38.79623 477595.2389 981208.2274 A1_South GF
FTK Innovis Prashant 40 Init Sites 8.874898 38.789436 476848.1247 981027.8832 A1_South GF
FTK Innovis Nuhamin 40 Init Sites 8.87274 38.800378 478051.093 980788.6365 A1_South GF
FTK Innovis Nuhamin 40 Init Sites 8.877273 38.802527 478287.648 981289.6656 A1_South RT
Nominal     Kirkos 9.008922 38.762342 473878.6303 995847.0768 A1_South GF
Colo Fireside Hamza Kirkos 9.009766 38.75898 473509.167 995940.63 A1_South RT
Nominal Fireside 9.04333333 38.77916667 475730.1662 999650.3715 A1_North GF
FTK Fireside Hamza Yeka 9.043149 38.779613 475779.2063 999629.9626 A1_North GF
FTK Fireside Hamza Yeka 9.043937 38.77984 475804.2066 999717.0675 A1_North RT
Nominal     Kolfe - Keran 9.02992026 38.70815856 467925.0511 998172.9264 A1_North GF
FTK Innovis Saravanan Kolfe - Keran 9.02996 38.708218 467931.5874 998177.3148 A1_North GF
FTK Innovis Saravanan Kolfe - Keran 9.029525 38.708368 467948.035 998129.2085 A1_North GF
FTK Revanth Kolfe - Keran 9.031273 38.709517 468074.5 998322.4 A1_North GF
Nominal Innovis Logesh Nefas Silk 8.94579808 38.74745087 472237.1124 988869.312 A1_South GF
FTK Innovis Logesh Nefas Silk 8.946764 38.747743 472269.2998 988976.0801 A1_South RT
FTK Innovis Revanth Nefas Silk 8.947264 38.744531 471916.2396 989031.6024 A1_South RT
FTK Innovis Logesh Nefas Silk 8.945108 38.747205 472210.0313 988793.0367 A1_South RT
Nominal     Nefas Silk 8.9514894 38.7594604 473557.7463 989497.6487 A1_South GF
FTK Fireside Hamza Nefas Silk 8.95226 38.761846 473820.0492 989582.6741 A1_South RT
FTK Fireside Hamza Nefas Silk 8.951554211 38.759334456 473543.906 989504.8231 A1_South GF
Nominal Innovis Logesh Nefas Silk 8.96489009 38.72614732 469896.7536 990981.7624 A1_South GF
FTK Innovis Logesh Nefas Silk 8.96532 38.72526 469799.2498 991029.3652 A1_South RT
FTK Innovis Logesh Nefas Silk 8.964231 38.726853 469974.2719 990908.8369 A1_South RT
Nominal     Nefas Silk 8.96594954 38.71287022 468437.3489 991100.0068 A1_South GF
FTK Maktech Logesh Nefas Silk 8.966812 38.712175 468361.0011 991195.4187 A1_South GF
FTK I-Engg Revanth Nefas Silk 8.96557 38.7137 468528.5 991058 A1_South RT
FTK Maktech Nuhamin Nefas Silk 8.967074 38.714307 468595.3843 991224.2022 A1_South RT
Nominal Innovis Logesh Nefas Silk 8.99165989 38.72852337 470160.1311 993941.1916 A1_South GF
FTK Innovis Logesh Nefas Silk 8.992341 38.727966 470098.9222 994016.5394 A1_South RT
FTK Innovis Logesh Nefas Silk 8.993407 38.728043 470107.4733 994134.3883 A1_South RT
FTK Maktech Beakal Nefas Silk 8.99358 38.727511 470049.012 994153.558 A1_South RT
FTK Innovis Logesh Nefas Silk 8.991598 38.728954 470207.4599 993934.3141 A1_South RT
Nominal Innovis Logesh Nefas Silk 8.98784991 38.72278763 469529.3533 993520.4381 A1_South GF
FTK Innovis Logesh Nefas Silk 8.987354 38.722976 469550.0173 993465.5955 A1_South RT
FTK Innovis Logesh Nefas Silk 8.987631 38.722873 469538.7188 993496.2287 A1_South GF
FTK Fireside Beakal Nefas Silk 8.987403 38.721656 469404.928 993471.123 A1_South RT
Nominal Innovis Logesh Yeka 9.03175001 38.78285797 476135.0837 998369.4968 A1_North GF
FTK Innovis Logesh Yeka 9.032205 38.782605 476107.311 998419.8162 A1_North RT
FTK Innovis Logesh Yeka 9.032566 38.78149 475984.7908 998459.8009 A1_North RT
Nominal     Akaki - Kalit 8.951376 38.770285 474747.6811 989484.3516 A1_South GF
FTK Igado Revanth Akaki - Kalit 8.95042 38.76906 474623.6 990384.7 A1_South RT
FTK Igado Nuhamin Akaki - Kalit 8.949518 38.770163 474734.1415 989278.9436 A1_South RT
Colo     Akaki - Kalit 8.950519 38.76915 474622.852 989389.682 A1_South GF
Nominal Innovis Logesh Yeka 9.02354 38.81197 479334.1753 997460.039 A1_North RT
FTK Innovis Logesh Yeka 9.023693 38.812612 479404.7445 997476.9181 A1_North RT
FTK Innovis Logesh Yeka 9.023728 38.811319 479262.6363 997480.8607 A1_North RT
FTK Innovis Logesh Yeka 9.024077 38.812132 479352.0108 997519.3994 A1_North GF
Nominal Innovis Logesh Yeka 9.02473024 38.82380767 480635.2863 997590.9808 A1_North GF
FTK Innovis Logesh Yeka 9.024562 38.82334 480583.8771 997572.4053 A1_North RT
FTK Innovis Logesh Yeka 9.023258 38.823352 480585.1263 997428.2372 A1_North RT
FTK Fireside Beakal Yeka 9.02503 38.824804 480744.806 997624.069 A1_North RT
FTK Innovis Logesh Yeka 9.024382 38.822385 480478.9062 997552.5558 A1_North RT
Nominal     Yeka 9.02437 38.8415 482579.7793 997550.2626 A1_North GF
FTK Fireside Hamza Yeka 9.023283 38.84155 482585.2225 997430.0839 A1_North RT
FTK Fireside Hamza Yeka 9.0255 38.84189 482622.6971 997675.1743 A1_North RT
Nominal Innovis Arun Bole 8.97549 38.896696 488644.6763 992144.0435 A1_South GF
FTK Innovis Arun Bole 8.97411 38.89567 488531.8535 991991.5064 A1_South GF
FTK Innovis Arun Bole 8.9756 38.8961 488579.1665 992156.2233 A1_South GF
FTK Innovis Arun Bole 8.9748 38.8964 488612.118 992067.7682 A1_South GF
Colo Innovis Beakal Bole 8.9768 38.89278 488214.266 992288.997 A1_South GF
FTK Zagwe Logesh Bole 8.974299 38.892413 488173.8437 992012.505 A1_South GF
Nominal     Yeka 9.03941994 38.87484995 486245.7409 999212.7255 A1_North GF
FTK Innovis Hamza Yeka 9.039739 38.874652 486223.9979 999248.0076 A1_North RT
FTK Innovis Hamza Yeka 9.038968 38.874345 486190.2286 999162.7792 A1_North RT
FTK Yeka 9.04123 38.88113 486245.814 999409.5249 A1_North GF
Nominal     Yeka 9.0297 38.8811 486932.2856 998137.882 A1_North GF
FTK Innovis Revanth Yeka 9.029889 38.85493 484056.0726 998159.8172 A1_North GF
FTK Innovis Revanth Yeka 9.027815 38.85384 483936.184 997930.5683 A1_North RT
FTK Maktech Revanth Yeka 9.0287 38.8559 484162.6288 998028.3219 A1_North RT
FTK Maktech Revanth Yeka 9.028593333 38.85719666 484305.1344 998016.473 A1_North RT
Colo Innovis Beakal Yeka 9.0297 38.85437 483994.5173 998138.9463 A1_North GF
Nominal Innovis Revanth Yeka 9.03028 38.8782 486613.5818 998202.1105 A1_North GF
FTK Innovis Revanth Yeka 9.030375 38.878157 486608.8594 998212.615 A1_North RT
FTK Innovis Revanth Yeka 9.0294 38.878157 486608.8235 998104.8213 A1_North RT
Nominal Zagwe Logesh Bole 9.01707 38.89541 488504.6294 996741.0589 A1_South GF
FTK Zagwe Logesh Bole 9.017975 38.896993 488678.6435 996841.0641 A1_South GF
FTK Zagwe Beakal Bole 9.01764 38.894117 488362.535 996804.118 A1_South GF
Colo Zagwe Logesh Bole 9.01707 38.89541 488504.6294 996741.0589 A1_South GF
Nominal Zagwe Logesh Bole 9.01776044 38.88123248 486946.4167 996817.8683 A1_South GF
FTK Zagwe Logesh Bole 9.016936 38.881339 486958.0946 996726.7164 A1_South RT
FTK Zagwe Logesh Bole 9.017451 38.881885 487018.1234 996783.6341 A1_South RT
FTK Maktech Logesh Bole 9.015 38.8806 486876.8019 996512.7035 A1_South RT
Nominal Zagwe Logesh Bole 9.00824 38.79333 477284.5434 995769.6083 A1_South GF
FTK Zagwe Logesh Bole 9.006707 38.794752 477440.7435 995600.035 A1_South RT
FTK Zagwe Logesh Bole 9.008077 38.795424 477514.6894 995751.458 A1_South RT
Nominal Zagwe Logesh Bole 9.00809 38.78028 475850.1789 995753.8603 A1_South GF
FTK Zagwe Logesh Bole 9.008138 38.781117 475942.1787 995759.1119 A1_South RT
FTK Zagwe Logesh Bole 9.007777 38.781236 475955.2344 995719.1927 A1_South RT
Nominal Zagwe Logesh Kirkos 8.98661 38.74672 472159.8755 993381.4534 A1_South GF
FTK Zagwe Logesh Kirkos 8.987892 38.744617 471928.8144 993523.3493 A1_South RT
FTK Zagwe Logesh Kirkos 8.987366 38.746521 472138.0594 993465.0505 A1_South GF
Nominal Innovis   40 Init Sites 8.997239 38.728154 470119.9884 994558.039 A1_South RT
FTK Innovis Revanth 40 Init Sites 8.998033 38.73226 470571.3676 994645.49 A1_South GF
FTK Innovis Revanth 40 Init Sites 8.996265 38.73086 470417.342 994450.1356 A1_South RT
FTK Revanth 40 Init Sites 8.997282 38.729093 470223.2 994562.7 A1_South RT
FTK Innovis Beakal 40 Init Sites 8.995312 38.728947 470206.994 994344.928 A1_South RT
Nominal     Nefas Silk 9.00071996 38.71945937 469164.6038 994943.6091 A1_South GF
FTK Innovis Hamza Nefas Silk 9.000724 38.719322 469149.5051 994944.0673 A1_South RT
FTK Innovis Hamza Nefas Silk 8.999684 38.718685 469079.4009 994829.1402 A1_South RT
FTK Revanth Nefas Silk 8.99969 38.718631 469073.5 994829.8 A1_South RT
Nominal Innovis Jeff Addis Ketema 9.03702986 38.73123179 470461.5211 998957.0065 A1_North GF
FTK Innovis   Addis Ketema 9.036583 38.731321 470471.2892 998907.5951 A1_North GF
FTK Innovis   Addis Ketema 9.037482 38.732448 470595.224 999006.8962 A1_North RT
FTK Fireside Revanth Addis Ketema 9.038 38.7325 470601 999064.2 A1_North GF
Colo Innovis Jeff Addis Ketema 9.03703 38.731232 470461.5442 998957.022 A1_North GF
Nominal Zagwe Jeff Addis Ketema 9.03876 38.71937 469158.0101 999149.2703 A1_North GF
FTK Zagwe Logesh Addis Ketema 9.039337 38.718612 469074.7525 999213.1269 A1_North RT
FTK Zagwe Logesh Addis Ketema 9.04 38.720165 469245.4886 999286.296 A1_North RT
Colo Zagwe Jeff Addis Ketema 9.03876 38.71937 469158.0101 999149.2703 A1_North GF
Nominal     Yeka 9.05887 38.77005 474729.3132 1001368.7 A1_North GF
FTK Fireside Revanth Yeka 9.059266 38.770306 474757.4745 1001412.463 A1_North GF
FTK     Yeka 9.059266 38.770016 474725.6044 1001412.484 A1_North GF
FTK Tesla Revanth Yeka 9.06061 38.770625 474792.6 1001561 A1_North RT
Colo     Yeka 9.05887 38.77005 474729.3132 1001368.7 A1_North GF
Nominal Innovis Revanth Gulele 9.0529 38.7548 473052.9384 1000709.76 A1_North GF
FTK Innovis Revanth Gulele 9.053197 38.75471 473043.0696 1000742.602 A1_North GF
FTK Innovis Revanth Gulele 9.054053 38.75545 473124.4584 1000837.186 A1_North RT
FTK Zagwe Logesh Gulele 9.05451 38.75213 472759.6294 1000887.958 A1_North RT
FTK Zagwe Revanth Gulele 9.05388 38.75438 473006.9 1000818 A1_North GF
Nominal Innovis Prashant Addis Ketema 9.033203767 38.73253111 470604.0113 998533.8941 A1_North RT
FTK Innovis Prashant Addis Ketema 9.033495 38.732553 470606.4408 998566.0907 A1_North RT
FTK Innovis Nuhamin Addis Ketema 9.032408 38.732591 470610.5291 998445.9105 A1_North RT
FTK Innovis   Addis Ketema 9.03277 38.732482 470598.5787 998485.9414 A1_North RT
FTK Addis Ketema 9.033197 38.73259 470610.4831 998533.1412 A1_North RT
Nominal Innovis   14 Moved to ATC9.061409252 38.88997561 487908.8199 1001643.278 A1_North GF
FTK Innovis Revanth 14 Moved to ATC 9.057052 38.87242 485979.3664 1001162.179 A1_North GF
FTK Innovis Revanth 14 Moved to ATC 9.058253 38.87158 485887.0998 1001294.992 A1_North RT
Nominal     Yeka 9.06595898 38.87074914 485796.0938 1002146.981 A1_North GF
FTK Fireside Hamza Yeka 9.065126 38.871681 485898.4674 1002054.852 A1_North GF
FTK Fireside Hamza Yeka 9.066284 38.871681 485898.5126 1002182.878 A1_North GF
FTK Tesla Revanth Yeka 9.064703 38.871164 485841.6 1002008 A1_North RT
Colo Fireside Hamza Yeka 9.06595898 38.87074914 485796.0938 1002146.981 A1_North GF
Nominal Zagwe Logesh Bole 9.01808 38.84426 482882.8263 996854.7239 A1_South GF
FTK Zagwe Logesh Bole 9.018536 38.844368 482894.7179 996905.1332 A1_South RT
FTK Zagwe Logesh Bole 9.018596 38.844072 482862.1877 996911.7805 A1_South GF
996901.641
FTK Fireside Nuhamin Bole 9.018505 38.84576163 483047.9 A1_South RT
FTK Fireside Beakal Bole 9.018071 38.850382 483555.688 996853.448 A1_South RT
Colo Zagwe Logesh Bole 9.01808 38.84426 482882.8263 996854.7239 A1_South GF
Nominal Zagwe logesh Bole 9.013789884 38.8569016 484272.0648 996379.8509 A1_South GF
FTK Zagwe logesh Bole 9.0137 38.857484 484336.0726 996369.8885 A1_South RT
FTK Zagwe logesh Bole 9.015414 38.856316 484207.7719 996559.4345 A1_South RT
Nominal Zagwe Logesh Bole 9.01085015 38.82617024 480894.2196 996056.304 A1_South GF
FTK Zagwe Logesh Bole 9.011802 38.826015 480877.207 996161.5465 A1_South GF
FTK Zagwe Logesh Bole 9.010746 38.824545 480715.582 996044.8747 A1_South GF
FTK Zagwe Revanth Bole 9.010863 38.8263 480908.5 996057.7 A1_South GF
FTK FireSide Revanth Bole 9.01085 38.82691 480975.5 996056.2 A1_South RT
FTK FireSide Revanth Bole 9.012008 38.826175 480894.8 996184.3 A1_South GF
Colo Zagwe Logesh Bole 9.01085015 38.82617024 480894.2196 996056.304 A1_South GF
Nominal Innovis Arun Lideta 9.022466 38.72972 470294.1773 997346.9697 A1_North GF
FTK Innovis Saravanan Lideta 9.022316 38.729977 470332.6342 997332.1264 A1_North GF
Colo Innovis Arun Lideta 9.022399 38.729777 470300.4366 997339.5577 A1_North GF
FTK Innovis Saravanan Lideta 9.022912 38.72992 470316.1954 997396.2626 A1_North GF
FTK Innovis Saravanan Lideta 9.021806 38.73087 470420.5181 997273.9078 A1_North GF
Nominal Innovis Logesh Yeka 9.0152395 38.78365 476221.0509 996544.0743 A1_North RT
FTK Innovis Nuhamin Yeka 9.015494 38.783316 476184.3575 996572.2331 A1_North RT
FTK Innovis Saravanan Yeka 9.015227 38.783067 476156.9724 996542.7303 A1_North RT
FTK Innovis Logesh Yeka 9.015426 38.78359 476214.4684 996564.6973 A1_North RT
FTK Revanth Yeka 9.015075 38.785242 476396 996525.8 A1_North RT
FTK Zagwe Nuhamin Yeka 9.015559 38.784619 476327.5746 996579.3347 A1_North RT
FTK Fireside Nuhamin Yeka 9.0168 38.7862 476501.4226 996716.4353 A1_North RT
Nominal Zagwe Logesh Bole 9.01556013 38.78953694 476868.1055 996579.1449 A1_South GF
FTK Zagwe Logesh Bole 9.015429 38.789141 476824.5794 996564.6725 A1_South RT
FTK Zagwe Beakal Bole 9.0162 38.790743 477000.704 996649.812 A1_South RT
Nominal Zagwe Logesh Bole 9.00502008 38.7900939 476928.6524 995413.823 A1_South GF
FTK Zagwe Logesh Bole 9.003563 38.788718 476777.3299 995252.8182 A1_South RT
FTK Zagwe Logesh Bole 9.00571 38.789522 476865.8369 995490.1352 A1_South RT
FTK Zagwe Revanth Bole 9.004303 38.789113 476820.8 995334.6 A1_South RT
Nominal Zagwe Logesh Bole 8.99791 38.81274 479417.3536 994626.3979 A1_South GF
FTK Zagwe Logesh Bole 8.997057 38.8137 479522.8242 994532.0384 A1_South RT
FTK Zagwe Logesh Bole 8.997276 38.811718 479304.9842 994556.3619 A1_South RT
Nominal     Bole 9.01065027 38.84697073 483180.4159 996033.1844 A1_South GF
FTK Igado Logesh Bole 9.010169 38.84647 483125.4 995980 A1_South RT
FTK Igado Nuhamin Bole 9.007919 38.847128 483197.5755 995731.2144 A1_South RT
FTK Igado Nuhamin Bole 9.010256 38.845979 483071.3954 995989.6406 A1_South RT
FTK Igado Nuhamin Bole 9.010185 38.845679 483038.4187 995981.8049 A1_South RT
FTK XMG Nuhamin Bole 9.007891 38.845816 483053.3696 995728.1793 A1_South RT
Nominal     Yeka 9.02299 38.85369 483919.4844 997397.1339 A1_North GF
FTK Innovis Hamza Yeka 9.022759 38.854412 483998.8274 997371.5634 A1_North RT
FTK Innovis Hamza Yeka 9.023103 38.854551 484014.1197 997409.5892 A1_North RT
FTK Fireside Nuhamin Yeka 9.020457 38.86039 484655.7568 997116.8032 A1_North RT
Nominal Innovis Logesh Kirkos 9.014526 38.76974 474692.1505 996466.1247 A1_South RT
FTK Innovis Logesh Kirkos 9.015616 38.769591 474675.8498 996586.6435 A1_South RT
FTK Innovis Logesh Kirkos 9.013707 38.769317 474645.6013 996375.6069 A1_South RT
FTK Innovis Logesh Kirkos 9.013854 38.768996 474610.3302 996391.8812 A1_South RT
FTK Acme Revanth Kirkos 9.013414 38.76948 474663.4963 996343.2021 A1_South RT
FTK ACME Logesh Kirkos 9.012643 38.76884 474593.1 996258 A1_South RT
FTK Fireside Beakal Kirkos 9.01237 38.76874 474582.089 996227.831 A1_South RT
FTK Acme Sharvendra Kirkos 9.01359 38.76902 474612.9497 996362.6922 A1_South RT
Nominal Innovis Revanth Yeka 9.04028008 38.81961254 480175.0618 999310.364 A1_North GF
FTK Innovis Revanth Yeka 9.040958 38.819452 480157.4552 999385.3222 A1_North RT
FTK Innovis Revanth Yeka 9.041362 38.820363 480257.5981 999429.9382 A1_North RT
Colo Innovis Beakal Yeka 9.04517 38.81816 480015.694 999851.063 A1_North GF
Nominal     Yeka 9.03181 38.8424 482679.0506 998372.7697 A1_North GF
FTK Fireside Hamza Yeka 9.031677 38.842473 482687.0673 998358.062 A1_North GF
FTK Fireside Hamza Yeka 9.032057 38.841547 482585.3137 998400.118 A1_North RT
Nominal Innovis Revanth Kolfe - Keran 8.99117087 38.71490042 468662.6851 993888.263 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.990665 38.71349 468507.611 993832.4556 A1_North RT
FTK Innovis Revanth Kolfe - Keran 8.990744 38.71585 468767.0245 993840.9879 A1_North RT
Nominal Innovis Revanth Yeka 9.03879 38.83116 481444.0779 999145.0162 A1_North GF
FTK Innovis Revanth Yeka 9.038419 38.831396 481469.9959 999103.9872 A1_North RT
FTK Maktech Logesh Yeka 9.040462 38.829803 481295.0262 999329.9383 A1_North RT
FTK Maktech Logesh Yeka 9.040462 38.829803 481295.0262 999329.9383 A1_North RT
FTK Maktech Nuhamin Yeka 9.039172 38.83175 481508.9 999187.2 A1_North RT
Nominal     Bole 8.999102 38.827967 481091.0932 994757.3619 A1_South GF
FTK Innovis Hamza Bole 8.998322 38.827944 481088.5247 994671.1281 A1_South GF
FTK Innovis Hamza Bole 8.999443 38.829081 481213.5558 994795.0048 A1_South RT
Nominal Akaki-Kalit 8.88568 38.757384 473324.7123 982222.0639 A1_South Nominal
Colo Maktech Hamza Akaki-Kalit 8.9463396 38.6853828 465413.922 988934.433 A1_South GF
FTK Maktech Hamza Akaki-Kalit 8.8859 38.75811 473404.5513 982246.3344 A1_South GF
Nominal     Nefas Silk 8.95714998 38.75558062 473131.6594 990123.7514 A1_South GF
FTK Fireside Hamza Nefas Silk 8.957394 38.756216 473201.5232 990150.6834 A1_South GF
FTK Fireside Hamza Nefas Silk 8.957514 38.756735 473258.5845 990163.9126 A1_South GF
FTK I-Engg Revanth Nefas Silk 8.923728 38.744552 471916.7 986429.5 A1_South RT
FTK Fireside Nuhamin Nefas Silk 8.950123 38.753986 472955.8471 989346.98 A1_South RT
FTK Fireside Nuhamin Nefas Silk 8.9499 38.7559 473166.2367 989322.1856 A1_South GF
FTK Fireside Nuhamin Nefas Silk 8.9509 38.7553 473100.3521 989432.7872 A1_South GF
Colo Fireside Hamza Nefas Silk 8.95714998 38.75558062 473131.6594 990123.7514 A1_South GF
Nominal Innovis Hamza Nefas Silk 8.97875 38.76346 473999.3593 992511.2388 A1_South RT
FTK Innovis Hamza Nefas Silk 8.978843 38.763447 473997.9369 992521.5216 A1_South RT
FTK Innovis Hamza Nefas Silk 8.979023 38.76321 473971.8984 992541.4389 A1_South GF
FTK Innovis Hamza Nefas Silk 8.979488 38.764042 474063.3859 992592.7894 A1_South RT
FTK Zagwe Revanth Nefas Silk 8.97852 38.76128 473759.7 992486 A1_South RT
FTK Zagwe Beakal Nefas Silk 8.97621 38.76199 473837.593 992230.526 A1_South RT
Colo Zagwe Beakal Nefas Silk 8.979716667 38.75836111 473438.953 992618.477 A1_South RT
FTK ATC Arun Nefas Silk 8.978753 38.763463 473999.6892 992511.5703 A1_South RT
Nominal Zagwe Logesh Kirkos 8.992876 38.74139 471574.4955 994074.6201 A1_South RT
FTK Zagwe Logesh Kirkos 8.992473 38.742501 471696.5822 994029.9791 A1_South RT
FTK Zagwe Logesh Kirkos 8.992509 38.743656 471823.5395 994033.8702 A1_South RT
Nominal     Nefas Silk 8.9371 38.7409 471516.2905 987908.1701 A1_South Nominal
FTK Fireside Revanth Nefas Silk 8.935849 38.73829 471229.2647 987770.0647 A1_South GF
FTK Fireside Revanth Nefas Silk 8.936976 38.742135 471519.1488 987908.1681 A1_South RT
FTK Fireside Revanth Nefas Silk 8.935586 38.738829 471288.4987 987740.946 A1_South GF
FTK Fireside Beakal Nefas Silk 8.934796 38.74119 471548.213 987653.422 A1_South RT
Nominal Innovis   40 Init Sites 8.994482837 38.84078736 482500.0173 994246.0412 A1_South GF
FTK Innovis Revanth 40 Init Sites 8.997037 38.84685 483166.5167 994528.1393 A1_South RT
FTK Innovis Revanth 40 Init Sites 8.997258 38.84754 483242.3684 994552.5408 A1_South RT
Colo Innovis Revanth 40 Init Sites 8.99664 38.84745 483232.4476 994484.2204 A1_South GF
Nominal Zagwe Arun Addis Ketema 9.020585084 38.72337824 469597.0072 997139.54 A1_North RT
FTK Zagwe Arun Addis Ketema 9.020666 38.723405 469599.9551 997148.4837 A1_North RT
FTK Zagwe Arun Addis Ketema 9.021014 38.722977 469552.9432 997186.9938 A1_North GF
FTK Zagwe Arun Addis Ketema 9.020546 38.722766 469529.7132 997135.2699 A1_North GF
FTK Addis Ketema 9.020578 38.723316 469590.1658 997138.762 A1_North RT
Nominal     Yeka 9.02719 38.784 476260.3004 997865.2761 A1_North GF
FTK Fireside Revanth Yeka 9.02653 38.785254 476398.0803 997792.2264 A1_North RT
FTK Fireside Revanth Yeka 9.028604 38.782018 476042.559 998021.7347 A1_North RT
FTK Zagwe Nuhamin Yeka 9.02587 38.7841 476271.2048 997719.3328 A1_North GF
Colo Fireside Revanth Yeka 9.02719 38.784 476260.3004 997865.2761 A1_North GF
Nominal     Kirkos 9.01651009 38.76601905 474283.3196 996685.7417 A1_South GF
FTK Fireside Revanth Kirkos 9.01591 38.76655 474341.6339 996619.3596 A1_South RT
FTK Fireside Revanth Kirkos 9.016414 38.76542 474217.4713 996675.1604 A1_South RT
FTK Fireside Revanth Kirkos 9.01587 38.76563 474240.5138 996615.0019 A1_South RT
Nominal     Nefas Silk 8.92264962 38.74617077 472094.6285 986310.1645 A1_South GF
FTK Innovis Hamza Nefas Silk 8.922431 38.74527 471995.5828 986286.0625 A1_South GF
FTK Innovis Hamza Nefas Silk 8.922599 38.747343 472223.4976 986304.4797 A1_South GF
FTK I-Engg Revanth Nefas Silk 8.923442 38.746982 472183.9 986397.7 A1_South RT
FTK I-Engg Nuhamin Nefas Silk 8.92269 38.744891 471953.9359 986314.7257 A1_South GF
Nominal Zagwe Logesh Arada 9.026648 38.76938 474653.4286 997806.3361 A1_North GF
FTK Zagwe Logesh Arada 9.026299 38.76881 474590.7573 997767.7909 A1_North GF
FTK Zagwe Logesh Arada 9.026171 38.768579 474565.3598 997753.6555 A1_North GF
FTK Zagwe Logesh Arada 9.026412 38.768064 474508.7747 997780.336 A1_North GF
FTK Arada 9.02663 38.76936 474651.2292 997804.3475 A1_North GF
Nominal Innovis Revanth Yeka 9.03602 38.84012 482428.6717 998838.3271 A1_North GF
FTK Innovis Revanth Yeka 9.036468 38.840197 482437.156 998887.8533 A1_North GF
FTK Innovis Revanth Yeka 9.036102 38.840148 482431.753 998847.3915 A1_North GF
FTK Fireside Revanth Yeka 9.036044 38.840088 482425.156 998840.982 A1_North RT
Nominal Innovis Arun Lideta 8.982632 38.7897 476883.937 992938.669 #N/A GF
FTK Innovis Arun Lideta 9.019997 38.73003 470328.0472 997073.9755 #N/A GF
FTK Innovis Arun Lideta 9.019897 38.72975 470297.2644 997062.9424 #N/A GF
FTK Innovis Arun Lideta 9.019633 38.730053 470330.5454 997033.7304 #N/A GF
FTK Fireside Beakal Lideta 9.02119 38.72984 470307.262 997205.887 #N/A RT
FTK Fireside Nuhamin Bole 8.98254 38.789703 476884.261 992928.497 #N/A GF
FTK Lideta 9.01954 38.73048 470377.469 997023.4138 #N/A GF
Nominal Innovis Arun Lideta 9.010906 38.741252 471560.7354 996067.997 #N/A RT
FTK Innovis Arun Lideta 9.010906 38.741252 471560.7354 996067.997 #N/A RT
FTK Innovis Arun Lideta 9.010805 38.74161 471600.0759 996056.8028 #N/A RT
FTK Innovis Revanth Lideta 9.01162 38.735828 470964.6309 996147.3618 #N/A RT
FTK Innovis Arun Lideta 9.011471 38.740142 471438.7777 996130.549 #N/A RT
FTK Innovis Nuhamin Lideta 9.013142 38.737514 471150.0626 996315.4983 #N/A RT
Nominal Zagwe Logesh Bole 9.01364 38.81229 479368.7836 996365.4977 A1_South GF
FTK Zagwe Logesh Bole 9.011645 38.81212 479349.9855 996144.9444 A1_South RT
FTK Zagwe Logesh Bole 9.01634 38.811919 479328.1603 996664.0249 A1_South RT
FTK Igado Nuhamin Bole 9.0141 38.8095 479062.1599 996416.5129 A1_South RT
Colo Zagwe Logesh Bole 9.01364 38.81229 479368.7836 996365.4977 A1_South GF
Nominal Zagwe logesh Bole 8.99775 38.80545 478616.0623 994609.1262 A1_South GF
Colo Zagwe logesh Bole 8.99775 38.80545 478616.0623 994609.1262 A1_South GF
FTK Zagwe logesh Bole 9.000117 38.8056 478632.6885 994870.8078 A1_South RT
FTK Zagwe logesh Bole 8.998381 38.805326 478602.4699 994678.8954 A1_South GF
FTK Revanth Bole 8.999826 38.804663 478529.7 994838.7 A1_South RT
FTK Zagwe logesh Bole 8.997112 38.805097 478577.2247 994538.611 A1_South GF
Nominal Innovis Arun Addis Ketema 9.026034743 38.73371117 470733.1278 997741.2025 A1_North RT
FTK Innovis Arun Addis Ketema 9.026965 38.733438 470703.1795 997844.0722 A1_North RT
FTK Innovis Arun Addis Ketema 9.027894 38.732588 470609.8338 997946.8494 A1_North RT
FTK Fireside Revanth Addis Ketema 9.02877075 38.73212644 470559.2 998043.8 A1_North RT
Nominal Innovis Revanth Kolfe - Keran 8.99906 38.69558 466539.7469 994762.1822 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.999095 38.695771 466560.7441 994766.0343 A1_North GF
FTK Innovis Revanth Kolfe - Keran 9.000202 38.695597 466541.7204 994888.4387 A1_North RT
FTK Innovis Nuhamin Kolfe - Keran 9.002712 38.693722 466335.8611 995166.113 A1_North RT
Nominal Innovis Prashant Arada 9.040493859 38.73995988 471421.0453 999339.2859 A1_North RT
FTK Innovis Prashant Arada 9.040154 38.740468 471476.8624 999301.6717 A1_North RT
FTK Innovis Prashant Arada 9.040169 38.739719 471394.5463 999303.3888 A1_North GF
FTK Innovis Prashant Arada 9.039638 38.73964 471385.822 999244.6884 A1_North GF
Nominal Innovis   Addis Ketema 9.040441889 38.73423023 470791.3363 999333.9941 A1_North GF
FTK Innovis   Addis Ketema 9.040426 38.734394 470809.3338 999332.2244 A1_North GF
FTK Innovis   Addis Ketema 9.04003 38.734942 470869.5288 999288.3993 A1_North RT
FTK Innovis   Addis Ketema 9.04053 38.73425 470793.5162 999343.734 A1_North GF
Nominal     Yeka 9.02300997 38.78002828 475823.5041 997403.4003 A1_North GF
FTK Fireside Hamza Yeka 9.023064 38.77992 475811.6069 997409.3809 A1_North GF
Colo     Yeka 9.02300997 38.78002828 475823.5041 997403.4003 A1_North GF
Nominal Innovis Arun Arada 9.0386357 38.752258 472772.5032 999132.9096 A1_North RT
FTK Innovis Arun Arada 9.03864 38.752258 472772.5035 999133.385 A1_North RT
FTK Innovis Arun Arada 9.03804 38.751491 472688.1625 999067.1073 A1_North RT
FTK Fireside Nuhamin Arada 9.0397 38.7509 472623.3349 999250.6786 A1_North RT
Nominal Innovis Arun Addis Ketema 9.031498 38.739824 471405.4024 998344.7276 A1_North RT
FTK Innovis Logesh Addis Ketema 9.03235 38.739112 471327.217 998438.9793 A1_North RT
FTK Innovis Arun Addis Ketema 9.0316 38.73899 471313.7493 998356.07 A1_North RT
FTK Innovis Arun Addis Ketema 9.032198 38.739244 471341.7125 998422.1641 A1_North RT
Nominal Innovis Arun Lideta 9.028163 38.745231 471999.4043 997975.596 A1_North RT
FTK Innovis Arun Lideta 9.028101 38.74627 472113.5924 997968.6619 A1_North RT
FTK Innovis Arun Lideta 9.027575 38.744313 471898.4646 997910.6582 A1_North RT
FTK Innovis Arun Lideta 9.028329 38.743917 471855 997994.0498 A1_North RT
FTK Revanth Lideta 9.02829 38.74634 472121.3 997989.6 A1_North RT
FTK Innovis Arun Lideta 9.027092 38.744673 471937.9936 997857.2308 A1_North RT
Nominal     Bole 9.01724 38.82491 480756.0433 996762.8178 A1_South GF
FTK Innovis hamza Bole 9.016728 38.82503 480769.2054 996706.2059 A1_South RT
FTK Innovis hamza Bole 9.016688671 38.825836312 480857.8246 996701.8154 A1_South RT
Nominal     Bole 9.019668 38.819594 480171.8981 997031.5363 A1_South GF
FTK Innovis Hamza Bole 9.018743 38.820246 480243.5082 996929.235 A1_South RT
FTK Innovis hamza Bole 9.019477 38.821305 480359.9413 997010.3274 A1_South RT
FTK Innovis Nuhamin Bole 9.0188 38.8196 480172.5102 996935.5718 A1_South RT
FTK Innovis Beakal Bole 9.018596 38.820452 480266.141 996912.972 A1_South RT
Nominal Innovis Arun Addis Ketema 9.043614 38.719547 469177.8758 999685.9074 A1_North GF
FTK Innovis Arun Addis Ketema 9.043581 38.719427 469164.6848 999682.2691 A1_North GF
FTK Innovis Arun Addis Ketema 9.043307 38.71933 469154.001 999651.9842 A1_North GF
FTK Fireside Revanth Addis Ketema 9.042865 38.716802 468876.1303 999603.3322 A1_North RT
FTK Innovis Arun Addis Ketema 9.043625 38.719336 469154.6874 999687.1414 A1_North GF
Nominal Innovis Logesh Kirkos 9.012143 38.75148 472685.0055 996203.9782 A1_South RT
FTK Innovis Logesh Kirkos 9.0124109 38.751851 472725.8026 996233.5691 A1_South RT
FTK Innovis Logesh Kirkos 9.0130923 38.750834 472614.0742 996308.9795 A1_South RT
FTK Innovis Logesh Kirkos 9.013919 38.750334 472559.1811 996400.4155 A1_South RT
Nominal Innovis Logesh Kirkos 9.0061307 38.77217 474958.6549 995537.7889 A1_South RT
FTK Innovis Logesh Kirkos 9.005736 38.771586 474894.4385 995494.1916 A1_South RT
FTK Innovis Logesh Kirkos 9.0055667 38.772411 474985.1051 995475.4177 A1_South RT
FTK Innovis Logesh Kirkos 9.0060781 38.772848 475033.1723 995531.9272 A1_South RT
FTK Innovis Beakal Kirkos 9.004408 38.770796 474807.515 995347.425 A1_South RT
FTK Innovis Nuhamin Kirkos 9.006627 38.77057 474782.8285 995592.7688 A1_South RT
FTK Innovis Beakal Kirkos 9.006125 38.771192 474851.16 995537.226 A1_South RT
Nominal Zagwe Arun Arada 9.0470769 38.7467 472162.3091 1000066.576 A1_North RT
FTK Zagwe Arun Arada 9.04767 38.746333 472122.0212 1000132.176 A1_North RT
FTK Zagwe Arun Arada 9.047087 38.745948 472079.6645 1000067.75 A1_North RT
FTK Zagwe Arun Arada 9.04666 38.746056 472091.5009 1000020.533 A1_North GF
Nominal Zagwe Arun Arada 9.0349762 38.755193 473094.7978 998728.1033 A1_North RT
FTK Zagwe Arun Arada 9.0353 38.755297 473106.2518 998763.8944 A1_North RT
FTK Zagwe Arun Arada 9.03517 38.754589 473028.43 998749.5741 A1_North GF
FTK Zagwe Nuhamin Arada 9.03298 38.755859 473167.8464 998507.3576 A1_North GF
FTK Innovies Nuhamin Arada 9.0376 38.7554 473117.7425 999018.1712 A1_North GF
FTK Innovies Nuhamin Arada 9.0377 38.7553 473106.7595 999029.2344 A1_North GF
Nominal     Akaki - Kalit 8.90033772 38.76358461 474007.498 983842.1442 A1_South GF
FTK Maktech Hamza Akaki - Kalit 8.9005429 38.763544 474003.0477 983864.8313 A1_South GF
FTK Maktech Hamza Akaki - Kalit 8.8998463237 38.764919322 474154.2082 983787.7233 A1_South GF
FTK     Akaki - Kalit 8.88545 38.757539 473341.7378 982196.6245 A1_South GF
Nominal Innovis Revanth Yeka 9.01320036 38.77835741 475639.2048 996318.9793 A1_North GF
FTK Innovis Hamza Yeka 9.013751 38.779583 475773.9471 996379.7756 A1_North RT
FTK Innovis Beakal Yeka 9.013217 38.77959 475774.6809 996320.7371 A1_North RT
FTK Maktech Sharvendra Yeka 9.013012 38.7758 475358.1051 996298.3259 A1_North RT
FTK Maktech Logesh Yeka 9.012689 38.776599 475445.9021 996262.5619 A1_North RT
Nominal Innovis Revanth Kolfe - Keran 8.99507966 38.67603031 464390.5369 994323.9634 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.994453 38.675833 464368.7879 994254.6998 A1_North GF
FTK Innovis Revanth Kolfe - Keran 8.99521 38.675498 464332.0397 994338.4254 A1_North GF
FTK Tesla Revanth Kolfe - Keran 8.993764 38.675177 464296.6 994178.6 A1_North RT
FTK Innovis Nuhamin Kolfe - Keran 8.992567 38.673271 464087 994046.4358 A1_North RT
Colo Innovis Revanth Kolfe - Keran 8.99507966 38.67603031 464390.5369 994323.9634 A1_North GF
Nominal Maktech Logesh Yeka 9.0207 38.777074 475498.6498 997148.2111 A1_North RT
FTK Maktech Logesh Yeka 9.020683 38.777066 475497.7694 997146.3321 A1_North RT
FTK Maktech Logesh Yeka 9.022716 38.776643 475451.4155 997371.1252 A1_North RT
FTK Maktech Hamza Yeka 9.017297 38.77586 475364.9902 996772.0634 A1_North RT
FTK Fireside Nuhamin Yeka 9.0178 38.77839 475643.095 996827.505 A1_North RT
FTK Maktech Logesh Yeka 9.019894 38.77626 475409.1297 997059.1559 A1_North GF
Nominal     Kirkos 8.99706 38.7647 474136.9604 994535.4689 A1_South GF
FTK   Revanth Kirkos 8.997 38.7665 994528.709 474334.805 A1_South RT
Nominal     Kirkos 9.0066101 38.7634319 473998.2584 995591.3998 A1_South GF
FTK ATC Revanth Kirkos 9.004599 38.76477 474145.1899 995368.9615 A1_South RT
FTK Fireside Revanth Kirkos 9.004599 38.764608 474127.4 995369 A1_South RT
FTK I-Engg Revanth Kirkos 9.004296 38.764608 474127.4 995335.5 A1_South RT
Nominal     Kirkos 9.01731 38.75716 473309.6809 996774.8134 A1_South GF
FTK Igado Revanth Kirkos 9.01531 38.755954 473177 996553.8 A1_South RT
Colo     Kirkos 9.01731 38.75716 473309.6809 996774.8134 A1_South GF
Nominal Zagwe Logesh Addis Ketema 9.02763854 38.74158487 471598.6297 997917.8942 A1_North RT
FTK Zagwe Logesh Addis Ketema 9.027215 38.741755 471617.2951 997871.055 A1_North RT
FTK Zagwe Logesh Addis Ketema 9.026317 38.741082 471543.2574 997771.8259 A1_North RT
Nominal Zagwe Logesh Addis Ketema 9.03022007 38.74214183 471660.045 998203.2609 A1_North RT
FTK Zagwe Logesh Addis Ketema 9.029367 38.740358 471463.9244 998109.0857 A1_North RT
FTK Zagwe Logesh Addis Ketema 9.030066 38.740733 471505.1941 998186.3368 A1_North RT
FTK Zagwe Logesh Addis Ketema 9.02974 38.740846 471517.5879 998150.2859 A1_North RT
Nominal Zagwe Logesh Addis Ketema 9.03399444 38.73875278 471287.867 998620.8144 A1_North RT
FTK Zagwe Logesh Addis Ketema 9.033993 38.738357 471244.3687 998620.6864 A1_North RT
FTK Zagwe Logesh Addis Ketema 9.033435 38.739628 471384.0137 998558.8948 A1_North RT
FTK Zagwe Logesh Addis Ketema 9.032811 38.73858 471268.7839 998489.9886 A1_North RT
Nominal Innovis Prashant 40 Init Sites 8.85666 38.779009 475700.4541 979012.207 A1_South GF
FTK Innovis Revanth 40 Init Sites 8.85141 38.79047 476960.3521 978431.0535 A1_South GF
FTK Innovis Revanth 40 Init Sites 8.850805 38.79091 477008.6965 978364.1392 A1_South GF
FTK I-Engg Revanth 40 Init Sites 8.8575 38.79 476909.1 979104.4 A1_South RT
FTK ATC Revanth 40 Init Sites 8.85762 38.79175 477101.4839 979117.5338 A1_South GF
Nominal     Kirkos 9.00885027 38.74433821 471899.7874 995840.4805 A1_South GF
FTK Igado Revanth Kirkos 9.007475 38.746718 472161.3 995688.3 A1_South RT
Nominal     Bole 9.00718 38.78481 476348.0224 995652.9566 A1_South GF
FTK Innovis Hamza Bole 9.007775 38.784638 476329.1562 995718.7498 A1_South RT
FTK Bole 9.0058972 38.784675 476333.1008 995511.1415 A1_South RT
FTK ACME Beakal Bole 9.005312 38.78493 476361.091 995446.427 A1_South RT
FTK ACME Logesh Bole 9.006572 38.783705 476226.5 995585.8 A1_South RT
Nominal Innovis Revanth Bole 9.000053 38.784467 476309.8586 994865.032 A1_South GF
FTK Innovis Hamza Bole 8.999455 38.784282 476289.4854 994798.9303 A1_South RT
FTK Innovis Hamza Bole 9.000782 38.784508 476314.4125 994945.6261 A1_South RT
FTK Innovis Logesh Bole 8.999437 38.783509 476204.52 994796.9904 A1_South RT
Colo Innovis Hamza Bole 9.000053 38.784467 476309.8586 994865.032 A1_South GF
Nominal     Bole 8.99174 38.79597 477573.6953 993945.2404 A1_South GF
FTK Innovis Hamza Bole 8.991633 38.794073 477365.1759 993933.5272 A1_South RT
FTK Innovis Hamza Bole 8.99333 38.794893 477455.4129 994121.0934 A1_South RT
FTK Zagwe Revanth Bole 8.992967 38.793915 477347.9 994081 A1_South RT
FTK Igado Beakal Bole 8.990888 38.794091 477367.108 993851.161 A1_South RT
FTK Innovis Hamza Bole 8.994532 38.79052 476974.8232 994254.2558 A1_South RT
FTK Innovis Hamza Bole 8.996041 38.79153 477085.9336 994421.0244 A1_South RT
FTK Innovis Nuhamin Bole 8.994645 38.793151 477264.0201 994266.5846 A1_South RT
FTK Innovis Logesh Bole 8.99531 38.79283 477228.7786 994340.1255 A1_South RT
Nominal Zagwe Logesh Addis Ketema 9.029413 38.73885 471298.1895 998114.2896 A1_North RT
FTK Zagwe Logesh Addis Ketema 9.030313 38.738865 471299.9093 998213.7911 A1_North RT
FTK Zagwe Logesh Addis Ketema 9.030154 38.73954 471374.0832 998196.1593 A1_North RT
FTK Zagwe Nuhamin Addis Ketema 9.028941 38.737898 471193.5213 998062.181 A1_North RT
FTK Zagwe Nuhamin Addis Ketema 9.0286385 38.7387039 471282.0709 998028.6735 A1_North RT
FTK Zagwe Beakal Addis Ketema 9.03403 38.73393 470757.823 998625.129 A1_North RT
Nominal Maktech Logesh Addis Ketema 9.034472 38.732944 470649.4927 998674.0749 A1_North RT
FTK Maktech Logesh Addis Ketema 9.03395 38.733848 470748.8044 998616.2908 A1_North RT
FTK Maktech Logesh Addis Ketema 9.0334421 38.732556 470606.7662 998560.2419 A1_North RT
FTK Maktech Hamza Addis Ketema 9.037343 38.738089 471215.1801 998991.0786 A1_North RT
FTK Fireside Revanth Addis Ketema 9.03395 38.7338 470743.529 998616.2946 A1_North RT
FTK Maktech Revanth Addis Ketema 9.03534 38.736396 471028.953 998769.7639 A1_North RT
Nominal     Lideta 9.021782 38.744253 471891.4217 997270.1979 A1_North RT
Nominal Zagwe Logesh Bole 8.98360986 38.78133982 475965.0511 993047.3161 A1_South GF
FTK Zagwe Logesh Bole 8.984391 38.780452 475867.5139 993133.7356 A1_South RT
Nominal Innovis Hamza Bole 9.011117 38.783183 476169.4526 996088.3291 A1_South RT
FTK Innovis Hamza Bole 9.011117 38.783183 476169.4526 996088.3291 A1_South RT
FTK Innovis Hamza Bole 9.011501 38.783251 476176.9517 996130.779 A1_South RT
FTK Innovis Hamza Bole 9.011602 38.782793 476126.619 996141.9752 A1_South RT
FTK Revanth Bole 9.010355 38.784075 476267.4 996004 A1_South RT
FTK Fireside Beakal Bole 9.010321 38.785108 476380.98 996000.2 A1_South RT
FTK Zagwe Logesh Bole 9.012154 38.78114 475945 996203.1 A1_South RT
Nominal Innovis Logesh Yeka 9.05107 38.77344 475101.3274 1000506.111 A1_North GF
FTK Innovis Logesh Yeka 9.05106 38.773508 475108.7999 1000505.001 A1_North GF
FTK Innovis Logesh Yeka 9.050592 38.772312 474977.3279 1000453.341 A1_North GF
FTK Fireside Nuhamin Yeka 9.0512 38.7739 475151.89 1000520.452 A1_North GF
Nominal Maktech Logesh Arada 9.042028 38.766639 474353.2615 999506.9141 A1_North RT
FTK Maktech Logesh Arada 9.042728 38.767183 474413.0977 999584.2668 A1_North GF
FTK Maktech Logesh Arada 9.041034 38.766357 474322.1987 999397.039 A1_North RT
FTK Maktech Logesh Arada 9.041146 38.768138 474517.9428 999409.2966 A1_North RT
FTK Maktech Revanth Arada 9.041205 38.768025 474505.5 999415.8 A1_North RT
Colo Maktech Logesh Arada 9.042028 38.766639 474353.2615 999506.9141 A1_North GF
Nominal     Arada 9.04506 38.78201 476042.767 999841.081 A1_North GF
FTK Maktech Hamza Arada 9.044317 38.781695 476008.0989 999758.957 A1_North GF
FTK Innovies Nuhamin Arada 9.044545 38.783511 476207.6947 999784.0452 A1_North RT
FTK     Arada 9.0449 38.7816 475997.6969 999823.4187 A1_North GF
Nominal Lideta 9.018686 38.738171 471222.7131 996928.3824 A1_North GF
FTK Innovis Hamza Lideta 9.018667 38.738172 471222.8215 996926.2817 A1_North RT
FTK Innovis Hamza Lideta 9.01987 38.738105 471215.5529 997059.2888 A1_North RT
FTK Innovis Hamza Lideta 9.018459 38.738124 471217.5294 996903.2893 A1_North RT
Nominal     Gulele 9.05231526 38.73347758 470709.578 1000646.758 A1_North GF
FTK Innovis Saravanan Gulele 9.052662 38.73146 470487.8757 1000685.256 A1_North RT
Nominal Innovis Prashant 14 Moved to ATC9.051432912 38.87040549 485757.7568 1000541.023 A1_North GF
FTK Innovis Revanth 14 Moved to ATC 9.0472 38.8747 486229.5568 1000072.877 A1_North GF
FTK Innovis Revanth 14 Moved to ATC 9.0455 38.8734 486086.6215 999884.9782 A1_North GF
FTK Innovis Revanth 14 Moved to ATC 9.0442753 38.8731176 486055.5 999749.6 A1_North GF
FTK Revanth 14 Moved to ATC 9.047115 38.87476 486236.1 1000063 A1_North GF
Colo Innovis Revanth 14 Moved to ATC 9.0472 38.87437 486193.2898 1000072.889 A1_North GF
Nominal Fireside Hamza Nefas Silk 8.95956 38.72237 469481.0839 990392.7885 A1_South GF
Colo Fireside Hamza Nefas Silk 8.95956 38.72237 469481.0839 990392.7885 A1_South GF
FTK Fireside Hamza Nefas Silk 8.959796 38.722265 469469.5612 990418.8889 A1_South GF
FTK Fireside Hamza Nefas Silk 8.959509 38.7226 469506.3629 990387.1309 A1_South GF
FTK Fireside Hamza Nefas Silk 8.959114 38.722561 469502.0428 990343.4637 A1_South GF
Nominal Zagwe logesh Bole 8.97184024 38.82809713 481103.9841 991743.3603 A1_South GF
Colo Zagwe logesh Bole 8.97184024 38.82809713 481103.9841 991743.3603 A1_South GF
FTK Zagwe logesh Bole 8.971985 38.829109 481215.2192 991759.3128 A1_South GF
FTK Zagwe Revanth Bole 8.971421 38.824959 480759 991697.2 A1_South GF
FTK Zagwe logesh Bole 8.97218 38.82919 481224.133 991780.8673 A1_South GF
Nominal     Kirkos 9.01207 38.77185 474923.8922 996194.4486 A1_South GF
FTK Zagwe Revanth Kirkos 9.01104 38.77221 474963.4 996080.5 A1_South RT
Colo     Kirkos 9.01207 38.77185 474923.8922 996194.4486 A1_South GF
Nominal     Lideta 9.01293 38.73296 470649.5101 996292.4223 A1_North GF
FTK Innovis Hamza Lideta 9.012924 38.732656 470616.0966 996291.7833 A1_North RT
FTK Tesla Nuhamin Lideta 9.011952 38.734767 470848.0413 996184.1516 A1_North RT
FTK Tesla Nuhamin Lideta 9.01439 38.73278 470629.8441 996453.8521 A1_North RT
Nominal Innovis 40 Init Sites 9.033678473 38.70794903 467902.3549 998588.4483 A1_North RT
FTK Innovis Revanth 40 Init Sites 9.034365 38.70581 467667.3256 998664.5387 A1_North GF
FTK Innovis Revanth 40 Init Sites 9.034373 38.70461 467535.4404 998665.5297 A1_North GF
FTK Fireside Logesh 40 Init Sites 9.03475 38.7038384 467450.7 998707.3 A1_North GF
FTK Fireside Nuhamin 40 Init Sites 9.03564 38.705641 467648.8654 998805.5162 A1_North RT
Colo Innovis Revanth 40 Init Sites 9.03365 38.70483 467559.5548 998585.5761 A1_North GF
Nominal     Bole 8.99298 38.77773 475568.8886 994083.4979 A1_South GF
FTK STEP office Logesh Bole 8.993507 38.776892 475476.8137 994141.818 A1_South Rt
FTK Innovis Hamza Bole 8.9925 38.7768 475466.6336 994030.4922 A1_South RT
FTK Innovis Hamza Bole 8.9929 38.7781 475609.5525 994074.6287 A1_South RT
Nominal Fireside Logesh Yeka 9.02386337 38.77577475 475356.0658 997498.0348 A1_North GF
FTK Fireside Logesh Yeka 9.023957 38.775876 475367.2003 997508.3796 A1_North GF
FTK Fireside Logesh Yeka 9.024112 38.775039 475275.2182 997525.5726 A1_North GF
FTK Tesla Logesh Yeka 9.025621 38.776648 475452.1614 997692.2964 A1_North RT
Nominal Zagwe Revanth Arada 9.02481 38.752189 472763.882 997604.3675 A1_North GF
FTK Zagwe Revanth Arada 9.02533 38.752657 472815.3577 997661.823 A1_North GF
FTK Zagwe Revanth Arada 9.02556 38.752296 472775.6984 997687.2783 A1_North GF
FTK Zagwe Hamza Arada 9.024477 38.755121 473086.106 997567.3343 A1_North RT
FTK Zagwe Hamza Arada 9.023851 38.755681 473147.608 997498.0835 A1_North RT
FTK Zagwe Arun Arada 9.02702 38.754149 472979.4652 997848.5559 A1_North RT
FTK Fireside Revanth Arada 9.023531 38.751619 472701.1 997463 A1_North RT
Nominal     Agnewak 8.23262 34.58284 674348.7875 910359.4311 A2_West GF
FTK ATC Revanth Agnewak 8.228894 34.58294 674361.4353 909947.4031 A2_West GF
Nominal     Agnewak 8.2456 34.60615 676911.2449 911805.1884 A2_West GF
FTK Prashant Agnewak 8.245603 34.606151 676911.3537 911805.5206 A2_West GF
Nominal     Agnewak 8.24103 34.58352 674420.0238 911289.8198 A2_West GF
FTK Zagwe Logesh Agnewak 8.240543 34.584147 674489.3 911236.2 A2_West GF
Nominal     Agnewak 8.264376 34.586197 674704.6973 913872.913 A2_West GF
FTK Zagwe Revanth Agnewak 8.270128 34.587402 674834.9 914509.6 A2_West GF
Nominal     Agnewak 8.25503 34.59369 675534.3171 912842.5927 A2_West GF
FTK Zagwe Revanth Agnewak 8.25645 34.591338 675274.6 912998.6 A2_West GF
Nominal     Agnewak 8.2488 34.59782 675992.0812 912155.4094 A2_West GF
FTK Zagwe Revanth Agnewak 8.247111 34.59537 675722.9 911967.5 A2_West GF
Nominal     Agnewak 8.23863 34.60052 676294.0538 911031.8546 A2_West GF
FTK ATC Revanth Agnewak 8.236031 34.60221 676481.4026 910745.1652 A2_West GF
Nominal     Agnewak 8.25276 34.58876 674992.1756 912589.378 A2_West GF
FTK Zagwe Beakal Agnewak 8.25153 34.58605 674694.153 912452.16 A2_West GF
FTK Zagwe Revanth Agnewak 8.25386 34.5831 674368.1 912708.6 A2_West GF
Nominal     Gedeo 6.41729 38.31054 423756.077 709384.3619 A2_West GF
FTK Zagwe Logesh Gedeo 6.42396 38.28085 420473.6781 710126.2583 A2_West GF
FTK ATC Gedeo 6.42416 38.28026 420408.4614 710148.4604 A2_West GF
Nominal     Jimma 7.85504 36.58598 233807.5317 869039.1049 A2_West GF
FTK Innovies Nuhamin Jimma 7.85114 36.58425 233614.2 868608.7 A2_West GF
FTK Innovies Nuhamin Jimma 7.85819 36.5886 234098.6 869385.9744 A2_West GF
Nominal     West Arsi 7.07313 38.7911 476930.3413 781838.3444 A2_East GF
FTK Adrian Revanth West Arsi 7.073716 38.791331 476955.9 781903.1 A2_East GF
Nominal     West Guji 5.6568 38.2413 415981.6613 625321.5761 A2_West GF
FTK Zagwe Logesh West Guji 5.636536 38.239458 415774.7406 623081.6492 A2_West GF
Nominal Innovis Revanth East Shewa 8.5245 39.2534 527887.709 942292.0529 A2_East GF
FTK Innovis Revanth East Shewa 8.5244 39.2541 527964.7546 942281.0479 A2_East GF
FTK Innovis Revanth East Shewa 8.52428 39.25431 527987.8749 942267.7965 A2_East GF
FTK Zagwe Logesh East Shewa 8.53232 39.25548 528116.0513 943156.7478 A2_East GF
FTK Zagwe Revanth East Shewa 8.53162 39.25555 528123.8 943079.4 A2_East GF
Nominal     Ilu Aba Bora 8.30756 35.58373 784600.5028 919227.0031 A2_West GF
FTK Zagwe Revanth Ilu Aba Bora 8.305925 35.583766 784605.7 919046.1 A2_West GF
Nominal     Ilu Aba Bora 8.29745 35.5831 784538.3507 918107.7608 A2_West GF
FTK Zagwe Revanth Ilu Aba Bora 8.29619 35.58227 784447.8 917967.7 A2_West GF
Nominal     Finfine Special 8.821479 38.869749 485676.6316 975118.0089 A2_East GF
FTK Innovis Hamza Finfine Special 8.821604 38.868692 485560.4007 975131.8691 A2_East GF
FTK Innovis Hamza Finfine Special 8.821122 38.870695 485780.6473 975078.5041 A2_East GF
FTK Zagwe Revanth Finfine Special 8.81881 38.86963 485663.4425 974822.9384 A2_East GF
Nominal Innovis Revanth East Shewa 8.74342 38.95506 495057.0336 966485.9216 A2_East GF
FTK Innovis Revanth East Shewa 8.743499 38.955038 495054.6148 966494.6558 A2_East GF
FTK Innovis Revanth East Shewa 8.742738 38.955578 495113.9997 966410.5159 A2_East GF
FTK Innovis Revanth East Shewa 8.745927 38.964507 496096.1387 966762.974 A2_East GF
Nominal     Arsi 7.92034 39.13117 514457.6317 875493.6341 A2_East GF
FTK Adrian Revanth Arsi 7.915744 39.128197 514130.1 874985.4 A2_East GF
FTK Innovis Hamza Arsi 7.9206528 39.130866 514424.1137 875528.204 A2_East GF
FTK Innovis Hamza Arsi 7.9208819848 39.130830467 514420.1892 875553.5395 A2_East GF
FTK Adrian Nuhamin Arsi 7.91986 39.13032 514363.9607 875440.54 A2_East GF
Nominal     Arsi 7.94573 39.1249 513765.7031 878300.3226 A2_East GF
FTK Innovis Hamza Arsi 7.9453305 39.125149 513793.1597 878256.1655 A2_East GF
FTK Innovis Hamza Arsi 7.9460132 39.1265101 513943.1491 878331.6846 A2_East GF
FTK Adrian Revanth Arsi 7.941665 39.122513 513502.7552 877850.8522 A2_East GF
Nominal     Arsi 7.95938 39.13064 514397.8553 879809.5466 A2_East GF
FTK Innovis Hamza Arsi 7.960528 39.13202 514549.9051 879936.5081 A2_East RT
FTK Adrian Revanth Arsi 7.953056 39.12722 514021.2 879110.3 A2_East GF
FTK Adrian Nuhamin Arsi 7.95907 39.12889 514204.9979 879775.2151 A2_East GF
Nominal Innovis Revanth East Shewa 8.57932 39.28573 531441.2903 948355.2098 A2_East GF
FTK Innovis Revanth East Shewa 8.579293 39.285926 531462.8603 948352.2409 A2_East GF
FTK Innovis Revanth East Shewa 8.579506 39.285765 531445.1264 948375.7761 A2_East GF
FTK I-Engg Beakal East Shewa 8.579338 39.285601 531427.094 948357.189 A2_East GF
Colo Innovis Revanth East Shewa 8.57932 39.28573 531441.2903 948355.2098 A2_East GF
Nominal     West Arsi 7.19745 38.61256 457224.7764 795594.5109 A2_West GF
FTK ATC West Arsi 7.195916 38.60793 456713.4492 795425.3629 A2_West GF
Nominal Innovis Revanth East Shewa 8.50517 39.260475 528667.7854 940155.533 A2_East GF
FTK Innovis Revanth East Shewa 8.5051605 39.2600456 528620.5261 940154.4509 A2_East GF
FTK Innovis Revanth East Shewa 8.505374 39.259128 528519.519 940177.9868 A2_East GF
FTK Innovis Revanth East Shewa 8.5049 39.25243 527782.4 940125.1 A2_East GF
FTK Innovis Revanth East Shewa 8.503903 39.251971 527731.9234 940014.8403 A2_East GF
Nominal Innovis Revanth East Shewa 8.5442 39.26951 529659.1724 944471.199 A2_East GF
FTK Innovis Revanth East Shewa 8.544665 39.269023 529605.5426 944522.57 A2_East RT
FTK Innovis Revanth East Shewa 8.544558 39.270352 529751.8062 944510.8428 A2_East RT
Nominal Innovis Revanth East Shewa 8.501086 39.28793 531689.8317 939706.1624 A2_East GF
FTK Innovis Revanth East Shewa 8.501063 39.287333 531624.1267 939703.5709 A2_East GF
FTK Innovis Revanth East Shewa 8.500911 39.286749 531559.863 939686.7188 A2_East GF
FTK Innovis Revanth East Shewa 8.50179 39.29283 532229.1 939784.4 A2_East GF
FTK Innovis Revanth East Shewa 8.502151 39.293603 532314.1231 939824.3727 A2_East GF
Nominal Innovis Revanth East Shewa 8.56632 39.16768 518451.8284 946910.325 A2_East GF
FTK Innovis Revanth East Shewa 8.566404 39.16772 518456.226 946919.6136 A2_East GF
FTK Innovis Revanth East Shewa 8.566791 39.167562 518438.8207 946962.3908 A2_East GF
FTK Innovis Revanth East Shewa 8.566815 39.167575 518440.2501 946965.0448 A2_East GF
FTK Zagwe Revanth East Shewa 8.56632 39.16768 518451.8284 946910.325 A2_East GF
FTK Prashant East Shewa 8.566318 39.167677 518451.4984 946910.1038 A2_East GF
Nominal Innovis Revanth East Shewa 8.5774 39.14508 515964.4133 948134.2639 A2_East GF
FTK Innovis Revanth East Shewa 8.577125 39.144442 515894.2199 948103.8348 A2_East GF
FTK Innovis Revanth East Shewa 8.577058 39.145054 515961.5666 948096.453 A2_East GF
FTK Innovis Revanth East Shewa 8.57689 39.145061 515962.3438 948077.88 A2_East GF
FTK Prashant East Shewa 8.577401 39.145079 515964.3032 948134.3744 A2_East GF
Nominal Innovis Revanth East Shewa 8.58122 39.13179 514501.8516 948556.0572 A2_East RT
FTK Innovis Revanth East Shewa 8.58099 39.131923 514516.4953 948530.6345 A2_East RT
FTK Innovis Revanth East Shewa 8.581359 39.131606 514481.5994 948571.4174 A2_East GF
FTK Innovis Revanth East Shewa 8.580762 39.132081 514533.89 948505.434 A2_East GF
FTK Zagwe Beakal East Shewa 8.58205 39.13072 514384.08 948647.778 A2_East GF
FTK Zagwe Logesh East Shewa 8.580409 39.13095 514409.4504 948466.3654 A2_East GF
Nominal Innovis Revanth East Shewa 8.60565 39.12105 513319.1937 951256.5285 A2_East GF
FTK Innovis Revanth East Shewa 8.60562 39.121226 513338.5601 951253.2179 A2_East GF
FTK Innovis Revanth East Shewa 8.607125 39.121971 513420.48 951419.6295 A2_East GF
FTK Innovis Revanth East Shewa 8.607144 39.121232 513339.1669 951421.7042 A2_East GF
Colo Beakal East Shewa 8.60871 39.1246 513709.692 951594.953 A2_East GF
FTK Prashant East Shewa 8.605646 39.121053 513319.5239 951256.0864 A2_East GF
Nominal Innovis Revanth East Shewa 8.74813 38.97435 497178.7831 967006.4404 A2_East GF
FTK Innovis Revanth East Shewa 8.74803 38.973938 497133.4669 966995.388 A2_East RT
FTK Innovis Revanth East Shewa 8.748104 38.974316 497175.0433 967003.5662 A2_East RT
Nominal Innovis Revanth East Shewa 8.55241 39.26979 529689.3509 945378.8833 A2_East GF
FTK Innovis Revanth East Shewa 8.552475 39.270457 529762.7472 945386.1209 A2_East GF
FTK Innovis Revanth East Shewa 8.552147 39.270993 529821.7578 945349.9 A2_East GF
Nominal Innovis Revanth East Shewa 8.554939 39.296608 532640.3775 945660.6488 A2_East RT
FTK Innovis Revanth East Shewa 8.55501 39.296774 532658.6392 945668.5124 A2_East RT
FTK Innovis Revanth East Shewa 8.554749 39.296701 532650.628 945639.6511 A2_East GF
FTK Zagwe Hamza East Shewa 8.55347 39.29728 532714.4541 945498.299 A2_East RT
FTK Innovis Revanth East Shewa 8.555177 39.296731 532653.893 945686.9716 A2_East GF
Nominal Innovis Revanth East Shewa 8.55441 39.28448 531305.778 945601.158 A2_East GF
FTK Innovis Revanth East Shewa 8.554112 39.284072 531260.9034 945568.1792 A2_East GF
FTK Innovis Revanth East Shewa 8.553803 39.284788 531339.722 945534.0756 A2_East GF
FTK I-Engg Revanth East Shewa 8.554 39.2856 531429.1 945555.9 A2_East RT
Nominal Innovis Revanth East Shewa 8.53411 39.23894 526295.6604 943353.4767 A2_East GF
FTK Innovis Revanth East Shewa 8.5326 39.2385 526247.3407 943186.5081 A2_East RT
FTK Innovis Revanth East Shewa 8.5333 39.2391 526313.3242 943263.9377 A2_East GF
FTK I-Engg Beakal East Shewa 8.5352 39.2353 525894.998 943473.736 A2_East GF
Nominal Innovis Revanth East Shewa 8.53521 39.27644 530422.5263 943477.8425 A2_East GF
FTK Innovis Revanth East Shewa 8.53476 39.276834 530465.9224 943428.1235 A2_East GF
FTK Innovis Revanth East Shewa 8.535309 39.277087 530493.722 943488.8385 A2_East GF
FTK Zagwe Revanth East Shewa 8.53503 39.27547 530315.8 943457.9 A2_East GF
FTK Revanth East Shewa 8.535665 39.275969 530370.7 943528.1 A2_East GF
FTK Zagwe Nuhamin East Shewa 8.535298 39.275454 530314.0081 943487.4938 A2_East GF
Nominal     Arsi 8.33149 39.32213 535469.3794 920959.3518 A2_East GF
FTK Innovis Hamza Arsi 8.331707 39.321893 535443.2638 920983.321 A2_East GF
FTK Adrian Revanth Arsi 8.331807 39.321893 535443.3 920994.4 A2_East GF
FTK Innovis Hamza Arsi 8.331609 39.324284 535706.5457 920972.7018 A2_East GF
Nominal     Arsi 8.13499 39.23373 525748.3815 899228.7076 A2_East GF
FTK Innovis Hamza Arsi 8.13515 39.232953 525662.7743 899246.3468 A2_East GF
FTK Innovis hamza Arsi 8.134927 39.232297 525590.5212 899221.6519 A2_East GF
FTK Adrian Revanth Arsi 8.13515 39.232953 525662.8 899246.3 A2_East GF
Nominal     West Arsi 7.194342 38.59732 455541.8787 795252.3747 A2_West GF
FTK ATC Revanth West Arsi 7.236215 38.609912 456936.0856 799880.2327 A2_West GF
FTK Zagwe Beakal West Arsi 7.193209 38.598656 455689.273 795126.992 A2_West GF
Nominal     West Arsi 7.2033 38.6117 457130.3762 796241.3087 A2_West GF
FTK Zagwe Revanth West Arsi 7.29522 38.67376 463989.3889 806397.6588 A2_West GF
FTK Revanth West Arsi 7.203034 38.609542 456892.1 796212.1 A2_West RT
FTK Revanth West Arsi 7.202059 38.611828 457144.4 796104.1 A2_West RT
Nominal     West Arsi 7.21396 38.60861 456790.2349 797420.0632 A2_West GF
FTK ATC West Arsi 7.18535 38.655 461909.4051 794253.1108 A2_West GF
Nominal     West Arsi 7.20677 38.62111 458169.605 796624.0446 A2_West GF
FTK ATC West Arsi 7.17016 38.6545 522647.325 46324585969 A2_West GF
Nominal Innovis Revanth East Shewa 8.56769 39.26646 529321.7253 947067.9208 A2_East GF
FTK Innovis Revanth East Shewa 8.56769 39.26646 529321.7253 947067.9208 A2_East RT
FTK Innovis Revanth East Shewa 8.56769 39.26646 529321.7253 947067.9208 A2_East GF
FTK Fireside Revanth East Shewa 8.568166 39.265986 499131.0735 966350.7581 A2_East RT
FTK Fireside Revanth East Shewa 8.568241 39.2639 529040 947128.6 A2_East RT
Colo Innovis Revanth East Shewa 8.56769 39.26646 529321.7253 947067.9208 A2_East GF
Nominal Innovis Revanth East Shewa 8.75475 38.97354 497089.7435 967738.3257 A2_East GF
FTK Innovis Revanth East Shewa 8.75484 38.973207 497053.1185 967748.2783 A2_East GF
FTK Innovis Revanth East Shewa 8.754968 38.973878 497126.9208 967762.4243 A2_East GF
FTK Fireside Revanth East Shewa 8.756628 38.974341 497177.9 967945.9 A2_East RT
Nominal     Jimma 7.67695 36.81762 259261.4778 849197.169 A2_West GF
FTK ATC Jimma 7.674814 36.81371 258828.7574 848963.0663 A2_West GF
FTK Jimma 7.67488 36.81312 258763.681 848970.7 A2_West GF
Nominal Innovis Revanth East Shewa 8.827494 38.856618 484232.9018 975783.5351 A2_East GF
FTK Innovis Revanth East Shewa 8.827494 38.85662 484233.1217 975783.535 A2_East GF
FTK Innovis Revanth East Shewa 8.828076 38.856743 484246.6722 975847.8737 A2_East GF
FTK Innovis Revanth East Shewa 8.823006 38.86588 485251.2275 975286.9791 A2_East GF
FTK Innovis Revanth East Shewa 8.827706 38.856923 484266.4504 975806.9602 A2_East GF
FTK Zagwe Logesh East Shewa 8.82559 38.85396 483940.5301 975573.1487 A2_East GF
Nominal Innovis Revanth East Shewa 8.5979 39.1142 512565.7391 950399.495 A2_East GF
FTK Innovis Revanth East Shewa 8.596876 39.115247 512680.9775 950286.3211 A2_East GF
FTK Innovis Revanth East Shewa 8.597167 39.115961 512759.5315 950318.5163 A2_East GF
FTK Zagwe Abhishek East Shewa 8.59907 39.11449 512597.61 950528.8539 A2_East GF
Nominal Innovis Revanth East Shewa 8.77412 38.99318 499249.9274 969879.6965 A2_East GF
FTK Innovis Revanth East Shewa 8.7732 38.9932 499252.1252 969777.9851 A2_East GF
FTK Innovis Revanth East Shewa 8.7736 38.9934 499274.1223 969822.207 A2_East GF
FTK Fireside Revanth East Shewa 8.77311 38.9931 499241.1268 969768.0352 A2_East GF
Nominal Innovis Revanth East Shewa 8.74919 38.95871 495458.5683 967123.7824 A2_East GF
FTK Innovis Revanth East Shewa 8.748738 38.957971 495377.2811 967073.8202 A2_East GF
FTK Innovis Revanth East Shewa 8.749159 38.958005 495381.026 967120.364 A2_East GF
FTK Fireside Revanth East Shewa 8.748065 38.95959 495555.345 966999.397 A2_East GF
Nominal Innovis Revanth East Shewa 8.54866 39.29126 532052.374 944966.0187 A2_East GF
FTK Innovis Revanth East Shewa 8.549278 39.29109 532033.6142 945034.3282 A2_East GF
FTK Innovis Revanth East Shewa 8.547716 39.291881 532120.793 944861.7056 A2_East GF
Nominal Innovis Revanth East Shewa 8.55323 39.27785 530576.2641 945470.1695 A2_East GF
FTK Innovis Revanth East Shewa 8.553243 39.277837 530574.8325 945471.6057 A2_East RT
FTK Innovis Revanth East Shewa 8.554067 39.277599 530548.5757 945562.6848 A2_East GF
FTK Zagwe Beakal East Shewa 8.551051 39.280931 530915.494 945229.514 A2_East RT
FTK Innovis Revanth East Shewa 8.553125 39.278329 530628.9849 945458.5991 A2_East RT
Nominal Innovis Revanth East Shewa 8.50565 39.277667 530559.9065 940209.9139 A2_East GF
FTK Innovis Revanth East Shewa 8.504725 39.277566 530548.8637 940107.642 A2_East GF
FTK Innovis Revanth East Shewa 8.504686 39.27687 530472.2646 940103.2755 A2_East GF
FTK Zagwe Logesh East Shewa 8.51127 39.27789 530584.0041 940831.2539 A2_East GF
FTK Innovis Revanth East Shewa 8.511404 39.278333 530632.7495 940846.1034 A2_East GF
Nominal Innovis Revanth East Shewa 8.5358 39.2519986 527732.6632 943541.2292 A2_East GF
FTK Innovis Revanth East Shewa 8.536068 39.252253 527760.641 943570.8764 A2_East RT
FTK Innovis Revanth East Shewa 8.5359 39.2511 527633.7637 943552.2203 A2_East GF
Nominal Innovis Revanth East Shewa 8.51269 39.24459 526918.9523 940985.7693 A2_East GF
FTK Innovis Revanth East Shewa 8.513095 39.245883 527061.2289 941030.6344 A2_East GF
FTK Innovis Revanth East Shewa 8.512957 39.243453 526793.7976 941015.2087 A2_East GF
FTK Zagwe Logesh East Shewa 8.523883 39.25078 527599.4097 942223.6521 A2_East GF
Nominal     Jimma 7.75801 37.22344 304080.3737 857955.7773 A2_West GF
FTK Innovis Revanth Jimma 7.759143 37.223148 304048.7 858081.2 A2_West GF
Nominal Innovis Revanth East Shewa 8.56863 39.2793 530734.5965 947172.8459 A2_East GF
FTK Innovis Revanth East Shewa 8.568812 39.280147 530827.7877 947193.0349 A2_East GF
FTK Innovis Revanth East Shewa 8.568407 39.279735 530782.4828 947148.2267 A2_East GF
FTK Fireside Revanth East Shewa 8.566683 39.27899 530700.6395 946957.5687 A2_East GF
Nominal Innovis Revanth East Shewa 8.54063 39.2634 528987.041 944076.0506 A2_East RT
FTK Zagwe Logesh East Shewa 8.540071 39.263745 529025.0506 944014.276 A2_East RT
FTK Innovis Revanth East Shewa 8.539953 39.263773 529028.1409 944001.2325 A2_East RT
FTK Zagwe Beakal East Shewa 8.539474 39.258427 528439.847 943947.878 A2_East RT
FTK Fireside Beakal East Shewa 8.53938 39.2575 528337.837 943937.418 A2_East RT
FTK Fireside Beakal East Shewa 8.53954 39.261738 528804.219 943955.421 A2_East RT
Nominal Innovis Revanth East Shewa 8.52015 39.27952 530762.6907 941813.1173 A2_East GF
FTK Innovis Revanth East Shewa 8.51955 39.27937 530746.2302 941746.772 A2_East GF
FTK Innovis Revanth East Shewa 8.51929 39.28003 530818.8883 941718.08 A2_East GF
FTK Innovis Revanth East Shewa 8.5254843 39.281946 531029.2571 942403.0485 A2_East GF
Nominal Innovis Revanth East Shewa 8.55604 39.26154 528781.1915 945779.5745 A2_East GF
FTK ATC Revanth East Shewa 8.55784 39.26438 529093.5851 945978.7883 A2_East GF
FTK Innovis Revanth East Shewa 8.5567 39.2619 528820.7584 945852.5682 A2_East GF
FTK Innovis Revanth East Shewa 8.5545 39.2608 528699.8729 945609.2635 A2_East GF
FTK Innovis Beakal East Shewa 8.55924 39.264142 529067.288 946133.548 A2_East RT
Nominal Innovis Revanth East Shewa 8.53346 39.26137 528764.1758 943283.2149 A2_East GF
FTK Innovis Revanth East Shewa 8.533175 39.26196 528829.128 943251.7506 A2_East GF
FTK Innovis Revanth East Shewa 8.532685 39.261592 528788.6654 943197.5509 A2_East GF
FTK I-Engg Revanth East Shewa 8.53331 39.26072 528692.7 943266.6 A2_East GF
Nominal Innovis Revanth East Shewa 8.546622 39.270589 529777.7277 944739.0481 A2_East GF
FTK Innovis Revanth East Shewa 8.548212 39.264255 529080.5595 944914.3482 A2_East GF
FTK Zagwe Logesh East Shewa 8.547035 39.269455 529652.9007 944784.6203 A2_East RT
FTK Innovis Revanth East Shewa 8.54787 39.26726 529411.2803 944876.7661 A2_East RT
Nominal Innovis Revanth East Shewa 8.5283318 39.2713165 529859.2096 942717.0184 A2_East GF
FTK Innovis Revanth East Shewa 8.528516 39.270511 529770.547 942737.3206 A2_East GF
FTK Innovis Revanth East Shewa 8.527777 39.27112 529837.627 942655.6669 A2_East GF
Nominal     East Shewa 8.14615 38.81595 479725.0947 900459.654 A2_East GF
FTK Adrian Beakal East Shewa 8.146901 38.816095 479741.106 900542.672 A2_East GF
FTK Innovis Hamza East Shewa 8.146467 38.815075 479628.7206 900494.7432 A2_East GF
FTK Innovis Hamza East Shewa 8.146843 38.815878 479717.198 900536.2708 A2_East GF
Nominal Innovis Revanth East Shewa 8.75862 38.94557 494013.4677 968166.5073 A2_East GF
FTK Innovis Revanth East Shewa 8.759536 38.944997 493950.4606 968267.7856 A2_East RT
FTK Innovis Revanth East Shewa 8.759338 38.945358 493990.1623 968245.8897 A2_East RT
FTK Innovis Revanth East Shewa 8.759097 38.945564 494012.8155 968219.2425 A2_East RT
Nominal Innovis Revanth East Shewa 8.75216 38.96679 496347.3058 967452.0451 A2_East GF
FTK Innovis Revanth East Shewa 8.752373 38.967043 496375.1347 967475.591 A2_East GF
FTK Innovis Revanth East Shewa 8.750931 38.965622 496218.8276 967316.1836 A2_East RT
FTK Innovis Sharvendra East Shewa 8.751567 38.96374 496011.8367 967386.5165 A2_East RT
Nominal Innovis Revanth East Shewa 8.74279 38.96728 496401.1098 966416.1331 A2_East GF
FTK Innovis Revanth East Shewa 8.74302 38.96731 496404.4117 966441.5606 A2_East GF
FTK Innovis Revanth East Shewa 8.74306 38.967672 496444.2287 966445.9794 A2_East GF
FTK Zagwe Logesh East Shewa 8.742906 38.973626 497099.1107 966428.9028 A2_East GF
Nominal Innovis Revanth East Shewa 8.74379 38.99247 499171.7735 966526.5409 A2_East GF
FTK Innovis Revanth East Shewa 8.7422 38.9921 499131.0735 966350.7581 A2_East RT
FTK Innovis Revanth East Shewa 8.7421 38.9924 499164.0705 966339.7019 A2_East GF
FTK Fireside Revanth East Shewa 8.742006 38.992073 499128.1 966329.3 A2_East GF
FTK Fireside Beakal East Shewa 8.7425 38.9909 498999.085 966383.928 A2_East GF
Nominal Innovis Revanth East Shewa 8.76431 38.99958 499953.8066 968795.1368 A2_East GF
FTK Innovis Revanth East Shewa 8.76535 38.999543 499949.7374 968910.1149 A2_East GF
FTK Innovis Revanth East Shewa 8.7641 39.0003 500032.9953 968771.9201 A2_East GF
FTK Fireside Revanth East Shewa 8.763989 39.000422 500046.4 968759.6 A2_East GF
Nominal Innovis Revanth East Shewa 8.78785 38.9029 489321.2016 971399.0049 A2_East GF
FTK Innovis Revanth East Shewa 8.787885 38.902728 489302.2864 971402.8793 A2_East GF
FTK Innovis Revanth East Shewa 8.787762 38.903602 489398.4032 971389.2561 A2_East GF
FTK Innovis Revanth East Shewa 8.789107 38.902558 489283.6254 971537.9837 A2_East GF
FTK Prashant East Shewa 8.787872 38.902905 489321.7521 971401.437 A2_East GF
Nominal     East Shewa 8.29696 38.94883 494365.2626 917127.863 A2_East GF
FTK Innovis Hamza East Shewa 8.297803 38.948378 494315.5014 917221.0658 A2_East RT
FTK Innovis Hamza East Shewa 8.299632 38.950572 494557.1249 917423.2368 A2_East RT
FTK Innovis Hamza East Shewa 8.296938 38.949355 494423.0742 917125.4234 A2_East GF
Nominal Innovis Revanth East Shewa 8.68992 39.03365 503701.7016 960571.0696 A2_East GF
FTK Innovis Revanth East Shewa 8.689518 39.0323307 503556.5745 960526.6137 A2_East GF
FTK Innovis Revanth East Shewa 8.689963 39.032145 503536.1422 960575.8091 A2_East GF
FTK ATC Logesh East Shewa 8.67642 39.03709 504080.2681 959078.6073 A2_East GF
Nominal     East Shewa 7.91913 38.71391 468466.806 875368.4334 A2_East GF
FTK Fireside Beakal East Shewa 7.919363 38.71508 468595.7835 875394.1035 A2_East GF
FTK Innovis Hamza East Shewa 7.91961 38.7135 468421.6515 875421.5297 A2_East GF
Nominal Innovis Revanth East Shewa 8.59718 39.12534 513791.5316 950320.2784 A2_East GF
FTK Innovis Revanth East Shewa 8.59691 39.125 513754.1301 950290.4163 A2_East GF
FTK Innovis Revanth East Shewa 8.59703 39.1244 513688.1059 950303.6614 A2_East GF
FTK Zagwe Revanth East Shewa 8.5966256 39.125498 513808.9369 950258.9923 A2_East GF
Nominal Innovis Revanth East Shewa 8.7491131 38.9821854 498040.5958 967115.0781 A2_East GF
FTK Innovis Revanth East Shewa 8.746694 38.98447 498291.8649 966847.6216 A2_East RT
FTK Innovis Revanth East Shewa 8.746436 38.984847 498333.3297 966819.0965 A2_East RT
FTK Zagwe Logesh East Shewa 8.746404 38.98484 498332.5597 966815.5587 A2_East RT
Nominal Innovis Revanth East Shewa 8.74274 39.00264 500290.375 966410.4501 A2_East GF
FTK Innovis Revanth East Shewa 8.7426 39.0017 500186.984 966394.9717 A2_East GF
FTK Innovis Revanth East Shewa 8.742 39.0023 500252.9787 966328.6387 A2_East GF
FTK Fireside Revanth East Shewa 8.7409916 39.00472 500519.1578 966217.1568 A2_East GF
Nominal Innovis Revanth East Shewa 8.5755 39.27102 529822.9105 947931.713 A2_East GF
FTK Innovis Revanth East Shewa 8.575296 39.271364 529860.7803 947909.1863 A2_East GF
FTK Innovis Revanth East Shewa 8.574898 39.271857 529915.0614 947865.2234 A2_East GF
FTK Zagwe Logesh East Shewa 8.574765 39.280445 530860.1001 947851.1986 A2_East GF
Nominal Innovis Revanth East Shewa 8.535133 39.290983 532023.0188 943470.5059 A2_East GF
FTK Innovis Revanth East Shewa 8.53427 39.2917 532101.9982 943375.1557 A2_East GF
FTK Innovis Revanth East Shewa 8.53447 39.2917 532101.9815 943397.2669 A2_East GF
FTK Zagwe Logesh East Shewa 8.5393 39.2917 532101.5779 943931.2519 A2_East GF
Nominal Innovis Revanth Finfine Special 8.81489 38.88307 487141.282 974389.0685 A2_East GF
FTK Innovis Revanth Finfine Special 8.815608 38.883675 487207.8382 974468.4272 A2_East GF
FTK Innovis Revanth Finfine Special 8.815188 38.884649 487314.934 974421.9603 A2_East GF
FTK Innovis Revanth Finfine Special 8.814575 38.883082 487142.5907 974354.2428 A2_East GF
FTK Prashant Finfine Special 8.814893 38.883067 487140.9522 974389.4003 A2_East GF
Nominal     East Shewa 8.56252 39.28511 531374.4434 946497.818 A2_East GF
FTK I-Engg Revanth East Shewa 8.5626 39.2847 531329.3 946506.6 A2_East GF
FTK Innovis Hamza East Shewa 8.561932 39.285084 531371.6304 946432.8 A2_East GF
FTK Innovis Hamza East Shewa 8.561423 39.28468 531327.2141 946376.503 A2_East GF
FTK I-Engg Revanth East Shewa 8.5628 39.2854 531406.3 946528.8 A2_East GF
Colo Innovis Hamza East Shewa 8.56252 39.28511 531374.4434 946497.818 A2_East GF
Nominal Innovis Revanth East Shewa 8.54603 39.25828 528423.184 944672.6701 A2_East GF
FTK Innovis Revanth East Shewa 8.5459 39.2589 528491.4238 944658.3436 A2_East GF
FTK Innovis Revanth East Shewa 8.5471 39.2586 528458.3202 944790.9882 A2_East GF
FTK I-Engg Revanth East Shewa 8.54656 39.2573 528315.3 944731.2 A2_East GF
Nominal Innovis Revanth East Shewa 8.75099 38.98928 498820.9273 967322.5506 A2_East GF
FTK Innovis Revanth East Shewa 8.748645 38.991202 499032.3185 967063.2919 A2_East RT
FTK Innovis Revanth East Shewa 8.748503 38.991197 499031.7682 967047.593 A2_East RT
FTK Adrian Logesh East Shewa 8.74413 39.268114 529490 966574.6 A2_East GF
FTK Zagwe Revanth East Shewa 8.74413 38.99291 499220.2 966564.1 A2_East GF
FTK Zagwe Revanth East Shewa 8.749731 38.992548 499180.4 967183.4 A2_East GF
Nominal Innovis Revanth East Shewa 8.75076 38.94261 493687.7769 967297.5869 A2_East GF
FTK Innovis Revanth East Shewa 8.750556 38.942787 493707.2414 967275.0306 A2_East GF
FTK Innovis Revanth East Shewa 8.748997 38.940422 493447.0918 967102.7144 A2_East GF
FTK Fireside Revanth East Shewa 8.749982 38.942486 493674.1252 967211.5766 A2_East GF
Nominal Innovis Revanth East Shewa 8.792959 38.999927 499991.9718 971962.453 A2_East GF
FTK Innovis Revanth East Shewa 8.792125 39.000364 500040.0313 971870.2493 A2_East GF
FTK Innovis Revanth East Shewa 8.7933 39.0007 500076.983 972000.1526 A2_East GF
FTK Innovis Revanth East Shewa 8.79291 39.000444 500048.8292 971957.0357 A2_East GF
FTK Innovis Revanth East Shewa 8.791136 39.002499 500305.7342 971758.0361 A2_East GF
Nominal Innovis Revanth East Shewa 8.79411 38.99141 499055.311 972089.7137 A2_East GF
FTK Innovis Revanth East Shewa 8.794142 38.991074 499018.3594 972093.2524 A2_East GF
FTK Innovis Revanth East Shewa 8.79442 38.99098 499008.0224 972123.9872 A2_East GF
FTK Innovis Revanth East Shewa 8.794613 38.990511 498956.4445 972145.3258 A2_East GF
Nominal Innovis Revanth East Shewa 8.78377 38.9986 499846.0301 970946.5545 A2_East GF
FTK Innovis Revanth East Shewa 8.782713 38.997343 499707.7864 970829.6976 A2_East GF
FTK Innovis Revanth East Shewa 8.783683 38.998482 499833.0526 970936.9362 A2_East GF
FTK Fireside Revanth East Shewa 8.78296 38.99741 499715.1551 970857.0049 A2_East GF
FTK Igado Revanth East Shewa 8.78257 38.99738 499711.9 970813.9 A2_East GF
Nominal Innovis Revanth East Shewa 8.75242 38.99522 499474.2588 967480.6318 A2_East GF
FTK Innovis Revanth East Shewa 8.7533 38.994 499340.0753 967577.9228 A2_East GF
FTK Innovis Revanth East Shewa 8.7529 38.9945 499395.0684 967533.6997 A2_East GF
FTK Zagwe Logesh East Shewa 8.782623 39.030258 503327.7392 970819.8807 A2_East GF
FTK Innovis Revanth East Shewa 8.78126 39.030465 503350.517 970669.1948 A2_East GF
Nominal Innovis Revanth East Shewa 8.73879 38.97533 497286.5047 965973.8429 A2_East GF
FTK Innovis Revanth East Shewa 8.73836 38.9746 497206.2076 965926.3093 A2_East GF
FTK Innovis Revanth East Shewa 8.73782 38.975 497250.2003 965866.6063 A2_East GF
FTK Innovis Revanth East Shewa 8.75111 39.02722 502993.8278 967999.3539 A2_East GF
FTK Innovis Revanth East Shewa 8.720395 39.008163 500897.9 963940.1 A2_East GF
FTK Revanth East Shewa 8.7058749 39.02113 502324.3 962334.9 A2_East GF
Nominal     East Shewa 8.727751 38.995543 499509.7526 964753.3333 A2_East GF
Nominal Innovis Revanth East Shewa 8.75859 38.95634 495198.0157 968163.0362 A2_East GF
FTK Innovis Revanth East Shewa 8.758561 38.956498 495215.3931 968159.8281 A2_East RT
FTK Innovis Revanth East Shewa 8.759412 38.956188 495181.3084 968253.915 A2_East GF
FTK Fireside Revanth East Shewa 8.760231 38.956703 495237.9615 968344.4537 A2_East GF
FTK Fireside Logesh East Shewa 8.75898 38.9541 494951.6525 968206.1823 A2_East GF
Nominal Innovis Revanth East Shewa 8.7794 38.92183 491402.8791 970464.32 A2_East GF
FTK Innovis Revanth East Shewa 8.7794 38.92183 491402.8791 970464.32 A2_East GF
FTK Innovis Revanth East Shewa 8.780502 38.921998 491421.381 970586.1488 A2_East GF
FTK Innovis Revanth East Shewa 8.780203 38.920992 491310.7347 970553.1157 A2_East GF
FTK Prashant East Shewa 8.779402 38.921827 491402.5492 970464.5411 A2_East GF
Nominal Innovis Revanth East Shewa 8.79055 38.91421 490565.1144 971697.2031 A2_East GF
FTK Innovis Revanth East Shewa 8.790496 38.914192 490563.1334 971691.2335 A2_East RT
FTK Innovis Revanth East Shewa 8.791144 38.914277 490572.4978 971762.8717 A2_East GF
Nominal     Arsi 7.95657 39.14144 515588.2335 879499.2878 A2_East GF
FTK Innovis Hamza Arsi 7.9566458 39.142434 515697.7805 879507.7052 A2_East GF
FTK Innovis Hamza Arsi 7.956367 39.140378 515471.1969 879476.8059 A2_East GF
FTK Fireside Revanth Arsi 7.954775 39.142573 515697.7805 879507.7052 A2_East GF
FTK Fireside Nuhamin Arsi 7.9552 39.14169 515615.8381 879347.8415 A2_East GF
Nominal     Arsi 7.95715 39.12311 513568.0449 879562.7621 A2_East GF
FTK Innovis Hamza Arsi 7.9575517 39.123392 513599.1111 879607.1799 A2_East RT
FTK Innovis Hamza Arsi 7.9582848866 39.123535361 513614.8869 879688.2396 A2_East GF
FTK Adrian Revanth Arsi 7.95778 39.12269 513521.7 879632.4 A2_East GF
Nominal Innovis Revanth East Shewa 8.66112 39.0552 506072.794 957387.353 A2_East GF
FTK Innovis Revanth East Shewa 8.660947 39.055073 506058.825 957368.225 A2_East GF
FTK Innovis Revanth East Shewa 8.66083 39.054623 506009.3203 957355.2829 A2_East GF
FTK Innovis Revanth East Shewa 8.66073 39.055238 506076.9808 957344.2371 A2_East GF
FTK ATC East Shewa 8.66112 39.0552 506072.794 957387.353 A2_East GF
Nominal Innovis Revanth East Shewa 8.80337 38.92754 492031.3763 973114.2228 A2_East GF
FTK Innovis Revanth East Shewa 8.8036692 38.9269655 491968.2034 973147.3135 A2_East GF
FTK Innovis Revanth East Shewa 8.8046055 38.9268917 491960.1076 973250.8288 A2_East GF
FTK Innovis Revanth East Shewa 8.8039654 38.926069 491869.6194 973180.0796 A2_East GF
FTK Fireside Nuhamin East Shewa 8.800851 38.926428 491909.0319 972835.7558 A2_East GF
973101.1698
FTK Fireside Nuhamin East Shewa 8.8032516 38.92583 491843.3203 A2_East GF
FTK Prashant East Shewa 8.803366 38.927536 492030.9363 973113.7807 A2_East GF
Nominal Innovis Revanth Arsi 7.96771 39.12803 514109.9212 880730.3517 A2_East GF
FTK Innovis Revanth Arsi 7.966676094 39.12903649 514220.8803 880616.0862 A2_East GF
FTK Innovis Revanth Arsi 7.966245725 39.12934888 514255.3232 880568.5189 A2_East GF
FTK Innovis Revanth Arsi 7.970946 39.133487 514711.2114 881088.2872 A2_East GF
FTK ATC Arsi 7.969561 39.132912 514647.8915 880935.1527 A2_East GF
Colo Innovis Revanth Arsi 7.96771 39.12803 514109.9212 880730.3517 A2_East GF
Nominal Innovis Revanth Arsi 7.97381 39.13341 514702.6232 881404.9045 A2_East GF
FTK Innovis Revanth Arsi 7.974183 39.132059 514553.721 881446.0924 A2_East GF
FTK Innovis Revanth Arsi 7.973699 39.131829 514528.3906 881392.5773 A2_East GF
FTK Adrian Revanth Arsi 7.972365 39.144364 515909.9 881245.6 A2_East GF
Nominal Innovis Revanth Arsi 7.96337 39.14018 515449.1127 880250.9918 A2_East GF
FTK Innovis Revanth Arsi 7.963546333 39.14031375 515463.8466 880270.4907 A2_East GF
FTK Innovis Revanth Arsi 7.963094884 39.14006288 515436.2153 880220.5729 A2_East GF
FTK Innovis Revanth Arsi 7.963440763 39.13979458 515406.6332 880258.8004 A2_East GF
FTK Innovis Prashant Arsi 7.963374 39.140176 515448.6717 880251.4339 A2_East GF
Nominal Innovis Revanth Arsi 7.94663 39.1398 515407.8581 878400.3434 A2_East GF
FTK Innovis Revanth Arsi 7.947557 39.139678 515394.3775 878502.8201 A2_East GF
FTK Innovis Revanth Arsi 7.947288 39.13986 515414.4464 878473.0885 A2_East GF
FTK ATC Revanth Arsi 7.94745 39.134763 514852.6818 878490.8117 A2_East GF
Nominal     West Arsi 7.196 38.602 456058.7445 795435.2145 A2_West GF
FTK ATC West Arsi 7.20058 38.6028 456147.5098 795941.4571 A2_West GF
Nominal     West Arsi 7.21235 38.61573 457576.1502 797241.4096 A2_West GF
FTK Zagwe Revanth West Arsi 7.213866 38.615767 457580.3762 797408.9999 A2_West GF
FTK Adrian Revanth West Arsi 7.20726 38.61621 457628.7 796678.7 A2_West GF
Nominal     West Arsi 7.20162 38.59881 455707.0916 796056.8139 A2_West GF
FTK Zagwe Revanth West Arsi 7.202629 38.598873 455714.1451 796168.3529 A2_West GF
Nominal     West Arsi 7.19198 38.62085 458139.5439 794989.0362 A2_West GF
FTK ATC West Arsi 7.198215 38.62285 458360.9274 795678.1318 A2_West GF
FTK West Arsi 7.198331 38.622292 458299.3 795691 A2_West GF
Nominal     West Arsi 7.18988 38.60913 456845.3674 794757.9699 A2_West GF
FTK ATC Revanth West Arsi 7.184517 38.61203 457165.0491 794164.8185 A2_West GF
Nominal     West Arsi 7.19849 38.59025 454761.7092 795711.6301 A2_West GF
FTK West Arsi 7.202556 38.58896 454619.6891 796161.2553 A2_West GF
Colo     West Arsi 7.19849 38.59025 454761.7092 795711.6301 A2_West GF
Nominal     West Arsi 7.20741 38.60189 456047.6985 796696.6017 A2_West GF
FTK ATC West Arsi 7.21018 38.61003 456946.6493 797002.0498 A2_West GF
Nominal     West Arsi 7.20641 38.59172 454924.7889 796587.0428 A2_West GF
FTK ATC West Arsi 7.210906 38.59342 455112.9192 797083.9092 A2_West GF
Nominal     West Arsi 7.18956 38.58712 454415.2461 794724.7272 A2_West GF
FTK Zagwe Revanth West Arsi 7.182209 38.586004 454291.2955 793912.1837 A2_West GF
Nominal     West Arsi 7.1821 38.59496 455280.1202 793899.2501 A2_West GF
FTK ATC West Arsi 7.19498 38.57906 453525.903 795324.7205 A2_West GF
Nominal Innovis Revanth East Shewa 8.52084 39.23418 525772.7025 941886.0863 A2_East GF
FTK Innovis Revanth East Shewa 8.52059 39.2356 525928.9984 941858.5424 A2_East GF
FTK Innovis Revanth East Shewa 8.5208 39.235 525862.9508 941881.7188 A2_East GF
FTK Innovis Revanth East Shewa 8.526001 39.235387 525905.1923 942456.743 A2_East GF
Nominal Innovis Revanth East Shewa 8.54001 39.28068 530888.7606 944008.847 A2_East GF
FTK Innovis Revanth East Shewa 8.539744 39.280309 530847.9532 943979.4095 A2_East GF
FTK Innovis Revanth East Shewa 8.539497 39.28013 530828.2739 943952.0879 A2_East GF
FTK ATC East Shewa 8.54297 39.280121 530827.0047 944336.0475 A2_East RT
Nominal Innovis Revanth Arsi 8.40399 39.33649 537043.71 928975.9349 A2_East GF
FTK Innovis Revanth Arsi 8.403859 39.336542 537049.4471 928961.4571 A2_East GF
FTK Innovis Revanth Arsi 8.404135 39.337069 537107.4382 928992.0202 A2_East GF
FTK Revanth Arsi 8.404102 39.337124 537113.5 928988.4 A2_East GF
Nominal Innovis Revanth East Shewa 8.54624 39.2762 530395.2408 944697.2537 A2_East GF
FTK Innovis Revanth East Shewa 8.545986 39.275693 530339.4661 944669.1326 A2_East RT
FTK Innovis Revanth East Shewa 8.54638 39.2758 530351.2102 944712.7 A2_East RT
FTK Maktech Revanth East Shewa 8.54978 39.28248 531086.0604 945089.1222 A2_East RT
FTK I-Engg Revanth East Shewa 8.551 39.281 530923.1 945223.9 A2_East RT
FTK I-Engg Beakal East Shewa 8.55086964 39.2768843 530470.179 945209.141 A2_East RT
FTK I-Engg Beakal East Shewa 8.54836 39.276525 530430.839 944931.658 A2_East RT
Colo Innovis Revanth East Shewa 8.54624 39.2762 530395.2408 944697.2537 A2_East GF
Nominal Innovis Revanth East Shewa 8.55287 39.19873 521869.4097 945424.9839 A2_East GF
FTK Innovis Revanth East Shewa 8.55224 39.198558 521850.5176 945355.3243 A2_East GF
FTK Innovis Revanth East Shewa 8.552907 39.199167 521917.4978 945429.0993 A2_East GF
FTK Zagwe Revanth East Shewa 8.55235 39.19862 521857.3342 945367.4889 A2_East GF
Nominal Innovis Revanth East Shewa 8.63095 39.08855 509742.5509 954052.5939 A2_East GF
FTK Innovis Revanth East Shewa 8.630953 39.08848 509734.8492 954052.9237 A2_East GF
FTK Innovis Revanth East Shewa 8.630628 39.088167 509700.4203 954016.9853 A2_East GF
FTK Innovis Revanth East Shewa 8.630998 39.088877 509778.5273 954057.9089 A2_East GF
FTK ATC East Shewa 8.630948 39.088552 509742.771 954052.3728 A2_East GF
FTK Zagwe Logesh East Shewa 8.630948 39.088552 509742.771 954052.3728 A2_East GF
Nominal Innovis Revanth Arsi 7.95332 39.13178 514523.7084 879139.6437 A2_East GF
FTK Innovis Revanth Arsi 7.952137 39.130676 514402.0757 879008.8227 A2_East GF
FTK Innovis Revanth Arsi 7.951884 39.132379 514589.7761 878980.9127 A2_East GF
FTK Fireside Revanth Arsi 7.957136 39.13575 514961.1 879561.7 A2_East GF
FTK Fireside Revanth Arsi 7.955887 39.13221 514571 879423.4 A2_East RT
Nominal Innovis Revanth East Shewa 8.76604 38.95232 494755.9767 968986.7309 A2_East GF
FTK Innovis Revanth East Shewa 8.7657 38.951882 494707.799 968949.1481 A2_East GF
FTK Innovis Revanth East Shewa 8.765123 38.955457 495100.9837 968885.3089 A2_East RT
Colo Innovis Revanth East Shewa 8.766073 38.952261 494749.4881 968990.3801 A2_East GF
Nominal     West Arsi 6.9782 39.1869 520644.2893 771343.0625 A2_East GF
FTK Adrian Revanth West Arsi 6.978776 39.18662 520613.3 771406.7 A2_East GF
FTK Adrian Beakal West Arsi 6.97674 39.18105 519998.18 771181.412 A2_East GF
FTK Adrian Beakal West Arsi 6.97666 39.18076 519966.15 771172.556 A2_East GF
Nominal Innovis Revanth Finfine Special 8.8332 38.8386 482251.8083 976415.1799 A2_East GF
FTK Innovis Revanth Finfine Special 8.833635 38.838733 482266.4544 976463.2657 A2_East GF
FTK Innovis Revanth Finfine Special 8.834275 38.839177 482315.3089 976534.0009 A2_East GF
FTK Zagwe Logesh Finfine Special 8.8371 38.8343 481779.1533 976846.5582 A2_East GF
FTK Zagwe Revanth Finfine Special 8.83697 38.83413 481760.5 976832.2 A2_East GF
FTK ATC Finfine Special 8.83787 38.83414 481761.6 976931.7 A2_East GF
Nominal Innovis Revanth East Shewa 8.5886 39.12903 514197.8731 949371.8503 A2_East GF
FTK Innovis Revanth East Shewa 8.58786 39.1295 514249.6174 949290.057 A2_East GF
FTK Innovis Revanth East Shewa 8.58743 39.1295 514249.6335 949242.5183 A2_East GF
Nominal     East Shewa 8.56644 39.29857 532855.3024 946932.3212 A2_East Nominal
FTK Innovis Revanth East Shewa 8.56977 39.29499 532461.0655 947300.1691 A2_East GF
FTK Innovis Revanth East Shewa 8.56878 39.29527 532491.9614 947190.7422 A2_East GF
FTK Zagwe 8.56644 39.29857 532855.3024 946932.3212 A2_East RT
Nominal Innovis Revanth East Shewa 8.557803 39.27407 530159.9276 945975.4433 A2_East GF
FTK Innovis Revanth East Shewa 8.557507 39.27399 530151.1473 945942.7125 A2_East GF
FTK Innovis Revanth East Shewa 8.557719 39.274543 530211.9857 945966.1937 A2_East GF
FTK I-Engg Revanth East Shewa 8.5576 39.2735 530097.2 945953 A2_East RT
Nominal Innovis Revanth East Shewa 7.93141 38.71513 468602.2076 876725.9255 A2_East GF
FTK Innovis Revanth East Shewa 7.93292 38.714832 468569.4771 876892.8823 A2_East GF
FTK Innovis Revanth East Shewa 7.931747 38.713547 468427.7569 876763.3017 A2_East GF
Nominal Innovis Revanth East Shewa 8.51509 39.26368 529019.782 941252.482 A2_East GF
FTK Innovis Revanth East Shewa 8.515203 39.264229 529080.1951 941265.016 A2_East GF
FTK Innovis Revanth East Shewa 8.515285 39.264098 529065.7713 941274.0717 A2_East GF
FTK ATC Revanth East Shewa 8.515056 39.255683 528139.6544 941248.1325 A2_East GF
FTK Fireside Beakal East Shewa 8.51377 39.2605 528669.897 941106.312 A2_East GF
FTK Fireside Beakal East Shewa 8.5111 39.2551 528075.779 940810.733 A2_East GF
FTK Zagwe East Shewa 8.51336 39.25642 528220.891 941060.6841 A2_East GF
Nominal Innovis Revanth East Shewa 8.76801 38.94159 493575.885 969204.6925 A2_East GF
FTK Innovis Revanth East Shewa 8.767291 38.939936 493393.9601 969125.2315 A2_East GF
FTK Innovis Revanth East Shewa 8.767831 38.942713 493699.3931 969184.884 A2_East GF
FTK Zagwe Abhishek East Shewa 8.76729 38.93994 493394.4 969125.1209 A2_East GF
Nominal Innovis Revanth Arsi 7.98187 39.13522 514901.8051 882296.0163 A2_East GF
FTK Innovis Revanth Arsi 7.98084 39.134482 514820.5114 882182.1214 A2_East GF
FTK Innovis Revanth Arsi 7.981585 39.136219 515011.9096 882264.5452 A2_East GF
FTK ACME logesh Arsi 7.97974 39.13291 514647.3089 882060.4584 A2_East GF
Nominal Innovis Revanth Finfine Special 8.92111 38.662 462840.8519 986147.3589 A2_East GF
FTK Innovis Revanth Finfine Special 8.919416 38.661455 462780.7633 985960.1275 A2_East GF
FTK Innovis Revanth Finfine Special 8.920212 38.66139 462773.6978 986048.1387 A2_East GF
FTK Fireside Logesh Finfine Special 8.922 38.651 461631.6094 986246.8805 A2_East GF
FTK Fireside Revanth Finfine Special 8.921657 38.651643 461702.3 986208.9 A2_East GF
FTK Revanth Finfine Special 8.919336 38.661024 462733.371 985951.3263 A2_East GF
Nominal Innovis Revanth Finfine Special 8.93474993 38.65403057 461966.1094 987656.183 A2_East GF
FTK Innovis Revanth Finfine Special 8.935104 38.653659 461925.2974 987695.3669 A2_East GF
FTK Innovis Revanth Finfine Special 8.935455 38.653755 461935.8876 987734.1631 A2_East GF
FTK Fireside Revanth Finfine Special 8.93338 38.6517 461709.7539 987504.9663 A2_East GF
FTK ATC Revanth Finfine Special 8.93333 38.65046 461573.428 987499.5673 A2_East GF
Nominal Innovis Revanth Finfine Special 8.947033 38.679328 464748.3736 989011.6683 A2_East GF
FTK Innovis Revanth Finfine Special 8.946569 38.679665 464785.3759 988960.3369 A2_East GF
FTK Innovis Revanth Finfine Special 8.946604 38.678483 464655.44 988964.3196 A2_East GF
FTK Fireside Logesh Finfine Special 8.945446 38.67818 464622.0189 988836.3219 A2_East RT
FTK Fireside Revanth Finfine Special 8.945446 38.67818 464622.0189 988836.3219 A2_East RT
FTK Fireside Revanth Finfine Special 8.947373 38.67808 464611.2 989049.4 A2_East GF
FTK fireside Revanth Finfine Special 8.944658 38.67868 464676.9 988749.2 A2_East GF
Colo Innovis Revanth Finfine Special 8.947089 38.678365 464642.5149 989017.9519 A2_East GF
Nominal Innovis Revanth Finfine Special 8.917089 38.652484 461794.2488 985703.773 A2_East GF
FTK Innovis Revanth Finfine Special 8.917168 38.652528 461799.0944 985712.5026 A2_East GF
FTK Innovis Revanth Finfine Special 8.917497 38.652232 461766.5862 985748.907 A2_East GF
FTK Fireside Revanth Finfine Special 8.9158 38.6527 461817.9 985561.2 A2_East GF
Finfine Special 461925.1349 985763.9047 A2_East
FTK Fireside Nuhamin 8.917634 38.653674 GF
Nominal Innovis Revanth Finfine Special 8.907267 38.605 456572.6451 984623.1038 A2_East GF
FTK Innovis Revanth Finfine Special 8.907267 38.605 456572.6451 984623.1038 A2_East GF
FTK Innovis Revanth Finfine Special 8.90717 38.60506 456579.2303 984612.3725 A2_East GF
FTK fireside Revanth Finfine Special 8.907799 38.60472 456541.9 984682 A2_East GF
FTK Innovis Revanth Finfine Special 8.907268 38.605227 456597.6026 984623.1878 A2_East GF
Nominal Innovis Revanth Finfine Special 8.9152 38.63989 460409.4496 985496.2527 A2_East GF
FTK Innovis Revanth Finfine Special 8.915304 38.640089 460431.3391 985507.7295 A2_East GF
FTK Fireside Revanth Finfine Special 8.9159 38.6399 460410.6 985573.6 A2_East GF
FTK Innovis Revanth Finfine Special 8.915766 38.639518 460368.6123 985558.8689 A2_East GF
Nominal Innovis Revanth Finfine Special 8.92387 38.63129 459464.9082 986455.7306 A2_East GF
FTK Innovis Revanth Finfine Special 8.9238 38.6313 459465.9999 986447.9904 A2_East GF
FTK Innovis Revanth Finfine Special 8.9242 38.6312 459455.0502 986492.2249 A2_East GF
FTK Innovis Revanth Finfine Special 8.924 38.6313 459466.022 986470.1022 A2_East GF
FTK Fireside Revanth Finfine Special 8.9238 38.6311 459464.9082 986455.7306 A2_East GF
FTK Fireside Revanth Finfine Special 8.9242 38.6312 459455.1 986492.2 A2_East GF
FTK Finfine Special 8.92387 38.63129 459464.9082 986455.7306 A2_East GF
Nominal Innovis Revanth Finfine Special 8.931786 38.646184 461103.1779 987329.3125 A2_East GF
FTK Innovis Revanth Finfine Special 8.931955 38.6466568 461155.1738 987347.9472 A2_East GF
FTK Innovis Revanth Finfine Special 8.9322 38.646103 461094.317 987375.0924 A2_East GF
FTK Fireside Revanth Finfine Special 8.926005 38.639866 460408 986690.8 A2_East GF
Nominal Innovis Revanth Finfine Special 8.92551 38.651 461631.9761 986634.9416 A2_East GF
FTK Innovis Revanth Finfine Special 8.924495 38.651748 461714.1041 986522.6469 A2_East RT
FTK Innovis Revanth Finfine Special 8.925477 38.651852 461725.6401 986631.2048 A2_East RT
FTK Fireside Logesh Finfine Special 8.9247233 38.65169 461707.7515 986547.8935 A2_East GF
FTK Fireside Revanth Finfine Special 8.925722 38.651595 461697.4 986658.3 A2_East GF
Nominal Innovis Revanth Finfine Special 8.936737 38.66995 463716.4156 987874.2672 A2_East GF
FTK Innovis Revanth Finfine Special 8.937148 38.669809 463700.9554 987919.7206 A2_East GF
FTK Innovis Revanth Finfine Special 8.936282 38.67005 463727.364 987823.9532 A2_East GF
Nominal Innovis Revanth Finfine Special 8.9298 38.66127 462761.4773 987108.1868 A2_East GF
FTK Innovis Revanth Finfine Special 8.928829 38.661398 462775.4508 987000.8215 A2_East RT
FTK Innovis Revanth Finfine Special 8.929097 38.662147 462857.8209 987030.3757 A2_East GF
FTK Innovis Revanth Finfine Special 8.929679 38.661308 462765.6426 987094.8054 A2_East RT
FTK Fireside Revanth Finfine Special 8.928606 38.66025 462649.2 986976.3 A2_East RT
Nominal Innovis Revanth Finfine Special 8.92827 38.673736 464131.8008 986937.7978 A2_East GF
FTK Innovis Revanth Finfine Special 8.928582 38.674568 464223.299 986972.2113 A2_East GF
FTK Innovis Revanth Finfine Special 8.928624 38.674233 464186.4742 986976.8872 A2_East GF
FTK Fireside Revanth Finfine Special 8.92862 38.6743166 464195.6645 986976.4369 A2_East GF
Nominal Innovis Revanth Finfine Special 8.93092984 38.68460024 465326.4363 987230.8275 A2_East GF
FTK Innovis Revanth Finfine Special 8.931004 38.68546 465420.9621 987238.9458 A2_East GF
FTK Innovis Revanth Finfine Special 8.930682 38.684811 465349.5831 987203.4069 A2_East RT
FTK Fireside Logesh Finfine Special 8.930873334 38.6851184 465383.3956 987224.5316 A2_East GF
FTK Fireside Revanth Finfine Special 8.926714 38.68458 465323.8 986764.7 A2_East GF
Nominal Innovis Revanth Finfine Special 8.84173 38.833831 481727.8087 977358.4587 A2_East GF
FTK Innovis Revanth Finfine Special 8.840125 38.833629 481705.5173 977181.0251 A2_East GF
FTK Innovis Revanth Finfine Special 8.840298 38.834446 481795.3649 977200.1114 A2_East GF
FTK Zagwe Logesh Finfine Special 8.82966 38.84292 482726.6893 976023.6068 A2_East GF
FTK Innovis Revanth Finfine Special 8.829292 38.842451 482675.0984 975982.9437 A2_East GF
Nominal Innovis Revanth Finfine Special 8.95057 38.6669 463382.4967 989403.9267 A2_East GF
FTK Innovis Revanth Finfine Special 8.950694 38.666907 463383.2787 989417.6353 A2_East GF
FTK Innovis Revanth Finfine Special 8.950897 38.666823 463374.0648 989440.087 A2_East GF
FTK Fireside Revanth Finfine Special 8.94981 38.6693 463646.3 989319.7 A2_East RT
Nominal Innovis Revanth Finfine Special 8.912994 38.62613 458896.4062 985253.8613 A2_East RT
FTK Innovis Revanth Finfine Special 8.91297 38.625798 458859.9026 985251.2448 A2_East RT
FTK Innovis Revanth Finfine Special 8.912475 38.624762 458745.9468 985196.6336 A2_East RT
FTK Innovis Revanth Finfine Special 8.91299 38.627522 459049.4455 985253.2647 A2_East RT
Nominal Innovis Revanth Finfine Special 8.91166 38.61721 457915.5671 985107.3789 A2_East GF
FTK Innovis Revanth Finfine Special 8.91166 38.61721 457915.5671 985107.3789 A2_East GF
FTK Innovis Revanth Finfine Special 8.911575 38.616542 457842.1155 985098.0574 A2_East GF
FTK Innovis Revanth Finfine Special 8.912145 38.617733 457973.1227 985160.9405 A2_East GF
FTK Finfine Special 8.91166 38.61721 457915.5671 985107.3789 A2_East GF
Nominal     West Arsi 6.9964 39.32241 535610.9721 773363.122 A2_East GF
FTK Adrian Revanth West Arsi 6.996894 39.322973 535673.1 773417.8 A2_East GF
Nominal     West Arsi 7.36424 38.67461 464088.742 814027.7419 A2_East GF
FTK ATC Revanth West Arsi 7.359491 38.66807 463366.5656 813503.2703 A2_East GF
Nominal     West Arsi 7.34388 38.67215 463815.5957 811777.1423 A2_East GF
FTK ATC West Arsi 7.340502 38.66602 463138.7495 811404.2039 A2_East GF
FTK Adrian Revanth West Arsi 7.341951 38.670497 463633 811564 A2_East GF
