Rate Analysis-1 - Tender
Rate Analysis-1 - Tender
Rate
excludin
Unit Per Km Avg Lead g
S.No. Description of Work Distance Rate Avg Rate Remarks
per Km Rate Contract
or's
profit
1 1st Km 153.00 153.00 153.00 139.09 139.09
2 2nd Km 17.00 170.00 15.45 154.54
3 3rd Km 17.00 187.00 15.45 169.99
4 4th Km 17.00 204.00 15.45 185.44
5 5th Km 17.00 221.00 15.45 200.89
6 6th Km 12.75 233.75 11.59 212.48
7 7th Km 12.75 246.50 11.59 224.07
8 8th Km 12.75 259.25 11.59 235.66
9 9th Km 12.75 272.00 11.59 247.25
10 10th Km 10 12.75 14.64 284.75 11.59 258.84
11 11th Km 10.20 294.95 9.27 268.11
12 12th Km 10.20 305.15 9.27 277.38
13 13th Km 10.20 315.35 9.27 286.65
14 14th Km 10.20 325.55 9.27 295.92
15 15th Km 10.20 335.75 9.27 305.19
16 16th Km 10.20 345.95 9.27 314.46
17 17th Km 10.20 356.15 9.27 323.73
18 18th Km 10.20 366.35 9.27 333.00
19 19th Km 10.20 376.55 9.27 342.27
20 20th Km 10.20 386.75 9.27 351.54
21 21st Km 9.15 395.90 8.32 359.86
22 22nd Km 9.15 405.05 8.32 368.18
23 23rd Km 9.15 414.20 8.32 376.50
24 24th Km 9.15 423.35 8.32 384.82
25 25th Km 9.15 432.50 8.32 393.14
26 26th Km 9.15 441.65 8.32 401.46
27 27th Km 9.15 450.80 8.32 409.78
28 28th Km 9.15 459.95 8.32 418.10
29 29th Km 9.15 469.10 8.32 426.42
30 30th Km 9.15 478.25 8.32 434.74
31 31st to 70th Km 40 8.25 330.00 808.25 7.5 300.00 734.74
32 Cartage upto 71th to 100th Km 30 6.60 198.00 1006.25 6 180.00 914.74
33 Cartage upto 101 st to 200 Km 100 5.95 595.00 1601.25 5.41 541.00 1455.74
34 Cartage upto 201 st to 250 Km 50 4.80 240.00 1841.25 4.36 218.00 1673.74
35 251 th to 272 22.00 4.25 93.50 1934.75 3.86 84.92 1758.66
251 th to 345 95.00 4.25 403.75 2338.50 3.86 366.70 2125.36
251 th to 473 223.00 4.25 947.75 2882.50 3.86 861.59 2620.25
1
2
570
CARRIAGE OF MATERIALS RATES
Distance from Quarry to Site in Kms. Total of
Deduct Total
Name of Quarry Net Quarry Cost of Stacking Column
Km No. loading & Royallity `` Toll tax rounded to Remarks
Quarry Rate Rate Pucca Katchcha Total Cartage Charges (3(b),
unloading N.P.
7,8,9)
1 2 3 3(a) 3(b) 4 5 6 7 8 9 10 11 12 13 Cartage for Pucca
Cement
30 Local 6400 110.8 6289.2 30 30 434.74 434.74 32.5 6756.44 6756.40 kabrai to Ramnager-272 Km
Structural Steel
242 Local 46600 110.8 46489.2 30 30 434.74 434.74 32.5 46956.44 46956.40 1 to 250 1673.74
251 to 272 84.92
20 mm Gauge grite Total 1758.66
272 Kabrai 1340 110.8 1229.2 271 1 272 2542.28 100 2542.28 32.5 3903.98 3904.00 Cartage for Kachcha
40 mm Gauge grite Ist 46.36
272 Kabrai 820 110.8 709.2 271 1 272 2542.28 100 2542.28 32.5 3383.98 3384.00
Total 1805.02
10mm Gauge grite Cartage for Pucca
272 Kabrai 1030 110.8 919.2 271 1 272 2542.28 100 2542.28 32.5 3593.98 3594.00
Coarse sand
450 Chopan 1067 110.8 956.2 472 1 473 4033.89 150 4033.89 32.5 5172.59 5172.60
(C) Materials
Less
RATE AS PER loading & LEAD IN CARRIAGE TOTAL
Sl. No. Description UNIT SOURCE REF
SOR unloading KM COST COST
charges
3 Boulder with minimum size of 300 mm for Pitching at Site cum 540.00 -110.80 132.5 345.00 2873.86 3435.60 M-003
4 Coarse sand i) (as per idsor ch-III/3ii) cum 1067.00 -110.80 182.5 473.00 4033.89 5172.60 M-004
5 Coarse sand i) (as per idsor ch-III/3ii) cum 1067.00 -110.80 182.5 473.00 4033.89 5172.60 M-005
6 Fine sand at Site Cum 325.00 -110.80 132.5 120.00 1288.37 1635.10 M-006
7 Moorum at Site Cum 1067.00 -110.80 132.5 272.00 4033.89 5122.60 M-007
12 Filter media/Filter Material as per Table 300-3 (MoRT&H Specification) cum 1340.00 -110.80 132.5 473.00 2542.28 3904.00 M-012
21 Stone crusher dust finer than 3mm with not more than 10% passing 0.075 sieve. cum 500.00 -110.80 132.5 272.00 2542.28 3064.00 M-021
51 Aggregates 10 mm nominal size (as per pwd sor 1/9i) cum 1030.00 -110.80 132.5 272.00 2542.28 3594.00 M-051
53 Aggregates 20 mm nominal size (as per pwd sor 1/e) cum 1340.00 -110.80 132.5 272.00 2542.28 3904.00 M-053
55 Aggregates 40 mm nominal size (as per pwd sor 1/bi) cum 820.00 -110.80 132.5 272.00 2542.28 3384.00 M-055
56 GI Pipe 100 mm Dia kg 300.00 300.00 M-56
69 Bearing (PTFE sliding plate bearing assembly of 80 tonnes ) nos 26500.00 - 0.00 26500.00 M-069
70 Bearing (Supply of sliding plate bearing of 80 tonne) nos 26500.00 - 0.00 26500.00 M-070
71 Bentonite kg 20.00 - 0.00 20.00 M-071
72 Binding wire(PWD SOR CH-1/10) kg 50.00 - 0.00 50.00 M-072
79 Brick each 6.20 0.00 6.20 M-079
80 C.I.shoes for the pile kg 40.00 - 0.00 40.00 M-080
81 Cement (as per pwd sor ch 1/5) tonne 6400.00 -110.80 32.5 30.00 434.74 6756.40 M-081
82 Cold twisted bars (HYSD Bars) (as per pwd sor ch 1/4b) tonne 46600.00 -110.80 32.5 30.00 434.74 46956.40 M-082
87 Corrosion resistant Structural steel tonne 75000.00 -110.80 32.5 30.00 434.74 75356.40 M-087
88 Corrugated sheet, 3 mm thick, "Thrie" beam section railing kg 120.00 - 0.00 120.00 M-088
90 Curing compound liter 65.00 - 0.00 65.00 M-090
91 Delineators from ISI certified firm as per the standard drawing given in IRC - 79 each 750.00 - 0.00 750.00 M-091
92 Earth Cost or compensation for earth taken from private land cum 39.00 - 0.00 39.00 M-092
Elastomeric slab seal expansion joint assembly manufactured by using chloroprene,
93 metre 18000.00 - M-093
elastomer for elastomeric slab unit conforming to clause 915.1 of IRC: 83 (part II), 0.00 18000.00
94 Electric Detonators @ 1 detonator for 1/2 gelatin stick of 125 gms each 100 nos 1200.00 - 0.00 1200.00 M-094
95 Epoxy compound with accessories for preparing epoxy mortar kg 400.00 - 0.00 400.00 M-095
96 Epoxy mortar kg 350.00 - 0.00 350.00 M-096
97 Epoxy primer kg 300.00 - 0.00 300.00 M-097
98 Epoxy resin-hardner mix for prime coat kg 400.00 - 0.00 400.00 M-098
99 Flag of red color cloth 600 x 600 mm each 19.00 - 0.00 19.00 M-099
100 Flowering Plants each 50.00 - 0.00 50.00 M-100
101 Galvanised MS flat clamp nos 40.00 - 0.00 40.00 M-101
Galvanised steel wire crates of mesh size 100 mm x 100 mm woven with 4mm dia. GI wire in
102 sqm 120.00 - M-102
rolls of required size. 0.00 120.00
103 Galvanised structural steel plate 200 mm wide, 6 mm thick, 24 m long kg 50.00 - 0.00 50.00 M-103
104 Gelatin 80% kg 120.00 - 0.00 120.00 M-104
105 Geo grids sqm 500.00 - 0.00 500.00 M-105
106 Geomembrane sqm 500.00 - 0.00 500.00 M-106
107 Geonets sqm 500.00 - 0.00 500.00 M-107
108 Geotextile sqm 500.00 - 0.00 500.00 M-108
109 Geotextile filter fabric sqm 500.00 - 0.00 500.00 M-109
110 GI bolt 10 mm Dia nos 40.00 - 0.00 40.00 M-110
111 Grouting pump with agitator hour 250.00 - 0.00 250.00 M-111
112 Grass (Doob) kg 5.00 - 0.00 5.00 M-112
113 Grass (Fine) kg 10.00 - 0.00 10.00 M-113
114 HDPE pipes 75mm dia metre 500.00 - 0.00 500.00 M-114
115 HDPE pipes 90mm dia metre 500.00 - 0.00 500.00 M-115
116 Hedge plants each 50.00 - 0.00 50.00 M-116
117 Helical pipes 600mm diameter metre 2000.00 - 0.00 2000.00 M-117
118 Hot applied thermoplastic compound litre 141.75 - 0.00 141.75 M-118
119 HTS strand tonne 93000.00 -110.80 32.5 30.00 434.74 93356.40 M-119
120 Joint Sealant Compound kg 150.00 - 0.00 150.00 M-120
121 Jute netting, open weave, 2.5 cm square opening for seeding and Mulching sqm 50.00 - 0.00 50.00 M-121
122 LDO for steam curing litre 35.00 - 0.00 35.00 M-122
123 M.S. Clamps nos 23.00 - 0.00 23.00 M-123
124 M.S. Clamps kg 70.00 - 0.00 70.00 M-124
125 M.S.shoes @ 35 Kg per pile of 15 m kg 52.00 - 0.00 52.00 M-125
126 Mild Steel bars tonne 46500.00 -110.80 32.5 30.00 434.74 46856.40 M-126
Summary
Lead 38
Cement and Steel Lead L Km
ist Km Per /t/km 48.85 1 48.85
2nd and 3rd km Per /t/km 11.65 2 23.3
4th and 5th km Per /t/km 9.5 2 19
6th to10th km Per /t/km 7.5 5 37.5 less 8Km
11th to 20th km Per /t/km 5.80 10 58
21st to 30th km Per /t/km 5.00 10 50
31st to 50th km Per /t/km 4.45 0
51st to 75th km Per /t/km 3.90 0
Total 30 236.65
Loading for cement 28
UnLoading for steel 14
Total 42
471.00
Bitumen - Mathura L Km
ist Km Per /t/km 68.4 1 68.4
2nd and 3rd km Per /t/km 16.4 2 32.8
4th and 5th km Per /t/km 13.35 2 26.7
6th and 10th km Per /t/km 10.55 5 52.75
11th 20th km Per /t/km 8.15 10 81.5
21st to 30th km Per /t/km 7 10 70
31st to 50th km Per /t/km 6.25 20 125
51 st to 75th km Per /t/km 5.45 25 136.25
76th to 100km Per /t/km 4.3 25 107.5
101st to 200km Per /t/km 3.85 100 385
201 on wards Per /t/km 3.7 322 1191.4
total 2277.3
Total 2277.3
1,080.00
Emulsion Haldia L Km
ist Km Per /t/km 68.4 1 68.4
2nd and 3rd km Per /t/km 16.4 2 32.8
4th and 5th km Per /t/km 13.35 2 26.7
6th and 10th km Per /t/km 10.55 5 52.75
11th 20th km Per /t/km 8.15 10 81.5
21st to 30th km Per /t/km 7 10 70
31st to 50th km Per /t/km 6.25 20 125
51 st to 75th km Per /t/km 5.45 25 136.25
76th to 100km Per /t/km 4.3 25 107.5
101st to 200km Per /t/km 3.85 100 385
201 on wards Per /t/km 3.7 880.00 3256
total 4341.9
Total 0
Consultancy Services for Preparation of Feasibility Study for Construction of Major Bridge its Approaches at Gomti River
(AAM Ghat) in Km 61.00 of NH-330A in the state of Uttar Pradesh.
This softawre is based on Standard Data book for analysis of Rates for Road and Bridge Works
This Software runs on Microsoft Excel
INPUT- Input the usage rates of Plant & Machinery, labour and material as applicable
SUMMARY - In this sheet summary of all the rates analysized is presented
ANALYSIS- The analysis has been presented in 16 nos. of spread sheets
Worksheet- 1 : CHAPTER-1 CARRIAGE OF MATERIALS
Worksheet- 2 : CHAPTER-2 SITE CLEARANCE
Worksheet- 3 : CHAPTER-3 EARTH WORK, EROSION CONTROL AND DRAINAGE
P&M-002 Batching and Mixing Plant (a) 30 cum capacity Concrete Mixing cum/hour 20 hour 751.63
P&M-003 Batching and Mixing Plant (b) 15 - 20 cum capacity Concrete Mixing cum/hour 13 hour 651.50
P&M-004 Bitumen Pressure Distributor Applying bitumen tack coat sqm/hour 1750 hour 1647.00
P&M-005 Bitumen Boiler oil fired Bitumen Spraying capacity in litre 1500 hour 708.00
P&M-006 Concrete Paver Finisher with 40 HP Motor Paving of concrete surface cum / hour 20 hour 2463.00
P&M-007 Concrete Pump of 45 & 30 cum capacity Pumping of concrete cum / hour 33 / 22 hour 1278.00
P&M-008 Concrete Bucket For Pouring concrete capacity in cum 1 hour 146.00
P&M-009 Concrete Mixer (a) 0.4/0.28 cum Concrete Mixing cum/hour 2.5 hour 487.00
P&M-010 Concrete Mixer (b) 1 cum Concrete Mixing cum/hour 7.5 hour 525.00
P&M-014 Dozer D - 80 - A 12 Spreading /Cutting / Clearing cum/hour 300/ 150/250 hour 3336.00
P&M-015 Dozer D - 50 - A 15 Spreading /Cutting / Clearing cum/hour 200/ 120/150 hour 3336.00
P&M-016 Emulsion Pressure Distributor Applying emulsion tack coat sqm/hour 1750 hour 1647.00
P&M-017 Front End loader 1 cum bucket capacity Soil loading / Aggregate loading cum/hour 60 /25 hour 1717.00
P&M-018 Generator (a) 125 KVA Genration of electric Energy KVA 100 hour 2277.00
P&M-021 Hotmix Plant - 120 TPH capacity DBM/BM/SDC/ Premix cum/hour 40 hour 7974.00
P&M-022 Hotmix Plant - 100 TPH capacity DBM/BM/SDC/ Premix cum/hour 30 hour 7000.00
P&M-023 Hotmix Plant - 60 to 90 TPH capacity DBM/BM/SDC/ Premix cum/hour 25 hour 17413.50
P&M-024 Hotmix Plant - 40 to 60 TPH capacity DBM/BM/SDC/ Premix cum/hour 17 hour 13942.50
P&M-025 Hydraulic Chip Spreader Surface Dressing sqm/hour 1500 hour 2115.00
P&M-026 Hydraulic Excavator of 1 cum bucket Soil Ordinary/Soil Marshy / Soil Unsuitable cum/hour 60 /60 /60 hour 2689.00
P&M-027 Integrated Stone Crusher 100THP Crushing of Spalls TPH 100 hour 14744.00
P&M-028 Integrated Stone Crusher 200 HP Crushing of Spalls TPH 200 hour 22932.00
P&M-030 Mastic Cooker Mastic Wearing coat capacity in tonne 1 hour 636.00
P&M-031 Mechanical Broom Hydraulic Surface Cleaning sqm/hour 1250 hour 1009.00
P&M-032 Motor Grader 3.35 mtr blade Clearing /Spreading /GSB /WBM cum/hour 200/200/50/50 hour 4747.00
P&M-033 Mobile slurry seal equipment Mixing and laying slurry seal sqm/hour 2700 hour 3808.00
Paver Finisher Hydrostatic with sensor control 100
P&M-034 Paving of DBM/ BM/SDC/ Premix cum/hour 40 hour 3363.75
TPH
P&M-035 Paver Finisher Mechanical 100 TPH Paving of WMM /Paving of DLC cum/hour 40/30 hour 4302.00
P&M-036 Piling Rig with Bantonite Pump 0.75 m dia to 1.2 m dia Boring attachment Rm/hour 2 to 3 hour 18807.00
P&M-037 Pneumatic Road Roller Rolling of Asphalt Surface cum/hour 25 hour 2440.00
P&M-038 Pneumatic Sinking Plant Pneumatic Sinking of wells cum/hour 1.5 to 2.00 hour 6591.00
P&M-039 Pot Hole Repair Machine Repair of potholes cum/hour 4 hour 1711.00
P&M-040 Prestressing Jack with Pump & access Stressing of steel wires/stands hour 533.00
P&M-043 Road marking machine Road marking Sqm/hour 100 hour 1859.00
P&M-044 Smooth Wheeled Roller 8 tonne Soil Compaction /BM Compaction cum/hour 70/25 hour 1967.00
P&M-045 Tandem Road Roller Rolling of Aspalt Surface cum/hour 30 hour 2429.00
Transportation of soil, GSB, WMM, Hotmix
P&M-046 Tipper - 5 cum Capacity in cum 5.5 km 27.48
etc.
Transportation of soil, GSB, WMM, Hotmix
P&M-047 Tipper - 5 cum Capacity in cum 5.5 tonne.km 11.31
etc.
Transportation of soil, GSB, WMM, Hotmix
P&M-048 Tipper - 5 cum Capacity in cum 5.5 hour 1649.00
etc.
P&M-049 Transit Mixer 4.0/4.5 cum Transportation of Concrete Mix to site cum/hour 4.5 hour 12.77
P&M-050 Transit Mixer 4/4.5 cum Transportation of Concrete Mix to site cum/hour 4.5 tonne.km 12.77
P&M-051 Transit Mixer 3.0 cum Transportation of Concrete Mix to site cum/hour 3 hour 6.38
P&M-052 Transit Mixer 3.0 cum Transportation of Concrete Mix to site cum/hour 3 tonne.km 6.38
P&M-056 Truck 5.5 cum per 10 tonnes Material Transport capacity/cum 4.5 km 28.28
P&M-057 Truck 5.5 cum per 10 tonnes Material Transport capacity/cum 4.5 hour 108.30
P&M-058 Truck 5.5 cum per 10 tonnes Material Transport capacity/cum 4.5 tonne.km 3.12
P&M-059 Vibratory Roller 8 tonne Earth or soil / GSB / WBM cum/hour 100/60/60 hour 1967.00
P&M-062 Wet Mix Plant 60 TPH Wet Mix cum/hour 25 hour 334.80
P&M-064 Batch type cold mixing plant 100-120 TPH capacity producing an average output of 75 tonne per hour hour 3909.00
P&M-067 Cement concrete batch mix plant @ 175 cum per hour (effective output) hour 3909.00
P&M-068 Cement concrete batch mix plant @ 75 cum per hour hour 937.00
P&M-076 Compressor with guniting equipment along with accessories hour 585.00
P&M-077 Drum mix plant for cold mixes of appropriate capacity but not less than 75 tonnes/hour. hour 29344.00
P&M-082 Induction, deinduction and erection of plant and equipment including all components and accessories for pneumatic method of well sinking. hour 9594.00
P&M-083 Joint Cutting Machine with 2-3 blades (for rigid pavement) hour 487.00
P&M-085 Piling rig Including double acting pile driving hammer (Hydraulic rig) hrs 17687.00
P&M-087 Snow blower equipment 140 HP @ 600 cum per hour hour 1950.00
P&M-092 Vibrating Pile driving hammer complete with power unit and accessories. hour 17687.00
As per IDSOR
L-01 Blacksmith (IInd class) day 400.00
CH-1A Item-3
As per IDSOR
L-02 Blacksmith (Ist class)/ Welder/ Plumber/ Electrician day 400.00
CH-1A Item-3
As per IDSOR
L-03 Blaster (Stone cutter) day 390.00
CH-1A Item-55
As per IDSOR
L-04 Carpenter I Class day 470.00
CH-1A Item-4
As per IDSOR
L-05 Chiseller (Head Mazdoor) day 365.00
CH-1A Item-21
As per IDSOR
L-06 Driller (Jumper) day 430.00
CH-1A Item-69
As per IDSOR
L-07 Diver day 350.00
CH-1A Item-14
As per IDSOR
L-08 Fitter CH-1A Item-22D
day 460.00
As per IDSOR
L-09 Mali day 365.00
CH-1A Item-63
As per
L-10 Mason (IInd class) PWdSOR CH-2 day 450.00
Item-12
As per
L-11 Mason (Ist class) (Bridge Work) PWDDSOR day 500.00
CH-1A Item-50
As per IDSOR
L-12 Mate / Supervisor day 390.00
CH-1A Item-15
As per IDSOR
L-13 Mazdoor day 350.00
CH-1A Ite-06
As per IDSOR
L-14 Mazdoor/Dresser (Semi Skilled) (Bridge Work) day 350.00
CH-1A Ite-06
As per IDSOR
L-15 Mazdoor/Dresser/Sinker (Skilled) day 350.00
CH-1A Ite-06
As per IDSOR
L-17 Operator(grouting) day 430.00
CH-1A Item-70
As per IDSOR
L-18 Painter I class day 430.00
CH-1A Item-17
As per IDSOR
L-19 Para medical personnel day 390.00
CH-1A Item-51
As per IDSOR
L-20 Welder day 460.00
CH-1A Item-32
(C) Materials
M-003 Boulder with minimum size of 300 mm for Pitching at Site cum 3435.60
M-065 Bearing (Cast steel rocker bearing assembly of 250 tonne ) nos #NAME?
Bearing (Elastomeric bearing assembly consisting of 7 internal layers of elastomer bonded to 6 nos. internal reinforcing steel laminates by the
M-066 nos #NAME?
process of vulcanisation,)
M-067 Bearing (Forged steel roller bearing of 250 tonne nos #NAME?
