50% found this document useful (2 votes)
2K views1 page

MEP Clearance

This document is a request for MEP clearance for pouring a slab on grade at Building No. 80 of the Millitary Colleges and Institutes project. It was submitted by an engineer from the engineering body of the armed forces to the contractor on December 25, 2021. The request is for comments to approve the mechanical and electrical works for the slab pouring from both the mechanical and electrical engineers. Once reviewed and signed, this MEP clearance does not authorize contract changes or variations to cost or schedule.

Uploaded by

Sa3id Hassan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
50% found this document useful (2 votes)
2K views1 page

MEP Clearance

This document is a request for MEP clearance for pouring a slab on grade at Building No. 80 of the Millitary Colleges and Institutes project. It was submitted by an engineer from the engineering body of the armed forces to the contractor on December 25, 2021. The request is for comments to approve the mechanical and electrical works for the slab pouring from both the mechanical and electrical engineers. Once reviewed and signed, this MEP clearance does not authorize contract changes or variations to cost or schedule.

Uploaded by

Sa3id Hassan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

MEP Clearance

Date: 25/Dec/21
Request no: MEP-001-REV.00

Project no. & title: Millitary Colleges and Institutes

Employer : ‫وزارة اـلدفاعـ‬


Engineer: Contractor:
‫الهيئة الهندسية للقوات المسلحة‬

We request your comments to approve works for :


Pouring of Slab on Grade at Building No. 80

Mechanical

Electrical

Submitted by : Signature:

Engineer Comments

Mechanical

Electrical

Signature: Date:

The engineer's representative


This site clarification shall not autorize any change to the contract or constitute a variation to the contract sum or duration