Nominal     West Arsi 7.268869 38.656973 462134.1958 803485.9349 A2_West GF
FTK ATC Revanth West Arsi 7.26936 38.66062 462536.8234 803539.9115 A2_West GF
Nominal     West Arsi 7.35314 38.67133 463725.8434 812800.9014 A2_East GF
FTK ATC West Arsi 7.358022 38.67569 464207.4375 813340.2554 A2_East GF
Nominal     West Arsi 7.21639 38.62601 458711.4561 797687.0881 A2_West GF
FTK Zagwe Revanth West Arsi 7.235386 38.636367 459856.5618 799786.1672 A2_West GF
Nominal     West Arsi 7.21785 38.59848 455672.2358 797851.0753 A2_West GF
FTK ATC Revanth West Arsi 7.216671 38.58385 454056.9393 797722.1845 A2_West GF
Nominal Innovis Revanth Arsi 8.03136 39.18934 520863.5533 887769.5889 A2_East GF
FTK Innovis Revanth Arsi 8.03205 39.190471 520988.1443 887845.9277 A2_East GF
FTK Innovis Revanth Arsi 8.032772429 39.19050249 520991.5771 887925.7955 A2_East GF
Nominal     West Arsi 7.09897 38.48453 443077.1396 784721.3439 A2_West GF
FTK Innovis Revanth West Arsi 7.09847 38.48012 443195.3943 784804.5684 A2_West GF
FTK Innovis Revanth West Arsi 7.097921 38.48461 443085.8452 784605.3657 A2_West GF
FTK Zagwe Revanth West Arsi 7.098479 38.480217 442600.7856 784667.595 A2_West GF
Nominal     Jimma 7.68013 36.8455 262340.1073 849533.3954 A2_West GF
FTK ATC Jimma 7.67598 36.84597 262389.669 849074.0378 A2_West GF
Nominal     Jimma 7.66859 36.84727 262529.0343 848255.7938 A2_West GF
FTK ATC Revanth Jimma 7.661135 36.845044 262279.2293 847432.3118 A2_West GF
Nominal     Jimma 7.66505 36.84186 261930.0063 847867.1765 A2_West GF
FTK ATC Jimma 7.66815 36.84 261726.4562 848211.1498 A2_West RT
Nominal     Jimma 7.66363 36.82907 260517.6607 847717.2025 A2_West GF
FTK ATC Revanth Jimma 7.66695 36.83 260622.2 848084 A2_West GF
FTK Jimma 7.667771 36.826604 260247.821 848176.686 A2_West GF
FTK Innovis Nuhamin Jimma 7.666162 36.825126 260083.8015 847999.513 A2_West GF
Colo     Jimma 7.66865 36.83258 260907.843 848270.592 A2_West GF
Nominal     Jimma 7.6761 36.82935 260555.5414 849096.5636 A2_West GF
FTK ATC Jimma 7.672979 36.82999 260624.4255 848750.9396 A2_West GF
Nominal     Jimma 7.68923 36.82196 259747.3552 850553.2385 A2_West GF
FTK ATC Revanth Jimma 7.6916 36.832716 260935.7 850809.4 A2_West GF
FTK Innovis Nuhamin Jimma 7.691413 36.832705 260934.3749 850788.7173 A2_West GF
FTK Innovis Beakal Jimma 7.692678 36.833181 260987.614 850928.394 A2_West GF
Nominal     Hadiya 7.55698 37.84681 372777.6382 835490.2323 A2_West GF
FTK ATC Hadiya 7.563354 37.84524 372606.2788 836195.4713 A2_West GF
FTK Fireside Revanth Hadiya 7.56106 37.84528 372610 835941.8 A2_West GF
Nominal     Gamo 6.0337 37.5473 339223.4561 667144.1341 A2_West GF
FTK ATC Gamo 6.037712 37.55327 339885.4982 667586.0111 A2_West GF
Nominal     Hadiya 7.54069 37.85391 373556.2932 833686.968 A2_West GF
FTK Fireside Logesh Hadiya 7.538854 37.852313 373379.5 833484.4 A2_West RT
Nominal     Wolayita 6.8284 37.75342 362253.6432 754957.3515 A2_West GF
FTK Fireside Revanth Wolayita 6.82766 37.75479 362404.8393 754875.1372 A2_West GF
FTK Fireside Nuhamin Wolayita 6.82755167 37.755185 362448.4624 754863 A2_West GF
Nominal Innovis Revanth Guraghe 8.12109 37.92955 382065.7181 897840.2423 A2_West GF
FTK Innovis Revanth Guraghe 8.1204 37.9299 382104.0815 897763.8467 A2_West GF
FTK Innovis Revanth Guraghe 8.1205 37.9309 382214.2958 897774.6132 A2_West GF
FTK Zagwe Logesh Guraghe 8.118544 37.930985 382223.1 897558.3 A2_West GF
FTK Zagwe Logesh Guraghe 8.12066 37.92928 382035.8426 897792.7754 A2_West GF
Nominal Innovis Revanth Guraghe 8.11402 38.3731 430934.1278 896956.3273 A2_West GF
FTK Innovis Revanth Guraghe 8.11434 38.37485 431126.988 896991.4086 A2_West RT
FTK ATC Guraghe 8.11101 38.37588 431239.9019 896623.0742 A2_West GF
FTK Innovis Revanth Guraghe 8.11405 38.37177 430787.6005 896959.8706 A2_West GF
Nominal Innovis Revanth Guraghe 8.11402 38.3731 430934.1278 896956.3273 A2_West GF
FTK Innovis Revanth Guraghe 8.117627 38.384539 432195.02 897353.1826 A2_West GF
FTK Innovis Revanth Guraghe 8.116983 38.384313 432170.0127 897282.0208 A2_West GF
FTK ATC Logesh Guraghe 8.119056 38.390442 432845.6112 897510.1885 A2_West GF
Nominal     Guraghe 8.12456 38.37243 430862.1135 898121.729 A2_West GF
FTK Innovis Revanth Guraghe 8.12396 38.37414 431050.4049 898055.1026 A2_West GF
FTK Innovis Revanth Guraghe 8.12503 38.37227 430844.5664 898173.7188 A2_West GF
FTK Zagwe Logesh Guraghe 8.12182 38.37402 431036.819 897818.5276 A2_West GF
FTK Adrian Logesh Guraghe 8.1214 38.37417 431053.2733 897772.0675 A2_West GF
Nominal Innovis Revanth Guraghe 8.20427 37.79256 366998.6589 907080.3597 A2_West GF
FTK Innovis Revanth Guraghe 8.2039 37.793 367047.0095 907039.3006 A2_West GF
FTK Innovis Revanth Guraghe 8.2031 37.7933 367079.7938 906950.7402 A2_West GF
Nominal Innovis Revanth Guraghe 8.29159 37.78246 365915.4069 916739.3034 A2_West GF
FTK Innovis Revanth Guraghe 8.292429834 37.78118396 365775.1443 916832.601 A2_West RT
FTK Innovis Revanth Guraghe 8.2917639 37.782134 365879.5591 916758.6429 A2_West RT
FTK Zagwe Logesh Guraghe 8.291467 37.782996 365974.4021 916725.5215 A2_West GF
FTK Zagwe Beakal Guraghe 8.29117 37.784145 366100.856 916692.293 A2_West GF
Nominal Innovis Revanth Guraghe 8.2811 37.7744 365024.0728 915582.0752 A2_West GF
FTK Innovis Revanth Guraghe 8.2818 37.7755 365145.4725 915659.1063 A2_West GF
FTK Innovis Revanth Guraghe 8.2814511 37.776052 365206.1546 915620.3387 A2_West RT
FTK Innovis Revanth Guraghe 8.28157 37.77457 365042.9579 915633.989 A2_West GF
FTK Zagwe Nuhamin Guraghe 8.281311 37.773342 364907.6095 915605.7664 A2_West GF
Nominal Fireside Logesh Halaba 7.30812 38.09312 399897.243 807911.4895 A2_West GF
FTK Fireside Logesh Halaba 7.30842 38.09206 399780.3 807944.9 A2_West GF
Nominal     Gamo 6.04075 37.54915 339430.3233 667923.158 A2_West GF
FTK Fireside Revanth Gamo 6.0415 37.5497 339491.4 668005.9 A2_West GF
Nominal     Gamo 6.05029 37.5505 339582.5743 668977.6663 A2_West GF
FTK ATC Gamo 6.054307 37.55302 339862.7063 669421.1112 A2_West GF
Nominal     Gamo 6.02213 37.55031 339553.2557 665863.8694 A2_West GF
FTK ATC Gamo 6.022792 37.5545 340017.2814 665935.8416 A2_West GF
Nominal     Gamo 6.02282 37.55977 340600.6753 665937.3959 A2_West GF
FTK Fireside Revanth Gamo 6.017511 37.547357 339225 665354 A2_West GF
FTK Fireside Revanth Gamo 6.016682 37.551622 339696.9 665261.1 A2_West GF
Nominal     Wolayita 6.840942 37.758607 362830.4678 756342.6549 A2_West GF
FTK ATC Wolayita 6.84359 37.75959 362939.8578 756635.167 A2_West RT
Nominal     Sidama 7.03275 38.47745 442287.0677 777401.5099 A2_West GF
FTK Innovis Revanth Sidama 7.032469 38.47774 442319.0629 777370.4093 A2_West GF
FTK Innovis Revanth Sidama 7.033067 38.47681 442216.4203 777436.6336 A2_West GF
FTK Innovis Revanth Sidama 7.0237357 38.4761646 442143.9833 776405.1271 A2_West GF
FTK ATC Sidama 7.023894 38.47812 442359.9766 776422.3864 A2_West GF
Nominal     Hadiya 7.555431 37.858443 374060.7325 835315.5777 A2_West GF
FTK Fireside Revanth Hadiya 7.55439 37.85688 373888 835200.9 A2_West GF
Nominal     Sidama 7.04333 38.49763 444517.1574 778568.6972 A2_West GF
FTK Innovis Revanth Sidama 7.042484 38.49829 444589.9506 778475.0928 A2_West GF
FTK Innovis Revanth Sidama 7.042387 38.49759 444512.6275 778464.4525 A2_West RT
Nominal     Bench Sheko 6.99856 35.58735 785871.2198 774376.5646 A2_West GF
FTK Zagwe Revanth Bench Sheko 7.003045 35.576268 784643.3 774866.1 A2_West GF
Nominal     Sidama 7.094771 38.400589 433806.7081 784268.2784 A2_West GF
FTK ATC Sidama 7.094904 38.38846 432467.266 784284.7303 A2_West GF
Nominal     Sidama 7.0199 38.47249 441737.6465 775981.5412 A2_West GF
FTK Innovis Revanth Sidama 7.019612 38.4738 441882.3015 775949.5398 A2_West GF
FTK Innovis Revanth Sidama 7.019949 38.47169 441649.2919 775987.0577 A2_West GF
FTK Innovis Revanth Sidama 7.018759 38.47376 441877.7776 775855.2446 A2_West GF
FTK ATC Sidama 7.015091 38.46892 441342.7346 775450.3454 A2_West GF
Nominal     Hadiya 7.550566 37.873993 375775.0716 834773.1901 A2_West GF
FTK ATC Hadiya 7.545741 37.873524 375721.9455 834239.8236 A2_West GF
Nominal     Gamo 6.04246 37.5899 343941.6402 668100.3877 A2_West GF
FTK Fireside Revanth Gamo 6.0431 37.5882 343753.6 668171.6 A2_West GF
Colo     Gamo 6.04246 37.5899 343941.6402 668100.3877 A2_West GF
Nominal     Gamo 6.040200676 37.56884203 341609.9855 667856.6452 A2_West GF
FTK Fireside Revanth Gamo 6.040198 37.56856 341578.7653 667856.4314 A2_West GF
FTK Gamo 6.0402007 37.568842 341609.9822 667856.6479 A2_West GF
Nominal     Hadiya 7.570851 37.858856 374110.7716 837020.4569 A2_West GF
FTK Fireside Revanth Hadiya 7.57265 37.8603 374270.6133 837218.9555 A2_West GF
Nominal Innovis Revanth Guraghe 8.11887 38.37822 431499.0437 897491.6682 A2_West GF
FTK Innovis Revanth Guraghe 8.118593 38.377901 431463.8515 897461.0974 A2_West RT
FTK Innovis Revanth Guraghe 8.118925 38.377551 431425.3471 897497.862 A2_West RT
FTK ATC Guraghe 8.120757 38.38243 431963.1908 897699.5834 A2_West GF
Nominal     Sidama 7.03922 38.48975 443646.3546 778115.2756 A2_West GF
FTK Innovis Revanth Sidama 7.038752 38.48938 443605.433 778063.5824 A2_West GF
FTK Innovis Revanth Sidama 7.039085 38.48906 443570.1305 778100.4344 A2_West GF
FTK Innovis Beakal Sidama 7.04234 38.489748 443646.51 778460.195 A2_West GF
Nominal     Sidama 7.04801 38.47805 442355.2201 779088.4473 A2_West GF
FTK Innovis Revanth Sidama 7.047395 38.47834 442387.173 779020.4225 A2_West RT
FTK Innovis Revanth Sidama 7.048767 38.47937 442501.0997 779171.9718 A2_West RT
FTK Innovis Revanth Sidama 7.04882 38.47943 442367.4474 779158.6338 A2_West RT
Nominal     Hadiya 7.55196 37.8519 373337.7885 834933.6834 A2_West GF
FTK Fireside Revanth Hadiya 7.558435 37.852639 373421.2 835649.4 A2_West GF
FTK ATC Hadiya 7.558668 37.853431 373508.6673 835674.9474 A2_West GF
Nominal     Wolayita 6.85498 37.7595 362933.164 757894.5984 A2_West GF
FTK Fireside Revanth Wolayita 6.85098 37.75229 362135.2356 757454.3778 A2_West GF
FTK ATC Wolayita 6.85014 37.75273 362183.6194 757361.3714 A2_West GF
Nominal     Gedeo 6.41569 38.30412 423045.8472 709208.4382 A2_West GF
FTK Zagwe Logesh Gedeo 6.413474 38.29359 421880.9882 708965.0471 A2_West GF
FTK ATC Gedeo 6.41373 38.29381 421905.3573 708993.3149 A2_West GF
Nominal     Sidama 6.600901647 38.42393464 436319.4128 729667.1121 A2_West GF
FTK Zagwe Logesh Sidama 6.60234 38.42541 436482.6938 729825.934 A2_West GF
Nominal     Sidama 7.08375 38.4898 443657.266 783038.1102 A2_West GF
FTK Innovis Revanth Sidama 7.082703 38.49028 443710.1481 782922.3049 A2_West GF
FTK Innovis Revanth Sidama 7.082484 38.48926 443597.477 782898.2179 A2_West GF
FTK Fireside Revanth Sidama 7.0890571 38.495291 444264.3047 783624.1538 A2_West GF
FTK ATC Sidama 7.087004 38.49453 444180.0172 783397.2727 A2_West GF
Nominal     Sidama 7.03823 38.50561 445397.9112 778003.9483 A2_West GF
FTK Innovis Revanth Sidama 7.036874 38.5048 445308.2912 777854.1362 A2_West GF
FTK Innovis Revanth Sidama 7.03933 38.50535 445369.3239 778125.5845 A2_West GF
FTK Revanth Sidama 7.044755 38.506527 445505.6 778743.9 A2_West GF
FTK ATC Sidama 7.045042 38.50746 445603.03 778756.8042 A2_West GF
Nominal     Sidama 7.070042 38.482963 442900.5333 781523.5078 A2_West GF
FTK Innovis Revanth Sidama 7.069589 38.48124 442710.1913 781473.6398 A2_West GF
FTK Innovis Revanth Sidama 7.069801 38.48378 442990.7323 781496.7649 A2_West GF
FTK Innovis Revanth Sidama 7.070173 38.48402 443017.2832 781537.8605 A2_West GF
FTK ATC Sidama 7.065832 38.4805 442628.0031 781058.3898 A2_West RT
Nominal     Sidama 7.05487 38.48494 443117.017 779845.9831 A2_West GF
FTK Innovis Revanth Sidama 7.05484 38.48514 443139.1019 779842.6422 A2_West GF
FTK Innovis Revanth Sidama 7.054335 38.48446 443063.9393 779786.8968 A2_West GF
FTK ATC Revanth Sidama 7.055468 38.48994 443669.3013 779911.4859 A2_West GF
FTK fireside Revanth Sidama 7.055433 38.490052 443681.7 779907.6 A2_West GF
Colo Innovis Revanth Sidama 7.05487 38.48494 443117.017 779845.9831 A2_West GF
Nominal     Sidama 7.04027 38.4751 442028.4484 778233.1457 A2_West GF
FTK Innovis Revanth Sidama 7.04048 38.47566 442090.3242 778256.292 A2_West GF
FTK Innovis Revanth Sidama 7.04064 38.47532 442052.7924 778274.0224 A2_West GF
FTK Innovis Beakal Sidama 7.040859 38.479483 442512.606 778297.719 A2_West RT
Colo Innovis Revanth Sidama 7.04027 38.4751 442028.4484 778233.1457 A2_West GF
Nominal     Sidama 7.0275 38.4848 443098.2198 776820.2168 A2_West GF
FTK Innovis Revanth Sidama 7.028173 38.48507 443128.1228 776894.5848 A2_West GF
FTK Innovis Revanth Sidama 7.027728 38.48452 443067.3219 776845.4565 A2_West GF
FTK Innovis Revanth Sidama 7.027942 38.48428 443040.8402 776869.1436 A2_West GF
FTK Innovis Revanth Sidama 7.029316 38.488591 443517.2 777020.5 A2_West GF
FTK ATC Sidama 7.030373 38.48952 443619.8848 777137.2588 A2_West GF
Nominal     Sidama 7.0452 38.482 442791.1299 778777.3127 A2_West GF
FTK Innovis Revanth Sidama 7.044195 38.48125 442708.173 778666.3007 A2_West GF
FTK Innovis Revanth Sidama 7.044183 38.48125 442708.1715 778664.9741 A2_West GF
FTK Fireside Nuhamin Sidama 7.049766 38.484802 443101.153 779281.7 A2_West RT
Colo Innovis Revanth Sidama 7.0452 38.482 442791.1299 778777.3127 A2_West GF
FTK Innovis Revanth Sidama 7.073239 38.48936 443607.3982 781876.16 A2_West GF
FTK Innovis Revanth Sidama 7.073991 38.49232 443934.3853 781958.9368 A2_West GF
FTK Innovis Revanth Sidama 7.072261 38.48981 443656.9767 781767.9865 A2_West GF
FTK ATC Sidama 7.079566 38.49598 444339.2554 782574.8195 A2_West GF
FTK Innovis Revanth Sidama 7.035215 38.49428 444146.1963 777671.9756 A2_West GF
FTK Innovis Revanth Sidama 7.033643 38.4946 444181.3515 777498.1514 A2_West GF
FTK ATC Revanth Sidama 7.032404 38.50306 445115.5896 777360.1781 A2_West GF
FTK Innovis Revanth Sidama 7.033044 38.503083 445118.205 777430.9279 A2_West GF
FTK Innovis Nuhamin Sidama 7.0352 38.5093 445805.1055 777668.5505 A2_West GF
FTK Innovis Revanth Sidama 7.023738 38.5007 444853.912 776402.4226 A2_West RT
FTK Innovis Revanth Sidama 7.02203 38.50063 444845.9793 776213.6102 A2_West GF
FTK Revanth Sidama 7.022891 38.502879 445094.5 776308.5 A2_West GF
FTK Innovis Nuhamin Sidama 7.0251 38.4997 444743.6 776553.1 A2_West GF
FTK Innovis Revanth Sidama 7.059082 38.47401 441910.4054 780312.9724 A2_West GF
FTK Innovis Revanth Sidama 7.059968 38.475684 441852.8527 780204.0336 A2_West GF
FTK Innovis Revanth Sidama 7.062314 38.48621 443258.1858 780668.7712 A2_West GF
FTK Innovis Revanth Sidama 7.061172 38.48694 443338.6684 780542.433 A2_West RT
FTK Fireside Revanth Sidama 7.06207 38.48774 443427.1 780641.6 A2_West GF
FTK Innovis Revanth Sidama 7.029212 38.47273 441765.3134 777010.9643 A2_West RT
FTK Innovis Revanth Sidama 7.029504 38.47128 441605.1992 777043.4259 A2_West GF
FTK Innovis Beakal Sidama 7.027442 38.470221 441487.976 776815.601 A2_West GF
Nominal     Sidama 7.0451 38.46526 440942.2694 778768.3409 A2_West GF
FTK Innovis Revanth Sidama 7.045228 38.46561 440980.9414 778782.4473 A2_West GF
FTK Innovis Revanth Sidama 7.044636 38.46428 440833.9744 778717.1691 A2_West GF
FTK Revanth Sidama 7.043701 38.464724 440882.9 778613.7 A2_West RT
Nominal     Gedeo 6.4056 38.3091 423595.0867 708092.226 A2_West GF
FTK ATC Logesh Gedeo 6.40557 38.30908 423592.8704 708088.9124 A2_West GF
Nominal     Gedeo 6.412331 38.313605 424094.3021 708835.6811 A2_West GF
FTK Zagwe Logesh Gedeo 6.41569 38.31041 423741.4623 709207.4984 A2_West GF
FTK ATC Gedeo 6.412581 38.31111 423818.414 708863.6889 A2_West GF
Nominal     Gedeo 6.3189 38.2598 418129.1119 698514.9006 A2_West GF
FTK Zagwe Logesh Gedeo 6.31679 38.25951 418096.7025 698281.6803 A2_West GF
Nominal     Sidama 7.067549 38.500095 444792.2736 781245.8376 A2_West GF
FTK Innovis Revanth Sidama 7.066185 38.49976 444755.1145 781095.0858 A2_West GF
FTK Innovis Revanth Sidama 7.068669 38.49992 444773.0797 781369.6754 A2_West GF
Colo Beakal Sidama 7.06926 38.49554 444289.428 781435.533 A2_West GF
FTK Innovis Revanth Sidama 7.068407 38.49927 444701.2633 781340.7882 A2_West GF
Nominal     Sidama 7.045912 38.490708 443752.9682 778854.9675 A2_West GF
FTK Innovis Revanth Sidama 7.047201 38.49051 443731.2556 778997.4916 A2_West RT
FTK Innovis Revanth Sidama 7.047413 38.49189 443883.6941 779020.7624 A2_West RT
FTK Fireside Beakal Sidama 7.043932 38.49008 443683.37 778636.152 A2_West GF
Colo Innovis Revanth Sidama 7.045912 38.49071 443753.1891 778854.9673 A2_West GF
Nominal     Gedeo 6.42217 38.2944 421971.8907 709926.2853 A2_West GF
FTK ATC Gedeo 6.425888 38.29106 421603.0905 710337.8286 A2_West GF
Nominal     Sidama 6.43459 38.29813 422386.2728 711298.7757 A2_West GF
FTK ATC Sidama 6.436813 38.296371 422192.0889 711544.8005 A2_West GF
Nominal     Sidama 6.88493 38.41753 435648.8754 761067.5382 A2_West GF
FTK Zagwe Logesh Sidama 6.8834 38.41766 435663.0322 760898.3768 A2_West GF
Nominal     Sidama 7.052475 38.470555 441528.0004 779582.9912 A2_West GF
FTK Innovis Revanth Sidama 7.053029 38.47158 441641.2741 779644.1083 A2_West RT
FTK Innovis Revanth Sidama 7.052542 38.47213 441701.9569 779590.201 A2_West RT
FTK Fireside Revanth Sidama 7.05432 38.47195 441682.3 779786.8 A2_West GF
Colo Innovis Revanth Sidama 7.052475 38.47056 441528.5526 779582.9905 A2_West GF
Nominal     Sidama 7.0197 38.49193 443884.7851 775957.0595 A2_West GF
FTK Innovis Revanth Sidama 7.018916 38.49352 444060.3079 775870.1976 A2_West GF
FTK Innovis Revanth Sidama 7.018506 38.49325 444030.4372 775824.904 A2_West GF
FTK Innovis Revanth Sidama 7.017113 38.493582 444066.9406 775670.867 A2_West GF
FTK ATC Sidama 7.023357 38.4892 443583.6954 776361.6719 A2_West GF
FTK Innovis Beakal Sidama 7.023018 38.489553 443622.643 776324.153 A2_West GF
Nominal     Sidama 7.0203 38.48114 442693.0952 776024.6954 A2_West GF
FTK Innovis Revanth Sidama 7.020019 38.48198 442785.8395 775993.5279 A2_West GF
FTK Innovis Revanth Sidama 7.0198 38.48032 442602.4644 775969.5202 A2_West GF
FTK ATC Sidama 7.035205 38.46491 440902.3614 777674.4788 A2_West GF
Nominal     Gedeo 6.40776 38.30557 423205.017 708331.5445 A2_West GF
FTK ATC Gedeo 6.409501 38.30375 423003.9999 708524.288 A2_West GF
Nominal Innovis Revanth Guraghe 8.1282 38.3811 431817.9173 898522.6933 A2_West GF
FTK Innovis Revanth Guraghe 8.127581 38.381821 431897.246 898454.1364 A2_West GF
FTK Innovis Revanth Guraghe 8.127694 38.381519 431863.9935 898466.6803 A2_West GF
FTK Zagwe Logesh Guraghe 8.12804 38.38083 431788.1442 898505.0494 A2_West GF
Nominal     Wolayita 6.85768 37.76752 363820.2204 758190.8566 A2_West GF
FTK Fireside Revanth Wolayita 6.85926 37.77371 364504.7179 758363.8054 A2_West GF
FTK Fireside Logesh Wolayita 6.85672 37.77435 364574.7 758082.8 A2_West GF
FTK Revanth Wolayita 6.861061 37.7773302 364905.3 758561.9 A2_West GF
Nominal     Gedeo 6.4076 38.31341 424072.037 708312.69 A2_West GF
FTK ATC Gedeo 6.389609 38.31017 423711.0492 706324.2347 A2_West GF
Nominal     Gamo 6.03421 37.557 340297.3702 667197.6756 A2_West GF
FTK Fireside Revanth Gamo 6.027319 37.5447 338933.7588 666439.3076 A2_West GF
FTK Fireside Revanth Gamo 6.028567 37.546785 339164.9 666576.7 A2_West GF
Nominal     Sidama 7.02586 38.49523 444250.0056 776637.6589 A2_West GF
FTK Innovis Revanth Sidama 7.025412 38.49545 444274.2511 776588.1059 A2_West GF
FTK Innovis Revanth Sidama 7.026593 38.49514 444240.1525 776718.7034 A2_West GF
FTK ATC Sidama 7.019149 38.4974 444488.8845 775895.4948 A2_West GF
Nominal     Hadiya 7.569507 37.849436 373071.0435 836874.5884 A2_West GF
FTK ATC Hadiya 7.566396 37.85125 373270.2796 836530.0732 A2_West GF
FTK Fireside Revanth Hadiya 7.566731 37.850371 373173.4 836567.4 A2_West GF
Nominal     Bench Sheko 6.99128 35.59357 786563.3572 773574.7709 A2_West GF
FTK Zagwe Revanth Bench Sheko 6.99072 35.59401 786612.3 773513.1 A2_West GF
Nominal     Gamo 6.00603 37.54623 339096.8661 664084.7761 A2_West GF
FTK Fireside Revanth Gamo 6.0035 37.5404 338450.7 663806.7 A2_West GF
Nominal     Wolayita 6.87226 37.75853 362830.9175 759805.5474 A2_West GF
FTK Fireside Revanth Wolayita 6.867062 37.75924 362907.9 759230.6 A2_West GF
FTK ATC Wolayita 6.86628 37.75853 362829.2036 759144.331 A2_West GF
Nominal     Wolayita 6.84762 37.76347 363369.7933 757079.6636 A2_West GF
FTK ATC Wolayita 6.85614 37.7627 363287.1268 758021.9481 A2_West RT
FTK Fireside Wolayita 6.855611 37.763938 363423.787 757963.103 A2_West RT
Nominal     Hadiya 7.5379 37.8613 374370.9037 833376.3428 A2_West GF
FTK Fireside Revanth Hadiya 7.53203 37.86328 374587.6898 832726.726 A2_West GF
FTK ATC Hadiya 7.532566 37.863815 374646.877 832785.8382 A2_West GF
Nominal     Hadiya 7.543018 37.867306 375035.0787 833940.5175 A2_West GF
FTK ATC Hadiya 7.543851 37.863405 374604.8844 834033.7417 A2_West GF
Nominal     Hadiya 7.55116 37.86263 374521.4789 834842.1233 A2_West GF
FTK ATC Hadiya 7.551947 37.856594 373855.7094 834930.8846 A2_West GF
FTK Fireside Revanth Hadiya 7.551009 37.855908 373779.7 834827.4 A2_West GF
FTK Fireside Revanth Hadiya 7.549632 37.852419 373394.4 834676.1 A2_West RT
FTK Fireside Beakal Hadiya 7.550471 37.852188 373369.132 834768.96 A2_West RT
Nominal     Sidama 7.05038 38.51297 446212.1938 779346.2856 A2_West GF
FTK Innovis Revanth Sidama 7.049806 38.51237 446145.8617 779282.8987 A2_West GF
FTK Innovis Revanth Sidama 7.049806 38.512372 446146.0826 779282.8984 A2_West GF
Nominal     Hadiya 7.551678 37.883052 376774.9299 834893.5724 A2_West GF
FTK Fireside Revanth Hadiya 7.56595 37.89364 377947.1806 836468.6381 A2_West GF
FTK Fireside Revanth Hadiya 7.55694 37.88517 377010.1 835474.8 A2_West GF
FTK ATC Hadiya 7.565256 37.891931 377758.4268 836392.3828 A2_West GF
Colo     Hadiya 7.551678 37.883052 376774.9299 834893.5724 A2_West GF
Nominal Innovis Revanth Guraghe 8.10558721 38.37700214 431362.6147 896023.3491 A2_West GF
FTK Innovis Revanth Guraghe 8.10685 38.37693 431354.8807 896162.9734 A2_West GF
FTK Innovis Revanth Guraghe 8.10474 38.37831 431506.5674 895929.4622 A2_West GF
FTK ATC Guraghe 8.102921 38.3744 431075.4651 895729.0175 A2_West GF
Nominal     Wolayita 6.865711 37.76355 363383.7886 759079.9817 A2_West GF
FTK ATC Wolayita 6.86287 37.76635 363692.4008 758765.0521 A2_West RT
FTK 8.921065 38.768908 474594.2086 986133.332 A1_South GF
FTK Innovies Nuhamin Akaki - Kalit 8.9215 38.768826 474585.2238 986181.4302 A1_South GF
Nominal 8.921065 38.768908 474594.2086 986133.332 A1_South GF
FTK Zagwe Abhishek 8.56122 39.29027 531942.3798 946354.5197 A2_East RT
FTK I-Engg Revanth East Shewa 8.547431 39.264699 529129.4802 944828.0377 A2_East GF
Nominal Zagwe Logesh East Shewa 8.54787 39.26726 529411.2803 944876.7661 A2_East Nominal
Nominal 8.878666 38.766486 474324.9818 981445.972 A1_South Nominal
FTK Tesla logesh Akaki - Kalit 8.878288 38.76584 474253.9269 981404.2261 A1_South RT
Nominal 8.866949 38.824317 480682.948 980147.0716 A1_South Nominal
FTK I-Engg Revanth Akaki - Kalit 8.8647 38.8242 480670 979898.4 A1_South RT
Colo Beakal Akaki - Kalit 8.86695 38.82497 480754.748 980147.148 A1_South GF
FTK Tesla Logesh Akaki - Kalit 8.867593 38.821974 480425.359 980218.3929 A1_South GF
Nominal Tesla Logesh Bole 8.98474005 38.8790675 486707.2607 993167.2959 A1_South Nominal
Colo Tesla Beakal Bole 8.98467 38.8791 486710.831 993159.55 A1_South GF
FTK Tesla Logesh Bole 8.981711 38.87731 486513.9664 992832.4763 A1_South GF
Nominal 8.9709599 38.8733318 486076.2737 991644.0119 A1_South Nominal
Colo Beakal Bole 8.97097 38.87332 486074.977 991645.129 A1_South GF
FTK Zagwe Logesh Bole 8.9712226 38.874732 486230.1977 991673.0026 A1_South GF
Nominal 8.99372 38.88368 487214.5762 994159.9316 A1_South Nominal
Colo Beakal Bole 8.99372 38.88368 487214.5762 994159.9316 A1_South GF
FTK Zagwe Logesh Bole 8.99444 38.88381 487228.8905 994239.5284 A1_South GF
FTK Zagwe Logesh Nefas Silk 8.9570769 38.69947 466963.5197 990120.2389 A1_South RT
Nominal 8.957254 38.697073 466700.0375 990140.0348 A1_South Nominal
Nominal 8.955459 38.691698 466109.0064 989942.073 A1_South Nominal
FTK Tesla Logesh Kolfe - Keran 8.95278 38.69406 466368.4123 989645.6703 A1_South RT
FTK TESLA Revanth East Shewa 8.9813248 38.666835 463378.4 992804.1 A1_North GF
FTK Beakal East Shewa 8.980755 38.667745 463478.404 992741.06 A1_North GF
Nominal East Shewa 8.980043 38.671254 463864.0483 992661.9946 A1_North Nominal
Nominal East Shewa 8.54019 39.269009 529604.3469 944027.8321 A2_East Nominal
FTK Adrian Logesh East Shewa 8.540248 39.268114 529505.8 944034.2 A2_East RT
Nominal Adrian Logesh East Shewa 8.519807 39.262957 528939.856 941773.918 A2_East Nominal
FTK Adrian Logesh East Shewa 8.518901 39.262626 528904.152 941678.485 A2_East GF
FTK ATC Revanth 8.515947 39.26857 529557.9 941347.6 A2_East GF
FTK Adrian Revanth East Shewa 8.515947 39.26857 529557.9 941347.6 A2_East GF
FTK Zagwe Beakal East Shewa 8.516125 39.268181 529515.072 941367.247 A2_East GF
Nominal 8.51582 39.269032 529608.7541 941333.593 A2_East Nominal
FTK Adrian Revanth 8.551519 39.26231 528866.3 945279.8 A2_East GF
Nominal 8.551598 39.262322 528867.5818 945288.5445 A2_East Nominal
Nominal 8.55991 39.281454 530972.333 946208.9708 A2_East Nominal
FTK Fireside Revanth 8.55907 39.281139 530972.333 946208.9708 A2_East GF
Nominal 8.75242 38.99522 499474.2588 967480.6318 A2_East Nominal
FTK Adrian Revanth 8.753009 38.995152 499466.7805 967545.7493 A2_East GF
Nominal 8.99144 38.860392 484654.753 993908.7543 A1_South Nominal
Colo Beakal Bole 8.99144 38.860392 484654.753 993908.7543 A1_South GF
FTK Zagwe logesh Bole 8.99192 38.85949 484555.6283 993961.8597 A1_South GF
Nominal Innovis Hamza Kirkos 9.00902 38.775 475269.905 995857.032 A1_South GF
Nominal Maktech Hamza Bole 9.01091 38.88318 487160.224 996060.432 A1_South GF
FTK Innovis Revanth Kirkos 9.005847 38.78753 476646.9 995505.4 A1_South RT
FTK I-Engg Nuhamin Kirkos 9.006032 38.767831 474481.7355 995527.1765 A1_South RT
FTK Innovis Revanth Kirkos 8.98954 38.822568 480497.2 993700.5 A1_South RT
Nominal Innovis Hamza Kirkos 9.007026 38.766518 474337.49 995637.163 A1_South GF
FTK Zagwe Nuhamin Kolfe - Keran 9.032784 38.713317 468545.356 998523.983 A1_North RT
Nominal Innovis Hamza Kolfe - Keran 9.0331 38.7138 468545.356 998523.983 A1_North GF
Nominal Zagwe Hamza Arada 9.03205 38.7708 474809.871 998403.473 A1_North GF
Nominal Innovis Hamza Bole 9.01948 38.8144 479601.022 997011.037 A1_South GF
FTK fireside Revanth Kirkos 8.991364 38.765602 474235.7 993905.7 A1_South RT
Nominal Zagwe Logesh Kirkos 8.99341 38.7667 474356.535 994131.791 A1_South GF
Nominal Maktech Hamza Akaki - Kalit 8.87222 38.8146 479614.812 980730.336 A1_South GF
FTK Tesla Revanth Gulele 9.05123 38.76192 473835.3 1000525 A1_North RT
Nominal Fireside Hamza Gulele 9.0496 38.76464 474134.108 1000344.2 A1_North GF
Nominal Innovis Hamza Bole 8.99604 38.7915 477082.636 994420.916 A1_South GF
Nominal Innovis Revanth Sidama 7.07957 38.49598 444339.256 782575.262 A2_West GF
Nominal Innovis Revanth Sidama 7.0352 38.510912 445983.146 777668.364 A2_West GF
Nominal Innovis Revanth Sidama 7.0227 38.5008 444864.835 776287.659 A2_West GF
Nominal Innovis Revanth Sidama 7.0597 38.4744 441953.555 780381.245 A2_West GF
Nominal Innovis Revanth Sidama 7.061172 38.4869 443334.251 780542.438 A2_West GF
Nominal Innovis Revanth Sidama 7.029212 38.4727 441762 777010.968 A2_West GF
FTK Zagwe Logesh Adama 8.560326 39.29033 531949.057 946255.6876 A2_East GF
FTK Zagwe Revanth 8.56022 39.2889 531791.7 946243.9 A2_East GF
FTK Zagwe Revanth 8.562009 39.291517 532079.5 946441.9 A2_East GF
Nominal Zagwe Abhishek   8.561108 39.290272 531942.609 946342.138 A2_East GF
FTK Revanth East Shewa 8.516419 39.248335 527330.9 941398.3 A2_East GF
Nominal Fireside Logesh East Shewa 8.516567 39.24786 527278.5677 941414.6215 A2_East Nominal
Finfine 9.068372 38.656231 462221.9 1002429 A2_East
FTK Fireside Revanth Special GF
Finfine 9.069718 38.663564 463027.8819 1002577.156 A2_East
Nominal Fireside Logesh Special Nominal
FTK Fireside Revanth Akaki - Kalit 8.902105 38.757475 473335.906 984037.9648 A1_South GF
Nominal Akaki - Kalit 8.901181 38.75766 473356.1789 983935.7963 A1_South Nominal
FTK Igado Revanth Kolfe - Keran 9.08962 38.762325 473882.6 1004769 A1_North GF
FTK Igado Revanth Kolfe - Keran 9.090834 38.762701 473924 1004903 A1_North GF
Colo Beakal Kolfe - Keran 9.09322 38.76184 473829.549 1005166.97 A1_North GF
Nominal Kolfe - Keran 9.084564 38.761354 473775.5142 1004210.007 A1_North Nominal
Nominal Kolfe - Keran 9.075694 38.758476 473458.6005 1003229.561 A1_North Nominal
FTK Fireside Nuhamin Kolfe - Keran 9.075646 38.758632 473475.7401 1003224.243 A1_North GF
FTK Fireside Nuhamin Kolfe - Keran 9.074504 38.760074 473634.1209 1003097.88 A1_North GF
Colo Beakal Kolfe - Keran 9.07494 38.76027 473655.692 1003146.07 A1_North GF
FTK Fireside logesh Kolfe - Keran 9.075694 38.758476 473458.6005 1003229.561 A1_North RT
Colo Bole 9.080942 38.729463 470270.7334 1003812.021 A1_South Colo
Nominal Bole 9.080942 38.729463 470270.7334 1003812.021 A1_South Nominal
Nominal Bole 8.9321658 38.714446 468607.6716 987364.8015 A1_South Nominal
Nominal Kirkos 9.065994 38.864187 485074.9536 1002151.115 A1_South Nominal
FTK Igado Logesh Kirkos 9.065852 38.865954 485269.131 1002135.344 A1_South RT
FTK Beakal Kirkos 9.06391 38.86438 485096.077 1001920.7 A1_South GF
FTK Igado Logesh Kirkos 9.065968 38.865457 485214.5183 1002148.189 A1_South RT
Tx     Kirkos 8.99706 38.7647 474136.9604 994535.4689 A1_South RT
Tx I-Engg Logesh Kirkos 8.996367 38.766963 474385.7 994458.7 A1_South RT
Tx Logesh Yeka 9.02112 38.84186 482619.1903 997190.9327 A1_North RT
Tx Logesh Akaki - Kalit 8.923243 38.802014 478233.96 986372.0126 A1_South RT
Tx Logesh Nefas Silk 8.960216 38.712533 468399.7843 990466.1452 A1_South RT
Tx Logesh Bole 8.993261 38.775296 475301.3699 994114.7279 A1_South RT
FTK Innovis Nuhamin Yeka 9.024223 38.825968 480872.695 997534.7876 A1_North RT
FTK Igado Nuhamin Bole 9.012023 38.787729 476669.1678 996188.2016 A1_South RT
FTK Igado Nuhamin Bole 9.012839 38.786517 476536.0082 996278.4945 A1_South RT
FTK Igado Nuhamin Bole 9.012737 38.788044 476703.8356 996267.12 A1_South RT
FTK Maktech Nuhamin Arada 9.0309 38.7462 472106.114 998278.1203 A1_North RT
FTK Innovis Nuhamin Addis Ketema 9.03261 38.731372 470476.5709 998468.3417 A1_North RT
FTK Igado Nuhamin 40 Init Sites 8.890309 38.774195 475173.3792 982732.6669 A1_South RT
Nominal     Arada 9.033041 38.750301 472556.999 998514.515 A1_North GF
FTK Maktech Hamza Arada 9.033613 38.750245 472550.888 998577.759 A1_North RT
FTK Maktech Hamza Arada 9.03243 38.751588 472698.401 998446.867 A1_North RT
Colo Maktech Hamza Arada 9.033514 38.750527 472581.873 998566.792 A1_North GF
FTK Fireside Nuhamin Bole 9.003856 38.779811 475798.3 995285.8 A1_South RT
FTK Zagwe Nuhamin Yeka 9.020833 38.800103 478029.7395 997161.451 A1_North RT
FTK Fireside Nuhamin Arada 9.054066 38.742802 471734.4615 1000839.581 A1_North RT
Nominal   7.191548 38.587783 454488.645 794944.435 #N/A GF
Colo 7.18956 38.58712 454415.246 794724.727 #N/A GF
Nominal   6.288449 38.346337 427696.879 695135.712 #N/A GF
Colo 6.412331 38.313605 424094.302 708835.681 #N/A GF
Nominal   6.850028 37.831356 370872.542 757327.135 #N/A GF
Colo 6.86571111 37.76355 363383.789 759079.994 #N/A GF
Nominal   5.879166 37.339405 316157.466 650120.308 #N/A GF
Colo 6.02213 37.55031 339553.256 665863.869 #N/A GF
Nominal   8.183725 34.851051 703926.21 905078.08 #N/A GF
Colo 8.2488 34.59782 675992.081 912155.409 #N/A GF
Nominal   7.665089 36.853073 263167.526 847865.287 #N/A GF
Colo 7.676108 36.82935 260555.546 849097.449 #N/A GF
Nominal   7.173728 39.458121 550581.516 792979.238 #N/A GF
Candidate MS 1.2. SAR
Candidate Submission Resubmitted SAR Received Validation by
Site type Remarks SAR Additional Remark
Approved/Rej Relaxation by Nokia
Status Date Date Vendor [AC]
ected reason
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Initially itNominal
was rejected
Approved with SAR
by owner
approved
but by
he RF
agreed now for  rent.Rejected(High
17-Nov-21rent)   17-Oct-21 18-Oct-21
Rooftop Checked Nominal with SAR RejectedRejected
Rejected by RFBuilding height is very 20-Apr-22
low 20-Apr-22 20-Apr-22
Rejected(Dropped 23-Apr 23-Apr 23-Apr
Rooftop Checked Rejected
Nominal with SAR Rejected bydue
SAQto high rental price)
Rooftop Approved(A
Checked & D seems
Nominal
same
Approvedwithbuilding)_confirmation
SAR approved by STEPreceived
RF after discussion with STEP on 09-June-22
19-May-22 19-May-22 19-May-22
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal with
Rejected(Owner
SAR Rejectedasking
by SAQ50000K_high  price) 29-09-2021   29-Sep-21 7-Oct-21
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF 24-10-2021 25-Oct-21 25-Oct-21
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF 24-10-2021 25-Oct-21 25-Oct-21
Rooftop Checked Approved Approved
Nominal with SAR approved by STEP RF 31-05-2022 6-Jun-22 31-05-2022 31-05-2022
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with
Rejected
SAR Rejected
(Block by RF
neighbour buildings)
  20-09-2021 31-Mar 31-Mar 31-Mar
the
the site location issite location
Greenfield
in side isChecked
militaryincamp
side military
and therecamp
is noand
Rejected
Nominal onethere
withtoSARis no one to by
communcate,
Rejected communcate,
they
CW they have
have informed informed
they are plan tothey
20-09-2021 are plan
constract new tobuilding,
constract new building,
20-Sep-21
we need we need new candidate
new 21-Sep-21
candidate
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   20-09-2021   20-Sep-21 21-Sep-21
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Rooftop Checked Approved
Nominal with SARApproved(Reverted
approved by RF to Colo)   20-09-2021   20-Sep-21 21-Sep-21
Rooftop Checked Owner
Rejected
Nominal withOwner
is asking is asking
50000K
SAR Rejected 5000K
Ber perby SAQBer perowner
month,Land month,Land owner Gebre 0911602402
Gebre 0911602402
20-09-2021   20-Sep-21 21-Sep-21
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   20-09-2021   20-Sep-21 21-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   4/10/2021   4-Oct-21 4-Oct-21
Rooftop Checked the ownerwith
Nominal
Approved gave us an
SAR appoitement
approved to sign
RF LA for tomorrow, after
byApproved
STEP he reads the LA
4/10/2021   document carefully
4-Oct-21 4-Oct-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominalnot
Rejected(Owner
Rejected with SAR Rejected
willing by SAQ
to sign DARA and confirmed  by Selcuk
18-11-2021
on 24-May-22)   11/18/2021 18-Nov-21
Greenfield Checked Nominal with SAR Rejected
Rejected by SAQ
Owner rejected   18-11-2021   11/18/2021 18-Nov-21
Rooftop with Jaffar
oved now(After discusstion Checked
Vs MulatuApproved
Nominal
on 08-June-22).
with SARInitially
approved rejected(moved 27-May
by STEP RF a lot from the nominal 27-May
to the wrong direction. Please try on the27-May
north direction)
Greenfield Checked Nominal
Rejected with SAR Rejected by SAQ
Owner rejected 6-Feb 2/6/2022 6-Feb-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   4/10/2021   4-Oct-21 5-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   4/10/2021   4-Oct-21 5-Oct-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   4/10/2021   4-Oct-21 5-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 11/26/2021
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 11/26/2021
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF   12/22/2021
Rooftop Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 12/29/2021
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 1/4/2022
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-11-2021 11-Nov-21 12-Nov-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 11-11-2021 11-Nov-21 12-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal with
Approved
Approved SAR approved
but before by STEP RF to owner  not willing
it was Rejected(Due 10/29/2021
for rent) 29-Oct-21 29-Oct-21
Rooftop Checked Nominal with SAR approvedApproved
Approved by RF   10/29/2021 29-Oct-21 29-Oct-21
radius for 146042 after
Rooftop
we secure Checked
the site 146002Rejected
Nominal
at this location)146002146002_A_FTK_PH09.0090238.775A9.00992638.7745849510050RT3515Rooftop465%33%100%60%49%44%78%
with SAR Rejected by STEP   14-09-2021   14-Sep-21 4-Oct-21
Rooftop Checked Approved
Nominal with SAR approvedResubmit
by RF   14-09-2021   14-Sep-21 4-Oct-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   14-09-2021   14-Sep-21 4-Oct-21
Rooftop Checked Rejected
Nominal
Rejected
with SAR
due to
Rejected
shadowby
and
RFblocked by near
  building
9-Mar-22   9-Mar-22 9-Mar-22
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   30-Jun-22   30-Jun-22 30-Jun-22
Nominal Nominal Nominal Nominal Nominal
Rooftop checked Rejected Rejected(DARA
Nominal with S signed for candidate-C)
  15-09-2021 9/15/2021 15-Sep-21 15-Sep-21
Greenfield checked Approved
Nominal with SAR approvedApproved
by RF   15-09-2021 9/15/2021 15-Sep-21 15-Sep-21
Rooftop checked Approved Nominal with S Approved   14-Jun 14-Jun 14-Jun
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SARApproved(Access
approved by STEPissue
RF resolved)
  8-Sep-21 9/11/2021 11-Sep-21 11-Sep-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   8-Sep-21 9/11/2021 11-Sep-21 11-Sep-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   8-Sep-21 9/11/2021 11-Sep-21 11-Sep-21
Nominal Nominal Nominal Nominal Nominal
Greenfield CheckedAgain Rivo/Zagwe
Nominal with
Rejected has submitted
SAR
Rejected(the
Rejected
candidate-A
bylocation
STEP isis out
not of
right.)
search ring(8.91449
2-Dec 38.77942_730
  m Away2-Dec
from nominal 2-Dec
Greenfield Checked Nominal with SAR
Rejected Rejected(the
Rejected bylocation
STEP is not right.)
  2-Dec   2-Dec 2-Dec
Greenfield Checked Nominal withRejected(Owner
Rejected SAR Rejected byhas
SAQno interest to rent) 17-May 17-May 17-May
Greenfield Checked Nominal with SAR approved byApproved
Approved STEP RF 13-Jun 13-Jun 13-Jun
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   12/10/2021   12-Oct-21 13-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   12/10/2021   12-Oct-21 13-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR
Rejected Rejected by SAQ
Rejected(owner not willing for rent)
  11/9/2021 9/16/2021 16-Sep-21 16-Sep-21
Greenfield Checked Nominal Rejected(Owner
Rejected with SAR Rejected
notbywilling
SAQ for rent)_26'Apr'22
  11/9/2021 9/16/2021 16-Sep-21 16-Sep-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   11/9/2021 9/16/2021 16-Sep-21 16-Sep-21
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   11/9/2021 9/16/2021 16-Sep-21 16-Sep-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SARApproved(Revereted
approved by RF to Colo) 19-May 19-May 19-May
Greenfield Checked Nominal with SAR Rejected(owner
Rejected Rejected by SAQnot willing)   10/29/2021 29-Oct-21 29-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF   10/29/2021 29-Oct-21 29-Oct-21
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   10/29/2021 29-Oct-21 29-Oct-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   29-09-2021   29-Sep-21 7-Oct-21
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF   17-10-2021   17-Oct-21 17-Oct-21
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF   25-10-2021   25-Oct-21 25-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR
Rejected(owner
Rejected by not
SAQ willing for rent)
  22-Aug-21 2-Dec 2-Dec 2-Dec
Greenfield Checked Rejected
Nominal with
Rejected(NOK
SAR Rejected
for by
RF).
RFnew search ongoing
  22-Aug-21 2-Dec 2-Dec 2-Dec
Rooftop Checked Rejected
Nominal with SAR Rejected
Rejected(Low
by RF BH)   8-Jul-22 8-Jul-22 8-Jul-22 8-Jul-22
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   22-Aug-21 2-Dec 2-Dec 2-Dec
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR approvedApproved
Approved by RF 28-Apr 28-Apr 28-Apr
RoofTop Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due   11/26/2021 19-Oct-21 19-Oct-21
Greenfield Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due   11/26/2021 19-Oct-21 19-Oct-21
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   11/26/2021 15-Oct-21 15-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   9/19/2021 19-Sep-21 19-Sep-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   9/19/2021   19-Sep-21 19-Sep-21
RoofTop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   12/28/2021 28-Dec-21 28-Dec-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   1-Nov-2021 1-Nov-21 1-Nov-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   1-Nov-2021 1-Nov-21 1-Nov-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 9-Feb 2/9/2022 9-Feb-22
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   15-10-2021   15-Oct-21 15-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   15-10-2021   15-Oct-21 15-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal Owner
Candidate-A not Rejected
with SAR
was available,
droped due
bynotoone
SAQ to communicate,
owner will
and candidate-C iscall
newand follow/ 03/03/3022
15-10-2021   15-Oct-21 15-Oct-21
Greenfield Checked Rejected
Nominal with SAR RejectedRejected
by RF   15-10-2021   15-Oct-21 15-Oct-21
Rooftop Checked NominalRejected(Candidate
Rejected with SAR Rejected need
by STEP
on near to condominium)10-Mar-22   10-Mar-22 10-Mar-22
Rooftop Checked Nominal withheight
Rejected
Rejected(The SAR Rejected
is to lowby
to STEP
address the targeted coverage
1-Jul-22
area.)   1-Jul-22 1-Jul-22
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   15-10-2021   15-Oct-21 15-Oct-21
Nominal Nominal Nominal Nominal Nominal
Rooftop checked Nominal with SAR
Rejected Rejected by SAQ
Rejected(Owner not willing for rent)
  30-10-2021 1-Nov-21 1-Nov-21
Rooftop checked Approved
Nominal with SAR approvedApproved
by RF   30-10-2021 1-Nov-21 1-Nov-21
Rooftop checked Nominal with SAR Rejected
Rejected by STEP ISD)
Rejected(less 20-May 20-May 20-May
Sharing checked Nominal
Approved
with SAR approved byApproved
STEP RF   30-10-2021 1-Nov-21 1-Nov-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   11/29/2021
Greenfield Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due   11/29/2021
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   11/29/2021
Rooftop Checked Rejected
Nominal Moved a lot,Rejected
with SAR how can by
weRF
mitigate
Rejected(Due the coverage gap
to low BH) coming from the other side.4/15/2022
4/15/2022 4/15/2022
Rooftop Checked Approved
Nominal with SARApproved(Reverted
approved by RF to Colo) 7/12/2022 7/12/2022 7/12/2022
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   10/29/2021 29-Oct-21 29-Oct-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   10/29/2021 29-Oct-21 29-Oct-21
Rooftop Checked Rejected
Nominal with SAR Rejected
AllRejected
3bysectors
RF blocked by neighbour
4/25/2022
buildings 25-Apr-22 25-Apr-22
Rooftop Checked Nominal
Rejected with SAR Ok,
Rejected(Not Rejected by STEP
still looks on lower level than the area)
4/25/2022 4/25/2022 4/25/2022
Rooftop Checked Rejected
Nominal with SAR RejectedRejected
by RFBoth E & F same location
4/25/2022 4/25/2022 4/25/2022
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 5-Feb 2/5/2022 5-Feb-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 11/17/2021
Rooftop Checked Nominal
Approved the owner
with SARApproved(SAQ
approved need
by STEP
issue
RFisdiscuss with his relatives
Resolved) to sign LA
12/2/2021
Rooftop Checked Rejected rejected(wrong
Nominal with SAR Rejected by STEPcoordinates) 5/31/2022 31-May 31-May
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 11/22/2021
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 11/22/2021
RoofTop Checked Approved
Nominal with SAR approvedChecked
by RF 12/24/2021 24-Dec-21 24-Dec-21
RoofTop Checked Rejected
Nominal
Rejected(Due
with SARtoRejected
high price
byconfirmed
SAQ by Omar on 30-June)
12/29/2021
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11/22/2021
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR
Approved(Reverted
approved by RF due to RT) 12/1/2021
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 12/1/2021
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 4/27/2022 4/27/2022 4/27/2022
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 4/27/2022 4/27/2022 4/27/2022
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   20-09-2021   20-Sep-21 21-Sep-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   20-09-2021   20-Sep-21 21-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal with SAR
Rejected Rejected by SAQ
Rejected(Owner not willing for rent)
  02-11-2021   4-Nov-21 4-Nov-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   02-11-2021   4-Nov-21 4-Nov-21
Greenfield Checked Nominal with SARApproved(Reverted
Approved approved by RF to Colo) 10-May 10-May 10-May
Sharing Checked Nominal with SAR approved by
Approved STEP RF
Approved   02-11-2021 4-Nov-21 4-Nov-21
Nominal Nominal Nominal Nominal Nominal
ven if we got
candidate
only 1even
possible
wasifdropped
webuilding
Rooftop duetower,
got only 1topossible
notthey
enough
askedspace
40,000birr
building
Rejected
Nominal for
withCW
tower, andasked
they
SAR there40,000birr
is no
Rejected byother building
RF and there isaround( Candidate
no other building has
18-10-2021 dropped)(Approved
around( candidate was
Candidate has18-Oct-21
dropped) dropped due to not enough space
18-Oct-21
candidateRooftop
was dropped due to not enough space
Rejected
Nominal for CW
candidate
with SAR
was Rejected
dropped due
by CW
to not enough space
  for CW
18-10-2021   18-Oct-21 18-Oct-21
Approved
Rooftop after discussion
Checked withApproved
Nominal
STEP RF(May
with SAR
24) &
approved
confirmation
by STEP
received
RF from jaffar on 09-June-22(direct
30-Apr discussion with30-Apr
Mulatu) 30-Apr
Rooftop Checked Nominal with SAR approvedApproved
Approved by RF 30-Apr 30-Apr 30-Apr
Greenfield Checked Rejected(Owner
Rejected documents
Nominal with SAR Rejectednot
bycomplete
SAQ and reverted
  to RT
21-Mar-22
oprtion)   21-Mar-22 21-Mar-22
Nominal Nominal Nominal Nominal Nominal
Rooftop checked Nominal with SAR Rejected(Owner
Rejected Rejected by SAQnot willing)   30-10-2021 1-Nov-21 1-Nov-21
Rooftop checked Nominal with SAR Rejected by
Rejected Rejected
STEP 10-May 10-May 10-May
Sharing checked Nominal
Approved
with SAR approved byApproved
STEP RF   30-10-2021 1-Nov-21 1-Nov-21
Nominal Nominal Nominal Nominal Nominal
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   19-09-2021   19-Sep-21 19-Sep-21
Greenfield Checked Rejected
Nominal with
candidate
SAR Rejected
was dropped
by SAQ
due to owner not
  willing19-09-2021   19-Sep-21 19-Sep-21
Rooftop Checked Rejected
Nominal with
Active
SARcandidate
Rejected
Active
was
by CW
dropped
candidatedue
wastodropped
space 19-09-2021
due to space   19-Sep-21 19-Sep-21
Rooftop Rejected(owner
Checked don't Rejected
have
Nominal
proper
with
document
SAR Rejected
for DARA
by SAQ
register and it was
  confirmed
21-Mar-22
by Selcuk on 05-June-22)
  21-Mar-22 21-Mar-22
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   5/11/2021 11-May-21 11-May-21
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF   5/11/2021 11-May-21 11-May-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal with SAR Rejected Approved
Rejected by STEP 12/9/2021
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF 12/9/2021
Rooftop Out off search ring Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 12/9/2021
Rooftop Checked Nominal with SAR
Approved approved bydiscussion
Approved(After STEP RF with mulatu) 4/11/2022 4/11/2022 4/11/2022
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   11/17/2021 29-Oct-21 29-Oct-21
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF   11/17/2021 29-Oct-21 29-Oct-21
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Rooftop Checked Rejected
Nominal with SAR Rejected(ET
Rejected by SAQ
site is pointed) 22-Feb 2/22/2022 22-Feb-22
Rooftop Checked Rejected
Nominal with SAR
Rejected(Owner
Rejected1st
byand
not
SAQ willing for rent)
2nd 11-11-2021 11-Nov-21 12-Nov-21
Rooftop Checked Nominal with SAR Rejectedsector
Rejected by RFis 20-May 20-May 20-May
blocked by
Rooftop Checked Rejected Approved(but
Nominal with SAR Rejectedneighbour
by RF 28-May 28-May 28-May
needs to
buildings
Rooftop Checked Nominal
Approved
with SAR approved byrelocate
STEP the
RF 22-Jun 22-Jun 22-Jun
year 1 site
Rejected(Due
Rooftop Checked Rejected
Nominal with SAR Rejected by STEP 25-Jun 25-Jun 25-Jun
to 144016)
blockage)
Rooftop Checked Rejected
Nominal with SAR
Rejected(Owner
Rejected by not
SAQ Owner
willingnot
forwilling
rent) for 11-11-2021
rent 11-Nov-21 12-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop checked Rejected
Nominal
Nominal
withcolocation
SARNominal
Rejected
option
colocation
byrefused
SAQ access
option refused
by building
access
owner
15-09-2021
by building owner
9/15/2021 15-Sep-21 15-Sep-21
Rooftop checked Nominal
Approved
with SAR approved byApproved
STEP RF   15-09-2021 9/15/2021 15-Sep-21 15-Sep-21
Greenfield checked Approved
Nominal with SAR approvedApproved
by RF   15-09-2021 9/15/2021 15-Sep-21 15-Sep-21
Obstruction
Rooftop
in 0°  and tapered roof willRejected
create
Nominal
Obstruction
shadowing
with SAR
in 0° 
Rejected
and tapered
by RFroof will create shadowing
25-Nov-21 25-Nov-21 25-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal As
withper
SARalignment
approved
with
Checked
bycustomer
RF new RT
  candidate 5-Jan
SAR is required at specific location
3-Sep-21(9.031415,
5-Sep-21
38.734660) OR (9.031273, 38.73
Rooftop Checked Approved
Nominal As
withper
SARalignment
approved
with
Checked
bycustomer
RF new RT
  candidate 5-Jan
SAR is required at specific location
3-Sep-21(9.031415,
5-Sep-21
38.734660) OR (9.031273, 38.73
Rooftop Checked Approved No Lattitude,
Nominal with SAR Longtude
approvedChecked
by RF and SMP,TSSR Submitted
5-Janas candidate E 5-Jan-22 5-Jan-22
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 3-Mar-22 3-Mar-22 3-Mar-22
Rooftop Checked Approved
Nominal As
withper
SARalignment
approved
with
Checked
bycustomer
RF new RT
  candidate 5-Jan
SAR is required at specific location
3-Sep-21(9.031415,
5-Sep-21
38.734660) OR (9.031273, 38.73
Nominal Nominal Nominal Nominal march 2/2022 site searching
Nominal
Rooftop Checked Approved
Nominal with SARApproved(Reverted
approved by RF to Colo)   18-11-2021 12/2/2021 11/18/2021 18-Nov-21
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF   18-11-2021 12/2/2021 11/18/2021 18-Nov-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   19-Aug-21   19-Aug-21 25-Aug-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   19-Aug-21   19-Aug-21 25-Aug-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   19-Aug-21   19-Aug-21 25-Aug-21
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   NA   NA NA
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   18-10-2021   18-Oct-21 18-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   18-10-2021   18-Oct-21 18-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF   1-Dec
Greenfield Checked Rejected
Nominal with SAR
Rejected(owner
Rejected by not
SAQ willing for rent)
  1-Dec
Rooftop Checked Nominal with SAR Rejected by
Rejected STEP
Rejected 26-Apr 26-Apr 26-Apr
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20-May 20-May 20-May
Rooftop Checked Approved NominalApproved(Reverted
with to Colo) 23-May 23-May 23-May
Sharing Checked Approved Nominal with S Approved   1-Dec
Nominal Nominal Nominal Nominal Nominal
Jaffar and Safaricaon
Rooftop STEP RF appeovedRejected
with
Nominal
9 mtrwith
master
SAR Rejected
TSSRbyRejected
RF   03-11-2021   4-Nov-21 4-Nov-21
Abel from safaricom are visited with Jaffar on Mar-29
Greenfield and they
Rejected
Nominal withagreed
candidate withdropped
thisby
SAR Rejected
was building
SAQ
due to owner not
  willing03-11-2021   4-Nov-21 4-Nov-21
Rooftop Approved Nominal with SAR approved by
Approved STEP RF
Approved 30-Mar 30-Mar 30-Mar
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   10/29/2021 29-Oct-21 29-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with Approved(Reverted
SAR approved by RFdue to RT option) 12/1/2021 12/3/2021
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 12/1/2021 12/3/2021
Rooftop Approved(No
Checked SD Issue
Approved
and it was confirmed
Nominal with by
S ottoom on 27-June-22)Reverted
4/27/2022
to Colo DARA Registeres 4/27/2022 4/27/2022
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 4/27/2022 4/27/2022 4/27/2022
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 11/18/2021
Greenfield Checked Approved
Nominal with SAR
Approved(Reverted
approved by RFfor RT option) 11/18/2021
Approved(OK,
Rooftop
but move
Checked
the nominal location
Rejected
Nominalofwith
Y1 site
SAR141051
Rejected
to 8.962282,38.763049)Nominal
by SAQ 4/28/2022
with SAR Rejected by SAQ Missing
4/28/2022
Document
4/28/2022
Rooftop Checked Approved Nominal with Approved 7/6/2022 7/6/2022 7/6/2022
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   20-09-2021   20-Sep-21 21-Sep-21
Rooftop Checked Rejected Rejected(Owner
Nominal with SAR not willing for rent)
Rejected by SAQ   20-09-2021   20-Sep-21 21-Sep-21
Rooftop Checked Approved Approved
Nominal with SAR approved by STEP RF   7-Jun   7-Jun 7-Jun
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked hasThe owner
The ownerRejected
Nominal
a plan
with has
SARaon
to build plan
thetoarea
Rejected build
byandonThey
SAQ the area and Theyto
are interested are interested
rent for only to
20-09-2021 rent for
2 years.  only 2 years.
20-Sep-21 22-Sep-21
Rooftop Checked Rejected
Nominal
Rejected
with SAR
(Out off
Rejected
searchby
ring
Wall
RFinter
mount
site option
distance
is in
notnear)
20-09-2021
sutable 31-Mar-22 31-Mar-22 31-Mar-22
Sharing Checked Nominal
Approved
with SAR approvedChecked,
byApproved
STEP TSSR
RF rejected in Drive
20-09-2021
By Results   20-Sep-21 22-Sep-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 10-11-2021 10-Nov-21 10-Nov-21
Greenfield Checked Approved
Nominal with SARApproved(Reverted
approved by RF to Colo) 10-11-2021 10-Nov-21 10-Nov-21
Rejected(Not
Rooftop Ok,Checked Nominal
the effective antenna
Rejected withisSAR
height not Rejected by STEP
able to over come the elevation difference
16-May
to serve the intended coverage
16-May
target) 16-May
Rooftop Checked Rejected
Nominal with SAR RejectedRejected
by RF Buikding height is low16-May 16-May 16-May
Rooftop Checked Rejected
Nominal with SAR RejectedRejected
by RF Buikding height is low16-May 16-May 16-May
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF 10-11-2021 10-Nov-21 10-Nov-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Rejected(Govt
by SAQ isssue)   22-09-2021 12/13/2021 12/13/2021 12/13/2021
Rooftop Rehected by civil Rejected
Nominal with SAR
candidate
Rejected
notbybeing
CW constructible
  22-09-2021 12/13/2021 12/13/2021 12/13/2021
Approved(After
Rooftopdiscussion with Mulatu,
Checked he agreed
Nominal
Approved cand-C
with SAR on 12-Apr-22)Hold(Can
approved by STEP RF we go for a building at 8.987372,38.707652) but
7-Apr it's Iron roof7-Apr
7-Apr
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR
28 Aug:
approved
Nokiaby
suggested
Approved
STEP RFto find 3rd candidate
23-09-2021
with in 160m 9/23/2021
north East 23-Sep-21 23-Sep-21
Greenfield Checked Approved
Nominal with
28SAR
Aug:approved
Nokia suggested
Approved
by RF to find 3rd candidate
23-09-2021
with in 160m 9/23/2021
north East 23-Sep-21 23-Sep-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR
Candidate
Rejected
A by
Owner
SAQnot Interested
  18-10-2021   18-Oct-21 18-Oct-21
Greenfield Checked Rejected
Nominal
Rejected(Due
with SARtoRejected
High price
byconfirmed
SAQ by Omar
  on 30-June)
18-10-2021   18-Oct-21 18-Oct-21
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   18-10-2021   18-Oct-21 18-Oct-21
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Rooftop Checked Rejected
Nominal with SAR
Rejected(Owner
Rejected by
Nominal
not
SAQwilling
withfor
SARrent)
Rejected11-11-2021
by SAQ 11-Nov-21 12-Nov-21
Rooftop Checked Rejected(Due
Rejected
Nominal with
to Owner
SAR Rejected
not willing
bytoSAQ
rent anymore confirmed by15-Apr
Moureen) 15-Apr 15-Apr
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 5-Jul-22 8-Jul-22 5-Jul-22 5-Jul-22
Rooftop Checked Nominal
Approved
with SARApproved(OK,but
approved by STEP
goRF
with 9m RTT) 8-Jul-22 8-Jul-22 8-Jul-22
Rejected(can weRooftop
go for 9.004061,
Checked Nominal
38.797087, Rejected
since with
it will be SAR Rejected
blocked by STEPon the proposed location).
by buildings 11-11-2021
Already suggested for hunt
11-Nov-21
with innovis 12-Nov-21
as cand-C
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal withRejected(owner
SAR Rejected by
notSAQ
willing for give  land) 3/11/2021 11-Mar-21 11-Mar-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Rejected(Govt
by SAQ issue)   3/11/2021 11-Mar-21 11-Mar-21
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 4/16/2022 4/16/2022 4/16/2022
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due   19-09-2021   19-Sep-21 19-Sep-21
Greenfield Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due   19-09-2021   19-Sep-21 19-Sep-21
Rooftop Checked Nominal with SAR approvedApproved
Approved by RF 30-Apr 30-Apr 30-Apr
Rooftop Checked Nominal with SARApproved(Reverted
Approved approved by RF to Colo) 6-May 6-May 6-May
Sharing Checked Nominal with SAR approved by
Approved STEP RF
Approved   19-09-2021   19-Sep-21 19-Sep-21
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-11-2021 12-Nov-21 12-Nov-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 11-11-2021 12-Nov-21 12-Nov-21
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 11-11-2021 12-Nov-21 12-Nov-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-11-2021 12-Nov-21 12-Nov-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   15-Aug-21 2-Dec 2-Dec 2-Dec
Rooftop Checked Rejected
Nominal with SAR RejectedRental
by SAQissue   15-Aug-21 2-Dec 2-Dec 2-Dec
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 2-Dec 2-Dec 2-Dec
Rooftop Checked
Rejected(Failed
Rejected
Nominal
at SD stage
with SAR
and Owner
Rejected
refuse
by SAQ
at Dara stage Dawit confirm
28-Feb
by mail 6-28-2022 28-Feb-22 28-Feb-22
Rooftop Checked Rejected
Nominal with SAR RejectedRejected
by RF Out off search ring 7-May 7-May 7-May
Rooftop Checked Approved
Nominal with SARApproved(Reverted
approved by RF to Colo) 28-Jun 28-Jun 28-Jun
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   NA 2-Dec 2-Dec 2-Dec
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   15-10-2021   15-Oct-21 16-Oct-21
Greenfield Checked Nominal with
Rejected SAR Rejected by
Rejected(owner notSAQ
willing this location)
  15-10-2021   15-Oct-21 16-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 10-May 10-May 10-May
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   15-10-2021   15-Oct-21 16-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approved
RevertedbytoRF
RT option   18-10-2021   18-Oct-21 18-Oct-21
Greenfield Family
Checked Family
land and landwith
Rejected
Nominal
they need and they Rejected
need
discussion
SAR discussion
to agreebyonSAQ to agree
leasing on leasinghave
the land.They the land.They
18-10-2021 haveaplans
plans to build   to build18-Oct-21
house. a house. 18-Oct-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 29-04-2022 2-Aug-22 29-Apr-22 3-May-22
Rooftop Checked Nominal
Rejected(Moved
Rejected withthe
a lot from SAR Rejected
nominal by STEP
in wrong direction and missed it's
29-04-2022
target coverage area.) 29-Apr-22 3-May-22
Rooftop Checked Nominal
Building
Rejected with height
SAR Rejected
is low rejected
by RF by TSSR due to No possibility
Rejected 29-04-2022 of deploying 9m tower
29-Apr-22 3-May-22
Rooftop Checked Nominal with
Rejected(They
Rejected SAR Rejected
agreed by STEP
on candidate-B but it was already rejected
24-May-22
in SAQ) 24-May-22 24-May-22
Greenfield Checked Nominal
Rejected(please
Rejected with SAR Rejected
go for 143010_C, bysite
since the STEP143011 is in the middle 23-Jul-22
of the condominium.) 23-Jul-22 23-Jul-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 11/18/2021
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 30-Jan 1/30/2022 30-Jan-22
Greenfield Checked Rejected
Nominal with SAR Rejected by SAQ
Rejected(government land) 19-May 19-May 19-May
Rooftop Checked Approved
Nominal with SAR approved byAppoved
STEP RF 2-Jun 2-Jun 2-Jun
Greenfield Checked Nominal Rejected(owner
Rejected with SAR Rejected
notby SAQ for rent/space issue) 06-Mar-22
willing 06-Mar-22 06-Mar-22
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Rejected(better
Nominal with SARto goRejected
to the middle
by STEP
of the condominium)_05-Apr-22
  18-10-2021   18-Oct-21 18-Oct-21
Rooftop Checked Rejected
Nominal with SAR Rejected by
Rejected
STEP   18-10-2021   18-Oct-21 18-Oct-21
Rooftop Checked Rejected
Nominal with SAR Rejected itbyhave
RF a shadow   28-May   31-May 31-May
Rooftop Checked Rejected
Nominal Rejected(out
with SAR Rejected
of searchby
ring
RFand missed target
  area) 28-May   31-May 31-May
Rooftop Checked
Rejected(we need a coandidate
Rejected on following
Nominal with S location_8.958387,38.689653
14-Junand nearby 14-Jun 14-Jun
Greenfield Checked Rejected
Nominal with SAR RejectedRejected
by RF 14-Jun 14-Jun 14-Jun
Rooftop Checked Approved Nominal wi Approved 18-Jun 18-Jun 18-Jun
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   15-10-2021   15-Oct-21 15-Oct-21
Greenfield Checked Nominal Rejected(Owner
Rejected with SAR Rejected
notbywilling
SAQ for rent)_26'Apr'22
  15-10-2021   15-Oct-21 15-Oct-21
Rooftop Checked Rejected RejectedRejected
Nominal with SARRejected out
by off
RF search ring and own building
4-Mayshadowing 4-May 4-May
Rooftop Checked Nominal with SAR RejectedRejected
Rejected by RF Out off search ring 4-May 4-May 4-May
Rooftop Checked Rejected
Nominal Rejected(NotOk,
with SAR Rejectedplease go for better candidate)
by STEP 7-May 7-May 7-May
Rooftop Checked Nominal with SAR approvedApproved
Approved by RF 7-May 7-May 7-May
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   15-10-2021   15-Oct-21 15-Oct-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 23-11-2021 23-Nov-21 23-Nov-21
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF   12/3/2021
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF   12/3/2021
Nominal Nominal Nominal Nominal Nominal   NA   NA NA
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   14-09-2021 12/13/2021 12/13/2021 12/13/2021
Greenfield Checked Nominal Rejected(Owner
Rejected with SAR Rejected
notbywilling
SAQ for rent)_26'Apr'22
  14-09-2021 12/13/2021 12/13/2021 12/13/2021
Rooftop Checked Nominal with SAR approvedApproved
Approved by RF 29-Apr 29-Apr 29-Apr
Rooftop Checked Nominal with SAR approvedApproved
Approved by RF 29-Apr 29-Apr 29-Apr
Rooftop Approved(Candidate-E
Checked Nominal with
Approved has re-activated
SAR approvedduebytoSTEP
DARARFsigned and colo has dropped
29-Apr on 29-June-22) 29-Apr 29-Apr
Nominal Nominal Nominal Nominal Nominal
Candidates are
Greenfield
planned as per old nominal need
Rejected
Candidates
Nominal
to find with
new
are SAR
search
planned
Rejected
as per by
oldRF
nominal need  to find new
19-Aug-21
search   19-Aug-21 20-Aug-21
Candidates are
Greenfield
planned as per old nominal need
Rejected
Candidates
Nominal
to find with
new
are SAR
search
planned
Rejected
as per by
oldRF
nominal need  to find new
19-Aug-21
search   19-Aug-21 20-Aug-21
Greenfield Checked Rejected
Nominal with SAR Rejected
TSSRbyRejected
RF   19-Aug-21   19-Aug-21 20-Aug-21
Rooftop Checked Nominal
Rejected(candwith SAR Rejected by SAQ Blocked by
Rejected D doesn’t have full documents to continue with12-Apr-22
LA signing) 12-Apr-22 12-Apr-22
Neighbour
Rooftop Checked Nominal with SAR RejectedRejected
Rejected by RF Blocked
buildingsby 21-Apr 21-Apr 21-Apr
Neighbour
Rooftop Checked Nominal
Rejected with SAR Rejected by RF
Rejected buildings 21-Apr 21-Apr 21-Apr
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 26-Apr 26-Apr 26-Apr
building is
Rooftop Checked Nominal with SAR RejectedRejected
Rejected by RF still under 21-Apr 21-Apr 21-Apr
construction
Nominal Nominal Nominal Nominal Nominal  
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   17-10-2021   11/17/2021 17-Nov-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   17-10-2021   11/17/2021 17-Nov-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   17-10-2021   11/17/2021 17-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   4/10/2021   4-Oct-21 4-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   4/10/2021   4-Oct-21 4-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   15-10-2021   15-Oct-21 15-Oct-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   15-10-2021   15-Oct-21 15-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield checked Nominal with SAR
Approved approved by RF to RT option)
Approved(reverted   14-09-2021 9/11/2021 14-Sep-21 14-Sep-21
Greenfield checked Rejected
Nominal with SAR Rejected
Rejected
by SAQ
by Owner   14-09-2021 9/14/2021 14-Sep-21 14-Sep-21
Rooftop checked Approved
Nominal with SAR Approved
Approved
by RF Out off search ring 29-Apr 29-Apr 29-Apr
Rooftop Approved(After Nominal
checked discussion with with
Approved SARwith
Mulatu approved by RF
clear justification and approved on_19.05.2022)Reverted
29-Apr to Colo 29-Apr 29-Apr
Sharing Checked Nominal with SAR approved by
Approved STEP RF
Approved   14-09-2021 9/14/2021 14-Sep-21 14-Sep-21
Nominal Nominal Nominal
Nominal With candidate
Nominal
Rooftop Checked Approved Nominal with S Approved 10-Jun   10-Jun 10-Jun
Greenfield Checked Nominal with SAR approved
Approved 29 Aug:byNokia
RF extended up to 180m18-Aug-21
Approved towards South   18-Aug-21 3-Sep-21
Coverage and Candidate
Greenfield Nominal
Details_1 sheet, KindlyResubmit
correct with SAR
Candidate IDRejected
and
29No.
Aug:byNokia
RF extended up to 180m18-Aug-21
Resubmit towards South   18-Aug-21 3-Sep-21
Nominal Nominal Nominal
Nominal With No candidate
Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 7/6/2022 7/6/2022 7/6/2022
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 7/6/2022 7/6/2022 7/6/2022
Rooftop Checked Rejected
Nominal with SARRejected
Rejected(not
by CW
constructable) 7/6/2022 7/6/2022 7/6/2022
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 9/2/2022 9/2/2022 9/2/2022
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due 11/18/2021
Greenfield Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due 11/26/2021
Rooftop Checked Rejected
Nominal with
Building
SAR Rejected
height Rejected
isbylow
RFand all 3 sectors blocked5/7/2022
by neighbour buildings 7-May 7-May
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11/18/2021 4-Nov-21
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 11-11-2021 11-Nov-21 12-Nov-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 7-Feb 2/7/2022 7-Feb-22
r STEP SAQ requestRooftop
we have created
Checked
duplicated candidate-C
Rejected
Nominal with
b/c payment
SAR Rejected
has made
by RF
wrongly for another candidate
11-11-2021
instead of candidate-B.11-Nov-21
Not able to proceed
12-Nov-21
dual payment for same candidate
r STEP SAQ requestRooftop
we have created
Checked
duplicatedNominal
Approved
candidate-C
with b/c
SAR payment
approved
hasby
made
STEP
wrongly
RF for another candidate
11-11-2021
instead of candidate-B.11-Nov-21
Not able to proceed
12-Nov-21
dual payment for same candidate
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11/17/2021
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF 11/17/2021
Nominal There is a RT
Nominal Nominal Nominal Nominal
available on
Rejected(High
Greenfield rent) & new
60Checked
deg(170 candidate-C
Rejected
Nominal serchRejected
with SAR was donebybySAQ
Macktech_RT_8.939547,8.939547_Waiting
  11/17/2021 for SAR report
11-Mar-21 11-Mar-21
m) & rent)
Rejected(High 250 & new candidate-C serch was done by Macktech_RT_8.939547,8.939547_Waiting for SAR report
Greenfield Rejected
Nominal with SAR Rejected by SAQ   11/17/2021 11-Mar-21 11-Mar-21
deg(135 m).
Rooftop If possible
Checked Nominal with SAR approved by
Approved Approved
STEP RF   23-Apr 23-Apr 23-Apr
please use the
Nominal Nominal
same Nominal Nominal Nominal NA NA NA NA NA
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 11-11-2021 11-Nov-21 12-Nov-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-11-2021 11-Nov-21 12-Nov-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring
  18-08-2021   18-Aug-21 31-Aug-21
Greenfield Checked Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring
  18-08-2021   18-Aug-21 31-Aug-21
Approved(O
K, but the Y1
site 146039
has to be
Greenfield Checked Rejected
Nominal with Rejected
SAR Rejected
Dueplanned
to
byOut
RF Of
on Search Ring
  18-08-2021   18-Aug-21 31-Aug-21
the nominal
Rooftop Checked Nominal
Approvedwith SAR approved by STEP RF   8-Jul-22   8-Jul-22 8-Jul-22
location of
Nominal Nominal Nominal Nominal this site to
Nominal
cover the
Greenfield Checked Nominal with SAR
Approved approved by RF
Approved(reverted
eastern to of
part RT oprtion)
  19-09-2021   19-Sep-21 19-Sep-21
Rejected(Since
Rooftop Checked Nominal
the site 144029Rejected
moved to with SAR location
the EEP this move the site 144019 4-May
Rejectedwereganu,
by STEP to the location( 9.003412,38.814308))
4-May 4-May
candidate.)
Rooftop Checked Nominal
Rejected with SAR Rejected
Rejected(Due by SAQdocument not recieved)14-May
to Ownership 14-May 14-May
Rooftop Checked Nominal with SAR Approved(OK,
Approved approved by STEP
butRF
use 9m RTT) 13-Jul 13-Jul 13-Jul
Greenfield Checked Nominal with SAR approvedApproved
Approved by RF   19-Sep-21   19-Sep-21 19-Sep-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Community
Rejected
Nominal land
withand
Rejected(due toneeds
SARowner anot
letter
Rejected by to be moureen
willing)
SAQ addressed to the 6-16-2022
confirm govenment,Kolfe
15-10-2021 Keranyo
  subcity15-Oct-21
lands office 15-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   15-10-2021   15-Oct-21 15-Oct-21
Rooftop Checked Rejected
Nominal with SAR RejectedRejected
by RF Out off search ring 4-May 4-May 4-May
Rooftop Checked Rejected
Nominal with SAR RejectedRejected
byBlocked
RF by neighbour buildings
4-May 4-May 4-May
Rooftop Checked Rejected
Nominal with SAR RejectedRejected
byBlocked
RF by neighbour buildings
9-May 9-May 9-May
Greenfield Checked Approved
Nominal with SARApproved(Reverted
approved by RF to COlo) 16-Jun 16-Jun 16-Jun
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   15-10-2021   15-Oct-21 15-Oct-21
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 11-11-2021 11-Nov-21 12-Nov-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 11-11-2021 11-Nov-21 12-Nov-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 12/22/2021
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   12/10/2021 12/22/2021 12-Oct-21 13-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   12/10/2021   12-Oct-21 13-Oct-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal with SAR
Rejected
Rejected
(Due
by RF
to Shadowing)
New search in progress
20-09-2021   20-Sep-21 22-Sep-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   20-09-2021   20-Sep-21 22-Sep-21
Rooftop Checked Rejected
Nominal Rejected(owner
with SAR Rejected
chaged
by SAQ
its mind at DARA
  stage) 1-Jul-22   1-Jul-22 1-Jul-22
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   11-Aug-22   11-Aug-22 11-Aug-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due   15-10-2021   15-Oct-21 16-Oct-21
Greenfield Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due   15-10-2021   15-Oct-21 16-Oct-21
Rooftop Checked Rejected
Nominal with SAR1st
Rejected
and 2nd
Rejected
bysector
RF is blocked by own building
10-Mayshadowing 10-May 10-May
Rooftop Checked Nominal
Rejected with SARtoRejected
Rejected(Due by CW
SD failed)confirmed by omar on 30-July
19-May 19-May 19-May
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   15-10-2021   15-Oct-21 16-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved Approved
Nominal with SAR approved by STEP RF   22-08-2021   22-Aug-21 3-Sep-21
Greenfield Checked Nominal with SAR approvedApproved
Approved by RF   22-08-2021   22-Aug-21 3-Sep-21
Greenfield Checked Nominal with SAR approvedApproved
Approved by RF   22-08-2021   22-Aug-21 3-Sep-21
Greenfield Checked Nominal with SAR approvedApproved
Approved by RF   22-08-2021   22-Aug-21 3-Sep-21
Nominal Nominal Nominal
Nominal With candidate
Nominal
Rooftop Checked Rejected
Nominal with SAR RejectedRejected
by RF Out off search ring 12-Apr 12-Apr 12-Apr
Rooftop Checked
Rejected(ISD
Rejected
Nominal
& BH is too
withhigh
SARand
Rejected
as per
Near
our
by with
RF
proposal
otherinnominal
this location_9.000589,38.767304)
& BH is16-Apr
too high 16-Apr 16-Apr
Rooftop Checked Rejected
Nominal with SAR
Building
Rejected
height
Rejected
by RF
is very low and block by neighbour
25-Apr buildings 25-Apr 25-Apr
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 5-Aug 5-Aug 5-Aug
Nominal Nominal Nominal Nominal Nominal
Rooftop checked 09 Sep:
Rejected
Nominal
Nokia with
suggested
Site
SARIDRejected
tochanged
extend by
the
from
SAQ
search
145004
radius
to 144141
due to dispute
5-Sep-21
around nominal area.
  Preferably
5-Sep-21
Rooftop 11-Sep-21
Greenfield checked Rejected
Nominal withSite
SARIDRejected
changedby
from
SAQ145004 to 144141
  5-Sep-21   5-Sep-21 11-Sep-21
Greenfield checked 09 Sep:
Approved
Nominal
Nokia suggested
withSite
SAR IDto
approved
changed
extend the
from
by search
RF145004
radius
to 144141
due to dispute
5-Sep-21
around nominal area.
  Preferably
5-Sep-21
Rooftop 11-Sep-21
Greenfield checked Nominal
Approved
with SAR approved byApproved
STEP RF 31-Aug-22   31-Aug-22 31-Aug-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   15-10-2021   15-Oct-21 16-Oct-21
Greenfield Checked Nominal withApproved(changed
Approved SAR approved by RFdue to RT option)
  15-10-2021   15-Oct-21 16-Oct-21
Rooftop Checked Approved Nominal with SApproved 2-May 2-May 2-May
Nominal Nominal Nominal Nominal Nominal
Same Building with
Rooftop
Candidate X , Please update
Rejected
Nominal
Coordinates
withand
SARphotos
Rejected
Rejected
byDue
RF to Colo 11/22/2021
Rooftop Checked Nominal
Approved
Approved(After
with SAR approved
discussion
by STEPwith
RFMulatu on 26-Apr-22)
11/22/2021 26-Apr-22 26-Apr-22
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 7-Feb 2/7/2022 7-Feb-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 22-Aug-21 2-Dec 2-Dec 2-Dec
Greenfield Checked Rejected
Nominal
Rejected(Due
with SAR
to Rejected
High price
byConfirmed
SAQ by Omer on 30-June)
22-Aug-21 2-Dec 2-Dec 2-Dec
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF NA 2-Dec 2-Dec 2-Dec
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR
Approved(reverted
approved by RF to RT option)
  15-10-2021   15-Oct-21 16-Oct-21
Greenfield Checked Nominal with SAR Rejected
Rejected by SAQ
Rejected(Due to high rent)   15-10-2021   15-Oct-21 16-Oct-21
Rooftop Checked Nominal with SAR approved
Approved by STEP RF
Approved(with 9m RTT) 30-Apr 30-Apr 30-Apr
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   15-10-2021   15-Oct-21 16-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   15-10-2021   15-Oct-21 16-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR
Approved(reverted
approved by RFto RT candidate)
  23-08-2021   23-Aug-21 25-Aug-21
10-octGreenfield
3 candidates already
Checked
proposed,Approved
same
Nominal
building
with SAR
compound,
approved
similar
Approved
by RFapartment buildings, not23-08-2021
possible, we can put  tower in23-Aug-21
any place in property,
25-Aug-21full search ring is same
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 29-Apr 29-Apr 29-Apr
10-octGreenfield
3 candidates already
Checked
proposed,Approved
same
Nominal
building
with SAR
compound,
approved
similar
Approved
by RFapartment buildings, not23-08-2021
possible, we can put  tower in23-Aug-21
any place in property,
25-Aug-21full search ring is same
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   15-10-2021   15-Oct-21 16-Oct-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   15-10-2021   15-Oct-21 16-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with Rejected(Due
SAR RejectedtobyGovernment
SAQ property)
  23-Aug-21   23-Aug-21 25-Aug-21
Greenfield Checked Rejected
Nominal
Rejected(Due
with SAR
to Rejected
no title deed)
by SAQ
confirmed by omar
  on 30-July
23-Aug-21   23-Aug-21 25-Aug-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   23-Aug-21   23-Aug-21 25-Aug-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   11-Aug-22   11-Aug-22 11-Aug-22
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   03-11-2021   4-Nov-21 4-Nov-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   03-11-2021   4-Nov-21 4-Nov-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   03-11-2021   4-Nov-21 4-Nov-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 5-Jan 5-Jan-22 5-Jan-22
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal with SAR
Rejected Rejected by
Rejected(Due toCW
not enough space)
  12/10/2021   12-Oct-21 13-Oct-21
Greenfield Checked Nominal with Rejected,(Owner
Rejected SAR Rejected by SAQ
not willing for rent)
  12/10/2021   12-Oct-21 13-Oct-21
Greenfield Checked NominalApproved(Reverted
Approved with SAR approved to
byRT
RF oprtion(candidate-D)
  13-Apr-22   13-Apr-22 13-Apr-22
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 28-Apr-22 28-Apr-22 28-Apr-22
Rooftop Checked Approved
Nominal with SAR Approved
Approved
by RF 2-May-22 2-May-22 2-May-22
Nominal Nominal Nominal Nominal Nominal
RoofTop Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   12/10/2021 44558 12-Oct-21 13-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   12/10/2021   12-Oct-21 13-Oct-21
RoofTop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 12/30/2021
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   15-10-2021   15-Oct-21 16-Oct-21
Rooftop Checked Rejected
Rejected(The
Nominal owner refuse
with SAR Rejected and has no interest to rent)
by SAQ 12/30/2021 30-Dec-21 30-Dec-21
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   15-10-2021   15-Oct-21 16-Oct-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 13-Nov-21 13-Nov-21 13-Nov-21
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Rooftop Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 11-Nov 2-Dec 2-Dec 2-Dec
Rooftop Checked Rejected
NominalOut
with
offSAR
search
Rejected
ring(Active
by RFcandidate for 142019) 30-Dec 30-Dec 30-Dec-21 30-Dec-21
Rooftop Checked Approved
Nominal with
Approved(BECAUSE
SAR Approved by RF
6mtr P is not feasible) 4-Jan 4-Jan-22 4-Jan-22
Rooftop Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 25-Jan 25-Jan-22 25-Jan-22
Rooftop Checked Nominal
Approved
with SAR Approved(OK,
approved by STEP
but use
RF 9m RTT) 6-Jul 6-Jul 6-Jul
Rooftop Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 11-Nov 2-Dec 2-Dec 2-Dec
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected Rejected(High
Nominal with SAR Rejected by SAQ rent) 12/1/2021
Greenfield Checked Nominal with SARRejected(not
Rejected enough space)
Rejected by CW 11/18/2021
Rooftop Checked Nominal with SAR approved by
Approved Approved
STEP RF 5/23/2022 5/23/2022 5/23/2022
Nominal Nominal Nominal Nominal Nominal
Rooftop checked Rejected
Nominal with SAR Rejected
TSSRbyRejected
RF   15-09-2021   15-Sep-21 15-Sep-21
Greenfield checked Nominal Rejected(Owner
Rejected with SAR Rejected
notbywilling
SAQ for rent)_26'Apr'22
  15-09-2021   15-Sep-21 15-Sep-21
Greenfield checked Approved
Nominal with SAR approvedApproved
by RF   15-09-2021   15-Sep-21 15-Sep-21
Rooftop Rejected(not
checked Nominal
able to obtain
Rejected with SAR
ownership
Rejecteddocuments
by SAQ ) Moureen
  confirm on email 7-15-2022 
14-May 14-May 14-May
Rooftop checked Nominal with SAR approved by
Approved STEP RF
Approved   15-Jul   15-Jul 15-Jul
Nominal Nominal Nominal Nominal Nominalby
Rejected
Owner :
Rooftop Checked Rejected
Nominal with SAR Rejectedrefused
by SAQto   6-Sep-21 9/11/2021 11-Sep-21 20-Sep-21
Greenfield Checked Rejected
Nominal with SAR Rejected byrent
Rejected
SAQ   6-Sep-21 9/11/2021 11-Sep-21 20-Sep-21
Rooftop Checked Rejected
NominalRejected
with SARbyRejected
STEP RF byon TSSR due to Shadowing29-Apr-22
STEP 29-Apr-22 29-Apr-22
Rooftop Checked Nominal with SAR Rejected
Rejected by STEP
Rejected(Due t   11-Aug-22 1-Jul-22 1-Jul-22 1-Jul-22
Rooftop Checked Approved(After
Rejected
Nominal withdiscussion
SAR Rejected
with Mulatu
by RF on 26-Apr-22)
  Rejected
9-Sep-21
on 5-July 9/11/2021 11-Sep-21 20-Sep-21
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Greenfield Checked Rejected
Nominal with Rejected(Due
SAR RejectedtobyGovernment
SAQ property) 11-11-2021 11-Nov-21 12-Nov-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 11-11-2021 11-Nov-21 12-Nov-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 6/30/2022 6/30/2022 6/30/2022
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 11-11-2021 11-Nov-21 12-Nov-21
Rooftop Checked Rejected
Nominal with SAR Rejected
Rejectedby(SD
CWDropped) 11-11-2021 11-Nov-21 12-Nov-21
Rooftop Checked Nominal
Approved
with SAR approved
Approved(OK,
by STEP
with
RF9m RTT) 7/7/2022 7/7/2022 7/7/2022
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF 2/12/2021 2/12/2021 2/12/2021
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 2/12/2021 2/12/2021 2/12/2021
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal with SAR
Rejected Rejected bytoCW
Rejected(Due CW_ET pointed)
  25-09-2021 9/27/2021 27-Sep-21 27-Sep-21
Rooftop Checked Rejected
Nominal with SAR Rejected
Rejected
by (High
SAQ price)   25-09-2021 9/27/2021 27-Sep-21 27-Sep-21
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 27-Apr 27-Apr 27-Apr
Rooftop Checked Rejected
Rejected
Nominal
(blockedwith
by neighbour
SAR Rejected
building
by RF& we need site  in 8.981813,38.763396)
14-Apr 14-Apr 14-Apr
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 11-11-2021 11-Nov-21 12-Nov-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 11-11-2021 11-Nov-21 12-Nov-21
Greenfield Checked Nominal with SAR RejectedResubmit
Resubmit by RF
Rooftop Checked Nominal
Approvedwith SAR approved
Approved(OK, but move by
theSTEP RF
site 142048 to collo with 111009)
2-Aug-22 2-Aug-22 2-Aug-22
Greenfield Checked Rejected
Nominal
Rejected(Due
with SAR
to noRejected
enough space)confirmed
by CW by omar on 30-July
6-Feb 2/6/2022 6-Feb-22
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal with SAR
Rejected(Another
Rejected by RF
ET site pointed)
  19-09-2021   19-Sep-21 19-Sep-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   19-09-2021   19-Sep-21 19-Sep-21
Greenfield Checked Nominal with SARApproved(Reverted
Approved approved by RF to Colo) 6-May 6-May 6-May
Sharing Checked Nominal with SAR approved by
Approved STEP RF
Approved   19-09-2021   19-Sep-21 19-Sep-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   10/9/2021   10-Sep-21 14-Sep-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   10/9/2021   10-Sep-21 14-Sep-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   10/9/2021   10-Sep-21 14-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal with SAR Rejected by
Rejected STEP
Rejected   4/10/2021 4-Oct-21 4-Oct-21 5-Oct-21
Rooftop Nominal
CW with SAR Rejected by
Nominal with SAR Rejected Rejected
by STEP with SAR Rejected4/10/2021
Rejected
Nominal by CW   4-Oct-21 5-Oct-21
Rooftop
Nominal with SAR Rejected byNominal
Rejected
STEP with SAR Rejected
Rejected(Please by
go for the STEP with
Nominal
location 8.989317,38.751666)
SAR Rejected by
29-Mar
STEP 29-Mar 29-Mar
Rooftop by Nominal
STEP with SARApproved(Reverted
Nominal with SAR Rejected Approved approvedNominal
by RF with
to Colo)
SAR Rejected by14-Apr
STEP 14-Apr 14-Apr
Sharing Checked Nominal with SAR approved by
Approved STEP RF
Approved   4/10/2021   4-Oct-21 5-Oct-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal
No available No available
with Candidatate,
SAR Candidatate,
RejectedPossible Possible
by CW candidate undercandidate under construction
construction
16-09-2021 9/12/2021 16-Sep-21 16-Sep-21
Rooftop Checked Nominal
Rejected with SAR Rejected
Rejected(ISD is not okby STEPgo in the other
please   direction)
16-09-2021 9/12/2021 16-Sep-21 16-Sep-21
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   16-09-2021 9/12/2021 16-Sep-21 16-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF   4/10/2021 12/16/2021 4-Oct-21 5-Oct-21
Rooftop Checked Rejected
Nominal with SAR Rejected
Owner not
by willing
SAQ Owner
to rent not willing 4/10/2021   4-Oct-21 5-Oct-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   20-Mar-22   20-Mar-22 20-Mar-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR Rejected
Rejected by SAQ
Rejected(LA not moving)   13-09-2021   13-Sep-21 5-Oct-21
Greenfield Checked Nominal with SAR Rejected
Rejected by SAQ
Rejected(LA not moving)   13-09-2021   13-Sep-21 5-Oct-21
Greenfield Since it isRejected
Checked Nominal
near to the
with
TSSR
SARapproved
Rejected site,
by STEP
please search around 8.999700,38.752475
Rejected 15-Apr area to make15-Apr
the grid better.15-Apr
Rooftop Checked Rejected by RF Out off search ring 16-May
Nominal with SAR RejectedRejected 16-May 16-May
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   13-09-2021   13-Sep-21 5-Oct-21
Nominal Nominal Nominal Nominal Nominal
t are as per old candidate
Greenfield
nominal so coming out25
of
Rejected
Nominal
Aug:
searchNokia
ring,
withSuggested
resubmit
Rejected
SAR Rejected
the
Due
extend
report
to
byOut
the
RFsearch
Of Search
along
Ring
the RAS 15-Aug-21
Biru street towards South
  for upto
15-Aug-21
225 m 3-Sep-21
t are as per old candidate
Greenfield
nominal so coming out25
of
Rejected
Nominal
Aug:
searchNokia
ring,
withSuggested
resubmit
Rejected
SAR Rejected
the
Due
extend
report
to
byOut
the
RFsearch
Of Search
along
Ring
the RAS 15-Aug-21
Biru street towards South
  for upto
15-Aug-21
225 m 3-Sep-21
t are as per old candidate
Greenfield
nominal so coming out of
Rejected
Nominal
search ring,
with SAR
resubmit
Rejected
Rejected(Due
the report
by STEP
to low ISD) 5-Jul-22   5-Jul-22 5-Jul-22
Rooftop Checked Rejected
Nominal
Rejected(Due
with SAR Rejected
to Low space
by CW3*1.6 confirmed by Omar)
Please include sharing
Rooftop Nominal
candidates data as a additional
Rejected with
option forSAR Rejected by CW
thisRejected(not
site enough space)   17-09-2021   17-Sep-21 4-Oct-21
Please include sharing
Rooftop
candidates data as a additional
Rejected
Nominal
option
with
forRejected
SAR
this Rejected
site Due to
byOut
RF Of Search Ring
  17-09-2021   17-Sep-21 4-Oct-21
Nominal Nominal Nominal Nominal Nominal
6-A (Nominal): 9.00589257,38.74029579
Greenfield and 145006-B
checked (Candidate):
Approved
Nominal with SAR 9.005941,38.739832
Approved(reverted have
approved by RF to RT 50m air Distance
option) inadition to
11/9/2021 access the site
9/16/2021 we need to get
16-Sep-21 letter from Ethiopian engineering c
16-Sep-21
Greenfield checked Approved
Nominal with SARApproved(Reverted
approved
 B is approved
by RF since
to Colo)
the tower height
11/9/2021
for C is 66m9/16/2021 16-Sep-21 16-Sep-21
Rooftop checked Rejected
Nominal with SARit's rejected
B is approved
Rejected bydue to 66m
STEP sinceheight
the tower height
4/30/2022
for C is 66m 4/30/2022 4/30/2022
Sharing checked Approved Approved
Nominal with SAR approved by STEP RF   11/9/2021 9/16/2021 16-Sep-21 16-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop checked Nominal
Approved
with SAR approved byApproved
STEP RF   15-09-2021 9/16/2021 16-Sep-21 16-Sep-21
Rooftop checked Approved
Nominal with SAR approvedApproved
by RF   15-09-2021 9/16/2021 16-Sep-21 16-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   6-Sep-21 9/11/2021 11-Sep-21 20-Sep-21
Rooftop Checked Rejected Rejected(Owner
Nominal with documents
SAR Rejected by SAQ not complete
  ) 6-Sep-21 9/11/2021 11-Sep-21 20-Sep-21
Approved(OK,
Rooftop but
Checked
we have to Approved
make
Nominal
appropriate
with SAR
azimuth
approved
planning
by RF
with 145021 since
  the distance
6-Sep-21
between9/11/2021
them is less than
11-Sep-21
300m.) 20-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop checked Approved
Nominal with SAR approved
4 Sep: 3Approved
RT
by Candidates
RF all of which are
6-Sep-21
far from 200m.
10/9/2021 10-Sep-21 11-Sep-21
Rooftop checked Nominal
Approved
with SAR approved
4 Sep: by
3Approved
RT
STEP
Candidates
RF all of which are
14-09-2021
far from 200m.
9/14/2021 14-Sep-21 14-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF #N/A 3/9/2021   3-Sep-21 3-Sep-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF #N/A 3/9/2021   3-Sep-21 3-Sep-21