Bearing (Pot type bearing assembly consisting of a metal piston supported by a disc, PTFE pads providing sliding surfaces against stainless steel
M-068 nos #NAME?
mating together with cast steel assemblies/fabricated structural steel assemblies duly painted with all components
M-069 Bearing (PTFE sliding plate bearing assembly of 80 tonnes ) nos 26500.00
M-091 Delineators from ISI certified firm as per the standard drawing given in IRC - 79 each 750.00
M-092 Earth Cost or compensation for earth taken from private land cum 39.00
Elastomeric slab seal expansion joint assembly manufactured by using chloroprene, elastomer for elastomeric slab unit conforming to clause
M-093 metre 18000.00
915.1 of IRC: 83 (part II),
M-094 Electric Detonators @ 1 detonator for 1/2 gelatin stick of 125 gms each 100 nos 1200.00
M-095 Epoxy compound with accessories for preparing epoxy mortar kg 400.00
M-102 Galvanised steel wire crates of mesh size 100 mm x 100 mm woven with 4mm dia. GI wire in rolls of required size. sqm 120.00
M-103 Galvanised structural steel plate 200 mm wide, 6 mm thick, 24 m long kg 50.00
M-121 Jute netting, open weave, 2.5 cm square opening for seeding and Mulching sqm 50.00
Modular strip/box seal expansion joint including anchorage catering to a horizontal movement beyond 70 mm and upto 140mm assembly
M-127 comprising of edge beams, central beam,2 modules chloroprene seal, anchorage elements, support and control system, all steel sections metre 1500.00
protected against corrosion and installed by the manufacturer or his authorised representative
Modular strip/box seal expansion joint catering to a horizontal movement beyond 140mm and upto 210mm box/box seal joint assembly containing
M-128 3 modules/cells and comprising of edge beams, two central beams, chloroprene seal, anchorage elements, support and control system, all steel metre 1500.00
sections protected against corrosion and installed by the manufacturer or his authorised representative
M-135 Perforated pipe of cement concrete, internal dia 100 mm metre 230.00
M-137 Pipes 200 mm dia, 2.5 m long for drainage metre 230.00
M-138 Plastic sheath, 1.25 mm thick for dowel bars sqm 55.00
M-141 Pre moulded Joint filler,25 mm thick for expansion joint. sqm 1103.00
M-145 Pre-packed cement based polymer concrete of strength 45 Mpa at 28 days kg 45.00
M-153 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Copper Strips) metre 400.00
M-154 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Galvanised carbon steel strips) metre 400.00
M-155 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Glass reinforced polymer/fibre reinforced polymer/polymeric strips) metre 400.00
M-156 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Stainless steel strips) metre 400.00
M-157 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. Aluminium strips) metre 400.00
M-159 Sand bags (Cost of sand and Empty cement bag) nos 10.00
M-164 Separation Membrane of impermeable plastic sheeting 125 micron thick sqm 55.00
M-167 Sludge / Farm yard manure @ 0.18 cum per 100 sqm at site of work for turfing cum 300.00
M-170 Steel circular hollow pole of standard specification for street lighting to mount light at 5 m height above deck level each 1000.00
M-171 Steel circular hollow pole of standard specification for street lighting to mount light at 9 m height above road level each 1500.00
M-172 Steel drum 300 mm dia 1.2 m high/empty bitumen drum nos 75.00
M-173 Steel helmet and cushion block on top of pile head during driving. kg 60.00
M-181 Synthetic Geogrids as per clause 3102.8 and approved design and specifications. sqm 500.00
M-187 Tube anchorage set complete with bearing plate, permanent wedges etc nos 5000.00
M-196 Wooden staff for fastening of flag 25 mm dia, one m long each 120.00
Overheads for Bridge Works 21% for input of Overheads or Contractors profit please type in collum C as like below
Type symble of apostrope(') then input value then one space then symble of
Overheads for Bridge Works (Rehabilitation) 26 %
percentage (%) for example '08 %
Items No. Summary of Rates calculated and used for analysis of rates of other items Unit Rate
per cm height
Item 8.3 Printing new letter and figures of any shade (ii) English Roman 0.60
per letter
Item 8.8 Painting Two Coats on New Concrete Surfaces sqm 74.00
Item 8.9 Painting angle iron post two coats sqm 66.00
Item 12.6 (B) Cement mortor 1:2 (Excluding OH & CP) cum 9,699.00
Item 12.6 (A) Cement mortor 1:3 (Excluding OH & CP) cum 9,208.00
Item 12.6 (D) Cement mortor 1:6 (Excluding OH & CP) cum 8,484.00
Item 12.8 (A) PCC Grade M15 including OH & CP for Open Foundation by Mixer cum 11,941.00
Item 12.8 (A) PCC Grade M15 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Mixer cum 8,627.00
Item 12.8 (B) PCC PCC Grade M20 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Mixer cum 8,944.00
Item 12.8 (C) RCC Grade M20 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Mixer cum 9,098.00
Item 12.8 (C) RCC RCC Grade M20 including OH & CP for Open Foundation by Batching Plant cum 12,368.00
Item 12.8 (C) RCC Grade M20 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Batching Plant cum 8,935.00
Item 12.8 (D) PCC Grade M25 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Mixer cum 9,318.00
Item 12.8 (D) PCC Grade M25 including OH & CP for Open Foundation by Batching Plant cum 12,646.00
Item 12.8 (D) PCC Grade M25 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Batching Plant cum 9,158.00
Item 12.8 (E) RCC Grade M25 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Mixer cum 9,476.00
Item 12.8 (E) RCC Grade M25 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Batching Plant cum 9,430.00
Item 12.8 (F) PCC Grade M30 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Mixer cum 9,358.00
Item 12.8 (F) PCC Grade M30 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Batching Plant cum 9,195.00
Item 12.8 (G) RCC Grade M30 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Mixer cum 9,499.00
Item 12.8 (G) RCC Grade M30 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Batching Plant cum 9,337.00
Item 12.8 (H) RCC Grade M35 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Mixer cum 9,602.00
Item 12.8 (H) RCC Grade M35 including OH & CP for Open Foundation by Batching Plant cum 9,849.00
Item 12.8 (H) RCC Grade M35 excluding OH & CP for Open Foundation by Batching Plant cum 13,109.00
Item 12.8 (H) RCC Grade M35 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Batching Plant cum 9,563.00
Item 12.11 (C) i PCC Grade M20 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material & Mechinery by Mixer cum 9,623.00
PCC Grade M20 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material & Mechinery by
Item 12.11 (C) i cum 9,184.00
Batching Plant
Item 12.11 (C) ii PCC Grade M25 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material & Mechinery by Mixer cum 13,069.00
PCC Grade M25 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material & Mechinery by
Item 12.11 (C) ii cum 9,389.00
Batching Plant
Item 12.11 (C) iii PCC Grade M30 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material & Mechinery by Mixer cum 9,876.00
PCC Grade M30 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material & Mechinery by
Item 12.11 (C) iii cum 9,432.00
Batching Plant
Item 12.11 (C) iv PCC Grade M35 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material & Mechinery by Mixer cum 9,971.00
Item 12.11 (C) iv PCC Grade M35 including OH & CP for Well Foundation (Bottom Plug) by Batching Plant cum 13,258.00
PCC Grade M35 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material & Mechinery by
Item 12.11 (C) iv cum 9,525.00
Batching Plant
Item 12.11 (F) iv PCC Grade M35 including OH & CP for Well Foundation (Well Cap) by Batching Plant cum 12,942.00
Item No. 3.13 Excavation for Structures (Manual Means) cum 483.00
Item No. 3.13 Excavation for Structures (Mechenical Means) cum 78.00
Item 14.1(A) RCC Grade M20 for super-structure including OH & CP by Batching Plant cum 14,204.00
Item 14.1(B) RCC Grade M20 for super-structure including OH & CP by Batching Plant cum 14,858.00
Item 14.1(E) RCC Grade M20 for super-structure including OH & CP by Batching Plant cum 15,330.85
Item 14.1(C) RCC Grade M30 for super-structure including formwork and excluding OH & CP by Batching Plant cum 11,238.00
Item 14.1(C) RCC Grade M30 for super-structure excluding formwork and excluding OH & CP by Batching Plant cum 9,365.00
Item 14.2 A Supplying ,fitting and placing HYSD bar reinforcement in super-structure exncluding OH & CP tonne 53,876.00
Item 13.6 Supplying, fitting and placing HYSD including OH & CP for sub-structure tonne 70,293.00
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
1.1 Loading and unloading of stone boulder / stone aggregates /
sand / kanker / moorum.
Placing tipper at loading point, loading with front end loader,
dumping, turning for return trip, excluding time for haulage
and return trip
Unit : cum
Taking output = 5.5 cum
Time required for
i) Positioning of tipper at loading point 1 Min
ii) Loading by front end loader 1 cum bucket capacity @ 13 Min
25 cum per hour
iii) Maneuvering, reversing, dumping and turning for 2 Min
return
iv) Waiting time, unforeseen contingencies etc 4 Min
Total 20 Min
a) Machinery
Tipper 5.5 tonnes capacity hour 0.330 1649.00 544.17 P&M-048
Front end-loader 1 cum bucket capacity @ 25 cum/hour hour 0.330 1717.00 566.61 P&M-017
1.4(III) Case III Katcha Track and Track in river bed / nallah bed and choe
bed.
Speed with load : 10 km / hour
Speed while returning empty : 15 km / hour
a) Machinery
I) Tipper 10 tonnes capacity
Time taken for onward haulage hour 1.000 1649.00 1649.00 P&M-048
Time taken for empty return trip hour 0.670 1649.00 1104.83 P&M-048
b) Overheads @ 12 % on (a) 330.46
c) Contractors profit @ 10 % on (a+b) 308.43
Cost for 100 t .km = a+b+c 3392.72
Rate per t.Km = (a+b+c)/100 33.93
say 33.90
8.3 801 Printing new letter and figures of any shade
Printing new letter and figures of any shade with synthetic
enamel paint black or any other approved colour to give an
even shade
ii) English and Roman
Hyphens and the like not to be measured and paid for
Detail for 100 letters of 16 cm height. i.e.1600 cm
Unit = per cm height per letter
a) Labour
Mate day 0.07 390 27.30
Painter Ist class day 1.25 430 537.50
Mazdoor day 0.50 350 175.00
b) Material
Paint Litre 0.50 190 95.00
c) Overheads @ 12 % on (a+b) 100.18
d) Contractors profit @ 10 % on (a+b+c) 93.50
Cost for 1600 cm = a+b+c+d 1028.47
Rate per cm height per letter = (a+b+c +d)/1600 0.64
say 0.60
8.8 803 Painting Two Coats on New Concrete Surfaces
Painting two coats after filling the surface with synthetic
enamel paint in all shades on new plastered concrete
surfaces
Unit = sqm
Taking output = 40 sqm
a) Labour
Mate day 0.12 390 46.80
Painter day 2.00 430 860.00
Mazdoor day 1.00 350 350.00
b) Material
Paint conforming to requirement of clause 803.3. Litre 6.00 190 1140.00
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
Unit = 1 cum
Taking output = 1 cum
a) Materials
Cement MT 0.51 6756.40 3445.76
Sand cum 1.05 5172.60 5431.23
b) Labour
Mate day 0.04 390.00 15.60
Mazdoor day 0.90 350.00 315.00
Total Material and Labour = (a+b) 9208.00
Unit = 1 cum
Taking output = 1 cum
a) Materials
Cement MT 0.67 6756.40 4540.30
Sand cum 0.93 5172.60 4827.76
b) Labour
Mate day 0.04 390.00 15.60
Mazdoor day 0.90 350.00 315.00
Total Material and Labour = (a+b) 9699.00
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
Unit = 1 cum
Taking output = 1 cum
a) Materials
Cement MT 0.29 6756.40 1945.84
Sand cum 1.20 5172.60 6207.12
b) Labour
Mate day 0.04 390.00 15.60
Mazdoor day 0.90 350.00 315.00
Total Material and Labour = (a+b) 8484.00
12.8 1500, 1700 Plain/Reinforced cement concrete in open foundation
& 2100 complete as per drawing and technical specifications
Unit : cum
Taking Output = 120 cum
a) Material
Cement MT 41.66 6756.40 281471.62
Coarse Sand cum 54.00 5172.60 279320.40
20 mm Aggregate cum 64.80 3904.00 252979.20
10 mm Aggregate cum 43.20 3594.00 155260.80
b) Labour
Mate day 0.84 390.00 327.60
Mason day 3.00 500.00 1500.00
Mazdoor day 18.00 350.00 6300.00
c) Machinery
Batching Plant @ 20 cum/hour hour 6.00 651.50 3909.00
Generator 100 KVA hour 6.00 1944.00 11664.00
Loader 1 cum capacity hour 6.00 1717.00 10302.00
Transit Mixer 4 cum capacity for lead upto 1 km. hour 15.00 12.77 191.55
Lead beyond 1 km, L-lead in km T-km 300L 12.77 61296.00 L= 16
Concrete Pump hour 6 1278.00 7668.00
Per Cum Basic Cost of Labour, Material & Mechinery (a+b+c) 8,935.00
d) Formwork @ 4% on cost of concrete i.e.cost of material, 42887.61
labour and machinery
e) Overheads @ 0.21 on (a+b+c+d) 234166.33
f) Contractors profit @ 10 % on (a+b+c+d+e) 134924.41
Cost for 120 cum = a+b+c+d+e+f 1484168.53
Rate per cum = ( a+b+c+d+e+f )/120 12368.07
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
say 12368.00
12.8 D PCC Grade M25
Unit = cum
Case I Using concrete Mixer
Taking output = 15 cum
a) Material
Cement MT 5.99 6756.40 40470.84
Coarse sand cum 6.75 5172.60 34915.05
40 mm Aggregate cum 5.40 3384.00 18273.60
20 mm Aggregate cum 5.40 3904.00 21081.60
10 mm Aggregate cum 2.70 3594.00 9703.80
b) Labour
Mate day 0.86 390.00 335.40
Mason day 1.50 500.00 750.00
Mazdoor day 20.00 350.00 7000.00
c) Machinery
Concrete mixer (cap. 0.40/0.28 cum) hour 6.00 487.00 2922.00
Generator 33 KVA hour 6.00 718.00 4308.00
Per Cum Basic Cost of Labour, Material & Mechinery (a+b+c) 9,318.00
Case II With Batching Plant, Transit Mixer and Conrete Pump
Unit : cum
Taking Output = 120 cum
a) Material
Cement MT 47.95 6756.40 323969.38
Coarse sand cum 54.00 5172.60 279320.40
40 mm Aggregate cum 43.20 3384.00 146188.80
20 mm Aggregate cum 43.20 3904.00 168652.80
10 mm Aggregate cum 21.60 3594.00 77630.40
b) Labour
Mate day 0.84 390.00 327.60
Mason day 3.00 500.00 1500.00
Mazdoor day 18.00 350.00 6300.00
c) Machinery
Batching Plant @ 20 cum/hour hour 6.00 651.50 3909.00
Generator 100 KVA hour 6.00 1944.00 11664.00
Loader 1 cum capacity hour 6.00 1717.00 10302.00
Transit Mixer 4 cum capacity for lead upto 1 km. hour 15.00 12.77 191.55
Transit Mixer 4 cum capacity lead beyond T-Km 300L 12.77 61296.00 L= 16
1 Km, L - lead in Kilometer
Concrete Pump hour 6 1278.00 7668.00
Per Cum Basic Cost of Labour, Material & Mechinery (a+b+c) 9,158.00
d) Formwork @ 3.75% of cost of concrete i.e.cost of material, 41209.50
labour and machinery
e) Overheads @ 0.21 on (a+b+c+d) 239427.18
f) Contractors profit @ 10 % on (a+b+c+d+e) 137955.66
cost of 120 cum = a+b+c+d+e+f 1517512.27
Rate per cum (a+b+c+d+e+f)/120 12645.94
say 12646.00
12.8 E RCC Grade M25
Unit = cum
Case I Using concrete Mixer
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
Taking output = 15 cum
a) Material
Cement MT 6.05 6756.40 40876.22
Coarse sand cum 6.75 5172.60 34915.05
20 mm Aggregate cum 8.10 3904.00 31622.40
10 mm Aggregate cum 5.40 3594.00 19407.60
b) Labour
Mate day 0.86 390.00 335.40
Mason day 1.50 500.00 750.00
Mazdoor day 20.00 350.00 7000.00
c) Machinery
Concrete mixer (cap. 0.40/0.28 cum) hour 6.00 487.00 2922.00
Generator 33 KVA hour 6.00 718.00 4308.00
Per Cum Basic Cost of Labour, Material & Mechinery (a+b+c) 9,476.00
Case II With Batching Plant, Transit Mixer and Conrete Pump
Unit : cum
Taking Output = 120 cum
a) Material
Cement MT 48.38 6756.40 326874.63
Coarse sand cum 54.00 5172.60 279320.40
20 mm Aggregate cum 64.80 3904.00 252979.20
10 mm Aggregate cum 43.20 3594.00 155260.80
Admixer Kg 193.52 72.00 13933.44
b) Labour
Mate day 0.84 390.00 327.60
Mason day 3.00 500.00 1500.00
Mazdoor day 18.00 350.00 6300.00
c) Machinery
Batching Plant @ 20 cum/hour hour 6.00 651.50 3909.00
Generator 100 KVA hour 6.00 1944.00 11664.00
Loader 1 cum capacity 1 cum hour 6.00 1717.00 10302.00
Transit Mixer 4 cum capacity for lead upto 1 km. hour 15.00 12.77 191.55
Transit Mixer 4 cum capacity lead beyond T-Km 300L 12.77 61296.00 L= 16
1 Km, L - lead in Kilometer
Concrete Pump hour 6.00 1278.00 7668.00
Per Cum Basic Cost of Labour, Material & Mechinery (a+b+c) 9,430.00
12.8 F PCC Grade M30
Unit = cum
Case I Using Concrete Mixer
Taking output = 15 cum
a) Material
Cement MT 6.08 6756.40 41078.91
Coarse sand cum 6.75 5172.60 34915.05
40 mm Aggregate cum 5.40 3384.00 18273.60
20 mm Aggregate cum 5.40 3904.00 21081.60
10 mm Aggregate cum 2.70 3594.00 9703.80
b) Labour
Mate day 0.86 390.00 335.40
Mason day 1.50 500.00 750.00
Mazdoor day 20.00 350.00 7000.00
c) Machinery
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
Concrete mixer (cap. 0.40/0.28 cum) hour 6.00 487.00 2922.00
Generator 33 KVA hour 6.00 718.00 4308.00
Per Cum Basic Cost of Labour, Material & Mechinery (a+b+c) 9,358.00
Case II Using Batching Plant, Transit Mixer and Conrete Pump
Unit : cum
Taking Output = 120 cum
a) Material
Cement MT 48.60 6756.40 328361.04
Coarse sand cum 54.00 5172.60 279320.40
40 mm Aggregate cum 43.20 3384.00 146188.80
20 mm Aggregate cum 43.20 3904.00 168652.80
10 mm Aggregate cum 21.60 3594.00 77630.40
b) Labour
Mate day 0.84 390.00 327.60
Mason day 3.00 500.00 1500.00
Mazdoor day 18.00 350.00 6300.00
c) Machinery
Batching Plant @ 20 cum/hour hour 6.00 651.50 3909.00
Generator 100 KVA hour 6.00 1944.00 11664.00
Loader 1 cum capacity hour 6.00 1717.00 10302.00
Transit Mixer 4 cum capacity for lead upto 1 km. hour 15.00 12.77 191.55
Transit Mixer 4 cum capacity lead beyond T-Km 300L 12.77 61296.00 L= 16
1 Km, L - lead in Kilometer
Concrete Pump hour 6.00 1278.00 7668.00
Per Cum Basic Cost of Labour, Material & Mechinery (a+b+c) 9,195.00
12.8 G RCC Grade M30
Case I Using Concrete Mixer
Unit = cum
Taking output = 15 cum
a) Material
Cement MT 6.10 6756.40 41214.04
Coarse sand cum 6.75 5172.60 34915.05
20 mm Aggregate cum 8.10 3904.00 31622.40
10 mm Aggregate cum 5.40 3594.00 19407.60
b) Labour
Mate day 0.86 390.00 335.40
Mason day 1.50 500.00 750.00
Mazdoor day 20.00 350.00 7000.00
c) Machinery
Concrete mixer (cap. 0.40/0.28 cum) hour 6.00 487.00 2922.00
Generator 33 KVA hour 6.00 718.00 4308.00
Per Cum Basic Cost of Labour, Material & Mechinery (a+b+c) 9,499.00
Case II Using Batching Plant, Transit Mixer and Conrete Pump
Unit = cum
Taking output = 120 cum
a) Material
Cement MT 48.80 6756.40 329712.32
Coarse sand cum 54.00 5172.60 279320.40
20 mm Aggregate cum 64.80 3904.00 252979.20
10 mm Aggregate cum 43.20 3594.00 155260.80
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
b) Labour
Mate day 0.84 390.00 327.60
Mason day 3.00 500.00 1500.00
Mazdoor day 18.00 350.00 6300.00
c) Machinery
Batching Plant @ 20 cum/hour hour 6.00 651.50 3909.00
Generator 100 KVA hour 6.00 1944.00 11664.00
Loader 1 cum capacity hour 6.00 1717.00 10302.00
Transit Mixer 4 cum capacity for lead upto 1 km. hour 15.00 12.77 191.55
Transit Mixer 4 cum capacity lead beyond T-Km 300L 12.77 61296.00 L= 16
1 Km, L - lead in Kilometer
Concrete Pump hour 6.00 1278.00 7668.00
Per Cum Basic Cost of Labour, Material & Mechinery (a+b+c) 9,337.00
12.8 H RCC Grade M35
Case I Using Concrete Mixer
Unit = cum
Taking output = 15 cum
a) Material
Cement MT 6.33 6756.40 42768.01
Coarse sand cum 6.75 5172.60 34915.05
20 mm Aggregate cum 8.10 3904.00 31622.40
10 mm Aggregate cum 5.40 3594.00 19407.60
b) Labour
Mate day 0.86 390.00 335.40
Mason day 1.50 500.00 750.00
Mazdoor day 20.00 350.00 7000.00
c) Machinery
Concrete mixer (cap. 0.40/0.28 cum) hour 6.00 487.00 2922.00
Generator 33 KVA hour 6.00 718.00 4308.00
Per Cum Basic Cost of Labour, Material & Mechinery (a+b+c) 9,602.00
Case II Using Batching Plant, Transit Mixer and Conrete Pump
Unit ; cum
Taking Output = 120 cum
a) Material
Cement MT 50.64 6756.40 342144.10
Coarse sand cum 54.00 5172.60 279320.40
20 mm Aggregate cum 64.80 3904.00 252979.20
10 mm Aggregate cum 43.20 3594.00 155260.80
Admixer Kg 202.56 72.00 14584.32
b) Labour
Mate day 0.84 390.00 327.60
Mason day 3.00 500.00 1500.00
Mazdoor day 18.00 350.00 6300.00
c) Machinery
Batching Plant @ 20 cum/hour hour 6.00 651.50 3909.00
Generator 100 KVA hour 6.00 1944.00 11664.00
Loader 1 cum capacity hour 6.00 1717.00 10302.00
Transit Mixer 4 cum capacity for lead upto 1 km. hour 15.00 12.77 191.55
Transit Mixer 4 cum capacity lead beyond T-Km 300L 12.77 61296.00 L= 16
1 Km, L - lead in Kilometer
Concrete Pump hour 6.00 1278.00 7668.00
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
Per Cum Basic Cost of Labour, Material & Mechinery (a+b+c) 9,563.00
d) Formwork @ 3% on cost of concrete i.e.cost of material, 34423.41
labour and machinery
e) Overheads @ 0.21 on (a+b+c+d) 248192.78
f) Contractors profit @ 10 % on (a+b+c+d+e) 143006.32
cost of 120 cum = a+b+c+d+e+f 1573069.47
Rate per cum (a+b+c+d+e+f)/120 13108.91
say 13109.00
Rate per cum (a+b+c+d)/120 Excluding OH & CP 9849.00
Note: Where ever concrete is carried out using batching plant,
transit mixer, concrete pump, admixers @ 0.4% of weight of
cement may be added for achieving desired slump of
concrete.
