Change Control Manufacturing Matrix
Change Control Manufacturing Matrix
Training
Level of change*
Changes
Process Validation
Batch Formula a) Change of Route of Mfg b) Inclusion /Delection of RM C) Change in RM quantity Manufacturing Process Sequence Change of mfg. Route Sequence of material additions in critical steps of Intermediate stage manufacturing. Sequence of material addition in non critical steps of Intermediate stage manufacturing. Sequence of material additions in critical steps of Final stage manufacturing of molecule formation or purification.
03 03 03
X X X
03 02
01
03
Vendor audit
X X X X X X X
Training
Level of change*
Changes
Process Validation
Sequence of material addition in non critical steps of Final stage manufacturing of molecule formation or purification. Change in the number of intermediate stages with out changing Mfg route. Process Parameter Critical Non Critical In Process Control Test Inclusion or deletion of test parameter Change In Specification Change of batch size Change of Site without change in equipment train FOR Non Sterile Within facility Within premises Out of premise. Change of Equipment
01
03
02 01
X X
X X
X X X
X X
X X
01 01 01
X X X
X X X
X X X
X X X
Long Term
01 02 03
X X
X X X
Vendor audit
X X X X X X X X X X
Training
X X X X X X
Level of change*
Changes
Process Validation
Equipment having same configuration Capacity change with no change in shape and operating principle. change in operating principle. Change of Material Change in the starting & key Raw material Specification Change in the Specification of Intermediate Change of vendor of starting raw material Change of vendor of raw material other than starting raw material Change in specification Material and configuration of construction of primary packing material Change in other specification parameter of primary packing material
Long Term
01 02 03
Long term
02 01 03 01
X X
03
Long term
01
Vendor audit
X X X X X X
Training
X X X X
Level of change*
Changes
Process Validation
Change in the vendor of Primary packing Material Change in the specification of Secondary packing material Change in product label artwork and shade card Change in sequence of secondary packing material Change in the specification of Finished Product
02 01 01 01 --
X X
X X
X X
X X
X X
X X
*Definition of Level of Changes: Level 1 : Are those that are unlikely to have any detectable impact on the quality attributes of the product Level 2; Are those could have a significant impact on the quality attributes of the product Level 3 : Are those that are likely to have a significant impact on the quality attributes of the product
Vendor audit