Candidate RT Rooftop
hight is too low please find another
Approved
Nominal
RT for
with
theSAR
same.
approvedResubmit
by RF   4/10/2021   4-Oct-21 4-Oct-21
ner is agreed the rent
Rooftop
and signed DARA
Checked
now andApproved
it was onfirmed by Ebenezer
Nominal with S on 28-June-22).
Not OK, ISD
Initially
nearitby
was
site
4/10/2021
Rejected due to Owner
  refuse4-Oct-21
at Dara Stage4-Oct-21
email confirmed 6-24-2022
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked
the active candidate
Rejected
Nominalowned
with SAR
by Government the
SAQactive
Rejected by and candidate
the local youths owned
  were by Government
arguing
10/29/2021 and the local
over the land youths were 29-Oct-21
29-Oct-21 arguing over the land
Greenfield Checked
Backup candidate
Rejected
Nominal owned
with SAR
by Government Backup
Rejected byand
SAQ candidate
the local youths owned
  were by Government
arguing
10/29/2021 and the local29-Oct-21
over the land youths were arguing over the land
29-Oct-21
Rooftop Checked Nominal with SAR approved
Approved NotOk,
by STEP
please
RFgo for the  location 20-Mar-22
Approved 8.972065, 38.712327(But Proposed location 20-Mar-22
20-Mar-22 BH is too short with Iron roof)
Nominal Nominal Nominal Nominal Nominal
Site 148008 the Site
Rooftop 148008
buliding is the buliding is
Checked
government government
buliding
Rejected
Nominal
andwith
hasbuliding
anissueand
forhas
SAR Rejectedten anissue
years
by SAQ forNo
and tenvalid
years andDeed
Title No valid
rightTitle
5-Sep-21
now,Deed rightperson
contact   now, contact person
Mr.Tesfaye
5-Sep-21 Mr.Tesfaye
8-Sep-210910513015
0910513015
the given
Rooftop Checked Rejected
Nominal Rejected(Block
with SAR Rejected by own
by RF
building cand
from hadn't
 0 to 150) 5-Sep-21 31-Mar 5-Sep-21 8-Sep-21
Sharing Checked Nominal
Approved with SAR approved byApproved
STEP RF space-
  13-09-2021 9/13/2021 13-Sep-21 13-Sep-21
6*14m.We
Nominal Nominal Nominal Nominal Nominal were
searching
Rooftop Checked
Cand A isRejectedCandand
aNominal
school A isthe
with aSAR
school and theby
management
Rejected management
not
SAQ
interested.newnot interested.
No other
cand NoRT
possible other
15-Sep-21 possible  RT candidates.
candidates. 15-Sep-21 21-Sep-21
1-There is GF
Greenfield Checked Rejected
Nominal with SAR Rejected by Rejected
STEP site very  near 15-Sep-21   15-Sep-21 21-Sep-21
Rooftop Checked Approved Approved(Reverted toto the nomial,
Colo)   3-Jun-22   3-Jun-22 3-Jun-22
Nominal with SAR approved by RF but it's
Sharing Checked Approved
Nominal with SAR approved by Approved
STEP RF fenced   for 15-Sep-21   15-Sep-21 21-Sep-21
primary
Nominal Nominal Nominal Nominal Nominal school.
2- we found
Greenfield Checked Nominal with SAR Rejected(Space
Rejected Rejected by CWnot enough)another GF, 11/18/2021
Rooftop Approved(please Nominal
Checked checkApproved with @
the building SAR9.054883,38.727070).
approved by STEP RFBut this it's historic
under construction
19-Apr and planned for Iron roof19-Apr 19-Apr
place, the
Rooftop Checked Approved
Nominal with SAR Approved Approved
by RF adminstration 19-Apr 19-Apr 19-Apr
told us, bring
Rooftop Checked Approved
Nominal with SAR Approved Approved
by RF specific letter 19-Apr 19-Apr 19-Apr
from
Nominal Nominal Nominal Nominal Nominal safaricom for
Greenfield Checked Approved
Nominal with SAR approvedChecked by RF Ethiopian
  18-11-2021   11/18/2021 18-Nov-21
science
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved acadamy, 20-Apr 20-Apr 20-Apr
after that
It is Gulele subcity administration
Rooftop Checked building,
Nominal
Rejected thewith
adminstration
SAR Rejectedhave
bymeeting
SAQ today,board
Approved we couldn't18-11-2021
get access to the roof
  top, but LA document18-Nov-21
11/18/2021 is given to his representative.
member will
Nominal Nominal Nominal Nominal Nominal decide
 Possible
Rooftop
candidate(GF) Possible
Checked candidate(GF)
is owned byRejected
Nominal iswith
owned
the government  SAR byRejected
the government
institution by SAQ institution
DRAHAND LEHIZEB DRAHAND LEHIZEB SHAMACHOCH
SHAMACHOCH
12/10/2021 ARADA
1-Feb-22 ARADA
SUBCITY SUBCITY WOREDA
1-Feb-22
WOREDA 4 1-Feb-224
Greenfield Checked Rejected Rejected
Nominal with SAR Rejected by STEP 20-09-2021 12/10/2021 22-Sep-21 23-Sep-21
Approved(From
Rooftop EHSChecked
point of viewNominal
Approved
it’s not possible
with SAR toapproved
work on the
by STEP
roof Oral
RF SAQ Confirm on mail
21-Apr
6-27-2022(Access Issue is resolved
21-Apr now) 21-Apr
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   18-11-2021   11/18/2021 18-Nov-21
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF   18-11-2021   11/18/2021 18-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominalcandidate candidate
with SARA,the
Rejected
owner A,the
bytold
SAQ us owner
he don'ttold us rent.
want he don't want rent.
11/18/2021
Greenfield Checked Rejected
Nominal with SAR Rejected
Rejected(LA
by SAQ
not moved) 11/26/2021
Rooftop Checked Nominal with SARApproved(Reverted
Approved approved by RF to Colo) 21-Apr 21-Apr 21-Apr
Sharing Checked Nominal with SAR approved by
Approved STEP RF
Approved 11/18/2021
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   13-10-2021   13-Oct-21 14-Oct-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   13-10-2021   13-Oct-21 14-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   13-10-2021   13-Oct-21 14-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal
Rejected(2nd
with SARsector
Rejected
is blocking
by RF by neighbour
  building)
22-Aug-21 3/31/2022 12/13/2021 12/13/2021
Greenfield Checked Rejected
Nominal with SAR
Rejected(due
Rejected by
to SAQ
owner not willing)
  22-Aug-21 12/13/2021 12/13/2021 12/13/2021
Greenfield Checked Rejected
Nominal with SAR
Rejected(due
Rejected by
to SAQ
owner not willing)
  22-Aug-21 12/13/2021 12/13/2021 12/13/2021
Greenfield Checked Nominal with SARRejected(Governement
Rejected Rejected by SAQ place) 7-May-22 7-May-22 7-May-22
Greenfield Checked Approved
Nominal with SARApproved(Reverted
approved by RF to Colo) 25-May-22 25-May-22 25-May-22
sharing Checked Approved Approved
Nominal with SAR approved by STEP RF   NA 12/13/2021 12/13/2021 12/13/2021
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal with SAR Rejected
Rejected
by CW
by CW   18-10-2021   18-Oct-21 18-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   18-10-2021   18-Oct-21 18-Oct-21
Rooftop Checked Nominal
Rejected with SAR
Rejected(Near to Rejected by STEPsite 143035 but
TSSR approved   ISD is 24-5-2022
300m)   24-5-2022 24-5-2022
Rooftop Checked Nominal
Reject
Approved with SAR
SD stage approved
Dawit by STEP
confirmed RF 6-24-2022(SD
on email   issue
6/16/2022
Resolved)   6/16/2022 6/16/2022
Rooftop Checked NominalRejected(Due
Rejected with SAR Rejected by STEP
to moved a lot in a wrong  direction)6/25/2022   6/25/2022 6/25/2022
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 2/12/2021
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 2/12/2021
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 2/12/2021
Nominal Nominal Nominal Nominal Nominal
Candidate-AGreenfield
& B has dropped due to owner
Rejected
Nominal
Candidate-A
not willing
withfor
SAR
&Candidate-A
rent
B Rejected
has dropped
by
& SAQ
Bdue
has
todropped
owner not
duewilling
to owner
10-11-2021
for rent
not willing for rent 10-Nov-21 10-Nov-21
Candidate-AGreenfield
& B has dropped due to owner
Rejected
Nominal
Candidate-A
not willing
withfor
SAR
&Candidate-A
rent
B Rejected
has dropped
by
& SAQ
Bdue
has
todropped
owner not
duewilling
to owner
10-11-2021
for rent
not willing for rent 10-Nov-21 10-Nov-21
Greenfield Checked Nominal with SARRejected(Moved
Approved approved by RF to RT option 25-Mar-22 25-Mar-22 25-Mar-22
Rooftop Checked Nominal with Rejected(Not
Rejected SAR Rejected enough
by CW space for CW) 29-Apr-22 29-Apr-22 29-Apr-22
Rooftop Checked Nominal with SARApproved(Reverted
Approved approved by RF to colo) 29-Apr-22 29-Apr-22 29-Apr-22
Sharing Checked Nominal with SAR approved by
Approved STEP RF
Approved 10-11-2021 10-Nov-21 10-Nov-21
Nominal Nominal Nominal Nominal Nominal
Resubmit to customer
Rooftopdue to Colo GBT candidate
Nominal
Approved
against
with SAR
NB GBT
approved byApproved
STEP RF   26-11-2021   14-Sep-21 14-Sep-21
Resubmit to customer
Greenfield
due to Colo GBT candidate
Approved
Nominal
against
withNB
SAR
GBT
approvedApproved
by RF   26-11-2021   14-Sep-21 14-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   14-09-2021 3-Dec 3-Dec 3-Dec
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   14-09-2021 3-Dec 3-Dec 3-Dec
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-11-2021 11-Nov-21 12-Nov-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 11-11-2021 11-Nov-21 12-Nov-21
Greenfield Checked Rejected
Nominal Rejected
with SARdue Rejected(Due
Rejected
to owner
by not
SAQ willing omar confirms11-11-2021 11-Nov-21 12-Nov-21
to Not OK, it
Greenfield Checked Rejected
Nominal with SAR Rejected by
is near
STEP to 2-Aug-22 2-Aug-22 2-Aug-22
Collo applied
Nominal Nominal Nominal Nominal Nominal
Y1 site.
Greenfield Checked Nominal with SAR
Rejected Rejected by SAQ
Rejected(administrasion not willing)
  24-10-2021   25-Oct-21 25-Oct-21
Greenfield Checked Rejected(Weneed
Rejected
Nominal with
candidate
SAR Rejected
in middlebyofRF
the condominium_9.014150,38.849123
  14-Apr   14-Apr 14-Apr
Rooftop Checked Nominal with SAR Rejected
Rejected Rejected(low
by STEP ISD) 29-Apr 29-Apr 29-Apr
Rooftop Checked Rejected
Nominal with SAR1st
RejectedRejected
and 2nd
bysector
RF is blocked by own building
10-Mayshadowing 10-May 10-May
Rooftop Checked Rejected Rejected(Due
Nominal with SAR Rejected by RFto low ISD) 16-Jul 16-Jul 16-Jul
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   24-10-2021   25-Oct-21 25-Oct-21
Nominal Nominal Nominal Nominal Nominal
here is a RT available
Greenfield
in 110 deg (120m). If possible
Rejected
Nominal
pleasewith
use as
SAR
candidate-B
Rejected
Rejected(Due
by SAQto SAQ)   18-11-2021   11/18/2021 18-Nov-21
Rooftop Checked Approved
Nominal with SAR Approved
Approved
by RF 29-Apr 29-Apr 29-Apr
Rooftop Checked Approved
Nominal with SAR Approved
Approved
by RF 29-Apr 29-Apr 29-Apr
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved   19-Apr   19-Apr 19-Apr
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 11/22/2021
Greenfield Checked Nominal with SAR
Approved approved by RF to RT oprtion)
Approved(reverted 11/22/2021
Rooftop Checked Nominal with SAR Rejected by
Rejected STEP
Rejected 4/29/2022 4/29/2022 4/29/2022
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 11-May 11-May 11-May
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR
Approved(reverted
approved by RF to RT option)
  18-11-2021   11/18/2021 18-Nov-21
Rooftop Checked
Rejectd(candidate-B
Nominal
Approvedwith
& CSAR
are approved
same building).
by STEPIt was
RF dropped by CW(CW5-May
issue is Resolved) 5-May 5-May
Rooftop Checked Rejected
Nominal with SAR RejectedRejected
by RF Out off search ring 5-May 5-May 5-May
Rooftop Checked Rejected
Nominal with SAR Rejected
It Have
by RF
shadow 27-May 27-May 27-May
Rooftop Checked Rejected
Nominal
candidate
withBSAR
dropped/failed
candidate
RejectedBbydropped/failed
onCW
Starctural analysis(civil
on Starctural18-11-2021
team)
analysis(civil team)  11/18/2021 18-Nov-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   4/10/2021 3-Dec 3-Dec 3-Dec
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 5/23/2022 23-May 23-May
Rooftop Checked Nominal with SAR Rejected
Rejected owner is by
notSAQ
willing to rent   3-Dec 3-Dec 3-Dec 3-Dec
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal with SAR Rejected(Owner
Rejected Rejected by SAQnot willing) 11/18/2021
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 11/26/2021
Rooftop Checked Approved NominalApproved(Reverted
with to Colo) 5/7/2022 7-May 7-May
Sharing Checked Approved Nominal with S Approved 11/18/2021
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF   18-11-2021   11/18/2021 18-Nov-21
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 4-May 4-May 4-May
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 4-May 4-May 4-May
Greenfield Checked Approved
Nominal with SAR
Approved(reverted
approved by RF to RT option)
  18-11-2021   11/18/2021 18-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Nominal with
Checked ThisRejected
candidate SAR the
is inside Rejected by SAQ
Rejected(owner
Ethiopian defence
not willing)
force and they need
11/18/2021
an official letter written directly to them
RoofTop Checked Approved
Nominal with SAR approvedChecked
by RF 11/18/2021
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF
Rooftop Checked Nominal
Rejected(Due
Rejected with
to Owner SARfor
asked Rejected by before
payment SAQ DARA confirmed by 19-Apr
Omar on 30- June) 19-Apr 19-Apr
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11/18/2021
Nominal Nominal Nominal Nominal Nominal
Resubmit to Greenfield
customer due to Colo GBT candidate against
Approved
Nominal withNB GBTapprovedApproved
SAR by RF   26-11-2021   20-Sep-21 22-Sep-21
er forResubmit
LA , the building
to customer
is share
Rooftop duewith
to Colo
4 person
GBT candidate
so he sayishe
Candidate-B against
Rejected
Nominal will
withcomeback
droped NB
dueGBT
SAR to usnot
toRejected
owner 03/03/2022,
SAQ forinformed
by willing Lamine
rent. So we went and he say
26-11-2021
for new we can wait, as the
search schedule we22-Sep-21
20-Sep-21 go and vist the owner is not available
Rejected by
Rooftop Checked Nominal
Approved Candidate-B
with SAR approved
is droped
by
Approved
due
STEPto owner
RF
CW : wall to not willing for rent.
9-Mar-22
So we went
10-Mar-22
for new search
9-Mar-22 9-Mar-22
be
Rooftop Checked Rejected
Nominal with SAR Rejected by CW
demolishmen   23-09-2021   23-Sep-21 23-Sep-21
Rooftop Nominaldiscussion
CheckedApproved(After
Approved with SAR approved t refused
with Mulatu by on by
RF 26-Apr-22) &  (reverted
22-09-2021
to RT oprtion)   22-Sep-21 22-Sep-21
owner
Rooftop Checked Nominal with SAR Rejected Rejected
Rejected by CW   22-09-2021   22-Sep-21 22-Sep-21
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 3-May 3-May 3-May
n in 120°  and also its
Rooftop
500 Mtrs away
Obstruction
from nominal
in 120° 
Rejected
Nominal
andand
coming
also
withits
too
SAR
500
close
Rejected
Mtrs
to another
away
byfrom
RFsite nominal and coming25-Nov-21
too close to another site 25-Nov-21 25-Nov-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SARRejected(Due
Rejected by CW
to Space Issue) 25-Feb-22
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF
Nominal Nominal Nominal
Nominal With candidate
Nominal
Rooftop Rejected Rejected
Nominal with SAR RejectedRejected
by RF 8-Apr 8-Apr 8-Apr
Rooftop Approved Nominal
Approved
with SAR Approved by
Approved
STEP RF 12-Apr 12-Apr 12-Apr
Rooftop Rejected Nominal with SAR Rejected by
Rejected STEP
Not Ok, please go for 146017_B
Rejected 14-Apr 14-Apr 14-Apr
Nominal Nominal Nominal Nominal Nominal
is a colo
site(ethio
telecom site)
we couldn't
access it. But
all necessary
LOS
Rooftop Checked Rejected
Rejected(owner
Nominal not willing
with SAR Rejected by SAQ he plannedinffomation
to sell rooftop)
4/10/2021   4-Oct-21 4-Oct-21
have been
at 20-30 deg will block
Greenfield
the signal. plz check ht on
Approved
Nominal
140-160 direction
with SARand
approved
possibility
Resubmit
by RFto use same  
gathered 4/10/2021   4-Oct-21 4-Oct-21
from 147016.
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF B)the owner 4/10/2021
    4-Oct-21 4-Oct-21
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF is abroad  that NA   NA NA
they gave us
Nominal Nominal Nominal Nominal Nominal an
appointemen
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF t for 23-11-2021 23-Nov-21 23-Nov-21
February 21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEPConditional
RF Approved by23-11-2021
Step 23-Nov-21 23-Nov-21
Greenfield Checked Nominal with SAR
Rejected Rejected(the
Rejected bylocation
STEP is not right) 13-Feb 2/13/2022 13-Feb-22
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-11-2021 11-Nov-21 12-Nov-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 11-11-2021 11-Nov-21 12-Nov-21
Rooftop Checked Rejected
Nominal with SAR Rejected
Rejected(Low
by STEP ISD) 11-11-2021 11-Nov-21
Rooftop Checked Reject(duethe
Rejected
Nominal building
to Owner
with notisRejected
SAR ownedatby
willing by aRF
daragroup
stageof)Moureen
people that they
confirm need to discuss on it together
11-11-2021
6-24-2022 11-Nov-21 12-Nov-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedRejected
by RF by
Approved   20-09-2021   20-Sep-21 22-Sep-21
CW: owner
Rooftop Checked Rejected request
Nominal with SAR Rejected by CW stairs   20-09-2021   20-Sep-21 22-Sep-21
outside the
Rooftop Checked Nominal with SAR Rejected
Rejected by STEP
Rejected(Due to low BH)
building   20-09-2021   20-Sep-21 22-Sep-21
Rooftop Checked Nominal with SAR Rejected
Rejected by RFto low ISD)
Rejected(Due   6/16/2022   6/16/2022 6/16/2022
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   NA   NA 24-Oct-21
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-11-2021 11-Nov-21 12-Nov-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 11-11-2021 11-Nov-21 12-Nov-21
Nominal Nominal Nominal Nominal Nominal
All candidates
Greenfieldare rejected due to notRejected
Nominal
enoughAll
space
with
candidates
SAR Rejected
are
All rejected
candidates
by CW dueare
to rejected
not enough
duespace
to not9/1/2021
enough space   1-Sep-21 3-Sep-21
ndidates are rejected
Rooftop
due to not enoughAll
space_New
candidates
Rejected
Nominal
search
are
All rejected
candidates
ongoing
with SAR
due
asare
Rejected
candidate-D
to rejected
not enough
bydue
CWspace_New
to not enough
search
space_New
ongoing
9/1/2021
search
as candidate-D
ongoing as
  candidate-D
1-Sep-21 3-Sep-21
All candidates
Rooftop are rejected due to notRejected
Nominal
enoughAll
space
with
candidates
SAR Rejected
are
All rejected
candidates
by CW dueare
to rejected
not enough
duespace
to not9/1/2021
enough space   1-Sep-21 3-Sep-21
Greenfield Checked Approved
Nominal with SAR
Approved(Reverted
approved by RF to RT option) 21-Mar-22   21-Mar-22 21-Mar-22
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 6-May-22 6-May-22 6-May-22
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 6-May-22 6-May-22 6-May-22
Nominal Nominal Nominal Nominal Nominal
Sharing Checked Approved Nominal with S Approved 23-11-2021 23-Nov-21 23-Nov-21
Greenfield Checked Approved
Nominal with SAR
Approved(reverted
approved by RF to RT option) 23-11-2021 23-Nov-21 23-Nov-21
Rooftop Checked Rejected
NominalRejected
with SAR
dueRejected
to ownerbynot
SAQwilling update on june 13 4-May 4-May 4-May
Greenfield Checked Approved
Nominal with SAR RejectedApproved
by RF 6/13/2022 6/13/2022 6/13/2022
Greenfield Checked Approved NominalApproved(Reverted
with to Colo) 6/13/2022 23-Nov-21 23-Nov-21
Rooftop Checked Nominal with SAR approvedApproved
Approved by RF 4-May 4-May 4-May
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 23-11-2021 23-Nov-21 23-Nov-21
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 11-11-2021 11-Nov-21 12-Nov-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 11-11-2021 11-Nov-21 12-Nov-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 11-11-2021 11-Nov-21 12-Nov-21
no candidate
Rooftopwith more height is available
Nominal
Approved in
with
area
SAR approved byApproved
STEP
Conditional
RF Approved by25-Nov-21
Step 25-Nov-21 25-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   6/10/2021   6-Oct-21 6-Oct-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   6/10/2021   6-Oct-21 6-Oct-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
NominalRejected(Government building
with SAR Rejected by SAQ so SAQ not
  moving)6/10/2021   6-Oct-21 6-Oct-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   6/10/2021   6-Oct-21 6-Oct-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   6/10/2021   6-Oct-21 6-Oct-21
Rooftop Checked Approved Approved
Nominal with SAR approved by STEP RF   8-Jun   8-Jun 8-Jun
Nominal Nominal Nominal Nominal Nominal
Rooftop
Rejected(Due
checked
to owner not
Rejected
Nominal
accepting
withrental
SARprice
Rejected
and he
by is
SAQ
expecting 100K
  Birr)_Confirmed
30-10-2021
on 13'Apr'22 from SAQ
1-Nov-21 1-Nov-21
Rooftop checked Rejected
Nominal
Rejected(Due
with SARtoRejected
High price
byconfirmed
SAQ by Omar
  on 30-June)
16-Apr 16-Apr 16-Apr
Rooftop checked Rejected
Nominal with SAR Rejected
Rejected by
DueRFto low ISD   1-Jul 1-Jul 1-Jul
Rooftop checked Rejected
Nominal with SAR Rejected(Due
Rejected by RF
to low ISD)   7-Jul 7-Jul 7-Jul
Rooftop checked Nominal
Approved
with SAR approved byApproved
STEP RF   17-Aug 17-Aug 17-Aug
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due   24-09-2021 28-10-2021 1-Nov-21 1-Nov-21
Greenfield Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due   24-09-2021 28-10-2021 1-Nov-21 1-Nov-21
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   24-09-2021 28-10-2021 1-Nov-21 1-Nov-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   3/10/2021   3-Oct-21 5-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   3/10/2021   3-Oct-21 5-Oct-21
Rooftop Checked Nominal with
Rejected SAR Rejected by CW and shadowing)
Rejected(CW_blocking   3/10/2021   3-Oct-21 5-Oct-21
Rooftop Checked From Nominal
SAR with
Rejected
the look SAR
thereRejected by RF
is blocking and shadowing, let's arrange
2-May-22
site visit) 2-May-22 2-May-22
Rooftop Checked Nominal with SAR Rejected
Rejected by STEP
Rejected(Due to low ISD) 16-Jun-22 16-Jun-22 16-Jun-22
Rooftop Checked NominalRejected(Please
Rejected with SAR Rejected by STEP
check @ 9.024319, 38.817474) 1-Jul-22 1-Jul-22 1-Jul-22
Rooftop Checked Approved
Nominal
Approved
with SAR
but we
approved
need candidate
by RF @9.024319, 38.817474
27-Jul-22 27-Jul-22 27-Jul-22
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 9-Aug-22 9-Aug-22 9-Aug-22
Rooftop checked Approved DueRFto EEP( transmission and
Nominal with SAR approvedApproved
by fiber)
30-10-2021 1-Nov-21 1-Nov-21
Rejected(Due
Rooftop checked Nominal with SAR Rejected bytoSTEP
Rejected ISD)   7-Jun   7-Jun 7-Jun
Rooftop checked Approved Nominal with S Approved 13-Jun 13-Jun 13-Jun
Greenfield Checked Rejected
Nominal with SAR Rejected
RejectedbyDue
RF to Colo
Greenfield Checked
Rejected(Dropped
Rejected
due with
Nominal to space
SARissue) confirmed
Rejected by CW by Ali and new search ongoing
17-Mar for this site 3/17/2022 17-Mar-22
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal with SAR Rejected by
Rejected STEP
Rejected   24-10-2021 17-Mar-22 25-Oct-21 25-Oct-21
Sharing Checked Nominal with SAR approved by
Approved STEP RF
Approved   24-10-2021 17-Mar-22 25-Oct-21 25-Oct-21
Rooftop Checked Nominal with SAR ApprovedApproved
Approved by RF 7/18/2022   7/18/2022 7/18/2022
Rooftop Checked Nominal with SAR Rejected
Rejected by STEP Issue)
Rejected(TSSR
Candidate-B was dropped due
24-10-2021
to civil   25-Oct-21 25-Oct-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   03-11-2021   4-Nov-21 4-Nov-21
Rooftop Checked Rejected
Nominal with SAR Rejected
Rejected
by CW
6-9-2022   03-11-2021   4-Nov-21 4-Nov-21
Rooftop Checked Approved Nominal with S Approved   9-Jun   9-Jun 9-Jun
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal with SAR Rejected(owner
Rejected by SAQnot willing)   19-09-2021   19-Sep-21 19-Sep-21
Rooftop Checked Rejected
Nominal with SAR RejectedRejected
by RF 23-May 23-May 23-May
w(After disscussion with
Rooftop
Mulatu VsChecked
Jaffar on 08-June-22).Initially
Approved
Nominal with SARrejected(The
approved bybuilding
STEP RFheight looks
  too low, 28-May
please check and confirm
  the final
28-Mayantenna height
28-Maybefore we go further)
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due   02-11-2021   4-Nov-21 4-Nov-21
Greenfield Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due   02-11-2021   4-Nov-21 4-Nov-21
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   02-11-2021 4-Nov-21 4-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   17-09-2021   17-Sep-21 4-Oct-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   17-09-2021   17-Sep-21 4-Oct-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   17-09-2021   17-Sep-21 4-Oct-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due   19-09-2021   19-Sep-21 19-Sep-21
Greenfield Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due   19-09-2021   19-Sep-21 19-Sep-21
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved   14-Apr   14-Apr 14-Apr
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal with SAR
Rejected(owner
Rejected by not
SAQ willing for rent)
  03-11-2021   4-Nov-21 4-Nov-21
Greenfield Checked Rejected
Nominal with SAR
Rejected(owner
Rejected by not
SAQ willing for rent)
  03-11-2021   4-Nov-21 4-Nov-21
Rooftop Checked Rejected
Nominal with SAR RejectedRejected
by RF
Building height is very low
10-May 10-May 10-May
Rooftop Checked Approved Approved with 9 Mtr RTT(Reverted to Colo)
Nominal with 10-Jun 10-Jun 10-Jun
Sharing Checked Approved Nominal with S Approved   03-11-2021   4-Nov-21 4-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal with
Rejected(Due
SAR Rejected
to Owner
by SAQnot willing to rent) 10-11-2021 10-Nov-21 10-Nov-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 10-11-2021 10-Nov-21 10-Nov-21
Greenfield Checked Approved
Nominal with SARApproved(Reverted
approved by RF to Colo) 18-Jun 18-Jun 18-Jun
Sharing Checked Approved Nominal wi Approved 10-11-2021 10-Nov-21 10-Nov-21
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 11-11-2021 11-Nov-21 12-Nov-21
Rooftop Checked Rejected
Nominal with SAR
Candidate
Rejected
B site
by is
CW there
not is no enough space
constructible 11-11-2021 11-Nov-21 12-Nov-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 4-Mar-22 4-Mar-22 4-Mar-22
Nominal Nominal Nominal Nominal Nominal
Rooftop checked Nominal
Approved
with SAR approved byApproved
STEP RF   15-09-2021   15-Sep-21 15-Sep-21
Greenfield checked Approved
Nominal with SAR approvedApproved
by RF   15-09-2021   15-Sep-21 15-Sep-21
Nominal Nominal Nominal Nominal Nominal
munity land and theGreenfield
peron responsible,Fetiya-+251911164386,
Checked Approved was
Nominal with notapproved
SAR aware of anyRF
arrangments to build a15-10-2021
Approved
by tower.She will have  a meeting15-Oct-21
with the community to discuss and give feedback o
15-Oct-21
Greenfield Checked Nominal with SAR
Approved approved
Approved by RF to RT Option)
(Revert   15-10-2021   15-Oct-21 15-Oct-21
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved   14-5-2022   14-5-2022 14-5-2022
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   18-10-2021   18-Oct-21 18-Oct-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   18-10-2021   18-Oct-21 18-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   18-10-2021   18-Oct-21 18-Oct-21
Greenfield Checked This Approved
Government
Nominal with
area,
SAR
they
approved
are agree
by but
RF toaccess
Approved(reverted issue we need18-10-2021
RT oprtion) Nokia Safari Access  letter further discussion 18-Oct-21
18-Oct-21
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 3-May 3-May 3-May
Nominal Nominal Nominal Nominal Nominal
Rooftop checked Approved
Nominal with SAR approvedApproved
by RF   30-10-2021 1-Nov-21 1-Nov-21
Rooftop checked Approved
Nominal with SAR approvedApproved
by RF   30-10-2021 1-Nov-21 1-Nov-21
Rooftop Checked
Rejected(Please
Rejected
Nominal
look with
for a SAR
betterRejected
height building.
by STEPSince there looks a lot 28-May
of building options) 28-May 28-May
Rooftop Checked Rejected
Nominal with SAR
Rejected(owner
Rejected by not
SAQ willing for rent) 3-Jan 3-Jan-22 3-Jan-22
Rooftop Checked Approved Nominal with S Approved 10-Jun 10-Jun 10-Jun
Rooftop Checked Rejected
Nominal with SAR Rejected Rejected
by SAQ 18-Jan
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   03-11-2021   4-Nov-21 4-Nov-21
Rooftop Checked Rejected
Nominal
Rejected(Due
with SAR
to owner
Rejected
rejected
by SAQ
Confirmed by Omar
  on 30-June)
03-11-2021   4-Nov-21 4-Nov-21
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   03-11-2021   4-Nov-21 4-Nov-21
Candidate
Rooftop was dropped due to space
Rejected
Nominal
issue with
Candidate
SAR Rejected
was Candidate
dropped
by CWduewas
todropped
space issue
due to space
6/10/2021
issue   6-Oct-21 6-Oct-21
cted due to sector block and it was already
Rooftop escalated
Rejected(Rejected with
due subcon
Rejected
Nominal towith for
sector
SAR re-hunting
block
Rejected
and itby
was
RFalready escalated
  with subcon
6/10/2021
for re-hunting)
31-Mar 6-Oct-21 6-Oct-21
cted due to sector block and it was already escalated
Rooftop Nominal
with subcon
Rejected with SAR
for
Rejected
re-hunting
Rejected bySTEP_05-Apr-22
by STEP Rejected by STEP 4-Mar-22 4-Mar-22 4-Mar-22
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal with SAR
Rejected Rejected by SAQ
Rejected(owner not willing for rent)
  29-09-2021   29-Sep-21 30-Sep-21
Rooftop Approved_STEP
Checked hasApproved
agreement with this Government
Nominal with S Building and it has confirmed
6-May
by Selcuk on 14-June-22 6-May 6-May
Rooftop
Rejected(Need
Checked
to find a newRejected
candidate for 146021
Nominal with on the by
SAR Rejected following
STEP locations( 8.997792,38.772277
6-Jun & 8.995288, 38.772916)
6-Jun 6-Jun
Rooftop Checked Rejected Rejected
Nominal with SAR Rejected by STEP 13-Jun 13-Jun 13-Jun
Rooftop Checked Nominal with SAR
Rejected Rejected by SAQ
Rejected(owner not willing for rent)
  29-09-2021   29-Sep-21 30-Sep-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 29-Jul-22 29-Jul-22 29-Jul-22
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 29-11-2021 29-Nov-21 29-Nov-21
Rooftop Checked
Reject DueRejected
to
Nominal
blockage
with
please
SARcheck(
Rejected
8.990339,
by RF 38.784990) and ( 8.989876,
6/15/2022
38.785902) 6/15/2022 6/15/2022
Rooftop Checked Rejected
Nominal
Rejected(Please
with SARcheck
Rejected
the roadside
by STEPbuildings to cover the6/28/2022
road) 6/28/2022 6/28/2022
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due   19-09-2021   19-Sep-21 19-Sep-21
Rooftop Approved(let's
Checked Nominal
plan
Approved withvisit
joint site SARbefore
approved by STEP
decision. RF
I suggest to finalize 1441056-May
before we lock this site) 6-May 6-May
Rooftop Checked Approved
NominalApproved(One
with SAR approved
more RT
by RF
available to avaoid
  ISD)19-09-2021   19-Sep-21 19-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   25-09-2021   25-Sep-21 25-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal with SAR
Rejected(owner
Rejected by not
SAQ willing for rent) 23-11-2021 23-Nov-21 23-Nov-21
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 25-Apr 25-Apr 25-Apr
Rooftop Checked Rejected Rejected(High
Nominal with SAR Rejected by SAQ rent) 23-11-2021 23-Nov-21 23-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   19-09-2021   19-Sep-21 19-Sep-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   19-09-2021   19-Sep-21 19-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   25-09-2021   25-Sep-21 25-Sep-21
Rooftop Checked Nominal
Rejected with SAR
Rejected(Not Rejected
enough by CW confirmed  on 13-May-22
space)_Oral 25-09-2021   25-Sep-21 25-Sep-21
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved   6/30/2022   6/30/2022 6/30/2022
Nominal Nominal Nominal Nominal Nominal
Rooftop checked Nominal
Approved
with SAR approved byApproved
STEP RF   18-09-2021 9/18/2021 18-Sep-21 18-Sep-21
Greenfield checked Approved
Nominal with SAR approvedApproved
by RF   14-09-2021 9/17/2021 17-Sep-21 17-Sep-21
Greenfield checked Approved
Nominal with SAR approvedApproved
by RF   18-09-2021 9/18/2021 18-Sep-21 18-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal
Rejected(Owner
with SAR Rejected
RejectedbyConfirmed
SAQ by Omer
  on 30-June)
15-10-2021   15-Oct-21 15-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   15-10-2021   15-Oct-21 15-Oct-21
Greenfield Checked Approved
Nominal
Approved(Please
with SAR approved
go for collo
by RFon 111585)Reverted
  to Colo
7/6/2022   7/6/2022 7/6/2022
sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   15-10-2021   15-Oct-21 15-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with Rejected
SAR Rejected
Due
Kindly
to
byOut
RF
search
Of Search
candidates
Ringas per 18-10-2021
new nominal   18-Oct-21 18-Oct-21
Greenfield Checked Rejected
Nominal with Rejected
SAR Rejected
Due
Kindly
to
byOut
RF
search
Of Search
candidates
Ringas per 18-10-2021
new nominal   18-Oct-21 18-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 18-Mar-22   18-Mar-22 18-Mar-22
Nominal Nominal Nominal Nominal Nominal
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   12/3/2021
Rooftop Checked Rejected Rejected(High
Nominal with SAR Rejected by SAQ rent) 23-11-2021 23-Nov-21 23-Nov-21
Rooftop Checked Nominal with SAR RejectedRejected
Rejected by RF 13-May 13-May 13-May
Rooftop Checked Nominal with SAR Rejected Approved
Rejected by SAQ 20-May 20-May 20-May
Rooftop Checked Rejected Rejected
Nominal with SAR Rejected by SAQ   6-Jun   6-Jun 6-Jun
Rooftop CheckedHold(Due to moved
Rejected
Nominal witha SAR
lot from the nominal
Rejected but there is no
by STEP   option near the nomial)
11-Jun   11-Jun 11-Jun
Greenfield Checked Rejected Rejected(land
Nominal with SAR Rejected by SAQ issue)   12/3/2021
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF    
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   27-10-2021   27-Oct-21 27-Oct-21
he representative,Abduselam-+251911795290,is
Rejected(a
Greenfield
member ofChecked not available
the mosque committee,
Rejected
Nominal withand
SARnot reachable
Musa-+251911191315,has
Rejected on phone,a
by SAQ member
said they ofdecided
we have the mosque,Musa-+251911191315,has
27-10-2021
not to rent after  discussion) Junesaid
27-Oct-21 they
1 2022 will get into contact after discussion
27-Oct-21
Greenfield Checked Rejected
Rejected(Due
Nominal withtoSAR
Government clinic
Rejected by SAQCofirmed by Omer on 30-June)
6/1/2022   6/1/2022 6/1/2022
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 12/1/2021
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 12/1/2021
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 11-11-2021 11-Nov-21 12-Nov-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-11-2021 11-Nov-21 12-Nov-21
Nominal Nominal Nominal Nominal Nominal
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF 30-11-2021 30-Nov-21 30-Nov-21
thewant
the owner don't owner
Rooftop don't
to rent want
Checked
and toifrent
even and
haveeven
weRejected
Nominal if weSAR
searched
with have
for searched
aRejected
new onebyfor
sinceathe
SAQ newplace
one is
since the aplace
around is around
residential
23-11-2021 a residential
area, there is no area, therebuilding
a possible is no a possible
23-Nov-21 height building height
23-Nov-21
Rooftop Checked Nominal
Rejected(The heightwith
Rejected SAR
is too Rejected
low. Looks by STEP
a lot of building is upcoming in 3-May
the area as well) 3-May 3-May
Greenfield
Checked,Out of search ring
Rejected
Nominal
Rejected
with SAR
(Out off
Rejected
searchby
ring
RFinter site distance in near)
30-11-2021 31-Mar 30-Nov-21 30-Nov-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   4/10/2021   4-Oct-21 4-Oct-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   4/10/2021   4-Oct-21 4-Oct-21
Greenfield
Panoramic Photos is not clear
Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring
  4/10/2021   4-Oct-21 4-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR
Approved approved by RF to RT oprtion)
Approved(reverted   12/10/2021   12-Oct-21 13-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF   12/10/2021   12-Oct-21 13-Oct-21
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 4/28/2022 4/28/2022 4/28/2022
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF   12/10/2021   12-Oct-21 13-Oct-21
Nominal Nominal Nominal Nominal Nominal
Rooftop checked Rejected
Nominal with SAR Rejected(Due
Rejected by RF
to low ISD)   15-09-2021   15-Sep-21 16-Sep-21
Rooftop checked Rejected
Nominal
Rejected with
(DueSAR
to Owner
Rejected
Rejected
by SAQ
confirmed by  Omar on 15-09-2021
30-June)   15-Sep-21 16-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   29-09-2021   29-Sep-21 30-Sep-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   29-09-2021   29-Sep-21 30-Sep-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   29-09-2021   29-Sep-21 30-Sep-21
Nominal Nominal Nominal Nominal Nominal
There is a buildingRooftop
at 150-210 deg plz check ht Approved
and
Nominal
possibility
withtoSAR
use approved
same Resubmit
by RF   29-09-2021   29-Sep-21 30-Sep-21
Please include sharing
Rooftop
candidates data as a additional
Nominal
Approved option
with SAR
for this
approved
site byApproved
STEP RF   29-09-2021   29-Sep-21 30-Sep-21
Please include sharing
Greenfield
candidates data as a additional
Approved
Nominal
option
withfor
SAR
thisapproved
site Resubmit
by RF   29-09-2021   29-Sep-21 30-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   29-09-2021   29-Sep-21 30-Sep-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   29-09-2021   29-Sep-21 30-Sep-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   29-09-2021   29-Sep-21 30-Sep-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 28-02-2022 28-02-2022 28-02-2022
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked
Reject due to ownership
Rejected
Nominal with
issueSAR
dropped
Rejected
at duebydiligence
SAQ (DD) stage email confirmed
9-May at 6-28-2022 9-May 9-May
Rooftop Checked Rejected
Owner
Nominalnotwith
willing
Owner
SARalso
Rejected
not
no willing
onebywas
SAQ
also
interested
no one for
wasrent
interested
in this12/3/2021
location
for rent in this location
Rooftop Checked Rejected
Owner
Nominalnotwith
willing
Owner
SARalso
Rejected
not
no willing
onebywas
SAQ
also
interested
no one for
wasrent
interested
in this location
for rent in this location
Rooftop Checked Nominal with SAR Rejected Rejected
Rejected by STEP
Under customer discussion
3-Mar-22 3-Mar-22 3-Mar-22
Rooftop Checked Rejected
Nominal with SARRejected
Rejected (Due
by RFto blockage) 28-Jun-22 28-Jun-22 28-Jun-22
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 2-Aug-22 2-Aug-22 2-Aug-22
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Rooftop Checked Rejected Rejected
Nominal with SAR Rejected by CWby CW 11-11-2021 11-Nov-21 12-Nov-21
Rooftop Checked Approved Approved
Nominal with SAR approved by STEP RF 26-May 26-May 26-May
Rooftop Checked Rejected Candidate
Nominal with SAR Rejected rejected blocked by neighbor
Approved
by RF bulidings 21-Apr
11-11-2021 21-Apr 21-Apr
Nominal Nominal Nominal Nominal Nominal
Sharing Checked Approved Nominal wi Approved 13-Nov-21 13-Nov-21 13-Nov-21
Rooftop Checked Nominal
Rejected(Antenna
Rejected with SAR Rejected
height
by STEP
is too low) rejected in TSSR
13-Nov-21 13-Nov-21 13-Nov-21
Rooftop Rejected(STEP Rejected
Nominalcandidate
Checked has Requested with SAR Rejected
near Boleby STEP and it was  informed with
Airport 7-Jun-22
ROM to find new
  search) 7-Jun-22 7-Jun-22
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due   6/10/2021 3-Dec 3-Dec 3-Dec
Rooftop Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due   6/10/2021 3-Dec 3-Dec 3-Dec
Rooftop Checked Rejected
Nominal with SARRejected(Due
Rejected by RF
to Shadowing) 20-Apr 20-Apr 20-Apr
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 15-Jul 15-Jul 15-Jul
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected(Owner
Rejected
Nominal withnot
SARinterested
Rejectedfor
byrent)_confirmed
SAQ by
  Selcuk 6/10/2021
on 16.05.22   6-Oct-21 6-Oct-21
Rooftop Checked Resubmit
Nominal with SAR
Resubmit(Resubmit
Rejected by RF exact BH) 6/6/2022 6/6/2022 6/6/2022
Rooftop Checked Approved Nominal with S Approved 6/9/2022 6/9/2022 6/9/2022
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal with Rejected(Due
SAR RejectedtobyGovernment
SAQ property)
  05-11-2021   11/5/2021 5-Nov-21
Rooftop Checked Rejected
Nominal with SAR Rejected
Rejected(ICT
by SAQ Park)   05-11-2021   11/5/2021 5-Nov-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Rejected(ICT
by SAQ Park)   05-11-2021   11/5/2021 5-Nov-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal withRejected
SAR Rejected
(Due to
byGovernment
SAQ property)
  22-Aug-21   22-Aug-21 24-Aug-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   22-Aug-21   22-Aug-21 24-Aug-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF   22-Aug-21   22-Aug-21 24-Aug-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   22-Aug-21   22-Aug-21 24-Aug-21
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Sharing Checked Nominal with SAR approved by
Approved STEP RF
Approved 11-11-2021 11-Nov-21 12-Nov-21
Greenfield Checked Nominal withRejected(owner
Rejected SAR Rejected by
notSAQ
willing for rent/LA) 11-11-2021 11-Nov-21 12-Nov-21
Rooftop Checked Nominal with SARApproved(Reverted
Approved approved by RF to Colo) 19-May 19-May 19-May
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 19-May 19-May 19-May
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 11-11-2021 11-Nov-21 12-Nov-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   17-10-2021 12/20/2021 17-Oct-21 18-Oct-21
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF   17-10-2021   17-Oct-21 18-Oct-21
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF   17-10-2021
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF   17-10-2021   17-Oct-21 18-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF   17-10-2021   17-Oct-21 18-Oct-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   17-10-2021   17-Oct-21 18-Oct-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   22-Aug-21 2-Dec 2-Dec 2-Dec
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   22-Aug-21 2-Dec 2-Dec 2-Dec
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF   17-10-2021   17-Oct-21 18-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF   17-10-2021   17-Oct-21 18-Oct-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   17-10-2021 12/29/2021 17-Oct-21 18-Oct-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal with SAR Rejected
Rejected by STEP
Rejected(BH is too low)   17-10-2021   11/17/2021 17-Nov-21
Greenfield Checked Nominal with SAR Rejected by
Rejected STEP
Rejected   17-10-2021   11/17/2021 17-Nov-21
Rooftop Checked
Rejected(Active
Rejected
Nominalcandidate
with SARwas
Rejected
droppedbydue
SAQto owner not  willing for17-10-2021
rent(02-Apr-22))   11/17/2021 17-Nov-21
Blocked by
Neighbour
Rooftop Checked Rejected
Nominal with SAR RejectedRejected
by RF buildings 21-Apr-22 21-Apr-22 21-Apr-22
Greenfield Checked Nominal
Approved
with SAR
Approved(EEP
approved bysite
STEPconfirmed
RF by Jaffar) 19-Apr-22 4/19/2022 19-Apr-22
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF   5-Jan 5-Jan-22 5-Jan-22
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF   5-Jan 5-Jan-22 5-Jan-22
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   5-Jan 5-Jan-22 5-Jan-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR Rejected Approved
Rejected by SAQ   15-10-2021   15-Oct-21 15-Oct-21
Greenfield Checked Nominal
Rejected(Owner
Rejected with SAR Rejected
not willing
by for
SAQrent & high rent)_26'Apr'22
  15-10-2021   15-Oct-21 15-Oct-21
Rooftop Checked Rejected(Not
Nominal
RejectedOK,
with
moved
SAR Rejected
too muchby
in STEP
wrong direction and resent 19-May
for approval) 19-May 19-May
Rooftop Checked Active
Nominal
candidate
Rejected withowner
SAR Rejected
refused by
to SAQ
rent(email confirmation on 6-14-2022
3-Jun 3-Jun 3-Jun
Greenfield Approved and DARA
Checked signed. Initially
Approved it haswith
Nominal Rejected(Due
S to Owner rejected confirmed
14-Junby Omar on 30-June) 14-Jun 14-Jun
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with
candidate-A,B,C
SAR Rejected
candidate-A,B,C
was
by SAQ
dropped due
was
todropped
owner due
17-10-2021
to owner   11/17/2021 17-Nov-21
Greenfield Checked Rejected
Nominal with
candidate-A,B,C
SAR Rejected
candidate-A,B,C
was
by SAQ
dropped due
was
todropped
owner due
17-10-2021
to owner   11/17/2021 17-Nov-21
Greenfield Checked Rejected
Nominal with
candidate-A,B,C
SAR Rejected
candidate-A,B,C
was
by SAQ
dropped due
was
todropped
owner due
17-10-2021
to owner   11/17/2021 17-Nov-21
Greenfield Checked Approved
Nominal with SARApproved(Reverted
approved by RF to Colo) 26-Mar-22   26-Mar-22 26-Mar-22
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   17-10-2021   11/17/2021 17-Nov-21
Nominal Nominal Nominal Nominal Nominal
Need to do
Greenfield
survey new Candidate as perRejected
new
Nominal
nominal
withplan
Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring
  11/17/2021   7-Oct-21 7-Oct-21
Need to do
Greenfield
survey new Candidate as perRejected
new
Nominal
nominal
withplan
Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 11/17/2021 7-Oct-21 7-Oct-21
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   11/17/2021   NA NA
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 23-11-2021 23-Nov-21 23-Nov-21
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF   12/3/2021
Nominal Nominal Nominal Nominal Nominal
Greenfield Out of Search ring Approved
Nominal with SAR approvedResubmit
by RF   23-Aug-21   23-Aug-21 26-Aug-21
Greenfield Checked Nominal Rejected(Owner
Rejected with SAR Rejected
notbywilling
SAQ for rent)_26'Apr'22
  23-Aug-21   23-Aug-21 26-Aug-21
Greenfield Out of Search ring Approved
Nominal with SAR approvedResubmit
by RF   23-Aug-21   23-Aug-21 26-Aug-21
Rooftop Checked Nominal with SAR
Rejected Rejected by SAQ
Rejected(Owner nit willing for rent) 16-May-22 16-May-22 16-May-22
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 19-May-22 19-May-22 19-May-22
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal
Rejected(Due
with SAR
to Rejected
space issue)_New
by CW scandidate
  hunt ongoing
12/3/2021
Rooftop Checked Rejected
Nominal with SAR
Rejected
Rejected
(Nearbywith
RF other nominal) 12/21/2021 21-Dec-21 21-Dec-21
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 20-Apr-22 20-Apr-22 20-Apr-22
Rooftop Checked Approved
Nominal with SAR Approved
Approved
by RF 20-Apr-22 20-Apr-22 20-Apr-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR
Approved(Reverted
approved by RF to RT option)
  15-10-2021   15-Oct-21 15-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   15-10-2021   15-Oct-21 15-Oct-21
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 7-May 7-May 7-May
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   14-09-2021 9/17/2021 17-Sep-21 17-Sep-21
Greenfield checked Approved
Nominal with SAR approvedApproved
by RF   18-09-2021 9/18/2021 18-Sep-21 18-Sep-21
Nominal Nominal Nominal Nominal Nominal
block complete signal
Rooftop
at 150-180 deg, check if obstructing
Approved
Nominal building
with SARcan
approved
be used
Approved
by
as RF
candidate   11-Sep-21   11-Sep-21 17-Sep-21
Rejected(Not
Rooftop Ok. it is nearRejected
Checked Nominal
to another
with
approved
SAR Rejected
site, let's
by STEP
move it to the middle
  way 11-Sep-21
to cover the condominium
  better)
11-Sep-21 17-Sep-21
Rooftop Nominal
Approved
with SAR approved byApproved
STEP RF    
block complete signal
Rooftop
at 150-180 deg, check if obstructing
Approved
Nominal building
with SARcan
approved
be used
Approved
by
as RF
candidate   11-Sep-21   11-Sep-21 17-Sep-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   11-Sep-21   11-Sep-21 17-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   02-11-2021   4-Nov-21 4-Nov-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   02-11-2021   4-Nov-21 4-Nov-21
Nominal Nominal Nominal
Nominal With candidate
Nominal
Rooftop Rejected Rejected Total Rejected
Nominal with SAR Rejectedcandidate
by RF is blocked by neighbour buildings
8-Apr 8-Apr 8-Apr
Rooftop Checked Nominal with SARRejected(Due
Rejected to No DG Space)
Rejected by SAQ 12-Apr 12-Apr 12-Apr
Rooftop Checked Rejected
Nominal
Rejected
withDue
SARtoRejected
High price
byConfirmed
SAQ by Omar on 30-June
25-Apr 25-Apr 25-Apr
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 11-11-2021 11-Nov-21 12-Nov-21
Rooftop Checked Rejected
Nominal with
Rejected
SAR Rejected
due to blockage
by RF and shadowing 1-Jul-22 1-Jul-22 1-Jul-22
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 5-Jul-22 5-Jul-22 5-Jul-22
Rooftop Checked Rejected
Nominal with Rejected(Due
SAR RejectedtobyGovernment
SAQ property) 11-11-2021 11-Nov-21 12-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal with
Approved Recieved
SAR approved
Approvalby
mail
STEP
from
RF STEP on 25052022
  02-11-2021   4-Nov-21 4-Nov-21
Rooftop Checked Nominal
Approved(Reverted
Approved with SAR approved
to candidate-A
by RF due to LA signed)18-May 18-May 18-May
Greenfield
Need New search find RT options
Rejected
Nominal with SAR
NeedRejected
New search
by RF
find RT options
  02-11-2021   4-Nov-21 4-Nov-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring
  03-11-2021   4-Nov-21 4-Nov-21
Greenfield Checked Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring
  03-11-2021   4-Nov-21 4-Nov-21
Rooftop Checked Rejected
Rejected(Due sectors
Nominal withare
S blocked by neighbouring buildings)
12-May 12-May 12-May
Rooftop Checked Approved Nominal with Approved 13-Jun 13-Jun 13-Jun
Rooftop Checked Approved Approved(OK,
Nominal with S but has to be with 9m RTT) 13-Jun 13-Jun 13-Jun
Nominal Nominal Nominal Nominal Nominal
Sharing Checked Nominal with SAR approved by
Approved STEP RF
Approved 3-Dec-2021
Rejected(GBT
Greenfield
Govt candidate
Checked
needs to be Nominal
Rejected with9.045454,38.856743
dropped and SAR Rejected by SAQis the new RT candidate
23-11-2021
and deployment team with submit
23-Nov-21
RT candidate)
23-Nov-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 23-11-2021 23-Nov-21 23-Nov-21
Rooftop Checked Nominal withto
Rejected
Rejected(Due SAR Rejected
loer byand
elevation STEP
not able to serve sec-1 properly)
18-May 18-May 18-May
Rooftop Checked Nominal with SARApproved(Reverted
Approved approved by RF to Colo) 30-Jun 30-Jun 30-Jun
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   03-11-2021   4-Nov-21 4-Nov-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   03-11-2021   4-Nov-21 4-Nov-21
Nominal Nominal Nominal Nominal Nominal
checked/ There Greenfield
is hill like struture at 350m from
Approved
Nominal
the site on
with
350SAR
degrees
approvedApproved
by RF   29-09-2021   29-Sep-21 5-Oct-21
checked/ There Greenfield
is hill like struture at 350m from
Rejected
Nominal
Rejected(Both
the site with
on 350
SAR
Cdegrees
and
Rejected
B ownerby are
SAQ some so owner
  want to29-09-2021
rent C)   29-Sep-21 5-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF   29-09-2021 7/15/2022 29-Sep-21 5-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked
candidateRejected
Nominal
is located
candidate
with
in school..This
SAR
is located
Rejected
in
wasschool..This
bydropped
SAQ due was
todropped
school mangement
due to24-Nov
school
notmangement
willing not willing
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF 5-Jan
Rooftop Checked Rejected
Nominal
Rejected(Due
with SAR Rejected
to SD fail)confirmed
by CW by omar on 30-July
19-Mar-22 19-Mar-22 19-Mar-22
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF 3-Dec 3-Nov-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected by
Rejected
SAQ 12/21/2021 6-Mar-22 6-Mar-22 6-Mar-22
Greenfield Checked Nominal
Approved
with SAR
Approved(OK,
approved byBut
STEP
can RF
we go for Collo?) 12/21/2021 21-Dec-21 21-Dec-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved Nominal with Approved   6-Sep-21   6-Sep-21 20-Sep-21
Rooftop Checked Nominal
Approved
with SAR Approved(SAQ
approved by STEP
issue
RFis resolved)
  6-Sep-21   6-Sep-21 20-Sep-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   6-Sep-21 6-Sep-21 20-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop checked Rejected
Nominal
Rejected with
(DueSAR
to Owner
Rejected
Rejected
by SAQ
confirmed by  Omar on 20-09-2021
30-june) 20-Sep-21 21-Sep-21
updatedRooftop
search ring view required in Approved
nominal
Nominalinfo
with
tabSAR approvedResubmit
by RF   20-09-2021   20-Sep-21 21-Sep-21
Rooftop checked Nominal
Approved
with SAR approved byApproved
STEP RF   20-09-2021 20-Aug-22 20-Sep-21 21-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop checked Approved
Nominal with SAR approvedApproved
by RF   20-09-2021 10/11/2021 11-Oct-21 11-Oct-21
Rooftop checked Rejected
Nominal with SAR
Candidate
Rejected
B site
by is
CWnot constructible
  20-09-2021 10/11/2021 11-Oct-21 11-Oct-21
Rooftop checked Approved
Nominal with SAR approvedApproved
by RF   20-09-2021 9/21/2021 21-Sep-21 22-Sep-21
Rooftop checked Rejected NominalRejected(owner
with S not willing) 10-Mar-22 10-Mar-22
Rooftop checked Rejected
Rejected(Ownership
Nominal withdocument
S not full,failed  at DARA stage) 6-Jun 6-Jun 6-Jun
Rooftop checked Approved Nominal with Approved   23-Jun 23-Jun 23-Jun
Rooftop checked Approved Nominal with S Approved   23-Jun 23-Jun 23-Jun
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF 12/21/2021 21-Dec-21 21-Dec-21
Greenfield Checked Rejected
Nominal with SAR
Rejected
Rejected
dueby
toSAQ
owner not willing 12/21/2021 21-Dec-21 21-Dec-21
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF 12/21/2021 21-Dec-21 21-Dec-21
Nominal Nominal Nominal Nominal Nominal
Possible candidate owner
Rooftop needs
checked a Rejected
detailed
Rejected dueletter
Nominal to
with describing
Addis
SAR the asked
university
Rejected equipment
by SAQ to be installed
for additional serviceaddressed
omar to Addis Ababa
20-09-2021
confirms   University, President22-Sep-21
20-Sep-21 office. Contact 0111232435
Greenfield checked Approved
Nominal with SAR approvedApproved
by RF   20-09-2021   20-Sep-21 21-Sep-21
Sharing checked Nominal
Approved
with SAR approved byApproved
STEP RF   20-09-2021   20-Sep-21 21-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Approved(Re-checked
checked Nominal with
Approved with
SAR
owner
approved
by Zagwe)Rejected(Owner
by STEP RF
Rejected by   not willing for rent)_26'Apr'22
20-09-2021   20-Sep-21 21-Sep-21
CW :
Rooftop checked Rejected
Nominal with SAR Rejected by CW
problematic   20-09-2021   20-Sep-21 21-Sep-21
Nominal Nominal Nominal Nominal access
Nominal
Need New
Rooftop
search exesting candidatesRejected
are
Nominal
not sutable
with SAR Rejected
TSSRbyRejected
RF   10/9/2021 9/14/2021 14-Sep-21 14-Sep-21
Need New
Greenfield
search exesting candidatesRejected
are
Nominal
notNeed
sutable
with
NewSAR
search
Rejected
exesting
by RF
candidates are  not sutable10/9/2021 9/14/2021 14-Sep-21 14-Sep-21
Need New
Greenfield
search exesting candidatesRejected
are
Nominal
notNeed
sutable
with
NewSAR
search
Rejected
exesting
by RF
candidates are  not sutable10/9/2021 9/14/2021 14-Sep-21 14-Sep-21
Rooftop Approved Nominal
Approved
with SAR approved byApproved
STEP RF
Rooftop
Not enough space in candidate-T
Rejected
Nominal with SAR
NotRejected
enough space
by CWin candidate-T
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   3/9/2021   3-Sep-21 3-Sep-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   3/9/2021   3-Sep-21 3-Sep-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   3/9/2021   3-Sep-21 3-Sep-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 25-Nov-21 25-Nov-21 25-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   15-Aug-21   15-Aug-21 19-Aug-21
Greenfield checked Approved
Nominal with SAR approvedApproved
by RF   15-Aug-21 9/11/2021 11-Sep-21 12-Sep-21
Rooftop checked Nominal
Approved
with SAR approved byApproved
STEP RF   15-Aug-21 9/11/2021 11-Sep-21 12-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected(Dropped
Rejected Nominal
due to with
high Sprice_Owner is asking 60000 EBT
25-Feb-22
per month)   25-Feb-22 19-Aug-21
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF   25-Feb-22   25-Feb-22 19-Aug-21
Rooftop Checked Approved Nominal with S Approved   25-Feb-22   25-Feb-22 19-Aug-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
Approved(At
with SARTSSR
approved
stage,bySTEP
STEPRFRFrejected due
  to shadowing)
02-11-2021   4-Nov-21 4-Nov-21
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Rooftop Approved Approved(field
Nominal
Approvedwith
visit
SAR done
approved
by Jaffar
by&STEP
STEPRFRF and they agreed11-11-2021
this candidate) 11-Nov-21 12-Nov-21
Abel from safaricomRooftop Nominal
are visited with Jaffar on Mar-29
Rejected withagreed
and they SAR Rejected bybuilding
STEP
with thisRejected 11-11-2021 11-Nov-21 12-Nov-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected NominalRejected(DARA
wi Issue) 12/3/2021
Rooftop Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 25-02-2022 25-Jan-22 25-Jan-22
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 25-02-2022 25-Jan-22 25-Jan-22
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 25-02-2022 25-Jan-22 25-Jan-22
Rooftop Rejected(Looks
Checked on
Rejected
Nominal
lower height
with SAR
compared
Rejected
to the
by sorrounding
STEP buildings, so please
7/6/2022
go for better height.) 7/6/2022 7/6/2022
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF 12/3/2021
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 12/21/2021 21-Dec-21 21-Dec-21
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF 12/21/2021 21-Dec-21 21-Dec-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due   03-11-2021   4-Nov-21 4-Nov-21
Greenfield Checked Nominal with SARApproved(Reverted
Approved approved by RF All to
arecolo)
government land
03-11-2021   4-Nov-21 4-Nov-21
Sharing Checked Nominal with SAR approved by
Approved STEP RF
Approved   03-11-2021   4-Nov-21 4-Nov-21
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 11-11-2021 11-Nov-21 12-Nov-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-11-2021 11-Nov-21 12-Nov-21
Nominal Nominal Nominal Nominal Nominal
Greenfield checked Rejected
Nominal with SAR RejectedRejected
by RF   20-09-2021
No progress shared by Innovis
20-Sep-21 21-Sep-21
Need
Greenfield Nominal
to do survey for another candidate
Rejected Rejected(Owner
with SAR Rejected
as well notbywilling
SAQ for rent)_26'Apr'22 24-Feb 2/24/2022 24-Feb-22
Rooftop Rejected(But
checked Rejected
ISD with 380m). Need
Nominal withnew
S searh on following location_9.041412,38.753491
18-May 18-May 18-May
Rooftop checked Rejected building
Nominal with SAR height
Rejected by isRF
very low 13mtr 23-May 23-May 23-May
Rooftop checked Nominal withISD
Rejected SARis not ok near
Rejected byto
RFanother nominal 11-Jun 11-Jun 11-Jun
Sharing checked Nominal
Approved
with SAR approved byApproved
STEP RF   20-09-2021   20-Sep-21 21-Sep-21
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 11-11-2021 11-Nov-21 12-Nov-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-11-2021 11-Nov-21 12-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop checked Approved
Nominal with SAR approvedApproved
by RF   30-10-2021 1-Nov-21 1-Nov-21
Rooftop checked Nominal
Approved
with SAR approved byApproved
STEP RF 01-03-2022 1-Mar-22 1-Mar-22
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Rooftop Checked Nominal
Rejected with SAR Rejected
Rejected(please bybuilding
check the STEP @ 9.003879,38.779810)
11-11-2021 11-Nov-21 12-Nov-21
Rooftop Checked Nominal with SAR Rejected
Rejected by SAQ price)
Rejected(High 11-11-2021 11-Nov-21 12-Nov-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 2-Dec 2-Dec 2-Dec
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 2-Dec 2-Dec 2-Dec
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   17-10-2021   11/17/2021 17-Nov-21
Rooftop Checked Nominal
Rejected(Owner
Rejected with SAR Rejected
not willing
by for
SAQrent & high
LA done byrent)_26'Apr'22
other subcon
17-10-2021   11/17/2021 17-Nov-21
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   17-10-2021   11/17/2021 17-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal with SAR RejectedSpace
by CWissue   15-10-2021   15-Oct-21 15-Oct-21
Rooftop Rejected(TheRejected
Checked Nominal
height is to
with
low
SAR
even
Rejected
to overcome
by STEPthe elevation  of the terrain) rejected in TSSR
15-10-2021   15-Oct-21 15-Oct-21
Rooftop Checked Nominal with SARApproved(Reverted
Approved approved by RF to Colo)   6/30/2022   6/30/2022 6/30/2022
Sharing Checked Nominal with SAR approved by
Approved Approved
STEP RF   15-10-2021   15-Oct-21 15-Oct-21
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 11-11-2021 12-Nov-21 12-Nov-21
RooftopCandidate
Checked
B was dropped
Rejected
Nominal
because
with
of high Candidate
SARpricing
Rejected
of by B was
owner
SAQanddropped
Nokia'sbecause of
mr.Dereje high pricingthe
11-11-2021
is handling of owner and
LA legal Nokia's
issues mr.Dereje
12-Nov-21 is handling the LA legal issues
12-Nov-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 16-Mar-22 16-Mar-22 16-Mar-22
Nominal Nominal Nominal Nominal Nominal
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   7-Sep-21   7-Sep-21 10-Sep-21
Greenfield Checked Approved
Nominal with SARApproved(Reverted
approved by RF to Colo)   7-Sep-21   7-Sep-21 10-Sep-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   7-Sep-21   7-Sep-21 10-Sep-21
Nominal Nominal Nominal Nominal Nominal
Sharing checked Nominal
Approved
with SAR approved byApproved
STEP RF   14-09-2021   14-Sep-21 14-Sep-21
Rooftop checked Rejected
 Contacts
Nominal with
not going
SAR
 Contacts
Rejected
through.
not going
Its
by court
SAQ
through.
house.Its
Newcourt
candidate
house.
14-09-2021
New
needed
candidate needed
  14-Sep-21 14-Sep-21
Nominal Nominal Nominal Nominal Nominal
Greenfield under government
Checked Rejected
Nominal and woreda
Rejected(Due
with SAR land
to no administration
Rejected
title deed
by SAQ office
confirmed they gave
by Omar us an appointment for
on 30-June)
18-10-2021   Thursday to decide for18-Oct-21
18-Oct-21 rent.
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   18-10-2021   18-Oct-21 18-Oct-21
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   18-10-2021   18-Oct-21 18-Oct-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 02-02-2022 02-02-2022 02-02-2022
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   02-11-2021   4-Nov-21 4-Nov-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal Rejected(Owner
Rejected with SAR Rejected
notbywilling
SAQ for rent)_26'Apr'22
  15-10-2021   15-Oct-21 15-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   15-10-2021   15-Oct-21 15-Oct-21
Rooftop Checked Nominal with SAR
Rejected Rejected byOK,ISD
Rejected(Not STEP is an issue) 16-May 16-May 16-May
Greenfield Checked Nominal with
Rejected(Due
Rejected SAR Rejected
to owner wants thebysite
SAQmoved from one location to
14-Jul
another) 14-Jul 14-Jul
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 22-Jul 22-Jul 22-Jul
Greenfield Checked Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 13-Feb 2/13/2022 13-Feb-22
Nominal Nominal Nominal Nominal Nominal
problem, Owners can't
Rooftop
decide amongst
Checked
themselvesNominal
for rent.with
Rejected SAR Rejected
Couldn't by SAQ
get decision since March and  we have 11/17/2021
LA and TSSR ready  on backup1-Oct-21
candidate B, Korabza
7-Oct-21Building Rent:'+2511182786
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved   23-Apr   23-Apr 23-Apr
Nominal Nominal Nominal Nominal Nominal TSSR
Submitted
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF but  los 16-May 16-May 16-May
blocked need
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF to  be 5-Sep-21   5-Sep-21 5-Sep-21
Nominal with SAR Rejected by SAQ rerouted
Rooftop Checked Rejected Rejected(Government building)
Cand C under 5-Sep-21   5-Sep-21 5-Sep-21
Nominal Nominal Nominal Nominal Nominal construction
LOS Blocked
Rooftop Checked Nominal
Approved STEP RF to 148016.
with SAR approved byApproved   LA 9/9/2021 9/11/2021 11-Sep-21 11-Sep-21
to be
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF  
collected 9/9/2021 9/11/2021 11-Sep-21 11-Sep-21
19/02/2022
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal
7 Sep: Candidate
with SARBapproved
is 160mApproved
in
byNorth
RF and Candidate C asked
7-Sep-21
for 250m in North
  West. Both
7-Sep-21
Rt 10-Sep-21
Rooftop Checked Approved
Nominal
7 Sep: Candidate
with
Approved(Reverted
SARBapproved
is 160m in
byNorth
RF
to colo
and
candidate-X)
Candidate C asked
7-Sep-21
for 250m in North
  West. Both
7-Sep-21
Rt 10-Sep-21
Rooftop Checked Rejected
Rejected
Nominal
inter site
with
distance
SAR Rejected
is very near
by RF
in 279mtr & 350mtr from
17-May-22
the nominal. 17-May-22 17-May-22
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF Colo candidate 7-Sep-21   7-Sep-21 10-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due 3-Dec 3-Dec 3-Dec
Rooftop Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due 3-Dec 3-Dec 3-Dec
Rooftop Checked Rejected Nominal
Rejected(We need with S
candidate 1-Jun
on 9.002051,38.740200 & nearby) 1-Jun 1-Jun
Rooftop Checked Resubmit Nominal with S
Resubmit with clear panoramic picture 27-Jun 27-Jun 27-Jun
Rooftop Checked Approved Nominal with S Approved 28-Jun 28-Jun 28-Jun
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   29-09-2021   29-Sep-21 30-Sep-21
Rooftop Checked Nominal withrequest
Rejected(owner
Rejected SAR rejected
50K forbyrental
SAQ price)email confirmed 6-28-2022
28-Apr 28-Apr 28-Apr
Rooftop Checked Rejected
Nominal with SAR Rejected
Reject due
by RF
to Shadow 29-Jun 29-Jun 29-Jun
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   29-09-2021   29-Sep-21 30-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop checked Nominal with SAR
Rejected Rejected by
Rejected(Due to SAQ
Owner not willing)
  30-10-2021 1-Nov-21 1-Nov-21
Rejected due
Rooftop checked Nominal with SAR Rejected to
Rejected by owner
SAQ   30-10-2021 1-Nov-21 1-Nov-21
unavailability
Rejected(Due
Rooftop checked Rejected
Nominal with SAR Rejected bytoSTEP
ISD) 6-Jun 6-Jun 6-Jun
Sharing checked Nominal
Approved
with SAR approved byApproved
STEP RF   30-10-2021 1-Nov-21 1-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop checked Nominal
Approved
with SAR approved byApproved
STEP RF   30-10-2021 1-Nov-21 1-Nov-21
Greenfield checked Approved
Nominal with SAR approvedApproved
by RF   30-10-2021 1-Nov-21 1-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF   5-Jan   18-Oct-21 18-Oct-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   5-Jan 18-Oct-21 18-Oct-21
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF   5-Jan 5-Jan-22 5-Jan-22
Rooftop Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   5-Jan 5-Jan-22 5-Jan-22
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF   5-Jan   18-Oct-21 18-Oct-21
Sharing Checked Nominal with SAR approved by
Approved STEP RF
Approved
Greenfield Checked Nominal with SAR
Rejected Rejected by
Rejected(Due toCW
not enough space) 24-Nov
Greenfield Checked Approved
Nominal with SAR
Approved(Reverted
approved by RF to RT option) 5-Apr 5-Apr 5-Apr
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 21-Dec 21-Dec-21 21-Dec-21
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Greenfield Checked Rejected
Nominal with SAR Rejected
Rejected(Due
by SAQ
to High rent) 11-11-2021 12-Nov-21 12-Nov-21
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 20-Apr 20-Apr 20-Apr
Greenfield Checked Rejected
Nominal with SAR Rejected
Rejected(NOK)
by SAQ 11-11-2021 12-Nov-21 12-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 23-11-2021 23-Nov-21 23-Nov-21
Rooftop Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 12/3/2021
Rooftop Checked Rejected
Nominal with SAR Rejected
Ownerbynot
SAQinterested 2/23/2022 23-Feb-22 23-Feb-22
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 17-Mar-22 17-Mar-22 17-Mar-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 12/3/2021 12/21/2021 3-Dec-21 3-Dec-21
Rooftop Checked Rejected(Owner
Rejected
Nominal with SAR
not willing
rejected
at Dara
by SAQ
stage) Moureen confirm 12/3/2021
6-24-2022 12/21/2021 3-Dec-21 3-Dec-21
Rooftop Checked Approved
Nominal with SARApproved(Reverted
approved by RF to Colo) 6/24/2022 6/24/2022 6/24/2022
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 6/24/2022 6/24/2022 6/24/2022
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF 12/3/2021 12/21/2021 3-Dec-21 3-Dec-21
Nominal Nominal Nominal Nominal Nominal
Paranomic
SharingPictures Missing dueNominal
to
Approved
Permission
with SAR approved byApproved
STEP RF   17-10-2021   17-Oct-21 18-Oct-21
Greenfield Checked Approved
Nominal with SARApproved(Reverted
approved by RF to colo)   17-10-2021   17-Oct-21 18-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   8/19/2021 12/13/2021 19-Aug-21 2-Sep-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   8/19/2021   19-Aug-21 1-Sep-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Rejected(Access
by SAQ issue)   8/19/2021   19-Aug-21 20-Aug-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Reject gobyfor
RFRT option   6/11/2022   6/11/2022 6/11/2022
Rooftop Checked Rejected
Nominal
Rejected(9Mtr
with SARRTT
Rejected
is not by
constructible
STEP and 6mtr
  P is not7/15/2022
OK)   7/15/2022 7/15/2022
Nominal Nominal Nominal
Nominal With No candidate
Nominal
Share
Sharing
other Candidates, This Nominal
isApproved
Colo RT
with SAR approved byApproved
STEP RF 11/24/2021
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 24-11-2021 24-Nov-21 24-Nov-21
Rooftop Checked Nominal with SAR Rejected
Rejected by STEP to ISD)
Rejected(Dur 24-11-2021 24-Nov-21 24-Nov-21
Nominal Nominal Nominal Nominal Nominal 24-Nov-21 24-Nov-21
Greenfield Checked NominalRejected(School
Rejected with SAR Rejected by SAQ not willing for rent)25-02-2022
management
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 25-02-2022
Greenfield Checked Approved Approved
Nominal with SAR approved by STEP RF 5/25/2022 25-May 25-May
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 11-11-2021 12-Nov-21 12-Nov-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 1/4/2022 4-Jan-22 4-Jan-22
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 11-11-2021 12-Nov-21 12-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 12/3/2021
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 12/3/2021
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 11-11-2021 12-Nov-21 12-Nov-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-11-2021 12-Nov-21 12-Nov-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR
Approved(reverted
approved by RF to RT option) 19-Mar-22 19-Mar-22 19-Mar-22
Rooftop Checked Rejected
Nominal with SAR Rejected(owner
Rejected by SAQnot willing) 30-Apr-22 30-Apr-22 30-Apr-22
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 13-May-22 13-May-22 13-May-22
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Rooftop Approved Nominal with SAR
Rejected Rejected by
Rejected(Due to SAQ
owner asking 55K) 11-11-2021 12-Nov-21 12-Nov-21
Rooftop Checked NominalRejected(SAR
Rejected with SAR Rejected by STEP
Rejected by STEP RF)_05-Apr-2211-11-2021 12-Nov-21 12-Nov-21
Rooftop Checked Approved Approved
Nominal with SAR approved by STEP RF 6/6/2022 6/6/2022 6/6/2022
Rooftop Checked Rejected
Nominal with Rejected
SAR Rejected
(Block by RF neighbourthe
buildings)
owner 11-11-2021 31-Mar 12-Nov-21 12-Nov-21
Nominal Nominal Nominal Nominal Nominal rejectNA to rent NA NA NA NA
the building
Rooftop Checked Rejected
Nominal with
Rejected
SARdue
Rejected
to owner
by SAQ and rent
request High we try to 11-11-2021
50,000 12-Nov-21 12-Nov-21
search new
Greenfield Checked Rejected(Due
Rejected
Nominal withtoSARowner
Rejected
rejectedbytoSAQ
rent)Confirmed
site with bythe
omar 11-11-2021
on 30-July 12-Nov-21 12-Nov-21
search ring
Rooftop Checked Nominal
Approved with SAR approved byApproved
STEP RF but we 8/10/2022 8/10/2022 8/10/2022
Nominal Nominal Nominal Nominal Nominal couldn’t
NA find NA NA NA NA
a candidate,
Rooftop Approved(But
Checked candidate
Nominal
Approved
is with
high SAR
price approved
but STEPby was STEP
accepted
RF and oneit'sside
wasofconfirmed
11-11-2021
by Ernes on 08'Apr'22) 12-Nov-21 12-Nov-21
the Area is
Rooftop Checked Rejected
Nominal with SAR Rejected,
RejectedNotbyOK(BH
CW is tooEmbassy
low) 11-11-2021 12-Nov-21 12-Nov-21
( Kenya,
Nominal Nominal Nominal Nominal With candidate Nominal British ,
Rooftop Checked Rejected
Nominal Rejected
with SARdueRejected
to SD Moureen
by CW confirm Russia) so we 4/13/2022
7-14-2022 4/13/2022 4/13/2022
can’t get
Rooftop Checked Rejected
Nominal with SARRejected(STEP STEPto goOn
Rejected byasked forthe
Colo)other 7/14/2022 7/14/2022 7/14/2022
sides there is
Sharing Checked Nominal
Approved with SAR approved byApproved
STEP RF no building or 20-Oct-21
GF,
Nominal Nominal Nominal Nominal Nominal
Candidate RT Rooftop
hight is too low please find another
Approved
Nominal
RT for
with
theSAR
same.
approvedResubmit
by RF   4/10/2021   4-Oct-21 4-Oct-21
Please include sharing
Rooftop
candidates data as a additional
Nominal
Approved option
with SAR
for this
approved
site byApproved
STEP RF   4/10/2021   4-Oct-21 4-Oct-21
Please include sharing
Greenfield
candidates data as a additional
Approved
Nominal
option
withfor
SAR
thisapproved
site Resubmit
by RF   4/10/2021   4-Oct-21 4-Oct-21
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Rooftop Checked SAR Rejected
Nominalbywith
CW(Roof Iron Shield
SAR Rejected by CWnot ok for the CW update
11-11-2021
on march 30) 12-Nov-21 12-Nov-21
Rooftop Checked Rejected
Nominal with SAR Rejected
TSSRbyRejected
RF 11-11-2021 12-Nov-21 12-Nov-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 6/2/2022 6/2/2022 6/2/2022
Rooftop
Second and 3rd candidate is blocked
Rejected
Nominal with SAR
Second
Rejected
and 3rdbycandidate
RF is blocked 11-11-2021 12-Nov-21 12-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop
Approved(theChecked Nominal
the
owner don't want owner
Approved with
to rent andSAR
don't
we approved
want toget
couldn't rent
byaSTEP
and RF
we couldn't
possible get a possible
RT). Candidate owner RT
12/1/2021till now.
is agreed toWe
rentreactivated now
now(14-Apr-22)
12/1/2021 12/1/2021
Rooftop Checked Approved
Nominal with SAR Approved
Approved
by RF 12/1/2021 12/1/2021 12/1/2021
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Rejected
by SAQ
by Owner   8/16/2021   16-Aug-21 1-Sep-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   8/16/2021   16-Aug-21 1-Sep-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   8/16/2021   16-Aug-21 1-Sep-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF
Greenfield Checked Approved
Nominal with SARApproved(Reverted
approved by RF to Colo)   9-Mar-22   9-Mar-22 9-Mar-22
Nominal Nominal Nominal Nominal Nominal
RoofTop Checked Approved
Nominal with SAR approvedApproved
by RF 11/13/2021
RoofTop Checked Approved
Nominal with SAR approvedApproved
by RF 11/13/2021
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 9-Feb 2/9/2022 9-Feb-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF   5-Jan 5-Jan-22 5-Jan-22
Rooftop Checked Approved
Nominal with
TSSR
SARsubmited
approvedas
Checked
bycandidate
RF D(The The owner of
5-Jan
B was willing to rent) 5-Jan-22 5-Jan-22
Rooftop Checked Rejected
Nominal with
Rejected(Due
SAR Rejected
to Owner
by SAQ
request high rent 50k) 25-Feb 25-Feb-22 25-Feb-22
Rooftop Checked Rejected
Nominal with SARRejected(STEP
Rejected by STEP
asked for Colo) 21-Jul 21-Jul 21-Jul
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   5-Jan 5-Jan-22 5-Jan-22
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   18-10-2021   18-Nov-21 18-Nov-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   18-10-2021   18-Nov-21 18-Nov-21
Nominal Nominal Nominal Nominal Nominal
Greenfield checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due   30-10-2021 1-Nov-21 1-Nov-21
Greenfield checked Nominal with SARApproved(Reverted
Approved approved by RF to Colo) 4/29/2022 4/29/2022 4/29/2022
Sharing checked Nominal with SAR approved by
Approved STEP RF
Approved   30-10-2021 1-Nov-21 1-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop checked Rejected
Nominal withDropped
SAR Rejected
due toDropped
owner
by SAQnot
duewilling
to owner
for rent
not willing
30-10-2021
for rent 1-Nov-21 1-Nov-21
Rooftop checked Rejected
Nominal with SAR
Rejected
Rejected
by civil_not
byRejected
CW enough
by civil_not
space enough
30-10-2021
space 1-Nov-21 1-Nov-21
Rooftop checked Nominal
Approved
with SAR approved byApproved
STEP RF   17-Mar-22 17-Mar-22 17-Mar-22
Nominal Nominal Nominal Nominal Nominal
Rooftop checked Nominal
Approved
with SAR approved byApproved
STEP RF   30-10-2021 1-Nov-21 1-Nov-21
Rooftop checked Approved
Nominal with SAR approvedApproved
by RF   30-10-2021 1-Nov-21 1-Nov-21
Nominal Nominal Nominal Nominal Nominal NA NA NA NA NA
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 05-11-2021 5-Nov-21 5-Nov-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 05-11-2021 5-Nov-21 5-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   29-09-2021   29-Sep-21 30-Sep-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   29-09-2021   29-Sep-21 30-Sep-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR Rejected
Rejected Aug: by SAQasked
29Rejected(Due
Nokia to SAQ)
to find a RT inside the Search ring3-Dec
8/18/2021 3-Dec 3-Dec
Rooftop Checked Nominal with SAR Rejected
Rejected Aug: by SAQasked
29Rejected(Due
Nokia to SAQ)
to find a RT inside the Search ring3-Dec
8/18/2021 3-Dec 3-Dec
Rooftop Checked Nominal with
Rejected(Due
Rejected to SAR Rejected
owner rejectedbytoSAQ
rent) confirmed by omar on
5/26/2022
30-july 26-May 26-May
Rooftop Checked Nominal with SAR Rejected
Rejected by RFto low ISD)
Rejected(Due 7/16/2022 7/16/2022 7/16/2022
Nominal Nominal Nominal Nominal Nominal
RoofTop Checked Rejected
Nominal with SAR Rejected
TSSRbyCandidate-B
Rejected
RF has dropped 11/11/2021
in civil
RoofTop Checked Nominal
Approved STEP by
with SAR approved asked to RF
Approved
STEP add 1 more pole but no enough space
11/11/2021
RoofTop Checked Rejected(Since
Rejected
Nominal with there are building
SAR Rejected options, please go for better
by STEP 5/26/2022
height) 26-May 26-May
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal
Rejected(Out
with SARoff
Rejected
search
4 Sep:by
ring
Candidate
RFinter site
C is
distance
out of Search
in near)
14-09-2021
Ring but RT 31-Mar 14-Sep-21 14-Sep-21
Rooftop Checked BUILDING
Rejected
Nominal with
UNDER
BUILDING
SARCONSTRUCTION.
Rejected
UNDERby CW
CONSTRUCTION.
New candidate New
to 14-09-2021
becandidate
searched to be searched
  14-Sep-21 14-Sep-21
Greenfield checked Rejected
Nominal
Rejected(Due
with SARtoRejected
High price
byconfirmed
SAQ on June 30 by Omer)
4-Apr-22 4-Apr-22 4-Apr-22
Sharing checked Nominal
Approved
with SAR approved byApproved
STEP RF 14-09-2021 14-Sep 14-Sep-21 14-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked NoRejected
possible
Nominalcandidate.Possible
with
No possible
SAR Rejected
candidate.Possible
GF(9.038271,38.719990)
by RF GF(9.038271,38.719990)
rejected
30-11-2021
by NPO
rejected by NPO 30-Nov-21 30-Nov-21
Search ring to
be extended
to 150m &
No possible
candidate.
Rooftop Checked Nominal with SAR Rejecte
Rejected Rejecteddue
by to
SAQowner reject
Possible 30-11-2021 30-Nov-21 30-Nov-21
GF(9.038271,
Sharing checked Nominal
Approved
with SAR approved byApproved
STEP RF 38.719990)  30-10-2021 1-Nov-21 1-Nov-21
Nominal Nominal Nominal Nominal Nominal rejected by
NPO
Greenfield Checked Nominal with SAR
Approved approved by RF to RT oprtion)
Approved(reverted 2/25/2022 25-Feb-22 25-Feb-22
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 2/25/2022
Rooftop Checked Resubmit This candidate
Nominal with SAR ID RF
should be C and building height
RejectedResubmit
by 2-Mayless than 15mtr 2-May 2-May
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF 2/25/2022
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
NominalApproved(GF
with SAR Approved
option changed
by RF to RT candidate-C)24-11-2021 24-Nov-21 24-Nov-21
TheRooftop
owner don't want to rent hisRejected
building0withThe
Nominal SARowner
Rejected
don'tby
want
SAQto rent his building 24-11-2021 24-Nov-21 24-Nov-21
Rooftop Checked Nominal Approved(After
Approved discussion
with SAR approved withRF
by STEP STEP Feedback 27Apr)
4-Mar-22 4-Mar-22 4-Mar-22
Greenfield Checked Approved
Nominal with SAR Approved
Approved
by RF 15-Apr-22 15-Apr-22 15-Apr-22
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   9/6/2021   6-Sep-21 6-Sep-21
Rooftop Checked Rejected
Nominal Rejected
with SAR
(Duerejected
to immediate
by RF blockage) and
  low BH9/6/2021 27-May 6-Sep-21 6-Sep-21
Rooftop checked Approved
Nominal with SAR approvedApproved
by RF   9/6/2021   6-Sep-21 6-Sep-21
Rooftop checked Nominal
Rejected with SAR Rejected
Rejected(due to blockbyand
CWaccess issue on rooftop)11/25/2021 25-Nov-21 25-Nov-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   8/22/2021 2-Dec 2-Dec 2-Dec
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   8/22/2021 2-Dec 2-Dec 2-Dec
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 12/3/2021
Greenfield Checked Nominal with SAR
Approved approved by RF to RT oprtion)
Approved(reverted 12/3/2021
ck for the final timeRooftop
for the location
Checked Nominal with SAR
9.065132,38.869666.(Since
Rejected Rejected isbynot
the elevation STEP
good can we go for a building
5/3/2022
on better elevation to get better
5-Maycoverage.we
5-May
can discuss on which building i
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF 12/3/2021 1-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal
Rejected
with due
SARtoRejected
SD Failed(Email
by CW Confirmed
  on june03-11-2021
17)   4-Nov-21 4-Nov-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   03-11-2021   4-Nov-21 4-Nov-21
Rooftop Checked Rejected
Nominal with SAR Rejected
Rejected(At
by SAQ
Dara stage)   6/18/2022   6/18/2022 6/18/2022
Rooftop Checked Approved
Nominal with SARApproved(Reverted
approved by RF to Colo)   8/10/2022   8/10/2022 8/10/2022
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   03-11-2021   4-Nov-21 4-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal with
Rejected SAR Rejected
Rejected(due by SAQnot willing for rent)
to owner 11/13/2021 13-Nov-21 13-Nov-21
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 11/13/2021 13-Nov-21 13-Nov-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due   03-11-2021   4-Nov-21 4-Nov-21
Greenfield Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due   03-11-2021   4-Nov-21 4-Nov-21
Greenfield Checked Rejected
Nominal with SARRejected(near
Rejected by RF
with colo site) 5/10/2022 10-May-22 10-May-22
Rooftop Checked Nominal with SAR Rejected by
Rejected Rejected
STEP 5/10/2022 10-May-22 10-May-22
Greenfield Checked Nominal with SARApproved(Reverted
Approved approved by RF to colo) 5/12/2022 12-May-22 12-May-22
Sharing Checked Nominal with SAR approved by
Approved STEP RF
Approved   03-11-2021   4-Nov-21 4-Nov-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   25/02/2022   10-Sep-21 17-Sep-21
Approved(Colo is activated
Sharing now_15-June-22)
Checked andApproved
we have dropped 145019_candidate-D
Nominal with S due to low
  ISD and25/02/2022
new search ongoing  on this location_9.019387,
10-Sep-21 17-Sep-21
38.731435
Greenfield Checked Rejected
Rejected(The
Nominal owner refuse
with SAR Rejected and has no interest
by SAQ   to rent)
25/02/2022   10-Sep-21 17-Sep-21
Kindly
Greenfield
search in NW direction from
Rejected
Nominal
nominalwith SARRejected
Rejecteddue
by RF
to obstruction   25/02/2022   10-Sep-21 17-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal
Rejected(Due
with SAR
to Rejected
, blockedby
& STEP
ISD with near by  site is not25-Feb-22
OK) 6/25/2022 25-Feb-22 25-Feb-22
Rooftop Checked Nominal Rejected(Owner
Rejected with SAR proceed
 we can Rejected
not
bywilling
withSAQ for rent)_26'Apr'22
this candidate since nearyby
25/02/2022
building are higher
  ones. 25-Feb-22 25-Feb-22
Rooftop Checked Rejected
Nominal with SAR Rejected
TSSRbyRejected
RF   25/02/2022   25-Feb-22 25-Feb-22
Rooftop Rejected(It
Checked Nominal
looks blocked
Rejected with SAR
from
Rejected
all angle.
by What
STEP is the purpose of this 5/19/2022
site being there?) 19-May-22 19-May-22
Rooftop Checked Rejected
Nominal with SAR Rejected
TSSRbyRejected
RF 6/10/2022   6/10/2022 6/10/2022
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 7/18/2022   7/18/2022 7/18/2022
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due 05-11-2021 5-Nov-21 5-Nov-21
Rooftop Checked Approved Nominal wi Approved 6/18/2022 6/18/2022 6/18/2022
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal with SAR
Rejected Rejected by SAQ
Rejected(owner not willing for rent)
  02-11-2021   4-Nov-21 4-Nov-21
Rooftop Checked Nominal with
Rejected SAR Rejected by is
Rejected(candidate CW not suitable for  CW) 02-11-2021   4-Nov-21 4-Nov-21
Rooftop Checked Nominal
Approvedwith SAR approved byApproved
STEP RF 4/29/2022 4/29/2022 4/29/2022
Nominal Nominal Nominal Nominal Approved(O
Nominal
K, But the Y1
Rooftop Approved
Checked (NotApproved
constructible
Nominal CWapproved
with SAR before andbyit's
site resolved
RF now)Rejected(To
144126
STEP 30-10-2021
be dropped, SD Failed) 1-Nov-21 1-Nov-21
has to be
Rooftop Checked Approved Nominal with 8-Jun 8-Jun 8-Jun
replanned at
Nominal Nominal NominalNominal With candidate 8.994928,
Nominal
38.815373)
Rooftop Checked Nominal
Rejected with SAR Rejected
Rejected(Owner by for
not willing SAQrent_confirmed on 23-05-22)
11-Apr 13-Apr 13-Apr
Rooftop Checked Nominal
Rejected
Out withring
of search SARand
Rejected
ISD isby
notRFgood please check at North
27-May
side 27-May 27-May
Rooftop Checked Nominal with SAR Rejected
Rejected by CW to CW)
Rejected(Due 10-Jun 10-Jun 10-Jun
Rooftop Nominalcandidate
Checked Rejected(This
Rejected with SARcan't
Rejected bycover
help to STEP the road, which needs to10-Jun
be covered) 10-Jun 10-Jun
Rooftop Checked Nominal with
Rejected SAR Rejected
Reject by STEP need at road side
due to Candidate 26-Aug 26-Aug 26-Aug
Nominal Nominal Nominal Nominal Nominal
RoofTop Checked Rejected
NominalRejected
with SAR
dueRejected
to ownerby
notSAQ
willing (omar Confirmed)
11/13/2021
RoofTop Checked Rejected
Nominal with SAR
Rejected(Due
Rejected byto
SAQ
Owner refused) 11/13/2021
RoofTop Checked Nominal
Approved
Approved(OK,
with SAR approved
but the Y1
by STEP
site 144119
RF has to be replanned)
8/16/2022 8/16/2022 8/16/2022
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal with SAR RejectedRejected
by RF   29-09-2021   29-Sep-21 1-Oct-21
Rooftop Checked Rejected
Nominal with SAR RejectedRejected
by RF   29-09-2021   29-Sep-21 1-Oct-21
Rooftop Checked Rejected
Nominal with SAR RejectedRejected
by RF   29-09-2021   29-Sep-21 1-Oct-21
Rooftop Checked Nominal
Rejected(After
Rejected with SARphysical
visit)Needs Rejectedvisit,
by STEP
so please arrange and let's30-Mar-22
physically visit it 30-Mar-22 30-Mar-22
Rooftop Checked Nominal with SAR
Rejected Rejected by
Rejected(due to CW
insufficient space) 12-Apr-22 12-Apr-22 12-Apr-22
Rooftop Checked Nominal
RejectedRejected
(Due withPrice,
to High SAR Rejected by SAQ 30 % confirmed by Omar
5 years contract, 16-Jun-22
on 30-June) 16-Jun-22 16-Jun-22
Rooftop Checked Nominal withRejected,
Rejected SAR Rejected by not
Owner SAQinterested for rent 11/25/2021 25-Nov-21 25-Nov-21
Nominal Nominal Nominal Nominal Nominal
found before needs time to decide.
Rooftop He need to discuss
Checked Nominal
Rejectedwithwith
his relatives
SAR Rejected
who are
Rejected(Due by
toCW
doing on telecom
not enough space)sector.17-10-2021
He gave us another  appointment for Feb-24.17-Nov-21
17-Nov-21 Parallely we were searching another
Rooftop Checked Nominal with SAR
Rejected Rejected by SAQ
Rejected(Owner not willing for rent)
  17-10-2021   17-Nov-21 17-Nov-21
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   17-10-2021   17-Nov-21 17-Nov-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 12/1/2021
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 12/1/2021
Nominal Nominal Nominal Nominal Nominal
The owner
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   on
agreed 15-10-2021 7/7/2022 15-Oct-21 15-Oct-21
30000 ETB
Rejected due to don't
Rooftop
have enough
Checked
space email
Nominal
Approved
confirmwith
moureen
SAR approved
7th july(Reapproved
by STEP RFbecause Space
 