C Bottom Plug
Concrete to be placed using tremie pipe
Case I Using Concrete Mixer
(i) PCC Grade M20
Unit = cum
Taking output = 15 cum
a) Material
Cement MT 5.55 6756.40 37498.02
Coarse sand cum 6.75 5172.60 34915.05
40 mm Aggregate cum 5.40 3384.00 18273.60
20 mm Aggregate cum 5.40 3904.00 21081.60
10 mm Aggregate cum 2.70 3594.00 9703.80
Admixer Kg 18.60 72.00 1339.20
b) Labour
Mate day 0.90 390.00 351.00
Mason day 1.50 500.00 750.00
Mazdoor day 20.00 350.00 7000.00
c) Machinery
Concrete mixer (cap. 0.40/0.28 cum) hour 6.00 487.00 2922.00
Generator 33 KVA hour 6.00 718.00 4308.00
Light Crane 3 tonnes capacity for handling tremie pipe hour 6.00 1032.00 6192.00
Per Cum Basic Cost of Labour, Material & Mechinery (a+b+c) 9623.00
Note 10% extra cement may be added where under water
concreting is involved.
Case II Using Batching Plant, Transit Mixer and Crane/concrete
pump
Unit ; cum
Taking Output = 120 cum
a) Material
Cement MT 44.40 6756.40 299984.16
Coarse sand cum 54.00 5172.60 279320.40
20 mm Aggregate cum 64.80 3904.00 252979.20
10 mm Aggregate cum 43.20 3594.00 155260.80
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
Admixer Kg 148.80 72.00 10713.60
b) Labour
Mate day 0.88 390.00 343.20
Mason day 3.00 500.00 1500.00
Mazdoor day 18.00 350.00 6300.00
c) Machinery
Batching Plant @ 20 cum/hour hour 6.00 751.63 4509.75
Generator 100 KVA hour 6.00 1944.00 11664.00
Loader 1 cum capacity hour 6.00 1717.00 10302.00
Transit Mixer 4 cum capacity for lead upto 1 km. hour 15.00 12.77 191.55
Transit Mixer 4 cum capacity, lead beyond 1 Km, L - T-Km 300L 12.77 61296.00 L= 16
lead in Kilometer
Concrete Pump hour 6.00 1278.00 7668.00
Per Cum Basic Cost of Labour, Material & Mechinery (a+b+c) 9184.00
Per Cum Basic Cost of Labour, Material & Mechinery (a+b+c) 9835.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete
pump
Unit = cum
Taking output = 120 cum
a) Material
Cement MT 47.88 6756.40 323496.43
Coarse sand cum 54.00 5172.60 279320.40
20 mm Aggregate cum 64.80 3904.00 252979.20
10 mm Aggregate cum 43.20 3594.00 155260.80
Admixer Kg 172.80 72.00 12441.60
b) Labour
Mate day 0.88 390.00 343.20
Mason day 3.00 500.00 1500.00
Mazdoor day 18.00 350.00 6300.00
c) Machinery
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
Batching Plant @ 20 cum/hour hour 6.00 651.50 3909.00
Generator 100 KVA hour 6.00 1944.00 11664.00
Loader 1 cum capacity hour 6.00 1717.00 10302.00
Transit Mixer 4 cum capacity for lead upto 1 km. hour 15.00 12.77 191.55
Transit Mixer 4 cum capacity, lead beyond 1 Km, L - T-Km 300L 12.77 61296.00 L= 16
lead in Kilometer
Concrete Pump hour 6.00 1278.00 7668.00
Per Cum Basic Cost of Labour, Material & Mechinery (a+b+c) 9389.00
Add 5% of cost of material and labour towards cost of 51582.08
forming sump, protective bunds, chiselling and making
arrangements for under water concreteing with tremie pipe..
Per Cum Basic Cost of Labour, Material & Mechinery (a+b+c) 9876.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete
pump
Unit = cum
Taking output = 120 cum
a) Material
Cement MT 48.64 6756.40 328631.30
Coarse sand cum 54.00 5172.60 279320.40
20 mm Aggregate cum 64.80 3904.00 252979.20
10 mm Aggregate cum 43.20 3594.00 155260.80
Admixer Kg 172.80 72.00 12441.60
b) Labour
Mate day 0.88 390.00 343.20
Mason day 3.00 500.00 1500.00
Mazdoor day 18.00 350.00 6300.00
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
c) Machinery
Batching Plant @ 20 cum/hour hour 6.00 651.50 3909.00
Generator 100 KVA hour 6.00 1944.00 11664.00
Loader 1 cum capacity hour 6.00 1717.00 10302.00
Transit Mixer 4 cum capacity for lead upto 1 km. hour 15.00 12.77 191.55
Transit Mixer 4 cum capacity, lead beyond 1 Km, L - T-Km 300L 12.77 61296.00 L= 16
lead in Kilometer
Concrete Pump hour 6.00 1278.00 7668.00
Per Cum Basic Cost of Labour, Material & Mechinery (a+b+c) 9432.00
(iv) PCC Grade M35
Unit = cum
Taking output = 120 cum
a) Material
Cement MT 50.64 6756.40 342144.10
Coarse sand cum 54.00 5172.60 279320.40
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
20 mm Aggregate cum 64.80 3904.00 252979.20
10 mm Aggregate cum 43.20 3594.00 155260.80
b) Labour
Mate day 0.84 390.00 327.60
Mason day 3.00 500.00 1500.00
Mazdoor day 18.00 350.00 6300.00
c) Machinery
Batching Plant @ 20 cum/hour hour 6.00 651.50 3909.00
Generator 100 KVA hour 6.00 1944.00 11664.00
Loader(capacity 1 cum) hour 6.00 1717.00 10302.00
Transit Mixer ( capacity 4.0 cu.m )
Transit Mixer 4 cum capacity for lead upto 1 km. hour 15.00 12.77 191.55
Lead beyond 1 Km, L - lead in Kilometer T-Km 300L 12.77 61296.00 L= 16
Concrete Pump hour 6.00 1278.00 7668.00
Formwork @ 3% of (a+b+c) 33985.88
d) Overheads @ 0.21 on (a+b+c) 245038.19
e) Contractors profit @ 10 % on (a+b+c+d) 141188.67
cost of 120 cum = a+b+c+d+e 1553075.39
Rate per cum (a+b+c+d+e)/120 12942.29
Say 12942.00
Note Where ever concrete is carried out using batching plant,
transit mixer, concrete pump, admixers @ 0.4% of weight of
cement may be added for achieving desired slump of
concrete.
B Mechanical Means
(i) Depth upto 3 m
Unit = cum
Taking output = 300 cum
a) Labour
Mate day 0.32 390 124.80
Mazdoor day 8.00 350 2800.00
b) Machinery
Hydraulic excavator 1.0 cum bucket capacity hour 6.00 2689 16134.00
c) Overheads @ 12 % on (a+b) 2287.06
d) Contractors profit @ 10 % on (a+b+c) 2134.59
Cost for 300 cum = a+b+c+d 23480.44
Rate per cum = (a+b+c+d)/300 78.27
say 78.00
Note Cost of dewatering upto 5% of (a+b) may be added, where
required. Assessment for dewatering shall be made as per
site conditions..
Unit = cum
Taking output = 120 cum
a) Material
Cement MT 47.95 6756.40 323969.38
Coarse sand cum 54.20 5172.60 280354.92
20 mm Aggregate cum 64.80 3904.00 252979.20
10 mm Aggregate cum 43.20 3594.00 155260.80
b) Labour
Mate day 0.84 390.00 327.60
Mason day 3.00 500.00 1500.00
Mazdoor day 18.00 350.00 6300.00
c) Machinery
Batching Plant @ 20 cum/hour hour 6.00 751.63 4509.75
Generator 100 KVA hour 6.00 1944.00 11664.00
Loader hour 6.00 1717.00 10302.00
Transit Mixer ( capacity 4.0 cu.m )
Transit Mixer 4 cum capacity lead upto 1 Km hour 15.00 12.77 191.55
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
Lead beyond 1 Km, L - lead in Kilometer T-Km 300L 12.77 61296.00 L= 16
Concrete Pump hour 6.00 1278.00 7668.00
Basic Cost of Labour, Material & Mechinery (a+b+c) for 120 cum 1116324.00
For formwork and staging add the following:
(i) For solid slab super-structure, 20-30% of (a+b+c)
(p) Height upto 5m
Basic Cost of Labour, Material & Mechinery (a+b+c) for 1116324.00
120 cum
d) Formwork and staging 20 % of (a+b+c) 20.00 223264.80
e) Overheads @ 0.21 on (a+b+c+d) 281313.65
f) Contractors profit @ 10 % on (a+b+c+d+e) 162090.24
Cost for 15 cum= a+b+c+d+e+f 1782992.69
Rate per cum (a+b+c+d+e+f)/120 14858.27
say 14858.00
C RCC Grade M 30
Unit = cum
Taking output = 120 cum
a) Material
Cement MT 48.79 6756.40 329644.76
Coarse sand cum 54.60 5172.60 282423.96
20 mm Aggregate cum 64.80 3904.00 252979.20
10 mm Aggregate cum 43.20 3594.00 155260.80
b) Labour
Mate day 0.88 390.00 343.20
Mason day 3.00 500.00 1500.00
Mazdoor day 19.00 350.00 6650.00
c) Machinery
Batching Plant @ 20 cum/hour hour 6.00 651.50 3909.00
Generator 100 KVA hour 6.00 1944.00 11664.00
Loader hour 6.00 1717.00 10302.00
Transit Mixer ( capacity 4.0 cu.m )
Transit Mixer 4 cum capacity lead upto 1 Km hour 15.00 12.77 191.55
Lead beyond 1 Km, L - lead in Kilometer T-Km 300L 12.77 61296.00 L= 16
Concrete Pump hour 6.00 1278.00 7668.00
Basic Cost of Labour, Material & Mechinery (a+b+c) for 120 cum 1123833.00
For formwork and staging add the following:
Unit = cum
Taking output = 120 cum
a) Material
Cement MT 51.60 6756.40 348630.24
Coarse sand cum 54.00 5172.60 279320.40
20 mm Aggregate cum 64.80 3904.00 252979.20
10 mm Aggregate cum 43.20 3594.00 155260.80
Admixture @ 0.4% of cement kg 206.40 72.00 14860.80
Admixer Kg 216.00 72.00 15552.00
b) Labour
Mate day 0.94 390.00 366.60
Mason day 3.50 500.00 1750.00
Mazdoor day 20.00 350.00 7000.00
c) Machinery
Batching Plant @ 20 cum/hour hour 6.00 751.63 4509.75
Generator 100 KVA hour 6.00 1944.00 11664.00
Loader hour 6.00 1717.00 10302.00
Transit Mixer ( capacity 4.0 cu.m )
Transit Mixer 4 cum capacity lead upto 1 Km hour 15.00 12.77 191.55
Lead beyond 1 Km, L - lead in Kilometer T-Km 300L 12.77 61296.00 L= 16
Concrete Pump hour 6.00 1278.00 7668.00
Basic Cost of Labour, Material & Mechinery (a+b+c) for 120 cum 1171352.00
For formwork and staging add the following:
(i) For solid slab super-structure, 18-28% of (a+b+c)
(p) Height upto 5m
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
Basic Cost of Labour, Material & Mechinery (a+b+c) for 1171352.00
120 cum
d) Formwork and staging 18 % of (a+b+c) 18.00 210843.36
e) Overheads @ 0.21 on (a+b+c+d) 290261.03
f) Contractors profit @ 10 % on (a+b+c+d+e) 167245.64
Cost for 15 cum= a+b+c+d+e+f 1839702.02
Rate per cum (a+b+c+d+e+f)/120 15330.85
say 15331.00
Note 1.Where ever concrete is carried out using batching plant,
transit mixer, concrete pump, admixers conforming IS: 9103
@ 0.4% of weight of cement may be added for achieving
desired slump of concrete.
Crushing of stone aggregates 13.2 mm nominal size. (Crushing of stone boulders of 150 mm size in an integrated stone
1.6 crushing unit of 200 tonnes per hour capacity comprising of primary and secondary crushing units, belt conveyor and cum #NAME?
vibrating screens to obtain stone aggregates of 13 mm nominal size.)
Crushing of stone aggregates 20 mm nominal size (Crushing of stone boulders of 150 mm size in an integrated stone
1.7 crushing unit of 200 tonnes per hour capacity comprising of primary and secondary crushing units, belt conveyor and cum #NAME?
vibrating screens to obtain stone aggregates of 20 mm nominal size.)
Crushing of stone aggregates 40 mm nominal size (Crushing of stone boulders of 150 mm size in an integrated stone
1.8 crushing unit of 200 tonnes per hour capacity comprising of primary and secondary crushing units, belt conveyor and cum #NAME?
vibrating screens to obtain stone aggregates of 40 mm nominal size.)
CHAPTER-2
SITE CLEARANCE
Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches
2.1 and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in
the depression/pit.)
In mud mortar
B 1000 numbers 563.00
Dismantling Guard Rails (Dismantling guard rails by manual means and disposal of dismantled material with all lifts and up to
2.7 a lead of 1000 metres, stacking serviceable materials and unserviceable materials separately.) metre 121.00
Dismantling Kerb Stone (Dismantling kerb stone by manual means and disposal of dismantled material with all lifts and up to
2.8 a lead of 1000 metre) metre 28.00
Dismantling Kerb Stone channel (Dismantling kerb stone channel by manual means and disposal of dismantled material with
2.9 all lifts and up to a lead of 1000 metre) metre 43.00
Dismantling Kilometre Stone (Dismantling of kilometre stone including cutting of earth, foundation and disposal of dismantled
2.10 material with all lifts and lead upto 1000 m and back filling of pit.)
A 5th KM stone each 547.00
B Ordinary KM Stone each 333.00
C Hectometre Stone each 67.00
Dismantling of Fencing (Dismantling of barbed wire fencing/ wire mesh fencing including posts, foundation concrete, back
2.11 filling of pit by manual means including disposal of dismantled material with all lifts and up to a lead of 1000 metres, stacking metre 63.00
serviceable material and unserviceable material separately. )
Dismantling of CI Water Pipe Line (Dismantling of CI water pipe line 600 mm dia including disposal with all lifts and lead upto
2.12 1000 metres and stacking of serviceable material and unserviceable material separately under supervision of concerned metre 170.00
department)
Removal of Cement Concrete Pipe of Sewer Gutter (Removal of cement concrete pipe of sewer gutter 1500 mm dia under
the supervision of concerned department including disposal with all lifts and up to a lead of 1000 metres and stacking of
2.13 serviceable and unserviceable material separately but excluding earth excavation and dismantling of masonry works.) metre 166.00
CHAPTER-3
EARTH WORK, EROSION CONTROL AND DRAINAGE
Excavation in Soil by Manual Means. (Excavation for roadway in soil using manual means including loading in truck for
3.1 carrying of cut earth to embankment site with all lifts and lead upto1000 metres.) cum 180.00
Excavation in ordinary rock by manual means (Excavation in ordinary rock using manual means including loading in a truck
3.2 and carrying of excavated material to embankment site with in all lifts and leads upto 1000 metres ) cum 274.00
Excavation in Soil with Dozer with lead upto 100 metres (Excavation for road way in soil by mechanical means including
3.3 cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including cum 142.00
trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.)
Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a
dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres ( average lead
3.4 50 metres ), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections.) cum 241.00
Excavation in Hard Rock (requiring blasting) with disposal upto 1000 metres (Excavation for roadway in hard rock (requiring
blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines,
3.5 grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres ) cum #NAME?
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in
soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side
3.6 slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location cum 148.00
within all lifts and lead upto 1000m)
Excavation in Ordinary Rockusing Hydraulic ExcavatorCK-90 and Tippers with disposal upto 1000 metres. (Excavation for
roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers,
3.7 transporting to embankment site within all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance with cum 180.00
requirements of lines, grades and cross sections.)
Excavation in Hard Rock (blasting prohibited) (Excavation for roadway in hard rock (blasting prohibited) with rock breakers
3.8 including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side
slopes in accordance with requirements of lines, grades and cross sections.)
Excavation in Marshy Soil (Excavation for roadway in marshy soil with hydraulic excavator 0.9 cum bucket capacity including
3.10 cutting and loading in tippers and disposal with in all lifts and lead upto 1000 metres, trimming of bottom and side slopes in cum 162.00
accordance with requirements of lines, grades and cross sections.)
Removal of Unserviceable Soil with Disposal upto 1000 metres (Removal of unserviceable soil including excavation, loading
3.11 and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause cum 150.00
305.)
Pre-splitting of Rock Excavation Slopes (Carrying out excavation in hard rock to achieve a specified slope of the rock face by
controlled use of explosives and blasting accessories in properly aligned and spaced drill holes, collection of the excavated
3.12 rock by a 80 HP dozer, loading in tipper by a front end loader and disposing of the material with all lifts and lead upto 1000 m, sqm 137.00
all as specified in clause No. 303)
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,
including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides
3.13 and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.)
Scarifying existing bituminous surface to a depth of 50 mm by mechanical means (Scarifying the existing bituminous road
3.15 surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres.) sqm 11.00
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material
3.16 obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to cum 629.00
meet requirement of table 300-2)
Construction of Embankment with Material Deposited from Roadway Cutting (Construction of embankment with approved
3.17 materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and cum 168.00
compacted to meet requirement of table 300-2)
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material
3.18 obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to cum 375.00
meet requirement of table No. 300-2)
Stripping, storing and re-laying top soil from borrow areas in agriculture fields. (Stripping of top soil from borrow areas located
3.21 in agriculture fields, storing at a suitable place, spreading and re-laying after taking the borrow earth to maintain fertility of the cum 85.00
agricultural field, finishing it to the required levels and satisfaction of the farmer.)
Turfing with Sods (Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or
3.22 other locations shown on the drawing or as directed by the engineer including preparation of ground, fetching of rods and sqm 56.00
watering)
Seeding and Mulching (Preparation of seed bed on previously laid top soil, furnishing and placing of seeds, fertilizer,
3.23 mulching material, applying bituminous emulsion at the rate of0.23 litres per sqm and laying and fixing jute netting, including sqm #NAME?
watering for 3 months all as per clause 308)
Surface Drains in Soil (Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified
3.24 lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in
embankment within a lead of50 metres (average lead 25 metres))
Aggregate Sub- Surface Drains (Construction of aggregate sub surface drain 300 mm x 450 mm with aggregates conforming
3.28 to table 300-4, excavated material to be utilised in roadway ) metre 715.00
Underground Drain at Edge of Pavement (Construction of an underground drain 1 m x 1 m (inside dimensions) lined with
3.29 RCC-20 cm thick and covered with RCC slab10 cm in thickness on urban roads) metre 6239.00
Construction of Rock fill Embankment (Construction of rock fill embankment with broken hard rock fragments of size not
3.31 exceeding 300 mm laid in layers not exceeding 500 mm thick including filling of surface voids with stone spalls, blinding top cum 83.00
layer with granular material, rolled with vibratory road roller, all complete as per clause 313)
Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting
3.32 and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) cum 248.00
Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary
3.33 rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with cum 337.00
all lift and lead upto 1000 metres )
Excavation in Hilly Areas in Hard Rock Requiring Blasting (Excavation in hilly areas in hard rock requiring blasting, by
3.34 mechanical means including trimming of slopes and disposal of cut material with all lifts and lead upto 1000 metres.) cum 413.00
Work in Urban Roads (The cost of earth work in urban roads inhabited area will be comparatively higher due to following
3.35 reasons:)
Embankment Construction with Fly ash/Pond ash available from coal or lignite burning Thermal Plants as waste material.
(Construction of embankment with fly ash conforming to table 1 of IRC: SP: 58 - 2001 obtained from coal or lignite burning
3.36 thermal power stations as waste material, spread and compacted in layer of 200mm thickness each at OMC, all as specified cum 660.00
in IRC: SP: 58-2001 and as per approved plans.)
CHAPTER-4
SUB-BASES, BASES ( NON- BITUMINOUS) AND SHOULDERS
4.1 Granular Sub-base with Close Graded Material (Table:- 400-1)
Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at
A OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and
compacting with vibratory power roller to achieve the desired density, complete as per clause 401 )
Cement Treated Soil Sub Base/ Base (Providing, laying and spreading soil on a prepared sub grade, pulverising, adding the
designed quantity of cement to the spread soil, mixing in place with rotavator, grading with the motor grader and compacting
4.5 with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base.) cum 955.00
Inverted Choke (Construction of inverted choke by providing, laying, spreading and compacting screening B type/ coarse
4.8 sand of specified grade in uniform layer on a prepared surface with motor grader and compacting with power roller etc) cum 7794.00
Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound
macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in
4.9 stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the
interstices of coarse aggregate, watering and compacting to the required density.)
A By Manual Means
(i) Grading- I (Using Screening Crushable type such as Moorum or Gravel)
(a) Using Screening Crushable type such as Moorum or Gravel cum #NAME?
(b) Using Screening Type-A (13.2mm Agg.) cum #NAME?
(ii) Grading- II (Using Screening Crushable type such as Moorum or Gravel)
(a) Using Screening Crushable type such as Moorum or Gravel cum #NAME?
(b) Using Screening Type-A (13.2mm Agg.) cum #NAME?
(c) Using Screening Type-B (11.2mm Agg.) cum #NAME?
(iii) Grading- III (Using Screening Crushable type such as Moorum or Gravel)
(a) Using Screening Crushable type such as Moorum or Gravel cum #NAME?
(b) Using Screening Type-B (11.2mm Agg.) cum #NAME?
B By Mechanical Means:
(i) Grading- I (Using Screening Crushable type such as Moorum or Gravel)
(a) Using Screening Crushable type such as Moorum or Gravel cum #NAME?
(b) Using Screening Type-A (13.2mm Agg.) cum #NAME?
(ii) Grading- II (Using Screening Crushable type such as Moorum or Gravel)
(a) Using Screening Crushable type such as Moorum or Gravel cum #NAME?
(b) Using Screening Type-A (13.2mm Agg.) cum #NAME?
(c) Using Screening Type-B (11.2mm Agg.) cum #NAME?
(iii) Grading- III (Using Screening Crushable type such as Moorum or Gravel)
(a) Using Screening Crushable type such as Moorum or Gravel cum #NAME?
(b) Using Screening Type-B (11.2mm Agg.) cum #NAME?
Crushed Cement Concrete Sub-base / Base (Breaking and crushing of material obtained by breaking damaged cement
concrete slabs to size range not exceeding 75 mm as specified in table 400.7 transporting the aggregates obtained from
4.10 breaking of cement concrete slabs at a lead of L km., laying and compacting the same as sub base/ base course, cum 491.00
constructed as WBM to clause 404 except the use of screening or binding Material.)
Penetration Coat Over Top Layer of Crushed Cement Concrete Base (Spraying of bitumen over cleaned dry surface of
crushed cement concrete base at the rate of 25 kg per 10 sqm by a bitumen pressure distributor, spreading of key
4.11 aggregates at the rate of 0.13 cum per 10 sqm by a mechanical gritter and rolling the surface as per clause 506.3.8) sqm #NAME?
Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification
including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying
4.12 in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to cum #NAME?
achieve the desired density.)
Construction of Median and Island with Soil Taken from Roadway Cutting (Construction of Median and Island above road
4.13 level with approved material deposited at site from roadway cutting and excavation for drain and foundation of other cum 403.00
structures, spread, graded and compacted as per clause 407)
Construction of Median and Island with Soil Taken from Borrow Areas (Construction of median and Island above road level
4.14 with approved material brought from borrow pits, spread, sloped and compacted as per clause 407) cum 492.00
Crusher Run Macadam Base (Providing crushed stone aggregate, depositing on a prepared surface by hauling vehicles,
4.17 spreading and mixing with a motor grader, watering and compacting with a vibratory roller to clause 410 to form a layer of
sub-base/Base)
CHAPTER-5
BASES AND SURFACE COURSES (BITUMINOUS)
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including
5.1 clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.) sqm #NAME?
