This document describes an online well integrity toolkit software created by Intetech Ltd. The software combines reservoir data, well design information, operating data, inspection results, and workover details into a single database. It also includes tools for quantitative data analysis, engineering and management feedback, and guidance for workover planning. The software is intended to help users manage well integrity.

Uploaded by

Paulo Ivo
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
97 views

Intetech WI Toolkit

This document describes an online well integrity toolkit software created by Intetech Ltd. The software combines reservoir data, well design information, operating data, inspection results, and workover details into a single database. It also includes tools for quantitative data analysis, engineering and management feedback, and guidance for workover planning. The software is intended to help users manage well integrity.

Uploaded by

Paulo Ivo
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

37 Mount Way | Waverton | Chester CH3 7QF, UK

Tel: +44 (0) 1244 336386 | Fax: +44 (0) 1244 336809
email: [email protected] | www.intetech.com

INTETECH WELL INTEGRITY TOOLKIT


This web-based software has been designed by Liane
• Smith and Dragan Milanovic of Intetech Ltd., established
• experts with extensive operating company experience in
the field of downhole engineering and operations. It is a
unique approach to well integrity management. The
software combines the functions of:

• A comprehensive database drawing together


reservoir information, well design, completion
condition, operating data, inspection results,
workover operations etc.
• Quantitative data analysis
• Immediate engineering and management feedback.
• Further functions are available to provide guidance
in planning and implementing workover operations.

Flowing Flowing
Bottom Flowing Bottom Flowing CO2 H2S Production Production
Hole Wellhead Hole W ellhead content content Rate of Rate of
Pressure Pressure Temp Temp in gas of gas Crude Oil Production Rate W ater HCO3, API
DATE (bar) (bar) (oC) (oC) (mole%) (mole%) (STBOPD) of Gas (scf/day) Bbls/day) mg/l pH gravity
26/07/1994 300 110 110 85 1.4 0 6000 12000 200 70 4.2 33
27/07/1996 300 105 110 87 1.4 0 5700 13000 220 70 4.2 33
29/07/1998 300 100 110 89 1.4 0 5400 14000 220 70 4.2 33
30/07/2000 300 95 110 91 1.4 0 5100 15000 260 70 4.2 33
01/08/2002 300 90 110 93 1.4 0 4800 16000 280 70 4.2 33
02/08/2004 300 85 110 95 Cumulative
1.4 Tubing
0 damage
4500 17000 300 70 4.2 33

3.5 100
Corrosion loss to date, mm;

90
Max. Corrosion Rate, mm/y

3.0
% Wall thickness loss

80 Maximum
2.5 70 corrosion rate,
mm/y
2.0 60
Corrosion loss
50
to date, mm
1.5 40
1.0 30 % wall
20 thickness loss
0.5
10
0.0 0
93

94

95

97

98

99

01

02

04

05
19

19

19

19

19

19

20

20

20

20
1/

6/

0/

3/

7/

2/

4/

9/

1/

5/
/0

/0

/1

/0

/0

/1

/0

/0

/0

/0
31

15

28

11

24

06

19

01

14

28

The business benefits


Date
include:
• Streamlining of data collection activities.
• Improved in-company networking between
departments (reservoir engineering, drilling,
operations, inspection, corrosion engineering
etc.)
• Consistency of approach to well integrity
problems.
• Fast identification of potentially dangerous
situations.
• Ease of technical evaluation of problem wells
and design of remedial action.
• Prioritisation of workover schedule.
• Instant feedback to management in accessible
format.

Registered in England No. 2575585


The web-based software opens with a field view
which can be zoomed and panned to focus on
particular areas. Field relief features can be
removed. Wells are indicated by type and well-
integrity status using a colour coding system so
that there is immediate indication of the status. A
small selection of the many data views are shown
here.

Clicking on an individual well reveals its’


status according to criteria relevant to the
field and the company. In this example the
estimated tubing life is indicated to exceed
the design life, the wellhead seals have
been successfully tested at the last check
but there is evidence of annulus pressure
problems exceeding set criteria so the well is
identified for shut-in for diagnostic testing.
Users who log on with administrator status
have access to adjust “rules” or to post a
note indicating waiver of normal rules for a Well data is entered in categories as “Design
specific well or other explanatory comments. data” (all information, design, test results etc. prior
to handover to operations) and “operational data”.
Data entry interfaces are set up so that there is
direct downloading from existing data sources
(such as Excel sheets or continuous reading
monitoring data). Where specific data is entered
infrequently, such as the well design, or annual
test results, then it may be entered directly by
typing into forms, but the majority of regularly
entered data is by direct loading to avoid
duplication of data collection effort.

Any data can be viewed directly in tabular format,


or graphed within user defined ranges (e.g. within
certain date periods). Any view of the screen can
be exported to other programs such as Excel or
Word, or emailed directly.
Production data is combined with well design data and well deviation survey data to calculate the maximum
corrosion rate in the tubing and use that information to estimate the remaining life of the tubing, giving
advanced warning of possible leaks or indicating potential sources of annulus pressure.
Comparison of annulus pressure data
graphs with tubing head pressure data gives
an immediate indication of excursions above
MAASP values and highlights wells requiring
diagnostic testing to evaluate the source of
SAP. SAP diagnostic test data is mathematically analysed
to evaluate the pressure build-up pattern, assisting in
diagnosing potential causes.
Diagnostic Test "C"-Annulus pressure
NORMAL BUILDUP PATTERN
Further calculations are available to assist in planning
1400
well workover operations.
1300

In total the integrity of 50 critical well components has


1200
been considered in the software, which can be
"C"-Annulus Pressure(psi)

Diagnostic Test "C"-Annulus pressure


1100 Transition time S-SHAPE BUILDUP PATTERN
tailored to meet individual company policies and
experience.
1400
1000
1300

1200
900
1100
Late
1000 Initial
period
"C"-Annulus Pressure(psi)

800
period
900

700
800 Transition period
0 4 700 8 12 16 20 24 Diagnostic
28 Test "C"-Annulus pressure
600
Time(hours) INCOMPLETE BUILDUP PATTERN
500
1900
400
1800
300 1700
200 1600
1500
100
1400
0
"C"-Annulus Pressure(psi)

1300
0 4 8 12 16 20 24 28
1200
Time(hours)
1100
1000
900
800
Late
700 Initial Transition period period
600 period
500
400
300
200
100
0
0 4 8 12 16 20 24 28
Time(hours)