Introduction - Key Informations
• The new tool is associated with a certification process at supplier plant level
• Granted for 4 years
• Associated with Bidlist (supplier plant scoring):
0 points deduction plant certified
2
Assessment tools – Present Situation
Tool
Selection Mass Prod
Design Phase Kick Indus Phase SOP
Phase Off Phase
Specific Audits
QIP V3 QIP V3
3
Main Specifications (1/2) - The key principles
59 / 61 Requirements
61 Requirements
Corporate
Management
5
39 / 61 Requirements
Manufacturing
System
50
Part & Process
35 / 61 Requirements
6
4
Main Specifications (2/2) - Common characteristics
Versatile tools which can be used on every manufacturing site & every
process
ISO-TS QIP V3
More focused on ISO More focused on
Generic Requirements Customer Specific
Requirements (CSR)
Performed by Mainly Performed by
Independent 3rd party Customer
Checks that Quality Checks how Quality
Systems are in place Systems are being used
5
59 / 61 Requirements
Purpose:
• Evaluate the overall robustness of processes on site:
Manufacturing System requirements are fully met and work effectively
• Drive the continuous improvement (identification of weak points & axes of
improvement)
Operational Requirements
• Maximum duration of the evaluation on site : 2 days
• Self-assessment done by supplier himself
• Updated continuously to integrate the impact of the events in the relationship
6
39 / 61 Requirements
Purpose:
• Evaluate the manufacturing maturity of a new supplier : Basics are in place
• At the beginning of a project, evaluate the effectiveness of operational launch
organization on supplier site
Operational Requirements
• Maximum duration of the evaluation on site: 1,5 2 days
• Self-assessment by supplier before evaluation: Can be avoided in case of emergency
(to be decided by the auditor)
7
35 / 61 Requirements
Purpose:
• At the end of a project, Confirm the qualification status
of the process:
Parts & Process controls are in place to ensure final product quality
Operational Requirements
• Maximum duration of the evaluation on site: 1 days
• Self-assessment by supplier before evaluation: Can be avoided in case of emergency
(to be decided by the auditor)
PURCHASING DEPARTMENT 01598_16_05418 / 15-12-2016 / DA-DSD
8
One Single assessment referential
Certification
Bidlist
Corporate (supplier plant scoring)
Management
5
4 1
Manufacturing
System
50
30 30
• Same questionnaire (same requirements) used for all the 3 types of audit
• All the audit results affect to Bidlist performance (supplier plant scoring)
9
QIP V3 Life Cycle
continuous Assessment with the same Questionnaire
10
New QIP - Production Site Assessment - Structure of the questionnaire
12*
Key
Elements
61
Requirements