Bituminous Macadam (Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average
output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to
5.3 site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per
clauses 501.6 and 501.7 to achieve the desired compaction)
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP
producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous
binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic
5.6 paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and
tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.)
Case - I: Mechanical method using Penetration grade Bitumen and HMP of appropriate capacity not less than 75
(i) tonnes/hour . sqm #NAME?
(ii) Case - II: Open-Graded Premix Surfacing using cationic Bitumen Emulsion sqm #NAME?
Close Graded Premix Surfacing/Mixed Seal Surfacing (Mechanical means using HMP of appropriate capacity not less than
75 tonnes/hour. Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2
mm to 0.09 mm (Type-a) or 13.2 mm to 0.09 mm (Type-b) aggregates using penetration grade bitumen to the required
5.11 line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying sqm #NAME?
and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to required level and grade. )
Seal Coat (Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and
5.12 cross fall using Type A and B seal coats)
(i) Case - I : Type A sqm #NAME?
Case - II : Type B (Providing and laying of premix sand seal coat with HMP of appropriate capacity not less than 75
(ii) tonnes/ hours using crushed stone chipping 6.7 mm size and penetration bitumen of suitable grade.) sqm #NAME?
Supply of Stone Aggregates for Pavement Courses (Supply of stone aggregates from approved sources confirming to the
physical requirement, specified in the respective specified clauses, including royalties, fees rents, collection, transportation,
stacking and testing and measured in cum as per clause 514.5 Competitive market rates to be ascertained. Alternatively,
5.13 rates for stone crushing given in chapter 1may be adopted, if found economical. In case for supply of aggregates at site are cum
not available, nearest crusher site may be ascertained. Loading and un-loading charges and cost of carriage may be added
to these rates to arrive at the cost at site.)
Mastic Asphalt (Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen meeting the
requirements given in table 500-29, prepared by using mastic cooker and laid to required level and slope after cleaning the
surface, including providing antiskid surface with bitumen precoated fine-grained hard stone chipping of 13.2 mm nominal
5.14 size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed sqm #NAME?
into surface when the temperature of surfaces not less than 1000C, protruding 1 mm to 4 mm over mastic surface, all
complete as per clause 515.)
Slurry Seal Providing and laying slurry seal consisting of a mixture of fine aggregates, portland cement filler, bituminous
5.15 emulsion and water on a road surface including cleaning of surface, mixing of slurry seal in a suitable mobile plant, laying and
compacting to provide even riding surface)
(i) Using bitumen emulsion and 9.5 mm or 13.2 mm nominal size aggregate cum #NAME?
(ii) Using bitumen emulsion and 19 mm or 26.5 mm nominal size aggregate cum #NAME?
(iii) Using cutback bitumen and 9.5 mm or 13.2 mm nominal size aggregate cum #NAME?
(iv) Using cutback bitumen and 19 mm or 26.5 mm nominal size aggregate cum #NAME?
Sand Asphalt Base Course (Providing, laying and rolling sand-asphalt base course composed of sand, mineral filler and
5.19 bituminous binder on a prepared sub-grade or sub-base to the lines, levels, grades and cross sections as per the drawings cum #NAME?
including mixing in a plant of suitable type and capacity, transporting, laying, compacting and finishing.)
Modified Binder (Supply of modified binder produced by mixing bitumen with modifier such as natural rubber or crumb rubber
or any other polymer found compatible with bitumen and which allows properties given in clause 521.3 and IRC: SP: 53
blending of modifier with bitumen to be done either at the refinery or at the site plant capable of producing the modified binder
5.20 to be delivered in drums which shall be agitated in melted condition using suitable device before use to ensure uniform tonne
dispersion.)
Stress Absorbing Membrane (SAM) with crack width 6 mm to 9 mm (Providing and laying of a stress absorbing membrane
over a cracked road surface, with crack width 6 to 9 mm after cleaning with a mechanical broom, using modified binder
complying with clause 521, sprayed at the rate of 11 kg per 10 sqm and spreading 11.2 mm crushed stone aggregates @
(ii) 0.12 cum per 10 sqm, sweeping the surface for uniform spread of aggregates and surface finished to conform to clause sqm #NAME?
902.)
Stress Absorbing Membrane (SAM) crack width above 9 mm and cracked area above 50 % (Providing and laying a single
coat of a stress absorbing membrane over a cracked road surface, with crack width above 9 mm and cracked area above
50 % after cleaning with a mechanical broom, using modified binder complying with clause 521, sprayed at the rate of 15
(iii) kg per 10 sqm and spreading 11.2 mm crushed stone aggregates @ 0.12 cum per 10 sqm, sweeping the surface for sqm #NAME?
uniform spread of aggregates and surface finished to conform to clause 902.)
Case - IV : Bitumen Impregnated Geotextile (Providing and laying a bitumen impregnated geotextile layer after cleaning
(iv) the road surface, geotextile conforming to requirements of clause 704.3, laid over a tack coat with 1.05 kg per sqm of sqm #NAME?
paving grade bitumen 80 - 100 penetration and constructed to the requirement of clause 704.4.5)
Recipe Cold Mix (Providing and laying of premix of crushed stone aggregates and emulsion binder, mixed in a batch type
5.22 cold mixing plant, laid over prepared surface, by paver finisher, rolled with a pneumatic tyred roller initially and finished with a
smooth steel wheel roller, all as per clause 519.3)
Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared
sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse
aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid
with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of
6.2 contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, cum #NAME?
debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing )
Transition section between rigid and flexible pavement (Due to change in the properties of materials and type of construction,
a gradual changeover from rigid pavement to flexible pavement is desirable to avoid any damage at the butting joint. After
provision of an expansion joint in the cement concrete slab, the thickness of slab should be tapered to 10 cm over a length of
6.4 3 m towards the flexible pavement. The deficiency of thickness caused due to tapering of the slab should be made up by the
asphaltic layers.)
Construction of Base/Sub-base of pavement with lean concrete - fly ash. (Construction of Base/sub-base using cement,
sand, fly ash and coarse aggregates proportioned as per table 4 of IRC: 74/1979 and with water content ratio, slump and
compressive strength as defined in the said table, mix prepared in a batching and mixing plant and compacted with a
6.5 vibratory roller 8-10 tonnes capacity within the time limit laid down vide clause 7.6.3 of IRC: 74-1979, construction joints cum #NAME?
properly formed at the end of day's work, cured for 14 days, all as specified in IRC: 74-1979 and as per approved plans.)
Cement - Fly ash concrete pavement. (Construction reinforced-reinforced, dowel jointed, plain cement concrete pavement
over a prepared sub base with 43 grade cement, coarse and fine aggregate conforming to IS 383, maximum size of coarse
aggregate not exceeding 25 mm, replacing cement by fly ash to the extent of 15% and sand by 10%, mixed in a batching and
mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and
6.6 finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, cum #NAME?
separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing
compound, finishing to lines and grades as per drawing )
CHAPTER-7
GEOSYNTHETICS AND REINFORCED EARTH
Sub- Surface Drain with Geotextiles (Construction of sub surface drain 200 mm dia using geotextiles treated with carbon
black with physical properties as given in clause 702.2.3 formed in to a stable network and a planar geocomposite structure,
7.1 joints wrapped with geotextile to prevent ingress of soil, all as per clause 702 and approved drawings including excavation metre 2856.00
and backfilling)
Narrow Filter Sub- Surface Drain (Construction of a narrow filter sub- surface drain consisting of porous or perforated pipe
7.2 laid in narrow trench surrounded by a geotextile filter fabric, with a minimum of 450 mm overlap of fabric and installed as per metre 1342.00
clause 702.3 and 309.3.5 including excavation and backfilling)
Laying Paving Fabric Beneath a Pavement Overlay (Providing and laying paving fabric with physical requirements as per
table 704-2 over a tack coat of paving grade Bitumen 80-100 penetration, laid at the rate of 1 kg per sqm over thoroughly
cleaned and repaired surface to provide a water resistant membrane and crack retarding layer. Paving fabric to be free of
7.3 wrinkling and folding and to be laid before cooling of tack coat, brooming and rolling of surface with pneumatic roller to sqm #NAME?
maximise paving fabric contact with pavement surface)
Laying Boulder Apron in Crates of Synthetic Geogrids (Providing, preparing and laying of geogrid crated apron 1 m x 5 m,
600 mm thick including excavation and backfilling with baffles at 1 metre interval, made with geogrids having characteristics
as per clause 704.2, joining sides with connectors/ring staples, top corners to be tie tensioned, placing of suitable cross
interval ties in layers of 300 mm connecting opposite side with lateral braces and tied with polymer braids to avoid bulging,
constructed as per clause 704.3. filled with stone with minimum size of 200 mm and specific gravity not less than 2.65,
7.4 packed with stone spalls, keyed to the foundation recess in case of sloping ground and laid over a layer of geotextile to cum #NAME?
prevent migration of fines, all as per clause 704 and laid as per clause 2503.3 and approved design.)
Reinforced Earth Retaining Wall (Reinforced earth retaining walls have four main components as under: a) Excavation for
foundation, foundation concrete and cement concrete grooved seating in the foundation for facing elements (facia material).
7.5 b) Facia material and its placement. c) Assembling, joining with facing elements and laying of the reinforcing elements. d)
Earthfill with granular material which is to be retained by the wall.)
Direction and Place Identification signs with size more than 0.9 sqm size board. (Providing and erecting direction and place
identification retro- reflectorised sign asper IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3,
fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75
8.6 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete45 sqm #NAME?
cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)
Overhead Signs (Providing and erecting overhead signs with a corrosion resistant aluminium alloy sheet reflectorised with
high intensity retro-reflective sheeting of encapsulated lense type with vertical and lateral clearance given in clause 802.2
and 802.3 and installed as per clause 802.7 over a designed support system of aluminium alloy or galvanised steel trestles
8.7
and trusses of sections and type as per structural design requirements and approved plans)
Painting on Steel Surfaces (Providing and applying two coats of ready mix paint of approved brand on steel surface after
8.9 through cleaning of surface to give an even shade) sqm 69.00
Painting Lines, Dashes, Arrows etc on Roads in Two Coats on New Work (Painting lines, dashes, arrows etc on roads in two
8.11 coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous surface, including cleaning the
surface of all dirt, dust and other foreign matter, demarcation at site and traffic control )
Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in
8.14 position including painting and printing etc)
(i) 5th kilometre stone (precast) each 6961.00
(ii) Ordinary Kilometer stone (Precast) each 4307.00
(iii) Hectometer stone (Precast) each 1073.00
Road Delineators (Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm
high above ground level, painted black and white in 15 cm wide stripes, fitted with 80 x 100 mm rectangular or 75 mm dia
8.15 circular reflectorised panels at the top, buried or pressed into the ground and confirming toIRC-79 and the drawings.) each 1031.00
Boundary pillar (Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25-1967, fixed in
8.16 position including finishing and lettering but excluding painting) each #NAME?
G.I Barbed wire Fencing 1.2 metre high (Providing and fixing 1.2 metres high GI barbed wire fencing with 1.8 m angle iron
posts 40 mm x 40 mm x 6 mm placed every 3 metres center to center founded in M15 grade cement concrete, 0.6 metre
below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on
8.17 one side only and provided with 9 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples, turn metre 263.00
buckles etc complete as per clause 807 )
G.I Barbed wire Fencing 1.8 metre high (Providing and fixing 1.8 metres high GI barbed wire fencing with 2.4 m angle iron
posts 50 mm x 50 mm x 6 mm placed every 3 metres center to center founded in M15 grade cement concrete, 0.6 metre
below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on
8.18 one side only and provided with 12 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples, metre 436.00
turn buckles etc complete as per clause 807 )
Fencing with welded steel wire Fabric 75 mm x 50 mm (Suggestive) (Providing 1.20 metre high fencing with angle iron posts
50 mm x 50 mm x 6 mm at 3 metre center to center with 0.40 metre embedded in M15 grade cement concrete, corner, end
8.19 and every 10th post to be strutted, provided with welded steel wire fabric of 75 mm x 50 mm mesh or 75 mm x 25 mm mesh metre 664.00
and fixed to iron posts by flat iron 50 x 5 mm and bolts etc. complete in all respects.)
Tubular Steel Railing on Medium Weight steel channel ( ISMC series) 100 mm x 50 mm (Providing, fixing and erecting 50
8.20 mm dia steel pipe railing in 3 rows duly painted on medium weight steel channels (ISMC series) 100 mm x 50 mm, 1.2 metres metre 2944.00
high above ground, 2 m centre to centre, complete as per approved drawings)
Tubular Steel Railing on Precast RCC posts, 1.2 m high above ground level (Providing, fencing and erecting 50 mm dia
8.21 painted steel pipe railing in 3 rows on precast M20 grade RCC vertical posts1.8 metres high (1.2 m above GL) with 3 holes metre 2622.00
50 mm dia for pipe, fixed 2 metres centre to, complete as per approved drawing)
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the
road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement
conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board,
8.22 keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH -
33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer,
all as specified)
Type - B, "THRIE" : Metal Beam Crash Barrier (Providing and erecting a "Thrie" metal beam crash barrier comprising of 3
mm thick corrugated sheet metal beam rail, 85 cm above road/ground level, fixed on ISMC series channel vertical post,
150 x 75 x 5 mm spaced 2 m centre to centre, 2 m high with 1.15 m below ground level, all steel parts and fitments to be
B galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical metre 5412.00
post with a space of channel section 150 x 75 x 5 mm, 546 mm long complete as per clause 810)
Road Traffic Signals electrically operated (Since it is a ready made item commercially produced and erected by specialised
8.24 firm in the electrical and electronic field, rate may be taken based on market enquiry from firms specialised in this field and
ISI certified for the approved design and drawing.)
Flexible Crash Barrier, Wire Rope Safety Barrier (Providing and erecting a wire rope safety barrier with vertical posts of
medium weight RS Joist (ISMB series) 100 mm x 75 mm (11.50 kg/m), 1.50 m long 0.85 m above ground and 0.65 m below
ground level, split at the bottom for better grip, embedded in M 15 grade cement concrete 450 x 450 x 450 mm, 1.50 m
center to center and with 4 horizontal steel wire rope 40 mm dia and anchored at terminal posts 15 m apart. Terminal post to
be embedded in M 15 gradecementconcretefoundation2400 x 450 x 900 mm (depth), strengthened by a strut of RS joist 100
8.25 x 75 mm, 2 m long at 450 inclination and a tie 100 x 8 mm, 1.50 m long at the bottom, all embedded in foundation concrete metre 2240.00
as per approved design and drawing, rate excluding excavation and cement concrete.)
Anti - Glare Screen with 25 mm steel pipe framework fixed with circular and rectangular vans (Providing and erecting an
anti - glare screen with 25 mm dia vertical pipes fabricated and framed in the form of panels of one metre length and 1.75
mtr height fixed with circular vane 250 mm dia at top and rectangular vane 600 x 300 mm at the middle, made out of steel
B sheet of 3 mm thickness, end vertical pipes of the panel made larger for embedding in foundation concrete, applying 2 metre 4445.00
coats of paint on all exposed surfaces, all as per approved design and drawings.)
Anti - Glare Screen with Rectangular Vane of MS sheet (Providing and erecting anti - glare screen with rectangular vanes
of size 750 x 500 mm made from MS sheet, 3 mm thick and fixed on MS angle 50 x 50 x 6 mm at an angle of 450 to the
direction of flow of traffic, 1.5 m center to center, top edge of the screen 1.75 m above ground level, vertical post firmly
C embedded in cement concrete foundation 0.60 m below ground level, applying 2 coats of paint on exposed faces, all metre 932.00
complete as per approved design and drawings)
Street Lighting (Providing and erecting street light mounted on a steel circular hollow pole of standard specifications for street
8.27 lighting, 9 m high spaced 40 m apart, 1.8 m overhang on both sides if fixed in the median and on one side if fixed on the
footpath, fitted with sodium vapour lamp and fixed firmly in concrete foundation.)
Cable Duct Across the Road (Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road
(new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at
both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3
m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to
8.29 minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher
than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings.)
Traffic Control System and Communication system (Providing a traffic control centre and communication system including
telecommunication facilities and related accessories, CCTV, radar, vehicle detection camera, central computer system These
are specialised item of telecommunication system and are the commercial products. The designer is required to contact the
8.32 manufacturers to ascertain market prices. In case of civil works required to be executed for these installations, pricing may
be done as per rates in relevant chapters for quantities derived approved design and drawing.)
Gantry Mounted Variable Message Sign board (Providing and erecting gantry mounted variable message sign board
8.33 electronically operated capable of flashing the desired message over a designed support system of aluminium alloy or
galvanised steel, erected as per approved design and drawings and with lateral clearance as per clause 802.3)
Using Plastic/Steel Barrel, Filled with Sand (Provision and installation of traffic impact attenuator at abutment/pier of
B flyovers bridges using plastic/steel barrels 0.60 m dia and 1.0 m in height, filled with sand in three rows and tied with20 sqm 3018.00
mm steel wire rope as per approved design and drawings)
With HI - DRO cell Sandwich (Patented) ((In this patented HI - DRO cell system, water gets discharged from plastic tubes
C on impact over a pre-determined time, thus absorbing the energy)) sqm 18142.00
Road Markers/Road Stud with Lense Reflector (Providing and fixing of road stud 100x 100 mm, die cast in aluminium,
resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling
8.35 hole 30 mm upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part each #NAME?
4:1973)
Traffic Cone (Provision of red fluorescent with white reflective sleeve traffic cone made of low density polyethylene (LDPE)
8.36 material with a square base of 390 x 390 x 35 mm and a height of 770 mm, 4 kg in weight, placed at 1.5 m interval, all as per each 251.00
BS 873)
Parking areas and Bus Laybyes for Trucks, Buses and Light vehicles (Pricing of parking areas may be done for the quantities
B of various items based on the approved dimensions and pavement design for a particular terrain and soil. Rates for items
may be from respective chapters.)
Policeman Umbrella (Provision of a 2 m high (floor to roof) umbrella for traffic policeman at road crossings, where
8.39 necessary, installed on a raised platform, built on a central support of a steel pipe 100 mm dia, roof made of 25 mm dia steel each
pipe to provide covered area of 3 sqm, roofed with CGI sheets, all steel parts to be given 2 coats of paint)
High Mast Pole Lighting at Interchanges and Flyovers (Providing and erecting a high mast pole lighting with 30 m high hot dip
galvanised mast designed to withstand forces exerted with wind speeds of 180 km per hour with 3 seconds gust, as per
IS:875 (Part 3) - 1978, fitted with a base flange, door at the base of mast with heavy duty internal lock, lantern carriage,
suitable winching arrangement for safe working load of 750 kg and high powered electrically driven power tools for raising
and lowering of lantern carriage, flexible 8 core electric cable, lightening conductor, earthing terminal, and fixing 2 nos
8.40 aviation obstruction lights on top of the mast, all complete as per approved design and drawings This is a specialised work
and is generally done by firms who specialise in such jobs. The detailed designs and estimates are submitted by the firms
alongwith their tender for checks by the Department. The cost of this work is required to be worked out based on approved
design, drawings and estimate of the lowest tender. A separate contract for this work is concluded as the contractors for
road and bridge works generally donot undertake such jobs.)
Portable Barricade in Construction Zone (Installation of a steel portable barricade with horizontal rail 300 mm wide, 2.5 m in
length fitted on a 'A' frame made with 45 x 45 x 5 mm angle iron section, 1.5 m in height, horizontal rail painted (2 coats)
8.43 with yellow and white stripes, 150 mm in width at an angle of 450, 'A' frame painted with 2 coats of yellow paint, complete each 2983.00
as per IRC:SP:55-2001 )
With Wooden Components (Construction of a permanent type barricade made of wooden components, 1.5 m high from
road level, fitted with 3 horizontal planks 200 mm wide and 3.66 m long on 100 x 100mm wooden vertical post, painted
B with yellow and white striups, 150 mm in width at an angle of450, complete as per IRC:SP:55-2001 ) each 3394.00
With Bricks (Construction of a permanent type barricade made with brick work in mud mortar, 1.5 m high, 4 m long, 600
C mm thick, plastered with cement mortar 1:6, painted with yellow and white strips) each 17969.00
Drum Delineator in Construction Zone (Provision of metal drum/empty bitumen drum delineator, 300 mm in diameter, 800
8.45 mm high, filled with earth for stability, painted in circumferential strips of alternate black and white 100 mm wide fitted with each 459.00
reflectors 3 Nos of 7.5 cm dia, all as per IRC:SP:55-2001)
Flagman (Positioning of a smart flagman with a yellow vest and a yellow cap and a red flag 600 x 600 mm securely fastened
8.46 to a staff 1 m in length for guiding the traffic) each 622.00
CHAPTER-9
PIPE CULVERTS
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically
9.1 mixed, placed in foundation and compacted by vibration including curing for 14 days.) cum 9997.00
Laying Reinforced Cement Concrete Pipe NP4/prestrssed concrete pipe on first class bedding in single row . (Laying
Reinforced cement concrete pipe NP4/prestrssed concrete pipe for culverts on first class bedding of granular material in
9.2 single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets . )
Maintenance of Earthen Shoulder (filling with fresh soil) (Making up loss of material/ irregularities on shoulder to the design
10.2 level by adding fresh approved soil and compacting it with appropriate equipment.) sqm 118.00
Maintenance of Earth Shoulder (stripping excess soil) (Stripping excess soil from the shoulder surface to achieve the
10.3 approved level and compacting with plate compactor) sqm 39.00
Filling Pot- holes and Patch Repairs with - Bituminous concrete, 40mm. (Removal of all failed material, trimming of
completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of
10.5 excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting,
trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2)
10.7 Dusting (Applying crusher dust to areas of road where bleeding of excess bitumen has occurred.) sqm 7.00
10.8 A Fog Seal (ref item 5.17) sqm #NAME?
B Crack Prevention courses. (ref item 5.21)
(i) Stress Absorbing Membrane (SAM) crack width less than 6 mm sqm #NAME?
(ii) Stress Absorbing Membrane (SAM) with crack width 6 mm to 9 mm sqm #NAME?
(iii) Stress Absorbing Membrane (SAM) crack width above 9 mm and cracked area above 50 % sqm #NAME?
(iv) Bitumen Impregnated Geotextile sqm #NAME?
C Slurry Seal (ref item 5.15)
(i) 5 mm thickness sqm #NAME?
(ii) 3 mm thickness sqm #NAME?
(iii) 1.5 mm thickness sqm #NAME?
D Surface Dressing for maintance works. (ref item 5.9)
(i) 19 mm nominal chipping size sqm #NAME?
(ii) 13 mm nominal size chipping sqm #NAME?
Repair of joint Grooves with Epoxy Mortar Repair of spalled joint grooves of contraction joints, longitudinal joints and
10.9 expansion joints in concrete pavements using epoxy mortar or epoxy concrete) metre 635.00
Repair of old Joints Sealant (Removal of existing sealant and re sealing of contraction, longitudinal or expansion joints in
10.10 concrete pavement with fresh sealant material) metre 51.00
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)
10.11 metre 47.00
Land Slide Clearance in soil (Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and
10.12 disposal of the same on the valley side) cum 73.00
Land slide Clearance in Hard Rock Requiring Blasting (Clearing of land slide in hard rock requiring blasting for 50% of the
10.13 boulders and disposal of the same on the valley side.) cum 134.00
Snow Clearance on Roads with Dozer (Snow clearance from road surface by a bull- dozer 165 Hp and disposing it on the
10.14 valley side) cum 5.00
Snow Clearance on Roads with Snow Blowers (Snow clearance from road surface by a snow blower and disposing on the
10.15 valley side.) cum 4.00
CHAPTER-11
HORTICULTURE
Spreading of Sludge Farm Yard Manure or/and good Earth (Spreading of sludge farm yard manure or/ and good earth in
11.1 required thickness (cost of sludge, farm- yard manure or/and good earth to be paid for separately)) cum 30.00
Grassing with ' Doobs' Grass (Grassing with 'Doobs' grass including watering and maintenance of the lawn for 30 days or
11.2 more till the grass forms a thick lawn free from weeds and fit for moving including supplying good earth if needed)
Maintenance of Lawns or Turfing of Slopes (Maintenance of lawns or Turfing of slopes (rough grassing) for a period of
11.4 one year including watering etc) sqm 279.00
11.6 Maintenance of Lawns with Fine Grassing for the First Year sqm 320.00
a) Planting Permanent Hedges including Digging of Trenches (Planting permanent hedges including digging of trenches,
11.7 60 cm wide and 45 cm deep, refilling the excavated earth mixed with farmyard manure, supplied at the rate of 4.65 cum per metre 516.00
100 metres and supplying and planting hedge plants at 30 cm apart)
Renovation Lawns including, Weeding, Forking the Ground, Top Dressing with Forked Soil (Renovation lawns including,
weeding, forking the ground, top dressing with forked soil, watering and maintenance the lawns, for 30 days or more, till
11.10 the grass forms a thick lawn, free from weeds, and fit for moving and disposal of rubbish as directed, including supplying sqm 21.00
good earth, if needed but excluding the cost of well decayed farm yard manure)
Supply at Site Well Decayed Farm Yard Manure (Supply at site of work well decayed farm yard manure, from any available
11.11 source, approved by the engineer in charge including screening and stacking) cum
Supply at Site of Work/ Store - Deoiled Neem Cake (Supply at site of work/ store- deoiled neem cake duly packed in used
11.12 gunny bags) quintal
11.13 Supplying Sludge (Supplying sludge duly stacked at site/ store) cum
Half Brick Circular Tree Guard, in 2nd class Brick, internal diametre 1.25 metres, and height 1.2 metres, above ground and
0.20 metre below ground (Half brick circular tree guard, in 2nd class brick, internal diametre 1.25 metres, and height 1.2
metres, above ground and 0.20 metre below ground, bottom two courses laid dry, and top three courses in cement mortar
11.14 1:6 ( 1 cement 6 sand) and the intermediate courses being in dry honey comb masonry, as per design complete) each 2304.00
Edging with 2nd class Bricks, laid dry lengthwise (Edging with 2nd class bricks, laid dry lengthwise, including excavation,
11.15 refilling, consolidation, with a hand packing and spreading nearly surplus earth within a lead of 50 metres) metre 44.00
Making Tree Guard 53 cm dia and 1.3 m high as per design from empty bitumen drum (Making tree guard 53 cm dia and 1.3
m high as per design from empty bitumen drum, slit suitably to permit sun and air, (supplied by the department at stock issue
11.16 rate) including providing and fixing 2 nos MS sheet rings 50 x 0.5 mm with rivets, complete in all respect) each 379.00
Making Tree Guard 53 cm dia and 2 metres high as per design from empty bitumen drums (Making tree guard 53 cm dia and
2 metres high as per design from empty bitumen drums, slit suitably to permit sun and air, ( supplied by the department at
11.17 stock issue rate) including providing and fixing four legs 40 cm long of 30 x 3 mm MS riveted to tree guard and providing each 763.00
and fixing 2 nos MS sheet rings 50 x 0.5 mm with rivets complete in all respects)
Wrought Iron and Mild Steel Welded Work (Wrought iron and mild steel welded work) (using angles, square bars, tees and
channel grills, grating frames, gates and tree guards of any size and design etc. including cost of screens and welding rods
11.18 or bolts and nuts complete fixed in position but without the cost of excavation and concrete for fixing which will be paid quintal 8557.00
separately)
Tree Guard with MS Iron (Providing and fixing MS iron tree guard 60 cm dia and 2 metre high above ground level formed of 4
Nos (25 x 6 mm) and 8 Nos (25 x 3 mm) vertical MS riveted to 3 Nos (25 x 6 mm) iron rings in two halves, bolted together
each tree
11.19 with 8 mm dia and 30 mm long bolts including painting two coats with paint of approved brand over a coat of priming, 2081.00
guard
complete in all respects.)
Tree Guard with MS Angle Iron and Steel Wire (Providing and fixing tree guard 0.60 metre square, 2.00 metre high
fabricated with MS angle iron 30 x 30 x 3 mm, MS iron 25 x 3 mm and steel wire3 mm dia welded and fabricated as per each tree
11.20 2861.00
design in two halves bolted together) guard
Compensatory Afforestation (Planting trees as compensatory afforestation at the rate of 290 trees per hectare at a spacing of
6 m by grubbing and leveling the ground upto a depth of 150 mm, digging holes 0.9 m dia, 1 m deep, mixing farm
11.21 yard/sludge manure with soil, planting of sapling 2 m high with 25 cm dia stem, backfilling the hole and watering) hectare 146424.00
CHAPTER-12
FOUNDATIONS
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,
12.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of
sides and bottom and backfilling with approved material.)
Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing and
12.5 technical specifications cum 6939.00
A Assuming depth of water 1.0 m and height of island to be 1.25m. each 92428.00
B Assuming depth of water 4.0 m and height of island 4.5 m. each 386434.00
Providing and constructing one span service road to reach island location from one pier location to another pier location
C metre 5114.00
Providing and laying cutting edge of mild steel weighing 40 kg per metre for well foundation complete as per drawing and
12.10 technical specification. tonne 92432.00
12.11 Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification
A Well curb
(i) RCC M20 Grade
Case I Using concrete mixer cum 14531.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 14271.00
(ii) RCC M25 Grade
Case I Using concrete mixer cum 15135.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 15062.00
(iii) RCC M35 Grade
Case I Using concrete mixer cum 15336.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 15274.00
B Well steining
(I) PCC M15 Grade cum 12631.00
(ii) PCC M20 Grade cum 13095.00
(iii) RCC M20 Grade
Case I Using concrete mixer cum 13320.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 13082.00
(iv) PCC M25 Grade
Case I Using concrete mixer cum 13642.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 13408.00
(v) RCC M25 Grade
Case I Using concrete mixer cum 13874.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 13806.00
(vi) PCC M30 Grade
Case I Using concrete mixer cum 13701.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 13462.00
(vii) RCC M30 Grade
Case I Using concrete mixer cum 13907.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 13670.00
(viii) RCC M35 Grade
Case I Using concrete mixer cum 14058.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 14001.00
(ix) RCC M40 Grade 14089.00
C Bottom Plug
(i) PCC Grade M20
Case I Using Concrete Mixer cum 13388.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 12782.00
(ii) PCC Grade M25
Case I Using Concrete Mixer cum 13685.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 13075.00
(iii) PCC Grade M30
Case I Using Concrete Mixer cum 13742.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 13135.00
(iv) PCC Grade M35
Case I Using Concrete Mixer cum 13874.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 13264.00
D Intermediate plug
(I) Grade M20 PCC
Case I Using Concrete Mixer cum 12808.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 12224.00
A Sandy soil
(i) Depth below bed level upto 3.0 M metre 4671.00
(ii) Beyond 3m upto 10m depth metre 6601.00
(iii) Beyond 10m upto 20m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 8718.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 16352.00
b Add 20% of cost for Kentledge including supports, loading arrangement and Labour . 19623.00
(v) Beyond 30m upto 40 m metre
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter 38852.00
b Add 20% of cost for Kentledge including supports, loading arrangement and Labour . metre 46622.00
B Clayey soil ( 6m dia. Well )
(i) Depth below bed level upto 3.0 M metre 6641.00
(ii) Beyond 3m upto 10m depth metre 14995.00
(iii) Beyond 10 m upto 20 m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 19804.00
b Add for dewatering @ 5% of cost, if required. metre 20794.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 37147.00
b Add 5% of cost for dewatering of the cost, if required metre 48756.00
c Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). metre 46434.00
(v) Beyond 30m upto 40 m
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 88256.00
b Add 5% of cost for dewatering, if required metre 111203.00
A Sandy soil
(i) Depth below bed level upto 3.0 M metre 13745.00
(ii) Beyond 3m upto 10m depth metre 9295.00
(iii) Beyond 10m upto 20m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 12275.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 23027.00
b Add 20% of cost for Kentledge including supports, loading arrangement and Labour) . metre 27632.00
(v) Beyond 30m upto 40 m
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 54710.00
b Add 20% of cost for Kentledge including supports, loading arrangement, and Labour etc. metre 65651.00
B Clayey soil ( 7m dia. Well )
(I) Depth below bed level upto 3.0 M metre 9295.00
(ii) Beyond 3m upto 10m depth metre 13318.00
(iii) Beyond 10 m upto 20 m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 17588.00
b Add for dewatering @ 5% of cost, if required. metre 18468.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 32991.00
b Add 5% of cost for dewatering on the cost, if required metre 43301.00
c Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). metre 41239.00
(v) Beyond 30m upto 40 m
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 78382.00
b Add 5% of cost for dewatering, if required metre 98762.00
c Add 20% of cost for Kentledge including supports, loading arrangement and Labour). 94059.00
C Soft rock ( 7m dia well )
(i) Depth of soft rock strata upto 3m metre 18737.00
D Hard rock ( 7m dia well )
(i) Depth upto 3 m metre 26960.00
Sinking of 8 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil,
12.14 clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is
reckoned from bed level.
A Sandy soil
(i) Depth below bed level upto 3.0 M metre 8532.00
(ii) Beyond 3m upto 10m depth metre 10483.00
(iii) Beyond 10m upto 20m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 13844.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 25969.00
b Add 20% of cost for Kentledge including supports, loading arrangement and Labour . metre 31163.00
(v) Beyond 30m upto 40 m
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 9128.00
b Add 20% of cost for Kentledge including supports, loading arrangement, and Labour etc. metre 10954.00
B Clayey soil ( 8m dia. Well )
(i) Depth upto 3.0 M metre 11387.00
(ii) Beyond 3m upto 10m depth metre 15978.00
(iii) Beyond 10 m upto 20 m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 21103.00
b Add for dewatering @ 5% of cost, if required. metre 22158.00
(iv) Beyond 20m upto 30 m
A Sandy soil
(i) Depth below bed level upto 3.0 M metre 8653.00
(ii) Beyond 3m upto 10m depth metre 11489.00
(iii) Beyond 10m upto 20m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 15173.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 28460.00
b Add 20% of cost for Kentledge including supports, loading arrangement and Labour . metre 34152.00
(v) Beyond 30m upto 40 m
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 67618.00
b Add 20% of cost for Kentledge including supports, loading arrangement, and Labour etc. metre 81142.00
B Clayey soil ( 9m dia. Well )
(i) Depth below bed level upto 3.0 M metre 12051.00
(ii) Beyond 3m upto 10m depth metre 17198.00
(iii) Beyond 10 m upto 20 m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 22712.00
b Add for dewatering @ 5% of cost, if required. metre 23848.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 42601.00
b Add 5% of cost for dewatering on the cost, if required metre 55913.00
c Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). metre 53251.00
(v) Beyond 30m upto 40 m
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 101213.00
b Add 5% of cost for dewatering, if required metre 127529.00
c Add 20% of cost for Kentledge including supports, loading arrangement and Labour). metre 121456.00
C Soft rock ( 9m dia well )
(i) Depth upto 3m metre 25652.00
D Hard rock ( 9m dia well )
(i) Depth of hard rock strata upto 3 m metre 31837.00
Sinking of 10 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy
12.16 soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of
sinking is reckoned from bed level.
A Sandy soil
(i) Depth below bed level upto 3.0 M metre 10301.00
(ii) Beyond 3m upto 10m depth metre 12164.00
(iii) Beyond 10m upto 20m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 16065.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 30136.00
b Add 20% of cost for Kentledge including supports, loading arrangement and Labour . metre 36162.00
(v) Beyond 30m upto 40 m
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 71600.00
b Add 20% of cost for Kentledge including supports, loading arrangement, and Labour etc. metre 85920.00
B Clayey soil (10m dia. Well )
A Sandy soil
(i) Depth from bed level upto 3.0 M metre 23476.00
(ii) Beyond 3m upto 10m depth metre 19232.00
(iii) Beyond 10m upto 20m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 25399.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 47643.00
b Add 20% of cost for Kentledge including supports, loading arrangement and Labour . metre 57172.00
(v) Beyond 30m upto 40 m
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 113194.00
b Add 20% of cost for Kentledge including supports, loading arrangement, and Labour etc. metre 135833.00
B Clayey soil (11 m dia. Well )
(i) Depth from bed level upto 3.0 M metre 22380.00
(ii) Beyond 3m upto 10m depth metre 35770.00
(iii) Beyond 10 m upto 20 m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 47242.00
b Add for dewatering @ 5% of cost, if required. metre 49604.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 88614.00
b Add 5% of cost for dewatering on the cost, if required metre 116306.00
c Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). metre 110768.00
(v) Beyond 30m upto 40 m
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 210534.00
b Add 5% of cost for dewatering, if required metre 265273.00
c Add 20% of cost for Kentledge including supports, loading arrangement and Labour). metre 252641.00
C Soft rock (11m dia well )
(i) Depth of soft rock strata upto 3m metre 58196.00
D Hard rock (11m dia well )
(i) Depth of hard rock upto 3 m metre 80030.00
Sinking of 12 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy
12.18 soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of
sinking is reckoned from bed level.
A Sandy soil
(i) I) Depth below bed level upto 3.0 M metre 48904.00
(ii) Beyond 3m upto 10m depth metre 55541.00
(iii) Beyond 10m upto 20m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 73352.00
(iv) Beyond 20m upto 30 m
A Sandy soil
(i) Depth from bed level upto 3.0 M metre 11023.00
(ii) Beyond 3m upto 10m depth metre 11928.00
(iii) Beyond 10m upto 20m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 15752.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 29546.00
b Add 20% of cost for Kentledge including supports, loading arrangement and Labour . metre 35455.00
(v) Beyond 30m upto 40 m
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 70199.00
b Add 20% of cost for Kentledge including supports, loading arrangement, and Labour etc. metre 84239.00
B Clayey soil (Twin D Type Well )
(i) Depth below bed level upto 3.0 M metre 13097.00
(ii) Beyond 3m upto 10m depth metre 19092.00
(iii) Beyond 10 m upto 20 m
a Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 25213.00
b Add for dewatering @ 5% of cost, if required. metre 26473.00
(iv) Beyond 20m upto 30 m
a Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 47290.00
b Add 5% of cost for dewatering on the cost, if required metre 62069.00
c Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). metre 59113.00
(v) Beyond 30m upto 40 m
a Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter metre 112355.00
b Add 5% of cost for dewatering, if required metre 141567.00
c Add 20% of cost for Kentledge including supports, loading arrangement and Labour). metre 134826.00
C Soft rock (Twin D Type well )
(i) Depth of soft rock strata upto 3m metre 29688.00
D Hard rock (Twin D Type well )
(i) Depth of hard rock strata upto 3 m metre 38123.00
12.21 Sand filling in wells complete as per drawing and technical specifications cum 2757.00
Providing steel liner 10 mm thick for curbs and 6mm thick for steining of wells including fabricating and setting out as per
12.22 detailed drawing tonne 83604.00
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and
12.23 removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-750 mm) metre 16645.00
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and
12.24 removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1000 mm) metre 26801.00
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and
12.25 removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200 mm) metre 33163.00
Driven cast-in-place vertical M35 grade R.C.C. pile excluding reinforcement complete as per drawing and & Technical
12.26 Specification (Pile diameter - 750 mm) metre 9915.00
Driven cast-in-place vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing and & Technical
12.27 Specification (Pile diameter - 1000 mm) metre 15862.00
Driven cast-in-place vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing and & Technical
12.28 Specification (Pile diameter - 1200 mm) metre 23148.00
Driven precast vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing and & Technical
12.29 Specification (Pile Diameter=500 mm) metre 5558.00
Driven precast vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing and & Technical
12.30 Specification (Pile Diameter=750 mm) metre 9386.00
Driven precast vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing and & Technical
12.31 Specification (Pile Diameter=1000 mm) metre 15625.00
Driven precast vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing and & Technical
12.32 Specification (Size of pile - 300 mm x 300 mm) metre 4119.00
Driven precast vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing and & Technical
12.33 Specification (Size of pile - 500 mm x 500 mm) metre 6733.00
Driven precast vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing and & Technical
12.34 Specification (Size of pile - 750 mm x 750 mm) metre 11701.00
Driven vertical steel piles complete as per drawing and & Technical Specification (Section of the pile - H Section steel column
12.35 400 x 250 mm (ISHB Series) ) metre 7604.00
Driven vertical steel piles complete as per drawing and & Technical Specification (Section of the pile - H Section steel column
12.36 450 x 250 mm (ISHB Series) ) metre 8656.00
12.37 Pile load test on single vertical pile in accordance with IS:2911(Part-IV)
12.38 Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification
A RCC Grade M20
(i) Using Concrete Mixer cum 12564.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 12361.00
B RCC Grade M25
(i) Using concrete mixer. cum 13106.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 12927.00
C RCC Grade M30
(i) Using concrete mixer. cum 13175.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 12897.00
D RCC Grade M35
(i) Using concrete mixer. cum 13318.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 13139.00
12.39 Levelling course for Pile cap cum 10611.00
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical
12.40 specifications tonne 70091.00
Supplying, fitting and placing un-coated Mild steel reinforcement complete in foundation as per drawing and technical
12.41 specification tonne 70626.00
13.2 Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical specifications sqm 954.00
13.3 Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications sqm 2351.00
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
13.4
Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and technical specification
13.7 tonne 69585.00
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe,
13.8 extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and each 499.00
Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
13.9
Supplying, fitting and fixing in position true to line and level cast steel rocker bearing conforming to IRC: 83(Pt.-1) section IX
13.11 and clause 2003 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. tonne capacity #NAME?
Supplying, fitting and fixing in position true to line and level forged steel roller bearing conforming to IRC: 83(Pt.-1) section IX
13.12 and clause 2003 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. tonne capacity #NAME?
Supplying, fitting and fixing in position true to line and level sliding plate bearing with PTFE surface sliding on stainless steel
13.13 complete including all accessories as per drawing and Technical Specifications and BS: 5400, section 9.1 & 9.2 (for PTFE) tonne capacity 102246.00
and clause 2004 of MoRTH Specifications.
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX
and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. cubic
13.14 #NAME?
centimetre
Supplying, fitting and fixing in position true to line and level sliding plate bearing with stainless steel plate sliding on stainless
13.15 steel plate with mild steel matrix complete including all accessories as per drawing and Technical Specifications. tonne capacity 453.00
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a
disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against
stainless steel mating surface, completre assembly to be of cast steel/fabricated structural steel, metal and elastomer
13.16 elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause tonne capacity #NAME?
2006 of MoRTH Specifications complete asper drawing and approved technical specifications.
CHAPTER-14
SUPER-STRUCTURE
High tensile steel wires/strands including all accessories for stressing, stressing operations and grouting complete as per
14.3 drawing and Technical Specifications tonne 186077.00
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and
14.4 Technical Specifications cum 17913.00
Mastic Asphalt (Providing and laying 12 mm thick mastic asphalt wearing course on top of deck slab excluding prime coat
with paving grade bitumen meeting the requirements given in table 500-29, prepared by using mastic cooker and laid to
required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated fine grained
14.5 hard stone chipping of 9.5 mm nominal size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm sqm #NAME?
center to center in both directions, pressed into surface when the temperature of surfaces not less than 100 deg. C,
protruding 1 mm to 4 mm over mastic surface, all complete as per clause 515.)
Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolurence
of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving
14.6 adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. metre 2528.00
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolurence of
vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving
14.7 adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. metre 2482.00
14.8 Providing, fitting and fixing mild steel railing complete as per drawing and Technical Specification metre 3297.00
14.9 Drainage Spouts complete as per drawing and Technical specification each 3529.00
14.10 PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification cum 11483.00
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical
14.11 specification cum 16262.00
Providing anti-corrosive treatment to HYSD reinforcement with Fusion Bonded Epoxy Coating (FBEC) (To be taken as per
14.12 the prevailing market rates.) tonne
Precast - pretensioned Girders (Providing, precasting, transportation and placing in position precast pretensioned concrete
14.13 girders as per drawing and technical specifications) cum 36197.00
14.14 Providing and fixing Helical pipes in voided concrete slabs metre 2987.00
Crash Barriers (The rate analysis for rigid crash barrier in reinforced cement concrete, semi-rigid crash barrier with metal
14.15 beam and flexible crash barrier with wire ropes have been made and included in chapter-8 on Traffic and Transportation.)
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface
14.16 after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) Sqm 57.00
Burried Joint (Providing and laying a burried expansion joint, expansion gap being 20 mm, covered with 12 mm thick, 200
mm wide galvanised wieldable structural steel plate as per IS: 2062, placed symmetrical to centre line of the joint, resting
14.17 freely over the top surface of the deck concrete, welding of 8 mm dia. 100 mm long galvanised nails spaced 300 mm c/c metre #NAME?
along the centre line of the plate, all as specified in clause 2604.)
Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical
(ii) Specification. metre #NAME?
Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported
(iii) spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing metre 454.00
and technical specifications.
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6% bitumen
(iv) by weight metre #NAME?
Asphaltic Plug joint (Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical
movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic
direction), covered with a closure plate of 200mm x 6mm of wieldable structural steel conforming to IS: 2062, asphaltic plug
14.19 to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat metre #NAME?
resistant foam caulking/backer rod, all as per approved drawings and specifications.)
Elastomeric Slab Steel Expansion Joint (Providing and laying of an elastomeric slab steel expansion joint, catering to right or
skew (less than 20 deg., moderately curved with maximum horizontal movement upto 50 mm, complete as per approved
drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring
14.20 compliance to the manufacturer's instructions for installation and clause 2606 of MoRTH specifications for road & bridge metre 25223.00
works.)
Compression Seal Joint (Providing and laying of compression seal joint consisting of steel armoured nosing at two edges of
the joint gap suitably anchored to the deck concrete and a preformed chloroprene elastomer or closed cell foam joint sealer
14.21 compressed and fixed into the joint gap with special adhesive binder to cater for a horizontal movement upto 40 mm and metre 3379.00
vertical movement of 3 mm.)
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement
upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or
14.22 their authorised representative ensuring compliance to the manufacturer's instructions for installation.) metre 25209.00
Modular Strip / Box Seal Joint (Providing and laying of a modular strip Box steel expansion joint including anchorage catering
to a horizontal movement beyond 70 mm and upto 140mm, complete as per approved drawings and standard specifications
14.23 to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's metre 2059.00
instructions for installation.)
Modular Strip / Box Seal Joint (Providing and laying of a modular strip box seal expansion joint catering to a horizontal
movement beyond 140mm and upto 210mm, complete as per approved drawings and standard specifications to be installed
14.24 by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for metre 2074.00
installation.)
CHAPTER-15
RIVER TRAINING AND PROTECTION WORKS
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40
15.1 kg each complete as per drawing and Technical specification.
A Boulder laid dry without wire crates. cum #NAME?
Boulder apron laid in wire crates (Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire
15.2 conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10% extra for laps and joints laid cum #NAME?
with stone boulders weighing not less than 40 kg each.)
