0% found this document useful (0 votes)
122 views1 page

Lamp02 - Cas-Mp-314-04-17-Rr-Peta Keseluruhan Tambang

This document is a map showing the planned mining areas for PT. Cakra Anadatu Sukses between 2014-2018. The map outlines two main mining blocks, one to the west and one to the east, separated by the Barito River. It also shows the boundaries of protected forest areas and where mining is permitted. Legend and location information is provided in Indonesian.

Uploaded by

Rino Ermawan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
122 views1 page

Lamp02 - Cas-Mp-314-04-17-Rr-Peta Keseluruhan Tambang

This document is a map showing the planned mining areas for PT. Cakra Anadatu Sukses between 2014-2018. The map outlines two main mining blocks, one to the west and one to the east, separated by the Barito River. It also shows the boundaries of protected forest areas and where mining is permitted. Legend and location information is provided in Indonesian.

Uploaded by

Rino Ermawan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

114°45'30"E 114°46'0"E 114°46'30"E 114°47'0"E 114°47'30"E 114°48'0"E 114°48'30"E 114°49'0"E 114°49'30"E 114°50'0"E 114°50'30"E 114°51'0"E

PETA RENCANA BUKAAN TAMBANG

1°0'0"S
1°0'0"S

PERIODE 2014-2018
IUP PT. CAKRA ANDATU SUKSES

1°0'30"S
1°0'30"S

1:40.000
625 312,5 0 625 1.250 1.875 2.500

1°1'0"S
1°1'0"S

Sistem Proyeksi :________ Universal Transverse Mercator


Referensi Elipsoid :________ Datum WGS 84 Zone 50 South
Sistem Grid :________ Geographic

1°1'30"S
1°1'30"S

Legenda: Garis Kontur


Batas Topografi
Jalan

1°2'0"S
1°2'0"S

Areal Port SRE

Sungai Barito
Keterangan:

1°2'30"S
1°2'30"S

Kawasan APL
Kawasan HPT
Kawasan HPK

1°3'0"S
1°3'0"S

APL Blok Barat Blok Timur


APL Dibuat Oleh Diperiksa 1 oleh

1°3'30"S
1°3'30"S

A. Basma Roby SP
Mine Engineer Sr Mine Engineer

Diperiksa 2 Oleh Disetujui Oleh

1°4'0"S
1°4'0"S

Rino Ermawan Aris Arnanto


Mgr Engineering KTT
HPK

1°4'30"S
1°4'30"S

1°5'0"S
1°5'0"S

HPT

1°5'30"S
1°5'30"S

114°45'30"E 114°46'0"E 114°46'30"E 114°47'0"E 114°47'30"E 114°48'0"E 114°48'30"E 114°49'0"E 114°49'30"E 114°50'0"E 114°50'30"E 114°51'0"E

You might also like