24 Inch Casing Cementing Program
24 Inch Casing Cementing Program
C)
Well: RQ-192
Rig: KDC-26
Cementing Program for 24" Casing
1.0
1 Objective:
The objective of this job is to cement the 24" Casing with 15.8 ppg Class G cement slurry and raise the cement
to the surface.
2 Well Data:
2.0
Condition the Mud prior to the cement job and reduce the YP of mud less than 10 (pphfs).
This Program is tentative however any changes take place in the planned Program. The
program has to be revised accordingly.
Mix Fluid, Slurry samples to be collected, one set of Samples to Company Man and one set to
NAPESCO Lab.
100 bbl @ 15.8 PPG equivalents (neat cement) has to carry out to the location for top job.
Re-Calculate the displacement volume as per the actual pipe tally on location.
3.0
KOC Program
CEMENT PROGRAM Date: 7-Apr-19
SURFACE
Well: RQ-0192 Objective: CASING 24 IN.
Rig: KDC-26
Data: Cmt Co: Dowell Avg Hole Size from Caliper (if available)
Plan TOC @ Density Yield Btm of Top of Caliper Vol
(feet) (ppg) (ft3/sx) Interval Interval (ft3)
Tail: 0 15.8 1.15 0 IHV without csg NO CALIPER
IHV with csg NO CALIPER
Csg Size 24 in 171.3 ppf -
Set @: 589 - OPEN HOLE VOLUMES IN BBLS
Casing IDs 22.62 - GAUGE CALIPER %Washout HOLE SIZE
Length Shoe- Collar 1 jts L 109.30 0.00 0 28.00
Hole Size: 28 inches E
BHST: 86 degrees F A
T Last Csg = 30 in. @ 48 ft
A
Last Csg OD: 30 inches D
I
ID: 29 inches L
Set @: 48 feet
Last Csg OD: 0 inches
ID: 0 feet
Set @: 0 inches
DP Stab-in Job 1 1 = Yes Tail Top @ 0 ft
DP Size DP Wt. DP I.D. 0 = No
5 19.5 4.276 Estimated Final
fluid type Weight Csg Run = 24 in. Displace. Pressure:
Displace With: Mud 9.5 ppg @ 589 ft 180 psi
CASING DETAILS
80 % 1.5 SF
MD OD WEIGHT ID GRADE Collapse 80% Burst Tensile CONN Makeup
(feet) (inches) (lb / ft) (inches) (psi) (psi) (lbs) Torque
588 24 171.3 ppf 22.62 K-55 928 2208 1847 DQ -
4.0
Submitted to :
Drilling Engineer - KOC Signed:
This report is the property of NAPESCO and is intended for private information of the above named party. This report nor any part thereof maybe published or disclosed to a third party without
approval of NAPESCO.
Well ID: RQ-192 Customer: KOC BHST: 91F
Density : 15.80 PPG Comp. Strength@24hrs : 1878 psi
Job : 24'' CSG
400 20 4000
360 18
3500
320 16
3000
280 14
2500
Compressive Strength (psi)
Transit Time (microsec/in)
240 12
Temperature (°F)
200 10 2000
160 8
1500
120 6
1000
80 4
500
40 2
0 0 0
0:00 5:00 10:00 15:00 20:00
Time (HH:MM)
5.0
CEMPRO Report
CEMPRO
Computational Results
Casing: 24"
Geothermal
Surface T. = 85 (F)
Conductivity Heat Capacity T. gradient
# Lithology TVD (ft) Density (lbm/ft3) T. (F)
(Btu/h-ft-F) (Btu/lb-F) (F/100ft)
1 Shale 589 140.0 0.920 0.30 1.02 91
Pipe:
Tool joint effect on hydraulics: No
Joint TJ
Length Wt TJ OD TJ ID Collapse Burst str.
# Description OD (in) ID (in) Grade length length Yield (psi)
(ft) (lbm/ft) (in) (in) str. (psi) (psi)
(ft) (in)
1 Casing, 182.000 589.0 24.000 182.000 22.582 24.000 22.582 K55 0.0 0.000 55000 1252 2843
(lbm/ft)
Inner string
Collapse str.
# Description OD (in) ID (in) Yield (psi) Burst str. (psi) Length (ft)
(psi)
1 VAM DP New 5.000 4.276 105000 12999 13304 549
Fluid properties
Conduc Heat
YP Gel
Density tivity capacity Inlet T.
