Saic Q 1011
Saic Q 1011
00 30-Jun-16
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
BA-016266-001 1 - N/A
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
05/31/2021 at 01:30 PM SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
SATIP-Q-001-02 3.1
SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL YES
W I
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Select Fill Material shall be used within 0.6 m (2 ft) of the bottom elevation
SAES-A-114
A1 of foundations, spread footings, or slabs-on-grade when fill is required to
Sec. 6.3.1
achieve final grade
Select Fill material shall have at least 100% passing 50mm sieve and
between 0-20% passing #200 sieve. Material passing the #40 sieve shall
have Liquid Limit (LL) between 0 - 35. SAES-A-114
A2
Sec. 6.1.2.1
Note: Plasticity Index not required if material has less than 15% fines
(passing #200 sieve).
Cohesive fill under footings, grade beams, mats, buildings and process
areas shall have been compacted to at least 90% of Modified Proctor SAES-A-114
A3
Density to ASTM D1557 or the degree of compaction specified in the IFC Sec. 6.3.6.1
drawings or project specifications, whichever is higher.
Damp proofing membrane (when required) are installed as per SASD-AB- SASD-AB-036850
A10
036850 Sht. 002 Sht. 2
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
The rough grading under slabs and footings shall be to a minimum SAES-Q-001
A12
tolerance of +0mm or -38mm. (ACI 302.1R-04, Sec. 4.1.2) Sec. 3.2
REMARKS:
REFERENCE DOCUMENTS:
1- SAES-Q-001 -- Criteria for the Design and Construction of Concrete Structures, 07 January 2016
2- SAES-A-114 -- Excavation and Backfill, 30 Sept 2014
3- AB-036850, Sht. 001 -- Damp Proofing Membrane Application Details,
4- AB-036850, Sht. 002 -- Damp Proofing Membrane Application Details,
5- SAES-Q-005 -- Concrete Foundations,
Contractor / Third-Party Saudi Aramco
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
Mahmoud elrouby Mr.Isa Aldossery
QC Inspector PID Representative
Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
Joy Mr.Ahmad M Alboali
QC Supervisor Proponent and Others
Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Manickam Initials and Date: