Structure Waiting Room
Structure Waiting Room
C6,C7,C8, ALONG
DISTRIBUTION BAR
(MIN. 2 Nos. BAR) ALONG SHORTER ALONG
PROJECT:
ALONG LONGER TOP REINF.
GRADE C12, C14
CONC.
COL. SHORTER SPAN LONGER SPAN
C9,C10,C16, C13 SPAN(Curtailed) (CURTAILED) DISTRIBUTION BAR SPAN(Curtailed) PROPOSED REMODELING OF CIRCULATING
MKD.
C17,C19,C20 AREA AT
COL.SIZE 350X300 350X300 400X400 MAHALIMARUP STATION
50(TYP.)
350 ALT. CURTAILMENT
400
350 0.15L1 ALONG SHORTER 0.25L1 0.25L2 ALONG LONGER 0.15L2
ROOF FL. LVL.
10
SPAN(Curtailed) SPAN(Curtailed) CERTIFICATE OF THE STRUCTURAL ENGINEER:
d(
>7
300
5m
300
400
L1(SHORTER SPAN) L2(LONGER SPAN)
m
FND. TO
)
CERTIFIED THAT THE STRUCTURAL DRAWING & DESIGN OF BOTH THE
4-20#+4-16# 4-20#+2-16# 4-20#+2-16# FOUNDATION AND SUPERSTRUCTURE OF THE BUILDING HAS BEEN MADE
M25
CONSIDERING THE SOIL TEST REPORT, AS PER THE RULES & REGULATIONS
(2 Set Stirrups) (1 Set Stirrups) (1 Set Stirrups) d
10d
135
MADE UNDER THE ACT AND ALSO CONSIDERING ALL POSSIBLE LOADS,
CONFINING CONFINING CONFINING SEISMIC LOAD & THE MOMENTS GENERATED BY THE PROPOSED STRUCTURE
TO BE BENT
ZONE-A=750mm ZONE-A=750mm ZONE-A=750mm CL. OF COL. AS PER THE BUREAU OF INDIAN STANDARD & NATIONAL BUILDING CODE OF
AT 135° DETAIL -1 CROSS TIE
& FDN. INDIA & CERTIFIED THAT IT IS SAFE AND STABLE IN ALL RESPECT AND
ARRANGEMENT
DT. OF PEDESTAL
F1 1600 1600 350 10# @ 150 C/C 8# @ 150 C/C TYP. FOOTING (TYP.) UNLESS SPECIALLY MENTIONED ON A DRAWING THE FOLLOWING NOTES SHALL APPLY
SECTION.
DO NOT SCALE THE DRAWING. TO ALL STRUCTURAL DRAWINGS.
600(TYP.)
BOTT. OF a2
1. CO-ORDINATE THIS DRAWING ALONG WITH RELEVANT ARCHITECTURAL AND SERVICES
FND. (-1500) WRITTEN DIMENSIONS TO BE DRAWINGS.
2. ALL DIMENSIONS AND LEVELS ARE IN MILLIMETERS UNLESS MENTION OTHERWISE.
d1
FOLLOWED. 3. DO NOT SCALE THE DRAWING, FOLLOW WRITTEN DIMENSIONS ONLY.
A B C D E F G 4. ALL STRUCTURAL DRAWINGS ARE BASED ON ARCHITECTURAL DRAWINGS. LAYOUT
3120 3380 3250 3250 3490 3120
DIMENSIONS AS GIVEN IN STRUCTURAL DRAWINGS SHALL BE VERIFIED FROM
a1 100 THK. RELEVANT ARCHITECTURAL DRAWINGS. IN CASE OF ANY AMBIGUITY IN DRAWINGS,
P.C.C. THE MATTER SHALL BE REFERRED TO THE CONSULTANT BEFORE EXECUTION OF
75 Ax(B) 75 WORK AT SITE.
5. ALL FOUNDATIONS SHALL BE REST ON VIRGIN SOIL WHENEVER THE SOIL CONTAIN
4
B1 B2 SECTION- B THE LOOSE SOIL POCKETS, THE SAME SHALL BE REMOVED AND REFILLED WITH THE
P.C.C., NET SAFE BEARING CAPACITY TAKEN FOR DESIGN OF ISOLATED FOOTING IS
C1 C2 C3 C4 C/L OF COLUMN 22 T/sq.m. AS PER SOIL TEST REPORT.
C/L OF FOOTING 6. THE LATEST REVISION OF THE DRAWING SHALL BE CONSIDERED WHILE REFERRING
S1 TO THE INDICATED DRAWING.
B19
B22
B31
B34
3250
S1
a2
B3 B4 B5 B6 B7 B8 C/L OF AT TOP
3
C5 C6 C7 C8 C9 C10 C11 ROOF BEAM BOTH WAY CONCRETE:
10Φ @ 100c/c 7. ALL CONCRETE WORK SHALL BE AS PER IS 456:2000.
500 ROOF PROJ. ROOF LVL. 8. ALL STRUCTURAL REINFORCED CONCRETE WORK SHALL BE WITH DESIGN MIX
B18
B26
B33
B21
B24
B28
B30
3750
==
350 CONCRETE:
B
C/L OF FOOTING a). 1:5:10 PLUM CONCRETE FOR FILLING CONCRETE UNDER FOUNDATION (WITH
B9 B10 MAXIMUM AGGREGATE SIZE OF 40 MM.) AND AS , PIT, TRENCHES ETC.
2 250
C12 C13 C14 8Φ @ 150c/c B b). M-15 FOR LEAN CONCRETE BELOW FOUNDATIONS & TIE PROTECTION.
-
B20
B23
B27
B29
B17
B25
B32
3250
S1 S1 S1 S1 S1 S1 SECTION X X
B1 B2
4
C1 C2 C3 C4
4 TOP OF
C1 C2 C3 C4
B22
B31
B34
3250
(+/-0.00)
WAITING AREA AT MAHALIMARUP STATION.
B3 B4 B5 B6 B7 B8
3
C5 C6 C7 C8 C9 C10 C11
3
B26
B33
B21
B24
B28
B30
3750
F1 F1 F1 F1 F1 F1 F1 ZONE-A
3750
B23
B27
B29
B17
B25
B32
3250