Excluding issue
15-10-2021
is resolved email confirmation
  15-Oct-21
by Biniyam 15-Oct-21
on July-8)
Nominal Nominal Nominal Nominal Nominal VAT. LA
Signed
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 147048 TSSR 18-10-2021 Owner not willing for rent
11/18/2021 18-Nov-21
Submitted 06/03/2022
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF but we The
  need
owner agreed on 30000 ETB Excluding 06/03/2022
VAT. LA Signed
06/03/2022
CW advice 06/03/2022
STEP has requested Rooftop
to create duplicate
Checked
candidateNominal
Approved
by usingwith
candidate-B
SAR approved
information
by STEP
dueRFto wrong payment
The
 
because theownerwas
agreed
made(payment
on 30000 ETB
issue)
Excluding
and it06/03/2022
wasVAT.
confirmed
LA Signed
06/03/2022
ny Ugur on 13-June-22)
Rooftop Checked Rejected
Nominal with SAR Rejected
Rejectedbydue space
RFto low BH   is only 13-Jun 13-Jun 13-Jun
24 m2
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 11-Nov
Update the Proposed
RoofTop
soltion to RT as photo shared
Nominal
Approved
arewith
Rooftop
SAR related
approved byApproved
STEP RF 11-Nov
Nominal Nominal Nominal Nominal Nominal  
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   17-10-2021   17-Oct-21 17-Oct-21
Need to do
Greenfield
survey new Candidate as perRejected
new
Nominal
nominal
withplan
Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring
  17-10-2021   17-Oct-21 17-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
NominalRejected
with SAR
dueRejected
to ownerbynot
SAQwilling Omar confirmed12/3/2021
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 12/3/2021
Rooftop Checked Rejected
Nominal with SAR RejectedRejected
Building
by RF height is very low only
4/29/2022
8mtr
Rooftop Checked Rejected
Nominal with SAR
Rejected
Rejected(missed
by RF target area) 6/30/2022
Greenfield Checked Approved
Nominal with SAR Approved
Approved
by RF 7/27/2022 7/27/2022 7/27/2022
Greenfield Checked Approved
Nominal with SAR Approved
Approved
by RF 7/27/2022 7/27/2022 7/27/2022
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF 12/3/2021
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal with SARRejected(due
Rejected to space issue)  
Rejected by CW 24-09-2021   24-Sep-21 5-Oct-21
Greenfield Checked Nominal with SARRejected(due
Rejected to space issue)  
Rejected by CW 24-09-2021   24-Sep-21 5-Oct-21
Rooftop Checked Nominal with SARRejected(due
Rejected to space issue)  
Rejected by CW 24-09-2021   24-Sep-21 5-Oct-21
Rooftop Checked Rejected(Due
Nominal to
Rejected High
with price
SAR owner by
Rejected asks for 40K)confirmed by omar8-Apr
SAQ on 30-July 8-Apr 8-Apr
Rooftop Checked Nominal with SAR approvedApproved
Approved by RF 27-Jun 27-Jun 27-Jun
Rooftop Checked Nominal with SAR approved byApproved
Approved STEP RF 27-Jun 27-Jun 27-Jun
Rooftop Checked Nominal withRejected(High
Rejected SAR Rejectedrent/unfinished
by SAQ building) 11/25/2021 25-Nov-21 25-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   10/8/2021   10-Aug-21 9-Oct-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   10/8/2021   10-Aug-21 9-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 12/21/2021 21-Dec-21 21-Dec-21
Rooftop Checked Rejected(Looks
Nominal withshadowed
Rejected SAR Rejected
& SAR
byisSTEP
not Approved) and rejected on TSSR
12/11/2021 12/21/2021 11-Dec-21 11-Dec-21
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 12/11/2021 12/21/2021 11-Dec-21 11-Dec-21
Rooftop Checked Approved Nominal wi Approved 6/18/2022 6/18/2022 6/18/2022
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SARApproved(Reverted
approved by RF to Colo)   17-Aug-21 3-Dec 3-Dec 3-Dec
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   17-Aug-21 3-Dec 3-Dec 3-Dec
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   NA 3-Dec 3-Dec 3-Dec
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   16-09-2021   16-Sep-21 16-Sep-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   16-09-2021   16-Sep-21 16-Sep-21
Greenfield checked Approved
Nominal with SAR approvedApproved
by RF   16-09-2021   16-Sep-21 16-Sep-21
Same - option A-Shadowing
Rooftop caused by roof share
Rejected
Same
Nominal
of- option
7.5mtr
withA-Shadowing
in
SAR
sec Rejected
3 caused
by RFby roof share of 7.5mtr30-Nov-21
in sec 3 30-Nov-21 30-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal
Rejected(Out
with SARoff
Rejected
search by
ring
RFinter site distance in near)25-Feb 31-Mar 31-Mar 31-Mar-22
Rooftop Checked Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 25-Feb 25-Feb-22 25-Feb-22
Greenfield Checked Nominal with SARApproved(Reverted
Approved approved by RF to Colo) 14-May 14-May-22 14-May-22
Sharing Checked Nominal with SAR approved by
Approved STEP RF
Approved 25-Feb 14-May-22 25-Feb-22
Nominal Nominal Nominal Nominal Nominal
RooftopBuildinh Height so high
Approved
Nominal with SAR approvedResubmit
by RF 12/11/2021 11-Dec-21 11-Dec-21
RooftopBuildinh Height so high
Nominal
Approved
with SAR approved byApproved
STEP RF 12/11/2021 11-Dec-21 11-Dec-21
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF 12/11/2021 11-Dec-21 11-Dec-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Rejected with SARtoRejected
Rejected(Due by confirmed
SD failed) CW by Omar on 30-July
11-Nov
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 11-Nov
Rooftop Checked NominalResubmit(LA
Resubmit with SAR Rejected bysigned
already RF with candidate-A) 29-Apr 29-Apr 29-Apr
Greenfield Checked NominalApproved(Because
with SAR approvedcolo
Approved by STEP RF is not ok in driveby) 1-Aug
111765 1-Aug 1-Aug
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   09-10-2021 9-Oct-21 10-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   09-10-2021 no candidate
  9-Oct-21 10-Oct-21
found within
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   09-10-2021 200m  radius, 9-Oct-21 10-Oct-21
The area is
Greenfield Checked Rejected
NominalRejected(Due
with SAR Rejected
to School Approved
byproperty
SAQ DARA by GDC
notwith Candidate
moving)
25-Nov-21 Dense Urban 25-Nov-21 25-Nov-21
there is no
Nominal Nominal Nominal Nominal Nominal green filed or
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   18-10-2021 roof top  site 11/18/2021 18-Nov-21
other than
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   18-10-2021 the Nominal,
  11/18/2021 18-Nov-21
LL for
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 20-Feb Nominal 20-Feb-22 20-Feb-22
candidate
Nominal Nominal Nominal Nominal Nominal insist they will
Greenfield Checked Rejected Site
Nominal with IDRejected
SAR changed by
from
RF 145019 to 144140 20/10/2021 not rent
  the 20-Oct-21 20-Oct-21
place if
Greenfield Checked Rejected Site
Nominal with IDRejected
SAR changed by
from
RF 145019 to 144140 20/10/2021 possible
  20-Oct-21 20-Oct-21
Nokia or
Greenfield Checked Rejected Site
Nominal with IDRejected
SAR changed by
from
RF 145019 to 144140 20/10/2021  
Safaricom 20-Oct-21 20-Oct-21
SAQ team
Rooftop Checked Rejected
Nominal withSite
SARID changedbyfrom
Rejected STEP145019 to 144140 7-Jun need to deal 7-Jun 7-Jun
Greenfield Checked Approved Approved
Nominal with SAR approved by STEP RF 31-Aug with the 31-Aug 31-Aug
owner
Greenfield Checked Rejected
Nominal withSite
SARIDRejected
changedbyfrom
SAQ145019 to 144140 25-Nov-21 waiting Nokia 25-Nov-21 25-Nov-21
for New
Nominal Nominal Nominal Site
Nominal
ID changed from 145019 to 144140 Candidate
Rooftop Checked Approved
Nominal withSite
SAR IDapproved
changed from
by RF145019 to 144140
  7-Sep 9/11/2021 9/11/2021 11-Sep-21
Rooftop Checked Approved
Nominal withSite
SAR IDapproved
changed from
by RF145019 to 144140
  7-Sep 9/11/2021 9/11/2021 11-Sep-21
Rooftop Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 7-Sep 7-Sep 7-Sep
Rooftop Checked Rejected
Nominal with SAR Rejected by SAQ new
Rejected(DARA search ongoing 7-Sep
issue) 9/11/2021 9/11/2021 11-Sep-21
Rooftop Approved(Ok,
Checked butNominal
Approved
the site 145013
with SAR
hasapproved
to be dropped
by STEP
fromRF
collo and has to be replanned
8-Jul to keep good ISD.) 8-Jul 8-Jul
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   30-10-2021 1-Nov-21 1-Nov-21
Rooftop Checked Rejected
Nominal with Rejecetd(Due
SAR RejectedtobyGovernment
SAQ property)
  30-10-2021 1-Nov-21 1-Nov-21
Rooftop Checked Rejected
Nominal with SARRejected
Rejected(STEP
by STEP
asked for colo)  23-Jul 23-Jul 23-Jul
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   30-10-2021 1-Nov-21 1-Nov-21
Nominal Nominal Nominal Nominal Nominal
Sharing Checked Nominal with SAR approved by
Approved STEP RF
Approved 13-Nov-21 13-Nov-21 13-Nov-21
Rooftop Checked Nominal with SARApproved(Reverted
Approved approved by RF to Colo) 13-Nov-21 13-Nov-21 13-Nov-21
Greenfield Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due 13-Nov-21 13-Nov-21 13-Nov-21
Rooftop Checked Nominal with to
Rejected
Rejected(Due SAR Rejected bybuilding
neighboring RF blockage and shadowing)
24-May-22 3-Jun-22 24-May-22 24-May-22
Greenfield Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due 13-Nov-21 13-Nov-21 13-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Rejected with SAR
Candidate Rejected
is having tooby
Rejected,
lowSTEP
SARheight
Rejected
and rejected
from STEP
by STEP
due
3-Sep-21
to height of 15   3-Sep-21 3-Sep-21
option have good height
Rooftop
4 Sep:
but coming
Two candidates
more closer
are out
toRejected
another
Nominal
of search
Rejected
site
with
ring
and
(2nd
SAR
but
farSFC
sector
Rejected
out nominal
and
is blocking
Nokia
by RFjoint
by visit
neighbour
revealed
building)
that 3-Sep-21
area is dense slum
3/31/2022
and finding3-Sep-21
more candidates
3-Sep-21
might be an issue.
RooftopApproved(Moved Nominal
Checked a lotApproved with SAR
to the wrong approved
direction, let's by
No possible trySTEP RF available
candidate
to maintan the Gridin
ofthis
the location(RT
sites
21-Apr-22
considering
& GBT)
the other sites.)
21-Apr-22 21-Apr-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   18-10-2021   18-Oct-21 18-Oct-21
Rooftop Checked Rejected
Nominal with SAR Rejected
Rejected
by CW
due to SD   18-10-2021   18-Oct-21 18-Oct-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   28-Jul   28-Jul 28-Jul
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   6-Sep 9/11/2021 9/11/2021 20-Sep-21
Plz check the possibility
Greenfield
to use 25
Themtr building
land lord asApproved
this
Nominal
will create
with SAR
obstruction
approvedResubmit
by RF The land  lord 6-Sep 9/11/2021 9/11/2021 20-Sep-21
requested requested
Greenfield Checked
40000 ETB Approved
Nominal with SAR approvedApproved
by RF 40000   ETB 6-Sep 9/11/2021 9/11/2021 20-Sep-21
Nominal perNominal
month to Nominal Nominal Nominal per month to
sign LA. After sign LA. After
Greenfield our attempts Approved
Checked Nominal with SAR approvedApproved
by RF our attempts
  9-Feb   9/2/2021 2-Sep-21
to convince to convince
Rooftop Checked
him failed, we Nominal
Approvedwith SAR approved by
Approved
STEP RF  
him failed, we 9-Feb   9/2/2021 2-Sep-21
requested requested
Greenfield Checked
that NPO Approved
Nominal with SAR approvedApproved
by RF that  NPO 9-Feb   9/2/2021 2-Sep-21
Nominal change
Nominalthe Nominal Nominal Nominal change the
sted 40000 ETB per month to signcandidate,
LA. After our attempts to convince him failed, we requested that NPO change the candidate, but no one had answered. Planned to search new candidate
candidate,
Greenfield but no one Rejected
Nominal with SAR Rejected
0911216386
by SAQ Biniyambut no one 24-Nov
had had
Contacted with Fitsum,waiting for feedback
Sharing Checked
answered. Nominal
Approvedwith SAR approved by
Approved
STEP RF answered.
Planned to Planned to
Nominal Nominal
search new Nominal Nominal Nominal search new
Rooftop candidate
checked Rejected
Nominal with SAR Rejected Owner rejected candidate
by SAQ   20-09-2021   9/20/2021 21-Sep-21
0911216386 0911216386
Rooftop Biniyam
checked Rejected
Nominal with SAR Rejected(Due
Rejected by
to CW Biniyam
Not constructible)
  20-09-2021   9/20/2021 21-Sep-21
Contacted Contacted
Rooftop checked
with Nominal
Approvedwith SAR approved by
Approved
STEP RF  
with 29-Jun   29-Jun 29-Jun
Fitsum,waitin Fitsum,waitin
Nominal Nominal
g for Nominal Nominal Nominal g for
Rooftop feedback
Checked Nominal
Approvedwith SAR approved byApproved
STEP RF feedback
  6-Sep   9/6/2021 8-Sep-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   6-Sep   9/6/2021 8-Sep-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   6-Sep   9/6/2021 8-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop checked Approved
Nominal with SAR approvedApproved
by RF   10-Sep   9/10/2021 16-Sep-21
interested for rent)_The
Rooftop
cadidate is
checked TheRejected
cadidate
inside Ethiopian
Nominal is
Federal inside
with SAREthiopian
police hospital Federal
Rejectedand
bythey policeanhospital
SAQneed access and
letterthey needcompoud,
for10-Sep
their an access New
letter for their
  candidate compoud
9/10/2021
was found bu
16-Sep-21
subcon_9.028329,38.743917)
Rooftopwaiting for SSR report
Approved
Nominal with SAR approvedApproved
by RF
Rooftop checked Nominal with SAR approved by
Approved STEP RF
Approved 16-May 16-May 16-May
Rooftop checked Approved
Nominal with SAR approvedApproved
by RF   10-Sep   9/10/2021 16-Sep-21
Nominal Nominal Nominal Nominal Nominal
RoofTop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Nov
RoofTop Checked Approved
Nominal with SAR approvedApproved
by RF 11-Nov
Nominal Nominal Nominal Nominal Nominal
RoofTop Checked Approved
Nominal with SAR
Approved(TI
approvedstarted
by RFon candidate D) 11-Nov
RoofTop Checked Approved
Nominal with SAR approvedApproved
by RF 11-Nov
RoofTop Checked Rejected
Nominal with SAR Rejected
Rejected(Due
by STEP
to low BH) 13-Jul 13-Jul 13-Jul
RoofTop Checked Rejected
Nominal Rejected(space
with SAR Rejected
not enough
by CW confirmrd by Omar) 19-Aug 19-Aug 19-Aug
Nominal Nominal Nominal Nominal Nominal
Greenfield checked Approved
Nominal with SAR approvedApproved
by RF   4-Sep 9/11/2021 11-Sep-21 12-Sep-21
Greenfield checked Approved
Nominal with SAR approvedApproved
by RF   4-Sep 9/11/2021 11-Sep-21 12-Sep-21
Rooftop checked Nominal Approved(After
Approved discussion
with SAR approved withRF
by STEP STEP Feedback 27Apr)28-Feb 28-Feb-22 28-Feb-22
Greenfield checked Nominal with SAR
Rejected Rejected by SAQ
Rejected(owner not willing for rent)
  4-Sep 9/11/2021 11-Sep-21 12-Sep-21
Nominal Nominal Nominal Nominal Nominal
didate-A RT height Rooftop
is too high, kindly seach
Candidate-A
for another
Rejected
Nominal
RTRT height
near
with is
Ras
SAR
tooMekonen
Rejected
high, kindly
stby RF
seach for another
  RT near
23-09-2021
Ras Mekonen st   9/23/2021 23-Sep-21
Rooftop Checked Rejected
Rejected(Due to high
Nominal S Approved
withrent_confirmed by STEP_16'Mar'22
by Oral on 09-June-22)
23-09-2021   9/23/2021 23-Sep-21
Rooftop Out off search ring Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   23-09-2021   9/23/2021 23-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR Rejected Approved
by SAQ   29-09-2021   9/29/2021 1-Oct-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   29-09-2021   9/29/2021 1-Oct-21
Rooftop Checked Rejected(Antenna
Rejected height
Nominal with SAR is too low,
Rejected please look for  better height
by STEP 31-May
building)   31-May 31-May
Rooftop Checked Rejected Rejected(Due
Nominal with SAR Rejected by RFto low ISD)   29-Jun   29-Jun 29-Jun
Rooftop Checked Rejected Rejected by
Nominal with SAR Rejected dueRFto Low ISD   13-Jul   13-Jul 13-Jul
Rooftop Checked Approved(OK,
Approved
Nominal withbut
SARAzimuth hasby
approved to STEP
be planned
RF considering
  the nearby
15-Julsites.)   15-Jul 15-Jul
Nominal Nominal Nominal Nominal Nominal
Rooftop checked Nominal
Approved
with SAR approved byApproved
STEP RF   20-09-2021   9/20/2021 21-Sep-21
Rooftop checked Approved
Nominal with SAR approvedApproved
by RF   20-09-2021   9/20/2021 21-Sep-21
Greenfield checked Approved
Nominal with SAR approvedApproved
by RF   20-09-2021   9/20/2021 21-Sep-21
Nominal Nominal Nominal Nominal Nominal
Rooftop checked Rejected(candidate
Rejected Nominal
is Courtwith
Building)_confirmed
S by Barraj/Ugar
  20-09-2021
on 09-June-22   9/20/2021 21-Sep-21
Greenfield checked Approved
Nominal with SAR approvedApproved
by RF   20-09-2021   9/20/2021 21-Sep-21
Greenfield checked
Rejected(Not
Rejected
Nominal
constructible
with SAR forRejected
RDU andbyGBT
CW confirmed by
  Omar by mail
7-Julon 17-Aug)   7-Jul 7-Jul
Greenfield checked Approved
Nominal with SAR approvedApproved
by RF   7-Sep   7-Sep 7-Sep
Greenfield Nominal
checkedwith SAR
Approved
approved by Nokia RF and
Approved
sent for STEP approval
  7-Sep   7-Sep 7-Sep
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   11/28/2021
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   11/28/2021
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 5-Feb 2/5/2022 5-Feb-22
Nominal Nominal Nominal Nominal Nominal
RoofTop Checked Rejected
Nominal with
candidate
SAR was
Rejected
dropped
by CW
due to not enough space 18-10-2021   11/18/2021 18-Nov-21
RoofTop Checked Rejected
Nominal withRejected(Due
SAR Rejectedto by
shadowing)at
STEP TSSR stage 18-10-2021 8/2/2022 11/18/2021 18-Nov-21
RoofTop
Rejected due to distance
Rejected
Nominal with SAR
Candidate
Rejected
change
by RFdue to distance 22-Feb 2/22/2022 22-Feb-22
RoofTop Checked Rejected
Nominal with SAR Rejected
Rejected(moved
by STEP a lot) 9-Mar-22 9/2/2022 9-Mar-22 9-Mar-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   18-10-2021   18-Oct-21 18-Oct-21
Greenfield Checked Nominal with SAR
Rejected Rejected
Rejected Dueby
to SAQ
Owner refused rent
  18-10-2021   18-Oct-21 18-Oct-21
Rooftop Rejected(heightRejected
Checked Nominal
looks toowith
low SAR
to address
Rejected
thebyintended
building
STEP height
coverage
is 11mtr
area.please
so rejected.
go for better height.)
2-May 2-May 2-May
Rooftop Checked Nominal with SARApproved(Reverted
Approved approved by RF to Colo) 20-Jun 20-Jun 20-Jun
Sharing Checked Nominal with SAR approved by
Approved Approved
STEP RF   18-10-2021   18-Oct-21 18-Oct-21
Nominal Nominal Nominal Nominal Nominal
Rooftop checked Rejected
Nominal with
Rejected(
SAR Rejected
Due
SARto Discussion
by
owner
SAQnot willing
and approval
to rent)pending
30-09-2021
with STEP   30-Sep-21 7-Oct-21
RooftopBuildng Height to HighRejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF 26-Jan
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 21-Jun 8/5/2022 21-Jun 21-Jun
Greenfield Checked Rejected
Nominal with SAR Rejected by
Rejected
SAQ   26-Jan   26-Jan 26-Jan
Nominal Nominal Nominal
Nominal With candidate
Nominal
Rooftop Checked Approved
Nominal with SAR approved by
Approved
STEP RF   7-Jun   7-Jun 7-Jun
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due 23-02-2022 23-02-2022 23-02-2022
Rooftop Checked Nominal with SARplease
Rejected Rejected
check
bythe
STEP
location 9.003493,38.764376
Approved for better ISD.
15-Apr 15-Apr 15-Apr
Rooftop Checked Rejected(Rejected
Nominal
Approved
with SARby approved
CW, Alsoby
6mSTEP
pole not
RF feasible)(CW Issue 20-Apr
is resolved) 20-Apr 20-Apr
Nominal Nominal Nominal
Nominal With candidate
Nominal
Rooftop Checked Nominal with SAR Rejected Rejected
Rejected by STEP
Not Ok, near to another site.
13-Apr 13-Apr 13-Apr
Sharing Checked Nominal with SAR approved by
Approved STEP RF
Approved 15-Nov 11/15/2021 15-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal with SAR Rejected(Due
Rejected by RF
to low ISD)   15-10-2021   10/15/2021 16-Oct-21
Rooftop Checked Rejected
Nominal
Rejected(Due
with SARtoRejected
high price
byconfirmed
SAQ by Omar
  on 30-June)
15-10-2021   10/15/2021 16-Oct-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   15-10-2021   10/15/2021 16-Oct-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   15-10-2021   10/15/2021 16-Oct-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   15-10-2021   10/15/2021 16-Oct-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   15-10-2021   10/15/2021 16-Oct-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   15-10-2021   10/15/2021 16-Oct-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   15-10-2021   10/15/2021 16-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out
Prison
off
bysearch
RF
so outside
ring candidate to be 22-Aug
considered 2-Dec 2-Dec 2-Dec
Greenfield Checked Rejected
Nominal with SAR Rejected
Out
Prison
off
bysearch
RF
so outside
ring candidate to be 22-Aug
considered 2-Dec 2-Dec 2-Dec
Rooftop Checked Nominal
Approvedwith SAR approved
Approved(please by STEP
go for tower RF
solution.Will go with 9m RTT)
30-Apr 30-Apr 30-Apr
Greenfield Checked Approved
Nominal with SAR
Approved(reverted
approved by RF to RT option) 23-Feb 6-Mar-22 6-Mar-22 6-Mar-22
Nominal Nominal Nominal
Nominal With candidate
Nominal
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 8-Apr 8-Apr 8-Apr
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal with SAR Rejected
Ownerbynot
SAQinterested 11-Nov
Rooftop Checked Rejected
Nominal with SAR
Owner
Rejected
is notby
available
SAQ for renting 30-Nov 30-Nov 30-Nov
Rooftop Checked Rejected
Nominal withRejected(Due
SAR Rejectedtoby
Blockage
RF and shadow) 29-Jun 29-Jun 29-Jun
Approved( 9M
RoofTop
RTT is suitable
Checked
on pent house
Approved
and it was confirmed
Nominal Please
withby search
S binyam onon the other side
29-June-22). to keep
Initially good
15-Apr
it was ISD.
Rejected(Rejected by TX
15-Apr
team due to15-Apr
HT)
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal with SAR Rejected(Owner
Building
Rejected height
by SAQ notiswilling)
more but no other
18-10-2021
options to find   11/18/2021 18-Nov-21
Rooftop Checked Approved
Nominal with SAR approved
Building
Approved
byheight
RF is more but no other
18-10-2021
options to find   11/18/2021 18-Nov-21
Rooftop Checked Nominal
Hold with
Hold(Needs
SAR approved
site Visit
by since
RF it looks blocked) 8-Jun   8-Jun 8-Jun
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF 18-10-2021   11/18/2021 18-Nov-21
Nominal Nominal Nominal Nominal Nominal
RoofTop Nominal with SAR Rejected(Owner
Checked/ Out of search Ring
Rejected Rejected by SAQnot willing) 11-Nov
RoofTop NominalRejected(Due
Checked/ Out of search Ring
Rejected with SAR Rejected by RFby neighbour building) 11-Nov
to blocked
RoofTopRejected(building Nominal
Checked is under
Rejected with SAR
construction Rejected
and by SAQ
owner was asking for 50,000ETB) Moureen
28-Aprconfirm by mail july 18 28-Apr 28-Apr
RoofTop Checked Nominal with SAR approved by
Approved STEP RF
Approved 16-Jul 16-Jul 16-Jul
RoofTop Checked Approved
Nominal with SAR approvedApproved
by RF 11-Nov
RoofTop Checked Rejected Rejected(LA
Nominal with S not moved) 11-Nov
RoofTop Checked Rejected
Nominal with SAR Rejected by
DueRFto Low BH 30-May 30-May 30-May
RoofTop Checked Approved Nominal with S Approved 11-Jun 11-Jun 11-Jun
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal with SAR Rejected
Rejected(TSSR
by STEP Issue)   15-10-2021   10/15/2021 16-Oct-21
Rooftop Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   15-10-2021   10/15/2021 16-Oct-21
Rooftop Checked Approved
Approved(Backup
Nominal with SAR
becuase
approved
we need
by RFSAR for 9.028680°,38.738754°)
  29-Jun   29-Jun 29-Jun
Rooftop Rejected
Checked
Due to lowRejected
ISD
Nominal
Since
with
it isSAR
nearRejected
to 148020,
by new
RF search is proposed
  around
6-Jul
9.034062°, 38.734646°
  6-Jul 6-Jul
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   28-Jul   28-Jul 28-Jul
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked
TSSR received
Rejected
Nominal
with
Rejected
with
option
SAR(2nd
“A"Rejected
while
sectoralignment
is
byblocking
RF is by
with
own
option
building)
"T" (ATC
11/17/2021
option, Approved).
31-Mar Lat/Long
29-Sep-21
are different.
7-Oct-21
Rooftop Checked
 Try the NB
Approved
Nominal
RT Candidate
with SAR
at coordinates
approvedChecked
(9.036344,
by RF 38.736749) and (9.037343,
11/17/202138.738089) which ate out of search ring
Rooftop Checked Nominal
Try the NBApprovedwith SAR
RT Candidate at approved by
coordinates STEP RF 38.736749) and (9.037343,
Approved
(9.036344, 11/17/202138.738089) which are
11/17/2021
out of search11/17/2021
ring
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF 3/10/2022 10-Mar-22 10-Mar-22
Rooftop Checked
TSSR received
Approved
Nominal
withwith
option
SAR“A"
approved
while alignment
Checked
by RF is with option "T" (ATC
2/10/2022
option, Approved). Lat/Long
10-Feb-22
are different.
10-Feb-22
Nominal Nominal Nominal
Nominal With No candidate
Nominal
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   03-11-2021   4-Nov-21 4-Nov-21
Nominal Nominal Nominal Nominal Nominalby
Rejected
Owner :
Rooftop Checked Rejected
Nominal with SAR Rejectedrefused
by SAQto   27-09-2021   9/27/2021 5-Oct-21
Rooftop Checked Rejected
Nominal with
Rejected
SAR Rejected rent
(Block by RF
neighbour buildings)
  27-09-2021 3/31/2022 9/27/2021 5-Oct-21
Candidate RT Rooftop
hight is too low please find another
Rejected
Nominal
RT for
with
theSAR
same.
RejectedRejected
by RF   27-09-2021   9/27/2021 5-Oct-21
Rooftop Checked Nominal with
Rejected SAR Rejected
Rejected(owner notbywilling
CW to remove tanker) 16-May 16-May 16-May
Rooftop Checked Nominal with SAR Rejected
Rejected by STEP ISD)
Rejected(Low 17-Aug 17-Aug 17-Aug
Rooftop Checked Nominal
Approved with SAR approved
Approved(After by RF
discussion with Mulatu on  26-Apr-22)14-Apr   14-Apr 14-Apr
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Ownerbynot
SAQ Willing   10-Apr   10/4/2021 4-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   10-Apr   10/4/2021 4-Oct-21
Greenfield Checked
Rejected(DueRejected
Nominal
to Not constructible
with SAR Rejected
for RDUby
and
CWGBT confirmed
  by Omar 13-Jul
by mail on 17-Aug)
  13-Jul 13-Jul
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal
Rejected(3nd
with SARsector
Rejected
is blocking
by RF by neighbour
  building)
11/17/2021 31-Mar 17-Nov-21 17-Nov-21
Rooftop Checked Approved
Nominal with SAR approved Checked
by RF by
Rejected   11/17/2021 17-Nov-21 17-Nov-21
Owner :
Rooftop Checked Rejected
Nominal with SAR Rejectedrefused
by SAQto   3-Mar-22 3-Mar-22 3-Mar-22
Approved(Rev
rent
Rooftop Checked Approved
Nominal with SAR approved by
erted RFColo)
to 21-Apr-22 21-Apr-22 21-Apr-22
Sharing Checked Nominal with SAR approved by
Approved STEP RF
Approved   11/17/2021   17-Nov-21 17-Nov-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 19-Oct
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 19-Oct 7/14/2022 7/14/2022 7/14/2022
Greenfield Checked Rejected
Rejected
Nominaldue
with
to small
SAR Rejected
space andby
elevation
CW Moureen confirm 7-14-2022
5-Feb 2/5/2022 5-Feb-22
Nominal Nominal Nominal Nominal Nominal
RoofTop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Nov
RoofTop Checked Approved
Nominal with SAR approvedApproved
by RF 11-Nov
RoofTop Checked Approved
Nominal with SAR approvedApproved
by RF 11-Nov
Nominal Nominal Nominal Nominal Nominal
RoofTop Checked Nominal
Approved
Approved(After
with SAR approved
discussion
by STEPwith
RFMulatu on 26-Apr-22)25-Feb 25-Feb 25-Feb
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 22-Aug 25-May 2-Dec 2-Dec
Greenfield Checked all
Rejected
Nominal
candidate
with all candidate
A,B,
SAR & RejectedA,B,
C not willing&for
by SAQC not
rentwilling
this is for rent this22-Aug
condominium is condominium
zone, zone,
2-Dec 2-Dec 2-Dec
Greenfield Checked Rejected
Nominal with SAR Rejected by
Rejected
SAQ 21-Apr 21-Apr 21-Apr
Greenfield Checked Approved
Nominal with SAR approved by RF 26-May 26-May 26-May
Sharing Checked Approved Approved
Nominal with SAR approved by STEP RF   NA 2-Dec 2-Dec 2-Dec
Nominal Nominal Nominal Nominal Nominal
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF 24-11-2021 24-Nov-21 24-Nov-21
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 24-11-2021 24-Nov-21 24-Nov-21
Greenfield Checked Rejected
Nominal
Rejceted with
(DueSAR
to Owner
Rejected
Rejected
by SAQ
Confirmed by omar on 24-11-2021
30-June) 24-Nov-21 24-Nov-21
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 24-11-2021 24-Nov-21 24-Nov-21
Nominal Nominal Nominal Nominal Nominal
Sharing Checked Nominal with SAR approved by
Approved STEP RF
Approved   02-11-2021 4-Nov-21 4-Nov-21
Greenfield Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due   02-11-2021   4-Nov-21 4-Nov-21
Greenfield Checked Nominal with SARApproved(Reverted
Approved approved by RF to Colo) 28-Apr 28-Apr 28-Apr
Greenfield Checked Nominal with SAR Rejected
Rejected by SAQ to SAQ)
Rejected(Due   02-11-2021   4-Nov-21 4-Nov-21
Nominal Nominal Nominal
Nominal With candidate
Nominal
 The owner asked for
Rooftop
50K and heChecked
is not willing toRejected
negotiatewith
Nominal .Approved (Mulauby
SAR Rejected confirmed
SAQ now(12-Apr-22) Needs
5-Apr
physical visiting
7-Apr of the site7-Apr
with nokia RF7-Apr
team, since it is high building.
Sharing Rejected Nominal
Approved
with SAR approved byApproved
STEP RF 7-Nov 11/7/2021 7-Nov-21
Nominal Nominal Nominal Nominal Nominal
Rooftop
Block by neighbour building
Rejected
Nominal with SARBlock
Rejected
by neighbour
by RF building 19-Jan
Rooftop Checked
RejectedRejected
Nominal
Due to unable
with SAR
to obtain
Rejected
ownership
by SAQdocuments Moureen Confirm
23-Jun7-13-2022 23-Jun 23-Jun
Rooftop Checked Nominal
Approved
with SARApproved(OK
approved by STEP
but Use
RF9Mtr RTT) 14-Jul 14-Jul 14-Jul
Nominal Nominal Nominal Nominal Nominal
it's anGreenfield
high school they 25
need
Aug:
direct
Nokia
application
Rejected
Nominal
suggested
it'swith
letter
an
to high
SAR
extend
school
Rejected
the search
they
byneed
SAQ
radius
direct
to 160m
application
stayingletter
on or17-Aug
south of the13-Dec-21
New Ambo road.
13-Dec-21
Preferably Rooftop
13-Dec-21
Greenfield under construction
25 Aug: NokiaRejected
Nominal
suggested
with
to extend
SAR Rejected
theunder
search
by
construction
radius
CW to 160m staying on or17-Aug
south of the13-Dec-21
New Ambo road.
13-Dec-21
Preferably Rooftop
13-Dec-21
Greenfield Checked Nominal with SAR RejectedRejected
Rejected by RF 22-Apr 22-Apr 22-Apr
Rooftop Checked Rejected Nominal with S Rejected 11-Jun 11-Jun 11-Jun
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF 13-Dec-21 13-Dec-21 13-Dec-21 13-Dec-21
Nominal Nominal Nominal Nominal Nominal
RoofTop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 1-Mar 3/1/2022 1-Mar-22
RoofTop Checked Approved
Nominal with SAR approvedApproved
by RF 11-Nov
RoofTop Checked Approved
Nominal withThis
SAR candidate
approvedThis
is by
shifting
candidate
RF to STEPis shifting
office to STEP
11-Nov
office
Nominal Nominal Nominal Nominal Nominal
Rejected
Greenfield
find RT options availableRejected
in
Nominal
that area
with
Rejected
SARfind
Rejected
GBT
RT options
candidate-A
by RFavailable
dropped
in that
duearea
to owner
25-Feb
not willing
Rejected
Greenfield
find RT options availableRejected
in
Nominal
that area
with
Rejected
SARfind
Rejected
GBT
RT options
candidate-B
by RFavailable
dropped
in that
duearea
to owner
25-Feb
not willing
Rooftop Nominal
by high with
Checked NearApproved SAR are
building approved by
Govt they STEP
don'tRF
Approvedwant for rent( need conformation
18-Mar-22 from tesla for near18-Mar-22
by buildings) 18-Mar-22
Nominal Nominal Nominal Nominal Nominal
Greenfield checked Approved
Nominal with SAR approvedApproved
by RF   20-09-2021 9/22/2021 9/22/2021 22-Sep-21
Greenfield checked Nominal with SAR
Rejected RejectedTeam
by SAQ
Rejected(TSSR given anby
rejected appointment
SAQ) for tomorrow
20-09-2021 9/22/2021 9/22/2021 22-Sep-21
Rooftop checked Approved
Nominal with SAR approvedApproved
by RF 1-Feb
Rooftop checked Approved
Nominal with SAR approvedApproved
by RF 1-Feb
Rooftop
Candidate proposed by STEP
Approved
Nominal with SAR approvedApproved
by RF
RooftopNot Ok, checked
please go for 149031_E,
Approved the owner with
Nominal is willing to rent to us and we aligned on
S Approved this but now you guys are proposing
14-Apr 14-Apr on some other place.
14-Apr
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 10-Feb 10-Feb-22 10-Feb-22
Nominal Nominal Nominal Nominal Nominal
Greenfield checked Nominal
Approved
with SAR approved byApproved
STEP RF 25-11-2021 25-11-2021 25-11-2021 25-11-2021
Nominal Nominal Nominal
Nominal With candidate
Nominal
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 16-Apr 16-Apr 16-Apr
Nominal Nominal Nominal
Nominal With candidate
Nominal
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 13-Apr 13-Apr 13-Apr
Nominal Nominal Nominal
Nominal With candidate
Nominal
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 13-Apr 13-Apr 13-Apr
Nominal Nominal Nominal
Nominal With candidate
Nominal
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 13-Apr Approved Approved
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 10-Feb 10-Feb-22 10-Feb-22
Nominal Nominal Nominal
Nominal With candidate
Nominal
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 19-May 19-May 19-May
Greenfield Checked Nominal withOk,
Rejected
Rejected(Not SARplease
Rejected
lookby
forSTEP
the position(8.252211,34.587174))
13-Apr 13-Apr 13-Apr
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR approved by
Approved Not
STEPenough
RF
Approved Space in ATC candidate
19-Mar-22 19-Mar-22 19-Mar-22
Greenfield Checked Rejected
Nominal with SAR Rejected
Not enough Not enough Space 11-Feb
by CW Space
Nominal Nominal Nominal
Nominal With No candidate
Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 8-Jul 8-Jul 8-Jul
Greenfield Checked Approved
Nominal with SAR Approved
Approved
by RF 13-Jul 13-Jul 13-Jul
Nominal Nominal Nominal
Nominal With candidate
Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Apr 11-Apr 11-Apr
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 19-Mar-22 19-Mar-22 19-Mar-22
Nominal Nominal Nominal Nominal Nominal
GreenfieldOut off search ring Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 20/10/2021   20-Oct-21 20-Oct-21
GreenfieldOut off search ring Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 20/10/2021   20-Oct-21 20-Oct-21
rejected due toGreenfield
not enough space for GBT build (as per
rejected
Rejected
Nominal
duegoogle
with picture).
to not
SARenough
Rejected
spacebyfor
CWGBT build (as per google
9-Mar-22
picture).   9-Mar-22 9-Mar-22
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 19-Apr-22 19-Apr-22 19-Apr-22
Nominal Nominal Nominal
Nominal With candidate
Nominal
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 13-Apr 13-Apr 13-Apr
Nominal Nominal Nominal
Nominal With candidate
Nominal
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 13-Apr 13-Apr 13-Apr
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 12-Nov
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 12-Nov
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 2-Mar 2-Mar-22 2-Mar-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 10-Feb 10-Feb-22 10-Feb-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected(Moved
Rejected a lotSAR
Nominal with from the Nominal,
Rejected please go for 408001_B or
by STEP 18-Apr
408001_C) 18-Apr 18-Apr
Greenfield Checked Rejected
Nominal with SAR RejectedRejected
by RF 12-Nov
Greenfield Checked Rejected
NominalRejected(not enoughbyspace
with SAR Rejected CW confirmed by Jesee) 12-Nov
Greenfield Checked Approved Nominal with S Approved 11-Jun 11-Jun 11-Jun
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR Rejected Approved
Rejected by STEP 12-Nov
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 12-Nov
Greenfield Approved(After
Checked discussion
ApprovedwithNominal
Mulatu with
& Melese
S confirmed on 25-Apr-22) & Reconfirmed
11-Apr on 14-June-22 11-Apr 11-Apr
Nominal Nominal Nominal Nominal Nominal
RoofTop Checked Building
Rejected
Nominal
Height
with
Building
too
SAR
small
Rejected
High
compared
toobysmall
RF
to Norminal
comparedand
to Norminal
Out of Search
12-Nov
and Out
Ringof Search Ring
Greenfield
Hold(ThisChecked Nominal
location is not Rejected
good withthe
to cover SARmarket.
Rejected
So by STEPsearch near to the nominal
please 11-Apr
or to the south of the nominal)
11-Apr 11-Apr
Greenfield Checked Approved Nominal with S Approved 10-Jun 10-Jun 10-Jun
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected(Government
Nominal with SAR Rejected
Rejected lands,by
New
SAQsearch ongoing as candidate-C)
20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Rejected(Government
Nominal with SAR Rejected
Rejected lands,by
New
SAQsearch ongoing as candidate-C)
20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Nominal with SARApproved(Reverted
Approved approved by RF to Colo) 1-Jun 1-Jun 1-Jun
Sharing Checked Approved Approved
Nominal with SAR approved by STEP RF 20/10/2021   20-Oct-21 20-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 1-Apr 1-Apr 1-Apr
Greenfield Checked Rejected
Nominal with
Rejected(ATC
SAR Rejectedcandidate
by CW has space isuue) 10-Feb 10-Feb-22 10-Feb-22
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 20/10/2021   20-Oct-21 20-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Nominal withApproved,Sent
Approved SAR approvedfor
by STEP
STEP RF
approval_1-Apr-22 1-Apr 1-Apr 1-Apr
Nominal with
Greenfield Checked Rejected SARRejected(candidate
Rejected has space issue) 10-Feb 10-Feb-22 10-Feb-22
by CW
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   10-Apr   10/4/2021 4-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   10-Apr   10/4/2021 4-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   10-Apr   10/4/2021 4-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 1-Mar 1-Mar-22 1-Mar-22
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 26/11/2021 26/11/2021 26/11/2021
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   10-Jun   10/6/2021 6-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   10-Jun   10/6/2021 6-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   10-Jun   10/6/2021 6-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 26/11/2021 26/11/2021 26/11/2021
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   10-Jun   10/6/2021 6-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   10-Jun   10/6/2021 6-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   10-Jun   10/6/2021 6-Oct-21
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 21-May 21-May 21-May
Greenfield Checked Nominal withnot
Rejected(owner
Rejected SAR Rejected
willing by SAQ
for rent)_Confirmed by  Burak on 18-May-22
3-Mar   3-Mar-22 3-Mar-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   10-Apr   10/4/2021 4-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   10-Apr   10/4/2021 4-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   10-Apr   10/4/2021 4-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF
Greenfield Checked Approved
Nominal with SARApproved(Reverted
approved by RF to Colo) 26/11/2021 26/11/2021 26/11/2021
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 20/10/2021   20-Oct-21 20-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   10-Jun   10/6/2021 6-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   10-Jun   10/6/2021 6-Oct-21
cted due to Height is
Rooftop
small compared to Norminal
Nominal
Approved
Heightwith
but SAR
Approved
approved
by STEP
byApproved
STEP RF 10-Feb
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   10-Jun   10/6/2021 6-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR RejectedHigh
by SAQ
Rental Due to high price 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Due to
byhigh
RF price
Due to high price 20/10/2021   20-Oct-21 20-Oct-21
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 27-Apr 27-Apr 27-Apr
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Rejected(Government
Rejected with SAR Rejected
land,by
NewSAQ
search ongoing as candidate-C)
10-11-2021 10-Nov-21 10-Nov-21
Greenfield Checked Nominal
Rejected(Government
Rejected with SAR Rejected
land,by
NewSAQ
search ongoing as candidate-C)
10-11-2021 10-Nov-21 10-Nov-21
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 3-May 3-May-22 3-May-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
TSSRbyRejected
RF 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Nominal with SAR Rejected(space
Rejected Rejected by CWnot enough) 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Nominal
Rejected with SAR Rejected
Rejected(owner byfor
not willing SAQrent_confirmed Jesse/Burak)
31-Mar 31-Mar 31-Mar
Greenfield Checked Nominal withHigh
Rejected SAR Rejected by confirmrd)7-15-2022
rent( email SAQ 25-May 25-May 25-May
Greenfield Checked Approved Approved
Nominal with SAR approved by STEP RF 15-Jul 15-Jul 15-Jul
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR Rejected by
Rejected SAQ
Rejected 12-Nov
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 20-Apr 20-Apr 20-Apr
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 12-Nov
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Rejected(Govt
by SAQland issue) 12-Nov
Greenfield Checked Rejected
Nominal with SAR Rejected
Rejected(Govt
by SAQland issue) 12-Nov
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 29-Apr 29-Apr 29-Apr
Nominal Nominal Nominal Nominal Nominal
Greenfield
Rejected, Initially
Checked Nominal
Approved(After
Rejected Better
with SAR
discussion to drop
Rejected
with this site
by STEP
from year 0 and
Melese_27-Mar-22)now it'sto make the
rejected andsite
we 417091
18-Mar part of year
need a candidate 0 18-Mar-22
in old nomial 18-Mar-22
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 17-May 17-May 17-May
Nominal Nominal Nominal Nominal Nominal
Greenfield
Rejected, Initially
Checked Nominal
Approved(After
Rejected Better
with SAR
discussion to drop
Rejected
with this site
by STEP
from year 0 and
Melese_27-Mar-22)now it'sto make the
rejected andsite
we 417027
18-Mar part of year
need a candidate 0 nomial
in old 18-Mar 18-Mar
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 16-May 16-May 16-May
Rooftop Checked Approved by RF Out off search ring 16-May
Nominal with SAR approvedApproved 16-May 16-May
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal with SAR Rejected
Rejected
by SAQ
By Owner 20/10/2021   20-Oct-21 20-Oct-21
GreenfieldOut off search ring Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 20/10/2021   20-Oct-21 20-Oct-21
Rooftop Checked Rejected
Nominal withRejected(Due
SAR Rejectedtobylow
RFBH)(18-Mar-22) 9-Mar 9-Mar-22 9-Mar-22
Rooftop Checked Rejected
Nominal with SAR RejectedRejectedBuilding
by RF height is low11-May 11-May 11-May
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF 20/10/2021   20-Oct-21 20-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR
Rejected(Owner
Rejected by not
SAQwilling for rent) 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 1-Apr 1-Apr 1-Apr
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR RejectedRejected
Rejected by CW 11-Feb
Greenfield Checked Approved Approved
Nominal with SAR approved by STEP RF 3-Jun 3-Jun 3-Jun
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   10-Apr   10/4/2021 4-Oct-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   10-Apr   10/4/2021 4-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 10-Feb 10-Feb-22 10-Feb-22
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   10-Apr   10/4/2021 4-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF   25-Feb   3-Mar-22 3-Mar-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 17-Feb 2/17/2022 17-Feb-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Greenfield
Rejected due to rental issue
Rejected
Nominal with SAR Rejected by
dueSAQ
to rental issue 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 11-Mar 11-Mar-22 11-Mar-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Ownerbynot
SAQinterested 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 9-Mar 9-Mar 9-Mar
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 27/10/2021   10/27/2021 10/27/2021
Greenfield Checked Nominal
Rejected with SARtoRejected
Rejected(Due by CW
not enough space and not interested now)
27/10/2021   10/27/2021 10/27/2021
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal with SARRejected
RejectedDue
by CW
to Space Issue 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Rejected
Nominal with
Rejected
SAR Rejected
(Block by RF
neighbour buildings)
  17-10-2021 3/31/2022 11/17/2021 17-Nov-21
Rooftop Checked Approved Nominal wi Approved   18-Jun-22 18-Jun-22 18-Jun-22
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 3/3/2022   3/3/2022 3/3/2022
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 10-Feb 10-Feb-22 10-Feb-22
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 9-Mar-22   9-Mar-22 9-Mar-22
Nominal Nominal Nominal
Nominal With candidate
Nominal
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 19-Apr 19-Apr 19-Apr
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 29-Mar 29-Mar 29-Mar
Nominal Nominal Nominal Nominal Rejected
NominalDue
owner refuse
Rooftop Checked Nominal with SAR Rejected to
Rejected bylet
SAQthe 3-Mar-22   3-Mar-22 3-Mar-22
work
Rooftop Checked Approved
Nominal with SAR Approved Approved
by RF
continue. 20/10/2021   20-Oct-21 20-Oct-21
Rooftop Checked Rejected
Nominal with SAR Rejected
Rejecetd(LA
by SAQ issue) 11-Aug   11-Aug 11-Aug
Rooftop Checked Approved
Nominal with SAR Approved
Approved
by RF 19-Aug   19-Aug 19-Aug
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 2-Sep   2-Sep 2-Sep
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 10-11-2021 10-Nov-21 10-Nov-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 10-11-2021 10-Nov-21 10-Nov-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 23-Mar 23-Mar-22 23-Mar-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR
Rejected Rejected by SAQ
Rejected(Owner not willing for rent) 10-Feb 10-Feb-22 10-Feb-22
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 20/10/2021   20-Oct-21 20-Oct-21
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 23-May-22 23-May-22 23-May-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Greenfield
Rejected(Rejected
Checked due toRejected
Nominal
this property
withdon't
SARhave
Rejected
proper
bydocuments/LA
SAQ not movable
20/10/2021
and we find candidate-C
  nearby)
20-Oct-21 20-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 20-Apr 20-Apr 20-Apr
Nominal Nominal Nominal Nominal Nominal
GreenfieldOut off search ring Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 27/10/2021   10/27/2021 10/27/2021
Rooftop Checked Nominal
Approved
with SAR approved
Coordinates
byApproved
STEPare
RFswapped b/w 407038
2-Mar-22
<--> 408129   2-Mar-22 2-Mar-22
Rooftop Checked Rejected
Nominal with SAR Rejected
TSSRby Rejected
CW Trjected by civil 8-Feb 2/8/2022 8-Feb-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved Approved
Nominal with SAR approved by STEP RF 3-Jun-22 3-Jun-22 3-Jun-22
Greenfield Checked Nominal with
Rejected Rejected(Due
SAR Rejected
to owner
by SAQnot willing for rent) 12-Nov
Greenfield Checked Nominal with
Rejected Rejected(Due
SAR Rejected
to owner
by SAQnot willing for rent) 12-Nov
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 20/10/2021   20-Oct-21 20-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 20-10-2021   20-Oct-21 20-Oct-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 30-Jan 1/30/2022 30-Jan-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 12-Mar-22   12-Mar-22 12-Mar-22
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal with not
Rejected(owner
Rejected SARwilling
Rejected
forby SAQ
rent)_confirmed by Burak_03-May-22
10-11-2021 10-Nov-21 10-Nov-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 10-11-2021 10-Nov-21 10-Nov-21
Greenfield Checked Nominal with SAR Rejected(Owner
Rejected Rejected by SAQnot willing) 9-May 9-May 9-May
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 7-Jul 7-Jul 7-Jul
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR Rejected
Rejected Rejected(Government
by SAQ land) 27/10/2021   10/27/2021 10/27/2021
Greenfield Checked Nominal with SAR Rejected
Rejected Rejected(Government
by SAQ land) 27/10/2021   10/27/2021 10/27/2021
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 27-Apr 27-Apr 27-Apr
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   13-10-2021   13-Oct-21 14-Oct-21
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved   17-May-22   17-May-22 17-May-22
Greenfield Checked Nominal
Rejected with SAR Rejected
Rejected(candidate by pointed
iwas SAQ in government
  land)
13-10-2021   13-Oct-21 14-Oct-21
Greenfield Checked Rejected
Nominal with SAR
Rejected(Owner
Rejected by not
SAQwilling for rent) 25-11-2021 25-11-2021 25-11-2021
Nominal Nominal Nominal Nominal Nominal
RoofTop Checked Approved
Nominal with SAR approved
Building
Approved
byHeight
RF Small compared to Norminal
12-Nov Value
RoofTop Checked Approved
Nominal with SAR approvedApproved
by RF 12-Nov
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 12-Nov
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 27/10/2021   10/27/2021 10/27/2021
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 27/10/2021   10/27/2021 10/27/2021
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb 18-Mar-22 18-Mar-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR approved by
Approved Approved
STEP RF 12-Nov 23-Jun-22 23-Jun-22 23-Jun-22
Greenfield Checked Nominal with
Rejected Rejected(Due
SAR Rejected
to owner
by SAQnot willing for rent)
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR RejectedSpace
by CWIssue 10-11-2021 10-Nov-21 10-Nov-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 10-11-2021 10-Nov-21 10-Nov-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 15-Feb 2/15/2022 15-Feb-22
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   17-10-2021   11/17/2021 17-Nov-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   17-10-2021   11/17/2021 17-Nov-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 01-03-2022 1-Mar-22 1-Mar-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Rejected
Nominal with SARmunicipal
Rejected by
office,
SAQrental issue 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 26-Mar 3/26/2022 26-Mar-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 12-Mar-22   12-Mar-22 12-Mar-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 10-11-2021 10-Nov-21 10-Nov-21
Greenfield Checked Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 10-11-2021 10-Nov-21 10-Nov-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 9-Mar-22 9-Mar-22 9-Mar-22
Nominal Nominal Nominal Nominal Nominal
Greenfield
Panoramic Photos is not clear
Approved
Nominal with SAR approvedResubmit
by RF   4/10/2021   4-Oct-21 4-Oct-21
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved   4/10/2021 10/8/2021 4-Oct-21 4-Oct-21
Greenfield
Panoramic Photos is not clear
Approved
Nominal with SAR approvedResubmit
by RF   4/10/2021   4-Oct-21 4-Oct-21
Greenfield Checked Rejected
Nominal with SAR
Rejected
Rejected
by Owner
by SAQ
: refused to rent 25/11/2021 25/11/2021 25/11/2021
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR Rejected(Not
Rejected Rejected by CW
enough space) 20-Apr 20-Apr 20-Apr
Greenfield Checked Nominal with SAR
Rejected Rejected by STEP
Rejected(Nominal Change by STEP) 12-Nov
Greenfield Checked Nominal with SAR
Rejected Rejected by STEP
Rejected(Nominal Change by STEP) 12-Nov
Greenfield Checked Nominal with SARApproved(Reverted
Approved approved by RF to Colo) 12-May 12-May 12-May
Sharing Checked Nominal with SAR approved by
Approved STEP RF
Approved 12-Nov
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with
Rejected Rejected(Due
SAR Rejected
to owner
by SAQnot willing for rent) 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Nominal with
Rejected Rejected(Due
SAR Rejected
to owner
by SAQnot willing for rent) 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Nominal with
Approved SAR approved by STEP
Approved(Reverted RF DARA registered
to Colo) 27-Apr 27-Apr 27-Apr
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal with
Rejected
SAR Rejected
( due toby
still
CW under construction) The
20-10-2021
two RT site are not accept by
20-Oct-21
Civil team 20-Oct-21
Rooftop Checked Rejected
Nominal with
Rejected
SAR Rejected
( due toby
still
CW under construction) The
20/10/2021
two RT site are not accept by
20-Oct-21
Civil team 20-Oct-21
Greenfield Checked Nominal
Rejected with SAR
Rejected(Try Rejected by RF
toRejected(Try
get RT Candidate
to get on
RT8.741189,38.992029)
Candidate on 8.741189,38.992029)
20/10/2021 20-Oct-21 20-Oct-21
Greenfield Checked Nominal with SAR Rejected
Rejected by STEP
Rejected(due to low ISD) 28-Apr 28-Apr 28-Apr
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 6-May 6-May 6-May
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Rejected
by SAQ
By Owner 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 9-Mar 9-Mar 9-Mar
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   13-10-2021   13-Oct-21 14-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   13-10-2021   13-Oct-21 14-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   13-10-2021   13-Oct-21 14-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 10-Feb 10-Feb-22 10-Feb-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF   4/10/2021   4-Oct-21 4-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   4/10/2021   4-Oct-21 4-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   4/10/2021   4-Oct-21 4-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Rejected
by SAQ
by Owner 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Nominal with SAR Rejected(Not
Rejected Rejected by CW
enough space) 9-Mar 9-Mar 9-Mar
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 25-Apr 25-Apr 25-Apr
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 4-Mar-22   4-Mar-22 4-Mar-22
Greenfield Checked Rejected
Nominal with SARCandidate
Rejected by Candidate
notSAQ
willing not willing for rent
for rent 10-Feb 10-Feb-22 10-Feb-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 10-11-2021 10-Nov-21 10-Nov-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 10-11-2021 10-Nov-21 10-Nov-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 10-Feb 10-Feb-22 10-Feb-22
Greenfield Checked Nominal with SAR Rejected by
Rejected SAQ
Rejected 9-May 9-May 9-May
Greenfield Checked Approved Approved
Nominal with SAR approved by STEP RF 28-May 28-May 28-May
Nominal Nominal Nominal
Nominal With candidate
Nominal
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 20-10-2021   20-Oct-21 20-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Nominal
Rejected with SAR refused
Rejected(Owner Rejectedtoby SAQ 02-May_Burak confirmed)
rent_on 29-Mar 29-Mar 29-Mar
Greenfield Checked Approved Approved
Nominal with SAR approved by STEP RF 8-Jun 8-Jun 8-Jun
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   13-10-2021   13-Oct-21 14-Oct-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   13-10-2021   13-Oct-21 14-Oct-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   13-10-2021   13-Oct-21 14-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF   25-11-2021   25-11-2021 25-11-2021
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 20-10-2021   20-Oct-21 20-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Nominal Nominal Nominal Nominal Nominal
GreenfieldDue to Space issue Rejected
Nominal with SAR Rejected
Due tobySpace
CW issue 12-Nov
Greenfield
Land documents are not clear
Rejected
Nominal with SARLand
Rejected
documents
by SAQare not clear 12-Nov
Greenfield Checked Rejected
Nominal with
Rejected
SAR Rejected
Due Owner
by SAQ
request change of place 24-Mar 24-Mar-22 24-Mar-22
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 10-Aug 10-Aug 10-Aug
Nominal Nominal Nominal Nominal Nominal
RoofTop Checked Nominal with SAR Rejected(owner
Rejected Rejected by SAQnot willing) 12-Nov
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 12-Nov
25-May)Rejected(Starting
Greenfield
from march,
Checked Nominal
I had been asking with
Approved SAR approved
you how by STEP RF
you are addressing the stadium, market place
10-May
and bus station, but you guys
10-May
didn't come 10-May
up with appropriate solution. So plea
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   4/10/2021   4-Oct-21 4-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   4/10/2021   4-Oct-21 4-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   4/10/2021   4-Oct-21 4-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   13-10-2021   13-Oct-21 14-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   13-10-2021   13-Oct-21 14-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   13-10-2021   13-Oct-21 14-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF   8/22/2022   8/22/2022 8/22/2022
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   8/22/2022   8/22/2022 8/22/2022
Greenfield Checked Rejected
Nominal with SAR
Rejected
Rejected
due to
bydocument
SAQ is not full 25/11/2021 25/11/2021 25/11/2021
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
GreenfieldOut off search ring Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 3/23/2022 13-10-2021 13-10-2021
GreenfieldOut off search ring Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 3/23/2022 13-10-2021 13-10-2021
Greenfield Checked Approved
Nominal with SARApproved(Reverted
approved by RF to Colo) 3/23/2022 23-Mar-22 23-Mar-22
Greenfield
Due to space issue candidate isRejected
rejected
Nominal withDue
SARtoRejected
space issue
by CW
candidate is rejected 2/11/2022
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF 10/12/2021 13-10-2021 13-10-2021
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Nominal
Approved
with SAR Approved by
Approved
STEP RF 4/14/2022 4/14/2022 4/14/2022
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 10/12/2021 13-10-2021 13-10-2021
Rejected by
Greenfield Checked Nominal with SAR RejectedCW:
Rejected by CWspace 25/11/2021 25/11/2021 25/11/2021
issue
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Greenfield
Rejected Due to Out Of Search
Rejected
Nominal
Ring with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 3/23/2022 13-10-2021 13-10-2021
Greenfield
Rejected Due to Out Of Search
Rejected
Nominal
Ring with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 3/23/2022 13-10-2021 13-10-2021
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 3/23/2022 3/23/2022 3/23/2022
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 8-Feb 2/8/2022 8-Feb-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Rejected with Pending/hold(Pend
SAR
Rejected(Pend Rejected
it till by STEP
jaffar finish itthe
tillresponse
jaffar finish
to the
thevisit
response
report)
23-Mar
to the visit report) 23-Mar 23-Mar
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 10-May 10-May 10-May
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 18-Mar 18-Mar-22 18-Mar-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with
Rejected(CW
Rejected teamSAR
dueRejected by CW space)_confirmed by Jesse/Burak
to insufficient 11-Feb
Greenfield Checked Approved Approved
Nominal with SAR approved by STEP RF 25-May 25-May 25-May
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 8-Feb 2/8/2022 8-Feb-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SARApproved(Reverted
approved by RF to Colo) 8-Feb 2/8/2022 8-Feb-22
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 18-Mar 18-Mar 18-Mar
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 10-11-2021 10-Nov-21 10-Nov-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 10-11-2021 10-Nov-21 10-Nov-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 10-Feb 9-Mar-22 9-Mar-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Rooftop Checked Nominal
Approved
with
Approved(LA
SAR approved
also signed
by STEP
for RF
same candidateT as A)11-Feb
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Greenfield Rejected(Not
Checked enough
Nominal
space_Candidate
Rejected with SAR Rejected
A should
by CW
be dropped because in Ethiotelecom
10/12/2021 Compound) 13-10-2021 13-10-2021
Greenfield Checked Nominal
Rejected with SAR Rejectedlocation
Rejected(candidate by CW was changed slightly)10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 16-May-22 16-May-22 16-May-22
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 10-11-2021 10-Nov-21 10-Nov-21
Rooftop Checked Nominal with SAR Rejected(Owner
Rejected Rejected by SAQnot willing) 10-11-2021 10-Nov-21 10-Nov-21
From
Rooftop
60 to 150 dgr blocked by own
Rejected
Nominal
buldingwith
FromSAR
60 to
Rejected
150 dgrbyblocked
RF by own bulding 27-Mar 27-Mar-22 27-Mar-22
Rooftop Checked NominalRejected(Not
Rejected with SAR Rejected by STEP
OK, moved a lot from the nominal) 12-May 12-May 12-May
Rooftop Checked Rejected Nominal with S Rejected 13-Jun 13-Jun 13-Jun
Rooftop Checked Hold(How
Approved can you
Nominal avoid the shadowing?)Reverted to Colo
with 5-Jul 5-Jul 5-Jul
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF 10-11-2021 10-Nov-21 10-Nov-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 4-Mar-22 4-Mar-22 4-Mar-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   4/10/2021   4-Oct-21 4-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   4/10/2021   4-Oct-21 4-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   4/10/2021   4-Oct-21 4-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 3/3/2022 3/3/2022 3/3/2022
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 25/11/2021 25/11/2021 25/11/2021
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Greenfield
Rejected Due to Out Of Search
Rejected
Nominal
Ring with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 3/24/2022 13-10-2021 13-10-2021
Greenfield
Rejected Due to Out Of Search
Rejected
Nominal
Ring with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 3/24/2022 13-10-2021 13-10-2021
Greenfield Checked Nominal with SARCustomer
Rejected Rejectedwant
by STEP
Rejected
candidate in this location 7.954893,39.131552
4/5/2022 4/5/2022 4/5/2022
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 11-May 11-May 11-May
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Rooftop Checked Approved
Nominal with SARApproved(Reverted
approved by RF to Colo) 20-10-2021   20-Oct-21 20-Oct-21
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF 20/10/2021   20-Oct-21 20-Oct-21
Nominal Nominal NominalNominal With candidate
Nominal
customer requested to find candidate in this location (6.976609,39.181454)
Greenfield Checked Nominal with SAR Rejected by
Rejected STEP
Rejected 6-Apr 6-Apr 6-Apr
Greenfield Checked Approved Approved
Nominal with SAR approved by STEP RF 3-Jun 3-Jun 3-Jun
Greenfield Checked Nominal
Approved with SAR Approved by RF
Approved 3-Jun 3-Jun 3-Jun
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Nominal with SAR
Rejected Rejected by SAQ
Rejected(owner not willing for rent)
Previous can-T
8-Mar-22
has dropped due to owner8-Mar-22
not willing for8-Mar-22
rent
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 2-May-22 2-May-22 2-May-22
Greenfield Checked Nominal with SAR
Rejected Rejected by SAQ
Rejected(owner not willing for rent)
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 10-11-2021 10-Nov-21 10-Nov-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 10-11-2021 10-Nov-21 10-Nov-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 12/11/2021 12/11/2021 12/11/2021
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 12/11/2021 12/11/2021 12/11/2021
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 15-Feb 2/15/2022 15-Feb-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20/10/2021   20-Oct-21 20-Oct-21
Greenfield
Rejected(Candidate-B
Checked Approved
has
Nominal
dropped
with
dueSAR
to GF
approved
option. by
WeRF
have found RT option in
20/10/2021
same location as candidate-C)
  20-Oct-21 20-Oct-21
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 20-Apr 20-Apr 20-Apr
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 10/12/2021 13-10-2021 13-10-2021
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 20/10/2021   20-Oct-21 20-Oct-21
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 11-Feb 11-Feb-22 11-Feb-22
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 18-Aug 18-Aug 18-Aug
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 24-Aug 24-Aug 24-Aug
Greenfield Checked Rejected
Nominal with SAR Rejected
Rejected(Owner
by SAQ issue) 15-Feb 2/15/2022 15-Feb-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20-10-2021   20-Oct-21 20-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 20-10-2021   20-Oct-21 20-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 19-Feb 2/19/2022 19-Feb-22
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Rejected
Nominal with SAR Rejected
Not enough
by CW space
Not enough space 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Rejected
Nominal with
candidate
SAR was
Rejected
dropped
by CW
due to not enough space 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 21-Mar-22 21-Mar-22 21-Mar-22
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Greenfield
Candidate has located in old nominal
Rejected
Nominal with SAR Rejected(owner
Rejected by SAQnot willing) 10/12/2021 13-10-2021 13-10-2021
Greenfield
Candidate has located in old nominal
Rejected
Nominal withRejected(No
SAR Rejectedlegal
by SAQ
documents available) 10/12/2021 13-10-2021 13-10-2021
it is near to the approved nominal 140047, so please
Greenfield Nominal
replanwith
Rejected it with
SARgood
Rejected
ISD. by
Rejected bySTEP
STEP RF/hold 27-Mar-22 27-Mar-22 27-Mar-22
Greenfield Checked Nominal with SAR approvedApproved
Approved by RF 18-Apr-22 18-Apr-22 18-Apr-22
Greenfield Checked Approved Approved
Nominal with SAR approved by STEP RF 30-May-22 30-May-22 30-May-22
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 24-Mar 3/24/2022 24-Mar-22
Greenfield Checked Rejected
Nominal with SAR Rejected
Not Enough
by CW Space 2/23/2022 23-Feb-22 23-Feb-22
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Greenfield
Not enough space for towerRejected
build
Nominal with SAR
NotRejected
enough space
by CWfor tower build 10/12/2021 13-10-2021 13-10-2021
active candidate
Greenfield
don't have Legal documents
Rejected
Nominal
active
of the
with
candidate
land
SAR Rejected
active
don'tcandidate
have
by SAQ
Legal
don't
documents
have Legal
of the
documents
land
10/12/2021
of the land 13-10-2021 13-10-2021
Rooftop Checked Nominal with SAR
Approved Approved(Reverted
approved by RF to GF option) 27-Mar-22 27-Mar-22 27-Mar-22
Rooftop Checked Nominal with SAR Rejected by
Rejected STEP
Rejected 27-Mar-22 27-Mar-22 27-Mar-22
Greenfield Checked Nominal with
Rejected(due
Rejected SAR Rejected
to owner by SAQbirrs per month)_confirm
asking 40000 18-Apr-22
by Jesse 18-Apr-22 18-Apr-22
Greenfield Checked Nominal with SARApproved(Reverted
Approved approved by RF to Colo) 7-May-22 7-May-22 7-May-22
Sharing Checked Nominal with SAR approved by
Approved STEP RF
Approved 10/12/2021 13-10-2021 13-10-2021
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Nominal with SAR
Rejected Rejected by
Rejected(Due toCW
not enough space) 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked NominalDARA
Rejected with SAR Rejected
Signed by SAQlocation at candidate D 4/2/2022
at different 4/2/2022 4/2/2022
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 7/19/2022 7/19/2022 7/19/2022
Nominal Nominal Nominal Nominal Nominal
Panoramic
Greenfield Nominal
Photos & Site Photos are not clearwith SAR
Rejected Rejected by SAQ
Rejected(owner not willing for rent)
  4/10/2021   4-Oct-21 4-Oct-21
Greenfield
Panoramic Photos is not clear
Approved
Nominal with SAR approvedResubmit
by RF   4/10/2021   4-Oct-21 4-Oct-21
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 5/6/2022 6-May-22 6-May-22
Greenfield
Panoramic Photos is not clear
Approved
Nominal with SAR approvedResubmit
by RF   4/10/2021   4-Oct-21 4-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR Rejected
Rejected by due
Rejected SAQto owner   4/10/2021 12/11/2021 12/11/2021 12/11/2021
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 4/2/2022 4/2/2022 4/2/2022
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   4/10/2021 12/11/2021 12/11/2021 12/11/2021
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   4/10/2021   4-Oct-21 4-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   4/10/2021   4-Oct-21 4-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   4/10/2021   4-Oct-21 4-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 4/2/2022 4/2/2022 4/2/2022
Greenfield Checked Nominal
Rejected with SAR Rejected
Rejected(High price by SAQ by Jawad & ROM)4/12/2022
confirmed 4/12/2022 4/12/2022
Greenfield Checked Nominal with SAR Rejected due
Rejected by CW
to space issue 25-Nov-21 25-Nov-21 25-Nov-21
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Nominal with SAR approved by
Approved Nominal
STEP RFwith SAR approved by STEP
Approved 2-AprRF 2-Apr 2-Apr
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Rooftop
building top covered by ironRejected
sheet.
Nominal with SAR
building
Rejected
top covered
by CW by iron sheet. 10/12/2021 13-10-2021 13-10-2021
Rooftop
building top covered by ironRejected
sheet.
Nominal with SAR
building
Rejected
top covered
by RF by iron sheet. 10/12/2021 13-10-2021 13-10-2021
SD with 140034, We
Greenfield
need this candidate
Due in
to following
ISD with
Rejected
Nominal
140034,
location(8.927751,38.650487)
with
WeSAR
needRejected
this candidate
by RF in following location(8.927751,38.650487)
27-Mar-22 27-Mar-22 27-Mar-22
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 18-Apr-22 18-Apr-22 18-Apr-22
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Nominal with SAR
Rejected Rejected by
Rejected(Due toCW
not enough space) 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 10/12/2021 13-10-2021 13-10-2021
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Rooftop
Nominal with SAR Rejected Rejected
by
Nominal
CW with SAR Rejected Rejected
by CW 10/12/2021 30-Mar 13-10-2021 13-10-2021
Greenfield
Nominal with SAR Rejected Rejected
by
Nominal
CW with SAR Rejected Rejected
by CW 10/12/2021 30-Mar 13-10-2021 13-10-2021
Rooftop
Nominal with SAR Rejected Rejected
by
Nominal
CW with SAR Rejected Rejected
by CW 10/12/2021 30-Mar 13-10-2021 13-10-2021
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 30-Mar 30-Mar 30-Mar
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Nominal with
Rejected SAR Rejected bydue
Rejected(Dropped SAQto owner not willing) 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 3/29/2022 3/29/2022 3/29/2022
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
ndidate not interested
Greenfield
any more to lease
active
andcandidate
alternative
Rejected
Nominal
notnot
interested
with
reachable
SARanyeither
Rejected
moreby
tophone
by
lease
SAQand alternative not reachable
10/12/2021
either by phone 13-10-2021 13-10-2021
ndidate not interested
Rooftop
any more to lease
active
andcandidate
alternative
Rejected
Nominal
notnot
interested
with
reachable
SARanyeither
Rejected
moreby
tophone
by
lease
SAQand alternative not reachable
10/12/2021
either by phone 13-10-2021 13-10-2021
Greenfield Nominalnot
CheckedRejected(Owner
Rejected with SAR Rejected
willing by SAQ
for rent and confirmed by Jesse/Burak27-Mar-22
on 24-May-22) 27-Mar-22 27-Mar-22
Greenfield Checked Approved Approved
Nominal with SAR approved by STEP RF 28-May-22 28-May-22 28-May-22
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 3/3/2022 3-Mar-22 3/3/2022
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 2/10/2022 10-Feb-22 10-Feb-22
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Nominal with SAR
Rejected Rejected
Rejected duebytoSAQ
owner not willing 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 10/12/2021 13-10-2021 13-10-2021
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP
Nominal
RF with SAR approved3/31/2022
by RF 3/31/2022 3/31/2022
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   4/10/2021   4-Oct-21 4-Oct-21
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF   4/10/2021   4-Oct-21 4-Oct-21
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   4/10/2021   4-Oct-21 4-Oct-21
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   4/10/2021   4-Oct-21 4-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   4/10/2021   4-Oct-21 4-Oct-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   4/10/2021   4-Oct-21 4-Oct-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 25-Nov-21 25-Nov-21 25-Nov-21
Nominal Nominal Nominal
Nominal With candidate
Nominal
Greenfield CHecked Nominal
Approved
with SAR approved byApproved
STEP RF 6-Apr 6-Apr 6-Apr
Nominal Nominal Nominal Nominal Nominal
Greenfield CHecked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb 11-Feb-22 11-Feb-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominallooks
Rejected(theRejected
location with SAR Rejected
not OK pleasebysearch
STEP around 7.342194,38.670526_17'Apr'2022)
11-Feb
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 9-May 9-May 9-May
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 18-Mar 18-Mar-22 18-Mar-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 18-Mar 18-Mar 18-Mar
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb 11-Feb-22 11-Feb-22
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 10/12/2021 13-10-2021 13-10-2021
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Rejected(Why
Nominal with
Rejected weSAR
can't
Rejected
go for the
by STEP
ATC GBT? It is on the better29-Mar
location) 3/29/2022 29-Mar-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 10-Feb 10-Feb-22 10-Feb-22
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal
Nominal With candidate
Nominal
Greenfield Checked
Rejected(sinceNominal
we have with
Rejected SAR
no site Rejected
serving the by STEP please research it to better
airport, 11-Apr
cover the airport) 11-Apr 11-Apr
Greenfield
owner Checked
changed his mind on the Rejected
agreed
Nominal
rental
withprice
SAR to
Rejected
30k birr..
by Candidate
SAQ has been dropped 7-Jun 7-Jun
and Confirmed by Jesse on 08-June-22 7-Jun
Greenfield Checked Approved NominalApproved(Reverted
with to Colo) 10-Jun 10-Jun 10-Jun
Sharing Checked Approved Nominal with S Approved
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal
Nominal With candidate
Nominal
NotGreenfield Checked
possible to have ownership documents
Nominaldue
Rejected withtoSAR
ongoing
Rejected
divorce.
by SAQ 11-Apr
Candidate has been dropped and Confirmed by Jesse on11-Apr
08-June-22 11-Apr
Greenfield Checked Rejected Rejected(Due
Nominal with to Flooded area next to river) 9-Jun 9-Jun 9-Jun
Greenfield Checked Approved Nominal with S Approved 17-Aug 17-Aug 17-Aug
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR Rejected(Not
Rejected Rejected by CW
enough space) 11-Feb
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 8-Apr 8-Apr 8-Apr
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal
Nominal With candidate
Nominal
Rooftop checked Approved(After
Nominal withdiscussion
Approved SAR approved
withby
Mulatu
STEP &
RFMelese confirmed on 16-Apr
25-Apr-22) 16-Apr 16-Apr
Nominal Nominal Nominal Nominal Nominal
gh here,I have given assigmnet to jaffar to replanRejected
Greenfield there. Wewith
Nominal need to review
Rejected
SAR duethe
Rejected 2 SAQ
toby siteschange
owner together.
his mind 27-Mar 27-Mar-22 27-Mar-22
Greenfield Checked
Nominal with SAR approved by Nokia RF andApproved
Approved sent for STEP approval 5-Sep 5-Sep 5-Sep
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Rejected
Nominal with SARSpace
Rejected
issuebywith
CW
Space
candidate-A
issue with candidate-A
10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Rejected
Nominal with SAR
Issue
Rejected
with owner
by Issue
SAQfor with
candidate-B
owner for candidate-B
10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Nominal
NotOk,
Approved with
please goSAR
forapproved
Approved(Candidate by has
the location STEP RF
8.118352,
suggested
37.931048
by STEP in
RF)order
12-Apr-22
to have better coverage(As12-Apr-22
per STEP) 12-Apr-22
Greenfield Checked Nominal
NotOk, pleasewith
Rejected SARthe
go for Rejected by STEP
location
Rejected8.118352,
By STEP37.931048 in order
20-Mar-22
to have better coverage(As20-Mar-22
per STEP) 20-Mar-22
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 2/11/2022
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 10/12/2021 13-10-2021 13-10-2021
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Approved
Nominal with SARCandidate
approvedApproved
isbydropped
RF due to ATC option
10/12/2021
with new nominal 13-10-2021 13-10-2021
Greenfield Checked Rejected
Nominal with SARCandidate
Rejected
Out off
is
bydropped
search
RF ringdue to ATC option
10/12/2021
with new nominal 13-10-2021 13-10-2021
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 23-03-2022 23-03-2022 23-03-2022
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with
Candidate-A
SAR Rejected
&Candidate-A
Bby
hasCW
space issue
& B has
for space
GBT issue
12/6/2021
for GBT 6-Dec-21 6-Dec-21
Greenfield Approved
Checked candidate-A
Approved
Rejected
Nominal
& candidate-A
backup-B
with SARwas
Rejected
& dropped
backup-B
by CW
due
wastodropped
space issue
due&tonew
space
12/6/2021
nominal
issue &and
newnew
nominal
searchand new
6-Dec-21
search 6-Dec-21
Greenfield Checked Rejected
Nominal with SAR
Rejected(owner
Rejected by not
SAQ willing for rent) 19-Mar-22 19-Mar-22 19-Mar-22
Greenfield Checked Approved Approved
Nominal with SAR approved by STEP RF 8-Jun 8-Jun 8-Jun
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 10/12/2021 13-10-2021 13-10-2021
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Rooftop
This candidate owner is not willing
Rejected
Nominal with SAR
ThisRejected
candidate
byowner
SAQ is not willing 10/12/2021 13-10-2021 13-10-2021
Rooftop
This candidate owner is not willing
Rejected
Nominal with SAR
ThisRejected
candidate
byowner
SAQ is not willing 10/12/2021 13-10-2021 13-10-2021
Greenfield checked Nominal with
Rejected(Owner
Rejected notSAR Rejected
willing by SAQ
for rent)_Confirmed by Burak on 19-May-2022
19-Mar-22 19-Mar-22 19-Mar-22
Greenfield checked Approved Approved
Nominal with SAR approved by STEP RF 28-May-22 28-May-22 28-May-22
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
has't
Greenfield
enough space it is 9m in one
Rejected
Nominal
directionwith
has't
SARenough
Rejected
space
byitCW
is 9m in one direction 10/12/2021 13-10-2021 13-10-2021
roof top Site
Rooftop
we have been there and it has
Rejected
Nominal
space
roof of
top
with
4.8×3m
Site
SARwe Rejected
have beenbythere
CW and it has space of 4.8×3m
10/12/2021 13-10-2021 13-10-2021
GreenfieldRejected(GVR
Checked private
Rejected
school notNominal
willing to provide full set of LA docs)_confirmed
with 19-Mar-22
by Demian on 23-June-2219-Mar-22 19-Mar-22
Greenfield Checked Approved Nominal with Approved 6-Jul-22 6-Jul-22 6-Jul-22
Nominal Nominal Nominal
Nominal With candidate
Nominal
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 16-Apr 16-Apr 16-Apr
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 2-Apr 2-Apr 2-Apr
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR
Rejected Rejected bytoSTEP
Rejected(Due near with Y1 site) 2-Apr 2-Apr 2-Apr
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 19-Apr 19-Apr 19-Apr
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 17-Mar 17-Mar 17-Mar
Greenfield
Space is not ok to built tower
Rejected
Nominal with SARSpace
Rejected
is not
byok
CWto built tower 11-Feb
Nominal Nominal Nominal
Nominal With candidate
Nominal
Greenfield Checked Nominal
Inter sitewith
Approved SAR approved
distance by
is very near STEP RF candidate has moved in
Approved
(702015 8-Apr
this location_7.550479,37.853044)
8-Apr 8-Apr
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 4-Jan 4-Jan-22 4-Jan-22
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 4-Jan 4-Jan-22 4-Jan-22
Nominal Nominal Nominal
Nominal With candidate
Nominal
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 19-Apr 19-Apr 19-Apr
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SARApproved(Reverted
Approved approved by RF to Colo) 2-Apr 2-Apr 2-Apr
Sharing Checked Nominal with SAR approved by
Approved STEP RF
Approved
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved by
Nominal
Approved
STEP RF
with SAR approved by 29-Mar
STEP RF 29-Mar 29-Mar
Greenfield Checked Rejected
Nominal with SAR Rejected Rejected
by CW
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 25-Mar 3/25/2022 25-Mar-22
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Rooftop Checked Nominal with SARApproved(Back
Approved approved by RFto GF option) 10/12/2021 13-10-2021 13-10-2021
Rooftop Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 10/12/2021 13-10-2021 13-10-2021
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 2/11/2022 13-10-2021 13-10-2021
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF 4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Nominal with SAR RejectedRejected
Rejected by CW 4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 18-May 18-May 18-May
Nominal Nominal Nominal Nominal Nominal
Rooftop
Unable to reach the owner
Rejected
Nominal with SAR Rejected
Unable tobyreach
SAQthe owner 24-Mar 3/24/2022 24-Mar-22
Rooftop Iron roof Rejected
Nominal with SAR RejectedIron
by RF
roof 24-Mar 3/24/2022 24-Mar-22
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 24-Mar 3/24/2022 24-Mar-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 21-Apr 21-Apr 21-Apr
Greenfield Checked Nominal with SARRejected(Owner
Rejected Rejected by SAQrefue the rent) 11-Feb
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 27-Mar 27-Mar-22 27-Mar-22
Greenfield Checked Rejected
Nominal with SAR Rejected
Not Enough
by CW Space 11-Feb
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked NominalApproved(After
with
Approved SAR approved
NotOK, by STEPthe
please discussion
exchange RFrollout
with Melese_27-Mar-22)
year of this site
20-Mar-22
with 704068(As per STEP)20-Mar-22 20-Mar-22
Greenfield Checked Rejected
Nominal with
dueSAR
to space
Rejected
issue
dueby
this
toCW
space
ATC issue
cand this
is dropped
ATC cand 11-Feb
is dropped
Nominal Nominal Nominal
Nominal With candidate
Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 19-Mar-22 19-Mar-22 19-Mar-22
Nominal Nominal Nominal Nominal Nominal
GreenfieldOut off search ring Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 23-Mar 23-Mar-22 23-Mar-22
GreenfieldOut off search ring Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 23-Mar 23-Mar-22 23-Mar-22
Greenfield Checked NominalApproved(After
with
Approved SAR approved
Pending/hold by by STEPwith
discussion
STEP(PendRF itMelese_27-Mar-22)
till jaffar finish the 23-Mar
response to the visit report) 23-Mar-22 23-Mar-22
Greenfield
Rejected due to space issue
Rejected
Nominal with SAR Rejected
Rejected due
by CW
to space issue 23-Mar
Nominal Nominal Nominal Nominal Nominal
Greenfield
Panoramic Photo missing inRejected
0Nominal
dgr with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 24-May 24-May 24-May
Greenfield Checked Nominal with SAR Rejected Rejected
Rejected by CW 11-Feb
Nominal Nominal Nominal Nominal Nominal
Greenfield
This Candidate is blocked by buildings
Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 4-Jan 4-Jan-22 4-Jan-22
Greenfield
Candidate-B & C both are in same
Rejected
Nominal
place with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 4-Jan 4-Jan-22 4-Jan-22
Greenfield
Candidate-B & C both are in same
Rejected
Nominal
place with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 4-Jan 4-Jan-22 4-Jan-22
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal Nominal Nominal
Greenfield
Panoramic Photos are not clear
Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 4-Jan 4-Jan-22 4-Jan-22
Greenfield
Panoramic Photos are not clear
Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Nominal with SAR Rejected Rejected
Rejected by CW 11-Feb
Greenfield Checked Nominal with SARApproved(Reverted
Approved approved by RF to Colo) 12-May 12-May 12-May
Sharing Nominal
Panoramic Photos are not Approved
clear with SAR approved by STEP RF
Approved 4-Jan 4-Jan-22 4-Jan-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Rejected(Due
Candidate A & B toNominal
both are in sameowner
land not
Rejected with
willing
SAR Rejected
for rent_owner
by SAQappointment with school4-Jan
head master not ok) 4-Jan-22 4-Jan-22
Greenfield
Candidate A & B both are in same
Rejected
Nominal
land with SAR Rejected
Same location
by RFas Cand B 4-Jan 4-Jan-22 4-Jan-22
Rooftop Checked Nominal with SAR Approved(reverted
Approved approved by RF to Colo) 19-May 19-May 19-May
Sharing Checked Nominal with SAR approved by
Approved STEP RF
Approved 4-Jan 4-Jan-22 4-Jan-22
Nominal Nominal Nominal Nominal Nominal
Greenfield
All 3 candidates in same land
Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 4-Jan 4-Jan-22 4-Jan-22
Greenfield
All 3 candidates in same land
Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 4-Jan 4-Jan-22 4-Jan-22
Greenfield
All 3 candidates in same land
Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring 4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 19-Apr 19-Apr 19-Apr
Greenfield Checked Nominal with SAR Rejected Rejected
Rejected by CW 11-Feb
Nominal Nominal Nominal Nominal Nominal
Both A & B Candidates are in same
Greenfield Rejected
Nominal
land with SARRejected(Government)
Rejected by SAQ Jun 23 4-Jan 4-Jan-22 4-Jan-22
Both A & B Candidates are in same
Greenfield Rejected
Nominal
land with SAR Rejected
Same location
by RFas Cand B 4-Jan 4-Jan-22 4-Jan-22
Rooftop Checked Approved
Nominal with SARApproved(Reverted
approved by RF to Colo) 23-Jun 23-Jun 23-Jun
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF 4-Jan 4-Jan-22 4-Jan-22
Both A & C Candidates are in same
Greenfield Rejected
Nominal
land with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring
  4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   4-Jan 4-Jan-22 4-Jan-22
Both A & C Candidates are in same
Greenfield Rejected
Nominal
land with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring
  4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Nominal with SAR RejectedRejected
Rejected by CW 11-Feb
GreenfieldOutoff search ring Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 17-Mar 17-Mar-22 17-Mar-22
Greenfield Checked Approved Nominal with S Approved 11-Jun 11-Jun 11-Jun
Rooftop Checked Nominal with SAR
Rejected
Rejected(Owner notRejected
willing tobysign
SAQthe agreement  moureen confirm)
4-Jan 4-Jan-22 4-Jan-22
Greenfield Nominal with SAR Rejected Rejected
Panoramic Photos are not clear
Rejected by SAQ   4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Resubmit
Nominal with SAR RejectedResubmit
by Panoramic
RF Photos are not clear
16-May 16-May 16-May
Greenfield Checked Nominal
Approved
with SAR approved by
Approved
STEP RF 18-Jul 18-Jul 18-Jul
Greenfield
Candidate LAT/LONG mismatch
Approved
Nominal with SAR approvedResubmit
by RF   4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF   4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF   4-Jan 4-Jan-22 4-Jan-22
Rooftop Checked Nominal
Approved
with SAR approved byAppoved
STEP RF   4-Jan 6/11/2022 4-Jan-22 4-Jan-22
by the church andGreenfield Checked
needs government approval Rejected
which
Nominal
is taking
withmuch
SAR Rejected
time and by SAQnot going to be approved12-Apr
likely 12-Apr
.. Candidate has been dropped 12-Apr
and Confirmed by Jesse on 08-June-22
Rooftop Checked Nominal with SAR
Rejected Rejected by SAQ
Rejected(owner not willing for rent)
  4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Nominal with SAR Rejected
Rejected by SAQ
Rejected(government land)   4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 19-May 19-May 19-May
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected(Not
Nominal enough
Rejected with SARspace
Rejected
& government
by CW and new  search ongoing
4-Janfor C) 4-Jan-22 4-Jan-22
Greenfield Checked Rejected(Not
Nominal enough
Rejected with SARspace
Rejected
& government
by CW and new  search ongoing
4-Janfor C) 4-Jan-22 4-Jan-22
Apprved(After
Rooftop discussion Approved
Checked Nominal
with Mulatu
withon
SAR
25-May-22)
approved Need
by STEP
to use
RF 9M RTT and we have already proposed with the same
20-May 20-May 20-May
Nominal Nominal Nominal Nominal Nominal
Greenfield checked Nominal
Approved
with SAR approved byApproved
STEP RF 23-Mar-22 23-Mar-22 23-Mar-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 20-Mar-22 20-Mar-22 20-Mar-22
Greenfield Checked Rejected
Nominal with SAR Rejected
ATC bydropped
RF ATC dropped 11-Feb
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 19-Mar-22 19-Mar-22 19-Mar-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with
Rejected(Owner
SAR Rejected
going
by SAQ
to modify as green
  park) 4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Approved
Nominal with SAR approvedChecked
by RF   4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF  
Greenfield Checked Approved
Nominal with SARApproved(Reverted
approved by RF to Colo)   4-Jan 4-Jan-22 4-Jan-22
Nominal Nominal Nominal Nominal Nominal
Rooftop Rejected(NOK
Checked for
Rejected
Nominal
CW as with
per mail
SARreceived
Rejectedfrom
by CW
Burak_15-Apr-22)
  & new candidate
4-Jan hunt ongoing 4-Jan-22 4-Jan-22
This
Rooftop
Candidate is blocked by buildings
Rejected
Nominal with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring
  4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Rejected
Nominal with SAR Rejected
Rejected by
DueRFto low ISD   22-Jun 22-Jun 22-Jun
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   4-Jan 4-Jan-22 4-Jan-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 19-Mar-22 19-Mar-22 19-Mar-22
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF   4-Jan 4-Jan-22 4-Jan-22
Rooftop Checked Rejected
Nominal Rejected(Rooftop is lengthen
with SAR Rejected by CW and not OK
  for CW) 4-Jan 4-Jan-22 4-Jan-22
Greenfield Approved
Nominal with SAR approved
Nominal withby
SARRF
Approved(Reverted
Rejected by RF to Colo) 29-Apr 29-Apr 29-Apr
Sharing Checked Nominal
Approved
with SAR approved byApproved
STEP RF   4-Jan 4-Jan-22 4-Jan-22
Nominal Nominal Nominal Nominal Nominal
Both A & B Candidates are in same
Greenfield Rejected
Nominal
land with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring
  4-Jan 4-Jan-22 4-Jan-22
Both A & B Candidates are in same
Greenfield Rejected
Nominal
land with Rejected
SAR Rejected
Due to
byOut
RF Of Search Ring
  4-Jan 4-Jan-22 4-Jan-22
GreenfieldOut off search ring Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring 17-Mar 17-Mar-22 17-Mar-22
Greenfield Checked Nominal with SAR Rejected Rejected
Rejected by CW 11-Feb
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 18-May 18-May 18-May
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal Nominal Nominal 10/12/2021 13-10-2021 13-10-2021
Greenfield Checkedreason for newreason
Rejected
Nominal with for
search thenew
SAR search
owner
Rejected the
doesby owner
notSAQ does not have
have willingness willingness
for rent/SAR
10/12/2021for rent/SAR Submitted
Submitted 13-10-2021 13-10-2021
Greenfield Checkedreason for newreason
Rejected
Nominal with for
search thenew
SAR search
owner
Rejected the
doesby owner
notSAQ does not have
have willingness willingness
for rent/SAR
10/12/2021for rent/SAR Submitted
Submitted 13-10-2021 13-10-2021
Greenfield CheckedWe have active
Nominal
Approved candidate-A
with & backup
SAR approved candidate-B
byApproved
STEP RF with in search19-Mar-22
ring, Then why Zegwe has done candidate-C?19-Mar-22
19-Mar-22
Nominal Nominal Nominal Nominal Nominal
it is on lower elevation and can't cover
Greenfield the hospital
Rejected
Nominal it is
with
on SAR
lowerRejected
elevationbyand
RFcan't cover the hospital 27-Mar 27-Mar-22 27-Mar-22
Still elevation
Still elevation
Greenfield not good
notand
good
can't
andcover
can't
the
cover
hospital
Rejected
Nominal the
withhospital(we needbya RF
SAR Rejected candidate near to hospital 16-Apr
and we already gave some location)
16-Apr 16-Apr
Greenfield Checked Nominal with SAR approved by
Approved Approved
STEP RF 17-May 17-May 17-May
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal Nominal Nominal
Greenfield
Nominal with SAR Rejected byNominal
STEP with SAR Rejected by
Rejected STEP
Rejected 29-Mar 29-Mar 29-Mar
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 19-Apr 19-Apr 19-Apr
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   4-Jan 4-Jan-22 4-Jan-22
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR RejectedRejected
Rejected by CW 11-Feb
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 28-Apr 28-Apr 28-Apr
Nominal Nominal Nominal
Nominal With candidate
Nominal
Greenfield Checked Nominal
Approved
with SAR Approved by
Approved
STEP RF 14-Apr 14-Apr 14-Apr
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 2-Apr 2-Apr 2-Apr
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 27-Mar 27-Mar-22 27-Mar-22
Greenfield Checked Rejected
Nominal with SAR Rejected
Not Enough
by CW Space 11-Feb
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected
Nominal with SAR
Rejected(No
Rejectedpossibility
by CW to use crane) 11-Feb
Rooftop Checked Nominal
Approved
with SAR
Approved(but
approved byhas
STEP
to beRF
with 9m RTT) 27-Jun 27-Jun 27-Jun
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 25-Mar 25-Mar-22 25-Mar-22
Greenfield
Rejected due to space issue
Rejected
Nominal with SAR Rejected
Rejected due
by CW
to space issue 25-Mar
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR Rejected(Not
Rejected Rejected by CW
enough space) 11-Feb
Greenfield Checked Nominal
Rejected with SAR
Rejected(can weRejected bybuilding
go for the STEP at 7.550479,37.853044)
8-Apr 8-Apr 8-Apr
Rooftop Checked Rejected
Nominal with SAR RejectedRejected
by RF
All 3 sectors have blocking
28-Apr 28-Apr 28-Apr
Rooftop Checked Nominal
Rejected with SARNokia
Rejected(by Rejected by SSAQ
H and team) confirmed by Demian
18-May 18-May 18-May
Nominal Nominal Nominal Nominal Nominal
Both A & B Candidates are in Approved
Greenfield same
Nominal
land with SAR approvedResubmit
by RF   4-Jan 4-Jan-22 4-Jan-22
Both A & B Candidates are inNominal
Greenfield Approved
same land
with SAR approved byApproved
STEP RF   4-Jan 4-Jan-22 4-Jan-22
Nominal Nominal Nominal Nominal Nominal
Rejected, search
Greenfield Nominal
near to thewith
on the opposite direction, Rejected
Rejected, SARonRejected
university
search by STEP
the opposite direction, near to the university
24-Mar 24-Mar-22 24-Mar-22
Greenfield Checked Nominal with SARApproved(Reverted
Approved approved by RF to Colo) 4-May 4-May 4-May
Greenfield
Due to space issue candidate isRejected
rejected
Nominal withDue
SARtoRejected
space issue
by CW
candidate is rejected 24-Mar
Sharing Checked Nominal with SAR approved by
Approved STEP RF
Approved
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Out off
bysearch
RF ring   17-10-2021   11/17/2021 17-Nov-21
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF   17-10-2021   11/17/2021 17-Nov-21
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 11-Feb-22 11-Feb-22 11-Feb-22
Greenfield Checked Rejected
Nominal with SAR RejectedRejected
by RF 13-Feb 2/13/2022 13-Feb-22
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 12-Jul 12-Jul 12-Jul
Nominal Nominal Nominal Nominal Nominal
Rooftop Nominal
Checked Rejected(As
Rejectedperwith SAR Rejected
Zerihun byRT
on 16-Apr, SAQcandidate inside university
27-Feb
is dropped 2/27/2022 27-Feb-22
Greenfield Checked Approved Appoved(OK,
Nominal with but by
SAR approved antenna height has to be 32m) 30-May
STEP RF 30-May 30-May
Nominal Nominal Nominal Nominal Nominal
Nominal Nominal Nominal Nominal Nominal
rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 9-Mar-2022 9-Mar-22 9-Mar-22
Nominal Nominal Nominal
Nominal With candidate
Nominal
Rooftop Checked Nominal with
Rejected(moved
Rejected to SAR Rejected
wrong bytoSTEP
location provide the intended coverage
2-May
target.) 2-May 2-May
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved
Greenfield
After direct discussion Nominal
Checkedwith mulatu
Approved with approved(Administration
on 23'Mar SAR approved
Approved(RT rejectedbybyRFSTEP) not
Reverted
willingtofor
Colo
middle
18-Mar-22
of the condiminium because
18-Mar-22
they are going
18-Mar-22
to start construction)
Nominal Nominal Nominal
Nominal With candidate
Nominal
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved
Rejected/Not OK,Greenfield
This site is positioned
Checked Nominal
in unpopolated
Rejectedareawith SARtoRejected
better bythe
move it to STEP
populated area(144129)_dropping
18-Mar-22 144063 from Y0 and
18-Mar-22
pull 144129 18-Mar-22
site from Y1
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 11-Mar-2022 11-Mar-2022 11-Mar-2022
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF
Greenfield Checked Approved
Nominal with SAR approvedApproved
by RF 6-Mar-22 6-Mar-22 6-Mar-22
Rooftop Checked REjected
Nominal
Approved
Approved(After
with
by STEP
SARalready
approved
discussion
escalated
by STEP with
to RF
subcon.
MulatuSTEP
on 26-Apr-22)
requested
9-Mar-22
the site in middle of the condominium
9-Mar-22 9-Mar-22
Nominal Nominal Nominal Nominal Nominal