# Fluid Model PV (cP) (lbf/100f n K (*) (lbf/100f
(ppg) (Btu/h- (Btu/lb- (F)
t2) t2)
ft-F) F)
1 MUD 9.50 BP 14.0 26.0 - - 0.0 0.000 0.00 -
2 PREFLUSH 8.40 BP 1.0 0.0 - - 0.0 0.000 0.00 60
3 TAIL 15.80 BP 57.0 9.0 - - 0.0 0.000 0.00 60
4 DISPLACE 9.60 BP 14.0 26.0 - - 0.0 0.000 0.00 60
*: (lbf-s^n/100ft2)
Pump
Surface line length = Surface line ID = 1.820 Maxi. P. rating = 10000 Maxi. pump horsepower = Pump stroke = 0.2000
100.0 (ft) (in) (psi) 400. (HP) (bbl/stk)
No choke P.
Output Summary
ECD @ ECD @
Flow rate Pump P. Pump P. @ 589.0 Free fall
Variables 589.0 (ft) 282.0 (ft) Weak zone Weak zone
(bpm) (psi) HHP (HP) (ft) (psi) (ft)
(ppg) (ppg)
Maxi. value 7.29 318 47. 502 15.91 15.91 n/a n/a 226.2
Mini. value 3.77 95 12. 306 9.50 9.20 n/a n/a 0.0
Maxi. @ time (min) 9.981 72.708 72.708 72.708 72.708 72.708 n/a n/a 14.683
Mini. @ time (min) 15.119 0.048 8.915 14.732 14.732 46.287 n/a n/a 0.048
Final fluid positions: ('-' means position in annulus for forward circ., and in pipe for reverse circ.)
Ann. fill - len.
Fluid Front (ft) Trail (ft) Pipe fill - len. (ft) Ann. fill - vol. (bbl) Pipe fill - vol. (bbl)
(ft)
PREFLUSH -0 -0 0.0 0.0 0.000 0.000
TAIL -0 549.2 589.0 39.8 230.985 19.731
DISPLACE 549.2 0.0 0.0 549.2 0.000 9.835
Geometry table
Description Start (ft) End (ft) Vol. (bbl) Vol. (bbl/ft)
Pipe: ID = 4.276 (in), 549.0 (ft) 0.0 549.0 9.751 0.018
Pipe: ID = 22.582 (in), 40.0 (ft) 549.0 589.0 19.815 0.495
Ann.: 29.000 x 24.000 (in), 48.0 (ft) 0.0 48.0 12.357 0.257
Ann.: 31.496 x 24.000 (in), 501.0 (ft) 48.0 549.0 202.464 0.404
Ann.: 31.496 x 24.000 (in), 40.0 (ft) 549.0 589.0 16.165 0.404
Volume inside entire pipe 0.0 589.0 29.567 0.050
Volume in entire annulus 0.0 589.0 230.985 0.392
Volume inside pipe and annulus 0.0 589.0 260.552 0.442
Pipe displacement (open ended) 0.0 589.0 300.008 0.509
Pipe displacement (closed ended) 0.0 589.0 329.574 0.560
Hole volume w/o pipe 0.0 589.0 560.560 0.952
Pipe surface area 4551.9 (ft2)
Wellbore surface area 4825.3 (ft2)
Event table
ECD @ 589.0 ECD @ 282.0
Job time (min) Rate in (bpm) Rate out (bpm) Vol. in (bbl) Fluid in/btm/out
(ft) (ppg) (ft) (ppg)
0.048 6.00 6.00 0.291 9.79 9.80 PREFLUSH/MUD/MUD
4.944 6.00 6.00 29.665 9.79 9.80 PREFLUSH/PREFLUSH/MUD
8.382 4.00 4.00 50.194 9.67 9.80 TAIL/PREFLUSH/MUD
14.732 4.00 4.00 75.593 9.50 9.80 TAIL/TAIL/MUD
60.780 4.00 3.88 259.788 14.10 12.14 TAIL/TAIL/PREFLUSH
71.132 6.00 3.87 301.291 15.43 14.92 DISPLACE/TAIL/PREFLUSH
72.683 6.00 6.00 310.598 15.89 15.89 DISPLACE/TAIL/TAIL
100 100
200 200
300 300
400 400
500 500
549.2
589 589