Cement concrete blocks (size 0.5 x 0.5 x 0.5 m) (Providing and laying of apron with cement concrete blocks of size
15.3 0.5x0.5x0.5 m cast in-situ and made with nominal mix of M-15 grade cement concrete with a minimum cement content of 250 cum 12180.00
kg/cum as per IRC: 21-2000.)
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of
15.4 embankment complete as per drawing and Technical specifications
A Stone/Boulder cum 6215.00
B Cement Concrete blocks of size 0.3x0.3 x0.3 m cast in cement concrete of Grade M15 cum 12180.00
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification
15.5 cum 6844.00
Geotextile Filter (Laying of a geotextile filter between pitching and embankment slopes on which pitching is laid to prevent
15.6 escape of the embankment material through the voids of the stone pitching/cement concrete blocks as well as to allow free sqm 752.00
movement of water without creating any uplift head on the pitching.)
Providing and laying Flooring complete as per drawing and Technical specifications laid over cement concrete bedding.
15.8
Gabian Structure for Retaining Earth (Providing and construction of a gabain structure for retaining earth with segments of
wire crates of size 7 m x 3 m x 0.6 m each divided into 1.5 m compartments by cross netting, made from 4 mm galvanised
steel wire @ 32 kg per 10 sqm having minimum tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating
15.12 conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100 x 100 mm, filled with boulders with cum #NAME?
least dimension of 200 mm, all loose ends to be tied with 4 mm galvanised steel wire)
Gabian Structure for Erosion Control, River Training Works and Protection works (Providing and constructing gabain
structures for erosion control, river training works and protection works with wire crates of size 2 m x 1 m x 0.3 m each
divided into 1m compartments by cross netting, made from 4 mm galvanised steel wire @ 32 kg per 10 sqm having minimum
15.13 tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with cum #NAME?
double twist, mesh size not exceeding 100 mm x 100 mm, filled with boulders with least dimension of 200 mm, all loose
ends to be securely tied with 4 mm galvanised steel wire.)
CHAPTER-16
REPAIR AND REHABILITATION
Removal of existing cement concrete wearing coat including its disposal complete as per Technical specification without
16.1 causing any detrimental effect to any part of the bridge structure and removal of dismantled material with all lifts and lead sqm 193.00
upto 1000m(Thickness 75 mm)
Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic
16.2 asphalt including disposal with all lift and lead upto 1000m. sqm 147.00
Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy
16.3 complete as per Technical specification sqm 1227.00
Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical specifications
16.4 including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with each 479.00
Cement/Epoxy
Sealing of cracks/porous concrete by injection process through nipples/Grouting complete as per Technical specification.
16.5
Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1.
16.7 kg 800.00
Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement
16.8 complete as per Technical specification sqm 418.00
Removal of defective concrete, cleaning the surface thoroughly, applying the shotcrete mixture mechanically with
compressed air under pressure, comprising of cement, sand, coarse aggregates, water and quick setting compound in the
proportion as per clause 2807.1., sand and coarse aggregates conforming to IS: 383 and table 1 of IS: 9012 respectively,
16.9 water cement ratio ranging from 0.35 to 0.50, density of gunite not less than 2000 kg/cum, strength not less than 25 Mpa sqm #NAME?
and workmanship conforming to clause 2807.6.
Applying pre-packed cement based polymer mortar of strength 45 Mpa at 28 days for replacement of spalled concrete
16.10 sqm #NAME?
Providing external prestressing with high tensile steel wires/strands including drilling for passage of prestessing steel, all
16.13 accessories for stressing and stressing operation and grouting complete as per drawing and Technical specification tonne 430916.00
Providing external prestressing with high tensile steel wires/strands including drilling for passage of prestessing steel, all
16.14 accessories for stressing and stressing operation and grouting complete as per drawing and Technical specification tonne 388511.00
16.22 Repair of RCC Railing (Carrying out repair of RCC M30 railing to bring it to the original shape.) metre 193.00
16.23 Repair of steel Railing (Repair of steel railing to bring it to the original shape) metre 296.00
CHAPTER-1
CARRIAGE OF MATERIALS
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
1.1 Loading and Unloading of Stone Boulder/Stone cum
aggregates/Sand/Kanker/Moorum.
Placing tipper at loading point, loading with front end loader,
dumping, turning for return trip, excluding time for haulage
and return trip
Unit = cum
Taking output = 5.5 cum
Time required for
i) Positioning of tipper at loading point 1 Min
ii) Loading by front end loader 1 cum bucket capacity 13 Min
@ 25 cum per hour
iii) Maneuvering, reversing, dumping and turning for 2 Min
return
iv) Waiting time, unforeseen contingencies etc 4 Min
Total 20 Min
a) Machinery
Tipper 5.5 tonnes capacity hour 0.330 1649.00 544.17 P&M-048
Front end-loader 1 cum bucket capacity @ 25 cum/hour hour 0.330 1717.00 566.61 P&M-017
Unit = cum
Taking output = 5.5 cum
a) Labour
Mate day 0.110 390.00 42.90 L-12
Mazdoor for loading and unloading day 0.750 350.00 262.50 L-13
b) Machinery
Tipper 5.5 tonne capacity hour 0.750 1649.00 1236.75 P&M-048
c) Overhead charges @ 12 % on (a+b) 185.06
d) Contractor's profit @ 10 % on (a+b+c) 172.72
Cost for5.5 cum = a+b+c+d 1899.93
Rate per cum = (a+b+c+d)/5.5 345.44
Note Unloading will be by tipping. say 345.00
1.3 Loading and Unloading of Cement or Steel by Manual Means
and Stacking.
Unit = tonne
Taking output = 10 tonnes
a) Labour
Mate day 0.080 390.00 31.20 L-12
Mazdoor for loading and unloading day 2.000 350.00 700.00 L-13
b) Machinery
Truck 10 tonne capacity hour 2.000 108.30 216.60 P&M-057
c) Overhead charges @ 12 % on (a+b) 113.74
d) Contractor's profit @ 10 % on (a+b+c) 106.15
Cost for10 tonnes = a+b+c+d 1167.69
Rate per tonnes = (a+b+c+d)/10 116.77
say 117.00
1.4 Cost of Haulage Excluding Loading and Unloading
Haulage of materials by tipper excluding cost of loading,
unloading and stacking.
Unit = t.km
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
Taking output 10 tonnes load and lead 10 km = 100 t.km
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
1.6 Crushing of Stone Aggregates 13.2 mm Nominal Size.
Unit = cum
Taking Output = 600 cum at crusher location.
a) Labour
Mate day 0.760 390.00 296.40 L-12
Mazdoor Skilled day 2.000 350.00 700.00 L-14
Mazdoor including breaking of any oversize boulder. day 17.000 350.00 5950.00 L-13
b) Material
Stone Boulder of size 150 mm and below cum 800.000 #NAME? #NAME? #NAME?
c) Machinery
Integrated stone crusher of 200 TPH including belt Hour 6.000 22932.00 137592.00 P&M-028
conveyor and vibrating screens
Front end loader 1 cum bucket capacity Hour 20.000 1717.00 34340.00 P&M-017
Tipper 5.5 cum capacity Hour 20.000 1649.00 32980.00 P&M-048
d) Overhead charges @ 12 % on (a+b+c) #NAME?
e) Contractor's profit @ 10 % on (a+b+c+d) #NAME?
Cost for 600 cum = a+b+c+d+e #NAME?
Rate per cum = (a+b+c+d+e)*0.95/600 #NAME?
say #NAME?
Note 1. 800 cum of stone boulders are needed to get 600 cum of
stone chips of size 13.2 mm.
2. 95 per cent of above cost will be attributed to the
production of 600 cum of stone chips of 13.2 mm size and
balance 5 per cent to the production of stone dust which
comes out as a by-product.
Unit = cum
Taking Output = 670 cum at crusher location.
a) Labour
Mate day 0.760 390.00 296.40 L-12
Mazdoor Skilled day 2.000 350.00 700.00 L-14
Mazdoor including breaking of any size boulder. day 17.000 350.00 5950.00 L-13
b) Material
Stone Boulder of size 150 mm and below cum 800.000 #NAME? #NAME? #NAME?
c) Machinery
Integrated stone crusher of 200 TPH including belt Hour 6.000 22932.00 137592.00 P&M-028
conveyor and vibrating screens
Front end loader 1 cum bucket capacity Hour 20.000 1717.00 34340.00 P&M-017
Tipper 5.5 cum capacity Hour 20.000 1649.00 32980.00 P&M-048
d) Overhead charges @ 12 % on (a+b+c) #NAME?
e) Contractor's profit @ 10 % on (a+b+c+d) #NAME?
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
Cost for 670 cum = a+b+c+d+e #NAME?
Rate per cum = (a+b+c+d+e)*0.90/670 #NAME?
say #NAME?
Note 1. 800 cum of stone boulders are needed to get 600 cum of
stone chips of size 20 and 40 mm.
2. 90 per cent of above cost will be attributed to the
production of 670 cum of stone aggregates of 20mm size
and balance 10 per cent will be for smaller size aggregates
and stone dust which comes out as a by-product.
Unit = cum
Taking Output = 750 cum at crusher location.
a) Labour
Mate day 0.760 390.00 296.40 L-12
Mazdoor Skilled day 2.000 350.00 700.00 L-14
Mazdoor day 17.000 350.00 5950.00 L-13
b) Material
Stone Boulder of size 150 mm and below cum 800.000 #NAME? #NAME? #NAME?
c) Machinery
Integrated stone crusher of 200 TPH including belt Hour 6.000 22932.00 137592.00 P&M-028
conveyor and vibrating screens
Front end loader 1 cum bucket capacity Hour 20.000 1717.00 34340.00 P&M-017
Tipper 5.5 cum capacity Hour 20.000 1649.00 32980.00 P&M-048
d) Overhead charges @ 12 % on (a+b+c) #NAME?
e) Contractor's profit @ 10 % on (a+b+c+d) #NAME?
Cost for 750 cum = (a+b+c+d+e)x0.85 #NAME?
Rate per cum = (a+b+c+d+e)x0.85/750 #NAME?
say #NAME?
Note 1. 800 cum of stone boulders are needed to get 600 cum of
stone chips of size 13.2 mm.
2. 85 per cent of above cost will be attributed to the
production of 750 cum of stone aggregates of 40mm size
and balance 15 per cent will be for smaller size aggregates
and stone dust which comes out as a by-product.
CHAPTER-2
SITE CLEARANCE
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
2.1 201 Cutting of Trees, including cutting of Trunks, Branches and
Removal
Cutting of trees, including cutting of trunks, branches and
removal of stumps, roots, stacking of serviceable material
with all lifts and up to a lead of 1000 metres and earth filling
in the depression/pit.
Unit = Each
(i) Girth from 300 mm to 600 mm
a) Labour
Mate day 0.020 390.00 7.80 L-12
Mazdoors for cutting trees including cutting, refilling, day 0.600 350.00 210.00 L-13
compaction of backfilling and stacking of serviceable
materials within 1000 metres lead by manual means.
b) Machinery
Tractor-trolley hour 0.100 873.00 87.30 P&M-053
c) Overhead charges @ 12 % on (a+b) 36.61
d) Contractor's profit @ 10 % on (a+b+c) 34.17
Rate for each tree = a+b+c+d 375.88
say 376.00
2.1 (ii) Girth from 600 mm to 900 mm
a) Labour
Mate day 0.040 390.00 15.60 L-12
Mazdoors for cutting trees including cutting, refilling, day 0.900 350.00 315.00 L-13
compaction of backfilling, and stacking of serviceable
materials within 1000 metres lead by manual means
b) Machinery
Tractor-trolley hour 0.300 873.00 261.90 P&M-053
c) Overhead charges @ 12 % on (a+b) 71.10
d) Contractor's profit @ 10 % on (a+b+c) 66.36
Rate for each tree = a+b+c+d 729.96
say 730.00
2.1 (iii) Girth from 900 mm to 1800 mm
a) Labour
Mate day 0.080 390.00 31.20 L-12
Mazdoors for cutting trees including cutting, refilling, day 2.000 350.00 700.00 L-13
compaction of backfilling and stacking of serviceable
materials within 1000 metres
b) Machinery
Tractor-trolley hour 0.400 873.00 349.20 P&M-053
c) Overhead charges @ 12 % on (a+b) 129.65
d) Contractor's profit @ 10 % on (a+b+c) 121.00
Rate for each tree = a+b+c+d 1331.05
say 1331.00
2.1 (iv) Girth above 1800 mm
a) Labour
Mate day 0.160 390.00 62.40 L-12
Mazdoors for cutting trees including cutting, refilling, day 4.000 350.00 1400.00 L-13
compaction of backfilling and stacking of serviceable
materials within 1000 metres
b) Machinery
Tractor-trolley hour 0.600 873.00 523.80 P&M-053
c) Overhead charges @ 12 % on (a+b) 238.34
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
d) Contractor's profit @ 10 % on (a+b+c) 222.45
Rate for each tree = a+b+c+d 2447.00
say 2447.00
2.2 201 Clearing Grass and Removal of Rubbish
Clearing grass and removal of rubbish up to a distance of 50
metres outside the periphery of the area .
By Manual Means
Unit = Hectare
Taking output = 1 Hectare
a) Labour
Mate day 2.000 390.00 780.00 L-12
Mazdoor day 50.000 350.00 17500.00 L-13
b) Overhead charges @ 12 % on (a) 2193.60
c) Contractor's profit @ 10 % on (a+b) 2047.36
Rate per Hectare = a+b+c 22520.96
say 22521.00
2.3 201 Clearing and Grubbing Road Land .
Clearing and grubbing road land including uprooting rank
vegetation, grass, bushes, shrubs, saplings and trees girth
up to 300 mm, removal of stumps of trees cut earlier and
disposal of unserviceable materials and stacking of
serviceable material to be used or auctioned, up to a lead of
1000 metres including removal and disposal of top organic
soil not exceeding 150 mm in thickness.
Unit = Hectare
Taking output = 1 Hectare
(i) By Manual Means:-
A In area of light jungle
a) Labour
Mate day 6.000 390.00 2340.00 L-12
Mazdoor day 150.000 350.00 52500.00 L-13
b) Machinery
Tractor-trolley hour 1.000 873.00 873.00 P&M-053
c) Overhead charges @ 12 % on (a+b) 6685.56
d) Contractor's profit @ 10 % on (a+b+c) 6239.86
Rate per Hectare = a+b+c+d 68638.42
say 68638.00
2.3 (i) B In area of thorny jungle
a) Labour
Mate day 8.000 390.00 3120.00 L-12
Mazdoor day 200.000 350.00 70000.00 L-13
b) Machinery
Tractor-trolley hour 2.000 873.00 1746.00 P&M-053
c) Overhead charges @ 12 % on (a+b) 8983.92
d) Contractor's profit @ 10 % on (a+b+c) 8384.99
Rate per Hectare = a+b+c+d 92234.91
say 92235.00
2.3 (ii) By Mechanical Means
A In area of light jungle
a) Labour
Mate day 0.160 390.00 62.40 L-12
Mazdoor day 4.000 350.00 1400.00 L-13
b) Machinery
Dozer 80 HP with attachment for removal of trees & hour 10.000 3336.00 33360.00 P&M-014
stumps
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
Tractor-trolley hour 1.000 873.00 873.00 P&M-053
c) Overhead charges @ 12 % on (a+b) 4283.45
d) Contractor's profit @ 10 % on (a+b+c) 3997.88
Rate per Hectare = a+b+c+d 43976.73
say 43977.00
2.3 (ii) B In area of thorny jungle
a) Labour
Mate day 0.240 390.00 93.60 L-12
Mazdoor day 6.000 350.00 2100.00 L-13
b) Machinery
Dozer 80 HP with attachment for removal of trees & hour 12.000 3336.00 40032.00 P&M-014
stumps
Tractor-trolley hour 1.500 873.00 1309.50 P&M-053
c) Overhead charges @ 12 % on (a+b) 5224.21
d) Contractor's profit @ 10 % on (a+b+c) 4875.93
Rate per Hectare = a+b+c+d 53635.24
say 53635.00
2.4 202 Dismantling of Structures
Dismantling of existing structures like culverts, bridges,
retaining walls and other structure comprising of masonry,
cement concrete, wood work, steel work, including T&P and
scaffolding wherever necessary, sorting the dismantled
material, disposal of unserviceable material and stacking the
serviceable material with all lifts and lead of 1000 metres
Unit = cum
Taking output = 1.25 cum
(i) Lime /Cement Concrete
I By Manual Means
A Lime Concrete, cement concrete grade M-10 and below
a) Labour
Mate day 0.040 390.00 15.60 L-12
Mazdoor for dismantling and loading day 1.000 350.00 350.00 L-13
b) Machinery
Tractor-trolley hour 0.270 873.00 235.71 P&M-053
c) Overhead charges @ 12 % on (a+b) 72.16
d) Contractor's profit @ 10 % on (a+b+c) 67.35
Cost for 1.25 cum = a+b+c+d 740.81
Rate per cum = (a+b+c+d)/ 1.25 592.65
say 593.00
2.4 (i) B Cement Concrete Grade M-15 & M-20
a) Labour
Mate day 0.050 390.00 19.50 L-12
Mazdoor for dismantling and loading day 1.250 350.00 437.50 L-13
b) Machinery
Tractor-trolley hour 0.270 873.00 235.71 P&M-053
c) Overhead charges @ 12 % on (a+b) 83.13
d) Contractor's profit @ 10 % on (a+b+c) 77.58
Cost for 1.25 cum = a+b+c+d 853.42
Rate per cum = (a+b+c+d)/ 1.25 682.73
say 683.00
2.4 (i) C Prestressed / Reinforced cement concrete grade M-20 &
above
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
a) Labour
Mate day 0.150 390.00 58.50 L-12
Blacksmith day 0.250 400.00 100.00 L-02
Mazdoor for dismantling, loading and unloading day 3.500 350.00 1225.00 L-13
b) Machinery
Tractor-trolley hour 0.270 873.00 235.71 P&M-053
c) Overhead charges @ 12 % on (a+b) 194.31
d) Contractor's profit @ 10 % on (a+b+c) 181.35
Cost for 1.25 cum = a+b+c+d 1994.87
Rate per cum = (a+b+c+d)/ 1.25 1595.89
say 1596.00
2.4 II By Mechanical Means for items No. 202( b)& ( c)
A Cement Concrete Grade M-15 & M-20
a) Labour
Mate day 0.020 390.00 7.80 L-12
Mazdoor for loading and unloading day 0.250 350.00 87.50 L-13
Mazdoor with Pneumatic breaker day 0.250 350.00 87.50 L-14
b) Machinery
Air Compressor 250 cfm with 2 leads of pneumatic hour 0.670 585.00 391.95 P&M-001
breaker @ 1.5 cum per hour
Tractor-trolley hour 0.270 873.00 235.71 P&M-053
c) Overhead charges @ 12 % on (a+b) 97.26
d) Contractor's profit @ 10 % on (a+b+c) 90.77
Cost for 1.25 cum = a+b+c+d 998.49
Rate per cum = (a+b+c+d)/ 1.25 798.79
say 799.00
2.4 II B Prestressed / reinforced cement concrete grade M-20 &
above
a) Labour
Mate day 0.050 390.00 19.50 L-12
Mazdoor with Pneumatic breaker day 0.660 350.00 231.00 L-14
Blacksmith day 0.250 400.00 100.00 L-02
Mazdoor for loading and unloading day 0.250 350.00 87.50 L-13
b) Machinery
Air Compressor 250 cfm with 2 leads of pneumatic hour 1.000 585.00 585.00 P&M-001
breaker @ 1.00 cum per hour
Tractor-trolley hour 0.270 873.00 235.71 P&M-053
c) Overhead charges @ 12 % on (a+b) 151.05
d) Contractor's profit @ 10 % on (a+b+c) 140.98
Cost for 1.25 cum = a+b+c+d 1550.73
Rate per cum = (a+b+c+d)/ 1.25 1240.58
say 1241.00
2.4 (ii) Dismantling Brick / Tile work
A In lime mortar
a) Labour
Mate day 0.020 390.00 7.80 L-12
Mazdoor for dismantling, loading and unloading day 0.500 350.00 175.00 L-13
b) Machinery
Tractor-trolley hour 0.270 873.00 235.71 P&M-053
c) Overhead charges @ 12 % on (a+b) 50.22
d) Contractor's profit @ 10 % on (a+b+c) 46.87
Cost for 1.25 cum = a+b+c+d 515.60
Rate per cum = (a+b+c+d)/ 1.25 412.48
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
say 412.00
2.4 (ii) B In cement mortar
a) Labour
Mate day 0.030 390.00 11.70 L-12
Mazdoor for dismantling, loading and unloading day 0.750 350.00 262.50 L-13
b) Machinery
Tractor-trolley hour 0.270 873.00 235.71 P&M-053
c) Overhead charges @ 12 % on (a+b) 61.19
d) Contractor's profit @ 10 % on (a+b+c) 57.11
Cost for 1.25 cum = a+b+c+d 628.21
Rate per cum = (a+b+c+d)/ 1.25 502.57
say 503.00
2.4 (ii) C In mud mortar
a) Labour
Mate day 0.016 390.00 6.24 L-12
Mazdoor for dismantling and loading day 0.400 350.00 140.00 L-13
b) Machinery
Tractor-trolley hour 0.270 873.00 235.71 P&M-053
c) Overhead charges @ 12 % on (a+b) 45.83
d) Contractor's profit @ 10 % on (a+b+c) 42.78
Cost for 1.25 cum = a+b+c+d 470.56
Rate per cum = (a+b+c+d)/ 1.25 376.45
say 376.00
2.4 (ii) D Dry brick pitching or brick soling
a) Labour
Mate day 0.014 390.00 5.46 L-12
Mazdoor for Dismantling, loading and unloading day 0.350 350.00 122.50 L-13
b) Machinery
Tractor-trolley hour 0.270 873.00 235.71 P&M-053
c) Overhead charges @ 12 % on (a+b) 43.64
d) Contractor's profit @ 10 % on (a+b+c) 40.73
Cost for 1.25 cum = a+b+c+d 448.04
Rate per cum = (a+b+c+d)/ 1.25 358.43
say 358.00
2.4 (iii) Dismantling Stone Masonry
A Rubble stone masonry in lime mortar
a) Labour
Mate day 0.024 390.00 9.36 L-12
Mazdoor for dismantling, loading and unloading. day 0.600 350.00 210.00 L-13
b) Machinery
Tractor-trolley hour 0.270 873.00 235.71 P&M-053
c) Overhead charges @ 12 % on (a+b) 54.61
d) Contractor's profit @ 10 % on (a+b+c) 50.97
Cost for 1.25 cum = a+b+c+d 560.65
Rate per cum = (a+b+c+d)/ 1.25 448.52
say 449.00
2.4 (iii) B Rubble stone masonry in cement mortar.
a) Labour
Mate day 0.030 390.00 11.70 L-12
Mazdoor for dismantling, loading and unloading. day 0.750 350.00 262.50 L-13
b) Machinery
Tractor-trolley hour 0.270 873.00 235.71 P&M-053
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
c) Overhead charges @ 12 % on (a+b) 61.19
d) Contractor's profit @ 10 % on (a+b+c) 57.11
Cost for 1.25 cum = a+b+c+d 628.21
Rate per cum = (a+b+c+d)/ 1.25 502.57
say 503.00
2.4 (iii) C Rubble Stone Masonry in mud mortar.
a) Labour
Mate day 0.020 390.00 7.80 L-12
Mazdoor for dismantling, loading and unloading. day 0.500 350.00 175.00 L-13
b) Machinery
Tractor-trolley hour 0.270 873.00 235.71 P&M-053
c) Overhead charges @ 12 % on (a+b) 50.22
d) Contractor's profit @ 10 % on (a+b+c) 46.87
Cost for 1.25 cum = a+b+c+d 515.60
Rate per cum = (a+b+c+d)/ 1.25 412.48
say 412.00
2.4 (iii) D Dry rubble masonry
a) Labour
Mate day 0.018 390.00 7.02 L-12
Mazdoor for dismantling, loading and unloading. day 0.450 350.00 157.50 L-13
b) Machinery
Tractor-trolley hour 0.270 873.00 235.71 P&M-053
c) Overhead charges @ 12 % on (a+b) 48.03
d) Contractor's profit @ 10 % on (a+b+c) 44.83
Cost for 1.25 cum = a+b+c+d 493.08
Rate per cum = (a+b+c+d)/ 1.25 394.47
say 394.00
2.4 (iii) E Dismantling stone pitching/ dry stone spalls.
a) Labour
Mate day 0.016 390.00 6.24 L-12
Mazdoor for dismantling, loading and unloading. day 0.400 350.00 140.00 L-13
b) Machinery
Tractor-trolley hour 0.270 873.00 235.71 P&M-053
c) Overhead charges @ 12 % on (a+b) 45.83
d) Contractor's profit @ 10 % on (a+b+c) 42.78
Cost for 1.25 cum = a+b+c+d 470.56
Rate per cum = (a+b+c+d)/ 1.25 376.45
say 376.00
2.4 (iii) F Dismantling boulders laid in wire crates including opening of
crates and stacking dismantled materials.
a) Labour
Mate day 0.020 390.00 7.80 L-12
Mazdoor for dismantling, loading and unloading day 0.500 350.00 175.00 L-13
b) Machinery
Tractor-trolley hour 0.270 873.00 235.71 P&M-053
c) Overhead charges @ 12 % on (a+b) 50.22
d) Contractor's profit @ 10 % on (a+b+c) 46.87
Cost for 1.25 cum = a+b+c+d 515.60
Rate per cum = (a+b+c+d)/ 1.25 412.48
say 412.00
2.4 (iv) Wood Work wrought framed and fixed in frames of trusses
upto a height of 5 m above plinth level
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
a) Labour
Mate day 0.060 390.00 23.40 L-12
Carpenter day 0.500 470.00 235.00 L-04
Mazdoor for dismantling, loading and unloading. day 1.000 350.00 350.00 L-13
b) Machinery
Tractor-trolley hour 0.270 873.00 235.71 P&M-053
c) Overhead charges @ 12 % on (a+b) 101.29
d) Contractor's profit @ 10 % on (a+b+c) 94.54
Cost for 1.25 cum = a+b+c+d 1039.94
Rate per cum = (a+b+c+d)/ 1.25 831.95
say 832.00
2.4 (v) Steel Work in all types of sections upto a height of 5 m above
plinth level excluding cutting of rivet.