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 12-Mar-22 12-Mar-22 12-Mar-22
Greenfield Checked Nominal withRejected(Due
Rejected SAR Rejected to
bySTEP
CW CW Rejected) 20-Apr-22 20-Apr-22 20-Apr-22
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved
Nominal Nominal Nominal
Nominal With candidate
Nominal
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 22-Apr 22-Apr 22-Apr
Nominal Nominal Nominal Nominal Nominal  
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF   15-Apr 15-Apr 15-Apr
Greenfield Checked Nominal with SAR
Rejected Rejected by SAQ
Rejected(Owner not willing for rent) 5-Apr 5-Apr 5-Apr
Greenfield Checkedhis mind
owner changed Nominal
on leasing
Rejected with
theSAR
land ..
Rejected
Candidate
by SAQ 2-May by Jesse on 08-June-222-May
has been dropped and Confirmed 2-May
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 16-Jun-22 16-Jun-22 16-Jun-22
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 18-Apr 18-Apr 18-Apr
Nominal Nominal Nominal
Nominal With candidate
Nominal
Nominal Nominal Nominal
Nominal With candidate
Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 4-Apr 4-Apr 4-Apr
Nominal Nominal Nominal
Nominal With candidate
Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 6-Apr 6-Apr 6-Apr
Nominal Nominal Nominal Nominal Nominal
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 9-Mar-22
Greenfield Checked Approved
Nominal with SARApproved(Reverted
approved by RF to Colo) 9-Mar-22 9-Mar-22 9-Mar-22
Nominal Nominal Nominal Nominal Nominal
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected by RF Wrong Coordinates 28-Apr
Nominal with SAR RejectedRejected 28-Apr 28-Apr
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved Approved 21-Jun 21-Jun 21-Jun
Rooftop Checked Rejected by RF Out off search ring 10-May
Nominal with SAR RejectedRejected 10-May 10-May
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Rejected Nominal with S Rejected 24-Jun-22 24-Jun-22 24-Jun-22
Nominal Nominal Nominal Nominal Nominal
Nominal Nominal Nominal Nominal Nominal
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 9-May 9-May 9-May
Nominal Nominal Nominal Nominal Nominal
Nominal Nominal Nominal Nominal Nominal
Rooftop Checked Approved
Nominal with SARApproved(Reverted
approved by RF to Colo) 7-May 7-May 7-May
Nominal Nominal Nominal Nominal Nominal
Nominal Nominal Nominal Nominal Nominal
Nominal Nominal Nominal Nominal Nominal
Nominal Nominal Nominal Nominal Nominal
Nominal Nominal Nominal Nominal Nominal
Nominal Nominal Nominal Nominal Nominal
Nominal Nominal Nominal Nominal Nominal
Nominal Nominal Nominal Nominal Nominal
Greenfield CheckedRejected(we
Rejected
Nominal
needwith
candidate
SAR Rejected
in 8.563595,
by RF39).289416 & P2_8.563431,
23-Apr
39.290690 23-Apr 23-Apr
Greenfield Checked Nominal with SAR Rejected by
Rejected STEP
Rejected 21-Apr 21-Apr 21-Apr
Greenfield Checked NominalApproved(After
with SAR approved
Approved by STEPwith
discussion RF Melese_27-Mar-22)
21-Apr 21-Apr 21-Apr
Nominal Nominal Nominal Nominal Nominal
Greenfield Nominalsite
CheckedApproved(Y0
Approvedwithreplacement
SAR approved by STEP
required forRF
this site due to it was 19-May-22
pulled from Y1) 19-May-22 19-May-22
Nominal Nominal Nominal
Nominal With candidate
Nominal
Greenfield Checked Nominal with SAR approved by
Approved STEP RF
Approved 16-May 16-May 16-May
Nominal Nominal Nominal
Nominal With candidate
Nominal
Greenfield Checked Approved Nominal with S Approved 23-May 23-May 23-May
Nominal Nominal Nominal
Nominal With candidate
Nominal
Greenfield Checked Approved
Nominal with SARApproved(Reverted
approved by RF to Colo) 31-May 31-May 31-May
Greenfield Checked Approved
Nominal with SAR approved by RF 31-May 31-May 31-May
Greenfield Checked Approved Approved
Nominal with SAR approved by STEP RF
Nominal Nominal Nominal
Nominal With candidate
Nominal
Nominal Nominal Nominal
Nominal With candidate
Nominal
Greenfield Checked Rejected
Nominal with SAR Rejected
Rejected(Low
by RFElevation) 10-Jun 10-Jun 10-Jun
Greenfield Checked Rejected
Nominal with SAR Rejected
Rejected(Low
by RFElevation) 10-Jun 10-Jun 10-Jun
Greenfield Checked Nominal
Approved
with SAR approved byApproved
STEP RF 12-Jul 12-Jul 12-Jul
Rooftop Checked Rejected
Nominal with SAR
Rejected(Low
Rejected byBH
RFand less space) 8-Jun 8-Jun 8-Jun
Nominal Nominal
Nominal with
Approved SAR approvedApproved
by STEP RF
Nominal Nominal Nominal With No candidate
Nominal Nominal
Nominal Nominal Nominal
Nominal With candidate
Nominal
Nominal Nominal Nominal
Nominal With candidate
Nominal
Rooftop Checked Approved
Nominal with SAR Approved
Approved
by RF 8-Jun 8-Jun 8-Jun
Sharing Checked Approved Approved
Nominal with SAR approved by STEP RF 8-Jun 8-Jun 8-Jun
Rooftop Checked Approved
Nominal with SARApproved(Reverted
approved by RF to Colo) 8-Jun 8-Jun 8-Jun
Nominal Nominal Nominal
Nominal With candidate
Nominal
Approved by
Checked(It's
Rooftop
STEP for MW(Subcon
only for MWneed
notApproved
for
to submit
RF) (Meskel
Nominal with flower
only Txbuilding
site SAR butOnly
theyMW
submitted 16-Apr
another bulding)already requested
16-Aprfor resubmit)
16-Apr
Checked(It's only for MW notApproved
Rooftop for RF)
Approved by STEP
Nominal with forsite
only Tx MW(CMC retail
Only
shop
MW|Gast Mall)
17-May 17-May 17-May
Checked(It's only for MW notApproved
Rooftop Approved
for RF) by STEP
Nominal withfor MW(Japan
only Tx site Tobacco International
Only MW enterprise
17-May) 17-May 17-May
Checked(It's only for MW notApproved
Rooftop for RF) Approved
Nominal by STEP
with only Tx sitefor MW(JemoOnly
retailMW
shop ) 17-May 17-May 17-May
Checked(It's only for MW notApproved
Rooftop for RF)
Approved
Nominal byonly
with STEPTxfor
siteMW(Garad Mall
Onlyretail
MW shop )17-May 17-May 17-May
Rooftop Checked
Rejected(can
Rejected
Nominal
we go with
for better
SARbuilding
Rejectedfor
bybetter
STEPperformance? Like 9.025030,38.824804)
5/30/2022 5/30/2022 5/30/2022
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 6/2/2022 6/2/2022 6/2/2022
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF 6/2/2022 6/2/2022 6/2/2022
Rooftop Checked Rejected
Nominal with Rejected
SAR Rejected
(low BH
by RF
and have shadow) 6/2/2022 6/2/2022 6/2/2022
Rooftop Checked Nominal
Approved
with SAR approved byApproved
STEP RF   2-Jun-22 2-Jun-22 2-Jun-22 2-Jun-22
Rooftop checked Nominal
Approved
with SAR approved by STEP RF 6/2/2022 6/2/2022 6/2/2022
Rooftop Checked Approved
Nominal with SARApproved(Reverted
approved by RF to Colo)   6/3/2022   6/3/2022 6/3/2022
Nominal Nominal Nominal Nominal Nominal          
Rooftop Checked Approved
Nominal with SAR approvedChecked
by RF   22/11/2021      
Rooftop Checked Approved
Nominal with SARApproved(Reverted
SAR Discussion
approved by RF toand
Colo)
approval pending
22/11/2021
with STEP 44239    
Sharing Checked Approved Approved
Nominal with SAR approved by STEP RF   22/11/2021      
Rooftop Checked Nominal with SAR approved by
Approved STEP RF
Approved 6/24/2022 6/24/2022 6/24/2022
Rooftop Checked Rejected
NominalRejected(By
with SAR Rejected
CW confirmed
by CW by Omar on 18-July) 6/24/2022 6/24/2022 6/24/2022
Rooftop Checked Approved
Nominal with SAR approvedApproved
by RF 25-Jun 25-Jun 25-Jun
Nominal Nominal Nominal Nominal Nominal          
Sharing Checked Approved Approved
Nominal with SAR approved by STEP RF        
Nominal Nominal Nominal Nominal Nominal          
Sharing Checked Approved Approved
Nominal with SAR approved by STEP RF        
Nominal Nominal Nominal Nominal Nominal          
Sharing Checked Approved Approved
Nominal with SAR approved by STEP RF        
Nominal Nominal Nominal Nominal Nominal          
Sharing Checked Approved Approved
Nominal with SAR approved by STEP RF        
Nominal Nominal Nominal Nominal Nominal          
Sharing Checked Approved Approved
Nominal with SAR approved by STEP RF        
Nominal Nominal Nominal Nominal Nominal          
Sharing Checked Approved Approved
Nominal with SAR approved by STEP RF        
Nominal Nominal Nominal Nominal
Nominal With No candidate          
Candidate as Candidate
Nokia RF MS 1.2. SAR MS 1.2. SAR MS 1.3. SAR MS 1.4.1. SAR MS 1.4.1. SAR MS 1.4.1. SAR
Received RF Pre- RF Pre- RF Pre-
Part of 14 Site per DPR Name as per Validation by Validation by
Active
list_ATC Convention DPR
Candidate Vendor [ST] Vendor [CM] from[AC]
Vendor Validation by Validation by Validation by
STEP [AC] STEP [ST] STEP [CM]
(X for Colo) Convention
  0 144001_0 Nominal Nominal NA  
  A 144001_A Approved Approved 17-Oct-21 20-May Approved  
B 144001_B Approved Approved 20-Apr-22
23-Apr
C 144001_C Approved Approved 25-Apr-22 Approved
D 144001_D SAR Approved Approved 19-May-22 20-May Approved
  0 144002_0 Nominal Nominal NA  
  A 144002_A Approved Approved 29-Sep-21 22-Nov-21 Approved  
B 144002_B Approved Approved
C 144002_C Approved Approved
D 144002_D SAR Approved Approved 6-Jun-22 7-Jun Approved
  0 149001_0 Nominal Nominal NA  
  A 149001_A Rejected
Block by neighbour buildings
31-Mar  
  B 149001_B Approved Approved 20-Sep-21 1-Feb-22 Approved  
  X 149001_X Approved Approved 20-Sep-21 23-09-2021 Approved Approved
  0 149002_0 Nominal Nominal NA  
  A 149002_A Approved Approved 20-Sep-21 4-Apr-22 Approved Approved
  B 149002_B Approved Approved 20-Sep-21 1-Feb-22 Approved  
  X 149002_X SAR Approved Approved 20-Sep-21 23-09-2021 Approved
  0 147001_0 Nominal Nominal NA  
  A 147001_A Approved Approved 4-Oct-21  
  B 147001_B SAR Approved Approved 4-Oct-21 2-Nov Approved Approved
  0 140001_0 Nominal Nominal    
  A 140001_A Approved Approved   29-Nov-21 Approved  
  B 140001_B Rejected Rejected    
C 140001_C SAR Approved Approved 27-May 8-Jun Approved
  P 140001_P Rejected Rejected
  0 146001_0 Nominal Nominal NA  
  A 146001_A Approved Approved 4-Oct-21  
  B 146001_B Approved Approved 4-Oct-21  
  D 146001_D SAR Approved Approved 4-Oct-21 20-Oct-21 Approved Approved
  0 144003_0 Nominal Nominal    
  A 144003_A Rejected Rejected    
  B 144003_B Rejected Rejected    
C 144003_C Approved Approved
D 144003_D Rejected Rejected
E 144003_E SAR Approved Approved 6-Jan-22 Approved
  0 142001_0 Nominal Nominal    
  A 142001_A SAR Approved Approved 12-Nov-21 22-Nov-21 Approved  
  B 142001_B Approved Approved    
  0 142002_0 Nominal Nominal    
  B 142002_B SAR Approved Approved 29-Oct-21 1-Feb-22 Approved  
  C 142002_C Approved Approved   30-Apr-22 Approved  
  A 146002_A SAR Approved Approved 14-Sep-21 16/Sep/21 Approved  
  B 146002_B Rejected Resubmit 14-Sep-21  
  C 146002_C Approved Approved 14-Sep-21 22-Nov-21 Approved
  D 146002_D Rejected Resubmit 9-Mar-22
  E 146002_E Approved Approved 30-Jun-22 6-Jul-22 Approved Approved
  0 145001_0 Nominal Nominal NA  
  A 145001_A Approved Approved 15-Sep-21 2-Nov Approved Approved
  B 145001_B Approved Approved 15-Sep-21  
  C 145001_C SAR Approved Approved 14-Jun 15-Jun-22 Approved 15-Jun-22
  0 146003_0 Nominal Nominal NA  
  A 146003_A Approved Approved 8-Sep-21 20-Oct-21 Approved Approved
  B 146003_B Approved Approved 8-Sep-21  
  C 146003_C Approved Approved 8-Sep-21  
  0 141002_0 Nominal Nominal NA  
Yes A 141002_A Approved Approved 2-Dec 11-May Rejected  
Yes B 141002_B Approved Approved 2-Dec 11-May Rejected  
C 141002_C Approved Approved 17-May 18-May Approved 17-May-22
D 141002_D SAR Approved Approved 13-Jun 15-Jun Approved 15-Jun-22
  0 141049_0 Nominal Nominal NA  
  A 141049_A SAR Approved Approved 12-Oct-21 15-Jun Approved Approved
  B 141049_B Approved Approved 12-Oct-21
  0 148001_0 Nominal Nominal NA  
  A 148001_A Approved Approved 11-Sep-21 1-Feb-22 Approved  
  B 148001_B Approved Approved 11-Sep-21 6-Apr Approved Approved
  C 148001_C Approved Approved 11-Sep-21  
  X 148001_X Approved Approved 11-Sep-21 17-09-2021 Approved Approved
  0 142003_0 Nominal Nominal    
A 142003_A SAR Approved Approved 19-May 20-May Approved
  B 142003_B Approved Approved   1-Feb-22 Approved  
  C 142003_C Approved Approved    
  X 142003_X Approved Approved   22-Nov-21 Approved  
  A 144005_A SAR Approved Approved 29-Sep-21 22-Nov-21 Approved
  B 144005_B Approved Approved 17-Oct-21  
  C 144005_C Approved Approved 25-Oct-21  
  0 141003_0 Nominal Nominal NA  
  A 141003_A Approved Approved 2-Dec  
  B 141003_B Approved Approved 2-Dec 1-Feb-22 Approved  
  C 141003_C Rejected Rejected 8-Jul-22
  X 141003_X Approved Approved 2-Dec  
  0 144007_0 Nominal Nominal    
A 144007_A SAR Approved Approved 28-Apr 29-Apr Approved
  B 144007_B Approved Approved   26-Feb-22 Approved  
  C 144007_C Approved Approved   11/8/2021 Approved  
  X 144007_X Approved Approved   6/12/2021 Approved  
  0 144008_0 Nominal Nominal NA  
  A 144008_A Approved Approved 19-Sep-21  
  B 144008_B Approved Approved 19-Sep-21  
C 144008_C SAR Approved Approved 28-Dec-21 10-Jan-22 Approved
  0 147002_0 Nominal Nominal    
  A 147002_A Approved Approved    
  B 147002_B Approved Approved    
  P 147002_P EEP Approved Approved 11-Feb-22 Approved
  0 143004_0 Nominal Nominal    
  A 143004_A SAR Approved Approved 15-Oct-21 2-Nov Approved Approved
  B 143004_B Approved Approved 15-Oct-21  
  0 143005_0 Nominal Nominal    
  A 143005_A Approved Approved 15-Oct-21  
  B 143005_B Approved Approved 15-Oct-21  
  C 143005_C Approved Approved 10-Mar-22 15-Mar-22 Approved  
  D 143005_D Approved Approved 1-Jul-22 2-Jun-22 Approved Approved
  X 143005_X Approved Approved 15-Oct-21 20-10-2021 Approved Approved
  0 144009_0 Nominal Nominal    
  A 144009_A Approved Approved   11-Nov-2021 Approved  
  B 144009_B Approved Approved    
C 144009_C Approved Approved 20-May 24-May Rejected
  X 144009_X Approved Approved    
  0 142080_0 Nominal Nominal    
  A 142080_A Rejected Rejected    
  B 142080_B Rejected Rejected   26-Feb-22 Approved  
  C 142080_C Rejected Rejected    
D 142080_D Approved Rejected 15-Apr 19-Apr Rejected
E 142080_E Approved Approved 12-Jul
  X 142080_X Colo Colo    
  0 147003_0 Nominal Nominal    
  B 147003_B Approved Approved    
  C 147003_C Approved Approved    
D 147003_D Rejected Rejected 25-Apr
E 147003_E Approved Approved 25-Apr
F 147003_F Rejected Rejected 25-Apr
  P 147003_P EEP Approved Approved 7-Feb-22 Approved
  0 140002_0 Nominal Nominal    
  A 140002_A Approved Approved    
  B 140002_B Approved Approved   1-Feb-22 Approved  
C 140002_C Approved Approved 31-May 1-Jun Rejected
  0 141050_0 Nominal Nominal    
  A 141050_A Approved Approved    
  B 141050_B Approved Approved    
C 141050_C Approved Approved 24-Dec-21 Approved
D 141050_D SAR Rejected Rejected 4-Jan-22 Approved
  X 141050_X Colo Colo    
  0 140023_0 Nominal Nominal    
  A 140023_A Approved Approved   1-Feb-22 Approved  
  B 140023_B Approved Approved    
C 140023_C SAR Approved Approved 27-Apr 29-Apr Approved
D 140023_D Approved Approved 27-Apr
  0 149006_0 Nominal Nominal NA  
  A 149006_A SAR Approved Approved 20-Sep-21 2-Nov Approved Approved
  B 149006_B Approved Approved 20-Sep-21  
  0 144091_0 Nominal Nominal    
  A 144091_A Approved Approved   11-Nov-2021 Approved
Reverted to Colo GBT
  B 144091_B Approved Approved    
C 144091_C Approved Approved 10-May 11-May Approved
  X 144091_X SAR Approved Approved   6/12/2021 Approved
  0 143057_0 Nominal Nominal    
  A 143057_A Approved Approved 18-Oct-21 2-Nov Approved Approved
  B 143057_B Approved Approved 18-Oct-21  
C 143057_C SAR Approved Approved 30-Apr-22 3-May Approved
E 143057_E Approved Approved
  D 143057_D Approved Approved 21-Mar-22 23-Mar-22 Approved
  0 144010_0 Nominal Nominal    
  A 144010_A Approved Approved   11-Nov-2021 Approved  
B 144010_B Approved Approved 10-May 11-May Rejected
  X 144010_X Approved Approved    
  0 144011_0 Nominal Nominal NA  
  X 144011_X Approved Approved  
  B 144011_B Approved Approved 19-Sep-21  
  A 144011_A Approved Approved 19-Sep-21 11/8/2021 Approved  
  C 144011_C Rejected Rejected 21-Mar-22 23-Mar-22 Approved  
  0 147005_0 Nominal Nominal NA  
  A 147005_A SAR Approved Approved 11-May-21 29-Nov-21 Approved  
  B 147005_B Approved Approved    
  0 144012_0 Nominal Nominal    
  A 144012_A Rejected Rejected   8-Apr Approved  
  B 144012_B Approved Approved    
  C 144012_C Rejected Rejected    
D 144012_D SAR Approved Approved 11-Apr 13-Apr Approved
  0 142005_0 Nominal Nominal    
  A 142005_A SAR Approved Approved 29-Oct-21 29-Nov-21 Approved  
  B 142005_B Approved Approved    
  0 144013_0 Nominal Nominal    
144013_C Rejected Rejected 24-Feb-22 Approved
  A 144013_A Rejected Rejected    
D 144013_D Rejected Rejected 20-May
E 144013_E Rejected Rejected 28-May
F 144013_F Approved Approved 30-Jun-22 Approved Approved
G 144013_G Rejected Rejected 25-Jun 29-Jun-22 Rejected Rejected
  B 144013_B Rejected Rejected   22-Nov-21 Approved  
  0 145002_0 Nominal Nominal NA  
  A 145002_A Approved Approved 15-Sep-21  
  B 145002_B SAR Approved Approved 15-Sep-21 23-Sep-21 Approved
  C 145002_C Approved Approved 15-Sep-21  
T 145002_T Obstruction
Rejected
in 0°  and tapered roof will25-Nov-21
create shadowing
  0 148002_0 Nominal Nominal NA  
  A 148002_A Approved Approved 3-Sep-21 17-09-2021 Approved Approved
  B 148002_B Approved Approved 3-Sep-21  
D 148002_D Approved Approved 5-Jan-22 2-Feb-22 Approved
E 148002_E SAR Approved Approved 3-Mar-22 8-Mar-22 Approved
  C 148002_C Approved Approved  
  0 140003_0 Nominal Nominal    
  A 140003_A Approved Approved 18-Nov-21 26-Feb-22 Approved  
  B 140003_B Approved Approved    
  0 145003_0 Nominal Nominal NA  
  A 145003_A Approved Approved 19-Aug-21  
  B 145003_B Approved Approved 19-Aug-21  
  C 145003_C Approved Approved 19-Aug-21  
  X 145003_X Approved Approved NA 9/23/2021 Approved
  0 143059_0 Nominal Nominal    
  A 143059_A SAR Approved Approved 18-Oct-21 2-Nov Approved Approved
  B 143059_B Approved Approved 18-Oct-21  
  0 147007_0 Nominal Nominal    
  A 147007_A Approved Approved    
  B 147007_B Rejected Rejected   1-Feb-22 Approved  
C 147007_C Approved Approved 26-Apr 27-Apr Rejected
C 147007_D Approved Approved 20-May
E 147007_E SAR Approved Approved 23-May 13-Jun Approved
  X 147007_X Colo Colo    
  0 144014_0 Nominal Nominal    
  A 144014_A Jaffar andRejected
Safaricaon STEP RF appeoved
4-Nov-21
with 9 mtr master
11-Nov-2021 Approved  
  B 144014_B
Mulatu & Abel from safaricom
Rejected
are visited with Jaffar on Mar-29
4-Nov-21
and they agreed with this building  
C 144014_C SAR Approved Approved 30-Mar 31-Mar Approved
  0 147008_0 Nominal Nominal    
  A 147008_A SAR Approved Approved 29-Oct-21 29-Nov-21 Approved  
  0 140004_0 Nominal Nominal    
  A 140004_A Approved Approved   1-Feb-22 Approved  
  B 140004_B Approved Approved    
C 140004_C Approved Approved 27-Apr-22 29-Apr Approved
D 140004_D Approved Approved
  0 142007_0 Nominal Nominal    
  A 142007_A Approved Approved    
  B 142007_B Approved Approved 1-Feb-22 Approved  
C 142007_C SAR Approved Approved 28-Apr-22 29-Apr Approved
D 142007_D SAR Approved Approved 7/6/2022 8-Jul Approved Approved
  0 149003_0 Nominal Nominal NA  
  B 149003_B Approved Approved 20-Sep-21  
  C 149003_C Approved Approved 20-Sep-21 23-Sep-21 Approved Approved
  D 149003_D SAR Approved Approved 7-Jun 8-Jun Approved
  0 149035_0 Nominal Nominal NA  
  A 149035_A Approved Approved 20-Sep-21 1-Feb-22 Approved  
  B 149035_B Out
Rejected
off search ring inter site distance
31-Mar-22
in near  
  X 149035_X Approved Approved 20-Sep-21 20-10-2021 Approved Approved
  0 143069_0 Nominal Nominal    
  A 143069_A Approved Approved    
  B 143069_B SAR Approved Approved 10-Nov-21 12/Nov/21 Approved  
C 143069_C Approved Approved 16-May 17-May Rejected
D 143069_D Rejected Rejected 16-May
E 143069_E Rejected Rejected 16-May
  X 143069_X Approved Approved   11-Nov-2021 Approved  
  0 143008_0 Nominal Nominal NA  
  A 143008_A Approved Approved 13-Dec-21  
  B 143008_B Approved Approved 13-Dec-21 2-Feb-22 Approved  
C 143008_C SAR Approved Approved 7-Apr-22 12-Apr Approved
  0 147010_0 Nominal Nominal NA  
  A 147010_A SAR Approved Approved 23-Sep-21 20-Oct-21 Approved Approved
  B 147010_B Approved Approved 23-Sep-21  
  0 143009_0 Nominal Nominal    
  A 143009_A Approved Approved 18-Oct-21 1-Feb-22 Approved  
  B 143009_B SAR Rejected Rejected 18-Oct-21 4-Apr-22 Approved  
  X 143009_X Approved Approved 18-Oct-21 20-10-2021 Approved
  0 144109_0 Nominal Nominal    
  A 144109_A Rejected Rejected   22-Nov-21 Approved  
C 144109_C Approved Approved 15-Apr 20-Apr Approved
  D 144109_D SAR Approved Approved  
  E 144109_E SAR Approved Approved 8-Jul-22 12-Jul-22 Approved Approved
  B 144109_B Rejected Rejected   4-Apr-22 Rejected  
  0 147058_0 Nominal Nominal    
  A 147058_A Approved Approved 11/29/2021 Approved
Reverted to Colo GBT
  B 147058_B Approved Approved   1-Feb-22 Approved  
C 147058_C SAR Approved Approved 16-Apr-22 20-Apr Approved
  0 144017_0 Nominal Nominal NA  
  A 144017_A Approved Approved 19-Sep-21  
  B 144017_B Approved Approved 19-Sep-21 26-Feb-22 Approved  
C 144017_C Approved Approved 30-Apr-22 3-May Approved
D 144017_D SAR Approved Approved 6-May-22 9-May Approved
  X 144017_X Approved Approved 19-Sep-21 11/8/2021 Cancelled for ATC  
  0 147011_0 Nominal Nominal    
  A 147011_A SAR Approved Approved 12-Nov-21 22-Nov-21 Approved  
  B 147011_B Approved Approved    
  0 147012_0 Nominal Nominal    
  A 147012_A Approved Approved    
  B 147012_B SAR Approved Approved 12-Nov-21 22-Nov-21 Approved  
  0 146005_0 Nominal Nominal NA  
Yes A 146005_A Approved Approved 2-Dec  
Yes B 146005_B Approved Approved 2-Dec 26-Feb-22 Approved  
Yes C 146005_C Approved Approved 2-Dec  
D 146005_D Approved Approved 28-Feb-22 15/Mar/22 Approved
E 146005_E Rejected Rejected 7-May-22
F 146005_F SAR Approved Approved 28-Jun 30/Jun/22 Approved Approved
Yes X 146005_X Approved Approved 2-Dec  
  0 141008_0 Nominal Nominal NA  
  A 141008_A Approved Approved 15-Oct-21  
  B 141008_B Approved Approved 15-Oct-21 1-Feb-22 Approved  
C 141008_C SAR Approved Approved 10-May-22 11-May Approved
  X 141008_X Approved Approved 15-Oct-21 20-10-2021 Approved
  0 143010_0 Nominal Nominal    
  A 143010_A Rejected Rejected 18-Oct-21 4-Apr-22 Approved  
  B 143010_B Rejected Rejected 18-Oct-21 10/19/2021Cancelled for ATC  
C 143010_C Approved Approved 3-May-22 9-May Approved Approved
D 143010_D Rejected Rejected 3-May-22 11-May Rejected
E 143010_E Rejected Rejected 3-May-22 14-May Approved
F 143010_F Approved Approved 24-May-22 25-May Rejected
G 143010_G Rejected Rejected 23-Jul-22 27-Jul Rejected Rejected
  0 142010_0 Nominal Nominal    
  A 142010_A Approved Approved    
  B 142010_B Approved Approved   1-Feb-22 Approved  
C 142010_C Approved Approved 19-May 20-May Approved
D 142010_D SAR Approved Approved 2-Jun Approved
  T 142010_T Rejected Rejected   8-Mar-22 Approved  
  0 143011_0 Nominal Nominal    
  A 143011_A Approved Approved 18-Oct-21 1-Feb-22 Approved  
  B 143011_B Approved Approved 18-Oct-21  
  C 143011_C Rejected Rejected 31-May  
  D 143011_D Rejected Rejected 31-May  
E 143011_E Approved Approved 14-Jun 15-Jun Rejected
F 143011_F Rejected Rejected 14-Jun
H 143011_H Approved Approved 18-Jun 20-Jun-22 Approved Approved
  0 143012_0 Nominal Nominal    
  A 143012_A Approved Approved 15-Oct-21  
  B 143012_B Approved Approved 15-Oct-21 1-Feb-22 Approved  
C 143012_C Rejected Rejected 4-May-22
D 143012_D Rejected Rejected 4-May-22
E 143012_E Approved Approved 7-May-22 9-May Approved
F 143012_F Approved Approved 7-May-22
  X 143012_X Approved Approved 15-Oct-21 20-10-2021 Approved
  0 146006_0 Nominal Nominal    
  A 146006_A SAR Approved Approved 23-Nov-21 14-Jan-22 Approved  
  B 146006_B Approved Approved    
  C 146006_C Approved Approved    
  0 143013_0 Nominal Nominal NA  
  A 143013_A Approved Approved 12/13/2021  
  B 143013_B Approved Approved 12/13/2021 10-Mar-22 Approved  
C 143013_C Approved Approved 4/29/2022
D 143013_D Approved Approved 4/29/2022
E 143013_E Approved Approved 4/29/2022 30-Apr Approved
  0 141009_0 Nominal Nominal NA  
  A 141009_A Approved Approved 19-Aug-21  
  B 141009_B Approved Approved 19-Aug-21  
  C 141009_C Approved Approved 19-Aug-21 20-Oct Approved Approved
D 141009_D Approved Approved 12-Apr-22 13-Apr Approved
C 141009_E Rejected Rejected 21-Apr
C 141009_F Rejected Rejected 21-Apr
H 141009_H SAR Approved Approved 26-Apr 29-Apr Approved
C 141009_G Rejected Rejected 21-Apr
  0 143014_0 Approved Approved    
  A 143014_A Approved Approved   Approved  
  B 143014_B SAR Approved Approved 17-Nov-21 29-Nov-21 Approved  
  C 143014_C Approved Approved    
  0 143015_0 Nominal Nominal NA  
  B 143015_B SAR Approved Approved 4-Oct-21 2-Nov Approved Approved
  C 143015_C Approved Approved 4-Oct-21  
  0 143016_0 Nominal Nominal    
  A 143016_A Approved Approved 15-Oct-21  
  B 143016_B SAR Approved Approved 15-Oct-21 2-Nov Approved Approved
  0 148004_0 Nominal Nominal NA  
  A 148004_A Approved Approved 14-Sep-21 10-Mar-22 Approved  
  B 148004_B Approved Approved 14-Sep-21 1-Feb-22 Approved  
C 148004_C Rejected Rejected 29-Apr-22
D 148004_D SAR Approved Approved 29-Apr-22 9-May Rejected
  X 148004_X Approved Approved 14-Sep-21 17-09-2021 Approved Approved
  0 142011_0 Nominal Nominal  
  A 142011_A SAR Approved Approved 10-Jun 13-Jun Approved  
  B 142011_B Approved Approved 18-Aug-21  
  C 142011_C Rejected Resubmit 18-Aug-21  
  0 144018_0 Nominal Nominal    
A 144018_A SAR Approved Approved  
B 144018_B SAR Approved Approved  
C 144018_C SAR Rejected Rejected 7/12/2022 Approved Approved  
D 144018_D SAR Approved Approved 9/2/2022 Approved Approved Approved
  0 142012_0 Nominal Nominal    
  A 142012_A Rejected Rejected   1-Feb-22 Approved  
  B 142012_B Rejected Rejected    
C 142012_C Rejected Rejected 7-May
  X 142012_X Colo Colo    
  0 142013_0 Nominal Nominal    
  A 142013_A Approved Approved    
  P 142013_P Rejected Rejected    
  B 142013_B Approved Approved   22-Nov-21 Approved  
  C 142013_C SAR Approved Approved 12-Nov-21 22-Nov-21 Approved  
  0 142014_0 Nominal Nominal    
  A 142014_A SAR Approved Approved 29-Nov-21 Approved  
  B 142014_B Approved Approved    
  0 142015_0 Nominal Nominal    
  A 142015_A Approved Approved   1-Feb-22 Approved  
  B 142015_B Approved Approved    
  C 142015_C SAR Approved Approved 23-Apr 25-Apr Approved  
  0 142056_0 Nominal Nominal    
  A 142056_A Approved Approved    
  B 142056_B SAR Approved Approved 12-Nov-21 22-Nov-21 Approved  
  0 146007_0 Nominal Nominal NA  
  A 146007_A Approved Approved 18-Aug-21  
  B 146007_B Approved Approved 18-Aug-21  
  C 146007_C Approved Approved 18-Aug-21  
  D 146007_D Approved Approved 8-Jul-22 11-Jul-22 Approved Approved
  0 144019_0 Nominal Nominal  
  A 144019_A Approved Approved 19-Sep-21 12/6/2021 Approved  
C 144019_C Approved Approved 4-May 11-May Rejected
D 144019_D Rejected Approved 14-May 16-May Rejected
E 144019_E Approved Approved 13-Jul 18-Jul Approved Approved
  B 144019_B Approved Approved 19-Sep-21
  0 143019_0 Nominal Nominal    
  A 143019_A Approved Approved 15-Oct-21 10-May Approved  
  B 143019_B Approved Approved 15-Oct-21  
C 143019_C Rejected Rejected 4-May-22
D 143019_D Rejected Rejected 4-May-22
E 143019_E Rejected Rejected 9-May-22
F 143019_F Approved Approved 16-Jun 17-Jun-22 Approved Approved
  X 143019_X Approved Approved 15-Oct-21 20-10-2021 Approved Approved
  0 142016_0 Nominal Nominal    
  A 142016_A Approved Approved    
  B 142016_B Approved Approved    
D 142016_D SAR Approved Approved 26-Dec-21 Approved
  0 141010_0 Nominal Nominal NA  
  A 141010_A SAR Approved Approved 12-Oct-21 26-Dec-21 Approved  
  B 141010_B Approved Approved 12-Oct-21  
  0 149008_0 Nominal Nominal NA  
  A 149008_A Rejected Rejected 20-Sep-21 12/6/2021 Rejected  
  B 149008_B Approved Approved 20-Sep-21  
  C 149008_C Rejected Rejected 1-Jul-22 2-Jun-22 Approved Approved
  D 149008_D Approved Approved 11-Aug-22 12-Aug-22
  0 141012_0 Nominal Nominal NA  
  B 141012_B Approved Approved 15-Oct-21 17/Oct/21 Approved  
  C 141012_C Approved Approved 15-Oct-21  
D 141012_D Rejected Rejected 10-May-22
E 141012_E SAR Approved Approved 19-May-22 20-May Approved
  X 141012_X Approved Approved 15-Oct-21 20-10-2021 Approved Approved
  0 141014_0 Nominal Nominal  
  X 141014_X Approved Approved 22-Aug-21  
  A 141014_A Approved Approved 22-Aug-21  
  B 141014_B Approved Approved 22-Aug-21  
  C 141014_C Approved Approved 22-Aug-21 6-Jun-22 Approved  
  0 146008_0 Nominal Nominal    
A 146008_A Rejected Rejected 12-Apr
B 146008_B Rejected Rejected 16-Apr
C 146008_C Rejected Rejected 25-Apr
D 146008_D Approved Approved 5-Aug 5-Aug Approved Approved
  0 144141_0 Nominal Nominal NA  
  A 144141_A Rejected Rejected 5-Sep-21 2-Nov Approved Approved
  B 144141_B Approved Approved 22-Jul-22 23-09-2021 Approved Approved
  C 144141_C Approved Approved 5-Sep-21  
  D 144141_D Approved Approved 31-Aug-22 2-Sep-22 Approved Approved
  0 141015_0 Nominal Nominal NA  
  A 141015_A Approved Approved 15-Oct-21  
  B 141015_B Approved Approved 15-Oct-21 26-Feb-22 Approved  
C 141015_C SAR Approved Approved 2-May-22 13-Jun Approved
  0 141054_0 Nominal Nominal    
  A 141054_A Rejected Rejected   26-Apr-22 Approved  
  B 141054_B SAR Approved Approved 26-Apr-22 26-Apr-22 Approved  
  P 141054_P EEP Approved Approved   9-Feb-22 Approved  
  0 141016_0 Nominal Nominal NA  
  A 141016_A Approved Approved 2-Dec  
  B 141016_B SAR Rejected Rejected 2-Dec 1-Feb-22 Approved  
  X 141016_X Approved Approved 2-Dec  
  0 141017_0 Nominal Nominal NA  
  A 141017_A Approved Approved 15-Oct-21 8-Apr Approved  
  B 141017_B Approved Approved 15-Oct-21 1-Feb-22 Approved  
C 141017_C SAR Approved Approved 30-Apr-22 3-May Approved
  0 141018_0 Nominal Nominal NA  
  A 141018_A SAR Approved Approved 15-Oct-21 2-Nov Approved Approved
  B 141018_B Approved Approved 15-Oct-21  
  0 141020_0 Nominal Nominal NA  
  A 141020_A Approved Approved 23-Aug-21 20-Oct-21 Approved Approved
  B 141020_B Approved Approved 23-Aug-21  
D 141020_D SAR Approved Approved 29-Apr-22 30-Apr Approved
  C 141020_C Approved Approved 23-Aug-21  
  0 141021_0 Nominal Nominal NA  
  A 141021_A SAR Approved Approved 15-Oct-21 2-Nov Approved Approved
  B 141021_B Approved Approved 15-Oct-21  
  0 141022_0 Nominal Nominal NA  
  A 141022_A Rejected Rejected 23-Aug-21 20-Oct-21 Rejecetd Rejected
  B 141022_B Approved Approved 22-Jul-22 22-Jul-22 Approved Approved
  C 141022_C Approved Approved 23-Aug-21  
  D 141022_D Approved Approved 11-Aug-22 8/12/2022  
  0 144021_0 Nominal Nominal    
  A 144021_A Approved Approved    
  B 144021_B SAR Approved Approved 4-Nov-21 24-Feb-22 Approved  
  C 144021_C Approved Approved    
D 144021_D Approved Approved 5-Jan-22
  0 141057_0 Nominal Nominal NA  
  A 141057_A Rejected Rejected 12-Oct-21 2-Nov Approved
  B 141057_B Approved Approved 12-Oct-21  
  C 141057_C Approved Approved 13-Apr-22 18-Apr Approved Approved
D 141057_D SAR Approved Approved 28-Apr-22 29-Apr Approved
E 141057_E Approved Approved 2-May-22
  0 141025_0 Nominal Nominal NA  
  A 141025_A Approved Approved 12-Oct-21  
  B 141025_B Approved Approved 12-Oct-21  
C 141025_C SAR Approved Approved 11-Jan-22 Approved
  0 141026_0 Nominal Nominal NA  
  A 141026_A Approved Approved 15-Oct-21  
141026_C Approved Approved 30-Dec-21 11-Jan-22 Approved
  X 141026_X Approved Approved 15-Oct-21 20-10-2021 Approved Approved
  0 144022_0 Nominal Nominal    
  A 144022_A SAR Approved Approved 13-Nov-21 22-Nov-21 Approved  
  0 142017_0 Nominal Nominal    
  A 142017_A Approved Approved 2-Dec  
142017_C Rejected Out off search ring30-Dec-21
D 142017_D Approved Approved 4-Jan-22 15-Jan-22 Approved
142017_E Rejected Rejected 25-Jan-22
142017_F Approved Approved 6-Jul 8-Jul-22 Approved Approved
  B 142017_B Approved Approved 2-Dec  
  0 142018_0 Nominal Nominal    
  A 142018_A Rejected Rejected   1-Feb-22 Approved  
  B 142018_B Rejected Rejected    
C 142018_C SAR Approved Approved 23-May 24-May Approved
  0 145005_0 Nominal Nominal NA  
  A 145005_A Approved Approved 15-Sep-21 23-Sep-21 Approved Cancelled for ATC
  B 145005_B Approved Approved 15-Sep-21 21-Mar-22 Approved  
  C 145005_C Approved Approved 15-Sep-21  
  D 145005_D SAR Rejected Rejected 14-May 16-May Approved  
  E 145005_E SAR Approved Approved 15-Jul 18-Jul Approved Approved
  0 149009_0 Nominal Nominal NA  
  A 149009_A Approved Approved 6-Sep-21 23-Sep-21 Approved Approved
  B 149009_B Approved Approved 6-Sep-21  
D 149009_D Approved Approved 29-Apr-22 30-Apr Approved
  E 149009_E Approved Approved 1-Jul-22 2-Jul-22 Rejected Rejected
  C 149009_C Approved Approved 9-Sep-21 26-Apr-22 Approved  
  0 142019_0 Nominal Nominal    
  A 142019_A Rejected Rejected 12-Nov-21 1-Feb-22 Rejected  
  B 142019_B Approved Approved    
  C 142019_C SAR Approved Approved 6/30/2022 2-Jul-22 Approved Approved
  0 142020_0 Nominal Nominal    
  A 142020_A Approved Approved    
  B 142020_B Rejected Rejected 12-Nov-21 22-Nov-21 Approved  
  C 142020_C SAR Approved Approved 7/7/2022 11-Jul-22 Approved Approved
  0 142021_0 Nominal Nominal    
  A 142021_A Approved Approved    
  B 142021_B SAR Approved Approved 12-Feb-21 29-Nov-21 Approved  
  0 146009_0 Nominal Nominal NA  
  A 146009_A Approved Approved 25-Sep-21 4-Apr-22 Approved  
  B 146009_B Approved Approved 25-Sep-21 12/6/2021 Approved  
C 146009_C SAR Approved Approved 27-Apr-22 29-Apr Approved
  D 146009_D Rejected Rejected 14-Apr
  0 142022_0 Nominal Nominal    
  A 142022_A Rejected Rejected    
  B 142022_B Approved Approved    
Resubmit Resubmit
D 142022_D Approved Approved 2-Aug-22 4-Aug-22 Approved Approved
  P 142022_P EEP Approved Approved 8-Feb-22 Approved
  0 144023_0 Nominal Nominal NA  
  A 144023_A Approved Approved 19-Sep-21 11/8/2021 Approved  
  B 144023_B Approved Approved 19-Sep-21  
C 144023_C SAR Approved Approved 6-May-22 9-May Approved 18-May-22
  X 144023_X Approved Approved 19-Sep-21  
  0 146010_0 Nominal Nominal NA  
  A 146010_A Approved Approved 10-Sep-21  
  B 146010_B Approved Approved 10-Sep-21  
  C 146010_C SAR Approved Approved 10-Sep-21 1-Feb-22 Approved  
  0 146011_0 Nominal Nominal NA  
  A 146011_A Approved Approved 4-Oct-21  
  B 146011_B Approved Approved 4-Oct-21 1-Feb-22 Approved  
C 146011_C Rejected
Rejected Due to Out Of Search
29-Mar
Ring 30-Mar Rejected
D 146011_D Approved Approved 14-Apr 14-Apr Approved
  X 146011_X SAR Approved Approved 4-Oct-21 20-10-2021 Approved Approved
  0 148005_0 Nominal Nominal NA  
  A 148005_A Approved Approved 16-Sep-21 2-Nov Approved Approved
  B 148005_B Approved Approved 16-Sep-21 4-Apr-22 Rejected  
  X 148005_X Approved Approved 16-Sep-21 17-09-2021
  0 146012_0 Nominal Nominal NA  
  A 146012_A Rejected Rejected Due to Colo4-Oct-21  
  B 146012_B Approved Approved 4-Oct-21  
  D 146012_D SAR Approved Approved 20-Mar-22 21-Mar-22 Approved
  0 146013_0 Nominal Nominal NA  
  A 146013_A Approved Approved 13-Sep-21 1-Feb-22 Approved  
  B 146013_B Approved Approved 13-Sep-21  
C 146013_C Approved Approved 15-Apr-22 18-Apr Rejected Rejected
D 146013_D Approved Approved 16-May
  X 146013_X Approved Approved 13-Sep-21 20-10-2021 Approved Approved
  0 146014_0 Nominal Nominal NA  
Yes A 146014_A Rejected Rejected Due to Colo15-Aug-21  
Yes B 146014_B 1st Rejected
sectoor is blocked by own bulding
15-Aug-21
0 to 90  
Yes C 146014_C SAR Approved Approved 6-Jul-22 6-Jul-22 Rejected Rejected
T 146014_T Rejected Rejected 10/Feb/22 Approved
  A 146015_A Rejected Rejected Due to Colo17-Sep-21 1-Feb-22 Approved  
  B 146015_B Rejected Rejected Due to Colo17-Sep-21  
  0 145006_0 Nominal Nominal NA  
  A 145006_A Approved Approved 11-Sep-21 1-Feb-22 Approved  
  B 145006_B Approved Approved 11-Sep-21 2-Jun Approved  
C 145006_C Approved Approved 4/30/2022 3-May Rejected
  X 145006_X SAR Approved Approved 11-Sep-21 23-09-2021 Approved Approved
  0 145007_0 Nominal Nominal NA  
  A 145007_A SAR Approved Approved 15-Sep-21 2-Nov Approved Approved
  B 145007_B Approved Approved 15-Sep-21  
  0 149010_0 Nominal Nominal NA  
  A 149010_A Approved Approved 6-Sep-21  
  B 149010_B Approved Approved 6-Sep-21 23-Sep-21 Approved Approved
  C 149010_C Approved Approved 6-Sep-21 6-Jun-22 Approved  
  0 148006_0 Nominal Nominal NA  
  A 148006_A Approved Approved 6-Sep-21  
  B 148006_B Approved Approved 14-Sep-21 16/Sep/21 Approved  
  0 148007_0 Nominal Nominal NA  
  A 148007_A SAR Approved Approved 3-Sep-21 17-Sep-21 Approved Approved
  B 148007_B Approved Approved 3-Sep-21  
  A 143020_A Rejected Resubmit 4-Oct-21  
  B 143020_B SAR Approved Approved 4-Oct-21 26-Apr-22 Approved  
  0 142024_0 Nominal Nominal    
  B 142024_B Approved Approved   1-Feb-22 Approved  
  C 142024_C Approved Approved    
  D 142024_D SAR Approved Approved 20-Mar-22 23-Mar-22 Approved  
  0 148008_0 Nominal Nominal NA  
  A 148008_A Approved Approved 5-Sep-21 1-Feb-22 Approved  
  B 148008_B Rejected
Block by own building from31-Mar-22
0 to 150  
  X 148008_X Approved Approved 13-Sep-21 17-09-2021 Approved Approved
  0 149011_0 Nominal Nominal NA  
  A 149011_A Approved Approved 15-Sep-21 23-Sep-21 Approved Approved
  B 149011_B Approved Approved 15-Sep-21 19-Apr-22 Rejected  
  C 149011_C SAR Approved Approved 6-Jun-22 6-Jun-22 Approved
  X 149011_X Approved Approved 15-Sep-21  
  0 140006_0 Nominal Nominal    
  A 140006_A Rejected Rejected   1-Feb-22 Approved  
B 140006_B SAR Approved Approved 19-Apr 20-Apr Approved
C 140006_C Approved Approved 19-Apr
D 140006_D Approved Approved 19-Apr
  0 140007_0 Nominal Nominal    
  A 140007_A Approved Approved    
C 140007_C SAR Approved Approved 20-Apr 20-Apr Approved
  B 140007_B Rejected Rejected   1-Feb-22 Approved  
  0 149012_0 Nominal Nominal NA  
  A 149012_A Approved Approved 1-Feb-22 1-Feb-22 Approved  
  B 149012_B Approved Approved 20-Sep-21 19-Apr-22 Rejected  
C 149012_C SAR Approved Approved 21-Apr-22 26-Apr-22 Approved
  0 140025_0 Nominal Nominal    
  A 140025_A SAR Approved Approved 18-Nov-21 29-Nov-21 Approved  
  B 140025_B Approved Approved    
  0 140008_0 Nominal Nominal    
  A 140008_A Approved Approved 1-Feb-22 Approved
Reverted to Colo GBT
  B 140008_B Rejected Rejected   4-Apr-22 Approved  
  D 140008_D Approved Approved 21-Apr 25-Apr Approved
  X 140008_X SAR Colo Colo   6/12/2021 Approved  
  0 143021_0 Nominal Nominal NA  
  A 143021_A Approved Approved 13-Oct-21  
  B 143021_B SAR Approved Approved 13-Oct-21 20-Oct-21 Approved Approved
  C 143021_C Approved Approved 13-Oct-21  
  0 143022_0 Nominal Nominal NA  
  A 143022_A 2nd
Rejected
sector is blocking by neighbour
3/31/2022
building  
  B 143022_B Approved Approved 12/13/2021  
  C 143022_C Approved Approved 12/13/2021  
D 143022_D Rejected Rejected 7-May-22 9-May-22 Approved
E 143022_E Approved Approved 25-May-22 27-May Approved
  X 143022_X SAR Approved Approved 12/13/2021  
  0 143023_0 Nominal Nominal    
  A 143023_A Approved Approved 18-Oct-21 2-Nov Approved Approved
  B 143023_B Approved Approved 18-Oct-21  
  C 143023_C Approved Approved 24-5-2022 25-May Rejected  
  D 143023_D Approved Approved 6/16/2022 17-Jun Approved Approved
  E 143023_E Rejected Rejected 6/25/2022 29-Jun Rejected Rejected
  0 143024_0 Nominal Nominal    
  A 143024_A Approved Approved    
  B 143024_B Approved Approved    
  C 143024_C SAR Approved Approved   29-Nov-21 Approved  
  0 143025_0 Nominal Nominal    
  A 143025_A Rejected Rejected   26-Feb-22 Approved  
  B 143025_B Rejected Rejected    
  C 143025_C Approved Approved 25-Mar-22 28-Mar-22 Approved  
D 143025_D Approved Approved 29-Apr-22 30-Apr Approved
E 143025_E Approved Approved 29-Apr-22 30-Apr Approved
  X 143025_X SAR Approved Approved   11-Nov-2021 Approved  
  0 148009_0 Nominal Nominal NA  
  A 148009_A SAR Approved Approved 14-Sep-21 1-Feb-22 Approved
  B 148009_B Approved Approved 14-Sep-21  
  0 146016_0 Nominal Nominal NA  
  A 146016_A SAR Approved Approved 3-Dec 21-Feb-22 Approved  
  B 146016_B Approved Approved 3-Dec  
  0 143026_0 Nominal Nominal    
  X 143026_X Colo Colo    
  A 143026_A Approved Approved    
  B 143026_B Rejected Rejected 12-Nov-21 13/Nov/21 Approved  
  C 143026_C SAR Rejected Rejected 2-Aug-22 2/Aug/22 Rejected Rejected
  0 144024_0 Nominal Nominal NA  
  A 144024_A Approved Approved 24-Oct-21 1-Feb-22 Approved  
  B 144024_B Approved Approved 14-Apr
C 144024_C Approved Approved 29-Apr 30-Apr Rejected
D 144024_D Rejected Rejected 10-May
E 144024_E Rejected Rejected 16-Jul
  X 144024_X Approved Approved 24-Oct-21 11/8/2021 Approved  
  0 140010_0 Nominal Nominal    
  A 140010_A Approved Approved 10-Mar-22 10-Mar-22 Approved  
B 140010_B Approved Approved 29-Apr-22
B 140010_D Approved Approved 29-Apr-22
C 140010_C SAR Approved Approved 19-Apr 20-Apr Approved
  0 140011_0 Nominal Nominal    
  A 140011_A Approved Approved    
  B 140011_B Approved Approved   1-Feb-22 Approved  
C 140011_C Approved Approved 29-Apr 9-May Rejected
D 140011_D SAR Approved Approved 11-May 12-May Approved
  0 140012_0 Nominal Nominal    
  A 140012_A Approved Approved   19-Mar-22 Approved  
C 140012_C Approved Approved 5-May 6-May Approved
D 140012_D Approved Approved 5-May
E 140012_E Rejected Rejected
  B 140012_B Approved Approved 29-Nov-21 Approved  
  0 140013_0 Nominal Nominal NA  
  A 140013_A Approved Approved 3-Dec  
C 140013_C SAR Approved Approved 23-May 24-May Approved
  B 140013_B Approved Approved 3-Dec 5/Dec/21 Approved  
  0 140014_0 Nominal Nominal    
  A 140014_A Approved Approved 26-Feb-22 Approved
  B 140014_B Approved Approved    
C 140014_C Approved Approved 7-May 14-Jun Approved
  X 140014_X Approved Approved   6/12/2021 Approved  
  0 140015_0 Nominal Nominal NA  
  A 140015_A Approved Approved    
C 140015_C SAR Approved Approved 4-May 6-May Approved
D 140015_D Approved Approved 4-May
  B 140015_B Approved Approved   20/Nov/21 Approved  
  0 147014_0 Nominal Nominal    
  A 147014_A Approved Approved 29-Nov-21 Approved  
  B 147014_B Approved Approved    
  C 147014_C Approved Approved    
D 147014_D SAR Rejected Rejected 19-Apr 29-Apr Approved
  X 147014_X Colo Colo    
  0 149013_0 Nominal Nominal NA  
  A 149013_A Approved Approved 20-Sep-21  
  B 149013_B Rejected Rejected 20-Sep-21
  C 149013_C SAR Approved Approved 10-Mar-22 14-Mar-22 Approved  
  A 149014_A Approved Approved 23-Sep-21 20-Oct-21 Approved Approved
  B 149014_B Approved Approved 22-Sep-21 26-Apr-22 Approved  
  C 149014_C Approved Approved 22-Sep-21  
D 149014_D SAR Approved Approved 3-May-22 6-May Approved
  T 149014_T Rejected Rejected 25-Nov-21  
  0 147015_0 Nominal Nominal    
  B 147015_B Rejected Rejected 27/Feb/22 Rejected  
  X 147015_X Colo Colo    
  0 146017_0 Nominal Nominal    
A 146017_A Rejected Rejected 8-Apr
B 146017_B SAR Approved Approved 12-Apr 18-Apr Approved Approved
C 146017_C Approved Approved 14-Apr
  0 147016_0 Nominal Nominal NA  
  A 147016_A Approved Approved 4-Oct-21 20-Oct-21 Approved Approved
  B 147016_B Rejected Resubmit 4-Oct-21  
  C 147016_C Approved Approved 4-Oct-21  
  X 147016_X Colo Colo NA  
  0 147017_0 Nominal Nominal    
  A 147017_A Approved Approved    
  B 147017_B SAR Approved Approved 23-Nov-21 29-Nov-21 Approved  
  P 147017_P Rejected Rejected   11-May Rejected  
  0 147018_0 Nominal Nominal    
  X 147018_X Colo Colo    
  A 147018_A Approved Approved    
  B 147018_B Approved Approved 7/22/2022 27-Jul-22 Rejected 27-Jul-22
  C 147018_C SAR Approved Approved 12-Nov-21 22-Nov-21 Approved  
  0 149015_0 Nominal Nominal NA  
  A 149015_A Approved Approved 20-Sep-21  
  B 149015_B Approved Approved 20-Sep-21 20-Oct-21 Approved Approved
  C 149015_C Rejected Rejected 20-Sep-21 31-Mar Approved  
  D 149015_D Rejected Rejected
  X 149015_X Rejected Rejected NA  
  0 147019_0 Nominal Nominal    
  A 147019_A SAR Approved Approved 12-Nov-21 22-Nov-21 Approved
  B 147019_B Approved Approved    
  0 147020_0 Nominal Nominal NA  
  A 147020_A Approved Approved 1-Sep-21  
  B 147020_B Approved Approved 1-Sep-21 18-Feb-22 Approved  
  C 147020_C Approved Approved 1-Sep-21  
  D 147020_D Approved Approved 21-Mar-22 23-Mar-22 Approved  
E 147020_E SAR Approved Approved 6-May-22 9-May Approved
F 147020_F Approved Approved 6-May-22
  0 147021_0 Nominal Nominal    
  X 147021_X Approved Approved 11/29/2021 Approved  
  A 147021_A Approved Approved   26-Feb-22 Approved  
C 147021_C Approved Approved 4-May 6-May Approved
  E 147021_E Approved Approved Approved  
  F 147021_F Approved Approved 13-Jun 14-Jun Approved  
D 147021_D Approved Approved 4-May
  B 147021_B Approved Approved    
  0 147022_0 Nominal Nominal    
  A 147022_A Approved Approved   22-Nov-21 Approved  
  B 147022_B Approved Approved    
  C 147022_C Approved Approved    
T 147022_T SAR Approved Approved 25-Nov-21 6/12/2021 Approved
  0 146018_0 Nominal Nominal NA  
  A 146018_A SAR Approved Approved 6-Oct-21 12-Feb-22 Approved
  B 146018_B Approved Approved 6-Oct-21  
  0 147023_0 Nominal Nominal NA  
  A 147023_A Approved Approved 6-Oct-21 20-Oct-21 Approved Approved
  B 147023_B Approved Approved 6-Oct-21  
  C 147023_C Approved Approved 6-Oct-21  
  D 147023_D SAR Approved Approved 8-Jun 9-Jun Approved  
  0 144025_0 Nominal Nominal    
  A 144025_A Approved Approved   11-Nov-2021 Approved  
  B 144025_B Rejected Rejected 16-Apr 18-Apr Approved Approved
  C 144025_C Rejected Rejected  
  D 144025_D Approved Approved  
  E 144025_E Approved Approved 18-Aug-22 18-Aug-22 Approved
  0 144026_0 Nominal Nominal    
  A 144026_A Approved Approved   1-Feb-22 Approved  
  B 144026_B Approved Approved    
  X 144026_X Approved Approved   11-Nov-2021 Approved  
  A 144027_A Approved Approved 3-Oct-21 19-10-2021
  B 144027_B Approved Approved 3-Oct-21  
  C 144027_C Approved Approved 3-Oct-21 22-Nov-21 Approved  
D 144027_D Rejected Rejected 2-May-22 3-May Rejected
E 144027_E Rejected Rejected 16-Jun-22 17-Jun Rejected Rejected
F 144027_F Approved Approved 1-Jul-22 2-Jul Approved
G 144027_G Approved Approved
H 144027_H Approved Approved 9-Aug-22 10-Aug Approved Approved
  A 144029_A Approved Approved   11-Nov-2021 Approved  
  B 144029_B   Approved Approved 7-Jun 8-Jun Rejected
  C 144029_C Approved Approved 13-Jun 14-Jun Approved
T 144029_T Rejected Rejected
P 144029_P EEP Approved Approved 19-Mar-22 Approved
  0 144030_0 Nominal Nominal NA  
  A 144030_A Approved Approved 17-Mar-22 26/Mar/22 Rejected  
  X 144030_X Approved Approved 17-Mar-22 26/Mar/22  
  C 144030_C SAR Approved Approved
  B 144030_B Rejected Rejected 24-Oct-21 11/8/2021 Rejected  
  0 144031_0 Nominal Nominal    
  A 144031_A Approved Approved    
  B 144031_B Rejected Rejecetd   11-Nov-2021 Approved  
  T 144031_T SAR Approved Approved 9-Jun-22 10-Jun Approved
  0 144032_0 Nominal Nominal NA  
  A 144032_A Approved Approved 19-Sep-21 8-Nov-21 Approved  
C 144032_C Rejected Rejected 23-May-22
  B 144032_B SAR Approved Approved 28-May 8-Jun Approved  
  0 144033_0 Nominal Nominal    
  A 144033_A Approved Approved   1-Feb-22 Approved  
  B 144033_B Approved Approved    
  X 144033_X Approved Approved   11-Nov-2021 Approved  
  0 146019_0 Nominal Nominal NA  
  A 146019_A SAR Approved Approved 17-Sep-21 20-Oct-21 Approved Approved
  B 146019_B Approved Approved 17-Sep-21  
  C 146019_C Approved Approved 17-Sep-21  
  0 144034_0 Nominal Nominal NA  
  A 144034_A Approved Approved 19-Sep-21 1-Feb-22 Approved  
  B 144034_B Approved Approved 19-Sep-21  
  C 144034_C SAR Approved Approved 14-Apr 18-Apr Approved Approved
  0 144035_0 Nominal Nominal    
  A 144035_A Approved Approved   11-Nov-2021 Approved  
  B 144035_B Approved Approved    
C 144035_C Rejected Rejected 10-May
D 144035_D Approved Approved 10-Jun 10-Jun Approved
  X 144035_X Approved Approved    
  0 143027_0 Nominal Nominal    
  A 143027_A Rejected Rejected 10-Nov-21 26-Feb-22 Approved  
  B 143027_B Approved Approved    
  C 143027_C SAR Approved Approved 18-Jun-22 20-Jun-22 Approved Approved
  X 143027_X Approved Approved   11-Nov-2021 Approved  
  0 143028_0 Nominal Nominal    
  A 143028_A Approved Approved    
  B 143028_B Rejected Rejected    
  C 143028_C SAR Approved Approved 4-Mar-22 7-Mar-22 Approved  
  0 145008_0 Nominal Nominal NA  
  A 145008_A SAR Approved Approved 15-Sep-21 2-Nov Approved Approved
  C 145008_C Approved Approved 15-Sep-21  
  0 143062_0 Nominal Nominal    
  A 143062_A Approved Approved 15-Oct-21  
  B 143062_B Approved Approved 15-Oct-21 16-May Approved  
  C 143062_C SAR Approved Approved 14-5-2022 18-May Approved  
  0 143029_0 Nominal Nominal    
  A 143029_A Approved Approved 18-Oct-21  
  B 143029_B SAR Approved Approved 18-Oct-21 2-Nov Approved Approved
  0 143030_0 Nominal Nominal    
  A 143030_A Approved Approved 18-Oct-21  
  B 143030_B Approved Approved 18-Oct-21 1-Feb-22 Approved  
C 143030_C SAR Approved Approved 3-May 6-May Approved
  0 144037_0 Nominal Nominal    
  A 144037_A Approved Approved   11-Nov-2021 Approved  
  B 144037_B Approved Approved    
C 144037_C Approved Approved 28-May 1/6/2022 Rejected
D 144037_D Approved Approved 3-Jan-22
F 144037_F SAR Approved Approved 10-Jun 13-Jun Approved
144037_E Approved Approved 20/Jan/22 Approved
  0 144038_0 Nominal Nominal    
  A 144038_A Approved Approved    
  B 144038_B SAR Rejected Rejected 4-Nov-21 11-Nov-2021 Approved  
  X 144038_X Approved Approved    
  A 146020_A Approved Approved 6-Oct-21 8-Nov-21 Approved  
  B Rejected due to sectorRejected
146020_B block and it was already escalated with subcon for re-hunting
31-Mar-22  
C 146020_C Rejected Rejected
  0 146021_0 Nominal Nominal NA  
  A 146021_A Approved Approved 29-Sep-21  
C 146021_C SAR Approved Approved 6-May-22 15-Jun Approved 15-Jun-22
D 146021_D Approved Approved 6-Jun-22 8-Jun Rejected
E 146021_E Approved Approved 13-Jun-22 13-Jun Rejected
  B 146021_B Approved Approved 29-Sep-21 12/6/2021 Approved  
  A 144039_A Approved Approved 1-Aug-22 1-Aug-22 Approved  
  B 144039_B Approved Approved    
  C 144039_C Rejected Rejected  
  D 144039_D SAR Approved Approved 6/28/2022 30-Jun-22 Rejected Rejected
T 144039_T Approved Approved
  0 144040_0 Nominal Nominal NA  
  A 144040_A Approved Approved 19-Sep-21 12/6/2021 Approved  
C 144040_C SAR Approved Approved 6-May-22 9-May Approved 18-May-22
  B 144040_B Approved Approved 19-Sep-21 25-Apr Approved  
  0 146022_0 Nominal Nominal NA  
  A 146022_A SAR Approved Approved 25-Sep-21 1-Feb-22 Approved
  0 142025_0 Nominal Nominal    
  A 142025_A Rejected Rejected   8-Apr Approved  
C 142025_C SAR Approved Approved 25-Apr-22 27-Apr Approved
  B 142025_B Rejected Rejected   14-Jan-22 Approved  
  0 144041_0 Nominal Nominal NA  
  A 144041_A SAR Approved Approved 19-Sep-21 11/8/2021 Approved
  B 144041_B Approved Approved 19-Sep-21  
  0 146023_0 Nominal Nominal NA  
  A 146023_A Approved Approved 25-Sep-21 20-10-2021 Approved Approved
  B 146023_B Approved Approved 25-Sep-21 20-Oct-21 Approved  
  C 146023_C SAR Approved Approved 6/30/2022 2-Jul-22 Approved Approved
  0 145009_0 Nominal Nominal NA  
  B 145009_B SAR Approved Approved 18-Sep-21 23-Sep-21 Approved  
  A 145009_A Approved Approved 14-Sep-21 2-NovCancelled for colo
Cancelled
GBT for colo GBT
  C 145009_C Approved Approved 18-Sep-21  
  0 143031_0 Nominal Nominal    
  A 143031_A SAR Rejected Rejected 15-Oct-21 2-Nov Approved Approved
  B 143031_B Approved Approved 15-Oct-21  
  C 143031_C SAR Approved Approved 7/6/2022 8-Jul-22 Hold Hold
  X 143031_X Approved Approved 15-Oct-21 19-10-2021 Cancelled Cancelled
  0 143032_0 Nominal Nominal    
  A 143032_A Approved Approved 18-Oct-21  
  B 143032_B Approved Approved 18-Oct-21  
  D 143032_D SAR Approved Approved 18-Mar-22 19-Mar-22 Approved  
  0 142026_0 Nominal Nominal    
  X 142026_X Approved Approved    
  A 142026_A Rejected Rejected   14-Jan-22 Approved  
C 142026_C Rejected Rejected 13-May
D 142026_D Approved Approved 20-May 24-May Approved
  E 142026_E Approved Approved 6-Jun 6-Jun Approved  
  F 142026_F Approved Approved 12-Jan 13-Jun Hold  
  B 142026_B Rejected Rejected    
  0 143034_0 Nominal Nominal    
  X 143034_X Approved Approved    
  A 143034_A Approved Approved    
  B 143034_B Rejected Rejected   1-Feb-22 Approved  
  C 143034_C SAR Rejected Rejected 1-Jun-22 2-Jun Approved  
  0 147024_0 Nominal Nominal    
  A 147024_A SAR Approved Approved   26-Feb-22 Approved  
  B 147024_B Approved Approved    
  0 147025_0 Nominal Nominal    
  A 147025_A Approved Approved    
  B 147025_B SAR Approved Approved 12-Nov-21 22-Nov-21 Approved  
  0 147026_0 Nominal Nominal    
  X 147026_X Colo Colo    
  A 147026_A Rejected Rejected    
C 147026_C Approved Approved 3-May 6-May Rejected
  B 147026_B Out
Rejected
off search ring inter site distance
31-Mar
in near  
  0 140016_0 Nominal Nominal NA  
  A 140016_A Approved Approved 4-Oct-21  
  B 140016_B SAR Approved Approved 4-Oct-21 20-Oct-21 Approved Approved
  C 140016_C Rejected Resubmit 4-Oct-21  
  0 141027_0 Nominal Nominal NA  
  A 141027_A Rejected Resubmit 12-Oct-21 22-Nov-21 Approved  
  B 141027_B Approved Approved 12-Oct-21  
D 141027_D SAR Approved Approved 28-Apr-22 29-Apr Approved
  C 141027_C Approved Approved 12-Oct-21  
  0 145010_0 Nominal Nominal NA  
  A 145010_A Approved Approved 15-Sep-21  
  B 145010_B SAR Rejected Rejected 15-Sep-21 23-Sep-21 Approved Approved
  0 146024_0 Nominal Nominal NA  
  A 146024_A SAR Approved Approved 29-Sep-21 22-Nov-21 Approved Under review
  B 146024_B Approved Approved 29-Sep-21  
  C 146024_C Approved Approved 29-Sep-21  
  0 146025_0 Nominal Nominal NA  
  A 146025_A Rejected Resubmit 29-Sep-21  
  B 146025_B SAR Approved Approved 29-Sep-21 20-Oct-21 Approved Approved
  C 146025_C Rejected Resubmit 29-Sep-21  
  0 146026_0 Nominal Nominal NA  
  A 146026_A Approved Approved 29-Sep-21  
  B 146026_B Approved Approved 29-Sep-21  
  C 146026_C Approved Approved 29-Sep-21 22-Nov-21 Approved Under review
D 146026_D SAR Approved Approved 28-02-2022 2-Mar-22 Approved
  0 146046_0 Nominal Nominal    
A 146046_A SAR Approved Approved 9-May 10-May Approved
  B 146046_B Rejected Rejected    
  C 146046_C Rejected Rejected    
  D 146046_D Rejected Rejected   4/Mar/22 Rejected  
  E 146046_E Rejected Rejected    
  F 146046_F Approved Approved 2-Aug-22 2-Aug-22 Approved Approved
  0 144101_0 Nominal Nominal    
  A 144101_A Rejected Rejected   1-Feb-22 Approved  
C 144101_C SAR Approved Approved 26-May 27-May Approved
  B 144101_B Rejected Rejected 21-Apr 22-Nov-21 Approved
Reverted to Colo GBT
  0 144042_0 Nominal Nominal    
  X 144042_X Colo Colo   22-Nov-21 Approved  
  A 144042_A Rejected Rejected   11-May Rejected  
  B 144042_B Rejected Rejected 7-Jun 8-Jun Rejected
  0 144043_0 Nominal Nominal NA  
  A 144043_A Approved Approved 3-Dec 5/Dec/21 Approved  
  B 144043_B Approved Approved 3-Dec  
C 144043_C Rejected Rejected 20-Apr 20-Apr Rejected
D 144043_D SAR Approved Approved 15-Jul 18-Jul Approved Approved
  0 144044_0 Nominal Nominal NA  
  A 144044_A Approved Approved 6-Oct-21 26-Feb-22 Approved  
B 144044_B Approved Approved 6-Jun-22
C 144044_C SAR Approved Approved 6/9/2022 10-Jun Approved
  0 144046_0 Nominal Nominal    
  A 144046_A Rejected Rejected 5-Nov-21 11-Nov-2021 Rejected  
  B 144046_B Approved Approved    
  C 144046_C Approved Approved    
  0 141029_0 Nominal Nominal NA  
  A 141029_A Rejected Rejected 22-Aug-21 20-Oct-21 Rejected Rejected
  B 141029_B Approved Approved 22-Aug-21  
  X 141029_X Approved Approved 22-Aug-21  
  C 141029_C Approved Approved 22-Aug-21  
  0 147028_0 Nominal Nominal    
  X 147028_X Colo Colo   22-Nov-21 Approved  
  A 147028_A Rejected Rejected   1-Feb-22 Approved  
C 147028_C SAR Approved Approved 19-May 20-May Approved
D 147028_D Approved Approved 19-May
  B 147028_B Approved Approved    
  A 141030_A SAR Approved Approved 17-Oct-21 22-Nov-21 Approved  
  B 141030_B Approved Approved 17-Oct-21  
141030_C Approved Approved
  0 141031_0 Nominal Nominal NA  
  A 141031_A Approved Approved  
  C 141031_C Approved Approved  
  B 141031_B SAR Approved Approved 17-Oct-21 29-Nov-21 Approved  
  0 144048_0 Nominal Nominal NA  
  A 144048_A SAR Approved Approved 2-Dec 28-Jan-22 Approved  
  B 144048_B Approved Approved 2-Dec  
  0 141032_0 Nominal Nominal NA  
  A 141032_A Rejected Resubmit 17-Oct-21 11/8/2021 Cancelled for ATC  
  B 141032_B Approved Approved 17-Oct-21  
  C 141032_C SAR Approved Approved 17-Oct-21 26-Feb-22 Approved  
  0 143035_0 Nominal Nominal    
  A 143035_A Approved Approved    
  B 143035_B Approved Approved    
  C 143035_C Approved Approved 17-Nov-21 29-Nov-21 Approved  
D 143035_D Rejected Rejected 21-Apr-22
P 143035_P SAR Approved Approved 19-Apr-22 19-Apr-22 Approved
  0 146047_0 Nominal Nominal    
  A 146047_A Approved Approved 5-Jan-22  
  B 146047_B Approved Approved 5-Jan-22  
  C 146047_C SAR Approved Approved 5-Jan-22 14-Jan-22 Approved  
  0 143038_0 Nominal Nominal    
  A 143038_A Rejected Rejected   24-May Approved  
  B 143038_B Rejected Rejected   26-Feb-22 Approved  
C 143038_C Rejected Rejected 19-May 20-May Rejected
D 143038_D Rejected Rejected 3-Jun 6-Jun Approved
E 143038_E SAR Approved Approved 14-Jun 15-Jun Approved 15-Jun-22
  0 143040_0 Nominal Nominal    
  A 143040_A Rejected Rejected 26-Feb-22 Approved  
  B 143040_B Rejected Rejected    
  C 143040_C Rejected Rejected    
  D 143040_D SAR Approved Approved 26-Mar-22 28-Mar-22 Approved  
  X 143040_X Approved Approved   11/29/2021 Approved  
  0 143041_0 Nominal Nominal NA  
  A 143041_A Approved Approved 1-Oct-21  
B 143041_B Approved Approved
  X 143041_X Approved Approved 11/29/2021 Approved  
  0 140018_0 Nominal Nominal    
  A 140018_A SAR Approved Approved 23-Nov-21 14-Jan-22 Approved  
  B 140018_B Approved Approved    
  0 143042_0 Nominal Nominal NA  
  A 143042_A Rejected Resubmit 23-Aug-21  
  B 143042_B Approved Approved 23-Aug-21 26-Feb-22 Approved  
  C 143042_C Rejected Resubmit 23-Aug-21  
D 143042_D Approved Approved 16-May-22 17-May Approved
E 143042_E SAR Approved Approved 19-May-22 20-May Approved
  0 142029_0 Nominal Nominal    
  A 142029_A Rejected Rejected   14-Jan-22 Approved  
  B 142029_B Approved Approved 21-Dec-21  
C 142029_C SAR Approved Approved 20-Apr-22 20-Apr Approved
D 142029_D Approved Approved 20-Apr-22
  0 143043_0 Nominal Nominal    
  A 143043_A Approved Approved   26-Feb-22 Approved  
  B 143043_B Approved Approved    
C 143043_C Approved Approved 7-May 9-May Approved
  0 145012_0 Nominal Nominal NA  
  A 145012_A SAR Approved Approved 14-Sep-21 2-Nov Approved Approved
  C 145012_C Approved Approved 18-Sep-21  
  0 145013_0 Nominal Nominal NA  
  A 145013_A Approved Approved 11-Sep-21  
  D 145013_D Approved Approved 11-Sep-21 11-May Rejected
  X 145013_X Approved Approved  
  B 145013_B Approved Approved 11-Sep-21  
  C 145013_C Approved Approved 11-Sep-21
  0 144049_0 Nominal Nominal    
  A 144049_A SAR Approved Approved 4-Nov-21 11-Nov-2021 Approved  
  B 144049_B Approved Approved    
  0 146028_0 Nominal Nominal    
A 146028_A Rejected Rejected 8-Apr
B 146028_B Approved Approved 12-Apr
C 146028_C SAR Rejected Rejected 25-Apr 26-Apr-22 Approved
  0 144050_0 Nominal Nominal    
  A 144050_A Approved Approved    
  C 144050_C Rejected Rejected    
  D 144050_D Approved Approved 6-Jul-22 Approved Approved  
  B 144050_B Rejected Rejected 12-Nov-21 22-Nov-21 Rejected  
  0 144051_0 Nominal Nominal    
  A 144051_A SAR Approved Approved 4-Nov-21 11-May Rejected  
C 144051_C Approved Approved 18-May 19-May Approved
  B 144051_B Rejected Resubmit    
  0 144052_0 Nominal Nominal    
  A 144052_A Approved Approved    
  B 144052_B Approved Approved    
C 144052_C Rejected Rejected 12-May 13-May Rejected
D 144052_D Approved Approved
E 144052_E SAR Approved Approved 13-Jun 14-Jun Approved
  0 147030_0 Nominal Nominal    
  X 147030_X Colo Colo    
  A 147030_A Rejected Rejected   26-Feb-22 Approved  
  B 147030_B Approved Approved    
  C 147030_C Approved Approved 18-May 19-May Rejected  
  D 147030_D SAR Approved Approved 30-Jun 2-Jul Approved Approved
  0 144054_0 Nominal Nominal    
  A 144054_A SAR Approved Approved 4-Nov-21 11-Nov-2021 Approved  
  B 144054_B Approved Approved    
  0 141033_0 Nominal Nominal NA  
  A 141033_A Approved Approved 29-Sep-21  
  B 141033_B SAR Rejected Rejected 29-Sep-21 20-Oct-21 Approved Cancelled for ATC
  C 141033_C Approved Approved 29-Sep-21 18-Jul-22 Approved Approved
  0 142030_0 Nominal Nominal    
  A 142030_A Rejected Rejected   26-Feb-22 Approved  
  B 142030_B Approved Approved    
  D 142030_D SAR Approved Approved 19-Mar-22 20-Mar-22 Approved  
  X 142030_X Colo Colo    
  0 142031_0 Nominal Nominal    
  A 142031_A Rejected Rejected 6-Mar-22 8-Mar-22 Rejeceted  
  B 142031_B Approved Approved 22-Jul-22 22-Jul-22 Approved Approved
  0 149018_0 Nominal Nominal NA  
  A 149018_A Approved Approved 6-Sep-21 13-Jun Approved Under review
  B 149018_B SAR Approved Approved 6-Sep-21 22-Nov-21 Approved  
  C 149018_C Approved Approved 6-Sep-21  
  0 149019_0 Nominal Nominal NA  
  A 149019_A SAR Rejected resubmit 20-Sep-21 20-Oct-21 Approved Approved
  B 149019_B Rejected resubmit 20-Sep-21  
  C 149019_C Approved Approved 20-Sep-21 23-Aug-22 Approved Approved
  0 149020_0 Nominal Nominal NA  
  A 149020_A Approved Approved 20-Sep-21  
  B 149020_B Approved Approved 20-Sep-21
  C 149020_C Approved Approved 20-Sep-21  
D 149020_D Approved Approved 10-Mar-22 15-Mar-22 Approved
  E 149020_E Approved Approved 6-Jun 6-Jun-22 Approved  
  F 149020_E Approved Approved 23-Jun
  G 149020_E SAR Approved Approved 23-Jun 27-Jun-22 Approved 27-Jun-22
  0 140019_0 Nominal Nominal    
  A 140019_A Approved Approved 21-Dec-21  
  B 140019_B SAR Rejected Rejected 21-Dec-21 26-Feb-22 Approved
  X 140019_X Colo Colo 21-Dec-21  
  0 149021_0 Nominal Nominal NA  
  A 149021_A SAR Rejected Rejected 20-Sep-21 12/6/2021 Approved  
  B 149021_B Approved Approved 20-Sep-21  
  X 149021_X Approved Approved 20-Sep-21 20-10-2021 Approved
  0 149022_0 Nominal Nominal NA  
  A 149022_A SAR Approved Approved 20-Sep-21 31-Mar Approved 18-May-22
  B 149022_B Approved Approved 20-Sep-21 23-Sep-21 Approved Cancelled for ATC
  0 148010_0 Nominal Nominal NA  
  A 148010_A Approved Approved 10-Sep-21 17-Sep-21 Approved Cancelled for ATC
  B 148010_B Approved Approved 10-Sep-21  
  C 148010_C Approved Approved 10-Sep-21  
X 148010_X Approved Approved
T 148010_T Rejected Rejected
  0 148011_0 Nominal Nominal NA  
  A 148011_A Approved Approved 3-Sep-21 17-09-2021Cancelled for ATC
Cancelled for ATC
  B 148011_B Approved Approved 3-Sep-21  
  C 148011_C Approved Approved 3-Sep-21  
T 148011_T SAR Approved Approved 25-Nov-21 6/12/2021 Approved
  0 145014_0 Nominal Nominal NA  
Yes A 145014_A Approved Approved 15-Aug-21  
  B 145014_B Approved Approved 15-Aug-21  
  T 145014_T SAR Approved Approved 15-Aug-21 23-Sep-21 Approved
  0 149023_0 Nominal Nominal NA  
Yes A 149023_A Rejected Rejected 16-Aug-21 18/Aug/21 Approved  
Yes B 149023_B Approved Approved 16-Aug-21  
Yes C 149023_C SAR Approved Approved 16-Aug-21 13-Jun-22 Approved  
  0 144055_0 Nominal Nominal    
  A 144055_A Rejected Rejected 4-Nov-21 11-Nov-2021 Approved  
  0 144056_0 Nominal Nominal    
  A 144056_A SAR Approved Approved 12-Nov-21 21-Feb-22 Approved  
  B 144056_B Rejected Rejected   22-Nov-21 Rejected  
  0 147031_0 Nominal Nominal    
  A 147031_A Approved Approved   9-Feb-22 Rejected  
  B 147031_B Rejected
Nominal with SAR Rejected
25-02-2022
by RF  
147031_C Approved Approved 25-02-2022
  B 147031_D Approved Approved 25-02-2022  
  E 147031_E Approved Approved 7/6/2022 Hold Hold  
  X 147031_X Colo Colo    
  0 147032_0 Nominal Nominal    
  A 147032_A SAR Approved Approved 21-Dec-21 14-Jan-22 Approved  
  B 147032_B Approved Approved 21-Dec-21  
  0 144057_0 Nominal Nominal  
  A 144057_A Approved Approved    
  B 144057_B Approved Approved 4-Nov-21 1-Feb-22 Approved
  X 144057_X Approved Approved 11-Nov-2021 Approved
  0 142032_0 Nominal Nominal    
  A 142032_A Approved Approved    
  B 142032_B SAR Approved Approved 12-Nov-21 22-Nov-21 Approved  
  0 149024_0 Nominal Nominal NA  
  A 149024_A Approved Approved 20-Sep-21  
  B 149024_B Rejected Rejected NA 26-Feb-22 Approved  
C 149024_C SAR Approved Approved 18-May 25-May Hold
D 149024_D Approved Approved 23-May
E 149024_E Rejected rejected 11-Jun
  X 149024_X Approved Approved 20-Sep-21 23-09-2021 Approved Approved
  0 142033_0 Nominal Nominal    
  A 142033_A Approved Approved    
  B 142033_B SAR Approved Approved 12-Nov-21 22-Nov-21 Approved  
  0 144059_0 Nominal Nominal    
  A 144059_A Approved Approved   11-Nov-2021 Approved  
D 144059_D SAR Approved Approved 1-Mar-22 2/Mar/22 Approved
  0 144105_0 Nominal Nominal    
  A 144105_A Rejected Rejected   13-Apr Rejected  
  B 144105_B Rejected Rejected   22-Nov-21 Approved  
  0 143044_0 Nominal Nominal    
  A 143044_A SAR Approved Approved 2-Dec 26-Feb-22 Approved  
  B 143044_B Approved Approved 2-Dec  
  0 143045_0 Nominal Nominal    
  A 143045_A Approved Approved    
  B 143045_B Approved Approved   29-Nov-21 Approved  
  X 143045_X Rejected Rejected    
  0 143046_0 Nominal Nominal    
  B 143046_B Approved Approved 15-Oct-21 2-Nov Approved Approved
  C 143046_C Approved Approved 15-Oct-21 11-May Rejected  
  D 143046_D SAR Approved Approved 6/30/2022 2-Jul Approved Approved
  X 143046_X Approved Approved 15-Oct-21 19-10-2021 Cancelled Cancelled
  0 143047_0 Nominal Nominal    
  A 143047_A Approved Approved    
  B 143047_B Rejected Rejected   22-Nov-21 Approved  
  C 143047_C SAR Approved Approved 16-Mar-22 19-Mar-22 Approved
  0 145015_0 Nominal Nominal NA  
  X 145015_X Approved Approved 7-Sep-21 23-09-2021 Approved Approved
  A 145015_A SAR Approved Approved 7-Sep-21 1-Feb-22 Approved  
  B 145015_B Approved Approved 7-Sep-21  
  0 148012_0 Nominal Nominal NA  
  X 148012_X Approved Approved 14-Sep-21  
  A 148012_A Approved Approved 14-Sep-21 17-Sep-21 Approved Approved
  0 143078_0 Nominal Nominal    
  A 143078_A SAR Rejected Rejected 18-Oct-21 1-Feb-22 Approved  
  B 143078_B Approved Approved 18-Oct-21  
  X 143078_X Approved Approved 18-Oct-21 20-10-2021 Approved Approved
  0 144060_0 Nominal Nominal    
B 144060_B SAR Approved Approved 02-02-2022 3/Feb/22 Approved
  A 144060_A Approved Approved   22-Nov-21 Approved  
  0 143063_0 Nominal Nominal    
  A 143063_A Approved Approved   21-Mar-22 Approved  
  B 143063_B Approved Approved    
C 143063_C Approved Approved 16-May 17-May Rejected
D 143063_D SAR Rejected Rejected 14-Jul 18-Jul Approved
E 143063_E SAR Approved Approved 22-Jul 18-Jul Approved Approved
P 143063_P Rejected Rejected  
  0 143048_0 Nominal Nominal NA  
  A 143048_A Approved Approved 1-Oct-21 26-Feb-22 Approved  
  B 143048_B SAR Approved Approved 23-Apr 24-May Approved
  0 148013_0 Nominal Nominal NA  
  A 148013_A SAR Approved Approved 16-May 17-May Approved  
  B 148013_B Approved Approved 5-Sep-21  
  C 148013_C Approved Approved 5-Sep-21 17-Sep-21 Approved Cancelled for ATC
  0 145016_0 Nominal Nominal NA  
  A 145016_A SAR Approved Approved 9-Sep-21 2-Nov Approved Approved
  B 145016_B Approved Approved 9-Sep-21  
  0 145017_0 Nominal Nominal NA  
  B 145017_B Approved Approved 7-Sep-21  
  C 145017_C Approved Approved 7-Sep-21 2-Nov Approved
Reverted to Colo GBT
D 145017_D Approved Approved 17-May-22
  X 145017_X SAR Approved Approved 7-Sep-21 6/12/2021 Approved
  0 146029_0 Nominal Nominal    
  A 146029_A Approved Approved 3-Dec  
  B 146029_B Approved Approved 3-Dec 26-Feb-22 Approved  
C 146029_C Approved Approved 1-Jun-22  
D 146029_D Rejected Rejected 27-Jun-22
E 146029_E SAR Approved Approved 28-Jun 30-Jun-22 Approved Approved
  0 146030_0 Nominal Nominal NA  
  A 146030_A Approved Approved 29-Sep-21 1-Feb-22 Approved  
B 146030_B SAR Approved Approved 28-Apr-22 29-Apr Approved
C 146030_C SAR Rejected Rejected
  X 146030_X Approved Approved 29-Sep-21 11/8/2021 Approved  
  0 144061_0 Nominal Nominal    
  A 144061_A Approved Approved   31-Mar Approved  
  B 144061_B Approved Approved   11-Nov-2021 Approved  
C 144061_C Approved Approved 7-Jun Rejected
  X 144061_X Approved Approved    
  0 144062_0 Nominal Nominal    
  A 144062_A SAR Approved Approved 1-Nov-21 11-Nov-2021 Approved Approved
  B 144062_B Approved Approved    
  0 143049_0 Nominal Nominal    
  A 143049_A Approved Approved 18-Oct-21 2-Nov-21 Approved Approved
B 143049_B SAR Approved Approved 18-Oct-21 25-Feb-22 Approved
C 143049_C Approved Approved 5-Jan-22
D 143049_D Rejected
Nominal with SAR Rejected5-Jan-22
by RF
  E 143049_E Approved Approved 44487 20-10-2021 Cancelled Cancelled
  X 140020_X Colo Colo  
  A 140020_A Rejected Rejected   26-Feb-22 Approved  
C 140020_C Approved Approved 5-Apr 7-Apr-22 Approved
  B 140020_B Approved Approved 21-Dec-21  
  0 142034_0 Nominal Nominal    
  A 142034_A Rejected Rejected   1-Feb-22 Approved  
C 142034_C SAR Approved Approved 20-Apr 20-Apr Approved
  B 142034_B Rejected Rejected    
  0 142035_0 Nominal Nominal    
  A 142035_A Rejected Rejected    
  B 142035_B Rejected Rejected    
T 142035_T Rejected
Nominal with SAR Rejected23-Feb-22
by SAQ 26-Feb-22 Approved
D 142035_D SAR Approved Approved 17-Mar-22 19-Mar-22 Approved
  0 142036_0 Nominal Nominal    
  A 142036_A Approved Approved 3-Dec-21  
  B 142036_B Approved Approved 3-Dec-21 26-Feb-22 Approved  
  C 142036_C Approved Approved 6/24/2022  
  D 142036_D Approved Approved  
  X 142036_X SAR Approved Approved 3-Dec-21  
  0 141037_0 Nominal Nominal NA  
  X 141037_X Approved Approved 44486 8/Nov/21 Approved  
  A 141037_A SAR Approved Approved 18-Oct-21 26-Feb-22 Approved  
  0 141038_0 Nominal Nominal NA  
  A 141038_A Approved Approved 8/19/2021  
  B 141038_B Approved Approved 8/19/2021  
  C 141038_C Approved Approved 8/19/2021 26-Feb-22 Approved  
  D 141038_D Rejected Rejected 6/11/2022  
  E 141038_E SAR Approved Approved 7/15/2022 18-Jul-22 Approved Approved
  0 146032_0 Nominal Nominal    
  X 146032_X Colo Colo    
  0 147033_0 Nominal Nominal    
  A 147033_A SAR Approved Approved 24-Nov-21 26-Feb-22 Approved  
  B 147033_B Rejected Rejected   29-Apr Rejected  
  0 143050_0 Nominal Nominal    
  A 143050_A Rejected Rejected   27/Feb/22 Approved  
  B 143050_B Approved Approved    
C 143050_C SAR Approved Approved 25-May 27-May Approved
  0 142039_0 Nominal Nominal    
  A 142039_A Approved Approved   22-Nov-21 Approved
Reverted to Colo GBT
D 142039_D SAR Approved Approved 4-Jan-22 14-Jan-22 Approved
  B 142039_B Approved Approved    
  0 142060_0 Nominal Nominal    
  A 142060_A SAR Approved Approved   14-Jan-22 Approved  
  B 142060_B Approved Approved    
  0 142040_0 Nominal Nominal    
  A 142040_A Approved Approved    
  B 142040_B SAR Approved Approved 12-Nov-21 22-Nov-21 Approved  
  0 142041_0 Nominal Nominal    
  A 142041_A Approved Approved 19-Mar-22 20-Mar-22 Approved  
B 142041_B Approved Approved 30-Apr-22 3-May Approved
C 142041_C SAR Approved Approved 13-May-22 16-May Approved
  0 142042_0 Nominal Nominal    
  A 142042_A Rejected Rejected   8-Apr Approved  
  B 142042_B Rejected Rejected   22-Nov-2021 Approved  
D 142042_D SAR Approved Approved 6/6/2022 7-Jun Approved
  C 142042_C Rejected
Blocking by neighbour buildings
31-Mar  
  0 142043_0 Nominal Nominal    
  A 142043_A SAR Approved Approved 12-Nov-21 22-Nov-2021 Approved  
  B 142043_B Approved Approved 7/22/2022 22-Jul-22 Approved Approved
  C 142043_C Approved Approved 8/10/2022 8/12/2022
  0 147034_0 Nominal Nominal    
  A 147034_A SAR Approved Approved 12-Nov-21 22-Nov-2021 Approved  
  B 147034_B Rejected Rejected    
  0 141040_0 Nominal Nominal    
A 141040_A Approved Approved 13-Apr 20-Apr Approved
B 141040_B SAR Hold Hold 7/14/2022 18-Jul Approved
  X 141040_X Colo Colo   8-Nov-2021 Approved  
  0 147035_0 Nominal Nominal NA  
  A 147035_A Rejected Resubmit 44473  
  B 147035_B SAR Approved Approved 4-Oct-21 20-Oct-2021 Approved Approved
  C 147035_C Rejected Resubmit 44473  
  0 147036_0 Nominal Nominal    
  A 147036_A Rejected Rejected   21-Mar-22 Approved  
  B 147036_B Rejected Rejected   10-Feb-22 Approved  
E 147036_E SAR Approved Approved 6-Jun-22 6-Jun-22 Approved
  C 147036_C Rejected Rejected   6-Jun-22 Approved  
  0 147037_0 Nominal Nominal    
  A 147037_A SAR Approved Approved 1-Dec-21 14-Jan-22 Approved  
  B 147037_B Approved Approved 12/1/2021 4-Apr-22 Approved  
  0 144064_0 Nominal Nominal NA  
  A 144064_A Approved Approved 44424  
  B 144064_B Approved Approved 44424  
  C 144064_C Approved Approved 44424  
X 144064_X Colo Colo Colo
  D 144064_D Approved Approved 9-Mar-22 10-Mar-22 Approved  
  0 147040_0 Nominal Nominal    
  A 147040_A Approved Approved   22/Nov/21 Approved  
  B 147040_B Approved Approved    
P 147040_P EEP Approved Approved   11-Feb-22 Approved  
  0 147063_0 Nominal Nominal    
  A 147063_A Approved Approved 5-Jan-22  
  B 147063_B Approved Approved 5-Jan-22  
D 147063_D Rejected Rejected 25-Feb-22 2-Mar-22 Approved
E 147063_E SAR Approved Approved 21-Jul 22-Jul-22 Hold Hold
  X 147063_X Approved Approved 5-Jan-22  
  0 147042_0 Nominal Nominal    
  A 147042_A Approved Approved    
  B 147042_B SAR Approved Approved 18-Nov-21 29-Nov-21 Approved  
  0 144066_0 Nominal Nominal    
  A 144066_A Approved Approved   1-Feb-22 Approved  
C 144066_C SAR Approved Approved 4/29/2022 30-Apr Approved
  X 144066_X Approved Approved   11/Nov/21 Approved  
  0 144067_0 Nominal Nominal    
  A 144067_A Approved Approved   11-Nov-21 Approved  
  B 144067_B Approved Approved    
  D 144067_D SAR Approved Approved 17-Mar-22 17/Mar/22 Approved  
  0 144069_0 Nominal Nominal    
  A 144069_A SAR Approved Approved 1-Nov-21 11-Nov-21 Approved  
  B 144069_B Approved Approved    
  0 144070_0 Nominal Nominal    
  A 144070_A SAR Approved Approved 5-Nov-21 11/11/2021 Approved  
  B 144070_B Approved Approved    
  0 146033_0 Nominal Nominal NA  
  A 146033_A SAR Approved Approved 30-Sep-21 8-Nov-21 Approved  
  B 146033_B Approved Approved 44468  
  0 142044_0 Nominal Nominal NA  
  A 142044_A Approved Approved 3-Dec  
  B 142044_B Approved Approved 3-Dec 1-Feb-22 Approved  
C 142044_C SAR Approved Approved 26-May 27-May Approved
  D 142044_D Rejected Rejected 7/16/2022
  0 142045_0 Nominal Nominal    
  B 142045_B Rejected Rejected   22-Nov-21 Approved  
  C 142045_C Approved Approved   19-Mar-22 Approved  
A 142045_A Approved Approved 26-May 6-Jan-22 Rejected
  0 148014_0 Nominal Nominal NA  
  A 148014_A Out
Rejected
off search ring inter site distance
31-Mar
in near
  B 148014_B Approved Approved 14-Sep-21 2-Nov-21 Approved Rejected by SAQ
C 148014_C Rejected Rejected 4-Apr-22 6-Apr-22 Approved Approved
  X 148014_X Approved Approved 14-Sep-21 17-09-2021 Cancelled Cancelled
  0 148015_0 Nominal Nominal  
A 148015_A Rejected Rejected
B 148015_B SAR Approved Approved 27-Apr-22 27-Apr-22 Approved
  X 148015_X Approved Approved 44453 17-09-2021 Approved Approved
  0 147069_0 Nominal Nominal    
  A 147069_A Approved Approved 25-Feb-22 10-Mar-22 Approved  
  B 147069_B Approved Approved    
C 147069_C Resubmit Resubmit 2-May
  X 147069_X Colo Colo    
  0 140021_0 Nominal Nominal    
  A 140021_A Approved Approved   15-Mar-22 Approved  
  B 140021_B Approved Approved   29-Nov-21 Approved  
  C 140021_C SAR Approved Approved 4-Mar-22 27-Apr-22 Approved  
D 140021_D Approved Approved 15-Apr
  0 148016_0 Nominal Nominal NA  
  A 148016_A Approved Approved 44445  
  B 148016_B Rejected Rejected Cancelled for ATC
Cancelled for ATC
  C 148016_C Approved Approved 44445  
T 148016_T Approved Approved 25-Nov-21 6/12/2021 Approved
  0 147076_0 Nominal Nominal NA  
Yes A 147076_A Approved Approved 2-Dec  
Yes B 147076_B SAR Approved Approved 2-Dec 25-Feb-22 Approved  
  0 147043_0 Nominal Nominal    
  A 147043_A Approved Approved    
  B 147043_B Approved Approved   26-Feb-22 Approved  
C 147043_C Approved Approved 5-May 6-May Rejected
  X 147043_X Colo Colo    
  0 144071_0 Nominal Nominal    
  A 144071_A Approved Approved 4-Nov-21 11-Nov-21 Approved  
  B 144071_B Approved Approved    
  C 144071_C Approved Approved 20-Jun-22 Approved Approved  
  D 144071_D SAR Approved Approved 8/10/2022
  X 144071_X Approved Approved    
  0 144072_0 Nominal Nominal    
  A 144072_A Rejected Rejected   22-Nov-21 Approved  
  B 144072_B SAR Approved Approved 13-Nov-21 29-Apr Approved  
  0 144073_0 Nominal Nominal    
  A 144073_A Approved Approved   1-Feb-22 Approved  
  B 144073_B Approved Approved    
C 144073_C Approved Approved 10-May 11-May Rejected
D 144073_D Approved Approved 10-May 11-May Rejected
E 144073_E SAR Approved Approved 12-May 13-May Approved
  X 144073_X Approved Approved   11/Nov/21 Approved  
  0 145018_0 Nominal Nominal NA  
  A 145018_A Approved Approved 17-Sep-21  
  X 145018_X SAR Approved Approved 17-Sep-21 15-Jun Approved Approved
  B 145018_B Approved Approved 17-Sep-21 23-Sep-21 Approved
  C 145018_C Approved Approved 17-Sep-21  
  0 147044_0 Nominal Nominal NA  
  A 147044_A Rejected Rejected 25-Jun-22 29-Jun-22 Rejected Rejected
  B 147044_B Rejected Resubmit 4-Oct-21 6/Oct/21 Approved  
  C 147044_C Approved Approved 4-Oct-21 20-10-2021 Approved Approved
D 147044_D Approved Approved 19-May-22 20-May Rejected
  E 147044_E Approved Approved 10-Jun-22 44725 Approved
  F 147044_F SAR Approved Approved 7/18/2022 22-Jul-22 Approved Approved
  0 144074_0 Nominal Nominal    
  A 144074_A Approved Approved   11-Nov-21 Approved  
  B 144074_B Approved Approved   6/18/2022 Approved Approved
  0 144075_0 Nominal Nominal    
  A 144075_A Approved Approved   11-Nov-21 Approved  
  B 144075_B Approved Approved    
C 144075_C SAR Approved Approved 29-Apr 30-Apr Approved
  0 144076_0 Nominal Nominal    
  A 144076_A Approved Approved   11-Nov Approved  
  B 144076_B SAR Approved Approved 8-Jun 9-Jun Approved
  0 144108_0 Nominal Nominal    
A 144108_A Approved Approved 13-Apr 15-Apr Approved
B 144108_B Rejected Rejected
C 144108_C SAR Rejected Rejected 10-Jun 22-Jun Rejected 22-Jun
D 144108_D Rejected Rejected 22-Jun 22-Jun Rejected 22-Jun
E 144108_E SAR Rejected Rejected 26-Aug 29-Aug
  0 147045_0 Nominal Nominal    
  A 147045_A SAR Rejected Rejected 10-Mar-22 10-Mar-22 Approved  
  B 147045_B Approved Approved   22-Nov-21 Approved
  C 147045_C SAR Approved Approved 8/16/2022
  0 146034_0 Nominal Nominal NA  
  A 146034_A Rejected Rejected 44468  
  B 146034_B Rejected Rejected 44468 20-Oct-21 Cancelled for ATC
Cancelled for ATC
  C 146034_C Rejected Rejected 44468  
D 146034_D Rejected Rejected 30-Mar-22 12-Apr-22 Rejected
E 146034_E Rejected Rejected 12-Apr-22 12-Apr-22 Rejected
F 146034_F SAR Rejected Rejected 16-Jun-22 16-Jun-22 Approved Approved
T 146034_T Rejected Rejected 25-Nov-21 6/12/2021 Approved
  0 147046_0 Nominal Nominal    
  A 147046_A Rejected Rejected   29-Nov-21 Rejected  
  B 147046_B Approved Approved    
  X 147046_X Colo Colo    
  0 147047_0 Nominal Nominal    
  A 147047_A Approved Approved    
  B 147047_B SAR Approved Approved   26-Feb-22 Approved  
  0 143052_0 Nominal Nominal    
  A 143052_A Approved Approved 15-Oct-21  
  B 143052_B Approved Approved 15-Oct-21 17/Oct/21 Approved  
  0 147048_0 Nominal Nominal    
  A 147048_A Approved Approved   29-Nov-21 Approved  
  B 147048_B Approved Approved 06/03/2022 8-Mar-22 Approved  
  C 147048_C SAR Approved Approved 06/03/2022 8-Mar-22 Approved  
  D 147048_D SAR Rejected Rejected 13-Jun  
  0 144077_0 Nominal Nominal    
  B 144077_B Approved Approved    
  C 144077_C SAR Approved Approved   22-Nov-21 Approved  
0 141042_0 Nominal Nominal
  X 141042_X Approved Approved 17-Oct-21 22-Nov-21 Approved  
  A 141042_A Approved Approved 17-Oct-21  
  0 142047_0 Nominal Nominal    
  A 142047_A SAR Rejected Rejected   26-Feb-22 Approved  
  B 142047_B Rejected Rejected    
C 142047_C Rejected Rejected
D 142047_D SAR Rejected Rejected
E 142047_E SAR Approved Approved
F 142047_F SAR Approved Approved
  X 142047_X Colo Colo    
  0 142048_0 Nominal Nominal NA  
  A 142048_A Approved Approved 24-Sep-21 20-10-2021Cancelled for ATC
Cancelled for ATC
  B 142048_B Approved Approved 24-Sep-21  
  C 142048_C Approved Approved 24-Sep-21  
D 142048_D Rejected Rejected 8-Apr-22 18-Apr Approved Approved
E 142048_E Approved Approved 27-Jun
X 142048_X Approved Approved 27-Jun
T 142048_T Approved Approved 25-Nov-21 6/12/2021 Approved
  0 146035_0 Nominal Nominal NA  
  A 146035_A Approved Approved 10-Aug-21  
  B 146035_B SAR Approved Approved 10-Aug-21 8-Nov-21 Approved  
  0 142049_0 Nominal Nominal    
142049_C Approved Approved 21-Dec-21
  A 142049_A Approved Approved 44541 11-May Rejected  
  B 142049_B Approved Approved 44541  
  D 142049_D Approved Approved 18-Jun-22 20-Jun-22 Approved Approved
  0 144079_0 Nominal Nominal NA  
  A 144079_A Approved Approved 3-Dec 1-Feb-22 Approved  
  B 144079_B Approved Approved 3-Dec  
  X 144079_X SAR Approved Approved 3-Dec  
  0 148017_0 Nominal Nominal NA  
  A 148017_A SAR Approved Approved 16-Sep-21 17-Sep-21 Approved
  B 148017_B Approved Approved 16-Sep-21  
  C 148017_C Approved Approved 16-Sep-21  
T 148017_T Shadowing
Rejected
caused by roof share of30-Nov-21
7.5mtr in sec 3
  0 147049_0 Nominal Nominal    
  A 147049_A Out
Rejected
off search ring inter site distance
31-Mar
in near  
  B 147049_B Rejected
Nominal with SAR Rejected25-Feb-22
by RF  
  C 147049_C Approved Approved 14-May-22 16-May Approved  
  X 147049_X SAR Colo Colo 25-Feb-22  
  0 146036_0 Nominal Nominal    
  A 146036_A Resubmit
Nominal with SAR approved
11-Dec-21
by RF
  B 146036_B Approved Approved 11-Dec-21 5-Aug-22 Approved Approved
  C 146036_C Approved Approved 11-Dec-21  
  0 142051_0 Nominal Nominal    
  A 142051_A SAR Approved Approved   26-Feb-22 Approved  
  B 142051_B Approved Approved    
C 142051_C Resubmit Resubmit 29-Apr
D 142051_D SAR Approved Approved 1-Aug 2-Aug-22 Approved Approved
  0 149025_0 Nominal Nominal NA  
A 149025_A Approved Approved
  B 149025_B Approved Approved 29-Sep-21  
  C 149025_C Approved Approved 29-Sep-21  
  T 149025_T Rejected Approved 25-Nov-21 19-Feb-22 Rejected
  0 147050_0 Nominal Nominal    
  A 147050_A Approved Approved   11/29/2021    
  B 147050_B Approved Approved    
C 147050_C SAR Approved Approved 20-Feb-22 21-Feb-22 Approved
0 144140_0 Nominal Nominal
20/10/2021 A 144140_A Rejected Rejected 13-Sep-21 23-09-2021Cancelled for ATC
Cancelled for ATC
20/10/2021 B 144140_B Rejected Rejected NA  
20/10/2021 C 144140_C Rejected Rejected NA  
D 144140_D SAR Rejected Rejected 7-Jun-22 9-Jun Rejected
E 144140_E SAR Approved Approved 31-Aug 2-Sep-202 Approved Approved
T 144140_T Approved Approved 25-Nov-21 6/12/2021 Approved
  0 145031_0 Nominal Nominal NA  
  A 145031_A Approved Approved 7-Sep-21  
  B 145031_B Approved Approved 7-Sep-21  
C 145031_C Rejected
Nominal with SAR Rejected by
7-Sep
RF
  D 145031_D Rejected Rejected 7-Sep-21 2-Feb-22 Approved  
  E 145031_E SAR Approved Approved 8-Jul 12-Jul-22 Approved Approved
  0 144081_0 Nominal Nominal    
  A 144081_A Approved Approved    
  B 144081_B Rejected Rejected 1-Nov-21 11-Nov-2021 Rejected  
  C 144081_C Approved Approved 23-Jul 27-Jul-2022 Hold 27-Jul-22
  X 144081_X Approved Approved    
  0 144083_0 Nominal Nominal    
  X 144083_X Colo Colo   22-Nov-21 Approved  
  A 144083_A SAR Approved Approved 13-Nov-21 20-Apr Approved  
  B 144083_B Rejected Rejected    
D 144083_D Rejected Rejected
  C 144083_C Rejected Rejected   15/Nov/21 Approved  
  0 148018_0 Nominal Nominal NA  
  A 148018_A Approved Approved 3-Sep-21 5-Sep-21 Approved  
  B 148018_B 2nd
Rejected
sector is blocking by neighbour
31-Mar-22
building  
C 148018_C SAR Approved Approved 21-Apr-22 25-Apr Approved
  0 143054_0 Nominal Nominal    
  A 143054_A Approved Approved 18-Oct-21  
  B 143054_B SAR Rejected Rejected 18-Oct-21 26-Feb-22 Approved  
  C 143054_C SAR Approved Approved 28-Jul 1-Aug-22 Approved Approved
  0 149027_0 Nominal Nominal NA  
  A 149027_A SAR Approved Approved 6-Sep-21 23-Sep-21 Approved Approved
  B 149027_B Rejected Resubmit 6-Sep-21  
  C 149027_C Approved Approved 6-Sep-21  
  0 148019_0 Nominal Nominal NA  
  A 148019_A Approved Approved 2-Sep-21  
  B 148019_B SAR Approved Approved 2-Sep-21 17-Sep-21 Approved Approved
  C 148019_C Approved Approved 2-Sep-21  
  0 147052_0 Nominal Nominal    
  A 147052_A Rejected Rejected   14-Jan-22 Approved  
  X 147052_X Colo Colo    
  0 149028_0 Nominal Nominal NA  
  A 149028_A Approved Approved 20-Sep-21  
  B 149028_B Rejected Approved 20-Sep-21 21/Sep/21 Rejected  
  C 149028_C Approved Approved 29-Jun 2/Jul/22 Approved Approved
  0 148020_0 Nominal Nominal NA  
  A 148020_A SAR Approved Approved 6-Sep-21 17-Sep-21 Approved Approved
  B 148020_B Approved Approved 6-Sep-21  
  C 148020_C Approved Approved 6-Sep-21  
  0 145021_0 Nominal Nominal NA  
  A 145021_A Approved Approved 10-Sep-21  
  B 145021_B Approved Approved 10-Sep-21 23-Sep-21 Approved Approved
D 145021_D Approved Approved
E 145021_E SAR Approved Approved 16-May-22 17-May Approved
  C 145021_C Approved Approved 10-Sep-21  
  0 144084_0 Nominal Nominal    
  B 144084_B SAR Approved Approved   22-Nov-21 Approved  
  C 144084_C Approved Approved    
  0 144085_0 Nominal Nominal    
  B 144085_B Approved Approved   22-Nov-21 Approved
Reverted to Colo GBT
  C 144085_C Approved Approved    
  D 144085_D Approved Approved 3-Aug-22 Rejected Rejected
  E 144085_E SAR Rejected Rejected 22-Aug-22 Approved Approved
  0 148021_0 Nominal Nominal NA  
  A 148021_A Approved Approved 4-Sep-21  
  B 148021_B Approved Approved 4-Sep-21  
D 148021_D SAR Approved Approved 28-Feb-22 27-Apr-22 Approved
Approved
but hold due to LA signed for GBT
  C 148021_C Approved Approved 4-Sep-21 17-09-2021 Approved Approved
  0 146037_0 Nominal Nominal NA  
  A 146037_A Rejected Resubmit 23-Sep-21  
  B 146037_B SAR Approved Approved 23-Sep-21 16-Mar-22 Approved  
  C 146037_C Approved Approved 23-Sep-21  
  0 146038_0 Nominal Nominal NA  
  A 146038_A Approved Approved 29-Sep-21 20-Oct-21 Approved Approved
  B 146038_B Approved Approved 29-Sep-21  
  C 146038_C Approved Approved 31-May 1-Jun Rejected  
  D 146038_D Rejected Rejected 29-Jun
  E 146038_E Rejected Rejected
  F 146038_F Approved Approved 15-Jul 18-Jul Approved Approved
  0 149029_0 Nominal Nominal NA  
  A 149029_A SAR Approved Approved 20-Sep-21 20-Oct-21 Approved Approved
  B 149029_B Approved Approved 20-Sep-21  
  C 149029_C Approved Approved 20-Sep-21  
  0 149030_0 Nominal Nominal NA  
  A 149030_A Approved Approved 20-Sep-21 23-Sep-21 Approved Approved
  B 149030_B Approved Approved 20-Sep-21  
  C 149030_C SAR Approved Approved 7-Jul 11-Jul Approved Approved
  D 149030_D SAR Approved Approved
  E 149030_E SAR Approved Approved 7-Sep
  0 141044_0 Nominal Nominal    
  A 141044_A Rejected Rejected    
  B 141044_B Rejected Rejected    
  P 141044_P EEP Approved Approved   7-Feb-22 Approved  
  0 147053_0 Nominal Nominal    
  A 147053_A Rejected Rejected    
  B 147053_B Approved Approved 2-Aug-22 2-Aug-22 Approved Approved
D 147053_D Rejected Rejected 24-Feb-22 Approved
E 147053_E SAR Approved Approved 7-Sep-22 7-Sep-22 Rejected
  0 143055_0 Nominal Nominal    
  A 143055_A Approved Approved 18-Oct-21  
  B 143055_B SAR Approved Approved 18-Oct-21 1-Feb-22 Approved  
C 143055_C Approved Approved 2-May-22 11-May Rejected
D 143055_D Approved Approved 20-Jun 22-Jun Approved 22-Jun-22
  X 143055_X Approved Approved 18-Oct-21 20-10-2021 Approved
  0 147071_0 Nominal Nominal NA  
  A 147071_A Approved Approved 30-Sep-21 21-Feb-22 Approved  
B 147071_B Rejected Rejected
D 147071_D Approved Approved
E 147071_E Approved Approved 8/5/2022 5-Aug-22 Approved Approved
  C 147071_C Rejected Rejected 22-Jul 22-Jul Approved 22-Jul
  0 146048_0 Nominal Nominal    
  A 146048_A SAR Approved Approved 7-Jun-22 9-Jun Approved  
  0 146050_0 Nominal Nominal    
T 146050_T Approved Approved 23-02-2022 25/Feb/22 Approved
A 146050_A Approved Approved 15-Apr-22 18/Apr/22 Rejected Rejected
B 146050_B SAR Approved Approved 20-Apr-22 26-Apr-22 Approved
  0 146051_0 Nominal Nominal    
A 146051_A Rejected Rejected 13-Apr-22 18-Apr Rejected Rejected
  X 146051_X Colo Colo    
  0 148024_0 Nominal Nominal NA  
  A 148024_A Approved Approved 15-Oct-21  
  B 148024_B SAR Rejected Rejected 15-Oct-21 20-Oct-21 Approved Approved
  0 148027_0 Nominal Nominal NA  
  A 148027_A Approved Approved 15-Oct-21  
  B 148027_B SAR Approved Approved 15-Oct-21 20-Oct-21 Approved Approved
  C 148027_C Approved Approved 15-Oct-21  
  0 148028_0 Nominal Nominal NA  
  A 148028_A SAR Approved Approved 15-Oct-21 20-Oct-21 Approved Approved
  B 148028_B Approved Approved 15-Oct-21  
  C 148028_C Approved Approved 15-Oct-21  
  0 141045_0 Nominal Nominal NA  
  A 141045_A Approved Approved 2-Dec  
  B 141045_B Approved Approved 2-Dec  
C 141045_C SAR Approved Approved 30-Apr 3-May Approved
T 141045_T Approved Approved 6-Mar-22 8-Mar-22 Approved
  0 146052_0 Nominal Nominal    
A 146052_A SAR Approved Approved 8-Apr-22 8-Apr Approved
  0 144110_0 Nominal Nominal    
  A 144110_A Approved Approved   22-Nov-21 Approved  
  T 144110_T Approved Approved 30-Nov 22-Nov-21 Approved  
  C 144110_C Rejected Rejected 29-Jun-22
  B 144110_B Approved Approved 15-Apr 18/Apr/22 Approved Rejected
  0 144111_0 Nominal Nominal    
  A 144111_A Approved Approved   1-Feb-22 Approved  
  B 144111_B Approved Approved   22-Nov-21 Approved
Reverted to Colo GBT
  C 144111_C Approved Approved 8-Jun 9-Jun Hold
  X 144111_X SAR Colo Colo   6/12/2021 Approved  
  0 144112_0 Nominal Nominal    
  B 144112_B Rejected Rejected   13/Nov/21 Approved  
  C 144112_C Rejected Rejected    
D 144112_D Rejected Rejected 28-Apr-22 29-Apr Rejected
  E 144112_E Approved Approved 18-Jul-22 22/Jul/22 Approved Approved
  A 144113_A Approved Approved    
  B 144113_B Approved Approved   22-Nov-21 Approved  
  C 144113_C Rejected Rejected    
  D 144113_D SAR Approved Approved 11-Jun 13-Jun-22 Approved  
  0 148025_0 Nominal Nominal NA  
  A 148025_A Rejected Rejected 15-Oct-21 26-Apr-22 Rejected  
  B 148025_B Approved Approved 15-Oct-21  
  C 148025_C Approved Approved  
  D 148025_D Approved Approved 6-Jul  
  E 148025_E SAR Approved Approved 28-Jul 1-Aug-22 Approved Approved
  0 148026_0 Nominal Nominal NA  
  A 148026_A Rejected
2nd sector is blocking by own31-Mar-22
building  
B 148026_B Approved Approved
C 148026_C SAR Approved Approved 18-May 20-May Approved
D 148026_D Approved Approved 10-Mar-22
T 148026_T Approved Approved 10-Feb-22
  0 145028_0 Nominal Nominal  
  0 144114_0 Nominal Nominal    
  A 144114_A SAR Approved Approved 4-Nov-21 11-Nov-2021 Approved  
  0 144116_0 Nominal Nominal NA  
  A 144116_A Approved Approved 27-Sep-21 20-Oct-21 Approved
  B 144116_B Rejected
Blocking by neighbour buildings
31-Mar-22  
  C 144116_C Rejected Resubmit 27-Sep-21  
E 144116_E Approved Approved 16-May-22 17-May Approved 18-May-22
F 144116_F SAR Approved Approved 17-Aug 22-Aug Rejected Rejected
  D 144116_D Approved Approved 14-Apr 26-Apr-22 Approved Rejected
  0 147054_0 Nominal Nominal NA  
  A 147054_A Rejected Rejected 4-Oct-21 26-Feb-22 Approved  
  B 147054_B Approved Approved 4-Oct-21  
  C 147054_C SAR Approved Approved 13-Jul 25-Jul-22 Approved Approved
  0 149033_0 Nominal Nominal NA  
  A 149033_A 3nd
Rejected
sector is blocking by neighbour
31-Mar-22
building  
B 149033_B Approved Approved
C 149033_C Approved Approved 3-Mar-22 8-Mar-22 Approved
D 149033_D Approved Approved 21-Apr-22 25-Apr Approved
  X 149033_X SAR Colo Colo  
  0 149034_0 Nominal Nominal    
  A 149034_A Approved Approved    
  B 149034_B Approved Approved 7/14/2022 18-Jul-22 Approved Approved
  P 149034_P EEP Approved Approved   7-Feb-22 Approved
  0 145029_0 Nominal Nominal    
  A 145029_A SAR Approved Approved   22-Nov-21 Approved  
  B 145029_B Approved Approved    
  C 145029_C Approved Approved    
  0 140022_0 Nominal Nominal    
  A 140022_A SAR Approved Approved 25-Feb-22 26-Apr-22 Approved  
  0 147056_0 Nominal Nominal NA  
Yes A 147056_A SAR Approved Approved 2-Dec 26-Feb-22 Approved  
Yes B 147056_B Rejected Rejected 2-Dec  
C 147056_C Rejected Rejected 21-Apr 13-May Approved
D 147056_D Approved Approved 26-May 27-May Approved
  X 147056_X Rejected Rejected 2-Dec  
  0 142062_0 Nominal Nominal    
  X 142062_X Colo Colo    
  A 142062_A Approved Approved    
  B 142062_B Rejected Rejected 24-Nov-21 1-Feb-22 Approved  
  C 142062_C Approved Approved    
  0 144087_0 Nominal Nominal    
  X 144087_X Approved Approved   22-Nov-21 Approved  
  A 144087_A Approved Approved   1-Feb-22 Approved  
C 144087_C SAR Approved Approved 28-Apr-22 29-Apr Approved
  B 144087_B Rejected Resubmit    
  0 146042_0 Nominal Nominal    
A 146042_A Approved Approved 7-Apr 12-Apr Approved
  X 146042_X Colo Colo    
  0 145025_0 Nominal Nominal    
  A 145025_A Rejected Rejected    
  B 145025_B Approved Approved 23-Jun 27-Jun-22 Approved 27-Jun-22
  C 145025_C Approved Approved 14-Jul 18-Jul-22 Approved 18-Jul-22
  0 143056_0 Nominal Nominal NA  
  A 143056_A Approved Approved 17-Aug-21  
  B 143056_B Approved Approved 17-Aug-21 26-Feb-22 Approved  
  C 143056_C Rejected Rejected 22-Apr  
  D 143056_D Approved Approved 11-Jun 14-Jun Rejected  
  X 143056_X SAR Approved Approved 13-Dec-21  
  0 144088_0 Nominal Nominal    
  A 144088_A SAR Approved Approved 1-Mar-22 1/Mar/22 Approved  
  B 144088_B Approved Approved    
  C This
144088_C
candidate is shifting to STEP
Approved
office Approved   22-Nov-21 Approved  
  0 147057_0 Nominal Nominal    
  A 147057_A Rejected Rejected    
  B 147057_B Rejected Rejected    
  C 147057_C SAR Approved Approved 18-Mar-22 20-Mar-22 Approved  
  0 149031_0 Nominal Nominal NA  
  A 149031_A Approved Approved 20-Sep-21  
  B 149031_B Approved Approved 20-Sep-21 20-Oct-21 Rejected
Rejected by SAQ 27-Nov-2021
  C 149031_C Approved Approved NA  
149031_D Approved Approved
149031_E Approved Approved
F 149031_F SAR Approved Approved 14-Apr-22 14-Jun Approved
  0 122001_0 Nominal Nominal    
T 122001_T SAR Approved Approved 10-Feb-22 10-Feb-22 Approved
  0 122003_0 Nominal Nominal    
T 122003_T SAR Approved Approved 26-Nov-21 28/Nov/21 Approved
  0 122011_0 Nominal Nominal    
  A 122011_A SAR Approved Approved 16-Apr 18-Apr Approved Approved
  0 122004_0 Nominal Nominal    
A 122004_A SAR Approved Approved 13-Apr-22 15-Apr Approved
  0 122006_0 Nominal Nominal    
A 122006_A SAR Approved Approved 13-Apr-22 15-Apr Approved
  0 122007_0 Nominal Nominal    
A 122007_A SAR Approved Approved 13-Apr 15-Apr Approved
  0 122008_0 Nominal Nominal    
T 122008_T SAR Approved Approved 10-Feb-22 10-Feb-22 Approved
  0 122010_0 Nominal Nominal    
B 122010_B SAR Approved Approved 19-May-22 20-May Approved
A 122010_A Approved Approved 13-Apr-22 15-Apr Rejected
  0 705037_0 Nominal Nominal    
  A 705037_A SAR Approved Approved 19-Mar-22 20-Mar-22 Approved  
705037_T Rejected Rejected 10-Feb-22 Approved
  0 404014_0 Nominal Nominal    
A 404014_A SAR Approved Approved 18-Jul-22 Approved Approved Approved
B 404014_B SAR Approved Approved    
  0 417034_0 Nominal Nominal    
A 417034_A SAR Approved Approved 11-Apr-22 13/04/2022 Approved
  0 414115_0 Nominal Nominal    
  A 414115_A SAR Approved Approved 19-Mar-22 20-Mar-22 Approved  
0 407002_0 Nominal Nominal    
A 407002_A Approved Approved 20-Oct-21  
B 407002_B Approved Approved 20-Oct-21  
C 407002_C Approved Approved 9-Mar-22  
D 407002_D SAR Approved Approved 19-Apr-22 20-Apr Approved
  0 403003_0 Nominal Nominal    
A 403003_A SAR Approved Approved 13-Apr-22 15-Apr Approved
  0 403005_0 Nominal Nominal    
A 403005_A SAR Approved Approved 15-Apr Approved
  0 140029_0 Nominal Nominal    
  B 140029_B Approved Approved    
  C 140029_C Approved Approved    
D 140029_D SAR Approved Approved 2-Mar-22 2-Mar-22 Approved
0 407004_0 Nominal Nominal    
A 407004_A Approved Approved 20-Oct-21  
B 407004_B Approved Approved 20-Oct-21  
T 407004_T SAR Approved Approved 10-Feb-22 10-Feb-22 Approved
  0 408001_0 Nominal Nominal    
A 408001_A Approved Approved 18-Apr-22
  B 408001_B Rejected Rejected   26-Feb-22 Approved  
  C 408001_C Approved Approved   20-Apr Approved  
  D 408001_D SAR Approved Approved 11-Jun 13-Jun Approved  
  0 408003_0 Nominal Nominal    
  B 408003_B Rejected Rejected   26-Feb-22 Approved  
  C 408003_C Rejected Rejected    
D 408003_D SAR Approved Approved 11-Apr-22 14-Jun Approved
  0 408004_0 Nominal Nominal    
  B 408004_B Rejected Rejected   26-Feb-22 Approved  
A 408004_A Approved Approved 11-Apr-22 13-Apr Rejected
C 408004_C Approved Approved 10-Jun 10-Jun Approved
0 407005_0 Nominal Nominal    
A 407005_A Approved Approved    
B 407005_B Approved Approved   1-Feb-22 Approved  
C 407005_C SAR Approved Approved 1-Jun-22 2-Jun Approved
X 407005_X Approved Approved   11-Nov-2021 Approved  
  0 417001_0 Nominal Nominal    
T 417001_T SAR Approved Approved 10-Feb-22 Approved
0 407006_0 Nominal Nominal    
A 407006_A Rejected
Nominal with SAR Rejected20-Oct-21
by RF  
B 407006_B Rejected
Nominal with SAR Rejected20-Oct-21
by RF  
C 407006_C SAR Approved Approved 1-Apr 4-Apr-22 Approved
407006_T Approved Approved 10-Feb-22 10-Feb-22 Approved
0 407007_0 Nominal Nominal    
A 407007_A Approved Approved 20-Oct-21 11/8/2021 Cancelled for ATC  
B 407007_B SAR Approved Approved 20-Oct-21 8-Nov-21 Approved  
0 407009_0 Nominal Nominal    
A 407009_A Rejected
Nominal with SAR Rejected by RF
   
B 407009_B Rejected
Nominal with SAR Rejected by RF
   
C 407009_C SAR Approved Approved 1-Apr-22 4-Apr-22 Approved
T 407009_T Approved Approved 10-Feb-22 10-Feb-22 Approved
  0 407010_0 Nominal Nominal NA  
  A 407010_A Approved Approved 4-Oct-21 20-10-2021Cancelled for ATC
Cancelled for ATC
  B 407010_B Approved Approved 4-Oct-21  
  C 407010_C Approved Approved 4-Oct-21  
D 407010_D SAR Approved Approved 1-Mar-22 3-Mar-22 Approved
T 407010_T Approved Approved 25-Nov-21 6/12/2021 Approved
  0 407011_0 Nominal Nominal NA  
  A 407011_A Approved Approved 6-Oct-21  
  B 407011_B Approved Approved 6-Oct-21 20-10-2021Cancelled for ATC
Cancelled for ATC
  C 407011_C Approved Approved 6-Oct-21  
T 407011_T SAR Approved Approved 25-Nov-21 6/12/2021 Approved
  0 407012_0 Nominal Nominal NA  
  A 407012_A Approved Approved 6-Oct-21 20-10-2021Cancelled for ATC
Cancelled for ATC
  B 407012_B Approved Approved 6-Oct-21  
  C 407012_C Approved Approved 6-Oct-21  
E 407012_E SAR Approved Approved 21-May-22 24-May Approved
  D 407012_D Approved Approved 3-Mar-22 8-Mar-22 Approved  
  0 407013_0 Nominal Nominal NA  
  A 407013_A Approved Approved 4-Oct-21 20-10-2021Cancelled for ATC
Cancelled for ATC
  B 407013_B Approved Approved 4-Oct-21  
  C 407013_C Approved Approved 4-Oct-21  
X 407013_X SAR Approved Approved
T 407013_T SAR Approved Approved 25-Nov-21 6/12/2021 Approved
0 407014_0 Nominal Nominal    
A 407014_A Approved Approved 20-Oct-21 11-Nov-2021 Approved  
B 407014_B SAR Approved Approved 20-Oct-21 11-Nov-21 Approved  
0 407015_0 Nominal Nominal    
A 407015_A SAR Approved Approved 20-Oct-21 1-Feb-22 Approved  
B 407015_B Approved Approved 20-Oct-21  
  0 407017_0 Nominal Nominal NA  
  A 407017_A Approved Approved 6-Oct-21 20-10-2021 Approved Approved
  B 407017_B Approved Approved 6-Oct-21  
D 407017_D SAR Approved Approved 21-Feb-22 Approved
  C 407017_C Approved Approved 6-Oct-21  
0 407020_0 Nominal Nominal    
A 407020_A Approved Approved
Rejected due to high price
1-Feb-22 Approved  
B 407020_B Approved Approved
Rejected due to high price  
C 407020_C SAR Approved Approved 27-Apr-22 9-May Approved
  0 407021_0 Nominal Nominal    
  A 407021_A Approved Approved    
  B 407021_B Approved Approved   1-Feb-22 Approved  
C 407021_C SAR Approved Approved 3-May-22 3-May-22 Approved
0 407023_0 Nominal Nominal    
B 407023_B Approved Approved 22-Oct-21 11/8/2021 Cancelled for ATC  
C 407023_C Approved Approved 22-Oct-21  
D 407023_D Approved Approved 31-Mar-22 4-Apr-22 Approved
E 407023_E Approved Approved 25-May-22 27-May Approved
F 407023_F SAR Approved Approved 15-Jul 18-Jul Approved Approved
  0 408025_0 Nominal Nominal    
  A 408025_A Rejected Rejected   1-Feb-22 Approved  
B 408025_B SAR Approved Approved 20-Apr-22 20-Apr Approved
  C 408025_C Approved Approved    
  0 408031_0 Nominal Nominal    
  A 408031_A Rejected Rejected   1-Feb-22 Approved  
  B 408031_B Rejected Rejected    
C 408031_C SAR Approved Approved 29-Apr-22 30-Apr Approved
  0 417003_0 Nominal Nominal    
T 417003_T Rejected
Nominal with SAR Rejected 18-Mar-22
by STEP 29-Apr Rejected
A 417003_A SAR Approved Approved 17-May 18-May Approved
  0 417004_0 Nominal Nominal    
  A 417004_A Rejected Rejected 18-Mar 29-Apr Rejected  
B 417004_B SAR Approved Approved 16-May 17-May Approved
C 417004_C Approved Approved 16-May
  0 417005_0 Nominal Nominal    
T 417005_T SAR Approved Approved 10-Feb-22 Approved
  0 417006_0 Nominal Nominal    
T 417006_T SAR Approved Approved 10-Feb-22 Approved
0 407024_0 Nominal Nominal    
A 407024_A Approved Approved   15-Mar-22 Approved  
B 407024_B Approved Approved    
C 407024_C Rejected Rejected 9-Mar-22 18-Mar-22 Approved
D 407024_D Rejected Rejected 11-May
X 407024_X Approved Approved   11-Nov-2021 Approved  
0 407025_0 Nominal Nominal    
A 407025_A Approved Approved 20-Oct-21 1-Feb-22 Approved  
B 407025_B Approved Approved 20-Oct-21  
C 407025_C SAR Approved Approved 1-Apr 11-Apr Approved
  0 404003_0 Nominal Nominal    
404003_T Nominal with SAR Rejected by CW
Rejected 10-Feb-22 Approved
A 404003_A SAR Approved Approved 3-Jun-22 6-Jun-22 Approved
  0 140030_0 Nominal Nominal NA  
  A 140030_A Approved Approved 4-Oct-21
  B 140030_B Approved Approved 4-Oct-21  
140030_T Approved Approved 10-Feb-22
  C 140030_C Approved Approved 4-Oct-21
  D 140030_D SAR Approved Approved 3-Mar-22 8-Mar-22 Approved  
0 407123_0 Nominal Nominal    
A 407123_A Approved Approved 20-Oct-21  
B 407123_B Approved Approved 20-Oct-21  
C 407123_C SAR Approved Approved 17-Feb-22 19-Feb-22 Approved
0 407026_0 Nominal Nominal    
A 407026_A Approved Approved    
B 407026_B Approved Approved   1-Feb-22 Approved  
C 407026_C SAR Approved Approved 11-Mar-22 4-Apr-22 Approved
0 407027_0 Nominal Nominal    
A 407027_A Approved Approved 22-Oct-21  
B 407027_B Approved Approved 22-Oct-21  
C 407027_C SAR Approved Approved 9-Mar 15-Mar-22 Approved
  0 407028_0 Nominal Nominal    
  A 407028_A SAR Approved Approved 27-Oct-21 3-May Approved  
  C 407028_C Approved Approved   20-Apr Approved  
  0 407029_0 Nominal Nominal    
A 407029_A Approved Approved   17-Feb-22 Approved  
  B 407029_B Rejected
Blocking by neighbour buildings
31-Mar-22  
  D 407029_D Approved Approved 18-Jun-22 20-Jun-22 Approved Approved
C 407029_C Approved Approved    
0 407030_0 Nominal Nominal    
A 407030_A Approved Approved    
B 407030_B Approved Approved    
C 407030_C SAR Approved Approved 3-Mar-22 8-Mar-22 Approved  
T 407030_T Approved Approved 10-Feb-22
  0 407031_0 Nominal Nominal    
A 407031_A SAR Approved Approved 20-Oct-21 11-Nov-2021 Approved  
B 407031_B Approved Approved 20-Oct-21  
0 407032_0 Nominal Nominal    
A 407032_A Approved Approved 20-Oct-21  
B 407032_B Approved Approved 20-Oct-21  
C 407032_C SAR Approved Approved 9-Mar-22 10-Mar-22 Approved  
  0 404058_0 Nominal Nominal    
A 404058_A SAR Approved Approved 19-Apr-22 20-Apr Approved
0 407033_0 Nominal Nominal    
A 407033_A Approved Approved    
B 407033_B Approved Approved   1-Feb-22 Approved  
C 407033_C SAR Approved Approved 29-Mar 30-Mar Approved
0 407034_0 Nominal Nominal    
A 407034_A SAR Approved Approved 3-Mar-22 8-Mar-22 Approved
B 407034_B Approved Approved 31-Mar Approved  
C 407034_C Approved Approved 11-Aug
D 407034_D Approved Approved 19-Aug Approved Approved 22-Aug-22
E 407034_E Approved Approved 2-Sep Approved Approved 7-Sep-22
  0 407035_0 Nominal Nominal    
  A 407035_A Approved Approved    
  B 407035_B Approved Approved    
T 407035_T SAR Approved Approved 23-Mar-22 24-Mar-22 Approved
0 407036_0 Nominal Nominal    
T 407036_T Approved Approved 10-Feb-22 10-Feb-22 Approved
A 407036_A Approved Approved 22-Oct-21  
B 407036_B Approved Approved 22-Oct-21  
C 407036_C SAR Approved Approved 23-May-22 24-May Approved
0 407037_0 Nominal Nominal    
A 407037_A Approved Approved 22-Oct-21  
B 407037_B Approved Approved 22-Oct-21 1-Feb-22 Approved  
C 407037_C SAR Approved Approved 20-Apr-22 20-Apr Approved
  0 407038_0 Nominal Nominal    
  A 407038_A Approved Approved    
  B 407038_B SAR Approved Approved 2-Mar-22 8-Mar-22 Approved  
T 407038_T TSSRNominal
Rejectedwith SAR Rejected by CE 10-Feb-22 Approved
0 407039_0 Nominal Nominal    
A 407039_A SAR Approved Approved 20-Oct-21 1-Feb-22 Approved  
B 407039_B Approved Approved  
  0 407086_0 Nominal Nominal    
A 407086_A SAR Approved Approved 3-Jun-22 6-Jun-22 Approved
  B 407086_B Rejected Rejected   1-Feb-22 Approved  
  C 407086_C Rejected Rejected    
0 407040_0 Nominal Nominal    
B 407040_B Approved Approved    
C 407040_C Approved Approved    
A 407040_A SAR Approved Approved 20-Oct-21 29-Nov-21 Approved  
0 407041_0 Nominal Nominal    
A 407041_A Approved Approved    
B 407041_B Approved Approved   11/8/2021 Approved
Reverted to Colo GBT
C 407041_C SAR Approved Approved 30-Jan-22 1-Feb-22 Approved
0 407088_0 Nominal Nominal    
A 407088_A Approved Approved    
B 407088_B Approved Approved    
C 407088_C SAR Approved Approved 12-Mar-22 13/Mar/22 Approved  
  0 407042_0 Nominal Nominal    
  A 407042_A Approved Approved   1-Feb-22 Approved  
  B 407042_B Approved Approved    
C 407042_C Rejected Rejected 10-May Approved
D 407042_D SAR Approved Approved 7-Jul 18-Jul Approved Approved
  0 407043_0 Nominal Nominal    
  A 407043_A Approved Approved   1-Feb-22 Approved  
  B 407043_B Approved Approved    
C 407043_C SAR Approved Approved 27-Apr 9-May Approved
  0 407045_0 Nominal Nominal NA  
  A 407045_A Approved Approved 13-Oct-21 20-10-2021Cancelled for ATC
Cancelled for ATC
  B 407045_B SAR Approved Approved 17-May-22 18-May Approved  
  C 407045_C Rejected Rejected 13-Oct-21 6/5/2022 Approved  
T 407045_T Approved Approved 25-Nov-21 6/12/2021 Approved
  0 407092_0 Nominal Nominal    
  A 407092_A Approved Approved   22-Nov-21 Approved  
  B 407092_B Approved Approved    
  C 407092_C SAR Approved Approved   1-Feb-22 Approved  
  0 407093_0 Nominal Nominal    
  A 407093_A Approved Approved    
  B 407093_B Approved Approved    
T 407093_T SAR Approved Approved 18-Mar-22 10-Feb-22 Approved
  0 407096_0 Nominal Nominal    
  A 407096_A SAR Approved Approved 23-Jun-22 27-Jun-22 Approved 27-Jun-22
  B 407096_B Rejected Rejected    
  0 407046_0 Nominal Nominal    
  A 407046_A Approved Approved   1-Feb-22 Approved  
  B 407046_B Approved Approved    
C 407046_C SAR Approved Approved 15-Feb-22 17/Feb/22 Approved
  0 407048_0 Nominal Nominal    
  A 407048_A Approved Approved   11/29/2021 Approved
Reverted to Colo GBT
  B 407048_B Approved Approved    
C 407048_C SAR Approved Approved 1-Mar-22 3-Mar-22 Approved
0 407049_0 Nominal Nominal    
A 407049_A Approved Approved    
B 407049_B Approved Approved   1-Feb-22 Approved  
D 407049_D SAR Approved Approved 26-Mar-22 28-Mar-22 Approved
0 407050_0 Nominal Nominal    
A 407050_A Approved Approved    
B 407050_B Approved Approved    
C 407050_C SAR Approved Approved 12-Mar-22 13/Mar/22 Approved  
  0 407051_0 Nominal Nominal    
  A 407051_A Approved Approved    
  B 407051_B Approved Approved    
  T 407051_T SAR Approved Approved 9-Mar-22 10-Mar-22 Approved  
  0 140031_0 Nominal Nominal NA  
  A 140031_A Rejected Resubmit 4-Oct-21  
  B 140031_B SAR Approved Approved 4-Oct-21 31-Mar Approved  
  C 140031_C Rejected Resubmit 4-Oct-21 11-Nov-2021 Approved  
T 140031_T Approved Approved 25-Nov-21 6/12/2021 Approved
  0 407052_0 Nominal Nominal    
A 407052_A Approved Approved 20-Apr 20-Apr Approved
  B 407052_B Rejected Rejected   14/Nov/21 Approved  
  C 407052_C Rejected Rejected    
D 407052_D SAR Approved Approved 12-May 13-May Approved
  X 407052_X Colo Colo   22-Nov-21 Approved  
0 407053_0 Nominal Nominal    
A 407053_A Approved Approved    
B 407053_B Approved Approved   1-Feb-22 Approved  
C 407053_C SAR Approved Approved 27-Apr 29-Apr Approved
0 407056_0 Nominal Nominal    
A 407056_A Approved Approved   11/8/2021 Approved  
B 407056_B Approved Approved   8-Nov-21 Approved  
C 407056_C Rejected Rejected  
D 407056_D Rejected Rejected 29-Apr Rejected
E 407056_E SAR Approved Approved 6-May 9-May Approved
0 407057_0 Nominal Nominal    
A 407057_A Approved Approved 19-Oct-21  
B 407057_B Approved Approved 19-Oct-21  
C 407057_C SAR Approved Approved 9-Mar 15-Mar-22 Approved
  0 407058_0 Nominal Nominal NA  
  A 407058_A Approved Approved 13-Oct-21  
  B 407058_B Approved Approved 13-Oct-21  
  C 407058_C Approved Approved 13-Oct-21 20-10-2021Cancelled for ATC
Cancelled for ATC
T 407058_T SAR Approved Approved 10-Feb-22 10-Feb-22 Approved
  0 407105_0 Nominal Nominal NA  
  A 407105_A SAR Approved Approved 4-Oct-21 20-Oct-21 Approved Approved
  B 407105_B Approved Approved 4-Oct-21  
  C 407105_C Approved Approved 4-Oct-21  
0 407059_0 Nominal Nominal    
A 407059_A Approved Approved   1-Feb-22 Approved  
B 407059_B Approved Approved    
C 407059_C Approved Approved 9-Mar 15-Mar-22 Approved
D 407059_D SAR Approved Approved 25-Apr 26-Apr Approved
0 407060_0 Nominal Nominal    
A 407060_A Approved Approved    
B 407060_B Approved Approved    
C 407060_C SAR Approved Approved 4-Mar-22 8-Mar-22 Approved  
407060_T Rejected
Nominal with SAR Rejected10-Feb-22
by SAQ 10-Feb-22 Approved
  0 407061_0 Nominal Nominal    
  A 407061_A Approved Approved    
  B 407061_B Approved Approved    
T 407061_T SAR Approved Approved 10-Feb-22 10-Feb-22 Approved
A 407062_A Rejected Rejected 9-May 10-May Approved
B 407062_B SAR Approved Approved 28-May 30-May Approved
  0 407062_0 Nominal Nominal    
0 407063_0 Nominal Nominal    
A 407063_A Approved Approved 19-Oct-21 11/8/2021 Approved  
B 407063_B Approved Approved 19-Oct-21  
C 407063_C Approved Approved 29-Mar 30-Mar Approved
D 407063_D SAR Approved Approved 8-Jun 9-Jun Approved
  0 407064_0 Nominal Nominal NA  
  A 407064_A Approved Approved 13-Oct-21 20-10-2021 Approved Approved
  B 407064_B Approved Approved 13-Oct-21  
  C 407064_C Approved Approved 13-Oct-21  
  T 407064_T SAR Approved Approved 25-Nov-21 6/12/2021 Approved  
0 407173_0 Nominal Nominal    
A 407173_A SAR Approved Approved 19-Oct-21 11/8/2021 Approved  
B 407173_B Approved Approved 19-Oct-21  
  0 408041_0 Nominal Nominal    
  B 408041_B Rejected Due to Space issue 1-Feb-22 Approved  
  C 408041_C Rejected
Land documents are not clear  
D 408041_D Rejected Rejected 24-Mar-22 28-Mar-22 Approved
A 408041_A SAR Approved Approved 10-Aug 16-Aug-22 Approved
  0 408005_0 Nominal Nominal    
  A 408005_A Rejected Rejected   22-Nov-21 Approved  
  B 408005_B Approved Approved    
C 408005_C SAR Approved Approved 10-May 25-May Approved
  0 407065_0 Nominal Nominal NA  
  A 407065_A Approved Approved 4-Oct-21 20-10-2021Cancelled for ATC
Cancelled for ATC
  B 407065_B Approved Approved 4-Oct-21  
  C 407065_C Approved Approved 4-Oct-21  
T 407065_T SAR Approved Approved 10-Feb-22 Approved
  0 407066_0 Nominal Nominal NA  
  A 407066_A Approved Approved 13-Oct-21 20-10-2021Cancelled for ATC
Cancelled for ATC
  B 407066_B Approved Approved 13-Oct-21  
  C 407066_C Approved Approved 13-Oct-21  
  D 407066_D SAR Approved Approved 8/22/2022 23-Aug-22 Approved Approved
  E 407066_E Approved Approved  
T 407066_T Approved Approved 25-Nov-21 6/12/2021 Approved
  0 408006_0 Nominal Nominal    
  A 408006_A Rejected Rejected    
  B 408006_B Rejected Rejected    
D 408006_D SAR Approved Approved 23-Mar-22 24-Mar-22 Approved
T 408006_T Rejected Rejected 10-Feb-22 Approved
  X 408006_X Rejected Rejected   22-Nov-21 Approved  
  0 408007_0 Nominal Nominal    
  A 408007_A Rejected Rejected    
  B 408007_B Rejected Rejected    
C 408007_C SAR Approved Approved 14-Apr 18-Apr Approved Approved
  0 408008_0 Nominal Nominal    
  A 408008_A SAR Approved Approved 13-10-2021 31-Mar Approved  
  B 408008_B Approved Approved    
  C 408008_C Approved Approved    
T 408008_T Approved Approved 25-Nov-21 6/12/2021 Approved
  0 408009_0 Nominal Nominal    
  A 408009_A Rejected Rejected    
  B 408009_B Rejected Rejected    
T 408009_T SAR Approved Approved 23-Mar-22 24-Mar-22 Approved
  0 417007_0 Nominal Nominal    
T 417007_T SAR Approved Approved 8-Feb-22 10-Feb-22 Approved
  0 417048_0 Nominal Nominal    
  A 417048_A Approved Approved 23-Mar 26-Mar Rejected  
B 417048_B SAR Approved Approved 10-May 11-May Approved
  0 417008_0 Nominal Nominal    
  A 417008_A SAR Approved Approved 18-Mar-22 21-Mar-22 Approved  
  0 417009_0 Nominal Nominal    
T 417009_T Rejected Rejected 10-Feb-22 Approved
A 417009_A SAR Approved Approved 25-May 27-May Approved
  0 417010_0 Nominal Nominal    
T 417010_T SAR Approved Approved 8-Feb-22 10-Feb-22 Approved
  0 417011_0 Nominal Nominal    
T 417011_T SAR Approved Approved 8-Feb-22 10-Feb-22 Approved
  X 417011_X Colo Colo    
  0 417012_0 Nominal Nominal    
T 417012_T SAR Approved Approved 10-Feb-22 Approved
  0 417013_0 Nominal Nominal    
T 417013_T SAR Approved Approved 10-Feb-22 Approved
  0 417014_0 Nominal Nominal    
  A 417014_A SAR Approved Approved 18-Mar 21-Mar-22 Approved  
  0 417015_0 Nominal Nominal    
T 417015_T SAR Approved Approved 10-Feb-22 Approved
  0 407067_0 Nominal Nominal    
  A 407067_A Approved Approved    
  B 407067_B Approved Approved    
T 407067_T SAR Approved Approved 9-Mar-22 10-Feb-22 Approved
0 407068_0 Nominal Nominal    
A 407068_A Approved Approved    
B 407068_B Approved Approved    
T 407068_T SAR Approved Approved 10-Feb-22 Approved
  0 408043_0 Nominal Nominal    
  A 408043_A Approved Approved   1-Feb-22 Approved  
  B 408043_B Approved Approved   1-Feb-22 Approved  
C 408043_C SAR Approved Approved 16-May 17-May Approved
  0 407069_0 Nominal Nominal    
  A 407069_A Approved Approved    
  B 407069_B Approved Approved   2-Feb-22 Approved  
C 407069_C Rejected
Nominal with SAR Rejected
27-Mar-22
by RF
D 407069_D Approved Approved 12-May-22 6-Jan Rejected
E 407069_E Approved Approved 13-Jun-22 14-Jun Rejected
F 407069_F Approved Approved 5-Jul-22 6-Jul Hold Hold
  X 407069_X Approved Approved   11-Nov-2021 Approved  
0 407116_0 Nominal Nominal    
A 407116_A Approved Approved    
B 407116_B Approved Approved   1-Feb-22 Approved  
C 407116_C SAR Approved Approved 4-Mar-22 8-Mar-22 Approved
  0 407070_0 Nominal Nominal NA  
  A 407070_A Approved Approved 4-Oct-21 20-10-2021Cancelled for ATC
Cancelled for ATC
  B 407070_B Approved Approved 4-Oct-21  
  C 407070_C Approved Approved 4-Oct-21  
T 407070_T SAR Approved Approved 3/3/2022 6-Dec-21 Approved
D 407070_D Approved Approved 25-Nov-21 6/12/2021 Approved
  0 408010_0 Nominal Nominal    
  A 408010_A Rejected Rejected    
  B 408010_B Rejected Rejected    
C 408010_C Approved Approved 7-Apr Rejected
D 408010_D SAR Approved Approved 11-May 12-May Approved
0 407071_0 Nominal Nominal    
A 407071_A Approved Approved 19-Oct-21  
C 407071_C SAR Approved Approved 19-Oct-21 11/8/2021 Approved  
X 407071_X Approved Approved 19-Oct-21  
  0 417115_0 Nominal Nominal    
A 417115_A Approved Approved 6-Apr 7-Apr Rejected
B 417115_B SAR Approved Approved 3-Jun 6-Jun Approved
C 417115_C Approved Approved 3-Jun
  0 140033_0 Nominal Nominal    
  A 140033_A Rejected Rejected    
  B 140033_B Rejected Rejected    
C 140033_C Approved Approved 8-Mar-22 8-Mar-22 Approved
D 140033_D SAR Approved Approved 2-May-22 3-May Approved
T 140033_T Approved Approved 10-Feb-22 Approved
  0 407072_0 Nominal Nominal    
  C 407072_C SAR Approved Approved 10-Nov-21 9-Feb-22 Approved  
  B 407072_B Approved Approved    
  0 407073_0 Nominal Nominal    
  A 407073_A Approved Approved 12/11/2021  
  B 407073_B Approved Approved 12/11/2021  
T 407073_T SAR Approved Approved 15-Feb-22 17-Feb-22 Approved
0 407074_0 Nominal Nominal    
A 407074_A Approved Approved    
B 407074_B Approved Approved   1-Feb-22 Approved  
C 407074_C SAR Approved Approved 20-Apr 20-Apr Approved
  0 407118_0 Nominal Nominal    
  A 407118_A SAR Approved Approved 13-10-2021 1-Feb-22 Approved  
  B 407118_B Approved Approved    
  0 407075_0 Nominal Nominal    
A 407075_A Approved Approved    
B 407075_B Approved Approved    
407075_T Rejected
Nominal with SAR Rejected11-Feb-22
by RF
D 407075_D SAR Approved Approved 18-Aug-22
E 407075_E SAR Approved Approved
C 407075_C Approved Approved 15-Feb-22 17-Feb-22 Approved
0 407076_0 Nominal Nominal    
A 407076_A Approved Approved 20-Oct-21  
B 407076_B Approved Approved 20-Oct-21  
C 407076_C SAR Approved Approved 19-Feb-22 21-Feb-22 Approved
  0 408011_0 Nominal Nominal    
  A 408011_A Rejected Rejected   26-Feb-22 Approved  
  B 408011_B Rejected Rejected    
  C 408011_C SAR Approved Approved 21-Mar-22 23-Mar-22 Approved  
  0 140034_0 Nominal Nominal    
  A 140034_A Approved Approved 26-Apr 26-Apr Approved  
  B 140034_B Approved Approved 20-Apr Approved  
  C 140034_C Approved Approved 27-Mar-22  
D 140034_D Approved Approved 18-Apr-22 28-Apr Approved
E 140034_E SAR Approved Approved 30-May-22 1-Jun Approved
  0 140035_0 Nominal Nominal    
  A 140035_A Approved Approved    
  B 140035_B Approved Approved    
C 140035_C SAR Approved Approved 24-Mar-22 25/Mar/22 Approved
140035_T Rejected
Nominal with SAR Rejected23-Feb-22
by CW 26-Feb-22 Approved
  0 140038_0 Nominal Nominal    
  A 140038_A Rejected Rejected    
  B 140038_B Rejected Rejected   1-Feb-22 Approved Reverted to GF
  C 140038_C Approved Approved 27-Apr-22 Approved  
D 140038_D Approved Approved
D 140038_D Approved Approved 18-Apr-22 20-Apr Approved
F 140038_F SAR Approved Approved 7-May-22 9-May Approved
  X 140038_X Rejected Rejected   22-Nov-21 Approved  
  0 140039_0 Nominal Nominal    
  A 140039_A Approved Approved   1-Feb-22 Approved  
  B 140039_B Approved Approved    
C 140039_C SAR Rejected Rejected 2-Apr-22 4-Apr-22 Approved
D 140039_D SAR Approved Approved 7/19/2022 25-Jul-22 Approved Approved
  0 140041_0 Nominal Nominal NA  
  A 140041_A Rejected Resubmit 4-Oct-21 11-Nov-2021 Approved  
  B 140041_B Rejected Resubmit 4-Oct-21  
D 140041_D SAR Approved Approved 6-May-22 9-May Approved
  C 140041_C Rejected Resubmit 4-Oct-21  
  0 140042_0 Nominal Nominal NA  
  A 140042_A Approved Approved 12/11/2021 1-Feb-22 Approved  
C 140042_C SAR Approved Approved 4/2/2022 4-Apr-22 Approved
  B 140042_B Approved Approved 12/11/2021  
  0 140043_0 Nominal Nominal NA  
  A 140043_A Approved Approved 4-Oct-21 20-10-2021Cancelled for ATC
Cancelled for ATC
  B 140043_B Approved Approved 4-Oct-21  
  C 140043_C Approved Approved 4-Oct-21  
D 140043_D SAR Approved Approved 2-Apr-22 4-Apr-22 Approved
E 140043_E Approved Approved 12-Apr-22 18-Apr-22 Approved
T 140043_T Approved Approved 25-Nov-21 6/12/2021 Approved
  0 140044_0 Nominal Nominal    
  A 140044_A Rejected Rejected    
  B 140044_B Rejected Rejected    
C 140044_C SAR Approved Approved 2-Apr 11-Apr Approved
  0 140047_0 Nominal Nominal    
  A 140047_A Rejected Rejected   22-Nov-21 Approved  
  B 140047_B Rejected Rejected    
  C 140047_C Rejected Rejected 27-Mar-22  
D 140047_D SAR Approved Approved 18-Apr-22 20-Apr Approved
  0 140068_0 Nominal Nominal    
  A 140068_A Approved Approved    
  B 140068_B SAR Approved Approved 13-10-2021 1-Feb-22 Approved  
  0 140048_0 Nominal Nominal    
  A 140048_A Rejected
Nominal with SAR Rejected by CW
  22-Nov-21 Approved  
  B 140048_B Rejected
Nominal with SAR Rejected by CW
   
  C 140048_C Rejected
Nominal with SAR Rejected by CW
   
D 140048_D SAR Approved Approved 30-Mar-22 7-Apr Approved
  0 140049_0 Nominal Nominal    
  A 140049_A Approved Approved    
  B 140049_B Approved Approved   26-Feb-22 Approved  
C 140049_C SAR Approved Approved 3/29/2022 30-Mar Approved
  0 140051_0 Nominal Nominal    
  A 140051_A Rejected Rejected    
  B 140051_B Rejected Rejected   22-Nov-21 Approved  
  C 140051_C Approved Approved 27-Mar-22 28/Mar/22 Approved  
D 140051_D SAR Approved Approved 28-May-22 30-May Approved
  0 140052_0 Nominal Nominal    
  A 140052_A Rejected Rejected    
  B 140052_B Rejected Rejected    
  C 140052_C SAR Approved Approved 3-Mar-22 8-Mar-22 Approved  
140052_T Approved Approved 10-Feb-22 10-Feb-22 Approved
  0 140054_0 Nominal Nominal    
  A 140054_A Approved Approved   1-Feb-22 Approved  
  B 140054_B Approved Approved    
C 140054_C SAR Approved Approved 31-Mar-22 4-Apr-22 Approved
  0 140055_0 Nominal Nominal NA  
  A 140055_A Approved Approved 4-Oct-21 20-10-2021 Approved Approved
  B 140055_B Approved Approved 4-Oct-21  
  C 140055_C SAR Approved Approved 4-Oct-21 6/Oct/21 Approved  
  0 140057_0 Nominal Nominal NA  
  A 140057_A Approved Approved 4-Oct-21 20-10-2021Cancelled for ATC
Cancelled for ATC
  B 140057_B Approved Approved 4-Oct-21  
  C 140057_C Approved Approved 4-Oct-21  
T 140057_T SAR Approved Approved 25-Nov-21 6/12/2021 Approved
  0 417054_0 Nominal Nominal    
A 417054_A SAR Approved Approved 6-Apr 7-Apr Approved
  0 417061_0 Nominal Nominal    
T 417061_T SAR Approved Approved 11-Feb-22 10-Feb-22 Approved
  0 417019_0 Nominal Nominal    
T 417019_T Rejected Rejected 10-Feb-22 Approved
A 417019_A SAR Approved Approved 9-May 10-May Approved
  0 417022_0 Nominal Nominal    
T 417022_T SAR Approved Approved 18-Mar-22 7/Mar/22 Approved
  0 417065_0 Nominal Nominal    
T 417065_T SAR Approved Approved 10-Feb-22 Approved
  0 417023_0 Nominal Nominal    
  A 417023_A SAR Approved Approved 18-Mar 21-Mar-22 Approved  
  0 417024_0 Nominal Nominal    
T 417024_T SAR Approved Approved 11-Feb-22 10-Feb-22 Approved
  0 408050_0 Nominal Nominal    
  A 408050_A SAR Approved Approved 13-10-2021 1-Feb-22 Approved  
  B 408050_B Approved Approved    
  0 417028_0 Nominal Nominal    
  A 417028_A SAR Approved Approved 4-Jan-22 4-Apr-22 Approved  
  B 417028_B Approved Approved 4-Jan-22  
C 417028_C Rejected Rejected 30-Mar Rejected
  0 404008_0 Nominal Nominal    
T 404008_T SAR Approved Approved 10-Feb-22 Approved
  0 404009_0 Nominal Nominal    
T 404009_T SAR Approved Approved 10-Feb-22 10-Feb-22 Approved
  0 404010_0 Nominal Nominal    
T 404010_T SAR Approved Approved 10-Feb-22 Approved
  0 404011_0 Nominal Nominal    
T 404011_T Approved Approved 11-Apr 13-Apr Rejected
A 404011_A Approved Approved 7-Jun 8-Jun Approved
B 404011_B SAR Approved Approved 10-Jun 13-Jun Approved
  X 404011_X Colo Colo    
  0 404012_0 Nominal Nominal    
T 404012_T SAR Approved Approved 10-Feb-22 Approved
  0 404061_0 Nominal Nominal    
T 404061_T Approved Approved 11-Apr 25-Apr Approved
A 404061_A Approved Approved 9-Jun 10-Jun Approved
B 404061_B SAR Approved Approved 17-Aug 22-Aug Approved Approved
  0 702001_0 Nominal Nominal    
702001_T Rejected Rejected 10-Feb-22 Approved
A 702001_A SAR Approved Approved 8-Apr 8-Apr Approved
  0 710001_0 Nominal Nominal    
T 710001_T SAR Approved Approved 10-Feb-22 Approved
  0 702002_0 Nominal Nominal    
  A 702002_A SAR Approved Approved 16-Apr 25-Apr Approved Rejected
  0 706010_0 Nominal Nominal    
  A 706010_A SAR Rejected Rejected 27-Mar-22 28-Apr Approved  
  B 706010_B SAR Approved Approved 5-Sep
  0 701010_0 Nominal Nominal    
  A 701010_A Rejected Rejected   1-Feb-22 Approved  
  B 701010_B Rejected Rejected    
  C 701010_C SAR Approved Approved 12-Apr-22 12-Apr-22 Approved  
  D 701010_D Approved Approved 20-Mar-22  
  0 701001_0 Nominal Nominal    
  A 701001_A Approved Approved    
T 701001_T SAR Approved Approved 10-Feb-22 Approved
  B 701001_B Rejected Rejected    
  0 701003_0 Nominal Nominal    
  A 701003_A Approved Approved   26-Feb-22 Approved  
  B 701003_B Rejected Rejected    
  T 701003_T SAR Approved Approved 23-03-2022 24-Mar-22 Approved  
  0 701004_0 Nominal Nominal    
  A 701004_A Rejected
Nominal with SAR Rejected6-Dec-21
by CW  
  B 701004_B Rejected
Nominal with SAR Rejected6-Dec-21
by CW 26-Feb-22 Approved  
  C 701004_C Approved Approved 19-Mar-22 20-Mar-22 Approved  
  T 701004_T SAR Approved Approved 8-Jun 9-Jun Approved
  0 701014_0 Nominal Nominal    
  A 701014_A SAR Approved Approved 13-10-2021 1-Feb-22 Approved  
  B 701014_B Approved Approved    
  0 701016_0 Nominal Nominal    
  A 701016_A Rejected Rejected    
  B 701016_B Rejected Rejected   22-Nov-21 Approved
  C 701016_C Approved Approved 19-Mar-22 20-Mar-22 Approved
D 701016_D SAR Approved Approved 22-May-22 30-May Approved
  0 701018_0 Nominal Nominal    
  A 701018_A Rejected Rejected    
  B 701018_B Rejected Rejected   22-Nov-21 Approved  
SAR C 701018_C SAR Rejected Rejected 19-Mar-22 20-Mar-22 Approved  
D 701018_D SAR Approved Approved 6-Jul-22 23-Jul-22 Approved Approved
  0 721002_0 Nominal Nominal    
  A 721002_A Approved Approved 16-Apr 18-Apr Approved Approved
  0 710009_0 Nominal Nominal    
A 710009_A SAR Approved Approved 2-Apr-22 4-Apr-22 Approved
  0 710003_0 Nominal Nominal    
T 710003_T SAR Approved Approved 10-Feb-22 Approved
  0 710005_0 Nominal Nominal    
T 710005_T SAR Approved Approved 10-Feb-22 Approved
  0 710014_0 Nominal Nominal    
A 710014_A Approved Approved 2-Apr 4-Apr-22 Rejected
B 710014_B SAR Approved Approved 19-Apr 20-Apr Approved
  0 706001_0 Nominal Nominal    
T 706001_T SAR Approved Approved 10-Feb-22 Approved
  0 704002_0 Nominal Nominal    
  A 704002_A Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
  B 704002_B Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
C 704002_C SAR Approved Approved 17-Mar-22 4-Apr-22 Approved
704002_T Rejected Rejected 10-Feb-22 Approved
  0 702003_0 Nominal Nominal    
A 702003_A SAR Approved Approved 8-Apr 11-Apr Approved
  0 704031_0 Nominal Nominal    
  A 704031_A Approved Approved 4-Jan-22  
  B 704031_B SAR Approved Approved 4-Jan-22 14-Jan-22 Approved  
  0 711003_0 Nominal Nominal    
A 711003_A SAR Approved Approved 19-Apr 20-Apr Approved
  0 704003_0 Nominal Nominal    
T 704003_T SAR Approved Approved 10-Feb-22 Approved
  0 704004_0 Nominal Nominal    
  A 704004_A Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
  B 704004_B Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
  C 704004_C Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
T 704004_T SAR Approved Approved 10-Feb-22 Approved
  0 702006_0 Nominal Nominal    
T 702006_T SAR Approved Approved 10-Feb-22 Approved
  0 710039_0 Nominal Nominal    
A 710039_A SAR Approved Approved 2-Apr-22 4-Apr-22 Approved
  X 710039_X Colo Colo    
  0 710020_0 Nominal Nominal    
  A 710020_A SAR Approved Approved 29-Mar 30-Mar Approved  
T 710020_T Rejected Rejected 10/Feb/22 Approved
  0 702007_0 Nominal Nominal    
  A 702007_A SAR Approved Approved 25-Mar-22 26/Mar/22 Approved  
  0 701005_0 Nominal Nominal    
  A 701005_A Approved Approved 27-Apr-22 27-Apr-22 Approved
Reverted to GBT option candidate-T
  B 701005_B Rejected Rejected    
T 701005_T SAR Approved Approved 13-10-2021 10-Feb-22 Approved
  0 704005_0 Nominal Nominal    
  A 704005_A Approved Approved 4-Jan-22  
  B 704005_B Nominal with SAR Rejected 4-Jan-22
Rejected by CW 1-Feb-22 Approved  
C 704005_C SAR Approved Approved 18-May-22 19-May Approved
  0 704006_0 Nominal Nominal    
  A 704006_A Rejected
Unable to reach the owner   26-Feb-22 Approved  
  B 704006_B Rejected Iron roof   24-Mar-22 Approved  
  C 704006_C SAR Approved Approved 24-Mar-22 25/Mar/22 Approved  
  0 702008_0 Nominal Nominal    
A 702008_A SAR Approved Approved 21-Apr 25-Apr Approved
T 702008_T Rejected Rejected 10-Feb-22 Approved
  0 706004_0 Nominal Nominal    
  A 706004_A SAR Approved Approved 27-Mar-22 28-Mar-22 Approved  
T 706004_T Rejected Rejected 10-Feb-22 Approved
  0 705001_0 Nominal Nominal    
  A 705001_A SAR Approved Approved 20-Mar-22 28-Apr Approved  
705001_T Rejected Rejected 10-Feb-22 Approved
  0 704035_0 Nominal Nominal    
  A 704035_A SAR Approved Approved 19-Mar-22 20-Mar-22 Approved  
  0 704132_0 Nominal Nominal    
  A 704132_A Rejected
Nominal with SAR Rejected
23-Mar-22
by RF  
  B 704132_B Rejected
Nominal with SAR Rejected
23-Mar-22
by RF  
D 704132_D SAR Approved Approved 23-Mar-22 25-Mar Approved
T 704132_T Rejected Rejected 10-Feb-22 Approved
  0 704007_0 Nominal Nominal    
  A 704007_A Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
  B 704007_B Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
C 704007_C SAR Approved Approved 24-May 25-May Approved
704007_T Nominal with SAR Rejected by CW
Rejected 10-Feb-22 Approved
  0 704008_0 Nominal Nominal    
  A 704008_A Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
  B 704008_B Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
  C 704008_C Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
T 704008_T SAR Approved Approved 10-Feb-22 Approved
  0 704009_0 Nominal Nominal    
  A 704009_A Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
  B 704009_B Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
T 704009_T Nominal with SAR Rejected by CW
Rejected 10-Feb-22 Approved
C 704009_C SAR Approved Approved 12-May 13-May Approved
  X 704009_X Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
  0 704010_0 Nominal Nominal    
  A 704010_A Approved Approved 4-Jan-22 10-Mar-22 Approved  
  B 704010_B Rejected Rejected 4-Jan-22  
C 704010_C Approved Approved 19-May-22 20-May Approved 27-Jun-22
  X 704010_X Approved Approved 4-Jan-22  
  0 704011_0 Nominal Nominal    
  A 704011_A Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
  B 704011_B Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
  C 704011_C Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
D 704011_D SAR Approved Approved 19-Apr-22 20-Apr Approved
704011_T Nominal with SAR Rejected by CW
Rejected 10-Feb-22 Approved
  0 704012_0 Nominal Nominal    
  A 704012_A SAR Approved Approved 4-Jan-22 10-Mar-22 Approved  
  B 704012_B Rejected Rejected 4-Jan-22  
  C 704012_C SAR Approved Approved 23-Jun 27-Jun-22 Approved 27-Jun-22
  X 704012_X Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
  A 704013_A Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
  B 704013_B Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
  C 704013_C Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
T 704013_T SAR Approved Approved 10-Feb-22 Approved
  A 704014_A Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
  B 704014_B Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
704014_T Nominal with SAR Rejected by CW
Rejected 10-Feb-22 Approved
Rejected
Nominal with SAR Rejected
17-Mar-22
by RF
B 704014_P SAR Approved Approved 11-Jun 13-Jun Approved
  A 704015_A SAR Rejected Rejected 4-Jan-22 5-Jan Approved
  B 704015_B Nominal with SAR Rejected by
Rejected SAQ
4-Jan-22 26-Feb-22 Approved  
C 704015_C Resubmit Resubmit 16-May-22
D 704015_D SAR Approved Approved 18-Jul 25-Jul-22 Hold Hold
  A 704016_A Resubmit
Nominal with SAR approved4-Jan-22
by RF  
  B 704016_B SAR Approved Approved 4-Jan-22 26-Feb-22 Approved  
  A 704017_A Approved Approved 4-Jan-22  
  B 704017_B Approved Approved 4-Jan-22 13-Jun Approved  
C 704017_C Approved Approved 12-Apr-22 13-Apr Approved
  A 704036_A Approved Approved 4-Jan-22 14-Jan-22 Approved  
  B 704036_B Approved Approved 4-Jan-22  
C 704036_C SAR Approved Approved 19-May-22 20-May Approved
  0 704018_0 Nominal Nominal    
  A 704018_A Approved Approved 4-Jan-22 1-Feb-22 Approved  
  B 704018_B Approved Approved 4-Jan-22  
C 704018_C SAR Approved Approved 20-May-22 25-May Approved
  0 705002_0 Nominal Nominal    
  T 705002_T SAR Approved Approved 23-Mar-22 24-Mar-22 Approved  
  0 705003_0 Nominal Nominal    
  A 705003_A SAR Approved Approved 20-Mar-22 21-Mar-22 Approved  
705003_T Rejected Rejected 10-Feb-22 Approved
  0 705009_0 Nominal Nominal    
  A 705009_A SAR Approved Approved 19-Mar-22 20-Mar-22 Approved  
  0 704019_0 Nominal Nominal    
  A 704019_A Approved Approved 4-Jan-22 14-Jan-22 Approved  
  B 704019_B Approved Approved 4-Jan-22  
  X 704019_X Approved Approved
  C 704019_C Approved Approved 4-Jan-22 14-Jan-22 Approved  
  0 704020_0 Nominal Nominal    
  A 704020_A Approved Approved 4-Jan-22 26-Feb-22 Approved  
  B 704020_B Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
  C 704020_C Rejected Rejected 22-Jun  
  X 704020_X Colo Colo 4-Jan-22  
  0 705005_0 Nominal Nominal    
T 705005_T SAR Approved Approved 10-Feb-22 Approved
  0 704022_0 Nominal Nominal    
T 704022_T SAR Approved Approved 10-Feb-22 Approved
  0 704046_0 Nominal Nominal    
  A 704046_A SAR Approved Approved 19-Mar-22 20-Mar-22 Approved  
  0 704024_0 Nominal Nominal    
  A 704024_A Approved Approved 4-Jan-22  
  B 704024_B Approved Approved 4-Jan-22 14-Jan-22 Approved  
C 704024_C SAR Approved Approved 29-Apr-22 30-Apr Approved
  X 704024_X Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
  0 704025_0 Nominal Nominal    
  A 704025_A Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
  B 704025_B Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
Rejected
Nominal with SAR Rejected
17-Mar-22
by RF
704025_T Nominal with SAR Rejected by CW
Rejected 10-Feb-22 Approved
D 704025_D SAR Approved Approved 18-May 19-May Approved
  0 704026_0 Nominal Nominal    
  A 704026_A Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
  B 704026_B Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
T 704026_T SAR Approved Approved 10-Feb-22 Approved
  0 705007_0 Nominal Nominal    
T 705007_T SAR Approved Approved 10-Feb-22 Approved
  0 701024_0 Nominal Nominal    
  A 701024_A Rejected Rejected   1-Feb-22 Approved  
  B 701024_B Rejected Rejected    
  C 701024_C SAR Approved Approved 19-Mar-22 20-Mar-22 Approved  
  0 706027_0 Nominal Nominal    
  A 706027_A Rejected Rejected 27-Mar-22  
  B 706027_B Rejected Rejected 16-Apr  
C 706027_C SAR Approved Approved 17-May 18-May Approved
  0 705008_0 Nominal Nominal    
T 705008_T SAR Approved Approved 10-Feb-22 Approved
  0 710050_0 Nominal Nominal    
  A 710050_A Rejected
Nominal with SAR Rejected by STEP
  30-Mar Rejected  
B 710050_B SAR Approved Approved 19-Apr 20-Apr Approved
  0 704027_0 Nominal Nominal    
  A 704027_A Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
  B 704027_B Rejected
Nominal with SAR Rejected4-Jan-22
by RF  
T 704027_T SAR Approved Approved 10-Feb-22 Approved
  0 702012_0 Nominal Nominal    
T 702012_T Nominal with SAR Rejected by CW
Rejected 10-Feb-22 Approved
A 702012_A SAR Approved Approved 28-Apr 29-Apr Approved
  0 711006_0 Nominal Nominal    
A 711006_A SAR Approved Approved 14-Apr 18-Apr Approved Approved
  0 710008_0 Nominal Nominal    
A 710008_A SAR Approved Approved 2-Apr 11-Apr Approved
  0 706005_0 Nominal Nominal    
  A 706005_A SAR Approved Approved 27-Mar-22 28-Mar-22 Approved  
706005_T Rejected Rejected 10-Feb-22 Approved
  0 706007_0 Nominal Nominal    
T 706007_T Approved Approved 10-Feb-22 Approved
B 706007_A SAR Approved Approved 27-Jun-22 30-Jun-22 Approved Approved
  0 702013_0 Nominal Nominal    
  A 702013_A SAR Approved Approved 25-Mar-22 28-Mar-22 Approved  
T 702013_T Rejected
Rejected due to space issue 10-Feb-22 Approved
  0 702014_0 Nominal Nominal    
T 702014_T SAR Approved Approved 10-Feb-22 Approved
  0 702015_0 Nominal Nominal    
T 702015_T Rejected Rejected 10-Feb-22 Approved
A 702015_A Approved Approved 8-Apr 8-Apr Rejected
A 702015_B Approved Approved 28-Apr
C 702015_C SAR Rejected Rejected 18-May 19-May Approved
  0 704028_0 Nominal Nominal    
  A 704028_A Resubmit
Nominal with SAR approved4-Jan-22
by RF  
  B 704028_B SAR Approved Approved 4-Jan-22 1-Feb-22 Approved  
  0 702016_0 Nominal Nominal    
  A 702016_A Rejected
Nominal with SAR Rejected 24-Mar-22
by STEP  
B 702016_B SAR Approved Approved 4-May-22 6-May Approved
T 702016_T Rejected Rejected 10-Feb-22 Approved
  X 702016_X Colo Colo    
  0 701008_0 Nominal Nominal    
  A 701008_A Rejected Rejected    
  B 701008_B Approved Approved    
T 701008_T SAR Approved Approved 10-Feb-22 Approved
  0 706008_0 Nominal Nominal    
T 706008_T SAR Approved Approved 11-Feb-22 10-Feb-22 Approved
A 141041_A SAR Approved Approved 13-Feb-22 15-Feb-22 Approved
B 141041_B SAR Approved Approved 12-Jul
0 141041_0 Nominal Nominal 13-Jul-22 13-Jul-22 Approved
0 407111_A Rejected Rejected 1-Mar-22 Approved
A 408129_A SAR Approved Approved 30-May 1-Jun Approved
  0 408129_0 Nominal Nominal    
0 141011_0 Nominal Nominal
A 141011_A SAR Approved Approved 9-Mar-22 10-Mar-22 Approved
0 141074_0 Nominal Nominal
B 141074_B Approved Approved 2-May 11-May Rejected
X 141074_X SAR Approved Approved
A 141074_A Approved Approved 18-Mar-22 23-Mar-22 Approved
0 144063_0 Nominal Nominal
X 144063_X Approved Approved
A 144063_A Approved Approved 18-Mar-22 23-Mar-22 Rejected
0 144065_0 Nominal Nominal
X 144065_X SAR Approved Approved
A 144065_A Approved Approved 11-Mar-2022 15-Mar-22 Approved
0 144068_0 Nominal Nominal
X 144068_X SAR Approved Approved
A 144068_A Approved Approved 6-Mar-22 8-Mar-22 Approved
A 142075_A SAR Approved Approved 9-Mar-22 26-Apr-22 Approved
0 142075_0 Nominal Nominal
0 142046_0 Nominal Nominal
A 142046_A SAR Approved Approved 12-Mar-22 13/Mar/22 Approved
A 143064_A Rejected Rejected 20-Apr-22 16-May Approved
X 143064_X Colo Colo
0 143064_0 Nominal Nominal
0 407001_0 Nominal Nominal
A 407001_A SAR Approved Approved 22-Apr 25-Apr Approved
0 407008_0 Nominal Nominal
A 407008_A SAR Approved Approved 15-Apr 18-Apr Approved Approved
T 407022_T Approved Approved 5-Apr 7-Apr Approved
A 407022_A Approved Approved 2-May 3-May Approved
B 407022_B SAR Approved Approved 16-Jun-22 16-Jun-22 Approved Approved
407022_0 Nominal Nominal
A 408071_A SAR Approved Approved 18-Apr 20-Apr Approved
408071_0 Nominal Nominal
408183_0 Nominal Nominal
A 408183_A SAR Approved Approved 4-Apr 6-Apr Approved Approved
407055_0 Nominal Nominal
A 407055_A SAR Approved Approved 6-Apr 7-Apr Approved
144036_0 Nominal Nominal
X 144036_X SAR Approved Approved
A 144036_A Approved Approved 9-Mar-22 10-Mar-22 Approved
0 146002_0 Nominal Nominal
0 144005_0 Nominal Nominal
C 146015_C Rejected 28-Apr
E 146015_E SAR Approved Approved 21-Jun 22-Jun Approved 22-Jun-22
D 146015_D Rejected Rejected 10-May
0 146015_0 Nominal Nominal
C 143020_C Rejected Rejected 24-Jun-22 26-Jun-22 Rejected
0 143020_0 Nominal Nominal
0 149014_0 Nominal Nominal
0 144027_0 Nominal Nominal
D 146020_D SAR Approved Approved 9-May 10-May Approved
0 146020_0 Nominal Nominal
0 141030_0 Nominal Nominal
D 140020_D SAR Approved Approved 7-May 9-May Approved
0 140020_0 Nominal Nominal
0 144113_0 Nominal Nominal
0 704013_0 Nominal Nominal
0 704014_0 Nominal Nominal
0 704015_0 Nominal Nominal
0 704016_0 Nominal Nominal
0 704017_0 Nominal Nominal
0 704036_0 Nominal Nominal
0 407111_B Rejected Rejected 23-Apr
0 407111_C Approved Approved 21-Apr 25-Apr Rejected
D 407111_D SAR Approved Approved 21-Apr 28-Apr Approved
0 407111_0 Nominal Nominal
P 407077_P SAR Approved Approved 19-May-22 20-May Approved
0 407077_0 Nominal Nominal
P 140102_P SAR Approved Approved 16-May 17-May Approved
0 140102_0 Nominal Nominal
A 141013_A SAR Approved Approved 23-May 13-Jun Approved
0 141013_0 Nominal Nominal
A 140076_A Approved Approved 31-May 1-Jun Approved
B 140076_B Approved Approved 31-May
X 140076_X SAR Approved Approved
0 140076_0 Nominal Nominal
0 140077_0 Nominal Nominal
A 140077_A Rejected Rejected
B 140077_B Rejected Rejected
X 140077_X Approved Approved
C 140077_C Rejected Rejected
X 140080_X Colo Colo
0 140080_0 Nominal Nominal
0 144137_0 Nominal Nominal
0 147079_0 Nominal Nominal
A 147079_A Approved Approved 8-Jun
X 147079_X SAR Approved Approved 8-Jun 9-Jun Approved
B 147079_B SAR Approved Approved 8-Jun 9-Jun Approved
  0 146055_0 Nominal Nominal    
  A 146055_A SAR Approved Approved 16-Apr 16-Apr Approved  
  A 144136_A Tx Approved Approved 17-May 17-May Approved  
  A 141081_A Tx Approved Approved 17-May 17-May Approved  
  A 142089_A Tx Approved Approved 17-May 17-May Approved  
  A 144135_A Tx Approved Approved 17-May 17-May Approved  
  D 147036_D Approved Approved   6-Jan-22 Rejected  
A 144137_A Approved Approved
B 144137_B SAR Approved Approved 2-Jun-22 6-Jun-22 Approved
C 144137_C Rejected Rejected
  D 149010_D SAR Approved Approved 2-Jun-22 6-Jun-22 Approved  
D 148016_D SAR Approved Approved 2-Jun-22 6/6/2022 Approved
  D 141014_D Approved Approved 3-Jun-22 6-Jun-22 Approved  
  0 149016_0   Nominal Nominal        
  A 149016_A   Approved Approved        
  B 149016_B Approved Approved 10-Mar-22 44630 Approved  
  X 149016_X SAR Colo Colo        
  C 144105_C Approved Approved   27-Jun-22 Approved 27-Jun-22
  D 147018_D SAR Approved Approved 6/24/2022 27-Jun-22 Approved 27-Jun-22
D 149012_D SAR Approved Approved 27-Jun 30-Jun-22 Approved Approved
  0 417175_0   Nominal Nominal        
  X 417175_X SAR Colo Colo        
  0 705035_0   Nominal Nominal        
  X 705035_X SAR Colo Colo        
  0 706014_0   Nominal Nominal        
  X 706014_X SAR Colo Colo        
  0 710077_0   Nominal Nominal        
  X 710077_X SAR Colo Colo        
  0 122015_0   Nominal Nominal        
  X 122015_X SAR Colo Colo        
  0 404002_0   Nominal Nominal        
  X 404002_X SAR Colo Colo        
  0 408158_0   Nominal Nominal        
MS 1.6. TSSR MS 1.6. TSSR MS 1.6. TSSR TSSRMS 1.8.1. MS 1.8.1. TSSR
RF pre- TSSR RF pre- TSSR Report Reviewed
Validation by Validation by Validation by TSSR Subco Received Checked By
Validation by Validation by from Subco Count
RF [AC] RF [ST] RF [CM] STEP [ST] STEP [CM] Date
     
Rejected
8-Apr-22     Maktech Submitted 4-Apr-22 Abhishek 2
(High rent)

6-Jun-22 Approved I Engineering Submitted 6-Jun-22 Sharvendra 2


     
7-Feb-22 RejectedSAR Rejected by SAQ     Fireside Submitted 7-Feb-22 Abhishek 1
 
 
10-Aug-22 Approved Fireside Submitted 9-Aug-22 Sharvendra 2
     
     
     
19/8/2022 Approved Approved   Innovis Submitted 18/8/2022 Sharvendra 4
     
     
4-Apr-22 Cand Rejected by SAQ     Innovis Submitted 3-Mar-22 Abhishek 2
31-Aug-22 Approved     Innovis Submitted 31-Aug-22 Rohit 4
     
     
10-Mar-22
Again validate
Approved
due to change 6m to 9m RT(Owner
  issue)   Zagwe Submitted 9-Mar-22 Abhishek 2
     
28-Apr-22  
Rejected due to SAR Rejected by SAQ   Maktech Submitted 28-Apr-22 Sharvendra 2
     
2-Jun-22 Approved Maktech Submitted 31-May-22 Abhishek 2
8-Feb-22 Approved Maktech Submitted 8-Feb-22 Prashant 1
     
     
     
1/28/2022 Approved
change Azimuth to 60/180/280    Zagwe Submitted 28-Jan-22 Hamza 2
     
     
     
 
28-Dec-2021 Approved Fireside Submitted 28-Dec-21 Prashant 1
6-Jan-2022 Approved   INNOVIS Submitted 5-Jan-22 Prashant 1
     
Propose
10-Dec-2021
Antenna Approved
Heigt at 33m Position to eliminate the Shadowing  effect Fireside Submitted 10-Dec-21 Hamza 2
     
     
19-Mar-22 Approved     Fireside Submitted 8-Mar-22 Abhishek 3
     
Rejected by
20-May-22 Rejected     Zagwe Submitted 24-Mar-22 Abhishek 3
STEP RF
     
     
     
12-Jul-22 Approved     Zagwe Submitted 12-Jul-22 Sharvendra 2
     
20-Apr-22 SAR Rejected by SAQ     Zagwe Submitted 20-Apr-22 Abhishek 1
     
16-Jun-22 Approved     Zagwe Submitted 14-Jun-22 Abhishek 2
     
16-Jul-22 Approved     Zagwe Submitted 24-Feb-22 Abhishek 3
     
     
     

     
7-Jun-22 SAR Rejected by SAQ Zagwe Submitted 17-May-22 Sharvendra 2
17-Jun-22 Approved Zagwe Submitted 17-Jun-22 Sharvendra 2
     
16-Jun-2022 Approved   Zagwe Submitted 6/16/2022 Sharvendra 1
     
     
     
     
     
25-Aug-2022 Approved   Igado Submitted 25-Aug-22 Sharvendra 2
     

     
     
28-Jul-22 Approved     Igado Submitted 28-Jul-22 Sharvendra 1
22-Feb-2022 Approved     ACME Submitted 22-Feb-22 Sharvendra 4
     
     
     
     
     

26-Jul-22 Approved     Innovis Submitted 26-Jul-22 Sharvendra 2


     
3-Jun-22 Approved but change due to 120 colo lis I Engineering Submitted 3-Jun-22 Sharvendra 2
     
     
8-Aug-22 Approved     Fireside Submitted 8-Aug-22 Sharvendra 2
     
     
     
10-Jan-2022 Approved   FireSide Submitted 9-Jan-22 Prashant 3
     
     
     
7-Jun-2022 Approved Maktech Submitted 7-Jun-22 Sharvendra 3
     
10-Feb-22 Approved 0 Maktech Submitted 9-Feb-22 Abhishek 1
     
     
     
     
29-Mar-22 SAR Rejected by STEP RF     ACME Submitted 28-Mar-22 Sharvendra 3

29-Jul-2022 Approved   Igado Submitted 29-Jul-22 Sharvendra 2


     
     
     

26-Jul-2022 Approved   Fireside Submitted 26-Jul-22 Sharvendra 2


     
     
     
     
6-May-22 RejectedSAR Rejected by RF IEngg Submitted 6-May-22 Sharvendra 2

31-Aug-22 Approved     TES Submitted 20-Aug-22 Sharvendra 2


     
     
     

9-May-22
Rejected as candidate P (EEP) is already approved and active. IGADO Submitted 9-May-22 Sharvendra 2

21-Jun-2022 Approved Igado Submitted 4-Feb-22 Abhishek 2


     
     
8-Mar-22 RejectedSAR Rejected by SAQ     Maktech Submitted 8-Mar-22 Abhishek 2

     
     
     
 
4-Jan-2022 Rejected SAR Rejected by SAQ Innovis Submitted 4-Jan-22 Prashant 2
8/22/2022 Approved     innovis Submitted 22-Aug-22 Sharvendra 3
     
     
     
10-May-22 Approved Igado Submitted 10-May-22 Sharvendra 1

     
29-Nov-2021 Approved       Maktech Submitted 29-Nov-21 Hamza 1
     
     
verted to Colo GBT      
     
Approved but
18-May-22 Change due Zagwe Submitted 11-May-22 Abhishek 1
to Colo Site
25-Jul-2022 Approved Approved   Fireside Submitted 23-Jul-22 Sharvendra 1
     
     
     
7/7/2022 Approved Igado Submitted 7/6/2022 Sharvendra 2

3/23/2022 SAR Rejected by SAQ Zagwe Submitted 23-Mar-22 Sharvendra 1


     
     

27-Jul-2022 Approved   Fireside Submitted 27-Jul-22 Sharvendra 2


     
5-Sep-22 Approved   TES Submitted 5-Sep-22 Rohit 2
     
 
25-Mar-2022 Rejected SAR Rejected by SAQ Acme Submitted 24-Mar-22 Sharvendra 1
     
27-Feb-2022 Approved     Maktech Submitted 27-Feb-22 Sharvendra 3
     
     
     
     
     
13-Apr-22 Approved IGADO Submitted 12-Apr-22 Abhishek 1
     
25-Mar-2022 Approved       Maktech Submitted 25-Mar-22 Sharvendra 2
     
     
24-Feb-22 Rejected (High rent) FireSide Submitted 24-Feb-22 Sharvendra 5
     

4-Jul-22 Approved FireSide Submitted 4-Jul-22 Sharvendra 1

     
     
13-Jun-2022 Approved 0     Zagwe Submitted 13-Jun-22 Sharvendra 3
     
 
     
8-Oct-2021Rejected due to Lower Roof Shadows 3rd
  Sector   Innovis Submitted Jaffar 4
     
 
8-Mar-22 Approved Maktech Submitted 8-Mar-22 Sharvendra 2
     
     
     
     
     
     
     
     
26-Aug-22 Approved       Tes Submitted 26-Aug-22 Sharvendra 2
     
9-Dec-2021 Approved
Update the SAF details     FireSide Submitted 9-Dec-21 Hamza 2
     
     
     
     

13-Aug-22 Approved     innovis Submitted 12-Aug-22 Rohit 2


     
24-Feb-22 Rejected by SAQ     Acme Submitted 24-Feb-22 Sharvendra 2
     
4-Apr-22 Approved ACME Submitted 1-Apr-22 Abhishek 2
     
2/3/2022 Approved       Innovis Submitted 3-Feb-22 Hamza 1
     
     
     
10-Aug-22 Approved IGADO Submitted 10-Aug-22 Sharvendra 7

     
     
22-Apr-22 Approved     Innovis Submitted 21-Apr-22 Sharvendra 2
23-May-22 SAR Rejected by SAQ IEngg Submitted 8-May-22 Abhishek 3

     
     
7-Oct-2021 SAR Rejected by SAQApproved   Maktech Submitted 7-Oct-21 Hamza 2
11-Jun-2022 Approved Innovis Submitted 11-Jun-22 Abhishek 2
     
     
     
17-Aug-22 Approved       fireside Submitted 16-Aug-22 Rohit 1
     
     
     
5-Sep-22 Approved     Fireside Submitted 5-Sep-22 Rohit 4
     
     
15-Mar-22 Rejected by CW     Zagwe Submitted 15-Mar-22 Abhishek 2
21-Jun-22 Approved Zagwe Submitted 13-Apr-22 Abhishek 4
     
25-Feb-22 Approved       Zagwe Submitted 24-Feb-22 Abhishek 1
     
     
23-Mar-22 Rejected by SAQ     Tesla Submitted 23-Mar-22 Sharvendra 2
21-Apr-22  SAR Rejected by SAQ     Tesla Submitted 21-Apr-22 Sharvendra 1
7/27/2022 Approved     Innovis Submitted 27-Jul-22 Rohit 1
     
Rejected by
17-Feb-22     Fireside Submitted 15-Feb-22 Abhishek 1
SAQ
24-May-22 SAR Rejected by SAQ IENG Submitted 24-May-22 Sharvendra 2

22-Jul-22 Approved Fireside Submitted 22-Jul-22 Sharvendra 2


     
     
verted to Colo GBT      
7-May-22  Rejected(Govt issue)     TESLA Submitted 7-May-22 Abhishek 1
9-May-22 Approved TSSR Subco Submitted 7-May-22 Abhishek 1
     
     
     

13-May-22 Approved but change due Colo Candidate Zagwe Submitted 13-May-22 Sharvendra 1
27-Aug-22 Approved     Fireside Submitted 26-Aug-22 Rohit 1
     
12-Jan-2022 Approved       Maktech Submitted 23-Dec-21 Prashant 2
     
     
     
28-Apr-22 Approved     MAKTECH Submitted 15-Mar-22 Abhishek 5
     
     
     
     
17-Mar-22 Rejected By SAQ Fireside Submitted 17-Mar-22 Sharvendra 1

ejected due to ( Shadowing


6-Jul-22in Sec-2 due to own building with 9M RTT). Use 6M Poles to avoide
Fireside
shadowing.Submitted 3-Jul-22 Abhishek 3
23-Aug-22 Approved       Igado Submitted 23-Aug-22 Sharvendra 2
     
     
     
19-May-22 Approved but change due to 120 colo lis Innovis Submitted 19-May-22 Sharvendra 1
27-Jul-2022 Approved     Innovis Submitted 27-Jul-2022 Sharvendra 1
     
     
     
10-Aug-22 Approved Fireside Submitted 10-Aug-22 Sharvendra 1

19-May-22 Rejected SAR Rejected by RF Igado Submitted 19-May-22 Sharvendra 2

     
     
     

21-Jun-22 Approved Zagwe Submitted 8-Jun-22 Abhishek 3


6-Mar-22 Rejected by SAQ     Zagwe Submitted 6-Mar-22 Sharvendra 1
     
10-Mar-22 Rejected by STEP
Rejected
RF by STEP RF   Fireside Submitted 10-Mar-22 Sharvendra 1
     
     
     

12-Jul-22 Panoramic
Approved pics for Sec-2&3 are missing Fireside Submitted 30-Jun-22 Abhishek 1
     
     
     

22-May-22 Rejected by STEP RF Igado Submitted 21-May-22 Sharvendra 2

12/7/2021 Approved     Innovis Submitted 7-Dec-21 Arun 1


     
19-Feb-2022 Approved       Zagwe Submitted 18-Feb-22 Abhishek 1
     
     
     
     
     

11-May-22 Approved Fireside Submitted 10-May-22 Sharvendra 2


     
     
     
29-Dec-21 Earlier it was approved as per old nominal
  Plan   Innovis Submitted 29-Dec-21 Prashant 4

4-May-22 Approved Igado Submitted 4-May-22 Sharvendra 1


     
1/11/2022 Approved       Fireside Submitted 11-Jan-22 Arun 1
     
     
29-Nov-2021 Approved       Zagwe Submitted 29-Nov-21 Hamza 1
     
     
     
29-Nov-2021 Approved       Maktech Submitted 29-Nov-21 Hamza 1
     
30-Mar-22 Approved     TESLA Submitted 28-Mar-22 Abhishek 2
     

30-May-22 Approved but change due to Reverted to Colo Igado Submitted 30-May-22 Sharvendra 2
31-Aug-22 Approved Approved   Innovis Submitted 31-Aug-22 Rohit 3
     
27-Jul-22 Approved     Igado Submitted 26-Jul-22 Sharvendra 3
     
     
     
     
     
14-Jul-22 Approved       Zagwe Submitted 14-Jul-22 Sharvendra 2
5-Sep-22 Approved     Fireside Submitted 5-Sep-22 Rohit 2
     
     
     

28-Jul-2022 Approved   Zagwe Submitted 28-Jul-22 Sharvendra 2


1) No propsed
antenna  pole    
proposed
     
location at 7.4
9-Feb-2022 Cand Rejected
on sheetby"7.
STEP RF     Maktech submitted 9-Feb-22 Prashant 2
General site
16-Mar-22       IGADO Submitted 16-Mar-22 Abhishek 1
photos".
16-Mar-22 Approved 2) No propsed
      IGADO Submitted 16-Mar-22 Abhishek 1
MW pole
 
proposed    
4-Feb-2022 Approved location at 7.5   Innovis Submitted 2-Feb-22 Prashant 1
on sheet "7.
  site
General    
photos".
     
3) No Land
Coordinates
     
at 7.6 on
 
sheet "7.    
23-Jul-22 Building
Resubmit General site
Ht and RF Ht need to be updated
    Maktech Submitted 22-May-22 Sharvendra 3
photos".
 
4) No    
panoramic  pic    
@ angle 120
19-Feb-2022 Approved Deg for Sec-2     Fireside Submitted 16-Feb-22 Abhishek 3
on sheet "8.
Panoramic  S1    
& S2 &   S3".    
5) MW
 
azimuth    
mismatch on
sheet "4. BTS
MW Cabling
information"
(119.45 Deg)
& "10.
Drawings
     
22-Aug-22 Approved       Innovis Submitted 22-Aug-22 Sharvendra 1
     
Approved but
5-May-22 reverted to     ACME Submitted 24-Feb-22 Abhishek 3
RT oprtion

20-May-22 RejectedSAR Rejected by SAQ Zagwe Submitted 19-May-22 Abhishek 3


10-Aug-22 Approved Igado Submitted 9-Aug-22 Sharvendra 4
     
     
     
     

18-Jun-22 Approved but change due to Reverted to Colo Fireside Submitted 18-Jun-22 Abhishek 1
15-Jul-2022 Approved   Fireside Submitted 15-Jul-2022 Sharvendra 2
     
     
     
12/26/2021 Approved   Innovis Submitted 26-Dec-21 Hamza 1
     
12/26/2021 Approved       Innovis Submitted 26-Dec-21 Hamza 1
     
     
     
     
14-Jul-22 Approved     Innovis Submitted 14-Jul-22 Sharvendra 2
30-Aug-22 Approved Innovis Submitted 30-Aug-22 Rohit 2
     
     
     
Resubmit2-Jun-22 Zagwe
due to Pole position need to change and Azimuth required 50/170/300 Submitted 19-May-22 Sharvendra 2
30-Jul-22 Rejected Due to SD failed Zagwe Submitted 2-Jun-22Sharvendra/Abhishek 2
30-Aug-22 Approved   fireside Submitted 30-Aug-22 Rohit 3
     
26-Jul-22 Approved     Fireside Submitted 26-Jul-22 Sharvendra 2
     
     
     
     

12-Aug-22 Approved Fireside Submitted 10-Aug-22 Rohit 1


     
22-Feb-2022 Rejected SAR Rejected by SAQ     Innovis Submitted 22-Feb-22 Abhishek 1
     
     
2-Sep-22 Approved       fireside Submitted 2-Sep-22 Rohit 1
     
     
     
22-Jun-22 Approved Innovis Submitted 21-Jun-22 Sharvendra 2
     
26-Mar-22 Rejected due to EEP.     ACME Submitted 26-Mar-22 . 1
29-Mar-22 Approved     ACME Submitted 29-Mar-22 Abhishek 1
5-May-2022 Approved but SAR status is backup
    Maktech Submitted 9-Feb-22 Abhishek 3
     
     
17-May-22 Rejected SAR Rejected by SAQ     Maktech Submitted 23-Feb-22 Abhishek 4
28-Jul-2022 Approved   Zagwe Submitted 28-Jul-22 Sharvendra 2
     
26-Apr-22 Reverted to RT option     Zagwe Submitted 26-Apr-22 Sharvendra 2
     
13-May-22 Approved I Engineering Submitted 12-May-22 Sharvendra 3
     
7-Jul-22 Approved     IGADO Submitted 7-Jul-22 Sharvendra 5
     
     
Approved but change due to revertedApproved
28-Dec-2021 to RT candidate   Innovis Submitted 27-Dec-21 Prashant 2
     
24-May-22 Approved Innovis Submitted 24-May-22 Sharvendra 1
     
     
9-Jun-22 Approved     ELITE Submitted 9-Jun-22 Sharvendra 4
     
     
3-Feb-2022 RejectedSAR Rejected by SAQ   Innovis Submitted Prashant 1
     
     
6-Sep-22 Approved     Innovis Submitted 6-Sep-22 Sharvendra 3
     
1/28/2022
Rejected due to TSS conducted on Candidate A and not Candidate D Innovis Submitted 28-Jan-22 Hamza 2
9-May-22 Approved       FireSIDE Submitted 23-Feb-22 Abhishek 2
     

     
     
     
     
30-May-22 Approved I Engineering Submitted 29-May-22 Sharvendra 3

     
     
     
11-Jan-2022 Approved   Innovis Submitted 11-Jan-22 Prashant 2
     
     
11-Jan-2022 RejectedSAR Rejected by SAQ FIRESIDE Submitted 11-Jan-22 Prashant 2
31-Aug-22 Approved       TES Submitted 25-Aug-22 Rohit 1
     
12/27/2021 Approved       INNOVIS Submitted 26-Dec-21 Prashant 1
     
S NOT BUILDABLE
12/8/2021
AS THE WHOLE ROOF IS IRON SHEETS AND
  NO COLUMN
  OR BEAM
Fireside
TO SUPPORT
Submitted
THE TOWER
8-Dec-21 Arun 1
 
30-Jun-2022 Backup Candidate(6mtr Pole is not feasible) Fireside Submitted 15-Jan-22 Abhishek 4
 
15-Jul-2022 Approved   Innovis Submitted 15-Jul-2022 Sharvendra 3
     
1. Cover sheet
 
have missing    
8-Apr-22 site id,(High
 Rejected Totalrent)     Maktech Submitted 8-Apr-22 Sharvendra 1
blocking on
 
0-90 degree    
2-Jun-22 Approved ( 1st sector ) Maktech Submitted 2-Jun-22 Abhishek 1
2. Google
snap  and    
elevation is
15-Oct-2021 Rejected     Zagwe Submitted 15-Oct-21 Hamza/Arun 3
not correct
3. BTS  Sheet    
have missing
 Azimuth  
atnenna    
Need to  be
details and    
RTT ht
20/130/250
20-Jul-22 Approved 4.Panaormic     Zagwe Submitted 20-Jul-22 Sharvendra 2
for sec
  2 is    
not correct
14-Feb-2022 Cand Rejected by SAQ   Maktech Submitted 13-Feb-22 Sharvendra 4
     
30-Apr-22 Rejected
Rejectedby STEP RF due to Shadowing Maktech Submitted 30-Apr-22 Sharvendra 2

     
     
3-Jun-22 SAR Rejected by SAQ     Innovis Submitted 3-Jun-22 Sharvendra 2
     
7-Jul-22 Approved     Innovis Submitted 6-Jul-22 Sharvendra 2
     
     

31-Aug-2022 Approved     Innovis Submitted 31-Aug-22 Sharvendra 4


     
     
1/28/2022 Approved
Already Approved by STEP     Zagwe Submitted 28-Jan-22 Hamza 2
     
     
22-Feb-22 Rejected by SAQ     Zagwe Submitted 22-Feb-22 Abhishek 2
4-May-22 Approved Zagwe Submitted 4-May-22 Sharvendra 2

     
     
     
26-08-2022 Approved Innovis Submitted 26-08-2022 Sharvendra 4
30-Jul-22 Rejected
Due to no enough space Maktech Submitted 8-Feb-22 Prashant 1
     
     
     
18-May-22 Approved but change due to Reverted to Colo Zagwe Submitted 18-May-22 Sharvendra 2
8-Aug-22 Approved   Fireside Submitted 6-Aug-22 Rohit 3
     
     
     
2-May-22 Approved       Innovis submitted 2-May-22 Sharvendra 1
     
     
     
30-Mar-22 Nominal with SAR Rejected by STEP Maktech Submitted 29-Mar-22 Abhishek 1
10-May-22 Rejected by STEP Due to Out Of Search Ring Zagwe Submitted 10-May-22 Abhishek 1
12/12/2021 Approved     Maktech Submitted 12-Dec-21 Arun 1
     
22-Nov-2021 Rejected Rejected by CW     Innovis Submitted 22-Nov-21 1
     
5-Aug-22 Approved       Innovis Submitted 5-Aug-22 Rohit 2
     
     

26-Mar-22 Approved Zagwe Submitted 19-Mar-22 Abhishek 3


     
     
     

16-Nov-2021 Approved   Innovis Submitted 15-Nov-21 Hamza


     
     
     
     
 
     
     
     
     
     

27-Jul-2022 Approved Approved   Innovis Submitted 27-Jul-22 Rohit 2


     
25-Nov-2021 Approved       Innovis Submitted 25-Nov-21 Hamza 1
     
     
     
6-Apr-2022 SAR Rejected by SAQ   Maktech Submitted 5-Apr-22 Abhishek 4
     
     
     
1-May-22 Approved     Tesla Submitted 27-Apr-22 Abhishek 1
     
18-Jun-2022 Approved   Approved   Zagwe Submitted Abhishek 3
     
     
11-Mar-22 Approved   Zagwe Submitted 22-Feb-22 Abhishek 4
     
     
     
22-Mar-22 Approved     Maktech Submitted 21-Mar-22 Abhishek 1
     
     
     
28-Jul-2022 Approved     Fireside Submitted 28-Jul-2022 Sharvendra 4
     
     
     
21-Jun-22 Approved but change due to Reverted  to Colo   Fireside Submitted 20-Jun-22 Sharvendra 1
26-Jul-22 Approved       Fireside Submitted 25-Jul-22 Sharvendra 1
     
     
16-May-22 Approved Maktech Submitted 16-May-22 Sharvendra 3

     
0
14-Jun-2022 Approved Maktech Submitted 14-Jun-2022 Sharvendra 1
     
     
     
     
13-May-22 Approved Fireside Submitted 12-May-22 Abhishek 2
     
28-Mar-22 Approved     Maktech Submitted 25-Mar-22 Sharvendra 2
     
     
verted to Colo GBT      
     
Approved but
4-May-22 Change due Maktech Submitted 4-May-22 Sharvendra 1
to Colo Site
27-Jul-22 Approved       Fireside Submitted 27-Jul-22 Sharvendra 1
     
     
11/30/2021 Approved       Zagwe Submitted 30-Nov-21 Arun 1
     
     
     
     
     

 Buldings between
29-Jul-22
230 to 280 degrees
Approved
are g+10 and RF Ht 25m but  approved after  approval from
Igado
STEP Submitted 22-Jul-22 Sharvendra 1
     
12/27/2021 Rejected by CW     Fireside Submitted 29-Nov-21 Arun 1
     
     
22-Jun-22 Approved     Innovis Submitted 22-Jun-22 Sharvendra 2
   
     
     
     
10-Mar-22 Approved       IGADO Submitted 10-Mar-22 Abhishek 1
     
     
     
29-Apr-22 Approved     Innovis Submitted 29-Mar-22 Abhishek 3

13-May-22 Approved but Change due to Colo Site IGADO Submitted 12-May-22 Abhishek 2
2-Jul-22 Approved     Innovis Submitted 2-Jul-22 Sharvendra 1
     
4-Apr-22 Approved     Zagwe Submitted 4-Apr-22 Sharvendra 2
     
     
2-Mar-22 Approved       Fireside Submitted 2-Mar-22 Sharvendra 2
     
     
27-Aug-22 Approved     fireside Submitted 26-Aug-22 Rohit 1
     
     

     
     

8/23/2022 Approved     Zagwe Submitted 22-Aug-22 Sharvendra 2


     
     

26-Apr-22 Approved TESLA Submitted 26-Apr-22 Abhishek 1


     
     
     

1-Jun-22 Approved Igado Submitted 1-Jun-22 Sharvendra 2


     
 Rejected by CW. Confirmed by Jaffar on mail
  on 18-Apr.  
10-Aug-22 Approved Igado Submitted 10-Aug-22 Sharvendra 2

10-Feb-2022 Strcutural Analysis didnt pass    Maktech Submitted 9-Feb-22 Sharvendra 1


     
     
3-Jun-22 Approved Innovis Submitted 3-Jun-22 Sharvendra 2
     
Azimuth
     
Need  to    
be      
80/200/3
17-Jun-22 Approved but change
20 due to Reverted to Colo Maktech Submitted 17-Jun-22 Sharvendra 1
29-Jul-2022 Approved     Zagwe Submitted 28-Jul-22 Sharvendra 2
     
     
18-May-22 Approved Igado Submitted 17-May-22 Sharvendra 2

     
     
     
     
     
4-May-22 Rejected SAR Rejected by SAQ Zagwe Submitted 19-Apr-22 Abhishek 2
1-Sep-22 Approved       Innovis Submitted 1-Sep-22 Rohit 2
     
     
     
11-Mar-22 Approved       Acme Submitted 11-Mar-22 Sharvendra 1
21-Feb-2022 Cand Rejected by CW     FIRESIDE Submitted 21-Feb-22 Sharvendra 2
     
     
13-May-22 Approved Zagwe Submitted 13-May-22 Sharvendra 3
     
     
     
1-Sep-22 Approved     Fireside Submitted 26-Oct-21 Rohit 1
     

7-Jun-22 Approved Igado Submitted 7-Jun-22 Sharvendra 4

     
11-Mar-22 RejectedSAR Rejected by SAQ     Zagwe Submitted 11-Mar-22 Abhishek 1
     
     
8-Aug-22 Approved       Igado Submitted 8-Aug-22 Sharvendra 1
     
     
1-Feb-22 Approved     Innovis Submitted 1-Feb-22 Abhishek 1
12-Apr-22 Rejected by STEP RF     Maktech Submitted 12-Apr-22 Sharvendra 2
     
1-Sep-22 Approved     fireside Submitted 1-Sep-22 Rohit 4
     
     
     
     
     
Low antenna
12/6/2021 Cand height
Rejected
14Mby CW FIRESIDE Submitted 6-Dec-21 Arun 1
which is not
31-May-22 Rejected     Fireside Submitted 26-Apr-22 Abhishek 1
acceptable as
discussed  
with Jaffar
3-Aug-2022 Approved   Fireside Submitted 3-Aug-22 Sharvendra 1
     
12/12/2021 Approved       Innovis Submitted 10-Dec-21 Hamza 1
     
     

18-Feb-22  
Rejected due to not enough space   ACME Submitted 18-Feb-22Sharvendra/Abhishek 2
     
29-Mar Approved     ACME Submitted 26-Mar-22 Abhishek 2
20-May-22 Approved Igado Submitted 19-May Sharvendra 1

     
15-Jul-22 Approved       Igado Submitted 15-Jul-22 Sharvendra 1
     

     
Approved but
15-Jun-22 Change due     FIRESIDE Submitted 14-Jun-22 Abhishek 2
to Colo Site

     
     
     
     
     
12-Feb-2022 Approved   Innovis Submitted 11-Feb-22 Abhishek 1
     
12-Feb-22 Approved     Maktech Submitted 10-Feb-22 Prashant 2
     
     
4-Jan-2022 SAR Rejected by SAQ     Zagwe Submitted 4-Jan-22 Prashant 1
     
     
10-Jun-22 Approved     Zagwe Submitted 10-Jun-22 Abhishek 2
     
3-Jan-2022 Rejected by SAQ FIRESIDE Submitted 31-Dec-21 Prashant 2
22-Jun-2022 Rejected SAR Rejected by SAQ Elite Submitted 3-Jun-2022 Abhishek 2

23-Aug-2022 Approved FIRESIDE Submitted 22-Aug-22 Sharvendra 2


     
8-Apr-22  Rejected by SAQ     Zagwe Submitted 8-Apr-22 Sharvendra 1
     
1-Sep-22 Approved     TES Submitted 1-Sep-22 Rohit 1
     
     
12/27/2021 Rejected by CW     Fireside Submitted 17-Dec-21 Prashant 1
 SAR
5/9/2022
Rejected Rejected
by STEP RF due to There is shadowing and blockage. Fireside Submitted 9-May-22 Sharvendra 2

8/23/2022 Approved Fireside Submitted 22-Aug-22 Sharvendra 3


1-Feb-2022 Rejected (due to EEP TSSR)     Innovis Submitted 1-Feb-22 Abhishek 4

25-Jun-2022 Approved Maktech Submitted 14-Jun-22 Abhishek 2


 
5-May-2022 SAR Rejected by CW Maktech Submitted 4-Feb-22 Abhishek 2
     
17-Mar-22  SAR Rejected by STEP RF     Fireside Submitted 17-Mar-22 Abhishek 1
31-Aug-22 Approved     TES Submitted 20-Aug-22 Sharvendra 1

6-Jun-22 RejectedSAR Rejected by STEP     Fireside Submitted 2-Jun-22 Sharvendra 4


     
     
15-Apr-2022
Rejected by CW Perspective as Non constructible Maktech Submitted 14-Apr-22 Sharvendra 1
15-Jun-2022 Approved Zagwe Submitted 15-Jun-22 Sharvendra 3
     
     

11-Jun-22 Approved     Innovis Submitted 10-Jun-22 Sharvendra 2


     
     
     
25-Aug-2022 Approved   TES Submitted 25-Aug-22 Sharvendra 2
     
2-Mar-22 Approved     Zagwe Submitted 1-Mar-22 Sharvendra 3
     
     
     
     
     
1-Jun-22 Approved     Zagwe Submitted 5-May-22Sharvendra/Abhishek 3
     
     
     

23-Jun-22 Approved but change due to Reverted to Colo Zagwe Submitted 23-Jun-22 Sharvendra 3
2-Aug-22 Approved   Igado Submitted 2-Aug-22 Sharvendra 2
     
     
7-Apr-22 Hold due to SAR Still not approved by
  STEP   Innovis Submitted 17-Mar-22 Abhishek 2
   
27-Jul-22 Approved     Maktech Submitted 27-Jul-22 Sharvendra 2
     
     
     
5-Mar-22 Approved     Zagwe Submitted 5-Mar-22 Abhishek 1
     
27-Nov-2021 Approved       Innovis Submitted 27-Nov-21 Hamza 1
     
     
     
     
8-Jun-22 Approved     Tesla Submitted 8-Jun-22 Sharvendra 3
     
     
3-Jan-2022 Approved       Fireside Submitted 28-Dec-21 Prashant 5
     
     
     
7-Jun-22 Approved Tesla Submitted 7-Jun-22 Sharvendra 5
     
the Main Beam from
9-Dec-2021
sites around all sectors as on 240 direction there
  is ongoing construction
  FireSide
which might cause
Submitted
Blocking 9-Dec-21
in future Hamza 1
     
31-May-22 SAR Rejected by STEP Zagwe Submitted 12-May-22 Abhishek 1
10-Jan-2022  Rejected due to owner not interested for rent FIRESIDE Submitted 7-Jan-22 Prashant 1
27-Jun-2022 Approved IGADO Submitted 27-Jun-2022 Sharvendra 3
 
     
     
29-Nov-2021 Rejected SAR Rejected by SAQ     Maktech Submitted 29-Nov-21 Hamza 1
31-Aug-22 Approved     Igado Submitted 31-Aug-22 Rohit 3

     
SAR Rejected by STEP RF
7-Mar-2022 Fireside Submitted 5-Mar-22 Abhishek 2
     
     
13-May-22 Approved Zagwe Submitted 13-May-22 Sharvendra 4
     
9-Aug-22 Approved       fireside Submitted 8-Aug-22 Rohit 2
     
 
 
 
     
     
5-Aug-22 Approved Zagwe Submitted 5-Aug-22 Sharvendra 4
     
     
8-Mar-22 Approved     Maktech Submitted 4-Mar-22 Abhishek 2
     
     
6-Jun-22 Approved Zagwe Submitted 6-Jun-22 Sharvendra 3
     
     
11/29/2021 Approved       Fireside Submitted 29-Nov-21 Arun 1
     
     
     
14-Mar-22 Rejected due to SAR Rejected by  CW   Zagwe Submitted 14-Mar-22 Sharvendra 4
8-Jul-22 Approved     Zagwe Submitted 8-Jul-22 Abhishek 1
     
2/9/2022 Approved       Maktech Submitted 9-Feb-22 Sharvendra 1
ncelled for colo GBT      
     
     
12/27/2021 Rejected SAR Rejected by SAQ     Fireside Submitted 29-Nov-21 Arun 1
     
     
26-Aug-22 Approved     Tes Submitted 25-Aug-22 Sharvendra 2
     
     
     
7-Jun-22 Approved     Tesla Submitted 7-Jun-22 Sharvendra 3
     
7/21/2022 Approved   Fireside Submitted 7/21/2022 Sharvendra 2
     

                 
                 
     
     
26-Jul-22 Approved     Fireside Submitted 25-Jul-22 Sharvendra 2
     
     
1-Jun-2022 Rejected SAR Rejected by SAQ     Fireside Submitted 6/1/2022 Sharvendra 1
     
10-Aug-22 Azimuth
Resubmit
need to be 0/120/240 & RF  Ht 28m   Fireside Submitted 10-Aug-22 Sharvendra 4
     
     
     
23-Dec-2021 Approved       Maktech Submitted 21-Dec-21 Prashant 1
     
16-Aug-22 Approved     igadotech Submitted 16-Aug-22 Rohit/Prashant 4
     
9-May-22 Nominal with SAR Rejected by STEP Zagwe Submitted 9-May-22 Abhishek 1
     
     
     
16-Jul-22 Approved     Innovis Submitted 17-Jun-22Sharvendra/Abhishek 4
     
     
13-Apr-22 Approved     Zagwe Submitted 13-Apr-22 Sharvendra 2
     
8-May-22 Approved IEngg Submitted 8-May-22 Sharvendra 2
     
     
     
25-Oct-2021 Rejected SAR Rejected by SAQ
Approved   Innovis Submitted Prashant 1
     
     
     
     
     
     
25-Feb-22 Approved     ACME Submitted 25-Feb-22 Prashant 3
     
     
     
     
     
2-Mar-22 Approved Fireside Submitted 1-Mar-22 Sharvendra 2
   
20-May-22 Rejected Rejected By SAQ Zagwe Submitted 11-May-22 Abhishek 2
     
     
15-Mar-22 Rejected by STEP
Rejected
RF by STEP RF   Zagwe Submitted 15-Mar-22 Sharvendra 2

26-Aug-22 Approved IGADO Submitted 26-Aug-22 Sharvendra 3


     
     
29-Jun-22 Approved I Engineering Submitted 2-Jun-22 Abhishek 5
verted to Colo GBT      
     
28-Jul-2022 Approved     Fireside Submitted 28-Jul-22 Rohit 3
28-Apr-22 Antenna height is too low     Fireside Submitted 28-Apr-22 Sharvendra 2
11-Jun Rejected by STEP RF due to ISD with other si Fireside Submitted 10-Jun-22 Abhishek 2
     
     
     
16-May-22 Rejected
Shadow from its own Building I Engineering Submitted 15-May-22 Sharvendra 6

     
9-May-22 SAR Rejected by SAQ     Fireside Submitted 13-Apr-22 Sharvendra 3

13-Jun-22 Approved Fireside Submitted 11-Jun-22 Abhishek 2


     
25-Feb-2022 RejectedSAR Rejected by SAQ ACME Submitted 25-Feb-22 Prashant 3
     
     
     
23-Dec-2021 RejectedSAR Rejected by SAQ
Approved   Innovis Submitted 23-Dec-21 Prashant 2
     
1-Sep-22 Approved     Tes Submitted 1-Sep-22 Rohit 3
     
     
25-Aug-22
Pls share Resubmit
the updated TSSR with corrected ET
  ID 113049   Tes Submitted 24-Aug-22 Sharvendra 1
     
17-Jun-22 Backup Candidate(Reverted to Colo) Igado Submitted 16-Jun-22 Abhishek 3

     
10-Mar-22 Approved     IGADO Submitted 24-Feb-22 Abhishek 3
     
 
     
     
     
5-Apr-22 Approved       Igado Submitted 4-Apr-22 Sharvendra 2
     
4/4/2022 Approved       Innovis Submitted 1-Apr-22 Abhishek 1
     
     
     
     
26-Feb-22 Approved     Innovis Submitted 26-Feb-22 Prashant 3
     
     
     
9-Feb-2022  Cand Rejected by SAQ     Fireside Submitted 9-Feb-22 Sharvendra 1
29-May-2022 Approved     Maktech Submitted 29-May-2022 Sharvendra 3
     
     
     
16-Mar-22 Approved     Zagwe Submitted 16-Mar-22 Sharvendra 2
     
     
     

18-Jun-22 Approved Innovis Submitted 17-Jun-22 Abhishek 1


     
     
     
     
Approved but
7-Jun-22 Change due     Innovis Submitted 7-Jun-22 Sharvendra 3
to Colo Site
7/27/2022 Approved GPS Locatio     Maktech Submitted 7/27/2022 Sharvendra 1
     
     
 
4-Jan-2022     Fireside Submitted 4-Jan-22 Prashant 2
     
10-Mar-22 Approved     Maktech Submitted 4-Mar-22 Abhishek 3
     
     
     
     
     

10-Jun-22 Approved Tesla Submitted 10-Jun-22 Abhishek 1


     
Rejected by
2-Mar-22     Zagwe Submitted 18-Feb-22 Abhishek 2
CW
     
9-May-22 Approved Igado Submitted 9-May-22 Sharvendra 2

     
     
     
8-Jul-22 Approved Tesla Submitted 8-Jul-22 Sharvendra 5
     
13-Jan-2022
Deploy SectorApproved
1 on Sector 3 Pole ( Put Sec 3 and
  1 on single Pole)
  Innovis Submitted 29-Nov-21 Hamza/Arun 3
     
     
 
TEP RF due to Not4-Apr-2022
Ok. it is near toRejected
another approved site, let's move it to the middle  way to cover
Innovis
the condominium
Submitted
better 4-Apr-22 Abhishek 3
27-Jul-2022 Max
Approved
RF antenna height available is 20m IGADO Submitted 27-Jul-22 Prashant 1
     
0
     
7-Jan-2022 Approved       Innovis Submitted 7-Jan-22 Prashant 2
     
     

15-May-22 Rejected SAR Rejected by SAQ Igado Submitted 14-May-22 Sharvendra 2


     
     
     
16-Jul-22 Approved     Fireside Submitted 14-Jul-22 Abhishek 2
20-May-22 RejectedSAR Rejected by SAQ     Maktech Submitted 17-May-22 Abhishek 2
     
1-Jun-2022 Approved
Recieved STEP approval
Rejected
on 25052022
by STEP RF   Fireside Submitted 17-Mar-22Sharvendra/Abhishek 4
20-May-22 Azimuth Need to be 20/140/260 Fireside Submitted 19-May-2022 Sharvendra 1
     
     
     
     
23-May-22 SAR Rejected by STEP RF Elite Submitted 19-May-22 Abhishek 3

20-Jun-22 Approved IGADO Submitted 16-Jun-22 Abhishek 3


     
26-Aug-22 Approved   TES Submitted 26-Aug-22 Sharvendra 4
3-Apr-2022 RejectedSAR Rejected by SAQ     Zagwe Submitted 3-Apr-22 Sharvendra 1
     
     
     
     
29-Nov-2021 Approved       Maktech Submitted 29-Nov-21 Hamza 1
     
     
     
30-Oct-2021  Nominal with SAR Rejected
  by SAQ  innovis Submitted 29-Oct-21 Prashant 1
21-Jul-22 Approved     Fireside Submitted 21-Jul-22 Sharvendra 4
     
     
     
30-Jul-22 Rejected Due to SD fail     Maktech Submitted 19-Mar-22 Abhishek 1
13-Aug-2022 Approved Fireside Submitted 13-Aug-22 Sharvendra 1
     
5-May-22 RejectedSAR Rejected by SAQ     Zagwe Submitted 23-Mar-22 Abhishek 3
     
     
Backup
29-Apr-22     Fireside Submitted 20-Apr-22 Abhishek 3
Candidate
19-Feb-22 Approved     Fireside Submitted 18-Feb-22 Abhishek 1
     
     
4-Feb-22 Rejected SAR Rejected by SAQ Maktech Submitted 3-Feb-22 Prashant 2
     
6-Sep-22 Approved     XMG Submitted 6-Sep-22 Rohit 2
     
 Rejected
21-Feb-22
due to Sec-2 is blocked/shadowed by own building
  as per my  observation.
Maktech Submitted 21-Feb-22 Abhishek 1
     
     
16-Mar-22 SAR Rejected by SAQ Maktech Submitted 16-Mar-22 Sharvendra 4
13-Jun-22 Rejected by SAQ Team     Maktech Submitted 13-Jun-22 Sharvendra 3

28-Jun-22 Approved Igado Submitted 28-Jun-22 Sharvendra 1


     
     
17-May-22 Rejected
Nominal with SAR Rejected by SAQ
    Fireside Submitted 17-May-22 Sharvendra 1
24-Aug-22 Approved     Fireside Submitted 24-Aug-22 Sharvendra 4
Tower Ht
     
mismatch in
 
Public sheet    
and      
Site&Sketch
24-Aug-22 Approved     fireside Submitted 24-Aug-22 Sharvendra 3
     
12-Jun-22 Approved     Zagwe Submitted 18-May-22 Abhishek 3
25-Oct-2021  Cand Rejected by CW     Zagwe Submitted 19-Oct-21 Arun 2
     
8-Oct-2021 Rejected
obstruction at 330 sec 3     Zagwe Submitted Arun 1
     
     
28-Jul-2022 Approved Igado Submitted 27-Jul-2022 Sharvendra 2
 
     
Cancelled for ATC
     
     
17-Oct-2021 Approved
Already Approved by STEP     Innovis Submitted Arun 1
     
     
     
26-Oct-2021 Approved 0 Approved   Innovis Submitted 26-Oct-21 Hamza 2
     
     
     
2-Aug-22 Approved     Zagwe Submitted 2-Aug-22 Sharvendra 2
     
17-May-22 Rejected
Rejectedby STEP RF due to shadowing
    Acme Submitted 17-May-22 Sharvendra 4
     
12-May-22 Approved Maktech Submitted 12-May-22 Sharvendra 6
19-Mar-22 Rejected by STEP
Rejected
RF by STEP RF   Fireside Submitted 9-Mar-22Sharvendra/Abhishek 3
     
3-Apr-22 RejectedSAR Rejected by SAQ     Zagwe Submitted 1-Apr-22 Sharvendra 2
     

     
     
17-Aug-22 Approved       Fireside Submitted 17-Aug-22 Sharvendra 1
     
7-Mar-22 Approved     ACME Submitted 6-Mar-22 Sharvendra 3
     
     
     
20-May-22 Approved but change due to Reverted  to Colo   Zagwe Submitted 18-May-22 Abhishek 2
25-Aug-22 Approved   Innovis Submitted 24-Aug-22 Sharvendra 2
     
     
22-Dec-2021 Approved       Maktech Submitted 21-Dec-21 Prashant 1
     
     
     

25-Jul-2022 Approved     Innovis Submitted 21-Jul-22 Sharvendra 1


     
     
8-Jul-22 Approved     Fireside Submitted 8-Jul-22 Sharvendra 5
     
     
1-Jul-2022 ResubmitRevise with 9M RTT Maktech Submitted 30-Jun-22 Sharvendra 5
     
     
1-Mar-22  Rejected by SAQ     Fireside Submitted 24-Feb-22 Abhishek 2
     
27-Apr-22 Approved       Zagwe Submitted 27-Apr-22 Sharvendra 1
     
     
     
12-Mar-22 RejectedSAR Rejected by SAQ     Zagwe Submitted 12-Mar-22 Sharvendra 5
8/19/2022 Approved   Fireside Submitted 19-Aug-22 Sharvendra 1
     
     
Rejected by 29-Apr-22
STEP RF due toRejected
The height is to low even to overcome
  the elevation
  of the terrain
Fireside Submitted 29-Apr-22 Sharvendra 2

27-Jul-22 Approved       Innovis Submitted 27-Jul-22 Sharvendra 1


     
     

13-May-22 Approved     Zagwe Submitted 13-May-22 Sharvendra 5


     
5-Aug-22 Approved       Igado Submitted 5-Aug-22 Rohit 1
     
     
     
28-Aug-22 Approved       Igado Submitted 27-Aug-22 Sharvendra 1
     
     
20-May-22 Rejected SAR Rejected by SAQ     Maktech Submitted 19-May-22 Sharvendra 3
     
26-Jul-2022 Approved   Maktech Submitted 26-Jul-2022 Sharvendra 3
     
22-Jul-2022 Approved Fireside Submitted 22-Jul-22 Sharvendra 4
     
     
     
     

14-Jul-22
Due to ownerRejected
wants the site moved from one location to another Innovis Submitted 20-Jul-22 Sharvendra 1
25-Jul-22 Approved Innovis Submitted 25-Jul-22 Sharvendra 2
15-Feb-2022 RejectedRejected by STEP RF   Maktech Submitted 15-Feb-22 Prashant 1
     
     
4-Jun-2022 Approved Maktech Submitted 6/1/2022Sharvendra/Abhishek 2
     
9-Jun-22 Approved     Innovis Submitted 1-Jun-22 Abhishek 3
     
24-Feb-2022 Rejected by SAQ(Gov building)
    Innovis Submitted 23-Feb-22 Sharvendra 7
     
25-Nov-2021 Approved       Innovis Submitted 25-Nov-21 Hamza/Jaffar 1
     
     
     
20-Apr-2022 Approved     Innovis Submitted 20-Apr-22 Sharvendra 2

30-Aug-2022 Approved     Innovis Submitted 29-Aug-2022 Sharvendra 4


     
     
     
     
     
23-Jul-22 Approved     Fireside Submitted 23-Jul-22 Sharvendra 2
     
     
2-May-22 Rejected By SAQ Zagwe Submitted 2-May-22 Sharvendra 2

24-Aug-22 Approved   Innovis Submitted 24-Aug-22 Sharvendra 3


 
17-May-22 RejectedSAR Rejected by SAQ     Fireside Submitted 17-May-22 Sharvendra 3
12/27/2021  Cand Rejected by SAQ     Fireside Submitted 23-Dec-21 Prashant 3

10-Aug-2022 Approved Approved Fireside Submitted 10-Aug-22 Sharvendra 3


     
29-Nov-21 Approved 0 Maktech Submitted 29-Nov-21 Arun 1
     
     
30-Nov-21
Rejected due to obstruction in sec2 will create shadowing
  for sec2
  Zagwe Submitted 30-Nov-21 Arun 1
25-Feb-22 Approved Acme Submitted 25-Feb-22 Sharvendra 3
 
 
     
28-Jul-22 Approved     Fireside Submitted 28-Jul-22 Rohit 4
     

     
     
     
1-Jun-22 Approved I Engineering Submitted 1-Jun-22 Sharvendra 3
     
     
     
     

22-Mar-22 Approved Maktech Submitted 19-Mar-22 Abhishek 2


     
     
30-May-22 RejectedSAR Rejected by SAQ     Fireside Submitted 11-May-22 Abhishek 3
   
   
27-Jul-2022 Approved Approved   Maktech Submitted 27-Jul-22 Sharvendra 1
     
26-Jul-2022 Approved     Innovis Submitted 26-Jul-22 Sharvendra 4
7-Mar-22 Approved but change due to Reverted  to Colo   Innovis Submitted 7-Mar-22 Abhishek 1
     
     
     
     
Azimuth
  Need    
to be
12-Aug-22 rejected 40/150/240     Innovis Submitted 2-Aug-22 Rohit 3
     
8-Aug-22 Approved     Igado Submitted 8-Aug-22 Sharvendra 2
     
2-Jun-22 Approved       Fireside Submitted 2-Jun-22 Abhishek 2
29-Apr-22 SAR rejected by STEP     Fireside Submitted 26-Apr-22 Abhishek 2
     
     
     
2-Jun-22 Approved Fireside Submitted 2-Jun-22 Sharvendra 1
     
verted to Colo GBT      
14-Jan-2022 Approved   Innovis Submitted 14-Jan-22 Prashant 3
     
     
TSSR
1/28/2022
is Approved Approved
as A Candidate can be over writtern
  with as per EEP
  TSSR Zagwe Submitted 28-Jan-22 Hamza 1
     
     
     
ropose Antenna Height
10-Dec-2021
to 28m to Approved
eliminate the effect shadowing on  2nd Sector due  to 3m elevated
Fireside
building Submitted 10-Dec-21 Hamza 2
     
8-Apr-22 Approved     Maktech Submitted 22-Mar-22 Abhishek 2

31-May-22 Approved Maktech Submitted 31-May-22 Sharvendra 3


     
13-May-22 SAR Rejected by SAQ     Maktech Submitted 13-May-22 Sharvendra 3
28-Feb-22 SAR Rejected by STEP RF     Maktech Submitted 28-Feb-22 Sharvendra 2
28-Jun-22 Approved Maktech Submitted 28-Jun-22 Sharvendra 3
     
     
20-Apr-2022 Rejected Rejected By SAQ     FIRESIDE Submitted 20-Apr-22 Sharvendra 2
     
Lat/Long
19-Aug-22 Approved Need to check FIRESIDE Submitted 19-Aug-22 Sharvendra 2
     
28-Jun-22 Approved       ACME Submitted 9-Apr-22 Abhishek 3
     
     
22-Apr-22 RejectedSAR Rejected by CW Igado Submitted 22-Apr-22 Sharvendra 2

2-Sep-22 Approved Approved   fireside Submitted 2-Sep-22 Rohit 1


     
     
15-Jun-2022 Approved     Zagwe Submitted 15-Jun-2022 Sharvendra 5
     
     
     
10-Feb-22
Due to Sec ht mismatch, Candidate is rejected
  by STEP RF   Fireside Submitted 8-Feb-22 Abhishek 1
10-Jun-22 Approved Fireside Submitted 10-Jun-22 Sharvendra 4
     
     
21-Apr-22 Approved       Zagwe Submitted 21-Apr-22 Sharvendra 1
     
     
     
     
     
30-Jul-22 Approved Innovis Submitted 30-Jul-22 Sharvendra 1
Approved but
10-Mar-22 Change due     Zagwe Submitted 9-Mar-22 Abhishek 1
to Colo Site
     
     
     
7-Jun-2022 Approved     Maktech Submitted 7-Jun-22 Sharvendra 3
     
     
     
2-Mar-22 RejectedSAR Rejected by SAQ Maktech Submitted 1-Mar-22 Sharvendra 2

24-Aug-2022 Approved Fireside Submitted 24-Aug-22 Sharvendra 2


     
     
21-Jan-2022 Approved     Innovis Submitted 16-Jan-22 Prashant 1
     
     
7-Jun-22 Approved but change due to Reverted to Colo Zagwe Submitted 7-Jun-22 Sharvendra 2
31-Aug-2022 Approved   TES Submitted 20-Aug-2022 Sharvendra 1
     
     
     
19-Mar-22 Approved     Maktech Submitted 17-Mar-22Sharvendra/Abhishek 3
     
1-Aug-2022 Approved     Maktech Submitted 1-Aug-22 Sharvendra 3
     
     
12/6/2021 Approved 0     FIRESIDE Submitted 6-Dec-21 Arun 2
     
     
27-Nov-2021 Approved   Innovis Submitted 27-Nov-21 Hamza 1
     
     
     
     

     
19-Feb-22
due to Shadow effect  
in 2nd and 3rd sector by Own Building, Reorientation   not possible
also Zagwelarge Roof
Submitted
Area 19-Feb-22 Sharvendra 1
20-Apr-22 Rejected
Rejected due to SAR Rejected by  CW   Zagwe Submitted 20-Apr-22 Sharvendra 4

     

Rejected by
15-Mar-22     Fireside Submitted 15-Mar-22 Sharvendra 1
SAQ
26-Apr-22 Rejected SAR Rejected by SAQ Fireside Submitted 26-Apr-22 Sharvendra 1
19-Aug-2022 Approved     Fireside Submitted 18-Aug-2022 Sharvendra 3
     
     
16-May-22 Rejected SAR Rejected by SAQ     Fireside Submitted 16-May-22 Sharvendra 1
23-Jul-22 Approved       Fireside Submitted 22-Jul-22 Sharvendra 1
     
     
     

28-Jul-2022 Approved GPS Location Pic missi   Igado Submitted 28-Jul-22 Sharvendra 1
     
     
     
10-May-22 Approved     Zagwe Submitted 10-May-22 Sharvendra 2

     
     
17-Oct-2021 Cancelled for ATC Option     Innovis Submitted 17-Oct-21 Hamza 2
     
28-Apr-22 SAR Rejected by CW Innovis Submitted 28-Apr-22 Sharvendra 2
     

25-Feb-22 Approved     Acme Submitted 25-Feb-22 Sharvendra 2


     
     
     

8/12/2022 Approved Approved   Igado Submitted 12-Aug-22 Sharvendra 2


     
27-Nov-2021  SAR Rejected by CW     Innovis Submitted 27-Nov-21 Hamza 2
     
SAR Rejected
6-Jul-22 by SAQ     Fireside Submitted 6-Jul-22 Sharvendra 4

2-Sep-22 Approved Approved   fireside Submitted 2-Sep-22 Rohit 1


     
     
11-May-22 Approved       Zagwe Submitted 11-May-22 Abhishek 1
     
     
     
Rejected(near
10-May-22 Zagwe Submitted 10-May-22 Abhishek 1
with colo site)

20-May-22 Approved but change due to Reverted to Colo Zagwe Submitted 19-May-22 Abhishek 1
27-Aug-2022 Approved     FireSide Submitted 27-Aug-22 Sharvendra 3
     
     
5-Sep-22 Approved   TES Submitted 5-Sep-22 Rohit 1
31-Mar-2022 Rejected SAR Rejected by SAQ Zagwe Submitted 31-Mar-22 Sharvendra 1
     
     
     
     
2/21/2022   in 3rd sector
Shadowing by its Own Building and blocking   Zagwe Submitted 21-Feb-22 Sharvendra 2

16-Jun-22 Rejected 1 Sector ge


Reverted     Fireside Submitted 16-Jun-22 Sharvendra 1
1-Aug-22 Backup to Colo Fireside Submitted 1-Aug-22 Sharvendra 2
     
     
24-Jun-22 Approved       Zagwe Submitted 24-Jun-22 Sharvendra 1
     
     
     
15-May-22 Approved Zagwe Submitted 14-May-22 Sharvendra 3
     
29-Nov-2021 Approved     Fireside Submitted 29-Nov-21 Hamza 1

     
21-Apr-22 SAR Rejected by SAQ Igado Submitted 21-Apr-22 Sharvendra 1

17-Jun-22 Rejected Rejected by CW Igado Submitted 15-Jun-22 Abhishek 4

     
     
     
6-Sep-22 Approved       FireSide Submitted 6-Sep-22 Rohit 2
     
     
Cancelled for ATC      
     

18-Apr-22 Nominal with SAR Rejected by CW ACME Submitted 18-Apr-22 Abhishek 1


18-Jun-22 Rejected SAR Rejected by SAQ Fireside Submitted 17-Jun-22 Abhishek 2
25-Feb-22 Rejected by SAQ Acme Submitted 25-Feb-22 Sharvendra 3
     
17-May-22 Rejected
 Rejected(Due to not enough space)
    Maktech Submitted 17-May-22 Abhishek 1
     
30-Aug-22 Approved     fireside Submitted 30-Aug-22 Rohit 4
     
     
3-Apr-22 Approved       Fireside Submitted 2-Apr-22 Sharvendra 1
     
     
28-Apr-22 Approved       Tesla Submitted 27-Apr-22 Abhishek 1
     
25-Feb-22 Approved but reject by CW     Maktech Submitted 24-Feb-22 Abhishek 1
8-Mar-22 Maktech Submitted 8-Mar-22 Abhishek 2
8-Mar-22 Approved Maktech Submitted 8-Mar-22 Abhishek 2
     
     
27-Jun-22 Approved       Fireside Submitted 27-Jun-22 Sharvendra 3

12-Aug-22 Approved Innovis Submitted 11-Aug-22 Rohit 1


     
     
     
     

30-Aug-22 Approved   Innovis Submitted 29-Aug-22 Rohit 3


     
Cancelled for ATC      
     
     
29-Apr-22 RejectedSAR Rejected by CW Zagwe Submitted 28-Apr-22 Abhishek 3

16-Aug-22 Approved fireside Submitted 15-Aug-22 Rohit 1


1/28/2022 Rejected by SAQ Zagwe Submitted 28-Jan-22 Hamza
     
     
19-Feb-22 Approved       Zagwe Submitted 18-Feb-22 Sharvendra 1
     
 
30-Apr-22 Rejected by S     Fireside Submitted 30-Apr-22 Sharvendra 4
     
24-Jun-22 Approved     Fireside Submitted 23-Jun-22 Sharvendra 2
     
11-May-22 Approved but C     Innovis Submitted 11-May-22 Sharvendra 1
     
29-Jul-2022 Approved /   Innovis Submitted 29-Jul-22 Sharvendra 1
     
8-May-2022 Approved     Zagwe Submitted 8-May-22 Sharvendra 4
     
     
 
     
     
     
  need
Azimuth    
to be
7-Aug-2022 Approved   Zagwe Submitted 6-Aug-2022 Rohit 4
30/150/270
     
     
Rejected
12-Apr-22
by STEPRejected
RF due to Not OK, the antenna height
  is not acceptable.
  Zagwe Submitted 6-Apr-22 Abhishek 2
     
     
30-Jul-22 Rejected Due to SD fail     Elite Submitted 20-Mar-22 Sharvendra 2
     

17-Aug-22 Approved I Engineering Submitted 16-Aug-22 Sharvendra 2


     
 
     
     
19-Feb-2022 RejectedSAR Rejected by SAQ Fireside Submitted 19-Feb-22 Sharvendra 1
     
     
     
21-May-22 Approved Fireside Submitted 8-Mar-22 Abhishek 3
     
Cancelled for ATC      
     
     

2-Sep-22 Approved fireside Submitted 2-Sep-22 Rohit 1


 
     
     
     
 
     
12-Jul-22 Approved       IGADO Submitted 12-Jul-22 Abhishek 1
     
     
17-Feb-22 RejectedSAR Rejected by SAQ     Fireside Submitted 16-Feb-22 Abhishek 2

3-Sep-22 Approved   Fireside submitted 3-Sep-22 Rohit 2


     
28-Jul-22 Approved     Fireside Submitted 28-Jul-22 Prashant 2
5-May-22 Approved but change due to Reverted  to Colo   Zagwe Submitted 5-May-22 Sharvendra 3
     

     
     
17-Mar-22 Rejected by STEP RF     Fireside Submitted 17-Mar-22 Abhishek 1
     
13-May-22 Approved Fireside Submitted 13-May-22 Sharvendra 3
     
     
13-Jun-22 Rejected Due to SD     Innovis Submitted 13-Jun-22 Sharvendra 1
12-Aug-22 Approved     Innovis Submitted 12-Aug-22 Sharvendra 1
     
9-Oct-2021 Approved 0   Maktech Submitted 9-Oct-21 Hamza 4
     
     
     
     
7-Oct-2021 Approved 0 Approved   Innovis Submitted Revanth 1
     
     
     
22-Aug-22 Approved     Innovis Submitted 22-Aug-22 Sharvendra 2
     
  Need
Azimuth    
9-Jun-22 RejectedSARtoRejected
be by CW     Fireside Submitted 25-May-22
Sharvendra/Abhishek 3
30/150/240
13-Jul-22 Approved Fireside Submitted 13-Jul-22 Sharvendra 1
     
27-Jul-2022 Approved   Innovis Submitted 23-Jul-22 Sharvendra 4
     
     
     
     
     

4-Jun-22 Approved Innovis Submitted 2-Jun-22 Abhishek 2


     
     
10-Dec-2021
Propose with
Approved
9M RTT Solution with 29m Antenna
  Height   Fireside Submitted 10-Dec-21 Hamza 2
     
     
TI Started on
21-May-22 Backup     Innovis Submitted 19-May-22
Sharvendra/Abhishek 4
Candidate D
     
     

     
     
     
2-Mar-22 Approved Fireside Submitted 1-Mar-22 Sharvendra 1
8-Oct-2021 Cand Rejected by SAQ     Zagwe Submitted 1-Oct-21 Arun 1
     
     
     
     
     
27-Nov-2021 Rejected Rejected by SAQ     Innovis Submitted 27-Nov-21 Hamza 1
     
     

1-Aug-22 Approved 1-Aug-22 Innovis Submitted 1-Aug-22 Rohit 3


     
27-Nov-2021 Approved
Already Approved by STEP     innovis Submitted 27-Nov-21 hamza 1
     
     
     
10-Feb-2022 RejectedSAR Rejected by SAQ   Zagwe Submitted 24-Oct-21 Hamza/Arun 3
     
22-Jul-22 Approved     Zagwe Submitted 22-Jul-22 Sharvendra 2
   
   
     
     
     
7-Feb-2022 Approved       Maktech Submitted 4-Feb-22 Prashant 1
     
     
15-Aug-22 Approved       Fireside Submitted 15-Aug-22 Rohit/Prashant 2
24-Feb-22
TSSR Validated and Approved but candidate change to E Maktech Submitted 24-Feb-22 Sharvendra 1
13-Mar-22 Rejected SAR Rejected by SAQ Maktech Submitted 13-Mar-22 Sharvendra 2
     
     
     

29-Jun-22 Approved but change due to Reverted to Colo Tesla Submitted 28-Jun-22 Abhishek 5
7/28/2022 Approved /     Zagwe Submitted 27-Jul-22 Sharvendra 1
     
22-Feb-22 RejectedRejected by SAQ Team Fireside Submitted 20-Feb-22 Sharvendra 1
 

15-Aug-22 Approved Fireside Submitted 15-Aug-22 Rohit/Prashant 2


     
     
28-Jun-2022 Approved   Maktech Submitted 11-Jun-22 Abhishek 3
     

25-May-22 Rejected
Rejected
by CW, Also 6m pole not feasible I Engineering Submitted 25-May-22 Sharvendra 4
     

2-Jul-2022 Approved     innovis Submitted 2-Jul-22 Sharvendra 4


     
     
1/13/2022 Rejected SAR Rejected by SAQ     Innovis Submitted 13-Jan-22 Arun 1
     
     
13-Jul-2022 Approved       Innovis Submitted 13-Jan-22 Abhishek 3
     
     
25-Nov-2021 Approved       Innovis Submitted 25-Nov-21 Hamza 1
     
     
     
     
     
1-Jun-22 Approved Zagwe Submitted 31-May-22 Abhishek 1
8-Mar-22 Approved Zagwe Submitted 5-Mar-22 Abhishek 1
     
12-Apr-22 Approved IGADO Submitted 11-Apr-22 Abhishek 2
     
     
     

26-Aug-22 Approved   Acme Submitted 25-Aug-22 Sharvendra 4


     
30-May-22 SAR Rejected by SAQ     Innovis Submitted 30-May-22 Sharvendra 2
verted to Colo GBT      

27-Aug-22 Approved     I Engineering Submitted 27-Aug-22 Sharvendra 4


     
     
     

30-Aug-22 Approved Fireside Submitted 29-Aug-22 Sharvendra 4


     
22-Feb-2022 SAR Rejected by SAQ     Zagwe Submitted 22-Feb-22 Abhishek 1
     
14-Jun-2022 Approved       Innovis Submitted 14-Jun-2022 Sharvendra 1
     
18-May-2022 RejectedSAR Rejected by STEP Zagwe Submitted 18-May-21 Sharvendra 4
     
     
     
5-Sep-22 Approved     Fireside Submitted 5-Sep-22 Rohit 2
     
     
 
7-Jun-22 Approved FIreside Submitted 9-Mar-22 Abhishek 2

     
     
29-Nov-2021 Approved       Innovis Submitted 29-Nov-21 Hamza 1
     
12/7/2021  Cand Rejected by SAQ     Zagwe Submitted 7-Dec-21 Arun 1
     
     
6-Jul-22 Approved Zagwe Submitted 18-May-22
Sharvendra/Abhishek 3
     
     
     
2-Aug-22 Approved     FIRESIDE Submitted 1-Aug-22 Sharvendra 2
     
     
 
8-Mar-22 Cand Rejected by SAQ Maktech Submitted 8-Mar-22 Sharvendra 2
Approved but
28-Apr-22 Change due Maktech Submitted 21-Apr-22 Abhishek 2
to Colo Site
15-Aug-22 Approved     Zagwe Submitted Sharvendra/Prashant
15-Aug-22 4
     
     
29-Jul-22 Approved       Innovis Submitted 28-Jul-22 Sharvendra 1
7-Feb-2022 RejectedSAR Rejected by CW Maktech Submitted 7-Feb-22 Prashant 1
     
18-Feb-2022 Approved     Maktech Submitted 18-Feb-22 Prashant 2

     
     
21-May-22 Approved     Innovis Submitted 30-Mar-22 Abhishek 3
     
7-Jun-22 Approved but     Innovis Submitted 7-Jun-22 Sharvendra 2
     
Need
2-Jun-22 Lat/Long
Approved Innovis Submitted 1-Jun-22 Abhishek 1
Approved
in DD     Submitted
25-Aug-22 igadotech 24-Aug-22 Sharvendra 3
Format(G
PS)      
23-Aug-22 Approved     TES Submitted 23-Aug-22 Sharvendra 2
     
3-May-22 Rejected SAR Rejected by SAQ     Ellite Submitted 2-May-22 Sharvendra 2
     
     
8-Aug-2022 Approved   Innovis Submitted 8-Aug-2022 Sharvendra 2
     
Approved but
2-May-22 Change due Zagwe Submitted 2-May-22 Sharvendra 1
to Colo Site
     
     
26-Apr-22 RejectedSAR Rejected by SAQ Zagwe Submitted 26-Apr-22 Sharvendra 1
20-Aug-22 Approved   Tes Submitted 20-Aug-22 Sharvendra 1
     
     
29-Jun-22 SAR Reject
Reverted     Tesla Submitted 29-Jun-22 Sharvendra 4
22-Jul-22 Backup to Colo     Tesla Submitted 22-Jul-22 Sharvendra 3
     
     
     
     
     
12-Aug-2022 Approved   Fireside Submitted 12-Aug-22 Sharvendra 3
     
1/28/2022 Approved     Innovis Submitted 28-Jan-22 Hamza 1
     

     
     
     
22-Apr-22 Approved     TESLA Submitted 22-Mar-22 Abhishek 2
     
     
d by SAQ 27-Nov-2021      
     
 

8-Jul-22 Approved Fireside Submitted 14-Jun-22 Abhishek 4


     
14-Apr-22 Approved Zagwe Submitted 14-Apr-22 Sharvendra 2
     
12-Apr-2022 Approved   Zagwe Submitted 12-Apr-22 Sharvendra 1
     
22-Apr-22 Approved       Zagwe Submitted 21-Apr-22 Abhishek 1
     
21-Apr-22 Approved Zagwe Submitted 21-Apr-22 Sharvendra 1
     
22-Apr-22 Approved Zagwe Submitted 12-Apr-22 Abhishek 1
     
25-Apr-22 Approved Zagwe Submitted 21-Apr-22 Abhishek 2
     
12-Apr-22 Approved Zagwe Submitted 12-Apr-22 Sharvendra 1
     
3-Jun-22 Approved Zagwe Submitted 28-May-22 Sharvendra 2

     
28-Apr-22 Approved     Zagwe Submitted 25-Apr-22 Abhishek 2

     
4-Aug-22 Approved     Innovis Submitted 3-Aug-22 Sharvendra 2
     
     
26-Apr-22 Approved Adrian Submitted 26-Apr-22 Abhishek 1
     
31-Mar-22 Approved       Zagwe Submitted 31-Mar-22 Sharvendra 1
     
     
     
     
22-Apr-22 Approved Zagwe Submitted 19-Apr-22 Abhishek 1
     
22-Apr-22 Approved Zagwe Submitted 21-Apr-22 Abhishek 1
     
22-Apr-22 Approved Zagwe Submitted 21-Apr-22 Abhishek 1
     
     
     
20-Jun-2022 Approved Zagwe Submitted 2-Mar-22 Abhishek 3
     
     
     
11-Mar-22 Approved Innovis Submitted 11-Mar-22 Abhishek 2
     
1-Jun-22 SAR Rejected by STEP Adrian Submitted 31-May-22 Abhishek 1
     
     
14-Jun-22 Approved     Adrian Submitted 14-Jun-22 Abhishek 2
     
     
     
14-May-22 Approved Adrian Submitted 13-May-22 Abhishek 2
     
     

27-Aug-22 Approved Adrian Submitted 27-Aug-22 Sharvendra 3


     
     
     

23-Jul-22 Approved       Innovis Submitted 22-Jul-22 Sharvendra 1


     
25-Mar-22 Approved Zagwe Submitted 25-Mar-22 Sharvendra 2
     
     
     
27-Jun-22 Approved Zagwe Submitted 1-Apr-22 Abhishek 2

     
     
10-Feb-22 Far end
Approved
site details missing. Drawings no
  proper.   Zagwe Submitted 8-Feb-22 Abhishek 2
     
     
     
1-Apr-22 Approved Zagwe Submitted 1-Apr-22 Abhishek 1

     
Cancelled for ATC      
     
     
3-Mar-22 Approved Zagwe Submitted 3-Mar-22 Sharvendra 2
25-Feb-2022
Approved but Changed due to New candidate Received Zagwe Submitted 24-Feb-22 Abhishek 1
     
     
Cancelled for ATC      
     
10-Feb-2022 Approved
No Far End site details (No LOS) Zagwe Submitted 8-Feb-22 Abhishek 2
     
Cancelled for ATC      
     
     
30-May-22 Approved Zagwe Submitted 27-May-22
Sharvendra/Abhishek 2
3-Mar-22  Candidate D rejected (Owner not willing
  to rent)   Zagwe Submitted 3-Mar-22 Sharvendra 1
     
Cancelled for ATC      
     
     
28-Jul-2022 Approved Fireside Submitted 28-Jul-22 Sharvendra 2

     
     
Need
22-Feb-22
Tower Position
Approved
with Ref. of Roof Area in Sheet  9. Drawings -  Layouts Zagwe Submitted 20-Feb-22Sharvendra/Abhishek 3
     
2-Sep-22 Approved     Maktech Submitted 2-Sep-22 Rohit 3
     
     
     
     
As discussed22-Feb-22
with STEP approved
Approved
at lower ht at 25M due to no coverage issue with nearby
Zagwe
sites Submitted 21-Feb-22 Abhishek 1
     
     
     
     
17-May-22 Approved IENG Submitted 12-May-22 Abhishek 2
     
     
     
23-May-22 Approved I Engineering Submitted 23-May-22 Sharvendra 2
     
Rejected
17-Mar-22
due to Lat/Long in TSSR are 560M deviated
  from SAR Lat/Long
  Zagwe Submitted 8-Feb-22 Abhishek 1
     
31-Mar-22 RejectedSAR Rejected by SAQ Zagwe Submitted 31-Mar-22 Abhishek 1

19-Jul-22 Approved Zagwe Submitted 19-Jul-22 Sharvendra 2


     
4-Apr-22 Rejected by SAQ     Adrian Submitted 4-Apr-22 Abhishek 2
29-Apr-22 Approved Adrian Submitted 29-Apr-22 Abhishek 2
     
     
4-Apr-22  Rejected by SAQ     Adrian Submitted 4-Apr-22 Abhishek 1
     
14-May-22 Approved Adrian Submitted 14-May-22 Abhishek 1
     
26-Mar-22 SAR Rejected by STEP Zagwe Submitted 24-Mar-22 Abhishek 2
24-May-22 Approved Zagwe Submitted 24-May-22 Sharvendra 1
     
     
6-Jul-22 Approved Zagwe Submitted 6-Jul-22 Sharvendra 4

     
25-Mar-22 Approved Zagwe Submitted 25-Mar-22 Sharvendra 2
     
23-Apr-22 Approved Zagwe Submitted 21-Apr-22 Abhishek 2
     
     
     
27-Apr-22 Rejected due to Low Bldg height (8M) Fireside Submitted 20-Apr-22 Abhishek 1

27-Jul-2022 Approved   Innovis Submitted 26-Jul-22 Sharvendra 1


     
     
     
22-Apr-22 Approved Fireside Submitted 15-Apr-22 Abhishek 2
     

30-Jul-22 Approved Innovis Submitted 29-Jul-22 Sharvendra 1


     
     
     

3-Mar-2022 Approved       Zagwe Submitted 3-Mar-22 Sharvendra 1


     
     
     
14-Mar-22 Approved Zagwe Submitted 14-Mar-22 Abhishek 2
     
     
14-Mar-22 Rejected by SAQ     Fireside Submitted 11-Mar-22 Abhishek 2
29-Apr-22 Approved Fireside Submitted 27-Apr-22 Abhishek 2
     
     
     
18-Apr-22 Approved Fireside Submitted 15-Apr-22 Abhishek 1
     
14-May-22 Approved       Innovis Submitted 13-May-22 Abhishek 2
     
     
17-Feb-22 Rejected by CW     Zagwe Submitted 16-Feb-22 Sharvendra 2
     
28-Jun-22 Approved     Zagwe Submitted 24-Jun-22 Abhishek 3
     
     
     
     
3-Mar-22 Approved     Zagwe Submitted 3-Mar-22 Abhishek 1

     
17-Feb-22 Approved     Zagwe Submitted 16-Feb-22 Sharvendra 3
     
     
     
     
9-Mar-22 Approved       Zagwe Submitted 9-Mar-22 Sharvendra 2
     
29-Apr-22 Approved Innovis Submitted 26-Apr-22 Abhishek 2
     
     
     
20-May-22 Approved Maktech Submitted 13-May-22 Abhishek 3
     
1-Mar-22 Rejected
As to owner not willing to continue
    Zagwe Submitted 15-Feb-22 Abhishek 1
     
   
   
 
     
     
     
22-Jun-22 Approved Zagwe Submitted 8-Mar-22 Abhishek 3
     
11-Mar-22 SAR Rejected by SAQ Innovis Submitted 11-Mar-22 Sharvendra 1
     
     
14-Jun-22 Approved Innovis Submitted 14-Jun-22 Sharvendra 1
     
     
     
27-Apr-22 Approved I Engineering Submitted 27-Apr-22 Sharvendra 1
     
     
25-Mar-22 Approved Zagwe Submitted 3-Mar-22 Abhishek 1
9-Feb-22 Reject due to CW as confirmed by Abdu Zagwe Submitted 8-Feb-22 Abhishek 1
     
23-Jun-22 Approved     Innovis Submitted 10-Mar-22 Abhishek 5

     
21-Jun-22 Approved Adrian Submitted 20-Jun-22 Sharvendra 1
     
     
     
     
     
10-Feb-22 Details
Approved
missing in report. Drawings not  proper.   Zagwe Submitted 8-Feb-22 Abhishek 2
     
     
verted to Colo GBT      
22-Feb-22 Approved Zagwe Submitted 22-Feb-22 Sharvendra 2
     
     
     
14-Mar-22 Approved   Innovis Submitted 14-Mar-22 Sharvendra 2
     
15-Mar-22 SAR Rejected by SAQ     Fireside Submitted 15-Mar-22 Abhishek 2
     
20-May-22 Rejected SAR Rejected by SAQ Fireside Submitted 19-May-22 Sharvendra 2
3-Aug-22 Approved Fireside Submitted 3-Aug-22 Sharvendra 2
     
     
     
6-May-22 Approved Fireside Submitted 29-Apr-22 Abhishek 2
     
Cancelled for ATC      
31-May-22 Approved     Zagwe Submitted 28-May-22 Abhishek 2
     
31-Mar-2022 Approved Zagwe Submitted 31-Mar-22 Sharvendra 1
     
     
     
12-Apr-22 Approved       Adrian Submitted 12-Apr-22 Sharvendra 1
     
     
     
3-Mar-2022 Approved Zagwe Submitted 3-Mar-22 Prashant 1
     
6-Jul-22 Approved     Adrian Submitted 5-Jul-22 Sharvendra 4
     
     
     
19-Feb-22 Approved Zagwe Submitted 18-Feb-22 Abhishek 1
     
verted to Colo GBT      
     
16-Mar-22 Approved Zagwe Submitted 16-Mar-22 Sharvendra 2
     
     
     
28-Mar-22 Approved Fireside Submitted 28-Mar-22 Abhishek 1
     
     
     
13-Mar-22 Approved   Innovis Submitted 12-Mar-22 Sharvendra 1
     
     
     
13-Mar-22 Approved     Zagwe Submitted 12-Mar-22 Sharvendra 2
     
     
20-Apr-22 Approved     Zagwe Submitted 19-Apr-22 Abhishek 2
     
14-Mar-2022  Cand Rejected by SAQ Zagwe Submitted 14-Mar-22 Abhishek 2
     

     
     
20-May-22 Approved but change due to Reverted to Colo I Engineering Submitted 20-May-22 Sharvendra 1
26-Jul-22 Approved       Innovis Submitted 26-Jul-22 Sharvendra 2
     
     
     
13-May-22 Approved IENG Submitted 13-May-22 Abhishek 1
     
     
t/Long Mismatch, Shared TSSR for new candidate and new candidate is rejected due to shadowing in sector-2
20-Feb-22     Zagwe Submitted 20-Feb-22 Sharvendra 1
*Kindly share TSS on Candidate B

13-May-22 Approved Zagwe Submitted 12-May-22 Abhishek 1


     
     
     
12-Mar-22 Approved Fireside Submitted 11-Mar-22 Abhishek 1
     
     
     
Cancelled for ATC      
7-May-2022 Approved Innovis Submitted 2-May-22 Abhishek 5
     
28-Dec-2021 Approved     Innovis Submitted 24-Dec-21 Prashant 1

     
     
12-Mar-22 Rejected by SAQ     Fireside Submitted 11-Mar-22 Abhishek 1
     
22-Apr-22 Rejected by CW Fireside Submitted 22-Apr-22 Sharvendra 3
26-Apr-22 Approved Fireside Submitted 25-Apr-22 Abhishek 1
     
     
     
5-Mar-22 Approved       Zagwe Submitted 5-Mar-22 Abhishek 1

     
     
     
14-Mar-22 Approved Innovis Submitted 14-Mar-22 Abhishek 2
25-May-22 Nominal with SAR Rejected by SAQ Innovis Submitted 25-May-22 Sharvendra 2
7-Jun-22 Approved 0 Fireside Submitted 30-May-22 Abhishek 2
     
     
     
     
2-Apr-22 SAR Rejected by SAQ Zagwe Submitted 30-Mar-22 Abhishek 2
16-Jun-22 Approved Zagwe Submitted 16-Jun-22 Sharvendra 1
     
     
     
     
12-Mar-22 Approved       Fireside Submitted 12-Mar-22 Abhishek 1
     
9-Feb-22 Approved       Zagwe Submitted 8-Feb-22 Abhishek 1
     
     
     
     
25-Apr-22 Approved Fireside Submitted 25-Apr-22 Sharvendra 3

     
28-May-22 Rejected(owner not willing)     Adrian Submitted 16-Apr-22 Abhishek 1
     
7-Jun-22 Approved Adrian Submitted 7-Jun-22 Sharvendra 3
     
Cancelled for ATC      
     
     
3-Mar-2022 Approved   Zagwe Submitted 3-Mar-22 Abhishek 1
     
Cancelled for ATC      
     
     
     
     
30-Jul-2022 Approved   Zagwe Submitted 29-Jul-22 Sharvendra 1
     
     
     
4-Apr-22 Approved but change due to Reverted to Colo Fireside Submitted 4-Apr-22 Sharvendra 1

29-Jul-2022 Approved     Fireside Submitted 29-Jul-22 Sharvendra 2


     
     
     
29-Jun-22 Approved Adrian Submitted 27-Apr-22Sharvendra/Abhishek 3
     
8-Apr-22 Approved     Fireside Submitted 8-Apr-22 Abhishek 2
     
     
21-Feb-2022  Cand Rejected by CW ACME Submitted 21-Feb-22 Abhishek 1
     
     
     
4-Apr-22 Approved Fireside Submitted 4-Apr-22 Sharvendra 1
     
25-Mar-22 Approved Zagwe Submitted 25-Mar-22 Abhishek 1
     
24-Mar-22
 Pending/hold(Pend it till Jaffar finish the response
  to the visit report)
  Zagwe Submitted 24-Mar-22 Sharvendra 1
12-May-22 Approved Zagwe Submitted 12-May-22 Abhishek 1
     
23-Mar-22 Approved       Zagwe Submitted 23-Mar-22 Sharvendra 1
     
15-Mar-22 Rejected Zagwe Submitted 14-Mar-22 Abhishek 1
25-May-22 Approved Zagwe Submitted 25-May-22 Sharvendra 1
     
16-Mar-22 Approved Zagwe Submitted 16-Mar-22 Abhishek 1
     
25-Mar-22 Approved but change due to Reverted to Colo Zagwe Submitted 25-Mar-22 Abhishek 1
 Lat/Long
1-Sep-22 Resubmit
Incorrect in TSSR and in GPS
  Capture   Tes Submitted 1-Sep-22 Rohit 2
     
24-Mar-22 Approved Zagwe Submitted 24-Mar-22 Abhishek 1
     
23-Jun-22 Approved Zagwe Submitted 23-Mar-22 Abhishek 5
     
23-Mar-22 Approved   Zagwe Submitted 23-Mar-22 Abhishek 1
     
16-Mar-22 Approved Zagwe Submitted 16-Mar-22 Abhishek 1
     
     
     
11-Mar-22 Approved Innovis Submitted 11-Mar-22 Sharvendra 1
     
   
     
10-Feb-22 Approved Zagwe Submitted 8-Feb-22 Abhishek 2
     
12-Apr-22 SAR Rejected by CW     Adrian Submitted 4-Apr-22 Sharvendra 2
     
20-Jun-22 Approved Adrian Submitted 20-Jun-22 Abhishek 1
     
     
     

     
     
     
     
4-Mar-22 Approved Zagwe Submitted 4-Mar-22 Abhishek 1
     
Cancelled for ATC      
     
     
3-Mar-22 Approved Zagwe Submitted 3-Mar-22 Sharvendra 1
9-Feb-2022
Approved But Dropped due to New Candidate proposed Zagwe Submitted 8-Feb-11 Abhishek 1
     
     
     

16-Jun-22 Approved Fireside Submitted 19-May-22 Abhishek 3


     
     
20-Feb-22 Approved but change due to Reverted  to Colo   Zagwe Submitted 20-Feb-22 Sharvendra 1
26-Jul-22 Approved     Innovis Submitted 26-Jul-22 Sharvendra 2
     

21-Jun-22 Approved Adrian Submitted 20-Jun-22 Sharvendra 1

     
     
     
9-Mar-22 SAR Rejected by SAQ Zagwe Submitted 9-Mar-22 Sharvendra 1
7-May-22 Approved Zagwe Submitted 5-May-22 Abhishek 2

     
9-Feb-22 Approved     Zagwe Submitted 8-Feb-22 Abhishek 1
     
     
     
     
17-Feb-22 Approved Zagwe Submitted 17-Feb-22 Sharvendra 2
     
     
     
20-May-22 Approved I Engineering Submitted 2-May-22 Abhishek 5
     
13-Apr-22 Approved     Adrian Submitted 11-Apr-22 Abhishek 2
     
     
     
     

17-Feb-2022 Approved Zagwe Submitted 17-Feb-22 Sharvendra 1


     
     
     
21-Feb-22 Approved Zagwe Submitted 20-Feb-22 Abhishek 1
     
     
     
24-Mar-22 Approved       ACME Submitted 24-Mar-22 Abhishek 1
     
7-May-22 SAR Rejected by SAQ     Fireside Submitted 7-May-22 Abhishek 1
     
     

8-Jun-22 Approved Fireside Submitted 8-Jun-22 Sharvendra 1


     
     
     
1-Apr-22 Approved Fireside Submitted 1-Apr-22 Sharvendra 1

     
     
Reverted to GF      
     
29-Apr-22 Nominal with SAR Rejected by STEP Fireside Submitted 29-Apr-22 Abhishek 1
25-Apr-22 SAR Rejected by SAQ Fireside Submitted 25-Apr-22 Abhishek 1
7-May-22 Approved but change due to Reverted to Colo Fireside Submitted 7-May-22 Abhishek 1
8-Aug-2022 Approved     Maktech Submitted 8-Aug-22 Sharvendra 3
     
     
     
17-Apr-22 Rejected SAR Rejected by SAQ Fireside Submitted 15-Apr-22 Abhishek 2
8-Aug-22 Approved Fireside Submitted 8-Aug-22 Sharvendra 2

22-Apr-22 SAR and TSSR Candidate Mismatch


    Fireside Submitted 22-Apr-22 Sharvendra 3
     
20-May-22 Approved Fireside Submitted 20-May-22 Sharvendra 2
     
     
     
8-Apr-22 Approved Fireside Submitted 8-Apr-22 Abhishek 1
     
     
Cancelled for ATC      
     
     
17-Apr-22 Approved Fireside Submitted 15-Apr-22 Abhishek 2

 
     
     
     
14-Apr-22 Approved Fireside Submitted 14-Apr-22 Abhishek 1
     
     
     
     
28-Apr-22 Approved Fireside Submitted 25-Apr-22 Abhishek 2
     
     
3-Apr-22 Approved       Fireside Submitted 2-Apr-22 Sharvendra 1
     
     
     
     
28-Apr-22 Approved Fireside Submitted 31-Mar-22 Abhishek 1
     
     
     
1-Apr-22 Approved Fireside Submitted 1-Apr-22 Sharvendra 1
     
     
     
15-Apr-22 Nominal with SAR Rejected by SAQ
    Fireside Submitted 15-Apr-22 Abhishek 1
7-Jun-22 Approved Fireside Submitted 7-Jun-22 Sharvendra 4
     
     
     
7-Jun-2022 Approved     Zagwe Submitted 7-Jun-22 Sharvendra 3

     
     
     
1-Apr-22 Approved Fireside Submitted 1-Apr-22 Sharvendra 1
     
     
     
27-Mar-22 Approved       Fireside Submitted 26-Mar-22 Sharvendra 1
     
Cancelled for ATC      
     
     
1-Apr-2022 Approved   Fireside Submitted 1-Apr-22 Sharvendra 1
     
16-Apr-22 Approved Adrian Submitted 14-Apr-22 Sharvendra 2
     
15-Mar-22 Approved Zagwe Submitted 15-Mar-22 Sharvendra 1
     
7-Apr-22 Rejected by STEP RF Zagwe Submitted 7-Apr-22 Sharvendra 1
12-May-22 Approved Zagwe Submitted 12-May-22 Abhishek 1
     
9-Mar-2022 Approved Zagwe Submitted 9-Mar-22 Sharvendra 2
     
17-Mar-22 Approved Zagwe Submitted 16-Mar-22 Abhishek 2
     
25-Mar-22 Approved       Zagwe Submitted 25-Mar-22 Sharvendra 1
     
15-Mar-22 Approved Zagwe Submitted 15-Mar-22 Sharvendra 1
     
26-Apr-22 Approved     Adrian Submitted 11-Apr-22 Abhishek 2
     
     
22-Apr-22 Approved     Zagwe Submitted 20-Apr-22 Abhishek 2
     

     
7-Apr-22 Approved Innovis Submitted 6-Apr-22 Sharvendra 1
     
7-Apr-2022 Approved   Innovis Submitted 6-Apr-22 Sharvendra 1
     
12-Apr-22 Approved Innovis Submitted 8-Apr-22 Abhishek 2
     
15-Jun-22 Approved but change due to Reverted to Colo Innovis Submitted 13-Jun-22 Abhishek 3
31-Aug-22 Approved     Tes Submitted 31-Aug-22 Sharvendra 2
     
28-Apr-22 Approved Innovis Submitted 28-Apr-22 Sharvendra 2
     
25-May-22 SAR Rejected by SAQ Innovis Submitted 25-May-22 Sharvendra 4
15-Jun-22 Approved Innovis Submitted 13-Jun-22 Abhishek 3
30-Aug-22 Approved Innovis Submitted 29-Aug-22 Rohit 1
     

21-Apr-22 Approved Fireside Submitted 21-Apr-22 Sharvendra 1


     
1-Apr-22 Approved Fireside Submitted 1-Apr-22 Sharvendra 1
     
25-Jun-22 Approved     Fireside Submitted 15-Apr-22 Abhishek 3
     
er STEP one site is28-Mar-22
not enough here,
Approved
I have given assignment to jaffar  to replan there.
  We need Fireside
to review the Submitted
2 sites together.26-Mar-22 Sharvendra 1
   
     
29-Mar-22 Rejected by CW     Zagwe Submitted 29-Mar-22 Sharvendra 1
     
26-Apr-22 Approved       Zagwe Submitted 25-Apr-22 Abhishek 1
     
     
     
29-Mar-22 Approved Zagwe Submitted 29-Mar-22 Abhishek 1
     
     
     
     
24-Mar-22 Approved       Zagwe Submitted 24-Mar-22 Sharvendra 1
     
     
     
25-Mar-2022 SAR Rejected by SAQ     Zagwe Submitted 24-Mar-22 Sharvendra 1
15-Jun-2022 Approved Zagwe Submitted 15-Jun-22 Abhishek 1
     
29-Mar-22 Approved       Zagwe Submitted 29-Mar-22 Sharvendra 1
     
     
     
     
29-Mar-22 SAR Rejected by SAQ     Zagwe Submitted 29-Mar-22 Sharvendra 1
9-Jun-22 Approved Zagwe Submitted 9-Jun-22 Sharvendra 2
     
     
     
28-Apr-22 Rejected by SAQ Team     Zagwe Submitted 25-Apr-22 Abhishek 2
22-Aug-22 Approved Zagwe Submitted 22-Aug-22 Sharvendra 1
     
15-Jul-22 Approved     Fireside Submitted 14-Jul-22 Sharvendra 3
     
15-Apr-22 Approved Fireside Submitted 15-Apr-22 Abhishek 1
     
1-Apr-22 Approved Fireside Submitted 1-Apr-22 Abhishek 1
     
24-Mar-22
Tower Ht
Approved
RF Antenna Ht need to make as per 5yr Plan Fireside Submitted 24-Mar-22 Sharvendra 1
     

22-Apr-22 Approved Fireside Submitted 19-Apr-22 Abhishek 2


     
31-Mar-2022 Approved Fireside Submitted 29-Mar-22 Abhishek 2
     
     
     
29-Apr-22 Approved Innovis Submitted 28-Apr-22 Abhishek 2

     
17-Apr-22 Approved Fireside Submitted 15-Apr-22 Abhishek 2
     
     
28-Jun-22 Approved     Fireside Submitted 16-Jun-22 Abhishek 1
     
28-Apr-22 Approved Zagwe Submitted 26-Apr-22 Abhishek 2
     
27-Mar-2022 Approved   Fireside Submitted 26-Mar-22 Sharvendra 1
     
     
     
     
1-Apr-22 Approved Innovis Submitted 1-Apr-22 Abhishek 1
     
20-Jun-22 Approved Fireside Submitted 21-Apr-22 Abhishek 2
     
Approved but
17-Apr-22 Change due Fireside Submitted 15-Apr-22 Abhishek 2
to Colo Site
     
     
31-Mar-22 Approved     Fireside Submitted 29-Mar-22 Abhishek 2
 
     
31-Mar-22 Approved       Fireside Submitted 31-Mar-22 Abhishek 1
     
to GBT option candidate-T      
     
25-Mar-22 Approved Zagwe Submitted 25-Mar-22 Abhishek 1
     
     
     
27-May-22 Approved Innovis Submitted 27-May-22 Sharvendra 1
     
     
     
14-Jul-22 Approved     Fireside Submitted 14-Jul-22 Sharvendra 3
     
25-Apr-22 Approved Fireside Submitted 21-Apr-22 Abhishek 1

     
28-Mar-22 Approved       Fireside Submitted 26-Mar-22 Sharvendra 1
 
     
30-Mar-22 Approved     Zagwe Submitted 30-Mar-22 Sharvendra 1

     
29-Mar-22 Approved       Zagwe Submitted 29-Mar-22 Sharvendra 1
     
     
     
19-May-22 Approved Fireside Submitted 19-May-22 Sharvendra 2

     
     
     
7-Jun-22 Approved Innovis Submitted 28-May-22 Abhishek 2

     
     
     
     
22-Apr-22 Approved Fireside Submitted 22-Apr-22 Sharvendra 3
     
     
     

21-May-22 Approved but change due to Reverted to Colo Fireside Submitted 19-May-22
Sharvendra/Abhishek 2
25-Aug-22 Approved     Tes Submitted 25-Aug-22 Sharvendra 2
     
     
     

24-Aug-22 Approved     TES Submitted 23-Aug-22 Sharvendra 3


     
     
     
     
29-Apr-22 Approved Innovis Submitted 26-Apr-22 Abhishek 2

     
     
     
     
31-Aug-22 Correct
Approved Conditionally Lat     TES Submitted 31-Aug-22 Sharvendra 4
     
     
     
22-Mar-22 Approved Fireside Submitted 22-Mar-22 Abhishek 1
     
     

17-Jun-22 Approved Innovis Submitted 16-Jun-22 Abhishek 1


28-May-22 Rejected SAR Rejected     Innovis Submitted 27-May-22
Sharvendra/Abhishek 4
     

     
14-Apr-22 Approved     Fireside Submitted 13-Apr-22 Sharvendra 2
     
Approved but
21-Jun-22 Change due     Fireside Submitted 14-Jun-22 Abhishek 2
to Colo Site
18-Apr-22 SAR Rejected by SAQ Fireside Submitted 18-Apr-22 Sharvendra 2
     
     
7-Jun-22 Approved Innovis Submitted 6-Jun-22 Abhishek 2
     
     
     
7-Jun-22 Approved Innovis Submitted 28-May-22 Abhishek 3
     
29-Mar-22 Approved Approved     Zagwe Submitted 29-Mar-22 Abhishek 1
     
30-Mar-22 Approved       Zagwe Submitted 30-Mar-22 Sharvendra 1

     
30-Mar-22 Approved     Zagwe Submitted 29-Mar-22 Abhishek 2
     
     
     
25-Aug-22 Approved Tes Submitted 24-Aug-22 Sharvendra 4
29-Apr-22 Approved but change due to Reverted  to Colo   Fireside Submitted 28-Apr-22 Abhishek 1
     
     
     
     
19-Aug-22 Approved     Fireside Submitted 19-08-2022 Sharvendra 4
     
25-Mar-22 Approved Zagwe Submitted 25-Mar-22 Sharvendra 1
     
30-Mar-22 Approved Zagwe Submitted 30-Mar-22 Sharvendra 2
     
29-Mar-22 Approved       Zagwe Submitted 29-Mar-22 Sharvendra 1
     
     
     
6-Jun-22 Approved Fireside Submitted 29-Apr-22 Abhishek 2
     
     
     
     

30-May-22 Approved Innovis Submitted 29-May-22 Sharvendra 2


     
     
     
10-Mar-22 Approved Innovis Submitted 9-Mar-22 Abhishek 1
     
31-Mar-22 Approved Zagwe Submitted 31-Mar-22 Sharvendra 1
     
     
     
30-Mar-22 Approved     Zagwe Subitted 29-Mar-22 Abhishek 2
     
28-Mar-22 SAR Rejected by STEP RF     Fireside Submitted 26-Mar-22 Sharvendra 1
17-Apr-22 SAR Rejected by STEP RF Fireside Submitted
25-May-22 Approved Fireside Submitted 25-May-22 Sharvendra 2
     
30-Mar-22 Approved Zagwe Submitted 30-Mar-22 Sharvendra 2
     
     
22-Apr-22 Approved Fireside Submitted 19-Apr-22 Abhishek 2
     
     
     
26-Apr-22 Approved Innovis Submit 18-Apr-22 Abhishek 3
     

28-Apr-22 Approved Fireside Submitted 27-Apr-22 Abhishek 1


     
8-Aug-22 Approved Zagwe Submitted 8-Aug-22 Sharvendra 3
     
17-Apr-22 Approved Fireside Submitted 15-Apr-22 Abhishek 2
     
28-Mar-22 Approved       Fireside Submitted 26-Mar-22 Sharvendra 1

     
25-Apr-22 SAR Rejected by CW Fireside Submitted 1-Apr-22 Abhishek 3
30-Jun-22 Approved Fireside Submitted 30-Jun-22 Sharvendra 1
     
28-Mar-22 Approved       Fireside Submitted 28-Mar-22 Abhishek 1

     
24-Mar-22 Approved Fireside Submitted 24-Mar-22 Sharvendra 1
     

8-Apr-22 SAR Rejected from Step RF Fireside Submitted 8-Apr-22 Sharvendra 1

13-Jun-22 Approved Fireside Submitted 24-May-22


Sharvendra/Abhishek 3
     
     
12-Apr-22 Approved     Fireside Submitted 12-Apr-22 Sharvendra 2
     
28-Mar-22 SAR Rejected by STEP RF     Fireside Submitted 26-Mar-22 Sharvendra 1
21-May-22 Approved but change due to Reverted to Colo Fireside Submitted 14-May-22 Abhishek 2

5-Sep-22 Resubmit 1- In Public sh     TES Submitted 5-Sep-22 Rohit 1


     
     
     
29-Mar-22 Approved Zagwe Submitted 29-Mar-22 Abhishek 1
     
31-Mar-22 Approved Fireside Submitted 29-Mar-22 Abhishek 2
15-Feb-22 RejectedRT Candidate required Innovis Submitted 15-Feb-22 Sharvendra 3

1-Mar-22 Rejected by SAQ Zagwe Submitted 17-Feb-22 Abhishek 1


6-Jun-22 Approved IENGG Submitted 1-Jun-22 Abhishek 2
     

15-Mar-22 Approved Tesla Submitted 15-Mar-22 Sharvendra 1

26-Jul-2022 Approved Innovis Submitted 26-Jul-2022 Sharvendra 1


23-Jun-2022 Approved but change due to Reverted to Colo Tesla Submitted 23-Jun-2022 Abhishek 2

29-Jul-2022 Approved Innovis Submitted 29-Jul-2022 Sharvendra 1


29-Aug-2022 Approved Innovis Submitted 27-Aug-2022 Sharvendra 2
12-Mar-2022 Approved but change due to 120 colo lis Zagwe Submitted 11-Mar-22 Abhishek 1

28-Jul-2022 Approved Fireside Submitted 28-Jul-22 Sharvendra 2


7-Mar-2022 Approved but change due to 120 colo lis Zagwe Submitted 7-Mar-22 Sharvendra 1
9-Mar-2022 Approved Tesla Submitted 9-Mar-22 Sharvendra 1

16-Mar-2022 Approved Tesla Submitted 16-Mar-22 Sharvendra 2


29-May-2022 Rejected SAR Rejected by CW Tesla Submitted 29-May-2022 Sharvendra 2
26-Aug-2022 Approved Innovis Submitted 25-Aug-2022 Sharvendra 4

7-Jun-2022 Approved Adrian Submitted 7-Jun-2022 Sharvendra 4

17-Apr-22 Approved Adrian Submitted 15-Apr-22 Abhishek 1


16-Apr-2022 SAR Rejected by SAQ Adrian Submitted 16-Apr-22 Sharvendra 1
6-Jun-2022 SAR Rejected by SAQ Adrian Submitted 6-Jun-2022 Abhishek 1
20-Jun-2022 Approved Zagwe Submitted 20-Jun-2022 Abhishek 2

26-Apr-2022 Approved Adrian Submitted 26-Apr-22 Abhishek 1

16-Apr-2022 Approved Adrian Submitted 15-Apr-22 Sharvendra 1

28-May-22 Approved Adrian Submitted 27-May-22 Abhishek 4

26-Aug-22 Approved TES Submitted 25-Aug-22 Sharvendra 2


10-Mar-2022 Approved but change due to Reverted to Colo Zagwe Submitted 10-Mar-22 Sharvendra 1

13-Jul-2022 Approved I Engineering Submitted 29-Jun-2022


Sharvendra/Abhishek 3

26-May-22 Approved Fireside Submitted 26-May-2022 Sharvendra 2

due to Resubmit23-May-2022 Fireside


due to SAR & TSSR Lat/Long Mismatch, Active Candidate is RT while TSSR Submitted
Submitted for GF 23-May-2022 Sharvendra 1
7-May-2022 Approved Zagwe Submitted 5-May-22Sharvendra/Abhishek 3

31-May-2022 Approved Zagwe Submitted 30-May-2022 Abhishek 1

16-May-2022 Approved Fireside Submitted 16-May-2022 Abhishek 1

23-May-2022 Approved Fireside Submitted 23-May-22 Sharvendra 2

9-Jun-2022 Approved but change due to Reverted to Colo Igado Submitted 9-Jun-2022 Sharvendra 2

6-Sep-22 Approved Innovis Submitted 6-Sep-22 Rohit 4

28/8/2022 Approved Approved Innovis Submitted 22/8/2022 Sharvendra 2

28-Jul-2022 Approved Fireside Submitted 28-Jul-2022 Rohit 3

23-Aug-2022 Approved Tes Submitted 23-Aug-2022 Sharvendra 1

     
TSSR not required due to It's only for MW
TSSR not required due to It's only for MW
TSSR not required due to It's only for MW
TSSR not required due to It's only for MW
TSSR not required due to It's only for MW
     

12-Jul-2022 Approved IGADO Submitted 23-Jun-2022 Abhishek 4

13-Jun-22     Maktech Submitted 10-Jun-22Sharvendra/Abhishek 2


8-Jun-22 Approved Innovis Submitted 8-Jun-22 Abhishek 1
 Sec-2
28-Jun-22
is shadowed
Rejected
due to own building. shift the poles
  from Penthouse.
  Zagwe Submitted 28-Jun-22 Abhishek 1
                 
  SAR Rejected from STEP              
                 
2-Sep-22 Approved     Fireside Submitted 2-Sep-22 Sharvendra 4
7-Jul-22 Approved   Fireside Submitted 7-Jul-22 Sharvendra 2
     