Unit = tonne
Taking output = 1 tonne
A Including dismembering
a) Labour
Mate day 0.140 390.00 54.60 L-12
Blacksmith day 1.000 400.00 400.00 L-02
Mazdoor for dismantling, loading and unloading day 2.500 350.00 875.00 L-13
Add 2.5 per cent of cost of labour for gas cutting, ropes, 33.24
pulleys etc.
b) Machinery
Tractor-trolley hour 0.170 873.00 148.41 P&M-053
c) Overhead charges @ 12 % on (a+b) 181.35
d) Contractor's profit @ 10 % on (a+b+c) 169.26
Rate per tonne = a+b+c+d 1861.86
say 1862.00
2.4 (v) B Excluding dismembering.
a) Labour
Mate day 0.220 390.00 85.80 L-12
Mazdoor for dismantling, loading and unloading day 2.000 350.00 700.00 L-13
Blacksmith day 0.500 400.00 200.00 L-02
Add 2.5 per cent of cost of labour for gas cutting, ropes, 24.65
pulleys etc.
b) Machinery
Tractor-trolley hour 0.170 873.00 148.41 P&M-053
c) Overhead charges @ 12 % on (a+b) 139.06
d) Contractor's profit @ 10 % on (a+b+c) 129.79
Rate per tonne = a+b+c+d 1427.71
say 1428.00
2.4 (v) C Extra over item No( v ) A and( v ) B for cutting rivets.
Unit = each
Taking output = 10 rivets
a) Labour
Mate day 0.010 390.00 3.90 L-12
Blacksmith day 0.130 400.00 52.00 L-02
Mazdoor day 0.130 350.00 45.50 L-13
b) Overhead charges @ 12 % on (a) 12.17
c) Contractor's profit @ 10 % on (a+b) 11.36
Cost for 10 rivets = a+b+c 124.92
Rate for each rivet = ( a+b+c)/10 12.49
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
say 12.00
2.4 (vi) Scraping of Bricks Dismantled from Brick Work including
Stacking.
Unit = numbers
Taking output = 1000 numbers
A In lime/Cement mortar
a) Labour
Mate day 0.140 390.00 54.60 L-12
Mazdoor day 3.500 350.00 1225.00 L-13
b) Overhead charges @ 12 % on (a) 153.55
c) Contractor's profit @ 10 % on (a+b) 143.32
Rate per1000 Nos = a+b+c 1576.47
say 1576.00
2.4 (iv) B In mud mortar
a) Labour
Mate day 0.050 390.00 19.50 L-12
Mazdoor day 1.250 350.00 437.50 L-13
b) Overhead charges @ 12 % on (a) 54.84
c) Contractor's profit @ 10 % on (a+b) 51.18
Rate per1000 Nos = a+b+c 563.02
say 563.00
2.4 (vii) Scraping of Stone from Dismantled Stone Masonry
Unit = cum
Taking output = 1 cum
A In cement and lime mortar
a) Labour
Mate day 0.060 390.00 23.40 L-12
Mazdoor day 1.400 350.00 490.00 L-13
b) Overhead charges @ 12 % on (a) 61.61
c) Contractor's profit @ 10 % on (a+b) 57.50
Rate per cum = a+b+c 632.51
say 633.00
2.4 (vii) B In Mud mortar
a) Labour
Mate day 0.010 390.00 3.90 L-12
Mazdoor day 0.300 350.00 105.00 L-13
b) Overhead charges @ 12 % on (a) 13.07
c) Contractor's profit @ 10 % on (a+b) 12.20
Rate per cum = a+b+c 134.16
say 134.00
2.4 (viii) Scarping Plaster in Lime or Cement Mortar from Brick/ Stone
Masonry
Unit = sqm
Taking output = 100 sqm
a) Labour
Mate day 0.160 390.00 62.40 L-12
Mazdoor for scarping and loading day 4.000 350.00 1400.00 L-13
b) Machinery
Tractor-trolley hour 0.320 873.00 279.36 P&M-053
c) Overhead charges @ 12 % on (a+b) 209.01
d) Contractor's profit @ 10 % on (a+b+c) 195.08
Cost for 100 sqm = a+b+c+d 2145.85
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
Rate per sqm = (a+b+c+d)/100 21.46
say 21.00
2.4 (ix) Removing all type of Hume Pipes and Stacking within a lead
of 1000 metres including Earthwork and Dismantling of
Masonry Works.
Unit = metre
Taking output = 1 metre
A Up to 600 mm dia
a) Labour
Mate day 0.020 390.00 7.80 L-12
Mazdoor day 0.520 350.00 182.00 L-13
b) Overhead charges @ 12 % on (a) 22.78
c) Contractor's profit @ 10 % on (a+b) 21.26
Rate per metre = a+b+c 233.83
say 234.00
2.4 (ix) B Above 600 mm to 900 mm dia
a) Labour
Mate day 0.030 390.00 11.70 L-12
Mazdoor day 0.700 350.00 245.00 L-13
b) Overhead charges @ 12 % on (a) 30.80
c) Contractor's profit @ 10 % on (a+b) 28.75
Rate per metre = a+b+c 316.25
say 316.00
2.4 (ix) C Above 900 mm
a) Labour
Mate day 0.050 390.00 19.50 L-12
Mazdoor day 1.200 350.00 420.00 L-13
b) Overhead charges @ 12 % on (a) 52.74
c) Contractor's profit @ 10 % on (a+b) 49.22
Rate per metre = a+b+c 541.46
say 541.00
Note 1. The excavation of earth, dismantling of stone masonry
work in head walls and protection works is not included which
is to be measured and paid separately.
2. Credit for retrieved stone from masonry work may be taken
as per actual availability.
2.5 202 Dismantling of Flexible Pavements
Dismantling of flexible pavements and disposal of dismantled
materials up to a lead of 1000 metres, stacking serviceable
and unserviceable materials separately
Unit = cum
Taking output = 1 cum
I By Manual Means
A Bituminous courses
a) Labour
Mate day 0.060 390.00 23.40 L-12
Mazdoor for dismantling, loading and unloading day 1.500 350.00 525.00 L-13
b) Machinery
Tractor-trolley hour 0.380 873.00 331.74 P&M-053
c) Overhead charges @ 12 % on (a+b) 105.62
d) Contractor's profit @ 10 % on (a+b+c) 98.58
Rate per cum = a+b+c+d 1084.33
say 1084.00
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
2.5 I B Granular courses
a) Labour
Mate day 0.040 390.00 15.60 L-12
Mazdoor for dismantling, loading and unloading. day 1.000 350.00 350.00 L-13
b) Machinery
Tractor-trolley hour 0.330 873.00 288.09 P&M-053
c) Overhead charges @ 12 % on (a+b) 78.44
d) Contractor's profit @ 10 % on (a+b+c) 73.21
Rate per cum = a+b+c+d 805.35
say 805.00
2.5 II By Mechanical Means
A Bituminous course
a) Labour
Mate day 0.010 390.00 3.90 L-12
Mazdoor day 0.300 350.00 105.00 L-13
b) Machinery
Tractor-trolley hour 0.380 873.00 331.74 P&M-053
Farm tractor with ripper @ 60 cum per hour hour 0.017 491.40 8.35 P&M-055
c) Overhead charges @ 12 % on (a+b) 53.88
d) Contractor's profit @ 10 % on (a+b+c) 50.29
Rate per cum = a+b+c+d 553.16
say 553.00
2.6 202 Dismantling of Cement Concrete Pavement
Dismantling of cement concrete pavement by mechanical
means using pneumatic tools, breaking to pieces not
exceeding 0.02 cum in volume and stock piling at designated
locations and disposal of dismantled materials up to a lead of
1000 metres, stacking serviceable and unserviceable
materials separately
Unit = cum
Taking output = 1 cum
a) Labour
Mate day 0.030 390.00 11.70 L-12
Semi skilled mazdoor for operating pneumatic tools day 0.500 350.00 175.00 L-14
Mazdoors as helpers including loading and unloading day 0.500 350.00 175.00 L-13
b) Machinery
Air compressor 250 cfm with two leads for pneumatic hour 1.000 585.00 585.00 P&M-001
cutters/ hammers @ 1 cum per hour
Tractor-trolley hour 0.400 873.00 349.20 P&M-053
Joint Cutting Machine with 2-3 blades hour 1.000 487.00 487.00 P&M-083
c) Overhead charges @ 12 % on (a+b) 213.95
d) Contractor's profit @ 10 % on (a+b+c) 199.68
Rate per cum = a+b+c+d 2196.53
say 2197.00
Note The above analysis is for removal of complete pavement. In
case full depth repair work is required to be done after
dismantling, provision of a concrete cutting and sawing
machine may be added for 0.25 hours.
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
Unit = running metre
Taking output = 1 metre
a) Labour
Mate day 0.006 390.00 2.34 L-12
Mazdoor including loading and unloading day 0.150 350.00 52.50 L-13
b) Machinery
Tractor-trolley hour 0.050 873.00 43.65 P&M-053
c) Overhead charges @ 12 % on (a+b) 11.82
d) Contractor's profit @ 10 % on (a+b+c) 11.03
Rate per metre = a+b+c+d 121.34
say 121.00
2.8 202 Dismantling of Kerb Stone
Dismantling kerb stone by manual means and disposal of
dismantled material with all lifts and up to a lead of 1000
metre
Unit = running metre
Taking output = 10 metre
a) Labour
Mate day 0.010 390.00 3.90 L-12
Mazdoor including loading and unloading day 0.150 350.00 52.50 L-13
b) Machinery
Tractor-trolley hour 0.200 873.00 174.60 P&M-053
c) Overhead charges @ 12 % on (a+b) 27.72
d) Contractor's profit @ 10 % on (a+b+c) 25.87
Cost for 10 m = a+b+c+d 284.59
Rate per metre = (a+b+c+d)/10 28.46
say 28.00
2.9 202 Dismantling of Kerb Stone Channel
Dismantling kerb stone channel by manual means and
disposal of dismantled material with all lifts and up to a lead
of 1000 metre
Unit = running metre
Taking output = 10 metre
a) Labour
Mate day 0.015 390.00 5.85 L-12
Mazdoor including loading and unloading day 0.225 350.00 78.75 L-13
b) Machinery
Tractor-trolley hour 0.300 873.00 261.90 P&M-053
c) Overhead charges @ 12 % on (a+b) 41.58
d) Contractor's profit @ 10 % on (a+b+c) 38.81
Cost for 10 m = a+b+c+d 426.89
Rate per metre = (a+b+c+d)/10 42.69
say 43.00
2.10 202 Dismantling of Kilometre Stone
Dismantling of kilometre stone including cutting of earth,
foundation and disposal of dismantled material with all lifts
and lead upto 1000 m and back filling of pit.
Unit = Each
Taking output = one KM stone
A 5th KM stone
Quantity of cement concrete = 0.392 cum
a) Labour
Mate day 0.130 390.00 50.70 L-12
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
Mazdoor day 0.750 350.00 262.50 L-13
b) Machinery
Tractor-trolley hour 0.150 873.00 130.95 P&M-053
c) Overhead charges @ 12 % on (a+b) 53.30
d) Contractor's profit @ 10 % on (a+b+c) 49.74
Rate for one 5th KM stone = a+b+c+d 547.19
say 547.00
B Ordinary KM Stone
Quantity of cement concrete = 0.269 cum
a) Labour
Mate day 0.020 390.00 7.80 L-12
Mazdoor day 0.500 350.00 175.00 L-13
b) Machinery
Tractor-trolley hour 0.100 873.00 87.30 P&M-053
c) Overhead charges @ 12 % on (a+b) 32.41
d) Contractor's profit @ 10 % on (a+b+c) 30.25
Rate for one ordinary KM stone = a+b+c+d 332.76
say 333.00
C Hectometre Stone
Quantity of cement concrete = 0.048 cum
a) Labour
Mate day 0.004 390.00 1.56 L-12
Mazdoor day 0.100 350.00 35.00 L-13
b) Machinery
Tractor-trolley hour 0.020 873.00 17.46 P&M-053
c) Overhead charges @ 12 % on (a+b) 6.48
d) Contractor's profit @ 10 % on (a+b+c) 6.05
Rate for one Hectometre stone = a+b+c+d 66.55
say 67.00
2.11 202 Dismantling of Fencing
Dismantling of barbed wire fencing/ wire mesh fencing
including posts, foundation concrete, back filling of pit by
manual means including disposal of dismantled material with
all lifts and up to a lead of 1000 metres, stacking serviceable
material and unserviceable material separately.
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
Dismantling of CI water pipe line 600 mm dia including
disposal with all lifts and lead upto 1000 metres and stacking
of serviceable material and unserviceable material separately
under supervision of concerned department
Unit = each
Taking output = 30 Nos
a) Labour
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
Mate day 0.480 390.00 187.20 L-12
Mazdoor day 10.000 350.00 3500.00 L-13
Electrician/Lineman day 2.000 400.00 800.00 L-02
b) Machinery
Tractor-trolley hour 1.500 873.00 1309.50 P&M-053
c) Overhead charges @ 12 % on (a+b) 695.60
d) Contractor's profit @ 10 % on (a+b+c) 649.23
Cost for 30 poles = a+b+c+d 7141.53
Rate per pole = (a+b+c+d)/30 238.05
say 238.00
I Ordinary soil
Unit = cum
Taking output = 10 cum
A Manual Means
(i) Depth upto 3 m
a) Labour
Mate day 0.14 390.00 54.60 L-12
Mazdoor day 3.50 350.00 1225.00 L-13
b) Overhead charges @ 0.21 on (a) 268.72
c) Contractor's profit @ 10 % on (a+b) 154.83
Cost for 10 cum = a+b+c 1703.15
Rate per cum = (a+b+c)/10 170.31
say 170.00
12.22 1200 & Providing Steel Liner 10 mm thick for Curbs and 6 mm thick
1900 for Steining of Wells including Fabricating and Setting out as
per Detailed Drawing.
Unit = 1 MT
Taking output = 1 MT
a) Material
i) Structural steel including 5 per cent wastage tonne 1.05 46956.40 49304.22 M-179
b) Labour
Mate day 1.24 390.00 483.60 L-12
Fitter day 6.00 460.00 2760.00 L-08
Blacksmith day 5.00 400.00 2000.00 L-01
Welder day 5.00 460.00 2300.00 L-02
Mazdoor day 10.00 350.00 3500.00 L-13
Electrodes, cutting gas and other consumables @ 5 per 2465.21
cent on cost a (a) above.
c) Overhead charges @ 0.21 on (a+b) 13190.74
d) Contractor's profit @ 10 % on (a+b+c) 7600.38
Rate for per MT (a+b+c+d) 83604.14
say 83604.00
12.25 1100 & Bored cast-in-situ M25 grade R.C.C. Pile excluding
1700 Reinforcement complete as per Drawing and Technical
Specifications and removal of excavated earth with all lifts
and lead upto 1000 m.
Pile diameter-1200 mm
Unit = meter
Taking output = 9 m
a) Materials
PCC Grade M25 cum 10.17 13069.00 132911.73 Item 12.11
(C) ii
Rate for concrete may be adopted same as for bottom plug
vide item no. 12.11( C ) (II)
Concrete to be cast with a tremie pipe 200mm dia.
b) Machinery( for boring and construction )
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
Hire and running charges of hydraulic piling rig with hour 6.00 18807.00 112842.00 P&M-036
power unit and complete accessories including shifting
from one bore location to another.
Hire and running charges of light crane for lowering hour 0.50 1032.00 516.00 P&M-013
reinforcement cage
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
Hire and running charges of Bentonite pump hour 6.00 Rate included in
piling rig
Loader I cum bucket capacity. hour 0.50 1717.00 858.50 P&M-017
Tipper 5.5 cum capacity for disposal of muck from pile hour 0.50 1649.00 824.50 P&M-048
bore hole
Bentonite kg 385.00 20.00 7700.00 M-071
c) Labour
Mate/Supervisor day 0.18 390.00 70.20 L-12
Mazdoor day 4.50 350.00 1575.00 L-13
d) Overhead charges @ 0.21 on (b+c) 26121.10
e) Contractor's profit @ 10 % on (b+c+d) 15050.73
Cost for 9 m = a+b+c+d+d+e 298469.76
Rate per metre (a+b+c+d+e)/9 33163.31
say 33163.00
12.38 B RCC Grade M25
Unit = cum
Taking output = 15 cum
'12.38B (ii) Using Batching Plant, Transit Mixer and Concrete Pump
a) Material
Cement tonne 5.99 6756.40 40470.84 M-081
Coarse sand cum 6.75 5172.60 34915.05 M-004
20 mm Aggregate cum 8.10 3904.00 31622.40 M-053
10 mm Aggregate cum 5.40 3594.00 19407.60 M-051
b) Labour
Mate day 0.16 390.00 62.40 L-12
Mason day 0.38 450.00 171.00 L-10
Mazdoor for concreting day 2.50 350.00 875.00 L-13
Mazdoor for breaking pile head, bending bars, cleaning day 1.00 350.00 350.00 L-13
etc.
c) Machinery
Batching Plant @ 20 cum/hour hour 0.75 651.50 488.63 P&M-002
Generator 100 KVA hour 0.75 1944.00 1458.00 P&M-080
Loader (capacity 1 cum) hour 0.75 1717.00 1287.75 P&M-017
Transit Mixer ( capacity 4.0 cu.m )
Lead upto 1 Km hour 2.00 12.77 25.54 P&M-049
Lead beyond 1 Km, L - lead in Kilometer tonne.km 37.5L 12.77 7662.00 Lead =16
km & P&M-
050
Concrete Pump hour 0.75 1278.00 958.50 P&M-007
Formwork @ 4 per cent on cost of concrete i.e. cost of 5590.19
a) Material, b) Labour and c) Machinery
Per Cum Basic Cost of Labour, Material & Machinery (a+b+c) 9430.00
of Item 12.8 (E) Case II
d) formwork
Add 10 per cent of cost of material, labour and 10.00 943.00
machinery (a+b+c) for Formwork
e) Overhead charges @ 0.21 on (a+b+c+d) 2178.33
f) Contractor's profit @ 10 % on (a+b+c+d+e) 1255.13
Rate perm (a+b+c+d+e+f) 13806.46
say 13806.00
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
13.10 710.1.4.o Providing and laying of Filter media with granular
f IRC:78 materials/stone crushed aggregates satisfying the
and 2200 requirements laid down in clause 2504.2.2. of MoRTH
specifications to a thickness of not less than 600 mm with
smaller size towards the soil and bigger size towards the wall
and provided over the entire surface behind abutment, wing
wall and return wall to the full height compacted to a firm
condition complete as per drawing and Technical
Specification.
Unit = cum
Taking output = 10 cum.
a) Labour
Mate day 0.32 390.00 124.80 L-12
Mazdoor for filling, watering, ramming etc. day 7.00 350.00 2450.00 L-13
Mazdoor (Skilled) day 1.00 350.00 350.00 L-15
b) Material
Filter media of stone aggregate conforming to clause cum 12.00 3904.00 46848.00 M-012
2504.2.2. of MoRTH specifications.
c) Machinery
Water Tanker of 6 KL capacity hour 0.06 967.00 58.02 P&M-060
d) Overhead charges @ 0.21 on (a+b+c) 10464.47
e) Contractor's profit @ 10 % on (a+b+c+d) 6029.53
cost for 10 cum of Fiter Media = a+b+c+d+e 66324.82
Rate per cum = (a+b+c+d+e)/10 6632.48
say 6632.00
13.13 2000 &
Supplying, fitting and fixing in position true to line
2200
and level Elastomeric bearing as per drawing and
Technical Specifications and BS: 5400, section
9.1 and clause 2004 of MoRTH Specifications.
Unit: one tonne capacity
Considering a 80 tonne capacity bearing for this analysis
a) Labour
Mate day 0.06 390.00 23.40 L-12
Mazdoor day 1.00 350.00 350.00 L-13
Mazdoor (Skilled) day 0.50 350.00 175.00 L-15
b) Material
Elastomeric bearing size 320x630x60 assembly of 80 tonnes each. 1.00 26500.00 26500.00 M-069
design load capacity duly painted complete with all its
components as per drawing and Technical Specifications
Unit = 1 cum
Taking output = 1 cum
Material
Concrete, Rate as per item No. 12.8 (A) excluding cum 1.00 11483.00 11483.00 Item 12.8
formworks (A)
Rate per cum say 11483.00
14.11 1500,160 Reinforced cement concrete approach slab including
0,1700 & reinforcement and formwork complete as per drawing and
2704 Technical specification
Unit = 1 cum
Taking output = 1 cum
a) Material
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
Cement concreteM30 Grade Refer relevant item of cum 1.00 9337.00 9337.00 Item 12.8
concrete in item 12.8(G)by using batching plant, (G)
excluding formwork i.e. per cum basic cost (a+b+c)
(Excluding OH & CP)
HYSD bar reinforcement Rate as per item No tonne 0.05 53876.00 2693.80 Item 14.2 A
14.2(Excluding OH & CP)
b) Overhead charges @ 0.21 on (a) 2565.68
c) Contractor's profit @ 10 % on(a+b) 1478.32
Rate per cum (a+b+c) 16261.55
say 16262.00
14.22 2607 Strip Seal Expansion Joint
Providing and laying of a strip seal expansion joint catering to
maximum horizontal movement upto 70 mm, complete as per
approved drawings and standard specifications to be
installed by the manufacturer/supplier or their authorised
representative ensuring compliance to the manufacturer's
instructions for installation.
A Stone/Boulder
Unit = cum
Taking output = 1 cum
a) Material
Stone weighing not less than 40kg cum 1.00 3435.60 3435.60 M-003
Stone spalls of minimum 25 mm size cum 0.20 3904.00 780.80 M-053
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
b) Labour
Mate day 0.04 390.00 15.60 L-12
Mason day 0.35 500.00 175.00 L-11
Mazdoor day 0.75 350.00 262.50 L-13
c) Overhead charges @ 0.21 on (a+b) 980.60
d) Contractor's profit @ 10 % on (a+b+c) 565.01
Rate per cum = (a+b+c+d) 6215.10
say 6215.00
15.4 B Cement Concrete Blocks of size 0.3x0.3 x0.3 m cast in
cement concrete of Grade M15
Unit = cum
Taking output = 1 cum
Concrete Grade M15 Rate as per item No. 12.8 (A) cum 1.00 11941.00 11941.00 Item 12.8
(A)
Add 2 per cent of cost to account for nominal surface 238.82
reinforcement and filling of granular material in recesses
between blocks.
Rate per cum 12179.82
say 12180.00
15.5 2504 Providing and laying Filter material underneath pitching in
slopes complete as per drawing and Technical specification
Unit = cum
Taking output = 1 cum
a) Material
Graded stone aggregate of required size cum 1.20 3904.00 4684.80 M-012
b) Labour
Mate day 0.05 390.00 19.50 L-12
Mazdoor (Skilled) day 0.25 350.00 87.50 L-15
Mazdoor * day 1.00 350.00 350.00 L-13
c) Overhead charges @ 0.21 on (a+b) 1079.78
d) Contractor's profit @ 10 % on (a+b+c) 622.16
Rate per cum = (a+b+c+d) 6843.74
say 6844.00
CHAPTER-8
TRAFFIC SIGNS, MARKINGS & OTHER ROAD APPURTENANCES
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
8.22 809 Reinforced Cement Concrete Crash Barrier
Unit = 1 MT
Taking output = 0.377MT
Detail of cost for 12T13 stand 40 m long cable (weight=0.377
MT)
a) Material
HT strand @9.42 kg/m including 2 per cent for wastage tonne 0.385 93356.40 35942.21 QUT
and extra length for anchoring
Sheathing duct ID 66 mm along with 5 per cent extra metre 42.00 270.00 11340.00 QUT
length 40 x 1.05 = 42 m.
Tube anchorage set complete with bearing plate, each 2.00 3600.00 7200.00 QUT
permanent wedges etc
Cement for grouting including 3 per cent wastage @ tonne 0.125 6756.40 844.55
3.00 kg/m = 3 x 1.03 x 40 = 123.60 kg (say, = 125 kg)
b) Labour
i) Labour for making and fixing cables,anchorages
CHAPTER-14
SUPER-STRUCTURE
Ref. to
Remarks/
Sr No MoRTH Description Unit Quantity Rate Rs Cost Rs
Input ref.
Spec.
Rate Analysis
Unit : Rm
Taking Output = 100 Rm
a) Construction of subgrade cum 255.00 375.00 95625.00
b) Providing granular sub-base cum 175.00 #NAME? #NAME?
c) Providing wet mix macadam cum 114.00 #NAME? #NAME?
d) Laying open graded premix carpet sqm 550.00 #NAME? #NAME?
e) Laying sand seal coat Type B sqm 550.00 #NAME? #NAME?
Cost for 100 m #NAME?
Unit : sqm
Taking Output = 100 sqm
a) Construction of subgrade cum 30.00 375.00 11250.00
b) Providing granular sub-base cum 20.00 #NAME? #NAME?
c) Providing wet mix macadam cum 22.50 #NAME? #NAME?
d) Laying open graded premix carpet sqm 100.00 #NAME? #NAME?
e) Laying sand seal coat Type B sqm 100.00 #NAME? #NAME?
Cost for 100 sqm #NAME?
Unit : each
Taking Output = one traffic sign
(i) 90 cm equilateral triangle
a) Labour
Mate/Supervisor day 0.03 350.00 10.50
Mason day 0.01 350.00 4.20
Painter day 0.02 300.00 5.81
Mazdoor day 0.91 250.00 227.50
Sub Total (a ) 248.01
b) Machinery
Concrete Mixer hr 0.05 270.00 12.96
Tractor Trolley hr 0.01 425.00 4.25
Generator 63 KVA hr 0.05 1115.00 53.52
Sub Total (b ) 70.73
c) Material
Mild steel Angle 75x 75x 6 mm kg 19.00 65.00 1235.00
Aluminum sheeting fixed with encapsulated lens
type reflective sheeting of 90 cm equilateral
triangle including lettering and signs sqm 0.35 10000.00 3500.00
Paint ready mixed approved brand ltr 0.05 126.00 6.77
Cement cum 0.03 6000.00 198.24
Sand cum 0.05 440.00 23.76
20 mm aggregate nominal cum 0.11 1463.00 158.00
Sub Total (c ) 5121.78
d) Overhead charges @ 0.08 on (a+b+c) 435.24
1 of 131
Rate Analysis
Sr. Reference to Description Unit Quantity Rate Cost
No. MoRT&H
Specifications
(ii) 60 cm circular
a) Labour
Mate/Supervisor day 0.03 350.00 10.50
Mason day 0.01 350.00 4.20
Painter day 0.02 300.00 5.81
Mazdoor day 0.91 250.00 227.50
Sub Total (a ) 248.01
b) Machinery
Concrete Mixer hr 0.05 270.00 12.96
Tractor Trolley hr 0.01 425.00 4.25
Generator 63 KVA hr 0.05 1115.00 53.52
Sub Total (b ) 70.73
c) Material
Mild steel Angle 75x 75x 6 mm kg 19.00 65.00 1235.00
Aluminum sheeting fixed with encapsulated lens
type reflective sheeting of 60 cm circular including
lettering and signs sqm 0.28 10000.00 2830.00
Paint ready mixed approved brand ltr 0.05 126.00 6.77
Cement cum 0.03 6000.00 198.24
Sand cum 0.05 440.00 23.76
20 mm aggregate nominal cum 0.11 1463.00 158.00
Sub Total (c ) 4451.78
d) Overhead charges @ 0.08 on (a+b+c) 381.64
2 of 131
Rate Analysis
Sr. Reference to Description Unit Quantity Rate Cost
No. MoRT&H
Specifications
(iii) 80 cm x 60 cm rectangular
a) Labour
Mate/Supervisor day 0.03 350.00 10.50
Mason day 0.01 350.00 4.20
Painter day 0.02 300.00 5.81
Mazdoor day 0.91 250.00 227.50
Sub Total (a ) 248.01
b) Machinery
Concrete Mixer hr 0.05 270.00 12.96
Tractor Trolley hr 0.01 425.00 4.25
Generator 63 KVA hr 0.05 1115.00 53.52
Sub Total (b ) 70.73
c) Material
Mild steel Angle 75x 75x 6 mm kg 19.00 65.00 1235.00
Aluminum sheeting fixed with encapsulated lens
type reflective sheeting of 80 cmx 60 cm
rectangular including lettering and signs sqm 0.48 10000.00 4800.00
Paint ready mixed approved brand ltr 0.05 126.00 6.77
Cement cum 0.03 6000.00 198.24
Sand cum 0.05 440.00 23.76
20 mm aggregate nominal cum 0.11 1463.00 158.00
Sub Total (c ) 6421.78
d) Overhead charges @ 0.08 on (a+b+c) 539.24
3 of 131
Rate Analysis
Sr. Reference to Description Unit Quantity Rate Cost
No. MoRT&H
Specifications
(iv) 90 cm Octagon
a) Labour
Mate/Supervisor day 0.03 350.00 10.50
Mason day 0.01 350.00 4.20
Painter day 0.02 300.00 5.81
Mazdoor day 0.91 250.00 227.50
Sub Total (a ) 248.01
b) Machinery
Concrete Mixer hr 0.05 270.00 12.96
Tractor Trolley hr 0.01 425.00 4.25
Generator 63 KVA hr 0.05 1115.00 53.52
Sub Total (b ) 70.73
c) Material
Mild steel Angle 75x 75x 6 mm kg 19.00 65.00 1235.00
Aluminum sheeting fixed with encapsulated lens
type reflective sheeting of 90 cm octagon including
lettering and signs sqm 0.67 10000.00 6720.00
Paint ready mixed approved brand ltr 0.05 126.00 6.77
Cement cum 0.03 6000.00 198.24
Sand cum 0.05 440.00 23.76
20 mm aggregate nominal cum 0.11 1463.00 158.00
Sub Total (c ) 8341.78
d) Overhead charges @ 0.08 on (a+b+c) 692.84
4 of 131
Rate Analysis
Sr. Reference to Description Unit Quantity Rate Cost
No. MoRT&H
Specifications
5 of 131
Rate Analysis
Sr. Reference to Description Unit Quantity Rate Cost
No. MoRT&H
Specifications
(ii) 1500mm x 2400mm
a) Labour
Mate/Supervisor day 0.03 350.00 10.50
Mason day 0.01 350.00 4.20
Painter day 0.02 300.00 5.81
Mazdoor day 0.86 250.00 215.00
Sub Total (a ) 235.51
b) Machinery
Concrete Mixer hr 0.05 270.00 12.96
Tractor Trolley hr 0.01 425.00 4.25
Generator 63 KVA hr 0.05 1115.00 53.52
Sub Total (b ) 70.73
c) Material
Mild steel Angle 75x 75x 6 mm kg 38.00 65.00 2470.00
Aluminum sheeting fixed with encapsulated lens
type reflective sheeting including lettering and
signs sqm 3.60 10000.00 36000.00
Paint ready mixed approved brand ltr 0.15 126.00 19.50
Cement cum 0.07 6000.00 396.48
Sand cum 0.11 440.00 47.52
20 mm aggregate nominal cum 0.22 1463.00 316.01
Sub Total (c ) 39249.51
d) Overhead charges @ 0.08 on (a+b+c) 3164.46
6 of 131
Rate Analysis
Sr. Reference to Description Unit Quantity Rate Cost
No. MoRT&H
Specifications
(iii) 1800mm x 3600mm
a) Labour
Mate/Supervisor day 0.03 350.00 10.50
Mason day 0.01 350.00 4.20
Painter day 0.02 300.00 5.81
Mazdoor day 0.86 250.00 215.00
Sub Total (a ) 235.51
b) Machinery
Concrete Mixer hr 0.05 270.00 12.96
Tractor Trolley hr 0.01 425.00 4.25
Generator 63 KVA hr 0.05 1115.00 53.52
Sub Total (b ) 70.73
c) Material
Mild steel Angle 75x 75x 6 mm kg 38.00 65.00 2470.00
Aluminum sheeting fixed with encapsulated lens
type reflective sheeting including lettering and
signs sqm 6.48 10000.00 64800.00
Paint ready mixed approved brand ltr 0.28 126.00 35.11
Cement cum 0.07 6000.00 396.48
Sand cum 0.11 440.00 47.52
20 mm aggregate nominal cum 0.22 1463.00 316.01
Sub Total (c ) 68065.12
d) Overhead charges @ 0.08 on (a+b+c) 5469.71
7 of 131
Rate Analysis
Sr. Reference to Description Unit Quantity Rate Cost
No. MoRT&H
Specifications
Unit : each
Taking Output = one overhead sign
Truss and vertical support
a) Labour
Mate/Supervisor day 0.96 350.00 336.00
Black smith day 8.00 325.00 2600.00
Mazdoor day 16.00 250.00 4000.00
Sub Total (a ) 6936.00
b) Machinery
Crane 3 ton capacity hr 12.00 415.00 4980.00
Truck hr 2.00 360.00 720.00
Sub Total (b ) 5700.00
c) Material
Galvanised Iron including 5 percent wastage kg 1500.00 97.50 146250.00
8 of 131
Rate Analysis
Sr. Reference to Description Unit Quantity Rate Cost
No. MoRT&H
Specifications
Excavation and Foundation concrete (6.75 cum)
a) Labour
Mate/Supervisor day 0.59 350.00 206.82
Mason day 0.75 350.00 262.50
Mazdoor day 13.00 250.00 3250.00
Sub Total (a ) 3719.32
b) Machinery
Concrete Mixer hr 3.00 270.00 810.00
Generator 63 KVA hr 3.00 1115.00 3345.00
Sub Total (b ) 4155.00
c) Material
Cement cum 1.86 6000.00 11151.00
Sand cum 3.04 440.00 1336.50
20 mm aggregate nominal cum 6.08 1463.00 8887.73
Sub Total (c ) 21375.23
d) Overhead charges @ 0.08 on (a+b+c) 34625.76
Unit : sqm
Taking Output = 10 sqm
a) Labour
Mate/Supervisor day 0.09 350.00 31.50
Painter day 0.55 300.00 165.00
Mazdoor day 2.00 250.00 500.00
Sub Total (a ) 696.50
b) Material
Road marking paint ltr 1.48 130.00 192.40
9 of 131
Rate Analysis
Sr. Reference to Description Unit Quantity Rate Cost
No. MoRT&H
Specifications
Unit : sqm
Taking Output = 640 sqm
a) Labour
Mate/Supervisor day 0.50 350.00 175.00
Mazdoor day 2.00 250.00 500.00
Sub Total (a ) 675.00
b) Machinery
Road marking machine @ 80 sqm per hr hr 8.00 110.00 880.00
Tractor trolley hr 8.00 425.00 3400.00
Sub Total (b ) 4280.00
c) Material
Hot applied thermoplastic compound ltr 2000.00 130.00 260000.00
Reflectorising glass beads kg 200.00 30.00 6000.00
Sub Total (c ) 266000.00
d) Overhead charges @ 0.08 on (a+b+c) 21676.40
10 of 131
Rate Analysis
Sr. Reference to Description Unit Quantity Rate Cost
No. MoRT&H
Specifications
11 of 131
Rate Analysis
Sr. Reference to Description Unit Quantity Rate Cost
No. MoRT&H
Specifications
12 of 131
Rate Analysis
Sr. Reference to Description Unit Quantity Rate Cost
No. MoRT&H
Specifications
g) Material
Quarry Spall cum 11.97 995.00 11910.15
13 of 131
Rate Analysis
Sr. Reference to Description Unit Quantity Rate Cost
No. MoRT&H
Specifications
Unit : Rm
Taking Output = 10m length
a) Labour
Mate/Supervisor day 0.01 350.00 3.50
Plumber day 0.01 325.00 3.25
Mazdoor day 0.25 250.00 62.50
Sub Total (a ) 69.25
b) Machinery
Tractor Trolley hr 0.04 425.00 17.00
c) Material
Channel post 100x 50, 10.8m long @ 9.2 kg per m
kg 99.36 65.00 6458.40
Steel pipe 40 mm diameter Rm 30.00 144.00 4320.00
Add 2 percent for cost of fabrication 1291.68
Sub Total (c ) 12070.08
d) Overhead charges @ 0.08 on (a+b+c) 972.51
14 of 131
Rate Analysis
Sr. Reference to Description Unit Quantity Rate Cost
No. MoRT&H
Specifications
Unit : Rm
Taking Output = 4.5m length
a) Labour
Mate/Supervisor day 0.06 350.00 21.00
Black smith day 0.50 325.00 162.50
Mazdoor day 1.00 250.00 250.00
Sub Total (a ) 433.50
b) Machinery
Tractor Trolley hr 0.10 425.00 42.50
c) Material
Corrugated sheet, 3mm thick, W beam section raili kg 41.21 90.00 3708.90
Channel post 150x 75x 5 mm, 1.8m long, 3 nos @
16.4 kg per m kg 88.56 65.00 5756.40
Spacer 150x 75x 5 mm channel 0.33m long, 3 nos
@ 16.4 kg per m kg 16.24 65.00 1055.60
Nuts and Bolts kg 20.00 50.00 1000.00
Add 25 percent for cost of fabrication 2880.23
Sub Total (c ) 14401.13
d) Overhead charges @ 0.08 on (a+b+c) 1190.17
15 of 131
Rate Analysis
Sr. Reference to Description Unit Quantity Rate Cost
No. MoRT&H
Specifications
Unit : Rm
Taking Output = 20m
Coursed Rubble masonry in cement mortar 1:3 cum 4.38 4532.00 19850.16
a) Labour
Mate/Supervisor day 0.16 350.00 56.00
Skilled mazdoor day 1.00 300.00 300.00
Mazdoor day 3.00 250.00 750.00
Sub Total (a ) 1106.00
b) Machinery
Tractor Trolley hr 1.50 425.00 637.50
c) Material
RCC Pipes 300mm dia m 60.00 225.00 13500.00
Granular soil with PI less than 6 for bedding cum 21.60 2216.00 47865.60
Collar for joints 300mm dia each 27.00 400.00 10800.00
Cement Mortar 1:3
Cement cum 0.03 6000.00 183.60
Sand cum 0.06 440.00 27.72
Sub Total (c ) 72376.92
d) Overhead charges @ 0.08 on (a+b+c) 5929.63
16 of 131
Rate Analysis
Sr. Reference to Description Unit Quantity Rate Cost
No. MoRT&H
Specifications
Unit : each
Taking Output = 30 nos
Triangular Red Reflector
a) Labour
Mate/Supervisor day 0.04 350.00 14.00
Mazdoor day 1.00 250.00 250.00
Sub Total (a ) 264.00
b) Material
Triangular red reflector from ISI certified firm as
per standard drawings given in IRC: 79 each 30.00 425.00 12750.00
17 of 131
Rate Analysis
Sr. Reference to Description Unit Quantity Rate Cost
No. MoRT&H
Specifications
Roadway Indicator
a) Labour
Mate/Supervisor day 0.04 350.00 14.00
Mazdoor day 1.00 250.00 250.00
Sub Total (a ) 264.00
b) Material
Roadway Indicator size 1.0m each 30.00 1000.00 30000.00
Unit : each
Taking Output = 50 nos
a) Labour
Mate/Supervisor day 0.04 350.00 14.00
Mazdoor day 1.00 250.00 250.00
Sub Total (a ) 264.00
b) Material
Aluminum studs 100mm x 100mm fitted with lens ref each 50.00 470.00 23500.00
add 10% of cost of material for fixing and installation 2350.00
Sub Total (b ) 25850.00
c) Overhead charges @ 0.08 on (a+b) 2089.12
18 of 131
Rate Analysis
Sr. Reference to Description Unit Quantity Rate Cost
No. MoRT&H
Specifications
H13 803 Painting two coats after filling the surface with
synthetic enamel paint in all shades on new
plastered concrete surfaces.
Unit : sqm
Taking Output = 40 sqm
a) Labour
Mate/Supervisor day 0.12 350.00 42.00
Painter day 2.00 300.00 600.00
Mazdoor day 1.00 250.00 250.00
Sub Total (a ) 892.00
b) Material
Enamel Paint ltr 6.00 126.00 756.00
H14 801 Painting new letters and figures of any shade with
synthetic enamel paint black or any other
approved colour to give an even shade.
Unit : per cm height per letter
Taking Output = 100 letters of 16 cm height
a) Labour
Mate/Supervisor day 0.12 350.00 42.00
Painter day 2.00 300.00 600.00
Mazdoor day 1.00 250.00 250.00
Sub Total (a ) 892.00
b) Material
Enamel Paint ltr 0.70 126.00 88.20
19 of 131
Rate Analysis
Sr. Reference to Description Unit Quantity Rate Cost
No. MoRT&H
Specifications
b) Labour
Mate day 0.04 350.00 14.00
Mazdoor day 1.00 250.00 250.00
Sub Total ( b ) 264.00
c) Material
Pre-moulded asphalt filler board sqm 0.32 505.00 161.60
TMT steel reinforcement MT 0.37 52000.00 19240.00
Sub Total ( c ) 19401.60
20 of 131
Rate Analysis
Sr. Reference to Description Unit Quantity Rate Cost
No. MoRT&H
Specifications
(b) Without Friction slab over RoB
Unit= Rm
Taking output= 10 m
a) M 40 grade concrete cum 4.00 8200.00 32800.00
b) Labour
Mate day 0.04 350.00 14.00
Mazdoor day 1.00 250.00 250.00
Sub Total ( b ) 264.00
c) Material
Pre-moulded asphalt filler board sqm 0.42 505.00 212.10
TMT steel reinforcement MT 0.50 52000.00 26000.00
Sub Total ( c ) 26212.10
b) Labour
Mate day 0.06 350.00 21.00
Mazdoor day 1.50 250.00 375.00
Sub Total ( b ) 396.00
c) Material
Pre-moulded asphalt filler board sqm 0.80 505.00 404.00
TMT steel reinforcement MT 0.94 52000.00 48880.00
Sub Total ( c ) 49284.00
Unit : each
Taking Output = 50 nos
a) Labour
Mate/Supervisor day 0.04 350.00 14.00
Mazdoor day 1.00 250.00 250.00
Sub Total (a ) 264.00
21 of 131
Rate Analysis
Sr. Reference to Description Unit Quantity Rate Cost
No. MoRT&H
Specifications
b) Material
Solar Studs each 50.00 1200.00 60000.00
add 10% of cost of material for fixing and installation 6000.00
Sub Total (b ) 66000.00
c) Overhead charges @ 0.08 on (a+b) 5301.12
22 of 131
Consultancy Services for Preparation of Feasibility Study for Construction of Major Bridge its Approaches at Gomti River (AAM Ghat) in Km
61.00 of NH-330A in the state of Uttar Pradesh.
Rate Analysis
Sr. Reference to Description Unit Quantity Rate Cost
No. MoRT&H
Specifications
Unit : each
Taking Output = one overhead sign
Truss and vertical support
a) Labour
Mate/Supervisor day 0.96 390.00 374.40
Black smith day 8.00 400.00 3200.00
Mazdoor day 16.00 350.00 5600.00
Sub Total (a ) 9174.40
b) Machinery
Crane 3 ton capacity hr 12.00 1075.00 12900.00
Truck hr 2.00 975.00 1950.00
Sub Total (b ) 14850.00
c) Material
Galvanised Iron including 5 percent wastage kg 1500.00 180.00 270000.00
Rate Analysis
Sr. Reference to Description Unit Quantity Rate Cost
No. MoRT&H
Specifications
Excavation and Foundation concrete (6.75 cum)
a) Labour
Mate/Supervisor day 0.59 390.00 230.45
Mason day 0.75 500.00 375.00
Mazdoor day 13.00 350.00 4550.00
Sub Total (a ) 5155.45
b) Machinery
Concrete Mixer hr 3.00 487.00 1461.00
Generator 63 KVA hr 3.00 1250.00 3750.00
Sub Total (b ) 5211.00
c) Material
Cement cum 1.86 6756.40 12556.77
Sand cum 3.04 5172.60 15711.77
20 mm aggregate nominal cum 6.08 3904.00 23716.80
Sub Total (c ) 51985.34
d) Overhead charges @ 12 % on (a) #NAME?