2-Jul-22 Backup Candidate Fireside Submitted 2-Jul-22 Sharvendra 2
                 
3-Sep-22 Approved adiucomm Submitted 3-Sep-22 Rohit 3
                 
2-Sep-22 Approved adiucomm Submitted 2-Sep-22 Rohit 1
                 
3-Sep-22 Approved adiucomm Submitted 3-Sep-22 Rohit 1
                 
RF AntennaRejected
4-Sep-22 Height is 9m and not available any other height. adiucomm Submitted 4-Sep-22 Rohit 1
                 
AR & TSSR and GPS Pic lat/long differ.
6-Sep-22 Resubmit2-Site Sketch & Pictures sheet, Antenna height and Azimuth
adiucomm
is missing.
Submitted 6-Sep-22 Rohit 2
                 
differ. 2-Site Sketch &7-Sep-22
Pictures sheet,
Resubmit
Antenna height and Azimuth is missing and please check tower leg photos
adiucomm that not belong7-Sep-22
Submitted to site. Rohit 1
                 
Proposed RF Ethiotel Colo TSSR Site Proposed Location of Building Ht Proposed Proposed Elect Tilt (Low
Type [Colo Tower-Ploe Pole-RTT on Tower-Pole Mech Tilt Band-High
Ant Hts ID in TSSR for RTT/RMP Azimuth
GBT-RT-GBT] Type Roof Ht Band)

20 RT RTT
In middle towards NE- wall13 9 0/120/240 0 2

21 RT RMP 14 9 0/120/240 0 2

33 RT RMPN&S corners of Rooftop 30 6 0/120/240 0 2

31 RT RMP NE, NW 27 6 90/210/330 0 2

21.5 111772 Colo GBT Existing 30 0/120/240 0 2

19.5 RT RMP
Along with NE wall on rooftop
15.7 6 0/120/240 0 2
27.7 111075 Colo GBT Existing 45 0/120/280 0 2

26 RT RTT
xNE,SE & NW corners of rooftop
20 9 0/120/240 0 2

32 RT RMP NE, SE, SW 28 6 20/140/270 0 2

32 RT RMP
NW,SW and at mid of north wall.
30 6 20/160/270 0 2
25 GBT GreenField 40 0/120/240 0 2

44 RT RMP 6 0/120/240 0 2

37 RT RMP 6 0/120/240 0 2
30 RT RTT 9 0/120/240 0 2

33 RT RTT 9 0/120/240 0 2

19 RT RMP
NW,SE & SW corners on rooftop
15 6 120/240/340 0 2

34 RT Mid
RMP
of north,SE&SW corners on rooftop
30 6 0/120/270 0 2
29.6 RT RMP NE, SE, NW 25.6 6 60/160/320 0 2

29 RT RMP
NE,SE&SW corners on rooftop
26 6 0/120/240 0 2

23 RT RTT 16 9 0/120/240 0 2

13 RT RMP SW side 9.8 6 90/210/330 0 2

35 GBT GreenField 40 20/140/260 0 2


37 GBT GreenField 40 20/140/270 0 2

23 RT RMP SW, SE 19 6 0/120/240 0 2

34 111822 Colo GBT Existing 45 0/120/240 0 2

25 112166 Colo GBT Existing 45 0/120/240 0 2


32 RT RMP N, S & SE 28 6 0/120/240 0 2

25 111673 Colo GBT Existing 30 0/120/240 0 2

37 GBT GreenField 40 0/120/240 0 2

28 111649 Colo GBT Existing 35 50/160/280 0 2

18 RT Corner
RMP
of NW upper, NW lower and SE lower 6 70 220 310 0 2

35 GBT GreenField 40 0/120/240 0 2


22 RT RTT NE corner 9 0/120/240 0 2

24 RT RMP NE, SE & SW 20 6 0/120/240 0 2

23 111699 Colo GBT Existing 30 20/140/260 0 2

31 111397 Colo GBT Existing 45 0/120/240 0 degree 2

RT

33 113018 Colo GBT Colo GBT 40 0/120/240 0 2

21 RT RMPNE,NW& SW on rooftop17.5 6 30/150/270 0 2

37 GBT GreenField 40 0/120/240 0 2

24 RT RTT NE corner on rooftop 17 9 0/120/240 0 2

20 RT RTT 9 0/120/240 0 2
15.5 111767 Colo GBT Existing 30 0/120/240 0 2

22 RT RMP NW, NE, SE 17.8 6 30/160/270 0 2

25 RT RTT 18 9 0/120/240 0 2
32 GBT GreenField 40 90/210/330 0 2
25 111166 Colo GBT Existing 35 30/180/270 0 2

25 RT RMP NE, SW, NW 19.33 6 100/200/350 0 2

25 GBT GreenField 30 0/120/240 0 2

37 112252 Colo GBT Existing 45 0/120/240 0 2

27.1 111399 Colo GBT Existing 35 0/120/240 0 2

24 RT RMP NW, NE & SE 20 6 0/120/240 0 2

27 RT RMP N & SE 23 6 0/120/240 0 2

22 RT RMPNE,NW& SW on rooftop 19 6 0/120/240 0 2

26 RT RMP W & SW 22 6 60/160/300 0 2

41 RT RMP NW, NE & SW 38 6 0/120/240 0 2

52 RT RMP NW, NE, SW 48.3 6 0/120/240 0 2

29 RT RMP 25 6 0/120/240 0 2

RT RMP

28.5 RT RMP NE & SW 24.5 6 0/120/240 0 2


23 111051 Colo GBT Existing 72 0/120/240 0 2

17 RT RTT RTT on Roof 9 0/120/240 0 2

23 111590 Colo GBT Existing 30 0/120/240 0 2

27 RT RMP 22 6 0/120/240 0 2

36 RT RMP
NW & NE corners on rooftop32 6 20/110/250 0 2

22 RT RTT 9 0/120/240 0 2

29 RT RTT 22 9 10/120/240 0 2

23 GBT GreenField 30 70/180/330 0 2


24 RT RMP
NE,NW&SW corners on rooftop
20 6 0/120/240 0 2

35 RT RMP 32 6 0/120/240 0 2
25.5 RT RMP SE side on penthose 21.6 6 20/140/250 0 2

24 111679 Colo GBT Existing 35 0/120/240 0 2


21 111170 Colo GBT Existing 35 0/120/240 0 2

21 RT RMP 17 6 30/150/270 0 2
22 RT RMP SW & NW on rooftop 18 6 0/160/260 0 2

21 RT RMP
NE & SE corners on rooftop17 6 0/120/240 0 2

30 GBT GreenField 40 0/120/240 0 2


30 GBT GreenField 40 0/120/240 0 2
30 113095 Colo GBT Existing 45 70/190/310 0 2

37 RT 35
41 RT RMP
NE,SE&SW corners on rooftop
40 6 0/120/240 0 2

24 RT RMP NW, NE, SE 21 6 0/120/240 0 2

25 GBT GreenField 30 0/120/240 0 2

39 RT RMP NW, NE, SW 36 6 0/90/270 0 2


26 111125 Colo GBT Existing 35 0/120/240 0 2

34 RT RMP 6 0/120/240 0 2

23 RT Along
RMP E & W sides of wall on rooftop
19 6 90/210/330 0 2

26   RT RTT   21 9 0/120/240 0 2

43 RT RTT NE side on pen 36 9 90/210/330 0 2


21 111015 Colo GBT Existing 35 0/120/240 0 2

32 GBT GreenField 40 0/120/240 0 2


30 113150 Colo GBT Existing 40 0/120/220 0 2
25 RT RYY 19 9 0/120/240 0 2

RT RTT

44 RT RMP
NE & NW corners on rooftop40 6 80/200/320 0 2
30 GBT GreenField 0 40 0/120/240 0 2

23 RT RMP N, SE & SW 21 6 0/120/240 0 2

27 RT RMP 23.65 6 0/120/240 0 2

19 RT RMP NE, SE, SW 15 6 0/150/270 0 2

24 111186 Colo GBT Existing 45 0/120/240 0 2

38 RT RMP
NE & SE corner on rooftop35.5 6 0/120/240 0 2

37 RT RMP NE,NW 33 6 0/120/240 0 2

25   GBT GreenField     40 50/140/230 0 2

21 RT RMP NW, SW 18 6 0/120/240 0 2


24 RT RTT South corner 9 0/120/240 0 2

28 RT RTT 9 0/120/240 0 2

29 RT RTT 22 9 0/120/240 0 2

33 GBT GreenField 40 0/120/240 0 2

22 RT RMP NW, NE, NW 19.6 6 30/140/240 0 2


23 111275 Colo GBT Existing 35 0/120/240 0 2

31 RT RTT 24 9 0/120/240 0 2

21 RT RMP N, S 17 6 0/120/270 0 2
7 GBT Green field 9 80/240/340 0 2

25 111212 Colo GBT Existing 45 0/120/240 0 degree 2

25 GBT GreenField 40 20 140 260 0 2


24 RT RMP
NE,SE & SW corners on rooftop
20 6 0/120/240 0 2
24 RT RMP
NE,SE & SW corners on rooftop
20 6 0/120/240 0 2

23 RT RMP 6 0/120/240 0 2

21 RT RMP NW, NE, SE 17 6 0/120/240 0 2

19 RT RTT NE corner on rooftop 13 9 0/120/240 0 2


33 RT RMP NW, SE, SW 29 6 0/120/240 0 2

35 GBT GreenField 40 0/120/240 0 2

34 RT RMP
NE,SE&SW corners on rooftop
30 6 70/190/310 0 2
26 RT RMP N, S, SW 22 6 0/120/240 0 2

33 GBT GreenField 40 0/120/240 0 2


32 112225 Colo GBT Existing 45 0/120/240

19 RT RTT 9 0/120/240 0 2

36 RT RMP 6 0/120/240 0 2

41 RT RMP . 37 6 30/150/270 0 2
50.65 RT RMP NW, SE, SW 46.65 6 0/120/240 0 2

24 RT RMP 17 9 50/170/270 0 2
21 RT RTT NE, SE 14 9 50/170/270 0 2
25 111073 Colo GBT Existing 45 0/120/240 0 2

22 112137 Colo GBT Existing 30 0/120/240 0 2

52 RT RMP 48 6 0/120/240 0 2

37 RT RMP 34 6 0/150/260 0 2
27 GBT Green field NE 30 0/120/240 0 2

23.4 RT RMP NW, SE, SW 19.37 6 0/140/240 0 2

33 RT RMP
NW,SW & SE corners on rooftop
29 6 40/150/300 0 2
35 GBT GreenField 40 0/120/240 0 2

35 GBT GreenField 40 40/160/280 0 2


23 111034 Colo GBT Existing 45 60/180/300 0 2

35 GBT GreenField 40 40/140/310 0 2

24 RT RMP NW, SE, SW 20 6 0/120/240 0 2

20 RT RMP NW, SE, SW 16 6 10/110/190 0 2

25 GBT GreenField 40 0/120/240 0 2

25 RT RMP NW, SE, SW 21 6 0/120/250 0 2

20 RT RTT 12 9 0/120/240 0 2

25 GBT GreenField 40 20/120/250 0 2

42.3 RT RMP NW, SW 38.3 6 160/260/350 0 2

26 RT RTT 9 0/120/240 0 degree


26 RT RTT
NE & SW corners on rooftop24 9 0/120/240 0 2

24 RT RMP NE, SW, NW 20 6 40/180/250 0 2

17 RT RTT 9 10/120/240 0 2
37 RT RMP NW and SE Corner 6 0/120/240 0 2
27.85 111835 Colo GBT Existing 35 60/180/300 0 2

24 RT RMP
North Corner and South Corner 6 20/120/210 0 2

RT

16 RT SE,SW
RMP& in between of these two 12
above. 9 100/210/320 0 2

26 RT RMP NE, SE, SW 19 9 30/150/260 0 2

21.7 RT RMP NW, NE & SW 17.7 6 0/120/240 0 2

32 RT RMP
NW,SE&SW corners on rooftop
28 6 0/120/240 0 2

RT RMP

42.7 RT RMP NE, SE, NW 38.7 6 20/130/250 0 2

36 RT RMP N, SE & W Corner 33 6 0/120/240 0 2

25 RT RTT 18 9 80/180/280 0 2

35 GBT GreenField 40 0/140/240 0 2

35/39/35 RT RMP SE, NW, N 31/35/31 6 100/250/350 0 2

20 RT RMP NE, SE, NW 16 6 0/120/240 0 2

22 RT RMP 6 0/120/240 0 2

32 RT RTT NE,SE&SW on rooftop 25 9 0/120/240 0 2


48 RT RMP N, SE, SW 44 6 30/150/250 0 2
34 RT RMP NE, SE, SW 30 6 0/120/240 0 2
25 GBT GreenField 30 0/120/240 0 2

37 GBT GreenField 40 60/190/310 0 2


27 111008 Colo GBT Existing 35 0/120/240 0 2

49 RT RMP NW, NE & SW 45 6 30/110/290 0 2

RT RMP
25 111417 Colo GBT Existing 45 0/120/240 0 2

RT

32 111198 Colo GBT Existing 35 00/120/240 0 2

24.5 RT RMP
NE & SE Corners on Rooftop18 6 0/120/240 0 2

21/21/21 112092 Colo GBT Existing 30 0/120/240 0 degree

38 111418 Colo GBT Existing 45 0/120/240 0 2

28 RT RMP 6 0/120/240 0 2
23.5 RT RMP NE,SE & SW corners 19.5 6 0/120/240 0 2

19 RT RMP
NW,SE&SW corners on rooftop
15 6 0/120/240 0 2

31 RT RTT
Mid of south wall on penthouse
24.5 9 0/120/240 0 2

25 RT RMP
NE,NW & SW corners on rooftop
22 6 30/150/270 0 2

39 RT RMP
NE & SE Corners on Rooftop35 6 0/120/240 0 2

20 111687 Colo GBT Existing 30 70/190/310 0 2

51 RT RMP NW, SE, SW 48.46 6 0/120/240 0 2


25 111004 Colo GBT Existing 45 0/120/220 0 2

21 RT Mid of north
RMPwall, Mid of south wall and17
NW corner. 6 0/140/260 0 2

24 RT RMP
SE,SW & MID of NE rooftop.
20 6 0/120/240 0 2

30 RT Mid
RMP od north wall,NE & SW corners
26 6 0/120/240 0 2

26 RT RMP NW & SW 22 6 60/160/300 0 2

25 RT RMP NW, SE, SW 21 6 0/120/240 0 2


28 111124 Colo GBT Greenfield 40 0/120/240 0 2

20 RT RTT South 9 0/120/240 0 2


25 111580 Colo GBT Exisitng 45 20/140/290 0 2

25 RT RTT Centre 9 0/120/240 0 2

23.5 RT RTT 16.58 9 60/170/300 0 2

15 RT RTT 10.42 9 0/120/240 0 2

35 GBT GreenField 0 40 0/120/240 0 2

19 RT RMP
NE & SE corners on rooftop
15.7 6 30/160/280 0 2
32 111153 Colo GBT Existing 45 60/180/350 0 2

27 RT RMP NE, SE& SW 23 6 20/140/240 0 2

35 RT RMP
NW,SW corners on rooftop33 6 0/120/240 0 2

26 111163 Colo GBT Existing 35 0/120/240 0 2

23 111582 Colo GBT Existing 30 0/120/240 0 2

22 RT RMP
NW,SE&SW corners on rooftop
18 6 0/120/240 0 2
20 RT RMP 16.6 0/120/240 0 2

27 RT RTT 20 9 0/120/240 0 2

28 RT RTT 21 9 0/120/240 0 2

27 RT RMP NE, SE, SW 23 6 20/140/220 0 2

30 RT RTT 23 9 0/120/240 0 2
21 111274 Colo GBT Existing 35 80/200/320 0 2

29 RT RMP NE, SE, NW 26 6 30/230/300 0 2

44 RT RMP
NE,NW & SE corners on rooftop
42 6 70/200/310 0 2
21.5 111851 Colo GBT Existing 30 0/120/240 0 2

24 RT RMP NW, NE & SW 20 6 0/120/240 0 2


21 RT RMP
NE & NW corner on rooftop18 6 0/120/240 0 2

41 RT RMP NE, NW 37 6 60/170/260 0 2

20 111022 Colo GBT Existing 30 0/120/240 0 2

36 RT RMP
NE, SE & NW corners on rooftop
32.8 6 40/140/300 0 2
42 RT RTT
In middle of south on rooftop36 9 0/120/240 0 2

32 113044 Colo GBT Existing 40 0/120/240 0 2

38 RT RMP
SE & SW Corners on Rooftop
34 6 0/120/240 0 2
25 GBT GreenField 30 0/120/240 0 2

20 111083 Colo GBT Existing 35 70/190/310 0 2

17 RT RTT NW corner 9 0/120/240 0 4


14 RT RMP
NE,SE&SW corners on rooftop
10 6 0/120/240 0 2

31 111026 Colo GBT Existing 35 0/120/240 0 2

23 RT RTT 9 0/120/240 0 2

17 RT RTT SE corner on rooftop 10 9 0/120/240 0 2

27 GBT GreenField 30 0/120/240 0 2


19 RT RMP NE, SE 15.5 6 40/120/240 0 2

34 113066 Colo GBT Colo 45 0/120/240 0 2

35 GBT GreenField 40 0/120/240 0 2

19 RT RTTNW & NE corners of tower12 9 0/120/240 0 2

29 RT RTT 22 9 0/120/240 0 2

28 RT RTT NE direction 9 0/120/240 0 2


31 RT RMPNW,SE&SW on rooftop 27 6 30/150/280 0 2

42 RT RMP North and SE corner 6 0/120/240 0 2


44 RT RMP NW, SE, SW 40 6 0/120/250 0 2

52 RT RMP NE, SE, SW 48.05 6 0/120/240 0 2

25 GBT GreenField 30 0/120/240 0 2

23 111017 Colo GBT Existing 35 0/120/240 0 2

RT 0/120/240 0 2
35 RT RMP N,S 32 6 90/180/290 0 2

35 GBT Greenfield 40 30/150/270 0 2


25 RT West,East
RMP & South corners on rooftop 6 0/120/240 0 2

52 RT RMPNW,SE&SW on rooftop 48 6 40/160/280 0 2

35 GBT GreenField 40 0/120/240 0 2

20 RT RMP
NE & SW corners on rooftop18 6 0/120/240 0 2
37.2 113041 Colo GBT ExistingNE & SW corners on rooftop 45 30/170/290 0 2

39 RT RMP NW, NE 36 6 0/90/240 0 2

RT
23 RT RTT 16 9 10/140/310 0 2

20.5 RT RTT SW side on penthouse 13.5 9 0/100/270 0 2

24 111719 Colo GBT Existing 30 0/120/240 0 2

33.5 RT RMP NW, E & SW 29.5 6 90/210/330 0 2


42 RT On
RMP
penthouse in SE corner of rooftop.
38 6 30/150/270 0 2

22 RT RTT 15 9 40/220/320 0 2
26.7 111279 Colo GBT Existing 35 10/120/240 0 2

18.5 RT RMP
NW, SW & SE corners on rooftop.
14.5 6 60/180/300 0 2

25 111676 Colo GBT Existing 45 80/180/290 0 2

32.4 RT RTT 25.4 9 0/120/240 0 2

29 RT RMP 6 0/120/240 0 2

19 RT RTT 12 9 0/120/240 0 2

24 RT RMP
NW and SE corner near to wall 6 0/120/240 0 2

28 RT RMP NE, SW, NW 24 6 0/120/240 0 2

36 RT RTT RTT on Roof 9 0/120/240 0 degree

25 RT RMP
NE,NW&SE corners on rooftop
21 6 0/120/240 0 2
48 RT RMP NE, SE and SW Corner 6 0/120/240 0 2
29 RT RTT 23 9 90/170/320 0 2

30 RT RTT 9 0/120/240 0 2
23.4 112087 Colo GBT Existing 30 0/120/240 0 2

32 RT RMP
NW,SW & SE corners on rooftop
30 6 90/200/300 0 2

43 RT RMP 39 6 20/150/310 0 2
39 RT RMP NW & SE 36 6 0/170/300 0 2

48 RT RMP 45 6 0/120/240 0 2

45 RT RMP 41 6 20/120/260 0 2

24 RT RMP NE, SE 20.5 6 0/120/240 0 2

21 RT RTT NW corner 9 0/120/240 0 2

35 RT RTT 31 9 0/120/240 0 2
37 RT RMP NE side on rooftop 33.1 6 0/120/240 0 2

21 RT RTT NE, NW & SW 14 9 0/120/240 0 2

25 RT RTT Centre 19 9 0/120/240 0 2

21 111585 Colo GBT Existing 30 0/120/240 0 2

30 GBT GreenField 0 40 0/120/240 0 2

24 112103 Colo GBT Existing 30 0/120/240 0 2

                   
                   

35 111410 Existing Colo GBT 50 0/120/240 0 2


25 GBT GreenField 40 0/120/240 0 2

28 RT RTT 21.6 9 0/120/240 0 2

33.6 RT RTT 9 0/120/240 0 2

26 111613 Colo GBT Existing 35 0/120/240 0 2

22 RT RTT 15 9 20/150/270 0 2

22 RT RMP 18.5 6 0/100/200 0 2

25 GBT GreenField 30 0/120/240 0 2

27 RT RMP SW, NW, SE 23 6 0/120/240 0 2

49 RT RTT
Toward South-East, near to edge 9 0/120/240 0 2

40 RT RMP 36 6 80 180 300 0 2

44 RT RMP SE & SW 42 6 70/170/280 0 2

35 RT RMP
NE,NW&SE corners on rofftop
32 6 10/130/270 0 2

42 RT RMP NW & NE 39 6 40/150/270 0 2

66 RT RMP NW, SE, NW 62.3 6 0/120/240 0 2


40 RT RMP
NE&SE corners on Penthouse
36 6 30/130/230 0 2

25 111272 Colo GBT Existing 35 60/160/270 0 2


19 RT RMP NW, NE, SW 16 6 0/110/220 0 2
36 RT RMPNE,NW&SW on rooftop 33 6 90/210/330 0 2

RT RMP

39 RT RTT E, S SW 36 9 70/200/290 0 2

44 RT RMPNE,NW&SW on rooftop 40.9 6 90/210/330 0 2

27 RT RMP 23 6 0/120/240 0 2

25 GBT GreenField 40 0/120/240 0 2

34 111674 Colo GBT Existing 45 0/120/240 0 2

37 113157 Colo GBT Existing 45 0/120/240 0 2

22 RT RTT SW corner on rooftop 15 9 80/200/320 0 2

23 RT RMP
NE,SE & SW corners on rooftop
18 6 30/150/270 0 2

19 RT RMP NW, SE & SW 15 6 90/220/330 0 2

29 RT RMP1st Pole(NE) 2nd Pole NW26.5 6 0/120/240 0 2

33   RT RMP   29.5 6 30/120/230 0 2

30 RT RMP NE, NW & SW 26 6 0/120/240 0 2


25 GBT GreenField 40 80/180/310 0 2

47 RT RMP N & SW 44 6 0/100/240 0 2

25 GBT GreenField 30 0/120/240 0 2

32 GBT GreenField 0 40 80/220/340 0 2


35 111063 Colo GBT Existing 45 0/120/240 0 2

25 111160 Colo GBT Existing 45 0 120 240 0 2

21.5 RT RMP 17.5 6 0/120/240 0 2

22 RT RTT NW side on rooftop 15 9 0/120/240 0 2

17 RT RTT SW corner on rooftop 10 9 0/120/240 0 2

23 RT RMP NW, NE, SW 19.3 6 0/120/240 0 2

31 RT RMP NW, SE, SW 27 6 0/120/260 0 2

33 RT RTT 9 0/120/240 0 2

25.5 RT RMP 21.74 6 60/180/300 0 2


20 112109 Colo GBT GBT 30 0/120/240 0 2
20 RT RMPNW, SW and South center 6 0/140/240 0 2

44 RT RMP NE, SW 41 6 60/160/230 0 2

43 RT RTT MID of SE 36.7 9 20/140/260 0 2


28.5 RT RMP
NE,NW&SE corners on rooftop
24.5 6 100/200/340 0 2

18 RT RMP 11 9 40/180/280 0 2
RT RMP

29 RT RMP
NE,NW&SE corners on rooftop
27 6 20/140/300 0 2

32 RT RTT SE corner on penthouse 25.2 9 30/180/280 0 2

38 112126 Colo GBT Existing 45 40/160/280 0 2


21 GBT GreenField 30 0/120/240 0 2

28 RT RTT 21 9 0/120/240 0 2

25 GBT GreenField 40 0/120/240 0 2


37 GBT GreenField 40 40/140/270 0 2

19 RT RMP
NE & NW corners on rooftop
15.5 6 0/120/240 0 2
22 111657 Colo GBT Existing 30 0/120/240 0 2

35 GBT GreenField 0 40 0/120/240 0 2

30 RT RMP
NW&SW corners on rooftop27 6 90/190/300 0 2
38 RT RMP
NW & NE corner on rooftop36 6 0/120/240 0 2
25.6 RT RTT SW corner 9 0/120/240 0 2

28 RT RTP SW corner 24 6 40/170/280 0 2

53 RT RTT 50 9 0/120/240 0 2

27 RT RMP SE & SW 24 6 120/220/310 0 2


50   RT RMP NE, SE, NW 46 6 40/140/270 0 2

49 RT RTT 45 9 0/120/240 0 2

RT RMP
25 111278 Colo GBT Existing 35 90/210/330 0 2

20 111643 Colo GBT Existing 30 0/120/240 0 2

42 RT RMPSE, NE, NW on penthouse38.2 6 70/210/340 0 2


23 RT RTT 9 0/120/240 0 2

20 RT RMP 6 0/120/240 0 2

20 111197 Colo GBT Existing 45 0/120/240 0 2

26 RT RMP 6 0/120/240 0 2

27 RT RMP 6 0/120/240 0 2

32 RT RMP NE, SE, NW 28 6 50/170/310 0 2

34 RT RMP NW & SW 30 6 50/170/270 0 2

59 RT RMP NE, SE, NW 55 6 90/180/290 0 2


24 RT RMP 20 6 0/120/240 0 2
21 GBT GreenField

29 111165 Colo GBT Existing 45 0/120/240 0 2

35 RT RMP N & SW 31 6 60/180/300 0 2

37 GBT GreenField 40 0/120/240 0 2


25 112263 Colo GBT Existing 45 0/120/240 0 2

25 RT RMP3 Pole in N, E, W corner 6 0/120/240 0 2

20 112120 Colo GBT Existing 30 0/120/240 0 degree 2

23 RT RMP NW, NE, SW 19.2 6 0/120/240 0 2

18.45 RT RMP 14.45 6 0/120/240 0 2

35 RT RMP
NE,NW & SE corners on rooftop
33 6 60/180/300 0 2

25 GBT GreenField 40 0/100/240 0 2

19 RT RMP NW, NE & SE 15 6 0/120/240 0 2


25 111752 Colo GBT Existing 30 0/120/240 0 2

17 RT RTT 12 9 0/120/240 0 2

37 111558 Colo GBT Existing 45 0/120/240 0 2

20 RT RMP 16 6 0/120/240 0 2
25 111419 Colo GBT Existing 45 00/120/240 0 2

20 112183 Colo GBT Existing 35 0/120/240 0 2

35 GBT GreenField 40 90/210/330 0 2

20 111837 Colo GBT Existing 30 90/210/330 0 degree 2

22 RT RMP NW, SE, SW 18 6 0/120/240 0 2

GBT GreenField
25 GBT GreenField 40 0/140/240 0 2
25 GBT GreenField 30 0/120/240 0 2

25 RT RMP NE, SW 22 6 20/160/260 0 2

23.6 RT RMP
On penthouse near to water tanks
19.6 6 0/120/240 0 2

18 RT RTT 11 9 40/140/300 0 2

33 RT RMP 6 0/120/240 0 2

26 RT RMP 22 6 70/190/340 0 2

23 111109 Colo GBT Existing 45 0/120/240 0 2

38 RT RMP N, SW, NW 35 6 40/160/260 0 2

31 RT RMP N, S, SW 27 6 90/190/320 0 2

26 111011 Colo GBT Existing 30 0/120/240 0 degree 2


19 RT RMP NE, SW 15 6 70/160/320 0 2
21 RT RTT 9 0/120/240 0 2

31 111135 Colo GBT Existing 35 60/180/300 0 2

28 RT RTT NE corner 21 9 0/120/240 0 2

23 RT RTT 9 0/120/240 0 2
20 RT RMP NE, SE & NW 16 6 0/120/240 0 2

34 111204 Colo GBT Existing 45 00/120/240 0 2

32 RT RMP NW, NE, SW 28 6 0/120/210 0 2

23 RT RMP 19 6 0/120/240 0 2

37 RT RMP
NE,NW&SE corners on rooftop
34 6 120/220/320 0 2

25 111172 Colo GBT Existing 45 0/120/240 0 2

25 113060 Colo GBT Existing 45 60/140/240 0 2


25 GBT GreenField 40 0/120/240 0 2

20 RT RTT 13.4 9 40/150/270 0 2

23 111138 Colo GBT Existing 45 0/120/240 0 2

33 GBT GreenField 40 30/150/270 0 2


16 RT RMP
NE, SE & SW corners on rooftop
12 6 40/160/320 0 2
35 GBT GreenField 40 0/120/240 0 2

23 RT RMP NW and SE Corner 6 0/120/240 0 2

29 RT RMP 6 0/120/240 0 2

28 RT RTT 9 0/120/240 0 2

25 GBT GreenField 30 50/170/290 0 2

23 RT RMP NW, NE, SW 16 9 0/120/240 0 2

46 RT RMP NW, NE 42 6 10/130/260 0 2


30 RT RMP 6 0/120/240 0 2
46 RT RMP N, S, NW 42 6 0/120/240 0 2

33 RT RMP NE, SW & NW 27 6 0/120/240 0 2

46 RT RMP NW, NE, SW 42 6 0/120/240 0 2

32/29/29 RT RMP
NW, SW & SE corners on rooftop
25 6 110/220/310 0 2

24 RT RMP NW & SW 21 6 90/180/340 0 2

31 117101 Colo GBT Existing 40 0/120/240 0 2

19 RT RTT 13 9 130/240/340 0 2

37,34,34 RT RMP 6 0/120/240 0 2


31 RT RMP
NE,NW&SE corners on rooftop
27.8 6 70/180/290 0 2

27 RT RMP 23.4 6 0/140/240 0 2


35 112222 Colo GBT Existing 45 0/130/250 0 2
25 GBT GreenField 40 0/120/240 0 2

32 GBT GreenField 40 0/120/240 0 2

23 RT RTT 16.5 9 10/150/270 0 2

26 111097 Colo GBT Existing 45 0/120/240 0 2

25 RT RMP 6 0/120/240 0 2

37 GBT GreenField 40 0/120/240 0 2


30 111407 Colo GBT Existing 45 60/180/300 0 2

23 RT RMP 19 6 0/120/240 0 2

22 RT RMP NW, SE, SW 18 6 140/220/330 0 2

27 RT RTT north 9 0/120/240 0 4

31 RT RTT 9 0/120/240 0 2

RT
20 RT RMP N, SW 16 6 40/170/300 0 2

RT
37 GBT GreenField 40 0/120/240 0 2
23 112076 Colo GBT Existing 30 0/120/240 0 2
18 RT RMP NW, SE, SW 15 6 0/120/240 0 2
31 111199 Colo GBT Exisitng 35 0/120/240 0 2

22 111207 Colo GBT Existing 45 0/120/240 0 degree 2

23 RT RMP N, S & SW 20 6 0/120/240 0 2

32 RT RTT 9 0/120/240 0 2

RT RMP

22 RT RMP NE & NW 18 6 0/120/240 0 2

24.5 112037 Colo GBT Existing 45 30/150/270 0 2

25 RT RTT 9 0/120/240 0 2

24 RT RTT 17.5 9 60/180/300 0 2

26 111230 Colo GBT Existing 35 0/120/240 0 2

22 RT RMP
SE,SW&NW corners on rooftop
18 6 0/120/240 0 2

32 GBT GreenField 40 0 2

32 GBT GreenField 40 0/120/240 0 2


23 112132 Colo GBT Existing 30 0/120/240 0 degree 2

21 111041 Colo GBT Existing 45 0/120/240 0 2


GBT GreenField
42 RT RTT 40 9 0/120/240 2 0

37 RT RMP 33.8 6 0/120/240 0 2


36 RT RMP NW, NE, SW 32 6 0/140/240 0 2

46 RT RMP NE, SE, SW 42 6 0/120/240 0 2

43 RT RMP NW, SE 39 6 10/120/240 0 2

23 RT RTT 19 6 120/220/320 0 2

23 RT RMP NE, SE & NW 20 6 60/180/300 0 2

27 RT RTT
Along mid of northern wall.21 9 60/180/300 0 2

29 RT RMP NW, SE, SW 25 6 0/120/240 0 2

41 RT RMP
NE,SE&NW corners on rooftop
37 6 30/150/280 0 2
47 RT RMP NE,NW&SE on rooftop 43 6 30/140/240 0 2
44 RT RMP NE, SE & SW 40 6 0/120/240 0 2

25.6 RT RTT 18.6 9 0/120/240 0 2

27 112161 Colo GBT Existing 45 30/150/270 0 2

32 RT RMP NW, NE & SW 30 6 0/120/240 0 2

25 RT RMP
NE,NW&SW corners on rooftop
21 6 0/120/240 0 2

20 RT RMP
NE&NW corners on rooftop16 6 0/120/240 0 2
25 RT RMP
NW & SE corners on rooftop22 6 30/150/270 0 2
25 RT RMP
NW & SE corners on rooftop22 6 30/150/270 0 2
19 RT RMP NW, SE, SW 15 6 0/120/240 0 2

28 113023 Colo GBT Existing 40 0/120/240 0 2

20 111884 Colo GBT Existing 30 0/100/180 0 2

30 RT RMPNE,SE & Mid of west wall 27 6 0/120/240 0 2

27 111009 Colo GBT Existing 35 0/120/240 0 2


RT

18 RT RMP NW, NE & SW 15 6 0/120/240 0 2

18 RT RTT 12 9 0/120/240 0 2

20 RT RTT 13.82 9 30/140/250 0 2

37 RT RMP NE, SE, SW 33 6 0/120/240 0 2

28 111400 Colo GBT Existing 38 0/120/240 0 2

23.5 RT RMP 19.5 9 0/120/240 0 2

25 111006 Colo GBT Existing 45 30/150/270 0 2

60 RT RMP
NE & SW corners on rooftop56 6 60/180/300 0 2
21 GBT GreenField 0 30 0/120/240 0 2

37 GBT GreenField 40 40/160/280 0 2

25 GBT GreenField 0 30 0/120/240 0 2

21 RT RMP 18 6 0/120/240 0 2

27 GBT GreenField 30 0/120/240 0 2

49 RT RMP
SE&SW corners on penthouse
45.3 6 30/160/270 0 2

31 RT RMP N&S corners on rooftop 29 6 0/120/240 0 2

35 111099 Colo GBT Existing 45 0/120/240 0 2

25 111095 Colo GBT Existing 45 110/200/330


21 RT RMP NW, SE, SW 17 6 60/170/260 0 2

RT

33 RT RMP NE, SE, SW 29 6 20/150/270 0 2

19.5 RT RTT 12.8 9 0/120/240 0 2


33 RT RMP N, S, SW 29 6 20/140/260 0 2

25 RT RTT 9 0/120/240 0 2
18 RT RMP 14 6 0/120/240 0 2

22 111143 Colo GBT Existing 35 0/120/240 0 2

22 RT RMP
NE & SE coners on rooftop20 6 30/130/280 0 2
37 RT RMP 33.1 6 30/140/240 0 2

22 RT RMP SE, SW, NW 18.2 6 0/160/250 0 2

45.5 RT RMP NE,SE&SW corners 41.5 6 90/200/310 0 2

25 RT RMP 6 0/120/240 0 2

35 RT RMP NE side on rooftop 31 6 20/150/270 0 2

23 RT RMP NW, SE & SW 21 6 0/120/240 0 2


37 GBT GreenField 40 30/120/240 0 2

29 RT RMP 6 0/120/240 0 2

35 RT RMP NE, SE, SW 31 6 0/120/240 0 2


41 RT RMP 6 0/120/240 0 2

26 RT RTT 9 0/120/240 0 2

37 GBT Greenfield 40 120/220/350 0 2

35 GBT GreenField 40 60/150/330 0 2

40 RT RMP NW & SE 35 6 00/170/250 0 2


29 RT RTT 22 9 20/150/260 0 2
36 RT RMP NW & SE 32 6 90/220/310 0 2

19 RT RMP NE,SE&SW on rooftop 15 6 120/240/340 0 2


25 112182 Colo GBT Existing 45 0/120/240 0 2

39 RT RMP N&S 36 6 0/120/240 0 2

25 RT RTT NE 18 9 0/120/240 0 2

45 RT RMPNE,SE&SW on penthouse 41 6 0/120/240 0 2

35 RT RTT 30 9 0/120/240 0 2

25/25/25 111411 Colo GBT Existing 45 30/160/270 0 degree 2

40 RT RMP 6 50/180/300 0 2

40 RT RMP NE,SE & SW 36 6 00/120/240 0 2

25 RT RMP 6 0/120/240 0 2
20 RT RTT
RTT on SW corners of tooftop
13 9 0/120/240 0 2
25 GBT GreenField 40 0/120/260 0 2

34 RT RMPNE,SE & at mid of NW. 30 6 60/180/300 0 2

25.9 RT RMP NE, SE & NW 21.9 6 20/140/260 0 2

52 RT RMP NE, NW 48 6 50/120/320 0 2

20.5 111136 Colo GBT Greenfield 35 0/140/240 0 2

32 RT RMP NW, SE, NW 28 6 30/150/270 0 2

38 RT RMP
East & West Corners of Rofftop 6 0/120/240 0 2

26 RT RMP N, NE, SW 22 6 0/120/240 0 2

25 RT RTT NE, SW, NW 21 9 40/160/250 0 2

25 RT RMP NW, SW 21 6 20/140/260 0 2

22 RT RTT 15 9 70/170/330 0 2

22 RT RMP 6 0/120/240 0 2

27 RT RTT NW corner 9 0/120/240 0 2

34 RT RMP NE, SE, NW 30 6 30/150/280 0 2


35 GBT Greenfield 40 0/120/260 0 2

25 RT RMP NE & NW 23 6 0/120/240 0 2


26 RT RMP
NW,SE&SW cornets on rooftop
22 6 120/220/310 0 2
21 111148 Colo GBT Existing 35 20/140/260 0 2

22.5 RT RMP N, SE, SW 18.7 6 0/120/240 0 2


25 GBT GreenField 40 0/120/240 0 2

28 RT RTT NW 21.4 9 30/150/260 0 2

36 RT RMP
NE,SE&SW corners on rooftop
31.85 6 0/120/240 0 2

32 GBT GreenField 40 0/100/190 0 2

32 GBT GreenField 40 0/120/240 0 2


34 111806 Colo GBT Existing 45 0/120/240 0 degree 2

31.9 113074 GBT Colo GBT 40 0/120/240 0 2

30 GBT GreenField 40 0/120/240 0 2

27 112158 Colo GBT Existing 45 0/120/240 0 2

30 GBT GreenField 40 20/120/240 0 2

46 RT RMP N, NW, SW 42 6 0/120/250 0 2


25 111042 Colo GBT Existing 35 0/120/240 0 degree 2

52 RT RMP 48 6 80/200/320 0 2
25 RT RTT 21 9 30/130/240 0 2
26 111210 Colo GBT Existing 40 0/120/240 0 degree 2

25 RT RMP 21 6 10/100/280 0 2

24 RT RMP
NE,NW & SW corners on rooftop
20 6 30/150/270 0 2

47 RT In middle
RMPof roof alongwith north & south
44 wall 6 0/150/270 0 2

30 GBT GreenField 40 60/150/250 0 2

37 GBT GreenField 40 0120/240 0 2

25 GBT GreenField 30 40/150/260 0 2

25 GBT GreenField 40 0/100/200 0 2

25 GBT GreenField 30 0/120/240 0 2

32 GBT GreenField 40 60/160/300 0 2

30 GBT GreenField 40 50/170/310 0 2

37 GBT GreenField 40 30/150/270 0 2

37 GBT GreenField 40 110/210/330 0 2

35 GBT Greenfield 40 0/120/240 0 2

30 GBT GreenField 50 120/220/310 0 2

30 GBT GreenField 0 40 0/120/240 0 2


35 GBT GreenField 40 0/120/240 0 2

30 GBT GreenField 40 0/120/240 0 2

30 GBT GreenField 40 0/120/240 0 2

37 GBT GreenField 40 0/120/240 0 2

30 GBT GreenField 40 0/120/240 0 2

45 GBT GreenField 50 30/120/220 0 4/2

45 GBT GreenField 50 30/120/220 0 4/2

37 GBT GreenField 40 30/150/270 0 4/2

37 GBT GreenField 40 0/120/240 0 2

37 211089 Colo GBT Existing 40 0/120/240 0 2

37 GBT GreenField 0 40 0/120/240 0 2

37 GBT GreenField 40 0/120/240 0 2

25 RT RTT Corners of rooftop 18 9 0/120/240 0 2

37 GBT GreenField 40 0/120/240 0 2


40 GBT GreenField 0 50 20/120/270 0 2
37 GBT GreenField
NE,NW & SW on GBT 40 0/120/240 0 2

37 GBT GreenField 40 0/120/240 0 2

37 GBT GreenField 40 60/130/310 0 2


40 GBT GreenField 0 50 0/120/240 0 2

40 211782 Colo GBT Existing 45 0/120/240 0 2

36 RT RTT 29 9 0/120/240 0 2

40 GBT GreenField 0 50 0/140/260 0 2

22 RT RTT 15 9 0/200/290 0 2

24 RT RMP
NW,SW&SE corners on rooftop
20 6 30/120/280 0 2

37 GBT GreenField 40 20/90/200 0 2

20 GBT GreenFieldNW & SW corners 50 0/120/240 0 2

40 GBT GreenField 50 0/120/240 0 2

37 GBT GreenField 40 30/170/290 0 2


37 GBT GreenField 40 160/260/350 0 2
37   GBT GreenField     40 140/240/340 0 2

30 GBT GreenField 40 30/180/280 0 2

35   GBT GreenField     40 0/120/240 0 3

37 GBT GreenField 40 0/120/240 0 2


37 GBT GreenField 40 0/120/240 0 2

26 RT RTT 19 9 100/220/320 0 2

37 GBT GreenField 0 40 0/120/240 0 2

37 GBT GreenField 40 60/180/280 0 2

10 RT RMP 8 6 0/120/240 0 2

30 211086 Colo GBT Existing 40 0/120/240 0 2

22 RT RMP
NW&SW corners on rooftop18 6 20/140/240 0 2

35 GBT GreenField 40 90/190/300 0 2

37 GBT GreenField 0 40 0/120/240 0 2

25 GBT GreenFieldNE & NW on GBT 30 0/120/240 0 2

30 GBT GreenField 40 0/120/240 0 2


30 GBT GreenField 40 40/140/290 0 2
30 GBT GreenField 40 90/210/330 0 2

32 GBT GreenField 40 0/120/240 0 2

26 RT RTT NW, NE & SW 19 9 30/150/270 0 2

19 RT RTT SW corner on rooftop 12 9 20/140/270 0 2

25 GBT GreenField 40 0/120/240 0 2

21 RT RTT 14 9 0/120/240 0 2

30 GBT GreenField 0 40 0/120/240 0 2

40 GBT GreenField 50 50/150/250 0 2

37 GBT GreenField 40 0/120/240 0 2

37 RT RTT 30 9 0/120/240 0 2

35 GBT GreenField 0 40 0/120/240 0 2

30 GBT GreenField 0 40 0/120/240 0 2

22 RT RTT 15 9 0/120/240 0 2

30 GBT GreenField 40 0/120/240 0 2


40 RT RMPNE,SE & NW on rooftop 36 6 0/120/240 0 2
40 RT RMP
NW,NE&SW corner on rooftop 6 0/120/240 0 2

35 GBT GreenField 40 0/140/260 0 2

25 GBT Greenfield 40 0/120/240 0 2

24 RT RTT NW&SW Corners 9 0/120/240 0 2

33 RT RTT 26 9 100/210/300 0 2

25 GBT GreenField 0 30 0/120/240 0 2

22 RT RMP 18 6 100/210/350 0 2

37 GBT GreenField 40 90/210/330 0 2


25 GBT GreenField 40 90/190/330 0 2

35 GBT GreenField 40 100/200/320 0 2

35 GBT GreenField 40 0/120/240 0 2

30 GBT GreenField 0 40 0/120/240 0 2

19 GBT GreenField 30 20/140/260 0 2

37 GBT GreenField 40 100/200/340 0 2

30 GBT GreenField 40 0/90/210 0 2


25 GBT GreenFieldNE & NW on GBT 40 0/120/240 0 2

42 RT RMP 38 6 10/100/280 0 2

30 GBT GreenField 40 0/120/240 0 2

30 GBT GreenField 0 40 0/120/240 0 2

37 GBT GreenField 0 40 0/120/240 0 2

37 GBT GreenField 40 60/150/290 0 2

37 GBT GreenField 40 80/140/300 0 4

37 GBT GreenField 40 0/120/240 0 2


38 211079 Colo GBT Existing 40 80/200/320 0 2

37 GBT GreenField 40 0/120/240 0 2

20 RT RMP 16 6 0/120/240 0 2

32 GBT GreenField 40 0/120/240 0 2

35 GBT GreenField 40 0/120/240 0 2

38 GBT GreenField 40 70/210/300 0 2


38 GBT GreenField 40 0/120/240 0 2

GBT GreenField

GBT GreenField
37 GBT GreenField 40 70/170/270 0 2

40 GBT GreenField 50 0/120/240 0 2

37 GBT GreenField 40 0/120/240 0 2


32 GBT GreenField 40 0/120/240 0 2
35 GBT GreenField 40 40/140/300 0 2

35 GBT GreenField 40 0/120/240 0 2


37 GBT GreenField 40 0/120/240 0 2

35 GBT GreenField 40 110/200/300 0 2

23 RT RTT 9 0/120/240 0 2

30 GBT GreenField 40 130/250/340 0 2

21 RT RMP 18 6 0/120/240 0 2

35 GBT GreenField 40 0/120/240 0 2

40 GBT GreenField 50 120/240/330 0 2


37 GBT GreenField 40 0/120/240 0 2

25 GBT GreenField 0 40 120/220/320 0 2

35 211170 Colo GBT Existing 40 0/120/240 0 2

35 GBT GreenField 40 110/210/310 0 2

37 GBT GreenField 40 140/240/340 0 2

28 GBT GreenField 30 0/120/240 0 2

30 GBT GreenField 40 0/120/240 0 2

30 GBT GreenField 40 0/120/240 0 2

30 GBT GreenField 0 40 0/120/240 0 2


30 GBT GreenField 40 0/120/240 0 2

30 GBT GreenField 0 40 0/120/240 0 2

30 GBT GreenField 40 0/120/240 0 2


30 GBT GreenField 40 0/120/240 0 2

30 GBT GreenField 40 0/120/240 0 2

30 GBT GreenField 40 0/120/240 0 2


36 222590 Colo GBT Existing 45 0/120/240 0 2

30 GBT GreenField 40 0/120/240 0 2

35 GBT GreenField 40 20/160/260 0 2

30 GBT GreenField 40 0/120/240 0 2


25 GBT GreenField 40 0/120/240 0 2

25 GBT GreenField 0 40 60/200/310 0 2

20 RT RMP NE&SE corners 16 6 30/150/270 0 2

37 GBT GreenField 40 40/210/320 0 2

45 GBT GreenField 50 40/210/320 0 2

37 GBT GreenField 40 100/200/310 0 2

37 GBT GreenField 0 40 60/140/320 0 2


37 GBT GreenField 40 0/120/240 0 2

24 RT RMP NW corner on rooftop 17 9 0/120/240 0 2

42 RT RTT 35 9 0/120/240 0 2
35 211219 Colo GBT Existing 40 40/160/280 0 2

30 GBT Greenfield 50 0/120/240 0 2

37 GBT GreenField 0 40 120/220/320 0 2


37 GBT GreenField 40 110/230/320 0 2

25 GBT GreenField 30 0/120/240 0 2

23 RT RTT 16 9 0/120/240 0 2

19 RT RMP
NE,SE&SW corners on rooftop
15 6 80/180/280 0 2

25 GBT GreenField 50 10/120/220 0 2

30 GBT GreenField 0 40 0/120/240 0 2

30 GBT GreenFieldNW & SW on GBT 40 0/120/240 0 2

38 GBT GreenField 40 60/200/320 0 2

37 GBT GreenField 40 0/120/240 0 2

37 GBT GreenField 40 0/120/240 0 2

30 GBT GreenField 0 40 0/120/240 0 2

18 RT RMP 16 6 0/120/240 0 2
37 GBT GreenField 40 0/120/240 0 2
37 GBT GreenField 40 0/120/240 0 2
25 117106 Colo GBT Existing 45 60/180/300 0 2

37 GBT GreenField 40 60/180/280 0 2


37 GBT Greenfield 40 0/120/220 0 2

25 GBT GreenField 30 100/200/300 0 2

25 GBT GreenField 30 100/200/300 0 2

25 GBT GreenField 30 90/220/340 0 2

25 GBT GreenField 30 20/120/220 0 2

37 GBT GreenField 0 40 0/110/210 0 2

19 GBT GreenField 30 90/200/320 0 2

37 GBT GreenField 0 40 0/120/240 0 2

25 RT RMP
NW & NE corners on rooftop18 9 0/120/240 0 2

45 GBT GreenField 0 50 0/120/240 0 2

42 GBT GreenField 50 90/200/300 0 2


35 GBT GreenField 40 20/120/280 0 2

35 GBT GreenField 40 10/120/280 0 2

30 RT RMP NE & SE 28 6 0/100/220 0 2

22 RT RMP N&S 20 6 0/120/240 0 2

25 GBT GreenField 0 40 0/120/240 0 2

30 GBT GreenField 40 0/120/260 0 2

30 GBT GreenField 0 40 0/120/240 0 2

30 GBT GreenField 40 0/100/220 0 2


35 GBT GreenField 40 0/120/240 0 2

30 GBT GreenField 0 40 140/230/330 0 2

37 GBT GreenField 40 0/120/240 0 2

40 GBT GreenField 0 50 30/120/240 0 2

30 GBT GreenField 0 40 0/120/240 0 2

37 GBT GreenField 40 40/140/250 0 2

37 GBT GreenField 40 60/180/330 0 2

27 GBT GreenField 30 50/180/280 0 2

28 GBT GreenField 30 0/120/240 0 2

22 RT RMP
NW, SE & SW corners on rooftop
18 6 70/180/310 0 2
35 GBT GreenField 40 30/140/270 0 2
34 244266 Colo GBT Existing 45 0/120/240 0 2

27 GBT GreenField 30 0/120/240 0 2

30 GBT GreenField 40 20/120/270 0 2


28 GBT GreenField 40 40/160/280 0 2
30 GBT GreenField 40 0/120/240 0 2

30 GBT GreenField 40 0/120/240 0 2

30 GBT GreenField 0 40 0/120/240 0 2

26 RT RMP
NE,NW&SE corners on rooftop
22.4 6 0/120/240 0 2

25 GBT GreenField 30 0/120/240 0 2

32 GBT GreenField 0 40 120/240/330 0 2

32 GBT GreenField 40 120/240/330 0 2

30 GBT GreenField 40 0/120/240 0 2

30 GBT GreenField 0 40 70/200/310 0 2

30 GBT GreenField 40 0/120/240 0 2


30 GBT GreenField 40 0/120/240 0 2

40 GBT GreenField 0 50 50/170/300 0 2

30 GBT GreenField 0 40 0/120/240 0 2


37 GBT GreenField 40 50/180/270 0 2
27 GBT GreenField 30 0/100/250 0 2
37 GBT GreenField 40 0/90/250 0 2

35 GBT GreenField 40 70/190/330 0 2

25 GBT GreenField 30 100/220/350 0 2

30 GBT GreenField 40 30/140/240 0 2

25 GBT GreenField 0 30 0/120/240 0 2

30 GBT GreenField 50 0/120/240 0 2

20 RT RMP 18 6 0/120/240 0 2

37 GBT GreenField 40 0/120/240 0 2

37 GBT GreenField 40 70/220/320 0 2

39 RT RMP
NW,SW&SE corners on rooftop
35 6 0/120/240 0 2

30 GBT GreenField 40 80/170/250 0 2

30 GBT GreenField 0 40 90/210/320 0 2

25 GBT GreenField 30 90/200/340 0 2

35 GBT GreenField 40 10/180/270 0 2

27 GBT GreenField 30 30/130/230 0 2

25 GBT GreenField 40 120/220/320 0 2

30 GBT GreenField 40 0/120/240 0 2


30 GBT GreenField 40 0/120/240 0 2

38 GBT GreenField 40 0/120/240 0 2

39.5/38/38 RT RMP NE, SW, NW 36 6 30/180/280 0 2

30 GBT GreenField 40 0/120/240 0 2

25 GBT GreenField 0 30 0/120/240 0 2

30 GBT GreenField 0 40 0/120/240 0 2

30 GBT GreenField 0 40 0/120/240 0 2

25 GBT GreenField 30 0/120/240 0 2

37 GBT GreenField 40 0/120/240 0 2

25 RT RMP NE, SW 21 6 30/130/240 0 2

30 GBT GreenField 40 20/150/270 0 2


35 222107 Colo GBT Existing 45 0/120/240 0 2

36 222092 Colo GBT Existing 45 0/120/240 0 2


30 GBT GreenField 40 30/150/270 0 2

27 222096 Colo GBT Existing 35 40/160/280 0 2

30 GBT GreenField 40 0/120/240 0 2

30 GBT GreenField 40 0/120/240 0 2


26 RT RTT 19.5 9 0/120/240 0 2

30 GBT GreenField 40 30/120/220 0 2

25 RT RTT 18 9 0/120/240 0 2
30 GBT GreenField 40 0/120/240 0 2

35 GBT GreenField 40 0/120/240 0 2

22 RT RTT NW side on rooftop 15 9 60/180/300 0 2

30 GBT GreenField 40 0/120/240 0 2

30 GBT GreenField 0 40 70/180/300 0 2

47 GBT GreenField 50 0/110/200 0 2

42 222642 Colo GBT Existing 50 60/180/300 0 2


35 GBT GreenField 40 0/120/240 0 2
23 222097 Colo GBT Existing 30 70/190/310 0 2

30 GBT GreenField 0 40 0/120/240 0 2

37 GBT GreenField 0 40 100/190/310 0 2

40 GBT GreenField 0 50 40/140/260 0 2

33 GBT GreenField 40 20/120/230 0 2

37 GBT GreenField 40 0/120/240 0 2

40 GBT GreenField 50 0/120/240 0 2

37 GBT GreenField 40 0/120/240 0 2

37 GBT GreenField 40 40/200/300 0 2

37 GBT GreenField 0 40 0/120/240 0 2


GBT GreenField
37 GBT GreenField 0 40 0/160/270 0 2

37 GBT GreenField 0 40 20/120/260 0 2

37 GBT GreenField 40 30/150/270 0 2

37 GBT GreenField 40 100/220/350 0 2

30 GBT GreenField 40 0/120/240 0 2

35 GBT GreenField 40 0/120/240 0 2


30 GBT GreenField 40 60/180/330 0 2

30 GBT GreenField 0 50 0/120/240 0 2

20 RT RMP
NW&SE corners on rofftop16 6 0/120/240 0 2
22 RT RTT 15 9 0/100/190 0 2

30 GBT GreenField 40 0/120/240 0 2

30 GBT GreenField 40 0/120/240 0 2

30 GBT GreenField 40 0/120/240 0 2

30 RT RMP 27 6 0/120/240 0 2

28 GBT GreenField 30 40/150/270 0 2

37 GBT GreenField 0 40 0/120/240 0 2


37 GBT GreenField 40 30/180/290 0 2

35 181534 Colo GBT Existing 45 30/180/290 0 2

30 GBT GreenField 40 0/120/240 0 2

20 RT RMP
NE,SE & SW corners on rooftop
16 6 0/120/240 0 2
25 GBT GreenField 40 0/120/240 0 2

21 RT RMP
NE,SE & SW corners on rooftop
17 6 40/160/300 0 2
32 GBT GreenField 40 0/120/240 0 2

22 RT RTT 15 9 40/180/280 0 2

25 112228 Existing Colo GBT 45 0/120/240 0 2


30 GBT GreenField 40 0/120/240 0 2

25 112257 Colo GBT Existing 45 0/120/240 0 2


21 111896 GBT GreenField 35 0/120/240 0 2
25 GBT GreenField 40 50/170/310 0 2

35 113054 Colo Existing GBT 45 20/140/280 0 2


25 GBT GreenField 0 40 0/120/240 0 2
32 RT RTT 25 9 0/140/270 0 2

28 RT RMP RMP 24 6 0/100/220 0 2


25 GBT GreenField 40 20/130/260 0 2
35 117134 Colo GBT Existing 50 0/120/240 0 2

30 RT RMP NW, NE, SE 26 6 30/150/270 0 2

37 GBT GreenField 40 0/120/240 0 2


GBT GreenField
37 GBT GreenField 40 0/120/240 0 4/2
37 GBT GreenField 40 0/120/240 0 4/2

37 GBT GreenField 40 0/120/240 0 2

37 GBT GreenField 40 0/120/240 0 2

35 GBT GreenField 40 30/150/270 0 4/2

34.5 112173 Colo GBT Existing 45 60/180/300 0 2


25 GBT GreenField 0 40 20/180/280 0 2

40 RT RMP NE, SE, NE 36 6 60/170/310 0 2

39 RT RMP NE, SE, SW 36 6 20/180/290 0 2

RT
37 GBT GreenField 40 30/140/250 0 2

37 GBT GreenField 40 0/120/240 0 2

35 GBT GreenField 40 0/120/240 0 2

30 GBT GreenField 40 30/130/260 0 2

37 GBT GreenField 40 0/110/200 0 2

29 111440 Colo GBT Existing 45 0/160/260 0 2

24 111852 Colo GBT Existing 30 0/120/240 0 2

35 112219 Colo GBT Existing 45 110/220/320 0 2

36 117135 Colo GBT Existing 45 0/120/240 0 2

32 RT RMP
NE & SE corners on rooftop
28.4 6 0/120/240 0 2

54 RT RTT
mid of NW side on upper roof
47 9 0/120/240 0 2
35.4 RT NE,NW&SE
RMP on penthouse
31.4 6 0/120/240 0 2
31 RT RMPNE,SE&SW on Penthouse 27 6 0/120/240 0 2
                   
                   
                   
19 111055 Colo GBT Existing     35 40/170/280 0 2
55 RT RTT 48 9 50/170/300 0 2
23 RT RMP NW, SE, SW 19.5 6 90/240/320 0 2
                   
27 222587 Colo GBT Existing 60 0/120/240 0 2
                   
22 222242 Colo GBT Existing 30 0/120/240 0 2
                   
24 181307 Colo GBT Existing 42 0/120/240 0 2
                   
9 181002 Colo GBT Existing 22 0/120/240 0 2
                   
30 244180 Colo GBT Existing 50 0/120/240 0 2
                   
25 244275 Colo GBT Existing 35 0/120/240 0 2
                   
TSSR Actual TSSR Actual TSSR Site
LAT LONG Name Comments

9.00369 38.8192 Jakros, Bole subcity

9.00375 38.81909 Jackros

9.009886 38.805516

9.00785 38.80526

9.037734 38.768809 Maximum Available ht is 23m

9.04461 38.750992
NIGERIA EMBASSY, AFNCHO BER
9.0434 38.75083

9.058694 38.781165 Ferensai Gurara

9.05963 38.751 kechene medhanialem

9.058568 38.752298 KECHENE 45


9.0574 38.7473

8.994554 38.74903

8.95721 38.78074
8.954378 38.78139

8.97673 38.74856

8.964069 38.748906NFAS SILK LAFTO

9.010032 38.7747 Bole,22


9.00814 38.7764

9.010623 38.718091 Torhailoch

9.01051 38.718068 Torhailoch

9.0045 38.7529
Around cherkos
Changed
church,from
Addis9M
Ababa
RTT to 2*6M Poles

8.920848 38.778269
8.91935 38.7778

8.866956 38.786639 9m Tower converted to 6m Poles

9.0326 38.7187

8.91801 38.73487 Conditionally Approved


9.01091 38.88318 Ayat 49

8.878837 new RT is not meeting coverage objective so keep Colo


38.811519

9.00329 38.85681semit condominium 2

9.002507 38.857754

8.94862 38.789804

9.031475 38.824805
8.9934 38.7091

9.001 38.704 PoleWeyira


Positions
Giorgis
confirmed by Wegene Dereje in mail

9.0021 38.7059 Maximum Available Ht is 23m

9.003622 38.783765

8.9466776 38.7201705

9.026634 38.8688993 Lemi-Kora

9.02595 38.86862 Tower


Lemi ht
kura
to 40M & RF ht to 37M changed.

9.0592 38.72723 Gulele finance

8.93234 38.76598
Approved with changed RF Ht 15.5m38.7666
8.93319 as per STEP Deploy Recommendation, later its update with 20m after space consolidation drive

9.06487 38.76243 Shiro meda

9.0518 38.7391
9.001047 38.835941
Bole sub city,wereda 09
8.999167 38.83556

8.95801 38.672158 Wellete

8.961 38.674 weleti condamineyem

8.99314 38.80903

8.977067 38.775516

8.97806 38.775471 Jafar Mosque

9.041022 38.861387 Kara

9.011996 38.865272 Lemikura sub city

8.982087 38.735266 Tsion Hotel

9.019087 38.79777 Yeka

9.020746 38.795826 shola gebeya

9.02123 38.73372

9.03146 38.733878merkato enchet tera


9.01845 38.74726 RF Ht changed

8.986892 38.697344

9.03554034 38.85443124

9.002378 38.846258

9.00258 Summit
38.84363
- Goro Street, Cambridge Academy

Azimuth
9.04055 38.84467 Changed to
10/120/240 by
Step RF and
Pole positions
changed to
minimize
9.068002 38.736035 Shadowing

8.970177 38.766529 Saris


8.972225 Near to St Joseph Church
38.7656

9.034646 38.74396
9.036847 38.742508 Abakora

9.03357 38.76818
9.02138 38.70768

kolfe 18
8.984527 Earlier it was mazoria,
38.707382 approved
Kolfe with 9M RTT but changed after CW mail.
8.984204 Addis
38.707009 Keranio,Werabeba
Azimuth change to 0/160/260
eda-01

9.029019
Around38.796914
Great Britain Embassy, Addis Ababa, Kebena

8.966 38.673 Ayer Tena


8.9662 38.673 Ayer Tena
8.96705 38.6729

9.00357 38.79778 werda 4, Bole

9.003394 38.797271

9.0633 38.7787 Yeka

8.98976 38.81705 GERJI kassanchis

8.98902 38.81593

9.02754 38.79197

9.0257 38.787237
Earlier ityeka
was approved
public library
with 9M RTT but changed after CW mail.

8.9977 38.7546

8.998881 38.755808 Kirkos


Owner not willing for 6M poles.
9.00133 38.75457

8.91627 38.82175
8.91729 38.82234
8.95433 38.68604

8.95936 38.70587 Jemo


Sec-2 pole location changed.
8.95774 38.70746 nifas silk lafto 1. The
area we are
going to put
8.961447 38.68717 our site(9m
RTT or 6m
pole is under
the white roof
2. Owner
Its difficult to
take pictures
while being
on the target
area since
8.958364 38.689668 kolfe
covered by
roof
3. Owner
agreed to
demolish the
roof after LA
signed
4. If the
roof is
8.97515 38.68487 removed,
there will not
be shadow
8.97539 38.685967 and blockage

9.0197 38.76999

8.98115 38.69781 Ayertena

8.885512 38.79275    

8.868129 NUH
8.990344 38.686454

8.987002 38.676334

8.996028 38.683127

9.044233 38.728429 Aba Koran

9.04408 38.73084 Malawi St


9.04426 38.72762

8.97063 38.70602
9m TowerLafto
placed1on Terrace in place of 6m Poles on penthouse

8.983677
6-Feb-00 Ethiopia Airport
8.98114 38.79925

8.9521 38.7223 Maximum Ht available is 25m

8.94869 38.7356 EEP


8.94903 38.72875
German Square/Varnero
8.94903 38.72875
German Square/Varnero

8.95363 38.74504

8.9395 38.7236 Haile Garment


Poles shifted to Penthouse

8.93577 38.746397
9.008956 38.76699 Kirkos

9.0017 38.8084 Gerji; Wereda 14

9.00335 38.81418 Gerji, Mebrathaile


9.0011
38.813686

9.02353 38.6861 kolfe keraniyo


9.02356019 38.68560186 RF Antenna Ht Changed

8.933007 38.753311

8.925029 38.765468

9.031558 38.762139 Arada


9.03073 38.76145 Abiyot

8.911248 38.769674
Akaki kality(Kality
AzimuthGebriel)
changed as per STEP.
8.912401 38.769229 Kality Gebriel
8.91538 38.76824

8.89202 38.78275 22m RF ht can be done on site

8.99834 38.76949 Addis Ababa

9.023672 38.743555
8.983922 Hiwot Luel Fisseha
38.801111

8.8842 38.7762 Kality

8.896584 38.772114 Akaki Kality


8.8933 38.7717
EEP TSSR.Kality
Towernorth
Height changed to 40M & RF height to 35M

8.881185 38.78315Tower
Akaki
Height
kality
changed to 40M & RF height to 35M
8.88384 38.782636 Maximum Ht Available is 23m

8.869961 38.771211gelan condominium

8.8729 38.7699 Gelan condeminium

8.865054 38.78221
kolfekeranyo
Converted
subcity wengat
from 9mst.Tower to 6m Poles

8.863532 38.81797

8.8648 38.8161 Tuludimtu

8.870495 38.805148 Tulu Dimutu

8.898688 38.813688

8.885949 CHRIST AMBASSDOR CHURCH


38.815224

TSS conducted on Candidate A and not Candidate D


8.98199 38.77393 Ayer Amba,
6M Poles
Bole changed to 9M RTT

8.920597 38.762748
AKAKI KALITI, wored 7

8.945134 38.768951
8.94026 38.77088
8.93681 38.77018

8.95078 38.77829

8.955811 38.763877Owner
NEFALIK
refused to construct 9m. Change 9m to 6m

8.95773
38.76599

8.963 38.756 Saris

8.96218 38.7563 Nifas silk

8.9953
38.71421 3 kuter mazoria

9.0399409 38.74718208 SEBARA BABUR

9.040788 38.747746 Piyassa

8.972289 38.759423

8.9676 38.76206

8.97252 38.74002Elshaddai_Int_Church

8.97021 38.7498

8.9819 38.7642 146009_B


Addis Ababa,Kirkos Subsicty
8.981041 38.763436 Welo Sefer
8.97621 38.76199 Pole Positions changed
8.9756 38.7587

8.97752 38.767183
8.97602 38.76669

8.98288 38.75406 Gotera pipesi

8.9887 As
38.7532
per Musab mail 18th May, height will be updated from 21 to 25m

9.023613 38.722693

8.990205 38.756957 kirkos 04 kebele

9.0018552 38.74927894

9.00589257 38.74029579

9.021632 38.738023
9.03288 38.74833
shalom BLDG, Arada piassa

9.0254607 38.727999 Addis Ketema

9.032715 38.725322Amanuel
RTTMesalemia
moved to penthouse from rooftop

9.0331 38.7138 18, Addis Ababa

8.97147 38.71696 koshe jemo

9.045464 38.733133

9.047984 38.74131 Arada


9.0444 38.74166

9.055625 38.728817 GULELEA

9.0595 38.7338 GULELEA


Slab position changed

9.0538366 38.7436033
SEMEN MEZEGAJA

9.065215 38.73102 Tsion Hotel

9.0615 38.721 Shegole


9.06293 38.71929 Maximum Available ht is 28

9.05575 38.71123
9.05633
38.70562

8.975892 38.676308

8.97589 38.6763 Kara Kore

9.05323 38.69231 borjkco

9.0463527 38.711918

9.045454 38.711447
Addis Ketema Sub_city
9.046335 38.711866

9.048439 Subcity Administration office


38.720238

9.014961 38.75379 Stadium legehar, Stadium

9.064464502 38.69828323

9.01432 38.84964

9.065528 38.750536 Gulele


9.060175 38.758 Azimuth Changed after STEP request
shiromeda

9.06931 38.7604

9.06931 38.76042 Shiromeda

9.062033 38.76077BAHLE SHOP CENTER

9.05022 38.75 Guto meda


9.049219 38.752394 Maximum Available ht 21m

9.057576 38.738278

9.0454 38.765451 Janmeda 05


9.04668 38.77049

9.036292 Kebena Int. Laboratory


38.773971
9.032053 38.770822

9.031937 38.773361 Kebena beliyer

9.023283337 38.76781667

9.01517 38.773609borjkco
New pole
kodaintroduced
sefer at NW corner for Sec-1.
9.0176 38.7815 North Addis Abeba

9.02064 38.78437

9.02187 38.7885
9.0202 38.786

9.02276 38.80259

9.030631 38.77747
9.030843 38.777546 14M
Arada
ht is not ok as discussed with Jaffar.

9.03117 38.77652
new RT is not meeting coverage objective so keep Colo

9.042531 38.775324

9.052044 38.780135

9.051802 Ferensay
38.77937Legasiyon, Around Abo Church
9.052168 38.780838

9.0645 38.7692

9.065017 38.768919 Ferensay

9.05905 38.78926

8.986125 38.760619

9.024592 38.79536
9.0257 Addis
38.795484
Ababa, Yeka Subcity, Around Shola

9.00825 38.78738
9.00873 38.78825 Building height is altered from 33m to 40m
Haya hulet

38.78858
8
9.008111

9.006 38.799 kebele 24

9.00664307 38.79902382

9.01948 38.81439
9.019518 38.814669

9.02255 38.81768
9.00368 38.8116

9.0051 38.8089 GURJIS245RF antenna moved to S3.

9.004312 38.809116Tower
WAREGENU
Height changed to 40M & RF height to 35M

9.010525 38.799071 24, Adiss Abeba


8.9915 38.860416724, Adiss Abeba

9.012115 38.796411

8.998938 38.821681 As Bole(04)


per Customer Request 9m tower proposed

8.986223 38.834056 Goro Sefera

8.994027 38.82924

9.021078 Kazanchis Temamaw Fok


38.765392
9.009626 38.850622 LEMIKURA
Roof Lauout Confirmed with customer.

9.00759 38.8335 Bole


9.00733 38.83545

9.0319 38.69269 Tewil Real State

9.03248 38.6937

9.029742 38.714283
Around Asrasimint, Addis Ababa

9.018689 38.716604

9.00981 38.68093 ANFO

9.019989 38.694373

9.00427 38.69754

8.95966 38.78485

8.957812 38.786931
Bole bulbula,wereda 12
3 38.78558
8.957881 38.78698393 mazoria bulbula

8.985501 38.77444
8.98489 38.77546

8.99418 38.766692
Meskel flawor, Nazra hotel

8.996251 38.773267
8.990372 38.784974 Addis Ababa

8.99943 38.77963 Bole

8.995475 38.759283 Global

8.991939 38.733261 Bsrategebriel

9.01714 38.80754

8.996701 38.743586 ALEKEB HOTEL


8.99556 38.744886 Kirkos

9.005743 38.715962 Augosta

8.997434 38.703309

8.997140
17
38.70465

8.979 38.714 Earlier approved with 30M tower & 25M RF height.

8.98661 38.72869

       
       

9.03419 38.68481
9.033766 38.68599 Kolfe

9.027913 38.830993 yeka

9.03447 38.83571

9.028 38.848

9.02816 38.84853 yeka ,wereda13

9.06904 38.71623 Gulela


Converted from 9m to 6m

8.895753 38.80452
Akaki kality,Wereda-09

8.892435 38.802443 KILINTO

9.0167 38.7504

9.012365 38.762318
Ethiopian Womens Federation Bldg

9.003127 38.769112

8.990385 38.773212 Ethio china

8.993854 38.773642 wollo sefer

8.991732 38.773832 Wolo Sefer GSM Ht changed


8.9915824 38.7880713
Around millenium hall

8.9854722 38.785361
8.986094 38.784136
8.987511 38.784829 Bole

8.98842 38.7917 Bole Airport


6M Poles changed to 9M RTT

8.987796 38.788651 bole

8.964832 38.840645 ICT PARK

8.87604 38.822382

8.86996 38.81998

9.06462 38.87673

9.06481 38.87496 Converted


Abado Ena from 6m Poles to 9m Tower
Tafou 20/21

8.87222 38.8146 tuli dumitu

8.8601 38.80664 tulu dimtu

8.98761 38.78 Bole, Addis Ababa

8.9093
Already approved
38.76338on 13 Jan but again submitted TSSR due to building change on 25 Feb

8.98123 38.6844 Ayer Tena


Earlier
8.9792it was approved
38.6803 as 143023_P, now only site ID change as discussed with STEP on 19th Apr

9.00316 38.74646 KIRKOS

9.018509 38.700315 keraneyo

9.051324 38.698442Asko condominiem


9.05195 38.7001 Maximum Available ht is 35m

9.04653 38.70449

9.053097 38.719823 Gulele finance

9.050267 38.708908 Kolfe Keranio

8.9508 38.741522
lafto, kebele11, Addiss abeba

8.949605 38.742231

9.013374 S1 Moved to upper left


38.71075 corner to avoid shadowing due to Buildings iron shed
betal

9.011772 38.726401

9.01625 38.737449
LIDETA MENAFESHA
8.99851 38.73637 Mehal Meda
8.95198529 38.78684454

9.01265 38.74679 Wabi shebele

9.01465 38.800861 Bole


9.016 38.7997
BOLE 45, MEGNAGEA

9.013972 38.836984 Changed


Bole to 9M RTT from 6M Poles.

9.01747 38.87396 Ayat

9.01559 38.871627AYAT
topmost
ADEBABAY
bldg ht is 25.2 (23.3+2M of penthouse)

9.04604252 38.85762035
9.045927 38.857419 Wereda 12

8.98289 38.86041

8.85093 38.81168
8.851286 38.812001 East shewaRF Ht revised to 37m

8.959882 38.769478 Akaki kality


8.95939 38.7709

8.966386 Nefas selk


38.74321Tower lafto
Height gofa to 40M & RF height to 35M
changed

9.028973 38.751828 Churchule Godana


9.0298 38.7522
9.034593 38.74795

9.034911 38.747191

9.027474 38.757789

9.026651 38.75799 wedajinet park


9.02667 38.758    
   
9.02635 38.75521 Erebe Kent  

9.04382 38.75874

9.0397 38.76405

9.04236 Equipment’s Arada


38.74453 position moved from lower roof to the penthouse.
9.041788 38.743846

9.0381 38.7255 Maximum Available ht is 20m

9.026978 38.73935

9.015666 38.729226

9.019951

38.75269 tikur anbesa

8.99267 38.84672Sumit Condominium

9.0215 38.8327 lemikura subcity


9.022456 38.8315Civil service unversity
9.02158 38.87415

9.02487 38.88576 Hayat Tsebel

8.972888 38.85482 Bole lemi


8.97228 38.85507

8.97942 38.72245

9.04399 38.754699

After
8.933116
field visit38.725455 Hayleidentified
correct Building Garmentand Lat/Long updated. Azimuth updated by STEP already

9.0086 38.8155 gerji

9.00437 38.78 Bole Atlas

8.96986 38.66612

8.9798 38.7082 koshe sefer


8.97963987 38.7067527 Maximum Available ht is 21m

9.002126 As active candidate is B, But Reviewing Candidate C as per Alindi Mail


38.673832

9.00367 38.67443

Building
9.004376 is Not clear in Google View, so Site checked on with ref of Paoramic Pics
38.685127
9.01625 38.72171

9.02894 38.72225

9.039187 38.700865 KOLFEA

9.03928 38.7003

9.011093 38.840308 Bole subcity


9m RTT Changed to 6m poles

9.05185
38.71407
GENERAL WINGET
9.0298 38.713

9.0414 38.7123 Atanatera

9.02879338
Lat/Long
38.73667987
of TSSR are checked
Merkato with SAR and matching. In tracker entered wrongly.

9.029 38.7367Lideta subcity woreda 8

9.007682 38.733711 Poles Shifted to Mumty

9.014937 38.744684DE-AFRIC, Lideta

9.01349 38.74423 DE-AFRIC

9.0028
38.7426 Kirkos

8.98592 38.76592 wereda 03

8.98732 38.7698
8.996622 DCT Recording Studio
38.794596
8.99656 38.79478

8.99675 38.79483333

8.98805 38.79886

9.009175 38.69547
9.009156 38.695417 Betel

9.05003 38.76433

8.960653 Azimuth Changed to 0/120/210 after STEP Request


38.732496

8.971732 38.72205 Jemo mikael

8.9756057 38.73335 Nefas Silk

8.97675 38.73173

8.90186 38.7786
8.902154 38.778284
Kality Genet Menafeshay

8.87719924 38.802547

RF Antenna but as per STEP


9.0095Deployment team it was agreed to put 2 Antenna(Including SAFARICOM) at the same ht, As 14.5m RF Antenna ht is not feasible.
38.7585

9.043149 38.779613 yeka


9.043937 38.77984 Yeka , Bela
9.03127 38.70952

8.947264 38.744531

8.95226 38.7618

8.964211 38.726836

8.966812 38.712175 Jemo3

8.967074 38.714307 koshe

8.992648 38.727921
8.99341 38.72804
8.99336 38.72767
Reapproved as Desgin updated with MW pole changed

8.987 38.723
SANTE Medical training college

8.9874 38.7216

9.032205 38.782605
Kenya Embassy,
Sec-1 shifted
Kebena
to penthouse from rooftop.

8.951 38.769 Saris

8.95074 38.76923

9.023728 38.811319 Yeka Subcity

9.02456 38.8233
9.02503 38.824804
3rd Sector Azimuth
Yeka changed to 290 as per customer request

9.023 38.842mikaele condeminyume


8.97681 38.8928
8.974325 38.892468 nifas silk lafto

9.04123 38.88113 Legetafo EEP TSSR

9.0287 38.8559 Lemi Kura

9.02963
38.85439

9.0294 38.87816

9.01764 38.894117
Hayat tsebel condominium
9.01707 38.89541

9.0149 38.8805 Ayat, lemikura

9.006775 38.794819
24 Adey ababa stadium

9.00814 38.781121

8.98783 38.744591

8.999319 38.718691 Torhailoch

9.038 Near
38.7325
Wereda 7 Youth Centre, Addiss Ababa
9.03702
38.73125 Maximum Available HT is 21.5m
9.04008
9.03876 38.72015
38.71937

9.05887 38.77005 Conditionally Approved

9.054505 38.752127
kechene Medhanialem

9.0582 38.8716 Yeka Ababo

9.06595898 38.87074914

9.018569 38.844384

9.01851 38.84576 CMC


6m Poles Replaced by 9m Tower

9.01814 38.84412

9.015438 38.856321
Bole Subcity, Summite

9.010851 38.826318 Jacros

9.012008 38.826175 Jacros


9.0108502 38.82617 RF Ht changed

9.02248 38.72979
9.015426 38.78359

9.01556 38.78462
9.0168 38.7862

9.0162 38.79074 22 Mazoria

9.004303 Adday Abeba Stadium


38.789113

8.997136 38.813583

9.01 38.846 SUMMIT BESHALE

9.01026 38.84598 Figa

9.020457 38.86039

9.012643 38.76884
Kasanchis, Around Elelle Hotel
9.01237 38.76874 kirkos
9.01359 38.76902 Kasanchis

9.04096 38.8195 KOTEBE

9.04509 38.81807

9.032057 38.841547 Yeka

8.990744 38.71585 Alart hospital

9.0385 38.8315 kotebe welgamo


9.040462 38.829803 kotebe welgamo
9.040462 38.829803 kotebe welgamo
8.999432 38.829005 TSSR Bole
Reapproved as per request of Civil Team

8.9463396 38.6853828

8.957142 38.755563

8.97852 38.76128 Gotera

8.9797 38.75839

8.99288 38.7414 Sarbet

8.936976 38.742135

8.9348 38.74119 Nifas silk

8.99704 38.84685 Semit

8.99663 38.84747

9.020666 38.72340524 Meznagna Kebeb

9.027208 38.784006

9.016414 38.76542
St.Yared Church , Cherkose Subsicty
8.922 38.745

8.92269 38.74489 Hana Mariam

9.02663 38.76936

9.036044 38.840088
Earlier
AKAKI
approved
KALIT
with 2 Poles. Now 3rd pole introduced.

8.98254 Ethiopian Airlines


38.789703

9.013142 38.737514 Balcha Hospital

9.01634 38.81192
Bole, minister of Agriculture

9.01378 38.8124

8.99775 38.80543GERJI ADWA BANK


9.000208 38.80567 Gerji

9.0287708 38.73213
MERKATO SEBATEGNA

9.0002 38.6956 BETEL SENA 30


9.00271 38.69372

9.040167 38.740472
9.04003 38.73494ADDISUMIKAYLE

Approved
9.02297 with 38.78001
changed RF Ht 22m as per STEP Recommendation and as per space availability

9.037889 38.751561 Arada Giorgis


9.0397
38.7509

9.0316 38.7396 Goro Sefera

9.02829 38.74634 Tekile Hayimanot

9.01673 38.82503

9.018743 38.820246 Gurd Shola

9.042865 38.716802 NA
9.043625 38.71934 LA signed so C will be retained

9.00583 38.771894

9.006125 38.771192
9.047632 38.746419
Due to Building Height As increase from the Time of SAR to TSS

matching with actual


9.035299
building snap
38.755373
from google earth, There is no panormic pictuer at 240 deg, and as per available own building will cause shadowing in sec 3

9.03298 38.75586 Arada

8.88545 38.757539 EEP TSSR, RF height is updated on 5th Aug from 25 to 35m

9.01336 38.7799 Addis Ababa


9.013012 38.7758
9.013 38.777 Haya hulet

Building height corrected 18m (including pent house).


8.99246 38.67321 Kolfe - Keran
Roof level is 15m (max RF @ 19m)
8.99508 38.676 Maximum Ht available is 25m

9.020766 38.776999 Yeka

9.0178 38.77839 NORTH ADDIS

8.997 38.7665 Sec-3


kazinoshifted on same pole with Sec-2.

9.004296 38.764608

9.01731 38.75716 Update STEP siteID, Update STEP SiteName

9.026317 38.741082

9.030222 38.740434 sidamo


Changed
tera from 9M RTT to 6M RMP.

9.033964 38.738341
8.857629 38.7899987 Akaki Kality
8.85762 38.79175
Akaki kality, Around Warehouse

9.007472 38.746844 Mexico

9.006572 38.783705 Yilma


RF HtSiga Bet and Pole positions changed
Revised

8.99946 38.78428 Medihaneyalem

9.00019 38.78456 RF Ht changed

8.99088 38.79409

8.99604 38.7915144113_B_FTK_PH0
BOLE MEDANYALEM

8.99531 38.79283 Bole Oromiya Bank

9.030448 38.738828 Merkato

9.03403 38.73393

9.037342 38.73801 Addis Ketema

8.984382 38.780519

9.011117 38.783183

9.01033 38.78406
Bole sub city,hayahulet
Pole position and azimuth update
9.0512 38.77368 Yeka

9.041146 38.768138
9.041205 38.768025 Janmeda
9.042183 38.766574

9.04446 38.78338 DEBEBE


9.0449 38.7816 EEP TSSR

9.01867 38.73817

Slab relocated
to lower roof,
Building
height revised
9.052662 38.73146 kolfe keranio to 31.85m, RF
height revised
to 36m
9.047115 Candidate
38.87476D&
Tafo
A are
Condominium
at same location. So candidate A is to repllace with D.

9.047115 Candidate
38.87476D&
Tafo
A are
Condominium
at same location. So candidate A is to repllace with D.
9.0464 38.87444

8.95949879 38.72238572

8.959456 38.72265 Jemo-1

8.97184 38.828097

8.97142 38.82496 Wereda 12

9.011037 38.772206
9.01194 38.77191

9.0119 38.73479 Lideta as per EP request of Azimuth change


Re-Approved
9.01439 38.73278
9.03365 38.70483

8.993342 38.776791

9.025621 38.776648 Dar Sahara

9.023531 38.751619 churchul

8.228955 34.582926Makot Airport Road

8.246 34.606

8.240543 34.584147 Agnewak

8.27 34.587 Gambela

8.256454 34.591338 Agnewak

8.247111 34.595373 Gambela

8.236 34.602

8.25159 34.58606 Gambela

6.423962 38.280849Dila…kebele; Abaya

7.85114 36.58425

7.073716 38.791331
Kofele, West Arsi, Oromia

5.637 38.239 Blue Hora


8.53162 39.25555
Oromia,East Shewa, Adama Town

8.305925 35.583766Oromia,Metu town

8.296185 35.58227 Metu, Illibabur

8.818806 38.869628 Gelan, hadide

8.745927 38.964507
KUDADA BISHOFTU

7.915744 39.128197
Ardu Kidus Gebriel Church

7.91986 39.13032 Assela Kela

7.941665 39.122513 Oromia, tiyo

7.95907 39.12889RF Assela


Ht changed
Stadium
to 37 and Tower Ht changed to 40m

8.57932 39.28573

7.195853 38.608014 kebel awasho

8.5049 39.25243 Tower/RF


Boko Sheneni
height reduced. From 50/47 to 40/37

8.544665 39.269023

8.501789 39.292826 Boko Shenen


8.56632 Mojo around Tsedie geberiemahiber
39.16768
8.56632 39.16768
Mojo around Tsedie geberiemahiber

8.5774 39.14508

8.58205 39.13072 MojoTown


8.580409 Around Yetebaberut Gas Station Mojo
39.130949

8.60866 39.12462

8.74803 38.97394 407014_B


East Shewa, Oromia Bishoftu

8.552486 39.271126ADAMA ARADA

8.55374 39.297281
Oromia, Adama, Around Collage

8.554 39.2856 Adama

Melka
8.5352 39.2353
Adama

8.53021 39.27461
Around Adisu Menaharia

8.535033 39.275469
Boko,kebee 11, Adama

8.535298 39.275454 East Shewa


8.331622 Dera_Post_Office,
39.321931 Dera /Dodotam, Asela road
8.331807 39.321893 Assela Road  

8.135351 ITAYA
39.233035
PRIMARY SCHOOL, Asela Road

8.13579 39.233067
Lat/long approved
Iteyya by Revanth to SubCon on WhatsApp chat.

7.236215 38.609912 Mender 2


7.193209 38.598656Shashemene Apusto

7.202923 38.609632 Shashemenie


Changed from 6m Poles to 9m Tower

7.18536 38.655 awash denko

7.170164 38.65451 Faji Sole


Earlier rejected by SAQ

8.568166 39.265986 Oromia, Adama

8.56769 39.26646 Maximum Available ht is 30m

8.756628 38.974341 Bishoftu

7.67481 36.81372 Jimma

8.825593 38.853959 Bright industry

8.599067 39.114493
Around Kebele 01, Oromia, Mojo

8.7736 38.9934 Oromia, Bishoftu


8.77311 38.99315 Oromia, Bishoftu
8.74794 38.95948 Bishoftu

8.549278 39.29109Adama_Special_Zone

8.553243 39.277837

8.551051 39.280931 Adama

8.511273 39.277892boko sub city adama

8.53607 Dembela sub city around winning mazoria


39.25225

8.523883 39.25078

7.759143 37.223148 Asendabo

8.5666 39.2789 Bole

8.540071
As 9m RT approved
39.263745
Oromia,
fromAdama
STEP around
RF, thisgebreal
candidate 2nd and 3rd sector are having shadowing.

8.525483 39.281946 boko


Tower subchanged
height ciyt to 40M and RF height to 35M.

8.55784 39.26438 Adama kidist silase

8.55908 39.26396 Adama Teyecha Arara

8.53331 39.26072 East Shoa


8.547035 39.269455Adama bole around
8.54787 39.26726

8.52847 Tower
39.270526
heightBERACHA,
changes to 40M(
ADAMA
From 30M) and RF height to 35m (From 25m)

8.146901 38.8161 zway

8.7591 38.94556

8.751589 38.963719 Bshoftu TVET

8.743 38.974

8.7422 38.9921 Oromia, Bishoftu

8.74201 38.99207
8.7425 38.9909

8.763989 39.000422 Bishoftu

8.787852 38.903488 Dukem

8.788 38.903 Dukem

8.296938 38.949355

8.676424 39.037094 Kebele 01

7.91926 38.71507 Batu


8.5966256 39.125498

8.74640 38.98484Bishoftu pyramid hotel

8.7409916 39.00472 Bishoftu

8.575 39.28 GENDODA

8.539 39.292 DABE, CHEFE

8.815155 38.884689 Dukem,Medelo

8.81489 38.883 Dukem

8.5628 39.2854 College

8.56252 39.28511

8.54656 39.2573 Goro

8.748647 38.989459

Bishoftu,Geb
8.749731 38.992548
eya

8.748997 38.940422 Oromia, Bishoftu

8.791136Lat/Long
39.002499
of TSSR are
BISHOFTU
same as of SAR. Need to update OnLine Tracker Lat/Long.
8.79476613 38.99070228

8.78257 38.99738
Adulala Resort and Spa

8.782623 39.030258Bishoftu East shewa

8.75111 39.02722 BISHOFTU


8.720395 39.008163 Bishoftu
8.7058749 39.02113 Bishoftu

8.760231 38.956703Lemlem tesfa School


8.75898 38.9541 Kebele 01

8.779402 38.921827 Oromia, Bishoftu

8.7892 38.9117

7.954775 39.142573

7.957479 39.12336 Asela Admin bldg

7.957787 39.122663 Tiyo, Arsi

8.66112 39.0552 Bishoftu East shewa


8.803401 Dukem, East shewa
38.927641

7.970946 39.133487 Asela

7.96771 39.12803

7.97237 39.14436
Tower ht changed
Tiyo
to 40M(from30M) & RF Ht to 35M(From 25M).

7.963534 39.140296 Wanofi Bar, Asela

7.96333 39.14029
TSSR submitted with option A but Lat/Long are same as T.

7.947458 39.134763

7.20056 38.6028477 KEBELE 01

7.207259 38.61621 Mender 2


7.207259 38.61621 Mender 2

7.203 38.599 Shashamene

7.192331 38.622292Shashemene, Oromia


7.19833 38.62229

7.184513 38.612056
Oromia, Shashemene, Kebele 02

7.20256 38.58896Oromia, Shashemene


7.04294 38.29437

7.21019 38.610107 Arada

7.21097 38.593451
shashemene(east shewa)

7.182209 38.586004
Around Buufata Konkoolataa
7.195 38.5791
OROMIYA, SHASHEMENE

8.526001 39.235387

8.542806 39.280179 011 kebele

8.404962 39.333733 To Sodere

8.404102 39.337124 Wonji

8.552349 39.198616
Oromia, Jego gudedo, Lume werda

8.63095 39.08855 Around Godeti


8.63095 39.08855

7.955809 39.13216 Asela Changed to 9M RTT

8.765117 Around Gensis Condominium


38.955476
8.76512 38.95546

6.97674 39.18105 Abibilign Hotel

8.837 38.834 GELANE


8.8369676 38.83413221 Gelan

8.5887191 39.1279947

8.56644 As per
39.29857
Owner Water Tank will be removed and Tower erected on Upeer Roof

8.55757 39.27357
Adama Goro woreda 04

7.932928 38.714802 Batu, zeway

8.51336 39.25642Around wenji mazorya

8.76729 38.93994

7.97974 39.13291 Dosha High School

8.91945 38.66136 ALEMGENA

8.91934 38.66102 Alemgena

8.933 38.652 Alem gena

8.9458796 38.678156 sebeta


8.947373 38.67808 Oromia, Sebata
8.944658 38.67868 Alemgena
8.947033 38.679328

8.9158 38.6527 SEBETA


8.91763 38.65367

8.908 38.605 Sebeta

8.907799 38.60472 Sebeta

8.9159 38.6399 SASI, Sebeta

8.9238 38.6311 kochu wagidu

8.925949 38.639909 alemgena

8.925722 38.651595 Gashu House

8.936 38.67 Finfine special

8.928633 38.660274 Sebeta


Earlier approved with 6M Poles.

8.929 38.674 Fetiy Sultan

8.930873334 38.684996 kora buhurbu


8.926714 38.68458 sebeta

8.829662 38.842915
Ethioipa
Towerbank
height
branch
changed
of gelan
to 40M and RF height to 35M.

8.95 38.669 Finfine special

8.913 38.628

8.91166 38.61721 Dima

6.996894 39.322973 Mender 2

7.359492 arsi negele kebele 03


38.668053

7.341 38.666 Arsi negele


7.341951 38.670497 Arsi negele

7.269342 38.660569 Kuyera

7.358096 38.675641arsi negele kebele 03

7.235 38.636 Hamus gebya

7.216671 38.583851 kebele 06

8.032074 39.190535Itosa/ Arise, Gonde

7.098479 38.480117 Bishan Guracha

7.676 36.846 Rift Vally University

7.661 36.845 Jimma

7.66815 36.84001 Central Jimma


7.666162
Tower ht changed
36.825126
to 40M(From30M),
Jimma RF ht changed to 35M (From28M) & azimuth changed
7.66867 36.83295

7.67298 36.83

7.6916 36.832716
TSSR Lat/Long
7.691541 are ok and Jimma
36.832633 confirmed by logesh on mail. 15-Jun, tower ht changed to 40M.
7.692678 36.8332 Jimma

7.561060 Wachamo Preparatory School


37.84528

6.038 37.553 Arba Minch

7.538854 37.852313
hosana City Administration

6.828 37.755 Wolayita

8.121 37.929 Emdebir Town

8.118544 37.930985
Welkite, Emdebir town

8.11108 38.37593 Btajira

8.119056 38.390442 Butajira

8.12182 38.37402 Kebele 04


8.12142 38.37414 Butajira,Gurage

8.204 37.793 Gubre town

8.291 37.783 Bekur Wereda


8.29115 37.78414Welkite town
8.281568 37.774567
Bekur Subcity, Ediget Ber Kebele
8.281311 37.773342

7.30842 38.09206 Alaba kullito

6.0415 37.5497 Aribaminch

6.05431 37.55302 Aribaminch

6.02279 37.5545 Arba Minch

6.016682 37.551622 Abaya

6.84359 37.75959 Wolayita sodo

7.0237 38.47614 BULCHA

7.55439 37.85688 hadiya

7.042566 38.497767
Approved
Hawasa
without Sec-3 Panoramic pics as per Musab

7.003045 35.576268 Bench Maji Zone

7.095 38.389

7.01509 38.46904
sidama rd, BISHOFTU

7.545741 37.873524 Hadya

6.0431 37.5882 Gamo

6.040198 37.568555 Aribaminch

7.57265 37.8603 HOSAINA


8.12068 38.3824
Meskan Wereda,kebele 01

7.04231 38.48973

7.04882 38.47943 Daka RF Ht Updated

7.558435 37.852639 Hosana

6.851 37.752 Wolayita

6.413 38.294

6.602 38.425 Aleta Wendo

7.0890571 38.495291

7.044755 38.506527 Hawassa

7.065832 38.4805 Betelhem

7.055433 38.490052 Korem Sefer


7.05487 38.48494

38.4751
7.04027
7.02933 38.48863
Hawassa Sebategna Camp

7.0452 38.482

7.079566 38.495975 Sidama, Hawasa

7.035152 TSSR
38.509362
not contain Hawasa
GPS tooltown
pic as discussed with Mr Omid sir by Innovis team.
7.023738 38.5007ELLOHE INN HOTEL

7.059968 38.475684

7.06126 38.48694 Hawasa


7.06207 38.48774

ng of TSSR are 25M


7.027635
deviated to SAR
38.470357
which i founf
Hawasa
ok as TSSR is having mobile pics and ROM approved TSSR to submit without GPS photo.

7.04367 38.464703 Hawassa

6.405571 38.309082 Dila

6.416 38.31

6.316794 38.259513
Wenago,kebele; tutu fera

7.06926 38.49554
7.068407 38.49927hawasa industrial park
7.045912

38.49071 Maximum Available ht is 23m

6.425862 38.291045 Dila

6.437 38.296 Sidamo

6.883398 38.417661 Shebe Dino

7.05432 38.47195 Hawasa

7.023018 38.489553

7.03521 38.46491 Hawassa

6.409 38.304 Kebele 05

8.128044 Gurage
38.380831
zone, Butajira, Around Arsema Church

6.85926 37.77371 Sodo

6.861061 37.7773302

6.39 38.31

6.028567 37.546785
Toyota Moenco sub dealer

7.01915 38.4974 Sidama/Gemeto Gale

7.566731 37.850371 Hosana

6.990719 35.594009 Tower


Mizan
height
Teferi
only changed from 30 M to 40 M.
6.0035 37.5404 Arba Minch

6.867062 37.759 Wolayita

6.85624 37.762825 Sodo city


6.85561 37.76394 Wolayta

7.53203 37.86328 Hosana

7.544 37.863 Hosana

7.551008 37.856559 Hadiya

7.550471 ConditionallyHosahna
37.852188 approved without GPS Pics as suggested by Musab.

7.04973 38.51228

7.5659500 37.894 Ambicho


7.5569400 37.88517 Hosana

7.55597 37.88528

8.102983 38.374424Butajira, ErinZaf,05

6.86287 37.76635 Enjori , Sodo


8.921376 38.768843

8.561217 39.29027
8.547431 39.264699 Aba Geda

8.87866 38.76649

8.86695 38.82432
8.867576 38.822028 Kolfe keranio

8.98474 38.87907 Maximum Available Ht is 25m


8.97098 38.87343 RF Antenna HT Changed
8.971098 38.874703
Bole Arabsa Condominium

8.99444 38.88307
8.99444 38.883807 arabsa beshale
8.9570769 38.69947

8.9528 38.69396
8.98133 38.66681 Kolfe keranio
8.98095 38.66774 RF Ht changed

8.54025 39.26811 Adama Post Office

8.518944 39.262632 Atana Tera

8.516157 39.268188 Neros School


8.516125 39.268181 Adama

8.551519 39.26231 Kerechele road

8.55907 39.281139 Collage Road

8.753009 38.995152 Ruphael Church

8.991518 38.860403
8.992 38.859
Around cemit health center

Sec-1&3 on same pole.


9.00603 38.76783 Africa Roa

8.991364 38.765602
8.562009 39.291517 Adama Town

8.516419 39.248335 Wenji mazoriya

9.068326
The location
38.656071
was pushedBurayu
like 30m from the previous one in the same EEP compound

8.90211 38.75748 Akaki

9.08962 38.76233

9.0932 38.76194

9.07485
Approved with 38.76011
changed RF Ht 24m as per STEP Recommendation and as per space availability

9.08094 38.72946

9.06382 38.86433

9.012839 38.786517 siteGolagul


shifted from the lift house to the terrace.

9.0308
Changed from 6M 38.746
pole to 9Msumale ter
RTT. Conditionally approved without GPS Pics as suggested by Musab.
9.03261 38.731372 Atobis Tera
8.890309 38.774195 Kality
       
       
       
9.03352 38.75054    
9.00386 38.77981
9.05407 38.7428
       
7.18959 38.58708 Oda Bultum
       
6.41227 Gedeo Development Association
38.31369
       
6.8657 37.76357
       
6.02209 37.55043
       
8.2528 34.5886
       
7.67726 36.82915
       

You might also like